Democracy Spraffa

Document Pack (Bookmarked) Planning Committee 08.06.2022

West Dunbartonshire Council · 8 June 2022
Back to Planning Committee — 8 June 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda 
Planning Committee 
Date:  Wednesday, 8 June 2022
___________________________________________________________________ 
Time:  10.00 a.m.
___________________________________________________________________ 
Format:  Hybrid Meeting
___________________________________________________________________ 
Contact:    Gabriella Gonda, Committee Officer  
Email: Gabriella.Gonda@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Planning Committee as detailed above.   
The Convener has directed that the powers contained in Section 43 of the Local
Government in Scotland Act 2003 will be used and Members will have the option to
attend the meeting remotely or in person at the Civic Space, Church Street,
Dumbarton. 
The business is shown on the attached agenda. 
Yours faithfully 
JOYCE WHITE 
Chief Executive 
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpeet Johal (Vice Chair)
Councillor Karen Conaghan
Councillor Diane Docherty
Councillor Ian Dickson
Councillor Daniel Lennie
Provost Douglas McAllister
Councillor June McKay
Councillor Chris Pollock
Councillor Hazel Sorrell 
All other Councillors for information 
Date of Issue: 25 May 2022 
Page 2

Page 3

PLANNING COMMITTEE 
WEDNESDAY, 8 JUNE 2022 
AGENDA 
1 APOLOGIES 
2 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in the item of business
on this agenda and the reasons for such declarations. 
3 RECORDING OF VOTES 
The Committee is asked to agree that all votes taken during the meeting will
be done by roll call vote to ensure an accurate record. 
4 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
5 PLANNING APPLICATIONS       
Submit report by the Chief Officer – Regulatory and Regeneration in respect
of the following planning applications:- 
(a) DC21/178/ADV – Range of advertisements include fascia signs and
freestanding 8m high double sided pole sign  (associated with
proposed coffee shop and drive-thru facility subject to application
DC21/176/FUL) at Morrison’s Supermarket 36 Glasgow Road,
Dumbarton, G82 1QZ by Trilogy (Leamington Spa) Ltd. 5 – 11 
(b) DC21/217/FUL – Development of a Plastics to Hydrogen Facility,
Hydrogen Vehicle Refuelling Station and Associated Infrastructure and
Landscaping at Vacant Land At Rothesay Dock, Cart Street, Clydebank
by AXIS PED.       13 – 30 
(c) DC22/052/FUL – Installation of decking (retrospective) at No. 144
Mirren Drive, Duntocher, Clydebank.    31 – 37 
(d)/
Page 3

Page 4

(d) DC21/138/FUL – Residential development of 88 dwellings comprising
of cottage flats, bungalows and flats with vehicular access, associated
car parking and landscape works at land at the corner of Glasgow
Road and Mill Road, Clydebank by West Dunbartonshire Council.          
39 – 67 
6 FELLING OF TREES WITHIN BRUCEHILL CLIFFS TREE  To Follow
PRESERVATION AREA       
Submit report by the Chief Officer – Regulatory and Regeneration on the
above. 
7 APPEAL NOTICE OF INTENTION – DC02/447: EXTENSION 69 – 97
TO QUARRY, SHEEPHILL QUARRY, MILTON, DUMBARTON                         
Submit report by the Chief Officer – Regulatory and Regeneration, providing
an update regarding the appeal decision for the above application, further
information relevant to the Review of Minerals Permission application (ROMP)
and the Scheduled Monuments Permission.   
8 STREET NAME FOR NEW HOUSING DEVELOPMENT SITE 99 – 101
AT FORMER BOWLING GREEN JOHN KNOX STREET
CLYDEBANK             
Submit report by the Chief Officer – Regulatory and Regeneration, allocating
one street name within the new housing development at former
Bowling Green, John Knox Street, Whitecrook, Clydebank. 
9 DEVELOPER CONTRIBUTIONS      103 – 128 
Submit report by the Chief Officer – Regulatory and Regeneration, seeking
the agreement of the Committee for a process to report and allocate
developer contributions received through the planning system. 
10 FRONTIERS OF THE ROMAN EMPIRE (ANTONINE WALL) 129 – 158
WORLD HERITAGE SITE SUPPLEMENTARY GUIDANCE       
Submit report by the Chief Officer – Regulatory and Regeneration, seeking
approval to consult on the draft Supplementary Guidance (SG) relating to the
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site. 
Page 4

Page 5

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 8 June 2022
_____________________________________________________________
DC21/178/ADV: Range of advertisements including fascia signs and
freestanding 8m high double sided pole sign
(associated with proposed coffee shop and drive-thru
facility subject to application DC21/176/FUL) at
Morrisons Supermarket, 36 Glasgow Road, Dumbarton,
G82 1QZ by Trilogy (Leamington Spa) Ltd
1. REASON FOR REPORT
1.1 The application has been subject of an objection from a Community
Council. Under the terms of the approved Scheme of Delegation, it
therefore requires to be determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant advertisement consent subject to the condition set out in Section 9
below.
3. DEVELOPMENT DETAILS
3.1 The application site is located within the northern part of the existing
Morrisons supermarket car park and is bounded by the A814 Glasgow
Road to the north and the access road leading into the supermarket main
car park and the associated petrol station from the west. From the east,
the plot neighbours the C-listed United Reform Church in Leven Street; to
the south, there is the remainder of the existing supermarket car park. The
immediate vicinity of this part of Dumbarton is characterised by St James
Retail Park with retail units and a number food outlets and further east is
Dumbarton East local centre.
3.2 The application proposes the installation of a mix of internally illuminated
fascia signage and non-illuminated signage at a proposed site of a drive-
through coffee shop, whose intended location is within the car park of the
supermarket.
ITEM 5a
Page 5

Page 6

The drive-thru coffee shop was refused by the Council in December 2021
(application ref: DC21/176/FUL) and is currently subject of an appeal to
the Planning and Environmental Appeals Division. Under planning
legislation, the Council cannot withhold determination of this
advertisement application pending the outcome of the appeal, even
though the planning application for the drive-thru coffee shop was refused
by the Council. Equally by the grant of advertisement approval it does not
imply that the drive-thru coffee ship is now acceptable.   
3.3 The advertisement signage proposed reflects the corporate identity of the
operator and includes the following elements:  
Principal signage:
• “Costa Coffee Drive-thru” sign to be located on the northern and
western elevations of the proposed café, to measure 2.62m in
maximum width and 1.57m in height.
• Internally illuminated “Costa Coffee” sign to be located on the southern
elevation of the building, fixed to box section rails finished to match
building colour. 2.62m in width and 1m in total height.
• Internally illuminated “Great coffee starts here” built up letters, to
measure 5.32m in width by 0.9m in height, to be placed on a new
slatted timber wall of the same width  and 2m of height to be placed at
the entrance to the drive-through lane.
• “Costa Coffee Drive-thru” pole sign to be placed opposite on the corner
of Glasgow Road and entrance to Morrisons car park; sign to be 6 m in
total height including the pole from the ground.
• Non-illuminated banner frame to be placed next to the aforementioned
pole sign.  Frame to measure 3.10m in width and 1.8m in height, to be
made of perforated metal sheet finished in black colour, fitted to posts
finished in the same colour.
Ancillary Signage
• “Hearts & Darts” cut out logo, A0 advertising and menu poster
internally illuminated signs, built-up letters to mark different service
points of the drive through, as well as pole-mounted waiting bay,
parking restriction and directional non-illuminated signs and a height
barrier with the associated warning signage.
The signs will be finished in a select variety of colours aligned with the
branding of Costa Coffee, specifically and predominantly dark red, black
and white.
Page 6

Page 7

4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have no objections to the
proposed advertisements.
5. REPRESENTATIONS
5.1 Two objections, including one from Dumbarton East & Central Community
Council, were received in connection with the application. The concerns
raised can be summarised as follows:
• Noise caused by the operation of the drive through.
• Road safety in relation to traffic levels and incidents of speeding.
• Number of fast food outlets in the area.
• Proposed signage excessive for the location.
5.2 The points raised in the objections received will be considered in the
Section 7 below.  
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
West Dunbartonshire Adopted Local Plan 2010
6.1 Policy DC1 advises that the Council will have regard to visual amenity
and the safety of pedestrian and vehicular traffic, and in particular to:
• the appropriateness of the location;
• in the case of remote signing, advertisements must not be located
where they will create a visual intrusion unless there are exceptional
circumstances which justify the need for display in a specific location;
• the size and design of any advertisement shall be sympathetic in scale
to its surroundings;
• in the case of illuminated advertisements, special regard shall be had
to avoidance of visual intrusion, distraction to motorists or confusion
with traffic signals.
6.2 The proposal complies with the policies of the adopted Local Plan and is
assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 The modified Plan and associated documents was approved by the
Council on 19 August 2020. The Council has advised the Scottish
Ministers of its intention to adopt the Plan. On 18 December 2020, the
Scottish Ministers issued a Direction in relation to the housing land
chapter of the Plan. None of the policies considered in the determination
of this application are effected by that Direction. Therefore, Local
Page 7

Page 8

Development Plan 2 is the Council’s most up to date policy position and is
afforded significant weight in the assessment and determination of
planning applications. 
7.2  Policy ENV12 states that advertisements which are sited on the business
premises to which they relate will be supported subject to compliance with
the criteria listed below. In all cases advertisements shall: 
• Not detract from the amenity of the area or character of buildings in
terms of positioning, scale, design or materials;
• Not result in any road safety or other hazard to the public;
• Not result in an accumulation of signage clutter; and
• Within Conservation Areas and on Listed Buildings, serve to improve
or enhance the appearance of the area/building.
Policy Context
7.3 Regulation 4(1) of the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984 limits the exercise of the
powers of control of advertisements solely to the interests of amenity and
public safety, and these matters are elaborated in regulation 4(2). The
adopted and proposed Local Development Plan policies provide standards
and a general approach to the protection of amenity and road safety.
Principle of Advertisements
7.4 With regards to the context of the wider retail environment of this part of
Dumbarton, the signs as proposed are considered to be ones which are
both ordinarily and commonly associated with these type of uses, and
especially those featuring drive through style food and drink
establishments which cater to customers travelling by car. Therefore the
signage is considered acceptable in principle.  
Visual Amenity
7.5 In assessing the impact on visual amenity, generally, the signs are
considered to be appropriate to their location and the building to which
they relate.  The proposed banner advertisements fronting Glasgow Road
and the cumulative effect with the existing banner advertisements for the
supermarket which may result in unnecessary visual clutter at this location
have been considered. Following discussion with the applicant, it is
advised that the banner signs could be removed after a 6 month period to
balance the promotion of the new business and the longer term visual
amenity at this location. This can be addressed by condition and it is
considered that the volume of signs proposed is sufficient to advertise the
business without constituting accumulation or visual clutter. In respect of
visual amenity, it is not considered that there is any impact resulting from
the proposed advertisements on the nearby listed building. 
Page 8

Page 9

Further consideration has been made in relation to the pole sign, also
referred to as the totem sign, to overlook the Glasgow Road roundabout at
the entrance to the site. While the original design of the totem sign was a
height of 8m, following discussions between the Planning Authority and
the applicant, a reduction in height to 6m has been agreed. This is
considered to be appropriate height in order to retain suitable visibility for
the business while reducing any excessive potential visual impact.
Public Safety
7.6 Whilst several of the signs are to be illuminated, given their location and
position, it is not considered that they will have the capacity to impede
vehicular safety and in particular distract drivers. Several of the signs are
to be fixed to the elevation of the building while others are to be
freestanding. Although some of these signs are in close proximity to
pavements, their fair scale and respective locations mean that there would
be no concern for the safety of the users of the pavement. Equally, it is not
expected that any of the proposed signage would obstruct or pose danger
to vehicles accessing the car park and the drive-through facility. One sign
overhangs the drive-through lane entrance, however  its purpose is to
delineate the maximum height of vehicles permitted to use the drive-
through to prevent building strikes. The Council’s Roads Service offers no
objections nor any requirement for any conditions to be attached to the
consent. The proposal is considered to be acceptable in respect of the
impact on road safety.
Objections Received
7.7 Whilst a variety of concerns are raised in respect of the drive-thru coffee
shop at this location, many of these are not matters to be considered as
part of an application for advertisement consent. Concerns were raised
over the proposed signage being excessive for the location. The proposed
signage layout consists of a mix of signs of varying sizes, some of which
would be attached to the proposed drive thru coffee shop building, while
others would be freestanding and located in the near vicinity of the
building. It is noted some of the signs would be in place to aid the
circulation of traffic within the site of the proposed drive through facility.
While overall the number of advertising elements might appear excessive,
when considered in the context of its function and spread over the
application site, each element of the advertisement proposal is justifiable.
The accumulation of signage and its visual impact is considered to be on
par with that of the nearby businesses, such as other drive through
restaurants.
Page 9

Page 10

8. CONCLUSION
8.1 The proposed signage raises no issues in terms of visual amenity or
road/pedestrian safety and adheres to the relevant policies of the adopted
Local Plan and proposed Local Development Plan 2. The signage is
appropriate for the location, does not result in an accumulation of signage,
and is of reasonable quality and design for the planned premises.
9. CONDITIONS
1. The proposed banners framed advertisements – Item M, as presented
in drawing “Costa Coffee Drive Thru Dumbarton, Glasgow Road –
Pack Revision 3”, shall be removed from site within 6 months of the
date of opening of the associated drive-thru coffee shop premises.
Peter Hessett
Chief Officer – Regulatory and Regeneration
Date: 8th June 2022
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager  
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendix:  Appendix 1 – Location Plan
Background Papers: 1. Application forms and plans;
2. West Dunbartonshire Local Plan 2010;
3. West Dunbartonshire Local Development Plan
2 Proposed Plan.
4. Representations
Wards affected:   Ward 3 – Dumbarton
Page 10

Page 11

West Dunbartonshire Council
16 Church Street
Dumbarton
G82 1QL
Reproduced by permission of Ordnance Survey
on behalf of HMSO © Crown copyright and
database right 2015. All rights reserved.
Ordnance Survey Licence number 100020790
Map Register No: HQ667
Date: 20 May 2022
DC21/178/ADV Range of advertisements
include fascia signs and
freestanding 8m high
double sided pole sign 
(associated with proposed
coffee shop and drive-thru
facility subject to
application DC21/176/FUL)
Supermarket
36 Glasgow Road
Dumbarton
G82 1QZ
Page 11

Page 12

Page 12

Page 13

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 8th June 2022
DC21/217/FUL: Development of a Plastics to Hydrogen Facility,
Hydrogen Vehicle Refuelling Station and Associated
Infrastructure and Landscaping at Vacant Land at
Rothesay Dock, Dock Street/Cart Street, Clydebank by
AXIS PED
1. REASON FOR REPORT
1.1 This application, raises new or significant issues meriting determination at
Planning Committee.  Under the approved scheme of delegation it
therefore requires to be determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission subject to conditions set out in Section 9
below.
3. DEVELOPMENT DETAILS
3.1 The application site covers an area of approximately 1.54 hectares and is
located at Rothesay Dock, Dock Street/Cart Street in Clydebank. The site
is bounded to the north by Cart Street and to the east by vacant land and
Dock Street. To the west of a fuel storage depot which includes some
vacant land immediately to the west of the site. The southern boundary of
the development site is the quayside of Rothesay Dock and then the River
Clyde. Immediately surrounding the site to the north is primarily
industrial/commercial land situated between the River Clyde and A814
Glasgow Road, together with Holm Park the football ground for Clydebank
Football Club, and areas of formal green open space and vacant land. The
A814 corridor is predominately commercial with some residential uses. To
the south of the southern spur of Rothesay Dock is used as a boatyard
with associate storage and repair workshops. On the opposite bank of the
River Clyde is the Renfrew Golf Club, green space (woodland) and further
industrial land uses. The proposed application takes access from two
ITEM 5b
Page 13

Page 14

separate points from Cart Street and then onto Dock Street with a further
junction used to exit the site, also on Cart Street via Dock Street. 
3.2 The nearest residential property is the former Hamilton Memorial Church
on Glasgow Road, approximately 110m north from the site. This property
is separated from the site by an embankment and the National Cycle
Network 7 path, and two large industrial units and their yards/compounds.
After this the nearest residential properties are located on North Elgin
Street, approximately 240mm to the north of the site. 
3.3 The site is accessed from Cart Street via Dock Street, which in turn
provides access to the A814 Glasgow Road. At present Dock Street only
serves the site, the fuel storage depot to the west and the boatyard
located on the southern side of Rothesay Dock. Plans for a new road link
and bridge across the River Clyde were approved in 2019. The new bridge
crossing will link Renfrewshire with Yoker and Clydebank, with the
northern access route to the bridge via Dock Street to Meadowside Street
on the southern bank of the Clyde. 
3.4 Planning permission is sought for the construction and operation of a
Plastics to Hydrogen Facility and a hydrogen vehicle refuelling facility,
which would also be capable of generating and exporting electricity. The
development is proposed to include a thermal conversion plant that would
utilise an advanced thermal treatment process involving gasification to
convert waste plastic into hydrogen electricity and potentially heat. The
facility could generate approximately 3.9MW of electricity gross or up to
approximately 2 tonnes per day of 99.999% pure water free hydrogen. The
hydrogen produced would be used as vehicle fuel and either be dispersed
at the proposed refuelling station or would be exported to another
refuelling station in the local area to be dispersed there.  The electricity
generated by the facility would be exported to the local electricity
distribution network and used to power the proposed development. The
Plastics to Hydrogen facility also provides the opportunity to generate heat
in the future which could be used within a district heat network to supply
heat to local users. 
3.5 The proposed development would use innovative technology to transform
non-recyclable waste plastic into an energy rich syngas from which
hydrogen could be extracted in an environmentally sustainable manner.
The hydrogen produced would be vehicle grade and is most likely to be
used as a fuel for HGVs but could also be used in buses. The tail gas
remaining following hydrogen extraction would still be energy rich and
would be utilised for the generation of electricity. This electricity would be
used for parasitic energy requirements or would be exported to the
national grid or local electricity distribution network. 
Page 14

Page 15

3.6 The proposed development consists of the following:
• A feedstock building measuring 63m long, 21m wide and 10.7m
high;
• A thermal conversion chamber building 27.5m long, 13.5m wide
and 10.7m high;
• Two stacks, one measuring 11m and one measuring 17m. The 11m
stack is used to safely disperse cleaned exhaust gasses from the
gas engines and the 17m one is used for the exhaust emissions
arising from the combustion of gasses used to heat the gasification
chamber;
• A flare package of 11m in height used to dispose of syngas during
start-up and shutdown conditions (2-3 times a year);
• Three feedstock silos, each 14m in height which store shredded
plastic;
• Hydrogen production plant, gas engines and ancillary plant;
• Containment walls 8m in height and 44m long at the hydrogen
refuelling station to prevent spillages;
• Refuelling station plant and dispensing equipment, pipe racking and
boundary fencing, associated hard surfaces and landscaping.
It is proposed that the feedstock building and thermal conversion changer
building would be clad in predominantly Corten steel. The containments
walls at the Hydrogen Refuelling Station would be finished in boardmarked
concrete. 
3.7 The process involves residual end of life plastic. The plastic is delivered in
bales by HGV vehicles and stored in silos. The plastic is put into the
Thermal Conversion Chamber where is undergoes a gasification process.
Gasification is a process where the waste plastic is heated in reduced
oxygen conditions to generate a gas that can be used as a fuel or to
produce hydrogen. The gas produced is known as a synthesis gas or
syngas. After further processing this syngas is compressed. It can then be
used for power generation or can be piped for further processing for
extraction of hydrogen.
3.8 The Planning Statement notes that the proposed development would have
the potential to provide direct permanent employment for approximately 23
full time workers. In addition there would also be construction employment
during the development of the site, with the entire fabrication and
construction period supporting over 100 temporary jobs. The facility would
operate 24 hours a day, 365 days a year. There would be staff rotation on
a shift basis. The delivery of the waste plastic feedstock and exports of
hydrogen are proposed to be undertaken between 0700 hours and 1900
hours (replicating the approved hours of deliveries of planning permission
DC12/143). The Hydrogen Refuelling Station is proposed to operate
between 0700hours and 2300 hours. 
Page 15

Page 16

3.9 The site has previously been granted planning permission for waste
management and energy generation. Planning permission was granted in
2012 (DC12/143) for a recycling centre. This included a sorting facility, an
aerobic digestion facility and external plant including 2 gas engines. The
conditions of this application were amended under application DC15/251.
Conditions 3, 6 and 8 of permission DC15/251 which relate to details of
hard surfacing, pedestrian/cycle crossing facility on Cart Street and the
approved remediation scheme were discharged and the site access was
created but no further works were completed. The proposed hydrogen
development is smaller in scale in terms of height and footprint and would
process less waste than the previous planning permission for a recycling
centre. The proposed tonnage of end of life plastics being processed by
the facility is 13,500 tonnes compared to the 95,000 tonnes of the
previously approved facility. 
3.10 Supporting technical information has been provided as part of the
application and this includes a Planning Statement, Air Quality
Assessment, Design Evolution Document, Drainage Impact Assessment,
Ecological Assessment Report, Flood Risk Assessment, Human Health
Risk Assessment, Landscape and Visual Impact Assessment, Local
Consultation Report, Noise Impact Assessment, Preliminary Site
Investigation Report and Transport Statement. 
4. CONSULTATIONS
4.1 Scottish Environment Protection Agency (SEPA) have no objection and is
satisfied that the proposal should have at least a neutral effect on flooding.
4.2 West Dunbartonshire Council Environmental Health have no objection
subject to conditions relating to contaminated land, noise impact
assessment, noise control, dust control, air quality, lighting and odour.
4.3 Health and Safety Executive (HSE), Scottish Water, Transport Scotland,
Renfrewshire Council and Historic Environment Scotland have no
objection to the proposed development.
4.4 West of Scotland Archaeology Service have no objections subject to a
programme of archaeological works in accordance with a written scheme
of investigation.  
4.5 Glasgow Airport have no objections subject to a condition in relation to the
requirement for a Bird Hazard Management Plan. Advice also provided in
relation to cranes. 
4.6 West Dunbartonshire Council Roads Service has no objections subject to
conditions in regard to directional signage and a cycle crossing point. 
Page 16

Page 17

4.7 Glasgow City Council and West Dunbartonshire Councils Waste
Management and Greenspace Services have not responded at the time of
writing the report. 
5. REPRESENTATIONS
5.1 None
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
West Dunbartonshire Adopted Local Plan 2010
6.1 The development site is located within a Potential Marketable Industry and
Business Class Opportunity Site (Category 2). Policy LE1 states that
within the existing and proposed industrial and business class designated
site there shall be a presumption in favour of uses which positively extend
the permanent employment of the site. The site is listed as being
safeguarded for industrial and business uses.
6.2 Policy SUS1 pursues a sustainable approach to development by seeking
to maintain and enhance the quality of the environment. The Council
seeks to encourage provisions for waste minimisation and recycling.
Policy PS4 states that proposals for new or extended waste management
infrastructure and facilities, including landfill sites, will be permitted within
general industrial areas.
6.3 Policy UR1 promotes the re-use of land and buildings that become vacant,
derelict or underused in order to stimulate the process of urban renewal.
Policy T4 requires developers to ensure that sites are well integrated into
walking cycling and pubic routes and Policy GD1 requires all new
development to be of a high quality of design and to respect the character
and amenity of the area in which it is located. The proposed development
complies with the policies of the adopted local plan as discussed below.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 The modified LDP 2 was approved by the Council in August 2020.  The
Scottish Government issued a direction to the Council on 18th December
2020 requiring modifications to the housing parts of LDP2. None of the
policies considered in the determination of these applications is affected
by the Direction. LDP2 is therefore the Council’s most up to date policy
Page 17

Page 18

position and has significant weight in the assessment and determination of
planning applications at this time.
7.2 The site is identified as a Business and Industrial Opportunity in Schedule
4 of the LDP2 and Policy E1 supports economic development by directing
proposals for business, industrial, or storage and distribution uses to the
sites. 
7.3 Policy ZW1 states that all development will require to meet with the aims
of the Zero Waste Plan and follow the principles of the Waste Hierarchy,
that is, give highest priority to the prevention of waste followed by reuse,
recycling, then recovery of other value (e.g. energy) with disposal as the
last option. The site has been identified as suitable for the management of
waste. 
7.4 Policies ENV6 does not support development which would have a
significant probability of being affected by flooding or would increase the
probability of flooding elsewhere. ENV8 requires developments to address
air quality, lighting and noise as part of the planning process. ENV9
requires all potentially contaminated sites to be remediated where
necessary to ensure that the site is suitable for the intended use.
7.5 Policy CON1 states that developments which maximise the extent to
which travel demands are met first through walking, then cycling, then
public transport and final through the use of private cars will be particularly
supported, and that all new developments will be required to link to
existing footpaths, cycle routes and public transport routes.
7.6 Policy BE1 states all archaeological site should be preserved in situ where
possible. Where not possible, provision should be made by the developer
to undertake the excavation, recording analysis, publication and archiving
of the archaeological remains.
Principle of Development
7.7 The relevant policies of the adopted local plan and LDP2 Proposed Plan
direct proposals for business, industrial and distribution uses to this site as
an appropriate site for industry. As such it is considered that this is an
appropriate location for such a facility in principle.  As the proposal takes
end of life plastics to create hydrogen this proposal is in line with the
designation. On the basis of the above, it is considered that this is an
appropriate location for the proposed development and the proposal is in
accordance with policy LE1 of the adopted local plan, and ED1 and ZW1
of the LDP2 Proposed Plan. 
Page 18

Page 19

7.8 The use of pure hydrogen as a fuel within electric fuel cell powered
vehicles significantly reduces the impacts of local air pollution. Hydrogen
vehicles do not produce any harmful NOx or particulate emission to the
atmosphere and hence provide significant benefit to the local air quality
and environmental health. Scotland has ambition targets to achieve 
net-zero greenhouse gas emission by 2045. At local level, initiatives such
as Climate Ready Clyde and Clyde Rebuilt recognise the increasing
effects of climate change on the 1.8 million people who live, work and play
in the Glasgow City Region and aim to gather resource and expertise in
order to bring about joined up actions to tackle the issue of climate change
in the region. Alongside the objectives to decarbonise and adapt to climate
change there is a real drive to rapidly transform the energy system to meet
the changing needs of consumer and society, and to grow a strong
hydrogen economy to deliver economic benefits for Scotland. Clyde
Mission aims to transform the riverside corridor running from Glasgow city
centre to the sea by bringing initiative for green transport and renewably
energy and freeing up large tracts of land in key locations for
development. The proposed development would contribute towards the
hydrogen economy whilst redeveloping a piece of brownfield land on the
river corridor and managing end of life plastic waste in a sustainable
manner. The proposed development is considered acceptable and will
bring wide ranging benefits to the local and wider area. 
Site Layout, Design and Appearance
7.9 The site is currently vacant land. The proposal includes one entrance to
the site, one exit and one entrance/exit, associated access and parking, a
hydrogen refuelling station, feedstock building which would incorporate a
site office/control block as well as the hydrogen production facility. The
hydrogen production facility consists of the following main process items,
feed system, thermal conversion chamber, residue collection system, gas
clean-up equipment, hydrogen separation equipment, hydrogen storage,
gas engine generators and gas clean up equipment. The largest building
on the site is the feedstock building. This will be 63m in length, 21m wide
and 10.7m high. This creates a floor space of 1323m2. The design of the
building is simple, rectangular in shape with a gable ended roof and
typically industrial. The largest structure on the site will be a stack which
sits at 11m in height. Materials proposed are mixes of steel and concrete
all in grey and the designs are industrial in their style
7.10 Landscaping is proposed to be provided along the frontage of the
proposed development with Cart Street. This includes retaining the
existing trees, proposed new trees and a landscape bund of approximately
1.3m in height with planting on top which runs along the frontage of the
site.  The Planning Statement notes that the landscaping will enhance the
experience of the area for users of the National Cycle Route (Route 7)
Page 19

Page 20

which runs parallel to Cart Street. The landscaping is also stated to
improve the visual appearance of the area for users of the new bridge
crossing linking Dock Street and Meadowside Street on the southern bank
of the Clyde. The proposal includes maximising the retention of existing
tree cover along the northern perimeter of the site and the reinforcement
of this with new native tree and shrub planting. If existing tree cover
cannot be retained further new native tree and shrub planting would be
provided. Some ground modelling is proposed to be carried out between
the retained vegetation and the proposed buildings in order to raise the
height of the intervening land by approximately 1-1.5m, with new planting
on top of this modified landform. Any granting of permission should be
conditioned to include full landscaping details to be provided. 
Environmental considerations
7.11 Initial concerns were raised by SEPA in regard to flooding. An initial Flood
Risk Assessment (FRA) was submitted in support of the application
however the FRA was not based on the most up to date information
available. This area is indicated in the SEPA Flood Maps as being at
potential medium-high flood risk. An updated FRA has since been
submitted which used the most up to date data. SEPA have now removed
their objection to the development as management measures are now
proposed and the development will have a neutral effect on flooding. As
such it is considered that the development will not have a significant
probability of being affected by flooding or would increase the probability
of flooding elsewhere in accordance with policy ENV6. 
7.12 Development brings with it the possibility of air quality, lighting and noise
issues. An Air Quality Assessment has been submitted in support of the
application. The assessment concludes that the construction and
operation of the proposed development would not have a significant
impact on local air quality, the general population or the local community.
Environmental Health are satisfied with  the Air Quality Assessment,
however the developer must ensure that there is adequate water supply is
available for works commencing on site to ensure that dust suppression
can be undertaken. The use of hydrogen will have significant benefits to
will improve local air quality.    
7.13 The submitted Noise Impact Assessment notes that there is the potential
for the development to be constructed in phases and so the calculations
are based on operation and construction. Noise levels predicted are below
the sleep disturbance criteria and within internal room noise allowances. 
Whilst the predictions are within acceptable levels it is still recommended
that conditions be applied to ensure that no noise disturbance is created. 
The same applies for lighting in that conditions should be applied to any
granting of permission to ensure that the lighting levels are appropriate.
Subject to conditions the development proposals comply with policy ENV8
Page 20

Page 21

which requires developments to address lighting and noise as part of the
planning process. 
7.14 As the site has previously been used as a ship yard and
industrial/commercial use, there is the potential for the land to be
contaminated. All potentially contaminated sites are required to be
remediated where necessary to ensure that the site is suitable for the
intended use. The Council’s Environmental Health Service have
recommended conditions to ensure that contaminated land is remediated,
the public health is protected and that the site is suitable for its intended
use. The addition of these conditions ensure compliance with policy
ENV9.
Transportation issues
7.15 A Transport Statement examines the existing highway network and has
found them to be of a suitable nature to support the development. A total
of ten staff car parking spaces are proposed as well as ten secure,
covered cycle parking spaces. The statement predicts a total of 126 two
way vehicle trips during a typical day, 100 of which would be HGV
movements. This equates to less than one vehicles every nine minutes.
The extant recycling centre planning permission has an associated daily
total two way trip number of 331 movements, meaning this development
would create less traffic. It is not expected that the construction phase will
create any more traffic than the operational phase. 
7.16 The facility will be served by an existing industrial access. There have
been no objections from the Council’s Roads Service to the development
using Dock Street. Both vehicle and cycle parking has been provided for
both staff and visitors. Recommendations for directional signage and a
cycle crossing have been given from the Council’s Roads Service.  The
inclusion of cycle parking and cycle crossing are in accordance with policy
CON1 which requires developments to maximise the extent to which travel
demands are met first through walking, cycling and public transport. 
Community Engagement
7.17 As the development is not a national or major development there was no
statutory requirement for pre-application consultation. The applicant
however commissioned a public consultation on the proposed
development. The community engagement included identifying and
notifying stakeholders (including local councillor, parliamentary
representative, Yoker Community Council and the
Grascadden/Scotstounhill Area Partnership). A website was created which
included a feedback form and meetings were offered. A press release on
the proposals was covered by the Clydebank Post and The Herald and
also in the trade and environmental press. One meeting was held with
Page 21

