Democracy Spraffa

Item 6 - Appendix 1

West Dunbartonshire Council · 13 March 2024
Back to Planning Committee — 13 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 14th February 2024
DC23/177/FUL: Erection of single wind turbine, 30m hub and 43m tip,
access track, substation and associated works at Land to
East of Broomhill Wood, Bonhill, Alexandria by Mr Harris
Smith.
1. REASON FOR REPORT
1.1 The planning application is subject to a substantial body of objection.
Under the terms of the approved Scheme of Delegation, it therefore
requires to be determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission and delegate authority to the Planning &
Building Standards Manager to issue the decision subject to the conditions
set out in Section 9 and subject to the conclusion of a legal agreement to
ensure that a suitable financial bond is put in place to cover restoration
liabilities for the site and the community benefit contribution.
3. DEVELOPMENT DETAILS
3.1 The application site is located to the east of Bonhill, Alexandria. The
nearest residential areas are Beechwood and Wheatcroft Estate, Bonhill
located approximately 440m to the west and Bellsmyre which is just over
1km to the south, though there is intervening woodland between the site
and both residential areas. The site is to the north of the Murroch Glen (a
steep wooded valley containing the Murroch Burn), on land which rises to
the northeast into the Kilpatrick Hills. It forms part of an area of plantation
woodland, bordered by the Murroch Glen and areas of grazing land. The
application site boundary extends to 0.89 hectares, but is within a much
larger area of land controlled by the applicant.
ITEM 6 - APPENDIX 1

Page 2

3.2 The proposal would involve the following works:
• Installation of a single wind turbine;
• Construction of a 550m access track;
• Construction of an electrical substation and underground cabling;
• Construction infrastructure (e.g. crane hardstanding area);
• Construction of 6 vehicle parking spaces;
3.3 The turbine would be a three-bladed, horizontal axis turbine, with a
nominal rated capacity of 250kW. It would have a hub height of 30m and a
maximum height to the blade tip of 43m. The turbine would be of the
conventional design for such pieces of equipment, featuring a tubular
tower and blades finished in a non-reflective pale grey colour consistent
with the industry standard used in most UK wind turbines. 
3.4 The turbine would sit on a concrete base measuring roughly 7.5m x 7.5m,
with an expected depth of 3m, although the exact design of the foundation
would depend upon which specific manufacturer’s turbine was used
(which is not known at this stage). In addition to the foundation, an area of
hardstanding would be required adjacent to the turbine as a crane platform
for construction and ongoing maintenance. Adjacent to the base of the
turbine would be an external substation measuring approximately 7.5m x
4m, and 2.8m in height. The colour of the substation is currently
unspecified, however the supporting statement suggests it will be either
green or pale grey. Due to the relatively small generator size of the
proposed turbine, a local connection to the distribution network is
anticipated and without the need for more extensive reinforcement or
upgrade works.
3.5 Access to the site would be by way of the existing private access track
leading to Highdykes Farm, which is, itself, accessed from Broomhill
Crescent. A new 550m access track would be created between the farm
track and the proposed turbine. The new track would be 4.5m wide and
surfaced in hardcore, with a passing place and areas to permit the turning
of long vehicles. The road is likely to sit above the existing ground by
approximately 300mm with banking at either side. No borrow pits are
proposed as part of the development and material would be imported to
construct the access track. The level of material required to be imported is
not, however, specified in the application submission. The access track
crosses a drainage ditch around 330 metres from the junction with the
existing farm track, which a short section of pipe being installed below the
hardcore.
3.6 In terms of the planning history of the site, there have been two previous
applications for the erection of a wind turbine of the same size, as well as
the associated access track on this site.

Page 3

The Planning Committee considered the first application (DC14/210) on 29
April 2015 and were minded to grant planning permission subject to the
conclusion of a legal agreement to ensure that a suitable financial bond is
put in place to cover restoration liabilities for the site and the community
benefit contribution. The financial bond was never concluded and with a
lack of any progress over an extended period, the application was
considered withdrawn in March 2021. 
3.7 The second application (DC22/190/FUL) was submitted in 2022. In addition
to the wind turbine and associated works, an agricultural storage shed was
also proposed as part of this application. All planning application proposals
require to be considered as a whole and in assessing the application it was
concluded that the proposed shed was not a form of development which
could be supported in this Green Belt location and would result in an
unjustified sporadic development within the Green Belt. The application was
refused by Planning Committee on 2nd August 2023 for the following reason: 
1. It has not been demonstrated that the proposed agricultural shed is
being provided in association with an agricultural land holding, nor has
the nature of any farming operation at this location been quantified.
Therefore it cannot be concluded that the proposed shed is specifically
required to support agriculture at this green belt and the shed would
result in unjustified sporadic development within the green belt
location. It is thus not a form of development that is supported in the
green belt by Policy 8 – Green Belts of the National Planning
Framework 4, Policy GB1 – Green Belt of the adopted West
Dunbartonshire Local Development Plan, Policy GB1 – Greenbelt and
Countryside of the proposed West Dunbartonshire Local Development
Plan 2. 
This refusal of planning permission was not appealed to the Scottish
Government Planning and Environmental Appeals Division. 
3.8 Works to create the access track associated with the wind turbine
commenced on site prior to this application being determined. The
applicant was advised that the works were being undertaken without
planning permission. The applicant was requested on a number of
occasions to stop works until such time that planning permission was
granted. The applicant continued works on the access track and a
Temporary Stop Notice was subsequently issued. Works initially continued
after the Notice was issued and then halted. At the expiry of the
Temporary Stop Notice works commenced again, despite it remaining that
no planning permission was in place. 
3.9 Further to the refusal of application DC22/190/FUL, an Enforcement Notice
was issued requiring the removal of the partially constructed access track.

Page 4

The applicant appealed this Enforcement Notice which was dismissed by
the Reporter of the Planning and Environmental Appeals Division of the
Scottish Government. Reports from residents within the area suggested that
works were ongoing to further develop the track. However a site visit on 30th
January 2024 has confirmed that the works are ongoing to remove the track
in accordance with the requirements of the Enforcement Notice. 
4. CONSULTATIONS 
4.1 West Dunbartonshire Council Environmental Health Service have no
objections to the proposal and recommends the following conditions
regarding noise in relation to the turbine, noise complaints, wind data,
point of contact, hours of work, delivery vehicles during construction,
construction noise, and noise attenuation.   
4.2 West Dunbartonshire Council Roads Service have no objections in relation
to flooding matters. A Traffic Management Plan was submitted and the
Roads Service confirmed that the clarifications and qualifications
contained within the plan made the proposal acceptable to the Roads
Service. 
4.3 West of Scotland Archaeological Service (WoSAS) have no objection
subject to a condition requiring the implementation of an archaeological
watching brief. 
4.4 West Dunbartonshire Council Biodiversity Officer has no further comments
to make on the current proposal. Comments from the previous application
note that the Preliminary Ecological Assessment submitted offers
mitigation in section 7 of the document and should be conditioned if the
development is to proceed. The proposed mitigation includes following
national guidelines and standards for any tree/hedgerow retention, that
best working practice measures are adhered to safeguard otters and
badgers, and a walkover survey prior to works commencing within bird
breeding season. If any otter or badger resting place is found then an
ecologist should produce an otter protection plan. Should the development
proceed there should be a clear intention provided of the biodiversity
enhancement works that will be included to meet the requirements of
NPF4 Policy 3. It should be specifically noted what is being regarded as
mitigation and enhancement so that a clear picture of the ‘positive effect
on biodiversity’ can be determined. 
4.5 Glasgow Airport and National Air Traffic Services have no objections to the
proposal.

