Agenda
Planning Committee
Date:  Wednesday, 11 October 2023
___________________________________________________________________
Time:  10.00 a.m.
___________________________________________________________________
Venue:  Council Chambers, Clydebank Town Hall, 5 Hall Street,
Clydebank G81 1UB
_________________________________________________________________
Contact:   Email: nicola.moorcroft@west-dunbarton.gov.uk
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Planning Committee as detailed above. 
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Ian Dickson
Councillor Daniel Lennie
Provost Douglas McAllister
Councillor June McKay
Councillor Karen Murray Conaghan
Councillor Chris Pollock
Councillor Hazel Sorrell
Councillor Sophie Traynor
All other Councillors for information
Date of Issue: 28 September 2023
Page 2

Page 3

PLANNING COMMITTEE
WEDNESDAY, 11 OCTOBER 2023
AGENDA
1 APOLOGIES
2 DECLARATIONS OF INTEREST
Members are invited to declare if they have any interests in the items of
business on this agenda and the reasons for such declarations.
3 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
4 MINUTES OF PREVIOUS MEETING 5 - 26
Submit for approval, as a correct record, the Minutes of Meeting of the
Planning Committee held on 20 September 2023.
5 NOTE OF SITE VISITATIONS 27
Submit, for information, Note of Site Visitations carried out on 18
September 2023.
6 SCOTTISH GOVERNMENT CONSULTATION ON   29 - 38
MANDATORY TRAINING ON PLANNING FOR ELECTED
MEMBERS
Submit report by Planning, Building Standards and  Environmental Health
Manager, seeking agreement to submit a response to the Scottish
Government consultation on mandatory training on planning for Elected
Members.
7/
Page 3

Page 4

7
8
SCOTTISH MINISTERS DECISION - SCHEDULED
MONUMENT CONSENT FOR QUARRYING
OPERATIONS - SHEEPHILL FORT, SHEEPHILL
QUARRY, MILTON, DUMBARTON
Submit report by Planning, Building Standards and Environmental Health
Manager, providing an update regarding the Scottish Ministers decision for
the above Scheduled Monument Consent.
SCOTTISH GOVERNMENT BUILDING WARRANT FEES
CONSULTATION
Submit report by Planning, Building Standards and Environmental
Health Manager, seeking agreement to submit a response to the
Scottish Government consultation on Building Warrant Fees. 
__________________________________________________________________
Page 4
39 - 43
45 - 56

Page 5

PLANNING COMMITTEE
At a Meeting of the Planning Committee held in Civic Space, 16 Church Street,
Dumbarton on Wednesday 20 September 2023 at 10.00 a.m.
Present: Councillors Karen Murray Conaghan, Ian Dickson, Daniel
Lennie, June McKay, Lawrence O’Neill, Chris Pollock, Hazel
Sorrell and Sophie Traynor.
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; Alan Williamson, Team Leader,
Development Planning and Place; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Joshua Doyle, Placemaking Co-ordinator; Matthew
Spurway, Development Planning and Place Officer; Gail
MacFarlane, Chief Officer - Roads and Neighbourhood; Craig
Jardine, Corporate Asset Manager; John Kerr, Housing
Development and Homelessness Manager; Nigel Ettles, Section
Head – Litigation (Legal Officer) and Nicola Moorcroft,
Committee Officer. 
Apologies: Apologies for absence were intimated on behalf of Provost
Douglas McAllister and Councillor Gurpreet Singh Johal.
Councillor Lawrence O’Neill in the Chair
DECLARATIONS OF INTEREST
Councillor Lawrence O’Neill, declared an interest in the item under the heading
DC23/083/FUL – Proposed erection of 27 affordable dwellings and associated works
at development site at Former Faifley Bowling Club, Clydebank by Knowes Housing
Association, being a member of the Knowes Housing Association Committee and
intimated that he would leave the meeting during consideration of that item.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Planning Committee held on 2 August 2023 were
submitted and approved as a correct record.
Item 4
Page 5

Page 6

OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
NOTE OF SITE VISITATION
A Note of Visitation carried out on 31 July 2023, a copy of which forms Appendix 1
hereto, was submitted and noted.
PLANNING APPLICATIONS
A report was submitted by the Planning, Building Standards and Environmental
Health Manager in respect of the following Planning applications:-
(a) DC23/098/FUL – New build education and community campus
comprising of new Early Years, Primary schools, ASN unit, library and
community facilities, together with associated parking, sports facilities
and landscaping at St. Joseph’s Primary School, Faifley Road,
Clydebank, G81 5EY by West Dunbartonshire Council.
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Planning, Building
Standards and Environmental Health Manager, the Chief Officer - Roads and
Neighbourhood, the Corporate Asset Manager and the Placemaking Co-ordinator
in further explanation, and in answer to Members’ questions, the Committee
agreed to grant planning permission subject the conditions set out in Section 9 of
the report, an amendment to condition 17 to allow the sport pitch to be used to
9pm daily, Design, location and light colour of floodlights and two further
conditions relating to EV Charging points and the design of floodlights, as detailed
within Appendix 2 hereto.
ADJOURNMENT
The Chair adjourned the meeting for a short recess. The meeting reconvened at
11.30 a.m. with all those listed in the sederunt present.
Councillor O’Neill, having earlier declared an interest in the following item of
business, left the meeting at this point. 
APPOINTMENT OF TEMPORARY CHAIR
Having heard the Legal Officer in relation to the aforementioned declaration of
interest by the Chair, Councillor O’Neill, the Committee agreed to appoint a
temporary Chair from amongst those Members present at the meeting. It was agreed
that Councillor Sophie Traynor would chair the meeting for the undernoted item of
Page 6

Page 7

business. Accordingly, Councillor Traynor assumed the Chair for the undernoted
item of business only.
Councillor Sophie Traynor in the Chair
(b) DC23/083/FUL – Proposed erection of 27 affordable dwellings and
associated works at development site at Former Faifley Bowling Club,
Clydebank by Knowes Housing Association
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Planning, Building
Standards and Environmental Health Manager, the Development Management
Team Leader and the Chief Officer – Roads and Neighbourhood in further
explanation, and in answer to Members’ questions, the Committee agreed to grant
planning permission subject to the conditions set out in Section 9 of the report,
with an additional condition relating to the monitoring of parking on the site after 12
months following occupation of the houses as detailed within Appendix 3 hereto.
Note: Councillor O’Neill re-entered the meeting at this point.
Councillor Lawrence O’Neill in the Chair
(c) DC23/102/FUL– Proposed erection of 26 dwellings with associated
ancillary development at development site, Pappert, Bonhill, Alexandria
by West Dunbartonshire Council (Housing)
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Planning, Building
Standards and Environmental Health Manager, the Team Leader – Development
Management and the Housing Development and Homelessness Manager; in
further explanation, and in answer to Members’ questions, the Committee agreed
to grant planning permission subject to the conditions set out in Section 9 of the
report, as detailed within Appendix 4 hereto.
(d) DC23/070/FUL– Change of use from cafe to tyre change garage at 6 Old
Street, Duntocher, Clydebank G81 6DE by Mr Peter Ferrier.
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Lead Planning Officer in
further explanation, and in answer to Members’ questions, the Committee agreed
to refuse planning permission for the reasons set out in Section 9 of the report, as
detailed within Appendix 5 hereto.
Page 7

Page 8

DEVELOPMENT PLAN SCHEME AND PARTICIPATION STATEMENT FOR
LOCAL DEVELOPMENT PLAN 3
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, seeking approval for a consultation draft Development Plan
Scheme and Participation Statement in relation to a new Local Development Plan
(LDP3).
After discussion and having heard the Team Leader, Development Planning and
Place in further explanation and in answer to Members’ questions, the Committee
agreed the publication of the consultation draft Development Plan Scheme and
Participation Statement out in Appendix 1 of the report.
INVITATION TO MAKE LOCAL PLACE PLAN
A report was submitted by the Planning, Building Standards and Environmental
Health Manager, seeking approval for an approach to Local Place Plans, which will
deliver new duties arising from the Planning (Scotland) Act 2019.
After discussion and having heard the Development Planning and Place Officer in
further explanation, the Committee agreed:-
(1) to the approach to Local Place Plans as set out in the report and gave
authority to Officers to issue the invitation to prepare Local Place Plans to
communities; and
(2) that Officers would submit a burden item for members consideration in setting
the 2024-25 budget for the preparation of Local Place Plans.
The meeting closed at 12.34 p.m.
Page 8

Page 9

APPENDIX 1 
PLANNING COMMITTEE
NOTE OF VISITATION – 31 JULY 2023
Present: Councillor Ian Dickson
Attending: James McColl - Development Management Team Leader and
Amy Melkevik, Lead Planning Officer
SITE VISIT
A site visit was undertaken in connection with the undernoted planning application:-
Land to East of Broomhill Wood, Bonhill, Alexandria
DC22/190/FUL - Erection of single wind turbine, 30m hub and 43m tip, access track,
substation, agricultural shed and associated works by Mr Harris Smith.
Page 9

