Democracy Spraffa

Item 8 - Scottish Government Building Warrant Fees Consultation

West Dunbartonshire Council · 11 October 2023
Back to Planning Committee — 11 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager     
Planning Committee: 11 October 2023   
_____________________________________________________________
Subject:  Scottish Government Building Warrant Fees Consultation
1. Purpose
1.1  To seek agreement of the Committee to submit a response to the
Scottish Government consultation on Building Warrant Fees.
2. Recommendations
2.1    It is recommended that the Committee agree the proposed Council
response set out in Appendix 1.
3.
3.1
Background
This consultation forms part of the work undertaken by the Verification
Delivery Model work stream, which is one of the seven work streams
being directed by the Building Standards Futures Board. The
consultation seeks to obtain views on proposed increases to the
building warrant fees required to deliver change to strengthen the
building standards system and the development of a new building
warrant fees model in Scotland. It intends to gather views and opinions
from a range of stakeholders, construction sector organisations and
businesses, and the general public.
3.2   The consultation was published on 21 July 2023 and closes on 24  
October 2023. 
4. Main Issues
4.1 The consultation:  Building Warrant Fees: consultation - Scottish Government
consultations - Citizen Space  covers four  main areas, as follows:
• Overview of building warrant fees
• Building warrants fees for High Risk Buildings (HRBs)
• Local authority building standards enforcement
• Devolved building warrant fees
4.2    The proposed changes outlined in the consultation aim to increase the 
building warrant fee income for building standards verifiers to sustain,
strengthen and improve the system in Scotland. This will include raising
additional income to support the proposed changes to the building
standards system, brought through the work of the Futures Board work
streams, which put an additional resource requirement on verifiers,

Page 2

certifiers and the Scottish Government Building Standards Division. It is
intended that it will introduce a building warrant fees model that can be
used flexibly in the future and put in place an annual uplift across all
fees, initially for a 3-year period.
4.3    The consultation seeks to obtain views on an increase in building
warrant fees and on increased fees specifically for new and enhanced
verification requirements for High Risk Buildings, to support the
Building Standards Hub, enhanced Scottish Government Building
Standards Division (BSD) monitoring and auditing and if the local
authority Building Standards enforcement role should be funded by
building warrant fees. It also seeks views on whether building warrant
fees should be devolved or set nationally. 
4.4      The proposed response to the consultation paper is set out in      
Appendix 1 and comprises of 12 questions related to:
• Part 1: Building Warrant Fees
• Part 2: High Risk Buildings
• Part 3: Building Standards Enforcement
• Part 4: Devolved Fees
• Part 5: Impact Assessments
Part 1:  Building Warrant Fees 4.5      
The building standards system in Scotland operates under the Building
(Scotland) Act 2003, introduced in 2005. Verifiers are appointed by   
Scottish Ministers and the 32 local authorities are currently appointed
to deliver the building standards service in their own geographical
areas. Their role is to protect the public interest by providing an
independent check of applications for building warrants. The current
verification service fee structure was initially established in the Building
(Fees) (Scotland) Regulations 2004. Building warrant fees are set on a
sliding scale and are based on the 'value of work' of the project being
undertaken. In July 2017 there was a change to the building standards
fee levels to increase the income of the system to achieve full cost
recovery for verification. Before that, the fees had not been changed
since 2005.   
4.6 Building warrant fees are used by verifiers to deliver the building
standards verification (building warrant) service. Funding is also
provided via Grant Aided Expenditure calculations (GAE) to support the
building standards statutory enforcement role. The verification service
is intended to be self-financing and as such, it is expected that fee
income should cover the cost of providing the verification service. It is
however, at the discretion of local authorities how the fee income is
used to fund the verification process, to meet the requirements of
Scottish Government's Building Standards Performance and Operating
Frameworks for Verifiers.