Page 5

4.6 RSPB Scotland note that the previous ecological report appears to be
based on site visit(s) during December 2022 (so outside the
recommended dates for protected species surveys) and the conclusion
that there would be no impact on birds was based on a desktop study
using only freely available data rather than survey visits – and so no actual
survey work had taken place. The updated application mentions NPF4
policies, but again says that based on an assessment in support of the
application, it concludes there will be no material impact on biodiversity,
including birds. It is unclear how this can be assessed from the data
provided. There is also no mention of proposed biodiversity
enhancements. 
4.7 Stirling Council and Inverclyde Council have no objections to the proposal. 
4.8 Loch Lomond & The Trossachs National Park Authority and Argyll and
Bute Council have not provided a response at the time of writing this
report. 
5. REPRESENTATIONS 
5.1 Fifty eight representations from fifty seven representees have been
received in connection with the proposal including from Beechwood &
Wheatcroft Residents Association. All are in objection. The full details are
contained within the planning file and are available for public viewing.
However, the points raised can be summarised as follows: 
Roads and traffic
• The estate roads are not suitable for heavy vehicles.
• There will be a noise impact from the HGV traffic.
• Concern for children and elderly in relation to the increase in traffic.
• There was never a road in this location before. 
Location and visual impact of the development 
• Concern for the visual impact on Dumbarton Rock, cluttering the
backdrop to & from the Kilpatrick and Lang Craig Hills & the Pappert
Well.
• No access track previously existed at this location previously.
• There are industrial estates within Dumbarton and Vale of Leven which
are more suited to a development of this nature.

Page 6

Residential amenity
• Nearby residents would be adversely affected by noise disturbance. 
• There are potential health side effects from living beside a wind
turbine, including from vibration, shadow flicker and ice throw.
• The area is a residential area and is too close to residents/houses.
• Scottish Government guidelines state that wind turbines should be no
closer than 2km away from residential properties. 
Environmental matters
• Air pollution may result from the development, particularly during
construction.
• The development would adversely impact upon wildlife, trees, and
hedgerows. 
Procedural concerns
• The applicant has not attended the resident’s association meetings to
discuss their plans.
• The applicant has not met his legal obligation to the residents to provide
compensation for previous work.
• There is no stated business aim and no community benefit.
• There is no stated life of the turbine and no bond for restoration on
decommissioning. 
Other matters
• What is the energy to be used for?
• The applicant intends to produce bio fuel which is not on the application.
• No connection to the grid has been indicated.
• The turbine name no longer seems to be in production.
• Property prices will be affected.
• Approval would set a precedent and open the area to further large scale
turbines.
• West Dunbartonshire Council’s Open Space Strategy 2011 states that
planning authorities are expected to support, protect and enhance open
space and opportunities for sport & recreation. 
5.2 The matters of concern raised above are addressed in Sections 6 and 7
below. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Policy 4 
6.1 Policy 1 relates to tackling the climate and nature crises and states that
when considering all development proposals significant weight will be given
to the global climate and nature crises.

Page 7

Policy 2 also relates to the climate in the form of climate mitigation and
adaptation and states development proposals will be sited and designed to
minimise lifecycle greenhouse gas emissions as far as possible and
development proposals will be sited and designed to adapt to current and
future risks from climate change. 
6.2 Policy 3 states that development proposals will contribute to the
enhancement of biodiversity and should integrate nature-based solutions
where possible. Proposals for local development will include appropriate
measures to conserve, restore and enhance biodiversity, in accordance
with national and local guidance. Policy 4 requires that development
proposals do not have an unacceptable impact on the natural environment
inclusive of environmental designations and protected species. Policy 5
states that development proposals will only be supported if they are
designed and constructed in accordance with the mitigation hierarchy by
first avoiding and then minimising the amount of disturbance to soils on
undeveloped land and in a manner that protects soil from damage
including from compaction and erosion that minimises soil sealing. 
6.3 Where there is potential for non-designated buried archaeological remains
to exist below a site, developers will provide an evaluation of the
archaeological resource at an early stage so that planning authorities can
assess impacts in accordance with Policy 7. 
6.4 Policy 8 supports development within the green belt in a limited number of
circumstances. These include: 
• development associated with agriculture, woodland creation,
forestry and existing woodland (including community woodlands); 
• horticulture, including market gardening and directly connected
retailing, as well as community growing; 
• essential infrastructure or new cemetery provision;
• minerals operations and renewable energy developments; 
• intensification of established uses, including extensions to an
existing building where that is ancillary to the main use. 
Additional requirements include justification is provided for the green belt
location; the purpose of the green belt is not undermined by the
development; the development is compatible with the surrounding
countryside and landscape character; the development is of an
appropriate scale, massing and external appearance and minimises visual
impact; and there will be no long-term impacts on the environmental
quality of the green belt.

Page 8

6.5  Policy 11 supports proposals for all forms of renewable, low-carbon and
zero emissions technologies. Policy 11 also states that development
proposals will only be supported where they maximise net economic
impact, including local and community socio-economic benefits such as
employment, associated business and supply chain opportunities. The
policy also lists impacts which must be addressed including residential
amenity, visual impact, noise and shadow flicker, impacts on road traffic
and on adjacent trunk roads, including during construction; and the quality
of site restoration plans including the measures in place to safeguard or
guarantee availability of finances to effectively implement those plans. 
6.6 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale as per Policy
14. Policy 20 states that development proposals that result in
fragmentation or net loss of existing blue and green infrastructure will only
be supported where it can be demonstrated that the proposal would not
result in or exacerbate a deficit in blue or green infrastructure provision,
and the overall integrity of the network will be maintained. The planning
authority’s Open Space Strategy should inform this. Green infrastructure is
defined as features or spaces within the natural and built environments
that provide a range of ecosystem services. An ecosystem services is the
benefits people obtain from ecosystems. 
6.7  Policy 23 relates to health and safety and states that development proposals
that are likely to raise unacceptable noise issues will not be supported. A
Noise Impact Assessment may be required where the nature of the proposal
or its location suggests that significant effects are likely. 
6.8  The matters relevant to the assessment against the above policies are
addressed in detail in Section 7 below. Based on that assessment, it is
concluded that the proposal is in accordance with NPF4. 
West Dunbartonshire Adopted Local Plan 2010 
6.9 The site of the proposed turbine is identified as Green Belt. Policy GB1
indicates a general presumption against development within the Green
Belt, other than in certain circumstances, including where there is a
specific locational requirement and established need for the development
and it cannot be accommodated on an alternative site. Development in the
Green Belt will not be permitted if it would have an adverse effect on the
landscape character of the area. 
6.10 All development is expected to be of a high quality of design and to respect
the character and amenity of the area in which it is located in accordance
with policy GD1.