Page 10

APPENDIX 2
DC23/098/FUL – New build education and community campus comprising of
new Early Years, Primary schools, ASN unit, library and community facilities,
together with associated parking, sports facilities and landscaping at St.
Joseph’s Primary School, Faifley Road, Clydebank, G81 5EY by West
Dunbartonshire Council.
GRANT full planning permission subject to the following conditions:-
1. The external materials to be used in the construction of the building hereby
permitted shall accord with the details set out on approved drawing FC-HML-
01-ZZ-D-A-48100 Rev PO3 and no substitutes shall be used without the prior
written agreement of the Planning Authority.
2. Further to Condition 1 above, prior to the approved brickwork associated with
the building hereby permitted being constructed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details.
3. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority.  The development shall thereafter be completed in accordance with
the approved details prior to the occupation of any unit within the
development.
4. The phasing of the development shall be undertaken in accordance with the
phasing details hereby approved and following the commencement of works
on site, the development phasing will be undertaken on a continuous basis
until completion, unless otherwise first agreed in writing by the Planning
Authority.
5. Notwithstanding the approved plans, all recommendations within the
Ecological Constraints Survey and Preliminary Bat Roost Assessment dated
1st December 2022 shall be followed.  Further survey work undertaken shall
be submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site and implemented as approved.
6. Notwithstanding condition 5 above and for the absolute avoidance of doubt, a
minimum of two bat activity surveys (dusk and dawn) shall be undertaken in
the activity season immediately preceding the demolition of the existing
building on site.  The survey results shall be submitted to and approved in
writing by the Planning Authority prior to any demolition commencing on site.
Page 10

Page 11

7. Notwithstanding condition 5 above, no site clearance works shall be
undertaken during any phase during the bird-nesting season March to
September inclusive unless first agreed in writing by the Planning Authority.
For the avoidance of doubt, any such agreement will require a full nesting bird
survey prior to the commencement of works on site, the methodology and
findings of which shall be submitted to the Planning Authority.
8. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site.
9. Notwithstanding the approved plans, full details of the proposed planting
schedule, inclusive of proposed tree planting on a two for one basis relative to
those being removed, shall be submitted to and approved in writing by the
Planning Authority prior to the commencement of any works on site and shall
be implemented with a timescale to be agreed with the Planning Authority.
10. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species.
11. That full details of maintenance and management for the landscaping
approved shall be submitted to and approved in writing by the Planning
Authority prior to the occupation of the new building hereby permitted.
Management and maintenance shall commence upon completion of the
landscaping.
12. Details of the management and operation of the community allotments shall
be submitted to and approved by the Planning Authority prior to the
occupation of the new building hereby permitted.  Management and operation
shall then be undertaken in accordance with the approved details at all times
thereafter.
13. Notwithstanding the submitted details, that prior to the commencement of
works on site, a final drainage regime inclusive of maintenance arrangements
shall be submitted to and approved in writing by the Planning Authority.  The
drainage regime shall then be implemented and maintained thereafter.  For
the avoidance of doubt, the drainage regime shall be implemented
commensurately with the construction of the development.
14. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing ty the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved.
Page 11

Page 12

15. That prior to the commencement of works on site, a bird hazard management
plan shall be submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport.  The submitted plan shall include:
• Management of any flat / shallow pitched / green roofs on buildings within
the site which may be attractive to nesting, roosting and loafing of birds.
The management plan shall comply with Advice Note 8: Potential Bird
Hazards from Building Design.
The Bird Hazard Management Plan shall be implemented as approved and on
completion of the development shall remain in force for the lifetime of the
development.  No subsequent alterations to the plan are to take place unless
first submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport.
16. No development shall take place until full details of soft and water-
landscaping works have been submitted to and approved in writing by the
Planning Authority.  Details shall comply with Advice Note 3: Potential Bird
Hazards from Amenity Landscaping and Building Design.  These details shall
include the species, number and spacing of shrubs and trees.
No subsequent alterations to the approved landscaping scheme are to take
place unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall also be implemented as
approved.
17. The noise mitigation requirements detailed in the Noise Impact Assessment –
Report no. 7355-05-00 Rev 00 and Report no. 7355-04-00 dated 7 June 2023
and 3 May 2023 relating to plant and mechanical services and sport pitch
shall be implemented in full, namely:
• The roof top plant compounds shall have compliant plant screens as
barriers that is having no gaps at the foot or between panels and a lifetime
surface density of 10kg/m2.
• The sports pitch shall not be used outwith the hours of 8am to 9pm daily.
• The sports pitch shall have rubber vibration reducers between the
weldmesh fencing panels to reduce ball impact noise.
18. All plant and equipment (including any ventilation system) to be installed or
operated shall be enclosed, attenuated and/or maintained such that any noise
there from shall not exceed International Standards Organisation (ISO) Noise
Rating 35 between 0700 and 2300 hours daily, within any nearby residential
property, with windows slightly open for ventilation, when measured and/or
calculated and plotted on an ISO rating curve chart.
Page 12

Page 13

19. In the event that the sports pitch floodlighting requires to operate outwith the
hours of 8am to 8pm of use of the sports pitch set out in condition 17 above, it
shall be switched off by 10pm.
20. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
21. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800.
22. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’.  It shall
detail any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement.
23. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority.  The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority.
24. The approved remediation scheme shall be carried out in accordance with its
terms prior to the commencement of development other than that required to
carry out remediation, unless otherwise agreed in writing by the Planning
Authority.  The Planning Authority shall be notified in writing of the intended
commencement of remediation works not less than 14 days before these
works commence on site. Upon completion of the remediation works and prior
to the site being occupied, a verification report which demonstrates the
effectiveness of the completed remediation works shall be submitted to and
approved in writing by the Local Planning Authority.
Page 13

Page 14

25. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved.
26. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours.  On completion of the works and at a time and or
phasing agreed by the Planning Authority, the developer shall submit a
validation report containing details of the source of the material and
associated test results to demonstrate its suitability for use.
27. That prior to the new building being brought into use, a Travel Plan for the site
shall be undertaken and submitted to and approved in writing by the Planning
Authority.  This shall include what initiatives will be brought forward in the
future to ensure the achievement of a meaningful switch away from the
private car inclusive of staff travel.  Any agreed actions and measures shall be
implemented.
28.
29   
No development shall commence within the development site outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed with West of
Scotland Archaeological Service and approved by the Planning Authority.
Thereafter the developer shall ensure that the programme of archaeological
works is fully implemented and that all recording and recovery or
archaeological resources within the development site is undertaken.
EV Charging Points
30. Floodlights
Page 14

Page 15

APPENDIX 3
DC23/083/FUL – Proposed erection of 27 affordable dwellings and associated
works at development site at Former Faifley Bowling Club, Clydebank by
Knowes Housing Association.
GRANT full planning permission subject to the following conditions:-
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be used for
the houses within the development site shall be submitted to and approved in
writing by the Planning Authority.  For the avoidance of doubt, all facing bricks
to be used shall be good quality clay bricks.  Thereafter, unless otherwise
agreed in writing with the Planning Authority, the development shall be
completed in strict accordance with the approved material details and palette.
2. Further to Condition 1 above, prior to the approved brickwork associated with
any house being constructed or installed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details.
3. That prior to the commencement of works on site full details of the timescale
for the phasing of the development shall be submitted to and approved in
writing by the Planning Authority.  Works shall then proceed as approved
unless an alternative timescale is first agreed in writing by the Planning
Authority.
4. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority.  The development shall thereafter be proceed in accordance with
the approved details.
5. Prior to the commencement of development on site, a detailed soft
landscaping plan shall be submitted to and approved in writing by the
Planning Authority.  Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved plan.
6. Prior to the commencement of development on site, a Biodiversity
Enhancement Plan setting out how the proposal enhances biodiversity
beyond the current baseline, together with the implementation on site, shall be
submitted to and approved in writing by the Planning Authority.  All measures
shall then be implemented as approved.  Thereafter, unless otherwise agreed
in writing with the Planning Authority, the development shall be completed in
accordance with the approved plan.
Page 15

Page 16

7. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site.
8. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species.
9. Full details of the form, management, operation and timescale for completion
on site of the community allotments, community gardens and play space or
any alternative form of community space developed following the results of a
community consultation shall be submitted to and approved by the Planning
Authority prior to the occupation of the first dwellinghouse hereby permitted.
Management and operation shall then be undertaken in accordance with the
approved details at all times thereafter.
10. In addition to the water survey submitted with the application, a follow up
water vole survey shall be undertaken and submitted to and approved in
writing by the Planning Authority.  All recommendations shall then be
implemented as approved.
11. All recommendations within the Preliminary Ecological Appraisal dated 18th
May 2023, the Bat Activity Surveys dated July 20223, shall be implemented.
This shall include all required further survey work identified as being required
for badgers.  This further survey work undertaken shall be submitted to and
approved in writing by the Planning Authority prior to the commencement of
any works on site and implemented as approved.
12. Prior to the commencement of development on site, details of the design and
location of cycle storage shall be submitted for the further written approval of
the Planning Authority and the development shall thereafter be completed in
accordance with the approved details prior to the occupation of any housing
unit within the development, unless otherwise agreed in writing with the
Planning Authority.
13. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course.
14. That within 4 weeks of the last of the houses hereby permitted being
completed, all roads and footways within the application site shall be
completed to a final wearing course.
15. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house.
The off-street parking provision shall be then remain unobstructed and
available for use by residents of the associated house at all times thereafter.
16. All on street parking and visitor parking spaces shall be formed
commensurately with the development of the houses that they serve.
Page 16