Page 3

4.7   A number of changes to the building standards system are currently 
being developed through the Building Standards Futures Board work 
streams. It is intended that these changes will strengthen and sustain 
the building standards system and will be introduced over the next few 
years. It is crucial that sufficient funding to local authority verifiers to
prepare accordingly as the proposed changes will place an additional
resource requirement on verifier staff, in relation to cost and time. Work
is being progressed through four main work steams: Compliance Plan
Approach for High Risk buildings; the Verification Delivery
Model Working Group  –  the creation of a permanent Central Building
Standards Hub (BSH) which  would support delivery of the verification
service such as the Scottish Type Approval Scheme (STAS, Technical
& Procedural Information Papers and the Customer Dispute Resolution
Process); the Digital Transformation work stream is investigating
options for the digital transformation of the building standards system in
Scotland; and the  Workforce Strategy work stream - sustainable
workforce, skilled workforce, professional framework, and a profession
for everyone.
4.8   The Scottish Government Building Standards Division (BSD)
commissioned two linked research projects on the building standards
fees system to review the building standards income and level of
reinvestment in service delivery, and to provide a building warrant fees
model, which is flexible to allow changes to building standards fees
over a 3-year period. 
4.9    The proposal to increase fees will also introduce requirements for
enhanced monitoring, auditing and reporting by the BSD to provide
assurance to Scottish Ministers that the strengthened system is being
implemented and delivered as planned by local authority verifiers. The
resources needed to support the implementation phase and for further
development of the system will also be considered with the fees
research providing a breakdown of the likely increased future cost of
the building standards verification service. It also identifies potential
increases to building warrant fees to fund the proposed changes.
4.10   The consultation seeks comments on the proposals to increase fees
across all 'value of work' bands, add an annual inflation uplift and
introduce a new fee calculation model that allows for future
adjustments within the 3 year lifespan of the model that may be made
on the basis of further research, evidence and reporting. The Council’s
response is supportive for the increase of building warrant fees in line
with inflation especially if the  verification function is to be self-
financing. 
Part 2: High Risk Buildings (HRBs)

Page 4

4.11  Following the tragic events at Grenfell Tower, London in June 2017 a
Ministerial Working Group (MWG) was set up to oversee a review of
building and fire safety through the creation of two expert Review
Panels. One panel considered Fire Safety and the other focussed on
Compliance and Enforcement. The Review Panel on Compliance and
Enforcement in Scotland concluded that the Scottish system is not
broken but that evidence clearly shows that there was a need to
strengthen the system. The Review Panel concluded that, whilst
maintaining the core elements of the system some reshaping would be
advised to ensure that it addresses the identified weaknesses. Both
Review Panels identified the potential for a 'national or central hub' that
would provide expertise in specialist and safety critical areas of the
design of complex buildings.
4.12   The establishment of a new Compliance Process for High Risk
Buildings through the introduction of a Building Warrant Compliance
Plan, a Compliance Plan Manager (CPM) role and a pre-application
assessment process is proposed. Going forward the Compliance Plan
process will also be tailored to suit building warrant applications for
residential buildings with any storey at a height of more than 11 metres;
educational establishments (Schools, colleges and universities),
community/sport centres and non-domestic buildings under local
authority control/where they have an interest in a building; hospital and
Residential Care buildings.
4.13   This proposal introduces an additional, enhanced fee for building
warrant applications for High Risk Buildings to cover additional costs 
experienced by verifiers on the introduction of the High Risk
Buildings compliance plan process including the requirement to pro-
actively monitor these applications. Again the Council is supportive in
principle of an enhanced  ee  which should be proportionate and fair to
the additional work required for High Risk Buildings.  
Part 3: Building Standards Enforcement
4.14    The statutory obligations relating to building standards for which fees 
are not charged include enforcement and the maintenance of the 
building standards register. The majority of local authority verifier 
teams are expected to fund both the verification and local authority 
statutory enforcement roles through building warrant fee income. The
consultation seeks views to provide enhanced and consistent
enforcement activity within the building standards system and formally
funding the building standards statutory enforcement role through the
building warrant fee. The recommended response recognises that
Building Standards Enforcement is a statutory function which is
currently funded  by annual grant  aided  expenditure.  It is unfair to
penalise the majority who comply with the system by having them pay
more in fees to cover the costs of those  who do not. The Building
Warrant fee needs to be proportionate to the development and it

