Agenda 
Planning Committee 
Date:  Wednesday, 8 May 2024
___________________________________________________________________ 
Time:  10.00 a.m.
___________________________________________________________________ 
Venue:  Council Chambers, Clydebank Town Hall, 5 Hall Street, 
Clydebank G81 1UB.
___________________________________________________________________ 
Contact:    Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk   
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a Special meeting of the Planning Committee as detailed
above.   
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive 
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Ian Dickson
Councillor Daniel Lennie
Provost Douglas McAllister
Councillor June McKay
Councillor Karen Murray Conaghan
Councillor Chris Pollock
Councillor Hazel Sorrell
Councillor Sophie Traynor 
All other Councillors for information 
Date of Issue: 24 April 2024 
Page 2

Page 3

PLANNING COMMITTEE
WEDNESDAY, 8 MAY 2024
AGENDA
1 APOLOGIES
2 DECLARATIONS OF INTEREST
Members are invited to declare if they have any interests in the items of
business on this agenda and the reasons for such declarations.
3 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
4 MINUTES OF PREVIOUS MEETING         5 - 19
Submit for approval, as a correct record, the Minutes of the Meeting of the
Planning Committee held 17 April 2024.
5 NOTE OF VISITATIONS         21
Submit, for information, Note of Site Visitations carried out on 15
April 2024.
6 SCOTTISH GOVERNMENT CONSULTATIONS:     23 - 56 
INVESTING IN PLANNING; MASTERPLAN CONSENT
AREAS; AND DEVELOPMENT PLAN AMENDMENTS
Submit report by the Chief Officer – Regulatory and Regeneration seeking
agreement to submit responses to various Scottish Government consultations
on proposed planning regulations and changes to how the planning system is
resourced.
7/
Page 3

Page 4

7 CONSTRUCTION AND OPERATION OF A 560MW   57 - 73
BATTERY ENERGY STORAGE SYSTEM WITH 
ASSOCIATED INFRASTRUCTURE, SUBSTATION, 
SECURITY FENCING, CCTV, SECURITY LIGHTING 
AND LANDSCAPING ON LAND AT COCHNO ROAD,
BEARSDEN, EAST DUNBARTONSHIRE - SECTION 
36 APPLICATION TO SCOTTISH GOVERNMENT 
ENERGY CONSENTS UNIT REF: ECU00004982
Submit report by the Chief Officer – Regulatory and Regeneration to agree a
response to a consultation received from the Scottish Government Energy
Consents Unit on behalf of the Scottish Ministers regarding a proposal for the
construction and operation of a 560MW Battery Energy Storage System with
associated infrastructure, substation, security fencing, CCTV, security lighting
and landscaping.
__________________________________________________________________
Page 4

Page 5

PLANNING COMMITTEE
At a Meeting of the Planning Committee held in the Civic Space, Council Offices, 16
Church Street on Wednesday, 17 April 2024 at 10.00 a.m.
Present: Councillors Ian Dickson, Gurpreet Singh Johal, Daniel Lennie,
June McKay, Karen Murray Conaghan, Lawrence O’Neill, Chris
Pollock, Hazel Sorrell and Sophie Traynor.
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Nigel Ettles, Principal Solicitor and Nicola Moorcroft,
Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Provost
Douglas McAllister.
Councillor Lawrence O’Neill in the Chair
DECLARATIONS OF INTEREST
Councillor Ian Dickson declared an interest in item DC23/120/FUL: Erection of
decking (retrospective) at 57B Broomhill Crescent, Bonhill, Alexandria by Mr John
Graham, being an adjacent resident and having been approached by both the
applicant and an objector regarding this planning application. Councillor Dickson left
the meeting during consideration of this item.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Planning Committee held on 13 March 2024 were
submitted and approved as a correct record.
PLANNING APPLICATIONS
Reports were submitted by the Planning, Building Standards and Environmental
Health Manager, in respect of the following Planning applications:-
ITEM 4
Page 5

Page 6

(a) DC23/211/PPP: Proposed construction of Marine Technology Park
comprising industrial units for marine engineering, fabrication, research
and development, and associated uses; along with site access and
associated infrastructure (in principle) at site of former Carless Oil
Terminal, Erskine Ferry Road, Old Kilpatrick by Malin Group.
Reference was made to a site visit which had been undertaken in respect of the
above application. The Planning, Building Standards and Environmental Health
Manager was heard in further explanation, and in answer to Members’ questions.
The Chair invited Mr Ryan McTeggart (Applicant’s Agent) to address the
Committee. Mr McTeggart was heard in respect of the application and in answer to
Members’ questions.
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation, and in answer to Members’
questions, the Committee agreed to refer the application to full Council for
determination, with a recommendation to grant planning permission, in principle,
subject to the conditions set out in Section 9 of the report, as detailed within
Appendix 1 hereto.
Having previously declared an interest in the next item, Councillor Dickson left the
meeting at this point.
(b) DC23/120/FUL: Erection of decking (retrospective) at 57B Broomhill
Crescent, Bonhill, Alexandria by Mr John Graham
Reference was made to a site visit which had been undertaken in respect of
the above application. The Lead Planning Officer Planning and the
Development Management Team Leader were heard in further explanation
and in answer to Members’ questions.
The Chair invited Mr William Cochrane, objector, to address the Committee.
Mr Cochrane was heard in respect of the application and in answer to
Members’ questions.
The Chair invited Mr John Graham, Applicant, to address the Committee. Mr
Graham was heard in respect of the application and in answer to Members’
questions.
ADJOURNMENT
The Chair adjourned the meeting for a short recess. The meeting reconvened
at 11.46 a.m. with the Elected Members listed in the sederunt present,
excluding Councillor Ian Dickson.
The Committee agreed to grant planning permission subject to the condition 2
set out Appendix 2 hereto and amend condition 1 to read as follows:
Page 6

Page 7

Notwithstanding the approved plans, the applicant and Planning Officers will
work collaboratively to reach a mutual agreed solution regarding the planter(s)
on the upper deck but ensuring that the upper tier is not to be used, other than
for access to woodland.
Councillor Dickson rejoined the meeting at this point.
STREET NAMING AND NUMBERING POLICY
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, requesting agreement to an addition of a name bank to the street
naming policy and allow consideration of street names to be named after a departed
individual.
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation and in answer to Members’
questions, the Committee agreed the new street naming and numbering policy
contained in Appendix 2 of the report and the suggested names, within the name
bank, contained in Appendix 3 of the report.
VALEDICTORY
PAMELA CLIFFORD – PLANNING, BUILDING STANDARDS AND
ENVIRONMENTAL HEALTH MANAGER
Councillor Lawrence O’Neill, Chair, provided the following valedictory, as this would
be the last meeting of the Planning Committee Pamela would be attending before
she moves onto a new role at East Ayrshire Council:
Pamela joined the Council in December 2006 as Development Management Section
Head. In 2012 she became Planning and Building Standards Manager, more
recently picking up Environmental Health along the way.
Pamela has always had a real focus and ambition in delivering the highest quality
new developments, being bold and really pushing forward the regeneration of the
area. This includes our key waterfront regeneration sites at Queens Quay, where
she has been pivotal in what has been achieved there to date. More recently, we had
the former Exxon site begin to progress and the Scottish Marine Technology Park,
on the Carless site, recommended for approval at full council, both of which Pamela
has been key in progressing.
Pamela has consistently driven up the quality of design; introducing and developing
the Council’s Place and Design Panel, which was a very bold approach within a
small authority covering some quite deprived areas. The success has been clear to
see, with the quality of the new developments we have seen on the ground, including
a variety of residential developments, the new Renton Campus and recently
approved Faifley Campus.
Page 7

Page 8

There has, of course, been controversial sites and developments that Pamela has
taken us through the journey of, the Duntiglennan site being at the top of that list.
Pamela has also overseen the development of both the LDP1 and LDP2, although
issues surrounding the aforementioned Duntiglennan site thwarted their eventual
adoption.
Finally, Pamela steered us though the challenges of the COVID pandemic,
successfully keeping the planning wheels turning.
Overall, Pamela has achieved a huge amount for West Dunbartonshire and will be
very much missed. Our loss is very much East Ayrshire’s gain.
Councillor Karen Murray Conaghan wished Pamela the very best of luck in her new
role. She hoped Pamela was looking forward to the new challenge but also that she
would look back at her time at West Dunbartonshire Council with fondness.
Councillor Gurpreet Singh Johal also wished Pamela well in her new role and
thanked her for all her support to him personally and the Planning Committee.
In response, Pamela thanked everyone for their kind words. She thanked current
and previous Chairs and Vice Chairs and members of the Planning Committee for
their support; the relationship between Officers and Elected Members has been
exceptional, all working towards a common goal of making a difference to the area. It
always being a real team effort.
Pamela thanked everyone at the Council for her seventeen and a half years of
service and is looking forward to seeing the completion of new developments in
West Dunbartonshire.
The meeting closed at 12.06 p.m.
Page 8

Page 9

APPENDIX 1 
DC23/211/PPP: Proposed construction of Marine Technology Park comprising
industrial units for marine engineering, fabrication, research and development,
and associated uses; along with site access and associated infrastructure (in
principle) at site of former Carless Oil Terminal, Erskine Ferry Road, Old
Kilpatrick by Malin Group. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of works associated with any part of the
development (apart from remediation works approved under DC18/245) and
unless otherwise agree in writing by the Planning Authority, applications for
the approval of matters specified in conditions shall be accompanied by:- 
(a) All proposed development platform(s); 
(b) Full site layout details showing the position of all buildings, roads,
access arrangements, parking areas, footpaths, green corridors, open
space, boundary treatments (inclusive of any walls, fences and gates)
and drainage infrastructure; 
(c) Notwithstanding (b) above, full details of the upgrade to Erskine Ferry
Road within the application site boundary; 
(d) Block and layout plans showing existing, proposed and finished floor
levels and elevations of each building, showing dimensions, and
palettes of external materials; 
(e) Details of existing and proposed site levels; 
(f) Any submissions that include proposals for buildings will provide details
of all parking provision associated with them inclusive of electric
vehicle charging points, cycle parking, shelter and storage provision,
shower, changing and drying facilities and any other facilities and
measures which promote and support active and sustainable travel; 
(g) Landscape and streetscape plans showing the locations and species of
all proposed trees, shrubs, hedges, palettes of hard landscaping
materials and street furniture; 
(h) Details of the management and maintenance of all landscaping and
planting identified in (g) above; 
(i) Details of all existing trees or hedging to be retained; 
(j) Surface Water Drainage arrangements and Sustainable Drainage
arrangements; 
Page 9

Page 10

(k) Details of the disposal of sewerage; 
(l) Full details showing the connection of all proposed buildings to fibre
optic networks; and 
(m) Sustainability Implementation Plan. 
2. Prior to the submission of the first application for the approval of matters
specified in condition submitted under Condition 1 above, a design guide to
establish the principles for the design and locations of buildings/structures,
street furniture, railings, bollards, signage, bins, substations, generators and
cycle parking shall be submitted to and approved in writing by the Planning
Authority.  Unless otherwise agreed in writing by the Planning Authority, each
application for approval of matters specified in conditions submitted under
Condition 1 above shall demonstrate adherence to this design guide.  For the
avoidance of doubt, this shall include adherence to the design principles of
the approved Design and Access Statement dated June 2023. 
3. All applications for the approval of matters specified in condition details
submitted under Condition 1 above shall follow the approach of the
masterplan and phasing plan approved under this permission unless
otherwise agreed by the Planning Authority. 
4. Notwithstanding condition 3 above, all applications for matters specified by
condition submitted under Condition 1 above shall include an up-to-date
phasing plan for the entire application site showing the relevant phases and
anticipated timescales for the development of each phase, and the inter-
relationship of the phases. 
5. The uses hereby permitted within the application site are Use Class 4
(business and light industry and Use Class 5 (general industry), together with
ancillary Use Class 3 (Food and Drink) and Use Class 10 (restricted to an
interpretation centre and a nursery/creche only).  For the absolute avoidance
of doubt, the approved uses within Use Classes 4 and 5 of the Town and
Country (Use Classes) Scotland Order 1997 (as amended) and as may be
subsequently amended or superseded, relate solely to marine engineering
and marine renewables fabrication, research and development, and
associated uses (water compatible or essential infrastructure) and are as
specified in Section 3.3.1 of the submitted Planning Statement dated October
2023.  Any changes in the approved use within the specific Use Class Order
or to other classes of the Use Classes Order will require the submission of a
further application for planning permission. 
6. In terms of Conditions 1 and 5 above, the appropriate minimum finished floor
levels shall be as outlined in the submitted Flood Risk Assessment (FRA)
(dated October 2023) for the proposed uses unless otherwise agreed by the
Planning Authority.  The proposed uses which are assessed as water
compatible or essential infrastructure shall be at a lower elevation – likely to
be 5.27m AOD.  The appropriate finished floor level which are assessed as
non-water compatible or essential infrastructure uses and equates to the
Page 10

Page 11

1:200 plus climate change plus freeboard level of 6.17m AOD.  Safe
access/egress shall be provided for any elements of development on site that
is not assessed as ‘water compatible’ or ‘essential infrastructure’ i.e. the
interpretation centre, nursery/creche and café and any other use within Class
3 and 10 of Use Classes (Scotland) Order 1997 shall be provided at an
elevation of >5.33m AOD. 
7. As part of any application for the approval of matters specified in conditions, a
Landscape and Ecological Management Plan shall be submitted to and
approved in writing by the Planning Authority.  This Plan shall include works to
enhance the Local Nature Reserve and the timing of works to negate the
impact on amphibians.  The approved Landscape and Ecological
Management Plan including any measures which shall be implemented on
site and unless otherwise agreed in writing by the Planning Authority. Any
modifications or updates required for this approved strategy shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved. 
8. Unless otherwise agreed in writing by the Planning Authority, as part of any
applications for approval of matters specified in conditions, and with regard to
the requirements of condition 1 above, a supporting report which evidences
how the relevant development proposals complies with and delivers the
requirements and aims of the ‘Landscape and Ecological Management Plan’
section of the Design Guide, approved under Condition 2 above. 
9. As part of any application of the approval of matters specified in condition ,
unless otherwise agreed with the Planning Authority, a Construction and
Environment Management Plan (CEMP) shall be submitted to and approved
in writing by the Planning Authority.  The CEMP shall include measures aimed
at ensuring that the areas of Special Protection Area adjacent to the
application site boundary are not adversely affected by pollution, run-off both
during and after the construction phase of the development.  The CEMP shall
also set out details of the schedule of works, including how it will be sought to
schedule all work, and especially those elements of construction with the
highest potential for noise and vibrational disturbance eg piling to the least
sensitive summer period from 16 March to 15 September.  The timetable shall
set out how the construction works will be programmed to minimise noise and
vibration generation during the months of September to March inclusive and
associated disturbance on wintering redshank and other qualifying features of
the Inner Clyde Special Protection Area.  The agreed mitigation measures of
CEMP shall be implemented on site and unless otherwise agreed in writing by
the Planning Authority and shall remain in place for the duration of the
construction phase of the full re-development of the site.  Any modifications or
updates required for the approved CEMP shall first be subject to the written
approval of the Planning Authority and implemented thereafter as approved. 
10. No development shall be undertaken on site between the months of
September to March inclusive until an acoustic/visual screen barrier has been
installed along the boundary between the Inner Clyde Special Protection Area
(SPA) and the area proposed for development works within the application
Page 11