Page 17

17. That prior to the commencement of works on site, full details of the proposed
drainage regime inclusive of calculations and overland flow details shall be
submitted to and approved in writing by the Planning Authority.  The drainage
regime shall then be implemented and maintained thereafter.  For the
avoidance of doubt, the drainage regime shall be implemented
commensurately with the construction of the houses it serves.
18. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing to the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved.
19. No site clearance works shall be undertaken during the bird nesting season
March to September inclusive unless first agreed in writing by the Planning
Authority.  For the avoidance of doubt, any such agreement will require a full
nesting bird survey prior to the commencement of works on site, the
methodology and findings of which shall be submitted to and approved by the
Planning Authority and shall be implemented as approved.
20. Prior to the commencement of development on site, details of the location and
design of electric charging points/units and associated infrastructure and
ducting to serve the development shall be submitted to and approved in
writing by the Planning Authority.  The approved car charging
points/units/ducting and associated infrastructure shall thereafter be installed
in accordance with the approved details at a timescale agreed by the Planning
Authority and maintained at all times thereafter.
21. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards.
22. Prior to the commencement of works on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets shall be submitted to
and approved in writing by the Planning Authority. Development shall then
proceed as approved.
23. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority.  Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall
be provided to new residents.
24. Prior to the commencement of any works on site, full details of the
incorporation of photovoltaic panels shall be submitted to and approved in
Page 17

Page 18

writing by the Planning Authority.  Thereafter the development shall be
undertaken in accordance with the approved details.
25. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved.
26. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported.  In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours.
On completion of the works and at a time and/or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use.
27. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
28. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority.  The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority.
29. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800.
Page 18

Page 19

30. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’.  It shall
detail any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement.
31. Review of parking and parking survey
Page 19

Page 20

APPENDIX 4
DC23/102/FUL– Proposed erection of 26 dwellings with associated ancillary
development at development site, Pappert, Bonhill, Alexandria by West
Dunbartonshire Council (Housing).
GRANT full planning permission subject to the following conditions:-
1. Prior to the commencement of development on site, exact details,
specifications and samples of all proposed external materials to be used
within the development site shall be submitted to and approved in writing by
the Planning Authority.  For the avoidance of doubt no consent is granted for
the brick samples submitted prior to determination and all facing bricks to be
used shall be good quality clay bricks.  Thereafter, unless otherwise agreed in
writing with the Planning Authority, the development shall be completed in
strict accordance with the approved material details and palette.
2. Further to Condition 1 above, prior to the approved brickwork associated with
any house being constructed or installed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details.
3. That prior to the commencement of works on site, full details of the timescale
for the build-out of the development shall be submitted to and approved in
writing by the Planning Authority.  Works shall then proceed as approved
unless an alternative timescale is first agreed in writing by the Planning
Authority.
4. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority.  The development shall thereafter be proceed in accordance with
the approved details.
5. Prior to the commencement of development on site, details of the design and
location of cycle storage shall be submitted for the further written approval of
the Planning Authority and the development shall thereafter be completed in
accordance with the approved details prior to the occupation of any house
within the development, unless otherwise agreed in writing with the Planning
Authority.
6. Notwithstanding the approved plans, all recommendations within the
Preliminary Ecological Appraisal dated 18th May 2023 shall be followed.  This
shall include all required further survey work identified as being required for
badgers.  Further survey work undertaken shall be submitted to and approved
in writing by the Planning Authority prior to the commencement of any works
on site and implemented as approved.
Page 20

Page 21

7. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of works on site, a further submission which demonstrates an
understanding on how the proposal enhances biodiversity beyond the current
baseline including any adjustments to the approved landscaping proposals
together with the implementation on site shall be submitted to and approved in
writing by the Planning Authority.  All measures shall then be implemented as
approved.
8. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site.
9. Notwithstanding the approved plans, an updated planting schedule to
incorporate a variety of tree types throughout the development shall be
submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site and shall be implemented with a
timescale to be agreed with the Planning Authority.
10. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species.
11. That full details of maintenance and management for the landscaping
approved shall be submitted to and approved in writing by the Planning
Authority prior to the occupation of the first dwellinghouse hereby permitted.
Management and maintenance shall commence upon completion of the
landscaping.
12. Prior to commencement of any works on site, a site management scheme for
construction traffic as recommended within the submitted Transport
Statement, shall be submitted to, and approved in writing by the Planning
Authority and thereafter shall be implemented in accordance with the
approved scheme.
13. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course.
14. That within 4 weeks of the last of the houses hereby permitted being completed,
all roads and footways within the application site shall be completed to a final
wearing course.
15. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house.
The off-street parking provision shall then remain unobstructed and available
for use by residents of the associated house at all times thereafter.
16. The additional parking provided on Pappert shall be constructed and made
available for use by local residents prior to the removal of the existing parking
area opposite no’s 127 to 131 Pappert.
Page 21

Page 22

17. That prior to the commencement of works on site, full details of the proposed
drainage regime inclusive of calculations and overland flow details shall be
submitted to and approved in writing by the Planning Authority.  The drainage
regime shall then be implemented and maintained thereafter.  For the
avoidance of doubt, the drainage regime shall be implemented commensurately
with the construction of the houses it serves. 
18. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site shall
be submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site.  The measures shall be implemented
and maintained as approved. 
19. Prior to the commencement of development with the site, details of the
number, location and design of electric charging points/units and associated
infrastructure and ducting to serve the development shall be submitted to and
approved in writing by the Planning Authority.  The approved car charging
points/units/ducting and associated infrastructure shall thereafter be installed
in accordance with the approved details in a timescale agreed by the Planning
Authority and maintained at all times thereafter. 
20. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
21. Prior to the commencement of works on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets shall be submitted to
and approved in writing by the Planning Authority.  Development shall then
proceed as approved. 
22. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority.  Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall
be provided to new residents. 
23. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved. 
Page 22

Page 23

24. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported.  In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours.
25. On completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to
demonstrate its suitability for use.
26. No development shall take place on site until such time as a noise impact
assessment in respect of the proposed air source heat pumps has been
submitted to and approved in writing by the Planning Authority.  This noise
impact assessment shall include an assessment of the potential for the
proposed heat pumps to cause noise nuisance affecting both the new houses
hereby permitted together with existing adjacent properties.  Where potential
noise disturbance is identified, proposals for the attenuation of that noise shall
be submitted to and approved in writing by the Planning Authority.  Any such
approved noise attenuation scheme shall be implemented prior to the
development being brought into use and shall thereafter be retained in
accordance with the approved scheme.  Should the approved noise
attenuation scheme impose restrictions upon the way in which operations on
the site are carried out, the site shall be operated in this manner unless
otherwise approved in writing by the Planning Authority.  The noise impact
assessment and any recommendations in respect of attenuation measures
shall be prepared by a suitably qualified person.
27. Prior to the site being occupied the applicant shall have a third party
independent verifier submit a verification report to the satisfaction of the
Planning Authority. Compliance with the relevant condition shall be evidenced
in the report.  This shall demonstrate that the projections as detailed within
Noise Impact Assessment are reliable and meet with Noise Impact
Assessment condition.
28. No development shall commence on site until such time as a noise control
method statement for the construction period has been submitted to and
approved in writing by the Planning Authority.  This statement shall identify
likely sources of noise (including specific noisy operations and items of
plant/machinery), the anticipated duration of any particularly noisy phases of
the construction works, and details of the proposed means of limiting the
impact of these noise-sensitive properties.  The construction works shall
thereafter be carried out in accordance with the approved method statement
unless otherwise approved in writing by the Planning Authority.
29. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
Page 23

Page 24

following hours unless otherwise approved in writing by the Planning
Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
30. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800.
31. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority.  This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’.  It shall
detail any procedures which are proposed to minimise the impact of noise and
vibration on the occupants of surrounding properties.  This statement shall be
prepared by a suitably qualified person, and the piling works shall thereafter
be carried out in accordance with the approved method statement.
32. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority.  The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust.  The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority.
33. No development shall commence on site until details for the storage and the
collection of waste arising from the development has been submitted to and
approved in writing by the Planning Authority.  The agreed details shall be in
place prior the occupation of the first housing unit/property within the site and
thereafter maintained for the lifetime of the development.
Page 24

