WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager      
Planning Committee: 14th February 2024
_____________________________________________________________
DC22/185/FUL: Change of ground for the siting of three holiday lodges,
associated waste water treatment plant and ancillary car
parking at Former Maryland Water Pumping Station,
Garshake Road, Dumbarton by Mrs Mary Gillies
1. Purpose
1.1 To provide the Committee with additional information following continuation of
the above planning application and to seek the Committee’s decision on the
application.
2. Recommendations
2.1 Grant planning permission subject to the revised conditions set out in
Appendix 2 of the report.
3. Background
3.1  The above planning application was presented to Planning Committee on 13th
April 2023. Appendix 1 contains a copy of the report previously considered by
Planning Committee. It was determined by Committee to continue the
application to allow officers to seek further detailed information on drainage and
parking, which were proposed to be secured through condition, prior to the
application being determined. The Planning Committee also requested that the
applicant address concerns raised about the visual impact and safety of the
stepped access to the lodges and the lack of disabled access.
3.2 The applicant subsequently submitted an updated layout with the following
changes:
• The stepped access from the car park to the central courtyard and
lodges at upper level has been removed and the resulting opening in the
1.1m high wall closed off with timber cladding consistent with the rest of
the wall.
• A new, more gradually sloping stepped access is proposed adjacent to
the western elevation of Unit 1.
• Addition of a second 1.2m wide hard surfaced footpath which takes a
wider sweep around the western side of Unit 1, with a lesser gradient (1
in 12) enabling wheelchair access.
ITEM 6e

Page 2

• Two car parking bays at the western end of the parking area have been
re-positioned to enhance the overall area for turning/reversing.
• One car park space has been designated for disabled drivers.
3.3 In addition to the proposed changes, further information on drainage has been
provided, which advises that waste water will be discharged via a soakaway to
an on-site Sewage Treatment Plant, with surface water drainage collected and
discharged via soakaways. A Phase 1 Desk Top Study on the historical usage,
geology and potential contamination has also been submitted.   
3.4 In addition to the further details requested by Planning Committee, the applicant
has also indicated that they are agreeable to the attachment of an additional
Planning Condition restricting occupancy of the lodges to a maximum of 4
people per unit.  
4. Main Issues
4.1 There are no material changes to either the development plan position or the
circumstances of the site since Committee previously considered the
application. 
Parking
4.2 With respect to the requirement for a turning area that facilitates cars to enter
and exit in a forward gear, which was highlighted in the original consultation
response from the Roads Service, two car parking bays at the western end of
the parking area have been re-positioned to enhance the overall area for
turning/reversing. Disabled parking provision has also now been added.  An
updated consultation response from the Roads Service advises that the revised
parking layout raises no concerns. It is therefore considered that the revised
parking layout is acceptable. 
Water Supply and Drainage Arrangements
4.3 With regard to foul and surface drainage, the applicant has submitted further
information which advises that waste water will be discharged via a soakaway
to an on-site Sewage Treatment Plant, with surface water drainage collected
and discharged via soakaways. It is noted that the drainage arrangements will
meet current standards and SEPA Guidelines. In support of the proposed
drainage arrangements, a Phase 1 Desktop Study on the historical usage,
geology and potential contamination has been submitted. This study identified
no potential contaminative uses of the site and concluded that the proposed
holiday lodges would have a very low impact on the site and that there is a very
low risk to current and future users. The drainage proposals have been
considered by the Roads Service, who raised no objection in their consultation
response. In light of this, it can be concluded that the proposed drainage
arrangements are acceptable.

Page 3

Design and Appearance of the development
4.4 In response to concerns about the safety and visual impact of the stepped
access from the centre of the car park to the courtyard and lodges at the upper
level, this access has been relocated to be adjacent to the western elevation of
Unit 1. The gradient of the access has also been significantly reduced. It is
considered that locating the stepped access to the side of the existing structure
and Unit 1 will significantly reduce the visual impact, with the more gradual
gradient also reducing safety concerns. As such, the new stepped access is
acceptable.
4.5 Further to concerns about the lack of disabled access to the lodges, the revised
layout includes a second 1.2m wide hard surfaced footpath which takes a wider
sweep around the western side of Unit 1, with a lesser gradient (1 in 12). It is
considered that this path will enable wheelchair access and is therefore
acceptable. 
Other matters
4.6 Whilst not an issue that the Committee sought additional or revised details in
respect of, the applicant has provided updated details on the occupancy of the
holiday lodges. The applicant has indicated that they are agreeable to the
attachment of a planning condition restricting occupancy of the lodges to a
maximum of 4 people per unit. It is considered that this will additionally allow
further control over the occupation and use of the site, further reducing any
potential impacts. 
Conclusion
4.7 It is considered that the revised layout and details has addressed the
requirements for further information on drainage and parking, which were
identified in the April 2023 Committee Report (see Appendix 1). Additional
changes to the stepped access and the provision of wheelchair access are also
welcome and acceptable. Overall, the amendments to the detail and design
beyond that previously granted planning permission in 2021, will have no
significant or adverse effects on the physical appearance of the overall
development or significant impacts on the surrounding landscape and visual
amenity. The proposed changes are considered acceptable.  It remains the
case that the revised proposal accords with NPF4, the adopted West
Dunbartonshire Local Plan and the proposed West Dunbartonshire Local
Development Plan 2. The recommendation in 2.1 of this report is to grant the
application subject to the revised conditions detailed in Appendix 2. 
5. People Implications
5.1 None.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications in terms of this report.

Page 4

7. Risk Analysis
7.1 No risks have been identified.
8. Equalities Impact Assessment (EIA)
8.1 Not required.
9. Environmental Sustainability
9.1 Matters relating to environmental sustainability have been fully considered via
the planning application assessment.
10. Consultation
10.1 Consultation was undertaken as part of planning processes associated with the
planning application. The proposed amendments and additional details
provided do not result in any significant change to the proposal that requires
the application publicity to be re-issued. 
10.2 An updated consultation response was received from the Council’s Roads
Service who raise no objections on parking the drainage matters.
11. Strategic Assessment
11.1 There are no strategic issues.
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager
Date: 14th February 2024 
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager
Pamela.Clifford@west-dunbarton.gov.uk
James McColl, Development Management Team
Leader