Democracy Spraffa

Item 4 - Draft Minutes Planning Committee 14 02 24

West Dunbartonshire Council · 13 March 2024
Back to Planning Committee — 13 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PLANNING COMMITTEE
At a Meeting of the Planning Committee held in the Civic Space, Council Offices, 16
Church Street, Dumbarton, on Wednesday, 14 February 2024 at 10.00 a.m.
Present: Councillors Ian Dickson, Gurpreet Singh Johal, Daniel Lennie,
Karen Murray Conaghan, Lawrence O’Neill, Chris Pollock and
Sophie Traynor.
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Cameron Clow, Planning Policy Officer; Nigel Ettles,
Section Head – Litigation (Legal Officer); and Nicola Moorcroft,
Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Provost
Douglas McAllister and Councillors June McKay and Hazel
Sorrell.
Councillor Gurpreet Singh Johal in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda. Councillor Karen Murray Conaghan declared, for the
purposes of transparency, that she had been contacted, as Ward Councillor,
regarding Planning Application Reference DC23/177/FUL but had not discussed the
application.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
MINUTES OF PREVIOUS MEETINGS
The Minutes of Meetings of the Planning Committee held on 6 December 2023
(ordinary) and 17 January 2024 (special) were submitted and approved as correct
records.
ITEM 4

Page 2

NOTE OF VISITATIONS 
A Note of Visitations carried out on 15 January 2024, a copy of which forms
Appendix 1 hereto, was submitted and amended to remove Councillor Chris Pollock
from the list of attendees. 
PLANNING APPLICATIONS 
Reports were submitted by the Planning, Building Standards and Environmental
Health Manager, in respect of the following Planning applications:- 
(a) DC23/210/PPP: Erection of three dwelling houses (in principle) at Old
Carman Water Works Site, Cardross Road, Renton, Dumbarton by Mr J
McDougal. 
Reference was made to a site visit which had been undertaken in respect of
the above application. The Planning, Building Standards and Environmental
Health Manager and the Development Management Team Leader were heard
in further explanation, and in answer to Members’ questions. 
The Chair invited Mr Jeremy Watson, objector, to address the Committee. Mr
Watson was heard in respect of the application and in answer to Members’
questions. 
After discussion, Councillor O’Neill, seconded by Councillor Lennie, moved;- 
That the Committee agree to grant planning permission, subject to the
conditions set out in Section 9 of the report, as detailed within Appendix 2
hereto. 
As an amendment, Councillor Murray Conaghan, seconded by Councillor Chris
Pollock, moved:- 
That the Planning application be refused due to over-development of the site. 
On a vote being taken, 2 Members voted for the amendment and 5 Members voted
for the motion, which was accordingly declared carried. 
(b) DC23/177/FUL: Erection of single wind turbine, 30m hub and 43m tip,
access track, substation and associated works at land to East of
Broomhill Wood, Bonhill, Alexandria by Mr Harris Smith. 
At this point, Councillor Ian Dickson, declared an interest in this item, being a
member of the Beechwood and Wheatcroft Residents Associations and left
the meeting during consideration of this item.

Page 3

Reference was made to a site visit which had been undertaken in respect of
the above application.  The Development Management Team Leader, was
heard in further explanation, and in answer to Members’ questions. 
The Chair invited Mr Harry Scammell, objector, (on behalf of Beechwood and
Wheatcroft Residents Association) to address the Committee. Mr Scammell
was heard in respect of the application and in answer to Members’ questions. 
The Chair invited Jack Fordy, objector, (on behalf Bonhill and Dalmonach
Community Council) to address the Committee. Mr Fordy was heard in
respect of the application and in answer to Members’ questions. 
The Chair invited Mr Waseem Hussain (Applicant’s Agent) to address the
Committee. Mr Hussain was heard in respect of the application and in answer
to Members’ questions. 
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager and the Development Management Team
Leader, in further explanation, and in answer to Members’ questions, the
Committee agreed:- 
(1) that it did not have enough information to make a decision, on this
application, at this moment in time; and 
(2) that this matter be continued at a future meeting of the Committee to
allow the Applicant to address the Committee and answer any
questions Members may have. 
ADJOURNMENT 
The Chair adjourned the meeting for a short recess. The meeting reconvened at
11.55 a.m. with the Elected Members listed in the sederunt present, including
Councillor Dickson. 
(c) DC23/202/FUL: Application under Section 42 of the Town and Country
Planning (Scotland) Act 1997, as Amended, in relation to Condition 17
(approach to risk assessment and any associated required remediation
strategy/plan) attached to Planning Permission, in Principle, reference
DC20/088 at Land at Former Dunglass Oil Terminal Dumbarton Road,
Bowling by West Dunbartonshire Council. 
The Development Management Team Leader was heard in further
explanation, and in answer to Members’ questions. After discussion, the
Committee agreed to grant planning permission subject to the conditions set
out in Section 9 of the report, as detailed within Appendix 4 hereto. 
(d) DC23/205/FUL: Application under section 42 of the Town and Country
Planning (Scotland) Act 1997 to vary Condition 7, relating to the timing

Page 4

of footpath delivery at Farm Road, Duntocher, Clydebank by Barratt
Homes West Scotland. 
The Development Management Team Leader was heard in further
explanation and in answer to Members’ questions. After discussion, the
Committee agreed to grant planning permission subject to the conditions set
out in Section 9 of the report, as detailed within Appendix 5 hereto. 
(e) DC22/185/FUL: Change of use of ground for the siting of three holiday
lodges including a waste water treatment plant and ancillary car parking
(being a revised design from that approved under Planning Permission
ref: DC21/096/FUL) at Former Maryland Water Pumping Station,
Garshake Road, Dumbarton by Mrs Mary Gillies. 
The Planning, Building Standards and Environmental Health Manager and the
Development Management Team Leader were heard in further explanation,
and in answer to Members’ questions. 
After discussion, Councillor O’Neill, seconded by Councillor Singh Johal, moved
that:- 
(1) the Committee agree to grant planning permission subject to the
conditions set out in Section 9 of the report, as detailed within
Appendix 6 hereto; and 
(2) an additional condition be added, that a barrier,1.8m in height is sited
close to the entrance of the development site. 
As an amendment, Councillor Murray Conaghan, seconded by Councillor Chris
Pollock, moved:- 
That the original Planning permission be revoked and this Planning
Application be refused. 
On a vote being taken, 3 Members voted for the amendment and 3 Members, voted
for the motion. There being an equality of votes, Councillor O’Neill, Chair, used his
casting vote in favour of the motion which was accordingly declared carried. 
(f) DC22/072/FUL: Residential development, landscaping and associated
Infrastructure at Hawthornhill Road, Dumbarton by Persimmon Homes. 
The Development Management Team Leader was heard in further
explanation, and in answer to Members’ questions. After discussion, the
Committee agreed to grant planning permission subject to the conditions set
out in Section 9 of the report, as detailed within Appendix 7 hereto.

