PLANNING COMMITTEE
At a Meeting of the Planning Committee held in the Civic Space, Council Offices, 16
Church Street on Wednesday, 17 April 2024 at 10.00 a.m.
Present: Councillors Ian Dickson, Gurpreet Singh Johal, Daniel Lennie,
June McKay, Karen Murray Conaghan, Lawrence O’Neill, Chris
Pollock, Hazel Sorrell and Sophie Traynor.
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Nigel Ettles, Principal Solicitor and Nicola Moorcroft,
Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Provost
Douglas McAllister.
Councillor Lawrence O’Neill in the Chair
DECLARATIONS OF INTEREST
Councillor Ian Dickson declared an interest in item DC23/120/FUL: Erection of
decking (retrospective) at 57B Broomhill Crescent, Bonhill, Alexandria by Mr John
Graham, being an adjacent resident and having been approached by both the
applicant and an objector regarding this planning application. Councillor Dickson left
the meeting during consideration of this item.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Planning Committee held on 13 March 2024 were
submitted and approved as a correct record.
PLANNING APPLICATIONS
Reports were submitted by the Planning, Building Standards and Environmental
Health Manager, in respect of the following Planning applications:-
ITEM 4

Page 2

(a) DC23/211/PPP: Proposed construction of Marine Technology Park
comprising industrial units for marine engineering, fabrication, research
and development, and associated uses; along with site access and
associated infrastructure (in principle) at site of former Carless Oil
Terminal, Erskine Ferry Road, Old Kilpatrick by Malin Group.
Reference was made to a site visit which had been undertaken in respect of the
above application. The Planning, Building Standards and Environmental Health
Manager was heard in further explanation, and in answer to Members’ questions.
The Chair invited Mr Ryan McTeggart (Applicant’s Agent) to address the
Committee. Mr McTeggart was heard in respect of the application and in answer to
Members’ questions.
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation, and in answer to Members’
questions, the Committee agreed to refer the application to full Council for
determination, with a recommendation to grant planning permission, in principle,
subject to the conditions set out in Section 9 of the report, as detailed within
Appendix 1 hereto.
Having previously declared an interest in the next item, Councillor Dickson left the
meeting at this point.
(b) DC23/120/FUL: Erection of decking (retrospective) at 57B Broomhill
Crescent, Bonhill, Alexandria by Mr John Graham
Reference was made to a site visit which had been undertaken in respect of
the above application. The Lead Planning Officer Planning and the
Development Management Team Leader were heard in further explanation
and in answer to Members’ questions.
The Chair invited Mr William Cochrane, objector, to address the Committee.
Mr Cochrane was heard in respect of the application and in answer to
Members’ questions.
The Chair invited Mr John Graham, Applicant, to address the Committee. Mr
Graham was heard in respect of the application and in answer to Members’
questions.
ADJOURNMENT
The Chair adjourned the meeting for a short recess. The meeting reconvened
at 11.46 a.m. with the Elected Members listed in the sederunt present,
excluding Councillor Ian Dickson.
The Committee agreed to grant planning permission subject to the condition 2
set out Appendix 2 hereto and amend condition 1 to read as follows:

Page 3

Notwithstanding the approved plans, the applicant and Planning Officers will
work collaboratively to reach a mutual agreed solution regarding the planter(s)
on the upper deck but ensuring that the upper tier is not to be used, other than
for access to woodland.
Councillor Dickson rejoined the meeting at this point.
STREET NAMING AND NUMBERING POLICY
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, requesting agreement to an addition of a name bank to the street
naming policy and allow consideration of street names to be named after a departed
individual.
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation and in answer to Members’
questions, the Committee agreed the new street naming and numbering policy
contained in Appendix 2 of the report and the suggested names, within the name
bank, contained in Appendix 3 of the report.
VALEDICTORY
PAMELA CLIFFORD – PLANNING, BUILDING STANDARDS AND
ENVIRONMENTAL HEALTH MANAGER
Councillor Lawrence O’Neill, Chair, provided the following valedictory, as this would
be the last meeting of the Planning Committee Pamela would be attending before
she moves onto a new role at East Ayrshire Council:
Pamela joined the Council in December 2006 as Development Management Section
Head. In 2012 she became Planning and Building Standards Manager, more
recently picking up Environmental Health along the way.
Pamela has always had a real focus and ambition in delivering the highest quality
new developments, being bold and really pushing forward the regeneration of the
area. This includes our key waterfront regeneration sites at Queens Quay, where
she has been pivotal in what has been achieved there to date. More recently, we had
the former Exxon site begin to progress and the Scottish Marine Technology Park,
on the Carless site, recommended for approval at full council, both of which Pamela
has been key in progressing.
Pamela has consistently driven up the quality of design; introducing and developing
the Council’s Place and Design Panel, which was a very bold approach within a
small authority covering some quite deprived areas. The success has been clear to
see, with the quality of the new developments we have seen on the ground, including
a variety of residential developments, the new Renton Campus and recently
approved Faifley Campus.