Page 12

site. Prior to its erection, details of the proposed screen barrier including its
location, extent, design and level of obscurity shall be submitted to, and
approved in writing by the Planning Authority.  The approved screening barrier
shall thereafter be implemented as approved in a timescale agreed in writing
by the Planning Authority.  Unless otherwise agreed in writing by the Planning
Authority, the approved screening barrier shall remain in place and
maintained for when construction works are taking place within the part of the
site impacting the SPA.  For the avoidance of doubt, these barriers shall be
sufficient to ensure that site operatives working on site are fully screened from
any wader species feeding within the SPA boundary out to a distance of 150
metres from the works. 
11. Notwithstanding the terms of Conditions 9 and 10 above, where work is
unavoidably during the sensitive wintering period of the months of September
to March inclusive and it is not practical or possible to pre-install acoustic and
visual screen barriers between the works and SPA then a suitability qualified
independent Ecological Clerk of Works shall be appointed by the
developer/applicant to oversee, monitor and ensure the effectiveness of all
ecological mitigation measures to protect the integrity of the Inner Clyde
Special Protection Area and other ecological designations.  The Planning
Authority shall be notified in writing once this person has been appointed. 
Thereafter, the EcoW shall remain in place for the duration of the construction
works associated with that part of the development and shall be kept
adequately informed of scheduling proposals and will be invested with
sufficient authority to halt or postpone any and all relevant works until such
times as they nave confirmed no Redshank or other wildfowl are feeding on
the SPA out to a distance of 150 metres of the works concerned, unless
otherwise agreed with the Planning Authority. 
12. Prior to the submission of the first application for the approval of matters
specified in conditions submitted under Condition 1 above, a Lighting Strategy
shall be submitted to and approved in writing by the Planning Authority. 
Thereafter, all application for the approval of matters specified in conditions
submitted under Condition 1 above shall demonstrate compliance with the
approved Lighting Strategy.  The Lighting Strategy shall provide specific
confirmation that night lighting will be avoided during the months of
September to March inclusive where such lighting would illuminate areas of
inter-tidal habitat of the Inner Clyde Special Protection Area (SPA) to levels in
excess of 1 Lux (i.e. the maximum natural night-time background light level). It
shall take into account all of the lighting needs associated with the
development during operational hours and shall be the minimum required to
perform the relevant lighting task.  It shall be specifically designed to minimise
the risk of light spillage beyond the development site boundary and into the
sky and to avoid dazzle or distract drivers on nearby roads.  The approved
strategies and lighting scheme, including any mitigation measures shall be
implemented on site and shall remain in place for the duration of the
construction and operational phase of the full re-development of the site, and
unless otherwise agreed in writing by the Planning Authority.  Any
modifications or updates required for these approved strategies shall first be
Page 12

Page 13

subject to the written approval of the Planning Authority and implemented
thereafter as approved. 
13. No development or construction activity including the temporary use of plant
or storage of materials shall take place within the application site boundary
which overlaps with the SPA or at any location within the SPA designation. 
14. As part of any applications for approval of matters specified in conditions
submitted under Condition 1 above, and with regard to the requirements of
condition 1 above, up-to-date ecology surveys inclusive of all protected
species insofar as required in relation to the area of proposed development
and associated ecological features shall accompany development proposals
within the site.  These surveys shall be carried out by a suitable qualified
ecologist at the appropriate time of year and will be provided to update the
baseline information provided through the Environmental Statement and
ecological surveys provided as part of this application.  Furthermore, should
the results of such surveys show them to be necessary, any such applications
shall also be accompanied by the relevant species protection plans to identify
any license requirements. 
15. As part of the submission of any application for approval of matters specified
in condition under Condition 1 above, it shall be demonstrated that the areas
where otter are identified to lie-up are maintained in the detailed design of the
development. 
16. Unless otherwise agreed in writing by the Planning Authority, as part of the
submission of any application for approval of matters specified in condition
under Condition 1 above an Otter Protection Plan shall be submitted to and
approved by the Planning Authority and any mitigation measures arising from
the Plan shall be implemented as approved. 
17. Prior to the commencement of any piling on site, a method statement setting
out how a ‘soft start’ piling methodology will be implemented on site in order to
ensure that marine mammals, particularly harbour porpoises, are not
impacted by ‘full impact strikes’. 
18. No removal of trees and vegetation shall take place during the bird nesting
season March to September inclusive unless first agreed in writing by the
Planning Authority, and a nesting bird survey shall be undertaken not more
than 48 hours prior to the commencement of site clearance works, the
findings of which shall be submitted and agreed by the Planning Authority. 
19. As part of the first application for the approval of matters specified in
conditions under Condition 1 above, an Energy Strategy for the site shall be
submitted for the approval of the Planning Authority.  The Energy Strategy
shall include details for the delivery and implementation of on-site low carbon
and renewable energy solutions, building specific technologies and features
alongside any other measures aimed at increasing energy efficiency on the
site.  The approved strategy including any agreed measures shall be
implemented on site and unless otherwise agreed in writing by the Planning
Page 13

Page 14

Authority and shall remain in place for the lifetime of the development.  Any
modifications or updates required for the approved strategy shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved.  All subsequent applications for matters specified by
condition under Condition 1 above shall demonstrate adherence to the agreed
approach. 
20. As part of any application of the approval of matters specified in condition 1
above, unless otherwise agreed with the Planning Authority a Construction
Traffic Management Plan (CTMP) shall be submitted to and approved in
writing by the Planning Authority.  The approved CTMP including any
mitigation measures shall be implemented on site and unless otherwise
agreed in writing by the Planning Authority and shall remain in place for the
duration of the construction phase of the full re-development of the site.  Any
modifications or updates required for the approved CTMP shall first be subject
to the written approval of the Planning Authority and implemented thereafter
as approved. 
21. Prior to the occupation of any part of the site, a site wide Travel Plan including
measures to minimise the impact of traffic and to promote sustainable and
active travel choices for staff and visitors shall be submitted to and approved
in writing by the Planning Authority.  The approved Travel Plan including any
agreed measures shall be implemented on site and unless otherwise agreed
in writing by the Planning Authority and shall remain in place for the lifetime of
the development.  Any modifications or updates required for the approved
Travel Plan shall first be subject to the written approval of the Planning
Authority and implemented thereafter as approved. 
22. Prior to the occupation of any part of Phase 2C on the approved phasing plan,
the works associated with the upgrading and widening of the existing private
section of Erskine Ferry Road to facilitate two-way traffic with a 2 metre
continuous shared footpath/cycleway on one side of the new road shall be
fully completed.  An emergency access shall also be formed along southern
east boundary of the site with the Dalmuir bonded warehouses and fully
completed to the satisfaction of the Planning Authority prior to the occupation
of any part of Phase 2C. 
23. Prior to submission of any application for the approval of matters specified in
conditions a detailed report on the nature and extent of any contamination for
that phase shall be submitted to and approved in writing by the Planning
Authority.  The report shall be prepared by a suitably qualified person and
shall include the following: 
a) A detailed site investigation identifying the extent, scale and nature of
contamination on the site (irrespective of whether this contamination
originates on the site)
b) An assessment of the potential risks (where applicable) to:
• human health
• property (existing and proposed), including buildings, crops,
livestock,pets, woodland and service lines and pipes
Page 14

Page 15

• groundwater and surface waters
• ecological systems
• archaeological sites and ancient monuments
c) An appraisal of remedial options, including a detailed remediation strategy
based on the preferred option. 
24. That unless otherwise first agreed in writing by the Planning Authority, no
development (other than investigative works) shall commence on any phase
until such time as a detailed Remediation Scheme for that phase has been
submitted to and approved in writing by the Planning Authority.  The scheme
shall be prepared by a suitably qualified person and shall detail the measures
necessary to bring the site to a condition suitable for its intended use.  The
scheme shall include method statements with details of all works to be
undertaken, the remediation objectives and criteria, a timetable of works
and/or details of the phasing of works relative to the rest of the development,
and site management procedures.  The completion of the remediation works
shall mitigate the risks that resulted in the site being identified as
contaminated land under Environmental Protection Act 1990 Part IIA in
relation to the intended use of the land after remediation. 
25. The approved Remediation Scheme shall be carried out in accordance with its
terms prior to the commencement of any development other than that
required to carry out remediation, unless otherwise agreed in writing by the
Planning Authority.  The Planning Authority shall be notified in writing of the
intended commencement of remediation works not less than 14 days before
these works commence on site. 
Upon completion of the remediation works, a verification report which
demonstrates the effectiveness of the completed remediation works shall be
submitted to and approved in writing by the Local Planning Authority 
26. Prior to development of each phase an updated Remediation Statement, as
defined in Section 78H(7) of Part IIA of the EPA 1990, shall be submitted and
approved by Planning Authority and by SEPA as the Enforcing Authority of
the Special Site.  This statement will confirm that the remediation proposed
under DC18/245 has been completed and will also detail the remediation
actions that are being, have been, or are expected to be, done across the
remainder of site as well as the time periods within which these things
were/are being/will be done. 
27. If the Remediation Plan requires it then a monitoring and maintenance
scheme (including the monitoring of the long-term effectiveness of the
proposed remediation) shall be submitted to and approved in writing by the
Planning Authority. Any actions/measures ongoing shall be implemented
within an agreed timescale with the Planning Authority in consultation with
Environmental Health.  Following completion of the actions/measures
identified in the approved remediation scheme a further report which
demonstrates the effectiveness of the monitoring and maintenance measures
shall be submitted to and approved by the Planning Authority. 
Page 15

Page 16

28. The presence of any previously unencountered contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the affected area shall
cease.  At this stage, if requested by the Planning Authority, an investigation
and risk assessment shall be undertaken, and an amended Remediation
Scheme shall be submitted to and approved by the Planning Authority prior to
the recommencement of works in the affected area.  The approved details
shall be implemented as approved. 
29. If there is a requirement to either re-use site won material or to import
material, then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and
approved by the Planning Authority prior to any material being re-used or
imported.  In addition to this and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm within landscaped areas
shall also be free from metals, plastic, wood, glass, tarmac, paper and odours. 
On completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use. 
30. Unless otherwise agreed by the Planning Authority, no works shall take place
on site until such time as a noise / vibration impact assessment has been
submitted to and approved in writing by the Planning Authority.  This
assessment shall include an assessment of the potential for the proposed use
to cause noise / vibration nuisance affecting nearby properties.  Where
potential disturbance is identified, proposals for the attenuation of that noise /
vibration shall be submitted to and approved in writing by the Planning
Authority.  Any such approved attenuation scheme shall be implemented prior
to the works commencing and shall thereafter be retained in accordance with
the approved scheme.  Should the approved attenuation scheme impose
restrictions upon the way in which operations on the site are carried out, the
site shall be operated in this manner unless otherwise approved in writing by
the Planning Authority.  The assessment and any recommendations in
respect of attenuation measures shall be prepared by a suitably qualified
person. 
31. Unless otherwise agreed by the Planning Authority. No development shall
commence on site until such time as a noise control method statement for the
construction period has been submitted to and approved in writing by the
Planning Authority,  This statement shall identify likely sources of noise
(including specific noisy operations and items of plant/machinery), the
anticipated duration of any particularly noisy phases of the construction works,
and details of the proposed means of limiting the impact of these noise
sources upon nearby residential properties and other noise-sensitive
properties.  The construction works shall thereafter be carried out in
accordance with the approved method statement unless otherwise approved
in writing by the Planning Authority. 
Page 16

Page 17

32. During works and any ancillary operations (including piling) which are audible
at the site boundary (or at such other place(s) as may first be agreed in writing
with the Planning Authority), shall be carried out between the following hours
unless otherwise approved in writing by the Planning Authority: 
Mondays to Fridays:  0800-1800
Saturdays:     0800-1300
Sundays and public holidays: No working 
33 No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: ‘Evaluation of Human Response to Vibration in Buildings’.  It shall detail
any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement. 
34. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by the Planning Authority.  The scheme shall identify likely sources of dust
arising from the development or its construction and shall identify measures to
prevent or limit the occurrence and impact of such dust.  The approved
scheme shall thereafter be implemented fully prior to any of the identified dust
generating activities commencing on site and shall be maintained thereafter,
unless otherwise approved by the Planning Authority. 
35. Unless otherwise agreed by the Planning Authority, and prior to the
commencement of development on site an air quality impact assessment in
accordance with the Environmental Protection UK guidance document
“Development Control: Planning for Air Quality 2017” shall be submitted to
and approved by the Planning Authority.  The findings of the assessment shall
be implemented prior to the development commencing on site or within a
timescale agreed by the Planning Authority. 
36. Prior to the commencement on any development on site, details of measures
to protect retained trees and areas of woodland on the site during construction
shall be submitted to and approved in writing by the Planning Authority.  The
details shall include specific details for the establishment of buffer zones for
the protection of trees and area of woodland along and within the site
boundary.  Thereafter, unless otherwise agreed in writing by the Planning
Authority, the approved measures shall be implemented and shall remain in
place for the duration when construction works are taking place on site. 
37. Any application for matters specified by condition submitted under Condition 1
above that proposes buildings or structures exceeding 15 metres in height
shall specifically identify full details of the location, height, layout, form and
materials of any such buildings and structures exceeding 15 metres above
Page 17

Page 18

ground level to allow a full assessment of these details in consultation with
Glasgow Airport. 
38. As part of any application of the approval of matters specified in condition 1,
unless otherwise agreed with the Planning Authority a Bird Hazard
Management Plan shall be submitted to and approved in writing by the
Planning Authority in consultation with Glasgow Airport.  The submitted plan
shall include details of: management of any flat/shallow pitched/green roofs
on buildings within the site which may be attractive to nesting, roosting and
“loafing” birds.  The management plan shall comply with Advice Note 8
‘Potential Bird Hazards from Building Design ’The Bird Hazard Management
Plan shall be implemented as approved, on completion of the development
and shall remain in force for the life of the development.  No subsequent
alterations to the plan are to take place unless first submitted to and approved
in writing by the Planning Authority in consultation with Glasgow Airport. 
39. No development shall take place in any phase until full details of soft and
water landscaping works shall be submitted to and approved in writing by the
Planning Authority, details must comply with Advice Note 3 ‘Potential Bird
Hazards from Amenity Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguardingasp).  These details shall include: 
• The species, number and spacing of trees and shrubs.
• Drainage details including SUDS – Such schemes must comply with Advice
Note 6 ‘Potential Bird Hazards from Sustainable urban Drainag Schemes
(SUDS) (available at www.aoa.org.uk/publications/safeguarding.asp ). 
No subsequent alterations to the approved landscaping scheme are to take
place unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall be implemented as
approved. 
40. No buildings shall be constructed within the Health and Safety Executive
consultation zone associated with the adjacent Dalmuir bonded warehouses.
Page 18