Page 5

CLYDEBANK BUSINESS PARK PLANNING GUIDANCE 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, seeking approval of the finalised version of Planning Guidance
relating to Clydebank Business Park for use in making planning decisions. 
After discussion and having heard the Planning Policy Officer in further explanation
and in answer to Members’ questions, the Committee agreed to approve the
finalised version of Clydebank Business Park Planning Guidance contained in
Appendix 1 of the report. 
DRAFT PAY DAY LENDING AND BETTING SHOP PLANNING GUIDANCE 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, seeking approval to consult on draft Planning Guidance relating to
Pay Day Lending and Betting Offices. 
After discussion and having heard the Planning Policy Officer in further explanation
and in answer to Members’ questions, the Committee agreed to approve the
publication of the Draft Pay Day Lending and Betting Shops Guidance (Appendix 1
to the report), for consultation, for a minimum of 8 weeks and that all background
information supporting the guidance to be distributed with the consultation. 
VALEDICTORY – ALAN WILLIAMSON 
Councillor O’Neill requested that formal thanks be recorded and sent to Alan
Williamson (who left his role, as Development Planning and Place Team Leader, in
January 2024), for his dedicated service, work and commitment to the Planning
Committee and to wish him well in his new role with Inverclyde Council. 
VALEDICTORY – JOSHUA DOYLE 
Councillor O’Neill requested that formal thanks be recorded to Joshua Doyle, who is
due to leave his role, as Placemaking Co-ordinator, at the end of February 2024, for
his dedicated work for the Planning Committee and to wish him well in his new role. 
The meeting closed at 13.25

Page 6

APPENDIX 1 
PLANNING COMMITTEE 
NOTE OF VISITATIONS – 15 JANUARY 2024 
Present: Councillors Gurpreet Johal, June McKay, John Millar, Chris
Pollock and Clare Steel. 
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager and James McColl,
Development Management Team Leader. 
SITE VISITS 
Site visits were undertaken in connection with the undernoted planning applications:- 
Former Playdrome site, Abbotsford Road, Clydebank 
DC23/149/FUL: Erection of 128 residential homes, associated roads, infrastructure
and open space on existing brownfield site, (former Playdrome site) by Miller Homes 
EXXON Site - Land at Former Dunglass Oil Terminal, Bowling and Dunglass
roundabout and areas of the site at Dumbuck. 
DC23/113/MSC: Details relating to the first Approval of Matters Specified by
Condition (AMSC) application  (Phase 1 and 2 works only) for conditions 1(a), 1(d),
12, 23, 24 and 30.

Page 7

APPENDIX 2 
DC23/210/PPP: Erection of three dwelling houses (in principle) at Old Carman
Water Works Site,Cardross Road, Renton, Dumbarton by Mr J McDougal. 
GRANT full planning permission subject to the following conditions:- 
1.  No development shall commence until such time as approval of the detailed
design, layout and other matters associated with the development (hereinafter
called "the matters specified in conditions") has been granted by the Planning
Authority.  Any application(s) for approval of matters specified in conditions
shall be submitted before the expiration of three years from the date of this
planning permission in principle and shall include: 
a)  the siting, design, external appearance and external materials of all
buildings and other structures;
b)  the means of access to the site;
c)  the layout of the site, including all car and cycle parking areas;
d)  the details of and timetable for the implementation of the hard and soft
landscaping for the site;
e)  details of the management and maintenance of the areas identified in
(d) above;
f)  full details of the design and location of all boundary walls and fences;
g)  the provision of surface water drainage works incorporating
Sustainable Drainage Systems (SuDS).  For the avoidance of doubt,
the submitted details shall be in accordance with CIRIA C753, the
SUDS Manual and Sewers for Scotland;
h)  the disposal of sewerage;
i)  details of existing and proposed site levels;
j)  details of the storage and collection of waste and recycling from the
new dwellinghouses;
k)  details of required sightlines and visibility splays;
l)  biodiversity enhancement measures to be incorporated into the
development;
m)  full details of the incorporation of low and zero carbon infrastructure
into the development;
n)  details of the provision for electric vehicle charging 
2.  Notwithstanding condition 1 above, prior to the commencement of
development on site, exact details, specifications and samples of all proposed
external materials to be used within the development site inclusive of hard
surfaces shall be submitted to and approved in writing by the Planning
Authority.  Thereafter, unless otherwise agreed in writing with the Planning
Authority, the development shall be completed in accordance with the
approved material details and palette.

Page 8

3.  Notwithstanding conditions 1 and 2 above and unless otherwise first agreed in
writing by the Planning Authority, the design and layout of the development
shall generally follow the indicative details submitted and approved inclusive
of siting of the dwellinghouses, one and a half storey design, pitched roof,
light coloured render and use of timber cladding. 
4. That with the first application for matters specified by condition application, full
details of the design and implementation of the works to the hairpin bend in
Cardross Road shall be submitted for the written approval of the Planning
Authority.  Works shall then proceed as approved. 
5. Notwithstanding the approved plans, all recommendations within the
Preliminary Ecological Appraisal dated 24 March 2023 shall be followed. 
6. Notwithstanding condition 5 above, no removal of and vegetation shall take
place during the bird nesting season March to September inclusive unless first
agreed in writing by the Planning Authority and nesting bird survey
undertaken not more than 48 hours prior to the commencement of site
clearance works, the findings of which shall be submitted to the Planning
Authority. 
7. Notwithstanding condition 3 above and prior to the commencement of works
on site, full details of mitigation in respect of Black Grouse shall be submitted
to and approved in writing by the Planning Authority and the agreed mitigation
measures implemented as approved.  The development shall then proceed as
approved. 
8. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house. 
The off-street parking provision shall then remain unobstructed and available
for use by residents of the associated house at all times thereafter. 
9. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved. 
10. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards.

Page 9

11. No development (other than investigative works) shall commence on site until
such time as a detailed report on the nature and extent of any contamination
of the site has been submitted to and approved in writing by the Planning
Authority.  The report shall be prepared by a suitably qualified person and
shall include the following: 
a) A detailed site investigation identifying the extent, scale and nature of
contamination on the site (irrespective of whether this contamination
originates on the site)
b) An assessment of the potential risks (where applicable) to:
• human health
• property (existing and proposed), including buildings, crops, livestock, 
pets, woodland and service lines and pipes
• groundwater and surface waters
• ecological systems
• archaeological sites and ancient monuments
c) An appraisal of remedial options, including a detailed remediation
strategy based on the preferred option. 
12. No development (other than works) shall commence on site until such time as
a detailed remediation scheme for the site has been submitted to and
approved in writing by the Planning Authority.  The scheme shall be prepared
by a suitably qualified person and shall detail the measures necessary to
bring the site to a condition suitable for the intended use by removing
unacceptable risks to human health, buildings and other property, and the
natural and historical environment.  The scheme shall include details of all
works to be undertaken, the remediation objectives and criteria, a timetable of
works and/or details of the phasing of works relative to the rest of the
development, and site management procedures.  The scheme shall ensure
that upon completion of the remediation works the site will not qualify as
contaminated land under Environmental Protection Act 1990 Part IIA in
Relation to the intended use of the land after remediation. 
13. The approved remediation scheme shall be carried out in accordance with its
terms prior to the commencement of development other than that required to
carry out remediation, unless otherwise agreed in writing by the Planning
Authority.  The Planning Authority shall be notified in writing of the intended
commencement of remediation works not less than 14 days before these
works commence on site.  Upon completion of the remediation works and
prior to the site being occupied, a verification report which demonstrates the
effectiveness of the completed remediation works shall be submitted to and
approved in writing by the Planning Authority.

Page 10

14. The presence of any previously unencountered contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the affected area shall
cease.  At this stage, if equested by the Planning Authority, an investigation
and risk assessment shall be undertaken and an amended remediation
scheme shall be submitted to and approved by the Planning Authority prior to
the recommencement of works in the affected area.  The approved details
shall be implemented as approved. 
15. If the remediation plan requires it then a monitoring and maintenance scheme
(including the monitoring of the long-term effectiveness of the proposed
remediation) shall be submitted to and approved by the Planning Authority. 
Any actions/measures ongoing shall be implemented within an agreed
timescale with the Planning Authority.  Following completion of the
actions/measures identified in the approved remediation scheme a further
report which demonstrates the effectiveness of the monitoring and
maintenance measures shall be submitted to and approved by the Planning
Authority. 
16. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being used.  In addition to this and in
accordance with BS3882:2015 and BS8601:2013, material to be used in the
top 300mm shall also be free from metals, plastic, wood, glass, tarmac, paper
and odours.  On completion of the works and at a time and or phasing agreed
by the Planning Authority, the developer shall submit a verification report
containing details of the source of the material and appropriate test results to
demonstrate its suitability for use. 
17. Prior to the commencement of development on the site, full details of any
external lighting within the site shall be submitted to and approved in writing
by the Planning Authority.  The lighting shall thereafter be installed as
approved. 
18. The applicant shall undertake a noise assessment to determine the impact of
noise from nearby noise sources on the proposed development using the
principles set out in British Standard BS 4142:2014 – “Methods for rating and
assessing industrial and commercial sound”, or a method agreed by the
Planning Authority. Where the Level of Significance as described within the
Scottish Government Document: “Technical Advice Note Assessment of
Noise”, identifies changes in noise as moderate or greater (assessed with
windows open), a scheme for protecting the proposed dwelling(s) from
industrial/stationary noise shall be submitted to, and approved by, the
Planning Authority.  The approved scheme for the mitigation of noise shall be
implemented prior to the occupation of the houses and shall be retained in
accordance with the approved scheme.  The noise impact assessment and
any recommendations in respect of mitigation measures shall be prepared by
a suitably qualified person.

