WEST DUNBARTONSHIRE COUNCIL Report by Planning, Building Standards and Environmental Health Manager Planning Committee: 14th February 2024 DC23/177/FUL: Erection of single wind turbine, 30m hub and 43m tip, access track, substation and associated works at Land to East of Broomhill Wood, Bonhill, Alexandria by Mr Harris Smith. 1. REASON FOR REPORT 1.1 The planning application is subject to a substantial body of objection. Under the terms of the approved Scheme of Delegation, it therefore requires to be determined by the Planning Committee. 2. RECOMMENDATION 2.1 Grant planning permission and delegate authority to the Planning & Building Standards Manager to issue the decision subject to the conditions set out in Section 9 and subject to the conclusion of a legal agreement to ensure that a suitable financial bond is put in place to cover restoration liabilities for the site and the community benefit contribution. 3. DEVELOPMENT DETAILS 3.1 The application site is located to the east of Bonhill, Alexandria. The nearest residential areas are Beechwood and Wheatcroft Estate, Bonhill located approximately 440m to the west and Bellsmyre which is just over 1km to the south, though there is intervening woodland between the site and both residential areas. The site is to the north of the Murroch Glen (a steep wooded valley containing the Murroch Burn), on land which rises to the northeast into the Kilpatrick Hills. It forms part of an area of plantation woodland, bordered by the Murroch Glen and areas of grazing land. The application site boundary extends to 0.89 hectares, but is within a much larger area of land controlled by the applicant. ITEM 6b
Page 2
3.2 The proposal would involve the following works: • Installation of a single wind turbine; • Construction of a 550m access track; • Construction of an electrical substation and underground cabling; • Construction infrastructure (e.g. crane hardstanding area); • Construction of 6 vehicle parking spaces; 3.3 The turbine would be a three-bladed, horizontal axis turbine, with a nominal rated capacity of 250kW. It would have a hub height of 30m and a maximum height to the blade tip of 43m. The turbine would be of the conventional design for such pieces of equipment, featuring a tubular tower and blades finished in a non-reflective pale grey colour consistent with the industry standard used in most UK wind turbines. 3.4 The turbine would sit on a concrete base measuring roughly 7.5m x 7.5m, with an expected depth of 3m, although the exact design of the foundation would depend upon which specific manufacturer’s turbine was used (which is not known at this stage). In addition to the foundation, an area of hardstanding would be required adjacent to the turbine as a crane platform for construction and ongoing maintenance. Adjacent to the base of the turbine would be an external substation measuring approximately 7.5m x 4m, and 2.8m in height. The colour of the substation is currently unspecified, however the supporting statement suggests it will be either green or pale grey. Due to the relatively small generator size of the proposed turbine, a local connection to the distribution network is anticipated and without the need for more extensive reinforcement or upgrade works. 3.5 Access to the site would be by way of the existing private access track leading to Highdykes Farm, which is, itself, accessed from Broomhill Crescent. A new 550m access track would be created between the farm track and the proposed turbine. The new track would be 4.5m wide and surfaced in hardcore, with a passing place and areas to permit the turning of long vehicles. The road is likely to sit above the existing ground by approximately 300mm with banking at either side. No borrow pits are proposed as part of the development and material would be imported to construct the access track. The level of material required to be imported is not, however, specified in the application submission. The access track crosses a drainage ditch around 330 metres from the junction with the existing farm track, which a short section of pipe being installed below the hardcore. 3.6 In terms of the planning history of the site, there have been two previous applications for the erection of a wind turbine of the same size, as well as the associated access track on this site.
Page 3
The Planning Committee considered the first application (DC14/210) on 29 April 2015 and were minded to grant planning permission subject to the conclusion of a legal agreement to ensure that a suitable financial bond is put in place to cover restoration liabilities for the site and the community benefit contribution. The financial bond was never concluded and with a lack of any progress over an extended period, the application was considered withdrawn in March 2021. 3.7 The second application (DC22/190/FUL) was submitted in 2022. In addition to the wind turbine and associated works, an agricultural storage shed was also proposed as part of this application. All planning application proposals require to be considered as a whole and in assessing the application it was concluded that the proposed shed was not a form of development which could be supported in this Green Belt location and would result in an unjustified sporadic development within the Green Belt. The application was refused by Planning Committee on 2nd August 2023 for the following reason: 1. It has not been demonstrated that the proposed agricultural shed is being provided in association with an agricultural land holding, nor has the nature of any farming operation at this location been quantified. Therefore it cannot be concluded that the proposed shed is specifically required to support agriculture at this green belt and the shed would result in unjustified sporadic development within the green belt location. It is thus not a form of development that is supported in the green belt by Policy 8 – Green Belts of the National Planning Framework 4, Policy GB1 – Green Belt of the adopted West Dunbartonshire Local Development Plan, Policy GB1 – Greenbelt and Countryside of the proposed West Dunbartonshire Local Development Plan 2. This refusal of planning permission was not appealed to the Scottish Government Planning and Environmental Appeals Division. 3.8 Works to create the access track associated with the wind turbine commenced on site prior to this application being determined. The applicant was advised that the works were being undertaken without planning permission. The applicant was requested on a number of occasions to stop works until such time that planning permission was granted. The applicant continued works on the access track and a Temporary Stop Notice was subsequently issued. Works initially continued after the Notice was issued and then halted. At the expiry of the Temporary Stop Notice works commenced again, despite it remaining that no planning permission was in place. 3.9 Further to the refusal of application DC22/190/FUL, an Enforcement Notice was issued requiring the removal of the partially constructed access track.
Page 4
The applicant appealed this Enforcement Notice which was dismissed by the Reporter of the Planning and Environmental Appeals Division of the Scottish Government. Reports from residents within the area suggested that works were ongoing to further develop the track. However a site visit on 30th January 2024 has confirmed that the works are ongoing to remove the track in accordance with the requirements of the Enforcement Notice. 4. CONSULTATIONS 4.1 West Dunbartonshire Council Environmental Health Service have no objections to the proposal and recommends the following conditions regarding noise in relation to the turbine, noise complaints, wind data, point of contact, hours of work, delivery vehicles during construction, construction noise, and noise attenuation. 4.2 West Dunbartonshire Council Roads Service have no objections in relation to flooding matters. A Traffic Management Plan was submitted and the Roads Service confirmed that the clarifications and qualifications contained within the plan made the proposal acceptable to the Roads Service. 4.3 West of Scotland Archaeological Service (WoSAS) have no objection subject to a condition requiring the implementation of an archaeological watching brief. 4.4 West Dunbartonshire Council Biodiversity Officer has no further comments to make on the current proposal. Comments from the previous application note that the Preliminary Ecological Assessment submitted offers mitigation in section 7 of the document and should be conditioned if the development is to proceed. The proposed mitigation includes following national guidelines and standards for any tree/hedgerow retention, that best working practice measures are adhered to safeguard otters and badgers, and a walkover survey prior to works commencing within bird breeding season. If any otter or badger resting place is found then an ecologist should produce an otter protection plan. Should the development proceed there should be a clear intention provided of the biodiversity enhancement works that will be included to meet the requirements of NPF4 Policy 3. It should be specifically noted what is being regarded as mitigation and enhancement so that a clear picture of the ‘positive effect on biodiversity’ can be determined. 4.5 Glasgow Airport and National Air Traffic Services have no objections to the proposal.
