PLANNING COMMITTEE 
At a Meeting of the Planning Committee held in Civic Space, 16 Church Street,
Dumbarton on Wednesday 20 September 2023 at 10.00 a.m. 
Present: Councillors Karen Murray Conaghan, Ian Dickson, Daniel
Lennie, June McKay, Lawrence O’Neill, Chris Pollock, Hazel
Sorrell and Sophie Traynor. 
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; Alan Williamson, Team Leader,
Development Planning and Place; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Joshua Doyle, Placemaking Co-ordinator; Matthew
Spurway, Development Planning and Place Officer; Gail
MacFarlane, Chief Officer - Roads and Neighbourhood; Craig
Jardine, Corporate Asset Manager; John Kerr, Housing
Development and Homelessness Manager; Nigel Ettles, Section
Head – Litigation (Legal Officer) and Nicola Moorcroft,
Committee Officer. 
Apologies: Apologies for absence were intimated on behalf of Provost
Douglas McAllister and Councillor Gurpreet Singh Johal. 
Councillor Lawrence O’Neill in the Chair 
DECLARATIONS OF INTEREST 
Councillor Lawrence O’Neill, declared an interest in the item under the heading
DC23/083/FUL – Proposed erection of 27 affordable dwellings and associated works
at development site at Former Faifley Bowling Club, Clydebank by Knowes Housing
Association, being a member of the Knowes Housing Association Committee and
intimated that he would leave the meeting during consideration of that item. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of the Planning Committee held on 2 August 2023 were
submitted and approved as a correct record.

Page 2

OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
NOTE OF SITE VISITATION 
A Note of Visitation carried out on 31 July 2023, a copy of which forms Appendix 1
hereto, was submitted and noted. 
PLANNING APPLICATIONS 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager in respect of the following Planning applications:- 
(a) DC23/098/FUL – New build education and community campus
comprising of new Early Years, Primary schools, ASN unit, library and
community facilities, together with associated parking, sports facilities
and landscaping at St. Joseph’s Primary School, Faifley Road,
Clydebank, G81 5EY by West Dunbartonshire Council. 
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Planning, Building
Standards and Environmental Health Manager, the Chief Officer - Roads and
Neighbourhood, the Corporate Asset Manager and the Placemaking Co-ordinator
in further explanation, and in answer to Members’ questions, the Committee
agreed to grant planning permission subject the conditions set out in Section 9 of
the report, an amendment to condition 17 and two further conditions relating to EV
Charging points and the design of floodlights, as detailed within Appendix 2
hereto. 
ADJOURNMENT 
The Chair adjourned the meeting for a short recess. The meeting reconvened at
11.30 a.m. with all those listed in the sederunt present. 
Councillor O’Neill, having earlier declared an interest in the following item of
business, left the meeting at this point. 
APPOINTMENT OF TEMPORARY CHAIR 
Having heard the Legal Officer in relation to the aforementioned declaration of
interest by the Chair, Councillor O’Neill, the Committee agreed to appoint a
temporary Chair from amongst those Members present at the meeting. It was agreed
that Councillor Sophie Traynor would chair the meeting for the undernoted item of

Page 3

business. Accordingly, Councillor Traynor assumed the Chair for the undernoted
item of business only. 
Councillor Sophie Traynor in the Chair 
(b) DC23/083/FUL – Proposed erection of 27 affordable dwellings and
associated works at development site at Former Faifley Bowling Club,
Clydebank by Knowes Housing Association 
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Planning, Building
Standards and Environmental Health Manager, the Development Management
Team Leader and the Chief Officer – Roads and Neighbourhood in further
explanation, and in answer to Members’ questions, the Committee agreed to grant
planning permission subject to the conditions set out in Section 9 of the report,
with an additional condition relating to the monitoring of parking on the site, as
detailed within Appendix 3 hereto. 
Note: Councillor O’Neill re-entered the meeting at this point. 
Councillor Lawrence O’Neill in the Chair 
(c) DC23/102/FUL– Proposed erection of 26 dwellings with associated
ancillary development at development site, Pappert, Bonhill, Alexandria
by West Dunbartonshire Council (Housing) 
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Planning, Building
Standards and Environmental Health Manager, the Team Leader – Development
Management and the Housing Development and Homelessness Manager; in
further explanation, and in answer to Members’ questions, the Committee agreed
to grant planning permission subject to the conditions set out in Section 9 of the
report, as detailed within Appendix 4 hereto. 
(d) DC23/070/FUL– Change of use from cafe to tyre change garage at 6 Old
Street, Duntocher, Clydebank G81 6DE by Mr Peter Ferrier. 
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Lead Planning Officer in
further explanation, and in answer to Members’ questions, the Committee agreed
to refuse planning permission for the reasons set out in Section 9 of the report, as
detailed within Appendix 5 hereto.