Page 25

APPENDIX 5
DC23/070/FUL– Change of use from cafe to tyre change garage at 6 Old Street,
Duntocher, Clydebank G81 6DE by Mr Peter Ferrier.
REFUSE planning permission subject to the following conditions:-
1. The proposal would result in the siting of a Class 5 (General Industrial) use –
tyre changing garage within an existing residential area.  No supporting
information has been submitted in terms of what other sites have been
considered and why the proposal could not be accommodated within an
existing business and industrial area as defined by the adopted Local Plan
and proposed Local Development Plan 2.  Accordingly the proposal is not
supported by Policy 26(d) (i) of NPF4 together with Policy LE 3 of the adopted
West Dunbartonshire Local Plan.
2. The proposal would not result in significant overall economic benefit to the
local area and therefore the proposal is not supported by Policy LE3 of the
adopted Local Plan.
3. The proposal is incompatible with established residential amenity due to the
potential for noise disturbance to occur to the detriment of adjacent residential
properties.  The proposal is therefore contrary to Policies, 9, 23(e) and
26(d)(ii) of NPF4, Policies GD1, H5 and LE3 of the adopted Local Plan and
policies CP1 and H4 of the proposed Local Development Plan 2.
Page 25

Page 26

Page 26

Page 27

PLANNING COMMITTEE
NOTE OF VISITATIONS – 18 SEPTEMBER 2023
Present: Councillors Karen Murray Conaghan (all sites), Lawrence O’Neill
(sites at St. Joseph’s Primary School, Abbeylands Road and 6
Old Street), Clare Steel (St. Joseph’s Primary School, site only),
Attending: James McColl - Development Management Team Leader and
Amy Melkevik, Lead Planning Officer
SITE VISITS
Site visits were undertaken in connection with the undernoted planning applications:-
Development site, Pappert, Bonhill, Alexandria
DC23/102/FUL - Proposed erection of 26 dwellings with associated ancillary
development.
St. Joseph’s Primary School, Faifley Road, Clydebank, G81 5EY
DC23/098/FUL - New build education and community campus comprising of  new Early
Years, Primary schools, ASN unit, library and community facilities, together with
associated parking, sports facilities and landscaping.
Abbeylands Road, Former Faifley Bowling Club, Clydebank
DC23/083/FUL - Proposed erection of 27 affordable dwellings and associated works.
6 Old Street, Duntocher, Clydebank G81 6DE
DC23/070/FUL - Change of use from cafe to tyre change garage.
Item 5
Page 27

Page 28

Page 28

Page 29

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 11 October 2023
_____________________________________________________________
Subject: Scottish Government consultation on mandatory training on
planning for Elected Members
1. Purpose
1.1 To seek the agreement of the Committee to submit a response to the
Scottish Government consultation on mandatory training on planning for
Elected Members.
2. Recommendations
2.1 It is recommended that the Committee agree the proposed Council
response set out in Appendix 1.
3. Background
3.1 An independent review of the Scottish planning system, published in May
2016, recommended mandatory training on planning for Elected Members.
Public consultation on the independent review indicated broad support for
mandatory training, and subsequently the requirement for mandatory
training was included in the Planning (Scotland) Act 2019, with Section 45
of that Act prohibiting Elected Members from carrying out specified
planning functions if they have not completed training specified by Scottish
Ministers, with these functions to be specified in Regulations. These
Regulations have not been published yet, and the purpose of the
consultation is to inform them.
3.2 At West Dunbartonshire, most of the Elected Member involvement in
planning functions takes place at Planning Committee. This is where the
majority of non-delegated planning applications are decided, as well as all
decisions on Local Development Plan matters, other planning policy
matters and responses to Scottish Government and other consultations.
Reviews of delegated planning decisions are undertaken by the Local
Review Body, which has the same membership as the Planning
Committee. Under the current Scheme of Delegation, Full Council decides
on planning applications which fall into the category of National
Developments, and also Major Developments that are significantly contrary
to the Development Plan. Under changes introduced by the Planning
(Scotland) Act 2019, certain stages of the Local Development Plan (the
Evidence Report and the Proposed Plan) will also need to be approved by
Item 6
Page 29

Page 30

Full Council, and because the Clyde Mission area, covering 500 metres
either side of the River Clyde, is now a National Development, more
planning applications received by the Council will be considered National
Developments and considered by Full Council. As a result of these
changes, Full Council will be involved in more planning decisions in the
future, relating to both the Local Development Plan and planning
applications.
3.3 Presently planning training is provided at the beginning of the new election
cycle for new and returning Elected Members. This covers the
development plan system, the determination of planning applications and
material considerations, enforcement, the Councillor Code of Conduct and
the Local Review Body. Whilst there is no formal planning training plan,
training has been delivered on NPF4, placemaking matters, health and
wellbeing considerations and at various stages of the local development
plan process.  Training is also provided on a request basis, for example,
when an Elected Member who previously was not involved in the Planning
Committee becomes a member of the Planning Committee. 
4. Main Issues
4.1 The Scottish Government published a consultation paper on Mandatory
Training on Planning for Elected Members in July 2023, with comments
sought by 26 October 2023 (Mandatory Training on Planning for Elected
Members (www.gov.scot)). The consultation responses will be used to
inform the preparation of Regulations relating to the provision for
mandatory training for Elected Members set out in the Planning (Scotland)
Act 2019. The consultation paper sets out context and asks a number of
questions relating to:
• The planning functions that Elected Members be prohibited from taking
decisions on until training requirements have been completed - for
example, the prohibition could be restricted to taking decisions on planning
applications, or could extend to include decisions on the Local
Development Plan and other policy documents.
• Whether different levels of training is required for Elected Members on the
Planning Committee, and other committees that take planning decisions -
most non-delegated planning applications are decided by the Planning
Committee, but some go to full council, and under the Planning
(Scotland)Act 2019, some decisions relating to the Local Development
Plan will also be taken at full council. The Local Review Body reviews
decisions on delegated planning applications.
• The content of any mandatory training and how it should be delivered - the
consultation paper asks if the mandatory training should focus on the key
principles and knowledge of the planning system, and suggests topics that
could be covered in mandatory training (1. importance of the plan led
system; 2. planning application process; 3. decision making at committee;
Page 30

Page 31

4. role of Elected Members; and 5. post-decision issues). A number of
options for delivery are set out, including online and in-person training, and
training delivered by Council officers or appointed trainers.
• Whether Elected Members should be required to pass a test before being
allowed to take planning decisions
• The frequency of mandatory training – suggestions include once a year,
every election cycle or just once;
• Whether and where information relating to the completion of training
should be published – suggestions include online or in the annual Planning
Performance Framework; and
• How the long-term effects of training could be monitored
4.2 The Council welcomes the consultation on mandatory training on planning
for Elected Members. Planning legislation and planning matters can be
complex and it is essential that Elected Members have adequate training to
enable them to make informed decisions.
4.3 The proposed response to the consultation paper is set out in Appendix 1.
Key points from the response are summarised below:
• It is the view of the Council that Elected Member involvement in the
determination of planning applications and decisions on Local
Development Plans should be prohibited until mandatory training has been
completed.
• However, many of the Council’s Elected Members have concerns that a
restriction on them taking part in decisions on planning functions is anti-
democratic, as they have been elected to take these decisions.
• It is the view of the Council that the training requirements for Elected
Members should be the same, regardless of whether their involvement in
planning decisions takes place at Planning Committee, Full Council or
Local Review Body.
• Mandatory training should focus on the key principles and knowledge of
the planning system, and the topics set out in the consultation paper are
what mandatory training should cover (These are: 1. Importance of a plan
led system; 2. Planning application processes; 3. Decision making at
committee; 4. Role of Elected Members; and 5. Post decision procedures).
Councils could complement these mandatory topics with information on
subjects such as conservation, listed buildings, biodiversity, enforcement,
affordable housing developer contributions, placemaking, sustainability,
net zero, etc
• Training should be provided by options of in-person training for Elected
Members who prefer to learn that way and an online course that can be
taken by Elected Members at their own convenience.
• The requirement for a test would focus Elected Members’ focus on
training, but it is recognised that this may be a disincentive for some
Elected Members to be a part of committees that take decisions on
planning matters.
Page 31

Page 32

• Mandatory training should be undertaken every election cycle, with Elected
Members encouraged to keep skills and knowledge up to date via annual
training covering emerging legislation and updated procedures and issues.
• It is not considered necessary to publish a list of which Elected Members
have undertaken the training course, with this information available on
request.
• Monitoring is supported if it will be purposeful and used to ensure
mandatory training is meeting objectives.
5. People Implications
5.1 There are no direct personnel issues associated with this report. Some of
the options set out in the consultation paper would require Council officers
to deliver mandatory training to Elected Members. There may resource
issues if the Planning Service have to deliver mandatory training, however,
these are likely to be minimal as the Council already provides in-house
training on planning for Elected Members.
6. Financial and Procurement Implications
6.1 There are options mentioned in the consultation paper which refer to the
Scottish Government procuring an online course or an online training
provider. However, no reference is made as to whether planning
authorities would be required to contribute to the cost of this. The Council
response advises that our planning training is currently delivered in house
and any costs to the Council would be an additional burden at a time of
budget restraint.
7. Risk Analysis
7.1 Planning decisions are quasi-judicial in nature and poor decisions can
result in costs being awarded at appeal or challenged at the Court of
Session, at which costs can also be awarded against planning authorities.
It is important to have well informed Elected Members in order to limit
decisions which could have financial and legal implications for the Council.
An intended outcome of mandatory training would be decisions being
taken on a better informed basis, and therefore the risk of poor decisions
being taken would be reduced. However, as the Council already provides
training in-house, it is not clear that the risk reduction for West
Dunbartonshire Council would be significant.
8. Equalities Impact Assessment (EIA)
8.1 The Scottish Government has undertaken an equalities impact
assessment of the consultation documents.
Page 32