Page 9

6.11 Policy E5 relates to development affecting trees. There are trees on site
which line the proposed access route. In accordance with policy E5 new
development proposed on sites with, or adjacent to, existing trees will be
assessed in accordance with best practice. Policy BE5 states that where
the presence of archaeology becomes apparent once development has
commenced, adequate opportunity must be afforded by the developer for
an archaeological investigation. 
6.12 The development takes access via a designated core path and as such
policy R5 applies. Policy R5 states that the Council will undertake to protect
Core Paths using the Council’s statutory powers. 
6.13 Policy DC6 states that renewable energy proposals will be permitted
where these would not give rise to unacceptable detriment to the
landscape, natural or build heritage, sport or recreation interests or local
amenity. Development proposals are to be considered against the
following criteria: 
• visual impact and effect on landscape character, including the
landscape character of the Kilpatrick Hills RSA;
• nature conservation interests;
• historic environment and its setting, including scheduled ancient
monuments;
• local amenity, including noise, traffic and broadcast interference;
• any cumulative impacts. 
6.14 Policy DC3 states that within the Glasgow Airport Safeguarding Zone,
development which adversely affects the operational integrity or safety of
the airport will not normally be permitted. 
6.15 Policy GN1 seeks to promote, protect and improve the Green Network. It
states that development which is detrimental to the green network will be
considered contrary to the Plan, and that new development should
contribute positively to the protection and improvement of the green
network. The Kilpatrick Hills are recognised as an important green network
resource in West Dunbartonshire owing to their landscape value, the
habitats and species found there and the outdoor recreation opportunities
they offer. Policy SUS1 states that all development should seek to
conserve and enhance environmental resources and ensure
environmental impact is minimised. 
6.16 Policy E3A states that the Council will seek to maintain and enhance the
environmental resources of the Plan area by protection of habitats,
species and natural features which are vulnerable and/or specifically
protected, including Local Nature Conservation Sites. It also states that
proposals should not have an adverse effect on the integrity or character

Page 10

of Local Nature Conservation Sites and that satisfactory arrangement for
habitat creation/site enhancement elsewhere should be made to
compensate where development would cause the total or partial loss of a
Local Nature Conservation Site. The application is in close proximity to
Murroch Burn but is located outwith the Local Nature Conservation Site. 
6.17 The matters relevant to the assessment against the above policies are
addressed in detail in Section 7 below. It is concluded that the proposal is
in accordance with the Local Plan. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the
Council would not adopt Local Development Plan 2. The Proposed Local
Development Plan 2 (LDP2), incorporating the recommended
modifications of the Examination Report received on 22 April 2020, which
were accepted by the Planning Committee of 19 August 2020, remains the
Council’s most up to date spatial strategy and is therefore afforded
significant weight in the assessment and determination of planning
applications, subject to compatibility with NPF4. The Scottish Ministers’
Direction relating to the adoption of LDP2, dated 18 December 2020, is
also a material consideration. 
7.2 The proposed turbine does not trigger Policy RE2: Spatial Framework for
Wind Energy, and therefore requires to be assessed against Policy RE3,
which is supportive of wind energy proposals where it can be
demonstrated that there will be no unacceptable significant adverse
impacts on the local area and the wider landscape and where they avoid
unacceptable landscape, visual, aviation, infrastructure, cumulative and
residential impacts and unacceptable impacts on the built and natural
environment and do not have an adverse effect on a Natura 2000 site. 
7.3 Policy GB1 restricts development in the green belt to a limited number of
circumstances. These include development associated with agriculture,
horticulture and forestry, rural economic development and infrastructure
with a specific locational need. 
7.4  Any development proposed within the Kilpatrick Hills Local Landscape Area
must; protect and enhance the landscape character; protect and enhance
the integrated network of habitats and important geological features; and
protect and enhance the Hills as an accessible recreation resource in
accordance with policy KH1.

Page 11

7.5 Policy H4 of the LDP2 relates to residential amenity. The policy states that
the Council will protect, preserve and enhance the residential character
and amenity of existing residential areas at all times In this regard, there
will be a general presumption against the establishment of non-residential
uses within, or in close proximity to, residential areas which potentially
have detrimental effects on local amenity or which cause unacceptable
disturbance to local residents. 
7.6 Policy ENV2 relates to landscape character. Development proposals should
be sited and designed to relate to the local landscape character of the area
and ensure that the integrity of this landscape character is maintained and,
where appropriate, enhanced. Policy ENV4 relates to forestry, trees and
woodland. The loss or fragmentation of long established woodland, high
conservation value or areas covered by tree preservation orders will only be
supported where any significant adverse effects are clearly outweighed by
significant social or economic benefits. Policy ENV8 relates to air, light and
noise pollution. All new development must ensure that significant adverse
noise impacts on surrounding properties and uses are avoided. 
7.7 Policy CON3 is not supportive of development which disrupts or adversely
impacts on any existing or potential core path, right of way, bridle path, or
footpath, including off-path access rights, used by the general public for
recreational or other purposes. 
7.8  Policy BE1 states that unscheduled archaeological sites should be
preserved insitu where possible. Where not possible, provision should be
made by the developer to undertake the excavation, recording analysis,
publication and archiving of the archaeological remains. Development that
would adversely impact on the operations of Glasgow Airport or would be
adversely affected by aircraft noise will not be permitted in accordance with
Policy E7. 
7.9 Policy CP1 requires new development to take a design led approach to
creating sustainable places which puts the needs of people first and
demonstrate the six qualities of successful places. Policy CP2 requires all
development to demonstrate that green infrastructure has been integrated
into the design approach from the outset. 
7.10 The matters relevant to the assessment against the above policies are
addressed in detail below. It is concluded that the proposal is in accordance
with proposed Local Development Plan 2. 
Kilpatrick Hills Local Landscape Area – Statement of Importance
7.11 This Statement of Importance explains the reasons why the Kilpatrick Hills
have been selected for the designation. The special qualities of the
Kilpatrick Hills are identified as being:

