WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 14th February 2024
_____________________________________________________________
DC22/210/PPP: Erection of three dwellinghouses (in principle) at Old
Carman Water Works Site, Cardross Road, Renton by Mr
J McDougal
1. REASON FOR REPORT
1.1 The planning application proposal is a departure from the adopted
development plan. Under the terms of the approved Scheme of Delegation,
it therefore requires to be determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission in principle subject to the conditions set out in
Section 9.  
3. DEVELOPMENT DETAILS
3.1 The site comprises the former Carman waterworks site which is located on
Cardross Rd near Renton. To reach the site from Renton, it is necessary to
take an unclassified, mostly single track road which connects the B857 Main
Street in Renton with the A814 Main Rd in Cardross. The site is
approximately 0.4 mile from the junction with the B857 and is located on a
hairpin turn. Due to this, the site is triangular in shape and features a
noticeable change in elevation between its lower and its upper parts. To the
west of the site, on the other side of the road, is a forested area adjacent to
Carman Hill House and Carman Reservoir.  To the east, also across the
road, and to the north, there are agricultural areas typically used for grazing.
The site is partially overgrown and features disused water supply
infrastructure in the form of three tanks and possible further associated
underground facilities. There is boundary treatment present in the form of a
historic stone wall; access is from the western side of the site via an iron
gate. 
3.2 The application seeks planning permission in principle for the erection of
three dwellinghouses. The existing water supply infrastructure will be
removed from the site to facilitate development. An indicative layout with
three detached dwellinghouses, two of which would face west with the third
facing east. Off street parking would be provided within driveway parking.
ITEM 6a

Page 2

As the application is considered in principle, any design and layout details
of the site and proposed houses provided in the submitted drawings are
indicative and would be submitted at the detailed stage. 
3.3 Improvements are proposed to the road surrounding the eastern and the
southern perimeter of the site as part of this application.  The existing hairpin
corner at the southernmost tip of the site would be altered, widened and
improved with asphalt finish to an adoptable standard. As a result, the
sightlines of the sharp corner and the dimensions of the carriageway would
be improved. The submission also indicates that the ownership of the corner
of the site where the widened carriageway and road verge would be
provided  
3.4 In terms of planning history, the site was previously subject to a permission
(DC02-332) for the formation of specialist market garden, including erection
of two growing buildings and erection of dwellinghouse. Permission was
later approved (DC10/025/FUL) for variation of condition 1 of permission
DC02-332 to extend the time period for the commencement of development
of market garden and dwellinghouse. Both of the applications have since
lapsed and no development of the site has taken place. 
4. CONSULTATIONS 
4.1 West Dunbartonshire Council Biodiversity Officer has no objection subject
to conditions relating to all recommendations within the Preliminary
Ecological Appraisal being followed, including the protection for nesting
birds. Furthermore, conditions to address biodiversity enhancement and
Black Grouse mitigation are required. 
4.2 West Dunbartonshire Council Environmental Health have no objection
subject to conditions relating to construction noise, contaminated land,
importation and reuse of soils, lighting, Noise Impact Assessment, as well
as noise control, hours of work, piling method statement, waste storage and
dust control during construction.  
4.3 West Dunbartonshire Council Roads have no objection to the proposal in
respect of roads and parking together with flooding matters. 
4.4 Scottish Water and West of Scotland Archaeological Service have no
objection to the proposed development. .

Page 3

5. REPRESENTATIONS 
5.1 One objection was received from a neighbouring resident. The full details
are contained within the planning file and are available for public viewing.
However, the key points of objection can be summarised as follows: 
• Neighbour notification was not issued to neighbouring property. 
• The site is within the Green Belt. 
• More than one house on site would be out of step with how other sites
within the Green Belt were redeveloped. 
• The site is in close proximity to a Local Nature Conservation Site and
may impact upon this designation, other locally sensitive areas and local
wildlife. 
• The development may result in more people seeking to gain access to
the area. 
• Road realignment may encourage unsuitably sized vehicles to attempt
to use the road, resulting in accidents. 
• Road safety concerns in relation to Cardross Road, which is narrow,
steep and used by notable levels of vehicle traffic, walkers and cyclists,
heavy goods vehicles. 
• There is a history of road accidents in winter conditions and speeding in
all conditions. 
• Access to the site may potentially be affected in the winter during
icy/snowy conditions. 
• Concern over insufficient turning space in the proposed western plots
within the site, as shown in the proposed site drawing.
• Noise from traffic may disturb neighbouring properties.
• Inaccurate site boundary in the submitted drawings.
• Access and servicing and neighbouring property may be impacted upon.
• Concerns regarding sightlines for the new access to the proposed
development.
• Concern regarding the height and finish of the boundary treatment for
the site in relation to sightlines for vehicles exiting the site and privacy of
the future inhabitants.
• No information is provided on bin storage and refuse collection. 
• Concern over the impact of refuse collection method on the amenity of
the site and its surroundings.
• Insufficient parking indicated in the drawings.
• Scale and design of the proposed dwellinghouses and utilisation of the
footprint of the site and its topography.
• The scale and design of the new houses is inappropriate and
overdevelopment would occur.
• It is incorrect to suggest flooding does not occur at this location. 
• The position of neighbouring properties is not shown in the application
submission.