Page 5
4.6 RSPB Scotland note that the previous ecological report appears to be based on site visit(s) during December 2022 (so outside the recommended dates for protected species surveys) and the conclusion that there would be no impact on birds was based on a desktop study using only freely available data rather than survey visits – and so no actual survey work had taken place. The updated application mentions NPF4 policies, but again says that based on an assessment in support of the application, it concludes there will be no material impact on biodiversity, including birds. It is unclear how this can be assessed from the data provided. There is also no mention of proposed biodiversity enhancements. 4.7 Stirling Council and Inverclyde Council have no objections to the proposal. 4.8 Loch Lomond & The Trossachs National Park Authority and Argyll and Bute Council have not provided a response at the time of writing this report. 5. REPRESENTATIONS 5.1 Fifty eight representations from fifty seven representees have been received in connection with the proposal including from Beechwood & Wheatcroft Residents Association. All are in objection. The full details are contained within the planning file and are available for public viewing. However, the points raised can be summarised as follows: Roads and traffic • The estate roads are not suitable for heavy vehicles. • There will be a noise impact from the HGV traffic. • Concern for children and elderly in relation to the increase in traffic. • There was never a road in this location before. Location and visual impact of the development • Concern for the visual impact on Dumbarton Rock, cluttering the backdrop to & from the Kilpatrick and Lang Craig Hills & the Pappert Well. • No access track previously existed at this location previously. • There are industrial estates within Dumbarton and Vale of Leven which are more suited to a development of this nature.
Page 6
Residential amenity • Nearby residents would be adversely affected by noise disturbance. • There are potential health side effects from living beside a wind turbine, including from vibration, shadow flicker and ice throw. • The area is a residential area and is too close to residents/houses. • Scottish Government guidelines state that wind turbines should be no closer than 2km away from residential properties. Environmental matters • Air pollution may result from the development, particularly during construction. • The development would adversely impact upon wildlife, trees, and hedgerows. Procedural concerns • The applicant has not attended the resident’s association meetings to discuss their plans. • The applicant has not met his legal obligation to the residents to provide compensation for previous work. • There is no stated business aim and no community benefit. • There is no stated life of the turbine and no bond for restoration on decommissioning. Other matters • What is the energy to be used for? • The applicant intends to produce bio fuel which is not on the application. • No connection to the grid has been indicated. • The turbine name no longer seems to be in production. • Property prices will be affected. • Approval would set a precedent and open the area to further large scale turbines. • West Dunbartonshire Council’s Open Space Strategy 2011 states that planning authorities are expected to support, protect and enhance open space and opportunities for sport & recreation. 5.2 The matters of concern raised above are addressed in Sections 6 and 7 below. 6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN National Planning Policy 4 6.1 Policy 1 relates to tackling the climate and nature crises and states that when considering all development proposals significant weight will be given to the global climate and nature crises.
Page 7
Policy 2 also relates to the climate in the form of climate mitigation and adaptation and states development proposals will be sited and designed to minimise lifecycle greenhouse gas emissions as far as possible and development proposals will be sited and designed to adapt to current and future risks from climate change. 6.2 Policy 3 states that development proposals will contribute to the enhancement of biodiversity and should integrate nature-based solutions where possible. Proposals for local development will include appropriate measures to conserve, restore and enhance biodiversity, in accordance with national and local guidance. Policy 4 requires that development proposals do not have an unacceptable impact on the natural environment inclusive of environmental designations and protected species. Policy 5 states that development proposals will only be supported if they are designed and constructed in accordance with the mitigation hierarchy by first avoiding and then minimising the amount of disturbance to soils on undeveloped land and in a manner that protects soil from damage including from compaction and erosion that minimises soil sealing. 6.3 Where there is potential for non-designated buried archaeological remains to exist below a site, developers will provide an evaluation of the archaeological resource at an early stage so that planning authorities can assess impacts in accordance with Policy 7. 6.4 Policy 8 supports development within the green belt in a limited number of circumstances. These include: • development associated with agriculture, woodland creation, forestry and existing woodland (including community woodlands); • horticulture, including market gardening and directly connected retailing, as well as community growing; • essential infrastructure or new cemetery provision; • minerals operations and renewable energy developments; • intensification of established uses, including extensions to an existing building where that is ancillary to the main use. Additional requirements include justification is provided for the green belt location; the purpose of the green belt is not undermined by the development; the development is compatible with the surrounding countryside and landscape character; the development is of an appropriate scale, massing and external appearance and minimises visual impact; and there will be no long-term impacts on the environmental quality of the green belt.
Page 8
6.5 Policy 11 supports proposals for all forms of renewable, low-carbon and zero emissions technologies. Policy 11 also states that development proposals will only be supported where they maximise net economic impact, including local and community socio-economic benefits such as employment, associated business and supply chain opportunities. The policy also lists impacts which must be addressed including residential amenity, visual impact, noise and shadow flicker, impacts on road traffic and on adjacent trunk roads, including during construction; and the quality of site restoration plans including the measures in place to safeguard or guarantee availability of finances to effectively implement those plans. 6.6 Development proposals will be designed to improve the quality of an area whether in urban or rural locations and regardless of scale as per Policy 14. Policy 20 states that development proposals that result in fragmentation or net loss of existing blue and green infrastructure will only be supported where it can be demonstrated that the proposal would not result in or exacerbate a deficit in blue or green infrastructure provision, and the overall integrity of the network will be maintained. The planning authority’s Open Space Strategy should inform this. Green infrastructure is defined as features or spaces within the natural and built environments that provide a range of ecosystem services. An ecosystem services is the benefits people obtain from ecosystems. 6.7 Policy 23 relates to health and safety and states that development proposals that are likely to raise unacceptable noise issues will not be supported. A Noise Impact Assessment may be required where the nature of the proposal or its location suggests that significant effects are likely. 6.8 The matters relevant to the assessment against the above policies are addressed in detail in Section 7 below. Based on that assessment, it is concluded that the proposal is in accordance with NPF4. West Dunbartonshire Adopted Local Plan 2010 6.9 The site of the proposed turbine is identified as Green Belt. Policy GB1 indicates a general presumption against development within the Green Belt, other than in certain circumstances, including where there is a specific locational requirement and established need for the development and it cannot be accommodated on an alternative site. Development in the Green Belt will not be permitted if it would have an adverse effect on the landscape character of the area. 6.10 All development is expected to be of a high quality of design and to respect the character and amenity of the area in which it is located in accordance with policy GD1.