Page 11

19. No development shall commence on site until such time as a noise control
method statement for the construction period has been submitted to and
approved in writing by the Planning Authority.  This statement shall identify
likely sources of noise (including specific noisy operations and items of
plant/machinery), the anticipated duration of any particularly noisy phases of
the construction works, and details of the proposed means of limiting the
impact of these noise sources upon nearby residential properties and other
noise-sensitive properties.  The construction works shall thereafter be carried
out in accordance with the approved method statement unless otherwise
approved in writing by the Planning Authority. 
20. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
Mondays to Fridays: 0800-1800 
Saturdays: 0800-1300 
Sundays and public holidays: No working 
21. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS6472
‘Evaluation of Human Response to Vibration in Buildings’.  It shall detail any
procedures, which are proposed to minimise the impact of noise and vibration
on the occupants of surrounding properties.  This statement shall be prepared
by a suitably qualified person, and the piling works shall thereafter be carried
out in accordance with the approved method statement. 
22. During the period of construction no commercial vehicle making deliveries to
or collecting material from the development shall enter or leave the site before
08:00 or after 18:00. 
23. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by the Planning Authority.  The scheme shall identify likely sources of dust
arising from the development or its construction, and shall identify measures
to prevent or limit the occurrence and impact of such dust.  The approved
scheme shall thereafter be implemented fully prior to any of the identified dust
generating activities commencing on site and shall be maintained thereafter,
unless otherwise approved by the Planning Authority.

Page 12

APPENDIX 3 
DC23/177/FUL: Erection of single wind turbine, 30m hub and 43m tip, access
track, substation and associated works at land to East of Broomhill Wood,
Bonhill, Alexandria by Mr Harris Smith. 
GRANT full planning permission subject to the following conditions:- 
1. The planning permission for the wind turbine hereby granted shall be for a
maximum period of 25 years and 6 months from the date of the permission. 
This period consists of a 25 year period of operation of the turbine followed by
a 6 month period for removal of the turbine, ancillary equipment, associated
hard standing and access track and restoration of the site to its former
condition, or other such condition as agreed in writing as acceptable to the
Planning Authority in accordance with the terms of Condition 6 below. 
2. Unless otherwise agreed in writing by the Planning Authority, should the
turbine cease to generate electricity for a continuous period of 6 months, the
turbine, ancillary equipment, associated hard standing and access track shall
be removed.  Restoration of the site to its former condition, or other such
condition as agreed in writing as acceptable to the Planning Authority in
accordance with the terms of Condition 6 below, shall thereafter take place
within 6 months. 
3. All external colours of the turbine and associated equipment cabinet shall be
agreed with the Planning Authority prior to the commencement of works and
shall be implemented as approved. 
4. No turbine, transformer building or any other above ground infrastructure shall
be illuminated or display any name, logo, sign or advertisement (other than
health and safety signage) unless and until otherwise approved in writing by
the Planning Authority. 
5. Within one year of the date of this consent, the turbine operator shall submit
an Outline Decommissioning, Restoration and Aftercare Scheme (the Outline
Decommissioning Scheme) for the Turbine development, for the written
approval of Planning Authority.  The Outline Decommissioning Scheme shall
include (but not necessarily be limited to) details of: 
a) Works for the decommissioning and removal of the turbine (together
with the foundations to a depth of at least one meter) and all above
ground ancillary infrastructure and equipment;
b) The treatment of any ground surfaces including access tracks,
hardstanding areas and any sub-surface elements including cabling to
restore the site to its former condition, or other such condition as is
agreed in writing by the Planning Authority;
c) Environmental management provisions, including waste management;
d) A decommissioning timetable;
e) Appropriate aftercare following site restoration; and

Page 13

f) How and when the Outline Decommissioning Scheme will be reviewed
during the operational life of the development.  The approved Outline
Decommissioning Scheme shall be implemented as approved, unless
otherwise agreed in writing by the Planning Authority. 
6. No later than 12 months prior to the decommissioning of the development, or
the expiration of the 25 year period of operation (whichever is earlier), a
detailed Decommissioning, Restoration and Aftercare Scheme, which takes
account of the latest version of the Outline Decommissioning Scheme
(approved under Condition 5) and which also takes into account of the current
best environmental practice, shall be submitted to and approved in writing by
the Planning Authority.  The development shall be decommission, the site
restored and aftercare thereafter in accordance with the scheme approved as
part of this condition, unless otherwise agreed in writing in advance by the
Planning Authority. 
7. Unless otherwise agreed in writing by the Planning Authority, if the wind
turbine fails to generate electricity for a continuous period of 12 months, the
turbine shall be deemed to have ceased to be required, and a scheme that
takes cognizance of Condition 6, setting out how the wind turbine and
associated infrastructure will be removed from the site, the ground restored
and aftercare carried out, shall be submitted for the written approval of the
Planning Authority no later than one month after the date of the expiry of the 6
months.  The scheme approved shall be implemented within 12 months of the
date of its approval. 
8. In order to ensure compliance with Condition 7, the wind turbine operator shall
submit 12 monthly generation and output figures to the Planning Authority to
evidence that the turbine is continuing to generate electricity and the 12
monthly reporting cycle shall commence from the date the turbine is
commissioned (turned on). 
9. Notwithstanding the approved plans, all recommendations within the
Preliminary Ecological Appraisal dated December 2022 shall be followed to
the satisfaction of the Planning Authority. 
10. That prior to works commencing on site a traffic management plan indicating
the proposals for the construction and delivery of the turbine and all
associated construction material shall be submitted to the Planning Authority
for their written approval, and shall thereafter be implemented as approved. 
The statement shall include the following information: 
a) The intended turbine transportation route including swept path
analysis, timings and methodology.
b) All temporary works including relocation of signs, guardrails, bollards,
street furniture and all temporary measures.
c) Any alteration to the public road network.
d) Details of the construction compound including staff car parking.
e) Details of proposed signage during the delivery and construction
period.

Page 14

f) Any necessary mitigation.
g) Details of the type, weight, frequency and number of delivery and
construction vehicles inclusive of those delivering all associated
construction materials, for example, hardcore and associated tonnage. 
h) Details of wheel washing facilities.
i) A condition report based on a joint survey of the proposed route to
ensure that all temporary alterations and any damage to the road
network are made good. 
11. No development shall take place within the development site until the
developer has secured the implementation of an archaeological watching
brief, to be carried out by an archaeological organisation acceptable to the
Planning Authority, during all ground disturbance.  The retained
archaeological organisation shall be afforded access at all reasonable times
and allowed to record, recover and report items or interest and finds.  A
method statement for the watching brief shall be submitted by the applicant
and agreed in writing with the Planning Authority in consultation with the West
of Scotland Archology Service prior to the commencement of the watching
brief.  The name of the archaeological organisation retained by the developer
shall be given the Planning Authority in writing prior to any works on site. 
12. Prior to the commencement of development full details of the surface water
drainage system shall be submitted for the written approval of the Planning
Authority and shall be implemented as approved prior to the occupation of the
building.  The drainage system shall incorporate the principles of Sustainable
Drainage Systems within its design, and shall thereafter be implemented as
approved. 
13. In accordance with ETSU- R- 97 (Simplified Method) the noise from the wind
turbine shall not exceed an LA90(10min) of 35dB at the boundary of the
curtilage of any noise sensitive premises at all times at wind speeds of up to
10 metres per second at 10m height as measured within the site. 
14. Prior to the installation of the turbine, the developer shall submit a report for
approval by the Planning Authority which demonstrates compliance with the
noise limits in Condition 13 above.  The report shall be prepared in
accordance with reference to the Institute of Acoustics Good Practice Guide
to the Application of ETSU-R-97 and associated supplementary guidance
notes. 
15. Prior to the installation of the turbine, the applicant shall provide written
confirmation to the Planning Authority that the noise from turbine operation
will be broad-band with no discernible tonal characteristics. 
16. Within 14 days from the receipt of a written request from the Planning
Authority or following a complaint to the Planning Authority from the occupant
of a dwelling regarding noise from the wind turbine operation, the wind turbine
operator shall, at the wind turbine operator’s expense, employ an independent
consultant approved by the Planning Authority to assess the level of noise
emissions from the wind turbine at the complainant’s property following