Page 22

Clyde Mission and Scottish Enterprise during the consultation period.
Overall the applicant notes that the consultation process received very
little feedback despite the range of stakeholders notified.
Proximity to Petrol Storage site
7.18 The site is located within close proximity to Inter Terminals UK Ltd which
is a large scale petrol storage site. Due to the way the proposed hydrogen
facility has been laid out, the part of the site in which people will be in
regular use, is outwith the Health and Safety Executive consultation zone.
As such the Health and Safety Executive had no objections to the
proposal. 
Archaeology
7.19 The plot of ground that is proposed for development falls within an
archaeological consultation trigger. This is due to the dock, however it is
unlikely to be substantially affected by the construction. It has however
been highlighted that there is possibility that deeper excavations could
encounter surviving archaeological deposits, features or artefacts of a
farm named “East Barns of Clyde”. It has been recommended a condition
is applied requiring a written scheme of investigation. This would in
accordance with policy BE1. 
8. CONCLUSION
8.1 The proposed development is considered to be in accordance with Policy
LE1 of the adopted Local Plan and Policy E1 of the LDP2 Proposed Plan
as this is a proposal for an industrial use which has been located on a site
which has been identified under both plans as being suitable for the
proposed use. Further as the proposal is identified as a suitable site for
waste disposal and the proposal is for a facility to turn end of life plastics
to hydrogen the proposal is in accordance with policy ZW1 of the LDP2
Proposed Plan. It is considered that the proposed use is to be supported
as it will transform non-recyclable waste plastic into a form that hydrogen
can be extracted in an environmentally sustainable manner which can be
used in heavy vehicles and electricity generation which reduces the
impacts of local air pollution but also contributes to sustainability targets
and the climate emergency. 
9. CONDITIONS
1. Unless otherwise agreed in writing, no development shall commence on
site until such time as full details of the design and location of all walls and
fences to be erected on site have been submitted to and approved in
Page 22

Page 23

writing by the Planning Authority, and these shall thereafter be
implemented as approved.
2. Unless otherwise agreed in writing, no development shall commence on
site until such time as exact details and specifications of all proposed
external materials have been submitted to and approved in writing by the
Planning Authority, and these materials shall thereafter be implemented as
approved.
3. Unless otherwise agreed in writing, no development shall commence on
site until such time as full details of all hard surfaces have been submitted
to and approved in writing by the Planning Authority, and these shall
thereafter be implemented as approved.
4. Unless otherwise agreed in writing, no development shall commence on
site until such time as a landscaping scheme for the boundaries of the site
has been submitted to and approved by the Planning Authority.  Such
scheme shall take account of BAA Advice Note 3 ‘Potential Bird Hazards
from Amenity Landscaping & Building Design’, and shall include details of
the maintenance arrangements.  The approved landscaping shall
thereafter be implemented not later than the next appropriate planting
season after the opening of the facility (or, in the case of landscaping
which serves a noise attenuation function, not later that the opening of the
facility), and the landscaping shall thereafter be maintained in accordance
with the approved arrangements.
5. Unless otherwise agreed in writing, no development shall commence on
site until such time as details of a pedestrian/cycle crossing facility on
Dock Street for use by persons using the cycle track along the former
railway line have been submitted to and approved in writing by the
Planning Authority. Such crossing shall be completed prior to the opening
of the facility.
6. No development (other than investigative works) shall commence on site
until such time as a detailed report on the nature and extent of any
contamination of the site has been submitted to and approved in writing by
the Planning Authority. The report shall be prepared by a suitably qualified
person and shall include the following:
a) A detailed site investigation identifying the extent, scale and nature of
contamination of the site (irrespective of whether this contamination
originates on the site);
b) An assessment of the potential risks to :
• Human health;
• Property (existing and proposed), including buildings, crops, livestock,
pets, woodland and service lines and pipes;
• Groundwater and surface waters;
Page 23

Page 24

• Ecological systems;
• Archaeological sites and ancient monuments.
c) An appraisal of remedial options, including a detailed remediation strategy
based on the preferred option.
7. No development (other than investigative works) shall commence on site
until a detailed remediation scheme for the site has been submitted to, and
approved in writing by the Planning Authority. The scheme shall be
prepared by a suitably qualified person and shall detail the measures
necessary to bring the site to a condition suitable for the intended use by
removing unacceptable risks to human health, buildings and other
property, and the natural and historical environment. The scheme shall
include details of all works to be undertaken, the remediation objectives
and criteria, a timetable of works and/or details of the phasing of works
relative to the rest of the development and its management procedures.
The scheme shall ensure that upon completion of the remediation works of
the site will not qualify as contaminated land under Environmental Health
Protection Act 1990 Part IIA in relation to the intended use of the land after
remediation.
8. The approved remediation scheme shall be carried out in accordance with
its terms prior to the commencement of development other than that
requiring to carry out the remediation, unless otherwise agreed in writing
by the Planning Authority. The Planning Authority shall be notified in
writing of the intended commencement of remediation works not less than
14 days before these works commence on site. Upon completion of the
remediation works and prior to the site being occupied, a verification report
which demonstrates the effectiveness of the completed remediation works
shall be submitted to and approved in writing by the Local Planning
Authority.
9. The presence of any previously unencountered contamination that
becomes evident during the development of the site shall be reported to
the Planning Authority in writing within one week, and work on the affected
area shall cease. At this stage, if requested by the Planning Authority, an
investigation and risk assessment shall be undertaken and an amended
remediation scheme shall be submitted to, and approved in writing by the
Planning Authority prior to the recommencement of works in the affected
area. The approved details shall be implemented as approved.
10. If the remediation plan requires it then a monitoring and maintenance
scheme (including the monitoring of the long-term effectiveness of the
proposed remediation) shall be submitted to, and approved in writing by
the Planning Authority. Any actions/measures ongoing shall be
implemented within an agreed timescale with the Planning Authority.
Following completion of the actions/measures identified in the approved
Page 24

Page 25

remediation scheme a further report which demonstrates the effectiveness
of the monitoring and maintenance measures shall be submitted to and
approved by the Planning Authority.
11. If there is a requirement to either re-use site won material on to import
material then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and
approved by the Planning Authority prior to any material being used, in
addition to this and in accordance with bs3882:2015 and BS8601:2013,
materials to be used in the top 300mm shall also be free from metals,
plastic, wood, glass, tarmac, paper and odours.
On completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a verification report
containing details on the source of the material and appropriate test
results to demonstrate its suitability for use.
12. Prior to the commencement of development on site, details of the
Sustainable Drainage System (SuDS) and its maintenance following
installation shall be submitted to and approved by the Planning Authority.
The SuDS shall be designed to ensure the contaminants present on the
site are not mobilised and that pollution pathways are not created. The
SuDS shall thereafter be formed and maintained on site in accordance
with the approved details prior to development
13. Unless otherwise agreed in writing, deliveries shall take place between
0700 hours and 1900hours and HGV vehicles shall visit the site hydrogen
refuelling station only between 0700hours and 2300hours.
14. Unless otherwise agreed in writing, no development shall commence on
site until a noise mitigation strategy as noted in Section 7.10 of the Noise
Impact Assessment (25th June 2021) has been submitted to, and
approved in writing by the Planning Authority and any measures arising
from the approved strategy shall be implemented as approved.
15. Upon completion of the development hereby approved an
independently sourced Verification Report shall be submitted for the
written approval of the Planning Authority which shall demonstrate
compliance with noise conditions of this planning permission. The report
shall demonstrate that the projections as detailed within the approved
Noise Impact Assessment are reliable and mitigate the noise sources.
16. Unless otherwise agreed in writing, no development shall commence on
site until such time as a noise control method statement for the
construction period has been submitted to, and approved in writing by the
Planning Authority. This statement shall identify likely sources of noise
Page 25

Page 26

(including specific noisy operations and items of plant/machinery), the
anticipated duration of any particular noisy phases of the construction
works, and details of the proposed means of limiting the impact of these
noise sources upon nearby residential properties and other noise-sensitive
properties. The construction works shall thereafter be carried out in
accordance with the approved method statement unless otherwise
approved in writing by the Planning Authority.
17. During the period of construction, all works and ancillary operations which
are audible, at the site boundary (or at such other places(s) as may first be
agreed in writing within the Planning Authority), shall be carried out
between the following hours unless otherwise agreed in writing by the
Planning Authority:
Monday to Fridays:   0800-1800
Saturdays:  0800-1300
Sundays and public holidays: No working
18. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning authority. This
statement shall include an assessment of the impact on the piling on
surrounding properties, taking into account the guidance contained in
BS6472:1992 "Evaluation of Human Response to Vibration in Buildings". It
shall detail any procedures, which are proposed to minimise the impact of
noise and vibration on the occupants of surrounding properties. This
statement shall be prepared by a suitably qualified person, and the piling
works shall thereafter be carried out in accordance with the approved
method statement.
19. Unless otherwise agreed in writing no development shall commence on
site, until an external lighting scheme shall be submitted to and approved
in writing by the Planning Authority. The scheme shall take into account all
of the lighting needs associated with the development during operational
hours and shall be the minimum required to perform the relevant lighting
task, it shall be specifically designed to minimise the risk of light spillage
beyond the development site boundary and into the sky and to avoid
dazzle of distract drivers on nearby road.
The scheme shall include:
• A statement settling out and justifying why the lighting scheme is required
• A report, prepared by a lighting engineer setting out the technical details of
the luminaries and columns, including their location, type, shape,
dimensions and expected luminance output and specifically explaining
what design attributes have been chosen to minimise light pollution.
• A plan illustrating illuminance levels across the development site and at
the boundary of the site. The level of illuminance shall be appropriate to
Page 26

Page 27

the character of the surrounding area as a whole. Four environmental
zones are internationally recognised, and the design will require to show
that control of overspill light is limited to the level required by the particular
environmental setting. 
• A plan illustrating illuminance levels beyond the boundary or the site,
together with the downward light output ratio of the lights.
• A statement which demonstrates how the lighting scheme will be viewed
against the wider landscape and, where appropriate, the potential role of
landscaping in minimising the date and night-time visual impact of the
installation.
• An operational statement, the purpose of which is to ensure that the
developer and the lighting designer have considered operational regimes
that can provide energy savings.
• Details of the proposed house of operation (unless explicitly agreed in
writing, all external lighting luminaires shall be turned off during daylight
hours and when not actively required).
Applicants should have regard to the guidance document “Controlling light
pollution and energy consumption” produced by the Scottish Executive
(March 2007).
20. Unless otherwise agreed in writing, no development shall commence on
site until a Bird Hazard Management Plan has been submitted to and
approved in writing by the Planning Authority in consultation with Glasgow
Airport. The submitted plan shall include details of the management of any
flat/shallow pitched/green roofs on buildings within the site which may be
attractive to nesting, roosting and loafing birds. The management plan
shall comply with Advice Note 8: Potential Bird Hazards from Building
Design.  The Bird Management Plan shall be implemented as approved,
on completion of the development and shall remain in force for the lifetime
of the development. No subsequent alterations to the plan are to take
place unless first submitted to and approved in writing by the Planning
Authority in consultation with Glasgow Airport.
Peter Hessett
Chief Officer – Regulatory and Regeneration
Date: 8th June 2022
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendix: Appendix 1 - Location Plan
Page 27

Page 28

Background Papers: 1. Application forms and plans;
2. Consultation responses;
3. West Dunbartonshire Local Plan 2010;
4. West Dunbartonshire Local Development Plan
2 Proposed Plan.
Wards affected: 6 – Clydebank Waterfront
Page 28

Page 29

Page 29

Page 30

DC21/217/FUL
¯
0 0.04 0.09 0.14 0.18
km
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 25/05/2022.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:2,500@A4
25/05/2022
DC21/217/FULWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
Page 30

Page 31

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 8thJune 2022
_____________________________________________________________
DC22/052/FUL: Installation of decking (retrospective) at No. 144 Mirren Drive,
Duntocher, Clydebank by Mrs C Shields
1. REASON FOR REPORT
1.1 An elected member has requested the application to be determined by the
Planning Committee and this has been agreed in conjunction with the Convenor
of the Committee and the appointed officer. Under the terms of the approved
Scheme of Delegation, it therefore requires to be determined by the Planning
Committee.
2. RECOMMENDATION
2.1 Grant full planning permission.
3. DEVELOPMENT DETAILS
3.1 The application site comprises a two storey semi-detached dwelling house situated
on the eastern side of Mirren Drive, Duntocher. Externally, the building is finished
in brown facing brick, grey / brown dry cast render and a dark, weathered concrete
tile roof. The property benefits from front and rear garden areas together with
driveway and a detached single garage. The dwelling house is situated within an
established residential area with a variety of dwelling houses of a similar design
theme on Mirren Drive and Farm Road.
3.2 An area of timber decking has been erected to the rear of the dwelling house,
accessed via a new set of French doors from the dining room. The decking projects
around 2.5 metres from the rear wall of the house and extends to a floor area of
around 6.5 square metres. The floor of the decking is around 1 metre high and is
enclosed by a timber balustrade. A set of stairs to the rear of the decking gives
access to the rest of the rear garden. As the works have already been undertaken,
the application is considered in retrospect.
4. CONSULTATIONS
4.1 None required.
ITEM 5c
Page 31

Page 32

5. REPRESENTATIONS
5.1 One objection was received in connection with the application. The concerns
raised can be summarised as follows:
• The height of the decking is twice the permitted level and gives clear views to
neighbouring gardens, to the detriment of the privacy of residents.
• Privacy issues have been exacerbated by the removal of an existing boundary
hedge which has been replaced by a fence that has been poorly constructed.
• The decking provides an elevated area from which items may be thrown into
neighbouring gardens.
• The decking may have been attached to the side wall of a neighbouring
extension.
• The proximity of the decking to the neighbouring extension combined with a lack
of a damp proof membrane may result in damage to this extension.
5.2 A further representation in support has been received. This notes that there are no
privacy concerns resulting from the proposal and highlights concerns regarding the
height and maintainability of adjacent boundary hedges. 
5.3 The points raised in the representations received will be considered in Section 7
below.  
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
West Dunbartonshire Adopted Local Plan 2010
6.1 Policy GD1 seeks to ensure that all new development is of a high quality of design
and respects the character and amenity of the area. The requirement for proposals
to be appropriate to the local area inclusive of design and the effect on privacy is
highlighted. Considering residential amenity, Policy H5 seeks to protect, preserve
and enhance the residential character and amenity of existing residential areas at
all times.
6.2 The proposal complies with the policies of the adopted Local Plan and is assessed
fully in Section 7 below.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Plan (LDP2) Proposed Plan
7.1 The modified LDP2 was approved by the Council in August 2020 and the Council
then advised the Scottish Ministers of its intention to adopt the Plan. The Scottish
Government issued a direction to the Council on 18th December 2020 requiring
modifications to the housing parts of LDP2. None of the policies considered in the
determination of these applications is affected by the Direction. LDP2 is therefore
the Council’s most up to date policy position and has significant weight in the
assessment and determination of planning applications at this time.
7.2 Policy CP1 of LDP2 seeks to ensure that all development takes a design lead
approach and seeks to protect and enhance the amenity of existing communities.
Policy H4 sets out that that the Council will protect, preserve and enhance the
Page 32

Page 33

residential character and amenity of existing residential areas at all time. It is
consider that the proposal presents no conflict with the relevant policies of LDP2.
Principle of Development
7.3 The erection of a small area of timber decking within the rear curtilage of a
dwellinghouse situated within an established residential area is acceptable in
principle subject to all material considerations being addressed. This type of
development is commonly found within residential areas and the development in
principle complies with the adopted and proposed Plans. 
Design and Appearance
7.4 The decking is of a compact appearance and is located within a rear curtilage. In
this instance, the decking is immediately to the rear of the existing house and
positioned adjacent to the blank gable of a neighbouring rear extension.
Accordingly it is not visible from any public vantage points. The structure is typical
of that often found within a domestic setting and no concerns in respect of the
design and appearance arise.
Impact on Residential Amenity 
7.5 In assessing areas of raised decking, particularly where they are accessed directly
from a room of the existing house, a balance must be sought between the creation
of an outside area of residents to relax and enjoy good weather, and ensuring that
neighbouring residents are not unacceptably disturbed by any activity associated
with the decking and the transference of activity directly from the house to the
decking. It must be ensured that the decking is not of a size that affords residents
the opportunity to undertake a wide range of functions throughout extensive
periods of the day and evening to the extent that regular and/or continuous activity
may impinge upon the enjoyment of neighbouring gardens. The decking which has
been erected extends to a floor area of around 6.5 metres and it is not considered
that an area of decking of this size would result in a level of activity that could
unacceptably disturb neighbouring residents.
7.6 The second amenity consideration in this case is that of overlooking and loss of
privacy. It must be considered whether the decking constructed leads to additional
and unacceptable overlooking and loss of privacy beyond the established position.
Neighbouring residential properties lie to both the side of rear of the application
site and a degree of overlooking and intervisibility between properties already
occurs from both upper windows and also over lower sections of boundary fencing.
The decking erected must be considered in this context. The decking is around 5.5
metres from the southern side boundary of the garden with the neighbouring house
beyond being at 90 degrees to the application site. The distance to the boundary
together with the boundary treatment ensures that no additional and unacceptable
overlooking occurs to the properties to the south. 
7.7 To the north, the decking adjoins the blank gable of a neighbouring extension.
More distant views towards the rear portion of the neighbouring garden to the north
are possible if standing on the very edge of the decking. From the centre of the
decking which will be where the bulk of the activity would be expected to occur,
the height of the decking together with the boundary fence ensures that no
significant or unacceptable overlooking occurs which would be to the detriment to
the privacy of neighbouring residents. The adjoining rear gardens of houses on
Page 33

Page 34

Farm Road are some 20 metres distant from the decking and no privacy
implications arise. 
7.8 Overall, it is considered that the decking constructed would not result in any
additional overlooking and loss of privacy beyond the established position and
accordingly no unacceptable impact on the privacy and amenity of neighbouring
residents occurs.   
Representations Received
7.9 Turning to the objection received, concerns are raised that the height of the
decking is twice the permitted level. Whilst it is true that the floor level of the
decking is in excess of the height which could be constructed as permitted
development, it does not follow that this renders the decking constructed to be
unacceptable. It does, however, require the submission of a planning application
and an assessment of all material planning considerations in the determination of
the planning application. As is assessed above, it is concluded that that no
additional and unacceptable overlooking and loss of privacy arises as a result of
the decking constructed. Whilst the concerns regarding the removal of a boundary
hedge are noted, this has no bearing on the assessment of the planning
application. Whether or not the decking is attached to the wall of the neighbouring
extension together with the provision of a damp proof membrane between the
decking and the neighbouring extension are civil matters which are not material to
the consideration of this application. Whilst nothing has been advanced to
substantiate the suggestion that items are thrown over garden fences at this
location this, in any case, this can also have no bearing on the assessment of the
planning application.
7.10 The representation in support is noted inclusive of the view that there are no
privacy implications resulting from the proposal.
8. CONCLUSION
8.1 The decking erected is acceptable both visually and in respect of the amenity of
neighbouring residents. The development also presents no conflict with both the
adopted West Dunbartonshire Local Plan together with the proposed West
Dunbartonshire Local Development Plan 2.  Whilst an objection has been received,
there are no material considerations which suggest that the application should be
refused. 
9. CONDITIONS
None.
Page 34

Page 35

Peter Hessett
Chief Officer – Regulatory and Regeneration
Date: 8th June 2022
Person to Contact: Pamela Clifford, Planning & Building Standards Manager  
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendix: Appendix 1 – Location Plan
Background Papers: 1. Application forms and plans;
2. West Dunbartonshire Local Plan 2010;
3. West Dunbartonshire Local Development Plan 2
Proposed Plan.
4. Representations
Wards affected:  Ward 4 - Kilpatrick
Page 35

Page 36

Page 36

Page 37

West Dunbartonshire Council
16 Church Street
Dumbarton
G82 1QL
Reproduced by permission of Ordnance Survey
on behalf of HMSO © Crown copyright and
database right 2015. All rights reserved. Ordnance
Survey Licence number 100020790
Map Register No: HQ668
Date: 20 May 2022
DC22/052/FUL Installation of decking
(Retrospective)
144 Mirren Drive
Duntocher
Clydebank
G81 6LD
Page 37

Page 38

Page 38

Page 39

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Regulatory and Regeneration
Planning Committee:  8th June 2022
___________________________________________________________________ 
Subject:   DC21/138/FUL: Proposed residential redevelopment of 88
dwellings comprising of cottage flats, bungalows and flats with
vehicular access, associated car parking and landscape works
at land at the corner of Glasgow Road and Mill Road, Clydebank
by West Dunbartonshire Council  
1. Purpose
1.1 To provide the Committee with additional information following continuation of
the above planning application and to seek the Committee’s decision on the
application.
2. Recommendations
2.1 Grant planning permission subject to the revised conditions set out in
Section 9 of Appendix 2 of the report.
3. Background
3.1  The above planning application was presented to Planning Committee on 6th
October 2021. Appendix 1 contains a copy of the report presented to October
Planning Committee. It agreed to continue the above application to allow
officers to give further consideration to parking provision.
4. Main Issues
4.1  Following the continuation of the above application a Transport Statement was
prepared to consider transport and traffic implications for the development of
88 affordable housing units focusing on pedestrian movements, cycling, and
public transport together with an indication of possible amounts of traffic
generated by such a development. Glasgow Road is a major route between
west of Glasgow and Clydebank. Both Glasgow Road and Mill Road have
footways on each side, are street lit and subject to 30 mile per hour speed
limit. There is a new cycle path incorporated within the proposed development
from the railway station car park south to Glasgow Road. The site is close to
National Cycle Route NCR7 which is some 350 metres from the site at the
south end of Dock Street. There are also a number of bus stops conveniently
located on Glasgow Road and Mill Road being less than 100 metres from the
site access. The railway station of Yoker operate a basic weekday and
Saturday service of 4 trains per hour in each direction (every 15 minutes)
westbound to Dalmuir via Clydebank and eastbound to Partick. Therefore
ITEM 5d
Page 39

Page 40

there are regular bus and train services in close proximity to the site and is in
walking distance to Clydebank town centre and the Queens Quay waterfront
area. The site also will be in close proximity to the new Renfrew/Clyde bridge
which will connect Clydebank and Glasgow with Renfrew. The new bridge will
have good walking and cycling provision. 
4.2 There are some 30 traffic movements an hour during weekday peak traffic
periods associated with 88 affordable homes. A total of 79 car parking spaces
were originally proposed which is slightly below the standard required for this
type of development. Since the continuation of the application the parking
provision has been reviewed and 99 car parking spaces (112.5%) now are
proposed together with a proposal that parking provision will be reviewed after
occupation where the provision could be increased to 110 spaces (125%) if
required. Nine marked and signed disabled spaces will be provided, with each
one close to each of the nine wheelchair accessible houses in the
development. Two electric vehicle charging points are to be provided with
ducting provided for all parking spaces (including the possible future
provision). Cycle parking is one space per flat and there is scope in the
garden of the houses to erect a shed or storage unit. This is all considered
acceptable by the Council’s Roads Service.
4.3     As part of the submitted Transport Statement a snapshot survey was made of
overnight parking at nearby developments. The survey was carried out after
11.00 pm on Wednesday 10th November 2021.  The snapshot survey showed
that the percentage demand for parking to be well below the 112.5% provided
for this development and ranged from 25% to 57% demand of allocated
parking spaces. Other measures proposed include Travel Plan to encourage
walking, cycling and use of public transport facilities for future residents and
this information available for first occupants. The car parking provided will also
be managed given the proximity of Yorker railway station.   Given the highly
sustainable location of the site and the submission of supporting information
the number of car parking spaces is considered acceptable.  If the needs of
the residents change as the development is occupied then functioning
additional spaces can be provided. This can be achieved via a planning
condition. 
4.4   During the continuation of the application further site investigations and
assessments have been undertaken. A revised site investigation report was
submitted and on the basis of the information provided the associated risks at
the site are now recognised. The report now acknowledges that
contamination, both chemical and physical, is present across the site and that
both remediation and mitigation will be necessary to enable this site to be
developed. The proposal is for areas of gross contamination to be excavated
and for further mitigation measures to be implemented to ensure that any
remaining contamination is properly and robustly managed. Remediation and
mitigation measures will require further discussion and this would be
conditioned as part of the planning consent.  A reduced capping depth in
landscaped areas or the mound has not been accepted.  As a result of the
Page 40

Page 41

recent report, condition 12 regarding a site investigation report has now been
met and can be removed from the set of conditions. Two additional conditions
are proposed Conditions 13 and 15 in terms of the completion of remediation
scheme and the monitoring and maintenance scheme of the long term
effectiveness of the proposed remediation. The SUDS condition (Condition
18) has been amended to remove reference to contaminants and pollution
pathways as this will be confirmed in the remediation strategy.
5. People Implications
5.1 None.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications in terms of this report.
7. Risk Analysis
7.1 No risks have been identified.
8. Equalities Impact Assessment (EIA)
8.1 Not required.
9. Consultation
9.1 Consultation was undertaken as part of planning processes associated with
the planning application.
10. Strategic Assessment
10.1 There are no strategic issues.
Peter Hessett
Chief Officer - Regulatory and Regeneration
Date: 8th June 2022
Person to Contact: Pamela Clifford, Planning & Building Standards Manager,
Email: Pamela.Clifford@west-dunbarton.gov.uk. 
Appendices:   Appendix 1 - Planning Committee Report: Ref:
DC21/138/FUL (06/10/2021)
Appendix 2 – Revised Conditions
Appendix 3 – Location Plan
Page 41

Page 42

Background Papers:  Transport Statement - 17th November 2021 
Site Investigation Report - Version 5 (May 2022)
Wards Affected: Ward 6 – Clydebank Waterfront
Page 42

Page 43

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Regulatory and Regeneration
Planning Committee: 8th October 2021
_____________________________________________________________
DC21/138/FUL: Proposed residential redevelopment of 88 dwellings
comprising of cottage flats, bungalows and flats with
vehicular access, associated car parking and landscape
works at land at the corner of Glasgow Road and Mill
Road, Clydebank by West Dunbartonshire Council 
1. REASON FOR REPORT
1.1 This application relates to a major development and under the terms of the
approved Scheme of Delegation it therefore requires to be determined by
the Planning Committee. 
2. RECOMMENDATION
2.1 Grant full planning permission subject to the conditions set out in Section
9.  
3. DEVELOPMENT DETAILS
3.1   The site is located at the corner of the junction of Glasgow Road and Mill
Road, Clydebank. Glasgow Road forms the site’s southern boundary and
Mill Road runs along the site’s eastern boundary. Mill Road marks West
Dunbartonshire’s boundary with Glasgow City Council. To the site’s
northern boundary is the railway line and Yoker train station which has a
small car parking area accessed off Mill Road. There is a bus stop directly
adjacent to the site’s access on Mill Road and to the south there is a bus
stop on Glasgow Road. On the eastern side of Mill Road, opposite the
application site is a supermarket. To the site’s  western boundary there are
a number of light industrial units that accommodate car
workshops/garages and printers and are accessed off Hamilton Street.
There is a also a parade of shops to the site’s western boundary and there
is direct access to these amenities from  the application site through
Hamilton Terrace. The site is broadly rectangular and flat. There are 
mature trees located on the south-eastern corner of the site. Within the
site itself there is an existing Scottish Water trunk sewer that runs north to
south though the site to the western side of the site. There is also a
Appendix 1
Page 43

Page 44

Scottish Water below ground storage facility along part of the boundary
with Glasgow Road.  
3.2  Planning permission is sought for  88 dwellings in total comprising of 38
houses and 50 flats. The dwelling sizes range from two to five bedrooms
and the proposed flats are one and two bedrooms. Nine wheelchair
accessible properties are proposed across the site. Access to the site
makes use of the existing vehicle access from Mill Road. The proposed
internal road layout takes the form of circulatory road that follows the
broadly rectangular form of the site. Within the circulatory road there are
blocks of terrace houses that are sited close to the road edge to form a
strong building line. Private garden grounds and car parking is proposed to
the rear of these houses with a secondary mews type road running
between these spaces. To the north of the circulatory road there are a mix
of houses and cottage flats. The cottage flats face in to a semi public
landscaped area. The gables of these properties face the railway line in
order partly to address railway noise and provide opportunity for views in
to the site. 
3.3 At the site’s north-western corner the proposal includes a large area of
open space with tree planting and wildflower planting. There are 3
bungalows proposed that have views to the open space and  there are two
blocks of terrace houses proposed that face on to Glasgow Road. These
properties have private gardens and car parking to the rear and are
accessed off the main circulatory road. Landscaping is proposed in front of
these houses to provide a visual buffer to Glasgow Road and setting to the
development. In between these two housing blocks a significant
landscaped area is also proposed. The layout partly responds to the
underground constraints but will provide high quality landscaped areas
that provides opportunities for movement through the site from Glasgow
Road and beyond and provides a high quality natural residential
environment. 
3.4  On the corner adjacent to Glasgow Road and Mill Road the scale of the
development increases to four storey blocks of flats that then further
increases to a six storey block. These taller buildings represent a
distinctive landmark building and incorporate a ‘saw tooth’ roof form that
accentuates the height and verticality further. The proposed layout
includes urban street planting to this corner facing the public elevations
and private space with car parking, cycle and refuse storage to the rear.
Within the site the house designs are simple in form making use of active
gable ends to add visual interest and passive surveillance of surrounding
streets. The saw tooth roof feature is also incorporated in to the house
type designs. Finishes proposed include dark grey windows and a mix of
dark grey and buff bricks. Recessed entrances to feature a black glazed
brick and soldier brick courses also add some visual interest and texture to
the dwellings. A similar materials pallete is proposed for the taller flatted
Page 44

Page 45

part of the development and their design will include the use of a darker
brick for the ground level and metal ‘zig zag’ shape to be included on the
window railings, again large window openings are also proposed. A simple
window design which repeats across the taller blocks of flats also unifies
the flatted development and similar, generous window opening feature on
the houses around the rest of the site. 
3.5 Supporting technical information has been provided as part of the
application and this includes a Design and Access Statement, a Pre-
application Consultation Report, Phase 2 Site Investigation, and Transport
Statement. 
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have raised no objections
provided that a further review of car parking provision can be undertaken
upon full occupation and that further car parking spaces can be formed if
necessary.
4.2  West Dunbartonshire Council Environmental Health has raised no
objections in principle but requested conditions with respect to
contaminated land, SUDS and maintenance, Noise Impact Assessment
and required mitigation measures, construction noise, piling method
statement, dust control and storage of waste.
4.3  West Dunbartonshire Council  Biodiversity Officer, Waste Services and
Scottish Water  have raised no objections to the proposed development.
4.4 Network Rail advise of no issues in principle but would wish to see the
provision of a suitable trespass fence of at least 1.8m in height along the
sites northern boundary.
4.5 Glasgow Airport Safeguarding has raised no objection, having now
considered the submitted Glint and Glare Assessment. A condition is
however recommended with respect to landscape species.
4.6  Glasgow City Council have not responded at the time of writing this report.
5. REPRESENTATIONS
5.1 One representation has been received with the focus of the comments
concerning the new bridge construction and the impact this could have on
the road infrastructure when combined with the construction of 88
dwellings within close proximity.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
Page 45

Page 46

West Dunbartonshire Adopted Local Plan 2010 
6.1 Policy UR1 encourages the redevelopment and re-use of underused,
vacant and/or derelict land and buildings for appropriate uses such as
housing. Policy H4 sets out standards expected of residential
development, requiring high quality design in the range of house types
and sizes and in terms of form, layout and materials. Policy GD1 seeks to
ensure that all new development is of a high quality of design and
respects the character and amenity of the area. 
6.2 Policy R2 specifies the open space provision required for all
developments. Assessment of open space requirements has been
undertaken against the more updated “Our Green Network” Planning
Guidance (2015) in Section 7 below.  
6.3 Policy T1 and T4 requires sites to integrated with sustainable travel and
Policy E5 relates to trees and requires new development proposals to
consider impacts on trees and incorporate suitable tree planting. Policies
F1 and F2 aims to ensure that new development is not at risk from, and
does not increase the risk of flooding, and has suitable SUDS drainage
infrastructure. The proposal complies with the policies of the adopted local
plan and is assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP1) Proposed Plan
7.1 On 27 April 2016, the Planning Committee took a final decision not to
accept the Local Development Plan Examination Report recommended
modification in respect of including the Duntiglennan Fields site in
Clydebank as a housing development opportunity, and therefore, as a
result of the Scottish Ministers’ Direction, the Local Development Plan has
remained unadopted but continues to be a material consideration in the
determination of planning applications.
7.2  The consideration of policies DS1, GN2, SD1, DS6 and GN3 and GN5
with regards to new residential development, green network, transport,
flooding and drainage are similar to that of the Adopted Plan.  DS7
requires any potential site contamination issues to be addressed and DS3
requires significant travel generating uses to be located within 400 metres
of a public transport network. DS1 seeks to ensure a high design quality in
housing and being suitable for a mix of occupants. 
7.3 The Residential Development: Principles of Good Design Guidance
applies to all developments of more than 3 units and has been taken
account of in the proposed design and site layout. The proposed
development is assessed against the Proposed Plan and the Residential
Development Guidance in Section 7 below. 
Page 46