Page 4

• The construction of the development may impact upon access on
Cardross Road and to neighbouring property. 
• The site could be confused with another site of a similar name. 
• It has been difficult to view the application online. 
The concerns raised are considered in Section 7 below. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Framework 4
6.1 Policy 1 relates to tackling the climate and nature crises and states that
when considering all development proposals significant weight will be given
to the global climate and nature crises. Policy 2 also relates to the climate
in the form of climate mitigation and adaptation and states development
proposals will be sited and designed to minimise lifecycle greenhouse gas
emissions as far as possible and development proposals will be sited and
designed to adapt to current and future risks from climate change. 
6.2 Policy 3 seeks to protect biodiversity and deliver positive effects from
development. It requires that local development will include appropriate
measures to conserve, restore and enhance biodiversity. It is noted that
measures should be proportionate to the nature and scale of development. 
6.3 Policy 6 aims to protect and expand forests, woodland and trees. It advises
that proposals will not be supported where they result in the loss of ancient
woodlands, ancient and veteran trees, or individual trees of high biodiversity
value. Where woodland is removed, compensatory planting is expected to
be delivered. 
6.4     Policy 8 supports development within the green belt in a limited number of 
circumstances. These include:  
• development associated with agriculture, woodland creation, forestry
and existing woodland (including community woodlands); 
• residential accommodation required for key workers in a primary
industry in the vicinity of the site;
• horticulture, including market gardening and directly connected retailing,
as well as community growing; 
• essential infrastructure or new cemetery provision;
• minerals operations and renewable energy developments; 
• intensification of established uses, including extensions to an existing
building where that is ancillary to the main use.

Page 5

Additional requirements include justification is provided for the green belt
location; the purpose of the green belt is not undermined by the
development; the development is compatible with the surrounding
countryside and landscape character; the development is of an appropriate
scale, massing and external appearance and minimises visual impact; and
there will be no long-term impacts on the environmental quality of the green
belt. 
6.5  As the site has been previously developed, Policy 9 addressing brownfield,
vacant and derelict land applies. Development proposals that will result in
the sustainable reuse of brownfield land including vacant and derelict land
and buildings, whether permanent or temporary, will be supported. 
6.6 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale as per Policy 14.
Policy 15 relates to local living and 20 minute neighbourhoods.
Development proposal will contribute to local living including, where
relevant, 20 minute neighbourhoods. Consideration will be given to existing
settlement pattern, and the level and quality of interconnectivity of the
proposed development with the surrounding area, including local access to
affordable and accessible housing options, ability to age in place and
housing diversity. 
6.7 Policy 16 relates to quality homes with part a) supporting proposals for new
homes on sites allocated for housing in Local Development Plans. The
application site is allocated in the proposed Local Development Plan 2 as a
residential development opportunity. 
6.8  Under part (f) of Policy 19 proposals for buildings that will be occupied by
people will be supported where they are designed to promote sustainable
temperature management, for example by prioritising natural or passive
solutions such as siting, orientation, and materials. 
6.9 Green infrastructure is considered through Policy 20. Proposals that result
in fragmentation or net loss of existing green infrastructure will only be
supported where it can be demonstrated that the proposal would not result
in or exacerbate a deficit in green infrastructure provision, and the overall
integrity of the network will be maintained. 
6.10  Policy 22 - Flood risk and water management states that proposals will not
increase the risk of surface water flooding to others, or itself be at risk;
manage all rain and surface water through sustainable urban drainage
systems (SUDS), and seek to minimise the area of impermeable surface.
Policy 23 does not support proposals which are likely to raise unacceptable
noise issues. Policy 24 supports proposals that incorporate appropriate,
universal, and future-proofed digital infrastructure.