Page 9
6.11 Policy E5 relates to development affecting trees. There are trees on site which line the proposed access route. In accordance with policy E5 new development proposed on sites with, or adjacent to, existing trees will be assessed in accordance with best practice. Policy BE5 states that where the presence of archaeology becomes apparent once development has commenced, adequate opportunity must be afforded by the developer for an archaeological investigation. 6.12 The development takes access via a designated core path and as such policy R5 applies. Policy R5 states that the Council will undertake to protect Core Paths using the Council’s statutory powers. 6.13 Policy DC6 states that renewable energy proposals will be permitted where these would not give rise to unacceptable detriment to the landscape, natural or build heritage, sport or recreation interests or local amenity. Development proposals are to be considered against the following criteria: • visual impact and effect on landscape character, including the landscape character of the Kilpatrick Hills RSA; • nature conservation interests; • historic environment and its setting, including scheduled ancient monuments; • local amenity, including noise, traffic and broadcast interference; • any cumulative impacts. 6.14 Policy DC3 states that within the Glasgow Airport Safeguarding Zone, development which adversely affects the operational integrity or safety of the airport will not normally be permitted. 6.15 Policy GN1 seeks to promote, protect and improve the Green Network. It states that development which is detrimental to the green network will be considered contrary to the Plan, and that new development should contribute positively to the protection and improvement of the green network. The Kilpatrick Hills are recognised as an important green network resource in West Dunbartonshire owing to their landscape value, the habitats and species found there and the outdoor recreation opportunities they offer. Policy SUS1 states that all development should seek to conserve and enhance environmental resources and ensure environmental impact is minimised. 6.16 Policy E3A states that the Council will seek to maintain and enhance the environmental resources of the Plan area by protection of habitats, species and natural features which are vulnerable and/or specifically protected, including Local Nature Conservation Sites. It also states that proposals should not have an adverse effect on the integrity or character
Page 10
of Local Nature Conservation Sites and that satisfactory arrangement for habitat creation/site enhancement elsewhere should be made to compensate where development would cause the total or partial loss of a Local Nature Conservation Site. The application is in close proximity to Murroch Burn but is located outwith the Local Nature Conservation Site. 6.17 The matters relevant to the assessment against the above policies are addressed in detail in Section 7 below. It is concluded that the proposal is in accordance with the Local Plan. 7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS West Dunbartonshire Local Development Plan (LDP2) Proposed Plan 7.1 On 15 March 2023, the Planning Committee took a decision that the Council would not adopt Local Development Plan 2. The Proposed Local Development Plan 2 (LDP2), incorporating the recommended modifications of the Examination Report received on 22 April 2020, which were accepted by the Planning Committee of 19 August 2020, remains the Council’s most up to date spatial strategy and is therefore afforded significant weight in the assessment and determination of planning applications, subject to compatibility with NPF4. The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18 December 2020, is also a material consideration. 7.2 The proposed turbine does not trigger Policy RE2: Spatial Framework for Wind Energy, and therefore requires to be assessed against Policy RE3, which is supportive of wind energy proposals where it can be demonstrated that there will be no unacceptable significant adverse impacts on the local area and the wider landscape and where they avoid unacceptable landscape, visual, aviation, infrastructure, cumulative and residential impacts and unacceptable impacts on the built and natural environment and do not have an adverse effect on a Natura 2000 site. 7.3 Policy GB1 restricts development in the green belt to a limited number of circumstances. These include development associated with agriculture, horticulture and forestry, rural economic development and infrastructure with a specific locational need. 7.4 Any development proposed within the Kilpatrick Hills Local Landscape Area must; protect and enhance the landscape character; protect and enhance the integrated network of habitats and important geological features; and protect and enhance the Hills as an accessible recreation resource in accordance with policy KH1.
Page 11
7.5 Policy H4 of the LDP2 relates to residential amenity. The policy states that the Council will protect, preserve and enhance the residential character and amenity of existing residential areas at all times In this regard, there will be a general presumption against the establishment of non-residential uses within, or in close proximity to, residential areas which potentially have detrimental effects on local amenity or which cause unacceptable disturbance to local residents. 7.6 Policy ENV2 relates to landscape character. Development proposals should be sited and designed to relate to the local landscape character of the area and ensure that the integrity of this landscape character is maintained and, where appropriate, enhanced. Policy ENV4 relates to forestry, trees and woodland. The loss or fragmentation of long established woodland, high conservation value or areas covered by tree preservation orders will only be supported where any significant adverse effects are clearly outweighed by significant social or economic benefits. Policy ENV8 relates to air, light and noise pollution. All new development must ensure that significant adverse noise impacts on surrounding properties and uses are avoided. 7.7 Policy CON3 is not supportive of development which disrupts or adversely impacts on any existing or potential core path, right of way, bridle path, or footpath, including off-path access rights, used by the general public for recreational or other purposes. 7.8 Policy BE1 states that unscheduled archaeological sites should be preserved insitu where possible. Where not possible, provision should be made by the developer to undertake the excavation, recording analysis, publication and archiving of the archaeological remains. Development that would adversely impact on the operations of Glasgow Airport or would be adversely affected by aircraft noise will not be permitted in accordance with Policy E7. 7.9 Policy CP1 requires new development to take a design led approach to creating sustainable places which puts the needs of people first and demonstrate the six qualities of successful places. Policy CP2 requires all development to demonstrate that green infrastructure has been integrated into the design approach from the outset. 7.10 The matters relevant to the assessment against the above policies are addressed in detail below. It is concluded that the proposal is in accordance with proposed Local Development Plan 2. Kilpatrick Hills Local Landscape Area – Statement of Importance 7.11 This Statement of Importance explains the reasons why the Kilpatrick Hills have been selected for the designation. The special qualities of the Kilpatrick Hills are identified as being:
Page 12
• Strong sense of remoteness, wildness and open horizons; • Distinctive geomorphology and topographical features; and • A unique diversity of views. The impact of the proposed development on these special landscape qualities of the Kilpatrick Hills is assessed below, and it is concluded that the proposal would not significantly detract from the special qualities of the Local Landscape Area. Renewable Energy Local Development Plan (Proposed Plan) Planning Guidance November 2016 7.12 Whilst written in the context of proposed Local Development Plan 1 together with Scottish Planning Policy (SPP), both of which no longer form a material consideration in the assessment of planning applications, much of the general advice and guidance set out remains relevant in assessing wind energy proposals. This document provides guidance on planning for wind energy including a Spatial Framework and guidance on the factors that will be considered in assessing wind energy proposals. The spatial framework applies to “wind farms” which are defined by the Council as: • Any development containing a turbine of 50m and above to tip height; or • Any development of 3 or more turbines, containing a turbine of 30m above to tip height. As this turbine is a single turbine and 43m to blade tip it falls under the threshold for assessment under the spatial framework. 7.13 It remains, however, that the document provides guidance on the assessment of all proposals for wind energy. This includes considering matters pertaining to landscape character, forestry and woodland, the water environment, the path network, built heritage, aviation, residential amenity in respect of noise, shadow flicker and visual intrusion, economic benefit, contribution towards renewable energy targets, effect on soils, impact on the road network and decommissioning. These matters are fully assessed in detail below where it is concluded that, in taking into account all material planning considerations, the wind turbine proposal is acceptable. 7.14 The guidance also highlights the expectation for all wind energy applications to provide a community benefit. In this case, the proposed turbine is indicated to have generating capacity of 250kw so any financial amount will be small.
