Approved Minutes - Planning Committee (Special) 17 01 24

West Dunbartonshire Council · 17 January 2024
Back to Planning Committee — 17 January 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PLANNING COMMITTEE 
At a Special Meeting of the Planning Committee held in the Council Chambers,
Clydebank Town Hall, 5 Hall Street, Clydebank on Wednesday 17 January 2024 at
10.00 a.m. 
Present:   Councillors Ian Dickson, Gurpreet Singh Johal, Daniel Lennie,
June McKay, Karen Murray Conaghan*, Chris Pollock, Hazel
Sorrell and Sophie Traynor. 
*Arrived later in the meeting 
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Gail MacFarlane, Chief Officer – Roads and
Neighbourhoods; Nigel Ettles, Section Head – Litigation (Legal
Officer) and Nicola Moorcroft, Committee Officer. 
Apologies: Apologies for absence were intimated on behalf of Provost
Douglas McAllister and Councillor Lawrence O’Neill. 
Councillor Gurpreet Singh Johal in the Chair 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
PLANNING APPLICATIONS 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager in respect of the following Planning applications:- 
(a) DC23/113/MSC: Details relating to the first Approval of Matters Specified
by Condition (AMSC) application (Phase 1 and 2 works only) for
conditions 1(a), 1(d), 12, 23, 24 and 30 at Exxon, Bowling.

Page 2

Reference was made to a site visit, which had been undertaken in respect of the
above application. The Development Management Team Leader was heard in
further explanation, and in answer to Members’ questions. 
The Chair invited Mr Graham Parton (objector) to address the Committee. Mr
Parton was heard in respect of the application and in answer to Members’
questions. 
The Chair invited Ms Susan Dick (objector) to address the Committee. Ms
Dick was heard in respect of the application and in answer to Members’
questions. 
The Chair invited Gail MacFarlane and Patricia Rowley (applicant - on behalf
of West Dunbartonshire Council) to address the Committee. Ms MacFarlane
and Ms Rowley were heard in respect of the application and in answer to
Members’ questions. 
After discussion and having heard the Development Management Team Leader in
further explanation, and in answer to Members’ questions, the Committee agreed
to grant planning permission subject to the conditions set out in Section 9 of the
report, as detailed within Appendix 1 hereto. 
ADJOURNMENT 
The Chair adjourned the meeting for a short recess. The meeting reconvened at
11.07 a.m. with the Elected Members listed in the sederunt present. 
(b) DC23/149/FUL: Erection of 128 residential homes, associated roads,
infrastructure and open space on existing brownfield site, (former
Playdrome site) Residential Development Site, Abbotsford Road,
Clydebank by Miller Homes. 
A copy of a letter (tabled) by Chief Executive Officer, Clydebank Co-operative
Society, setting out objections to this planning application, was circulated for
consideration to the Committee members and the applicant – Miller Homes 
The Committee agreed to accept the tabled letter noted above. 
Reference was made to a site visit, which had been undertaken in respect of the
above application. The Planning and Building Standards and Environmental
Health Manager, was heard in further explanation, and in answer to Members’
questions. 
The Chair invited Ms Marie McNair MSP (objector) to address the Committee.
Ms McNair was heard in respect of the application and in answer to Members’
questions.