Page 4

There has, of course, been controversial sites and developments that Pamela has
taken us through the journey of, the Duntiglennan site being at the top of that list.
Pamela has also overseen the development of both the LDP1 and LDP2, although
issues surrounding the aforementioned Duntiglennan site thwarted their eventual
adoption.
Finally, Pamela steered us though the challenges of the COVID pandemic,
successfully keeping the planning wheels turning.
Overall, Pamela has achieved a huge amount for West Dunbartonshire and will be
very much missed. Our loss is very much East Ayrshire’s gain.
Councillor Karen Murray Conaghan wished Pamela the very best of luck in her new
role. She hoped Pamela was looking forward to the new challenge but also that she
would look back at her time at West Dunbartonshire Council with fondness.
Councillor Gurpreet Singh Johal also wished Pamela well in her new role and
thanked her for all her support to him personally and the Planning Committee.
In response, Pamela thanked everyone for their kind words. She thanked current
and previous Chairs and Vice Chairs and members of the Planning Committee for
their support; the relationship between Officers and Elected Members has been
exceptional, all working towards a common goal of making a difference to the area. It
always being a real team effort.
Pamela thanked everyone at the Council for her seventeen and a half years of
service and is looking forward to seeing the completion of new developments in
West Dunbartonshire.
The meeting closed at 12.06 p.m.

Page 5

APPENDIX 1 
DC23/211/PPP: Proposed construction of Marine Technology Park comprising
industrial units for marine engineering, fabrication, research and development,
and associated uses; along with site access and associated infrastructure (in
principle) at site of former Carless Oil Terminal, Erskine Ferry Road, Old
Kilpatrick by Malin Group. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of works associated with any part of the
development (apart from remediation works approved under DC18/245) and
unless otherwise agree in writing by the Planning Authority, applications for
the approval of matters specified in conditions shall be accompanied by:- 
(a) All proposed development platform(s); 
(b) Full site layout details showing the position of all buildings, roads,
access arrangements, parking areas, footpaths, green corridors, open
space, boundary treatments (inclusive of any walls, fences and gates)
and drainage infrastructure; 
(c) Notwithstanding (b) above, full details of the upgrade to Erskine Ferry
Road within the application site boundary; 
(d) Block and layout plans showing existing, proposed and finished floor
levels and elevations of each building, showing dimensions, and
palettes of external materials; 
(e) Details of existing and proposed site levels; 
(f) Any submissions that include proposals for buildings will provide details
of all parking provision associated with them inclusive of electric
vehicle charging points, cycle parking, shelter and storage provision,
shower, changing and drying facilities and any other facilities and
measures which promote and support active and sustainable travel; 
(g) Landscape and streetscape plans showing the locations and species of
all proposed trees, shrubs, hedges, palettes of hard landscaping
materials and street furniture; 
(h) Details of the management and maintenance of all landscaping and
planting identified in (g) above; 
(i) Details of all existing trees or hedging to be retained; 
(j) Surface Water Drainage arrangements and Sustainable Drainage
arrangements;