Page 19

APPENDIX 2 
DC23/120/FUL: Erection of decking (retrospective) at 57B Broomhill Crescent,
Bonhill, Alexandria by Mr John Graham. 
GRANT full planning permission subject to the following conditions:- 
1. Notwithstanding the approved plans, the planter located on the upper deck as
detailed in drawing PL-806-01 Rev B Original, Existing and Proposed Site
Plans & Sections, shall be created within 8 weeks of the granting of this
permission. Thereafter the planter shall remain in place upon the deck for the
lifetime of the development; and 
2. Notwithstanding the approved plans, the boundary screen fence as detailed in
drawing PL-806-01 Rev B ‘Original, Existing and Proposed Site Plans &
Sections’, shall be erected within 8 weeks of the granting of this permission,
with the final design and location details agreed in writing with the Planning
Authority prior to erection. Thereafter the boundary fence shall remain in place
upon the deck for the lifetime of the development. 
Page 19

Page 20

Page 20

Page 21

PLANNING COMMITTEE
NOTE OF VISITATIONS – 15 APRIL 2024
Present: Councillors Karen Murray Conaghan and Chris Pollock.
Attending: Pamela Clifford, Planning, Building Standards and Environmental
Health Manager and James McColl, Development Management
Team Leader. 
SITE VISITS
Site visits were undertaken in connection with the undernoted planning applications:-
Site of former Carless Oil Terminal, Erskine Ferry Road, Old Kilpatrick by Malin
Group
DC23/211/PPP: Proposed construction of Marine Technology Park comprising
industrial units for marine engineering, fabrication, research and development, and
associated uses; along with site access and associated infrastructure (in principle) by
Malin Property Group.
57B Broomhill Crescent, Bonhill, Alexandria
DC23/120/FUL: Erection of decking (retrospective) by Mr John Graham
ITEM 5
Page 21

Page 22

Page 22

Page 23

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 8th May 2024
_____________________________________________________________
Subject: Scottish Government Consultations: Investing in Planning;
Masterplan Consent Areas; and Development Plan Amendments
1. Purpose
1.1 To seek the agreement of the Committee to submit responses to various
Scottish Government consultations on proposed planning regulations and
changes to how the planning system is resourced.
2. Recommendations
2.1 It is recommended that the Committee agree the proposed Council
responses set out in Appendix 1 (Investing in Planning), Appendix 2
(Masterplan Consent Areas Regulations: Consultation) and Appendix 3
(Development Plan Amendment Regulations: Consultation).
3. Background
3.1 The Planning (Scotland) Act 2019 has introduced new changes and
responsibilities to the planning system in Scotland. The Scottish
Government published the following consultation documents:
• Investing in Planning – A Consultation on Resourcing Scotland’s
Planning System (31 May 2024) -In response to current resourcing
challenges as well as new aspects of the planning system, it sets out
proposals to improve capacity and build resilience within planning
authorities
• Masterplan Consent Area Regulations: Consultation (22 May 2024)
- are a new upfront consenting mechanism for development proposals,
which remove the need for planning and other consent applications.
• Development Plan Amendment Regulations: Consultation (22 May
2024) - With the new 10 year review period for the National Planning
Framework and Local Development Plans, the 2019 act introduced a
mechanism for these plans to be amended between full review cycles.
ITEM 6
Page 23

Page 24

4. Main Issues
Investing in Planning Consultation
4.1 The Scottish Government is committed to working with stakeholders to
ensure the planning system is better equipped to deal with current and
future challenges. They recognise that there is a need to build capacity and
skills to enable good quality development that improves places, benefits
our quality of life and helps to grow a wellbeing economy and transition to
net zero. The investing in planning consultation contains proposals seeking
to address the resourcing challenges faced by local planning authorities,
and new aspects of the planning system, such as Masterplan Consent
Areas. The proposals contain a mix of short-term solutions and building
long term resilience. Below is a summary of the key proposals within the
consultation and the views expressed to those proposals in the Council’s
consultation response in Appendix 1 of this report.
4.2 The proportionality of assessments: Stakeholders have raised concerns
about the level of information required to support planning applications and
demonstrate that they meet the requirements of NPF4. Applicants have
reported requirements differing significantly between authorities, potentially
increasing the time and cost to applicants, authorities and communities in
evaluating evidence. The Chief Planner is looking to set up a short life
working group to contribute expertise and share examples of proportionate
approaches. The consultation asks if any assessments might benefit from
improved proportionality. The recommended response does not suggest
specific assessments but supports sharing of best practice and a more
standardised approach to assessments would be beneficial.
4.3 Use of processing agreements: The consultation asks about use and
effectiveness of planning processing agreements in giving greater
understanding and certainty to all parties of decision-making timescales. In
West Dunbartonshire the Planning Service frontload all major and
significant applications which has resulted in major application timescales
being well below the Scottish national average. The Service do not tend to
use processing agreements, but have developed a Pre-Application
Framework instead, which is a more informal, flexible tool and includes
public engagement, elected member engagement and the Place and
Design Panel. There is no requirement to use a processing agreement if
detailed pre application discussions take place as all the issues are
understood upfront by applicant and officers and can be addressed
together with early consultee comments. It is considered that a processing
agreement would just add a further level of bureaucracy. 
4.4 Streamlining, alignment and standardisation: This section suggests
providing standardised templates for Section 75 agreements, improved
cross council working to align different consents, and asks for any other
Page 24

Page 25

suggestions for streamlining, alignment or standardisation. The
recommended response states certain types of smaller applications, such
as householder applications, have similar issues and requirements.
Standardised approaches to these types of developments may be helpful
in speeding up the processing of these types of applications. A
standardised template for Section 75 agreements would also be helpful. 
4.5 Skills, Recruitment and Retention: There is a challenge in recruiting and
retaining planners, especially in the public sector, due to the lack of
resources, and a general shortage of experienced planners. Additional
demands on the skills pool, such as the increased complexity of
applications and demand from other sectors, such as energy, are also
contributory factors. The response highlights that specialist skills are
lacking within local authorities, as they have been lost over time due to
resource challenges. Specific subject areas include landscape, heritage,
urban design and ecology. The response also highlights other actions that
could be taken to address skill shortages, such as upskilling existing local
government staff, and investigating the opportunities to support other built
environment professionals (e.g. architects or surveyors) to move into
planning. Whilst it is recognised that good progress is being made to
encourage school leavers to join the profession through the joint work of
the Scottish Government, RTPI and HOPS through bursaries and this will
assist the profession in the future, more needs to be done to address the
lack of experienced planners at present which can disproportionately affect
smaller planning authorities. Whilst the larger planning authorities can
upskill existing staff this can be difficult in a smaller Local Authority where
focus can be in processing of applications to achieve good performance
levels and deliver development on the ground.  
4.6 Establishing a central planning hub to support planning authorities:
The consultation suggests that a Planning Hub would provide a central
pool of staff or specialists local authorities could be called upon when
needed. This could help to provide capacity, increase resilience, and allow
better access to specialists in local authorities. The idea is very similar to
the Building Standards Hub. The recommended response supports in part
the idea, which could be of benefit  to smaller planning authorities, like
West Dunbartonshire, which has less resilience to the  loss of staff and
less resources to engage specialists. However, at this stage more
information is required about how it would operate and costs. There is also
some concern the hub may recruit some planning officers from local
authorities thus causing more difficulties. The response also suggests a
number of specialisms would be beneficial to have within the hub and
suggests the hub could be hosted by the Improvement Service, which has
an established relationship with local authorities and would be a natural
extension to some of the services they provide. An increase to planning
fees would be the most straightforward way to fund the hub, however any
Page 25

Page 26

funding proposal would need to be consistent with the Verity House
Agreement and again further details would be required before commitment.
4.7 Planning fees: The consultation proposes a number of changes to
planning fees to provide more resources directly to local authorities.
Devolving power to set planning fees to local authorities is proposed but it
is not supported in the response. Setting fees locally would likely be
complex and time consuming to implement. It could also lead to
disagreements between authorities and developers, which would be
unproductive, lead to longer timescales, and increase uncertainty. The
consultation also proposes an annual inflationary increase to planning
fees, which is supported and it is recommended that this should be
implemented now. 
4.8 The consultation proposes that local authorities could increase
discretionary fees on sites not allocated in the local plan. The proposed
response supports this proposal on the basis that sites allocated in the
plan have already undergone a degree of assessment and scrutiny,
whereas an unallocated site has not. It is also proposed to introduce fees
for appeals and Local Review Bodies. The recommended response
supports this measure due to the time and resource responding to an
appeal, or running a Local Review Body requires. However, the response
does suggest that a fee higher than that proposed in the consultation
(between 10% and 40%) might be more appropriate.
4.9 The consultation proposes introducing a fee category for hydrogen
projects, increased fees for prior notifications and approval categories.
which is supported. Introducing a fee for using the online planning and
building warrant portal is also proposed.  The response does not agree
with this proposal. A fee for the use of the portal on top of planning fees,
may leave applicants feeling they are paying for their application twice.
Charging for the portal through planning fees would effectively pass the
cost onto local authorities. A fee may also discourage applicants from
using the portal, which is usually the most efficient way to receive and
process applications. 
4.10 Energy application threshold:  Changing the 50MW threshold for energy
applications to be determined by local authorities is supported, as it would
give a greater level of local control over these projects and the local
authority would receive the full planning fee on proposals above 50MW,
where they currently only receive half. It would also alleviate pressures on
the Energy Consents Unit.
4.11 Prioritisation: The consultation asks which actions should be prioritised.
The response supports prioritising increasing fees with inflation and
charges for prior notifications and approval and guidance for the policies of
Page 26

Page 27

NPF4.  Throughout the response, it has been highlighted that many of the
resource issues faced by planning authorities are due to wider local
authority and public sector resource challenges. It is not just planning
services that are responsible for a well-functioning planning system. Other
local authority services (e.g. roads, housing, green space, communities)
also contribute to planning and they are challenged by the availability of
resources. The broad range of policies in NPF4 has put more pressure on
these services which need to be adequately resourced, otherwise the
planning process will be slowed down. The same applies to Key Agencies,
who are not able to provide the level of support they once were. More
adequate funding for other services of local authorities and the public
sector (such as fees) should also be considered.
Masterplan Consent Areas (MCAs)
4.12 MCA schemes will front-load consenting, by giving upfront consent for
several types of consent, including planning permission, roads construction
consent, listed building consent, and conservation area consent. The 1997
Act provides that planning authorities will be able to prepare a MCA
‘Scheme’ setting out the detail of what they are giving consent for, through
the MCA scheme. The MCA scheme can include conditions, limitations
and exceptions which may cover aspects such as development
parameters, design and environmental matters. Within adopted MCA
areas, development could be brought forward in line with the agreed
scheme without the need for any further application.
4.13 The Council’s response to the MCA regulations consultation is set out in
Appendix 2. The key points from the Council’s response include:
• Agreement with the principle of the regulations and is supportive of
guidance being prepared before this part of the planning act comes into
force.
• Agreement with all forms of development which the Planning and
Roads Authorities would otherwise grant consent for being able to be
granted with a MCA.
• Agreement that no additional areas should be excluded to those within
the Planning Act, such as World Heritage Sites or Sites of Special
Scientific Interest.
• Suggestions that the requirements in relation to the duty to periodically
consider making an MCA scheme should be set out in regulations,
rather than guidance, so as to ensure certainty and consistency.
• Agreement with requirements to consult community councils and hold
public consultation events for possible proposals for a masterplan
consent areas scheme.
• Agreement that reasoning should be provided for any conditions placed
on a MCA scheme, as is the case with planning applications.
• Agreement with regulations in relation to who a planning authority must
notify about a proposed MCA scheme and how consultation should be
Page 27

Page 28

undertaken as these broadly align with existing processes for planning
applications.
• Agreement that there should be a minimum 30-day period for
representations in line with current arrangements for Environmental
Impact Assessment applications, with a suggested wording to clarify
that this a longer period is acceptable.
• Agreement with the requirement to hold a hearing for development
which would be national development as well as the proposal to give all
interested parties the opportunity to be heard at such a hearing.
• Agreement with proposals in relation to notification of Ministers;
inclusion in the planning register and for publication of decision notices
online, with a suggestion to remove the requirement to publish a
decision notice in a local newspaper or reduce the required content of
notices to be published in a local newspaper.
• Agreement with the proposals for altering a MCA scheme, noting that
the requirements for review should be proportionate to the extent that
the scheme is to be altered.
• A suggestion that the form of notices should be included in regulations.
• Agreement that the processes for a MCA, which relates to
Environmental Impact Assessment development should have similar
procedures to Environmental Impact Assessment applications.
Development Plan Amendment Regulations
4.14 The Planning Act (Scotland) 2019 amended the Town and Country
Planning Act (Scotland) 1997 to require the Scottish Government to fully
review the National Planning Framework (NPF) every 10 years and
planning authorities to fully review Local Development Plans (LDP) every
10 years. Given the length of time between these review periods, they also
added provisions to enable both documents to be amended between full
review cycles. The regulations will set out the processes to amend
development plan documents and requirements the Scottish Government
and planning authorities must consider when preparing amendments.
4.15 The Scottish Government are proposing that if an amendment would
change at least half (nine or more) of the national developments or at least
half (17 or more) of the national planning policies in the NPF then this
would trigger a full review. This is acknowledged as being a high bar to
trigger a full review, their reason given is that the wish to provide
confidence in the planning system over the long term and that a full review
is resource intensive for stakeholders.
4.16 The consultation paper sets out the process for amending the NPF which
includes engagement and justification, preparation, consultation, scrutiny,
and adoption. It also sets out the following process for amending LDPs,
Page 28

Page 29

which includes justification, preparation, consultation, examination and
adoption. 
4.17 The Council’s response to the Development Plan amendment regulations
consultation is set out in Appendix 3. The key points from the Council’s
response include:
• When considering if an amendment to the NPF would trigger a full
review of the NPF a combination of changes to national planning
policies and national developments should be considered.
• The way the consultation paper is worded makes it ambiguous as to
whether Scottish Ministers will be required to outline the engagement
that will take place during the NFP amendment process by regulation. It
is suggested that this is an explicit requirement of the regulation, and
that it should take the form of a Participation Statement.
• The Council agree that there should be flexibility within the regulations,
for both NPF and LDP amendments, as to which groups of the public
should be engaged and the weight given to statutory consideration for
plan making, as the scope of who needs to be engaged and what
needs given deep consideration will vary depending on the nature of
the amendment.
• The Council agrees that there should be flexibility in consultation
timescales for NPF and LDP amendments to enable longer periods if
necessary, depending on the scope of the amendment. However, the
proposed minimum timescale of six weeks may be too short.
• Currently a full Proposed LDP needs to be approved by full Council;
however, it is currently proposed an amendment would not. This does
not seem consistent with a collaborative planning system; a key
outcome of the planning reforms and it is recommended that the
requirement for approval by full Council is retained.
5. People Implications
5.1 There are no direct personnel issues associated with this report. However,
the outcomes of the Investing in Planning consultation may assist in
addressing some resourcing issues arising from the implementation of
changes to the planning system including Masterplan Consent Areas.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications associated with this
report.
Page 29