Page 12

• Strong sense of remoteness, wildness and open horizons;
• Distinctive geomorphology and topographical features; and
• A unique diversity of views. 
The impact of the proposed development on these special landscape
qualities of the Kilpatrick Hills is assessed below, and it is concluded that
the proposal would not significantly detract from the special qualities of the
Local Landscape Area. 
Renewable Energy Local Development Plan (Proposed Plan) Planning
Guidance November 2016
7.12 Whilst written in the context of proposed Local Development Plan 1
together with Scottish Planning Policy (SPP), both of which no longer form
a material consideration in the assessment of planning applications, much
of the general advice and guidance set out remains relevant in assessing
wind energy proposals. 
This document provides guidance on planning for wind energy including a
Spatial Framework and guidance on the factors that will be considered in
assessing wind energy proposals. The spatial framework applies to “wind
farms” which are defined by the Council as: 
• Any development containing a turbine of 50m and above to tip
height; or 
• Any development of 3 or more turbines, containing a turbine of
30m above to tip height. 
As this turbine is a single turbine and 43m to blade tip it falls under the
threshold for assessment under the spatial framework. 
7.13  It remains, however, that the document provides guidance on the
assessment of all proposals for wind energy. This includes considering
matters pertaining to landscape character, forestry and woodland, the
water environment, the path network, built heritage, aviation, residential
amenity in respect of noise, shadow flicker and visual intrusion, economic
benefit, contribution towards renewable energy targets, effect on soils,
impact on the road network and decommissioning. These matters are fully
assessed in detail below where it is concluded that, in taking into account
all material planning considerations, the wind turbine proposal is
acceptable. 
7.14 The guidance also highlights the expectation for all wind energy
applications to provide a community benefit. In this case, the proposed
turbine is indicated to have generating capacity of 250kw so any financial
amount will be small.

Page 13

However, the guidance does not have a minimum threshold and therefore
this is aspect is applicable and a financial contribution would be required if
the proposal is approved. 
Overall, it is considered that the proposal presents no conflict with the aims
of the guidance. 
Site Selection and Design
7.15 The application site was selected by the applicant as it was established to
benefit from an above average windspeed. Further operational
advantages include its proximity to a grid connection point and the
proximity off the A82 being relatively short without requiring extensive
works impacting the local road network. In terms of impacts on the
surrounding area, although the nearest settlement to the site (Bonhill) is
located only 440m away, the site is well screened from it by high ground
and trees. The 440m distance from residential properties is noted in
multiple objections as being too close due to Scottish Government
Guidance. However the guidance which notes 2km as being the
separation distance relates to wind farms and is also contained within
Scottish Planning Policy, which has been superseded by National
Planning Framework 4. 
7.16 The wind turbine is located in the green belt and requires to be justified
against Policy 8 of NPF4 and GB1 of both the adopted Plan and Proposed
Plan. Essential infrastructure is acceptable within the green belt with
reference to the above policies. Essential infrastructure includes all forms
of renewable energy generation. Therefore the wind turbine itself together
with the associated access, crane pad and sub-station would in principle
be acceptable. The design and height of the turbine would follow current
wind energy industry practice, and the turbine would be of the type widely
used elsewhere. The location of the proposed turbine has also been
selected in order to minimise its prominence. Due to the height of the
turbine, some views from sensitive locations such as the Loch Lomond
and the Trossachs National Park and Kilpatrick Hills are unavoidable but
not significant enough to be unacceptable. It is acknowledged that an
effort has been made by the applicant to minimise the impact of the
development on the landscape. 
Impact on Landscape Character
7.17 The proposed turbine would be located on the edge of the Kilpatrick Hills
which are designated as “Rugged Moorland Hill” Landscape Character
Type (LCT). The actual application site is on the boundary of the urban
area and the Rugged Moorland Hill LCT of the Kilpatrick Hills. The
Kilpatrick Hills have a distinctive upland character created by the
combination of elevation, exposure, rugged landform, moorland vegetation
and the predominant lack of modern development.

Page 14

These areas share a sense of apparent naturalness and remoteness
which contrasts strongly with the farmed and developed lowland areas.
The general aim should be to conserve the upland character of the
Rugged Moorland Hills and where possible, the visual influence of existing
developments should be reduced. New developments which would
introduce modern elements or which would undermine the sense of
`wildness' and remoteness should be resisted even though it is accepted
that these areas already contain tall structures such as pylons and
communications masts. Although this landscape can provide an essential
location for this type of infrastructure, the erection of certain structures can
lead to disproportionate levels of landscape impact, affecting the remote
character of the moorland hills. Additional masts and other tall structures
should be discouraged within the hills, with particular concerns relating to
wind development. It is therefore vital that developments which could have
a significant and adverse effect on the landscape character are resisted. 
7.18 In general, there is limited capacity to accommodate wind turbines within or
adjacent to the Rugged Moorland Hill LCT of the Kilpatrick Hills, particularly
in areas which are identified as Green Belt and which form part of the
landscape and recreational setting for the settlements which they surround.
In this instance however, the sloping ground and established tree coverage
would help to screen the site from surrounding areas. This tree cover would
also limit the visibility of the proposed access track. The proposed turbine
would be viewed from certain positions in the context of an urban area,
backclothed by the hills and woodland and importantly, it would not impact
upon the skyline or detract from the remoteness of the Kilpatrick Hills. On
this basis, it is considered that the wind turbine would not have a significant
impact on the landscape quality or the character of the Kilpatrick Hills and
surrounding area. This is a similar opinion taken when 2014 previous
application was assessed and approved. 
Designated Landscapes
7.19 Regional Scenic Areas/Local Landscape Areas are landscapes which
have been designated as of local importance by the relevant local
planning authority. Such designations seek to preserve a high quality
landscape and its natural character. The Regional Scenic Area/Local
Landscape Area most affected by this proposal is the Kilpatrick Hills
Regional Scenic Area/Local Landscape Area, which covers the area of the
Kilpatrick Hills located within the West Dunbartonshire Council area. The
wind turbine would be located in close proximity to the Kilpatrick Hills
Regional Scenic Area but within the more recently designated Local
Landscape Area. Whilst the site is readily visible from a wide area within
the Regional Scenic Area/Local Landscape Area the turbine would be
close to the urban edge where it would be seen against the backdrop of
other man-made development.

Page 15

When viewed from outwith the Regional Scenic Area/Local Landscape
Area it would normally be seen against a backdrop of rising land and it
would not break the skyline. Although it would introduce a large man-
made structure into the environment, the turbine would not be visually
dominant or would detract from the sense of remoteness and wildness
provided by the Kilpatrick Hills. The overall impact upon the Regional
Scenic Area/Local Landscape Area is therefore considered to be
acceptable. The turbine would be 4km from the southern boundary of
Loch Lomond and Trossachs National Park. Whilst it would be visible from
some places within the National Park, it would be seen in the context of an
urban area, backclothed by the hills and woodland and would not impact
on the skyline of the Kilpatrick Hills which forms part of the setting of the
National Park. This was previously confirmed as part of the response to
the last planning application by the Loch Lomond and Trossachs National
Park Planning Authority in their consultation response. Since then, nothing
significant has changed in terms of changes to the landscape character to
arrive at a different opinion. There is also no change in the proposed
access track and this, together with the other infrastructure proposed
raises no concerns. 
Visual Impact
7.20 The information accompanying the application demonstrates that the wind
turbine would not be visible from most of the closest built up area (Bonhill)
because of the intervening high ground, but that it would be visible from
much of Dumbarton and from areas further afield such as Port Glasgow, at
distances of up to 10km. However, when viewed from distance, it would be
difficult to differentiate the turbine from the overall urban context due to the
proximity of the turbine to the built up area of Bonhill. Consequently, the
visual impact would be less significant from greater distance. Outwith
settlements, the wind turbine would be visible from much of the western
shore of Loch Lomond, the River Clyde and areas within the Kilpatrick Hills.
However, due to the distances involved and the size of the turbine, it will not
have a significant impact on the landscape from distance and therefore will
have an acceptable visual impact. 
7.21 The applicant has provided photomontages and wireframe drawings for
each of 20 previously agreed viewpoints, in accordance with the national
methodology for such visual modeling exercises. These photomontages
provide a representation of how the turbine might typically appear in clear
weather from representative and sensitive locations, although obviously
the appearance would vary according to weather conditions. The majority
of the viewpoints demonstrate that the turbine would not be visible or that
it would be seen at sufficient distance to have little impact on the
landscape. From the viewpoints at Auchiewannie Wood and Cardross
Road, the turbine would be visible to the rear/side of the settlement of
Bonhill.