Page 15

procedures to be agreed with the Planning Authority.  The wind turbine
operator shall provide to the Planning Authority the independent consultant’s
assessment and conclusions regarding the said noise complaint, including all
calculations, audio recordings and the raw data upon which those
assessments and conclusions are based.  Such information shall be provided
within 28 days of the date of the written request of the Planning Authority
unless otherwise extended in writing by the Planning Authority.  The wind
turbine operator shall take such remedial action as required by the Planning
Authority. 
17. Wind speed, wind direction and power generation data shall be continuously
logged and provided to the Planning Authority in a format to be agreed at its
request and within 28 days of such a request.  Such data shall be retained by
the operator for a period of not less than 12 months. 
18. No development shall commence on site until details of a nominated person
have been submitted in writing to the Planning Authority for the development
who will act as a point of contact for local residents (in connection with
conditions 13 - 17), together with the arrangements for notifying and
approving any subsequent change in the nominated representative.  The
nominated representative shall have responsibility for liaison with the Planning
Authority in connection with any noise complaints made during the
construction, operation and decommissioning of the wind turbines. 
19. During the period of construction, all works and ancillary operations (including
piling) which are audible at the site boundary (or at such other place(s) as
may first be agreed in writing with the Planning Authority), shall be carried out
between the following hours unless otherwise approved in writing by the
Planning Authority: 
Mondays to Fridays:  0800-1800
Saturday:    0800-1300
Sundays and public holidays: No working 
20. During the period of construction no delivery or removal of material from the
site shall take place outwith the hours of 8am to 6pm Mondays to Fridays and
8am to 1pm on Saturdays, and not at all on Sundays or Public Holidays
unless otherwise approved in writing by the Planning Authority. 
21. The applicant shall ensure that all works carried out on site are carried out in
accordance with the current BS5228, 'Noise control on construction and open
sites'.  No further development shall commence on site until such time as a
noise control method statement for the construction period has been
submitted to and approved in writing by the Planning Authority. This statement
shall identify likely sources of noise (including specific noisy operations and
items of plant/machinery), the anticipated duration of any particularly noisy
phases of the construction works, and details of the proposed means of
limiting the impact of these noise sources upon nearby residential properties
and other noise-sensitive properties. The construction works shall thereafter

Page 16

be carried out in accordance with the approved method statement unless
otherwise approved in writing by the Planning Authority. 
22. Before any further plant and machinery is used on the premises it shall be
enclosed with sound insulating material in accordance with a scheme which
shall first be approved in writing by the Planning Authority.  The sound
insulation measures shall thereafter be retained. 
23. Within 14 days from the receipt of a written request from the Planning
Authority or following a complaint to the Planning Authority following a
complaint alleging shadow flicker nuisance, the wind turbine operator shall at
the wind turbine operator’s expense: 
a) Employ an independent consultant approved by the Planning Authority
to assess the conditions likely to be causing the incidences of shadow
flicker to which the complaint relates. 
b) Within 28 days of receipt of the written request from the Planning
Authority, the wind turbine operator shall submit to the Planning
Authority, the independent consultant’s report on shadow flicker,
detailing any amendments to the operation of the wind turbine
necessary to mitigate any further incidences of shadow flicker, for the
written approval of the Planning Authority.  The turbine shall thereafter
operate in accordance with the amendments to operation as approved. 
24. Notwithstanding the approved plans, and prior to any works on site, a further
submission which demonstrates an understanding on how the proposal
enhances biodiversity beyond the current baseline shall be submitted to and
approved in writing by the Planning Authority.  All measures shall then be
implemented as approved.

Page 17

APPENDIX 4 
DC23/202/FUL: Application under Section 42 of the Town and Country
Planning (Scotland) Act 1997, as Amended, in relation to Condition 17
(approach to risk assessment and any associated required remediation
strategy/plan) attached to Planning Permission, in Principle, reference
DC20/088 at Land At Former Dunglass Oil Terminal Dumbarton Road, Bowling
by West Dunbartonshire Council. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of works associated with any part of the
development (apart from remediation works), an application(s) for approval of
detailed design matters shall be submitted for the written approval of the
Planning Authority.  Unless otherwise agreed in writing by the Planning
Authority, all applications for the approval of matters specified in conditions
shall be accompanied by: 
a) Development platforms and site layout plans showing the position of all
buildings, roads, access arrangements, parking areas, footpaths,
waterfront walkway, green corridors, open space, boundary treatments
and drainage infrastructure. 
b) Block and layout plans showing existing, proposed and finished floor
levels and elevations of each building, showing dimensions, and
palettes of external materials. 
c) Applications that include proposals for buildings, will provide details of
cycle parking, shelter and storage provision, electric car charging
points, shower, changing and drying facilities and any other facilities
and measures which promote and support active and sustainable
travel. 
d) Landscape and streetscape plans showing the locations and species of
all proposed trees, shrubs, hedges, palettes of hard landscaping
materials and street furniture.  Where applicable, all trees and planting
shall be sited at least 10 metres in distance from the railway boundary
located within the application site.  Where it is agreed for trees, shrubs
are to be planted adjacent to the railway boundary located within the
application site, these shall be positioned at a minimum distance from
the boundary which is greater than their predicted mature height. 
2. Any applications(s) for approval of matters specified in conditions for any
phase or part of the development submitted under Condition 1 shall also
accord with the elements of approved 'design and construction' and
'operational phase' management plans and strategies associated with
Conditions 3, 4, 6, 7, 8, 10, 11, 13, 14, 15, 16 that are relevant to the
development being proposed.

Page 18

3. Prior to the submission of the first application for the approval of matters
specified in conditions, a Phasing Plan including details for the subsequent
delivery for each phase of the development alongside timescales for
implementation of the various phases shall be submitted to and approved in
writing by the Planning Authority.  The Phasing Plan shall contain a strategy
for the submission of a series of future detailed applications as under
Condition 1 above including the delivery and implementation of the approved
zones (including the waterfront walkway, green spaces and green network
corridors).  The approved Phasing Plan including any measures there within
shall be implemented on site and unless otherwise agreed in writing by the
Planning Authority.  Any modifications or updates of the approved phasing
plan shall be subject to the written approval of the Planning Authority and
implemented thereafter as approved. 
4. Prior to the submission of any application for matters specified in Condition 1
(parts B, C or D), a design strategy to establish the principles for the design
and locations of street furniture, railings, bollards, signage, bins, substations,
generators and cycle parking shall be submitted to and approved in writing by
the Planning Authority.  Unless otherwise agreed in writing by the Planning
Authority, each application for approval of matters specified in conditions
submitted shall adhere to the principles and requirements approved through
the design strategy. 
5 Unless otherwise agreed in writing by the Planning Authority, prior to the
submission of any application for matters specified in Condition 1 (A, B, C or
D), a Preliminary Options Appraisal Report including a condition survey and
scheme of repairs for the conservation, repair and reuse of Dunglass Castle
(including the house, garden, walls) and the Henry Bell Obelisk in both in the
short term and long term shall be submitted to and approved in writing by the
Planning Authority.  Prior to the occupation of any buildings to be located
within Zones A and B as identified on Parameters Plan (Drawing No.
30953/4504/002 Rev F), details of the final chosen option for Dunglass Castle
(including the house, garden and castle walls) and the Henry Bell Obelisk
shall be submitted to and agreed in writing Planning Authority.  These details
shall include a programme of works including timescales for obtaining relevant
permissions alongside timelines for the delivery and completion of the works
for the Dunglass Castle (including the house, garden, walls) and the Henry
Bell Obelisk.  Thereafter this shall be implemented as approved in accordance
with the approved final strategy. 
6. Prior to the submission of the first application for the approval of matters
specified in conditions, a Soil Management Plan and Earthworks and
Materials Movement Strategy shall be submitted to and approved in writing by
the Planning Authority.  Beyond the details set out in in Chapter 15 (Schedule
of Mitigation and Monitoring) of the approved 'Environmental Statement
Volume 1 Main Text (Dated: September 2019), these submissions shall
include: 
•  Details of the assessment criteria and sampling frequency that would
adequately demonstrate suitability for use.