Page 6

(k) Details of the disposal of sewerage; 
(l) Full details showing the connection of all proposed buildings to fibre
optic networks; and 
(m) Sustainability Implementation Plan. 
2. Prior to the submission of the first application for the approval of matters
specified in condition submitted under Condition 1 above, a design guide to
establish the principles for the design and locations of buildings/structures,
street furniture, railings, bollards, signage, bins, substations, generators and
cycle parking shall be submitted to and approved in writing by the Planning
Authority.  Unless otherwise agreed in writing by the Planning Authority, each
application for approval of matters specified in conditions submitted under
Condition 1 above shall demonstrate adherence to this design guide.  For the
avoidance of doubt, this shall include adherence to the design principles of
the approved Design and Access Statement dated June 2023. 
3. All applications for the approval of matters specified in condition details
submitted under Condition 1 above shall follow the approach of the
masterplan and phasing plan approved under this permission unless
otherwise agreed by the Planning Authority. 
4. Notwithstanding condition 3 above, all applications for matters specified by
condition submitted under Condition 1 above shall include an up-to-date
phasing plan for the entire application site showing the relevant phases and
anticipated timescales for the development of each phase, and the inter-
relationship of the phases. 
5. The uses hereby permitted within the application site are Use Class 4
(business and light industry and Use Class 5 (general industry), together with
ancillary Use Class 3 (Food and Drink) and Use Class 10 (restricted to an
interpretation centre and a nursery/creche only).  For the absolute avoidance
of doubt, the approved uses within Use Classes 4 and 5 of the Town and
Country (Use Classes) Scotland Order 1997 (as amended) and as may be
subsequently amended or superseded, relate solely to marine engineering
and marine renewables fabrication, research and development, and
associated uses (water compatible or essential infrastructure) and are as
specified in Section 3.3.1 of the submitted Planning Statement dated October
2023.  Any changes in the approved use within the specific Use Class Order
or to other classes of the Use Classes Order will require the submission of a
further application for planning permission. 
6. In terms of Conditions 1 and 5 above, the appropriate minimum finished floor
levels shall be as outlined in the submitted Flood Risk Assessment (FRA)
(dated October 2023) for the proposed uses unless otherwise agreed by the
Planning Authority.  The proposed uses which are assessed as water
compatible or essential infrastructure shall be at a lower elevation – likely to
be 5.27m AOD.  The appropriate finished floor level which are assessed as
non-water compatible or essential infrastructure uses and equates to the

Page 7

1:200 plus climate change plus freeboard level of 6.17m AOD.  Safe
access/egress shall be provided for any elements of development on site that
is not assessed as ‘water compatible’ or ‘essential infrastructure’ i.e. the
interpretation centre, nursery/creche and café and any other use within Class
3 and 10 of Use Classes (Scotland) Order 1997 shall be provided at an
elevation of >5.33m AOD. 
7. As part of any application for the approval of matters specified in conditions, a
Landscape and Ecological Management Plan shall be submitted to and
approved in writing by the Planning Authority.  This Plan shall include works to
enhance the Local Nature Reserve and the timing of works to negate the
impact on amphibians.  The approved Landscape and Ecological
Management Plan including any measures which shall be implemented on
site and unless otherwise agreed in writing by the Planning Authority. Any
modifications or updates required for this approved strategy shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved. 
8. Unless otherwise agreed in writing by the Planning Authority, as part of any
applications for approval of matters specified in conditions, and with regard to
the requirements of condition 1 above, a supporting report which evidences
how the relevant development proposals complies with and delivers the
requirements and aims of the ‘Landscape and Ecological Management Plan’
section of the Design Guide, approved under Condition 2 above. 
9. As part of any application of the approval of matters specified in condition ,
unless otherwise agreed with the Planning Authority, a Construction and
Environment Management Plan (CEMP) shall be submitted to and approved
in writing by the Planning Authority.  The CEMP shall include measures aimed
at ensuring that the areas of Special Protection Area adjacent to the
application site boundary are not adversely affected by pollution, run-off both
during and after the construction phase of the development.  The CEMP shall
also set out details of the schedule of works, including how it will be sought to
schedule all work, and especially those elements of construction with the
highest potential for noise and vibrational disturbance eg piling to the least
sensitive summer period from 16 March to 15 September.  The timetable shall
set out how the construction works will be programmed to minimise noise and
vibration generation during the months of September to March inclusive and
associated disturbance on wintering redshank and other qualifying features of
the Inner Clyde Special Protection Area.  The agreed mitigation measures of
CEMP shall be implemented on site and unless otherwise agreed in writing by
the Planning Authority and shall remain in place for the duration of the
construction phase of the full re-development of the site.  Any modifications or
updates required for the approved CEMP shall first be subject to the written
approval of the Planning Authority and implemented thereafter as approved. 
10. No development shall be undertaken on site between the months of
September to March inclusive until an acoustic/visual screen barrier has been
installed along the boundary between the Inner Clyde Special Protection Area
(SPA) and the area proposed for development works within the application