Page 6

West Dunbartonshire Adopted Local Plan 2010 
6.11 The site lies within the Green Belt and Policy GB1 states that within the
areas of Green Belt shown on the Proposals Map there will be a general
presumption against development other than:
• agriculture and forestry, including community woodlands; or 
• the appropriate re-use of vacant buildings which would be desirable to
retain; or
• for their local significance, historic or architectural character; or
• outdoor recreation, leisure or tourist proposals which are appropriate for
the countryside, contribute to the social and economic development of
the Plan area and are not contrary to other policies and proposals
contained within the Local Plan; or
• where there is a specific locational requirement and established need
for the development and it cannot be accommodated on an alternative
site; or
• where there is a necessity for additional land for development purposes,
having regard to the requirements of the approved Structure Plan. 
Development will not be permitted which would have an adverse effect on
the landscape character of the local area. Proposals for new buildings,
extensions or the change of use of existing buildings within the Green Belt
will have to pay particular regard to design, siting, landscaping, nature
conservation and protection of habitats. 
6.12  Policy H1 of the adopted Local Plan highlights that the sites identified in
Schedules H1 and H2 represent the main opportunities for private sector
housing development. The site is not allocated for residential development
in Schedule H2. Policy UR1 further encourages the redevelopment and re-
use of underused, vacant and/or derelict land and buildings for appropriate
uses such as housing. Policy RD1 which sets out a preference for
residential development on brownfield sites. 
6.13 Policy H4 sets out standards expected of all residential development,
requiring high quality design in the range of house types and sizes and in
terms of form, layout and materials. Policy H5 safeguards and where
possible enhances the character and amenity of existing residential area.
Policy GD1 seeks to ensure that all new development is of a high quality of
design and respects the character and amenity of the area.

Page 7

6.14 Policy E1 relates to the Council’s biodiversity duty with Policy E4 specifically
focusing on the protection and retention of trees subject to a Tree
Preservation Order (TPO). Policy E5 goes on to set out an expectation for
development proposals on sites with or adjacent to, existing trees or
woodlands to take account of trees at the beginning of the design process
and includes a requirement for a tree survey. Policy R2 specifies the open
space provision required for all developments. Assessment of open space
requirements has been undertaken against the updated position set out in
in Section 7 below. 
6.15 Policies F1 and F2 aim to ensure that new development is not at risk from,
and does not increase the risk of flooding, and has suitable SUDS drainage
infrastructure. Policy DC7 supports the inclusion of on-site micro-renewable
technologies. 
Development Plan Conclusions
6.16 The site lies within the Green Belt and the construction of three
dwellinghouses, not designed to accommodate key workers in a local
primary industry such as agriculture, is not a form of development supported
by Policy 8 of NPF4 or Policy GB1 of the adopted Local Plan. However, the
site is an allocated residential development opportunity in proposed Local
Development Plan 2 which reflects the Council’s most up to date spatial
strategy. Based on the proposed Local Development 2 site allocation, the
proposed residential development would in turn be supported by Policy 16
and the Green Belt policies would not be applicable in the assessment of
the application. In light of the residential development allocation within
proposed Local Development Plan 2 which carries significant weight in the
assessment and determination of planning applications, it is considered that
the material considerations are such that a departure from Policy 8 of NPF4
and Policy GB1 of the adopted Local Plan can be justified in this instance.
Subject to the full assessment set out in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local
Development Plan 2 (LDP2), incorporating the recommended modifications
of the Examination Report received on 22 April 2020, which were accepted
by the Planning Committee of 19 August 2020, remains the Council’s most
up to date spatial strategy and is therefore afforded significant weight in the
assessment and determination of planning applications, subject to
compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material
consideration.

Page 8

7.2 Policy H2 supports new housing development on sites in Schedules 2 and
3. This site is an allocated residential development opportunity included in
Schedule 2. Policy CP1 of proposed LDP2 seeks to ensure that all
development the layout and form of the development, including the
relationship between the buildings, streets and spaces, protect and
enhance the amenity of existing communities, future occupiers and
neighbouring development sites. It indicates that all new development will
be expected to contribute towards creating successful places by having
regard to the six qualities of a successful place. Policy H4 sets out that that
the Council will protect, preserve and enhance the residential character and
amenity of existing residential areas at all time. 
7.3 Policies GI2 and GI4 relate to green infrastructure. Policy GI2 requires new
development to meet with the open space standards set out within the
policy. Where a development has difficulty providing these standards on
site, or where a relaxation of the standards can be justified, developers will
require to accord with Policy GI4 and provide a contribution towards the
types of projects outlined within the policy and detailed in the Green
Network and Green Infrastructure Planning Guidance. GI4 sets out the
requirements for Developer Contributions. 
7.4 Policy CON1 requires that significant travel generating uses are designed
to encourage sustainable transport. CON3 encourages improvements to
core paths and the development of new core paths and Policy CON4 sets
out a need for all developments to install sufficient broadband provisions. 
7.5 Policy ENV8 requires developments to address air quality, lighting and
noise as part of the planning process, whilst policy ENV9 requires all
potentially contaminated sites to be remediated where necessary to ensure
that the site is suitable for the intended use. 
7.6 RE4 encourages micro-generation and heat recovery technologies within or
associated with individual properties and Policy RE5 relates to low and zero
carbon buildings and states that new buildings should conform to the
sustainability standards. 
7.7 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree,
water environment and flooding policies of the adopted Local Plan. Policy
CP2 requires the integration and consideration of green infrastructure from
the outset of the design process through to its maintenance and
stewardship of the resource. 
7.8 It is considered that the application proposal complies with the relevant
policies above as set out in the following assessment below.