Page 19

•  A Waste Management and Recycling Strategy to address on-site waste
and materials. 
The approved plans and strategies shall be implemented on site and unless
otherwise agreed in writing by the Planning Authority.  These shall remain in
place for the duration of the construction phase of the full re-development of
the site.  Any modifications or updates required shall first be subject to the
written approval of the Planning Authority and implemented thereafter as
approved. 
7. Prior to the submission of the first application for the approval of matters
specified in conditions, a Construction Traffic Management Plan (CTMP) shall
be submitted to and approved in writing by the Planning Authority.  Beyond
the details and scope set out in in Chapter 15 (Schedule of Mitigation and
Monitoring) if the approved 'Environmental Statement Volume 1 Main Text
(Dated: September 2019), the CTMP shall include details of measures for
minimising the disruption of the construction works on existing local bus
services along the A82 and A814.  As part of such details it shall also
demonstrate continuity of access along the A82 and A814 at all times, to allow
for the continued operation of local bus services, except where otherwise
agreed by the Planning Authority.  The approved CTMP including any
measures therewithin shall be implemented on site and unless otherwise
agreed in writing by the Planning Authority and shall remain in place for the
duration of the construction phase of the full redevelopment of the site.  Any
modifications or updates required for the approved CTMP shall first be subject
to the written approval of the Planning Authority and implemented thereafter
as approved. 
8. Prior to the submission of the first application for the approval of matters
specified in conditions, a Flood Risk Management Plan, a Construction Flood
Response Plan and a Construction Drainage Plan shall be submitted to and
approved in writing by the Planning Authority.  Beyond the details and scope
set out in in Chapter 15 (Schedule of Mitigation and Monitoring) of the
approved 'Environmental Statement Volume 1 Main Text (Dated: September
2019), the Construction Drainage Plan shall include confirmation that all foul
drainage installed within the application site shall discharge into the public
sewer network at all times.  The approved plans including any measures
therewithin shall be implemented on site and shall remain in place for the
duration of the construction phase of the full re-development of the site,
unless otherwise agreed in writing by the Planning Authority.  Any
modifications or updates required for these approved plans shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved. 
9. Prior to the occupation of any part of the site, all measures agreed in
accordance with Condition 8 above which are associated with addressing
flood risk shall be implemented.  This shall also include those measures set
out in Section 5.3.5 of the approved 'Environmental Statement Non-technical
Summary (September 2019)' and Chapter 7 and figure 7.2 'Conceptual Flood
Mitigation Strategy' of the approved 'Environmental Statement Volume 1 Main

Page 20

Text (Dated: September 2019)' .Once implemented, all of these measures
shall be maintained thereafter unless otherwise agreed in writing by the
Planning Authority. 
10 Prior to the submission of the first application for the approval of matters
specified in conditions, a Lighting Strategy and an Otter Mitigation Strategy
shall be submitted to and approved in writing by the Planning Authority. 
Beyond the details and scope set out in in Chapter 15 (Schedule of Mitigation
and Monitoring) of the approved 'Environmental Statement Volume 1 Main
Text (Dated: September 2019), the Lighting Strategy shall provide specific
confirmation that night lighting will be avoided during the months of
September to March inclusive where such lighting would illuminate areas of
inter-tidal habitat of the Inner Clyde Special Protection Area (SPA) to levels in
excess of 1 Lux (i.e. the maximum natural night-time background light level).
The approved strategies, including any measures therewithin shall be
implemented on site and shall remain in place for the duration of the
construction phase of the full re-development of the site, and unless otherwise
agreed in writing by the Planning Authority.  Any modifications or updates
required for these approved strategies shall first be subject to the written
approval of the Planning Authority and implemented thereafter as approved. 
11. Prior to the submission of the first application for the approval of matters
specified in conditions, a Landscape Framework and Strategy shall be
submitted to and approved in writing by the Planning Authority.  Beyond the
details and scope set out in in Chapter 15 (Schedule of Mitigation and
Monitoring) of the approved Environmental Statement Volume 1 Main Text
(Dated: September 2019), the Landscape Framework and Strategy shall be
prepared in accordance with the approved 'Landscape Framework Objectives'
document (Dated October 2020) and shall update the approved masterplan
and parameters plan for the site.  The approved Landscape Framework and
Strategy including any measures therewithin shall be implemented on site and
unless otherwise agreed in writing by the Planning Authority.  Any
modifications or updates required for this approved strategy shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved. 
12. Unless otherwise agreed in writing by the Planning Authority, as part of any
applications for approval of matters specified in conditions, and with regard to
the requirements of condition 1 above, a supporting report which evidences
how the relevant development proposals complies with and delivers the
requirements and aims of the 'Landscape Framework and Strategy' approved
under Condition 11 above. 
13 Prior to the submission of the first application for the approval of matters
specified in conditions, a Construction Environmental Management Plan
(CEMP) shall be submitted to and approved in writing by the Planning
Authority.  Beyond the details and scope set out in in Chapter 15 (Schedule of
Mitigation and Monitoring) of the approved 'Environmental Statement Volume
1 Main Text (Dated: September 2019), the CEMP shall also include a
timetable and programme for all noise and vibration generating works

Page 21

associated with the construction of the development including the use of plant
and machinery and vehicle movements.  The timetable shall set out how the
construction works will be programmed to minimise noise and vibration
generation during the months of September to March inclusive and associated
disturbance on wintering redshank and other qualifying features of the Inner
Clyde Special Protection Area.  Any noise generating works and/or operations
agreed in consultation with the Planning Authority as being unavoidable
during the period specified shall be accompanied by a schedule of mitigation
detailing the measures that will be put in place to mitigate those impacts that
will be caused by noise generating works and operations.  The approved
CEMP including any measures there within shall be implemented on site and
shall remain in place for the duration of the construction phase of the full re-
development of the site, unless otherwise agreed in writing by the Planning
Authority.  Any modifications or updates required for the approved CEMP
shall first be subject to the written approval of the Planning Authority and
implemented thereafter as approved. 
14. Prior to the submission of the first application for the approval of matters
specified in conditions, a Written Scheme of Archaeological Investigation and
Programme of Archaeological Works shall be submitted to and approved in
writing by the Planning Authority.  Notwithstanding the details and scope set
out in in Chapter 15 (Schedule of Mitigation and Monitoring) of the approved
'Environmental Statement Volume 1 Main Text (Dated: September 2019), this
investigation shall be subject to a full Risk Assessment considering all areas
of the site not previously covered by permission DC18/013 for the
Remediation Strategy for the site.  If required by the Risk Assessment, the
scope for the Written Scheme of Archaeological Investigation shall be
extended beyond the boundary of Zone F of the site and may include other
areas.  The approved written investigation and programme of works including
any measures there within shall be implemented on site and shall remain in
place for the duration of the construction phase of the areas subject to the
investigation, unless otherwise agreed in writing by the Planning Authority. 
Any modifications or updates required for the approved written investigation
and programme of works shall first be subject to the written approval of the
Planning Authority and implemented thereafter as approved. 
15. Prior to the submission of the first application for the approval of matters
specified in conditions, an Energy Strategy shall be submitted to and
approved in writing by the Planning Authority.  Further to the approach and
overarching aims set out in the approved 'Energy Masterplan' (Dated, May
2020) document, the Energy Strategy shall include details for the delivery and
implementation of on-site low carbon and renewable energy solutions,
building specific technologies and features alongside any other measures
aimed at increasing energy efficiency on the site.  The approved strategy
including any measures there within shall be implemented on site and unless
otherwise agreed in writing by the Planning Authority and shall remain in
place for the lifetime of the development.  Any modifications or updates
required for the approved strategy shall first be subject to the written approval
of the Planning Authority and implemented thereafter as approved.