Page 3

The Chair invited Ms Fiona McInnes, on behalf of Clydebank Co-operative
Society (objector), to address the Committee. Ms McInnes was heard in
respect of the application and in answer to Members’ questions. 
The Chair invited Mr Robert McKinnon and Mr Tom Cahill (on behalf of Miller
Homes Ltd.) to address the Committee. Mr McKinnon and Mr Cahill were
heard in respect of the application and in answer to Members’ questions. 
After discussion and having heard the Planning and Building Standards and
Environmental Health Manager and the Chief Officer – Roads and
Neighbourhoods, in further explanation, and in answer to Members’ questions,
Councillor Johal Singh moved that the Committee:- 
(1) refer the application to full Council for determination, with a preliminary  
recommendation, based on the information considered to date, that it be
approved, subject to the conditions in Section 9 of the report, as detailed
within Appendix 2 hereto; and 
(2) include the following additional condition:- 
That at all times, during the construction of the development, vehicular and
pedestrian access shall remain available via Abbotsford Road, or any other
equivalent access road, to all existing properties which were, at the time of
granting planning permission, accessed via Abbotsford Road. 
As an amendment, Councillor Ian Dickson, seconded by Councillor Chris Pollock,
moved:- 
That an additional condition be attached to any planning consent, requiring the
applicant, one year after completion of the development, to undertake a traffic
survey to assess the adequacy of parking on the site and to provide additional
parking if the survey suggests that parking facilities are inadequate. 
As a second amendment, Councillor Murray Conaghan, seconded by Councillor Sophie
Traynor, moved:- 
That the planning application be refused due to the concerns raised as to the loss
of car parking and the adequacy of parking provided on the development site. 
On a vote being taken between the first amendment (Councillor Dickson) and the
second amendment (Councillor Murray Conaghan), 1 Member voted for the first
amendment and 2 Members, voted for the second amendment, which was
accordingly declared carried. 
On a further vote being taken, between the amendment (Councillor Murray
Conaghan) and the motion (Councillor Johal Singh), 3 Members voted for the
amendment and 5 Members voted for the motion, which was accordingly declared
carried.

Page 4

The meeting closed at 12.46 p.m.

Page 5

APPENDIX 1   
(a) DC23/113/MSC: Details relating to the first Approval of Matters Specified
by Condition (AMSC) application (Phase 1 and 2 works only) for
conditions 1(a), 1(d), 12, 23, 24 and 30 at Exxon, Bowling. 
GRANT full planning permission subject to the following conditions:- 
1. Other than the details approved for Phase 1 and 2 in terms of this permission,
no approval is given in respect of the position of all buildings, footpaths,
waterfront walkway, green corridors, open space, boundary treatments and
drainage infrastructure in respect of the requirements of Condition 1(a) of
planning permission in principle DC20/088 and the approval of these details
shall be sought via further applications for matters specified by conditions in
connection with the further requirements of Condition 1(a) of planning
permission in principle DC20/088. 
2. That prior to the commencement of development works with the exception of
those in connection with site set-up and creation of development compounds
on site, a full planting schedule for all landscaping and new tree planting
hereby approved in connection with the Phase 1 works together with the
timescale for implementation shall be submitted to and approved in writing by
the Planning Authority.  The schedule will set out how tree planting is
maximised in compensation for those lost.  The landscaping shall then be
implemented as approved unless otherwise first agreed in writing by the
Planning Authority. 
3. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping in
connection with the phase 1 works shall be replaced within the next planting
season with others of a similar size and species. 
4. That prior to the commencement of development works on site, full details of
maintenance and management for the landscaping approved in connection
with the Phase 1 works shall be submitted to and approved in writing by the
Planning Authority, unless otherwise first agreed in writing by the Planning
Authority.  Management and maintenance shall commence within a timescale
agreed with the Planning Authority. 
5. Prior to the felling of any trees within the site a scheme for the use of felled
timbers for structures within the site including (but not limited to) benches,
sculptures and wildlife features shall be submitted to and approved in writing. 
The scheme shall then be implemented as approved unless otherwise agreed
in writing by the Planning Authority.