Page 30

7. Risk Analysis
7.1 There are no risks associated with this report.
8. Equalities Impact Assessment (EIA)
8.1 The responses to these consultations are not policy and do not themselves
have any relevance to the four areas. The responses are screened out as
not relevant.
9. Consultation
9.1 Planning officers have discussed the content of the consultation
documents and attended Heads of Planning Scotland events to discuss
the consultation documents.
10. Strategic Assessment
10.1 The consultations will be of relevance to the following strategic priorities:
• A strong local economy and improved employment opportunities –
through setting planning policy for housing and economic development
within a wider framework which has addressing climate change and
nature recovery as primary guiding principles.
• Meaningful community engagement with active empowered and
informed citizens who feel safe and engaged – through setting
guidance for when and how communities should be engaged in the
development planning process.
Alan Douglas
Chief Officer – Regulatory and Regeneration
Date: 8th May 2024
_________________________________________________________________
Person to Contact: Pamela Clifford Planning, Building Standards and
Environmental Health Manager 
pamela.clifford@west-dunbarton.gov.uk 
Cameron Clow, Development Planning & Place Officer
cameron.clow@west-dunbarton.gov.uk
Matthew Spurway, Development Planning & Place
Officer
matthew.spurway@west-dunbarton.gov.uk
Page 30

Page 31

Appendix: Appendix 1: Response to Investing in Planning
Appendix 2: Response to Proposals for Masterplan
Consent Area Regulations
Appendix 3: Response to Proposals for Development
Plan Amendment Regulations
Background Papers: Investing in Planning – a consultation on resourcing
Scotland’s planning system
https://www.gov.scot/publications/investing-planning-
consultation-resourcing-scotlands-planning-system/
Masterplan consent area regulations: consultation 
https://www.gov.scot/publications/masterplan-consent-
areas-consultation-draft-regulations/
Development plan amendment regulations:
consultation
https://www.gov.scot/publications/proposals-
regulations-amend-national-planning-framework-local-
development-plans-2/
Wards Affected: All
Page 31

Page 32

Appendix 1: Investing In Planning Consultation Response
Proportionality
Question 1: which assessments might benefit most from improved proportionality?
West Dunbartonshire Council (WDC) would support sharing best practice on
proportionality of assessments for planning applications, including those listed in the
consultation paper. While we do not have any specific assessments to suggest, it
would generally be helpful to have a high level, standardised approach for
assessments needed to meet NPF4 requirements. It would also be helpful if
guidance on assessments that currently exists is better publicised, such as the
Developing with Nature guidance and templates produced by NatureScot to support
the implementation of Policy 3. We have not seen many examples of this being
used. In addition, more guidance produced to support the policies of NPF4. 
We also find that having early discussions with applicants can help to establish a
proportional approach and establish what is required from an early stage so when
the planning application is submitted it contains all the required documents. 
Certainty
Question 2: To what extent do you agree that processing agreements are an
effective tool for creating certainty in planning decision making timescales? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Partly agree.
WDC partly agree that processing agreements are a helpful tool. WDC do not use
Processing Agreements, however we have developed a Pre-app Framework, which
we use to create a form of (less formal) agreement between the planning authority
and developers on how applications are taken forward. In West Dunbartonshire the
Planning Service frontload all major and significant applications which has resulted in
major application timescales being well below the Scottish national average. The
Pre-Application Framework is used instead, which is a more informal, flexible tool
and includes public engagement, elected member engagement and the Place and
Design Panel. There is no requirement to use a processing agreement if detailed pre
application discussions take place as all the issues are understood upfront by
applicant and officers and can be addressed together with consultee comments. This
allows for flexibility, which can be lacking with processing agreements. We have
some concern that rigid agreements do not allow for flexibility and can be used to put
pressure on planning authorities, possibly in cases where delays are not the fault of
the planning authority. It is considered that a processing agreement would just add a
further level of bureaucracy. 
Question 3: Do you consider that current resourcing issues are impacting on the use
of processing agreements? 
ITEM 6 -
APPENDIX 1
Page 32

Page 33

Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Strongly agree.
As a planning authority we would not be willing to enter into agreements where we
were unsure if we could deliver the service. As a planning authority, we would not,
and do not offer the pre-application framework when we are unsure about our ability
to resource it effectively. Presently the Council charge for the pre-application
framework and our experience is that applicants are supportive of this charging on
the basis that the agreement and service results in better outcomes through the
application process. 
Question 4: Would you be willing to pay a discretionary fee to enter into a processing
agreement? Yes | No view | no. Please explain your view.
Yes.
We are supportive of this in principle. We currently charge for our pre-application
framework and our experience is that applicants are supportive of this charging on
the basis that the agreement and service results in better outcomes through the
application process.
Question 5: What additional actions can we take to improve certainty in the planning
process?
Certainty in the system is not just down to applicants and planning services, but also
to services and consultees within the council and other agencies. The broader lack
of resources across local authorities and within key agencies is also factor in
providing certainty within the system. This means that resourcing issues, for
example, in environment health and roads and transport departments within councils
can have a knock on effect on the timing of planning decisions. It is also not
uncommon for consultees (internal and external) to request additional time to provide
responses to a planning application. However often planning is seen as the delaying
factor when in fact it is a consultee who is struggling to reply in the timescale. 
A wider view of the resources in local authorities and agencies involved in planning
needs to be considered when addressing certainty and timeliness of decisions.  A
charge for consultee responses could help to support services who are struggling to
resource their responses on time.
Streamlining, Alignment and Standardisation
Question 6 Do you have further ideas on opportunities for streamlining, alignment or
standardisation?
Many small applications, such as householder’s applications, raise similar needs and
require similar assessments in processing the application. A standardised approach
for appraising and reporting some types of development may be helpful. 
Page 33

Page 34

Skills, Recruitment and Retention
Question 7 Are there any skills actions which you think should be prioritised?
The skills strategy to identify specialist skills needed to address NPF4 requirements.
Planning authorities have lost a lot of skills and expertise in specialist subject areas
due to resource constraints, such as landscape, heritage, urban design and ecology.
NPF4 brings in a number of new requirements, such as biodiversity enhancement,
sustainability and a greater emphasis on previously existing requirements, such as
climate change mitigation and adaptation. These skills need to be resourced. 
Question 8 Are there any skills actions not identified
Upskilling existing local authority staff to have an understanding of specialisms that
over time been lost or reduced at councils over time (such as landscape, biodiversity
and heritage) may also be worth investigating. While this would not replace
specialists it would better equip local authorities to deal with these subjects. More
formal support could be provided for this, perhaps with collaboration with more
professional bodies or sharing skills between local authorities. 
Whilst it is recognised that good progress is being made to encourage school leavers
to join the profession through the joint work of the Scottish Government, RTPI and
HOPS through bursaries and this will assist the profession in the future, more needs
to be done to address the lack of experienced planners at present which can
disproportionately affect smaller planning authorities. Whilst the larger planning
authorities can upskill existing staff this can be difficult in a smaller Local Authority
where focus can be in processing of applications to achieve good performance levels
and deliver development on the ground.  
The government could also investigate the possibility of supporting other built
environment professionals to move into planning, such as architects, surveyors and
urban designers. These professions may already have some familiarity with, and
skills relevant to planning processes. This certainly would help to address the
planning skill shortage. 
A Planning Hub
Question 9: Do you think that the concept of a ‘planning hub’, modelled on the
Building Standards Hub would support authorities and deliver improvement in the
system? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Partially agree.
West Dunbartonshire Council support in principle the idea of a planning hub and the
key priorities identified. In particular this will be helpful to smaller planning authorities
with fewer resources. Depending on the overall cost and how it is funded the Hub
could provide better value to local authorities than commissioning consultants or
agency staff on an ad-hoc basis, which has been a result of the loss of specialists in
local authorities. However, at this stage more information is required about how it
Page 34

Page 35

would operate and costs. There is also some concern the hub may recruit some
planning officers from local authorities thus causing more difficulties. 
It should be noted, however, that as well as loss of specialisms within planning
authorities there has been a reduction in the resourcing and capability of key
agencies, who are not able to support planning authorities in the way they once did.
It is reiterated that smooth running of the planning system is not just about adequate
resourcing of planning services, but the wider range of public sector bodies that
support the system. The need for a solution like the Planning Hub is in part due to
lack of resources across the public sector.
Question 10: Are there other ways a hub could add value and provide support in the
short and longer term?
As well as energy, heat, biodiversity and climate adaptation, it is also suggested that
GIS (or other digital planning support), landscape, design, heritage are included.
On energy specifically, support in understanding emerging and expanding
technologies (such as battery storage and hydrogen) would be very welcome.
Hosting a Planning Hub
Question 11: Which of the options do you think is most suitable, and why?
i. Within Scottish Government 
ii. Within public organisation 
iii. Within a host authority
iv. Other 
v. No view
ii. Within a Public Organisation
West Dunbartonshire Councils preference is within a public organisation and would
specifically suggest the Improvement Service. The Improvement service already
undertakes some of the key priorities identified for the Planning Hub, such as
supporting planning authorities on emerging issues and organising training and skill
sharing. We also note that paragraph 60 of the consultation paper states that once
operational the hub could further expand into areas of performance and
improvement. Given the overlap with function it already provides and the established
relationship it already has with local authorities, the Hub would be a natural
expansion to the Improvement Service. 
Financing the Hub
Question 12: How do you think a Planning Hub could be resourced?
An increase to planning fees, would be a simple way to secure funding for the Hub.
However, any method of funding will need to be consistent with the Verity House
Agreement i.e. it should not be ring fenced. This could leave any funding of the hub
which comes from local authorities vulnerable to budget saving exercises. We also
wish to reiterate that a hub would be plugging a gap left by reduced resources within
planning authorities and key agencies, meaning even if funding was provided by
Page 35

Page 36

increased planning fees, this effectively shifts the resource burden from the Scottish
Government to local government. 
Planning Fees
Question 13: Do you agree that planning fees should increase annually in line with
inflation? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Strongly agree.
While this would not provide full cost recovery, it would protect planning authorities
against continued rising costs from inflation. It would also provide more certainty to
applicants planning their applications than the current, irregular increase in fees.
Question 14: Is a calculation based on the 12 month Consumer Price Index the most
appropriate mechanism? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
No view
Question 15: Should an annual inflationary increase apply to: 
i. individual fees and increments; 
ii. Individual fees, increments and maximums; 
iii. No view.
ii. Individual fees, increments and maximums.
WDC’s view is that the inflationary increase should apply Individual fees, increments
and maximums, for the reasons stated in the consultation paper; “only increasing the
individual fees and increments would potentially lead to more applications reaching
the maximum fee quicker and may impact planning authorities’ ability to recover their
costs in determining applications.”
Locally Setting Planning Fees
Question 16: What would be your preferred approach to how planning fees are set in
the future?
Fee setting by Government is the preferred approach of this Council. Local
authorities setting their own fees would require time and resources and could be
complex to implement. It would be more confusing for applicants and the
development industry who may also compare fees and services between authorities.
It could lead to disagreements that lead to longer timescales and uncertainty within
the system. Having recently set the fees for the pre application service this was a
complex process in order to get correct and reasonable fees. Also, if fees set locally
Heads of Finance may influence the setting of the fees too high. 
Page 36

Page 37

Question 17: Are there key principles which should be set out in the event that fee
setting powers are devolved to planning authorities.
There should be a standardised process or method for setting fees. Fees should
enable local authorities to reach full cost recovery and be proportionate to the scale
and type of planning application.
Increasing Discretionary Charging
Question 18: What other processes that support the determination of a planning
application could authorities be given powers to charge at their discretion?
As mentioned in other parts of our response, other services within local authorities
and public sector bodies are essential within the planning process. Fees could also
be introduced to resource service areas (such as roads or flooding) where they
support determining planning applications, or where external support is needed to
determine an application such as landscape and visual impact advice.
Question 19: Do think the circumstances where a refund can be requested is set out
as part of any published information regarding the introduction of a discretionary
charge?
Yes.
Fee for Proposals on Unallocated Sites in the Development Plan
Question 20: Do you agree with the principle that authorities should have
discretionary powers to increase fees for a proposal on an unallocated site within the
development plan? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Strongly  agree.
Allocated sites have already been assessed to a degree, requiring less assessment
to take place at the planning application stage. This will be even more the case with
new style local plans, where local authorities are expected to front load more work
on sites through design briefs and masterplans. Additional fees for unallocated sites
would reflect that the local authority has undertaken site assessment or produced a
masterplan or development brief for the site to be assessed against. 
Masterplan Consent Areas
Question 21: Do you agree that planning authorities should be able to recoup the
costs of preparing a Masterplan Consent Area through discretionary charging? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Strongly Agree.
Given that the cost of preparing a Masterplan Consent Area will vary widely
depending on context, complexity, and scope, recouping cost through discretionary
Page 37

Page 38

charging is appropriate. The potential for an ongoing workstream associated with
verifying development is in line with the scheme, it would be reasonable for charging
to support this resource.
Fees for Planning Appeals
Question 22: Do you agree with the types of appeals that should incur a fee? Yes |
No view | no. Please explain your view.
No.
WDC agree fees should be payable most of the development types listed. Not all of
the development types listed as requiring a fee for appeal require a fee for an
application, for example Tree Works Consent. There should be consistency between
application types that require a fee and appeal types that require a fee. 
It is understood why there is no fee suggested for appeals for non-determination, as
it could be perceived as unfair to pay twice in this instance, however there are
circumstances where timescales to process an application extend due to the need
for applicants to provide additional information. Particularly where a consultee, such
as a key agency, request more information or assessments.  In cases where it is
found that authorities do not have sufficient information to determine an application it
may be reasonable to apply a fee for non-determination. 
Fee Level
Question 23: Do you agree that setting the fee for applying to appeal the refusal of
planning permission (to either DPEA or the planning authority) is set as a percentage
of the original planning application fee? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Strongly agree.
This will ensure that the fee is proportional to the proposal. 
Question 24: If a percentage of fee approach to appeal charging was considered
most appropriate, what level do you consider would be most appropriate to reflect
volume of work by DPEA or the LRB?
10% | 20% | 30% | 40% | No view | Other. Please explain your view
Other.
It is appreciated that balance needs to be struck between recovering costs and
access to justice, however we would expect the level of time and resource in
deciding an appeal is similar to that of deciding a planning application. We would
consider it appropriate for the fee for an appeal to be at least 50% of the application
fee.
Page 38