Page 8

site. Prior to its erection, details of the proposed screen barrier including its
location, extent, design and level of obscurity shall be submitted to, and
approved in writing by the Planning Authority.  The approved screening barrier
shall thereafter be implemented as approved in a timescale agreed in writing
by the Planning Authority.  Unless otherwise agreed in writing by the Planning
Authority, the approved screening barrier shall remain in place and
maintained for when construction works are taking place within the part of the
site impacting the SPA.  For the avoidance of doubt, these barriers shall be
sufficient to ensure that site operatives working on site are fully screened from
any wader species feeding within the SPA boundary out to a distance of 150
metres from the works. 
11. Notwithstanding the terms of Conditions 9 and 10 above, where work is
unavoidably during the sensitive wintering period of the months of September
to March inclusive and it is not practical or possible to pre-install acoustic and
visual screen barriers between the works and SPA then a suitability qualified
independent Ecological Clerk of Works shall be appointed by the
developer/applicant to oversee, monitor and ensure the effectiveness of all
ecological mitigation measures to protect the integrity of the Inner Clyde
Special Protection Area and other ecological designations.  The Planning
Authority shall be notified in writing once this person has been appointed. 
Thereafter, the EcoW shall remain in place for the duration of the construction
works associated with that part of the development and shall be kept
adequately informed of scheduling proposals and will be invested with
sufficient authority to halt or postpone any and all relevant works until such
times as they nave confirmed no Redshank or other wildfowl are feeding on
the SPA out to a distance of 150 metres of the works concerned, unless
otherwise agreed with the Planning Authority. 
12. Prior to the submission of the first application for the approval of matters
specified in conditions submitted under Condition 1 above, a Lighting Strategy
shall be submitted to and approved in writing by the Planning Authority. 
Thereafter, all application for the approval of matters specified in conditions
submitted under Condition 1 above shall demonstrate compliance with the
approved Lighting Strategy.  The Lighting Strategy shall provide specific
confirmation that night lighting will be avoided during the months of
September to March inclusive where such lighting would illuminate areas of
inter-tidal habitat of the Inner Clyde Special Protection Area (SPA) to levels in
excess of 1 Lux (i.e. the maximum natural night-time background light level). It
shall take into account all of the lighting needs associated with the
development during operational hours and shall be the minimum required to
perform the relevant lighting task.  It shall be specifically designed to minimise
the risk of light spillage beyond the development site boundary and into the
sky and to avoid dazzle or distract drivers on nearby roads.  The approved
strategies and lighting scheme, including any mitigation measures shall be
implemented on site and shall remain in place for the duration of the
construction and operational phase of the full re-development of the site, and
unless otherwise agreed in writing by the Planning Authority.  Any
modifications or updates required for these approved strategies shall first be