Page 16

Further viewpoints at Auchenreoch Muir and the core path at Highdykes
Farm show the turbine appearing more dominant in views looking
south/south west. It is accepted that turbine development cannot take
place on this site without being visible from a large area, however the size
of turbine proposed is suitable for the location and will minimise any visual
impacts beyond 5km and the proposal is therefore acceptable. 
7.22 The landform behind the turbine provides a backdrop setting which would
ensure that from most viewpoints, the turbine would not breach the skyline
of the Kilpatrick Hills. Although the turbine is a total height of 43 m, the
location, size and setting of the turbine are such that it will not have a
detrimental visual impact on the Kilpatrick Hills regional scenic area or
significantly alter the local landscape. It is further considered, the access
track would not result in an adverse visual impact within the landscape. 
Residential Amenity
7.23 The proposed turbine would be located 440m from the edge of Bonhill, but
its impact would be minimal as between the proposed turbine and the
settlement is an area of plantation woodland and a further area of
woodland adjacent to the houses. This would provide adequate separation
in terms of both amenity and visual impact, ensuring that the turbine would
be adequately screened from the nearest residential properties. Whilst the
wind turbine may be visible from some urban areas further from the site,
such as Dumbarton and parts of Alexandria, it would be sufficiently distant
to avoid being visually dominant and therefore it would have an
acceptable impact. The proposed access track takes access from an
existing track which serves Highdykes Farm. It is visually separated from
the nearest residential neighbours by trees. As part of the operation of the
turbine there are minimal traffic movements proposed. As such the
proposed access road will not have an unacceptable impact to residential
amenity. 
Shadow Flicker
7.24 Shadow flicker is the flickering effect caused when rotating wind turbine
blade periodically cast shadows through constrained openings such as the
windows of neighboring properties. The distance at which shadow flicker
is created is accepted to be 10 times the rotor diameter. In this case the
rotor diameter is 26m and as such the distance would be 260m. The
closest property to the proposed wind turbine is 65B Broomhill Crescent,
notes at 447m away from the proposed turbine. The application also gives
scope for a 25m buffer for micro siting. This could mean the turbine could
be 422m away from 65B Broomhill Crescent, however this is still outwith
the 260m distance at which shadow flicker could be created.

Page 17

The Council’s Environmental Health Service have raised no objection in
this regard, although they nonetheless recommend a condition for any
granting of permission, requiring the site operator to investigate any
complaints and instigate appropriate mitigation measures in the event of
shadow flicker occurring. 
Noise & Air Quality
7.25 Turbines produce two distinct types of noise – the mechanical noise
produced by the machine and the aerodynamic noise produced by the
passage of the blades through the air. The “Assessment and Rating of
Noise from Wind Farms” (Final Report, Sept 1996, DTI), (ETSU-R-97)
provides a UK framework for the measurement of wind turbine noise,
including indicative noise levels deemed to be appropriate. Subsequent
UK government reports have concluded that there is no evidence of health
affects arising from infrasound or low frequency noise generated by
turbines. 
7.26 The supporting information predicts that the operation of the wind turbine is
capable of meeting ETSU-R-97 standards at the nearest properties, the
closest of which is 440m from the proposed turbine location. Hours of work
could be limited by condition to avoid disturbance during the construction
phase to nearby residential properties. The Council’s Environmental Health
Service has no objection to the proposal on noise grounds subject to
appropriate conditions. No issues have been raised in terms of air quality. 
Road Traffic Impact
7.27 As part of the proposal, an access track is proposed which joins the
existing farm track leading from Broomhill Crescent at the point before the
entrance to Highdykes Farm. As noted above, the construction of this
track has already commenced. The applicant has stated that this was
done as the access track was existing and was being upgraded. The
Traffic Management Plan submitted as part of the application states that
where practicable, material for the access track and hard standings will be
recycled material that is available on-site. Any additional material that is
required shall be sourced from a local quarry. As part of the “proposed”
access track already constructed on site, it is clear that recycled materials
have not been used. Deliveries have occurred from local quarries,
however, there appears to have been no co-ordination of or a structured
approach to deliveries which the objections highlight has caused
congestion on the residential roads with large delivery vehicles being
unable to pass on both the residential roads and the farm track. If the
application is approved, a robust condition regarding a delivery
management strategy for materials delivered on site would be required to
ensure that the further importation of material would be carefully managed
and to minimise the disruption to adjacent residential properties.

Page 18

The Council’s Roads Service have no objections to the proposal subject to
the implementation of the Traffic Management Plan. Comments raised in
objections regarding continuous traffic from a wood mill/sawmill/bio fuel
facility cannot be considered at this time due to the application not
including such details. The wind turbine and its construction is not
considered to be a large traffic generating use. Whilst concerns are raised
in respect of potential to damage to road surfaces, any damage that did
occur would be a matter to be addressed in conjunction with the Council’s
Roads Service. 
7.28 Once operational a wind turbine would generate negligible traffic, but the
size of the turbine components is such that delivery of the turbine to the
site can cause disruption due to oversized loads. Deliveries would be from
the south, off the A82, onto Stirling Road (A813) heading northbound and
then towards the Nobleston roundabout. From there any deliveries would
traverse onto residential roads to the south of the Bonhill area via
Beechwood Drive, Murroch Crescent and Broomhill Crescent before
moving onto the access track and onto the “proposed” access into the site.
The Traffic Management Plan states that from point 6
Redburn/Beechwood Drive measures would be required in order to
facilitate the deliveries of the wind turbine. For the duration of the journey
a support vehicle is recommended. At point 6, the open verges would
need to be used and a banksman and support vehicle. The same applies
for point 7 Beechwood Drive / Murroch Crescent. Once the turbine
delivery would reach point 8 Murroch Crescent/Broomhill Crescent the
previous measures as well as the clearing of parked cars is
recommended. At point 10, the alignment of the track is noted to be a
“concern”. It is indicated that the track would be required to be widened to
support load-bearing surface to the western edge. This track is not,
however, included within the applicant’s ownership or within the red line
boundary of the site. Accordingly, any works required to this track would
be a civil matter between the parties involved and if the works are to an
extent that planning permission is required, a separate application would
require to be brought forward in this circumstance. Point 11 is from the
“proposed” new access track which has been designed for the proposed
use. 
Impact on recreation, open space and the core path network
7.29 The development will not result in the loss of open space that has been
laid out with the purpose of providing amenity, an area of public access or
an area for countryside recreation. There is also no impact on any areas
of open space specifically identified on the Proposals Maps of the adopted
local plan or proposed local development plan. Consequently, it is not
considered that the proposal will adversely impact on open space or
countryside recreation or the sustainable access to such.