Page 22

16. Prior to the occupation of any part of the site, a Travel Plan including
measures to minimise the impact of traffic and to promote sustainable and
active travel choices for staff and visitors shall be submitted to and approved
in writing by the Planning Authority.  The Travel Plan shall include the details
and requirements as set out in Section 7 of the approved 'Transport
Assessment (Dated April 2019).  The approved Travel Plan including any
measures there within shall be implemented on site and unless otherwise
agreed in writing by the Planning Authority and shall remain in place for the
lifetime of the development.  Any modifications or updates required for the
approved Travel Plan shall first be subject to the written approval of the
Planning Authority and implemented thereafter as approved. 
17. Unless otherwise agreed in writing by the Planning Authority, no development
shall commence on site until the approach to undertaking an assessment of
the risks to all new receptors, such as people and buildings, that this
development will introduce has been submitted to and agreed in writing by the
Planning Authority.  The assessment of the risks to all new receptors shall
then be undertaken in accordance with the approved approach unless
otherwise agreed in writing by the Planning Authority.  If the risk assessment
identifies any unacceptable risks on any part of the site then a remediation
strategy will be submitted to and approved in writing by the Council as
Planning Authority prior to development works commencing on that part of the
site.  The report shall be prepared by a suitably qualitied person. 
18. Unless otherwise agreed in writing by the Planning Authority, prior to the
submission of any approval of matters specified in conditions applications
AMSC), a full Site Investigation and Risk Assessment for areas of the AMSC
site not previously covered by the Remediation Strategy to be undertaken in
accordance with permission DC18/013 shall require to be submitted to and
approved in writing by the Planning Authority.  The approved details shall be
implemented as approved. 
19. In the event that contamination, which has not previously been identified and
assessed, becomes evident at any time during the development of the site, it
shall be reported in writing to the Planning Authority within 1 week.  If such
contamination can be dealt with without departing from the principles and
outcome of an already approved remediation strategy then works can
continue on the affected part of the site.  If the contamination would result in a
departure from the principles and outcome of the approved remediation
strategy and if requested by the Planning Authority, works shall cease and/or
an investigation and risk assessment shall be undertaken and an amended
remediation strategy shall be submitted to the Planning Authority for approval. 
The amended remediation strategy, once approved in writing by the Planning
Authority, shall be implemented as approved prior to the recommencement of
works in the affected area. 
20. Prior to the occupation of any part of the site and unless otherwise agreed in
writing by the Planning Authority, the proposed upgrade of Dunglass
Roundabout Junction of the A82 (T) with the A814 to traffic signal control shall

Page 23

be constructed in accordance with approved plan 'Eastern Access' (Drawing
No. 30953-STN- 00-XX-DR-D-0021 Rev P01). 
21. Prior to the occupation of any part of the site and unless otherwise agreed in
writing by the Planning Authority, the proposed upgrade of the Dumbuck
signalised junction of the A82 (T) with the A814 shall be constructed in
accordance with approved plan 'Western Access' (Drawing No. 30953-STN-
00-XX-DR-D-0020 Rev P01). 
22. Development proposals affecting the route of NCN7, shall include
arrangements for the temporary diversion of the NCN7.  Such details shall be
accompanied by measures which seek to mitigate the impact of the diversion
such as the provision for wayfinding signage and the use of distinctive
materials alongside other measures of route design required to ensure that
the diverted route remains clear, attractive and intuitive to users.  Thereafter
the approved temporary diversion and associated mitigation measures shall
be undertaken in a timescale agreed in writing by the Planning Authority.  The
mitigation measures shall be maintained on site for as long as the temporary
diversion of the NCN7 remain in place. 
23. Development proposals that propose to alter the route of NCN7 shall include
details for the final arrangement of post-development reconfiguration of NCN7
at the western end of the site.  These details shall include the final route and
positioning of NCN7.  Thereafter, the approved details shall be implemented
as approved in a timescale agreed in writing by the Planning Authority. 
24. Any development proposals that will permanently affect the route and function
of existing bus stops shall be accompanied by a report assessing and
reviewing the impact of the proposed road layout upon existing bus stop
locations (including those stops situated along the A82 and A814).  If
required, the report shall include details for any new bus stops required or
details for relocation of existing bus routes.  The approved report, including
any identified findings and measures shall be implemented in a timescale
agreed in writing by the Planning Authority. 
25. Prior to the commencement of any development on site, a trespass proof
fence of minimum 1.8 metres in height shall be installed along the boundary of
the railway line within the application site.  Prior to its installation, details of the
proposed trespass fencing including its location and design shall be submitted
to, and approved in writing by the Planning Authority.  The approved trespass
fence shall thereafter be implemented as approved in a timescale agreed in
writing by the Planning Authority.  Unless otherwise agreed in writing by the
Planning Authority, the approved trespass fence shall remain in place for the
duration of when construction works are taking place on the part of the site
impacting the railway. 
26. No development shall take place, between the months of September to March
inclusive, until an independent Ecological Clerk of Works (ECoW) or on-site
Ecologist (with ornithological experience) has been appointed by the
developer/applicant to oversee, monitor and ensure the effectiveness of all

Page 24

ecological mitigation measures to protect the integrity of the Inner Clyde
Special Protection Area and other ecological designations.  The Planning
Authority shall be notified in writing once this person has been appointed. 
Thereafter, the ECoW shall remain in place for the duration of the construction
works associated with that part of the development, unless otherwise agreed
with the Planning Authority. 
27. Further to Condition 26, prior to appointing the ECoW, a 'scope of works' and
'terms of reference' for that person shall be submitted to and approved in
writing by, the Planning Authority.  This specifically shall detail the role and
remit of the ECoW and the circumstances and timescales during the
construction phase whereby they will require to be present within the
application site.  As a minimum, this shall detail that the ECoW shall: 
•  Be kept adequately informed of and ensure compliance with the
construction timetable and programming (including any variations to
such details) to be agreed under the terms of approved CEMP
alongside all other ecological mitigation measures and proposals which
are to be in place for the lifetime of the construction work associated
with the redevelopment of the site. 
•  Have the capacity and authority to halt/postpone any construction
works taking place during the sensitive over-wintering months (i.e. from
September to March inclusive) and until such time as they believe the
operations concerned will not result in any redshank, cormorants,
goldeneye, oystercatchers, red-breasted merganser (or any other
notified bird species) being displaced from feeding or roosting within
the identified Inner Clyde Special Protection Area or within the
designated Site of Special Scientific Interest (SSSI). 
28. No development shall commence, between the months of September to
March inclusive until a screening and protective barrier has been installed
along the boundary between the Inner Clyde Special Protection Area (SPA)
and the area proposed for development works within the application site
(southern boundary of the water/foreshore edge boundary of the works area). 
Prior to its erection, details of the proposed screening barrier including its
location, extent, design and level of obscurity shall be submitted to, and
approved in writing by the Planning Authority.  The approved screening barrier
shall thereafter be implemented as approved in a timescale agreed in writing
by the Planning Authority.  Unless otherwise agreed in writing by the Planning
Authority, the approved screening barrier shall remain in place for when
construction works are taking place within the part of the site impacting the
SPA. 
29. Further to Condition 28 above, in the event that any such screening barrier is
to be replaced by more permanent screen planting, details of such proposals
shall be submitted to and approved in writing by the Planning Authority prior to
the removal of the screening barrier (between the months of September to
March inclusive).  Such proposals shall include details for planting along the
edge of the development site area (referred to as the 'Green Corridor' on the

Page 25

approved Masterplan and Parameters Plan) combined with tree/scrub
retention and appropriate reinforcement planting along the route of the
new/upgraded road and along the edge of the existing railway line.  The
approved screen planting details shall thereafter be implemented as approved
in a timescale agreed in writing by the Planning Authority. 
30. As part of any applications for approval of matters specified in conditions, and
with regard to the requirements of condition 1 above, up-to-date protected
species surveys insofar as required in relation to the area of proposed
development and associated ecological features shall accompany
development proposals within the site.  These surveys shall be carried out by
a suitable qualified ecologist at the appropriate time of year and will be
provided to update the baseline information provided through the
Environmental Statement and ecological surveys provided as part of this
application.  Furthermore, should the results of such surveys show them to be
necessary, any such applications shall also be accompanied by the relevant
species protection plans to identify any license requirements. 
31. Prior to the commencement on any development on site, details of measures
to protect retained trees and areas of woodland on the site during construction
shall be submitted to and approved in writing by the Planning Authority.  The
details shall include specific details for the establishment of buffer zones for
the protection of trees and area of woodland along and within the site
boundary.  Thereafter, unless otherwise agreed in writing by the Planning
Authority, the approved measures shall be implemented and shall remain in
place for the duration when construction works are taking place on site.