Page 9

subject to the written approval of the Planning Authority and implemented
thereafter as approved. 
13. No development or construction activity including the temporary use of plant
or storage of materials shall take place within the application site boundary
which overlaps with the SPA or at any location within the SPA designation. 
14. As part of any applications for approval of matters specified in conditions
submitted under Condition 1 above, and with regard to the requirements of
condition 1 above, up-to-date ecology surveys inclusive of all protected
species insofar as required in relation to the area of proposed development
and associated ecological features shall accompany development proposals
within the site.  These surveys shall be carried out by a suitable qualified
ecologist at the appropriate time of year and will be provided to update the
baseline information provided through the Environmental Statement and
ecological surveys provided as part of this application.  Furthermore, should
the results of such surveys show them to be necessary, any such applications
shall also be accompanied by the relevant species protection plans to identify
any license requirements. 
15. As part of the submission of any application for approval of matters specified
in condition under Condition 1 above, it shall be demonstrated that the areas
where otter are identified to lie-up are maintained in the detailed design of the
development. 
16. Unless otherwise agreed in writing by the Planning Authority, as part of the
submission of any application for approval of matters specified in condition
under Condition 1 above an Otter Protection Plan shall be submitted to and
approved by the Planning Authority and any mitigation measures arising from
the Plan shall be implemented as approved. 
17. Prior to the commencement of any piling on site, a method statement setting
out how a ‘soft start’ piling methodology will be implemented on site in order to
ensure that marine mammals, particularly harbour porpoises, are not
impacted by ‘full impact strikes’. 
18. No removal of trees and vegetation shall take place during the bird nesting
season March to September inclusive unless first agreed in writing by the
Planning Authority, and a nesting bird survey shall be undertaken not more
than 48 hours prior to the commencement of site clearance works, the
findings of which shall be submitted and agreed by the Planning Authority. 
19. As part of the first application for the approval of matters specified in
conditions under Condition 1 above, an Energy Strategy for the site shall be
submitted for the approval of the Planning Authority.  The Energy Strategy
shall include details for the delivery and implementation of on-site low carbon
and renewable energy solutions, building specific technologies and features
alongside any other measures aimed at increasing energy efficiency on the
site.  The approved strategy including any agreed measures shall be
implemented on site and unless otherwise agreed in writing by the Planning

Page 10

Authority and shall remain in place for the lifetime of the development.  Any
modifications or updates required for the approved strategy shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved.  All subsequent applications for matters specified by
condition under Condition 1 above shall demonstrate adherence to the agreed
approach. 
20. As part of any application of the approval of matters specified in condition 1
above, unless otherwise agreed with the Planning Authority a Construction
Traffic Management Plan (CTMP) shall be submitted to and approved in
writing by the Planning Authority.  The approved CTMP including any
mitigation measures shall be implemented on site and unless otherwise
agreed in writing by the Planning Authority and shall remain in place for the
duration of the construction phase of the full re-development of the site.  Any
modifications or updates required for the approved CTMP shall first be subject
to the written approval of the Planning Authority and implemented thereafter
as approved. 
21. Prior to the occupation of any part of the site, a site wide Travel Plan including
measures to minimise the impact of traffic and to promote sustainable and
active travel choices for staff and visitors shall be submitted to and approved
in writing by the Planning Authority.  The approved Travel Plan including any
agreed measures shall be implemented on site and unless otherwise agreed
in writing by the Planning Authority and shall remain in place for the lifetime of
the development.  Any modifications or updates required for the approved
Travel Plan shall first be subject to the written approval of the Planning
Authority and implemented thereafter as approved. 
22. Prior to the occupation of any part of Phase 2C on the approved phasing plan,
the works associated with the upgrading and widening of the existing private
section of Erskine Ferry Road to facilitate two-way traffic with a 2 metre
continuous shared footpath/cycleway on one side of the new road shall be
fully completed.  An emergency access shall also be formed along southern
east boundary of the site with the Dalmuir bonded warehouses and fully
completed to the satisfaction of the Planning Authority prior to the occupation
of any part of Phase 2C. 
23. Prior to submission of any application for the approval of matters specified in
conditions a detailed report on the nature and extent of any contamination for
that phase shall be submitted to and approved in writing by the Planning
Authority.  The report shall be prepared by a suitably qualified person and
shall include the following: 
a) A detailed site investigation identifying the extent, scale and nature of
contamination on the site (irrespective of whether this contamination
originates on the site)
b) An assessment of the potential risks (where applicable) to:
• human health
• property (existing and proposed), including buildings, crops,
livestock,pets, woodland and service lines and pipes