Page 6

6. All recommendations within the Ecology Survey Report dated November 2023
and associated 2023 Ecology Technical Report date October 2023 shall be
followed.  This shall include all required mitigation during the works on site. 
All further survey work undertaken shall be submitted to and approved in
writing by the Planning Authority prior to the commencement of development
works on site with no works including vegetation clearance within the vicinity
of SPA/SSSI.  Any mitigation measures arising from the further survey work
shall be implemented as approved. 
7. Notwithstanding condition 6 above, no tree works, removal or scrub clearance
shall occur on site from March through to August (inclusive) each year unless
otherwise agreed in writing with the Planning Authority prior to clearance
works commencing.  In the event that clearance is proposed between March
to August (inclusive), a suitable bird nesting survey shall be carried out by a
suitably qualified ecologist covering the proposed clearance area and shall be
submitted to and approved in writing by the Planning Authority before those
clearance works commence.  Once written approval has been given, the
works themselves should be carried out within a specified and agreed
timescale. 
8. Notwithstanding condition 6 above, no development works shall be
undertaken on site with no works including vegetation clearance within the
vicinity of the SPA/SSSI during the period September to March inclusive until
a further full winter survey is undertaken in respect of wintering birds within
the SPA / SSSI with the survey results and recommendations submitted to
and agreed in writing by the Planning Authority in consultation with
NatureScot. 
9. Prior to any development works on site with no works within the vicinity of
SPA/SSSI during the period September to March inclusive, the survey results
and recommendations that require to be submitted in connection with
condition 8 above shall be used to formulate a detailed mitigation strategy in
respect of the impact of any construction works within the site on the wintering
bird population of the SPA / SSSI.  This mitigation strategy shall be submitted
either as part of an updated Construction Environmental Management Plan
(CEMP) focusing on the Phase 1 and 2 works or as a standalone document
accompanying the updated CEMP and approved in writing by the Planning
Authority in consultation with NatureScot.  All mitigation shall then be
implemented as approved unless otherwise first agreed in writing by the
Planning Authority. 
10. Prior to the commencement of development works on site, full details of how
toolbox talks to ensure all site personnel involved in Phase 1 and 2 of the
development are aware of matters relating to ecology and protected species
will be delivered to ensure that all personnel are aware of what to do should
evidence of species be discovered during construction shall be submitted to
and approved in writing by the Planning Authority.  The agreed approach shall
then be implemented unless otherwise first agreed in writing by the Planning
Authority.

Page 7

11. That prior to the commencement of development works on site in connection
with Phases 1 and 2, an updated Construction Environmental Plan (CEMP)
specifically addressing the Phase 1 and 2 works shall be submitted to and
agreed in writing by the Planning Authority. For the avoidance of doubt, the
CEMP will consider (but not be limited to) the impact from noise, dust and air
quality and construction activities for Phases 1 and 2.  The CEMP for Phases
1 and 2 of the development shall thereafter be implemented on site as
approved unless otherwise first agreed in writing with the Planning Authority. 
12. That prior to the commencement of development works on site in connection
with phases 1 and 2, an updated Construction Traffic Management Plan
(CTMP), specifically addressing the Phase 1 and 2 works shall be submitted
to and agreed in writing by the Planning Authority.  The CTMP for Phases 1
and 2 of the development shall thereafter be implemented on site as approved
unless otherwise first agreed in writing with the Planning Authority. 
13. Notwithstanding condition 12 above, all vehicles transporting construction
material to and from the proposed development shall be sheeted, unless
otherwise first agreed in writing with the Planning Authority. 
14. Notwithstanding condition 12 above and prior to the commencement of any
works on site in connection with Phases 1 and 2, vehicle wheel cleaning
facilities shall be installed and brought into operation on the site, unless
otherwise first agreed in writing with the Planning Authority. 
15. The Materials Management Strategy previously submitted and approved in
connection with condition 6 of Planning permission in principle DC20/088 shall
be fully followed at all times during the Phase 1 and 2 works hereby permitted
unless a modification is first agreed in writing by the Planning Authority. 
16. All material to be used in the top 300mm of the development platforms shall
be free from deleterious materials such as metals, plastic, wood, glass,
tarmac, paper and odours.  On completion of the works in respect of each of
the two phases hereby permitted the developer shall submit for approval to
the Planning Authority a verification report containing details of the source of
the material and associated test results to demonstrate its suitability for use. 
17. That unless otherwise agreed in writing by the Planning Authority, prior to
service buses commencing use of the relocated eastbound bus stop on the
A82 at Dumbuck, the existing bus shelter shall be relocated to the new
stopping position.  The final position of the shelter shall first be submitted to
and agreed in writing by the Planning Authority. 
18. That prior to any alterations or works commencing affecting the A814, the
traffic modelling data to support the position of the westbound A814 bus stop
and demonstrate that westbound traffic flow will not be impacted by a bus
using the stop and vehicles waiting to turn left shall be submitted to and
approved in writing by the Planning Authority.