Page 13
However, the guidance does not have a minimum threshold and therefore this is aspect is applicable and a financial contribution would be required if the proposal is approved. Overall, it is considered that the proposal presents no conflict with the aims of the guidance. Site Selection and Design 7.15 The application site was selected by the applicant as it was established to benefit from an above average windspeed. Further operational advantages include its proximity to a grid connection point and the proximity off the A82 being relatively short without requiring extensive works impacting the local road network. In terms of impacts on the surrounding area, although the nearest settlement to the site (Bonhill) is located only 440m away, the site is well screened from it by high ground and trees. The 440m distance from residential properties is noted in multiple objections as being too close due to Scottish Government Guidance. However the guidance which notes 2km as being the separation distance relates to wind farms and is also contained within Scottish Planning Policy, which has been superseded by National Planning Framework 4. 7.16 The wind turbine is located in the green belt and requires to be justified against Policy 8 of NPF4 and GB1 of both the adopted Plan and Proposed Plan. Essential infrastructure is acceptable within the green belt with reference to the above policies. Essential infrastructure includes all forms of renewable energy generation. Therefore the wind turbine itself together with the associated access, crane pad and sub-station would in principle be acceptable. The design and height of the turbine would follow current wind energy industry practice, and the turbine would be of the type widely used elsewhere. The location of the proposed turbine has also been selected in order to minimise its prominence. Due to the height of the turbine, some views from sensitive locations such as the Loch Lomond and the Trossachs National Park and Kilpatrick Hills are unavoidable but not significant enough to be unacceptable. It is acknowledged that an effort has been made by the applicant to minimise the impact of the development on the landscape. Impact on Landscape Character 7.17 The proposed turbine would be located on the edge of the Kilpatrick Hills which are designated as “Rugged Moorland Hill” Landscape Character Type (LCT). The actual application site is on the boundary of the urban area and the Rugged Moorland Hill LCT of the Kilpatrick Hills. The Kilpatrick Hills have a distinctive upland character created by the combination of elevation, exposure, rugged landform, moorland vegetation and the predominant lack of modern development.
Page 14
These areas share a sense of apparent naturalness and remoteness which contrasts strongly with the farmed and developed lowland areas. The general aim should be to conserve the upland character of the Rugged Moorland Hills and where possible, the visual influence of existing developments should be reduced. New developments which would introduce modern elements or which would undermine the sense of `wildness' and remoteness should be resisted even though it is accepted that these areas already contain tall structures such as pylons and communications masts. Although this landscape can provide an essential location for this type of infrastructure, the erection of certain structures can lead to disproportionate levels of landscape impact, affecting the remote character of the moorland hills. Additional masts and other tall structures should be discouraged within the hills, with particular concerns relating to wind development. It is therefore vital that developments which could have a significant and adverse effect on the landscape character are resisted. 7.18 In general, there is limited capacity to accommodate wind turbines within or adjacent to the Rugged Moorland Hill LCT of the Kilpatrick Hills, particularly in areas which are identified as Green Belt and which form part of the landscape and recreational setting for the settlements which they surround. In this instance however, the sloping ground and established tree coverage would help to screen the site from surrounding areas. This tree cover would also limit the visibility of the proposed access track. The proposed turbine would be viewed from certain positions in the context of an urban area, backclothed by the hills and woodland and importantly, it would not impact upon the skyline or detract from the remoteness of the Kilpatrick Hills. On this basis, it is considered that the wind turbine would not have a significant impact on the landscape quality or the character of the Kilpatrick Hills and surrounding area. This is a similar opinion taken when 2014 previous application was assessed and approved. Designated Landscapes 7.19 Regional Scenic Areas/Local Landscape Areas are landscapes which have been designated as of local importance by the relevant local planning authority. Such designations seek to preserve a high quality landscape and its natural character. The Regional Scenic Area/Local Landscape Area most affected by this proposal is the Kilpatrick Hills Regional Scenic Area/Local Landscape Area, which covers the area of the Kilpatrick Hills located within the West Dunbartonshire Council area. The wind turbine would be located in close proximity to the Kilpatrick Hills Regional Scenic Area but within the more recently designated Local Landscape Area. Whilst the site is readily visible from a wide area within the Regional Scenic Area/Local Landscape Area the turbine would be close to the urban edge where it would be seen against the backdrop of other man-made development.
Page 15
When viewed from outwith the Regional Scenic Area/Local Landscape Area it would normally be seen against a backdrop of rising land and it would not break the skyline. Although it would introduce a large man- made structure into the environment, the turbine would not be visually dominant or would detract from the sense of remoteness and wildness provided by the Kilpatrick Hills. The overall impact upon the Regional Scenic Area/Local Landscape Area is therefore considered to be acceptable. The turbine would be 4km from the southern boundary of Loch Lomond and Trossachs National Park. Whilst it would be visible from some places within the National Park, it would be seen in the context of an urban area, backclothed by the hills and woodland and would not impact on the skyline of the Kilpatrick Hills which forms part of the setting of the National Park. This was previously confirmed as part of the response to the last planning application by the Loch Lomond and Trossachs National Park Planning Authority in their consultation response. Since then, nothing significant has changed in terms of changes to the landscape character to arrive at a different opinion. There is also no change in the proposed access track and this, together with the other infrastructure proposed raises no concerns. Visual Impact 7.20 The information accompanying the application demonstrates that the wind turbine would not be visible from most of the closest built up area (Bonhill) because of the intervening high ground, but that it would be visible from much of Dumbarton and from areas further afield such as Port Glasgow, at distances of up to 10km. However, when viewed from distance, it would be difficult to differentiate the turbine from the overall urban context due to the proximity of the turbine to the built up area of Bonhill. Consequently, the visual impact would be less significant from greater distance. Outwith settlements, the wind turbine would be visible from much of the western shore of Loch Lomond, the River Clyde and areas within the Kilpatrick Hills. However, due to the distances involved and the size of the turbine, it will not have a significant impact on the landscape from distance and therefore will have an acceptable visual impact. 7.21 The applicant has provided photomontages and wireframe drawings for each of 20 previously agreed viewpoints, in accordance with the national methodology for such visual modeling exercises. These photomontages provide a representation of how the turbine might typically appear in clear weather from representative and sensitive locations, although obviously the appearance would vary according to weather conditions. The majority of the viewpoints demonstrate that the turbine would not be visible or that it would be seen at sufficient distance to have little impact on the landscape. From the viewpoints at Auchiewannie Wood and Cardross Road, the turbine would be visible to the rear/side of the settlement of Bonhill.
