Page 1

Agenda
Special Meeting of the Planning
Committee
Date:  Wednesday, 17 January 2024
___________________________________________________________________
Time:  10.00 a.m.
___________________________________________________________________
Venue:  Council Chambers, Clydebank Town Hall, 5 Hall Street,
Clydebank G81 1UB.
___________________________________________________________________
Contact:  Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a Special meeting of the Planning Committee as detailed
above.  
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Ian Dickson
Councillor Daniel Lennie
Provost Douglas McAllister
Councillor June McKay
Councillor Karen Murray Conaghan
Councillor Chris Pollock
Councillor Hazel Sorrell
Councillor Sophie Traynor
All other Councillors for information
Date of Issue: 8 January 2024
Page 2

Page 3

PLANNING COMMITTEE
WEDNESDAY, 17 JANUARY 2024
AGENDA
1 APOLOGIES
2 DECLARATIONS OF INTEREST
Members are invited to declare if they have any interests in the items of
business on this agenda and the reasons for such declarations.
3 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
4 PLANNING APPLICATIONS
Submit report by the Planning, Building Standards and Environmental Health
Manager – in respect of the following Planning applications:-
(a) DC23/113/MSC: Details relating to the first Approval of 5 – 28
Matters Specified by Condition (AMSC) application
(Phase 1 and 2 works only) for conditions 1(a), 1(d), 12,
23, 24 and 30 at Exxon, Bowling.
(b) DC23/149/FUL: Erection of 128 residential homes, 29 – 57
associated roads, infrastructure and open space on
existing brownfield site, (former Playdrome site) Residential
Development Site, Abbotsford Road, Clydebank by Miller Homes.
__________________________________________________________________
Page 3

Page 4

Page 4

Page 5

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 17th January 2024
DC23/113/MSC: Details relating to the first Approval of Matters
Specified by Condition (AMSC) application (Phase 1
and 2 works only) for conditions: 
1(a) (development platforms and site layout, roads,
access arrangements, parking areas, footpaths,
waterfront walkway, green corridors, open space,
boundary treatments and drainage infrastructure), 
1(d) (landscape and streetscape plans showing the
locations and species of all proposed trees, shrubs,
hedges - Phase 1 works only), 
12 (compliance with landscape framework and
strategy), 
23 (reconfiguration of cycle route), 
24 (bus stop provision and review) and 
30 (updated species survey and species protection
plans) attached to Planning permission in principle
(PPiP) reference DC20/088 at land at the former
Dunglass Oil Terminal, Dumbarton Road, Bowling by
West Dunbartonshire Council. 
1. REASON FOR REPORT
1.1 This application considers the approval of matters specified by condition in
connection with a planning permission in principle for a development that in the
hierarchy of development proposals was a major planning application as
defined by The Town and Country Planning (Hierarchy of Developments)
(Scotland) Regulations 2009, which was previously considered by the Planning
Committee. Under the terms of the approved Scheme of Delegation, it therefore
requires to be determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission subject to the conditions set out in Section 9 below.
3. DEVELOPMENT DETAILS
3.1 The application site extends to approximately 56 hectares and is located on the
northern bank of the River Clyde. It is bounded by the River Clyde, the Glasgow
to Dumbarton and Helensburgh railway line and the A82 Trunk Road. The
national cycle route - NCN7 runs along the northern boundary of the site and
cuts across the western part of the site. The cyclepath provides a local route to
Bowling and Dumbarton as well as onto Glasgow and Balloch beyond. 
ITEM 4a
Page 5

Page 6

Two Category B listed buildings comprising Dunglass Castle and Obelisk
Memorial to Henry Bell are also found within the site. The Inner Clyde Special
Protection Area (SPA), Ramsar Site (Wetlands of international important) and
the Milton Burn Sites of Special Scientific Interest (SSSI) overlap and border
the site to the south, along the River Clyde foreshore.   
3.2 The majority of the site comprises land of the former Dunglass Oil Terminal
which was previously occupied by and currently remains under the ownership
of Exxon Mobil and Esso Petroleum Company Limited. This was historically
used as a fuel distribution terminal from the 1920s until the 1990’s. While the
majority of the site comprises the former oil terminal, there are other sections
of land within the application site under separate ownership. The application
site also extends beyond the former oil terminal to include surrounding, existing
road infrastructure. The former terminal has been vacant and unused since
decommission and clearance was completed in 2001. Other land subject to the
application includes fields and strips of land under private ownership and the
Council is progressing the purchase of the whole application site. An extensive
programme of remediation of parts of the former oil terminal site was granted
planning permission in 2019 (ref DC18/013). This comprises of works for areas
known as Centerfield, Garden, Northfield and Westfield. A further planning
permission was granted in December 2020 (ref DC20/182) for an alternative
revetment solution along the Centrefield frontage. The Eastfield area of the site
has previously been remediated in 2014 under planning permission DC11/218.
Esso and EXXON Mobil are currently undertaking the remediation works
granted under the DC18/013 permission. It is currently expected that this work
will be concluded by the end of February 2024 although there is a subsequent
monitoring period thereafter. 
3.3 In December 2020, planning permission in principle was approved (ref
DC20/088) for the re-development of the site comprising a mixed use
development through a masterplan approach comprising of: 
• Up to 44,450m2 of commercial and industrial development comprising a mix
of storage, distribution, industrial, business and office space; 
• a new spine road with associated drainage and lighting infrastructure;
• Upgrades to the public road network;
• A new junction on the A82 at Dumbuck with closure of the existing junction; 
• A remodelled junction on A82 at Dunglass;
• An enhanced routing of a section of the National Cycle Network Route 7; 
• A new underbridge of the Glasgow-Dumbarton Railway at the western
access to the site; 
• A new railway overbridge at the eastern access to the site; 
• Flood mitigation works; 
• Site drainage works;
• Landscaping, green corridors and green open space;
• Environmental mitigation works;
• Establishment of platforms for development across the site. 
Page 6

Page 7

3.4 This application considers the details submitted for the approval of matters
specified in conditions 1(a & d), 12, 23, 24 and 30 in respect of the above
Planning Permission in Principle Permission (DC20/088). These conditions
relate to the following details: 
• Condition 1 (a) - Development platforms and site layout plans showing the
position of all buildings, roads, access arrangements, parking areas,
footpaths, waterfront walkway, green corridors, open space, boundary
treatments and drainage infrastructure; 
• Condition 1 (d) Landscape and streetscape plans showing the locations and
species of all proposed trees, shrubs, hedges – in relation to the Phase 1
works only;  
• Condition 12 - Supporting report to demonstrate accordance with
Landscape Framework and Strategy – in relation to Phase 1 works only; 
• Condition 23 - NCN7 reconfiguration plans; 
• Condition 24 - Bus Stop Provision Report; and 
• Condition 30 - Species Survey/Species Protection Plan. 
3.5 The redevelopment of the site forms part of the Council’s City Deal project. The
development will provide a platform for major industrial and commercial
development whilst, at the same time, provide road and infrastructure
improvements to relieve pressure and provide an alternative route to the A82
through Milton. The development of the site will be progressed through 4
phases as follows: 
• Phase 1 – road infrastructure work covering the eastern junction works at
Dunglass, western junction works at Dumbuck, the eastern railway
overbridge, western railway underbridge and the new spine road through
the site.
• Phase 2 - creation of three development platforms (East, Central and
West).
• Phase 3 - landscaping and utilities and energy infrastructure facilities. 
• Phase 4 - on-site buildings, Dunglass Castle and Henry Bell Obelisk
works. 
The current application considers phases 1 and 2 only. No buildings are
currently proposed and any layout on the platforms is purely indicative at this
stage. 
3.6 Whilst condition 1 (a) includes the requirement for details relating to the
waterfront footpath, green corridors, open space,  the position of buildings and
parking areas,  these aspects of the condition are not considered in the current
application submission. As with any large scale redevelopment site of this
nature, it is expected that the detail of the development will be brought forward
through multiple applications for matters specified by condition. The remaining
details within Condition 1 (a) and Phases 3 and 4 will therefore come forward
as part of future planning applications. 
Page 7

Page 8

3.7 In support of the application submission the applicant has provided updated
ecology and protected species surveys, bus stop provision report and a
supporting report to demonstrate accordance with the Landscape Framework
and Strategy. 
4. CONSULTATIONS 
4.1 West Dunbartonshire Council Roads Service have no objections on roads or
flooding matters to the proposed development. However it is advised that
further traffic modelling data is required in respect of the westbound bus stop
position on the A814. 
4.2 West Dunbartonshire Council Environmental Health have no objections subject
to conditions in respect of an updated Construction Environmental
Management Plan and material management and verification. 
4.3 West Dunbartonshire Council Biodiversity Officer offers no objections but it is
advised that the recommendations and mitigation identified in the ecology
report is followed and tool box talks are provided to site personnel. 
4.4 NatureScot offer no objections but set out a detailed position on assessing and
mitigating any impact on the wintering birds of the Inner Clyde Special
Protection Area / Site of Special Scientific Interest 
4.5 Royal Society for the Protection of Birds offer no objections but highlight a
number of points in respect of updated ecology surveys, impact upon the
SPA/SSSI, biodiversity enhancement and a Tern colony within the site. 
4.6 Transport Scotland offer no objections but highlight the requirements of
conditions 20 and 21 of the planning permission in principle and the need to
agree the final detailed design for the Trunk Road works. 
4.7 Strathclyde Partnership for Transport have no objections although a preference
for an accessible three bay bus shelter to the eastbound bus stop on the A82
is highlighted together with concern regarding the proximity of the westbound
bus stop on the A814 to the signalised junction. 
4.8 Scottish Environmental Protection Agency, Historic Environment Scotland and      
Network Rail have no objections to the proposed development. 
4.9 Sustrans have not responded at the time of writing this report. 
5. REPRESENTATIONS 
5.1 Six objections have been received in connection with the application. The detail
of each submitted representation is available in the electronic planning file for
the application and available for public viewing. The points and concerns raised
can, however, be summarised as follows: 
Page 8

Page 9

• The proposal will result in the loss of trees within the site, including two trees
which may be around 200 years old together with a further 15 similar trees. 
• Tree removal would be contrary to proposed LDP2 and NPF4 and trees
being removed are potentially within or adjacent to the SPA and SSSI.
• An existing wildlife pond is found on the site and this is potentially within or
adjacent to the SPA and SSSI. The pond should be retained. 
• The proposal does not protect and enhance biodiversity and natural assets
as required by NPF4.
• Not much of the site is being kept as existing woodland or grassland. 
• New landscaping proposals would be inferior to existing specimens.
• The proposal will develop greenspace and thus reduce access to these
areas. 
• The proposal does not meet climate change commitments.
• The area is at risk of flooding.
• The areas of the site within the Green Belt should be protected from
development.
• Felled trees should be used for structures within the site including benches,
sculptures and wildlife features.
• No details are provided in respect of the Sheepfold area of the site. 
• Equestrian access requires to be incorporated into the whole site. 
• Quadbike and scrambler bike access requires to be prevented. 
The points of objection are addressed in Section 7 below. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Policy 4
6.1 National Planning Framework 4 (NPF4) did not form part of the adopted
development plan at the time the application for Planning permission in principle
was determined. Whilst the granting of planning permission in principle is not
revisited in the context of NPF4, it is now part of the adopted development plan
against which the current, and any future applications for matters specified by
condition are required to be assessed against NPF4. 
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises. Policy 2 also relates to the climate in the form
of climate mitigation and adaptation and states development proposals will be
sited and designed to minimise lifecycle greenhouse gas emissions as far as
possible and development proposals will be sited and designed to adapt to
current and future risks from climate change. The principle of the
redevelopment of the site is established and the current application under
consideration does not raised any new matters with reference to these policies. 
6.3 Policy 3 requires development proposals to contribute to the enhancement of
biodiversity. The policy goes on to set out the requirement for proposals for
national and major development to demonstrate that it will conserve, restore
and enhance biodiversity. 
Page 9

Page 10

Policy 4 sets out requirements to be met when development affects Special
Protection Areas/Sites of Special Scientific Interest (in this case the Inner
Clyde). Policy 6 addresses development proposals that impact upon trees.
Policy 7 addresses the historic environment and requires development
proposals to fully assess the impact on historic assets or places including listed
buildings. This is relevant to Dunglass Castle and Henry Bell Obelisk which are
listed buildings within the site. 
6.4 Part of the site is identified as being within the Green Belt and Policy 8 sets out
the circumstances where development within the Green Belt is appropriate.
This includes essential infrastructure as defined by NPF4. Transport proposals
and travel networks identified by the Local Development Plan fall under the
definition of essential infrastructure and such proposals are identified for this
site in proposed Local Development Plan 2. In any case, with Planning
permission in principle having already been granted for the development of the
site, no further assessment is required in this respect of this Policy. 
6.5  As the site has been previously developed, Policy 9 addressing brownfield,
vacant and derelict land applies. Development proposals that will result in the
sustainable reuse of brownfield land including vacant and derelict land and
buildings, whether permanent or temporary, will be supported. 
6.6 Policy 13 supports proposals to improve, enhance or provide active travel
infrastructure, public transport infrastructure or multi-modal hubs. Development
proposals will be designed to improve the quality of an area whether in urban
or rural locations and regardless of scale as per Policy 14. Policy 15 relates to
local living and 20 minute neighbourhoods. Development proposal will
contribute to local living including, where relevant, 20 minute neighbourhoods.
Policy 18 supports development which provide infrastructure in line with that
identified in Local Development Plans and their delivery programmes. The
provision of the new transport infrastructure within the site is identified in
proposed Local Development Plan 2 
6.7 Green infrastructure is considered through Policy 20. Proposals that result in
fragmentation or net loss of existing green infrastructure will only be supported
where it can be demonstrated that the proposal would not result in or
exacerbate a deficit in green infrastructure provision, and the overall integrity of
the network will be maintained. 
6.8  Policy 22 requires that proposals will not increase the risk of surface water
flooding to others, or itself be at risk; manage all rain and surface water through
sustainable urban drainage systems (SUDS), and seek to minimise the area of
impermeable surface. Policy 23 does not support proposals which are likely to
raise unacceptable noise issues. 
6.9 It is considered that the application proposal being assessed complies with the
relevant policies of NPF4 and is assessed fully in Section 7 below. 
West Dunbartonshire Adopted Local Plan 2010 
Page 10