Page 26

APPENDIX 5 
(d) DC23/205/FUL: Application under section 42 of the Town and Country
Planning (Scotland) Act 1997 to vary Condition 7, relating to the timing
of footpath delivery at Farm Road, Duntocher, Clydebank by Barratt
Homes West Scotland. 
GRANT full planning permission subject to the following conditions:- 
1. No development shall commence on site until such time as approval of the
detailed design and layout of the residential development (hereinafter called
“the matters specified in conditions”) has been granted by the planning
authority.  Any application for approval of matters specified in conditions shall
be submitted before the expiration of three years from the date of this
planning permission in principle and shall include: 
a) the overall site layout;
b) the orientation, size, height, design and external appearance of the
proposed houses;
c) the means of drainage and sewage (including perimeter drainage)
which shall incorporate the principles of Sustainable Drainage Systems
(SuDS);
d) details of the full access arrangements (including a swept path analysis
to demonstrate the suitability of the road layout within the site for refuse
vehicles) ;
e) provisions for car parking;
f) boundary walls/fences to be erected and/or retained;
g) existing and proposed site levels and floor levels;
h) hard and soft landscaping for the site;
i) the provision of private open space within each house plot to West
Dunbartonshire Council’s Residential Design Guidance Standards; and
j) provisions for the storage and collection of waste arising from the
development. 
2. Prior to the commencement of development on site, details of the measures
to be taken to protect the existing trees on the site, as identified in the Tree
Survey and Arboricultural Report, dated September 2019, shall be submitted
to and approved in writing by the planning authority.  The approved measures
shall thereafter be fully implemented during the course of all construction
works on the site. None of these trees shall be felled, lopped or topped except
as otherwise approved by the authority. 
3. Further to Section 4.2 of the approved Extended Phase 1 Habitat Survey
(dated 15 August 2019) the further badger, otter, water vole and bat surveys
and assessments shall be carried out and submitted for approval by the
planning authority as part of the detailed application(s) for the matters
specified in conditions.  If no works have commenced on site by 1 August
2021, a new habitat survey shall be undertaken and submitted as part of the
detailed application(s).  This shall either confirm that the findings and

Page 27

recommendations of the original survey remain valid or alternatively outline
further recommendations as required based on current circumstances. 
4. No development shall take place within the development site until the
developer has secured the implementation of a programme of archaeological
works in accordance with a written scheme of investigation which has been
submitted to and approved in writing by the planning authority.  Thereafter the
developer shall ensure that the programme of archaeological works is fully
implemented and that all recording and recovery of archaeological resources
within the development site is undertaken to the satisfaction of the Planning
Authority in agreement with the West of Scotland Archaeological Service. 
5. Further to Appendix 4: ‘Flood Risk Assessment’ of the approved Engineering
Assessment and Drainage Report (dated September 2019), any modification
or alterations to the indicative masterplan layout of the proposed residential
development (as shown on approved plan ‘Masterplan’ (Drawing No. 5914(2)
S005 Rev E) shall be subject to a further Flood Risk Assessment.  This shall
be submitted as part of the application(s) for the approval of matters specified
in conditions. 
6. No development shall commence on site until a site-specific Construction
Environmental Management Plan (CEMP) has been submitted to and
approved in writing by the planning authority.  The CEMP shall include the
following information: 
a) a site management plan including details of the management/storage
of soil and construction materials, of the storage of all waste materials,
and for the parking of all vehicles associated with the construction
operations;
b) a construction method statement, detailing the hours of construction
operations and deliveries, measures to prevent the transmission of
noise to adjoining residents, and measures to control the spread of
dust from the site;
c) details of wheel-washing arrangements;
d) a construction traffic management plan; and
e) details of construction stage sustainable drainage measures, including
provision for
f) the prevention of pollution of groundwater or surface watercourses. 
7. Unless otherwise agreed in writing by the Planning Authority, none of the
houses within the development shall be occupied until bus stops and shelters
have been provided on Craigielea Road, in locations to be agreed with the
Council, as Roads Authority, and Strathclyde Partnership for Transport. 
Furthermore a footpath linking these stops with the development shall be
provided prior to the occupation of the 64th dwellinghouse in the development
site. 
8. That the development shall be implemented in a continuous programme of
construction commencing with the northern field as Phase 1 and concluding
with the southwestern field as Phase 2.

Page 28

APPENDIX 6 
DC22/185/FUL: Change of use of ground for the siting of three holiday lodges
including a waste water treatment plant and ancillary car parking (being a
revised design from that approved under Planning Permission ref:
DC21/096/FUL) at Former Maryland Water Pumping Station, Garshake Road,
Dumbarton by Mrs Mary Gillies. 
GRANT full planning permission subject to the following conditions:- 
1. No individual shall reside in the tourist accommodation for more than 28
consecutive days. In addition, no individuals shall reside in the tourist
accommodation for more than 60 days in the calendar year.  To this effect, a
permanent log book shall be kept of all visitors who stay at the tourist
accommodation for the lifetime of the development. This shall note the names
and addresses of all visitors.  The log book shall be made available for the
inspection of the Council as Planning Authority, if requested. 
2. Prior to the commencement of development, full details of the parking
arrangement will be provided to the Planning Authority for written approval. 
Thereafter, the approved parking arrangement shall be formed and available
prior to the lodges hereby approved being first brought into use.  The spaces
and access arrangements shall thereafter be kept available for the lifetime of
the development. 
3. Prior to the commencement of development, full details of the surface and foul
drainage shall be provided to the Planning Authority for written approval. 
Thereafter, the approved arrangements shall be implemented prior to the
lodges hereby approved being brought into use. The drainage arrangements
shall thereafter be maintained for the lifetime of the development.  For the
avoidance of doubt, the arrangement will incorporate sustainable drainage
arrangements (SuDS). 
4. Prior to the lodges hereby approved being first brought into use, the lodges
operator shall submit a Management Plan to the Planning Authority for their
written approval.  The Management Plan shall include details of day to day
site management and maintenance and how potential noise and guest
behaviour issues are to be dealt with, should they arise.  Thereafter, the site
will operate in accordance with the approved Management Plan for the
lifetime of the development unless otherwise agreed by the Planning
Authority. 
5. Prior to the commencement of works, full details of both hard and soft
landscaping works shall be submitted to and approved in writing by the
Planning Authority.  Where appropriate, these details shall include proposed
finished and existing grounds levels and contours, hard surfacing materials
and lighting.  Thereafter, the approved details shall be fully implemented in
accordance with the approved details prior to the lodges being brought into

Page 29

use, unless otherwise agreed by the Planning Authority.  Any trees, shrubs, or
hedges planted in accordance with this condition which are removed, die,
become severely damaged or become seriously diseased within five years if
planting shall be replaced within the next planting season by trees, shrubs or
hedging plants of similar size and species to those originally required to be
planted. 
6. The 1.6m high wall to the north of the gable end of unit 1 and the 1.1m high
wall along the front edge of the former water tank shall be finished in timber
cladding to match that across the wider site. 
7. Prior to the commencement of development on site, the finishing materials to
be used shall be submitted to the Planning Authority for written approval.  
Thereafter, the approved materials shall be implemented as approved. 
8. If there is a requirement to either re-use site one material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being used.  In addition to this and in
accordance with BS3882:2015 and Bs8601:2013 material to be used in the
top 300mm shall also be free from metals, plastic, wood, glass, tarmac and
odours. On completion of the works and at a time and/or phasing agreed by
the Planning Authority, the developer shall submit a verification report
containing details of the source of the material and appropriate test results to
demonstrate its suitability for use. 
9.  the presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of works.  The approved details shall be implemented as
approved.