Page 39

Question 25: Do you agree that an authority should consider waiving or reducing an
appeal fee where they have offered such a waiver on the related planning
application? 
Strongly agree | Partially agree | No view | Partially disagree | Strongly disagree.
Please explain your view.
Strongly agree
We currently waive fees in certain instances and would be supportive of being able
to waive fees for appeals in these cases.
Digital Service Charge
Question 26: Do you have views on how a service charge for applying for planning
permission or a building warrant online could be applied?
We do not agree that there should be a charge for using the portal. We would like to
encourage applicants to use the online portal rather than other means and a service
charge would dissuade applicants from using it. Other means of submitting
applications are more resource intense for the council to process and so we do not
believe a charge for the use of the online portal as appropriate. 
We also think that applicants would feel it is unreasonable to be charged twice (the
planning fee and then use of the portal) which could be perceived as unfair.
Question 27: What other options are there to resource the operation and
improvement of the eDevelopment service?
Other options may include charging the planning authorities subscriptions for
accepting planning applications through the portal or taking a portion of planning
fees to fund the portal. We would consider both of these to be unacceptable.
Charging a fee for authorities to accept applications to use the portal means the
subscription could be subject to savings during budgeting. The portal taking a portion
of the planning fee would effectively be ring fencing and against the Verity House
Agreement.
Energy Generation
Question 28: Should the current threshold of 50MW for applications for electricity
generation which are to be determined by authorities be altered?
Yes.
Given the explanation provided in the consultation paper, that the size of equipment
in terms of megawatts generated is increasing, it is logical that the threshold is
increased to allow local authorities to take more decisions on renewable energy
developments. This will also allow a greater level of local control of these
developments, more of which are coming forward due to the supportive nature of
NPF4 towards energy developments.
Question 29: Should different thresholds apply to different types of generating
stations? 
Page 39

Page 40

Yes | No view | no. Please explain your view.
Yes.
Different technologies scale differently in correspondence to the megawatts they
produce or store. For example a 50MW wind farm will have a very different footprint
and effects to a 50MW battery storage facility or 50MW solar farm. Therefore
different thresholds for different technologies would be appropriate.
Question 30: What would be the resource implications of increasing the threshold for
the determination of applications for onshore electricity generating stations?
Local authorities already assess  Energy Consent Unit applications in a similar way
to planning applications, before making a recommendation to the ECU. There may
be additional workload in terms of administration with regards to issuing decisions
and running committees, however the planning authority would also benefit from the
full planning fee, rather than the 50% they currently receive, to process these
applications. 
Given the evidence in paragraph 125 of the consultation paper, it may be appropriate
to introduce a different timescale for determining energy development applications of
approximately six months.  
Question 31: If Scottish Government were to make a voluntary contribution
equivalent to a percentage of the offshore electricity fee to authorities, what level of
contribution would be appropriate to support some recovery of costs? Please provide
justification for your answer.
WDC does not have evidence to specify a certain level; however the voluntary
contribution would be welcomed and should reflect assessments which may be
undertaken by a council to come to a position on a proposal, such as: 
• assessing visual impact from the shore;
• assessing impact from transport of equipment personnel to the construction
site;
• assessing the impact of onshore cable landing sites and subsequent need for
electricity grid upgrade or expansion; and
• assessing potential socio-economic benefit.
The contribution should also take into account that these assessments may require
commissioning of specialists, planning authorities do not have ‘in house’.
Hydrogen
Question 32: Should we introduce a new category of development for applications
for hydrogen projects? If so, how should these fees be set/calculated?
Yes.
WDC agree that a new category for hydrogen should be introduced. A site area
based fee of a similar to category 10 for exploration of oil and gas exploration, or
category 15 for winning and working of mineral may be more appropriate. There is
Page 40

Page 41

potential risk to these kind of facilities that needs to be taken into account of in
calculating a fee. An alternative approach would be to base a fee on the expected
volume of hydrogen to be produced and stored at the facility. This would mean the
fee scales with potential risk. 
Yes
Question 33: Are there different considerations for hydrogen production when
compared with proposals which are concerned only with storage and distribution?
Yes | No view | no. Please explain your view.
Yes, as hydrogen production is a industrial/ chemical process whilst storage and
distribution uses tend to be less process driven. 
Prior Notification/Approval
Question 34: Do you agree that the standard £100 which applies to most prior
notification and approval applications is appropriate? 
Yes | No view | no. Please explain your view.
No
The £100 fee is not commensurate with the level of work involved in processing
them. The fee should be much higher. 
Question 35: Are there particular PDR classes where you think the current fee
should be amended? If so, please explain why that is considered to be the case.
WDC would suggest a fee should be applied to any PDR class that requires a
neighbour notification, as this is then an administration requirement on the council
which  results in a cost for the Council. 
Shellfish Farming
Question 36: Would a reduction of the current fee (£200 per 0.1 hectare) be an
appropriate approach to resolving this issue? 
N/A
Question 37: What would you consider to be a reasonable fee for shellfish farm 
applications? (Please elaborate on your answer using an average shellfish farm
development (5 x 220m twin-headline longlines at 20m spacing with 30m end
moorings) as an example.)
N/A
Question 38: Which proposal would you most like to see implemented? Please
explain the reason for your answer.
Fees increasing with inflation and charging for appeals. We believe that these are
the most likely to have immediate impact. 
Inflationary increases in planning fees insulate planning authorities from rising costs
and provide more certainty than the current way appeal fees are raised. 
Page 41

Page 42

Addressing the resourcing of Planning Authorities and key Stakeholders. Appeals
and Local Review Bodies require resources to carry out, but there is not additional
resource for the local authority to do so. 
Question 39: Do you have other comments on the cumulative impact of the
proposals?
Regardless of what solutions the government chooses to pursue, the overall balance
should lead to a net increase to planning authority finances and resources.  Costs to
planning authorities arising from proposals such as funding the planning hub or
charging for the online application portal should, on the whole, not come at the
expense of existing resources within planning authorities.
Question 40: Do you have other ideas to help resource the planning system? Please
set out how you think the proposal could be resourced.
We have highlighted at multiple points throughout the consultation, that it is not only
planning services  that are necessary for an effective planning system. Other council
services and Key Agencies are also having to manage performing their functions
with less resources. Funding needs to be considered for these other parts of the
public sector. We would suggest that some kind of fee could be applied, to allow
some cost recovery to other parts of councils and Key Agencies when providing their
advice to planning. 
Page 42

Page 43

Appendix 2: Masterplan consent area regulations: consultation
Approach to Regulations
Question 1:
A) To what extent do you agree with the principle that regulations be kept to the
minimum necessary and that more advice be offered in guidance and kept updated?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
It is agreed that regulations should be kept to the minimum necessary and agree that
further guidance is useful in aiding the interpretation of the legislation. The Council
would however suggest that any guidance on how to take forward a Masterplan
Consent Area should be published at the time that the regulations come into force,
and would be more supportive of the regulations being more comprehensive if that
will not be the case.
Excluding kinds of development from schemes
Question 2: 
A) We are not proposing to regulate to exclude any form of development from having
potential to be within a MCA. To what extent do you agree with this approach?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
It is agreed that all of these consents which the Planning and Roads Authorities
would otherwise determine should be included.
Places that cannot be included in a scheme
Question 3:
A) We are not proposing any changes to the designations listed in schedule 5A
(paragraph 3(4)). To what extent do you agree with this approach?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
The Council is satisfied with the list of exclusions listed within Schedule 5A of the
Planning Act. It is agreed that Conservation Areas should not be added to the
protected areas on this list.
ITEM 6 -
APPENDIX 2
Page 43

Page 44

Duty to periodically consider making a scheme statement
Question 4: 
A) To what extent do you agree that the matters above in relation to the statement
be set out in guidance rather than regulations?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
d) Disagree
B) Please explain your view.
The Council disagrees that the matters set out in relation to statements on
consideration of making a Masterplan Consent Area scheme should be set out in
guidance and not in regulations. Including detail of these requirements, as indicated
by the Planning Act, within regulations provides more certainty for planning
authorities and will ensure greater consistency for others who engage with this part
of the planning system. 
It is noted that part 3 (4) of the draft regulations  requires planning authorities to
notify community councils if they are considering making a MCA. It is suggested that
requiring authorities to issue statements notifying community councils and others in
cases where a MCA is not taken forward would ensure the same level of
transparency. 
The Council agrees with the matters covered in the consultation paper in relation to
each of these requirements, but would suggest that the list should also include
owner, lessee or occupier for areas within and adjacent to areas considered for
bringing a MCA forward.
Consultation on possible proposals for a masterplan consent area scheme
Question 5: 
A) Draft Regulation 3(4) specifies that planning authorities must consult with
community councils before determining the content of any MCA proposals which
may be publicised. To what extent do you agree with this?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
The Council agrees that community councils should be notified at this stage. It is
also suggested that owner, lessee or occupier, within and adjacent to the proposed
MCA should be notified when considering a MCA.
Question 6:
A) Draft Regulation 3 provides how consultation for possible proposals for a MCA
scheme is to be undertaken, including notification and the requirement to undertake
two public events, with opportunity to make comments to the planning authority. To
what extent do you agree with this approach?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
Page 44

Page 45

b) Agree
B) Please explain your view.
The Council agrees with the consultation requirements which are in line with those
required during pre-application for planning permission. It is suggested that the
regulations could remove the requirement for two consultations for smaller scale
development, for example proposals that would otherwise be a local application.
MCAs for self-build housing could potentially be smaller scale. Undertaking this form
of consultation and public events should be at the discretion of the planning authority
for proposals which would otherwise be local planning applications. 
MCA schemes form and content
Question 7:
A) To what extent do you agree that the regulations should require reasons for
conditions to be set out in the MCA scheme?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
It is agreed that conditions should have reasons, in line with conditions for planning
applications in order to be consistent
Question 8:
Are there any further aspects you consider should be required to be included in a
MCA scheme? Please specify and explain why.
No 
Consultation on proposals for a masterplan consent area scheme
Question 9: 
A) Draft Regulation 4(3) and Schedule 1 of the draft MCA Regulations specify those
who a planning authority must consult with before determining the content of any
MCA proposals which may be publicised. 
To what extent do you agree with these groups? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
The Council agrees with the proposals about who a planning authority must notify
about a proposed MCA scheme, these align with exiting processes for planning
applications.
Question 10:
A) Draft Regulation 4(2) provides how consultation in relation to a MCA scheme is to
be undertaken. To what extent do you agree with this approach? 
Page 45

Page 46

a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
The Council agrees with the proposals about how consultation is to be undertaken,
these align with existing processes. 
Publicity for proposals
Question 11: 
A) Draft Regulation 4(5) sets a 30 day period for representations if they are to be
treated as valid representations. To what extent do you agree with this period? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
It is agreed that there should be 30 day period for representations, in line with the
period for Environmental Impact Assessment (EIA) applications. The Council would
be supportive of the “a date not earlier than…” wording from the Development
Management Regulations being used. 
Hearings
Question 12: 
A) To what extent do you agree with the required circumstances, i.e. that where the
scheme would authorise a national development, that there be a requirement for a
hearing, as set out within Draft Regulation 5(1)? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree 
B) Please explain your view.
It is agreed that there should be a requirement to hold a hearing  if appropriate in
terms of representation where a scheme would authorise a national development.
Question 13: 
A) To what extent do you agree with the proposals for those who must be given an
opportunity to appear before and be heard by a committee of the planning authority
at a hearing as set out within Draft Regulations 5(2) and (3)? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view
It is agreed that any person form whom the planning authority has received a valid
representation should be given the opportunity to appear before and be heard at a
hearing in relation to a proposed MCA. This is in line with the current processes for
planning applications.
Page 46

Page 47

Requirement to notify the Scottish Ministers of certain proposals
Question 14:
A) To what extent do you agree that a Notification Direction be issued requiring that
in the above circumstances such MCA schemes be notified to the Scottish
Ministers? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree 
B) Please explain your view.
It is agreed that the circumstances requiring a notification to Ministers should align
with those which exist for planning applications, as is proposed in the draft
regulations. 
Publicise
Question 15: 
A) To what extent do you agree with the proposed requirements in relation to the
publication of MCA schemes and the decision notice as set out in Draft Regulation
7? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
c) Neutral
B) Please explain your view.
It is agreed that decision notices should be made available to view, and that the
information set out in the proposed regulations is reasonable to include in such a
notice. It is agreed that notices should be published online on the planning authority
website, however, it is suggested however that requiring this to be published in a
local newspaper is not appropriate. A requirement to notify interested parties of the
decision and where a decision notice is available for inspection, in line with the
development management regulations would be more appropriate. It is considered
that the cost associated with a newspaper notice including all of the required
information would not be proportionate to the likely readership. A notice including
less information, excluding points b and c of the Draft Regulation 7 may be more
appropriate for publication in a local newspaper. A template for such a notice in
regulations or guidance would be welcomed. 
Planning Register
Question 16: 
A) To what extent do you agree with the proposed requirements in relation to the
planning register as set out in Draft Regulation 9? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view. 
Page 47

Page 48

It is agreed that details of Masterplan Consent Areas should be included in the
planning register as set out in Draft Regulation 9 for Legal and search purposes. 
Alteration of a MCA scheme
Question 17: 
A) To what extent do you agree with the proposals for the procedures for altering a
MCA scheme, as set out in Draft Regulation 8? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
It is agreed that the process for altering a MCA scheme should apply many of the
same requirements as the making a MCA scheme. It is considered however that the
process for alteration of a scheme should be proportionate to the extent that the
scheme is to be altered. It is suggested that more extensive PAC-style events may
still be appropriate if significant changes are proposed. The processes should be
similar to those for authorising a MCA. As set out above, consultation and public
event requirements for local scale development should be at the discretion of the
planning authority. 
Prescribed Form
Question 18: 
A) To what extent do you agree with the approach not to prescribe forms of notices
within the Draft Regulations? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
d) Disagree 
B) Please explain your view.
It is considered that including prescribed forms within regulations would be beneficial
for ensuring consistency. Including such notices in guidance would be supported, if
not in regulations. 
Environmental Impact Assessment
Question 19: 
A) To what extent do you agree with the proposed process set out in the Draft
Masterplan Consent Area Scheme (Environmental Impact Assessment) (Scotland)
Regulations 2024 contained within Annex B? 
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
Page 48

Page 49

It is agreed that the procedure for a MCA which relates to Environmental Impact
Assessment development should resemble the procedure in the 2017 Environmental
Impact Assessment regulations.
Impact Assessments
Question 20:
A) To what extent do you agree with our approach to the impact assessments?
a) Strongly Agree b) Agree c) Neutral d) Disagree e) Strongly Disagree
b) Agree
B) Please explain your view.
It is agreed that the regulations relate to procedures for policy which has already
been made and assessed through the 2019 Planning Act, therefore screening out
the impact assessments is appropriate.
Page 49