Page 5

cannot sustain a wide range of building standards functions without
impacting negatively development viability and potential income. 
Part 4: Devolved Building Warrant Fee
4.15   Currently, the structure of fees for building warrants is set centrally by 
the Scottish Government and provides for consistent and predictable 
costs nationally. The payable fee to the local authority verifier depends 
on the value of the building warrant work and other factors such as any 
certification discounts and surcharges. The research reviewed the fee 
system in England and Wales that is set by each individual local
authority or approved inspector and explored the advantages and
disadvantages of three main options. It is considered that a devolved
system (in full or part) would introduce variations in fee levels and
approaches across Scotland, which could cause complication for those
users who operate across several authorities and cause significant
challenges for Local Authorities delivering Building Standards. One of
the purposes of setting building warrant fees locally is full cost
recovery. This would be a complex exercise for Building Standard
Authorities to engage with, taking up officer time and there would
remain the inability to estimate what level of income will be received in
any given year so full cost recovery could not be  guaranteed.  There
are further  complexities to consider if Building Warrant fees are set
locally not least how the  centralised functions like the Central Hub
would be fairly funded from each Local Authority, economies of scale
for smaller local authorities and higher fees  in a  local authority could
discourage development.
People Implications
5.1      The consultation proposals if implemented would place additional 
resource requirement on verifiers. The additional income from
increased building warrant fees would be required to offset the
additional resources required to meet these duties.  It is recognised at
a national level that there is a shortage of experienced building
standards officers, which make recruiting additional, knowledgeable
staff very challenging.
5.2    The increased requirements and levels of knowledge to fulfil the
proposals will require additional resources to train existing staff and to
expand the building standards team to fulfil all the additional duties
required.
Financial Implications
6.1  A strengthened and sustained building standards section will require
more financial resources to employ, train and retain staff.  This is
5    
6

Page 6

recognised by the Scottish Government and is one of the main 
purposes of this consultation.  An average increase of resources of 30%
was assumed, but this will be subject to further research and refinement
over the planned 3 year staged fee increases, with the intention that the
necessary funding for the strengthened system is identified and fully
delivered by year 3. It is difficult to accurately predict the actual effect
that the proposed fee changes would have for the Council. It is expected
that the outcome of this consultation will result in a likely increase in
building warrant fees for the Council. It is likely that some, or all, of the
additional income would be required to be invested back in the service to
help support the building standard function and the additional
responsibilities. 
6.2   The building standards system is designed to be self-financing and it is
expected that the Building Standards Hub would be financed from
building standards fees. 
6.3 The proposal to increase fees will also introduce requirements for
enhanced monitoring, auditing and reporting by the BSD to provide
assurance to Scottish Ministers that the strengthened system is being
implemented and delivered as planned by local authority verifiers.
7. Risk Analysis
7.1 If the building standards system is to be self-financing as well as cover
costs for a central Building Standards hub and additional
responsibilities for high risk buildings  it is essential that the building
warrant fees are of a scale and level to ensure this.
7.2 Building Warrant fee income can vary from year to year depending on
the national and local economy and development taking place in the
area.   If the additional income does not materialise the Council will
have this additional cost that is in effect a cut to their income at a time
when Local Authorities are under severe financial constraints. These
monies will have to be found from the local authority budget, resulting
in reduction in the Building Standards budget and quality of service.
8. Equalities Impact Assessment (EIA)
8.1  The Scottish Government has undertaken an equalities impact
assessment of the consultation documents.
9. Consultation
9.1 The Chief Officer: Resources and Legal Services have been consulted in
the preparation of the report.
10. Strategic Assessment

Page 7

10.1    The proposals are in keeping with the Council’s Strategic priorities.
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 11th October 2023   
______________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Pamela.Clifford@west-dunbarton.gov.uk
Judi Ferguson, Acting Principal Building Standards
Surveyor
Judi.ferguson@west-dunbarton.gov.uk   
Appendix:   Appendix 1 : Response to Scottish Government 
consultation on Building Warrant Fees 
Background Papers:       Scottish Government Consultation on Building 
Warrant Fees. The consultation can be accessed
here: 
Building Warrant Fees: consultation - Scottish
Government - Citizen Space