Page 16
Further viewpoints at Auchenreoch Muir and the core path at Highdykes Farm show the turbine appearing more dominant in views looking south/south west. It is accepted that turbine development cannot take place on this site without being visible from a large area, however the size of turbine proposed is suitable for the location and will minimise any visual impacts beyond 5km and the proposal is therefore acceptable. 7.22 The landform behind the turbine provides a backdrop setting which would ensure that from most viewpoints, the turbine would not breach the skyline of the Kilpatrick Hills. Although the turbine is a total height of 43 m, the location, size and setting of the turbine are such that it will not have a detrimental visual impact on the Kilpatrick Hills regional scenic area or significantly alter the local landscape. It is further considered, the access track would not result in an adverse visual impact within the landscape. Residential Amenity 7.23 The proposed turbine would be located 440m from the edge of Bonhill, but its impact would be minimal as between the proposed turbine and the settlement is an area of plantation woodland and a further area of woodland adjacent to the houses. This would provide adequate separation in terms of both amenity and visual impact, ensuring that the turbine would be adequately screened from the nearest residential properties. Whilst the wind turbine may be visible from some urban areas further from the site, such as Dumbarton and parts of Alexandria, it would be sufficiently distant to avoid being visually dominant and therefore it would have an acceptable impact. The proposed access track takes access from an existing track which serves Highdykes Farm. It is visually separated from the nearest residential neighbours by trees. As part of the operation of the turbine there are minimal traffic movements proposed. As such the proposed access road will not have an unacceptable impact to residential amenity. Shadow Flicker 7.24 Shadow flicker is the flickering effect caused when rotating wind turbine blade periodically cast shadows through constrained openings such as the windows of neighboring properties. The distance at which shadow flicker is created is accepted to be 10 times the rotor diameter. In this case the rotor diameter is 26m and as such the distance would be 260m. The closest property to the proposed wind turbine is 65B Broomhill Crescent, notes at 447m away from the proposed turbine. The application also gives scope for a 25m buffer for micro siting. This could mean the turbine could be 422m away from 65B Broomhill Crescent, however this is still outwith the 260m distance at which shadow flicker could be created.
Page 17
The Council’s Environmental Health Service have raised no objection in this regard, although they nonetheless recommend a condition for any granting of permission, requiring the site operator to investigate any complaints and instigate appropriate mitigation measures in the event of shadow flicker occurring. Noise & Air Quality 7.25 Turbines produce two distinct types of noise – the mechanical noise produced by the machine and the aerodynamic noise produced by the passage of the blades through the air. The “Assessment and Rating of Noise from Wind Farms” (Final Report, Sept 1996, DTI), (ETSU-R-97) provides a UK framework for the measurement of wind turbine noise, including indicative noise levels deemed to be appropriate. Subsequent UK government reports have concluded that there is no evidence of health affects arising from infrasound or low frequency noise generated by turbines. 7.26 The supporting information predicts that the operation of the wind turbine is capable of meeting ETSU-R-97 standards at the nearest properties, the closest of which is 440m from the proposed turbine location. Hours of work could be limited by condition to avoid disturbance during the construction phase to nearby residential properties. The Council’s Environmental Health Service has no objection to the proposal on noise grounds subject to appropriate conditions. No issues have been raised in terms of air quality. Road Traffic Impact 7.27 As part of the proposal, an access track is proposed which joins the existing farm track leading from Broomhill Crescent at the point before the entrance to Highdykes Farm. As noted above, the construction of this track has already commenced. The applicant has stated that this was done as the access track was existing and was being upgraded. The Traffic Management Plan submitted as part of the application states that where practicable, material for the access track and hard standings will be recycled material that is available on-site. Any additional material that is required shall be sourced from a local quarry. As part of the “proposed” access track already constructed on site, it is clear that recycled materials have not been used. Deliveries have occurred from local quarries, however, there appears to have been no co-ordination of or a structured approach to deliveries which the objections highlight has caused congestion on the residential roads with large delivery vehicles being unable to pass on both the residential roads and the farm track. If the application is approved, a robust condition regarding a delivery management strategy for materials delivered on site would be required to ensure that the further importation of material would be carefully managed and to minimise the disruption to adjacent residential properties.
Page 18
The Council’s Roads Service have no objections to the proposal subject to the implementation of the Traffic Management Plan. Comments raised in objections regarding continuous traffic from a wood mill/sawmill/bio fuel facility cannot be considered at this time due to the application not including such details. The wind turbine and its construction is not considered to be a large traffic generating use. Whilst concerns are raised in respect of potential to damage to road surfaces, any damage that did occur would be a matter to be addressed in conjunction with the Council’s Roads Service. 7.28 Once operational a wind turbine would generate negligible traffic, but the size of the turbine components is such that delivery of the turbine to the site can cause disruption due to oversized loads. Deliveries would be from the south, off the A82, onto Stirling Road (A813) heading northbound and then towards the Nobleston roundabout. From there any deliveries would traverse onto residential roads to the south of the Bonhill area via Beechwood Drive, Murroch Crescent and Broomhill Crescent before moving onto the access track and onto the “proposed” access into the site. The Traffic Management Plan states that from point 6 Redburn/Beechwood Drive measures would be required in order to facilitate the deliveries of the wind turbine. For the duration of the journey a support vehicle is recommended. At point 6, the open verges would need to be used and a banksman and support vehicle. The same applies for point 7 Beechwood Drive / Murroch Crescent. Once the turbine delivery would reach point 8 Murroch Crescent/Broomhill Crescent the previous measures as well as the clearing of parked cars is recommended. At point 10, the alignment of the track is noted to be a “concern”. It is indicated that the track would be required to be widened to support load-bearing surface to the western edge. This track is not, however, included within the applicant’s ownership or within the red line boundary of the site. Accordingly, any works required to this track would be a civil matter between the parties involved and if the works are to an extent that planning permission is required, a separate application would require to be brought forward in this circumstance. Point 11 is from the “proposed” new access track which has been designed for the proposed use. Impact on recreation, open space and the core path network 7.29 The development will not result in the loss of open space that has been laid out with the purpose of providing amenity, an area of public access or an area for countryside recreation. There is also no impact on any areas of open space specifically identified on the Proposals Maps of the adopted local plan or proposed local development plan. Consequently, it is not considered that the proposal will adversely impact on open space or countryside recreation or the sustainable access to such.