Page 11

6.10 Part of the site is identified as being within the Green Belt with Policy GB1
setting out the circumstances where development within the Green Belt is
appropriate. This includes there being a specific locational requirement and
established need for the development. In assessing the application for Planning
permission in principle for the site (ref DC20/088) it was concluded that a site
specific locational requirement and need had been sufficiently established and
justified in accordance with this policy. With Planning permission in principle
having already been granted for the development of the site, no further
assessment is required in this respect. 
6.11 A significant portion of the site is identified as a Specialised Economic
Development Site, where Policy LE4 supports the redevelopment of this site for
employment uses. Policy LE6 also identifies much of the site as a Strategic
Employment Location. Policies UR1 and RP1 supports the re-development and
regeneration of vacant sites within the urban area and Policy GN1 states that
new development should contribute positively to the protection and
improvement of the Green Network. In granting Planning permission in principle
it was concluded that the proposed development accorded with these policies
and with the details being considered under this current application accord with
the overall indicative masterplan, it remains that the proposal accords with
these policies. 
6.12 Policy GD1 lists the criteria which all new development has to comply with to
create high quality design without any adverse impact on the character and
amenity of the area. 
6.13 Policy T1 supports developments which provide sustainable transport and path
and cycle links, supported by a Green Travel Plan and Policy T2 states that
opportunities will be sought to develop an alternative route to the A82 at
Bowling/Milton by extending the A814. Policy T3 states the Council will support
development which provides a link road from A814 Bowling to A814 Dumbuck
terminating in Bowling in the vicinity of the entrance to the former Exxon site.
Policy T4 requires walking, cycling and public transport routes to be integrated
into the development. Policy R5 states that waterfront sites will be required to
provide paths to and along the river bank as well as an expectation to integrate
new paths into the off-road path network where appropriate. 
6.14  Policy BE2 relates to protection of Listed Buildings and seeks to ensure that
there is no adverse impact on their character, appearance and setting. Policy
BE4(5) specifically encourages the rejuvenation and restoration of Dunglass
Castle and improvements to the setting of the castle will aid in this regard. Policy
BE5 relates to archaeology and sets out the circumstances in which
development will be allowed. 
6.15 Policies E1, E2A E2B, F1, F2, F3, relate to the Council’s biodiversity duty,
nature conservation, water environment and flooding matters. It is considered
that the detail of the proposed development, subject to appropriate mitigation
measures secured through further conditions, complies with these policies. 
Page 11

Page 12

6.16  It is considered that the application proposal being assessed complies with the
relevant policies of the adopted Local Plan and is assessed fully in Section 7
below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration, although it does not directly
affect the development proposal under consideration. 
7.2 Proposed Local Development Plan 2 identifies a development strategy which
seeks to encourage the redevelopment of the site to primarily increase the
business and industrial opportunities available within West Dunbartonshire.
Esso Bowling Policy 1 outlines the acceptable uses within the site and requires
a comprehensive masterplan to be provided of which development proposals
must be in accordance with. Policy E1 also more broadly supports business
and industrial development on this site. Esso Bowling Policy 2 sets out the
infrastructure requirements for the site in relation to Roads, Walking, Cycling
and Public Transport. The policy specifically requires the provision of a link road
to provide a through route for public transport and a relief road for the A82 and
also places active travel requirements that the development must provide. Esso
Bowling Policy 3 sets out the requirements for the provision of green network
and green infrastructure that must be provided within the site. Policy GB1 takes
a similar approach to the adopted Local Plan in respect of development within
the Green Belt. In granting Planning permission in principle it was concluded
that the proposed development accorded with these policies and with the
details being considered under this current application according with the
indicative masterplan, it remains that the proposal accords with these policies. 
7.3  Policy CP1 seeks to ensure that new development takes a design led approach
to creating sustainable places which put the needs of people first and
demonstrate that they contribute towards creating successful places by having
regard to the six qualities of a successful place (distinctive, adaptable, resource
efficient, easy to get to/move around, safe and pleasant, and welcoming). Policy
CP2 relates to the provision of green infrastructure within new developments. 
7.4 Policies ENV1, ENV2 and ENV4 focus on nature conservation and biodiversity,
landscape character and trees. Similar to the other plans, these policies
stipulate that development with potential to have an impact upon on ecological
designations like a SPA or SSSI will only be allowed if there would be no
adverse impacts on the nature conservation interest, or where there are
imperative reasons of overriding public interest. 
Page 12

Page 13

In this case in determining the application for Planning permission in principle,
it was concluded the disruption to ecology on the site itself during the work is
considered to be outweighed by the longer term environmental benefits of
redeveloping the site, and subject to suitable safeguards whilst the work is
taking place and thereafter during operational stage, the works would not
adversely impact upon the protected habitat of the Inner Clyde SPA or other
ecological designations. 
7.5 Policies ENV5, ENV6, ENV9, BE1 and BE2 are similar to policies in the adopted
Local Plan in relation to the water environment, flooding, contaminated land,
archaeology and cultural and built heritage with the proposals meeting with the
requirements set out. Policy ENV8 relates to air, noise and light pollution and
sets out specific requirements for each of these policy areas in this regard,
whilst policy ENV9 requires all potentially contaminated sites to be remediated
where necessary to ensure that the site is suitable for the intended use. 
7.6 Policy CON1 sets out the transport requirements for new development. It
requires the development proposal to accord with Designing Streets, National
Roads Development Guidelines and Regional and Local Transport Strategies.
It also requires such developments to prioritise active travel and walking,
cycling and public transport links within and outwith the site, including a specific
expectation for electrical charging points to be provided within the site. 
7.7 It is considered that the application proposal being assessed complies with the
relevant policies above as set out in the following assessment below. 
Principle of Development
7.8 As set out in paragraph 3.3 above, planning permission in principle for the re-
development of the site has been granted through planning permission
DC20/088 and the principle of development is not being assessed as part of
this proposal. The current proposal reflects the masterplan layout together with
the parameters plan which were agreed in granting Planning permission in
principle. 
Site and Road Infrastructure and appearance
7.9 The current application largely considers infrastructure works associated with
the creation of the road network within the site together with the development
platforms. To the eastern end of the site, the proposal will involve the
modification and signalisation of the existing Dunglass roundabout and new
road access into the site from the A814, replacing the existing site entrance at
this location. This new eastern access requires the existing railway overbridge
to be upgraded to form part of the road network being created. The proposal
will utilise the existing bridge abutments with a new bridge deck and parapets
to create a new three lane road. Overall, the bridge will largely retain its current
visual form. A new roundabout will be created beyond the bridge with an access
road terminating in a roundel to the east providing access to the development
platforms within Zone A (Eastfield). The roundabout will also provide access to
Zone B (Centerfield). From the roundabout, the new spine road will travel west
through the site along the route identified within the approved masterplan. The
spine road will be of single carriageway design to a width of 7.3 metres. 
Page 13

Page 14

There will be footway provision to both sides of the new road inclusive of a 3
metre wide shared footway and cycleway to the southern side of the road. A
further roundabout around a third of the way along the road will provide access
to the development platforms within Zone C (Westfield). 
7.10 To the western end of the new spine road where it meets the railway, a new
railway underbridge is proposed. This will comprise a single span concrete
portal design which will carry the two electrified rail lines above the new road.
Wingwalls will be integrated into the design and these will retain the rail
embankments. The spine road then terminates at the Dumbuck junction
connecting to both the A82 and A814 via a new gyratory arrangement which
will replace existing Glasgow Road junction. The cycle path will also be locally
diverted around the new road infrastructure. Road levels across the undulations
of the site will be addressed via the use of embankments where required. Whilst
the new road infrastructure inclusive of railway overbridge and underbridge will
undoubtedly take a form and appearance typical of such infrastructure, the new
infrastructure must be considered in the context of the wider redevelopment of
the site rather than as a standalone development. Although the proposed
infrastructure will be new additions, it is intended it will be embedded in the site
and the wider area. It will not dominate the large site and will have an
acceptable visual impact in the wider urban context. The proposed landscaping
will further soften the appearance and the infrastructure and overall the
arrangement raises no concerns. 
7.11 Turning to the development platforms which will comprise phase two of the
works on site, this will involve be the creation of three development platforms
within the south-eastern extent. This comprises Zones A, B and C as detailed
on the masterplan. The works will comprise a cut and fill arrangement across
the three platform zones with a maximum level change at any point of
approximately 3 metres (occurring on Centerfield’s southern platform). The
platforms will form the basis for the development of future buildings as part of
the later phases of the development and will ensure the proposed future
buildings will be above the 1 in 200 year flood level (plus climate change and
600mm freeboard) in line with the details accepted by SEPA at the Planning
Permission in Principle stage. The development platforms will be formed by
engineering infill material and it is expected that the net fill imported into the site
will be around 125,000 m3. The platforms created will follow the overall
masterplan for the site and be appropriate in the context of the site. They will
also facilitate the development of the commercial and industrial floorspace
within the site. The development of the platforms themselves inclusive of
building design, position, access, parking and servicing will be considered via
further planning application submissions in the future. 
7.12 Overall, the proposed roads and development platform infrastructure layout
accords with the masterplan and is considered acceptable and as is the
appearance of the infrastructure works in terms of the site and the wider area. 
Page 14

Page 15

Landscaping and placemaking
7.13 Landscaping and placemaking were considered in detail in assessing the
application for Planning permission in principle, informed by discussions with
NatureScot. This included an initial landscape framework and in granting
permission, condition 11 required a more detailed landscape strategy to be
submitted and agreed prior to the first application for matters specified by
condition application. The wider landscaping of the site will come forward as
part of later phases of the development via future application submissions. 
7.14 In so far as landscaping is considered as part of this application submission,
landscaping is provided around the new road infrastructure to ensure an
attractive setting and soften the appearance of the infrastructure into the site.
This will include avenue tree planting, wildflower verges, a wetland grass mix
within swales and native shrub, hedgerow and woodland mixes. This approach
ensures that whilst the early phases of the development largely address
infrastructure development, placemaking and green infrastructure are
embedded into the development of the wider site even as part of these early
phases. This will result in a development which creates a quality place designed
to take account of its waterfront setting. The supporting compliance statement
provided by the applicant in terms of condition 12 of the Planning permission in
principle sets out how the development currently being considered accords with
the overall landscaping strategy agreed under condition 11 of the planning
permission in principle. Full planting schedules can be addressed by condition
together with the implementation of the landscaping works. 
Impact on Trees
7.15 In granting Planning permission in principle, no concerns arose in respect of
the impact on trees. However, the consideration of trees is still required in the
context of the detail of the development of the site and via the overall landscape
strategy proposed.  Implementing the development of the site which follows the
approved masterplan layout will result in the loss of trees. The current proposal
follows the masterplan layout of the Planning permission in principle and
therefore the provision of the roads and development platform infrastructure
within the site will have an impact upon existing trees within parts of the site,
more notably towards the western side. The landscape strategy agreed does,
however, seek to identify and retain trees and groups of trees where possible
as part of the landscaping of the wider site. One of the key landscaping
considerations for the later phases of the development will be the retention of
the remaining trees and existing landscape features within the site.   
7.16 Condition 31 of the planning permission in principle requires details of tree
protection for trees and areas of woodland to be retained during the works to
be agreed. Whilst this requirement is separate to the current application
submission, the aboricultural method statement submitted by the applicant in
respect of this condition provides a tree survey assessment of the condition of
trees within the site together with details of the trees to be removed. 117 trees
or groups of trees are identified for removal to allow the development to
proceed. This includes 1 category A tree and 26 category B trees. 
Page 15

Page 16

The majority of trees to be removed are, however, lower quality category C
trees which are generally poorer specimens with a more limited life span and
category U trees where, regardless of any development proposals, the correct
course of action aboriculturally would be removal. Tree species generally
comprise Oak, Ash, Sycamore, Birch and Willow. 
7.17 The loss of trees is specifically highlighted as a concern in the objections
submitted. In particular two individual specimens are highlighted as being
mature and high quality trees. Whilst the trees are not tagged, in reviewing the
details submitted in respect of condition 31 of the planning permission in
principle with the applicant, the two specimens in question can be identified as
T62, and a tree within the group G68. T62 is identified as a category C Ash tree
which is in poor condition with Ash dieback observed and a lifespan of up to 10
years remaining. Trees within the group G68 are identified as comprising semi-
mature Ash, Sycamore and Goat Willow. These are again identified as category
C trees with a limited expected lifespan of 10 to 20 years. Both trees would be
removed to allow the development to proceed as would other trees in the
vicinity. 
7.18 Whilst the loss of any trees is unfortunate, the application site is some 56
hectares in total and across a site of this size the number of trees being lost
represents a comparatively small number. Any tree loss will also be
compensated for via the wider landscaping proposals for the site that will come
forward as part of future phases of the development of the site. A condition
attached to this permission is recommended that the planting schedule and new
tree planting for Phase 1 works sets out how tree planting is maximised in
compensation for those trees lost.  The current proposal does include tree
planting and the creation of a tree lined avenue which will in part compensate
for the loss of trees and a full planting schedule that maximises the new tree
planting as part of the landscaping can be addressed by condition.     
7.19 The submitted objections also highlight that felled trees should be used for
structures within the site including benches, sculptures and wildlife features. It
is agreed that such an approach could add value to the development of the site
and a condition can set out a strategy for the use of felled trees as features
within the site. The condition will also address how the felled trees will be stored. 
Ecology, biodiversity and protected species
7.20 In assessing the application for planning permission in principle, the impact on
ecology, biodiversity and protected species was considered in detail and
informed by a number of assessments both as part of the Environmental Impact
Assessment (EIA) and via separate supporting submissions, including a Habitat
Regulations Appraisal, Appropriate Assessment and surveys relating to specific
species such as Bat and Otter. The site is partly within and also adjacent to a
number of ecological designations including the Inner Clyde Special Protection
Area (SPA); the Ramsar site; and Site of Special Scientific Interest (SSSI). 
Page 16