Page 4

DEVELOPMENT PLAN SCHEME AND PARTICIPATION STATEMENT FOR
LOCAL DEVELOPMENT PLAN 3 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, seeking approval for a consultation draft Development Plan
Scheme and Participation Statement in relation to a new Local Development Plan
(LDP3). 
After discussion and having heard the Team Leader, Development Planning and
Place in further explanation and in answer to Members’ questions, the Committee
agreed the publication of the consultation draft Development Plan Scheme and
Participation Statement out in Appendix 1 of the report. 
INVITATION TO MAKE LOCAL PLACE PLAN 
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, seeking approval for an approach to Local Place Plans, which will
deliver new duties arising from the Planning (Scotland) Act 2019. 
After discussion and having heard the Development Planning and Place Officer in
further explanation, the Committee agreed:- 
(1) to the approach to Local Place Plans as set out in the report and gave
authority to Officers to issue the invitation to prepare Local Place Plans to
communities; and 
(2) that Officers would submit a burden item for members consideration in setting
the 2024-25 budget for the preparation of Local Place Plans. 
The meeting closed at 12.34 p.m.

Page 5

APPENDIX 1 
PLANNING COMMITTEE 
NOTE OF VISITATION – 31 JULY 2023 
Present: Councillor Ian Dickson 
Attending: James McColl - Development Management Team Leader and 
Amy Melkevik, Lead Planning Officer 
SITE VISIT 
A site visit was undertaken in connection with the undernoted planning application:- 
Land to East of Broomhill Wood, Bonhill, Alexandria
DC22/190/FUL - Erection of single wind turbine, 30m hub and 43m tip, access track,
substation, agricultural shed and associated works by Mr Harris Smith.

Page 6

APPENDIX 2 
DC23/098/FUL – New build education and community campus comprising of
new Early Years, Primary schools, ASN unit, library and community facilities,
together with associated parking, sports facilities and landscaping at St.
Joseph’s Primary School, Faifley Road, Clydebank, G81 5EY by West
Dunbartonshire Council. 
GRANT full planning permission subject to the following conditions:- 
1. The external materials to be used in the construction of the building hereby
permitted shall accord with the details set out on approved drawing FC-HML-
01-ZZ-D-A-48100 Rev PO3 and no substitutes shall be used without the prior
written agreement of the Planning Authority. 
2. Further to Condition 1 above, prior to the approved brickwork associated with
the building hereby permitted being constructed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details. 
3. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority.  The development shall thereafter be completed in accordance with
the approved details prior to the occupation of any unit within the
development. 
4. The phasing of the development shall be undertaken in accordance with the
phasing details hereby approved and following the commencement of works
on site, the development phasing will be undertaken on a continuous basis
until completion, unless otherwise first agreed in writing by the Planning
Authority. 
5. Notwithstanding the approved plans, all recommendations within the
Ecological Constraints Survey and Preliminary Bat Roost Assessment dated
1st December 2022 shall be followed.  Further survey work undertaken shall
be submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site and implemented as approved. 
6. Notwithstanding condition 5 above and for the absolute avoidance of doubt, a
minimum of two bat activity surveys (dusk and dawn) shall be undertaken in
the activity season immediately preceding the demolition of the existing
building on site.  The survey results shall be submitted to and approved in
writing by the Planning Authority prior to any demolition commencing on site.