Page 9

Creating Places Guidance and Green Network and Green Infrastructure
Guidance
7.9 The Creating Places Guidance – November 2022 seeks to achieve high
quality development with a design-led approach based on a thorough
appraisal of the site and an analysis of its context, and sets out that this is
expected for all development proposals. It is considered that the
development responds to the local context and accords with the approach
set out in the Guidance at this Planning in Principle stage.   
7.10 The Green Network and Green Infrastructure Guidance – November 2022
seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space
created. This will include a focus on biodiversity enhancement. The on-site
provision follows the Guidance in respect of residential development
proposals. The proposal accords with the approach set out in the Guidance. 
Principle of Development
7.11 Within the adopted Local Plan, the site is situated within the Green Belt. The
erection of three dwellinghouses would not be a development supported
within a Green Belt location by either Policy 8 of NPF4 or Policy GB1 of the
adopted Local Plan. However, proposed Local Development Plan 2,
incorporating the recommended modifications of the Examination Report
received on 22 April 2020, forms the Council’s most up to date spatial
strategy and can therefore be afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with
NPF4. The site is identified as a residential development opportunity within
proposed Local Development Plan 2 and this allocation was supported by
the Reporter in the Examination Report, and not subject to any
recommended modifications. 
7.12    Notwithstanding the position of proposed Local Development Plan 2 as the
Council’s most up to date spatial strategy, it remains that the adopted Local
Plan does not identify the site as a development opportunity but rather a
site within the Green Belt.  Accordingly, Policy GB1 of the adopted Local
Plan and Policy 8 of NPF4 are relevant as set out in paragraphs 6.4 and
6.11 above. In assessing whether there are any material considerations
which would justify a departure from the adopted development plan, it is
recognised that whilst the Council took the decision not to adopt proposed
Local Development Plan 2, it remains a significant material planning
consideration in the assessment of planning applications. If proposed Local
Development Plan 2 had been adopted, the residential development
allocation would have changed its status of the site in respect of the policy
assessment within NPF4. Policy 8 would not be applicable and Policy 16
would support the development of the allocated site. Furthermore, Policy 9
of NPF4 also supports the sustainable redevelopment of brownfield sites.

Page 10

7.13 In further considering the proposal, the indicative capacity set out in
proposed Local Development Plan 2 is for three houses. Based on the
indicative layout submitted, it is considered that a development of three
units could be suitably accommodated on site, including accommodating
the topography of the site, in a way which balances the development of an
allocated site with the character of the wider Green Belt. 
7.14 The proposal would require demolition of the existing disused water supply
infrastructure within the site, predominantly in the form of underground
water tanks, which has been redundant for a significant period of time. The
existing site does not feature any buildings but it is noted that there are
detached dwellinghouses within the locality along Carman Road. As the site
has not performed its infrastructural function for some time, it remains shut
off with the access gate closed and parts of the site overgrown and subject
to spontaneous rewilding, all contained within the area bounded by the
historic wall demarcating its limits. The redevelopment of the site would
remove a disused brownfield site and, subject to the final design and layout
of any new development, result in a positive impact on the visual amenity
of the area. As it is understood that the water supply needs have since been
superseded by other infrastructure serving the area, it is not considered that
the loss of the site to a housing development would raise concerns.   
7.15 It is considered that in this instance a departure in respect of Policy 8 of
NPF4 and from Policy GB1 of the adopted Local Plan can be justified and
the principle of residential development accepted on site. 
Indicative design, layout and visual impact within the landscape 
7.16 No detailed information has been submitted, however an indicative layout
has been proposed. The number and size of the properties proposed is
considered acceptable in this context. The setback from the road level and
the screening afforded by the remaining boundary wall around the perimeter
of the site, also manages the visual impact and prominence of the new
development in the immediate vicinity. The properties would benefit from
open outlook overlooking the Vale of Leven and the surrounding Kilpatrick
Hills. This section of Carman Road, while predominantly rural in character,
does feature several residential properties, with some located a distance
away from the road level.  The proposal is considered to be consistent with
the development pattern of the area and a suitable reuse of the vacant
derelict site. 
7.17   Whilst recognising that the application is considered in principle only, it must
be assessed whether a suitable development could be achieved on site. In
this instance, such an assessment can be guided by the indicative layout
and details submitted.  The indicative details suggests the proposed houses
are of one-and-a-half-storey in height.