Page 17

The planning permission in principle application was also considered in detail
by NatureScot who, in their consultation response, concluded the site could be
developed in a way which would not have an adverse impact on the SPA and
other relevant ecological designations, subject to the suitable mitigation
measures proposed being in place and a range of planning conditions
addressing a variety of matters. 
7.21 In recognition of the high mobility of wildlife and that the ecological baseline
may change between the granting of planning permission and works being
undertaken on site, Condition 30 of the Planning permission in principle
requires the current application to be informed by updated protected species
surveys and species protection plans where appropriate. The updated surveys
found that the habitat within and adjacent to the site remained generally
unsuitable for water vole. No field signs of badger were found within the site or
the 100 metre survey buffer and it is noted that woodlands to the west of the
site lack suitable embankments for setts to be excavated and human
disturbance along the cycle path would likely discourage badgers. 
7.22 Turning to bats, a preliminary roost assessment (PRA) was carried out in 2020
and identified trees which had the potential to support roosting bats across the
wider site. A revised PRA was carried out in March 2023 with 20 trees re-
assessed within and immediately adjacent to the red line boundary. Trees
which had the potential to support roosting bats were then subject to a climbed
aerial inspection in August 2023. Of the 20 trees identified, none had high
potential to support roosting bats, 8 had moderate potential; 3 had low potential
and 9 had negligible potential. The climbed inspections did not identify any bat
roosts. Various recommendations are set out including felling trees under
supervision of a licenced bat ecologist, pre-felling inspections for any trees with
a moderate bat roost potential and where features are too large to be assessed
using an endoscope, activity surveys immediately prior to felling. In addition to
the tree assessments, the suitability of the site to support commuting and
foraging bats was re-assessed using static bat detectors. The applicant advises
that three visits were carried out across the survey season (May, August and
September 2023) with six detectors placed for a minimum of six nights to record
bats. Whilst bat activity was noted, no specific concerns are highlighted.
Recommendations including in respect of bat friendly lighting within the site are
set out. In further surveying protected species, otter were confirmed to remain
active within parts of the wider site and are known to have been present for a
number of years despite ongoing remediation works. Separately to this
application, the requirement for an otter mitigation strategy has been addressed
via condition 10 of the planning permission in principle. No additional concerns
arise in the submitted ecology survey in respect of this application.   
7.23 NatureScot have considered the current application submission in respect of
ensuring the proposals would not result in adverse effects on the integrity of the
adjacent Inner Clyde European Special Protection Area (SPA) and
underpinning Site of Special Scientific Interest (SSSI). In assessing the
planning permission in principle application, one of the key considerations was
the impact on overwintering birds inclusive of Redshank within the SPA/SSSI. 
Page 17

Page 18

As highlighted in the consultation response from NatureScot and reflected in
the Appropriate Assessment undertaken by the Council when considering the
Planning permission in principle application, in granting permission there was
a specific expectation that as far as is operationally possible any elements of
the construction programme with the highest potential for noise and vibrational
disturbance would be scheduled within the least sensitive ‘summer’ period of
the year, i.e. from April to August inclusive, when wintering Redshank are not
using the Inner Clyde estuary. The road and development platform
infrastructure works are significant elements of construction and have a high
potential for noise and vibrational disturbance. Of note is the proximity of the
works to install the western railway underbridge adjacent to the SPA/SSSI
boundary. As the installation of the western underbridge requires the closure of
the railway line which is expected to be restricted to the Christmas period, it is
now known that significant construction works will require to be undertaken
adjacent to the SPA/SSSI during the middle of the overwintering period. 
7.24 NatureScot advise in their most recent consultation response that mid-winter is
by far the most sensitive time for wintering birds as resources are scarce.
Therefore any displacement from what feeding and roosting habitat resources
that do remain available at this time can have potentially catastrophic
consequences for the birds’ energy reserves and therefore their ability to
migrate northwards again come the spring. Significant mitigation measures
could therefore be necessary if the railway crossing is to be delivered in a
manner that is compliant with the legislation. However the precise nature of the
measures required could depend significantly on the way in which the protected
birds actually utilise the areas of the SPA/SSSI that are within the 150 metre
‘disturbance distance threshold’ of the works. NatureScot go on to advise that
at present, information on this is limited. The habitat that is both within this
radius and within the designation appears unsuited to feeding and there is no
recent information on whether any bird species utilise this area for roosting. It
will therefore be essential that further updates of wintering birds include a focus
on this specific area of the Inner Clyde SPA/SSSI. Only when an understanding
of how the bird’s use this area has been achieved do NatureScot consider it will
be possible to determine what mitigation measures will be adequate to ensure
compliance with the statutory protection afforded to the SPA/SSSI. NatureScot
further state they will be able to advise further on the required mitigation
measures required for this particular aspect of the development once the full
results of the new wintering bird surveys/investigations are completed.
Discussions with NatureScot have concluded that measures which ensure that
the western underbridge can be delivered without the risk of disturbance to the
protected birds of the Inner Clyde should ideally be brought forward as part of
an updated Construction Environmental Management Plan (CEMP). This is the
approach set out by the applicant in the submitted ecology report which
provides an update on wintering birds on the site utilising a variety of available
data sources. Early winter 2023/24 survey work undertaken to date also
confirms that wintering bird behaviours are in line with the 2016/17 surveys. A
condition will ensure that all further survey work is completed and submitted
together with an updated CEMP and any mitigation requirement prior to any
work during the overwintering period. 
Page 18

Page 19

7.25 The Council’s Biodiversity Officer has also considered the ecology submissions
and is content with the approach taken together with the methodology and
findings. She specifically highlights the requirement to follow the mitigation set
out in terms of bats together with the potential licencing requirements for otter.
Tool box talks to relevant site staff require to be carried out in relation to
protected species on site and pre-construction walk over surveys take place at
each phase. The RSPB also highlighted the requirement for the spine road to
feature landscape screening to provide a buffer to the SPA/SSSI. The applicant
has confirmed the proposal seeks to protect, retain, and enhance existing
vegetation along the route including the avenue tree planting along the new
spine road, supplemented with native scrub planting and Hornbeam and
Hawthorn hedgerows and marginal planting. These planting treatments aim to
deliver a strong green infrastructure to filter views to and from the road,
embedding the new infrastructure into its surrounding environment, limiting
impacts to existing sensitive features. Screening is therefore provided as part
of the proposal. The lack of survey information is highlighted but full survey
details have now been submitted and have been fully considered. A Tern colony
within the site is highlighted in the RSPB’s response. The applicant has
confirmed that the area of the site where Terns are found falls under Phase 3.
As such, proposals for this area including proposals affecting the old dock
infrastructure (where the common Tern’s nest) will be confirmed at the future
relevant stage. 
7.26 The requirement for biodiversity enhancement is raised in the objections and
also questioned by the RSPB consultation response, with the objections
specifically highlighting the requirements of NPF4. The planning permission in
principle granted does not require biodiversity enhancements to be specifically
brought forward as part of the currently submitted application and the current
proposal relates to infrastructure works with limited associated landscaping.
NPF4 was also not in place at the time of the determination of the Planning
permission in principle.  Landscaping proposals for the site will come forward
as part of future phases of the development of the site and biodiversity
enhancement proposals can be brought forward as part of this. A pond which it
is considered should be retained for wildlife habitat is also highlighted in the
objections. No concerns regarding the loss of ponds within the site is
highlighted by the consultees and it is noted that the landscape strategy
identifies that a number of seasonal ponds exist within Zone E (Northfield and
Greenfield) an area which will be retained as open spaces and green corridor. 
7.27 Overall, subject to the approach set out above and the imposition of appropriate
conditions, the impact upon ecology, biodiversity and protected species within
and adjacent to the site remains acceptable. 
Roads, transport and sustainable access
7.28 Roads, transport and sustainable access matters were fully assessed, informed
by a Transport Assessment, in granting Planning permission in principle and
the proposed road layout follows the masterplan for the Planning permission in
principle. 
Page 19

Page 20

The modification and signalisation of the Dunglass roundabout and new road
access into the site from the A814 to the east together, with the new gyratory
arrangement which will replace existing Glasgow Road junction at Dumbuck to
the west have already been agreed in granting planning permission in principle
and conditions 20 and 21 require the upgrade work to be completed prior to the
occupation of any part of the site. Transport Scotland offer no objections to the
current application. They specifically highlight the requirements of conditions
20 and 21 of the Planning permission in principle and the requirement for a
detailed design package for the trunk road works. 
7.29 A key element of the development of the site is for the proposed spine road to
provide a relief road should there be a congestion issue or closure on the A82,
and this is achieved by the proposed design. In terms of sustainable access,
the proposed arrangement will facilitate active travel that makes it easy and
attractive for pedestrians cyclists and other users to move around the
development with a shared pedestrian and cycle path along one side of the
spine road. This will be complemented by further access provision such as the
waterfront walkway the details of which will be brought forward as part of future
phases of the development. New crossing points will also be provided on the
A82 at Dumbuck and the A814 at Dunglass. The cyclepath NCN Route 7
presently runs along the northern boundary of the railway line and the proposed
western and eastern access road connections to the development site will
impact on the current alignment of NCN Route 7. Realigned sections of NCN
Route 7 are therefore proposed to replace provision on a like for like basis, but
the opportunity has also been taken to enhance the route and provide
connections to the site.  A temporary diversion of the cyclepath route will be
required during construction and the applicant confirms that construction
sequencing discussions are currently ongoing in relation to this area, with the
detail yet to be concluded. This detail will be addressed separately via condition
22 of the Planning permission in principle. Overall, the Council’s Road’s Service
offer no objection to the proposal. 
7.30 Considering the alterations to the existing bus stops, the position of the existing
stops on the eastbound A82 at Dumbuck and both the eastbound and
westbound bus stops on the A814 at Dunglass will be adjusted to accommodate
the new road layout. On the A82 at Dumbuck, the position of the bus stop will
be adjusted and this will allow the creation of a bus layby to modern standards
with longer entry and exit slips and provide high access kerbs. SPT offer no
objections to this arrangement. Whilst a new three bay bus shelter is requested,
the applicant advises this cannot be accommodated within the available space
and the existing shelter will be relocated to take account of the relocated bus
stopping position. This is also not a new stop, but an existing stop and the
approach taken will have a neutral impact on existing bus service users. To
take account of initial comments raised by SPT, the positioning of the bus stops
on the A814 at Dunglass has been amended together with the provision of an
additional pedestrian crossing arm provided at the junction. SPT highlight
concerns at the proximity of the westbound bus stop to the traffic signals at the
eastern access to the site. 
Page 20

Page 21

The Council’s Roads Service advise that the bus stop position can generally be
accepted but it would require to be demonstrated that west bound AM peak flow
traffic would not be impacted by a bus using the stop and vehicles waiting to
turn left. It is request that modelling data to support this is submitted for
consideration and the Roads Service ask that this is addressed by condition. 
7.31 Overall, it is concluded that the design and layout of the development from a
roads, transport and sustainable access perspective is acceptable. 
Contamination and Ground Condition Matters
7.32 Contaminants from the former oil storage facility are being addressed via the
remediation undertaken by Esso and EXXON Mobil prior to the site being taken
over by the Council. In assessing the application for planning permission in
principle, both SEPA and the Council’s Environmental Health Section were
content that the remediation strategy will successfully mitigate the
contamination on site from the oil terminal use and enable its re-development.
Environmental Health  offer no objections noting that as this application relates
only to Phase 1 and 2 (infrastructure and development platforms) any
contaminated land remediation requirements will be addressed by the
implementation of the Earthworks and Material Management Strategy
previously submitted and agreed in terms of condition 6 of the Planning
permission in principle. It is recommended that the approved materials
management strategy is implemented and remain in place for Phases 1 and 2
of the development. It is further recommended that material to be used in the
top 300mm shall also be free from deleterious materials such as metals, plastic,
wood, glass, tarmac, paper and odours. These details can be addressed by
condition. SEPA have advised they no comments on site remediation or ground
conditions.   
Built and cultural heritage
7.33 The category B listed Dunglass Castle and the Henry Bell Obelisk lie within the
site. The masterplan for the planning permission in principle illustrated that the
proposed development had been orientated and sited so as to preserve the
setting and not compromise these buildings. The Phase 1 and 2 works follow
the masterplan and Historic Environment Scotland offer no objections.
Proposals for Dunglass Castle and the Henry Bell Obelisk will come forward via
future applications for phase 4 of the works on site. Archaeology is addressed
separately via condition 14 of the Planning permission in principle with a written
scheme of investigation and programme of works agreed via this condition. No
further archaeological matters arise. 
Other Technical matters
7.34 Conditions attached to the Planning permission in principle required a
Construction Environmental Management Plan (CEMP) and Construction
Traffic Management Plan (CTMP) to be agreed prior to this first application for
matters specified by condition which considers the detail of the phase 1 and 2
works. Accordingly, the documents were agreed at a relatively high level. 
Page 21

Page 22

In their consultation response, Environmental Health advise that additional
detailed information is required to ensure that  the phase 1 and 2 works will not
impact on sensitive receptors (for example residential properties) with regards
to the impact from noise, dust and air quality and construction activities. They
advise that with the CEMP previously approved being high level further details
specifically relating to the phase 1 and 2 works are required.   This can be
addressed by condition as can an accompanying updated CTMP. 
7.35 Flooding matters were fully considered in granting planning permission in
principle with flood risk management plans and construction flood response
plans being considered and agreed separately to this application via conditions
attached to the planning permission in principle. The Council’s Road Service
offer no objection on the grounds of flooding and SEPA advise they have no
comments to make on the application. Whilst Network Rail are involved in the
delivery of the project, in their capacity as planning consultee, they have no
objections to the proposal. 
Communications Strategy 
7.36 A  communications plan is being developed by the Council to ensure West
Dunbartonshire residents, businesses and elected members are well informed
at all of the various stages of this project. A range of communications tools will
be used to achieve this, including bespoke communications with those
businesses/residents impacted by ongoing work ahead of each key milestone;
working with key partners including Transport Scotland to ensure key
messaging is distributed to a wide audience to maximise reach; detailed
website updates; and social media posting on a regular basis. The Council will
also work closely with the contractor to put advance signage in place, issue
regular letter updates locally and publish online footage to track progress,
increase knowledge and engagement with the site and project. The Council
also participates in the Glasgow City Region City Deal Communications Group
and all updates will be shared with them, and align with wider messaging.  
Outstanding points raised in the objections
7.37 In considering the points of objection not already addressed through the
assessment above, concerns are raised regarding the lack of details in respect
of the area of the site known as Sheepfold. This area, also known as Greenfield,
primarily forms part of Zone E within the wider redevelopment site. Zone E will
comprise the open spaces and Green Corridor within the site and will remain
undeveloped. This Zone also includes the area for the waterfront pathway.
These aspects of the development are not considered as part of this
application. Whilst there is concern that the greenspaces within the site will be
developed and only limited parts of the site are retained as grassland and
woodland, the Greenfield and Northfield areas of the wider site (which comprise
Zone E) extend to some 14 hectares of 56 hectares site, comprising woodland,
grassland and marshy grassland. This area will remain undeveloped and
retained as open spaces and Green Corridor. Whilst the concerns regarding
climate change commitments is noted, planning permission in principle has
already been granted for the redevelopment of this site and this matter does
not require further consideration at this stage. 
Page 22