Page 7

7. Notwithstanding condition 5 above, no site clearance works shall be
undertaken during any phase during the bird-nesting season March to
September inclusive unless first agreed in writing by the Planning Authority. 
For the avoidance of doubt, any such agreement will require a full nesting bird
survey prior to the commencement of works on site, the methodology and
findings of which shall be submitted to the Planning Authority. 
8. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site. 
9. Notwithstanding the approved plans, full details of the proposed planting
schedule, inclusive of proposed tree planting on a two for one basis relative to
those being removed, shall be submitted to and approved in writing by the
Planning Authority prior to the commencement of any works on site and shall
be implemented with a timescale to be agreed with the Planning Authority. 
10. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
11. That full details of maintenance and management for the landscaping
approved shall be submitted to and approved in writing by the Planning
Authority prior to the occupation of the new building hereby permitted. 
Management and maintenance shall commence upon completion of the
landscaping. 
12. Details of the management and operation of the community allotments shall
be submitted to and approved by the Planning Authority prior to the
occupation of the new building hereby permitted.  Management and operation
shall then be undertaken in accordance with the approved details at all times
thereafter. 
13. Notwithstanding the submitted details, that prior to the commencement of
works on site, a final drainage regime inclusive of maintenance arrangements
shall be submitted to and approved in writing by the Planning Authority.  The
drainage regime shall then be implemented and maintained thereafter.  For
the avoidance of doubt, the drainage regime shall be implemented
commensurately with the construction of the development. 
14. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing ty the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved.

Page 8

15. That prior to the commencement of works on site, a bird hazard management
plan shall be submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport.  The submitted plan shall include: 
• Management of any flat / shallow pitched / green roofs on buildings within
the site which may be attractive to nesting, roosting and loafing of birds. 
The management plan shall comply with Advice Note 8: Potential Bird
Hazards from Building Design. 
The Bird Hazard Management Plan shall be implemented as approved and on
completion of the development shall remain in force for the lifetime of the
development.  No subsequent alterations to the plan are to take place unless
first submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. 
16. No development shall take place until full details of soft and water-
landscaping works have been submitted to and approved in writing by the
Planning Authority.  Details shall comply with Advice Note 3: Potential Bird
Hazards from Amenity Landscaping and Building Design.  These details shall
include the species, number and spacing of shrubs and trees. 
No subsequent alterations to the approved landscaping scheme are to take
place unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall also be implemented as
approved. 
17. The noise mitigation requirements detailed in the Noise Impact Assessment –
Report no. 7355-05-00 Rev 00 and Report no. 7355-04-00 dated 7 June 2023
and 3 May 2023 relating to plant and mechanical services and sport pitch
shall be implemented in full, namely: 
• The roof top plant compounds shall have compliant plant screens as
barriers that is having no gaps at the foot or between panels and a lifetime
surface density of 10kg/m2. 
• The sports pitch shall not be used outwith the hours of 8am to 9pm daily. 
• The sports pitch shall have rubber vibration reducers between the
weldmesh fencing panels to reduce ball impact noise. 
18. All plant and equipment (including any ventilation system) to be installed or
operated shall be enclosed, attenuated and/or maintained such that any noise
there from shall not exceed International Standards Organisation (ISO) Noise
Rating 35 between 0700 and 2300 hours daily, within any nearby residential
property, with windows slightly open for ventilation, when measured and/or
calculated and plotted on an ISO rating curve chart.

Page 9

19. In the event that the sports pitch floodlighting requires to operate outwith the
hours of 8am to 8pm of use of the sports pitch set out in condition 17 above, it
shall be switched off by 10pm. 
20. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working 
21. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800. 
22. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’.  It shall
detail any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement. 
23. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority.  The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority.   
24. The approved remediation scheme shall be carried out in accordance with its
terms prior to the commencement of development other than that required to
carry out remediation, unless otherwise agreed in writing by the Planning
Authority.  The Planning Authority shall be notified in writing of the intended
commencement of remediation works not less than 14 days before these
works commence on site. Upon completion of the remediation works and prior
to the site being occupied, a verification report which demonstrates the
effectiveness of the completed remediation works shall be submitted to and
approved in writing by the Local Planning Authority.