Page 8

19. That prior to the commencement of development works on site, a
communications strategy designed to make road users, local residents, local
business owners and the public in general aware of the proposed works, the
likely impact upon the locality and updates of progress in respect of the Phase
1 and 2 works hereby permitted shall be submitted to and approved in writing
by the Planning Authority.  The strategy shall then be implemented as
approved unless otherwise first agreed in writing by the Planning Authority.

Page 9

APPENDIX 2 
(b) DC23/149/FUL: Erection of 128 residential homes, associated roads,
infrastructure and open space on existing brownfield site, (former
Playdrome site) Residential Development Site, Abbotsford Road,
Clydebank by Miller Homes. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be used
within the development site shall be submitted to and approved in writing by
the Planning Authority.  For the avoidance of doubt, all facing bricks to be
used shall be good quality clay bricks.  Thereafter, unless otherwise first
agreed in writing with the Planning Authority, the development shall be
completed in strict accordance with the approved material details and palette. 
2. Further to Condition 1 above, prior to the approved brickwork associated with
any house being constructed on site, a sample panel of the brickwork shall be
constructed on site in order for it and the associated mortar to be reviewed,
inspected and approved in writing by the Planning Authority.  Thereafter,
unless otherwise first agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details. 
3. Prior to the commencement of development on site, full details of the
timescale/phasing for the build-out of the development shall be submitted to
and approved in writing by the Planning Authority.  Works shall then proceed
as approved unless an alternative timescale is first agreed in writing by the
Planning Authority. 
4. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority.  The development shall thereafter be proceed in accordance with
the approved details. 
5. Prior to commencement of development on site, a 'Play Equipment Strategy'
for the site shall be submitted to and approved in writing by the Planning
Authority.  This shall include (but not be limited to) the following: 
• Details and specifications of forms of play equipment and structures to
be provided within the site. 
• Provide full details regarding the maintenance arrangements for all play
equipment and associated features within the site. 
• Provide timescales for implementation of the play equipment.

Page 10

Thereafter, the approved play equipment strategy and all associated features
and specifications shall be installed within the development in accordance
with the strategy unless otherwise first agreed in writing by the Planning
Authority and maintained in accordance with the approved details for the
lifetime of the development. 
6 Notwithstanding the approved plans, all recommendations within the
Ecological Constraints Survey dated 23rd August 2022 shall be followed. 
This shall include all required further survey work identified as being required
for otters.  Further survey work undertaken shall be submitted to and
approved in writing by the Planning Authority prior to the commencement of
development on site and implemented as approved. 
7. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of development on site, the recommendations in paragraph
4.2.12 of the Ecological Constraints Survey dated 23rd August 2022, in
respect of re-establishing the ecological baseline shall be followed and the
approach to this submitted to and approved in writing by the Planning
Authority. 
8. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of development on site, a further submission which
demonstrates an understanding on how the proposal enhances biodiversity
beyond the current baseline including any adjustments to the approved
landscaping proposals together with the implementation details on site shall
be submitted to and approved in writing by the Planning Authority.  All
measures shall then be implemented as approved. 
9. Prior to commencement of development on site, a full planting schedule shall
be submitted for the further written approval of the Planning Authority.
Thereafter, the approved hard and soft landscaping and all associated
approved planting details shall be implemented within a timescale to be
agreed with the Planning Authority prior to the commencement of works on
site. 
10. Any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
11. Prior to commencement of development on site, a site management scheme
for construction traffic, shall be submitted to, and approved in writing by the
Planning Authority and thereafter shall be implemented in accordance with the
approved scheme.  For the avoidance of doubt, construction access shall only
be taken via Abbotsford Road and at no time will any vehicular access be
taken to or from Argyll Road, unless otherwise agreed in writing with the
Planning Authority. 
12. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course.