Page 30

APPENDIX 7 
DC22/072/FUL: Residential development, landscaping and associated
Infrastructure at Hawthornhill Road, Dumbarton by Persimmon Homes. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be used for
the houses within the development site shall be submitted to and approved in
writing by the Planning Authority.  Thereafter, unless otherwise agreed in
writing with the Planning Authority, the development shall be completed in
strict accordance with the approved material details and palette. 
2. Further to condition 1 above, unless otherwise agreed in writing with the
Planning Authority, the brick type to be used for the elevation treatment of all
houses within the development site shall be of the ‘Forterra Victorian Mixture’
specification and variety. 
3. Further to Conditions 1 and 2 above, prior to the approved brickwork
associated with any house being constructed or installed on site, a sample
panel of this brickwork shall be constructed on site in order for it and the
associated mortar to be reviewed, inspected and approved in writing by the
Planning Authority.  Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved brick details. 
4. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed prior to the
commencement of works on site with the Planning Authority. 
5. Notwithstanding the approved plans , an updated planting schedule to
incorporate Hawthorn planting and clarify the suitability of the planting within
the SuDS area shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of any works on site and shall be
implemented with a timescale to be agreed with the Planning Authority. 
6. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
7. That full details of maintenance and management for the landscaping
approved shall be submitted to and approved in writing by the Planning
Authority prior to the start of construction of the development hereby
permitted.  Management and maintenance shall commence upon completion
of the landscaping. 
8. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course.

Page 31

9. That within 4 weeks of the last of the houses hereby permitted being
completed, all roads and footways within the application site shall be
completed to a final wearing course. 
10. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house. 
The offstreet parking provision inclusive of garages where they part of this
parking provision shall be shall then remain unobstructed and available for
use by residents of the associated house at all times thereafter. 
11. No construction works except ground investigation works shall commence on
site until the existing pedestrian crossing on Cardross Road shall be relocated
and be fully operational in the new position. 
12. No construction works shall commence on site until full details of the new
position of the existing bus stop on Cardross Road currently in the position of
the relocated pedestrian crossing shall be submitted to and approved in
writing by the Planning Authority in consultation with SPT with the relocation
taking place and the bus stop being available for use by services 
13. That the approved drainage regime inclusive of the SuDS pond shall be fully
implemented.  For the avoidance of doubt, the drainage regime shall be
implemented commensurately with the construction of the houses it serves. 
14. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing ty the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved. 
15. No site clearance works shall be undertaken during the bird nesting season
March to September inclusive unless first agreed in writing by the Planning
Authority.  For the avoidance of doubt, any such agreement will require a full
nesting bird survey prior to the commencement of works on site, the
methodology and findings of which shall be submitted to the Planning
Authority 
16. That prior to the commencement of any works on site, full details of the
incorporation of low or zero carbon generating technologies shall be
submitted to and approved in writing by the Planning Authority.  Thereafter the
development shall be undertaken in accordance with the approved details. 
17. Prior to the commencement of development with the site, details of the
location and design of electric charging points/units and associated
infrastructure and ducting to serve the development shall be submitted to and
approved in writing by the Planning Authority.  The approved car charging
points/units/ducting and associated infrastructure shall thereafter be installed

Page 32

in accordance with the approved details at a timescale agreed by the Planning
Authority and maintained at all times thereafter. 
18. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
19. Details of the provision of grit bins for the development shall be submitted to
and approved in writing by the Planning Authority.  The agreed details shall be
in place prior the occupation of the first house within the site and thereafter
maintained for the lifetime of the development. 
20. Prior to the commencement of works on site, details of any street furniture
shall be submitted to and approved in writing by the Planning Authority and
shall be implemented within an agreed timescale. 
21. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority.  Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall
be provided to new residents. 
22. No development (other than investigative work) can take place until such time
as a comprehensive site investigation has been carried out to the appropriate
Phase level and submitted to and approved in writing by the Planning
Authority.  The investigation shall be completed by a suitably qualified and
competent person and completed in accordance with advice given in the
following: 
•  Planning Advice Note 33 (2000) and Part IIA of the Environmental
Protection
• Act 1990 (as inserted by section 57 of the Environment Act 1995)
• BS 10175:2011+A1:2013 – British Standards institution ‘The
Investigation of Potentially Contaminated Sites – Code of Practice’.
•  Land Contamination and Development Management -Guidance.
https://www.epscotland.org.uk/wp[1]content/uploads/2019/09/ConLanD
evGuide_12-Aug19-FINAL.pdf 
23. If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated and these linkages must be
subjected to risk assessment.  If a Phase 2 investigation is required, then a
risk assessment of all relevant pollution linkages will require to be submitted. 
24. If the risk assessment identifies any unacceptable risks then an appraisal of
remedial options followed by a detailed remediation scheme will be submitted
to and approved in writing by the Planning Authority.  No works other than

Page 33

investigative works shall be carried out on site prior to receipt of the Planning
Authority’s written approval of the remediation scheme. 
25. No development (other than investigative works) shall commence on site until
such time as a detailed remediation scheme for the site has been submitted to
and approved in writing by the Planning Authority.  The scheme shall be
prepared by a suitably qualified person and shall detail the measures
necessary to bring the site to a condition suitable for the intended use by
removing unacceptable risks to human health, buildings and other property,
and the natural and historical environment.  The scheme shall include details
of all works to be undertaken, the remediation objectives and criteria, a
timetable of works and/or details of the phasing of works relative to the rest of
the development, and site management procedures.  The scheme shall
ensure that upon completion of the remediation works the site will not qualify
as contaminated land under Environmental Protection Act 1990 Part IIA in
relation to the intended use of the land after remediation. 
26. The approved remediation scheme shall be carried out in accordance with its
terms prior to the commencement of development other than that required to
carry out remediation, unless otherwise agreed in writing by the Planning
Authority.  The Planning Authority shall be notified in writing of the intended
commencement of remediation works not less than 14 days before these
works commence on site. 
27. Upon completion of the remediation works and prior to the site being
occupied, a   verification report which demonstrates the effectiveness of the
completed remediation works shall be submitted to and approved in writing by
the Local Planning Authority. 
28. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved. 
29. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported.  In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours. 
30. On completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use.

Page 34

31 No development shall commence on site until such time as a noise control
method statement for the construction period has been submitted to and
approved in writing by the Planning Authority.  This statement shall identify
likely sources of noise (including specific noisy operations and items of
plant/machinery), the anticipated duration of any particularly noisy phases of
the construction works, and details of the proposed means of limiting the
impact of these noise-sensitive properties.  The construction works shall
thereafter be carried out in accordance with the approved method statement
unless otherwise approved in writing by the Planning Authority. 
32. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working 
33. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority.  The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority. 
34. No commercial vehicle making deliveries to or collecting material from the
development shall enter or leave the site before 0800 or after 1800. 
35. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’.  It shall
detail any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement. 
36. Notwithstanding condition 36 above, full details of the design, height and
location of an acoustic fence adjacent the sports pitch shall be submitted to
and approved in writing by the Planning Authority.  The fence shall then be
erected prior to the occupation of any dwellinghouse on plots 32 to 44
inclusive.

Page 35

37. No development shall commence on site until details for the storage and the
collection of waste arising from the development and the location of grit bins
shall be submitted to and approved in writing by the Planning Authority.  The
agreed details shall be in place prior the occupation of the first housing
unit/property within the site and thereafter maintained for the lifetime of the
development.