Page 10

25. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved. 
26. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours.  On completion of the works and at a time and or
phasing agreed by the Planning Authority, the developer shall submit a
validation report containing details of the source of the material and
associated test results to demonstrate its suitability for use. 
27. That prior to the new building being brought into use, a Travel Plan for the site
shall be undertaken and submitted to and approved in writing by the Planning
Authority.  This shall include what initiatives will be brought forward in the
future to ensure the achievement of a meaningful switch away from the
private car inclusive of staff travel.  Any agreed actions and measures shall be
implemented. 
28. No development shall commence within the development site outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed with West of
Scotland Archaeological Service and approved by the Planning Authority. 
Thereafter the developer shall ensure that the programme of archaeological
works is fully implemented and that all recording and recovery or
archaeological resources within the development site is undertaken. 
29       EV Charging Points 
30.  Floodlights

Page 11

APPENDIX 3 
DC23/083/FUL – Proposed erection of 27 affordable dwellings and associated
works at development site at Former Faifley Bowling Club, Clydebank by
Knowes Housing Association. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be used for
the houses within the development site shall be submitted to and approved in
writing by the Planning Authority.  For the avoidance of doubt, all facing bricks
to be used shall be good quality clay bricks.  Thereafter, unless otherwise
agreed in writing with the Planning Authority, the development shall be
completed in strict accordance with the approved material details and palette. 
2. Further to Condition 1 above, prior to the approved brickwork associated with
any house being constructed or installed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority. 
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details. 
3. That prior to the commencement of works on site full details of the timescale
for the phasing of the development shall be submitted to and approved in
writing by the Planning Authority.  Works shall then proceed as approved
unless an alternative timescale is first agreed in writing by the Planning
Authority. 
4. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority.  The development shall thereafter be proceed in accordance with
the approved details. 
5. Prior to the commencement of development on site, a detailed soft
landscaping plan shall be submitted to and approved in writing by the
Planning Authority.  Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved plan. 
6. Prior to the commencement of development on site, a Biodiversity
Enhancement Plan setting out how the proposal enhances biodiversity
beyond the current baseline, together with the implementation on site, shall be
submitted to and approved in writing by the Planning Authority.  All measures
shall then be implemented as approved.  Thereafter, unless otherwise agreed
in writing with the Planning Authority, the development shall be completed in
accordance with the approved plan.

Page 12

7. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site. 
8. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
9. Full details of the form, management, operation and timescale for completion
on site of the community allotments, community gardens and play space or
any alternative form of community space developed following the results of a
community consultation shall be submitted to and approved by the Planning
Authority prior to the occupation of the first dwellinghouse hereby permitted. 
Management and operation shall then be undertaken in accordance with the
approved details at all times thereafter. 
10. In addition to the water survey submitted with the application, a follow up
water vole survey shall be undertaken and submitted to and approved in
writing by the Planning Authority.  All recommendations shall then be
implemented as approved. 
11. All recommendations within the Preliminary Ecological Appraisal dated 18th
May 2023, the Bat Activity Surveys dated July 20223, shall be implemented. 
This shall include all required further survey work identified as being required
for badgers.  This further survey work undertaken shall be submitted to and
approved in writing by the Planning Authority prior to the commencement of
any works on site and implemented as approved. 
12. Prior to the commencement of development on site, details of the design and
location of cycle storage shall be submitted for the further written approval of
the Planning Authority and the development shall thereafter be completed in
accordance with the approved details prior to the occupation of any housing
unit within the development, unless otherwise agreed in writing with the
Planning Authority. 
13. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course. 
14. That within 4 weeks of the last of the houses hereby permitted being
completed, all roads and footways within the application site shall be
completed to a final wearing course. 
15. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house. 
The off-street parking provision shall be then remain unobstructed and
available for use by residents of the associated house at all times thereafter. 
16. All on street parking and visitor parking spaces shall be formed
commensurately with the development of the houses that they serve.