Page 11

Houses of this size would be acceptable, given the semi-open nature of the
site and this is the predominant height of other houses along Carman Road
outwith the urban settlement. The suggested ratio of plot size to house is
considered acceptable and the properties would have an acceptable
amount of private garden ground at the rear providing outdoor amenity
space for the occupants. The houses would be set back from Carman Road
by a reasonable distance, with sizable front curtilages fronting each of the
three houses. The design indicates render houses incorporate details as
timber cladding and such an approach would be considered appropriate for
the Green Belt location. 
7.18 Overall, it is considered that an appropriate, attractive outward facing
development could be achieved on site that does not result in
overdevelopment nor any adverse impacts on the wider landscape within
this Green Belt location. Whilst the lack of detail on a variety of aspects of
the development is highlighted in the objection received, this application is
in principle only and does not consider the final detail of the development of
the site. Conditions can guide the detailed design of the houses which will
be subject of a further detailed application.   
Residential amenity 
7.19 Potential impact on neighbouring properties has been considered in relation
to privacy and overshadowing. As the current application is for planning
permission in principle it is not possible to assess specific details. However,
based on the suggested indicative details which indicate one-and-a-half-
storey houses and taking into account their position relative to neighbouring
properties and within the application plot, it is considered that the site could
be developed without any unacceptable overshadowing or loss of privacy
would occur. This will be fully assessed at the detailed stage.  Any noise
and activity generated by the new houses would be typical of that emanating
from a domestic setting and it is not considered that any undue noise
disturbance would occur. 
7.20    Whilst the Council’s Environmental Health Service advice on the need for a
noise impact assessment is noted. This will determine suitable mitigation
measures are incorporated within the development to minimise noise
sources that are likely to impact upon new residents. This matter can
therefore be addressed by condition.     
Roads and parking 
7.21 The application site is accessed via Cardross Road, which is a single track
road with some steep inclines. A variety of concerns are raised in the
objection in respect of roads and access matters. The Council’s Roads
Service has no objections to the principle of three houses on the site,
subject to the applicant providing relevant dimensioned sightline splays
(noting that the national speed limit applies).

Page 12

The ability for the final development detail to achieve the required sightlines
is indicated in the indicative layout provided. The proposed site plan
indicates that there is sufficient space for off-road parking and it therefore
can be concluded the final development detail can provide adequate off-
street parking. Based on the indicative layout, access to the driveways
would be from Cardross Road approximately where the current gate is
(upper plots) and through a new road opening (lower plot). 
7.22    There is an opportunity for improvements to the tight hairpin bend adjacent
to the site as a result of the development.  The indicative layout indicates
how this will be achieved as part of the development and the Council’s
Roads Service raise no additional requirements in this respect. Full details
of the delivery of this improvement can be addressed by condition. 
Accessibility
7.23    The site is outwith the build settlement and thus doesn’t specifically promote 
20 minute neighbourhoods. However, it is a development opportunity within
the proposed Local Development Plan 2 and is only of a small scale. None-
the-less, the settlement of Renton lies in reasonably close proximity with a
range of local facilities including public transport links within a typically 20
minute walk from the site. Despite the out-of-settlement location, the site is
reasonable accessible to local facilities. 
Ecology, Biodiversity and Impact on Existing Vegetation.
7.24 There are no environmental designations covering any part of the site and
also no buildings to be demolished. It does, however, lie opposite the
Carman Muir Local Nature Conservation Site (LNCS) and ecology and
biodiversity considerations arise as a result of this together with the re-
wilding and re-naturalisation of the site and the rural location in the Green
Belt. The application assessment is informed by a preliminary ecological
appraisal. This identifies a variety of habitats within the site, but that these
are in poor condition. No field signs of protected species were identified,
Opportunities for foraging and commuting bats were highlighted, as were
limited opportunities for foraging badger. Opportunities for nesting birds
were also highlighted with recommendations in respect of nesting bird
surveys. The opportunity for biodiversity enhancement is highlighted. 
7.25    The Council’s Biodiversity Officer raises no concerns regarding the findings
or methodology used. However, highlight survey information from the Black
Grouse RSPB monitoring scheme which confirms that there are records of
black grouse within 1.5 km of the proposed development site. The
Biodiversity Officer highlights the requirement for mitigation in this respect.
Conditions can ensure that all recommendations within the Appraisal are
followed including the protection for nesting birds, biodiversity enhancement
and Black Grouse mitigation.