Page 47

West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.4 The modified LDP2 was approved by the Council in August 2020 and the
Council then advised the Scottish Ministers of its intention to adopt the
Plan. The Scottish Government issued a direction to the Council on 18th
December 2020 requiring modifications to the housing parts of LDP2.
None of the policies considered in the determination of these applications
is affected by the Direction. LDP2 is therefore the Council’s most up to
date policy position and has significant weight in the assessment and
determination of planning applications at this time. 
7.5 Similarly to Policy DS1 of LDP 1, Policy CP1 seeks to ensure that housing
is of a high quality, adaptable and is designed to be suitable for a mix of
occupants.  It indicates that all new development will be expected to
contribute towards creating successful places by having regard to the six
qualities of a successful place (distinctive, adaptable, resource efficient,
easy to get to/move around, safe and pleasant, and welcoming). 
7.6 Policy GI2, BE1, FCC1, ENV1, ENV4, ENV5 and ENV6 are similar to the
green network, built heritage, tree, water environment and flooding
policies of the Adopted and LDP 1 policies, albeit that Policy GI2 sets a
higher open space standard to that of the adopted Local Plan and LDP 1.
Policies CP2 requires the integration and consideration of green
infrastructure from the outset of the design process through to its
maintenance and stewardship of the resource. 
7.7 Policy CON1 requires that significant travel generating uses are designed
to encourage sustainable transport and Policy CON4 sets out a need for
all developments to install sufficient broadband provisions. Policy ENV8
requires developments to address air quality, lighting and noise as part of
the planning process, whilst policy ENV9 requires all potentially
contaminated sites to be remediated where necessary to ensure that the
site is suitable for the intended use. It is considered that the proposals
comply with the above policies as discussed below. 
Principle of Development
7.8  The site had previously accommodated three multi-storey blocks of flats
with some lower level maisonettes. There were circa. 330 dwellings across
the site but these had historically suffered with maintenance and repair
issues. It was agreed in November 2015 by the Council  to proceed with
the demolition of these blocks and work was completed last year on the
demolition and site clearance. The construction of new dwellings on a site
previously used for residential purposes is therefore acceptable in
principal and does not conflict with the land use policies of the adopted
and Proposed Plans. 
Page 47

Page 48

7.9 Compatibility with surrounding land uses
The site is surrounded by a range of existing land uses.  To the north of
the site is the main Glasgow to Balloch railway line and Yoker train station.
Mill Road and Glasgow Road form the site’s more public boundaries with a
supermarket store being on the opposite side of Mill Road. To the site’s
southern and western sites there are mix of commercial properties. The
site is also under the flight path to Glasgow airport and therefore has the
potential to be impacted by a number of noise sources. It is acknowledged
that the site had accommodated residential properties in the past but
these were much denser and with an entirely different layout.
7.10 A Noise Impact Assessment and supplementary reports have been submitted as
part of the proposals and it makes recommendations with respect to mitigation
measures that should be incorporated in to the building construction. These
mitigation measures include the use of a higher performing type of glazing,
specific glazing combinations, use of attenuated trickle ventilation and the use of
tiles or other weatherproof outer sheeting for the proposed roofs.  A combination
of these measures will help to address rail, road and aircraft noise, as well as
commercial noise sources.  Having regard to the well established use of the site
for residential in the past and current construction methods to include the
aforementioned mitigation measures it is considered that the site remains
suitable for residential development. The measures necessary to mitigate the
noise sources can be secured by condition and are necessary for a site of such
urban character.
Site Layout, Design and Appearance
7.11 The layout has been the subject to extensive pre-application discussion
with suggested layout changes having been incorporated in to the final
submission. The development has been designed to reflect and
complement its surroundings but to also act as a landmark feature to
announce the arrival in West Dunbartonshire as it is on the Council
boundary between West Dunbartonshire and Glasgow City Council.   
7.12   The nature of the proposal is broadly described at paragraphs 3.2-3.4
above.  The proposed layout uses a circulatory road within the centre of
the site with an internal ‘mews’ style road sitting in the centre that allows
easy movement through for pedestrians and cyclists. A range of house
types are orientated and sited around the edge of the site to make the
most of their location and to add interest and variation to the streets. At
the north western corner of the site is an existing mound of contaminated
land that would be cost prohibitive to remove from the site.  It is intended
to securely cap this area and cover with a 450mm deep layer of clean soil
and introduce wildflower planting which is considered an appropriate
response to the  constraint on site. 
7.13      Design  of the houses and flats take advantage of its prominent location
whilst reflecting the constraints within and alongside the site. The corner
flatted development features a ‘saw  tooth’  roof  and taller window form to
Page 48

Page 49

create a degree of dominance to the corner. The repeated window
arrangement is also a strong design element when read alongside the
proposed recessed entrance features. Soldier brick courses, deep window
reveals and zig zag metal railings also add interest to the flats and are
features that are repeated on the  houses and cottage flats within the site.
A mix of  materials is proposed across the site with bricks that have a buff
and dark grey tone that will complement each other and provide an
attractive contrast within the site together with a high quality black glazed
brick which will be used in recessed entrances. Concrete dark grey roof
tiles are also proposed and will blend with the brick choices.  The
fenestration will have  matt dark grey frames and the Juliet balconies that
feature on the taller flats will be matt dark grey too with a ‘zig zag’ shape
too add more visual interest.  
7.14 It is considered that the proposed layout responds well to the site
constraints and will create a landmark building to mark the arrival in to
West Dunbartonshire. The layout is imaginative and will provide a range of
housing options using high quality materials and represents a well
considered design solution and placemaking approach.   
Open Space and Landscaping
7.15    The presence of the main Scottish Water sewer and the underground
storage facility along Glasgow Road has resulted in  generous areas of
landscaping and open space. The proposed amenity space equates to
over 7800 sqm which exceeds the requirements of ‘Our Green Network
Planning Guidance.’ The amenity areas take a number of different forms.
There  are spaces provided to the rear of the flats for communal amenity
purposes, there are more open landscaped areas that will face Glasgow
Road and the land in the northern corner will also provide a valuable
green space and setting for the development. Individual houses and the
bungalows will also have their own private and defined garden space
which are considered to be commensurate with the amenity needs of each
dwelling type. High quality landscaping suited to the setting of the
development will also be provided and includes a range of treatments
across the site including the use of wildflower meadow grass planting to
the  earth mound to the north-western corner.  Other areas will be formally
planted with amenity shrubs, hedges and tree planting and species will be
selected to add to the sites biodiversity value. Native trees will also be
selected  and bulb and wildflowers will also feature to add seasonal
interest. The landscaping will also include swales and rainwater gardens
to help to manage rainwater runoff. It is envisaged that the required play
space can be located at various locations within the site along with public
art and these requirements can be addressed via conditions. 
Page 49

Page 50

7.16    The proposed layout does result in the loss of existing trees at the corner
of Glasgow Road and Mill Road. In total 18 trees across the whole site
will be removed as part of the development. The loss of the existing trees
at the site’s southwestern corner is unfortunate but necessary to create
the landmark building and the siting it requires to maximise its visual
impact. The proposed landscape plans illustrate that heavy standard
trees will be planted along the street edge with Mill Road and Glasgow
Road to create a strong green edge to the site. The landscape plans
indicate that over 80 trees will be planted on the site along with shrubs.
Quality landscape spaces are also proposed within other parts of the site
which will mitigate against the loss of the aforementioned trees on the
corner. It is felt that the levels of new planting across the site as part of a
well considered landscape approach with  trees having been selected
that are better suited to a new urban layout will provide a quality
landscape setting to the development that can not only be enjoyed by
residents but people passing through the development too.  The
development will therefore have an attractive green setting which is
welcomed given the site’s  urban surroundings
Roads, Parking, Access and Permeability
7.17 The site is well connected with bus routes along Mill Road and Glasgow
Road. Yoker train station adjoins the site  and established cycle routes run
parallel to Glasgow Road. It should also be noted that the new
Renfrew/Clyde  Bridge will also be built within close proximity to the
application site. A  total of 79 car parking spaces are proposed which is 
slightly below the standard required for this type of development. The
submitted Transport Statement provides justification for the reduced level
based on the profile and habits of future residents and the sustainable
location. Given the highly sustainable location of the site and the
submission of supporting information the number of car parking spaces is
considered acceptable by the Roads Service. If the needs of the residents
change as the development is occupied then functioning additional spaces
can be provided. This can be achieved via a planning condition.  
7.18  The development will also be providing electric vehicle charging points
and cycle storage for the flats. Accessible spaces are also included in the
layout for the residents of the wheelchair accessible dwellings. In terms
of the layout it is anticipated that the layout would create a ‘shared zone’
where the road network is shared by vehicles, cyclists and pedestrians
with the aim being to prioritise people over car users. The layout provides
links through the site to Yoker train station and the location of the new
Renfrew Bridge which will increase the permeability through the site and
create new pedestrian movements through the site. 
Page 50

Page 51

Technical Matters
7.19 The Council’s Environmental Health Service have requested a site
investigation report including remediation and mitigation measures for
treatment of the ground conditions. These matters alongside other
matters including  dust mitigation and construction activity can be
addressed as planning conditions. It should be noted that the
contaminated land to the site’s north-western corner is to be capped and
soil to a depth of 450mm shall be added. Thereafter the mound will
treated with wildflower planting mix to enhance the visual impact. This
approach is considered to be acceptable.  
7.20  In support of the application a Flood Risk Assessment, Energies
Strategy, Invasive Weed Strategy, Ecological Survey Report, Drainage
strategy to include SUDS and Reflectivity Analysis Report have been
submitted. The Council’s Road Service have advised that the findings of
the Flood Risk Assessment is acceptable and will not present a flood risk
to residents and the surroundings. The SUDS design includes swales
and rainwater gardens to manage rainwater runoff from hard surfaces.
This approach to SUDS being integrated in to the landscaping proposal
is a welcome response given the urban nature of the site. 
Pre-application Consultation
7.21 As the proposal constitutes a major development, statutory pre-application
consultation was carried out prior to the submission of the application. A
Proposal of Application Notice was received in February 2019 regarding
the redevelopment of the site.  Given that two years had lapsed since the
original Proposal of Application Notice process started and the scheme
has evolved, further engagement with the local community on the revised
proposals took place recently. The applicant has subsequently submitted
a Public Consultation Report which identifies that an online 
consultation/information event was held on 17th February 2021. This event
comprised of a presentation and participants had the opportunity to ask
questions. The event was publicised on the Council’s website, Facebook
page and tenant participation Facebook pages. In addition to the statutory
requirements
As a response of these public discussion forums lifts were introduced to all
closes of the flatted blocks which includes the four storey blocks, they had
previously only been in the six storey blocks. 
Place and Design Panel and Pre application Elected Member Briefing 
7.22 The development  has evolved over the last three years. Earlier versions
of  layouts and early capacity studies were presented to the Place and
Design Panel in September 2018. The Panel were of the view that the
urban setting would not lend itself to supporting detached suburban type
development that might lose its scale on the site but would perhaps be
suited to town houses and flatted development which would allow the
Page 51

Page 52

volume to change across the site. The concepts discussed at the Panel
session are evident in the current layout. 
7.23 The application was also presented to a pre application Elected Member
Briefing on 30th March 2021. The Elected Member Briefing raised matters
concerning accessibility and lift access, sustainability aspects, zero carbon
approach as renewable energy sources and the use of triple glazing.
These issues have been addressed in the final submission.
8. CONCLUSION
8.1 The redevelopment of this vacant and brownfield  site for residential
purposes complies with local planning policies which seeks to support
urban renewal and regeneration. The proposals have been subject to
extensive discussions with officers at the pre-application stage and the
design of the site has clearly evolved through and been informed by the
feedback provided through this pre-application process, the Place and
Design Panel  and the separate Elected Member Briefing. The
development will provide high quality housing  with excellent open space
provision and connections to the surrounding area. The design and
prominence of the flatted development at the corner  between Mill Street
and Glasgow Road will be a bold landmark building and will enhance and
contribute positively to the further regeneration of the area.  
9. CONDITIONS
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be
used for the dwellings/flats and associated hard landscaping, to
include boundary treatments and waste storage facilities within the
development site shall be submitted to and approved in writing by
the Planning Authority. For the avoidance of doubt the brick to be
used shall comprise of i) Ibstock Arden Weathered Grey, ii) Ibstock
Himley Ebony Black and iii) a glazed black brick. Full details the
proposed glazed black brick and its exact location for use on the
buildings shall be submitted to and agreed by the Planning Authority
prior to works commencing on site. The development shall be
completed in accordance with the approved material details and
palette unless otherwise agreed by the Planning Authority.
2. Prior to the first occupation of the flats hereby approved details of
the proposed cycle storage and refuse/recycling stores shall be
submitted for the written approval of the Planning Authority. The
approved details shall be installed prior to the first occupation of the
flats hereby approved on an agreed phased basis. The constructed
cycle stores and refuse/recycling stores shall be maintained for the
Page 52

Page 53

lifetime of the development unless otherwise agreed by the Planning
Authority.
3. Prior to works commencing on site a proposed planting schedule to
include heavy standard tree planting shall be submitted for the
written approval of the Planning Authority to be read in conjunction
with the soft landscape arrangements approved under drawings XX –
DR-L-90-002 Rev A and XX-DR-L-90-001. The planting schedule
include native species and planting to increase the biodiversity value
of the site. The approved landscape plans shall be implemented no
later than the next available planting season or  a phased scheme to
be agreed with the Planning Authority. Any trees, shrubs or plants
forming part of the approved landscape scheme which die, are
removed or become seriously damaged or diseased, within a period
of 5 years from the date of their planting, shall be replaced in the
next planting season with others of similar sizes and species unless
the Planning Authority gives written approval to any variation. The
landscaping arrangements as approved shall thereafter be
maintained in accordance with these details for the lifetime of the
development unless otherwise agreed  by the Planning Authority.
It should be noted that the submitted landscape  details must comply
with Advice Note 3 ‘Potential Bird Hazards from Amenity
Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguarding.asp). 
No subsequent alterations to the approved landscaping scheme shall
take place unless submitted to and approved in writing by the
Planning Authority.  
4. Prior to works commencing on site details of a children’s play area to
be incorporated in to the site’s landscaping areas shall be submitted
for the written approval of the Planning Authority. The children’s play
shall be installed upon occupation of the 30th dwelling unless
otherwise agreed by the Planning Authority and shall be maintained
for the lifetime of the development unless otherwise agreed.
5. Prior to works commencing on site details of public art  to be
incorporated in the site’s landscaping scheme shall be submitted for
the written approval of the Planning Authority. The agreed public art
shall be installed upon completion of the development and shall be
maintained for the lifetime of the development unless otherwise
agreed.
Page 53

Page 54

6. No house/bungalow shall be occupied within the site until the vehicle
parking spaces associated with that house unit have been
constructed and provided within the site in accordance with
approved site layout (drawing no. ABC-XX-XX-DR-A-0010-Rev J –
Proposed site plan). The aforementioned parking shall thereafter be
retained and be capable of use at all times and shall not be removed
or altered without the prior written approval of the Planning
Authority.
7. Twelve months after the full occupation of the dwellings hereby
approved a Transport Statement and survey findings shall be
submitted for the approval  of the Planning Authority. The required
submissions shall detail the use of the approved car parking
provision and if necessary shall provide details of additional spaces
to include location and a timescale for their implementation.
Thereafter the additional parking, if constructed, shall be retained
and be capable of use at all times and shall not be removed or
altered without the prior written approval of the Planning Authority.
8. Prior to the commencement of development with the site, details of
the location and design of an electric charging point(s)/unit(s) to
serve the development shall be submitted to and approved in writing
by the Planning Authority. The approved car charging point(s)/unit(s)
and associated infrastructure shall thereafter be installed in
accordance with the approved details at a timescale agreed by the
Planning Authority and maintained as such thereafter.
9. Prior to the occupation of the first unit within the site, the developer
shall install the necessary infrastructure to enable the full
development and all associated properties to be connected to the
existing fibre optic network, where available in West Dunbartonshire,
and in accordance with the relevant telecommunications provider’s
standards.
10. Notwithstanding the plans hereby approved details of additional
horizontal traffic calming measures throughout the development site
shall be  submitted for the written approval of the Planning Authority.
The approved works shall be installed as agreed prior to the first
occupation of the unit hereby approved or an alternative timeframe
to be agreed by the Planning Authority. The constructed traffic
calming measures shall be maintained thereafter for the lifetime of
the development.
11. Notwithstanding the plans hereby approved full details of the
junction between Mill Road, the development access and Yoker Train
Station shall be submitted for the written approval of the Planning
Authority. The works shall thereafter be carried out in accordance
Page 54

Page 55

with the approved plans and maintained as such for the lifetime of
the development unless otherwise agreed. 
12. No development (other than investigative works) shall commence on
site until such time as a detailed report on the nature and extent of
any contamination of the site has been submitted to and approved in
writing by the Planning Authority. The report shall be prepared by a
suitably qualified person and shall include the following:
a) A detailed site investigation identifying the extent, scale and
nature of contamination on the site (irrespective of whether this
contamination originates on the site)
b) An assessment of the potential risks (where applicable) to:
a. Human health
b. Property (existing and proposed) including buildings, crops
and livestock, pets, woodland and service lines and pipes
c. Groundwater and surface waters
d. Ecological systems
e. Archaeological sites and ancient monuments
c) An appraisal of remedial options, including a detailed remediation
strategy based on the preferred option.
13. No development (other than investigative works) shall commence on
site until such time as a detailed remediation scheme for the site has
been submitted to and approved in writing by the Planning Authority.
The scheme shall be prepared by a suitably qualified person and
shall detail the measures necessary to bring the site to a condition
suitable for the intended use by removing unacceptable risks to
human health, buildings and other property, and the natural and
historical environment. The scheme shall include details of all works
to be undertaken, the remediation objectives and criteria, a timetable
of works and/or details of the phasing of works relative to the rest of
the development, and site management procedures. The scheme
shall ensure that upon completion of the remediation works the site
will not qualify as contaminated land under the Environmental
Protection Act 1990 Part IIA in relation to the intended use of the land
after remediation.
14. The presence of any previously unexpected contamination that
becomes evident during the development of the site shall be
reported to the Planning Authority in writing within one week, and
work on the site shall cease. At this stage, if requested by the
Planning Authority, an appropriate investigation and risk assessment
shall be undertaken and a remediation scheme shall be submitted to
Page 55

Page 56

and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be
implemented as approved.
15. If the remediation plan requires it then a monitoring and maintenance
scheme  (including the  monitoring of the long-term effectiveness of
the proposed remediation) shall be submitted to and approved by the
Planning Authority. Any actions ongoing shall be implemented within
the timescale agreed by the Planning Authority in consultation with
Environmental Health. Following completion of the actions/measures
identified in the approved remediation scheme a further report which
demonstrates the effectiveness of the monitoring and maintenance
measures shall be submitted to and approved in writing by the
Planning Authority.
16. If there is a requirement to either re-use site won material or to
import material then the assessment criteria and sampling frequency
that would adequately demonstrate its suitability for use shall be
submitted to and approved by the Planning Authority prior to any
material being re-used or imported.  In addition to this and in
accordance with BS3882:2015 and BS8601:2013, material to be used
in the top 300mm shall be free from metals, plastic, wood, glass,
tarmac, paper and odours. On completion of the works and at a time
and or phasing agreed by the Planning Authority the developer shall
submit a verification report containing details of the source of the
material and associated test results to demonstrate its suitability for
use.
17. Prior to the commencement of development on site, details of the
Sustainable Urban Drainage System (SUDS) and its maintenance
following installation shall be submitted to and approved by the
Planning Authority. The SUDS shall be designed to ensure that
contaminants present on the site are not mobilised and that pollution
pathways are not created. The Sustainable Urban Drainage System
(SUDS) shall thereafter be formed and maintained on site in
accordance with the approved details.
18. No development shall take place on site until such time as a suitably
updated noise impact assessment has been submitted to and
approved in writing by the Planning Authority. This noise impact
assessment shall include an assessment of the potential for
occupants of the development to experience noise nuisance arising
from nearby sources  including commercial premises, plant
noise.  Where a potential for noise disturbance is identified,
Page 56

Page 57

proposals for the attenuation of that noise shall be submitted to and
approved in writing by the Planning Authority. Any such approved
noise attenuation scheme shall be implemented prior to the
development being brought into use and shall thereafter be retained
in accordance with the approved scheme. The noise impact
assessment and any recommendations in respect of attenuation
measures shall be prepared by a suitably qualified person.
As this area is subject to noise from aircraft, assessment of this
source must be detailed within the Noise Impact Assessment
including detailed mitigation measures for this noise source. The
development will require high specification  acoustic roof insulation
as a minimum and double/triple glazing.
19. No development shall commence on site until such time that a noise
assessment has been submitted and approved by the Planning
Authority in writing, The noise assessment shall determine the
impact of road traffic noise on the development using the principles
set out in ‘Calculation of Road Traffic Noise’ (DoT/Welsh Office,
HMSO, 1988) or by a method to be agreed by the Planning Authority.
The survey shall take cognisance of the Scottish Government
Document: “Technical Advice Note Assessment of Noise”. Where the
submitted report identifies potential noise disturbance, it shall
include a scheme for protecting residents of the proposed dwellings
from road traffic  noise. The scheme shall ensure that the internal
levels do not exceed 40dB daytime and 35 dB night time and the
external levels do not exceed 55dB daytime in any rear garden areas,
when measured as LAeq.T. The approved mitigation measures shall
be implemented prior to the first  occupation of the dwellings hereby
approved and shall be retained and maintained for the lifetime of the
development.
20 No development shall commence until such time that details of noise
attenuation/soundproofing works have been submitted to and
approved in writing by the Planning Authority. The approved noise
attenuation/soundproofing measures shall be implemented prior to
the development being brought into use and shall thereafter be
retained in accordance with the approved scheme.
21 Upon completion of the development hereby approved an
independently  Verification Report shall be submitted for the written
approval of the Planning Authority which shall demonstrate
compliance with noise conditions of this planning permission. The
report shall demonstrate that the projections as detailed within the
approved Noise Impact Assessment are reliable and mitigate the
noise sources. 
Page 57

Page 58

22 No development shall commence on site until such time as a noise
control method statement for the construction period has been
submitted to and approved in writing by the Planning Authority. This
statement shall identify likely sources of noise (including specific
noisy operations and items of plant/machinery), the anticipated
duration of any particularly noisy phases of the construction works,
and details of the proposed means of limiting the impact of these
noise-sensitive properties. The construction works shall thereafter
be carried out in accordance with the approved method statement
unless otherwise approved in writing by the Planning Authority.
23 During the period of construction, all works and ancillary operations
which are audible at the site boundary (or at such other place(s) as
may first be agreed in writing by the Planning Authority), shall be
carried out between the following hours unless otherwise approved
in writing by the Planning Authority: 
• Mondays to Fridays: 0800-1800
• Saturdays: 0800-1300
• Sundays and public holidays: No working
24. No piling works shall be carried out until a method statement has
been submitted to and approved in writing by the Planning Authority.
This statement shall include an assessment of and take into account
the following:
• The impact of the piling on surrounding properties.
• Detail any procedures which are required to minimise the impact of
noise and vibrations on the occupants of surrounding properties.
This statement as submitted shall be prepared by a suitably qualified
person and shall take into account the guidance contained in
BS6472:1984 ‘Evaluation of Human Response to Vibration of
Buildings’. The piling works shall thereafter be carried out in
accordance with the approved method statement until they are
completed on site.
25. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for
the control and mitigation of dust has been submitted to and
approved in writing by the Planning Authority. The scheme shall
identify likely sources of dust arising from the development or its
Page 58

Page 59

construction, and shall identify measures to prevent or limit the
occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust
generating activities commencing on site and shall be maintained
thereafter, unless otherwise approved by the Planning Authority.
26. Prior to the commencement of development on site, an Air Quality
Impact Assessment shall be submitted for the written approval of the
Planning Authority. The report should use a method based on the
principles set out in the Environmental Protection UK document
Development Control: Planning for Air Quality (2010 Update),
Scottish Government publication ‘Local Air Quality Management
Technical Guidance LAQM.TG (09) and ‘Delivering Cleaner Air for
Scotland – Guidance from Environmental Protection Scotland and
the RTPI Scotland – January 2017’. The recommendations within the
approved Air Quality Report shall be implemented prior to the first
occupation of the dwellings or an alternative timescale agreed by the
Planning Authority.
27. Prior to work commencing details of the sites proposed lighting
scheme shall be submitted for the written approval of the Planning
Authority and should include details of lamp type and luminaire. The
lighting installation shall thereafter be carried out in accordance with
the approved details unless otherwise agreed by the Planning
Authority.
28. No development shall commence on site until details for the storage
and the collection of waste arising from the development shall be
submitted to and approved in writing by the Planning Authority. The
agreed details shall be in place prior the occupation of the first
housing unit/property within the site and thereafter maintained for
the lifetime of the development.
29. Should works commence on the development hereby approved after
the start of the next bat breeding season (April 2022) then a further
Bat Survey shall be undertaken and submitted for the written
approval of the Planning Authority. In the event that bats are
encountered during other works, all works should cease and Nature
Scot or a licenced ecologist contacted.
Peter Hessett
Chief Officer – Regulatory and Regeneration
Page 59

Page 60

Date: 6th October   2021
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans;
2. Consultation responses;
3. West Dunbartonshire Local Plan 2010;
4. West Dunbartonshire Local Development Plan
Proposed Plan;
5. West Dunbartonshire Local Development Plan
2 Proposed Plan.
6. ‘Our Green Network’ Guidance
7. Residential Development Design Guidance
Wards affected: Ward 6 - Clydebank  Waterfront
Page 60

Page 61

Appendix 2
9. CONDITIONS
1. Prior to the commencement of development on site, exact details, specifications and
samples of all proposed external materials to be used for the dwellings/flats and
associated hard landscaping, to include boundary treatments and waste storage
facilities within the development site shall be submitted to and approved in writing by
the Planning Authority. For the avoidance of doubt the brick to be used shall comprise
of i) Ibstock Arden Weathered Grey, ii) Ibstock Himley Ebony Black and iii) a glazed
black brick. Full details the proposed glazed black brick and its exact location for use
on the buildings shall be submitted to and agreed by the Planning Authority prior to
works commencing on site. The development shall be completed in accordance with
the approved material details and palette unless otherwise agreed by the Planning
Authority.
2. Prior to the first occupation of the flats hereby approved details of the proposed cycle
storage and refuse/recycling stores shall be submitted for the written approval of the
Planning Authority. The approved details shall be installed prior to the first occupation
of the flats hereby approved on an agreed phased basis. The constructed cycle stores
and refuse/recycling stores shall be maintained for the lifetime of the development
unless otherwise agreed by the Planning Authority.
3. Prior to works commencing on site a proposed planting schedule to include heavy
standard tree planting shall be submitted for the written approval of the Planning
Authority to be read in conjunction with the soft landscape arrangements approved
under drawings XX –DR-L-90-002 Rev A and XX-DR-L-90-001. The planting schedule
include native species and planting to increase the biodiversity value of the site. The
approved landscape plans shall be implemented no later than the next available
planting season or  a phased scheme to be agreed with the Planning Authority. Any
trees, shrubs or plants forming part of the approved landscape scheme which die, are
removed or become seriously damaged or diseased, within a period of 5 years from
the date of their planting, shall be replaced in the next planting season with others of
similar sizes and species unless the Planning Authority gives written approval to any
variation. The landscaping arrangements as approved shall thereafter be maintained
in accordance with these details for the lifetime of the development unless otherwise
agreed  by the Planning Authority.
It should be noted that the submitted landscape  details must comply with Advice
Note 3 ‘Potential Bird Hazards from Amenity Landscaping & Building Design’
(available at www.aoa.org.uk/publications/safeguarding.asp). 
No subsequent alterations to the approved landscaping scheme shall take place
unless submitted to and approved in writing by the Planning Authority.  
4. Prior to works commencing on site details of a children’s play area to be incorporated
in to the site’s landscaping areas shall be submitted for the written approval of the
Planning Authority. The children’s play shall be installed upon occupation of the 30th
dwelling unless otherwise agreed by the Planning Authority and shall be maintained
for the lifetime of the development unless otherwise agreed.
Page 61

Page 62

5. Prior to works commencing on site details of public art  to be incorporated in the site’s
landscaping scheme shall be submitted for the written approval of the Planning
Authority. The agreed public art shall be installed upon completion of the development
and shall be maintained for the lifetime of the development unless otherwise agreed.
6. No house/bungalow shall be occupied within the site until the vehicle parking spaces
associated with that house unit have been constructed and provided within the site in
accordance with approved site layout (drawing no. ABC-XX-XX-DR-A-0010-Rev N –
Proposed site plan). The aforementioned parking shall thereafter be retained and be
capable of use at all times and shall not be removed or altered without the prior written
approval of the Planning Authority.
7. Twelve months after the full occupation of the dwellings hereby approved a Transport
Statement and survey findings shall be submitted for the approval  of the Planning
Authority. The required submissions shall detail the use of the approved car parking
provision and if necessary shall provide details of additional spaces to include location
and a timescale for their implementation. Thereafter the additional parking, if
constructed, shall be retained and be capable of use at all times and shall not be
removed or altered without the prior written approval of the Planning Authority.
8. Prior to the commencement of development with the site, details of the location and
design of an electric charging point(s)/unit(s) to serve the development shall be
submitted to and approved in writing by the Planning Authority.  Ducting shall be
provided for all parking spaces including the additional spaces. The approved car
charging point(s)/unit(s) and associated infrastructure shall thereafter be installed in
accordance with the approved details at a timescale agreed by the Planning Authority
and maintained as such thereafter.
9. Prior to the occupation of the first unit within the site, the developer shall install the
necessary infrastructure to enable the full development and all associated properties
to be connected to the existing fibre optic network, where available in West
Dunbartonshire, and in accordance with the relevant telecommunications provider’s
standards.
10. Notwithstanding the plans hereby approved details of additional horizontal traffic
calming measures throughout the development site shall be  submitted for the written
approval of the Planning Authority. The approved works shall be installed as agreed
prior to the first occupation of the unit hereby approved or an alternative timeframe to
be agreed by the Planning Authority. The constructed traffic calming measures shall
be maintained thereafter for the lifetime of the development.
11. Notwithstanding the plans hereby approved full details of the junction between Mill
Road, the development access and Yoker Train Station shall be submitted for the
written approval of the Planning Authority. The works shall thereafter be carried out in
accordance with the approved plans and maintained as such for the lifetime of the
development unless otherwise agreed.
12. No development (other than investigative works) shall commence on site until such
time as a detailed remediation scheme for the site has been submitted to and approved
in writing by the Planning Authority. The scheme shall be prepared by a suitably
qualified person and shall detail the measures necessary to bring the site to a condition
suitable for the intended use by removing unacceptable risks to human health,
buildings and other property, and the natural and historical environment. The scheme
shall include details of all works to be undertaken, the remediation objectives and
criteria, a timetable of works and/or details of the phasing of works relative to the rest
Page 62