Page 23

7.38 The Planning permission in principle does not contain any specific requirements
in terms of equestrian access, however the site will be accessible to a range of
users as detailed in paragraphs 7.28 to 7.31 above. Any measures required to
prevent anti-social quad and motorbike use within the site would be a matter
for the landowner separate to the planning process. 
Elected Members Briefing
7.39 Prior to the submission of the application, an Elected Members Briefing was
held on 10th May 2023.  This briefing provided Members with details of the
infrastructure works and development platforms for Phases 1 and 2 of the
development of the site. Members were afforded the opportunity to highlight
any issues which they considered the forthcoming application submission
required to consider or address. The proposals to take forward Phases 1 and 2
of the development of the site were welcomed. Clarification was sought on the
phasing of the delivery of the new road infrastructure, the signalisation of the
junctions with the trunk road and the communications strategy informing the
public of the works. The delivery of works to Dunglass Castle was also queried.
These points are addressed in the development details and the assessment
above. 
8. CONCLUSION 
8.1 The acceptability of the re-development of the site is already established, with
the granting of planning permission in principle. This application considers
phases 1 and 2 of the development of the site comprising the road
infrastructure, development platforms and associated details relating to
compliance with the approved landscape strategy, bus stop details and review,
cycle path diversion and updated ecology and protected species surveys. The
proposal reflects the masterplan layout together with the parameters plan which
were approved under the planning permission in principle. 
8.2 Whilst the early phases of the development largely address road and
infrastructure development together with the development platforms,
placemaking and green infrastructure are embedded into the development of
the wider site even as part of these early phases. This will result in a
development which creates a quality place designed to take account of its
waterfront setting. The landscaping provided as part of the phase 1 works also
follows the approved landscape strategy. A much needed relief road is provided
which will alleviate congestion on A82 and provide an alternative access when
the A82 is closed. The proposed arrangement also will facilitate active travel
that makes it easy and attractive for pedestrians and cyclists to move around
the development with a shared pedestrian and cycle path along one side of the
spine road. New crossing points will be provided on the A82 at Dumbuck and
the A814 at Dunglass together with realigned sections of Cyclepath NCN Route
7.   
Page 23

Page 24

8.3 The site features a number of habitats together with the Inner Clyde SPA/SSSI
Updated ecology and protected species surveys are acceptable.  The potential
impact upon the overwintering birds within the SPA/SSSI remains a sensitive
issue and further details in terms of protection and mitigation can be addressed
by condition, informed by additional survey work beyond that already provided. 
8.4 It is considered that the proposals for phases 1 and 2 accord with the provisions
of NPF4, the adopted West Dunbartonshire Local Plan and proposed West
Dunbartonshire Local Development Plan 2.   The  delivery of the first two
phases of this ambitious development proposal is welcomed which seeks to
bring the large waterfront former oil terminal site back into use with new
development proposals to support the local economy and provide alternative
road and transport routes. 
9. CONDITIONS 
1. Other than the details approved for Phase1 and 2 in terms of this permission, 
no approval is given in respect of the position of all buildings, footpaths,
waterfront walkway, green corridors, open space, boundary treatments and
drainage infrastructure in respect of the requirements of Condition 1(a) of
planning permission in principle DC20/088 and the approval of these details
shall be sought via further applications for matters specified by conditions in
connection with the further requirements of Condition 1(a) of planning
permission in principle DC20/088. 
2. That prior to the commencement of development works with the exception of
those in connection with site set-up and creation of development compounds
on site, a full planting schedule for all landscaping and new tree planting hereby
approved in connection with the Phase 1 works together with the timescale for
implementation shall be submitted to and approved in writing by the Planning
Authority. The schedule will set out how tree planting is maximised in
compensation for those lost. The landscaping shall then be implemented as
approved unless otherwise first agreed in writing by the Planning Authority. 
3. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping in
connection with the phase 1 works shall be replaced within the next planting
season with others of a similar size and species. 
4. That prior to the commencement of development works on site, full details of
maintenance and management for the landscaping approved in connection with
the Phase 1 works shall be submitted to and approved in writing by the Planning
Authority, unless otherwise first agreed in writing by the Planning Authority. 
Management and maintenance shall commence within a timescale agreed with
the Planning Authority.   
5. Prior to the felling of any trees within the site a scheme for the use of felled
timbers for structures within the site including (but not limited to) benches,
sculptures and wildlife features shall be submitted to and approved in writing.
Page 24

Page 25

The scheme shall then be implemented as approved unless otherwise agreed
in writing by the Planning Authority. 
6. All recommendations within the Ecology Survey Report dated November 2023
and associated 2023 Ecology Technical Report date October 2023 shall be
followed. This shall include all required mitigation during the works on site.  All
further survey work undertaken shall be submitted to and approved in writing
by the Planning Authority prior to the commencement of development works on
site with no works including vegetation clearance within the vicinity of
SPA/SSSI.  Any mitigation measures arising from the further survey work shall
be implemented as approved. 
7. Notwithstanding condition 6 above, no tree works, removal or scrub clearance
shall occur on site from March through to August (inclusive) each year unless
otherwise agreed in writing with the Planning Authority prior to clearance works
commencing. In the event that clearance is proposed between March to August
(inclusive), a suitable bird nesting survey shall be carried out by a suitably
qualified ecologist covering the proposed clearance area and shall be submitted
to and approved in writing by the Planning Authority before those clearance
works commence. Once written approval has been given, the works themselves
should be carried out within a specified and agreed timescale. 
8. Notwithstanding condition 6 above, no development works shall be undertaken
on site with no works including vegetation clearance within the vicinity of the
SPA/SSSI during the period September to March inclusive until a further full
winter survey is undertaken in respect of wintering birds within the SPA / SSSI
with the survey results and recommendations submitted to and agreed in writing
by the Planning Authority in consultation with NatureScot.   
9. Prior to any development works on site with no works within the vicinity of
SPA/SSSI during the period September to March inclusive, the survey results
and recommendations that require to be submitted in connection with condition
8 above shall be used to formulate a detailed mitigation strategy in respect of
the impact of any construction works within the site on the wintering bird
population of the SPA / SSSI. This mitigation strategy shall be submitted either
as part of an updated Construction Environmental Management Plan (CEMP)
focusing on the Phase 1 and 2 works or as a standalone document
accompanying the updated CEMP and approved in writing by the Planning
Authority in consultation with NatureScot. All mitigation shall then be
implemented as approved unless otherwise first agreed in writing by the
Planning Authority. 
10. Prior to the commencement of development works on site, full details of how
toolbox talks to ensure all site personnel involved in Phase 1 and 2 of the
development are aware of matters relating to ecology and protected species
will be delivered to ensure that all personnel are aware of what to do should
evidence of species be discovered during construction shall be submitted to
and approved in writing by the Planning Authority. The agreed approach shall
Page 25

Page 26

then be implemented unless otherwise first agreed in writing by the Planning
Authority. 
11. That prior to the commencement of development works on site in connection
with Phases 1 and 2, an updated Construction Environmental Plan (CEMP)
specifically addressing the Phase 1 and 2 works shall be submitted to and
agreed in writing by the Planning Authority. For the avoidance of doubt, the
CEMP will consider (but not be limited to) the impact from noise, dust and air
quality and construction activities for Phases 1 and 2. The CEMP for Phases 1
and 2 of the development shall thereafter be implemented on site as approved
unless otherwise first agreed in writing with the Planning Authority. 
12. That prior to the commencement of development works on site in connection
with phases 1 and 2, an updated Construction Traffic Management Plan
(CTMP), specifically addressing the Phase 1 and 2 works shall be submitted to
and agreed in writing by the Planning Authority. The CTMP for Phases 1 and 2
of the development shall thereafter be implemented on site as approved unless
otherwise first agreed in writing with the Planning Authority. 
13. Notwithstanding condition 12 above, all vehicles transporting construction
material to and from the proposed development shall be sheeted, unless
otherwise first agreed in writing with the Planning Authority. 
14. Notwithstanding condition 12 above and prior to the commencement of any
works on site in connection with Phases 1 and 2, vehicle wheel cleaning
facilities shall be installed and brought into operation on the site, unless
otherwise first agreed in writing with the Planning Authority. 
15. The Materials Management Strategy previously submitted and approved in
connection with condition 6 of Planning permission in principle DC20/088 shall
be fully followed at all times during the Phase 1 and 2 works hereby permitted
unless a modification is first agreed in writing by the Planning Authority. 
16. All material to be used in the top 300mm of the development platforms shall be
free from deleterious materials such as metals, plastic, wood, glass, tarmac,
paper and odours. On completion of the works in respect of each of the two
phases hereby permitted the developer shall submit for approval to the
Planning Authority a verification report containing details of the source of the
material and associated test results to demonstrate its suitability for use. 
17. That unless otherwise agreed in writing by the Planning Authority,  prior to
service buses commencing use of the relocated eastbound bus stop on the A82
at Dumbuck, the existing bus shelter shall be relocated to the new stopping
position. The final position of the shelter shall first be submitted to and agreed
in writing by the Planning Authority.   
18. That prior to any alterations or works commencing affecting the A814, the traffic
modelling data to support the position of the westbound A814 bus stop and
demonstrate that westbound traffic flow will not be impacted by a bus using the
Page 26

Page 27

stop and vehicles waiting to turn left shall be submitted to and approved in
writing by the Planning Authority. 
19. That prior to the commencement of development works on site, a
communications strategy designed to make road users, local residents, local
business owners and the public in general aware of the proposed works, the
likely impact upon the locality and updates of progress in respect of the Phase
1 and 2 works hereby permitted shall be submitted to and approved in writing
by the Planning Authority. The strategy shall then be implemented as approved
unless otherwise first agreed in writing by the Planning Authority. 
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 17th January 2024   
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager 
Pamela.Clifford@west-dunbarton.gov.uk 
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk  
Appendix: Location Plan   
Background Papers: 1.  Application forms and plans 
2.  Consultation responses 
3.  National Planning Framework 4 
4.  West Dunbartonshire Local Plan 2010 
5.  Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended 
7. Public objections 
8. Planning permission in principle DC20/088
9.  Planning permissions DC11/218,
DC18/013,DC20/182 
Wards affected: Ward 3 (Dumbarton) 
Page 27

Page 28

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 04/01/2024.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:12,000@A404/01/2024
ITEM 4a - APPENDIX 1 - LOCATION PLAN
Page 28

Page 29

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 17th January 2024
DC23/149/FUL: Erection of 128 residential homes, associated roads,
infrastructure and open space on existing brownfield site,
Residential Development Site, Abbotsford Road, Clydebank
by Miller Homes.
1. REASON FOR REPORT
1.1 The planning application is a national development as set out in the Schedule
to the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009 as the application site sits within the Clyde Mission area as
set out in National Planning Framework 4. Under the terms of the approved
Scheme of Delegation, it therefore requires to be considered by the Planning
Committee before being determined by the Council. 
2. RECOMMENDATION
2.1 That the Planning Committee hears the applicant and those who have made
representations and refers the application to full Council for determination with
a preliminary recommendation, based on the information considered to date,
that it be approved, subject to the conditions in Section 9 below. 
3. DEVELOPMENT DETAILS
3.1 The application site is located within the town centre of Clydebank, on the site
of the former Playdrome Leisure Centre and car park, and extends to
approximately 3.56 hectares in size. The site’s northern boundary adjoins the
Forth and Clyde Canal which is a scheduled monument. To the east is Argyll
Road and to the south is Chalmers Street with the elevated Helensburgh to
Glasgow railway line beyond. To the west of the site is Abbotsford Road and
the rear of commercial units associated with Alexander Street. The surrounding
uses are predominantly community and retail based, with residential properties
located opposite of Argyll Road. 
3.2 The Playdrome Leisure Centre closed in 2017 and following the opening of a
new Leisure Centre on Queens Quay. Works to demolish the building and clear
the site were completed in early 2022. The majority of the application site now
lays vacant with a mix of hardstanding, hardcore areas that are starting to green
following demolition as well as existing amenity planting throughout the site as
well as around the boundary. The application site also incorporates Abbotsford
Road which remains open together with a car park located to the west of
Abbotsford Road. These spaces are currently used by visitors to facilities
nearby including the Clyde Shopping Centre. 
ITEM 4b
Page 29

