WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 13th March 2024
DC23/177/FUL: Erection of single wind turbine, 30m hub and 43m tip,
access track, substation and associated works at Land to
East of Broomhill Wood, Bonhill, Alexandria by Mr Harris
Smith.
1. PURPOSE
1.1 To provide the Committee with the opportunity to further consider the
planning application, to allow for the Applicant to be present at Planning
Committee in order to answer further questions regarding the application
and to seek the Committee’s decision on the application.
2. RECOMMENDATION
2.1 Grant planning permission and delegate authority to the Planning &
Building Standards Manager to issue the decision subject to the conditions
set out in Section 9 of Appendix 1 of the report, and subject to the conclusion
of a legal agreement to ensure that a suitable financial bond is put in place
to cover restoration liabilities for the site and the community benefit
contribution.
3. BACKGROUND
3.1 The above planning application was presented to Planning Committee on
14th February 2024. Appendix 1 contains a copy of the report considered by
Planning Committee. It was determined by the Planning Committee to
continue the application to allow for the Applicant to be present at Planning
Committee in order to answer further questions regarding the application.
3.2 Following the February meeting of the Planning Committee, the applicant
was invited to attend Planning Committee. A reply was received on 27th
February 2024 confirming that the applicant would be able to attend
Planning Committee on 13th March 2024.
ITEM 6

Page 2

4. MAIN ISSUES
4.1 There are no material changes to either the development plan position or
the circumstances of the site since Committee previously considered the
application. 
4.2 Since the publication of the original Committee Report (Appendix 1) and as
reported to Members at February Planning Committee, a further objection
was received from Dame Jackie Baillie MSP. This highlights resident’s
concerns regarding the applicant’s intentions and practices on site and the
lack of any attempt to foster positive relations with nearby residents.
Concerns regarding the works undertaken without planning permission are
also raised and the proximity to residential properties and whether the
turbine will have any impact upon the supply to the National Grid. The
continued concern of constituents is highlighted by Dame Jackie Baillie
MSP and that opposition to the proposal remains. No material planning
considerations that have not already been assessed in the original
Committee Report have been raised in this objection. 
4.3 A further letter has been received from the Beechwood and Wheatcroft
Residents Association which sets out a range of queries in relation to the
proposal and the discussion at February Planning Committee. A response
to these additional queries is as follows: an assessment against Policy GB1
of the adopted Local Plan and proposed Local Development Plan 2 is set
out in the Committee Report in Appendix 1. The Committee report further
sets out that the grid connection can be addressed via a separate
consenting process where required. Condition 2 in Section 9 of the report
addresses the situation where the turbine does not generate electricity for
a continuous period of 6 months and subsequent decommissioning
requirements. Further queries in respect of construction vehicles,
contractors parking, deliveries and vehicle movements would be addressed
via the traffic management plan required by condition 10 as set out in the
Committee report. There is no objection from the Council’s Roads Service
and they do not identify the requirement for a Roads Bond. Matters relating
to the use of the existing access track to the site are also considered in the
original Committee report. Decommissioning requirements would be
addressed by condition and in the event the turbine was not
decommissioned as required, a bond will be in place to cover this. Noise
matters are addressed previously and land ownership is not a material
planning consideration. It would not be considered appropriate to
specifically seek to control the timescale for implementing the proposal on
site. 
4.4 It remains the case that the proposal accords with NPF4, the adopted West
Dunbartonshire Local Plan and the proposed West Dunbartonshire Local
Development Plan 2 and the recommendation remains to Grant planning

Page 3

permission and delegate authority to the Planning and Building Standards
Manager to issue the decision subject to the conditions set out in Section 9
of Appendix 1 of the report, and subject to the conclusion of a legal
agreement to ensure that a suitable financial bond is put in place to cover
restoration liabilities for the site and the community benefit contribution. 
5. PEOPLE IMPLICATIONS
5.1 None.
6. FINANCIAL AND PROCUREMENT IMPLICATIONS
6.1 There are no financial or procurement implications in terms of this report.
7. RISK ANALYSIS
7.1 No risks have been identified.
8. EQUALITIES IMPACT ASSESSMENT (EIA)
8.1 Not required.
9. ENVIRONMENTAL SUSTAINABILITY
9.1 Matters relating to environmental sustainability have been fully considered
via the planning application assessment.
10. CONSULTATION
10.1 Consultation was undertaken as part of planning processes associated with
the planning application. 
11. STRATEGIC ASSESSMENT
11.1 There are no strategic issues.
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager
Date: 13th March 2024

Page 4

Person to Contact: Pamela Clifford, Planning & Building Standards
Manager
Email: Pamela.Clifford@west-dunbarton.gov.uk
James McColl, Development Management Team
Leader
Email: James.McColl@west-dunbarton.gov.uk