Page 33

9. Consultation
9.1 An information/discussion session was held for Elected Members on 13
September 2023, at which comments which have informed this response
were collated. The consultation paper and contents of this report were
shared with Committee Services and Legal Services.
10. Strategic Assessment
10.1 As planning decisions can impact on all of the Council’s strategic priorities,
it is considered that the proposed mandatory training is relevant to all.
Pamela Clifford
Planning, Building Standards and Environmental Health Manager
Date: 11th October 2023
_________________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager
Pamela.clifford@west-dunbarton.gov.uk
Alan Williamson, Development Planning & Place Team
Leader
Alan.williamson@west-dunbarton.gov.uk
Appendix: Appendix 1: Response to Scottish Government
consultation on mandatory training on planning for
Elected Members
Background Papers: Scottish Government consultation paper on mandatory
training on planning for Elected Members - Mandatory
Training on Planning for Elected Members
(www.gov.scot)
Wards Affected: All
Page 33

Page 34

Page 34

Page 35

Question 1: Should the determination of planning applications be the only
specified function that Elected Members are prohibited from doing until
training requirements have been completed?
Planning legislation is complex and it is essential that Elected Members have
adequate training to enable them to make informed decisions. All Elected Members
should be trained on all parts of planning system and not just restricted to planning
applications. This should include local development planning and policy matters,
enforcement, placemaking, the Local Review Body and the Councillor Code of
Conduct.  The planning system raises issues of probity, conflicts of interest and
conduct for Elected Members and can be confusing and complex. It is an area of
decision making in which Elected Members must be impartial and be seen to act
impartially and training would assist in these requirements. 
Elected Members have an important role to play in policy making requiring the
identification of community needs, setting objectives to meet those needs,
establishing priorities between competing demands and allocating resources. The
Local Development Plan plays a significant role in the planning system as it forms
the policy basis for planning decisions on planning applications. As an Elected
Member, key decisions on the content of the development plan will probably arise
during the life of a council and they will rank as some of the most important decisions
they will make. The content of a Local Development Plan may have a profound effect
on the future quality of life for the communities that they represent. As various stages
of the new Local Development Plan require to be determined by Council it is
important that all Elected Members are trained to provide informed decisions. 
As a general point, many of the Elected Members of West Dunbartonshire Council
have concerns about restrictions being introduced on them with regard to taking
decisions which they have been democratically elected to take by their constituents.
Concerns were also expressed about situations arising wherein there is insufficient
trained members at a meeting to allow a decision to be reached.
Question 2: Should the training requirements vary for Elected Members
depending on whether they participate in a planning committee, Full Council
or Local Review Body? 
No. It is considered that the level of training should be the same for all Elected
Members regardless of what level of decision-making they are participating at. This
is because, depending on planning authority schemes of delegation, decisions on
some National and Major Developments (and therefore significant applications), are
taken at Full Council, and Elected Members taking decisions on these applications
should have received the same level of training as Planning Committee members.
Similarly, as there is no right of appeal to decisions taken at Local Review, and
therefore Elected Members on the Local Review Body are taking the final decision
on a planning application, it is considered that members of the Local Review Body
should receive the same level of training as Planning Committee members. 
Item 6
Appendix 1
Page 35

Page 36

Also it gives an element of flexibility for Elected Members who are not part of the
Planning Committee but then become a member of the Planning Committee as this
can be done without additional training being required. 
Question 3: Should the mandatory training be focused on the key principles
and knowledge of the planning system? 
Yes. Mandatory training should be focused on the general key principles and
knowledge of the planning system, with planning authorities complementing this with
information relating to local level policies and issues such as conservation, listed
buildings, biodiversity, enforcement,  affordable housing developer contributions,
placemaking, sustainability, net zero, etc. .
Question 4: Do you agree with the list of topics to cover?
Yes. The list of topics is comprehensive and appears to cover the key principles and
knowledge that would be required to enable competent involvement in planning
decisions with more local matters as detailed in Question 3 above being covered
separately.
Question 5: Are there any other topics that you think should be covered in the
mandatory training? 
No
Question 6: Which would be your preferred option for how the training should
be delivered? 
It is considered a combination of Options 1 and 3 would be appropriate. Option 1
(Training could be delivered in-person with the Scottish Government setting out the
overarching key principles which the training should cover and it would then be up to
each local authority to develop the detailed content and deliver the training) would
enable planning authorities to provide an in-person training session for Elected
Members who would prefer to learn this way. Planning authorities could add local
issues to such a session, but with key principles set out by the Scottish Government,
there would be a consistency in the training delivered by all planning authorities.
Option 3 (Training could be delivered online with the Scottish Government
developing (or procuring) an online training course for Elected Members to access
individually at a time that suits them) would provide consistency of training across all
planning authorities and would also allow Elected Members to access training at a
time that suits them, and also to revisit it if they think necessary. 
Option 4 is not supported as it could not be certain that the chosen training provider
would be of sufficient quality and the planning authority would have had no say in
their selection. It is not clear who would meet the costs of supplying this training, and
with many authorities currently providing their training in-house, this could be an
additional cost at a time of budget restraint. Also, as it is likely that planning
authorities would have demand for training at the same time (i.e. following elections),
if there was only one or a few authorised training providers, there could be a delay in
Page 36

Page 37

some planning authorities receiving training, impacting on the timescales for
decisions to be made.
Question 7: Do you have any further comments on how the training should be
delivered?
No
Question 8: Should there be a requirement for Elected Members to have
passed a test before being allowed to undertake a planning decision?
The requirement of undertaking a test would focus Elected Members attention on the
training, however this may be a disincentive for some Elected Members to be part of
the Planning Committee or take part in planning decisions. A test is used in
Licencing and it is quite effective and is an accepted part of training.  Consideration
would need to be given if the test should be just for Planning Committee members or
all Elected Members involved in planning decision making.   
Question 9: How often should Elected Members be required to retake the
training?
Mandatory training should be once every election cycle and this should include new
Elected Members and refresher courses for more experienced Elected Members.  It
should be within 3 months of being elected and continued membership of Planning
Committee will require training/refresher training.
Thereafter, Elected Members should be encouraged to keep their skills and
knowledge up to date by attending training sessions on at least an annual basis
Elected Members should be updated regularly on changes in legislation and
procedures, as up to date knowledge is essential for those Elected Members
involved in making decisions on planning applications and on local development plan
documents. 
Question 10: Should Elected Member’s completion of the training be made
available to the public?
There should be no requirement to publish this information but it should be available
if a member of the public requests it.  The information will be recorded within the
Council, and if there is a prohibition on any Elected Members taking part in a
decision, this would be known by the Member and by council officers.
Question 11: If the completion of training is made public, do you think the
information being provided within PPF / statutory annual reports and on the
Local Authorities website are sufficient?
As above, it is not considered necessary to publish this information however if it was
to be published the Planning Performance Framework/statutory annual reports would
be place to report it. 
Page 37

Page 38

Question 12: Do you have any comments / suggestions on the best ways to
monitor the long term effects of the mandatory training of Elected Members?
Given there are some concerns around the introduction of mandatory training, it is
considered that some form of monitoring should be introduced to ensure it is meeting
objectives. However, any monitoring should be purposeful, and not just done for the
sake of doing it.
Monitoring could include quantitative data around how many Members have been
trained in each planning authority, and the numbers involved in decisions on
planning applications, to monitor if the requirement to undertake training has reduced
Elected Member involvement. It could also include qualitative data collected from
Elected Members, planning officers, applicants and communities around what their
views on the impact of training has been. To make this more worthwhile, if possible
pre-mandatory training baseline data should be collected for comparison purposes.
The provision of training and the number of trained Elected Members could be a
performance indicator in the Planning Performance Framework. 
Question 13: Do you have any comments on the impact assessments
undertaken as part of the consultation on mandatory training on planning for
Elected Members? 
No
Page 38