Page 30

The turning area adjacent to the existing Clydebank Waterfront Parish Church
which is accessed via Abbotsford Road is also included in the development site.
3.3 Planning permission is sought for the construction of one hundred and twenty
eight houses and associated works. The development comprises of a range of
dwelling sizes including fourteen, two bedroomed properties, one hundred and
thirteen three bedroom properties and one, four bedroom property. These are
mixed across the site between semi-detached and terraced properties. There
are eight different house types across the mostly flat site which would be a mix
of two and three storey in height. External materials are proposed to comprise
of grey concrete roof tiles, facing bricks together with dark grey uPVC windows
and doors. Each property will feature adjacent parking either within street bays
or parking courts as well as private garden areas. Rear gardens will be defined
by 1800mm high timber slatted fences as well as 800mm timber dividing fue
fences. Boundary fences will also include localised sections of acoustic fencing
to a maximum height of 3 metres. The terraced blocks which spans Chalmers
Street and Argyll Road incorporated a feature corner property in order to allow
the terrace to curve around the corner. These properties will be outward facing
from the site. Along Abbotsford Road, and more briefly along Chalmers Road,
the configuration of the three storey townhouses creates a saw tooth style
arrangement due to the gable facing front elevation. The remainder of the
houses predominately have their principle elevation to the internal roads and
paths of the site. Other design features such a canopies, solar panels and
Juliette balconies are proposed on various house types. 
3.4 There is one existing vehicular access point on Chalmers Street from which it
is proposed to maintain and extend site access from. The access from
Chalmers Street, onto Abbotsford Road also serves an existing car park as well
as access to the rear of commercial properties and this access is retained as
part of the development as is access to the Church. As noted above, each
house is proposed to have its own dedicated parking space meaning one
hundred and twenty eight spaces are provided with an additional twenty two
visitor parking spaces located throughout the development. Three electric
vehicle charging points are proposed to be located within these visitor parking
spaces. Twenty eight further spaces are proposed to be created to serve the
existing properties including the adjacent Credit Union, Salvation Army and
Church of Scotland – Waterfront Parish Church buildings. Internally to the site,
four new roads are to be created as well as an internal car park. There are a
network of new footpaths proposed throughout the site with six pedestrian links
to the wider surrounding area. 
3.5 The proposal features open and amenity green space. This is principally
comprised of a large area of open space which incorporates play provision to
the north of the site and an area of open space within a linear park running
along the western boundary of the site, totalling an area in excess of 6700sqm.
Additionally, the eastern and western boundaries of the site have green strips
between the housing and the boundary which allows for much of the existing
boundary treatment to be retained. Small pockets of green space are also
proposed throughout the internal layout of the site. 
Page 30

Page 31

3.6 In support of the application, the applicant has submitted a range of supporting
documentation and information including a Supporting Statement, NPF4
Assessment, Response to Clyde Mission, Pre-application Consultation Report,
Design and Access Statement, Transport Statement, Travel Plan, Tree Report,
Ecological Constraints Survey, Energy Statement, Statement of Community
Benefit, Noise Impact Assessment, Factoring and Management Proposal and
3rd Party Access Statement.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have no objection to the proposal
in respect of roads and parking, other than the proposed temporary construction
access. No objections on flooding matters.
4.2 West Dunbartonshire Council Environmental Health Service have no objections
subject to conditions relating to an updated report on contaminated land, further
associated contaminated land conditions, an updated Noise Impact
Assessment, construction noise, hours of work, piling, dust control, air quality,
lighting and waste.
4.3 West Dunbartonshire Council Biodiversity Officer has no objections to the
proposed development.
4.4 West Dunbartonshire Council Dept. Of Education and Cultural Services have
no objections to the proposed development based on the capacity and current
roll numbers for high schools and primary schools within the area. 
4.5 Historic Environment Scotland have no objections to the proposed development
but note the need for Scheduled Monument Consent in relation to works located
within the scheduled area of the Forth and Clyde Canal. 
4.6 Glasgow Airport no objections but note that the use of a crane will require
consultation with the airport. 
4.7 Scottish Canals have no objections to the proposed development.
4.8 The Coal Authority have no objections to the proposed development further to
the submitted letter confirming that the thick coal seam outcrop is not expected
to bisect this site, specifically owing to a fault.
4.9 Scottish Water, Scottish Power, Scottish Environmental Protection Agency
(SEPA), Strathclyde Partnership for Transport (SPT) and West of Scotland
Archaeology Service have no objections to the proposed development. 
5. REPRESENTATIONS
5.1 Three representations have been received in connection with the proposed
development which includes objection submitted on behalf of Marie McNair
MSP, the Clydebank Co-operative Society and one member of the public.
Page 31

Page 32

The full details are contained within the planning file and are available for public
viewing. However, the points raised can be summarised as follows:
• The proposal will have a significant negative impact to the local area.
• This application will virtually erode the car parking spaces that remain.
• The proposed development fails to meet the West Dunbartonshire Council
parking standards.
• There will be a loss of 192 spaces including 5 accessible spaces which
service local shops and businesses at the Clydebank Shopping Centre.
• Local businesses which will be impacted are against this proposal as are
those who use this car park and visit Clydebank Shopping Centre for social
activities and essential shopping.
• There will be more limited entry for those who depend on travelling by car
to Clydebank Shopping Centre where business and employment are
already being hit by online and city traders.
• An approval would have an adverse impact on the economic welfare, not
only to Clydebank Shopping Centre, but to the community of Clydebank.
• The removal of the car parking will seriously undermine active travel, as this
facility is used by the public who commute from Clydebank train station for
work and leisure.
5.2 The matters raised above are considered and addressed in Sections 6 and 7
below.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy Framework 4
6.1 Eighteen National Developments have been identified within NPF4. These are
significant developments of national importance that will help deliver the spatial
strategy. NPF4 highlights that National Development status does not grant
planning permission and all relevant consents are required. Clyde Mission is a
national development focused on the Clyde and an area up to 500 metres from
the river edge. One of the aims is to repurpose and reinvigorate brownfield land
and support local living. The site lies partly within the Clyde Mission area and
the proposed development will revitalise a vacant brownfield site within the town
centre and Clyde Mission area. 
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises. Policy 2 also relates to the climate in the form
of climate mitigation and adaptation and states development proposals will be
sited and designed to minimise lifecycle greenhouse gas emissions as far as
possible and development proposals will be sited and designed to adapt to
current and future risks from climate change.
6.3 Policy 3 requires development proposals to contribute to the enhancement of
biodiversity. The policy goes on to set out the requirement for proposals for
national and major development to demonstrate that it will conserve, restore
and enhance biodiversity. 
Page 32

Page 33

Policy 7 addresses the historic environment and supports development
affecting scheduled monuments where direct impacts on the scheduled
monument are avoided, and significant adverse impacts on the integrity of the
setting of a scheduled monument are avoided. 
6.4 As the site has been previously developed, Policy 9 addressing brownfield,
vacant and derelict land applies. Development proposals that will result in the
sustainable reuse of brownfield land including vacant and derelict land and
buildings, whether permanent or temporary, will be supported.
6.5 Policy 13 supports proposals to improve, enhance or provide active travel
infrastructure, public transport infrastructure or multi-modal hubs. This includes
proposals for electric vehicle charging infrastructure. 
6.6 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale as per Policy 14.
Policy 15 relates to local living and 20 minute neighbourhoods. Development
proposal will contribute to local living including, where relevant, 20 minute
neighbourhoods. Consideration will be given to existing settlement pattern, and
the level and quality of interconnectivity of the proposed development with the
surrounding area, including local access to affordable and accessible housing
options, ability to age in place and housing diversity.
6.7 Policy 16 relates to quality homes. Part (b) requires development proposals that
include 50 or more homes to be accompanied by a statement of Community
benefit. Part (c) supports proposals for new homes that improve choice, this
includes a range of size of homes. Part (f) states that development proposals
for new homes on land not allocated for housing in the Local Development Plan
will only be supported in limited circumstances where: the proposal is supported
by an agreed timescale for build-out; the proposal is otherwise consistent with
the plan spatial strategy and other relevant policies including local living and 20
minute neighbourhoods; and either delivery of sites is happening earlier than
identified in the deliverable housing land pipeline, the proposal is consistent
with policy on rural homes, is for smaller scale opportunities within an existing
development or the proposal is for the delivery of less than 50 affordable homes
as part of a local authority supported affordable housing plan.
6.8 Green infrastructure is considered through Policy 20. Proposals incorporating
new or enhanced blue and/or green infrastructure will be supported. Where
appropriate, this will be an integral element of the design that responds to local
circumstances
6.9 Policy 21 relates to play, recreation and sport and requires development
proposals that are likely to be occupied or used by children and young people
to be incorporate well designed, good quality provision for play at an appropriate
scale. New streets should be inclusive and enable children and young people
to play in the neighbourhood. New play provision will as far incorporate a range
of requirements including being accessible. 
Page 33

Page 34

6.10  Policy 22 - Flood risk and water management states that proposals will not
increase the risk of surface water flooding to others, or itself be at risk; manage
all rain and surface water through sustainable urban drainage systems (SUDS),
and seek to minimise the area of impermeable surface. Policy 23 does not
support proposals which are likely to raise unacceptable noise issues. The
agent of change principle applies to noise sensitive development. Policy 24
supports proposals that incorporate appropriate, universal, and future-proofed
digital infrastructure.
6.11 Policy 27 - City, town, local and commercial centres part (e) relates to town
centre living. Development proposals for residential development within
city/town centres will be supported, including new build residential
development.
6.12 The proposed development lies partly within the Clyde Mission area where the
redevelopment of underused brownfield sites is supported. Following a policy
assessment, it is concluded that the detail of the proposal is supported by NPF4
and is assessed fully in Section 7 below. 
West Dunbartonshire Adopted Local Plan 2010 
6.13  Policy UR1 encourages the redevelopment and re-use of underused, vacant
and/or derelict land and buildings for appropriate uses such as housing. Policy
RD1 give preference to residential development on brownfield sites within the
urban area rather than on greenfield land. 
6.14 Policy H4 sets out standards expected of residential development, requiring
high quality design in the range of house types and sizes and in terms of form,
layout and materials. Policy H5 safeguards and where possible enhances the
character and amenity of existing residential area. Policy GD1 seeks to ensure
that all new development is of a high quality of design and respects the
character and amenity of the area. 
6.15 The site is listed in Schedule RET4 – Retail Development Opportunities.
RET4(2) is identified as being an opportunity for the erection of a Class 1
superstore of 8000sqm. These opportunity sites will be supported by the
Council for retail development subject to conformity with the provisions of Policy
RET 2 and other Local Plan policies. 
6.16 Policy RET5 seeks to improve the environment of the town centre of Clydebank
in partnership with other agencies. Applications for non-retail uses within the
designated town centres, will be favourably considered where they contribute
to the vitality and viability of the town centre and do not conflict with other Local
Plan policies. 
6.17  Policy BE 5 relates to Scheduled Ancient Monuments and other Archaeological
Sites. As the Forth and Clyde Canal is scheduled monument this policy applies.
Policy R4 – Forth and Clyde Canal also applies. Part A of this policy states
there will be a general presumption against development which is not
compatible with the objective of protecting and improving the recreational and
navigational amenity of the canal. 
Page 34

Page 35

Part C encourages recreational and sporting activities adjacent to the canal.
Part D relates to footpaths on the offside and Part F seeks to orientate
development towards and integrate with the canal. Policy BE2 seeks to ensure
that the setting of any listed building is not adversely affected. 
6.18 Policy R2 specifies the open space provision required for all developments.
Assessment of open space requirements has been undertaken against the
more updated “The Green Network and Green Infrastructure Guidance -
November 2022 as set out in Section 7 below. 
6.19  Policy T1 and T4 requires sites to be integrated with sustainable travel. Policy
E1 relates to the Council’s biodiversity duty and Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable
tree planting. Policies F1 and F2 aim to ensure that new development is not at
risk from, and does not increase the risk of flooding, and has suitable SUDS
drainage infrastructure. Policy DC7 supports the inclusion of on-site micro-
renewable technologies. 
6.20  As the site is identified within the adopted Local Plan as a retail development
opportunity, the proposed residential development is contrary to the Plan.
Following a full assessment of the application proposal, it is considered that the
material considerations are such that a departure from the adopted Local Plan
can be justified. This assessment is set out fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration.
7.2 The Clydebank Town Centre Development Strategy supports a range of
development including: 
• Maintaining the Clyde Shopping Centre as an attractive retail core while
allowing a greater mix of uses throughout the Town Centre;
• Developing a stronger evening economy, leisure opportunities and greater
residential development within and around the Town Centre;
• Transforming the area around the Forth and Clyde Canal as a focal point
and multi-functional area for recreation which connects people again with
the Canal; and
• Development of the former Playdrome site.
Page 35

Page 36

7.3 Clydebank Policy 3 encourages a mix of uses on the Playdrome site that deliver
high quality place-making and design standards. Development proposals
should align with the site briefs and Clydebank Can Guidance. On the
Playdrome site, development proposals for retail units that integrate with and
provide a strong frontage and relationship with the Canal, in accordance with
Policies WD1 and FCC1, will be supported.
7.4 Clydebank Proposal 1, Co-operative Building relates to proposal for the Co-
operative Building but also its setting and character for proposals in the
surrounding area due to its Category B listing. 
7.5 Policy CP1 seeks to ensure that housing is of a high quality, adaptable and is
designed to be suitable for a mix of occupants. It indicates that all new
development will be expected to contribute towards creating successful places
by having regard to the six qualities of a successful place (distinctive,
adaptable, resource efficient, easy to get to/move around, safe and pleasant,
and welcoming). Policy CP2 requires the integration and consideration of green
infrastructure from the outset of the design process through to its maintenance
and stewardship of the resource.
7.6 Policy H4 relates to residential amenity. The policy states that the Council will
protect, preserve and enhance the residential character and amenity of existing
residential areas at all times.
7.7 Other Town Centre areas (non-core town centre) are covered in Policy SC3.
Proposals for non-retail uses, including housing will be supported in these areas
where the development encourages visits to the Town Centre and are
appropriate to the Town Centre’s role and function. 
7.8 As the proposal area is within the scheduled area for the Forth and Clyde Canal,
applies. Policy BE1 states that where development would adversely affect a
scheduled monument or the integrity of the setting of a scheduled monument,
permission will only be granted where there are exceptional circumstances.
Policy FCC1 also relates to the canal and seeks to enhance this green network
asset. Development that would have an adverse impact on the canal or its
setting will not be permitted.
7.9 Policies GI2 and GI4 relate to green infrastructure. Policy GI2 requires new
development to meet with the open space standards set out within the policy.
Where a development has difficulty providing these standards on site, or where
a relaxation of the standards can be justified, developers will require to accord
with Policy GI4 and provide a contribution towards the types of projects outlined
within the policy and detailed in the Green Network and Green Infrastructure
Planning Guidance. GI4 sets out the requirements for Developer Contributions.
Policy CP2 requires the integration and consideration of green infrastructure
from the outset of the design process through to its maintenance and
stewardship of the resource.
Page 36