Page 11

13. That within 4 weeks of the last of the houses hereby permitted being
completed, all roads and footways within the application site shall be
completed to a final wearing course. 
14. Prior to the occupation of any house, the on-street parking provision
associated to that house shall be completed and be available for use by
residents of the associated house.  The on-street parking provision shall then
remain unobstructed and available for use by residents of the associated
house at all times thereafter
.
15. The additional parking provided on Abbotsford Road, as identified on drawing
ARC/SITE001 Rev Q – Site Layout shall be constructed and made available
for use prior to the removal of the existing parking area. 
16. That prior to the commencement of development on site, full details of the
proposed drainage regime inclusive of calculations and overland flow details
shall be submitted to and approved in writing by the Planning Authority.  The
drainage regime shall then be implemented and maintained thereafter.  For
the avoidance of doubt, the drainage regime shall be implemented
commensurately with the construction of the houses it serves. 
17. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing by the Planning Authority prior to the
commencement of development on site.  The measures shall be implemented
and maintained as approved. 
18. The approved car charging points/units/ducting and associated infrastructure
shall be installed in accordance with the approved details in a timescale
agreed by the Planning Authority and maintained at all times thereafter. 
19 .Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
20. Prior to the commencement of development on site, details of any street
furniture inclusive of grit bins and telecommunications cabinets as well as
lighting and bins adjacent to the canal, shall be submitted to and approved in
writing by the Planning Authority and within a timescale agreed with the
Planning Authority. 
21. The Residential Travel Plan as approved as part of this application shall be
provided on occupation of each dwelling to new residents.

Page 12

22. No development (other than investigative works) shall commence on site until
such time as a revised report on the nature and extent of any contamination of
the site has been submitted to and approved in writing by the Planning
Authority.  The report shall be prepared by a suitably qualified person and
shall include the following: 
a) A detailed site investigation identifying the extent, scale and nature of
contamination on the site (irrespective of whether this contamination
originates on the site) 
b) An assessment of the potential risks (where applicable) to: 
• human health
• property (existing and proposed), including buildings, crops,
livestock, pets, woodland and service lines and pipes
• groundwater and surface waters
• ecological systems
• archaeological sites and ancient monuments 
c) An appraisal of remedial options, including a detailed remediation
strategy based on the preferred option. 
23. No development (other than works) shall commence on site until such time as
a detailed remediation scheme for the site has been submitted to and
approved in writing by the Planning Authority.  The scheme shall be prepared
by a suitably qualified person and shall detail the measures necessary to
bring the site to a condition suitable for the intended use by removing
unacceptable risks to human health, buildings and other property, and the
natural and historical environment.  The scheme shall include details of all
works to be undertaken, the remediation objectives and criteria, a timetable of
works and/or details of the phasing of works relative to the rest of the
development, and site management procedures.  The scheme shall ensure
that upon completion of the remediation works the site will not qualify as
contaminated land under Environmental Protection Act 1990 Part IIA in
relation to the intended use of the land after remediation. 
24. The approved remediation scheme shall be carried out in accordance with its
terms prior to the commencement of development other than that required to
carry out remediation, unless otherwise agreed in writing by the Planning
Authority.  The Planning Authority shall be notified in writing of the intended
commencement of remediation works not less than 14 days before these
works commence on site.  Upon completion of the remediation works and
prior to the site being occupied, a verification report which demonstrates the
effectiveness of the completed remediation works shall be submitted to and
approved in writing by the Planning Authority.