Page 39

WEST DUNBARTONSHIRE COUNCIL
Report by the Planning, Building Standards and Environmental Health
Manager  
Planning Committee: 11 October 2023
___________________________________________________________________
Subject: Scottish Ministers Decision - Scheduled Monument Consent for
Quarrying Operations, Sheephill Fort, Sheephill Quarry, Milton,
Dumbarton.  
1. Purpose
1.1 To provide the Committee with an update regarding the Scottish Ministers
decision for the above Scheduled Monument Consent.
2. Recommendations
2.1 That the Committee notes the decision of the Scottish Ministers.
3. Background
3.1 The Council agreed to accept the conditions of the Review of Minerals
permission (ROMP) for Sheephill Quarry in January 2021.   The planning
permission granted in 1949 for Sheephill Quarry allows the full excavation of
the whole site, which includes the rock under Sheep Hill Scheduled
Monument and the agreed ROMP includes this area.  The vitrified fort of
Sheephill was designated as a Scheduled Ancient Monument by the
Secretary of State in 1970. An application was made for Scheduled
Monument consent to Historic Environment Scotland on 13th September
2021. Previously, Scheduled Ancient Monument Consent (SAMC) was
granted in 2002 by Historic Scotland subject to a condition that the
archaeological excavation be carried out in strict accordance with a Written
Scheme of Investigation and that the loss of the fort shall be mitigated by the
excavation, recording and publishing of findings. Although the Planning
Committee in November 2021 submitted a response to the Scheduled
Monument Consent. It recognised the long complex history of Sheephill Fort
and the previous grant of Scheduled Monument Consent. The Council
indicated that the Scheduled Monument Consent (SMC) should be refused
as Sheephill Fort is an important archaeological site which should be
retained.  The Council advised that when assessing the application for SMC
consideration should be given by Historic Environment Scotland to their own
policies relating to Scheduled Monuments and in particular the Scheduled
Monument Consent Policy. If Historic Environment Scotland are minded to
grant consent the Council would recommend that a strict Written Scheme of
Investigation of the loss of the fort is required to mitigate by the excavation,
recording and publishing of the findings. This formed the basis of this
Council’s response to the Scheduled Monument Consent.
Item 7
Page 39

Page 40

3.2   On 18th November 2021 Historic Environment Scotland notified the Scottish
Ministers of its intention of grant of scheduled monument consent.  On 9th
September 2022 the Scottish Ministers directed that they would determine
the application themselves. 
4. Main Issues
4.1 The application was considered by means of written submissions and a site
visit by a Reporter appointed by the Scottish Ministers for that purpose. The
Reporter recommended that scheduled monument consent is granted
subject to conditions. The Scottish Ministers agreed with the Reporter’s
recommendations and has granted scheduled monument consent subject to
conditions. The decision letter and associated report is available:  
https://www.dpea.scotland.gov.uk/Casedetails.aspx?ID=121939
4.2   The Scottish Ministers agree with the Reporter’s findings and conclusions
with regard to the relevant policy in Historic Environment Policy for Scotland
(HEPS) and the Scheduled Monuments Consents Policy (SMCP) which
provides specific policies intended to apply to and inform the determination
of applications of this type. The SMCP makes clear that the scheduling
designation is in order to secure the long-term protection of monuments in
the national interest, in situ and as far as possible in the form that they have
come down to us. It sets out various principles that apply to scheduled
monuments. Of particular relevance to this case is that “The principle of
preserving scheduled monuments will only be set aside in circumstances
where wider considerations are deemed, on balance, to be of greater
importance to the national interest”. 
4.3  The Scottish Ministers also agree with the following findings of the Reporter:
• The proposal would be directly contrary to the SMCP, and consequently
also contrary to the overarching principles and policies outlined in HEPS.
• Policy documents cannot anticipate or be easily applied to the
circumstances of every case, particularly where they are novel or
exceptional in some way. In such cases, this does not mean that the policy
should be set aside, but it increases the likelihood that there may be
justification for a proposal despite being contrary to policy.
• The national policy context in which the 2002 decision (to grant scheduled
monument consent for the same works as proposed in this current
application) was taken was similar to current policy. This is in that policy
presumed against granting scheduled monument consent for developments
which would have an adverse impact on scheduled monuments unless there
were exceptional circumstances.
• No exceptional circumstances were found to support the 2002 decision.
The decision document concluded that the proposal was contrary to the
policy that applied at the time. Scheduled monument consent was
nevertheless granted.
Page 40

Page 41

4.4  The Scottish Ministers note that it appears to the Reporter that the 2002
decision was taken in view of compensatory provisions in the Act and the
financial liability that Historic Scotland may have faced if consent had been
refused. The Reporter’s view is that compensatory provisions are not material
and should not have a bearing on the decision.  The Scottish Ministers do not
share that view and consider that in deciding whether or not to grant consent
they are entitled to take into account the significant cost implications for the
public purse. 
4.5  Notwithstanding the Reporter’s view regarding the issue of compensation, the
Reporter still recommends approval of the application. He advises that given
the underlying intent of policy in regard to protection of scheduled monuments
has not altered (in the time since the 2002 decision), there is a compelling
case for maintaining consistency in decision-making in the particular
circumstances of this case. In 2002, no exceptional circumstances were
presented despite policy seeking to protect scheduled monuments in
recognition of their national importance, as it continues to do. The Reporter
states that given nothing appears to have materially changed since 2002, he
considers that this application should be determined in a manner consistent
with the 2002 decision.  
4.6    The Scottish Ministers however consider that in this case, consistency in itself
is not a sufficient reason for approving the current application. The Scottish
Ministers are also entitled to reach a different view to that taken in 2002 on the
merits of preserving the scheduled monument.   The Scottish Ministers have
concluded that the proposal is directly contrary to the SMCP and HEPS.
However the Scottish Ministers give substantial weight, as a material
consideration, to the significant cost to the public purse likely to be incurred in
the event of refusing consent, under the provisions in section 7(1) of the Act
(compensation for refusal of scheduled monument consent). The liability for
compensation in the event of a refusal of consent is likely to amount to several
million pounds. The Scottish Ministers consider that this material
consideration outweighs the relevant provisions of SMCP and HEPS in this
case and justifies a departure from those policy documents. 
4.7    In reaching this decision, the Scottish Ministers have taken into account the
fact that although it is of national importance and can contribute significantly to
understanding of the past, the scheduled monument is located within the
quarry boundary and is consequently inaccessible to the public. The loss of
Sheep Hill, as well as the monument upon it, would result in a complete
inability to continue to understand, appreciate or even be aware of its
historical existence, importance and original landscape context.  
Page 41

Page 42

4.8    The Scottish Ministers agreed with the Reporter that a requirement for
archaeological investigations and recording would be consistent with the
requirements of policy SMCP4 in the Scheduled Monument Consents Policy.
It is justified to require such investigations, in recognition of the site’s national
importance, but particularly because once it has been destroyed, the only
means by which its historical existence would be capable of being understood
and appreciated would be through reference to published records. 
The Scottish Ministers granted scheduled monument consent for the
proposed quarrying operations subject to three conditions relating to
archaeological investigation work.   
5. People Implications
5.1 There are no personnel issues.
6. Financial Implications
6.1 There are no financial implications for the Council.
7. Risk Analysis
7.1 A risk assessment is not required.
8. Equalities Impact Assessment (EIA)
8.1  There are no equalities issues identified.
9. Consultation
9.1 There are no requirements for consultation.
10. Strategic Assessment
10.1    The Council agreed the conditions of the Review of Minerals Permission
(ROMP) in January 2021 and it supports the strategic priorities of the
Council.
Page 42

Page 43

Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 11th October 2023
______________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Email: Pamela.Clifford@west-dunbarton.gov.uk
Appendix: None
Background Papers: Scottish Ministers Decision – Scheduled Monument 
Consent for Quarrying Operations Sheephill Fort 
https://www.dpea.scotland.gov.uk/Casedetails.aspx?ID=1
21939 
WP 98/076: Review of Minerals Permission 
Wards affected: Ward 3 (Dumbarton)
Page 43

Page 44

Page 44

Page 45

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager     
Planning Committee: 11 October 2023   
_____________________________________________________________
Subject:  Scottish Government Building Warrant Fees Consultation
1. Purpose
1.1  To seek agreement of the Committee to submit a response to the
Scottish Government consultation on Building Warrant Fees.
2. Recommendations
2.1    It is recommended that the Committee agree the proposed Council
response set out in Appendix 1.
3.
3.1
Background
This consultation forms part of the work undertaken by the Verification
Delivery Model work stream, which is one of the seven work streams
being directed by the Building Standards Futures Board. The
consultation seeks to obtain views on proposed increases to the
building warrant fees required to deliver change to strengthen the
building standards system and the development of a new building
warrant fees model in Scotland. It intends to gather views and opinions
from a range of stakeholders, construction sector organisations and
businesses, and the general public.
3.2 The consultation was published on 21 July 2023 and closes on 24
October 2023.
4. Main Issues
4.1 The consultation:  Building Warrant Fees: consultation - Scottish Government
consultations - Citizen Space  covers four  main areas, as follows:
• Overview of building warrant fees
• Building warrants fees for High Risk Buildings (HRBs)
• Local authority building standards enforcement
• Devolved building warrant fees
4.2    The proposed changes outlined in the consultation aim to increase the 
building warrant fee income for building standards verifiers to sustain,
strengthen and improve the system in Scotland. This will include raising
additional income to support the proposed changes to the building
standards system, brought through the work of the Futures Board work
streams, which put an additional resource requirement on verifiers,
Item 8
Page 45