Page 19

7.30 The existing access track to Highdykes Farm which will provide access to
the application site is designated as a core path. Whilst this track will be
used to access the site and for deliveries during construction, overall the
impact on users of the core path will be minimal during construction and
following completion it is not considered there will be any discernible
impact. 
Cumulative Impacts
7.31 The proposal would be the first significant wind turbine to be located within
the West Dunbartonshire area, so there would be no localised cumulative
impacts. The proposed wind turbine is well separated from other wind
turbine development in neighbouring Council areas. 
Natural Heritage – Designated Sites/Peat and Soils/Habitats/Protected
Species/Ornithology
7.32 There are no site-specific statutory nature conservation designations
within the site and it is not considered that the proposal would have any
detrimental impact on any other designated sites. A Preliminary Ecological
Assessment (PEA) was submitted in support of the application. The
surveys included an extended Phase 1 habitat survey with protected
species walkover survey, which considered not only habitats and species
of plant present but also the potential presence of relevant European
Protected Species (Bats and Otters, Badgers, Water Voles and breeding
birds). It was concluded that in general, habitats and plant species were
common and typical of former agricultural land that has been planted up
with young deciduous woodland, with no notable species found. Habitats
and plant species are therefore not considered ecological constraints for
the proposed development. Bats, badgers, otters, water voles and
breeding birds were also considered not to be an ecological constraint in
the PEA. 
7.33 The consultation response from the RSPB notes that the site visit for the
PEA was carried out in mid-December 2022 (which is now outside the
recommended dates for protected species surveys). The conclusion that
there would be no impact on birds was based on a desktop study using
only freely available data rather than survey visits – and so no actual
survey work has taken place. The PEA states that if site preparation work
is to be undertaken between March and September that the presence of
breeding birds should be assessed by an ecologist prior to work
commencing on site. As it is an offence to disturb any active bird nest, any
granting of permission would require a condition relating to acceptable
months for working or further survey work to establish that there are no
breeding birds. The RSPB also note that the updated application mentions
NPF4 policies and concludes there will be no material impact on
biodiversity, including birds.

Page 20

Whilst the RSPB state that it is unclear how this can be assessed from the
data provided, they raise no specific concerns regarding potential impact
on any particular bird species, migratory routes, the general commuting
and foraging of birds within the locality or a concern regarding bird
collisions. No information is highlighted in respect of a need for specific
avoidance or mitigation in respect of birds. 
7.34 The Council’s Biodiversity Officer previously noted that no additional
species protection plans or follow up surveys were identified in the PEA.
The proposed mitigation includes following national guidelines and
standards for any tree/hedgerow retention, that best working practice
measures are adhered to safeguard otters and badgers, and a walkover
survey prior to works commencing within bird breeding season. If any otter
or badger-resting place is found then an ecologist will produce an otter
protection plan. It can therefore be concluded that the proposal will not
adversely impact upon protected species and it is appropriate that the pre-
start surveys and any required protection plans identified at this stage are
conditioned should the development proceed. Special Protection Area
(SPA) connectivity is not mentioned as an issue in the PEA. Annex 1 of
Nature Scot’s “Assessing the impact of small-scale wind energy proposals
on the natural heritage” guidance document considers SPA’s within a
20km connectivity zone to be relevant. Therefore, both Inner Clyde SPA
and Loch Lomond SPA should be considered. Greenland White - Fronted
Goose is the relevant species to be considered and has a core foraging
range of 5-8km. The Loch Lomond SPA is around 10km from the
proposed development site and therefore falls out with requirement for
further assessment. The Carbon and Peatland 2016 map shows the site
area to not be within an area of peatland. Whilst acknowledging the points
highlighted in the consultation response from the RSPB, having fully
considered the impact upon ecology, and informed by the consultation
response from the Council’s Biodiversity Officer, subject to condition, the
impacts of the development upon designated sites, peat and soils,
habitats, protected species and ornithology are all considered acceptable. 
Hydrological & Hydrogeological Impact
7.35 The Supporting Statement provided as part of the application states that
the site has no watercourses within it, and it is not anticipated that the
development would impact significantly upon any water course or local
groundwater. During site visits, it was noted that the access road (being
constructed without the benefit of planning permission) crossed a small
drainage ditch and the road thus included a small section of pipe at this
location. No concerns arise from this arrangement and no wider issues are
considered to arise in this respect.

Page 21

Historic Environment Impacts
7.36 No historic buildings or monuments are located within the site. There are a
number of monuments in the vicinity of the site, although there would be
no direct impact on these from construction or operation of the wind
turbine. In regard to archaeology, WoSAS have no objection however the
implementation of an archaeological watching brief would be required prior
to the commencement of any development on site. 
Renewable Energy Targets
7.37 Scotland’s long-term climate change targets will require the near-complete
decarbonisation of the energy system by 2050, with renewable energy
meeting a significant share of the need. The Scottish energy strategy sets
a 2030 target for the equivalent of 50% of the energy for Scotland’s heat,
transport and electricity consumption to be supplied by renewable
sources. This approach is supported via NPF4’s just transition spatial
principle that seeks to empower people to shape their places and ensure
the transition to net zero is fair and inclusive. 
Economic Impact
7.38 The proposed development would have minimal impact on the potential
use of the wider area for grazing or forestry whilst the construction of the
wind turbine would provide some short-term employment during
construction. In the longer term, once completed and operational, there
would be a requirement for site maintenance, although it is acknowledged
this would likely be minimal. It is not considered that the proposed wind
turbine would have any impact on tourism within West Dunbartonshire or
neighbouring areas. It is therefore considered that whilst any development
of this nature will have a positive impact, the scale of the development
would result in the long-term economic benefits being negligible. 
Community Benefit
7.39 The Council’s Renewable Energy Planning Guidance (2016) states that in
line with Scottish Government guidance, the Council expects all wind
energy applicants to provide a community benefit of a minimum £5,000
per MW of installed capacity. This would be payable annually and would
increase relative to the Retail Price Index. The contribution is expected
from all wind energy developments. As such it is recommended that
should the application be granted, a legal agreement should be put in
place to address the community benefit contribution. 
Aviation Safety
7.40 NATS and Glasgow Airport have no objections in terms of airport
safeguarding.