Page 37

7.10 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree, water
environment and flooding policies of the adopted Local Plan. Policy ENV8
requires developments to address air quality, lighting and noise as part of the
planning process, whilst policy ENV9 requires all potentially contaminated sites
to be remediated where necessary to ensure that the site is suitable for the
intended use.
7.11 Policy CON1 requires that significant travel generating uses are designed to
encourage sustainable transport. CON3 encourages improvements to core
paths, natural routes and access and Policy CON4 sets out a need for all
developments to install sufficient broadband provisions.
7.12 RE4 encourages micro-generation within or associated with individual
properties and Policy RE5 relates to low and zero carbon buildings and states
that new buildings should conform to the sustainability standards. 
7.13 It is considered that the development proposal being assessed complies with
the relevant policies and development strategy as addressed below.
Creating Places Guidance and Green Network and Green Infrastructure
Guidance
7.14 The Creating Places Guidance – November 2022 seeks to achieve high quality
development with a design led approach based on a thorough appraisal of the
site and an analysis of its context, and sets out that this is expected for all
development proposals. The proposal has been informed by a comprehensive
pre-application process as encourage by the Guidance. This has resulted in a
development proposal that achieves a high quality design that responds to the
local context and accords with the approach set out in the Creating Places
Guidance. 
7.15 The Green Network and Green Infrastructure Guidance - November 2022
seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space
created. This will include a focus on biodiversity enhancement. The on-site
provision follows the above Guidance in respect of residential development
proposals. The open space also integrates with the wider green network
adjacent inclusive of pathway connections and accords with the above
Guidance.
Clydebank Town Centre Development Framework 2021
7.16 This document provides a framework for Clydebank town centre to deliver the
social and cultural ambitions of the community. The document identifies that
what is needed now, amongst other things, is residential development within
the town centre. The Playdrome site itself is shown as a residential site within
the Priority Phase 1 within this document. Also identified within the vision for
Clydebank Town Centre is the reconnection of the new “centre” with the canal,
the river and transport infrastructure to create a new public “heart” for the town.
One of the key concepts of this is a new linear park connecting the town centre
to Queens Quay and the Forth & Clyde Canal which is brought forward as part
of this application. 
Page 37

Page 38

Whilst the Framework sets out a development mix of flatted blocks together
with family housing, the proposal being considered does not include flats nor
does it incorporate some ground floor active uses to key edges and corners of
the site as identified in the Framework as a potential approach, overall, the
development is supported by the Framework. 
Principle of Development
7.17 The site is a brownfield site within the town centre of Clydebank. It is not
specifically identified in either the adopted Local Plan (LP) or the proposed
Local Development Plan 2 (LDP2) as a residential development opportunity.
Whilst not identified as a residential development opportunity, the sustainable
re-use of brownfield land is supported through Policy 9 of NPF4. Policy 16
requires development proposals for 50 or more homes to be supported by a
Statement of Community Benefit and this has been provided by the applicant.
The Statement demonstrates that the proposal meets local housing
requirements, enhances local infrastructure and improves the residential
amenity of the surrounding area and brings residential development back into
the town centre. Policy 16 also supports development proposals for new homes
on land not allocated for housing where they are supported by an agreed
timescale for build-out, that the proposal is otherwise consistent with the plan
spatial strategy and other relevant policies including local living and 20 minute
neighbourhoods. However Policy 16 also requires housing on allocated sites to
either be delivery of sites earlier than identified in the plan, consistent with policy
on rural homes, for smaller scale opportunities, or for less than 50 affordable
homes as part of a local authority supported affordable housing plan. This
proposal does not fit into any of these categories however it should be
acknowledged that the aspirations for the site have changed since both the
adopted Local Plan and proposed Local Development Plan 2 were written.
West Dunbartonshire Council’s 2021 Clydebank Town Centre Development
Framework identifies the former Playdrome site as a site primarily for residential
development and is supported by Policy 15 encouraging local living. 
7.18 The site now also sits within the Clyde Mission Area. The Clyde Mission is
focused on the River Clyde and the riverside from South Lanarkshire in the east
to Inverclyde and Argyll and Bute in the west and focusing on an area up to
around 500 metres from the river edge. Clyde Mission is an ambitious
redevelopment programme being taken forward. It is a collective, cross-sector
effort and partnership working will help bring forward assets and sites that are
ready for redevelopment to sustain a range of uses. Mixed use, including
residential and redevelopment of brownfield land is within the designation and
classes of development contributing to Clyde Mission. In further assessing the
application proposal, it is also noted that this site was first taken to market by
this Council in 2009. Given the location of the site within the town centre, the
primary focus was to regenerate the site for commercial/retail uses. However,
due to a shift in market trends, the site is no longer attractive for such uses.
Having attempted to dispose of the site for nine years for commercial uses, it is
clear that the site being brought forward for residential uses is the only, current
viable development option which also meets the ambitions of Clydebank
Development Framework and NPF4. 
Page 38

Page 39

7.19 The proposal to redevelop underused and vacant land is also supported by
Policy UR1 of the Local Plan together with Policy RD1 which sets out a
preference for residential development on brownfield sites. Policy H2 of
proposed LDP2 supports new housing development on sites in Schedules 2
and 3, this Policy does not preclude the development of other sites where
appropriate. 
7.20  Policy 27 of NPF4 further supports the development of housing on this site. The
site is identified as being part of the Town Centre in the adopted Local Plan.
Part (e) of Policy 27 supports development proposals for residential
development within town centres including new build residential development.
Within the LDP2, Policy SC3 supports housing where the development
encourages visits to the town centre and are appropriate to the Town Centre’s
role and function. The role and function of town centres in general has changed
in recent times with a reduction in the floorspace required. A housing
development retains people within the town centre, extending its hours of use
and increasing its role and vibrancy. The Clydebank Town Centre Development
strategy further supports the position of bringing residential development into
the town centre by encouraging allowing greater mix of uses throughout the
town centre and also identifies the Playdrome site as a site for development.
Policy 15 of NPF4 supports development proposals that will contribute to local
living including, where relevant, 20 minute neighbourhoods. The provision of
new residential properties within an accessible town centre area inclusive of
nearby transport links contributes to local living in accordance with the policy.
7.21 Overall, the application site is identified as a retail development opportunity
within the adopted Local Plan and not specifically as a residential development
opportunity within proposed Local Development Plan 2. Whilst the development
does not meet the criteria of Policy 16 of NPF4 more weight should be attached
to other NPF4 policies regarding local living, town centre living and the use of
brownfield sites. Therefore, the principle of the development of housing on this
brownfield site, situated within the town centre of Clydebank and within the
Clyde Mission area can be supported. A departure from the development plan
can therefore be justified in this instance for the reasons outlined above.
Site Layout, Design and Appearance
7.22 New residential layouts require to be well designed, take cognisance of the
setting into which they are introduced and provide a high quality environment
of well-designed buildings in a setting of gardens and open space whilst
recognising the impact on existing neighbouring properties. The site is located
within the defined town centre, however, residential areas lie to the east and to
the south beyond the railway. To the south, on Whitecrook Street (which has
its rear gardens bounding Argyll Road) there are three storey terraced tenement
flats and to the south are a mix of two storey, terraced houses as well as four
storey blocks of flats although these are blocked from view by the railway line.
The proposed development follows the overall theme and pattern of
development by emulating the terraced pattern in the locality whilst providing a
wider range of housing types in the housing sizes. It is considered that the
density of development is compatible with the character and amenity of the
wider adjacent residential area and appropriate for a town centre location. 
Page 39

Page 40

7.23 It is recognised that the layout requires to be designed to respond to the
constraints of the site, including surrounding roads, commercial properties and
the adjacent canal which is a scheduled monument. A large sewer is also
located under the northern part of the site fronting the canal. There is one
existing vehicular access point which will remain as is with a main loop road
extending from this through the new development with further streets spurring
off. Pedestrian links are, however, strengthened with multiple pedestrian links
to and from the site from Argyll Road as well as a pathway connecting the canal
tow path, through the open space and into the site. Whilst the sewer precludes
the development of buildings fronting the canal, the development takes the
opportunity to locate an area of open space and landscaping next to the canal
tow path providing an attractive Canal frontage with pedestrian links to the
development and Argyle Road ensuring this area is active. This approach, also
reduces any impact upon the Canal as a scheduled monument. Separation is
gained between the residential and commercial properties by the inclusion of a
linear park. This also provides a green linkage and pedestrian route through
what was once a very impenetrable site linking the Canal and Church to the
railway station before connecting to Titan Boulevard via Hume Street. The
creation of a linear park is a key aspect of the Clydebank Town Centre
Development Framework. 
7.24 Considering design, the proposed buildings are two and three storeys in height
with a variety of different house types which will assist in creating visual interest
within the development. The proposed houses will be of a modern design and
it is considered that this approach will enhance and contribute positively to the
aesthetic of the area. The houses will also feature solar panels incorporated
into the roof covers. Whilst the Clydebank Town Centre Development
Framework sets out a development mix of flatted blocks together with family
housing, the proposal being considered does not include flats. However, the
use of three storey buildings to reinforce the edges of the development and
maximise density on this town centre site responds to the overall approach set
out in the Development Framework. It is therefore considered that the proposed
layout has responded to, and made the most of the site and its surrounding
environments and what is proposed successfully integrates into the wider area.
The built ratio of each plot accords with the requirements of the Council’s
Creating Places Guidance (2022) and this ensures a suitable level of garden
ground and associated private amenity space is provided for new residents. 
7.25 Turning to the proposed materials, the new houses will be finished externally in
facing brick and a concrete tile roof. The facing brick details submitted by the
applicant comprise of two clay bricks, one in a red tone and one in a buff tone
with an industrial appearance. The use of clay bricks provides a high quality
visual appearance and this material is a positive addition to the wider
development. The use of such a material is in accordance with the established
approach taken on other sites where the use of high quality materials has been
proposed to ensure the best possible development. The use of appropriate
conditions will ensure the acceptable bricks are used as well an appropriate
mortar colour. 
Page 40

Page 41

The development has been subject of extensive pre application discussions
with the Placemaking Co-ordinator and Planning Officers to ensure it provides
a high quality development in terms of layout, design and materials which
responds to the town centre location. 
7.26 In further considering the appearance of the new development, it is
acknowledged that street furniture can have an adverse visual impact and dilute
the quality of the appearance of the development if not carefully considered. It
is therefore appropriate to attach a condition requiring full details of the siting
and position of items such as telecommunications cabinets and grit bins.
7.27 Overall, it is considered that the proposal will create a well-designed and
integrated development which will address the six qualities of successful places
by having a distinctive identity, forming safe streets, having quality green
infrastructure, using high quality materials and being sustainable, all complying
with policies GD1, DS1 and CP1 of the adopted and proposed Plans alongside
the Residential Development Design Guidance.
Impact on the Forth and Clyde Canal
7.28 The site lies adjacent to the Forth and Clyde Canal which is a scheduled
monument. The length of the monument is approximately 3 miles (5 km) and
runs from the western edge of Old Kilpatrick (on the west) to a point 600m west
of the bascule bridge at Linnvale (on the east). The monument includes the
entire length in water together with the banks on either side together with the
tow path running along the side. It is a superlative example of Georgian civil
engineering. It was the first of Scotland's great inland waterways to be
constructed (between 1768 and 1790). Policy 7 of NPF4 relates to scheduled
monuments and supports development that where direct impacts on scheduled
monuments are avoided and significant adverse impacts on the integrity of the
setting are avoided. The Canal has much activity surrounding it and this
residential development will only enhance this activity. Policy FCC1 of proposed
LPD2 and Policy R4 of the Local Plan relate to the Forth and Clyde Canal itself.
These policies seek to enhance the green network asset and also encourage
recreational activities adjacent to the canal. The play park element of the
proposal is adjacent to the Canal which is supported by these policies. Scottish
Canals in their consultation response noted that vibro-piling is proposed and
that this would require further details. Also details of any public realm lighting in
areas adjacent to the Canal are requested as well as litter bins. The
requirement for Third Party Works approval is also noted and that access to the
Canal should be maintained at all time. It is considered that these points can
be addressed by condition. Historic Environment Scotland have no objections
to the proposal but note the requirement for Scheduled Monument Consent.
West of Scotland Archaeology Service have noted that no archaeological
issues arise and no conditions are required.
Residential Amenity
7.29 In assessing the amenity of both existing residents within the town centre the
site has been cleared of development in the recent past although what was
there previously was not a residential development. 
Page 41

Page 42

Whilst the new development will introduce new houses in proximity to existing
residential properties where it was previously a leisure centre, the scale and
massing of the previous building was significant and the new houses will likely
have a lesser impact. It is acknowledged that the new buildings will, however,
extend across a larger area of the site than the leisure centre. The row of
tenement flats which has their rear gardens facing onto Argyll Road is three
storeys in height, with the majority of the proposed development being two
storey in height with some three storey properties. It is further considered that
there is no adverse impact on daylight or sunlight to the nearest houses will
occur due to the separation distances proposed. Window to window
relationships within the development itself are also acceptable. The inclusion of
a play park within the vicinity will be a positive addition to residential amenity as
will the addition of further pedestrian links through the site. The development
will undoubtedly bring additional activity to the area, the occupation of new
dwellings is not expected to cause any noise or activity beyond that typically
found in a town centre area. 
7.30 Whilst it is accepted that any construction site will produce an element of short
term noise and disruption, the Council’s Environmental Health Service highlight
the requirement that the construction of the development is undertaken in a way
that ensures that adjacent residential amenity is not adversely affected. A range
of conditions are recommended and it is considered appropriate to attach these.
These include restricting construction working hours to 8am to 6pm Monday to
Friday and 8am to 1pm on Saturdays. Conditions relating to piling and dust
control are also recommended. 
7.31 In further assessing the amenity of the residents of the new houses proposed
there are a number surrounding noise sources due to the sites central location
within the existing settlement of Clydebank. In order to address the impact
created from the surrounding noise sources, including the adjacent Argyll Road,
acoustic fences are proposed for some properties. In a limited number of
properties these acoustic fences reach a height of 3 metres. The majority of
acoustic fences proposed are 2.5 metres in height. In support of the application,
a Noise Impact Assessment (NIA) was submitted. The Council’s Environmental
Health Service has commented that the NIA makes assumptions throughout
the document. As such conditions will be required relating to
validation/verification of the mitigation measures proposed. This would consist
of a report being submitted detailing the various specifications of acoustic
glazing, ventilation, and construction elements being installed in each of the
properties in line with the colour coded drawings that form part of the NIA. Whilst
further details are required, it is overall concluded that there are no significant
concerns regarding noise that would make the development unacceptable. As
such conditions are recommended in relation to an updated NIA to be
submitted. 
Page 42