Page 11

• groundwater and surface waters
• ecological systems
• archaeological sites and ancient monuments
c) An appraisal of remedial options, including a detailed remediation strategy
based on the preferred option. 
24. That unless otherwise first agreed in writing by the Planning Authority, no
development (other than investigative works) shall commence on any phase
until such time as a detailed Remediation Scheme for that phase has been
submitted to and approved in writing by the Planning Authority.  The scheme
shall be prepared by a suitably qualified person and shall detail the measures
necessary to bring the site to a condition suitable for its intended use.  The
scheme shall include method statements with details of all works to be
undertaken, the remediation objectives and criteria, a timetable of works
and/or details of the phasing of works relative to the rest of the development,
and site management procedures.  The completion of the remediation works
shall mitigate the risks that resulted in the site being identified as
contaminated land under Environmental Protection Act 1990 Part IIA in
relation to the intended use of the land after remediation. 
25. The approved Remediation Scheme shall be carried out in accordance with its
terms prior to the commencement of any development other than that
required to carry out remediation, unless otherwise agreed in writing by the
Planning Authority.  The Planning Authority shall be notified in writing of the
intended commencement of remediation works not less than 14 days before
these works commence on site. 
Upon completion of the remediation works, a verification report which
demonstrates the effectiveness of the completed remediation works shall be
submitted to and approved in writing by the Local Planning Authority 
26. Prior to development of each phase an updated Remediation Statement, as
defined in Section 78H(7) of Part IIA of the EPA 1990, shall be submitted and
approved by Planning Authority and by SEPA as the Enforcing Authority of
the Special Site.  This statement will confirm that the remediation proposed
under DC18/245 has been completed and will also detail the remediation
actions that are being, have been, or are expected to be, done across the
remainder of site as well as the time periods within which these things
were/are being/will be done. 
27. If the Remediation Plan requires it then a monitoring and maintenance
scheme (including the monitoring of the long-term effectiveness of the
proposed remediation) shall be submitted to and approved in writing by the
Planning Authority. Any actions/measures ongoing shall be implemented
within an agreed timescale with the Planning Authority in consultation with
Environmental Health.  Following completion of the actions/measures
identified in the approved remediation scheme a further report which
demonstrates the effectiveness of the monitoring and maintenance measures
shall be submitted to and approved by the Planning Authority.

Page 12

28. The presence of any previously unencountered contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the affected area shall
cease.  At this stage, if requested by the Planning Authority, an investigation
and risk assessment shall be undertaken, and an amended Remediation
Scheme shall be submitted to and approved by the Planning Authority prior to
the recommencement of works in the affected area.  The approved details
shall be implemented as approved. 
29. If there is a requirement to either re-use site won material or to import
material, then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and
approved by the Planning Authority prior to any material being re-used or
imported.  In addition to this and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm within landscaped areas
shall also be free from metals, plastic, wood, glass, tarmac, paper and odours. 
On completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use. 
30. Unless otherwise agreed by the Planning Authority, no works shall take place
on site until such time as a noise / vibration impact assessment has been
submitted to and approved in writing by the Planning Authority.  This
assessment shall include an assessment of the potential for the proposed use
to cause noise / vibration nuisance affecting nearby properties.  Where
potential disturbance is identified, proposals for the attenuation of that noise /
vibration shall be submitted to and approved in writing by the Planning
Authority.  Any such approved attenuation scheme shall be implemented prior
to the works commencing and shall thereafter be retained in accordance with
the approved scheme.  Should the approved attenuation scheme impose
restrictions upon the way in which operations on the site are carried out, the
site shall be operated in this manner unless otherwise approved in writing by
the Planning Authority.  The assessment and any recommendations in
respect of attenuation measures shall be prepared by a suitably qualified
person. 
31. Unless otherwise agreed by the Planning Authority. No development shall
commence on site until such time as a noise control method statement for the
construction period has been submitted to and approved in writing by the
Planning Authority,  This statement shall identify likely sources of noise
(including specific noisy operations and items of plant/machinery), the
anticipated duration of any particularly noisy phases of the construction works,
and details of the proposed means of limiting the impact of these noise
sources upon nearby residential properties and other noise-sensitive
properties.  The construction works shall thereafter be carried out in
accordance with the approved method statement unless otherwise approved
in writing by the Planning Authority.