Page 63

of the development, and site management procedures. The scheme shall ensure that
upon completion of the remediation works the site will not qualify as contaminated land
under the Environmental Protection Act 1990 Part IIA in relation to the intended use of
the land after remediation. 
13. The approved remediation scheme shall be carried out in accordance with its terms
prior to the commencement of development other than that required to carry out
remediation, unless otherwise agreed in writing by the Planning Authority. The
Planning Authority shall be notified in writing of the intended commencement of
remediation works not less than 14 days before these works commence on site. Upon
completion of the remediation works and prior to the site being occupied, a verification
report which demonstrates the effectiveness of the completed remediation works shall
be submitted to and approved in writing by the  Planning Authority.
14. The presence of any previously unexpected contamination that becomes evident
during the development of the site shall be reported to the Planning Authority in writing
within one week, and work on the site shall cease. At this stage, if requested by the
Planning Authority, an appropriate investigation and risk assessment shall be
undertaken and a remediation scheme shall be submitted to and approved by the
Planning Authority prior to the recommencement of site works.  The approved details
shall be implemented as approved.
15. If the remediation plan requires it then a monitoring and maintenance scheme
(including the  monitoring of the long-term effectiveness of the proposed remediation)
shall be submitted to and approved by the Planning Authority. Any actions ongoing
shall be implemented within the timescale agreed by the Planning Authority in
consultation with Environmental Health. Following completion of the actions/measures
identified in the approved remediation scheme a further report which demonstrates the
effectiveness of the monitoring and maintenance measures shall be submitted to and
approved in writing by the Planning Authority.
16. A monitoring and maintenance scheme (including the monitoring of the long-term
effectiveness of the proposed remediation) shall be submitted to and approved by the
Planning Authority. Following completion of the actions/measures identified in the
approved remediation scheme a further report which demonstrates the effectiveness
of the monitoring and maintenance measures shall be submitted to and approved in
writing by the Planning Authority.
17. If there is a requirement to either re-use site won material or to import material then
the assessment criteria and sampling frequency that would adequately demonstrate
its suitability for use shall be submitted to and approved by the Planning Authority prior
to any material being re-used or imported.  In addition to this and in accordance with
BS3882:2015 and BS8601:2013, material to be used in the top 300mm shall be free
from metals, plastic, wood, glass, tarmac, paper and odours. On completion of the
works and at a time and or phasing agreed by the Planning Authority the developer
shall submit a verification report containing details of the source of the material and
associated test results to demonstrate its suitability for use.
18. Prior to the commencement of development on site, details of the Sustainable Urban
Drainage System (SUDS) and its maintenance following installation shall be submitted
to and approved by the Planning Authority. The Sustainable Urban Drainage System
Page 63

Page 64

(SUDS) shall thereafter be formed and maintained on site in accordance with the
approved details.
19. No development shall take place on site until such time as a suitably updated noise
impact assessment has been submitted to and approved in writing by the Planning
Authority. This noise impact assessment shall include an assessment of the potential
for occupants of the development to experience noise nuisance arising from nearby
sources  including commercial premises, plant noise.  Where a potential for noise
disturbance is identified, proposals for the attenuation of that noise shall be submitted
to and approved in writing by the Planning Authority. Any such approved noise
attenuation scheme shall be implemented prior to the development being brought into
use and shall thereafter be retained in accordance with the approved scheme. The
noise impact assessment and any recommendations in respect of attenuation
measures shall be prepared by a suitably qualified person.
As this area is subject to noise from aircraft, assessment of this source must be
detailed within the Noise Impact Assessment including detailed mitigation measures
for this noise source. The development will require high specification  acoustic roof
insulation as a minimum and double/triple glazing.
20. No development shall commence on site until such time that a noise assessment has
been submitted and approved by the Planning Authority in writing, The noise
assessment shall determine the impact of road traffic noise on the development using
the principles set out in ‘Calculation of Road Traffic Noise’ (DoT/Welsh Office,
HMSO, 1988) or by a method to be agreed by the Planning Authority. The survey
shall take cognisance of the Scottish Government Document: “Technical Advice Note
Assessment of Noise”. Where the submitted report identifies potential noise
disturbance, it shall include a scheme for protecting residents of the proposed
dwellings from road traffic  noise. The scheme shall ensure that the internal levels do
not exceed 40dB daytime and 35 dB night time and the external levels do not exceed
55dB daytime in any rear garden areas, when measured as LAeq.T. The approved
mitigation measures shall be implemented prior to the first  occupation of the
dwellings hereby approved and shall be retained and maintained for the lifetime of
the development.
20 No development shall commence until such time that details of noise
attenuation/soundproofing works have been submitted to and approved in writing by
the Planning Authority. The approved noise attenuation/soundproofing measures
shall be implemented prior to the development being brought into use and shall
thereafter be retained in accordance with the approved scheme.
21 Upon completion of the development hereby approved an independent  Verification
Report shall be submitted for the written approval of the Planning Authority which
shall demonstrate compliance with noise conditions of this planning permission. The
report shall demonstrate that the projections as detailed within the approved Noise
Impact Assessment are reliable and mitigate the noise sources. 
22 No development shall commence on site until such time as a noise control method
statement for the construction period has been submitted to and approved in writing
by the Planning Authority. This statement shall identify likely sources of noise
(including specific noisy operations and items of plant/machinery), the anticipated
duration of any particularly noisy phases of the construction works, and details of the
proposed means of limiting the impact of these noise-sensitive properties. The
Page 64

Page 65

construction works shall thereafter be carried out in accordance with the approved
method statement unless otherwise approved in writing by the Planning Authority.
23 During the period of construction, all works and ancillary operations which are audible
at the site boundary (or at such other place(s) as may first be agreed in writing by the
Planning Authority), shall be carried out between the following hours unless
otherwise approved in writing by the Planning Authority: 
• Mondays to Fridays: 0800-1800
• Saturdays: 0800-1300
• Sundays and public holidays: No working
24. No piling works shall be carried out until a method statement has been submitted to
and approved in writing by the Planning Authority.  This statement shall include an
assessment of and take into account the following:
• The impact of the piling on surrounding properties.
• Detail any procedures which are required to minimise the impact of noise and
vibrations on the occupants of surrounding properties.
This statement as submitted shall be prepared by a suitably qualified person and shall
take into account the guidance contained in BS6472:1984 ‘Evaluation of Human
Response to Vibration of Buildings’. The piling works shall thereafter be carried out in
accordance with the approved method statement until they are completed on site.
25. Unless otherwise approved in writing by the Planning Authority, no development shall
commence on site until such time as a scheme for the control and mitigation of dust
has been submitted to and approved in writing by the Planning Authority. The
scheme shall identify likely sources of dust arising from the development or its
construction, and shall identify measures to prevent or limit the occurrence and
impact of such dust.  The approved scheme shall thereafter be implemented fully
prior to any of the identified dust generating activities commencing on site and shall
be maintained thereafter, unless otherwise approved by the Planning Authority.
26. Prior to the commencement of development on site, an Air Quality Impact
Assessment shall be submitted for the written approval of the Planning Authority. The
report should use a method based on the principles set out in the Environmental
Protection UK document Development Control: Planning for Air Quality (2010
Update), Scottish Government publication ‘Local Air Quality Management Technical
Guidance LAQM.TG (09) and ‘Delivering Cleaner Air for Scotland – Guidance from
Environmental Protection Scotland and the RTPI Scotland – January 2017’. The
recommendations within the approved Air Quality Report shall be implemented prior
to the first occupation of the dwellings or an alternative timescale agreed by the
Planning Authority.
27. Prior to work commencing details of the sites proposed lighting scheme shall be
submitted for the written approval of the Planning Authority and should include details
of lamp type and luminaire. The lighting installation shall thereafter be carried out in
accordance with the approved details unless otherwise agreed by the Planning
Authority.
Page 65

Page 66

28. No development shall commence on site until details for the storage and the collection
of waste arising from the development shall be submitted to and approved in writing
by the Planning Authority. The agreed details shall be in place prior the occupation of
the first housing unit/property within the site and thereafter maintained for the lifetime
of the development.
29. Should works commence on the development hereby approved after the start of the
next bat breeding season (April 2022) then a further Bat Survey shall be undertaken
and submitted for the written approval of the Planning Authority. In the event that bats
are encountered during other works, all works should cease and Nature Scot or a
licenced ecologist contacted.
Page 66

Page 67

West Dunbartonshire Council
16 Church Street
Dumbarton
G82 1QL
Reproduced by permission of Ordnance Survey
on behalf of HMSO © Crown copyright and
database right 2015. All rights reserved. Ordnance
Survey Licence number 100020790
Map Register No: HQ670
Date: 23 May 2022
DC21/138/FUL Residential development of
88 dwellings comprising of
cottage flats, bungalows
and flats with vehicular
access, associated car
parking and landscape
works
Development Site At Glasgow Road And
Mill Road
Clydebank
Page 67

Page 68

Page 68

Page 69

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Regulatory and Regeneration 
Planning Committee: 8th June 2022 
___________________________________________________________________
Subject: Appeal Decision  - DC02/447: Extension to Quarry, Sheephill
Quarry, Milton, Dumbarton (PPA-160-2034)
1. Purpose
1.1 To provide the Committee with an update regarding the appeal decision for
the above application, further information relevant to the Review of Minerals
Permission application (ROMP) and the Scheduled Monuments Permission.
2. Recommendations
2.1 That the Committee notes the outcome of the appeal and the current
situation regarding the ROMP and Scheduled Monument Consent.
3. Background
3.1 The Committee will recall that the above application was refused by the
Council in March 2021. Shortly after, the appellant appealed the decision to
the Planning and Environmental Appeals Division. The February 2022
Planning Committee  was advised a “Notice of Intention” was issued by the
Reporter that he was minded to allow the appeal and grant planning
permission subject to 39 conditions and following the signing and registering
or recording of a planning obligation under section 75 of the Town and
Country Planning (Scotland) Act 1997 or some suitable alternative
arrangement, securing a bond sufficient to cover the expected restoration
and aftercare works for the quarry extension.  The legal agreement also
relinquish all rights to quarry or otherwise extract rock from the excambion
area adjacent to Milton Hill.  The Reporter had given the appellant and the
Council up to a 12 week period to conclude the planning obligation.  The
principle of such a bond had been previously agreed between the appellant
and Council officers and it is necessary to ensure that the quarry extension
site is restored after it has been worked.
4. Main Issues
4.1 The Council advised the Reporter that a planning obligation under Section
75 of the Act, as detailed above has been submitted to and acknowledged
by the Keeper of the Registers of Scotland. As a result the Reporter issued
the planning decision notice for the above extension on 9th May 2022. The
Reporter in reaching the decision on balance found that the proposal was in
accordance with the development plan and the reasons and justification for
ITEM 7
Page 69

Page 70

the approval were detailed in the report to February 2022 Planning
Committee which is contained in Appendix 1 and a copy of the planning
decision notice.  
4.2  The Reporter’s decision is final. However there is a right of appeal to the
Court of Session within 6 weeks of the date of the appeal decision however
this could only be made on a point of law.  It is considered the conclusions
and decision reached by the Reporter are reasonable and justified and there
are no points of law which could form grounds for an appeal to the Court of
Session. 
Award of Costs 
4.3 The appellant submitted a claim for an award of costs to the Reporter for the
appeal.  The Council refused the extension area because of the effect it
would have on amenity of the area and on the residents of nearby
properties. The appellant submitted that the council acted unreasonably
because it failed to give complete, precise and reasons for refusal; reached
its decision without reasonable planning grounds for doing so; and refused
the application solely on the grounds that it did not accord with the provision
of the development plan and without having regard to other material
considerations. 
4.4  The  Reporter found, although the Council’s reason for refusing the
application was brief and makes no reference to any policies in the
development plan and does not explicitly apply the test in Section 25 of the
Act, he was not persuaded that the reason given is not sufficiently “complete,
precise and relevant” to quote the Circular. In terms of the effects on
residential amenity, the Reporter found a lack of technical evidence as to the
effects from noise, vibration and dust and failed to identify why such effects
would be significant for nearby properties or identify which those properties
are.  The Council had failed to demonstrate any reasonable planning
grounds for its decision in relation to noise, vibration and dust and the
Reporter considered it to be unreasonable behaviour. On the appellants third
point the Reporter agreed that the appeal proposal required to be considered
on its own merits and separate from the ROMP decision.  The Reporter did
not consider that the Council acted unreasonably in not making reference in
its decision to the condition in the ROMP consent which would prohibit
extraction in the excambion area. The Council did not seek to bring in the
hours of operation of the quarry as an additional reason for refusal as this
was controlled by a planning condition, the terms of which were not a matter
of dispute between the council and the appellant. 
4.5 A partial award of the appellant’s expenses in addressing only these matters
(being effects of noise, vibration and dust on nearby residential properties)
was granted.  It was concluded that the council has acted unreasonably by
not being able to support with reasonable planning grounds, its reasons for
refusal as it relates to the effects of noise, vibration and dust on nearby
residential properties.
Page 70

Page 71

Update on Review of Minerals Permission (ROMP)       
4.6    It was previously advised to Committee that the quarry operator  is appealing
the conditions contained within the ROMP Decision Notice and had
requested that the ROMP application should be determined only subject to
the conditions set out in the Decision Notice with the exception that condition
2 in the Decision Notice should be deleted.  Condition 2 excludes the Milton
Hill area from quarrying. The quarry operator previously had advised that
once the Decision Notice is issued, and planning permission granted, for the
extension area the quarry operator has agreed to withdraw the appeal
against the ROMP conditions. The appellant’s agent has advised that this
will take place once the timescale for the appeal to the Court of Session for
the extension area has passed. 
Scheduled Monument Consent
4.7   Historic Environment Scotland on 21st November were minded to grant
Scheduled  Monument Consent for quarrying  operations which affect the
Scheduled Monument. This was subject to a number of conditions regarding
the excavation, recording and publishing of findings regarding the Sheephill
Fort. The application is still awaiting a decision from the Scottish Ministers
who have extended the time period for consideration. To date no decision
has been issued by the Scottish Ministers.    
5. People Implications
5.1 There are no personnel issues.
6. Financial and Procurement Implications
6.1 As indicated in section 4 above the  quarry operator has made a claim
against the council for the award of its expenses in making the appeal
against the refusal of the extension application.  The Council opposed any
award of expenses. The Reporter has found the council liable to the
appellant in respect of the expenses of the appeal. This is a partial award
and the council and the appellant are expected to agree expenses between
themselves. However if this is unsuccessful it will be remit the account to the
Auditor of the Court of Session to decide on a party/party basis. 
6.2   The award of expenses will be paid from the Planning and Building Standards
budget.  When  the withdrawal of the appeal of the ROMP and the 
agreement  of the ROMP between the Council and quarry operator the
significant financial implications for the Council of excluding the Milton Hill
area from quarrying will be removed.  
Page 71

Page 72

7. Risk Analysis
7.1 A risk assessment is not required.
8. Equalities Impact Assessment (EIA)
8.1  There are no equalities issues identified.
9. Consultation
9.1 Consultation was carried out during the planning and appeal processes.
10. Strategic Assessment
10.1    The ROMP and extension application supports the strategic priorities of the
Council.
Peter Hessett
Chief Officer – Regulatory and Regeneration
Date: 8th June 2022
______________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendices: Appendix 1 – 16th February 2022 Planning Committee
report 
Background Papers: Appeal Decision Notice – DC02/447
Claim for an Award of Expenses Decision Notice –
DC02/447 
Planning Committee Reports
-11th March 2020
- 11th November 2020
- 26th January 2021
- 3rd March 2021
- 10 November 2021
Wards affected: Ward 3 (Dumbarton)
Page 72

Page 73

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Regulatory and Regeneration 
Planning Committee: 16th February 2022 
___________________________________________________________________
Subject: Appeal Notice of Intention - DC02/447: Extension to Quarry,
Sheephill Quarry, Milton, Dumbarton
1. Purpose
1.1 To provide the Committee with an update regarding the appeal decision for
the above application, further information relevant to the Review of Minerals
Permission application (ROMP) and the Scheduled Monuments Permission.
2. Recommendations
2.1 That the Committee notes the intended outcome of the appeal and current
situation regarding the ROMP and Scheduled Monument Consent.    
3. Background
3.1 The Committee will recall that the above application was refused by the
Council in March 2021. Shortly after, the appellant appealed the decision to
the Planning and Environmental Appeals Division. The Council has been
notified of a “Notice of Intention” that the Reporter is minded to allow the
appeal and grant planning permission subject to 39 conditions and following
the signing and registering or recording of a planning obligation under section
75 of the Town and Country Planning (Scotland) Act 1997 or some suitable
alternative arrangement, securing a bond sufficient to cover the expected
restoration and aftercare works for the quarry extension. The Reporter has
given the appellant and the Council up to a 12 week period to conclude the
planning obligation.  The principal of such a bond had been previously agreed
between the appellant and Council officers and it is necessary to ensure that
the quarry extension site is restored after it has been worked. If, by the end of
the 12 week period, the relevant obligation has not been registered or
recorded the Reporter will consider whether planning permission should be
refused or granted without a planning obligation.
4. Main Issues
4.1 A copy of the Notice of Intention is contained within Appendix 1. The Reporter
in reaching the decision on balance found that the proposal was in
Appendix 1
Page 73

Page 74

accordance with the development plan. There was some tension with policy
DC8 Minerals albeit the need for the development is one of several
considerations, however it was concluded that the policy does not explicitly
state that a need for the development must be demonstrated. For the same
reason there is some tension with policy GB1 Green Belt. The only significant
environmental effects are the visual effects of the extension from some
locations, including cumulative effects with the extraction of the remainder of
the quarry. However the Reporter concluded that these did not give rise to
significant conflict with the development plan.  
4.2  In respect of the other main issues it was concluded that there would be no
other significant environmental effects and no conflict with the development
plan. The updated noise assessment was not found to be inconsistent with
the advice in Annex A of PAN50 and subject to the proposed noise conditions
which sets noise limits, significant adverse noise effects are unlikely.  In terms
of blasting/vibration there are a number of proposed conditions which would
control blasting in the extension area identical to those now imposed in the
ROMP permission. There is no technical evidence before the Reporter which
indicates that blasting from the extension area would cause vibration at
problematic levels for any nearby properties. A similar conclusion was
reached on dust deposition and relevant conditions would aim to ensure the
extension area is operated so as to minimise the release of dust. In terms of
the effects on core path users it was acknowledged there might be increased
levels of noise and dust for path users in the vicinity of the proposed
extension but this would only be for a fairly short stretch of path and unlikely
to be a significant deterrent to users of the path. The low ecological value of
the site means that there are no significant effects on biodiversity. Other
matters identified by objectors were not considered to have a significant
effect. 
4.3   It was concluded by the Reporter that the proposed development accords with
the relevant provisions of the development plan and that there are no material
considerations which justify refusing to grant planning permission. The
Reporter considered that the reasoned conclusions on the significant
environmental effects of the proposed development are up to date. For the
most part, the Reporter has imposed the conditions proposed by the Council
and only made slight amendments so they align with the ROMP conditions.
The Reporter has removed Conditions 19 and 20 relating to the main quarry
road and to wheel washing of vehicles leaving the quarry and removed the
first condition that the proposed development commence with 2 years as he
does not believe that they are necessary for the appeal development. 
Update on Review of Minerals Permission (ROMP)
4.4   The appellant is appealing the conditions contained within the ROMP Decision
Notice and has requested that the ROMP application should be determined
only subject to the conditions set out in the Decision Notice with the exception
that condition 2 in the Decision Notice should be deleted.  Condition 2
excludes the Milton Hill area from quarrying.  An appeal was lodged by the
Page 74

Page 75

appellant on 21st December 2021 to the Planning and Environmental Appeals
Division. The appellant has stated that condition 2 is contrary to the local
development plan and there is no other planning justification for imposition of
condition 2.  Condition 2 of the ROMP should be removed on the grounds that
the imposition of it restricts the mineral rights of the appellant. Following the
issuing of the Notice of Intention to grant planning permission for the
extension area, the appellant and the Council have agreed to sist (i.e.
suspend) the ROMP appeal pending the conclusion of the planning obligation
and the issuing of the Decision Notice for the extension area. 
Once the Decision Notice is issued, and planning permission granted, for the
extension area the appellant has agreed to withdraw the appeal against the
ROMP conditions. 
Scheduled Monument Consent
4.5    The Council lodged representations to Historic Environment Scotland to the
application for Scheduled Monument Consent for removal of Sheephill Fort.
Historic Environment Scotland on 21st November were minded to grant
Scheduled  Monument Consent for quarrying  operations which affect the
Scheduled Monument  subject to a number of conditions regarding the
excavation, recording and publishing of findings regarding the Sheephill Fort.
The application is presently awaiting a decision from the Scottish Ministers
who have extended the time period for consideration.  
5. People Implications
5.1 There are no personnel issues.
6. Financial and Procurement Implications
6.1 The appellant has made a claim against the council for the award of its
expenses in making the appeal against the refusal of the extension
application.  The Council has opposed any award of expenses. The claim
will be dealt with by the Reporter at the same time as determining the appeal
for the extension area.
6.2 There are significant financial implications for the Council if the appeal of the
ROMP conditions proceeds and is successful.
7. Risk Analysis
7.1 A risk assessment is not required.
8. Equalities Impact Assessment (EIA)
8.1  There are no equalities issues identified.
Page 75

Page 76

9. Consultation
9.1 Consultation was carried out during the planning and appeal processes.
10. Strategic Assessment
10.1    The ROMP and extension application supports the strategic priorities of the
Council. 
Peter Hessett
Chief Officer – Regulatory and Regeneration 
Date: 16th February 2022
______________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendices: Appendix 1 – Appeal: Notice of Intention – EIA   
Development: 18th January 2022 
Background Papers:  Planning Committee Reports
- 11th March 2020
- 11th November 2020
- 26th January 2021
- 3rd March 2021
- 10 November 2021
Wards affected: Ward 3 (Dumbarton)
Page 76

Page 77

Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
Planning and Environmental Appeals Division
Appeal: Notice of Intention – EIA Development
T: 0300 244 6668
E: dpea@gov.scot

Notice of Intention
For the reasons given below I am minded to allow the appeal and grant planning
permission in principle subject to the 39 conditions listed in Schedule 1 of the notice and
following the signing and registering or recording of a planning obligation under section 75
of the Town and Country Planning (Scotland) Act 1997, or some suitable alternative
arrangement, securing a bond sufficient to cover the expected restoration and aftercare
works for the quarry extension.
The appellant made a claim against the council for the award of its expenses in making this
appeal.  I will deal with that claim at the same time as determining the appeal
Background
1. The planning application to which this appeal relates was made in 2002 and
determined by the council in 2021.  It will therefore be helpful to explain the context in which
the appeal has been made.
2. Planning permission for Sheephill Quarry was first granted on appeal by the
Secretary of State for Scotland in 1949.  In the late 1960s Dunbartonshire County Council
granted planning permission for a residential development at Milton Hill.  These houses
would be (and now are) close to the western edge of the consented extraction area.  It
appears that the quarry may not have been operational at that time and the County Council
was perhaps not cognisant of the full terms of the permission for the quarry when it
approved the housing development.
3. In 1997 West Dunbartonshire Council gave notice, under the statutory arrangements
for the ‘Review of Old Minerals Permissions’ (ROMP), that the quarry was an active site
Notice by David Liddell, a Reporter appointed by the Scottish Ministers
 Planning appeal reference: PPA-160-2034
 Site address: Sheephill Quarry, Milton, G82 2RN
 Appeal by William Thompson & Son (Dumbarton) Ltd against the decision by West
Dunbartonshire Council
 Application for planning permission DC02/447 dated 28 March 2003 refused by notice
dated 26 March 2021
 The development proposed: Quarry Extension
 Application drawings: see Schedule 2 of this Notice
 Date of site visit by Reporter: 31 August and 26 November 2021
Date of notice:   18 January 2022
Page 77

Page 78

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
2
and an application must be made to provide for new planning conditions for the quarry. 
Around this time the close proximity between the houses at Milton Hill and the edge of the
consented extraction area became apparent. 
4. It seems that the quarry operator and council officers then discussed how to resolve
the potential conflict between extraction at the quarry and housing in close proximity.  It was
proposed that the quarry operator would forego its rights to extract the westernmost part of
the quarry (the part closest to the houses at Milton Hill – ‘the excambion area’) in return for
a proposal to extend the quarry to the northwest – the extension area which is the subject
of this appeal.  Not working the excambion area would preserve a distance of about 150
metres between the quarry workings and the houses at Milton Hill.  Therefore there were
two concurrent planning applications – one for the ROMP (where council officials
recommended a condition preventing extraction in the excambion area) and one for the
proposed quarry extension.   
5. Councillors had been minded, in 2005, to approve both applications subject to a
planning agreement to ensure restoration of the land in the extension area following
extraction.  However it seems that the applicant could not obtain all the necessary consents
for the agreement, so it could not be entered into.  Both applications remained dormant
until, in 2019, the land ownership issues seem to have been resolved.   
6. Given the long hiatus between the council’s initial consideration of the applications
and their resurrection in 2019, the council re-notified the neighbouring properties of the
applications in 2020.  A number of letters of representation were made in respect of the
applications.  Both applications then went back to the planning committee and then to a full
meeting of the council in 2021.  The council approved the updated ROMP conditions (one
of which precludes extraction in the excambion area) but refused the application for
extraction in the extension area.  The current appeal is against that refusal. 
7. An EIA Report (as we would now call it) was submitted with the 2003 application. 
This addressed the environmental effects of operating the quarry on the working
assumption that the proposed extension area would be worked instead of the excambion
area.  Prior to the applications being determined in 2021 updated environmental information
had been provided on ecological effects (2021) and effects from noise and vibration (2020). 
8. The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2011 were replaced with new EIA regulations in 2017.  However because of
the date the original application was made the statutory position is that it is the 2011
Regulations, as they applied on the day before the 2017 Regulations came into force, which
have force for this appeal.  As an extension to a quarry, Schedule 2 of the 2011
Regulations identifies the appeal development as EIA development. 
9. Following my initial review of the evidence before me and immediately after my
accompanied site inspection, on 1 September 2021 I issued a request for further evidence
on a number of matters.  All of those who had made representations to the council in 2020
and who had, by 1 September 2021, made representations to DPEA following the appeal
were included in that request. 
10. As part of that exercise, I asked the appellant to clarify which environmental effects,
if any, the EIA Report identifies as significant.  I also asked the appellant to update the
landscape and visual assessment in the EIA Report, including visualisations and other
Page 78

Page 79

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
3
supporting information in line with currently available technology and good practice.  That
additional information was subject to publication, consultation and neighbour notification in
accordance with the requirements of the 2011 Regulations.  Since updated assessments
had recently been submitted on ecological effects and on effects from noise and vibration, I
did not ask for further updates in relation to these matters.
11. I am required to examine the environmental information, reach a reasoned
conclusion on the significant environmental effects of the proposed development and
integrate that conclusion into my final decision.  In that respect I have taken the following
into account:
 the EIA report submitted to the council on 21 March 2003;
 the additional information submitted to the council in 2021 on ecological effects and
in 2020 on effects from noise and vibration;
 consultation responses from internal and statutory consultees made to the council in
2019 and 2020;
 representations from members of the public made to the council in 2020 and to
DPEA following the appeal;
 the response to my 1 September 2021 request for further evidence;
 responses to my subsequent request for further evidence in relation to noise effects;
and
 the additional information on landscape and visual effects provided by the appellant
at my request, and the subsequent comments on this information following its
publication and notification to neighbours of the site.
Reasoning
12. I am required to determine this appeal in accordance with the development plan,
unless material considerations indicate otherwise.  The development plan comprises the
Glasgow and Clyde Valley Strategic Development Plan and the West Dunbartonshire Local
Plan 2010.  I have not been directed to any provisions of the Strategic Development Plan
as having a significant bearing on the appeal.
13. The council had, following its examination, proposed to adopt a replacement local
development plan in 2016 but ultimately chose not to do so for reasons which are not
relevant to this appeal.  The council has a new 2020 proposed local development plan,
modified after its examination.  The council intends to adopt the 2020 plan but the Scottish
Ministers have directed it not to do so until certain changes (again unconnected to the
appeal proposal) are made to it.
14. In my view the modified 2020 plan, having been found to be suitable for adoption
insofar as it relates to the appeal proposal, can be treated as an important material
consideration and as representing the council’s most recent policy position.  Having never
been adopted and now, in effect, replaced by the 2020 plan by having reached an
equivalent stage, I see little justification for paying regard to the policies of the 2016 plan.
15. Sheephill Quarry lies to the east and northeast of the village of Milton.  It is accessed
from the Dunglass Roundabout on the A82 trunk road, which lies to the south.  There is a
large quarry void, but much of the area which would be extracted under the 1949 consent is
yet to be worked.  This includes most of Sheep Hill itself, which is to the southeast of the
Page 79

Page 80

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
4
current void.  Auchentorlie Wood lies to the south of the quarry, between it and the A82. 
The excambion area covers the northwestern corner of Auchentorlie Wood, with the houses
at Milton Hill lying immediately to the southwest and downhill of this area. 
16. Greenland Farm (in the same ownership as the quarry) lies to the northeast of the
quarry.  To the northwest of the quarry void is the proposed extension area.  The access
track to Greenland Farm, a core path, runs along the northern part of the appeal site.  The
track continues westwards, downhill to join Milton Brae where the houses of most of the
objectors to the appeal are located.
17. The excambion area is 2.33 hectares in size of which, says the appellant, an area of
1.76 hectares would be extracted if it were to be worked.  The size of the extension area is
1.53 hectares with a proposed extraction area of 1.07 hectares.  The appellant advises that,
although less rock could be won from the extension than from the excambion, it would
facilitate the removal of more rock from the main quarry area.  Overall, if there was to be a
‘swap’ the net effect would be that an extra 0.93 million tonnes of rock could be extracted.
18. The council refused permission for the quarry extension, against the advice of its
planning officials, because it was ‘unacceptable because of the effect it would have on the
amenity of the area and the residents of nearby property’.  In responding to the appeal, the
council identifies a number of policies (none of which feature in the reason for refusal) in the
2010 local plan (and in the 2016 and 2020 plans) which it says the development would not
comply with.  This is because of its landscape and visual effects (including on the setting of
the Kilpatrick Hills), loss of high grassland, effects on residential amenity and disruption to
core path users when the core path would need to be closed during blasting.  The council
also identifies amenity concerns should the ownership of Greenland Farm become divorced
from that of the quarry.
19. The appellant argues that there would be no significant landscape, visual,
environmental or amenity effects arising from the proposed quarry extension.  The proposal
fully complies with the development plan.  Its swap with the excambion area would,
although extraction there would be technically feasible, avoid the significant effects on
amenity and natural heritage, and the landscape and visual effects, which would inevitably
be caused by extraction there.  Greenland Farm would remain in the same ownership.
20. To supporters of the appeal it offers the opportunity to exchange the prospect of
extraction at the excambion area, which would bring noise, vibration, dust and other
disruption much closer to their homes at Milton Hill, for extraction at the appeal site which is
much further from any homes and so would have much lesser adverse effects.  They also
point to the adverse ecological effects if the part of Auchentorlie wood (part of a local nature
conservation site) which lies in the excambion area were to be subject to extraction.
21. Objectors to the appeal do not consider that there need be any such swap, and
doubt that the excambion area would ever be worked.  There would be landscape and
visual effects and a loss of residential and wider amenity from extraction in the extension
area.  The new woodland to the north of the extension area, planted since the applications
were considered by the council in 2005, is not referred in the EIA Report, and the 2021
ecological update is said to be insufficient.  The objectors also point to the effects on the
core path and on the operation of neighbouring farmland during blasting.  Bowling and
Milton Community Council shares these concerns, stating also that reducing visitor
numbers to the area would affect local businesses.
Page 80

Page 81

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
5
22. It seems to me that the first issue I must address is whether or not I should consider
the proposed quarry extension on its own merits, or instead consider it as part of a package
along with the accompanying benefits of avoiding certain adverse effects by not extracting
in the excambion area.  In my view it is the merits of the appeal proposal alone which I
should place greatest weight on.
23. This is primarily because the ROMP consent already precludes extraction in the
excambion area.  So the current position is that extraction cannot take place there.  Any
decision I take on this appeal would not change that.  An appeal has in fact now been made
against the condition of the ROMP consent which precludes extraction in the excambion
area.  However I still understand the appellant’s position to be that, if I allow the appeal, it
would not pursue any proposal to extract in the excambion area.  Regardless of my
decision in this appeal, if the ROMP appeal is not withdrawn and requires to be determined
it will be for the reporter appointed for that appeal to decide the case on its merits.
24. The appellant has said that it might seek compensation from the council because the
ROMP conditions now limit the amount of material that could otherwise have been
extracted under the terms of the 1949 consent.  But I deem that to be a matter for the
appellant and the council rather than a prospect (the outcome of which cannot be known)
which has a bearing on the planning merits of the appeal proposal.
25. Therefore, having regard to the provisions of the development plan, the
environmental information before me and the views expressed in the written evidence, the
other main issues I address in this notice are:
 The need for the proposed development
 Landscape and visual effects
 Effects on residential amenity, including due to noise effects
 Effects on core path users
 Ecological effects
The need for the proposed development
26. Policy DC 8 – Minerals of the 2010 local plan presumes against mineral extraction
within or adversely affecting areas which have been identified as important for nature
conservation, landscape conservation or built heritage.  Elsewhere, one of the criteria
against which applications are to be assessed is a justification of the need for the extracted
material within the regional market area.
27. I asked for further evidence on this matter, and take account of the responses
received.  I do not read the above policy as presuming against any mineral extraction in the
green belt.  If that had been the intention, I would expect that to have been stated in more
certain terms.  Green belts are, according to the local plan, to serve a number of purposes
so I think it would be too narrow (and for the reader of the plan it would leave too much to
interpretation) to consider them to be one such ‘area’ listed in the policy.  In any event, I
take account of the ecological, landscape and visual effects of the proposal.  There are no
important built heritage assets which would be significantly affected.
Page 81