Page 19
7.30 The existing access track to Highdykes Farm which will provide access to the application site is designated as a core path. Whilst this track will be used to access the site and for deliveries during construction, overall the impact on users of the core path will be minimal during construction and following completion it is not considered there will be any discernible impact. Cumulative Impacts 7.31 The proposal would be the first significant wind turbine to be located within the West Dunbartonshire area, so there would be no localised cumulative impacts. The proposed wind turbine is well separated from other wind turbine development in neighbouring Council areas. Natural Heritage – Designated Sites/Peat and Soils/Habitats/Protected Species/Ornithology 7.32 There are no site-specific statutory nature conservation designations within the site and it is not considered that the proposal would have any detrimental impact on any other designated sites. A Preliminary Ecological Assessment (PEA) was submitted in support of the application. The surveys included an extended Phase 1 habitat survey with protected species walkover survey, which considered not only habitats and species of plant present but also the potential presence of relevant European Protected Species (Bats and Otters, Badgers, Water Voles and breeding birds). It was concluded that in general, habitats and plant species were common and typical of former agricultural land that has been planted up with young deciduous woodland, with no notable species found. Habitats and plant species are therefore not considered ecological constraints for the proposed development. Bats, badgers, otters, water voles and breeding birds were also considered not to be an ecological constraint in the PEA. 7.33 The consultation response from the RSPB notes that the site visit for the PEA was carried out in mid-December 2022 (which is now outside the recommended dates for protected species surveys). The conclusion that there would be no impact on birds was based on a desktop study using only freely available data rather than survey visits – and so no actual survey work has taken place. The PEA states that if site preparation work is to be undertaken between March and September that the presence of breeding birds should be assessed by an ecologist prior to work commencing on site. As it is an offence to disturb any active bird nest, any granting of permission would require a condition relating to acceptable months for working or further survey work to establish that there are no breeding birds. The RSPB also note that the updated application mentions NPF4 policies and concludes there will be no material impact on biodiversity, including birds.
Page 20
Whilst the RSPB state that it is unclear how this can be assessed from the data provided, they raise no specific concerns regarding potential impact on any particular bird species, migratory routes, the general commuting and foraging of birds within the locality or a concern regarding bird collisions. No information is highlighted in respect of a need for specific avoidance or mitigation in respect of birds. 7.34 The Council’s Biodiversity Officer previously noted that no additional species protection plans or follow up surveys were identified in the PEA. The proposed mitigation includes following national guidelines and standards for any tree/hedgerow retention, that best working practice measures are adhered to safeguard otters and badgers, and a walkover survey prior to works commencing within bird breeding season. If any otter or badger-resting place is found then an ecologist will produce an otter protection plan. It can therefore be concluded that the proposal will not adversely impact upon protected species and it is appropriate that the pre- start surveys and any required protection plans identified at this stage are conditioned should the development proceed. Special Protection Area (SPA) connectivity is not mentioned as an issue in the PEA. Annex 1 of Nature Scot’s “Assessing the impact of small-scale wind energy proposals on the natural heritage” guidance document considers SPA’s within a 20km connectivity zone to be relevant. Therefore, both Inner Clyde SPA and Loch Lomond SPA should be considered. Greenland White - Fronted Goose is the relevant species to be considered and has a core foraging range of 5-8km. The Loch Lomond SPA is around 10km from the proposed development site and therefore falls out with requirement for further assessment. The Carbon and Peatland 2016 map shows the site area to not be within an area of peatland. Whilst acknowledging the points highlighted in the consultation response from the RSPB, having fully considered the impact upon ecology, and informed by the consultation response from the Council’s Biodiversity Officer, subject to condition, the impacts of the development upon designated sites, peat and soils, habitats, protected species and ornithology are all considered acceptable. Hydrological & Hydrogeological Impact 7.35 The Supporting Statement provided as part of the application states that the site has no watercourses within it, and it is not anticipated that the development would impact significantly upon any water course or local groundwater. During site visits, it was noted that the access road (being constructed without the benefit of planning permission) crossed a small drainage ditch and the road thus included a small section of pipe at this location. No concerns arise from this arrangement and no wider issues are considered to arise in this respect.
Page 21
Historic Environment Impacts 7.36 No historic buildings or monuments are located within the site. There are a number of monuments in the vicinity of the site, although there would be no direct impact on these from construction or operation of the wind turbine. In regard to archaeology, WoSAS have no objection however the implementation of an archaeological watching brief would be required prior to the commencement of any development on site. Renewable Energy Targets 7.37 Scotland’s long-term climate change targets will require the near-complete decarbonisation of the energy system by 2050, with renewable energy meeting a significant share of the need. The Scottish energy strategy sets a 2030 target for the equivalent of 50% of the energy for Scotland’s heat, transport and electricity consumption to be supplied by renewable sources. This approach is supported via NPF4’s just transition spatial principle that seeks to empower people to shape their places and ensure the transition to net zero is fair and inclusive. Economic Impact 7.38 The proposed development would have minimal impact on the potential use of the wider area for grazing or forestry whilst the construction of the wind turbine would provide some short-term employment during construction. In the longer term, once completed and operational, there would be a requirement for site maintenance, although it is acknowledged this would likely be minimal. It is not considered that the proposed wind turbine would have any impact on tourism within West Dunbartonshire or neighbouring areas. It is therefore considered that whilst any development of this nature will have a positive impact, the scale of the development would result in the long-term economic benefits being negligible. Community Benefit 7.39 The Council’s Renewable Energy Planning Guidance (2016) states that in line with Scottish Government guidance, the Council expects all wind energy applicants to provide a community benefit of a minimum £5,000 per MW of installed capacity. This would be payable annually and would increase relative to the Retail Price Index. The contribution is expected from all wind energy developments. As such it is recommended that should the application be granted, a legal agreement should be put in place to address the community benefit contribution. Aviation Safety 7.40 NATS and Glasgow Airport have no objections in terms of airport safeguarding.