Page 13

7.26   Whilst the site has re-naturalised with vegetation and scrub there are no
significant trees on site and no concerns arise in respect of the impact upon
existing vegetation. 
Flooding Matters
7.27 Concerns regarding flooding are raised in the objections received. Whilst
proposed Local Development Plan 2 identifies the requirement for any
proposals for residential development on this site to be informed by a flood
risk assessment, the site is not shown on SEPA’s flood maps at being at
risk of either river or surface water flooding. The Council’s Roads Service
has considered the proposal and advises that the site is not within an area
at flood risk. They do not identify any requirement for a flood risk
assessment and offer no objections on flood risk grounds. Drainage
arrangements can be addressed by condition. 
Open space provision
7.28 In terms of open space provision for residential developments, this is set out
within Policy GI2 of proposed Local Development Plan 2 together with the
Our Green Network guidance. For small developments of less than 10
houses, a developer contribution is generally considered appropriate rather
than the provision of open space within the development site itself. Open
space calculations together with the level of any contribution are based on
the number of bedrooms provided. As this application is considered in
principle, open space requirements and developer contributions will be
addressed at the detailed stage of the development. 
Other Technical Matters
7.29 The Council’s Environmental Health Service raise no concerns and
conditions are recommended to address the presence of any unexpected
contamination and in respect ensuring the suitability of either re-using site
won material or importing material to the site,  construction hours inclusive
of site deliveries together with dust control.  Scottish Water offer no
objection noting current capacity within the existing network. West of
Scotland Archaeological Service offer no objections and, in noting the
previous development of the site, do not consider any archaeological work
necessary.   
7.30 The requirement to incorporate zero carbon generating technologies and
make provision for the connection of the development to available
broadband networks can be addressed by condition. 
Outstanding points of objection

Page 14

7.31 In considering the outstanding points raised in the objection, neighbour
notification is issued to any premises within 20 metres of the application
site. Where there is neighbouring land with no premises, inclusive of private
roads, a press advertisement is placed in accordance with the Town and
Country Planning (Development Management Procedure) Regulations
2013 and this occurred in this instance. Whilst concern is raised that a
neighbouring property did not receive a notification, the curtilage of this
neighbouring property is around 100 metres from the application site and
therefore no neighbour notification was required in terms of the regulations. 
The application site, inclusive of sightlines, is clearly defined in red in the
submitted plans. Whilst concern is raised regarding possible confusion with
a nearby premises with a similar name, the correct application site has been
assessed. The submitted plans and drawings clearly indicate the position of
the site within the local context and the relationship of neighbouring
properties is fully understood. The online Portal has been checked and the
application is available for viewing. 
8. CONCLUSION 
8.1 The site lies within the Green Belt and the construction of three
dwellinghouses are not designed to accommodate key workers in a local
primary industry such as agriculture, is not a form of development supported
by Policy 8 of NPF4 or Policy GB1 of the adopted Local Plan.
Notwithstanding this, within proposed Local Development Plan 2 that
reflects the Council’s most up-to-date planning policy position, it is identified
as a residential development opportunity. The principle of the residential
development on the site is therefore supported by proposed Local
Development Plan 2, and that three houses could be accommodated within
an appropriate arrangement. It is considered that significant weight can be
attached to the proposed Local Development 2 site allocation in the
determination of this application and that the material considerations are
such that a departure from Policy 8 of NPF4 and Policy GB1 of the adopted
Local Plan can be justified in this instance.
8.2   Overall, the proposal would allow the development of an unmanaged,
previously developed site subject to a suitable design and layout which
responds to the site and is appropriate for the rural landscape. An additional
and welcome benefit of the development would be the improvements to the
tight hairpin bend on Cardross Road adjacent to the site. 
9. CONDITIONS 
1. No development shall commence until such time as approval of the detailed
design, layout and other matters associated with the development
(hereinafter called "the matters specified in conditions") has been granted
by the Planning Authority. Any application(s) for approval of matters