Page 82

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
6
28. The Kilpatrick Hills are identified as a Regional Scenic Area in the local plan and
therefore would in my view reasonably be considered to be an area identified for landscape
conservation, applying the terms of DC 8.  I return to landscape and visual effects below.
29. But for the meantime the second part of policy DC 8, including the need for the
material to be extracted, is relevant.  The appellant’s position is that it is the proposed
surrender of the excambion area which establishes the need for the extension area to
replace it.  In the context of the discussions the appellant has had with council officials that
is an entirely reasonable position to adopt.  Although I find above that, for the most part, I
must consider the appeal proposal on its own merits, I do also keep in mind that that
proposed swap was a driver for the making of the extension proposal in the first place.
30. However I do not have any detailed evidence before me from any party as to
whether the landbank (as referred to by the appellant) of consented mineral reserves is
deficient.  Therefore, applying one of the criteria of DC 8 to the proposal before me, the
evidence does not show whether or not there is a need for the appeal proposal ‘within the
regional market area’.
31. The appellant points to a previous appeal decision (PPA-160-2022) at the nearby
Dumbuckhill Quarry.  In that proposal the reporter appears to have accepted a continuing
need for working the quarry without having detailed evidence as to need.  However that
proposal appears to have been, in effect, to work the quarry to a different profile than the
previous consent.  The reporter seems to have been addressing the question of whether it
could be the case that there was no longer a need for the quarry at all.  That is different
from the circumstances of the appeal proposal, which is to extend a quarry.
32. Local plan policy GB 1 Green Belt presumes against development, with certain
exceptions.  One of these is where there is a specific locational requirement and
established need for the development and it cannot be accommodated on an alternative
site.
33. I agree with the appellant insofar as minerals can only be worked where they are
found, so there is a specific locational requirement.  I presume the reference in GB 1 to ‘an
alternative site’ is intended to mean an alternative site outwith the green belt.  I don’t have
information about what other such alternative sites might exist but, in any event, I don’t
think it would appropriate to apply this test to a proposal to extend what is a long
established quarry which provides part of the reserve of construction aggregates for the
wider area.  However, again I find that there is no clear evidence as to whether or not there
is a current need to work the reserves on the appeal site.
Landscape and visual effects
34. Policy E 9 Landscape Character of the local plan says that development in the green
belt must have particular regard to the landscape character and distinctiveness of West
Dunbartonshire and adjoining areas.  Proposals should positively contribute to conservation
or regeneration of these landscapes.  Proposals which are detrimental to the landscape
character will not generally be supported unless they are supported by other local plan
policies.
35. Policy GB 1 Green Belt says that development which has an adverse effect on the
landscape character of the local area will not be permitted.  Green belt policy aims to
Page 82

Page 83

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
7
protect the character, landscape setting and identity of the urban area, particularly where
settlements are at risk of coalescence.  Policy GD 1 Development Control requires
development to respect the character of the area in which it is located.
36. As I explain above, I asked the appellant for updated visualisations and other
material to describe and illustrate the expected landscape and visual effects of the
proposed extension.  The original EIA Report, and indeed the additional information, seek
to assess such effects in combination with the corresponding reduction in overall effects
from the quarry which would be the case if the excambion area is not extracted.
Development of the quarry including extraction of the excambion area is described as the
‘Permitted Development’.  However, as I set out above there is no current consent to
extract in the excambion area.
37. The 2011 Regulations require me to consider the effects of the appeal proposal
alone and in combination with other development.  The most relevant other development in
this case is the extraction of the other parts of the quarry.  Some objectors are critical of the
quality of the updated landscape and visual assessment.  I agree that the visualisations
could perhaps have been rendered in finer detail.  And the analysis does not seem to offer
a view on the significance of the effects of the extension in combination with the
development of the rest of the quarry as currently permitted.  Despite this, I am satisfied
that the updated assessment provides me with sufficient information to reach a view on the
likely significant landscape and visual effects of the development.
38. In respect of landform I accept that the size of the extension area may be quite
modest, but the effects of deep extraction and the formation of terraces would, at the level
of the site itself, be dramatic.  Considering the extension alone I agree with the updated
assessment that the improved grassland landcover of the site is not particularly sensitive.
39. The updated assessment identifies the site as being within an area of rugged
moorland landscape character.  I have not been provided with a map showing the full extent
of this area of rugged moorland.  However the Kilpatrick Hills, which extend for several
kilometres to the north and east, could reasonably be described as rugged moorland of
similar character to the appeal site.  The effects on landscape character of the quarry itself
would be to change that from rugged moorland to a working (and then restored) hard rock
quarry.  However, that effect would be very localised.  Albeit the quarry would be visible
from elsewhere within the Kilpatrick Hills, given the extensive size of this area there would
not be a significant effect on its landscape character or on the landscape setting of the hills.
In this respect I see no significant conflict with policies E 9, GB 1 and GD 1 of the local plan.
40. Turning to visual effects, the updated assessment provides visualisations from eight
representative viewpoints.  Seven of these are in the area to the west and north of the
quarry and at fairly close proximity to it.
41. Viewpoint 8, on the other hand, is on the southern side of the Clyde at Erskine Golf
Club.  Considering the visual effects of the extension alone, the distance from this location
and the screening by Sheep Hill would render the effect insignificant.  But the
photomontage of the extension with the rest of the quarry extracted shows a much greater
magnitude of cumulative effect, which would be significant.  I would observe, however, that
this view directly across the river from the quarry is likely to be have the greatest magnitude
of combined effects from any location on the south side of the river.  Similar views would be
possible from Marr Hall Hotel and, if only glimpsed occasionally through woodland, from the
Page 83

Page 84

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
8
footpaths near this location.  Views of the extension itself are likely to be more appreciable
from further west along the southern shore of the Clyde, for example from the A8 at
Langbank and on the stretch of the road east of junction 31.  Again I think the cumulative
effects would likely be significant from these locations.   
42. It seems that from viewpoint 7, on the A82 at Milton, the extension development
would not be visible.  It would be visible from viewpoint 5, slightly to the north on Milton
Brae.  But the photomontage shows only minor re-profiling at the site in this view, which I
accept would not be significant.  Viewpoint 3 is further north again on Milton Brae.  Although
closer to the site the view of the development is still a partial one, and for only a short
stretch of the road.  I accept that it is below the level of a significant environmental effect.
43. I take a different view in respect of visibility from the core path.  Travelling east from
Milton Brae on the path, views of the extension development would become fuller and
closer.  Albeit the photograph from viewpoint 2 at Mattockhill is cluttered by trees in the
foreground, my judgement from my site inspection is that, walking towards the extension
development in such close proximity the visual effects would be significant, especially if
machinery and activity in the quarry is visible in the view ahead.
44. I think there would also be significant effects for walkers heading west and then
south on the path towards viewpoint 1.  Clear views would seem likely to be available down
towards the extension.
45. I also disagree with the updated assessment about the visual effects from Middleton.
I think that the topographical change where the top of the ridge at the end of the extension
would be lowered would be a significant visual effect.  However I do note that this viewpoint
is not a publicly accessible location.  Even at Viewpoint 6 (Dunbowie) I would say the same
effect would perhaps be significant, albeit this does not appear to be a well-visited or easily
accessible location.
46. It can be seen that I find that, in term of the EIA Regulations, there would significant
visual effects from the appeal proposal, including in combination with the effects of
developing the remainder of the consented quarry.  However the extent of visual effects
from the extension alone would be experienced in a limited number of locations in close
proximity to the site, as I find above.  I do not find these effects to be so severe or
widespread that they would fall foul of the requirements in policies E 9 and GB 1.
47. The site is not within the area identified as the Kilpatrick Hills in policy RSA 1 of the
local plan.  Therefore this policy does not directly apply in this case.
Effects on residential amenity
48. The potential effects on residential amenity from the appeal proposal are noise,
vibration (from blasting) and dust.  The closest receptors are the houses along Milton Brae.
49. Local plan policy DC 8 – Minerals requires that the impact of the proposal on the
amenity of local properties be considered.  As the supporting text to policy DC 8 points out,
Planning Advice Note (PAN) 50 provides advice on controlling the environmental effects of
surface mineral workings.
Page 84

Page 85

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
9
50. In respect of residential amenity, the council’s response to the appeal says the
following:
‘If the proposed development is permitted, there will inevitably be significant noise from the
operation of the extension to the quarry.  That noise will be generated by the working of the
quarry and by the vehicles used to transport the excavated material.  The blasting will lead
to ground borne vibration as well as airborne vibration.  Dust generated at the extension
area is likely to be blown and deposited at the nearby properties. There will be a significant
increase in noise, vibration and dust for properties which are near the area of the
extension.’
Noise
51. Annex A of PAN 50 covers noise (excluding noise from blasting).  It recommends a
model for the prediction of the likely level of noise emissions from proposed minerals
development and a method for setting noise limits for incorporation into planning conditions.
52. Annex A (whilst commenting that each case should be considered on its merits) says
that the nominal daytime limit at noise sensitive properties should normally be 55 dB
(decibels) LAeq,1hr.1  The PAN goes on to state that a lower nominal daytime limit might be
appropriate in quieter rural areas if a limit set at 55dB would exceed the existing
background noise levels by more than 10dB.  This lower level should not normally be below
45dB, since this may be difficult to achieve and such a limit should prove tolerable to most
people in rural areas.  The night-time nominal limit should be 42dB.
53. The appellant’s updated noise assessment makes predictions of operational noise
which are stated to be worst case because they assume plant working at the closest point
and/or highest topographical level to receptors and assume ideal meteorological conditions
for sound propagation.  The background noise levels measured in the earlier 2003 noise
assessment are used.
54. The council’s proposed noise limits for the quarry extension are almost identical to
those specified in the equivalent ROMP condition.  The principal difference is that, at
Middleton, the allowable limit when drilling the upper bench of the extension would be 48dB
rather than the 45dB limit which would normally apply.  The council also confirmed that
these limits are intended to be applied using the LAeq,1hr noise index.
55. My procedure notice asked for further evidence on a number of matters in relation to
noise effects.  Like the Milton Brae residents I remain doubtful that I can place great
reliance on the 2003 Mattockhill noise surveys as an indicator of current background noise
levels at Middleton given the age and short duration of the survey and the distance between
the two locations.  However I accept the point made by the appellant that the measured
noise levels are only marginally above (by 1dB) the level which would result in the lower
45dB noise limit identified in PAN 50 being applied.  This lower limit is indeed used for
1 LAeq is an A-Weighted noise index used to describe the equivalent continuous sound level - the sound level
of a steady sound having the same energy as a fluctuating sound over a period of one hour.  Normal hearing
covers the frequency (pitch) range from about 20 Hz to 20,000 Hz but sensitivity is the greatest between
about 500 Hz and 5,000 Hz. The A-Weighting is an electrical circuit built into noise meters to mimic this
characteristic of human hearing. [Definition adapted from PAN 50 Annex A]
Page 85

Page 86

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
10
Middleton other than when drilling the upper bench of the extension, as noted above.  The
limit applied in the early morning and in the evening would be 42dB.  
56. Noting the worst-case nature of the predictions, the short duration of drilling to the
upper bench, the relatively low limit of 48dB in absolute terms and that the lowest PAN 50
derived limits would apply at all other times, I am satisfied that the overall level of noise
effects experienced at Middleton would not be significantly adverse.  The Milton Brae
residents, in responding to my procedure notice, carefully applied the advice in the
technical annex to PAN 1/2011 Planning and Noise.  Whilst I accept this was a reasonable
exercise to undertake, annex A of PAN 50 remains extant and is the most directly relevant
source of Scottish Government advice relevant to the noise effects from mineral workings.
Both the ROMP noise condition and the council’s proposed noise condition for the appeal
development are based on the advice in the PAN.  I do not see a strong reason to depart
from that advice, which would ensure a consistent approach to both sets of conditions.
57. I also asked about the likely noise effects at properties on Milton Brae closer to the
extension area than Middleton.  In responding, the appellant reproduced the results of
background noise monitoring in this vicinity (undertaken for Dumbuckhill Quarry) which
appear to show that there is a higher level of background noise further south along Milton
Brae than at Middleton.  The conclusion that noise from the quarry extension would, at
these locations, be well below (even when drilling) the PAN 50 derived limits appears
reasonable, and it has not been challenged by any other party.
58. At Greenland Farm, predicted noise levels from the proposed extension are below
the background noise measurements used in the assessment, and also below the upper
PAN 50 55dB limit which would apply.  Noise levels from the extension would also be below
background levels at the two other proxy receptors – 9 Milton Hill and Auchentorlie.
59. I do not find that the updated noise assessment is inconsistent with the advice in
Annex A of PAN 50.  Ultimately, subject to the proposed noise condition which sets noise
limits which I find to be appropriate and with which the quarry operations must comply,
council environmental health officers did not object to the proposal.  The statement in the
council’s response to the appeal is a very generalised one which does not draw support
from or refer to either the technical evidence on noise or the advice of its own officials.  I
take note of the evidence from the Milton Brae residents but I do not think that it identifies a
likelihood of significant adverse noise effects.  Overall, I find no conflict with policy DC 8.
Vibration 
60. The council proposes a number of conditions which would control blasting in the
extension area, identical to those now imposed in the ROMP permission.  Proposed
condition 12 would require that ground vibration from blasting does not exceed a peak
particle velocity of 6 mm/s in 95% of all blasts (with no individual blast to exceed 12 mm/s)
as measured at any nearby vibration sensitive property.  These limits are in accordance
with the advice in the February 2000 Annex B of PAN 50.  There would be no blasting
outwith the hours of 10am to 4pm, nor on weekends or bank holidays.
61. Other than at Middleton Farm, predicted vibration levels from the extension would be
below those predicted from working the other parts of the quarry.  Albeit there are no
predictions for the closer properties on Milton Brae, the predictions for Middleton (a mean of
2.1 mm/s) are much lower that than that required by the condition.  There is no technical
Page 86

Page 87

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
11
evidence before me which indicates that blasting from the extension area would cause
vibration at problematic levels for any nearby properties.  Therefore it does not appear likely
that the vibration levels in the proposed condition would be breached.  In the event that they
were breached the condition would itself provide a means to address this.   Therefore I do
not find any conflict with the requirements of policy DC 8.
Dust
62. PAN 50 does not provide any recommended limits for dust deposition as it does for
levels of noise and vibration.  There is no detailed evidence to the effect that dust from the
proposed extension would cause a significant effect at any nearby properties, and no
objection from the council’s environmental health officials.  Conditions 17 and 18 (identical
to the equivalent conditions in the ROMP consent) would aim to ensure the extension area
is operated so as to minimise the release of dust.  Therefore I do not find any conflict with
the requirements of policy DC 8.
Greenland Farm
63. The council identifies a particular concern about amenity at Greenland Farm should
its ownership become divorced from that of the quarry.  The appellant says that would not
happen whilst the quarry remains operational but I do not take that as a guarantee.  I note
that the applicant’s recycling business already seems to make use of land at the
farmhouse.  Of more direct relevance, the existing quarry is already fairly close to the
farmhouse.  The proposed extension would not take extraction closer to the house than the
existing quarry void, indeed extraction would proceed westwards, generally away from the
house.  Therefore I do not find there to be a strong basis for concerns about any significant
effects on residential amenity at Greenland Farm.
Effects on core path users
64. One of the criteria identified in Policy DC 8 Minerals of the 2010 local plan is impacts
on ‘sport and recreation interests’, which could include impacts on path users.
65. The quarry extension at its northwestern edge would come close to the core path.
However the extraction area would be set back so that for the most part there would be no
direct conflict with path users.  The exception to this would be when blasting was taking
place, when the path would have to be closed before and during each blasting event.
66. The appellant advises that blasting at the quarry takes places about once a month,
and that this involves closure of the path for about twenty to thirty minutes.  It is stated that
this would continue to be required even without the extension.  The proposed conditions on
blasting would avoid closure of the path in the evenings, weekends and public holidays
when one might expect greatest use would be made of it.
67. I acknowledge that there might be increased levels of noise and dust for path users
in the vicinity of the proposed extension, but this would only be for a fairly short stretch of
path and I do not think this is likely to be a significant deterrent to users of the path.  Annex
A of PAN 50 advises (paragraph 42) that footpaths should not normally be regarded as
noise-sensitive.  I identify above the significant visual effects from stretches of the path but I
do not think these would be so severe or extensive so as to create any significant conflict
with policy DC 8.
Page 87

Page 88

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
12
Ecological effects
68. Policy E 1 Biodiversity Duty in the local plan says that the council will further the
conservation of biodiversity when exercising its planning functions.  Reference is made to
the biodiversity duty placed on the council by the Nature Conservation (Scotland) Act 2004.
Policies GD 1 and DC 8 require effects on the natural environment to be taken into account.
69. Chapter 8 of the EIA Report covers ecology.  The appellant’s Phase 1 habitat survey
identified the appeal site as semi-improved acid grassland and scattered bracken and being
generally of low ecological value.
70. The appellant’s ecological update, following a further site walkover in 2021, noted
that the habitat type and management of the land had not changed since the original
survey.  No signs of badger were found (consistent with the findings of a previous badger
survey in 2004).  The only sensitivity noted in the update report is the need to take account
of any effects on ground nesting birds, depending on when the site is first cleared.  This
could be controlled by a planning condition.
71. In responding to the appeal the council refers to a loss of ‘high grassland’.  Like the
appellant, I am not familiar with this descriptor.  I agree with the appellant that the semi-
improved grassland and areas of scrubby bracken on the site are of no notable ecological
value.  Objectors are critical of the brevity of the ecological update.  However I am satisfied,
given the lack of change of the habitats on the site, that it is sufficient to enable me to
determine the effects of the development.  All told, the low ecological value of the site
means that I am satisfied that the above policy requirements would be met.  There would
be no significant effects on biodiversity.
Other matters
72. Objectors identify that agricultural operations in the farmland to the west of the
extension would be affected by the proposed extension.  However this farmland already lies
close to the working quarry and I do not see a strong reason for believing that there would
be significant conflict between such uses.  The community council is concerned about loss
of visitors to the area but I do not consider that extending the quarry, despite the effects I
identify, would be likely to have a significant effect in this regard.
73. The appellant’s appeal statement states that the western quarry faces are
excessively high and that developing the extension area would be beneficial in ensuring
safe and stable slopes.  However I have not been provided with any detailed evidence
which would allow me to take great account of any such benefits.  It has not been put to me
that the quarry would otherwise be unsafe, or that further working of the quarry would be
the only means to address this issue.
74. Objectors note that there would be a financial benefit to the appellant in working the
extension area instead of the excambion area, since overall more minerals could be
extracted in the former situation rather than the latter.  I find above that my primary concern
must be with the effects of the appeal proposal on its own right.  I do not consider that any
financial benefit for the appellant is a material consideration counting against the proposal.
Page 88

Page 89

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
13
75. The EIA Report assesses other impacts relating to hydrology and hydrogeology,
access and traffic, cultural heritage, climate and material assets.   The council did not
identify any such impacts in its reasons for refusal and, subject to the imposition of
appropriate conditions, I am satisfied that no additional significant environmental effects
would occur.
Conclusions
The development plan
76. Drawing on my findings above, in respect of the statutory development plan I find
that there is a lack of detailed evidence as to the need for the extracted material within the
regional market area.  There is therefore some tension with policy DC 8 Minerals, albeit the
need for the development is one of several considerations – the policy does not explicitly
state that a need for the development must be demonstrated.  For the same reason there is
some tension with policy GB 1 Green Belt.
77. The only significant environmental effects which I identify (and in this respect I
disagree with the EIA report and subsequent updated landscape and visual assessment)
are the visual effects of the extension from some locations, including cumulative effects with
the extraction of the remainder of the quarry.  However I do not find that these give rise to
significant conflict with the development plan.
78. In respect of the other main issues I identify, I conclude that there would be no other
significant environmental effects and no conflict with the development plan.  Overall, on
balance I find the proposal to be in accordance with the development plan.
Other material considerations
79. As I state at paragraph 15 above, I consider the proposed 2020 local development
plan, as modified, to be an important material consideration in this case.
80. In respect of the need for the development, I note that policy MIN 1 Minerals and
Aggregates Extraction in the 2020 plan does not require evidence that there is a need or
market demand for a proposal to extract minerals.  This provides some counterweight to the
tension with the local plan policies which look for such evidence.
81. The policy provision in the 2020 plan have similar aims to the 2010 local plan in
respect of the protection of residential amenity, nature conservation and path networks.  In
light of my findings above, I see no significant conflict with the 2020 plan in these respects.
82. The policies in the 2020 plan also seek very similar outcomes in respect of
landscape character.  However policy MIN1 is more explicit in identifying visual impacts as
a consideration, saying that there should be ‘no significant negative impact on landscape,
including visual impact’.
83. I identify above certain visual effects which I deem, in terms of the EIA Regulations,
to be significant environmental effects.  However that is a different undertaking from the
application of planning policy to a development proposal.  The visual effects of the
proposed extension alone are very localised, and such effects are to be expected from
most mineral developments.  The cumulative effects are greater in extent, but the extension
Page 89

Page 90

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
14
proposal makes only a modest contribution to these.  Any tension with the requirements of
policy MIN 1 are not sufficient to outweigh my finding that the proposal is in overall
compliance with the statutory development plan.
84. I take note of all the representations made to the council and to DPEA, both in
support of and in opposition to the development.  In the former category, many of the
representations point to the adverse effects of extraction in the excambion area.  These
effects are not ones which I can consider in any detail in this appeal, and they do not affect
my conclusions on the effects of mineral extraction on the appeal site.
Overall conclusion
85. Overall, I conclude, for the reasons set out above, that the proposed development
accords with the relevant provisions of the development plan and that there are no material
considerations which justify refusing to grant planning permission.  I have considered all
other matters raised, none of which lead me to alter my conclusions.  I am satisfied that my
reasoned conclusions on the significant environmental effects of the proposed development
are up to date.
86. Accordingly, I will defer determination of this appeal for a period of up to twelve
weeks to enable the relevant planning obligation (either an agreement with the planning
authority or a unilateral obligation by the appellant under section 75 of the Town and
Country Planning (Scotland) Act 1997 or some suitable alternative arrangement as may be
agreed by the parties) to be completed and registered or recorded, as the case may be,
securing a bond sufficient to cover the expected restoration and aftercare works for the
quarry extension.  The principal of such a bond had been agreed by between the appellant
and council officials, and I agree that it is necessary to ensure that the quarry extension site
is restored after it has been worked.  If, by the end of the twelve week period, a copy of the
relevant obligation with evidence of registration or recording has not been submitted to this
office, I will consider whether planning permission should be refused or granted without a
planning obligation.
87. The council provided a set of proposed conditions to be imposed should the appeal
be allowed.  These are very similar to the ROMP conditions for the main part of the quarry.
For the most part I propose to impose those conditions, giving much the same reasons as
the council gave for the ROMP conditions.  I have amended proposed condition 5 to better
match the equivalent ROMP condition.  The council’s proposed conditions 19 and 20 relate
to the main quarry road and to wheel washing of vehicles leaving the quarry.
Notwithstanding the council’s view, I do not think they are necessary for the appeal
development, and I would omit them.  I am not aware of any statutory requirement that the
proposed development need commence within two years, therefore I would omit the
council’s proposed first condition.  If there is such a statutory requirement, this would
endure regardless of the omission of the condition.  I have amended Table A – Noise
Criteria for condition 4 to clarify what noise index is to be used.  I have made slight
adjustments so that the numbering of equivalent conditions for the extension and the main
quarry are aligned.
David Liddell
Reporter
Page 90

Page 91

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
15
Schedule 1: Proposed Conditions
1. [Not used]
2. The development hereby approved shall endure until 21 February 2042 and at the
end of the period of permission all quarrying operations, including the crushing of rock and
the transfer of aggregates from the site, shall cease.
Reason: In order that the timeframe of this permission aligns with that of the main quarry.
3. Subject to the details specified in subsections 3(a)-3(b) below, the normal daytime
operating hours for the quarry shall be 0600 hours to 2200 hours daily and no operations
other than emergency works, water pumping, servicing, maintenance and testing of plant
shall take place outside these hours.
3(a)  Outwith 0700 hours to 1900 hours Monday to Friday and 0700 hours to 1400 hours
on Saturday and Sundays, with the exception of haulage vehicles entering and leaving the
site, all operations shall be undertaken below ground level within the quarry void.
3(b)  Loading and despatch of aggregates for specific contracts may be undertaken
outwith the specified hours where no less than 24 hours written notice (excluding weekend
days and public holidays) has been given to the Planning Authority.
Reason: To retain control over future quarrying operations of the site, in the interests of the
amenity of the area.
4. Noise attributable to the operators at Sheephill quarry shall not exceed the limits
specified in Table A (Noise Criteria) attached to this permission at Greenland Farm,
Auchentorlie House, No. 9 Milton Hill, and Middleton.
Reason: To minimise noise nuisance, in the interests of the amenity of the area.
5. Advance notification of a minimum of 48 hours for the relaxation of the noise limits
identified in condition 4 above for soils and overburden operations to be undertaken shall
be given to the Planning Authority.
Reason: To retain control over the future operations on site, in the interests of amenity of
the area.
6. The applicant shall undertake a noise monitoring programme at the locations as
described in condition 4 above and the frequency and times of such monitoring shall be
agreed by the Planning Authority and the results shall be submitted in writing to the
Planning Authority on a frequency to be agreed with the Authority.  The noise monitoring
shall be carried out in accordance with the methods specified in PAN50: Annex A - The
Control of Noise at Surface Mineral Working and in so far as is reasonably practical, the
operation shall ensure that the best practice methodologies set out in PAN50 are adopted.
Reason: To limit noise nuisance, in the interests of the amenity of the area
7. Blasting operations shall be carried out between 1000 and 1600 hours Monday to
Friday, with no blasting permitted at weekends and on public holidays and the quarry
Page 91

Page 92

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
16
operator shall endeavour to ensure that, as far as is practicable, blasting shall be carried
out between 1000 and 1300 hours.
Reason: To limit the impact of noise nuisance, in the interests of the amenity of the area.
8. Prior to the commencement of blasting operations details of the methods employed
to minimise air overpressure from blasting operations shall be submitted to the Planning
Authority for written approval.  All blasting operations shall take place only in accordance
with the scheme as approved or with such subsequent amendments as may receive the
written approval of the Planning Authority.
Reason: In order to control noise nuisance, in the interests of the amenity of the area.
9. Notwithstanding the requirements of condition 7 and 8 above, if as a result of any
emergency situation or need to ensure safe quarry practices, blasting is required to take
place outside the specified hours, the times and reasons for such an event shall be notified
in writing to the council’s Environmental Health Service within two days of the occurrence.
Reason: In order to control noise nuisance, in the interests of the amenity of the area.
10. Within four weeks of the date of this approval, the operator shall submit a blast
monitoring scheme that will record all blasts within the quarry area, with the monitoring
points to be set at locations to be agreed by the Planning Authority.
Reason: In order to control noise nuisance, in the interest of the amenity of the area.
11. The operator shall monitor all blasts and records shall be maintained so that peak
particle velocity can be identified and these records shall be made available for inspection
by any authorised party during office hours at the quarry with copies being supplied to the
Planning Authority on a three monthly basis.  In the event that recorded values exceed the
agreed level the operator shall notify the Planning Authority of the event within one working
day and shall provide an assessment of its implication with respect to future blasting activity
and the site’s vibration limit.
Reason: In order to control noise nuisance, in the interest of the amenity of the area.
12. Ground vibration as a result of blasting operations shall not exceed a peak particle
velocity of 6 mm/s in 95% of all blasts measured over any period of twelve months and no
individual blast shall exceed a peak particle velocity of 12 mm/s as measured at any nearby
vibration sensitive property.  The measurement shall be the maximum of three mutually
perpendicular directions taken at the ground surface at any vibration sensitive building; all
to the satisfaction of the Planning Authority.
Reason: In order to control noise nuisance, in the interest of the amenity of the area.
13. Blasting shall be carried out using the best practicable means available to ensure
that the resultant noise, vibration and air overpressure are minimised in accordance with
current British Standards and Mineral Guidelines and the best practice methodologies as
set out in PAN 50.
Page 92

Page 93

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
17
Reason: In order to control noise and vibration nuisance, in the interest of the amenity of
the area.
14. For the duration of this permission and up to the completion of all aftercare works
warning signs shall be erected and maintained by the operator next to all publicly
accessible areas within or adjacent to the quarry.  Details of the locations of these signs
shall be submitted to and approved by the Planning Authority.
Reason: To allow safe access, in the interests of public safety.
15. Blasting shall only be carried out after suitable audible and visible warnings have
been given and the method of such warnings shall be submitted to the Planning Authority.
Thereafter the approved warnings shall be given in writing by the operator to the occupiers
of all the properties around the site.
Reason: In the interests of public safety.
16. The operator shall ensure that the Council’s Environmental Health Service be given
a minimum of 48 hours email notification, excluding weekends and public holidays, before
every blast at the quarry.
Reason: In order to provide adequate notice for Environmental Health Service to allow the
monitoring of blasting operations.
17. The quarry operator shall ensure that all operations are controlled so as to prevent or
minimise the release of dust into the atmosphere and the dust mitigation measures listed in
the Environmental Statement shall be implemented and in a method which ensures that the
best practice methodologies as set out in PAN50 are adopted.
Reason: In order minimise dust from the quarry operations, in the interests of the amenity of
the area.
18. Visual assessments of dust emissions from all plant and operations shall be made at
least once per day during operations and remedial actions taken as may be required.  The
operator shall maintain a diary of weather conditions, visual assessment of dust and any
mitigation measures implemented on a daily basis.  The diary shall also record any
complaints relating to dust, any investigations undertaken in respect of complaints and any
remedial actions undertaken as a result of the investigation.  The diary shall be retained on-
site and made available to the Planning Authority on request.
Reason: In order minimise dust from the quarry operations, in the interests of the amenity of
the area.
19. [Not used]
20. [Not used]
21. Within three months of the date of this consent an updated plan and programme of
the anticipated phasing of the extension quarry operations shall be submitted and approved
by the Planning Authority.  Any changes to the approved phasing programme and plan shall
be notified and approved by the Planning Authority.
Page 93

Page 94

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
18
Reason: To retain control over future quarrying and operations of the site, in the interests of
the amenity of the area
22. The methods of working within the quarry shall be as described within the
approved documents forming part of this consent and any changes to the operating
procedures or methods shall be submitted to and approved in writing by the Planning
Authority and shall be implemented as approved.
Reason: To retain control over future quarrying and operations of the site, in the interests of
the amenity of the area.
23. The topsoil and subsoils to be removed shall be stored as described in the
applicant’s written submission and shall be retained on site for eventual reuse as part of the
restoration works as described in condition 31.
Reason: To retain control over materials for the future restoration on site.
24. If it becomes necessary to relocate any of the existing or new soil storage mounds
within the site then such soils cannot be relocated until the Planning Authority gives written
approval of the new storage locations and methods of storage.
Reason: To retain control over materials for the future restoration on site.
25. If it becomes necessary to relocate the mineral stock piles from the location indicated
in the applicant's submission, then such relocation cannot take place until the Planning
Authority gives written approval of the new storage locations and methods of storage.
Reason: To retain control over the future operations on site, in the interests of amenity of
the area.
26. Details of any boundary walls and fences to be erected for the full extent of the
application site shall be submitted to and approved in writing by the Planning Authority and
shall be implemented as approved.
Reason: To retain control over the future operations on site, in the interests of the amenity
of the area.
27. No materials shall be imported to the site for the purposes of storage, crushing,
screening, processing, manufacturing or onward transportation.
Reason: To retain control over the future operations on site, in the interests of amenity of
the area.
28. Any chemical, oil or diesel storage tanks installed within the application site shall be
sited on impervious bases and surrounded by impervious bunded walls and the bunded
areas shall be capable of containing 110% of the tank volume and should enclose all fill and
draw pipes.
Reason: To prevent environmental pollution, in the interests of public safety.
Page 94