Page 43

Traffic, parking and road safety
7.32 The applicant has submitted a Transport Statement in support of the proposal.
Whilst, the Transport Statement notes that one hundred and twenty seven
houses are proposed and that all are terraced, the proposal as submitted is for
one hundred and twenty eight houses in a mix of terraced and semi-detached.
These minor variations do not impact on the ability to assess the proposal. 
7.33 The development site incorporates an existing area of public parking located to
the west of Abbotsford Road. This area comprises some one hundred and
ninety two spaces, including five accessible spaces, used presently by visitors
to neighbouring facilities. These parking spaces currently serve a number of
uses, including overspill from the adjacent shopping centre, in particular the Co-
op building, the Credit Union building immediately adjacent and the Waterfront
Church to the north. A degree of staff parking for the shops and businesses is
also likely. It is also possible that a certain amount of park-and-ride activity may
take place in this area. Parking surveys were carried out by the applicant on a
number of days at a variety of times in order to assess the level of parking within
the area. It was concluded there is more than sufficient free parking available
in neighbouring commercial parking area to accommodate the diversion of
existing parking on the development site, should it be displaced by the
proposed residential development.
7.34 In terms of parking within the residential development proposed, one hundred
and twenty eight private vehicle spaces are provided, on-street for the one
hundred and twenty eight properties. In addition there are twenty two general
visitor bays including nine disabled bays. Twenty eight further spaces are
proposed to be created to serve the existing properties including the adjacent
Credit Union building. Three electric vehicle charging points are proposed to be
located within visitor parking spaces. 
7.35 In assessing traffic generated by the new development, it is important to
acknowledge that any trip generation must be offset against the former
development use of the site. The Transport Statement states that it would be
the case that traffic was generated by the previous Leisure Centre use during
the weekday morning and evening commuting peak hours when a residential
development would also be expected to generate its peak travel activity. Thus
the figures would in practice be higher than any net new travel on the local
transport network as a result of the proposed residential development. This is
considered within the Transport Statement as being readily capable of being
accommodated by the existing transport network in and around the site. Given
that the predicted residential development trip generation would, in practice, be
reduced due to the effect of the previous leisure centre trips being removed
from the local road network, it is considered that the traffic and travel impact of
the proposed residential development would be accommodated on the local
travel networks. 
Page 43

Page 44

7.36 The Council’s Roads Service has considered the application proposal and has
no objections in regard to the site access being served by the existing access
from Abbotsford Road as road widths and geometry are all acceptable. Parking
levels provided are concluded to be below the prescribed parking standards
however due to the close proximity to local transport provision and good active
travel links are considered to be acceptable. It is however noted that the
application details suggests the creation of a temporary access from Argyll
Road for the construction phase of the development. The Roads Service would
refuse this request unless evidence is provided to show that safe access/egress
cannot be maintained from Abbotsford Road. As such it is recommended that
any granting of permission attach a condition relating to the submission of a site
management scheme for construction traffic.
7.37 Concerns regarding the removal of parking, the impact that the removal of
parking will have on the surrounding area and the proposals perceived failure
to meet the West Dunbartonshire Council parking standards are raised in the
objections submitted. The Council’s Roads Service note that the parking
standards adopted by the Council follow the guidance provided in the National
Roads Development Guidelines. Whilst the Guidelines do provide some
expected parking provision levels, they also highlight that these can be adapted
to suit proposed developments which are located in central locations. In main
urban areas where a development is serviced by good active travel and public
transport links with access to healthcare, education, food shopping and
employment these parking levels can be reduced. The former Playdrome site
is centrally located within Clydebank with short walking distances to Chalmers
Street Bus services and Clydebank Train Station. Chalmers Street and the
surrounding area is serviced by 22 different bus services providing access
across Clydebank, into Glasgow and east to Dumbarton. The site is also located
adjacent to the NCN7 route providing an off road cycling route to both
Dumbarton and Glasgow, as well as access onto other parts of the road
network. West College Scotland is located in close proximity to the site as is
Whitecrook and Cunnard Primary School providing access to education.
Additionally Clydebank Shopping Centre, Clydebank Health Centre and the
Golden Jubilee Hospital are also within a short walk or transport ride of the
development site, all of which provides the opportunity to reduce the parking
provision which would be normally required in a more residential suburban
environment. 
7.38  In regards to the reduced parking provision for those wishing to use the
shopping centre and local transport whilst the proposal will remove 192 public
parking spaces there is existing capacity within the public car park on
Coldstream Road to accommodate required parking levels. Parking survey
evidence provided in the Transport Statement, albeit only surveyed over two
week day periods and one Saturday period, highlights that the existing parking
within Coldstream Road is underutilised and has the capacity to cope with the
additional demands. 
Page 44

Page 45

7.39 In support of the application the applicant has submitted an Access Statement
which addresses vehicular and pedestrian access arrangement that have a
direct effect on the existing operators/users/businesses who solely make use
of Abbotsford Road. The statement covers the measures that have been agreed
with each of the existing users to ensure that their access is preserved both
during the construction period and beyond. The Salvation Army, The Dalmuir
Credit Union, the Clydebank Shopping Centre, The Clydebank Co-Operative
and the Church of Scotland – Waterfront Parish Church are all outlined within
the statement as having had access rights created as well as additional parking
spaces in some cases. 
7.40  As such it is considered that the removal of existing parking in order to make
way for the new residential development will not have a significant adverse
impact as there are alternative vehicle parking areas within the vicinity as well
as good public transport links and the Council’s Roads Service offer no
objection to the proposal on this basis. The addition of one hundred and twenty
eight homes into the town centre will increase footfall and vitality which in turn
will have a positive impact to the local area and an economical boost to local
businesses and other community uses. 
Sustainable Transport
7.41  The site is located within the heart of Clydebank. The further point in the north
of the site is approximately 315m from the bus stops on Chalmers Street. These
existing stops, at the time of the Transport Statement, served 22 different bus
services. In addition, the entrance to Clydebank Railway Station, also on
Chalmers Street, is approximately 360m from the furthest point in the north of
the site. The development site benefits from a wide range of pedestrian
facilities, including traffic signal controlled crossing of Argyll Road to the east
and Chalmers Street to the south. Cycling is catered for in the form of National
Cycling Route 7 which runs east – west along the Forth and Clyde Canal,
turning south from the Canal adjacent to Argyll Road and continues east into
Glasgow and west to Dumbarton and beyond. To the east of Argyll Road, Route
7 becomes Route 754 and follows the Canal east with connections to other
routes to Glasgow City Centre before continuing east towards Edinburgh. It is
therefore concluded that the combination of a regular train service, high
frequency bus services, dedicated off road cycle routes and a well-established
pedestrian network ensure that the site is highly accessible in terms of access
to sustainable transport. The site is also located within the heart of the town
centre with a wide range of facilities within walking distance. In addition, the
applicant has provided a travel information pack which encourages reduced
dependency on the private car by highlighting the location of local amenities,
public transport services and active travel routes to be provided to the residents
of the new houses. It is recommended that the provision of this travel plan is
conditioned. 
Page 45

Page 46

Trees, landscaping and open space
7.42 A variety of trees exist within the site. These are in the form of boundary planting
and amenity planting within what was the car park of the leisure center. They
are not protected by a Tree Protection Order and formed part of the soft
landscaping scheme for the leisure centre that previously occupied the site. It
is accepted that trees internal to the site are required to be removed in order to
accommodate the new development. It is not considered that they are
significant specimens and new tree planting is provided (one hundred and six
new trees proposed) as part of the new development. The existing tree planting
around the boundary of the site will be retained as part of the new development.
7.43 The landscaping strategy includes a variety of plants, flowers and trees to
encourage wildlife and biodiversity to the site. In terms of hard landscaping
areas, variety is also proposed with a mix of materials. New tree planting is also
proposed throughout the development. The Council’s Biodiversity Officer offers
no objection to the approach to the proposed landscaping. The overall
approach to planting is considered appropriate and the implementation and
maintenance can be addressed by condition. 
7.44 In respect of open space within the proposed development, this is principally
comprised of a large area of open space which includes play equipment to the
north of the site and a linear park to the west of the site. There is also green
space between the houses and the boundary of the site as well as pockets of
green space throughout the development. In terms of the requirements of Policy
GI2 of proposed Local Development Plan 2 together with the Our Green
Network guidance, the required greenspace for the number of bedrooms
provided within the overall development of this site is 9363sqm. The
greenspace for this site provided exceeds this required number and therefore
the level of green space provided by the development is acceptable. 
7.45 As noted, there is a proposed play park to be included within the green space
at the north of the site, between the housing development and the Forth and
Clyde Canal. The inclusion of a play park is in accordance with the aims of
Policy 21 of NPF4 which requires development proposal that are likely to be
occupied or used by children to incorporate well designed, good quality
provision for play at an appropriate scale. However, no details of the play
equipment which is to be installed has been provided. A condition requiring this
detail to be provided would ensure that the range of requirements of Policy 21,
including inclusivity are met. 
7.46 Overall, there is no unacceptable impact on existing open space and the quality
and range of open spaces will all contribute to the overall success of the
transformation of this vacant site. 
Flooding and drainage
7.47 Parts of the site are identified as having a medium flood risk for surface water.
The Council’s Roads Service noted that the development of the site would
address the existing surface water flood risk. SEPA have no objections to the
proposal. 
Page 46

Page 47

In terms of drainage, SuDS is incorporated into the development to address
surface water, with attenuation proposed within an area to the south west of the
site. Whilst details of the overall approach is provided, this is not supported by
detailed calculations to allow it to be concluded that the design capacity is
appropriate. Overland flow pathways are also not provided and it cannot be
concluded that any run-off in extreme events will not impact on either the
existing or proposed residential properties. However, there is no suggestion
that a suitable system cannot be provided and final details can therefore be
addressed by condition. 
Ecology
7.48 There are no environmental designations covering any part of the site however
the Inner Clyde which is designated as an area of SPA, SSSI, Ramsar and
RSPB reserve is found approximately 0.5km south of the site. The Ecological
Constraints Survey does however conclude that due to the distance from the
site there will be no impacts upon the Inner Clyde designations. The survey
report does not highlight any protected species of concern. Whilst the area may
provide suitable habitat for foraging otter and water vole, no field signs of either
were found. A pre-construction survey for otters is however recommended as
part of the survey report. Due to the high mobility of wildlife and to re-establish
the ecological baseline, if the proposed works are not commenced within 12
months of the report it is recommended that the project ecologist should be
contacted to determine the requirement for repeat ecological surveys. This
should also be conditioned. The report also highlights the timing of the works
to take account of nesting bird season and this is recommended to be
conditioned for any granting of permission. Further recommendations are
contained within the preliminary ecological appraisal including Tool Box Talks
for contractors, tree and vegetation removal to be avoided outwith the bird
nesting season, pollution prevention measures in relation to the canal, removal
of non-native species, avoidance of injury, obstruction and disturbance of
mammal species, sensitive lighting designs to avoid affecting foraging or
commuting bats, and biodiversity enhancement measures. This will be
addressed by condition. The Council’s Biodiversity Officer also offers no
concerns in respect of the proposal in respect of ecological impact or the
findings of the ecological appraisal.
Other Technical Matters 
7.49 A ground investigation report has been submitted in support of the proposal
however the Council’s Environmental Health Service have noted that the site
investigation is incomplete. As such contaminated land conditions should be
added to any granting of planning permission. Other recommended conditions
from Environmental Health relate to air quality and lighting. Scottish Water offer
no objection noting current capacity within the existing network. 
7.50 The site includes within it, Core Path 119 which is the tow path which runs
alongside the canal. Whilst no works are being done which would involve the
Core Path being diverted, a condition is recommended to ensure that the Core
Path is not obstructed during construction.
Page 47

Page 48

7.51 The Council’s Education and Cultural Services offered no objections. Figures
provided show three hundred and eighty nine spaces currently available within
the two high schools within the catchment area for the site. Five hundred and
eighty seven spaces are also currently available within the three primary
schools for the area as well as a possible further three hundred and forty eight
spaces within one other primary school which could possibly lie within the
catchment area of the site dependant on the postcode it is allocated. 
Pre-application Consultation
7.52 The proposal constitutes “national” development under the Town and Country
Planning Hierarchy of Developments (Scotland) Regulations 2009, and
therefore statutory pre-application consultation is required prior to the
submission of the planning application. The applicant submitted the Proposal
of Application Notice (reference PAN22/002) in February of 2022. At this time
the Covid emergency legislation was still in place. Two public meetings were
held, one virtually on the 4th of April 2022 and one in person at Waterfront Parish
Church on 3rd of May 2022. The applicant also created a micro-webpage in
order to raise awareness of the proposal. Approximately 25 people attended
the face to face event. During the pre-application consultation process the main
points raised by interested parties related to parking provision and its loss,
access to and from the development, access rights and the developments
integration with surrounding businesses and organisations. 
Place and Design Panel
7.53 The design proposal was reviewed by the Council’s Place and Design Panel in
July 2022. The general design principles that underpin the scheme including a
legible street pattern, back to back gardens and clear pedestrian routes were
welcomed by the Panel. Whilst the proposal does move away from the specific
layout and typology within the development framework, the layout, the Panel
considered that it arguably delivers a more permeable development which
helps to promote pedestrian movement through the town centre. The provision
of outward facing areas of landscape, play and public realm were welcomed as
was the introduction of townhouses. Their location at key edges of the site was
acknowledged, and suggested that further detail sections may support the
continued refinement of their placement. The panel welcomed the applicants
desire to introduce different roof types, especially those seen on the
townhouses, where the introduction of a saw tooth profile helped to break up
the massing of the development as a whole. The discussion focussed on more
detailed elements of the proposal that should be refined further in its
development. The comments of the panel were taken into account in concluding
the final design.
Elected Members Briefing
7.54 Following the Place and Design Panel, an Elected Members Briefing was held
on 9th August 2022. This briefing provided Members with details of the proposed
residential development on the site and the main issues that would require to
be addressed in the planning application submission. 
Page 48

