Page 1

WEST DUNBARTONSHIRE COUNCIL 
Report by the Chief Officer - Regulatory and Regeneration 
Planning Committee:  8th June 2022
___________________________________________________________________ 
Subject:         DC21/138/FUL: Proposed residential redevelopment of 88
dwellings comprising of cottage flats, bungalows and flats with
vehicular access, associated car parking and landscape works
at land at the corner of Glasgow Road and Mill Road, Clydebank
by West Dunbartonshire Council     
1. Purpose 
1.1 To provide the Committee with additional information following continuation of
the above planning application and to seek the Committee’s decision on the
application. 
2. Recommendations 
2.1 Grant planning permission subject to the revised conditions set out in
Section 9 of Appendix 2 of the report. 
3. Background 
3.1    The above planning application was presented to Planning Committee on 6th
October 2021. Appendix 1 contains a copy of the report presented to October 
Planning Committee. It agreed to continue the above application to allow
officers to give further consideration to parking provision.    
4. Main Issues 
4.1     Following the continuation of the above application a Transport Statement was
prepared to consider transport and traffic implications for the development of
88 affordable housing units focusing on pedestrian movements, cycling, and
public transport together with an indication of possible amounts of traffic
generated by such a development. Glasgow Road is a major route between
west of Glasgow and Clydebank. Both Glasgow Road and Mill Road have
footways on each side, are street lit and subject to 30 mile per hour speed
limit. There is a new cycle path incorporated within the proposed development
from the railway station car park south to Glasgow Road. The site is close to
National Cycle Route NCR7 which is some 350 metres from the site at the
south end of Dock Street. There are also a number of bus stops conveniently
located on Glasgow Road and Mill Road being less than 100 metres from the
site access. The railway station of Yoker operate a basic weekday and
Saturday service of 4 trains per hour in each direction (every 15 minutes)
westbound to Dalmuir via Clydebank and eastbound to Partick. Therefore
Page 1 of 4

Page 2

there are regular bus and train services in close proximity to the site and is in
walking distance to Clydebank town centre and the Queens Quay waterfront
area. The site also will be in close proximity to the new Renfrew/Clyde bridge
which will connect Clydebank and Glasgow with Renfrew. The new bridge will
have good walking and cycling provision. 
4.2  There are some 30 traffic movements an hour during weekday peak traffic
periods associated with 88 affordable homes. A total of 79 car parking spaces
were originally proposed which is slightly below the standard required for this
type of development. Since the continuation of the application the parking
provision has been reviewed and 99 car parking spaces (112.5%) now are
proposed together with a proposal that parking provision will be reviewed after
occupation where the provision could be increased to 110 spaces (125%) if
required. Nine marked and signed disabled spaces will be provided, with each
one close to each of the nine wheelchair accessible houses in the
development. Two electric vehicle charging points are to be provided with
ducting provided for all parking spaces (including the possible future
provision). Cycle parking is one space per flat and there is scope in the
garden of the houses to erect a shed or storage unit. This is all considered
acceptable by the Council’s Roads Service. 
4.3     As part of the submitted Transport Statement a snapshot survey was made of
overnight parking at nearby developments. The survey was carried out after
11.00 pm on Wednesday 10th November 2021.  The snapshot survey showed
that the percentage demand for parking to be well below the 112.5% provided
for this development and ranged from 25% to 57% demand of allocated
parking spaces. Other measures proposed include Travel Plan to encourage
walking, cycling and use of public transport facilities for future residents and
this information available for first occupants. The car parking provided will also
be managed given the proximity of Yorker railway station.   Given the highly
sustainable location of the site and the submission of supporting information
the number of car parking spaces is considered acceptable.  If the needs of
the residents change as the development is occupied then functioning
additional spaces can be provided. This can be achieved via a planning
condition. 
4.4      During the continuation of the application further site investigations and
assessments have been undertaken. A revised site investigation report was
submitted and on the basis of the information provided the associated risks at
the site are now recognised. The report now acknowledges that
contamination, both chemical and physical, is present across the site and that
both remediation and mitigation will be necessary to enable this site to be
developed. The proposal is for areas of gross contamination to be excavated
and for further mitigation measures to be implemented to ensure that any
remaining contamination is properly and robustly managed. Remediation and
mitigation measures will require further discussion and this would be
conditioned as part of the planning consent.  A reduced capping depth in
landscaped areas or the mound has not been accepted.  As a result of the
Page 2 of 4

Page 3

recent report, condition 12 regarding a site investigation report has now been
met and can be removed from the set of conditions. Two additional conditions
are proposed Conditions 13 and 15 in terms of the completion of remediation
scheme and the monitoring and maintenance scheme of the long term
effectiveness of the proposed remediation. The SUDS condition (Condition
18) has been amended to remove reference to contaminants and pollution
pathways as this will be confirmed in the remediation strategy. 
5. People Implications 
5.1 None. 
6. Financial and Procurement Implications 
6.1 There are no financial or procurement implications in terms of this report. 
7. Risk Analysis 
7.1 No risks have been identified. 
8. Equalities Impact Assessment (EIA) 
8.1 Not required. 
9. Consultation 
9.1 Consultation was undertaken as part of planning processes associated with
the planning application.   
10. Strategic Assessment 
10.1 There are no strategic issues. 
Peter Hessett
Chief Officer - Regulatory and Regeneration 
Date: 8th June 2022 
Person to Contact: Pamela Clifford, Planning & Building Standards Manager, 
Email: Pamela.Clifford@west-dunbarton.gov.uk. 
Appendices:                     Appendix 1 - Planning Committee Report: Ref:
DC21/138/FUL (06/10/2021)                                           
Appendix 2 – Revised Conditions  
Appendix 3 – Location Plan 
Page 3 of 4

Page 4

Background Papers:      Transport Statement - 17th November 2021                                          
Site Investigation Report - Version 5 (May 2022) 
Wards Affected: Ward 6 – Clydebank Waterfront 
Page 4 of 4