Page 13

17. That prior to the commencement of works on site, full details of the proposed
drainage regime inclusive of calculations and overland flow details shall be
submitted to and approved in writing by the Planning Authority.  The drainage
regime shall then be implemented and maintained thereafter.  For the
avoidance of doubt, the drainage regime shall be implemented
commensurately with the construction of the houses it serves. 
18. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing to the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved. 
19. No site clearance works shall be undertaken during the bird nesting season
March to September inclusive unless first agreed in writing by the Planning
Authority.  For the avoidance of doubt, any such agreement will require a full
nesting bird survey prior to the commencement of works on site, the
methodology and findings of which shall be submitted to and approved by the
Planning Authority and shall be implemented as approved. 
20. Prior to the commencement of development on site, details of the location and
design of electric charging points/units and associated infrastructure and
ducting to serve the development shall be submitted to and approved in
writing by the Planning Authority.  The approved car charging
points/units/ducting and associated infrastructure shall thereafter be installed
in accordance with the approved details at a timescale agreed by the Planning
Authority and maintained at all times thereafter. 
21. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
22. Prior to the commencement of works on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets shall be submitted to
and approved in writing by the Planning Authority. Development shall then
proceed as approved. 
23. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority.  Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall
be provided to new residents. 
24. Prior to the commencement of any works on site, full details of the
incorporation of photovoltaic panels shall be submitted to and approved in

Page 14

writing by the Planning Authority.  Thereafter the development shall be
undertaken in accordance with the approved details. 
25. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved. 
26. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported.  In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours. 
On completion of the works and at a time and/or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use. 
27. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working 
28. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority.  The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority. 
29. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800.

Page 15

30. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’.  It shall
detail any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement. 
31. Review of parking and parking survey

Page 16

APPENDIX 4 
DC23/102/FUL– Proposed erection of 26 dwellings with associated ancillary
development at development site, Pappert, Bonhill, Alexandria by West
Dunbartonshire Council (Housing). 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be used
within the development site shall be submitted to and approved in writing by
the Planning Authority.  For the avoidance of doubt no consent is granted for
the brick samples submitted prior to determination and all facing bricks to be
used shall be good quality clay bricks.  Thereafter, unless otherwise agreed in
writing with the Planning Authority, the development shall be completed in
strict accordance with the approved material details and palette. 
2. Further to Condition 1 above, prior to the approved brickwork associated with
any house being constructed or installed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority. 
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details. 
3. That prior to the commencement of works on site, full details of the timescale
for the build-out of the development shall be submitted to and approved in
writing by the Planning Authority.  Works shall then proceed as approved
unless an alternative timescale is first agreed in writing by the Planning
Authority. 
4. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority.  The development shall thereafter be proceed in accordance with
the approved details. 
5. Prior to the commencement of development on site, details of the design and
location of cycle storage shall be submitted for the further written approval of
the Planning Authority and the development shall thereafter be completed in
accordance with the approved details prior to the occupation of any house
within the development, unless otherwise agreed in writing with the Planning
Authority. 
6. Notwithstanding the approved plans, all recommendations within the
Preliminary Ecological Appraisal dated 18th May 2023 shall be followed.  This
shall include all required further survey work identified as being required for
badgers.  Further survey work undertaken shall be submitted to and approved
in writing by the Planning Authority prior to the commencement of any works
on site and implemented as approved.

Page 17

7. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of works on site, a further submission which demonstrates an
understanding on how the proposal enhances biodiversity beyond the current
baseline including any adjustments to the approved landscaping proposals
together with the implementation on site shall be submitted to and approved in
writing by the Planning Authority.  All measures shall then be implemented as
approved. 
8. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site. 
9. Notwithstanding the approved plans, an updated planting schedule to
incorporate a variety of tree types throughout the development shall be
submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site and shall be implemented with a
timescale to be agreed with the Planning Authority. 
10. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
11. That full details of maintenance and management for the landscaping
approved shall be submitted to and approved in writing by the Planning
Authority prior to the occupation of the first dwellinghouse hereby permitted.
Management and maintenance shall commence upon completion of the
landscaping. 
12. Prior to commencement of any works on site, a site management scheme for
construction traffic as recommended within the submitted Transport
Statement, shall be submitted to, and approved in writing by the Planning
Authority and thereafter shall be implemented in accordance with the
approved scheme. 
13. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course. 
14. That within 4 weeks of the last of the houses hereby permitted being completed,
all roads and footways within the application site shall be completed to a final
wearing course. 
15. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house. 
The off-street parking provision shall then remain unobstructed and available
for use by residents of the associated house at all times thereafter. 
16. The additional parking provided on Pappert shall be constructed and made
available for use by local residents prior to the removal of the existing parking
area opposite no’s 127 to 131 Pappert.