Page 22
Decommissioning 7.41 Should permission be granted, there would be a requirement for decommissioning and site restoration. A legal agreement to ensure that a suitable financial bond is put in place to cover restoration liabilities for the site would be required. Site restoration would be triggered by either the expiry of any permission or if the project ceased to operate for a specific period of time. Matters raised in objections 7.42 A wide range of matters were raised in the objections received, many of which are already addressed as part of the main assessment set out above. Multiple objections question what the energy is to be used for and that no grid connection has been shown. A lack of grid connection, however, can be done via a separate consenting process where required. 7.43 The availability of the turbine type which has been applied for has been brought into question. However, the application notes that the final choice of the wind turbine will be dependent upon availability. Conditions associated to any granting of permission would ensure that the impact of any turbine would remain the same. 7.44 Alternative locations for the proposal have been suggested, however the applicant has stated that this is a good site for wind energy creation due to wind speeds and the application requires to be assessed on its own merits. It is contended that the applicant has indicated to residents that he intends to produce bio fuel. The application form and supporting documents do not indicate this and the Planning Authority can only assess the submitted proposal. Matters relating to traffic and the road have been assessed above. 7.45 Whilst there has been some removal or trees and hedgerows these are not protected and the extent of the removal undertaken is in any case limited. Matters raised in respect of the Council objective for Natural & Semi Natural Green Space and the impact on the green belt are assessed above. 7.46 One objector states that West Dunbartonshire Council’s Open Space Strategy 2011 states that planning authorities are expected to support, protect and enhance open space and opportunities for sport and recreation. As set out in the assessment above, the development proposal will not impact upon or result in the loss of open space that has been laid out with the purpose of providing amenity, an area of public access or an area for countryside recreation. 7.47 Any perceived impact upon property values is not a material planning consideration. Finally, the applicant non-attendance at the local residents meeting has been brought into question. As this is not a procedural requirement for the application, it is not a material planning consideration.
Page 23
8. CONCLUSION 8.1 The proposed wind turbine complies with both the adopted and proposed local plans as well as NPF4. The sloping landscape and urban character in the vicinity of the site mitigates against the visual impact of the turbine on the Kilpatrick Hills or the Loch Lomond and the Trossachs National Park and there would be no adverse cumulative impacts. The distance from the nearest residential property and intervening tree coverage is sufficient to ensure that there would be no unacceptable impact on residential properties. A legal agreement would ensure that a suitable financial bond is put in place to cover future restoration liabilities for the site and community benefit would also require to be addressed in a similar way. Previously planning permission was granted for the erection of a wind turbine of the same size, as well as the associated access track on this site in 2015, although the decision notice was never issued and the application subsequently withdrawn. 8.2 Planning application DC22/190/FUL was refused due to the concern regarding the proposed agricultural shed. By removing the proposed agricultural shed, this current proposal addresses the concerns raised in 2023 refusal. 8.3 Overall, the proposed development would allow the erection of a wind turbine which would be appropriately sited, have no unacceptable impacts and would contribute to renewable energy targets. 9. CONDITIONS 1. The planning permission for the wind turbine hereby granted shall be for a maximum period of 25 years and 6 months from the date of the permission. This period consists of a 25 year period of operation of the turbine followed by a 6 month period for removal of the turbine, ancillary equipment, associated hard standing and access track and restoration of the site to its former condition, or other such condition as agreed in writing as acceptable to the Planning Authority in accordance with the terms of Condition 6 below. 2. Unless otherwise agreed in writing by the Planning Authority, should the turbine cease to generate electricity for a continuous period of 6 months, the turbine, ancillary equipment, associated hard standing and access track shall be removed. Restoration of the site to its former condition, or other such condition as agreed in writing as acceptable to the Planning Authority in accordance with the terms of Condition 6 below, shall thereafter take place within 6 months.
Page 24
3. All external colours of the turbine and associated equipment cabinet shall be agreed with the Planning Authority prior to the commencement of works and shall be implemented as approved. 4. No turbine, transformer building or any other above ground infrastructure shall be illuminated or display any name, logo, sign or advertisement (other than health and safety signage) unless and until otherwise approved in writing by the Planning Authority. 5. Within one year of the date of this consent, the turbine operator shall submit an Outline Decommissioning, Restoration and Aftercare Scheme (the Outline Decommissioning Scheme) for the Turbine development, for the written approval of Planning Authority. The Outline Decommissioning Scheme shall include (but not necessarily be limited to) details of: a) Works for the decommissioning and removal of the turbine (together with the foundations to a depth of at least one meter) and all above ground ancillary infrastructure and equipment; b) The treatment of any ground surfaces including access tracks, hard- standing areas and any sub-surface elements including cabling to restore the site to its former condition, or other such condition as is agreed in writing by the Planning Authority; c) Environmental management provisions, including waste management; d) A decommissioning timetable; e) Appropriate aftercare following site restoration; and f) How and when the Outline Decommissioning Scheme will be reviewed during the operational life of the development. The approved Outline Decommissioning Scheme shall be implemented as approved, unless otherwise agreed in writing by the Planning Authority. 6. No later than 12 months prior to the decommissioning of the development, or the expiration of the 25 year period of operation (whichever is earlier), a detailed Decommissioning, Restoration and Aftercare Scheme, which takes account of the latest version of the Outline Decommissioning Scheme (approved under Condition 5) and which also takes into account of the current best environmental practice, shall be submitted to and approved in writing by the Planning Authority. The development shall be decommission, the site restored and aftercare thereafter in accordance with the scheme approved as part of this condition, unless otherwise agreed in writing in advance by the Planning Authority. 7. Unless otherwise agreed in writing by the Planning Authority, if the wind turbine fails to generate electricity for a continuous period of 12 months,
Page 25
the turbine shall be deemed to have ceased to be required, and a scheme that takes cognizance of Condition 6, setting out how the wind turbine and associated infrastructure will be removed from the site, the ground restored and aftercare carried out, shall be submitted for the written approval of the Planning Authority no later than one month after the date of the expiry of the 6 months. The scheme approved shall be implemented within 12 months of the date of its approval. 8. In order to ensure compliance with Condition 7, the wind turbine operator shall submit 12 monthly generation and output figures to the Planning Authority to evidence that the turbine is continuing to generate electricity and the 12 monthly reporting cycle shall commence from the date the turbine is commissioned (turned on). 9. Notwithstanding the approved plans, all recommendations within the Preliminary Ecological Appraisal dated December 2022 shall be followed to the satisfaction of the Planning Authority. 10. That prior to works commencing on site a traffic management plan indicating the proposals for the construction and delivery of the turbine and all associated construction material shall be submitted to the Planning Authority for their written approval, and shall thereafter be implemented as approved. The statement shall include the following information: a) The intended turbine transportation route including swept path analysis, timings and methodology. b) All temporary works including relocation of signs, guardrails, bollards, street furniture and all temporary measures. c) Any alteration to the public road network. d) Details of the construction compound including staff car parking. e) Details of proposed signage during the delivery and construction period. f) Any necessary mitigation. g) Details of the type, weight, frequency and number of delivery and construction vehicles inclusive of those delivering all associated construction materials, for example, hardcore and associated tonnage. h) Details of wheel washing facilities. i) A condition report based on a joint survey of the proposed route to ensure that all temporary alterations and any damage to the road network are made good. 11. No development shall take place within the development site until the developer has secured the implementation of an archaeological watching