Page 46

certifiers and the Scottish Government Building Standards Division. It is
intended that it will introduce a building warrant fees model that can be
used flexibly in the future and put in place an annual uplift across all
fees, initially for a 3-year period.
4.3    The consultation seeks to obtain views on an increase in building
warrant fees and on increased fees specifically for new and enhanced
verification requirements for High Risk Buildings, to support the
Building Standards Hub, enhanced Scottish Government Building
Standards Division (BSD) monitoring and auditing and if the local
authority Building Standards enforcement role should be funded by
building warrant fees. It also seeks views on whether building warrant
fees should be devolved or set nationally. 
4.4      The proposed response to the consultation paper is set out in      
Appendix 1 and comprises of 12 questions related to:
• Part 1: Building Warrant Fees
• Part 2: High Risk Buildings
• Part 3: Building Standards Enforcement
• Part 4: Devolved Fees
• Part 5: Impact Assessments
Part 1:  Building Warrant Fees 4.5      
The building standards system in Scotland operates under the Building
(Scotland) Act 2003, introduced in 2005. Verifiers are appointed by   
Scottish Ministers and the 32 local authorities are currently appointed
to deliver the building standards service in their own geographical
areas. Their role is to protect the public interest by providing an
independent check of applications for building warrants. The current
verification service fee structure was initially established in the Building
(Fees) (Scotland) Regulations 2004. Building warrant fees are set on a
sliding scale and are based on the 'value of work' of the project being
undertaken. In July 2017 there was a change to the building standards
fee levels to increase the income of the system to achieve full cost
recovery for verification. Before that, the fees had not been changed
since 2005.   
4.6 Building warrant fees are used by verifiers to deliver the building
standards verification (building warrant) service. Funding is also
provided via Grant Aided Expenditure calculations (GAE) to support the
building standards statutory enforcement role. The verification service
is intended to be self-financing and as such, it is expected that fee
income should cover the cost of providing the verification service. It is
however, at the discretion of local authorities how the fee income is
used to fund the verification process, to meet the requirements of
Scottish Government's Building Standards Performance and Operating
Frameworks for Verifiers.
Page 46

Page 47

4.7   A number of changes to the building standards system are currently 
being developed through the Building Standards Futures Board work 
streams. It is intended that these changes will strengthen and sustain 
the building standards system and will be introduced over the next few 
years. It is crucial that sufficient funding to local authority verifiers to
prepare accordingly as the proposed changes will place an additional
resource requirement on verifier staff, in relation to cost and time. Work
is being progressed through four main work steams: Compliance Plan
Approach for High Risk buildings; the Verification Delivery
Model Working Group  –  the creation of a permanent Central Building
Standards Hub (BSH) which  would support delivery of the verification
service such as the Scottish Type Approval Scheme (STAS, Technical
& Procedural Information Papers and the Customer Dispute Resolution
Process); the Digital Transformation work stream is investigating
options for the digital transformation of the building standards system in
Scotland; and the  Workforce Strategy work stream - sustainable
workforce, skilled workforce, professional framework, and a profession
for everyone.
4.8   The Scottish Government Building Standards Division (BSD)
commissioned two linked research projects on the building standards
fees system to review the building standards income and level of
reinvestment in service delivery, and to provide a building warrant fees
model, which is flexible to allow changes to building standards fees
over a 3-year period. 
4.9    The proposal to increase fees will also introduce requirements for
enhanced monitoring, auditing and reporting by the BSD to provide
assurance to Scottish Ministers that the strengthened system is being
implemented and delivered as planned by local authority verifiers. The
resources needed to support the implementation phase and for further
development of the system will also be considered with the fees
research providing a breakdown of the likely increased future cost of
the building standards verification service. It also identifies potential
increases to building warrant fees to fund the proposed changes.
4.10   The consultation seeks comments on the proposals to increase fees
across all 'value of work' bands, add an annual inflation uplift and
introduce a new fee calculation model that allows for future
adjustments within the 3 year lifespan of the model that may be made
on the basis of further research, evidence and reporting. The Council’s
response is supportive for the increase of building warrant fees in line
with inflation especially if the  verification function is to be self-
financing. 
Part 2: High Risk Buildings (HRBs)
Page 47

Page 48

4.11  Following the tragic events at Grenfell Tower, London in June 2017 a
Ministerial Working Group (MWG) was set up to oversee a review of
building and fire safety through the creation of two expert Review
Panels. One panel considered Fire Safety and the other focussed on
Compliance and Enforcement. The Review Panel on Compliance and
Enforcement in Scotland concluded that the Scottish system is not
broken but that evidence clearly shows that there was a need to
strengthen the system. The Review Panel concluded that, whilst
maintaining the core elements of the system some reshaping would be
advised to ensure that it addresses the identified weaknesses. Both
Review Panels identified the potential for a 'national or central hub' that
would provide expertise in specialist and safety critical areas of the
design of complex buildings.
4.12   The establishment of a new Compliance Process for High Risk
Buildings through the introduction of a Building Warrant Compliance
Plan, a Compliance Plan Manager (CPM) role and a pre-application
assessment process is proposed. Going forward the Compliance Plan
process will also be tailored to suit building warrant applications for
residential buildings with any storey at a height of more than 11 metres;
educational establishments (Schools, colleges and universities),
community/sport centres and non-domestic buildings under local
authority control/where they have an interest in a building; hospital and
Residential Care buildings.
4.13   This proposal introduces an additional, enhanced fee for building
warrant applications for High Risk Buildings to cover additional costs 
experienced by verifiers on the introduction of the High Risk
Buildings compliance plan process including the requirement to pro-
actively monitor these applications. Again the Council is supportive in
principle of an enhanced  ee  which should be proportionate and fair to
the additional work required for High Risk Buildings.  
Part 3: Building Standards Enforcement
4.14    The statutory obligations relating to building standards for which fees 
are not charged include enforcement and the maintenance of the 
building standards register. The majority of local authority verifier 
teams are expected to fund both the verification and local authority 
statutory enforcement roles through building warrant fee income. The
consultation seeks views to provide enhanced and consistent
enforcement activity within the building standards system and formally
funding the building standards statutory enforcement role through the
building warrant fee. The recommended response recognises that
Building Standards Enforcement is a statutory function which is
currently funded  by annual grant  aided  expenditure.  It is unfair to
penalise the majority who comply with the system by having them pay
more in fees to cover the costs of those  who do not. The Building
Warrant fee needs to be proportionate to the development and it
Page 48

Page 49

cannot sustain a wide range of building standards functions without
impacting negatively development viability and potential income. 
Part 4: Devolved Building Warrant Fee
4.15   Currently, the structure of fees for building warrants is set centrally by 
the Scottish Government and provides for consistent and predictable 
costs nationally. The payable fee to the local authority verifier depends 
on the value of the building warrant work and other factors such as any 
certification discounts and surcharges. The research reviewed the fee 
system in England and Wales that is set by each individual local
authority or approved inspector and explored the advantages and
disadvantages of three main options. It is considered that a devolved
system (in full or part) would introduce variations in fee levels and
approaches across Scotland, which could cause complication for those
users who operate across several authorities and cause significant
challenges for Local Authorities delivering Building Standards. One of
the purposes of setting building warrant fees locally is full cost
recovery. This would be a complex exercise for Building Standard
Authorities to engage with, taking up officer time and there would
remain the inability to estimate what level of income will be received in
any given year so full cost recovery could not be  guaranteed.  There
are further  complexities to consider if Building Warrant fees are set
locally not least how the  centralised functions like the Central Hub
would be fairly funded from each Local Authority, economies of scale
for smaller local authorities and higher fees  in a  local authority could
discourage development.
People Implications
5.1      The consultation proposals if implemented would place additional 
resource requirement on verifiers. The additional income from
increased building warrant fees would be required to offset the
additional resources required to meet these duties.  It is recognised at
a national level that there is a shortage of experienced building
standards officers, which make recruiting additional, knowledgeable
staff very challenging.
5.2    The increased requirements and levels of knowledge to fulfil the
proposals will require additional resources to train existing staff and to
expand the building standards team to fulfil all the additional duties
required.
Financial Implications
6.1  A strengthened and sustained building standards section will require
more financial resources to employ, train and retain staff.  This is
5    
6
Page 49