Page 18

17. That prior to the commencement of works on site, full details of the proposed
drainage regime inclusive of calculations and overland flow details shall be
submitted to and approved in writing by the Planning Authority.  The drainage
regime shall then be implemented and maintained thereafter.  For the
avoidance of doubt, the drainage regime shall be implemented commensurately
with the construction of the houses it serves. 
18. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved. 
19. Prior to the commencement of development with the site, details of the
number, location and design of electric charging points/units and associated
infrastructure and ducting to serve the development shall be submitted to and
approved in writing by the Planning Authority.  The approved car charging
points/units/ducting and associated infrastructure shall thereafter be installed
in accordance with the approved details in a timescale agreed by the Planning
Authority and maintained at all times thereafter. 
20. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
21. Prior to the commencement of works on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets shall be submitted to
and approved in writing by the Planning Authority.  Development shall then
proceed as approved. 
22. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority.  Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall
be provided to new residents. 
23. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved.

Page 19

24. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported.  In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours. 
25. On completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use. 
26. No development shall take place on site until such time as a noise impact
assessment in respect of the proposed air source heat pumps has been
submitted to and approved in writing by the Planning Authority.  This noise
impact assessment shall include an assessment of the potential for the
proposed heat pumps to cause noise nuisance affecting both the new houses 
hereby permitted together with existing adjacent properties.  Where potential
noise disturbance is identified, proposals for the attenuation of that noise shall
be submitted to and approved in writing by the Planning Authority.  Any such
approved noise attenuation scheme shall be implemented prior to the
development being brought into use and shall thereafter be retained in
accordance with the approved scheme.  Should the approved noise
attenuation scheme impose restrictions upon the way in which operations on
the site are carried out, the site shall be operated in this manner unless
otherwise approved in writing by the Planning Authority.  The noise impact
assessment and any recommendations in respect of attenuation measures
shall be prepared by a suitably qualified person. 
27. Prior to the site being occupied the applicant shall have a third party
independent verifier submit a verification report to the satisfaction of the
Planning Authority. Compliance with the relevant condition shall be evidenced
in the report.  This shall demonstrate that the projections as detailed within
Noise Impact Assessment are reliable and meet with Noise Impact
Assessment condition. 
28. No development shall commence on site until such time as a noise control
method statement for the construction period has been submitted to and
approved in writing by the Planning Authority.  This statement shall identify
likely sources of noise (including specific noisy operations and items of
plant/machinery), the anticipated duration of any particularly noisy phases of
the construction works, and details of the proposed means of limiting the
impact of these noise-sensitive properties.  The construction works shall
thereafter be carried out in accordance with the approved method statement
unless otherwise approved in writing by the Planning Authority. 
29. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the

Page 20

following hours unless otherwise approved in writing by the Planning
Authority: 
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working 
30. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800. 
31. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’.  It shall
detail any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement. 
32. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority.  The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority. 
33. No development shall commence on site until details for the storage and the
collection of waste arising from the development has been submitted to and
approved in writing by the Planning Authority.  The agreed details shall be in
place prior the occupation of the first housing unit/property within the site and
thereafter maintained for the lifetime of the development.

Page 21

APPENDIX 5 
DC23/070/FUL– Change of use from cafe to tyre change garage at 6 Old Street,
Duntocher, Clydebank G81 6DE by Mr Peter Ferrier. 
REFUSE planning permission subject to the following conditions:- 
1. The proposal would result in the siting of a Class 5 (General Industrial) use –
tyre changing garage within an existing residential area.  No supporting
information has been submitted in terms of what other sites have been
considered and why the proposal could not be accommodated within an
existing business and industrial area as defined by the adopted Local Plan
and proposed Local Development Plan 2.  Accordingly the proposal is not
supported by Policy 26(d) (i) of NPF4 together with Policy LE 3 of the adopted
West Dunbartonshire Local Plan. 
2. The proposal would not result in significant overall economic benefit to the
local area and therefore the proposal is not supported by Policy LE3 of the
adopted Local Plan. 
3. The proposal is incompatible with established residential amenity due to the
potential for noise disturbance to occur to the detriment of adjacent residential
properties.  The proposal is therefore contrary to Policies, 9, 23(e) and
26(d)(ii) of NPF4, Policies GD1, H5 and LE3 of the adopted Local Plan and
policies CP1 and H4 of the proposed Local Development Plan 2.