Page 95

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
19
29.  All artificial lighting units installed at the quarry shall have a purpose and shall be so
sited and directed as to minimise the potential for light pollution and glare outside the quarry
boundary. 
Reason: To prevent light pollution, in the interests of the amenity of the area 
30.  No later than six months after the permanent cessation of quarrying or the date set
by condition 2 above, whichever is the sooner, all buildings, plant, machinery and areas of
hardstanding including the internal access roads shall be removed and the ground
reinstated in accordance with the conditions of this permission relating to restoration. 
Reason: In order to retain effective control over quarry operations, in the interest of the
amenity of the area. 
31.  Within six months of the date of this consent, a restoration masterplan for the whole
of the quarry area and including details of the restoration or replanting of dilapidated
features such as boundary hedges and drystone dykes, as well as details showing how
recreational access and links to the local path network would be achieved, along with
details of aftercare and afteruse, shall be submitted to and approved in writing by the
Planning Authority.  This shall include how the restoration of the extension area is
integrated within the overall restoration proposals of the full quarry area. 
Reason: To ensure the satisfactory restoration of the quarry site. 
32.  Not later than two years before the expiry of this permission or permanent cessation
of quarrying, whichever is the sooner, a detailed final restoration scheme for the site
including aftercare and maintenance shall be submitted for the written approval of the
Planning Authority.  The approved scheme shall be implemented before the expiry of this
permission. 
Reason: To ensure the satisfactory restoration of the quarry site. 
33.  The restoration scheme approved under the terms of condition 32 above shall
include a bird hazard management plan to be approved in writing by the Planning Authority
in consultation with Glasgow Airport.  The submitted plan shall include details of the design,
maintenance and management of any water bodies and wetlands to minimize birdstrike
hazard. 
Reason: To ensure restoration proposals do not cause operational issues for Glasgow
Airport. 
34.  The restoration scheme approved under the terms of condition 32 above shall be
implemented and the works completed within twelve months of the completion of all
quarrying operations or the date stated in condition 2 above, whichever is the sooner. 
Reason: To ensure the satisfactory restoration of the quarry site. 
35.  In the event that during the life of this permission mineral extraction ceases for a
continuous period in excess of two years or the use is discontinued for a like period, then
unless as may otherwise be agreed in writing by the Planning Authority, within six months
of either event occurring, a revised final restoration scheme that modifies and updates that
Page 95

Page 96

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a
20
approved by condition 32 above, shall be submitted for the written approval of the Planning
Authority, including any modifications as may be required, detailing the steps to be taken to
restore the site.
Reason: In order to retain effective control of the future restoration of the quarry site and to
ensure an acceptable restoration scheme.
36. Within six months of being approved any revised restoration scheme that may have
been required under the terms of condition 35 above shall be implemented and the works
completed.
Reason: In order to retain effective control of the future restoration of the quarry site.
37. The approved aftercare scheme shall be implemented following cessation of mineral
extraction and in accordance with the approved timetable as required by condition 35
above, unless as may otherwise be agreed in writing by the Planning Authority.
Reason: To ensure the satisfactory restoration of the quarry site.
38. Within twelve months from the date of this permission, and thereafter at twelve
monthly intervals, the applicant shall submit a plan to a scale of not less than 1:2500
indicating the progress of quarrying operations.  The plan will indicate the current position of
the extraction areas, the extent of spoil disposal and any landscaping or restoration works
that have been implemented.
Reason: In order to retain effective control of quarry operations in the site, in the interests of
the amenity of the area.
39. Prior to any tree felling work taking place, all trees that require to be felled shall be
inspected by an experienced bat surveyor to check for the presence or otherwise of bats.  If
bats are found then no tree felling work shall take place until the relevant licence is
obtained.
Reason: In the interests of protecting wildlife species.
40. The applicant shall ensure that the footpath from Milton Brae via Greenland
Farm to Loch Humphrey, where it passes close to the quarry, is kept open to the public
(other than during any times of blasting in the quarry) or that an alternative appropriate
footpath is provided.
Reason: In order to allow safe access, in the interests of public safety.
41. No development shall commence on the extension area, including any soil stripping,
until an updated ecological survey has taken place.  The ecological report shall be
submitted to and approved by the Planning Authority.  In the event of any protected species
being identified no works shall be undertaken within the identified area until appropriate
mitigation measures have been submitted to and approved by the Planning Authority and
the approved mitigation measures implemented on site.
Reason: In order to protect wildlife in the interests of the amenity of the area.
Page 96

Page 97

PPA-160-2034 
Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
www.gov.scot/policies/planning-environmental-appeals/ abcdefghij abcde abc a 
21
42.  No development shall take place within the development site until the developer has
secured the implementation of a programme of archaeological works in accordance with the
written scheme of investigation which has been submitted for approval of the Planning
Authority.  Thereafter the developer shall ensure that the programme of archaeological
works is fully implemented and that all recording and recovery of archaeological resources
within the site is undertaken to the satisfaction of the Planning Authority in consultation with
West of Scotland Archaeology Service. 
Reason: In order to protect any archaeological heritage/ features within the site. 
Table A – Noise Criteria – Condition 4 
Receptor  Noise Criteria 
Extension 
Soils and
overburden
handling*
Routine
operations
Including drilling
Routine
operations 
Out of hours
operations**
Milton Hill 70 55 55 42
Greenland 70 55 55 55
Middleton 70 48# 45 42
Auchentorlie 70 49 49 42 
All figures are in decibels LAeq,1hr
* For a period of up to eight weeks in any twelve month period. The temporary works shall
not start until 0800 hours and not on Sundays or Bank Holidays.
# Only when drilling to upper bench, 45dB for all other benches.
** Out of hours operations are those outwith 0700 hours to 1900 hours Monday to Friday and
0700 hours to 1400 hours on Saturday, and include Bank Holidays. 
Schedule 2:  Application drawings 
Figure 1 - Site Location Plan, 20 March 2003
Figure 2 - Existing Topography, 20 March 2003
Figure 3 - Development Plan, 20 March 2003
Figure 4 – X-Section, 20 March 2003
Figure 5 - Excavation Boundary Following Excambion, 20 March 2003
Figure RevRest0404 – Indicative Restoration Plan, 7 April 2004
Figure SH04/04a – Excavation Boundary Following Excambion, 7 April 2004
Figure SH04/04b - X-section B, 7 April 2004 
Page 97

Page 98

Page 98

Page 99

WEST DUNBARTONSHIRE COUNCIL
Report by the Chief Officer - Regulatory and Regeneration
Planning Committee:  8th June 2022
___________________________________________________________________
Subject: Street name for new housing development site at Former Bowling
Green John Knox Street Clydebank 
1. PURPOSE
1.2 To allocate one street name within the new housing development at former
Bowling Green, John Knox Street, Whitecrook, Clydebank.
2. RECOMMENDATIONS
2.1 It is recommended that Pavillion Court is the street name.
3. BACKGROUND
3.1 Permission was granted for erection of three storey block of flats, comprising 18
units and associated parking/open space on the site of the former Bowling
Green, John Knox Street, Whitecrook, Clydebank. Vehicular access to the site is
off the existing John Knox Street.
4. MAIN ISSUES
4.1 The street name proposed for consideration is Pavillion Court. The name is
derived from the existing Bowling Pavillion which lies to the south-east of the
former bowling green. The club had two bowling greens and the development
relates to the green that is located furthest away from the Pavillion. Pavillion
Court is suggested as the street name. The name proposed meets the
requirement of the Council’s Street Naming Policy.
5. PEOPLE IMPLICATIONS
5.1 There are no people implications.
6. FINANCIAL IMPLICATIONS
6.1 There are no financial implications.
7. RISK ANAYSIS
7.1 There are no known risks to the Council.
8. EQUALITIES IMPACT ASSESSMENT (EIA)
ITEM 8
Page 99

Page 100

8.1 None.
9. CONSULTATION
9.1 As part of the Council’s Street Naming Policy Clydebank East Community
Council and the elected members for Clydebank Waterfront (Ward 6) have been
consulted on the suggestion of Pavillion Court. No comments have been
received at  the time of writing the report.
10. STRATEGIC ASSESSMENT
10.1 This proposal does not impact on any of the Council’s strategic priorities.
Peter Hessett
Chief Officer – Regulatory and Regeneration
Date: 8th June 2022 
Person to Contact: Pamela Clifford, Planning & Building Standards Manager
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendices:  Site plan.
Background Papers: Street Naming and Numbering Policy 
Wards Affected: Ward 6 – Clydebank Waterfront
Page 100

Page 101

Pavillion Court
Page 101

Page 102

Page 102

Page 103

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 8th June 2022
_____________________________________________________________
Subject: Developer contributions
1. Purpose
1.1 To seek the agreement of the Committee for a process to report and
allocate developer contributions received through the planning system.
2. Recommendations
2.1 It is recommended that the Committee agree the proposed procedures for
managing developer contributions set out in Appendix 1 and the criteria for
the allocation developer contributions towards green network and green
infrastructure projects/enhancement as set out in Appendix 2.
3. Background
3.1 The Council’s Local Development Plan and Supplementary Guidance sets
out standards for the provision of new open space and other green
infrastructure within new developments. For new residential development
the option exists, in prescribed circumstances, for a financial contribution to
be made towards open space, or other green network, provision/
enhancement in an off-site location rather than providing on site.
3.2 Developer contributions can also be received for other reasons such as for
off-site car parking provision or sustainable access measures.
4. Main Issues
4.1 Whilst the Local Development Plan and associated Supplementary
Guidance on Green Network and Green Infrastructure sets out the
circumstances under which developer contributions will be collected as
well as the level of developer contributions, these documents do not set
out the procedures for how these funds will be managed and reported, or
the types of projects that the funds will be allocated towards. The reason
for this is that these are matters that may need to be more frequently
reviewed than the Local Development Plan and Supplementary Guidance.
ITEM 9
Page 103

Page 104

Procedures for monitoring, requesting and allocating developer
contributions
4.2 The proposed procedures are attached as Appendix 1. These set out that
the Council will maintain a database recording the development sites from
which developer contributions have been received and what projects the
contributions have been spent on or allocated to. After the end of each
financial year a report will be brought to the next appropriate Planning
Committee detailing funds received and how these have been
spent/allocated. Council service areas wanting to make use of developer
contribution funds will complete and submit a pro-forma to the Planning,
Building Standards and Environmental Health Manager or representative
who will consider the request. On completion of an approved project, a
project completion pro-forma will be submitted setting out how developer
contribution funds have been used.
Allocation of developer contributions towards green network and green
infrastructure projects
4.3 The proposed allocation process is attached as Appendix 2. This sets out
three considerations the Planning Service will take into account in
allocating developer contribution funding. These are:
• Proximity to the site from which the developer contribution has been
received;
• Deliverability of project;
• Eligible project types – this section includes the details of strategic and
local green network and green infrastructure projects that may be
suitable for contributions.
4.4 With regard to proximity, the first considerations will be the distance of the
project from the development site, with the first preference for the project
site to be within 250 metres of the development site as this aligns with the
accessibility standard set out in the Green Network and Green
Infrastructure Supplementary Guidance. Second preference will for the
project site to be within 800 metres of the development site as this aligns
with the 20 minute neighbourhood approach. Beyond these preferences
the Planning Service will consider projects within the same community
council area, then the same electoral ward, then the same locality planning
area as the development site. The option also exists for any projects within
the West Dunbartonshire Council area to be considered. All projects
funded by developer contributions should be of benefit to the residents of
the site from which the contribution has been received, meaning that the
further the project site is from the development site, the more strategic in
nature the project or the location of the project should be.
Page 104

Page 105

4.5 With regards to deliverability, it is important for the operation of the
developer contribution process that contributions are spent and projects
are delivered. For this reason projects will be delivered by the Council or in
close partnership with the Council (including through the Participatory
Budgeting process), or by the developer from which the contribution has
been received. Also, any contribution received from April 2022 will be
required to be spent within 10 years from the date the contribution is
received, after which the contribution will be returned to the developer.
Eligible project types
4.6 The Local Development Plan (LDP2) sets out the types of green network/
green infrastructure projects towards which developer contributions will be
directed. These are:
• Playparks and sports pitches
• Allotments and community gardens
• Biodiversity improvements
• Environmental improvements
• Path and access improvements
• Woodland management and planting
• Strategic green network projects
4.7 Appendix 2 identifies some specific projects that would fall within these
categories and would be suitable for receiving developer contributions.
Status of developer contributions at 31 March 2022
4.8 In line with the procedures set out in Appendix 1 (and previously approved
procedures), information is provided below in relation to developer
contributions received and spent. For completeness and to provide a
baseline record, all transactions through the developer contribution fund
since 2007 are summarised below. In future years, reporting will cover
contributions received and spent/allocated in the previous financial year.
Financial year Contributions
received
Contributions spent
2007-March 2017 £620,882.23 £363,798.24
April 2017-March 2018 £40,480 £0
April 2018-March 2019 £22,382.91 £0
April 2019-March 2020 £34,876.44 £12,000
April 2020-March 2021 £267,595.00 £50,000
April 2021-March 2022 £24,289.23 £0
Current balance £584,706.87
4.9 Of the current balance £325,000 is allocated or earmarked as follows:
Page 105

Page 106

• £200,000 for sustainable access improvements for the Golden Jubilee
Hospital in Clydebank
• £50,000 for pocket park at Dumbarton Waterfront (already delivered)
• £50,000 for improvements to Christie Park, Alexandria
• £25,000 for green network improvements at Faifley Knowes,
Clydebank
• In principle support for eligible participatory budgeting projects
4.10 Previously supported projects include improvements to East End Park and
Posties Park in Dumbarton, and Goldenhill Park and Melfort Park in
Clydebank.
5. People Implications
5.1 There are no people implications associated with this report.
6. Financial and Procurement Implications
6.1 The proposed procedures will ensure that developer contributions received
are managed, reported and spent in an orderly and transparent manner.
Local government procurement rules will be followed for any projects being
delivered by the Council using developer contributions funds.
7. Risk Analysis
7.1 There are no risks associated with this report.
8. Equalities Impact Assessment (EIA)
8.1 The policy requires that equality issues should be considered in the
identification and design of projects making use of developer contribution
funding.
9. Consultation
9.1 No consultation is required in relation to this matter.
10. Strategic Assessment
10.1 This report has no direct impact on the Council’s strategic priorities.
Peter Hessett
Chief Officer – Regulatory and Regeneration
Date: 8th June 2022
_________________________________________________________________
Page 106

Page 107

Person to Contact: Pamela Clifford, Planning & Building Standards
Manager
pamela.clifford@west-dunbarton.gov.uk
Alan Williamson, Development Planning & Place Team
Leader
alan.williamson@west-dunbarton.gov.uk
Appendix: 1. Procedures for monitoring, requesting and allocating
developer contributions
2. Allocation of developer contributions towards green
network and green infrastructure projects
3. Equalities impact assessment
Background Papers: West Dunbartonshire Local Development Plan (2020)
Green Network and Green Infrastructure
Supplementary Guidance (2022)
Wards Affected: All
Page 107

Page 108

Page 108

Page 109

Appendix 1
Procedure for monitoring, requesting and allocating developer contributions
1. The Council’s Planning Service will maintain a database for recording
developer contributions. This will record the development site they were
received from and the projects they were spent on or are allocated to be spent
on.
2. After the end of each financial year, a report will be prepared for the Planning
Committee detailing developer contributions received and where they have
been spent or are proposed to be spent. This report will relate to funds currently
held and projects being or still to be delivered. This report will also offer the
opportunity for the system set out in this document  to be reviewed and for the
criteria for identifying eligible projects to be reviewed (for example as set out in
“Allocation of developer contributions towards green network and green
infrastructure projects”)
3. Any Council service or partner organisation which wishes to make use of the
green network/green infrastructure developer contribution fund should have
regard to the “Allocation of developer contributions towards green network and
green infrastructure projects” paper and make a request for funding by
completing the attached project request pro-forma. Requests for use of other
types of developer contributions received e.g. commuted sums for parking
should also be submitted on the pro-forma. The request will then be considered
by the Planning, Building Standards and Environmental Health Manager or
representative.
4. Should the project be approved by the Planning, Building Standards and
Environmental Health Manager or representative agreement will be reached on
the timing of transfer of funds to the delivery partner.
5. On completion of the project, the delivery partner will be required to submit a
project completion pro-forma setting out the final project cost and detailing
when the work was physically completed, and the final monetary total for the
project. This report will be kept on the Developer Contribution System for that
particular project. Any underspend of developer contribution funding will be
returned to the developer contribution account, and linked again to the
development site from which the contribution was received.
Page 109

Page 110

Planning Service Developer Contributions
Project Request Pro-forma
Project Name:
Project Type:
Location:
Community Council area:
Ward:
Locality Planning Area:
Project details:
Estimated total cost:
Amount requested from developer contribution fund:
Other funding sources:
Reasons for developer contributions being required:
Has an Equality Impact Assessment been carried out for the project?
Please provide a summary of the assessment below and attach a copy of the
full assessment
Page 110

Page 111

Planning Service Developer Contributions
Project Completion Pro-forma
Project Name:
Project Type:
Location:
Community Council area:
Ward:
Locality Planning Area:
Project details:
Total cost:
Project completion date:
Amount received from developer contribution fund:
Amount received from other funding sources:
Amount to be returned to developer contribution fund (if any):
Page 111

Page 112

Page 112

Page 113

Appendix 2
Allocation of developer contributions towards green network and
green infrastructure projects
In allocating developer contributions towards green network and green infrastructure
projects, the Planning Service will take account of the following criteria.
• Proximity to the site from which the developer contribution has been received
• Deliverability of project
• Eligible project types – this section includes the details of strategic and local green
network and green infrastructure projects that may be suitable for contributions.
Equality issues will be considered in the identification and design of projects making
use of developer contribution funding.
Proximity to the site from which the developer contribution has been
received
Opportunities for the allocation of developer contributions will be considered in the
following order:
• Within a 250 metre walk of the development site from the site from which the
developer contribution has been received – this is in line with the accessibility
standard set out in the Green Network and Green Infrastructure Supplementary
Guidance.
• Within an 800 metre walk of the development site from which the developer
contribution has been received – this aligns with the 20 Minute Neighbourhood
approach.
• Within the same community council area as the development site from which the
development contribution has been received.
• Within the same Council electoral ward as the development site from which the
development contribution has been received.
• Within the same locality planning area as the development site from which the
development contribution has been received – the current locality planning areas
are the three main settlement areas of Clydebank, Dumbarton and Vale of Leven.
• Within the West Dunbartonshire Council area.
All projects to be funded by developer contributions should provide green
network/green infrastructure benefits for the residents of the site from which the
developer contributions have been received. This means that the further the project
site is from the development site, the more strategic in nature the project or the
location of the project should be.
Deliverability of project
It is important for the operation of the developer contribution process that the
developer contributions are spent and projects delivered. To ensure this, the Council
will consider the following deliverability criteria:
Page 113

Page 114

• The project will be delivered by the Council or delivered in close partnership with
the Council. This may include projects identified through the Council’s
Participatory Budgeting process
• The project will be undertaken by the developer of the site from which the
contribution is received.
• The project will be delivered to completion, or the developer contribution
demonstrably spent, within 10 years of the contribution being received by the
Council, or the contribution will be returned to the developer. This will apply to
contributions received from April 2022. 
Eligible project types 
Local Development Plan 2 sets out the types of green infrastructure projects towards
which developer contributions will be directed. Further detail on project types are
provided below. 
Play parks and sports pitches, including provision of, improvements and
enhancements
Where a development will result in additional use of an existing play park/sports pitch,
there may be a requirement to upgrade, enhance or enlarge those facilities.
Where new residential development does not provide on-site play parks or sports
pitches, and there is no facility in the immediate vicinity or within 250 metres of the
development site, where practicable there will be a requirement for a new play area or
sports pitch to be installed to meet the accessibility standard.
The Council will ensure that new or upgraded play parks provide appropriate
accessible play equipment. 
Allotments and community gardens
The provision of new allotments and community gardens, or enhancement/expansion
of existing facilities will be eligible for a contribution from the developer contribution
fund where the proposed site is in an area of demand and where the new development
is likely to increase this. 
Biodiversity improvements to existing green infrastructure
This may involve enhancing existing areas of natural habitats, the provision of new
habitats, or the improvement of connections between habitats. Such projects should
include elements that increase interaction between people and nature. 
Environmental improvements to existing green infrastructure
Projects may be eligible for a contribution from the developer contributions fund where
they can: deliver upgrades to an area of land, civic space or public realm to provide a
useable open space for the community; help provide green infrastructure to enhance
the character and amenity of the area; or bring vacant, derelict or dilapidated land back
into active use. Contributions can also be used towards public art within developments,
as well to enhance existing or new areas of public realm or civic space, which will help
to improve the environment, with reference to the history of a site or to provide a focal
point for the new space.  
Page 114

Page 115

Path and access improvements
Where a new development is in close proximity to an existing path and access
network, and that particular development will result in increased usage of that network,
then projects that would help to improve safety, upgrade the existing network to cope
with the increased usage, and/or make paths suitable for shared use, will be eligible
for a contribution from the developer contributions fund. The provision of new paths
that will improve the connectivity of the development site with the green network will
also be eligible. 
Woodland management and planting
Woodland management or planting projects that create or enhance woodlands that
are accessible to the local community. 
(Examples of local green network projects that align with these project types are
included later in this paper.) 
Strategic Green Network Projects (West Dunbartonshire Local Development
Plan)
West Dunbartonshire sits within the Central Scotland Green Network area. The
Central Scotland Green Network is identified as a National Development in the
National Planning Framework. The Central Scotland Green Network programme aims
to change the face of central Scotland by restoring and improving its rural and urban
landscape. Workstreams for the period to 2030 relate to natural climate solutions,
liveable places, health and wellbeing, and green recovery. 
The Glasgow and Clyde Valley Green Network Partnership has developed a Blueprint,
which is a framework for the creation of a Strategic Green Network for the benefit of
people and wildlife in the Glasgow City Region. It focusses on the creation of a
Strategic Access Network and a Strategic Habitat Network. The access network seeks
to facilitate the off-road movement of people around and between communities
through greenspace, and the habitat network seeks to facilitate the movement of
wildlife through the landscape. 
The strategic green network projects set out in the Local Development Plan, and in
greater detail below, will help to deliver the Central Scotland Green Network and the
Glasgow and Clyde Valley Green Network Blueprint within West Dunbartonshire.  
River Clyde to John Muir Way Access and Heritage Route
The River Clyde and the Kilpatrick Hills are two of West Dunbartonshire’s key
recreational, natural and cultural heritage assets. The project aims to link them, via
other green network assets such as the Duntocher Burn and Goldenhill Park, and
numerous communities along its length, by a high quality walking and cycling route. 
This project is as a key component in delivering the regional, strategic green network
and connecting to the wider countryside via Auchnacraig Woods and the John Muir
Way, as detailed in the map below. 
Page 115

Page 116

The project would create a valuable addition to the region’s network of strategic access
routes, which would act as a draw for walkers and cyclists to West Dunbartonshire, as
well as functioning as a local access network encouraging walking and cycling around
and between communities and community facilities. The project also will connect into
to other strategic green network projects, the Clydebank Linear Park project and the
Faifley Knowes project, which are detailed below. 
Forth and Clyde Canal
The project aims to create a new linear park, including recreational and gym
equipment with corresponding path, biodiversity, environmental and habitat
improvements, encouraging better and increased usage of the Canal and to provide
new path connections from Centre 81 and other appropriate points. 
The Forth and Clyde Canal towpath and surrounding natural environment within
central Clydebank is in need of significant path, access and environmental
improvements to the towpath and to improve its use as a recreation resource. 
The Canal is underutilised as a recreational resource by the communities despite it
being part of the NCN 7 national cycle route. This is due to a number of reasons
including lack of safety, general feel, poor paths and lightning and no other recreational
facilities to encourage usage. 
The project was borne out of discussions and feedback with the community and other
stakeholders, such as Scottish Canals, the Golden Jubilee Hospital and the Glasgow
and Clyde Valley Green Network Partnership, during the Clydebank Can design
workshops. 
Alexandria Footbridge across River Leven
The former “Black Bridge” which connected Bonhill with Alexandria and Renton was a
popular connection providing people with a walking and cycling route to facilities such
as schools, shops, transport and health centres. The bridge was initially closed due to
deterioration of the decking and was subsequently demolished. The project therefore
focusses on providing a new bridge to connect the communities again.
Page 116

Page 117

The loss of this important connection has significantly increased walking and cycling
distances to destinations such as Vale of Leven Academy. The next nearest river
crossings is via the “Polaroid Bridge” in Renton and the Jamestown Bridge, both a
significant distance away. 
“The Development of the Alexandra Footbridge across the River Leven must not have
an adverse effect on the Endrick Water Special Area of Conservation (SAC) for which
Atlantic salmon, Brook lamprey and River lamprey are the qualifying interests or on
the Inner Clyde Special Protection Area (SPA) for which Redshank are the qualifying
interest. Proposals for development must be accompanied by an expert assessment
to inform a project-level Habitats Regulations Appraisal (HRA). The Council as
‘Competent Authority’ will carry out the HRA. If it is concluded that the proposal is likely
to have a significant effect, the Council must then undertake an Appropriate
Assessment of the implications of the development for the conservation interests for
which the area has been designated. Development which could harm an
internationally important site will only be approved in exceptional circumstances.” 
Havoc Playing Fields/Brucehill Cliffs and Path to Cardross 
The project is aimed at the improvement of this important and well-used recreational
open space and nature resource, which is proposed by the Council as a potential Local
Nature Reserve. The current condition of the site is deteriorating, and this requires to
be addressed for the benefit of the community and visitors, as well as, the nature on
the site. This will involve the improvement of the playing fields and associated facilities;
woodland management/planting; improvements to the path network, including a
connection which will enable the path network in this area to connect with Cardross to
improve connectivity between the two areas and further afield; removal of the invasive
species (Himalayan Balsam) adjacent to the shorefront; and providing interpretation
within Havoc to explain the important conservation value of the site in relation to its
proximity to the Inner Clyde Special Protection Area.
Page 117

Page 118

The area is extensively used by the community and is a much loved and important
natural area which requires to be protected for its proximity to protected species and,
where appropriate, sensitively enhanced to ensure that the recreational and health
benefits that this important open space provides is improved to continue to offer a wide
variety of activities to occur. 
“Development of the Havoc Playing Fields/Brucehill Cliffs and Path to Cardross
project must not have an adverse effect on the Inner Clyde Special Protection Area
(SPA) for which Redshank are the qualifying interest. Proposals for development must
be accompanied by an expert assessment to inform a project-level Habitats
Regulations Appraisal (HRA). This may require a study of redshank behaviour in the
affected area of the SPA, which is likely to involve survey over at least one
overwintering season. The Council as ‘Competent Authority’ will carry out the HRA. If
it is concluded that the proposal is likely to have a significant effect, the Council must
then undertake an Appropriate Assessment of the implications of the development for
the conservation interests for which the area has been designated. Development
which could harm an internationally important site will only be approved in exceptional
circumstances.” 
Faifley Knowes
Faifley Knowes is a 19 hectare greenspace between the Hardgate and Faifley areas
of Clydebank. The project is aimed encouraging better and increased usage of the
Faifley Knowes woodland and to enhance, promote and protect the biodiversity value
of the woodland, habitats and other known features. 
Page 118

Page 119

The project will upgrade the path network, undertake biodiversity and environmental
improvements, improve safety within the Knowes and provide better interpretation.
This is an important recreational resource for the community of Faifley and provides
an important contribution to the strategic green network. 
Strategic Green Network Projects (Additional) 
Clydeside Community Park to Queens Quay Strategic Access Project
Although part of the wider aspiration to connect the River Clyde to the John Muir
Way, as detailed in the project above, this part of strategic access route has been
kept as a separate project due to its complexity arising from land ownership issues
and also the fact that the proposed Hospital to Dalmuir Station project, detailed
below, is a key connection between the two projects. 
Page 119

Page 120

The project was originally identified in a Strategic Green Network Strategy for the
Clyde Waterfront regeneration area in 2010 and worked up in more details as part of
a local Green Network Strategy for the Dalmuir area in 2011. It was also included in
the Spatial Strategy for the wider Clydebank area in 2016. 
Delivery of the project would create a valuable addition to the regional and local
network of strategic access routes which would act as a draw for walkers and
cyclists to West Dunbartonshire as well as functioning as a local access network
encouraging walking and cycling around and between communities and community
facilities. 
Development of the Clydeside Community Park to Queens Quay Strategic Access
Project must not have an adverse effect on the Inner Clyde Special Protection Area
(SPA) for which Redshank are the qualifying interest. Proposals for development
must be accompanied by an expert assessment to inform a project-level Habitats
Regulations Appraisal (HRA). This may require a study of redshank behaviour in the
affected area of the SPA, which is likely to involve survey over at least one
overwintering season. The Council as ‘Competent Authority’ will carry out the HRA. If
it is concluded that the proposal is likely to have a significant effect, the Council must
then undertake an Appropriate Assessment of the implications of the development
for the conservation interests for which the area has been designated. Development
which could harm an internationally important site will only be approved in
exceptional circumstances. 
Auchnacraig & Edinbarnet Woods, Faifley
Auchnacraig Woodland Park is a large semi-natural woodland on the edge of Faifley. 
The site was once part of a country estate and this history is reflected by the presence
of veteran specimen trees, tree-lined avenues and parkland style fencing particularly
Page 120

Page 121

around the former site of Auchnacraig House. It is also the site of the Cochno Stone,
hailed as the best example of Neolithic cup and ring marks in Scotland. 
The Woodland Park is an important part of the habitat and access network in the area.
Diverse semi-natural woodlands of this size and age are uncommon locally, making
this site important for nature conservation.  The site is also an important recreational
resource for both local people and visitors to the area.  The path network is extensive,
with a combination of surfaces and unsurfaced routes and numerous opportunities for
circular routes. Auchnacraig Wood and car park form part of a wider network of access
routes in the locality and provide a key access link to the Cochno Hill, the Kilpartrick
Hills and the John Muir Way. 
The project will upgrade the path network, undertake biodiversity and environmental
improvements, improve safety within the park and provide greater interpretation. 
Golden Jubilee to Dalmuir Station Strategic Access Project
The connection to the Golden Jubilee Hospital from Dalmuir Station and bus stops on
Dumbarton Road is poor, which means that patients have to drive to the Hospital
instead of having the option to arrive by public transport. The Hospital has also stated
that there is no route that provides a direct and easy connection to and from the station
for staff. Therefore, a new green infrastructure connection from the Hospital to the
Station is required. This would also provide new connections to the Canal and increase
the recreational offer for communities in this area, as well as Hospital Staff and
Patients. 
Local Green Network Projects 
Christie Park and Woodland Improvements
Christie Park is an important recreational area near the centre of Alexandria. The
formal and amenity areas of the park are in generally good order, but the woodland is
in need of investment and improvement. The project will therefore require path
improvements within the woodland to make the paths and steps safer, as well as,
where feasible, to make them DDA compliant within the lower section of the woodland;
tree works and thinning; removal of non-native tree species; replacement native tree
planting; repairing and repainting of iron work within the park; and installation of
interpretation panels within the Park to explain the fountain, cenotaph and gates. 
Page 121

Page 122

Christie Park is an important and well-loved park to the community and residents of
Alexandria, which makes this a key project. It has its own established group – Friends
of Christie Park – who have suggested many of the improvements to the park that
require to be undertaken. By improving the path network to enable all abilities to enjoy
the Park and its woodland the whole community of Alexandria can benefit. 
Drumry Park and Open Space Improvements, Clydebank
This area of open space is one of the few areas of recreational open space within
Drumry and is a well-used community resource. However, as the use of the open
space and play facilities has increased, this has led to the need for improvements to
the site to be improved, which are beyond normal maintenance issues for the Council.
The work includes: upgrading of existing play areas; resurfacing works to BMX track
and paths; installation of outdoor gym equipment’s; installation of new goal posts;
hedge and tree planting; and creation of a community orchard. 
Dumbarton Castle Coastal Path Improvements
The project aims to improve the area for the local community and also to enhance
the visitor experience and maximise its potential as a key tourist destination. An
increase in use of the site has led to the deterioration in the condition of the site and
Page 122