Page 26
brief, to be carried out by an archaeological organisation acceptable to the Planning Authority, during all ground disturbance. The retained archaeological organisation shall be afforded access at all reasonable times and allowed to record, recover and report items or interest and finds. A method statement for the watching brief shall be submitted by the applicant and agreed in writing with the Planning Authority in consultation with the West of Scotland Archology Service prior to the commencement of the watching brief. The name of the archaeological organisation retained by the developer shall be given the Planning Authority in writing prior to any works on site. 12. Prior to the commencement of development full details of the surface water drainage system shall be submitted for the written approval of the Planning Authority and shall be implemented as approved prior to the occupation of the building. The drainage system shall incorporate the principles of Sustainable Drainage Systems within its design, and shall thereafter be implemented as approved. 13. In accordance with ETSU- R- 97 (Simplified Method) the noise from the wind turbine shall not exceed an LA90(10min) of 35dB at the boundary of the curtilage of any noise sensitive premises at all times at wind speeds of up to 10 metres per second at 10m height as measured within the site. 14. Prior to the installation of the turbine, the developer shall submit a report for approval by the Planning Authority which demonstrates compliance with the noise limits in Condition 13 above. The report shall be prepared in accordance with reference to the Institute of Acoustics Good Practice Guide to the Application of ETSU-R-97 and associated supplementary guidance notes. 15. Prior to the installation of the turbine, the applicant shall provide written confirmation to the Planning Authority that the noise from turbine operation will be broad-band with no discernible tonal characteristics. 16. Within 14 days from the receipt of a written request from the Planning Authority or following a complaint to the Planning Authority from the occupant of a dwelling regarding noise from the wind turbine operation, the wind turbine operator shall, at the wind turbine operator’s expense, employ an independent consultant approved by the Planning Authority to assess the level of noise emissions from the wind turbine at the complainant’s property following procedures to be agreed with the Planning Authority. The wind turbine operator shall provide to the Planning Authority the independent consultant’s assessment and conclusions regarding the said noise complaint, including all calculations, audio recordings and the raw data upon which those assessments and
Page 27
conclusions are based. Such information shall be provided within 28 days of the date of the written request of the Planning Authority unless otherwise extended in writing by the Planning Authority. The wind turbine operator shall take such remedial action as required by the Planning Authority. 17. Wind speed, wind direction and power generation data shall be continuously logged and provided to the Planning Authority in a format to be agreed at its request and within 28 days of such a request. Such data shall be retained by the operator for a period of not less than 12 months. 18. No development shall commence on site until details of a nominated person have been submitted in writing to the Planning Authority for the development who will act as a point of contact for local residents (in connection with conditions 13 - 17), together with the arrangements for notifying and approving any subsequent change in the nominated representative. The nominated representative shall have responsibility for liaison with the Planning Authority in connection with any noise complaints made during the construction, operation and decommissioning of the wind turbines. 19. During the period of construction, all works and ancillary operations (including piling) which are audible at the site boundary (or at such other place(s) as may first be agreed in writing with the Planning Authority), shall be carried out between the following hours unless otherwise approved in writing by the Planning Authority: Mondays to Fridays: 0800-1800 Saturday: 0800-1300 Sundays and public holidays: No working 20. During the period of construction no delivery or removal of material from the site shall take place outwith the hours of 8am to 6pm Mondays to Fridays and 8am to 1pm on Saturdays, and not at all on Sundays or Public Holidays unless otherwise approved in writing by the Planning Authority. 21. The applicant shall ensure that all works carried out on site are carried out in accordance with the current BS5228, 'Noise control on construction and open sites'. No further development shall commence on site until such time as a noise control method statement for the construction period has been submitted to and approved in writing by the Planning Authority. This statement shall identify likely sources of noise (including specific noisy operations and items of plant/machinery), the anticipated duration of any particularly noisy phases of the construction works, and details of the proposed means of limiting the impact of these noise sources upon nearby residential properties and other noise-sensitive properties. The
Page 28
construction works shall thereafter be carried out in accordance with the approved method statement unless otherwise approved in writing by the Planning Authority. 22. Before any further plant and machinery is used on the premises it shall be enclosed with sound insulating material in accordance with a scheme which shall first be approved in writing by the Planning Authority. The sound insulation measures shall thereafter be retained. 23. Within 14 days from the receipt of a written request from the Planning Authority or following a complaint to the Planning Authority following a complaint alleging shadow flicker nuisance, the wind turbine operator shall at the wind turbine operator’s expense: a) Employ an independent consultant approved by the Planning Authority to assess the conditions likely to be causing the incidences of shadow flicker to which the complaint relates. b) Within 28 days of receipt of the written request from the Planning Authority, the wind turbine operator shall submit to the Planning Authority, the independent consultant’s report on shadow flicker, detailing any amendments to the operation of the wind turbine necessary to mitigate any further incidences of shadow flicker, for the written approval of the Planning Authority. The turbine shall thereafter operate in accordance with the amendments to operation as approved. 24. Notwithstanding the approved plans, and prior to any works on site, a further submission which demonstrates an understanding on how the proposal enhances biodiversity beyond the current baseline shall be submitted to and approved in writing by the Planning Authority. All measures shall then be implemented as approved.
Page 29
Pamela Clifford Planning, Building Standards and Environmental Health Manager Date: 14th February 2024 Person to Contact: Pamela Clifford, Planning & Building Standards Manager Email: Pamela.Clifford@west-dunbarton.gov.uk James McColl, Development Management Team Leader Email: James.McColl@west-dunbarton.gov.uk Appendix: Location Plan Background Papers: 1. Application forms and plans 2. Consultation responses 3. Representations 4. National Planning Framework 4 5. West Dunbartonshire Local Plan 2010 6. Proposed West Dunbartonshire Local Development Plan 2 2020, as amended 7. Kilpatrick Hills Local Landscape Area Statement of Importance 8. Renewable Energy Local Development Plan (Proposed Plan) Planning Guidance November 2016 Wards affected: Ward 3 (Dumbarton)