Page 22

Decommissioning
7.41 Should permission be granted, there would be a requirement for
decommissioning and site restoration. A legal agreement to ensure that a
suitable financial bond is put in place to cover restoration liabilities for the
site would be required. Site restoration would be triggered by either the
expiry of any permission or if the project ceased to operate for a specific
period of time. 
Matters raised in objections
7.42 A wide range of matters were raised in the objections received, many of
which are already addressed as part of the main assessment set out above.
Multiple objections question what the energy is to be used for and that no
grid connection has been shown. A lack of grid connection, however, can
be done via a separate consenting process where required. 
7.43 The availability of the turbine type which has been applied for has been
brought into question. However, the application notes that the final choice
of the wind turbine will be dependent upon availability. Conditions
associated to any granting of permission would ensure that the impact of
any turbine would remain the same. 
7.44  Alternative locations for the proposal have been suggested, however the
applicant has stated that this is a good site for wind energy creation due to
wind speeds and the application requires to be assessed on its own merits.
It is contended that the applicant has indicated to residents that he intends
to produce bio fuel. The application form and supporting documents do not
indicate this and the Planning Authority can only assess the submitted
proposal. Matters relating to traffic and the road have been assessed above. 
7.45 Whilst there has been some removal or trees and hedgerows these are not
protected and the extent of the removal undertaken is in any case limited.
Matters raised in respect of the Council objective for Natural & Semi Natural
Green Space and the impact on the green belt are assessed above. 
7.46  One objector states that West Dunbartonshire Council’s Open Space
Strategy 2011 states that planning authorities are expected to support,
protect and enhance open space and opportunities for sport and
recreation. As set out in the assessment above, the development proposal
will not impact upon or result in the loss of open space that has been laid
out with the purpose of providing amenity, an area of public access or an
area for countryside recreation. 
7.47 Any perceived impact upon property values is not a material planning
consideration. Finally, the applicant non-attendance at the local residents
meeting has been brought into question. As this is not a procedural
requirement for the application, it is not a material planning consideration.

Page 23

8. CONCLUSION 
8.1 The proposed wind turbine complies with both the adopted and proposed
local plans as well as NPF4. The sloping landscape and urban character
in the vicinity of the site mitigates against the visual impact of the turbine
on the Kilpatrick Hills or the Loch Lomond and the Trossachs National
Park and there would be no adverse cumulative impacts. The distance
from the nearest residential property and intervening tree coverage is
sufficient to ensure that there would be no unacceptable impact on
residential properties. A legal agreement would ensure that a suitable
financial bond is put in place to cover future restoration liabilities for the
site and community benefit would also require to be addressed in a similar
way. Previously planning permission was granted for the erection of a
wind turbine of the same size, as well as the associated access track on
this site in 2015, although the decision notice was never issued and the
application subsequently withdrawn. 
8.2 Planning application DC22/190/FUL was refused due to the concern
regarding the proposed agricultural shed. By removing the proposed
agricultural shed, this current proposal addresses the concerns raised in
2023 refusal. 
8.3 Overall, the proposed development would allow the erection of a wind
turbine which would be appropriately sited, have no unacceptable impacts
and would contribute to renewable energy targets. 
9. CONDITIONS 
1. The planning permission for the wind turbine hereby granted shall be for a
maximum period of 25 years and 6 months from the date of the
permission. This period consists of a 25 year period of operation of the
turbine followed by a 6 month period for removal of the turbine, ancillary
equipment, associated hard standing and access track and restoration of
the site to its former condition, or other such condition as agreed in writing
as acceptable to the Planning Authority in accordance with the terms of
Condition 6 below. 
2. Unless otherwise agreed in writing by the Planning Authority, should the
turbine cease to generate electricity for a continuous period of 6 months,
the turbine, ancillary equipment, associated hard standing and access track
shall be removed. Restoration of the site to its former condition, or other
such condition as agreed in writing as acceptable to the Planning Authority
in accordance with the terms of Condition 6 below, shall thereafter take
place within 6 months.

Page 24

3. All external colours of the turbine and associated equipment cabinet shall
be agreed with the Planning Authority prior to the commencement of works
and shall be implemented as approved. 
4. No turbine, transformer building or any other above ground infrastructure
shall be illuminated or display any name, logo, sign or advertisement (other
than health and safety signage) unless and until otherwise approved in
writing by the Planning Authority. 
5. Within one year of the date of this consent, the turbine operator shall
submit an Outline Decommissioning, Restoration and Aftercare Scheme
(the Outline Decommissioning Scheme) for the Turbine development, for
the written approval of Planning Authority. The Outline Decommissioning
Scheme shall include (but not necessarily be limited to) details of: 
a) Works for the decommissioning and removal of the turbine (together
with the foundations to a depth of at least one meter) and all above
ground ancillary infrastructure and equipment; 
b) The treatment of any ground surfaces including access tracks, hard-
standing areas and any sub-surface elements including cabling to
restore the site to its former condition, or other such condition as is
agreed in writing by the Planning Authority; 
c) Environmental management provisions, including waste management; 
d) A decommissioning timetable; 
e) Appropriate aftercare following site restoration; and 
f) How and when the Outline Decommissioning Scheme will be reviewed
during the operational life of the development. 
The approved Outline Decommissioning Scheme shall be implemented as
approved, unless otherwise agreed in writing by the Planning Authority. 
6. No later than 12 months prior to the decommissioning of the development,
or the expiration of the 25 year period of operation (whichever is earlier), a
detailed Decommissioning, Restoration and Aftercare Scheme, which
takes account of the latest version of the Outline Decommissioning
Scheme (approved under Condition 5) and which also takes into account
of the current best environmental practice, shall be submitted to and
approved in writing by the Planning Authority. 
The development shall be decommission, the site restored and aftercare
thereafter in accordance with the scheme approved as part of this
condition, unless otherwise agreed in writing in advance by the Planning
Authority. 
7. Unless otherwise agreed in writing by the Planning Authority, if the wind
turbine fails to generate electricity for a continuous period of 12 months,

Page 25

the turbine shall be deemed to have ceased to be required, and a scheme
that takes cognizance of Condition 6, setting out how the wind turbine and
associated infrastructure will be removed from the site, the ground
restored and aftercare carried out, shall be submitted for the written
approval of the Planning Authority no later than one month after the date
of the expiry of the 6 months. 
The scheme approved shall be implemented within 12 months of the date
of its approval. 
8. In order to ensure compliance with Condition 7, the wind turbine operator
shall submit 12 monthly generation and output figures to the Planning
Authority to evidence that the turbine is continuing to generate electricity
and the 12 monthly reporting cycle shall commence from the date the
turbine is commissioned (turned on). 
9. Notwithstanding the approved plans, all recommendations within the
Preliminary Ecological Appraisal dated December 2022 shall be followed
to the satisfaction of the Planning Authority. 
10. That prior to works commencing on site a traffic management plan
indicating the proposals for the construction and delivery of the turbine and
all associated construction material shall be submitted to the Planning
Authority for their written approval, and shall thereafter be implemented as
approved. The statement shall include the following information: 
a)  The intended turbine transportation route including swept path
analysis, timings and methodology.
b)  All temporary works including relocation of signs, guardrails,
bollards, street furniture and all temporary measures.
c)  Any alteration to the public road network.
d)  Details of the construction compound including staff car parking.
e)  Details of proposed signage during the delivery and construction
period.
f)  Any necessary mitigation.
g)  Details of the type, weight, frequency and number of delivery and
construction vehicles inclusive of those delivering all associated
construction materials, for example, hardcore and associated
tonnage.
h)  Details of wheel washing facilities.
i) A condition report based on a joint survey of the proposed route to
ensure that all temporary alterations and any damage to the road
network are made good. 
11. No development shall take place within the development site until the
developer has secured the implementation of an archaeological watching