Page 13

32. During works and any ancillary operations (including piling) which are audible
at the site boundary (or at such other place(s) as may first be agreed in writing
with the Planning Authority), shall be carried out between the following hours
unless otherwise approved in writing by the Planning Authority: 
Mondays to Fridays:  0800-1800
Saturdays:     0800-1300
Sundays and public holidays: No working 
33 No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: ‘Evaluation of Human Response to Vibration in Buildings’.  It shall detail
any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement. 
34. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by the Planning Authority.  The scheme shall identify likely sources of dust
arising from the development or its construction and shall identify measures to
prevent or limit the occurrence and impact of such dust.  The approved
scheme shall thereafter be implemented fully prior to any of the identified dust
generating activities commencing on site and shall be maintained thereafter,
unless otherwise approved by the Planning Authority. 
35. Unless otherwise agreed by the Planning Authority, and prior to the
commencement of development on site an air quality impact assessment in
accordance with the Environmental Protection UK guidance document
“Development Control: Planning for Air Quality 2017” shall be submitted to
and approved by the Planning Authority.  The findings of the assessment shall
be implemented prior to the development commencing on site or within a
timescale agreed by the Planning Authority. 
36. Prior to the commencement on any development on site, details of measures
to protect retained trees and areas of woodland on the site during construction
shall be submitted to and approved in writing by the Planning Authority.  The
details shall include specific details for the establishment of buffer zones for
the protection of trees and area of woodland along and within the site
boundary.  Thereafter, unless otherwise agreed in writing by the Planning
Authority, the approved measures shall be implemented and shall remain in
place for the duration when construction works are taking place on site. 
37. Any application for matters specified by condition submitted under Condition 1
above that proposes buildings or structures exceeding 15 metres in height
shall specifically identify full details of the location, height, layout, form and
materials of any such buildings and structures exceeding 15 metres above

Page 14

ground level to allow a full assessment of these details in consultation with
Glasgow Airport. 
38. As part of any application of the approval of matters specified in condition 1,
unless otherwise agreed with the Planning Authority a Bird Hazard
Management Plan shall be submitted to and approved in writing by the
Planning Authority in consultation with Glasgow Airport.  The submitted plan
shall include details of: management of any flat/shallow pitched/green roofs
on buildings within the site which may be attractive to nesting, roosting and
“loafing” birds.  The management plan shall comply with Advice Note 8
‘Potential Bird Hazards from Building Design ’The Bird Hazard Management
Plan shall be implemented as approved, on completion of the development
and shall remain in force for the life of the development.  No subsequent
alterations to the plan are to take place unless first submitted to and approved
in writing by the Planning Authority in consultation with Glasgow Airport. 
39. No development shall take place in any phase until full details of soft and
water landscaping works shall be submitted to and approved in writing by the
Planning Authority, details must comply with Advice Note 3 ‘Potential Bird
Hazards from Amenity Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguardingasp).  These details shall include: 
• The species, number and spacing of trees and shrubs.
• Drainage details including SUDS – Such schemes must comply with Advice
Note 6 ‘Potential Bird Hazards from Sustainable urban Drainag Schemes
(SUDS) (available at www.aoa.org.uk/publications/safeguarding.asp ). 
No subsequent alterations to the approved landscaping scheme are to take
place unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall be implemented as
approved. 
40. No buildings shall be constructed within the Health and Safety Executive
consultation zone associated with the adjacent Dalmuir bonded warehouses.

Page 15

APPENDIX 2 
DC23/120/FUL: Erection of decking (retrospective) at 57B Broomhill Crescent,
Bonhill, Alexandria by Mr John Graham. 
GRANT full planning permission subject to the following conditions:- 
1. Notwithstanding the approved plans, the planter located on the upper deck as
detailed in drawing PL-806-01 Rev B Original, Existing and Proposed Site
Plans & Sections, shall be created within 8 weeks of the granting of this
permission. Thereafter the planter shall remain in place upon the deck for the
lifetime of the development; and 
2. Notwithstanding the approved plans, the boundary screen fence as detailed in
drawing PL-806-01 Rev B ‘Original, Existing and Proposed Site Plans &
Sections’, shall be erected within 8 weeks of the granting of this permission,
with the final design and location details agreed in writing with the Planning
Authority prior to erection. Thereafter the boundary fence shall remain in place