Page 50

Appendix 3: Development Plan Amendment Regulations: Consultation
Response
Amending the National Planning Framework
Requirement for a Full Review of the National Planning Framework
Question 1: To what extent do you agree that it is appropriate to adopt a broad and
high-level approach as to when a full review of the NPF is required?  
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree. 
This approach is necessary to ensure that national planning policy or developments
are not changed too significantly through the simplified amendment process.
Especially since significant changes could necessitate the review of Local
Development Plans.
Question 2: In cases where amendments would require changes to half or more of
the contents of the NPF, to what extent do you agree that a full review of the NPF
would be required?  
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
It is noted that long term confidence in the planning system is a consideration in
defining this threshold. However it is highlighted that easy process by which to make
amendments to the NPF could in itself create uncertainty. In the English planning
system where continuous changes to their equivalent national document, the
National Planning Policy Framework, has led to local authorities withdrawing or
pausing Local Plan preparation while waiting for updates to this document. However,
it is understood that the more defined process of consultation and scrutiny proposed
for an NPF amendment (addressed in later questions) than in the English system,
does help in addressing this issue.
It is agreed that half of the policies or national development is a reasonable trigger,
however the Scottish Government should also consider  what the bar is for changing
a combination of national planning policies and national developments. As currently
proposed it is either half or more of policies OR half or more of developments. This
could mean that 16 of the 33 policies could be changed AND 8 of the policies could
be changed in an amendment, without triggering a full review, despite this being an
arguably greater change to the framework than amending half of the policies, or half
of the developments independently. It seems likely that these will be changed in
combination, as a change to national developments (such as an additional national
development) would likely necessitate a change in policy to support the
development.
ITEM 6 -
APPENDIX 3
Page 50

Page 51

Engagement and Justification
Question 3: In preparing an amendment to the NPF, to what extent do you agree that
the Scottish Ministers should have the same considerations as they would for a full
review of the NPF, where that is relevant to the proposed amendment?
Strongly agree | agree | neutral | disagree | strongly disagree. 
Agree.
It is logical that Ministers should have regard to considerations under 3AB(3)(a),
3AB(3)(a), 3A(4A), 3A(5) and 3A(3e) as this keeps considerations for amending the
NPF consistent in considerations with full NPF review. Applying different weight to
these considerations depending on the subject of these amendments is appropriate.
Regarding engagement, it is noted that paragraph 29 of the consultation document it
is “envisaged” that Ministers would usually provide an update as to the engagement
they intend to carry out, appropriate to the specific amendment. It is not clear from
this if the regulations will require Ministers to release an update to engagement. It is 
considered it would be logical to require a Participation Statement for amendments.
This is a requirement for full reviews of the NPF under Section 3AB(4) of the 1997
Act, and applying the requirements to amendments through the regulation would
provide more certainty to stakeholders as to what can be expected regarding 
expect. The participation statement can still appropriate to the scope of the
amendment. 
Preparation
Question 4: To what extent do you agree with the list of those the Scottish Ministers
should consult with on a proposed amendment i.e. the public at large, key agencies
and planning authorities?
Strongly agree | agree | neutral | disagree | strongly disagree. 
Agree.
The included list is agreed, and use of broad term "public at large" in paragraph 35 of
the consultation paper. “The public at large” enables flexibility to engage those to
whom the amendment is most relevant. Again, we would like to highlight participation
statement as a useful tool to specify stakeholders of interest and provide certainty in
the engagement that will take place.
Question 5: To what extent do you agree that a copy of the proposed amendment
should be laid in the Scottish Parliament during the consultation period?
Strongly agree | agree | neutral | disagree | strongly disagree. 
Agree
Page 51

Page 52

As a full reviewed version of the NPF is laid before parliament it makes sense that
amendments are also laid before parliament, given it is a national policy document.
Question 6: To what extent do you agree with the proposed minimum 6 week
consultation period, understanding that the timescale may be extended when
deemed appropriate given the significance and nature of the amendment? 
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree. We agree that a flexible timescale for consultation is appropriate. However,
six weeks may be too short and eight weeks may be a more appropriate minimum
length. 
Consideration of comments and representations
Question 7: To what extent do you agree that the Scottish Ministers be required to
publish an Explanatory Report before the amended NPF is adopted?  
Strongly agree | agree | neutral | disagree | strongly disagree.
Strongly Agree. Having a clear understanding of the evidence and consideration of
representation received through consultation is essential for transparency in a
participatory planning system. 
Parliamentary Approval
Question 8: To what extent do you agree that all amendments to the NPF should
have to be approved by a resolution of the Scottish Parliament?  
Strongly agree | agree | neutral | disagree | strongly disagree.
Strongly Agree. This provides consistency with the process for fully reviewing the
NPF. 
Taking Effect
Question 9: To what extent do you agree that the amended NPF should take effect
when it has been adopted by Scottish Ministers?
Strongly agree | agree | neutral | disagree | strongly disagree.
Strongly Agree. This seems reasonable. 
Publication
Question 10: To what extent do you agree that the full updated version of the
amended NPF, incorporating the amendment, should be published as soon as
practicable after it has been adopted by Scottish Ministers?
Page 52

Page 53

Strongly agree | agree | neutral | disagree | strongly disagree.
Strongly Agree. This seems reasonable and would provide full transparency. 
Amendment to Local Development Plans
Early Engagement/discussions
Question 11: To what extent do you agree that the full updated version of the
amended NPF, incorporating the amendment, should be published as soon as
practicable after it has been adopted by Scottish Ministers?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
The public should have an equivalent opportunity to be involved with an amendment
to the LDP as with a full LDP review especially if it is dealing with controversial and
sensitive issues which previously had public interest. 
Question 12: To what extent do you agree that planning authorities should be
required to provide a statement outlining how they intend to engage with
stakeholders on an amendment to a LDP? 
Strongly agree | agree | neutral | disagree | strongly disagree.
Setting out how stakeholders will be engaged on an amendment to the plan is
reasonable. In practice it seems likely that the Planning Authority will use the
decision to amended plan as an opportunity to update the Participation Statement.
Although simply requiring a statement does enable some flexibility.
Question 13: To what extent do you agree that not every amendment to a LDP
should require specific participation of children and young people?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
The engagement taking place should be relevant and proportionate to the
amendment being proposed. In areas that are of limited interest to children and
young people a requirement to engage them may be unnecessary and may add
unnecessary time and engagement apathy.  A statement should be provided why it is
not necessary to engage children and young people. 
Information and Considerations
Question 14: To what extent do you agree that, when preparing an amendment, a
planning authority must have regard to the information and considerations set out in
regulation 9 of the Town and Country Planning (Scotland)(Development Planning)
regulations 2023?
Page 53

Page 54

Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
It is generally agreed that considerations in regulation 9 of the 2023 development
planning regulations should be considerations in amending a plan, and that these
issues can be given appropriate weight depending on the amendment. 
Justification
Question 15: To what extent do you agree that an authority should be required to
collate relevant evidence to inform the proposed amendment and prepare a
Justification of Amendment Statement?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
The local authority should have to present a reasoned justification for amendments
with evidence including the results of engagement. Clear guidance on the expected
content and extent of the justification statement in the LDP guidance would be
helpful.
Question 16: To what extent do you agree that a Play Sufficiency Assessment should
not be required for an amendment to a LDP?  
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
The Play Sufficiency Assessment will not be relevant to all amendments. Local
Authorities can still have regard to it when it is appropriate and provide a statement
why it is not relevant for the amendment. 
Question 17: To what extent do you agree that an authority should not be required to
have regard to the self-build list for every amendment to a LDP?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree.
The self-build list will not be relevant to all amendments, but the local authority can
still have regard to where relevant and provide a statement why it is not relevant. 
Consultation
Question 18: To what extent do you agree that approval by the full council is not
always required before the publication of a proposed amendment to a LDP for
consultation?
Strongly agree | agree | neutral | disagree | strongly disagree
Page 54

Page 55

Disagree.
It is inconsistent for a full proposed LDP to require agreement by full council, but not
an amendment. It is recommended that amendment should go to full council. 
Question 19: To what extent do you agree that the proposed amendment to a LDP
should be published for consultation, alongside the Justification of Amendment
statement and any statement on the consequences for the Delivery Programme
which are to be published for information?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
All information on the amendment should be provided alongside it with the
consultation.
Question 20: To what extent do you agree that planning authorities should be
required to notify Scottish Ministers and to consult with the public at large and key
agencies, alongside others they consider appropriate, when amending a LDP?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree. This would seem reasonable and would depend on the scale and significance
of the amendment. 
Question 21: To what extent do you agree with the proposed minimum 6 weeks
consultation period, understanding that the timescale may be extended when
deemed appropriate given the scale of the amendment?
Strongly agree | agree | neutral | disagree | strongly disagree
Agree that regulation should allow flexibility to enable consultations that are
proportionate to the amendment. However, six weeks may be too short and eight
weeks may be a more minimum appropriate length. 
Consideration of Representations/examination
Question 22: To what extent do you agree with our proposed approach to
independent examination?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree
The approach for amending the LDP is the same as for a full LDP, however the
examination process should be proportionate to the nature of the amendment.
Taking Effect
Question 23: To what extent do you agree that an amendment to a LDP should take
effect when it is adopted by the planning authority? 
Strongly agree | agree | neutral | disagree | strongly disagree 
Page 55

Page 56

Agree.
This is consistent with the approach to a full LDP and it is not considered that an
alternative approach is necessary and could be confusing.
Publication
Question 24: To what extent do you agree that a full, updated version of the
amended LDP, incorporating the amendment, should be published in the same way
as the initial LDP?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree. 
It is requested clarity on an issue regarding publication date. Section 24 (3) of the
1997 act states that "In the event of any incompatibility between a provision of the
National Planning Framework and a provision of a local development plan,
whichever of them is the later in date is to prevail." Does this Section 24 (3) refer to
plans as a whole or, can it also apply to individual amendments of plans?  For
example, in a case where an LDP is later in date than the NPF, but the NPF is then
amended, is the whole NPF now considered later in date than that LDP, or just the
amendment to the NPF?
If the later, it may be helpful to require LDPs and the NPF with incorporated
amendments, to have a summary of amendments, which specify the parts of the
plan have been subsequently amended and at what date. 
Impact Assessment
Question 25: To what extent do you agree with our approach to the impact
assessments for the proposed regulations?
Strongly agree | agree | neutral | disagree | strongly disagree.
Agree, however this is an issue for the Scottish Government to satisfy themselves. 
Page 56

Page 57

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration 
Planning Committee: 8th May 2024
___________________________________________________________________
Subject: Construction and operation of a 560MW Battery Energy Storage
System with associated infrastructure, substation, security
fencing, CCTV, security lighting and landscaping on Land at
Cochno Road, Bearsden, East Dunbartonshire - Section 36
application to Scottish Government Energy Consents Unit ref:
ECU00004982
1. Purpose
1.1 To agree the Council’s response to a consultation received from the Scottish
Government Energy Consents Unit on behalf of the Scottish Ministers regarding
a proposal for the construction and operation of a 560MW Battery Energy
Storage System with associated infrastructure, substation, security fencing,
CCTV, security lighting and landscaping.
2. Recommendations
2.1 It is recommended that the Council agrees to object to the above development
and that the response contained in Appendix 2 forms this Council’s formal
response to the proposal.
3. Background
3.1  The Scottish Ministers received an application under section 36 of the Electricity
Act 1989 for the construction and operation of a battery energy storage facility
with a maximum power output of 560 megawatt. The application site is located
within the East Dunbartonshire local authority area however the assessment of
the submitted application is undertaken via the Scottish Government Energy
Consents Unit for the Scottish Ministers.  West Dunbartonshire Council has
been consulted as neighbouring planning authority with the application site lying
generally to the north of the local authority boundary. The application is referred
to under the project name of Whitehall BESS. The location of the site is shown
in Appendix 1.
3.2  A date of 15th May 2024 has been agreed with the Scottish Government Energy
Consents Unit for the submission of the Council’s consultation response.  The
application documents are available to view via the Energy Consents Unit
website via the following link: Scottish Government - Energy Consents Unit -
Application Details
ITEM 7
Page 57

Page 58

4. Main Issues
4.1  The site is situated on land at Whitehall Farm, Cochno Road, East
Dunbartonshire and extends to approximately 29 hectares. It is located
immediately north and east of the local authority boundary which follows the
line of Cochno Road at this location. The site itself is located within the open
countryside comprising part of the Green Belt as defined by the adopted East
Dunbartonshire Local Development Pan 2. To the south, the site is bound by
Cochno Road with Whitehill Farm located directly adjacent to the southeast of
the site. To the west, the site is bound by Cochno Road along its southern
extent before following the general line of Lower Stourfold Glen. The northern
and eastern boundaries of the site generally cut across open land before
following the existing tree line to Cochno Road. The nearest residential
properties within West Dunbartonshire are the houses directly opposite the site
at Edinbarnet, Cochno Road. Properties at Craigton Street, Burnbrae Street,
Craighaw Street and Field Road lie around 170 metres from the southernmost
boundary of the proposed site. Loansdean, Cochno Road is around 200 metres
from the site. 
4.2  The proposal is for a 560 MW Battery Energy Storage Facility with associated
infrastructure. It is indicated that the development would have an operational
lifespan of 40 years. The proposed development would comprise a number of
containerised units to house battery energy storage systems and associated
ancillary infrastructure. Each container will have the appearance of a standard
metal ISO/shipping container and it is indicated these will be soundproof. The
containers would be arranged in parallel banks and would likely be finished in
dark grey or green and would be prefabricated off-site. The containers would
be accessed via an external galvanised metal open grid walkway supported by
stairs and railings. The dimensions of the containers would be approximately
2.6m x 2.4m x 12.2m (height x depth x width). The containers together with
other equipment will be placed on concrete plinths. In the submitted documents
it is indicated that concrete will be installed in a manner which can be removed
at the end of the development’s life cycle, to return the land to agricultural use.
The proposal would see 224 containers in total. There will be 1 inverter per
container and 1 transformer per 2 containers giving a total of 224 inverters and
112 transformers, arranged in formation alongside the containers. The
transformers and inverters will measure approximately 2.7m x 1.4m x 2.6m, and
2.3m x 1.4m x 1.5m respectively. Underground cables would connect the facility
to the grid off-site at Drumchapel and Windyhill substations. A substation
measuring 3.9m x 3.7m x 13.6m is to be located to the south of the site. All
structures and development as laid out above will be enclosed within an
acoustic fence, proposed to stand at 4m high.
4.3 A 4m wide access road will be installed, with the proposed access point to
Cochno Road located on the western edge of the site. It is indicated that
landscape proposals for the site will seek to enhance existing landscape
features, screen views of the battery containers and enhance biodiversity. 
Page 58