Page 123

upgrades to the path network in the site and bridge over the Gruggies Burn are
required, along with upgrades to the picnic site, including new benches and tables.
The site would also benefit from new interpretation panels and signage to enhance
the visitor experience. 
“Development of the Dumbarton Castle Coastal Path Improvements must not have
an adverse effect on the Inner Clyde Special Protection Area (SPA) for which
Redshank are the qualifying interest. Proposals for development must be
accompanied by an expert assessment to inform a project-level Habitats Regulations
Appraisal (HRA). This may require a study of redshank behaviour in the affected area
of the SPA, which is likely to involve survey over at least one overwintering season.
The Council as ‘Competent Authority’ will carry out the HRA. If it is concluded that the
proposal is likely to have a significant effect, the Council must then undertake an
Appropriate Assessment of the implications of the development for the conservation
interests for which the area has been designated. Development which could harm an
internationally important site will only be approved in exceptional circumstances. 
Garshake Avenue/Whiteford Crescent Open Space
The project aims to enhance the access to this area of open space that connects two
communities. It also aims to undertake woodland management to enhance
biodiversity and to make the area safer. The project will also enhance and extend the
existing play park for the benefit of both communities through tree thinning, removal
and planting; path improvements, play park extension and enhancement; and habitat
enhancement. 
The area is well used by two separate communities that, due to recent housing
completions, have resulted in more people using the area for recreational purposes
and the main path through the site as a route to and from the schools. 
Lusset Glen, Old Kilpatrick
This is an important community and wildlife resource within Old Kilpatrick. 
Page 123

Page 124

Because of increased usage, the minor paths within the wood require to be upgraded
along with replacing the existing benches and installing a picnic site. A new path link
is also required to link with the Wester Isles Estate to provide an off-road link to
Kilpatrick Station, local schools and the Erskine Bridge. Lighting within the site also
requires to be improved to ensure safety in the dark. 
O’Hare Play Area, Bonhill
The project is aimed at bringing a redundant ball park back into community use and
improving the environment of the area. 
In addition to a new all-weather surface, the area will be also landscaped and trees
will be planted to enhance its contribution to biodiversity within the area. 
Millburn Gardens Access Improvements, Renton
This park is a well-used community resource for recreation and provides and
important link to and from St Martins Primary School and the Vale of Leven
Academy. 
Page 124

Page 125

Due to the increase in usage of the path network, the paths, benches and picnic
tables within the park require to be upgraded and/or replaced. Tree planting along
the burn is also required and will help to increase biodiversity and amenity within the
park itself. 
Overtoun Estate Access and Paths, Dumbarton
Overtoun Estate is an extremely well-used recreational area located to the north of
Dumbarton. It is extensively used by the local community and visitors from further
afield. The path and access infrastructure was improved 12 years ago with a grant
from the Forestry Commission Scotland; however, the infrastructure is in need of
further investment as many paths have deteriorated and one of the timber bridges is
in poor condition. This is a result of the significant popularity of the area for the
community and visitors and its increased usage, especially since the Woodland Trust’s
purchase of adjacent land and the creation of Lang Craigs Wood. 
Page 125

Page 126

The project will: upgrade the path network within the area, re-open disused paths;
replace the timber bridge near the pond; create new parking areas to cope with visitors
to the area; overhaul the drainage within the site; improve woodland management and
planting of native trees; and address non-native species (rhododendron and bamboo)
encroaching in the area. 
Polaroid Bridge Environmental Improvements, Renton
This is a well-used route to and from the Strathleven Estate and the industrial estate
to Renton and Renton Railway Station and the National Cycling Network cycle track
on the west side of the river. The bridge is well used as a link by the local
communities both for recreation and to access businesses/employment in the
industrial estate. 
Due to the increase in usage of the route by a wide range of users, the project aims
to clear scrubs and tree felling around the bridge to enhance health and safety and
security of the route. Replacement planting will be undertaken away from the bridge
with installation of new benches adjacent to the cycle track. The bridge itself will also
be upgraded and improved visually and functionally, by greening it and ensuring that
it can be used by all abilities.
Page 126

Page 127

AssessmentNo 501 Owner alan.williamson
Resource
Regeneration,
Environment
and Growth
Service/Establishment Regeneration
 
First Name Surname Job title
Head Officer Alan Williamson Development Planning &Place Team Leader
(include job titles/organisation)
Members Ricardo Rea
 
(Please note: the word 'policy' is used as shorthand for stategy policy function or
financial decision)
Policy Title Developer contributions
 
The aim, objective,purpose and intended out come of policy
The policy sets out the procedures for monitoring, requesting and allocating developer
contributions
 
 
Service/Partners/Stakeholders/service users involved in the development
and/or implementation of policy.
Developer contributions will, in the main be spent by the following Council services:
Greenspace, Roads and Transportation, Regeneration, Planning
Does the proposals involve the procurement of any goods or
services? Yes
If yes please confirm that you have contacted our procurement
services to discuss your requirements. No
SCREENING
You must indicate if there is any relevance to the four areas
Duty to eliminate discrimination (E), advance equal opportunities
(A) or foster good relations (F) Yes
Relevance to Human Rights (HR) Yes
Relevance to Health Impacts (H) Yes
Relevance to Social Economic Impacts (SE) Yes
Who will be affected by this policy?
Residents and visitors to West Dunbartonshire who will benefit from the infrastructure provided
through Council expenditure of developer contributions.
Who will be/has been involved in the consultation process?
The policy relates to the internal procedures of how money received through developer contributions
will be managed, reported and spent. The funding received is not a general funding pot, but is to be
linked to projects connected in some way to the site that the developer contribution was received from.
There is therefore no public involvement in the allocation of developer contribution funding.
Please outline any particular need/barriers which equality groups may have in relation to this
policy list evidence you are using to support this and whether there is any negative impact on
particular groups.
 
Needs Evidence Impact
Age
Cross Cutting
The council needs to
consider issues in
the round
Equality issues and
other cross cut
Ensuring that
equality issues are
considered at every
stage supports a
Page 127

Page 128

robust approach
Disability
Social & Economic
Impact
The council is
committed so that
developments
support both social
and economic
inclusion
Factors in this area
cross cut
Helps ensure a
joined up approach
Sex
Gender Reassign
Health
The council is
committed to
ensuring that the
physical
environment
supports health
Mental and physical
health cross cut,
physical
environments have
impacts in these
areas
Helps ensure a
joined up approach
Human Rights
Council needs to
take account of the
Human Rights Act
These
considerations cross
cut with equalities,
health and economic
impact
Positive in
embedded human
rights
Marriage & Civil
Partnership
Pregnancy &
Maternity
Race
Religion and Belief
Sexual Orientation
Actions
Policy has a negative impact on an equality group,but is still to be implemented, please provide
justification for this.
Will the impact of the policy be monitored and reported on an ongoing bases?
The receipt and expenditure of developer contributions will be reported to Planning Committee on an
annual basis.
Q7 What is you recommendation for this policy?
Intoduce
Please provide a meaningful summary of how you have reached the recommendation
The policy requires that equality issues should be considered in the identification and design of projects
making use of developer contribution funding.
Page 128

Page 129

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Regulatory & Regeneration
Planning Committee: 8 June 2022
Subject: Frontiers of the Roman Empire (Antonine Wall) World Heritage
Site Supplementary Guidance
1 Purpose
1.1 The purpose of the report is to seek approval to consult on the draft
Supplementary Guidance (SG) relating to the Frontiers of the Roman Empire
(Antonine Wall) World Heritage Site.
2. Recommendations
2.1 It is recommended that the Committee approves the publication of the Draft
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
Supplementary Guidance for consultation.
3. Background
3.1 The Antonine Wall runs through five local authority areas across central
Scotland: Falkirk, North Lanarkshire, East Dunbartonshire, Glasgow and West
Dunbartonshire. In July 2008, it was designated as a World Heritage Site,
becoming an extension of the trans-national ‘Frontiers of the Roman Empire
World Heritage Site’ which includes Hadrian’s Wall in England and the
German Limes.
3.2 All local authorities along the Antonine Wall include safeguarding policies of
the Antonine Wall World Heritage Site in their Local Development Plans. To
support the implementation of the policy, the local authorities prepared a joint
Supplementary Planning Guidance document in 2011. Together, the
development plan policy and guidance are used in the determination of
planning applications, and to guide development which has the potential to
impact the World Heritage Site.
3.3 Under the Planning (Scotland) Act 2006, guidance referred to in the Local
Development Plan (LDP) could be prepared as statutory Supplementary
Guidance, and if so, would form part of the Development Plan once adopted.
Whilst, this will no longer be the case under the Planning (Scotland) Act 2019,
transitionary arrangements allow for guidance associated with Local
Development Plans prepared under the 2006 Act (e.g. LDP2) to continue to
form part of the development plan.
3.4 Policy AW1 of the West Dunbartonshire Local Development Plan (LDP2)
identifies that Supplementary Guidance will be prepared in relation to the
ITEM 10
Page 129

Page 130

Antonine Wall.
4. Main Issues
4.1 The Draft Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
Supplementary Guidance has been updated by the partner local authorities
and is attached for approval at Appendix 1.
4.2 The Supplementary Guidance is intended for use by developers and
landowners, the general public and other agencies when seeking to undertake
built development. The Supplementary Guidance will also continue to be used
by the Council to determine planning applications, and to provide pre-
application advice.
4.3 The Supplementary Guidance firstly sets out the policy background and
requirements for development within the World Heritage Site or the buffer
zone. It then provides detailed guidance and advice for developers with
proposals within the protected areas in terms of how to assess any potential
impacts of development on the World Heritage Site and buffer area; for
instance relating to the landscape setting and any physical impacts on
archaeological remains above and below ground. The document then sets out
the necessary actions and steps to be taken in the pre-application stage, and
what information is required to be provided to the planning authority.
4.4 The Supplementary Guidance also provides design advice for developers on
how to avoid or mitigate any impacts on the World Heritage Site and buffer
area, as well as setting out enforcement steps for any breaches of planning
control.
Next steps
4.5 The Draft Supplementary Guidance will be published for a minimum 6-week
consultation period, the outcome of which, and any subsequent proposed
changes to the guidance, will be reported to Committee.
4.6  As this Supplementary Guidance is being prepared jointly by the five
authorities any amendments following consultation will also need to be agreed
jointly. However, because the five authorities are at differing stages in their
Local Development Plan preparation processes, the timing of each of their
consultations on the Supplementary Guidance will vary. Several of the other
authorities have already consulted on the document and have received
comments and suggested amendments from Scottish Government Key
Agencies. These changes have been incorporated into the version of the
Supplementary Guidance in Appendix 1.
5. People Implications
5.1 There are no people implications associated with this report.
Page 130

Page 131

6. Financial & Procurement Implications
6.1 There are no financial or procurement issues associated with this report.
7. Risk Analysis
7.1 Maintaining an up-to-date Supplementary Guidance will help the Council to
achieve the right type of development in the right place and secure the
protection of the Frontiers of the Roman Empire (Antonine Wall) World
Heritage Site.
8. Equalities Impact Assessment
8.1 The policy has a range of potential positive impacts both in of an opportunity
for community empowerment and engaging with under represented groups,
and in the eventual final shape of places; no groups with the protected
characteristics are disadvantaged by these impacts. No negative impacts are
identified.  The guidance will inform future impact assessments of planning
proposals.
9. Environmental Sustainability
9.1 A Strategic Environmental Assessment (SEA) Screening Report was prepared
and submitted to the SEA Gateway for consideration by the consultation
authorities. The screening document found that there will not be any
substantial changes to the content of the Supplementary Guidance that would
change the findings of the previous Environment Report produced for the
Supplementary Planning Guidance document in 2011. As such, further
assessment is not required.
10. Consultation
10.1 The draft Supplementary Guidance document in Appendix 1 will be published
for a minimum 6 week consultation period.
11. Strategic Assessment
11.1 The Council’s land use planning documents will support Council’s
strategic priorities of a strong local economy and improved job
opportunities.
Chief Officer: Peter Hessett
Service Area: Regulatory & Regeneration
Date:  8 June 2022 
________________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager 
Page 131

Page 132

pamela.clifford@west-dunbarton.gov.uk
Alan Williamson, Development Planning & Place Team
Leader
alan.williamson@west-dunbarton.gov.uk 
Appendices: Appendix 1 – Frontiers of the Roman Empire (Antonine
Wall) World Heritage Site Supplementary Guidance
Appendix 2 – Equalities Impact Assessment
Background Papers: None
Wards Affected: Ward 3: Dumbarton
Ward 4: Kilpatrick
Ward 6: Clydebank Waterfront
Page 132

Page 133

APPENDIX 1: Draft Supplementary Guidance for consultation
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
Supplementary Guidance
Contents:
1. Introduction
1.1 Section 1 Introduction
1.2 Purpose of Supplementary Guidance
1.3 The Antonine Wall
1.4 The Frontiers of the Roman Empire World Heritage Site
1.5 Buffer Zone
1.6 Protecting the Wall
2. Application Process
2.1 Section 2 Introduction
2.2 Site Audit
2.3 Pre-Application Discussions
2.4 Environmental Impact Assessment
2.5 Scheduled Monument Consent
2.6 Permitted Development and Other Consents
3. Assessing the Impact of Development
3.1 Section 3 Introduction
3.2 Physical Impacts
3.3 Impacts on Setting
3.4 Cumulative Impacts
3.5 Adding Value
3.6 Other Planning Policies and Assessments
4. Design and Mitigating Impacts
4.1 Section 4 Introduction
4.2 Design Criteria
4.3 Mitigation
4.4 Enforcement
Appendix 1 - Statement of Outstanding Universal Value 
Appendix 2 - Summary of Key Points 
Appendix 3 - Further Information and Contacts 
Appendix 4 - Map of Antonine Wall, Council Areas, Scheduled Areas and Buffer
Zones 
Appendix 5 - The Antonine Wall Then and Now
1. Introduction
1.1 SECTION 1 INTRODUCTION
1.1.1 This Supplementary Guidance provides advice for developers, decision makers and
the public on managing the impact of development on the Frontiers of the Roman
Empire (Antonine Wall) World Heritage Site (FRE(AW)WHS) and its setting. The
Page 133

Page 134

guidance supports the implementation of the development plan policies agreed by the
five Councils along the Antonine Wall: Falkirk, North Lanarkshire, East
Dunbartonshire, Glasgow City and West Dunbartonshire.
1.1.2 The Guidance will be a material consideration in the assessment and determination
of planning applications affecting the Antonine Wall and its setting. It will then be
progressively adopted as statutory Supplementary Guidance alongside the emerging
Local Development Plans being prepared by the five local authorities.
1.2 PURPOSE
1.2.1 The purpose of the SG is to:
▪ explain the significance of the Antonine Wall and its status as a World
Heritage Site;
▪ encourage early and effective consultation with Councils and Historic
Environment Scotland;
▪ outline the approach and procedure for assessing development affecting the
World Heritage Site;
▪ set out the criteria which will be applied in determining planning applications
for development along the line of,  and within the setting and vicinity of the
World Heritage Site;
▪ guide decisions on planning appeals and enforcement.
1.3 THE ANTONINE WALL
1.3.1 The Antonine Wall is the most substantial and important Roman monument in
Scotland. Built on the orders of the Emperor Antoninus Pius in the years following
140 AD, it extends for some 60 kilometres across central Scotland from Bo’ness on
the River Forth to Old Kilpatrick on the River Clyde and marked the north western
frontier of the Roman Empire.
1.3.2 The Wall functioned both as a frontier control and military defence. It
comprised of a substantial turf rampart built on a solid stone base fronted to the north
by a broad, deep ditch and outer mound. To the south of the rampart was a road, the
Military Way, which permitted the movement of troops, goods and materials and
connected the series of permanent stone built forts which occur at roughly two mile
intervals along its length. Between some of the forts there are smaller forts, or fortlets.
Camps used by the troops building the Wall also occur at regular distances along the
frontier.
1.3.3 The Antonine Wall is of great significance for a number of reasons. It
represents one of many sections of a massive military system which stretched over
5000 km from northern Britain, through Europe to the Black Sea, and from there to
the Red Sea and across North Africa to the Atlantic coast. This frontier helped to
protect – and define – the Roman Empire, one of the greatest states ever to have
existed. The Antonine Wall was the most northerly frontier of the Empire, the last of a
series of planned frontiers built in the 2nd Century AD and, at the time, the most
complex ever constructed by the Romans.
1.3.4 Today around one third of the Antonine Wall survives is visible above ground,
at places such as Bearsden, Bar Hill and Rough Castle. Around one third lies in
urban areas while the remainder lies in open countryside or open spaces within urban
areas and, though not visible above ground,  survives below ground. Only 2 km of the
original 60 kilometres of the Antonine Wall have been completely lost through
quarrying and the construction of roads, railways and the Forth and Clyde Canal. The
Wall continues to be subject to considerable development pressures and given its
significance it is imperative that the remaining sections – whether visible on the
ground or not – are safeguarded from inappropriate development.
Page 134

Page 135

1.4 THE FRONTIERS OF THE ROMAN EMPIRE (ANTONINE WALL) WORLD
HERITAGE SITE – FRE(AW)WHS
1.4.1 In July 2008 the international cultural and archaeological importance of the Antonine
Wall was recognised when the World Heritage Committee of UNESCO inscribed the
site as Scotland’s fifth World Heritage Site (WHS). The Antonine Wall became an
extension of the trans-national Frontiers of the Roman Empire World Heritage Site
which includes Hadrian’s Wall in England and the Upper Raetian German Limes. The
intention is that the WHS will eventually include all surviving sections of the frontiers
of the Romans in Europe, Africa and the Middle East.
1.4.2 With World Heritage Site status comes a commitment to protect the exceptional
cultural significance of the Antonine Wall and Outstanding Universal Values (OUV) for
which the site was inscribed. The Statement of Outstanding Universal Value,
provided at Appendix 1, not only identifies the reasons for the Wall’s inscription as a
World Heritage Site but provides the basis for its effective protection and
management. 
1.4.3 It is imperative that development does not compromise the values for which the
Antonine Wall was inscribed as a World Heritage Site, its authenticity and integrity.
1.5 BUFFER ZONE
1.5.1 To protect the important landscape setting of the Antonine Wall a Buffer Zone has
been designated to the north and south of the monument. The Buffer Zone does not act as an
absolute barrier to development but defines a zone where added protection to the immediate
setting of the World Heritage Site is given.  Development proposals within the buffer zone will
be given careful consideration to determine whether it is likely to significantly detract from  the
Outstanding Universal Value  authenticity or  integrity of the Antonine Wall World Heritage
Site.
1.5.2 Section 3 Assessing the Impact of Development provides further guidance on Buffer
Zones and the setting of the Antonine Wall.
The boundaries of the World Heritage Site and the Buffer Zones are shown on page
** as well as on the Proposals Maps of the relevant local plans/local development
plans listed in Appendix 3.
[insert map showing WHS and buffer zone]
1.6 PROTECTING THE WALL
1.6.1 World Heritage Site designation does not result in additional direct legal protection.
Nevertheless, the Antonine Wall is protected through the planning system and in
some areas through designation as a scheduled monument.
Scottish Planning Policy
1.6.2 Scottish Planning Policy (SPP) provides a statement of the Scottish Government’s
policy on nationally important land use matters. The Historic Environment Policy for
Scotland (HEPS) sets out the Scottish Governments policies for the historic
environment and provides policy direction. Paragraph 147  of SPP refers to World
Heritage Sites and states that “Where a development proposal has the potential to
affect a World Heritage Site, or its setting, the planning authority must protect and
preserve its Outstanding Universal Value.” The glossary of SPP clearly defines the
term ‘Outstanding Universal Value’ and emphasises that the Statement of OUV is the
key reference for the future effective protection and management of the WHS. The
glossary also clearly defines setting.  SPP emphasises that setting is more than
simply the immediate surroundings of a site. It can also relate to how the site was
intended to fit into the landscape, the views from it and how the site is seen from the
surrounding area. Planning Advice Note (PAN) 2/2011: Planning and Archaeology
Page 135

Page 136

and the Managing Change in the Scottish Environment Guidance Notes complete a
suite of documents that together set out the Scottish Ministers’ policies for planning
and the historic environment. Links to all the documents mentioned are listed in
Appendix 3.
Development Plan Policy
1.6.3 Decisions on planning applications require to be made in accordance with the
development plan unless material considerations indicate otherwise. The local
development plans of each Councilinclude policies to protect and enhance the
historic environment and archaeology. National planning policy on the historic
environment is also a material consideration for applications
1.6.4 Each of the five Councils along the Antonine Wall has also agreed to include the
specific planning policies on the Antonine Wall and its buffer zone in their
development plans as they are revised and updated. This document provides
additional guidance and information on the implementation of these policies in the
development management process.
Antonine Wall Policy 1
There will be a presumption against development which would have an adverse
impact on the Frontiers of the Roman Empire (Antonine Wall) World Heritage Site as
defined on the Proposals Map.
Antonine Wall Policy 2
There will be a presumption against development within the Frontiers of the Roman
Empire (Antonine Wall) World Heritage Site buffer zones which would have an
adverse impact on the Site and its setting, unless:
▪ mitigating action to the satisfaction of the Council in consultation with Historic
Environment Scotland can be taken to redress the adverse impact; and
▪ there is no conflict with other Local Development Plan policies.
1.6.5 In addition to protection under planning legalisation, about two-thirds of the Wall
which has remained unaffected by modern development, is scheduled as a
monument of national importance under the Ancient Monuments and Archaeological
Areas Act 1979. Most works carried out within the boundaries of the monument
require Scheduled Monument Consent (SMC): the prior written consent of Historic
Environment Scotland. SMC is separate from planning consent and one can be given
without prejudice to the other. Section 2.5 provides more information.
KEY POINTS
▪ This document provides advice for decision makers, developers and members of the
public on managing the impact of development on the Frontiers of the Roman Empire
(Antonine Wall) World Heritage Site and its setting;
▪ The SG is a material consideration in the assessment and determination of planning
applications affecting the Antonine Wall and its settings and will be adopted as
statutory Supplementary Guidance, which forms part of the  Local Development Plan;
▪ The Antonine Wall is of international significance. As a World Heritage Site its
outstanding universal value, authenticity and integrity must be protected.
▪ There is a presumption against development which would have an adverse impact on
the Antonine Wall and its setting.
2. Application Process
2.1 SECTION 2 INTRODUCTION
Page 136

Page 137

2.1.1 This section provides guidance on key stages in the process of applying for planning
permission where a proposed development may have an impact on the
FRE(AW)WHS or its setting. It also identifies where other permissions or
assessments may be required, for example scheduled monument consent from
Historic EnvironmentScotland.
2.2 SITE AUDIT
2.2.1 Developers considering proposals within the WHS and Buffer Zone should look
carefully at their site to determine whether the development proposed is likely to have
an impact on the fabric or setting of the Antonine Wall. Table 2.1 below outlines some
of the key information that will influence whether proposals have an adverse impact,
and should be discussed with the Council at the pre-application stage. Adverse
impacts are examined further in Chapter 3.
Table 2.1 – Site Audit; Key Questions
Factor Key Questions
Location Is the site in:
• World Heritage Site
• Buffer Zone
• Other designated area
• Scheduled Monument
Site characteristics
and setting
Is the site:
• Greenfield
• Previously developed
What are the key landscape characteristics:
• Topography
• Tree cover
• Enclosed or open
What is the landscape character of the site and its setting?
What is the cultural significance and historic importance of
the existing site characteristics and setting?
How will the proposal impact on views to/from the Antonine
Wall?
Will the proposal affect existing public access to the World
Heritage Site?
Will the proposal have a direct impact on the remains of the
Antonine Wall and associated archaeological features?
Development
Characteristics
• Size/footprint
• Proposed Use
• Building design  and materials/scale/height/form/massing
• Landscaping proposals including boundary treatment
Development
Plan Policies
What other planning policies and designations apply to the
site?
2.2.2 It is emphasised that the general principle of new development at any specific
location may be deemed unacceptable because of other policies in the development
Page 137

Page 138

plan. For example green belt, open space and countryside protection policies may
rule out the principle of particular types of development or land use.
2.3 PRE-APPLICATION DISCUSSIONS
2.3.1 Developers will be expected, as early as possible, to engage with the Council in
pre-application discussions. Contact details for each local authority are provided in
Appendix 3.
2.3.2 Early, positive and meaningful engagement will allow unacceptable proposals to be
identified before significant costs are incurred and allow other projects to move
forward more efficiently. Using Table 2.1 above as a basis, along with any available
plans, drawings, photographs or photomontages and documentation, developers
should aim to provide the Council with as much information as possible relating to the
proposed development and the site.
2.3.3 With suitable information the Council will be able to make a preliminary assessment
of the proposal, considering relevant development plan policies and the potential for
adverse impacts on the WHS and its setting. Discussions may also cover:
▪ any additional information required, for example detailed archaeological
investigations, landscape assessments etc.;
▪ where a proposal might be amended to allow more favourable consideration
(see Section 4);
▪ the Council’s procedure for processing applications, including key contacts
and application fees (including any advertisement charges);
▪ where wider consultation is required with specialist archaeological services,
statutory organisations and other interest groups. This may also involve
statutory Pre-Application Consultation.
▪ advice on other relevant statutory processes, e.g. Listed Building/
Conservation Area Consents, Scheduled Monument Consent.
2.3.4 In many circumstances, only full applications for Planning Permission will be
acceptable for sites within the WHS and Buffer Zone. Applications for Planning
Permission in Principle often cannot provide sufficient information to enable detailed
assessment of impacts on the WHS or its setting. Where Planning Permission in
Principle is sought, the reasons for this should be discussed with the Council at this
pre-application stage.
2.3.5 All discussions and pre-application advice is given without prejudice to the final
decision of the Council on any application that may be submitted.
2.4 ENVIRONMENTAL IMPACT ASSESSMENT
2.4.1 Certain types of developments may require Environmental Impact Assessment (EIA)
under the The Town and Country Planning (Environmental Impact Assessment)
(Scotland) Regulations 2017. Schedule 1 and 2 of the Regulations set out the types
of development to which this applies. This can be discussed during pre-application
discussions and further information is provided at Section 3.9
2.5 SCHEDULED MONUMENT CONSENT
2.5.1 Any works directly affecting a designated Scheduled Monument requires Scheduled
Monument Consent (SMC) which is obtained from Historic Environment Scotland.
SMC is required for any works or operations that would ‘ demolish, destroy, remove,
repair, alter or add to’ those parts of the FRE(AW)WHS designated a scheduled
monument. This includes invasive archaeological investigations. Applications for
SMC are made directly to Historic Environment Scotland.
Page 138

Page 139

2.5.2 Advice on the SMC process and requirements should be sought at an early stage
from the Heritage Directorate, Historic Environment Scotland. As in the case of
planning applications, early pre-application contact, this time with Historic
Environment Scotland, is strongly advised. To streamline the process advice on
applications for planning permission and SMC should be sought at the same time.
Where both planning permission and SMC are required, development cannot proceed
without both consents in place. The annex to PAN 2/1011 provides a flowchart
outlining the consideration of archaeology in planning decisions and will be applicable
to applications affecting the Antonine Wall regardless of the need for SMC.
2.5.3 The presumption of scheduling is that any future works will be the minimum
necessary consistent with the preservation of the monument. The Historic 
Environment Scotland website and the HEPS includes further information on
scheduling and SMC and can be used to identify the location of scheduled
monuments: see Appendix 3.
2.6 PERMITTED DEVELOPMENT & OTHER CONSENTS
2.6.1 Development that does not require planning permission, for example householder
development within urban areas – where the Wall is known to have survived under
the modern-day ground surface – has the potential to have adverse impacts without
any assessment or appropriate mitigation. Developers and property owners are
strongly urged to seek advice from the Council before undertaking any works within
the WHS or Buffer Zone to determine whether their proposal is covered by permitted
development rights and to discuss potential impacts.
2.6.2 SMC will still be required for permitted development that does fall within the
boundaries of the scheduled monument.
2.6.3 It is the responsibility of the developer to ensure all necessary consents, including
Building Warrants, Conservation Area Consent and Listed Building Consent, are
obtained.
KEY POINTS
▪ Understand your development site: what are the potential impacts of the proposal on
the WHS and its setting?
▪ Developers are expected to engage with the Council as early as possible;
▪ Unconnected to the need for planning permission, Scheduled Monument Consent is
required for works to any part of the FRE(AW)WHS designated a scheduled
monument.
3. Assessing the Impact of Development
3.1 SECTION 3 INTRODUCTION
3.1.1 This section of the SG provides information on the Council’s approach to assessing
the potential impacts of development on the Antonine Wall WHS and its setting,
including the criteria that will be used.
3.1.2 Development must not compromise the Outstanding Universal Value for which the
Antonine Wall was inscribed as a WHS. The key consideration in assessing the
impact of development – as outlined in the development plan – is the presumption
against development which would have an adverse impact on the Antonine Wall and
its setting; that is any impact that would damage the integrity, authenticity,
significance or understanding of the WHS. Examples of what could be considered
adverse include development that:
Page 139

Page 140

▪ destroys or would lead to the damage of archaeological remains;
▪ interrupts key views to, from, or within the WHS;
▪ changes the character of the landscape in and around the WHS;
▪ reduces people’s appreciation or understanding of the WHS in its landscape
setting;
▪ could negatively affect any of the qualities or significance for which the WHS
was inscribed.
3.1.3 Impacts may be physical: upon the fabric of the monument; on the setting of the
wall: development that harms the character of the landscape around the WHS; or
cumulative: development that has the potential to add to the existing negative effects
of past or current developments thereby creating further and possibly greater adverse
effects. This section considers each category of impact in turn and other factors that
will be considered in assessing the impact of development.
3.2 PHYSICAL IMPACTS
3.2.1 Within the FRE(AW)WHS new development of any scale is likely to have a physical
effect on the fabric of the monument and could result in loss of or damage to
significant archaeological remains. Such impacts intrinsically affect the integrity of the
site – one of the reasons for which it was inscribed as a WHS. Therefore any physical
impact on the surviving fabric of the WHS – whether upstanding or below ground, –
will be considered to be adverse.
3.2.2 Where sections of the WHS have previously been developed the fabric of the
Antonine Wall may have already been compromised. In these areas the key
consideration in determining if a proposal would have an adverse physical impact will
be whether the new development will result in additional loss or damage to
archaeological remains. As an initial guide, the current depth of development on a
site sets a sub-ground limit – known as the Vertical Buffer Zone – below which no
excavation should take place (see Figure 3.1). The vertical buffer zone may include
complex archaeological deposits, with features relating to other periods of history,
and site investigations to determine the vertical buffer zone may themselves have
adverse impacts.Carefully located and designed proposals on previously developed
sites that do not extend below the vertical buffer zone may, therefore, be acceptable
in certain circumstances, provided they do not conflict with other planning policies
Pre-application advice should be sought to scope out potential archaeological
impacts of any proposal, particularly those impacts which may extend beyond the
WHS and its associated features. 
[INSERT REVISED FIGURE 3.1 SHOWING VERTICAL BUFFER ZONE]
Page 140