Page 15

specified in conditions shall be submitted before the expiration of three
years from the date of this planning permission in principle and shall include:
a) the siting, design, external appearance and external materials of all
buildings and other structures;
b) the means of access to the site;
c) the layout of the site, including all car and cycle parking areas;
d) the details of and timetable for the implementation of the hard and soft
landscaping for the site;
e) details of the management and maintenance of the areas identified in
(d) above;
f) full details of the design and location of all boundary walls and fences;
g) the provision of surface water drainage works incorporating Sustainable
Drainage Systems (SuDS). For the avoidance of doubt, the submitted
details shall be in accordance with CIRIA C753, the SUDS Manual and
Sewers for Scotland;
h) the disposal of sewerage;
i) details of existing and proposed site levels;
j) details of the storage and collection of waste and recycling from the new
dwellinghouses;
k) details of required sightlines and visibility splays;
l) biodiversity enhancement measures to be incorporated into the
development;
m) full details of the incorporation of low and zero carbon infrastructure into
the development;
n) details of the provision for electric vehicle charging 
2. Notwithstanding condition 1 above, prior to the commencement of
development on site, exact details, specifications and samples of all
proposed external materials to be used within the development site
inclusive of hard surfaces shall be submitted to and approved in writing by
the Planning Authority. Thereafter, unless otherwise agreed in writing with
the Planning Authority, the development shall be completed in accordance
with the approved material details and palette. 
3. Notwithstanding conditions 1 and 2 above and unless otherwise first agreed
in writing by the Planning Authority, the design and layout of the
development shall generally follow the indicative details submitted and
approved inclusive of siting of the dwellinghouses, one and a half storey
design, pitched roof, light coloured render and use of timber cladding. 
4. That with the first application for matters specified by condition application,
full details of the design and implementation of the works to the hairpin bend
in Cardross Road shall be submitted for the written approval of the Planning
Authority. Works shall then proceed as approved.

Page 16

5. Notwithstanding the approved plans, all recommendations within the
Preliminary Ecological Appraisal dated 24 March 2023 shall be followed. 
6. Notwithstanding condition 5 above, no removal of and vegetation shall take
place during the bird nesting season March to September inclusive unless
first agreed in writing by the Planning Authority and nesting bird survey
undertaken not more than 48 hours prior to the commencement of site
clearance works, the findings of which shall be submitted to the Planning
Authority. 
7. Notwithstanding condition 3 above and prior to the commencement of works
on site, full details of mitigation in respect of Black Grouse  shall be
submitted to and approved in writing by the Planning Authority and the
agreed mitigation measures implemented as approved.  The development
shall then proceed as approved. 
8. That prior to the occupation of any house, the off-street parking provision
shall be completed and be available for use by residents of the associated
house. The off-street parking provision shall then remain unobstructed and
available for use by residents of the associated house at all times thereafter. 
9. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site
shall be submitted to and approved in writing by the Planning Authority prior
to the commencement of any works on site. The measures shall be
implemented and maintained as approved. 
10. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the
relevant telecommunications provider’s standards. 
11. No development (other than investigative works) shall commence on site
until such time as a detailed report on the nature and extent of any
contamination of the site has been submitted to and approved in writing by
the Planning Authority. The report shall be prepared by a suitably qualified
person and shall include the following:
a) A detailed site investigation identifying the extent, scale and nature of
contamination on the site (irrespective of whether this contamination
originates on the site)
b) An assessment of the potential risks (where applicable) to:
• human health
• property (existing and proposed), including buildings, crops,
livestock, pets, woodland and service lines and pipes

Page 17

• groundwater and surface waters
• ecological systems
• archaeological sites and ancient monuments
c) An appraisal of remedial options, including a detailed remediation
strategy based on the preferred option. 
12. No development (other than works) shall commence on site until such time
as a detailed remediation scheme for the site has been submitted to and
approved in writing by the Planning Authority. The scheme shall be
prepared by a suitably qualified person and shall detail the measures
necessary to bring the site to a condition suitable for the intended use by
removing unacceptable risks to human health, buildings and other property,
and the natural and historical environment. The scheme shall include details
of all works to be undertaken, the remediation objectives and criteria, a
timetable of works and/or details of the phasing of works relative to the rest
of the development, and site management procedures. The scheme shall
ensure that upon completion of the remediation works the site will not qualify
as contaminated land under Environmental Protection Act 1990 Part IIA in
relation to the intended use of the land after remediation. 
13. The approved remediation scheme shall be carried out in accordance with
its terms prior to the commencement of development other than that
required to carry out remediation, unless otherwise agreed in writing by the
Planning Authority. The Planning Authority shall be notified in writing of the
intended commencement of remediation works not less than 14 days before
these works commence on site. Upon completion of the remediation works
and prior to the site being occupied, a verification report which
demonstrates the effectiveness of the completed remediation works shall
be submitted to and approved in writing by the Planning Authority. 
14. The presence of any previously unencountered contamination that
becomes evident during the development of the site shall be reported to the
Planning Authority in writing within one week, and work on the affected area
shall cease. At this stage, if requested by the Planning Authority, an
investigation and risk assessment shall be undertaken and an amended
remediation scheme shall be submitted to and approved by the Planning
Authority prior to the recommencement of works in the affected area. The
approved details shall be implemented as approved. 
15. If the remediation plan requires it then a monitoring and maintenance
scheme (including the monitoring of the long-term effectiveness of the
proposed remediation) shall be submitted to and approved by the Planning
Authority. Any actions/measures ongoing shall be implemented within an
agreed timescale with the Planning Authority. Following completion of the
actions/measures identified in the approved remediation scheme a further
report which demonstrates the effectiveness of the monitoring and