Page 59

4.4  Battery Energy Storage Solutions provide a means of allowing for the storage
of energy at times when generating stations are working at full capacity which
can then be released when additional power is needed within the grid during
peak times or when energy generation has dropped. As more energy sources
are now renewable, such as wind and solar, balancing generation versus
demand is a critical issue for grid stability. In short, the proposed battery takes
in generated electricity when there is a surplus and stores it until there is a
demand for electricity which can be released to meet this demand.
4.5 Appendix 2 comprises the recommended response to the consultation. National
Planning Framework 4 (NPF4) sets out the long-term vision for the
development of Scotland through the National Spatial Strategy. NPF4 aims to
meet Scotland’s climate ambition which will require a rapid transformation
across all sectors of the economy and society. This proposal constitutes a
National Development as it supports renewable electricity generation,
repowering, and expansion of the electricity grid under National Development
3: Strategic Renewable Electricity Generation and Transmission Infrastructure.
NPF4 recognises that additional electricity generation from renewables and
electricity transmission capacity of scale is fundamental to achieving a net zero
economy.  Whilst the Council considers that the proposal could therefore be
held to support the overarching aims of the NPF4 to achieve net zero targets
and provide a stable domestic energy supply, it must be ensured that such
development happens in the right place. Therefore, it must be assessed if there
are any potential adverse impacts upon West Dunbartonshire resulting from the
proposed development which would be outweighed by any benefits.
4.6 In considering the proposal, it is concluded that no concerns arise in respect
of matters relating to the impact upon the Kilpatrick Hills, flood risk, roads, and
traffic, built and cultural heritage, and health and safety. However, a variety of
concerns do arise. 
4.7 In assessing the Green Belt location to the north of Faifley, it is considered that
the applicant has not demonstrated that there are no other suitable sites
available in a location outwith the Green Belt. It is considered that the industrial
character of the development would be to the visual harm of the locality
resulting in the industrialisation of the Green Belt. Whilst landscape mitigation
is proposed, any planting would take years to develop and mature,
exacerbating the visual impact within the short to medium term. This is
considered unacceptable or unjustified. The development cannot, therefore, be
held to be supported by Policies 8 and 11(e)(i) of NPF4. 
4.8 Turning to the impact upon ecology, biodiversity and protected species, the
applicant’s preliminary ecological appraisal fails to identify the adjacent Local
Nature Conservation Site (LNCS) within West Dunbartonshire and assess the
potential cross boundary impact upon ecology, biodiversity and protected
species within West Dunbartonshire. It therefore cannot be concluded that
adverse impacts would not occur within the West Dunbartonshire area.  Turning
to the impact on the core path network, while no routes are physically
interrupted by the proposal, there will be a visual and noise impact to users of
the routes and the character of the routes will be changed. It is considered that
Page 59

Page 60

there is the potential for there to be adverse visual amenity impacts on core
path users. The overall feeling of being in the wider countryside and outwith the
built-up area would be lost. Cochno Road also acts as a connection between
the various core path routes at this location and the impact of construction traffic
to users of these routes has not been considered or addressed. The
development cannot, therefore, be held to be supported by Policies 3, 4 and
11(e)(iii) and (ix)
4.9 With regard to residential amenity, it has not been demonstrated beyond doubt
that there would be no impact upon residential amenity within West
Dunbartonshire by way of noise. Finally, it is considered essential that given the
type of development together with its size and location, that full details of de-
commissioning and site restoration is provided to ensure that the requirements
of Policy 11(e)(i) of NPF4 are met.
5. People Implications
5.1      None.
6. Financial and Procurement Implications
6.1      There are no financial or procurement implications in terms of this report.
7. Risk Analysis
7.1       No risks have been identified.
8. Equalities Impact Assessment (EIA)
8.1      Not required.
9. Environmental Sustainability
9.1 Matters relating to environmental sustainability are fully considered via the
application assessment.
10. Consultation
10.1 Responsibility for wider consultation on the submitted application rests with the
Scottish Ministers and Energy Consents Unit as part of the application process.
11. Strategic Assessment
11.1 The following strategic priorities of the Council are relevant:
• Our Communities - Resilient and Thriving
• Our Environment - A Greener Future
• Our Economy - Strong and Flourishing
Page 60

Page 61

Alan Douglas
Chief Officer – Regulatory and Regeneration
Date: 8th May 2024
Person to Contact: James McColl, Development Management Team
Leader
Email: james.mcColl@west-dunbarton.gov.uk
Appendix 1: Location Plan
Appendix 2: Council’s Consultation Response
Background Papers: 1. Application documents
2. National Planning Framework 4
3. Adopted East Dunbartonshire Local Development
Plan 2
Wards affected: Adjacent Ward 4 (Kilpatrick)
Page 61

Page 62

Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 24/04/2024. All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Battery Storage Consultation Map
U
Scale: 1:3,000 @a4
24/04/2024
ITEM  7   -  A PPENDIX 1
Page 62

Page 63

Appendix 2 – West Dunbartonshire Consultation Response to Scottish
Government Energy Consents Unit. 
Section 36 application ref: ECU00004982 - Construction and operation of a
560MW Battery Energy Storage System with associated infrastructure,
substation, security fencing, CCTV, security lighting and landscaping on Land
at Cochno Road, Bearsden, East Dunbartonshire - project name Whitehall BESS.
West Dunbartonshire Council objects to the above proposal as neighbouring
Planning Authority. Full details of the Council’s consideration of the development
proposal are set out below. 
Context
An application has been made to the Scottish Ministers under Section 36 of the
Electricity Act 1989 (as amended) for the construction and operation of a battery
energy storage facility with a maximum power output of 560 megawatt. The application
site is located within the East Dunbartonshire local authority area and the assessment
of the application proposal is undertaken via the Scottish Government Energy
Consents Unit. West Dunbartonshire Council has been consulted as neighbouring
planning authority with the application site lying generally to the north of the local
authority boundary. 
Site description and development proposal
Extending to approximately 29 hectares, the proposed site is situated on land at
Whitehall Farm, Cochno Road, East Dunbartonshire. The site lies immediately north
and east of the local authority boundary which follows the line of Cochno Road at this
location. The site itself is located within the open countryside comprising part of the
Green Belt as defined by the adopted East Dunbartonshire Local Development Pan 2.
To the south, the site is bound by Cochno Road with Whitehill Farm located directly
adjacent to the southeast of the site. To the west, the site is bound by Cochno Road
along its southern extent before following the general line of Lower Stourfold Glen.
The northern and eastern boundaries of the site generally cut across open land before
following the existing tree line to Cochno Road. The nearest residential properties
within West Dunbartonshire are the houses directly opposite the site at Edinbarnet,
Cochno Road. Properties at Craigton Street, Burnbrae Street, Craighaw Street and
Field Road lie around 170 metres from the southernmost boundary of the proposed
site. Loansdean, Cochno Road is around 200 metres from the site. 
The proposal is for a 560 MW Battery Energy Storage Facility with associated
infrastructure. It is indicated that the development would have an operational lifespan
of 40 years. The proposed development would comprise a number of containerised
units to house battery energy storage systems and associated ancillary infrastructure.
Each container will have the appearance of a standard metal ISO/shipping container
and it is indicated these will be soundproof. The containers would be arranged in
parallel banks, and would likely be finished in dark grey or green and would be
prefabricated off-site. The containers would be accessed via an external galvanised
ITEM 7 -
APPENDIX 2
Page 63

Page 64

metal open grid walkway supported by stairs and railings. The dimensions of the
containers would be approximately 2.6m x 2.4m x 12.2m (height x depth x width). The
containers together with other equipment will be placed on concrete plinths. In the
submitted documents that concrete will be installed in a manner which can be removed
at the end of the development’s life cycle, to return the land to agricultural use. The
proposal would see 224 containers in total. It is further indicated that there will be 1
inverter per container and 1 transformer per 2 containers giving a total of 224 inverters
and 112 transformers, arranged in formation alongside the containers. The
transformers and inverters will measure approximately 2.7m x 1.4m x 2.6m, and 2.3m
x 1.4m x 1.5m respectively. Underground cables would connect the facility to the grid
off-site at Drumchapel and Windyhill substations. A substation measuring 3.9m x 3.7m
x 13.6m is to be located in the located to the south of the site. All structures and
development as laid out above will be enclosed within an acoustic fence, proposed to
stand at 4m high. 
A 4m wide access road will be installed, with the proposed access point to Cochno
Road located on the western edge of the site. It is indicated that landscape proposals
for the site will seek to enhance existing landscape features, screen views of the
battery containers and enhance biodiversity. 
Battery Energy Storage Solutions provide a means of allowing for the storage of
energy at times when generating stations are working at full capacity which can then
be released when additional power is needed within the grid during peak times or when
energy generation has dropped. As more energy sources are now renewable, such as
wind and solar, balancing generation versus demand is a critical issue for grid stability.
Battery storage allows energy to be stored during peak renewable generation periods
and released when demand outstrips generation. In short, the proposed battery takes
in generated electricity when there is a surplus and stores it until there is a demand
for electricity which can be released to meet this demand. 
The applicant has submitted a number of supporting documents with the application
to the Energy Consents Unit, including a supporting planning statement, design and
access statement, flood risk assessment, historic environment assessment,
preliminary ecological appraisal, transport statement, noise impact assessment,
battery safety management plan and landscape and visual impact assessment. 
Appraisal 
This application has been submitted to the Scottish Government under Section 36 of
the Electricity Act 1989, as it is development with a generating capacity of over 50MW.
Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. In this instance, the application is made
under the Electricity Act 1989 and therefore the Development Plan does not have the
primacy in the determination of the application.  It does, however, provide a basis for
the assessment of this proposal and it is established practice to take the development
plan into account in such decisions. The development plan comprises National
Planning Framework 4 and adopted East Dunbartonshire Local Development Plan 2. 
Page 64

Page 65

Principle of Development
National Planning Framework 4 (NPF4) sets out the long-term vision for the
development of Scotland through the National Spatial Strategy. NPF4 aims to meet
Scotland’s climate ambition which will require a rapid transformation across all sectors
of the economy and society. This proposal constitutes a National Development as it
supports renewable electricity generation, repowering, and expansion of the electricity
grid under National Development 3: Strategic Renewable Electricity Generation and
Transmission Infrastructure.  NPF4 recognises that additional electricity generation
from renewables and electricity transmission capacity of scale is fundamental to
achieving a net zero economy. Policy 1 states that there is a need to encourage,
promote and facilitate development that addresses the global climate emergency and
nature crisis, whilst Policy 2 seeks to encourage, promote and facilitate development
that minimises emissions and adapts to the current and future impacts of climate
change. The electricity transmitted for storage within the proposed batteries will have
come from a mixture of renewable and non-renewable sources with the purpose of the
batteries to ensure there is always grid stability. As renewable energy becomes more
prevalent, grid stability becomes a significant issue due to the intermittent nature of
renewable energy generation. 
Whilst the Council considers that the proposal could therefore be held to support the
overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply, it must be ensured that such development happens in the
right place. Therefore, it must be assessed if there are any potential adverse impacts
upon West Dunbartonshire resulting from the proposed development which would be
outweighed by any benefits. Policy 11(e) of NPF4 sets out in detail the matters for the
project design and mitigation to address. 
Landscape and Visual Impact and impact on the Green Belt
The site is situated within the Green Belt to the north of the settlement of Faifley. Policy
8 of NPF4 sets out the types of development that are supported within the Green Belt
locations. This includes essential infrastructure and proposals that relates to the
distribution and transmission of electricity grid networks fall under this definition.
However, Policy 8 is clear that for development proposals in Green Belt locations, the
purpose of the Green Belt must not be undermined. Policy 11 additionally seeks to
encourage, promote, and facilitate all forms of renewable energy development,
including energy storage and distribution infrastructure. The policy sets out a range of
criteria that proposals should be assessed against to ensure the impact of the project
design and mitigation is addressed. This includes ensuring there is no adverse impact
on landscape and visual impact. 
Policy 8 requires that the reasons why the Green Belt is essential must be provided
together with why the development cannot be provided on a site outwith the Green
Belt. The applicant advises that the site has been chosen due to it’s proximity to
appropriate grid connections. While this is accepted from a technical perspective, the
applicant has not provided any analysis of other site options that were considered
outside of the Green Belt and why it was not possible to locate them in an alternative
place. It therefore cannot be concluded that no other suitable sites are available in a
location outwith the Green Belt. 
Page 65

Page 66

Policy 8 further requires that proposals must be compatible with the established
countryside and landscape and be designed to ensure that it is of an appropriate scale,
massing and external appearance to minimise visual impact upon the Green Belt. That
a development of this nature would have a visual impact is not in doubt. The applicant’s
Landscape and Visual Impact Assessment (LVIA) acknowledges that the baseline
landscape character of the site would be altered as a result of the proposed
development bringing adverse effects on landscape character, during both the
construction and operation phases. It is identified in the LVIA that the development
would introduce built elements which would be evident in its immediate landscape
setting. The Council is concerned at the potential for the industrial character of the
development and the harm to the visual harm to the locality, resulting in the
industrialisation of the Green Belt at this location. Whilst the proposed landscape
mitigation is acknowledged, the site is in close proximity to the settlement boundary of
Faifley and visually, the development will likely be viewed in the context of the adjacent
settlement. It will likely have negative impacts on landscape and natural setting of the
Green Belt, potentially having an adverse visual impact. Whilst the development is
identified as being temporary, there are no details of decommissioning or restoration.
With a possible development lifespan of up to 40 years, any impacts from the
operational phase of the development will occur over a long period of time. 
The Council is of the view that the applicant has not demonstrated that there are no
other suitable sites are available in a location outwith the Green Belt. The Council also
considers that the industrial character of the development will result in visual harm to
the locality resulting in the industrialisation of the Green Belt. This would not be
acceptable. The development cannot, therefore, be held to be supported by Policies
8(a)(ii) and 11(e)(ii) of NPF4. 
Impact upon the Kilpatrick Hills
Notwithstanding visual impact considerations within the Green Belt, the potential
impact on the landscape character and features of the Kilpatrick Hills Local Landscape
Area (LLA) must also be considered. The proposed site is approximately 270m away
from the boundary of the LLA. The ‘Statement of Importance’, which is the evidence
underpinning the LLA explains that the lower slopes of the Kilpatrick Hills contribute to
its setting, by acting as an important landscape buffer. The designation contains areas
of lower slopes to protect the setting of the hills, meaning the proposed development
site is removed from this buffer. 
The theoretical zone of visibility in the applicant’s LVIA does include southern areas of
the LLA. One of the special landscape qualities of the LLA is the long views across the
Glasgow conurbation, which emphasise the contrast between remote uplands and
developed lowlands. Visually intrusive development between the conurbations and the
Kilpatrick Hills could erode this special quality. The LVIA assesses that there would be
negligible impact stating the development is unlikely to be visible from the viewpoint.
Further, the tree screening mitigation would further reduce the visibility once
established. 
Given that the site is some distance from the designation boundary and visibility is
expected to be low from the LLA, the Council considers that based on the assessment
within the submitted LVIA, it is unlikely there will be an adverse impact on the Kilpatrick
Hills 
Page 66