Page 141

3.2.3 Development should avoid areas of surviving archaeological remains.  Avoiding the
World Heritage Site and, in particular areas which are scheduled will be the best
approach.   Even in areas which have already been developed, the presence,
location, depth and sensitivity of deposits cannot always be predicted.  In many
instances it may be appropriate to carry out an archaeological evaluation to help
determine where Roman deposits lie ahead of making a planning application.  This
may help to design proposals which avoid areas of archaeological deposits. For
smaller developments where surviving Roman deposits are assessed as being
improbable, an archaeological  watching brief and mitigation strategy may be more
appropriate – this should be discussed with the local authority and Historic
Environment Scotland at an early stage.  Moving development outwith the WHS will
not automatically avoid physical impact.  Although not covered by the WHS, impacts
upon archaeological deposits from other periods will not always be acceptable and
should also be considered as part of the development planning process.
3.2.4 Proposals should also consider potential long term impacts arising from development,
for example through compression and hydrological impacts. 
3.2.5 To properly inform the design and assessment process (including pre application
discussions) it is essential that any new development site overlying the boundaries of
the WHS is, at the outset and at the developer’s expense, the subject of a detailed
archaeological investigation undertaken by a suitably qualified professional. The
Chartered Institute for Archaeologist’ list of Registered Organisations a good starting
point for selecting a consultant.
Physical Impact within the Buffer Zone
3.2.6 There may be sub-surface archaeological deposits  within or outwith the defined
buffer zone, outwith the line of the World Heritage Site, or Scheduled areas. This is
because the exact line of the Wall is not clear, and new elements may be discovered
during site works. Where known archaeological  remains are present, investigation
will be required in conjunction with new development. Where previously unknown
archaeological deposits are identified during site works the Council should be
informed immediately and further archaeological investigations may be required.
KEY POINTS
▪ Any physical impact on the surviving fabric of the WHS - whether upstanding or below
ground -known or previously unrecognised - will not be permitted. This refers to both
Scheduled Monument and unscheduled sections of the WHS.
▪ Proposals on previously developed sites that do not extend below the vertical buffer
zone may be acceptable in certain circumstances.
▪ Detailed archaeological investigations will be required to accompany any proposals
for development within the boundaries of the WHS.
▪ Where the extent or presence of archaeological remains is unclear, pre-determination
evaluation will be required.
3.3 IMPACTS ON SETTING
3.3.1 The Antonine Wall was not constructed in isolation. It was
deliberately positioned with reference to the surrounding topography, resources
and landscape of central Scotland, notably the southern edge of the valley
formed by the Rivers Kelvin and Carron – a position that offered the Wall wide-
ranging views over the Kilsyth Hills, the Campsie Fells, and Kilpatrick Hills and
meant that it too was widely visible in the landscape. The setting of the
FRE(AW)WHS is predominately well preserved and readily perceptible and it is
Page 141

Page 142

this relationship with the landscape that is a fundamental part of what makes
the WHS so significant and contributes to how it is experienced, understood
and appreciated: its outstanding universal value which must be protected.
3.3.2 The Buffer Zone has been defined to ensure that all proposals for
development within it are considered carefully as they may have the potential
to affect the WHS; the adjacent environment that it is part of, and which
contributes to the character, significance and understanding of the Wall. The
capacity for new development in the Buffer Zone varies significantly along the
length of the WHS and while the Council does not seek to prevent change to
the landscape within the Buffer Zone, it is considered essential that new
development is effectively accommodated within the landscape and is
designed and located to conserve and enhance the setting of the WHS. This
also applies to developments out with the Buffer Zone that may have an impact
by virtue of their scale or visual relationship with the Antonine Wall.
Development in the Buffer Zone
3.3.3 Antonine Wall Policy 2 presumes against development within the
buffer zone which would have an adverse impact on the WHS and its setting,
unless mitigating action to the satisfaction of the Council in consultation with
Historic  Environment Scotland can be taken to redress the adverse impact.
Section 4 covers potential mitigation action, however, it should be noted that in
many instances it will not be possible to mitigate the adverse impact of a
proposed development upon the AW(FRE)WHS. Adverse impacts will be
defined as those which could affect the following criteria:
▪ a) The authenticity and integrity of the setting, e.g.:
- Changes to the prominence/dominance of the WHS in the landscape;
- Obstruction of views to and from the WHS;
- Changes in the overall preservation of the landscape setting.
▪ B) The significance of the setting, e.g.:
- How the function and meaning of the WHS relates to the landscape;
- How the WHS is understood and can be appreciated in the landscape;
- Relationships between components of the WHS and related sites.
▪ c) The character of the landscape in which the WHS sits, including the
contribution the WHS makes to wider landscape character.
▪ d) The quality of the wider landscape.
3.3.4 Additional information on the Buffer Zone; how it was defined and its
key characteristics can be found in the Nomination Document and the report
‘Definitions of Buffer Zones to the World Heritage Site’. Historic Environment
Scotland has also produced advice on Managing Change in the Historic
Environment (see Appendix 3). These documents will be a material
consideration in the determination of proposals and their possible impacts.
Development affecting the wider landscape setting of the World Heritage Site
3.3.5 In addition to the defined Buffer Zone it may be necessary to
consider potential impacts of new development outside the Buffer Zone on
longer distance views to and from significant landscape features – notably the
upland edge of the Campsie Fells and Kilpatrick Hills – which play an important
part in the appreciation and significance of the WHS. Most development
beyond the Buffer Zone will not have an adverse effect on the setting of the
WHS or its setting, however, major development in particular has the potential
to detract from or damage longer distance views to and from the Site. The
Page 142

Page 143

criteria for judging whether impacts on wider setting can be considered
‘adverse’ are broadly the same as those outlined above.
3.3.6 Within built up areas, parts of the WHS, particularly the scheduled
monument, may also have a setting which will require to be determined on a
site by site basis.
KEY POINTS
▪ There will be a presumption against development within the Buffer Zone which would
have an adverse impact on the WHS and its setting.
▪ The Criteria set out in paragraph 3.5.3 will be applied in the assessment of what is an
adverse impact on the setting of the Frontiers of the Roman Empire (Antonine Wall)
World Heritage Site.
3.4 CUMULATIVE IMPACTS
3.4.1 New development will be assessed on its own merits. However, there are
potential instances where development impacts, acceptable in isolation, combine to
create adverse cumulative impacts on the WHS. These may be physical – where a
series of developments have resulted in significant losses of archaeological material, or
affect the setting of the WHS – where a sequence of new developments erodes visual
connections with the landscape. Councils will therefore consider the potential for new
development to create, add to or set a precedent for adverse cumulative impacts. Such
consideration will include:-
▪ What developments or types of development, in the vicinity of the proposed site
have adversely affected the integrity of the WHS in the past?
▪ What ongoing activities, developments or natural processes are affecting its
physical condition and survival, and the integrity of its setting?
▪ What other developments are proposed in the short- to medium-term that are
likely to contribute to adverse effects on the WHS?
▪ Whether the impact of the proposed development is likely to contribute to
cumulative effects generated by the above?
KEY POINT
▪ The Council may advise developers to demonstrate they have given due
consideration to the cumulative impact of their development on the Antonine Wall and
its setting.
3.5 ADDING VALUE
3.5.1 Where development would not have an adverse impact on the Antonine Wall
and its setting, proposals should seek to make a positive contribution to the
conservation, management and understanding of the WHS and its setting.
Sympathetic, high-quality design of development can have the potential to add
value by enhancing the character of the WHS and its setting; promoting
improved access, (including by public transport), to, and interpretation of the
site; and contributing to a wider appreciation and understanding of the WHS in
its landscape context. Opportunities should be identified early in the planning
process. Pre-application discussions with the Council and the archaeology
service will assist in drawing out suitable ideas which can be implemented
through the development process.
3.6 OTHER PLANNING POLICIES & ASSESSMENTS
Page 143

Page 144

3.6.1 In addition to the impact of proposed development upon the WHS and its setting,
applications for planning permission will also be considered against relevant policies in the
Council’s development plan, other supplementary guidance and the national policy
framework. Details can be viewed online or can be seen, and discussed, at the appropriate
Council offices.
3.7ENVIRONMENTAL IMPACT ASSESSMENT
3.7.1 Schedules 1 and 2 of the Town and Country Planning (EIA) (Scotland)
Regulations 2017 set out the types of development likely to have significant impacts
on the environment and which are required to undergo Environmental Impact
Assessment. Both scheduled monuments and World Heritage Sites are defined as
‘sensitive areas’ under the Regulations. Where any proposed Schedule 2
development falls within a scheduled monuments or WHS and is likely to have
‘significant environmental effects,’ an Environmental Impact Assessment is required
(Schedule 1 development always requires EIA). This includes any type of
development that would ordinarily have permitted development rights, but is located
within the sensitive area/is above the thresholds set out in the Regulations.
https://www.legislation.gov.uk/ssi/2017/102/contents/made
3.7.2 EIA development that falls within the Scheduled Area will also require
Scheduled Monument Consent. Planning Circular 1/2017 provides further information
on the EIA Regulations.
http://www.gov.scot/Publications/2017/05/6292
4. Design and Mitigating Impacts
4.1 SECTION 4 INTRODUCTION
The purpose of this section is to outline the general design principles for new development
within the WHS and Buffer Zone.
4.1.1 A core principle of the modernised planning system is the focus on the quality of
outcomes, taking account of the sustainable use of land, good design and the
protection and enhancement of the built and natural environment. The international
significance of the Antonine Wall means good quality design will be vital for any
development on or near the WHS, including within the Buffer Zone and fundamental
to the avoidance of any adverse impact.
4.2 DESIGN CRITERIA
4.2.1 In the first instance, there is a presumption against development which would have an
adverse impact on the Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
and its setting. Key to the avoidance and minimisation of adverse impacts on the WHS will be
good design which takes account of the following principles:
▪ Careful site selection:
▪ Site selection should avoid the WHS, in particular those areas which
are scheduled;
▪ Site selection within the Buffer Zone should  avoid the most sensitive
areas and avoid obstructing views to/from, and limiting existing
access to the WHS;
▪ Prioritise previously developed sites, taking account of the ‘vertical
buffer zone’ and allowing, where possible, development to fit within
existing settlement patterns.
▪ Well considered development layout:
Page 144

Page 145

▪ Proposed development should seek to maximise the benefit of
existing site features, especially topography and vegetation, to
eliminate adverse visual impacts.
▪ Appropriate building design:
▪ The characteristics of the site, landscape and local building styles
should inform the form, massing, height and materials of new
buildings, generating coherent, high quality solutions.
▪ High quality landscape design:
▪ Landscaping – both hard and soft – should be as much part of the
development process as the architecture. Well planned and executed
design may enable development to be accommodated by the site
and wider landscape and has the potential to reinforce existing
landscape features and character.Additional landscaping can also
impact on intervisibility between different parts of the WHS and it’s
setting. It is therefore important that the location and specification of
new landscaping is considered in relation to impact in the WHS and
its setting.
4.3 MITIGATION
4.3.1 Antonine Wall Policy 2 states there will be a presumption against development within
the Buffer Zone which would have an adverse impact on the Site and its setting
unless mitigating action to the satisfaction of the Council, in consultation with Historic
Environment Scotland, can be taken to redress the adverse impact. Mitigation
measures potentially reduce any identified impacts to an acceptable level. It is
emphasised though that not all adverse impacts can be successfully mitigated.
Impacts on the WHS and its setting should primarily be avoided through positive
siting and design decisions in preference to the use of other mitigation measures.
4.3.2 Examples of mitigation may include landscaping proposals which are designed to
reflect and strengthen local landscape character and the visual setting of the
Antonine Wall. Mitigation measures however should not in themselves potentially
generate adverse impacts.
4.3.3 Design matters and the potential for mitigation measures should be discussed at the
pre-application stage, and appropriate reports submitted in support of any application
demonstrating that discussions have been effectively incorporated in the finalised
proposals. In the event that permission is granted suitable conditions and, if
necessary, planning agreements will ensure the proper implementation of agreed
mitigation measures.
4.3.4 Conditions will be used to ensure that development does not proceed 
before a programme for appropriate mitigation has been identified,  or where
archaeological recording has taken place. Conditions will ensure that safeguards are
in place to protect important features. When imposing conditions, planning officers
will consult with Historic Environment Scotland and/or Council’s Archaeologists to
ensure that the proposed measures are proportionate, enforceable and effective in
conserving OUV. Examples of suitable conditions might include landscaping  and/or
protective buffer zones around key in-situ sections of the wall
KEY POINTS
All development within the Frontiers of the Roman Empire (Antonine Wall) World Heritage
Site and Buffer Zone will be expected to be of good design, demonstrating: careful site
selection; well considered development layout; appropriate building design and materials;
high quality landscape design.
Page 145

Page 146

▪ Mitigating action which redresses the adverse impact of development within the
Buffer Zone may be acceptable but must be discussed in consultation with – and be
to the satisfaction of - the Council and Historic Environment Scotland.
▪ Mitigation of adverse impacts will not be possible in all instances.
4.4 ENFORCEMENT
4.4.1The unique trans-national nature of the Frontiers of the Roman Empire
(Antonine Wall) World Heritage Site means that damage to the Antonine Wall could
affect the integrity and significance of the WHS as a whole – with international
implications for Scotland.
4.4.2 The recognition of the WHS’s Outstanding Universal Value, means the Antonine Wall
requires the highest level of statutory protection. Loss or damage to upstanding
archaeological remains  and those buried beneath the ground will be treated as a particularly
serious breach of regulatory controls. Other impacts of unauthorised development will be
judged against the same guidance for new developments with respect to the effect on the
character, integrity or significance of the World Heritage Site. Non-compliance with planning
conditions or agreements may also result in significant adverse impacts.
4.4.3 Breaches of planning control will be investigated and if appropriate enforced
by the Council, or in consultation with Historic Environment Scotland. In all cases it
will be required that ongoing work cease with immediate effect, to allow a proper
assessment of the impacts and prevent damage or loss once it is established that
there is or has been a breach. In particular it may be considered appropriate to issue
a temporary stop notice requiring an immediate halt to activity and allowing time for
further enforcement action to be put in place to protect the site or archaeological
remains. Full details of the enforcement powers available to planning authorities are
set out in Planning Circular 10/2009: Planning Enforcement. Remedying the breach
will take account of particular circumstances, but can include full site reinstatement.
Non-compliance with enforcement or stop notices can also be prosecuted at the
Sherriff Court.
4.4.4 Any person carrying out unauthorised works or allowing unauthorised works
to be carried out on a Scheduled Monument without consent are guilty of an offence.
Works are defined as: anything resulting in the demolition or destruction of a
scheduled monument; any works for the purpose of removing or repairing a
scheduled monument; or any flooding or tipping operations. The Historic Environment
(Amendment)(Scotland) act 2014 introduced new powers to enable Scottish Ministers
to serve scheduled monument enforcement notices, complemented by temporary
stop notices where unauthorised works are taking place on a scheduled monument.
Further information on this is available on Historic Environment Scotland's website 
https://www.historicenvironment.scot/advice-and-support/applying-for-
consents/scheduled-monument-consent/compliance/
KEY POINTS
▪ The Council will seek to protect the Outstanding Universal Value of the World
Heritage Site through a robust approach to unauthorised development. The
Statement of Outstanding Universal Value is located here:
http://www.antoninewall.org/world-heritage/nomination-and-inscription/souv
▪ ICOMOS have prepared guidance on the process of commissioning HERITAGE
IMPACT ASSESSMENTS (HIAs)  for World Heritage (WH) properties in order to
evaluate effectively the impact of potential development on the Outstanding Universal
Value (OUV) of properties. This is located here : http://www.icomos-uk.org/world-
heritage/
Page 146

Page 147

APPENDIX  1 : STATEMENT OF OUTSTANDING UNIVERSAL VALUES
The Statement of Outstanding Universal Value for the Frontiers of the Roman Empire
(Antonine Wall) World Heritage Site as contained in the decision notice of the World
Heritage Committee outlines the exceptional cultural significance of the Antonine Wall:
“The Antonine Wall fully illustrates the effort of building the Limes on the frontiers of
the Roman Empire, at the time of its apogee and greatest extension in the British
Isles and worldwide (middle of the 2nd century AD). It embodies a high degree of
expertise in the technical mastery of earthen defensive constructions, in the
construction of a strategic system of forts and camps, and in the general military
organisation of the Limes. The Antonine Wall also demonstrates the diffusion of the
military and civil engineering of the Roman civilisation to the whole of Europe and the
Mediterranean world.”
The Antonine Wall meets three of the selection criteria for inscription as a World
Heritage Site, (ii), (iii) and (iv):
(ii) The Antonine Wall is one of the significant elements of the Roman Limes
present in Europe, The Middle East and North Africa. It exhibits important
interchanges of human and cultural values at the time of the apogee of the
Roman Empire;
(iii) The Antonine Wall bears testimony to the maximum extension of the Roman
Empire, by the consolidation of its frontiers in the north of the British Isles, in
the middle of the 2nd Century AD. The property illustrates the Roman Empire’s
ambition to dominate the world in order to establish its law and way of life
there in a long-term perspective;
(iv) The Antonine Wall is an outstanding example of the technological development
of Roman military architecture and frontier defence
Page 147

Page 148

APPENDIX 2: KEY POINTS
• The Antonine Wall is of international significance. As a World Heritage Site (WHS) its
outstanding universal value, authenticity and integrity must be protected.
• There is a presumption against development which would have an adverse impact on
the Antonine Wall and its setting.
• Developers are expected to engage with the Council as early as possible.
• Any physical impact on the surviving fabric of the WHS – whether upstanding or
below ground, known or previously unrecognised – will only be permitted in
exceptional circumstances ;
• All development within the WHS and Buffer Zone will be expected to be of good
design, demonstrating: careful site selection; well considered development layout;
sympathetic, high-quality building  building and landscape design and materials.
• Mitigating action which redresses the adverse impact of development within the
Buffer Zone may be acceptable but must be discussed in consultation with – and be
to the satisfaction of – the Council and Historic Environment Scotland.
• The Council and Historic Environment Scotland will seek to protect the Outstanding
Universal Value of the WHS through a robust approach to unauthorised development.
APPENDIX 3: GLOSSARY
Antonine Wall
The Roman Empire frontier system running across central Scotland from the Firth of Forth to
the Clyde Estuary, constructed c AD 142 on the orders of the Emperor Antoninus Pius.
Inscribed as part of the Frontiers of the Roman Empire World Heritage Site in July 2008.
Authenticity
Depending on the type of cultural heritage, and its cultural context, properties may be
understood to meet the conditions of authenticity if their cultural values (as recognised in the
nomination criteria proposed) are truthfully and credibly expressed through a variety of
attributes including: form and design; materials and substance; use and function; traditions,
techniques and management systems; location and setting; language, and other forms of
intangible heritage; spirit and feeling; and other internal and external factors.
Buffer Zone
For the purposes of effective protection of the nominated property, a buffer zone is an area
surrounding the nominated property which has complementary legal and/or customary
restrictions placed on its use and development to give an added layer of protection to the
property. This should include the immediate setting of the nominated property,
important views and other areas or attributes that are functionally important as a support to
the property and its protection. The area constituting the buffer zone should be determined in
each case through appropriate mechanisms.
Environmental Impact Assessment (EIA): Environmental Impact Assessment (EIA) is the
process of assessing the likely environmental impacts of a proposal and identifying options to
minimise environmental damage.
Frontiers of the Roman Empire: World Heritage Site composed of three walls in different
parts of Europe- Antonine Wall, Hadrian’s Wall, German Limes forming part of the frontiers of
the Roman Empire.
The Historic Environment Policy for Scotland: sets out how Historic Environment Scotland
fulfils its regulatory and advisory roles and how it expects others to interpret and implement
Scottish Planning Policy. It is a material consideration in the Scottish planning system.
Page 148

Page 149

Integrity
Integrity is a measure of the wholeness and intactness of the natural and/or cultural heritage
and its attributes. Examining the conditions of integrity, therefore requires
assessing the extent to which the property: includes all elements necessary to express its
Outstanding Universal Value; is of adequate size to ensure the complete representation of the
features and processes which convey the property’s significance; suffers from adverse
effects of development and/or neglect.
Scheduled Monument: A nationally significant monument, building or site included in the
Schedule of Monuments maintained by Historic Environment Scotland. 
Setting:  the way the surroundings of a historic asset or place contribute to how it is
understood, appreciated and experienced. 
World Heritage Site: World Heritage Sites are cultural and/or natural sites considered to be
of ‘Outstanding Universal Value’, which have been inscribed on the World Heritage List by the
World Heritage Committee.
Outstanding Universal Value: Outstanding Universal Value means cultural and/or natural
significance which is so exceptional as to transcend national boundaries and to be of common
importance for present and future generations of all humanity. As such, the permanent
protection of this heritage is of the highest importance to the international community as a
whole. At the time of inscription of a property on the World Heritage List, the World Heritage
Committee adopts a Statement of Outstanding Universal Value which will be the key
reference for the future effective protection and management of the property.
APPENDIX 4: GENERAL INFORMATION
Antonine Wall World Heritage Site website: 
http://www.antoninewall.org/
Antonine Wall Management Plan:
https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationId=f477ec1e-8366-4295-ac10-a5c900aab488
Antonine Wall nomination document
http://www.antoninewall.org/sites/default/files/Antonine%20Wall%20Nomination%20doc.pdf
Historic Environment Scotland:
www.historicenvironment.scot
Data Services:
https://portal.historicenvironment.scot/spatialdownloads
Scheduled monuments:
https://www.historicenvironment.scot/advice-and-support/listing-scheduling-and-
designations/scheduled-monuments/
Chartered Institute for Archaeologists (CIfA):
http://www.archaeologists.net/
Historic Environment  Scotland) Act 2014
http://www.legislation.gov.uk/asp/2011/3/pdfs/asp_20110003_en.pdf
Planning Advice Note (PAN) 2/2011: Planning and Archaeology
http://www.gov.scot/Publications/2011/08/04132003/0
Page 149

Page 150

Definitions of Buffer Zones to the World Heritage Site (Land Use Consultants
report for Historic Environment Scotland, July 2006) – available on request
Managing Change in the Historic Environment (Historic Environment Scotland) World
Heritage Sites: 
https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationid=89d391d9-9be2-4267-919f-a678009ab9df
Managing Change in the Historic Environment (Historic Environment Scotland)
Setting: https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationId=80b7c0a0-584b-4625-b1fd-a60b009c2549
Scheduled Monument Consent: https://www.historicenvironment.scot/archives-and-
research/publications/publication/?publicationId=515c06f2-d8b0-40f9-919f-a88000d44a5b
LOCAL DEVELOPMENT PLANS
Falkirk Local Development Plan 2:
/https://www.falkirk.gov.uk/services/planning-building/planning-policy/
North Lanarkshire Local Development Plan:
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-plans/local-
development-plan
East Dunbartonshire Local Development Plan 2:
https://www.eastdunbarton.gov.uk/residents/planning-and-building-standards/planning-
policyGlasgow City Development Plan
https://www.glasgow.gov.uk/index.aspx?articleid=16184
West Dunbartonshire Local Development Plan:
https://www.west-dunbarton.gov.uk/council/strategies-plans-and-policies/local-development-
planning/
CONTACTS
East Dunbartonshire Council
Development Applications Team, Southbank House, 1 Strathkelvin Place Kirkintilloch, G66
1XQ
Tel: 0300 123 4510
Email: planning@eastdunbarton.gov.uk
Falkirk Council
Planning & Environment, Development Services, Abbotsford House, David’s Loan, Falkirk,
FK2 7YZ
Tel: 01324 504950
Email: planenv@falkirk.gov.uk
Glasgow City Council
Development and Regeneration Services, 229 George Street, Glasgow, G1 1QU
Tel: 0141 287 8555 
Email: developmentplan@glasgow.gov.uk
North Lanarkshire Council
Development Management, Planning and Development, Fleming House, 2 Tryst Road,
Cumbernauld, G67 1JW
Tel: 01236 632500
Email: ESEnquiries@northlan.gov.uk
West Dunbartonshire Council
Development Management Section, 16 Church Street, Clydebank, G81 1TG
Page 150

Page 151

Tel: 01389 738575
Email:buildingandplanning@west-dunbarton.gov.uk
Historic Environment Scotland - Planning, Consents & Advice
Longmore House, Salisbury Place, Edinburgh, EH9 1SH.
Tel: 0131 668 8716
Email:  HMconsultations@hes.scot
Page 151

Page 152

Page 152

Page 153

AssessmentNo 500 Owner jhall2
Resource Transformation Service/Establishment Regulatory
First Name Surname Job title
Head Officer Pamela Clifford Planning and Building Standards Manager
(include job titles/organisation)
Members Alan Williamson, Development Planning and Place Team Leader; James Hall,
Policy Planning Officer
(Please note: the word 'policy' is used as shorthand for stategy policy
function or financial decision)
Policy Title Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
Supplementary Guidance
The aim, objective,purpose and intended out come of policy
The Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
Supplementary Guidance will: - explain the significance of the Antonine Wall
and its status as a World Heritage Site; - encourage early and effective
consultation with Councils and Historic Environment Scotland; - outline the
approach and procedure for assessing development affecting the World
Heritage Site; - set out the criteria which will be applied in determining
planning applications for development along the line of, and within the
setting and vicinity of the World Heritage Site; - guide decisions on planning
appeals and enforcement
Service/Partners/Stakeholders/service users involved in the
development and/or implementation of policy.
This draft guidance has been prepared in conjunction with the other four
local authorities on the Antonine Wall, and Historic Environment Scotland. A
range of COuncil services, but mostly the Development Management Team,
and some and external stakeholders and key agencies, and the wider
community, will contribute through the consultation process and
implementation of the guidance.
Does the proposals involve the procurement of any goods or
services? Yes
If yes please confirm that you have contacted our
procurement services to discuss your requirements. No
SCREENING
You must indicate if there is any relevance to the four areas
Duty to eliminate discrimination (E), advance equal
opportunities (A) or foster good relations (F) Yes
Relevance to Human Rights (HR) Yes
Relevance to Health Impacts (H) Yes
Relevance to Social Economic Impacts (SE) Yes
Who will be affected by this policy?
The guidance will have relevance to all people who live, work and visit here, those who own
land, property and businesses as well as those who would wish to invest in the area, but
especially those who live within, or wish to invest or develop within, or close to, the Antonine
Wall World Heritage Site and Buffer Area
Who will be/has been involved in the consultation process?
The Draft Supplementary Guidance is going forward to committee for approval to consult.
Page 153

Page 154

Consultation will follow thereafter.
Please outline any particular need/barriers which equality groups may have in
relation to this policy list evidence you are using to support this and whether there is
any negative impact on particular groups.
Needs Evidence Impact
Age
Boosting
participation of
under-represented
groups is an aim of
the Councils 2021-
2025 Equality
Outcomes, younger
people are often
under represented
Data is not currently
available for these
groups in relation to
this policy
The widespread
benefits are
expected to be
positive across these
groups however
data is not available
as to whether this
will be evenly
positive. . No aspect
of this advice
disadvantages other
groups.
Cross Cutting
The Council is
committed to it's
Community
Empowerment
Strategy therefore it
is important that
strong joint work
across the Council
and partners
supports this.
Evidence suggests
(for Example the
Scottish Social
Attitudes Survey)
shows that the more
contact different
groups have with
each other, the less
likely people are to
hold negative
attitudes about
other groups.
Inclusive projects
which bring
different groups
together provide and
opportunities to
foster good relations
and strengthen
social cohesion.
Disability
Boosting
participation of
under-represented
groups is an aim of
the Councils 2021-
2025 Equality
Outcomes
Adults with a long-
term illness or
disability are less
likely to visit the
outdoors. Source:
Scottish Household
Survey 2017 (Last
updated: September
2018) Sick or
disabled adults more
likely to use bus.
Source: Transport
and Travel in
Scotland 2019 (Last
updated: September
2020)
This policy seeks to
protect important
heritage assets,
which will have
widespread benefits
across the age
bands, it has the
potential to have
greater positive
impact on people
with a disability who
currently are less
likely to access
outdoor space for
recreation, by
promoting measures
which ensure that
open spaces are
accessible and safe.
In particular the
policy includes
measures to ensure
that new play areas
include accessible
Page 154

Page 155

play equipment. This
policy does not
disadvantage any
groups.
Social & Economic
Impact
As this is important
strategic work the
guidance should
reflect the needs of
Fairer Scotland Duty
and the Statutory
Guidance to
assessing impact in
this area
Adults living in the
most deprived areas
less likely to visit the
outdoors In 2019,
43% of adults in the
20% most deprived
areas of Scotland
visited the outdoors
at least once a week,
compared to 66% of
adults in the 20%
least deprived areas.
Source: Scottish
Household Survey
2019 (Last updated:
September 2020)
People from
households with
lower incomes are
more likely to take
the bus, and less
likely to take the
train than those on
higher incomes.
Source: Transport
and Travel in
Scotland 2019 (Last
updated: September
2020)
Proposals to better
protect important
heritage assets will
benefit people of all
economic and social
statuses. However
there is potential for
the impact to be
more positive for
people living in the
most deprived
neighbourhoods as
these groups have
reported using
outdoor space for
recreation less than
others.
Sex
It is important that
out door spaces are
perceived as safe
and inclusive
Men and women
equally likely to visit
the outdoors.
Source: Scottish
Household Survey
2019 (Last updated:
September 2020) A
slightly higher
proportion of men
walk almost every
day. 24% of men
walked as a means
of transport on 6-7
days in the last week
in 2019, compared
to 20% of women. A
higher proportion of
men cycle. 7% of
men had cycled at
least once as a
With regards to
access to the
outdoors and
heritage sites, the
benefits will be
evenly split between
women and men, as
these groups access
outdoor space with
comparable
frequencies.
Page 155

Page 156

means of transport
in the last week,
compared to 3% of
women. Source:
Transport and
Travel in Scotland
2019 (Last updated:
September 2020)
Women use bus
more frequently
Women use the bus
slightly more than
men. 40% of women
had used the bus in
the last month in
2017 compared to
37% of men. There
is little difference in
train use by gender.
30% of women and
29% of men had
used the train within
the past
month.Women are
less likely to have
access to car and
rely more heavily on
public transport
Source: Transport
and Travel in
Scotland 2019 (Last
updated: September
2020)
Gender Reassign Access to safe public
spaces is important.
Those who have
changed or are
changing danger
may suffer from
greater isolation.
The widespread
benefits are
expected to be
positive across these
groups however
data is not available
as to whether this
will be evenly
positive.
Health
It is important that
communities of
place and experience
have an opportunity
to influence the
process, and that
physical and mental
health
considerations are
taken into account
Research shows that
the way places
function, look and
feel can influence
our health and
wellbeing…..Improvi
ng the quality of
places and the
opportunities we
have access to can
help to tackle
Improving the
protection of the
World Heritage Site
the main ambition of
this policy and it is
intended to have
benefits for
education, culture,
health and
wellbeing.
Page 156

Page 157

inequalities.”
Placestandard.scot
Human Rights
The Council must act
in accordance with
the requirements of
the European
Convention on
Human Rights
The policy may place
limits on the use of
property for some
land owners.
Any limit on the use
of property is based
on consideration of
the potential impact
on the fabric and
setting of the World
Heritage Site, as well
as the general
interest of the wider
community.
Marriage & Civil
Partnership
Cross cuts with sex
in some aspects
Data is not currently
available for these
groups in relation to
this policy..
Unlikely to have a
differential impact
outside those linked
to sex
Pregnancy &
Maternity
Public spaces need
to be accessible for
people looking after
children and using
push chairs etc.
Data is not currently
available for these
groups in relation to
this policy
The widespread
benefits are
expected to be
positive across these
groups however
data is not available
as to whether this
will be evenly
positive. . No aspect
of this advice
disadvantages other
groups.
Race
Boosting
participation of
under-represented
groups is an aim of
the Councils 2021-
2025 Equality
Outcomes; BME
groups are often
under represented
The ethnic groups
most likely to have
access to a car or
van at the time of the
2011 Census were
White: Other British
and Pakistani (both
83% of households).
The figure for the
overall population
was 77%. African
households, at 47%,
were least likely to
have access to a car.
Source: Analysis of
Equality Results
from the 2011
Census: Part 2
(Published: March
2015)
The benefits of this
policy may
particularly benefit
groups without
access to a car, this
is not evenly
distributed by race,
however all groups
will benefit from this
policy and none will
be disadvantaged.
Religion and Belief
There is some cross
cutting of religion
and ethnicity in
terms of
considerations
Data is not currently
available for these
groups in relation to
this policy
The widespread
benefits are
expected to be
positive across these
groups however
Page 157

Page 158

data is not available
as to whether this
will be evenly
positive.
Sexual Orientation
LGB people are often
under represented
in similar processes
so it is important
that views are
gathered inclusively
Little difference in
visits to the
outdoors between
LGB and straight
people. Source:
Scottish Household
Survey 2017 (Last
updated: September
2018)
The benefits of
proposals to
improve access to
high quality open
space will be evenly
distributed in
relation to sexual
orientation.
Actions
Policy has a negative impact on an equality group,but is still to be implemented, please
provide justification for this.
n/a
Will the impact of the policy be monitored and reported on an ongoing bases?
The implementation will be monitored annually through the Housing Land Audit, the
Planning Performance Framework and the Antonine Wall Protection Group
Q7 What is you recommendation for this policy?
Intoduce
Please provide a meaningful summary of how you have reached the recommendation
The policy has a range of potential positive impacts both in of an opportunity for community
empowerment and engaging with under represented groups, and in the eventual final shape
of places; no groups with the protected characteristics are disadvantaged by these impacts.
No negative impacts are identified. The guidance will inform future impact assessments of
planning proposals.
Page 158