Page 13

25. The presence of any previously unencountered contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved. 
26. If the remediation plan requires it then a monitoring and maintenance scheme
(including the monitoring of the long-term effectiveness of the proposed
remediation) shall be submitted to and approved by the Planning Authority.
Any actions/measures ongoing shall be implemented within an agreed
timescale with the Planning Authority.  Following completion of the
actions/measures identified in the approved remediation scheme a further
report which demonstrates the effectiveness of the monitoring and
maintenance measures shall be submitted to and approved by the Planning
Authority. 
27. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported.  In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours.  On completion of the works and at a time and/or
phasing agreed by the Planning Authority, the developer shall submit a
validation report containing details of the source of the material and
associated test results to demonstrate its suitability for use. 
28. Prior to commencement of development on site, an updated noise
assessment shall be submitted to, and approved in writing by the Planning
Authority, to determine the impact of noise on the proposed development. 
The noise impact assessment and any recommendations in respect of
mitigation measures shall be implemented as agreed prior to the development
being brought into use and where appropriate shall be retained in accordance
with approved details.  The noise assessment shall include an assessment of
aircraft noise taking into account the structure of the roof design as a possible
pathway for noise transmission. 
29. Prior to occupation of any house, the applicant shall have a third party
independent verifier submit a verification report which shall provide verification
of the installed noise mitigation measures demonstrating that the projections
as detailed within the approved noise impact assessment are reliable and
meet with the relevant conditions.

Page 14

30. Prior to the commencement of development on site, a noise control method
statement for the construction period shall be submitted to and approved in
writing by the Planning Authority.  This statement shall identify likely sources
of noise (including specific noisy operations and items of plant/machinery), the
anticipated duration of any particularly noisy phases of the construction works,
and details of the proposed means of limiting the impact of these noise-
sensitive properties.  The construction works shall thereafter be carried out in
accordance with the approved method statement unless otherwise approved
in writing by the Planning Authority. 
31. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise first agreed in writing by the Planning
Authority: 
•  Mondays to Fridays:   0800 – 1800
•  Saturdays:     0800 – 1300
•  Sundays and public holidays:  No Working 
32. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800, unless otherwise first agreed in writing by the Planning Authority. 
33. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority. This statement
shall include an assessment of the impact of the piling on surrounding
properties, taking into account the guidance contained in BS 6472: 1984
‘Evaluation of Human Response to Vibration in Buildings’.  It shall detail any
procedures which are proposed to minimise the impact of noise and vibration
on the occupants of surrounding properties. This statement shall be prepared
by a suitably qualified person, and the piling works shall thereafter be carried
out in accordance with the approved method statement. 
34. Prior to the commencement of development on site a scheme for the control
and mitigation of dust shall be submitted to and approved in writing by the
Planning Authority.  The scheme shall identify likely sources of dust arising
from the development or its construction, and shall identify measures to
prevent or limit the occurrence and impact of such dust.  The approved
scheme shall thereafter be implemented fully prior to any of the identified dust
generating activities commencing on site and shall be maintained thereafter,
unless otherwise first agreed by the Planning Authority.

Page 15

35. Prior to the commencement of development on site, an air quality impact
assessment shall be submitted to and approved by the Planning Authority.
The report should use a method based on the principles set out in the
Environmental Protection UK document Development Control: Planning for Air
Quality (2010 Update), Scottish Government publication “Local Air Quality
Management Technical Guidance LAQM.TG(09)”, and “Delivering Cleaner Air
for Scotland - Guidance from Environmental Protection Scotland and the
Royal Town Planning Institute Scotland, January 2017”.  The
recommendations of the assessment shall be implemented prior to the
development commencing on site or within a timescale agreed by the
Planning Authority. 
36. Prior to the commencement of development on site, details (including specific
luminaire and lamp type; beam control; wattage; the use of reflectors; baffles;
louvers; cowling; lux contours/distribution diagrams and columns
types/colours) of the lights /floodlights have been submitted to and approved
in writing by the Planning Authority.  The floodlights shall then be
implemented in accordance with the approved details and shall be maintained
in this condition.  Any subsequent changes to their position or specification
shall be subject to the prior written approval of the Planning Authority.  The
applicant should also take cognisance of the nearby commercial premises
and any associated floodlights.  The potential for obtrusive light affecting the
properties must be assessed and appropriate mitigation measures put in
place to negate any nuisance from any lights on the commercial premises. 
37. Prior to the commencement of development on site, details for the storage
and the collection of waste arising from the development shall be submitted to
and approved in writing by the Planning Authority.  The agreed details shall be
in place prior the occupation of the first house within the site and thereafter
maintained for the lifetime of the development.