Page 67

Ecology, biodiversity and protected species
Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects
from development and strengthen nature networks.  Policy 4 seeks to protect, restore
and enhance natural assets, making best use of nature-based solutions. The policy is
primarily focused on designated areas including sites designated as a local nature
conservation site or landscape area. Policy 11 also requires biodiversity impact to be
addressed.  The applicant has submitted a preliminary ecological appraisal in support
of the proposal and this primarily assesses impacts upon the proposed site. The
appraisal does not identify the adjacent Local Nature Conservation Sites (LNCS)
within West Dunbartonshire, as set out on the proposals map of proposed LDP2. 
These comprise of three LNCS areas; Edinbarnet woodlands and Wester Cochno
Parkland both of which area adjacent to the proposed site, and Wester Cochno Burn. 
The Council’s Biodiversity Officer advises that West Dunbartonshire Council has
undertaken a two year nature restoration project within the area known as Auchnacraig
Estate (which is comprised of the three LNCS above), and on Faifley Knowes to the
south.  Both Auchnacraig and Faifley have now been connected by a new native
woodland which straddles the hillside to the east of Douglas Muir Road.  This has
created an integrated habitat which connects the urban environment to wider Green
Belt and the Kilpatrick Hills LLA. The Council’s Biodiversity Officer further advises that
to the northwest of the site, Glasgow University at Cochno Farm have also been
carrying out a number of nature restoration works including a large scale planting
programme as well as a private forestry grant development north of Duntocher. 
Collectively all the work put in by the various agencies in this location has resulted in
landscape and nature restoration around the proposed development site. Assessing
the potential impact upon the three LNCS making up Auchnacraig Estate, Auchnacraig
wood is a semi-natural broadleaved woodland with a number of veteran broadleaved
and conifer trees. Parts of the woodland has been established for a long time, with
parts of it thought to be ancient woodland associated with the former Auchnacraig
estate. Other woodland is younger native broadleaved woodland planted over the past
20 years. Diverse semi-natural woodlands of this size and age are uncommon locally,
making this site important for nature conservation. Its value is enhanced by the fact
that it is located on the fringe of an urban environment where wildlife habitats tend to
be small and of low diversity. The Council’s Biodiversity Officer advises that the
woodland will have a positive effect on the surrounding environment as it will provide
a reservoir of species which can migrate into surrounding areas when conditions are
suitable. 
The Council’s Biodiversity Officer further advises that a Phase 1 survey carried out at
Auchnacraig recognised the importance of the varied mosaic habitats.  Areas of
wetland pockets were found throughout the Estate.  The Estate features the Cochno
burn from which a wildlife pond is supplied and this has also been restored for wildlife
as part of the habitat restoration project.  Any proposed development to the north of
the site may have an impact on the hydrology of the LNCS site and this requires to be
assessed. 
Page 67

Page 68

Considering specific species, the Council’s Biodiversity Officer advises that evidence
of badger foraging and pine marten scat were found in 2023 surveys.  Herpetofauna
surveys of the pond were undertaken and include common toad in the species list.
The open mosaic habitat is suitable for hedgehog and previous records of local bat
surveys on the site have found both common and soprano pipistrelles as well as
daubentons. Previous records of otter and watervole exist for both the Cochno and
Hardgate burns.  Recent watervole surveys have reconfirmed their presence at Faifley
thus the development site requires to be considered for watercourse and fossorial
watervole as they are within the distribution range of the proposed site. 
It is therefore possible that all of the above species found within West Dunbartonshire
to the immediate west and south of the site could potentially be using the proposed
development site. The Council’s Biodiversity Officer advises that further species
specific surveys require to be carried out in respect of the proposed development site.
Issues such as adverse noise, vibration, lighting and hydrology pollution are not
discussed in the PEA and also require to be examined. 
In terms of biodiversity enhancement, the proposed area is also a mixed habitat and
wet and marshy sections should not be given over to inappropriate tree planting under
the role of biodiversity enhancement, as these are valuable habitats of their own
accord. 
Overall, the applicant’s preliminary ecological appraisal has been considered by the
Council’s Biodiversity Officer and this fails to identify the adjacent LNCS within West
Dunbartonshire and assess the potential cross boundary impact upon ecology,
biodiversity and protected species within West Dunbartonshire. It therefore cannot be
concluded that adverse impacts would not occur within the West Dunbartonshire area. 
The Council does not consider that the proposal can be held to be supported by
Policies 3, 4 or 11(e)(ix) of NPF4. 
Residential amenity
There is the potential for amenity impacts to occur to residents within West
Dunbartonshire, with the closest residential properties being at Edinbarnet on Cochno
Road, immediately to the west of the site. Infrastructure within the site would be
situated around 90 to 100 metres from these properties. Further properties lie to the
northern edge of Faifley, approximately 170 metres from the proposed site. The site
equipment itself is around 280 metres these residential properties in Faifley together
with Loansdean on Cochno Road. The applicant, however, requests micro-siting of up
to 100 metres and this could result in the proposed infrastructure being substantially
closer to nearby properties than the current layout suggests. The site entrance will be
taken from Cochno Road, opposite the properties at Edinbarnet. 
Policy 11 of NPF4 requires that impacts on communities and individual dwellings
including residential amenity, and noise are addressed. A noise impact assessment
(NIA) has been submitted in support of the proposal and this has been considered by
the Council’s Environmental Health Service. A number of points are highlighted with
respect to the noise impact assessment. It is noted that the predicted noise is higher
at one receptor during the night but lower at other receptors. It is questioned whether
this is correct and the cause of this requires to be clarified. It is further noted that the
noise impact assessment applies a 2dB penalty for tonality being just perceptible at
Page 68

Page 69

the receptors. For cooling plant associated with battery storage an assessment and
discussion of NR curves as per the REHIS development guide quoted in the Noise
Assessment is expected. In the absence of this, it cannot be concluded that no adverse
impact will occur to residential properties. 
In further assessing the noise assessment, Para 4.6.2 states that mitigation is required
to ensure compliance with the BS4142 assessment for daytime noise. It is not clear
from the results how this conclusion has been reached and furthermore there is no
discussion or suggestion of suitable mitigation and its predicted effectiveness. The
Council’s Environmental Health Service note that the applicant has stated that there
should be flexibility around the siting of the equipment within the site boundary, with
micro siting of up to 100 metres. There is no acknowledgement of this within the NIA.
Any impacts from different configurations of equipment requires to be fully discussed
and assessed. In the absence of this, the Council considers that it is not considered
that it has been demonstrated that there will be no unacceptable impact on
neighbouring amenity resulting from the operation of the development. It is not
therefore considered that the potential impacts from noise are addressed in
accordance with Policy 11(e)(i). 
Any construction project will result in an element of noise and disturbance. In order to
manage any potential noise disturbance during the construction phase of the
development, in the event that consent was granted, the Councill would seek a that
construction work and any ancillary operations are restricted to between 8am to 6pm
Monday to Friday and 8am to 1pm on Saturday. No working should be permitted on
Sundays or public holidays, including local holidays within the West Dunbartonshire
Council area. 
Traffic and Road Safety
Policy 11 of NPF4 requires the impacts on road traffic to be appropriately addressed,
including during construction. Access to the site will be taken from the A811 via Cochno
Road which is partly within the West Dunbartonshire boundary. The site access itself
will adjoin a West Dunbartonshire section of Cochno Road.  A 24 month construction
phase is identified and the applicant’s transport statement advises that the
construction phase of the development would generate around 109 two-way
movements per day during the first three months (218 individual movements), with
daily movements decreasing thereafter. 
The applicant’s Transport Statement sets out that a review of Cochno Road outlines
how the carriageway has a suitable width to allow for simultaneous two-way
movement, from its junction with the A810 towards the access of Law Farm. Beyond
this towards the site, Cochno Road is predominantly single track, measuring circa
3.5m width. There are four formal passing places between the site and the Law Farm
access, which could be used to allow small vehicles to pass in the event of conflict.
Given the narrow width along sections of Cochno Road, with limited space to widen
the carriageway to provide passing places for HGVs, it is proposed to stagger arrivals
and departures. A detailed Construction Traffic Management Plan (CTMP) would be
developed. It is advised that no HGV movements will occur at the site during peak
hours, in addition to the school closing hour. It is further advised that there will be no
construction vehicle movements directly to the west of the site along Cochno Road.
Overall, the applicant does not consider that the proposals would result in a severe
Page 69

Page 70

impact upon the local road network. Once operational, the applicant anticipates
between 10 and 20 vehicle trips to the site per annum. 
The Council’s Roads Service has considered the proposal and does not identify any
issues or objections. It is noted that a detailed CTMP will be prepared by the applicant
and the Council requests that in the event that the Scottish Ministers were minded to
grant consent, this is conditioned including a requirement for any CTMP to be agreed
with West Dunbartonshire Council due to the proximity of the site to the Council area
and use of the road network within the Council area. 
Impact upon the core path network
Policy 11 of NPF4 requires matters relating to public access including long distance
walking and cycling routes and scenic routes to be suitably addressed. A variety of
core paths connect Faifley to the open countryside via Cochno Road. The applicant’s
supporting documents identifies East Dunbartonshire core path ED/153/1 which is
located to the south and east of the site and extending northeast from Cochno Road,
noting that only minor visual effects would occur in respect of users of this core path.
This East Dunbartonshire Core Path connects with the West Dunbartonshire Core
Path network to the opposite side of Cochno Road. The applicant’s submission does
not consider the impact on the core path network and connections to the core path
network within West Dunbartonshire. While no routes are physically interrupted by the
proposal, there will be a visual and noise impact to users of the routes and the
character of the routes will be changed. The Council considers that there is the
potential for there to be adverse visual amenity impacts on core path users. Whilst
landscape mitigation could seek to reduce the visual impact, the overall feeling of
being in the wider countryside and in ‘nature’ would be lost should the proposal
proceed.  Cochno Road acts as a connection between all of these routes and the
impact of construction traffic to users of these routes has not been considered or
addressed. The Council does not consider that the potential impact upon the core path
network has been addressed as required of Policy 11(e)(iii). 
Flood risk
Considering matters relating to flood risk, a flood risk assessment has been submitted
in support of the proposal. This does not identify the site itself as being as
unacceptable risk of flooding. The proposed development is also not predicted to
increase surface water runoff or flooding to the surrounding catchment. It is noted that
in a consultation response to the Energy Consents Unit, SEPA offer no objection on
the grounds of flood risk. 
Built and cultural heritage
The application is accompanied by a desk-based assessment of the historic
environment, which identified three heritage assets relevant to West Dunbartonshire:
Edinbarnet House which is a Category B listed building, the Scheduled Monument
Cochno Cup and Ring Marked Stone, and the Antonine Wall World Heritage Site
buffer. Historic Envirobnment Scotland (HES) in their consultation response to the
Energy Consents Unit notes that there are no designated heritage assets are located
within the development site application boundary. HES are therefore satisfied that
there will not be any direct impacts. HES also specifically consider the potential for
impact on both the Cochno Stone and Antonine Wall buffer zone and conclude that
any impact on their setting is not likely to be significant. Being guided by the response
Page 70

Page 71

from HES, the Council is therefore content that there is no significant impact on historic
assets within or adjacent to West Dunbartonshire. Potential archaeological matters
within the site would be for the Scottish Ministers to consider. 
Health and safety
The applicant acknowledges that there are potential hazards associated with HV
electrical systems and BESS facilities, such as a fire and thermal runaway event,
which could result in the formation of harmful gases. In response to this, an Outline
Safety Management Plan Design has been submitted in support of the proposal. This
details the operational measures, which will be included to mitigate hazards and
reduce the risks to people and the environment. The key measures which will be
installed to reduce risk at the BESS include the use of systems to monitor the operation
of the BESS and continuously observe the temperature, voltage and other process
parameters. These will immediately alert operators to potential issues. It is advised
that in the event of a problem occurring, battery sections can be readily isolated
automatically. A fire and gas detection system will be installed alongside conventional
fire, heat and gas detectors, for the early detection of a fire event. An automatically
operated fire suppression system will also be installed. It is for the Scottish Ministers
to satisfy themselves that an unacceptable risk does not occur and to inform this
assessment, the Council would expect the Scottish Fire and Rescue Service to be
consulted on the application proposal. It is noted at the time of writing, no consultation
response is available online from this organisation. 
Site Decommissioning and Restoration
Policy 11(e)(xi) of NPF4 requires matters relating to the decommissioning of
developments, including ancillary infrastructure, and site restoration to be addressed.
The applicant has indicated that the intended lifetime of the proposal is 40 years, after
which the facility will be decommissioned and the land restored to its former state.
However no other information regarding this has been submitted. It is essential that
given the type of development together with its size and location, that full details of de-
commissioning and site restoration is provided to ensure that the requirements of
Policy 11(e)(xi) of NPF4 are met. 
In the event that the Scottish Ministers were minded to grant consent for the
development, the Council considers that there is the requirement for a financial bond
to ensure sufficient funds are available to decommission and restore the site. If the
developer was to go out of business with unfinished works potentially being left this
can be safeguarded by ensuring that a bond or other financial provision is to put in
place to cover such an eventuality. The bond or other financial provision would address
reinstatement works both in the event of a developer failing or being unable to
complete restoration works together with any failure in the aftercare arrangements
associated with the site restoration. The Council also considers that in the event that
the development fails to export electricity to the grid for a continuous period of 12
months it will be considered to have become redundant and the components of the
development removed and the site restored. In the event that consent was granted,
the Council considers it essential that that this requirement is to be addressed by a
condition.
Page 71

Page 72

Summary and conclusions
The Council consider that proposals such as this can be held to support the
overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply. The support as a national development is also acknowledged.
However, it remains that such development require to be sited in the right locations
and the benefits of such developments require to be balanced with any potential
adverse impacts. 
In considering the proposal, it is concluded that no concerns arise in respect of matters
relating to the impact upon the Kilpatrick Hills, flood risk, roads and traffic, built and
cultural heritage, and health and safety. However, a variety of concerns do arise. 
In assessing the Green Belt location to the north of Faifley, the Council is of the view
that the applicant has not demonstrated that there are no other suitable sites available
in a location outwith the Green Belt. The Council also considers that the industrial
character of the development would be to the visual harm of the locality resulting in
the industrialisation of the Green Belt. Whilst landscape mitigation is proposed, any
planting would take years to develop and mature, exacerbating the visual impact within
the short to medium term. This is not considered acceptable or justified. The
development cannot, therefore, be held to be supported by Policies 8 and 11(e)(i) of
NPF4. 
Turning to the impact upon ecology, biodiversity and protected species, the applicant’s
preliminary ecological appraisal fails to identify the adjacent LNCS within West
Dunbartonshire and assess the potential cross boundary impact upon ecology,
biodiversity and protected species within West Dunbartonshire. It therefore cannot be
concluded that adverse impacts would not occur within the West Dunbartonshire area.
Turning to the impact on the core path network, while no routes are physically
interrupted by the proposal, there will be a visual and noise impact to users of the
routes and the character of the routes will be changed. The Council considers that
there is the potential for there to be adverse visual amenity impacts on core path users.
The overall feeling of being in the wider countryside and outwith the built-up area would
be lost. Cochno Road also acts as a connection between the various core path routes
at this location and the impact of construction traffic to users of these routes has not
been considered or addressed. The development cannot, therefore, be held to be
supported by Policies 3, 4 and 11(e)(iii) and (ix)
With regard to residential amenity, the Council does not consider that it has been
demonstrated beyond doubt that there would be no impact upon residential amenity
within West Dunbartonshire by way of noise. Finally, the Council considers it essential
that given the type of development together with its size and location, that full details
of de-commissioning and site restoration is provided to ensure that the requirements
of Policy 11(e)(i) of NPF4 are met.
West Dumbartonshire Council therefore objects to this proposal due to the above
concerns relating to the Green Belt location of the development, visual impact, impact
upon ecology, biodiversity and protected species, potential impact upon the users of
the core path network, potential impact upon adjacent residential amenity and the
failure to provide a decommissioning and restoration scheme. The Council does not
Page 72

Page 73

consider that the benefits of the proposed development outweigh any adverse impacts
to the adjacent West Dunbartonshire area.