Page 50

recognised by the Scottish Government and is one of the main 
purposes of this consultation.  An average increase of resources of 30%
was assumed, but this will be subject to further research and refinement
over the planned 3 year staged fee increases, with the intention that the
necessary funding for the strengthened system is identified and fully
delivered by year 3. It is difficult to accurately predict the actual effect
that the proposed fee changes would have for the Council. It is expected
that the outcome of this consultation will result in a likely increase in
building warrant fees for the Council. It is likely that some, or all, of the
additional income would be required to be invested back in the service to
help support the building standard function and the additional
responsibilities. 
6.2   The building standards system is designed to be self-financing and it is
expected that the Building Standards Hub would be financed from
building standards fees. 
6.3 The proposal to increase fees will also introduce requirements for
enhanced monitoring, auditing and reporting by the BSD to provide
assurance to Scottish Ministers that the strengthened system is being
implemented and delivered as planned by local authority verifiers.
7. Risk Analysis
7.1 If the building standards system is to be self-financing as well as cover
costs for a central Building Standards hub and additional
responsibilities for high risk buildings  it is essential that the building
warrant fees are of a scale and level to ensure this.
7.2 Building Warrant fee income can vary from year to year depending on
the national and local economy and development taking place in the
area.   If the additional income does not materialise the Council will
have this additional cost that is in effect a cut to their income at a time
when Local Authorities are under severe financial constraints. These
monies will have to be found from the local authority budget, resulting
in reduction in the Building Standards budget and quality of service.
8. Equalities Impact Assessment (EIA)
8.1  The Scottish Government has undertaken an equalities impact
assessment of the consultation documents.
9. Consultation
9.1 The Chief Officer: Resources and Legal Services have been consulted in
the preparation of the report.
10. Strategic Assessment
Page 50

Page 51

10.1    The proposals are in keeping with the Council’s Strategic priorities.
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 11th October 2023   
______________________________________________________________
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Pamela.Clifford@west-dunbarton.gov.uk
Judi Ferguson, Acting Principal Building Standards
Surveyor
Judi.ferguson@west-dunbarton.gov.uk   
Appendix:   Appendix 1 : Response to Scottish Government 
consultation on Building Warrant Fees 
Background Papers:       Scottish Government Consultation on Building 
Warrant Fees. The consultation can be accessed
here: 
Building Warrant Fees: consultation - Scottish
Government - Citizen Space
Page 51

Page 52

Page 52

Page 53

Appendix 1: Response to the Consultation on the Increase in Building Warrant
Fees
Question 1.1:  Do you agree building warrant fees should be increased to
strengthen the building standards system in Scotland? 
Strongly agree - Additional demands on building standards to strengthen and 
sustain the service need to be adequately financed and therefore the building 
warrant fees should be increased in line with inflation especially if the
verification function is to be self-financing.
Question 1.2: - Do you agree that a proportion of the building warrant fee should
be used to support a central Building Standards Hub?
Strongly agree - The work of the Hub will enhance and help standardise the
service delivered by all local authorities, thereby improving the customer
experience. 
Being able to draw on specialist knowledge is extremely important to
smaller Local Authorities, who often have to rely upon expensive third party
specialists. Providing training, in a standardised way, to increase the
professionalism of staff across Scotland should also be supported.
Whilst supportive in principle, further details of the cost of the Building
Standards hub is required and how it is to be shared among Local
Authorities. It is understood the expected cost would be about £1m per year.
The costs to each authority are likely to be significant and more detail is
required as to how the costs to each local authority are to be apportioned. It
should be noted that the building warrant fees are being asked to finance
significant costs:   Local Authority Building Standards Services to be self-
financing and to fund the Central Hub.  Any increase must be proportionate
to the scale of development and should not act as a deterrent to economic
growth. This is particularly prevalent in a social and economic challenging
area like West Dunbartonshire where the area is affected by downturns in
national economic conditions, and slow to react to upturns in the economy,
making development viability challenging.
In addition, the country is facing economic challenging times following the
pandemic the additional income may not materialise together with more
requirements on development in terms of sustainability and net zero. If the
additional income does not materialise local authorities will have this
additional cost, which is in effect a cut to their income at a time when Local
Authorities are under severe financial constraints. These monies will have to
be found from the local authority budget, in all likelihood, result in a cut to
building standards budget and the quality of service provided.
Question 1.3 - Do you support the introduction of enhanced verification  and
certification auditing, monitoring and reporting of fee investment to 
support the implementation of the strengthened building standards 
system over the next 3 years?
Item 8
Appendix 1
Page 53

Page 54

It is agreed that there should be an open, honest and transparent use of the
building warrant fees to provide a quality customer focussed building
standards service. However as detailed above Local Authorities are facing
severe financial constraints and the Building Standards service in years,
where there is a fall income is not self-financing and the Council will subsidise
the service. Equally, if there is an increase income the Council will require
some of this income to be reinvested in the Council to offset the years were
there has been a fall income. There is a fine balance to achieve in terms of
building standards income and financing the service.
Question 1.4 - Do you agree that, before any planned increases or adjustments to
building warrant fees in the second and third year, progress should be
reviewed against suitable criteria towards the planned outcomes?
Yes - It seems reasonable to have a new fee calculation model that allows for
future adjustments within 3-year lifespan of the model, which allows further
research, evidence and reporting. This will allow the model to be fully
assessed before further increases are introduced in year two and three given
the fee income is intended to finance full cost recovery for the local authority,
to part finance the Building Standards hub and to subsidise additional
requirement for high-risk buildings. This increase finance support from the
building warrant fee is require to be closely monitored in year one to ensure
that it is fully meeting these new costs before planned increases are
introduced in year 2 and 3.  .
Question 2.1 - Do you support the introduction of an enhanced fee for High Risk
Building warrant applications? 
Support    An enhanced fee should be proportionate and fair to the additional 
work, as these projects often pay higher building warrant fees and as detailed
above it should not be deterrent to economic growth and development. These
developments are already facing higher costs in terms of increased building
costs and enhanced requirements in terms of net zero and sustainability. .
Question 3.1 - Should a portion of building warrant fees be used to fund the local
authority compliance enforcement role but only as it relates to the
building warrant process? 
No - Enforcement, as a statutory function, should be funded by annual grant 
aided  expenditure.  It is unfair to penalise the majority who comply with the 
system by having them pay more in fees to cover the costs of those 
who do not. The Building Warrant fee needs to be proportionate to the 
development and it cannot sustain a wide range of building standards 
functions without impacting negatively development viability and potential
income.
Question 3.2 - Should a portion of building warrant fees be used to fund the local
authority building standards wider statutory role covering both building
Page 54

Page 55

warrant compliance enforcement and dangerous and defective
buildings? 
No – The Building Standards function needs more robust legislation to enable
the recovery of costs from owners of defective and dangerous buildings in a
timely and cost effective way. Often Local Authorities have to find a budget to
fund repairs to deflective and dangerous buildings and often this involves
significant costs with little or no guarantee that these costs will be repaid by
owners. This is particularly challenging when Local Authority budgets are
under increasing financial constraints. 
Question 4.1 – Should building warrant fees be set at national or local level?
National level - There are many complexities to consider, not least how the
centralised functions like the Hub would be fairly funded from each Local
Authority, economies of scale for smaller local authorities, could fees higher in 
the  local authority discourage development but likewise, could we 
deliver the required service with lower fees to attract development?  It is 
not clear if these fees could be used as income generating for other 
services within a local authority, nor how this would affect increased 
Scottish Government scrutiny.  With the strengthening of the  building 
standards system, it will be difficult to know what level to pitch fees at. Further
detail to support this is as follows:
• One of the purposes of setting building warrant fees locally is full cost
recovery. This would be a complex exercise for Building Standard Authorities
to engage with, taking up officer time and there would remain the inability to
estimate what level of income will be received in any given year so full cost
recovery could not be guaranteed.
• In areas like West Dunbartonshire which have a high percentage of
contaminated land sites as well as other site related constraints Building
Warrant fees are likely to be higher due to these upfront costs and additional
resources required to resolve, this is likely to be a disincentive for developers
who may develop in other less challenging Council areas which may have
cheaper Building Warrant fees.
• May cause competition between different Councils in terms of setting Building
fees therefore impacting on resources.
• Building Warrant fees are not ring-fenced, at present so there is currently no
correlation between income and resources. Councils could ultimately raise
fees for general income purposes rather than for full cost recovery, which
would not benefit the Building Standards service.
• Recently the Planning Legislation has allowed the setting of discretionary fees
for pre application discussions  to be set locally and this Council having
recently set them, this  involved a lot of benchmarking and work by officers to
get a fair and reasonable tier of fees.
.
Page 55

Page 56

Question 5.1 - Are there any proposals in this consultation which you consider
impact or have implications on people with protected characteristics?
Choose from the following options:
No – Not aware of implications on people with protected characteristics.
Question 5.2 - Do you think that any of the proposals in this  consultation have any
financial, regulatory or resource implications for you and/or your
business (if applicable)? 
Yes - The proposals will require additional resources and staff and therefore
the additional fee income discussed in this consultation
Question 5.3 - Do you think that any of the proposals in this  consultation have any
impact or implications on island communities? 
N/A
Question 5.4 - Do you think that any of the proposals in this  consultation have any
impact on the inequalities of outcome caused by socio-economic
disadvantage? 
Yes - An increase in fees will add to the costs of those making small home
improvements as well as the larger developments.  This may make the costs
for those with a socio-economic disadvantage prohibitive to carrying out the
works and thereby improving the building. It also has more impact in areas
like West Dunbartonshire, which have social and economic challenges
Page 56