Page 18

maintenance measures shall be submitted to and approved by the Planning
Authority. 
16. If there is a requirement to either re-use site won material or to import
material then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and
approved by the Planning Authority prior to any material being used. In
addition to this and in accordance with BS3882:2015 and BS8601:2013,
material to be used in the top 300mm shall also be free from metals, plastic,
wood, glass, tarmac, paper and odours. On completion of the works and at
a time and or phasing agreed by the Planning Authority, the developer shall
submit a verification report containing details of the source of the material
and appropriate test results to demonstrate its suitability for use. 
17. Prior to the commencement of development on the site, full details of any
external lighting within the site shall be submitted to and approved in writing
by the Planning Authority. The lighting shall thereafter be installed as
approved. 
18. The applicant shall undertake a noise assessment to determine the impact
of noise from nearby noise sources on the proposed development using the
principles set out in British Standard BS 4142:2014 – “Methods for rating
and assessing industrial and commercial sound”, or a method agreed by
the Planning Authority. Where the Level of Significance as described within
the Scottish Government Document: “Technical Advice Note Assessment
of Noise”, identifies changes in noise as moderate or greater (assessed with
windows open), a scheme for protecting the proposed dwelling(s) from
industrial/stationary noise shall be submitted to, and approved by, the
Planning Authority. 
The approved scheme for the mitigation of noise shall be implemented prior
to the occupation of the houses and shall be retained in accordance with
the approved scheme. The noise impact assessment and any
recommendations in respect of mitigation measures shall be prepared by a
suitably qualified person. 
19. No development shall commence on site until such time as a noise control
method statement for the construction period has been submitted to and
approved in writing by the Planning Authority. This statement shall identify
likely sources of noise (including specific noisy operations and items of
plant/machinery), the anticipated duration of any particularly noisy phases
of the construction works, and details of the proposed means of limiting the
impact of these noise sources upon nearby residential properties and other
noise-sensitive properties. The construction works shall thereafter be
carried out in accordance with the approved method statement unless
otherwise approved in writing by the Planning Authority.

Page 19

20. During the period of construction, all works and ancillary operations which
are audible at the site boundary (or at such other place(s) as may first be
agreed in writing with the Planning Authority), shall be carried out between
the following hours unless otherwise approved in writing by the Planning
Authority: 
Mondays to Fridays: 0800-1800
Saturdays: 0800-1300
Sundays and public holidays: No working 
21. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority. This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in
BS6472 ‘Evaluation of Human Response to Vibration in Buildings’. It shall
detail any procedures, which are proposed to minimise the impact of noise
and vibration on the occupants of surrounding properties. This statement
shall be prepared by a suitably qualified person, and the piling works shall
thereafter be carried out in accordance with the approved method
statement. 
22.  During the period of construction no commercial vehicle making deliveries
to or collecting material from the development shall enter or leave the site
before 08:00 or after 18:00. 
23. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by the Planning Authority. The scheme shall identify likely sources of dust
arising from the development or its construction, and shall identify measures
to prevent or limit the occurrence and impact of such dust. The approved
scheme shall thereafter be implemented fully prior to any of the identified
dust generating activities commencing on site and shall be maintained
thereafter, unless otherwise approved by the Planning Authority.

Page 20

Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 14th February 2024 
Person to Contact: Pamela Clifford, Planning & Building Standards
Manager  
Pamela.Clifford@west-dunbarton.gov.uk 
James McColl, Development Management Team  
Leader
James.Mccoll@west-dunbarton.gov.uk 
Appendix:   Location Plan   
Background Papers:  
1. Application form, plans and supporting documents;
2. National Planning Framework 4;
3. West Dunbartonshire Local Plan 2010;
4. West Dunbartonshire Local Development Plan 2
Proposed Plan 2020;
5. Consultation responses;
6. Objection received;
7. Application nos: DC02-332, DC10/025/FUL. 
Wards affected:  Ward 2 (Leven)