Page 26

brief, to be carried out by an archaeological organisation acceptable to the
Planning Authority, during all ground disturbance. The retained
archaeological organisation shall be afforded access at all reasonable
times and allowed to record, recover and report items or interest and finds.
A method statement for the watching brief shall be submitted by the
applicant and agreed in writing with the Planning Authority in consultation
with the West of Scotland Archology Service prior to the commencement
of the watching brief. 
The name of the archaeological organisation retained by the developer
shall be given the Planning Authority in writing prior to any works on site. 
12. Prior to the commencement of development full details of the surface
water drainage system shall be submitted for the written approval of the
Planning Authority and shall be implemented as approved prior to the
occupation of the building. The drainage system shall incorporate the
principles of Sustainable Drainage Systems within its design, and shall
thereafter be implemented as approved. 
13. In accordance with ETSU- R- 97 (Simplified Method) the noise from the
wind turbine shall not exceed an LA90(10min) of 35dB at the boundary of
the curtilage of any noise sensitive premises at all times at wind speeds of
up to 10 metres per second at 10m height as measured within the site. 
14. Prior to the installation of the turbine, the developer shall submit a report
for approval by the Planning Authority which demonstrates compliance
with the noise limits in Condition 13 above. The report shall be prepared in
accordance with reference to the Institute of Acoustics Good Practice
Guide to the Application of ETSU-R-97 and associated supplementary
guidance notes. 
15. Prior to the installation of the turbine, the applicant shall provide written
confirmation to the Planning Authority that the noise from turbine operation
will be broad-band with no discernible tonal characteristics. 
16. Within 14 days from the receipt of a written request from the Planning
Authority or following a complaint to the Planning Authority from the
occupant of a dwelling regarding noise from the wind turbine operation,
the wind turbine operator shall, at the wind turbine operator’s expense,
employ an independent consultant approved by the Planning Authority to
assess the level of noise emissions from the wind turbine at the
complainant’s property following procedures to be agreed with the
Planning Authority. The wind turbine operator shall provide to the Planning
Authority the independent consultant’s assessment and conclusions
regarding the said noise complaint, including all calculations, audio
recordings and the raw data upon which those assessments and

Page 27

conclusions are based. Such information shall be provided within 28 days
of the date of the written request of the Planning Authority unless
otherwise extended in writing by the Planning Authority. The wind turbine
operator shall take such remedial action as required by the Planning
Authority. 
17. Wind speed, wind direction and power generation data shall be
continuously logged and provided to the Planning Authority in a format to
be agreed at its request and within 28 days of such a request. Such data
shall be retained by the operator for a period of not less than 12 months. 
18. No development shall commence  on site until details of a nominated
person have been submitted in writing to the Planning Authority for the
development who will act as a point of contact for local residents (in
connection with conditions 13 - 17), together with the arrangements for
notifying and approving any subsequent change in the nominated
representative. The nominated representative shall have responsibility for
liaison with the Planning Authority in connection with any noise complaints
made during the construction, operation and decommissioning of the wind
turbines. 
19. During the period of construction, all works and ancillary operations
(including piling) which are audible at the site boundary (or at such other
place(s) as may first be agreed in writing with the Planning Authority),
shall be carried out between the following hours unless otherwise
approved in writing by the Planning Authority: 
Mondays to Fridays:   0800-1800 
Saturday:     0800-1300 
Sundays and public holidays:  No working 
20. During the period of construction no delivery or removal of material from
the site shall take place outwith the hours of 8am to 6pm Mondays to
Fridays and 8am to 1pm on Saturdays, and not at all on Sundays or Public
Holidays unless otherwise approved in writing by the Planning Authority. 
21. The applicant shall ensure that all works carried out on site are carried out
in accordance with the current BS5228, 'Noise control on construction and
open sites'. No further development shall commence on site until such
time as a noise control method statement for the construction period has
been submitted to and approved in writing by the Planning Authority. This
statement shall identify likely sources of noise (including specific noisy
operations and items of plant/machinery), the anticipated duration of any
particularly noisy phases of the construction works, and details of the
proposed means of limiting the impact of these noise sources upon nearby
residential properties and other noise-sensitive properties. The

Page 28

construction works shall thereafter be carried out in accordance with the
approved method statement unless otherwise approved in writing by the
Planning Authority. 
22. Before any further plant and machinery is used on the premises it shall be
enclosed with sound insulating material in accordance with a scheme
which shall first be approved in writing by the Planning Authority. The
sound insulation measures shall thereafter be retained. 
23. Within 14 days from the receipt of a written request from the Planning
Authority or following a complaint to the Planning Authority following a
complaint alleging shadow flicker nuisance, the wind turbine operator shall
at the wind turbine operator’s expense: 
a) Employ an independent consultant approved by the Planning Authority
to assess the conditions likely to be causing the incidences of shadow
flicker to which the complaint relates.
b) Within 28 days of receipt of the written request from the Planning
Authority, the wind turbine operator shall submit to the Planning
Authority, the independent consultant’s report on shadow flicker,
detailing any amendments to the operation of the wind turbine
necessary to mitigate any further incidences of shadow flicker, for the
written approval of the Planning Authority. The turbine shall thereafter
operate in accordance with the amendments to operation as approved. 
24. Notwithstanding the approved plans, and prior to any works on site, a
further submission which demonstrates an understanding on how the
proposal enhances biodiversity beyond the current baseline shall be
submitted to and approved in writing by the Planning Authority. All
measures shall then be implemented as approved.

Page 29

Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 14th February 2024 
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager 
Email: Pamela.Clifford@west-dunbarton.gov.uk   
James McColl, Development Management Team
Leader 
Email: James.McColl@west-dunbarton.gov.uk  
Appendix: Location Plan   
Background Papers: 1.  Application forms and plans 
2.  Consultation responses 
3.  Representations 
4.  National Planning Framework 4 
5.  West Dunbartonshire Local Plan 2010 
6.  Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended 
7.  Kilpatrick Hills Local Landscape Area Statement
of Importance 
8.  Renewable Energy Local Development Plan
(Proposed Plan) Planning Guidance November
2016   
Wards affected: Ward 3 (Dumbarton)