Page 49

Members were afforded the opportunity to highlight any issues which they
considered the forthcoming application submission required to consider or
address and this included housing mix, emergency access, linkages to adjacent
facilities, access to the public open space and factoring arrangements, parking
provision, EV charging and managing construction traffic. 
8. CONCLUSION
8.1 The site is within the defined town centre and whilst not an allocated site for
housing National Planning Framework 4 encourages vitality and viability of town
centres through town centre living. Subject to the appropriate use of conditions,
the proposed development is acceptable. The layout and design of the
development has been developed to ensure that it integrates with the existing
form as well as creating a high quality development which enhances the local
area whilst also taking into consideration the constraints of the site. The
development will provide much needed housing in a central town centre
location with good connections to the surrounding area and wider green
network. 
8.2 The proposal will result in a high quality residential development. It is
acknowledged that whilst contrary to specific aspects of the Development Plan
in respect of the retail development opportunity allocation in the adopted Local
Plan, the aspirations for the site have evolved since this Plan was prepared.
The Clydebank Town Centre Development Framework 2021 identifies the need
for residential development within the town centre with the Playdrome site itself
is shown as a residential site within the Priority Phase 1. The proposed
development will deliver this priority. The proposal is not an allocated residential
development opportunity in the Local Development Plan and thus does not fully
accord with the requirements of Policy 16 of NPF4. However, considering NPF4
as a whole, the proposal is considered to be in accordance with the spatial aims
most notably in respect of Clyde Mission, redeveloping brownfield sites,
contributing to town centre living and 20 minute neighbourhoods. 
8.3 The proposed redevelopment of this prominent brownfield site within the town
centre site with one hundred and twenty eight new dwellings in a mix of two,
three and four bedroom homes is welcomed. The proposal will result in a high
quality and permeable development creating positive relationships with
adjacent streets and spaces. The proposed development will also bring
residents into the town centre, supporting the economy of the town centre and
adjacent community uses. 
9. CONDITIONS
1. Prior to the commencement of development on site, exact details, specifications
and samples of all proposed external materials to be used within the development
site shall be submitted to and approved in writing by the Planning Authority. For
the avoidance of doubt, all facing bricks to be used shall be good quality clay bricks.
Thereafter, unless otherwise first agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved material
details and palette.
Page 49

Page 50

2. Further to Condition 1 above, prior to the approved brickwork associated with any
house being constructed on site, a sample panel of the brickwork shall be
constructed on site in order for it and the associated mortar to be reviewed,
inspected and approved in writing by the Planning Authority. Thereafter, unless
otherwise first agreed in writing with the Planning Authority, the development shall
be completed in strict accordance with the approved brick details.
3. Prior to the commencement of development on site, full details of the
timescale/phasing for the build-out of the development shall be submitted to and
approved in writing by the Planning Authority. Works shall then proceed as
approved unless an alternative timescale is first agreed in writing by the Planning
Authority.
4. Prior to the commencement of development on site, full details of all hard surfaces
shall be submitted for the further written approval of the Planning Authority. The
development shall thereafter be proceed in accordance with the approved details.
5. Prior to commencement of development on site, a 'Play Equipment Strategy' for
the site shall be submitted to and approved in writing by the Planning Authority.
This shall include (but not be limited to) the following:
• Details and specifications of forms of play equipment and structures to be
provided within the site.
• Provide full details regarding the maintenance arrangements for all play
equipment and associated features within the site.
• Provide timescales for implementation of the play equipment.
Thereafter, the approved play equipment strategy and all associated features
and specifications shall be installed within the development in accordance with
the strategy unless otherwise first agreed in writing by the Planning Authority
and maintained in accordance with the approved details for the lifetime of the
development.
6. Notwithstanding the approved plans, all recommendations within the Ecological
Constraints Survey dated 23th August 2022 shall be followed. This shall include all
required further survey work identified as being required for otters. Further survey
work undertaken shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of development on site and implemented as
approved.
7. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of development on site, the recommendations in paragraph 4.2.12
of the  Ecological Constraints Survey dated 23th August 2022, in respect of re-
establishing the ecological baseline shall be followed and the approach to this
submitted to and approved in writing by the Planning Authority.
Page 50

Page 51

8. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of development on site, a further submission which demonstrates
an understanding on how the proposal enhances biodiversity beyond the current
baseline including any adjustments to the approved landscaping proposals
together with the implementation details on site shall be submitted to and approved
in writing by the Planning Authority. All measures shall then be implemented as
approved.
9. Prior to commencement of development on site, a full planting schedule shall be
submitted for the further written approval of the Planning Authority. Thereafter, the
approved hard and soft landscaping and all associated approved planting details
shall be implemented within a timescale to be agreed with the Planning Authority
prior to the commencement of works on site.
10. Any trees, shrubs or areas of grass which die, are removed, damaged or become
diseased within five years of completion of the landscaping shall be replaced within
the following year with others of a similar size and species.
11. Prior to commencement of development on site, a site management scheme for
construction traffic, shall be submitted to, and approved in writing by the Planning
Authority and thereafter shall be implemented in accordance with the approved
scheme. For the avoidance of doubt, construction access shall only be taken via
Abbotsford Road and at no time will any vehicular access be taken to or from Argyll
Road, unless otherwise agreed in writing with the Planning Authority.
12. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course.
13. That within 4 weeks of the last of the houses hereby permitted being completed,
all roads and footways within the application site shall be completed to a final
wearing course.
14. Prior to the occupation of any house, the on-street parking provision associated to
that house shall be completed and be available for use by residents of the
associated house. The on-street parking provision shall then remain unobstructed
and available for use by residents of the associated house at all times thereafter.
15. The additional parking provided on Abbotsford Road, as identified on drawing
ARC/SITE001 Rev Q – Site Layout shall be constructed and made available for
use prior to the removal of the existing parking area.
16. That prior to the commencement of development on site, full details of the
proposed drainage regime inclusive of calculations and overland flow details shall
be submitted to and approved in writing by the Planning Authority. The drainage
regime shall then be implemented and maintained thereafter. For the avoidance of
doubt, the drainage regime shall be implemented commensurately with the
construction of the houses it serves.
17. That all surface water shall be intercepted within the site both during construction
and on completion of the development and full details of measures to ensure that
Page 51

Page 52

surface water run-off is contained within the site shall be submitted to and approved
in writing by the Planning Authority prior to the commencement of development on
site. The measures shall be implemented and maintained as approved. 
18. The approved car charging points/units/ducting and associated infrastructure shall
be installed in accordance with the approved details in a timescale agreed by the
Planning Authority and maintained at all times thereafter.
19. Prior to the occupation of the first house within the site, the developer shall install
the necessary infrastructure to enable the full development and all associated
properties to be connected to the existing fibre optic network, where available in
West Dunbartonshire, and in accordance with the relevant telecommunications
provider’s standards.
20. Prior to the commencement of development on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets as well as lighting and bins
adjacent to the canal, shall be submitted to and approved in writing by the Planning
Authority and within a timescale agreed with the Planning Authority.
21. The Residential Travel Plan as approved as part of this application shall be
provided on occupation of each dwelling to new residents.
22. No development (other than investigative works) shall commence on site until such
time as a revised report on the nature and extent of any contamination of the site
has been submitted to and approved in writing by the Planning Authority. The
report shall be prepared by a suitably qualified person and shall include the
following:
a) A detailed site investigation identifying the extent, scale and nature of
contamination on the site (irrespective of whether this contamination originates
on the site)
b) An assessment of the potential risks (where applicable) to:
• human health
• property (existing and proposed), including buildings, crops, livestock, pets,
woodland and service lines and pipes
• groundwater and surface waters
• ecological systems
• archaeological sites and ancient monuments
c) An appraisal of remedial options, including a detailed remediation strategy
based on the preferred option.
23. No development (other than works) shall commence on site until such time as a
detailed remediation scheme for the site has been submitted to and approved in
writing by the Planning Authority. The scheme shall be prepared by a suitably
qualified person and shall detail the measures necessary to bring the site to a
condition suitable for the intended use by removing unacceptable risks to human
health, buildings and other property, and the natural and historical environment.
Page 52

Page 53

The scheme shall include details of all works to be undertaken, the remediation
objectives and criteria, a timetable of works and/or details of the phasing of works
relative to the rest of the development, and site management procedures. The
scheme shall ensure that upon completion of the remediation works the site will
not qualify as contaminated land under Environmental Protection Act 1990 Part IIA
in relation to the intended use of the land after remediation.
24. The approved remediation scheme shall be carried out in accordance with its terms
prior to the commencement of development other than that required to carry out
remediation, unless otherwise agreed in writing by the Planning Authority. The
Planning Authority shall be notified in writing of the intended commencement of
remediation works not less than 14 days before these works commence on site.
Upon completion of the remediation works and prior to the site being occupied, a
verification report which demonstrates the effectiveness of the completed
remediation works shall be submitted to and approved in writing by the Planning
Authority.
25. The presence of any previously unencountered contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease. At this stage,
if requested by the Planning Authority, an appropriate investigation and risk
assessment shall be undertaken and a remediation scheme shall be submitted to
and approved by the Planning Authority prior to the recommencement of site
works. The approved details shall be implemented as approved.
26. If the remediation plan requires it then a monitoring and maintenance scheme
(including the monitoring of the long-term effectiveness of the proposed
remediation) shall be submitted to and approved by the Planning Authority. Any
actions/measures ongoing shall be implemented within an agreed timescale with
the Planning Authority. Following completion of the actions/measures identified in
the approved remediation scheme a further report which demonstrates the
effectiveness of the monitoring and maintenance measures shall be submitted to
and approved by the Planning Authority.
27. If there is a requirement to either re-use site won material or to import material then
the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition to
this and in accordance with BS3882:2015 and BS8601:2013, material to be used
in the top 300mm shall also be free from metals, plastic, wood, glass, tarmac, paper
and odours.
On completion of the works and at a time and/or phasing agreed by the Planning
Authority, the developer shall submit a validation report containing details of the
source of the material and associated test results to demonstrate its suitability for
use.
28. Prior to commencement of development on site, an updated noise assessment
shall be submitted to, and approved in writing by the Planning Authority, to
determine the impact of noise on the proposed development. The noise impact
Page 53

Page 54

assessment and any recommendations in respect of mitigation measures shall be
implemented as agreed prior to the development being brought into use and where
appropriate shall be retained in accordance with approved details. The noise
assessment shall include an assessment of aircraft noise taking into account the
structure of the roof design as a possible pathway for noise transmission.
29. Prior to occupation of any house, the applicant shall have a third party independent
verifier submit a verification report which shall provide verification of the installed
noise mitigation measures demonstrating that the projections as detailed within the
approved noise impact assessment are reliable and meet with the relevant
conditions.
30. Prior to the commencement of development on site, a noise control method
statement for the construction period shall be submitted to and approved in writing
by the Planning Authority. This statement shall identify likely sources of noise
(including specific noisy operations and items of plant/machinery), the anticipated
duration of any particularly noisy phases of the construction works, and details of
the proposed means of limiting the impact of these noise-sensitive properties. The
construction works shall thereafter be carried out in accordance with the approved
method statement unless otherwise approved in writing by the Planning Authority.
31. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following
hours unless otherwise first agreed  in writing by the Planning Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
32. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or after
1800, unless otherwise first agreed in writing by the Planning Authority.
33. No piling works shall be carried out until a method statement has been submitted
to and approved in writing by the Planning Authority. This statement shall include
an assessment of the impact of the piling on surrounding properties, taking into
account the guidance contained in BS 6472: 1984 ‘Evaluation of Human Response
to Vibration in Buildings’. It shall detail any procedures which are proposed to
minimise the impact of noise and vibration on the occupants of surrounding
properties. This statement shall be prepared by a suitably qualified person, and the
piling works shall thereafter be carried out in accordance with the approved method
statement.
34. Prior to the commencement of development on site a scheme for the control and
mitigation of dust shall be submitted to and approved in writing by the Planning
Authority. The scheme shall identify likely sources of dust arising from the
development or its construction, and shall identify measures to prevent or limit the
occurrence and impact of such dust. The approved scheme shall thereafter be
implemented fully prior to any of the identified dust generating activities
Page 54

Page 55

commencing on site and shall be maintained thereafter, unless otherwise first
agreed by the Planning Authority.
35. Prior to the commencement of development on site, an air quality impact
assessment shall be submitted to and approved by the Planning Authority. The
report should use a method based on the principles set out in the Environmental
Protection UK document Development Control: Planning for Air Quality (2010
Update), Scottish Government publication “Local Air Quality Management
Technical Guidance LAQM.TG(09)”, and “Delivering Cleaner Air for Scotland -
Guidance from Environmental Protection Scotland and the Royal Town Planning
Institute Scotland, January 2017”. The recommendations of the assessment shall
be implemented prior to the development commencing on site or within a timescale
agreed by the Planning Authority.
36. Prior to the commencement of development on site, details (including specific
luminaire and lamp type; beam control; wattage; the use of reflectors; baffles;
louvers; cowling; lux contours/distribution diagrams and columns types/colours) of
the lights /floodlights have been submitted to and approved in writing by the
Planning Authority. The floodlights shall then be implemented in accordance with
the approved details and shall be maintained in this condition. Any subsequent
changes to their position or specification shall be subject to the prior written
approval of the Planning Authority.
The applicant should also take cognisance of the nearby commercial premises and
any associated floodlights. The potential for obtrusive light affecting the properties
must be assessed and appropriate mitigation measures put in place to negate any
nuisance from any lights on the commercial premises.
37. Prior to the commencement of development on site, details for the storage and the
collection of waste arising from the development shall be submitted to and
approved in writing by the Planning Authority. The agreed details shall be in place
prior the occupation of the first house within the site and thereafter maintained for
the lifetime of the development.
Page 55

Page 56

Pamela Clifford 
Planning, Building Standards and Environmental Health Manager
Date: 17th January 2024 
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager
Pamela.Clifford@west-dunbarton.gov.uk
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Consultation responses
3. Representations
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended
7. Creating Places Guidance (2022)
8. Green Network and Green Infrastructure
Guidance (2022)
9. Clydebank Town Centre Development Framework
2021
Wards affected: Ward 6 (Clydebank Waterfront)
Page 56

Page 57

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 04/01/2024.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:2,500@A404/01/2024
ITEM 4b - APPENDIX 1 - LOCATION PLAN                                 
Page 57