Page 1

Agenda
Planning Committee
Date:  Wednesday, 20 September 2023
___________________________________________________________________
Time:  10.00 a.m.
___________________________________________________________________
Venue:  Civic Space, Council Offices, 16 Church Street, Dumbarton, G82 1QL.
___________________________________________________________________
Contact:   Email: nicola.moorcroft@west-dunbarton.gov.uk
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Planning Committee as detailed above.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Ian Dickson
Councillor Daniel Lennie
Provost Douglas McAllister
Councillor June McKay
Councillor Karen Murray Conaghan
Councillor Chris Pollock
Councillor Hazel Sorrell
Councillor Sophie Traynor
All other Councillors for information
Date of Issue: 7 September 2023
Page 2

Page 3

PLANNING COMMITTEE 
WEDNESDAY, 20 SEPTEMBER 2023 
AGENDA 
1 APOLOGIES 
2 DECLARATIONS OF INTEREST 
Members are invited to declare if they have any interests in the items of
business on this agenda and the reasons for such declarations. 
3 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
4 MINUTES OF PREVIOUS MEETING             5 -10 
Submit for approval, as a correct record, the Minutes of Meeting of the
Planning Committee held on 2 August 2023. 
5 NOTE OF SITE VISITATION             11 -12 
Submit, for information, Note of Site Visitation carried out on 31 July 2023. 
6 PLANNING APPLICATIONS 
Submit report by the Planning, Building Standards and Environmental Health
Manager – in respect of the following Planning applications:-             
(a) DC23/098/FUL - New build education and community campus         13 - 34
comprising of  new Early Years, Primary schools, ASN unit, 
library and community facilities, together with associated parking,
sports facilities and landscaping at St. Joseph’s Primary School, 
Faifley Road, Clydebank, G81 5EY by West Dunbartonshire Council. 
(b) DC23/083/FUL - Proposed erection of 27 affordable dwellings         35 - 56
and associated works at development site at Former Faifley 
Bowling Club, Clydebank by Knowes Housing Association. 
Page 3

Page 4

(c) DC23/102/FUL - Proposed erection of 26 dwellings with       57 - 78
associated ancillary development at development site,
Pappert, Bonhill, Alexandria by West Dunbartonshire Council
(Housing).
(d) DC23/070/FUL - Change of use from cafe to tyre change         79 - 90
garage at 6 Old Street, Duntocher, Clydebank G81 6DE by 
Mr Peter Ferrier. 
7 DEVELOPMENT PLAN SCHEME AND PARTICIPATION     91 - 126     
STATEMENT FOR LOCAL DEVELOPMENT PLAN 3  
Submit report by the Planning, Building Standards and Environmental Health
Manager, seeking approval for a consultation draft Development Plan Scheme
and Participation Statement in relation to a new Local Development Plan
(LDP3). 
8 INVITATION TO MAKE LOCAL PLACE PLAN     127 - 152  
Submit report by the Planning, Building Standards and Environmental Health
Manager, seeking approval for an approach to Local Place Plans, which will
deliver new duties arising from the Planning (Scotland) Act 2019. 
__________________________________________________________________ 
Page 4

Page 5

PLANNING COMMITTEE
At a Meeting of the Planning Committee held in Council Chambers, Clydebank Town
Hall, 5 Hall Street, Clydebank G81 1UB on Wednesday, 2 August 2023 at 10.00 a.m.
Present:
Attending:
Apologies:
Councillors, Ian Dickson, Gurpreet Singh Johal, Daniel Lennie,
June McKay, Lawrence O’Neill, Hazel Sorrell and Sophie
Traynor.
Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Ashleigh Ross: Technical Support Co-ordinator; Nigel
Ettles, Section Head – Litigation (Legal Officer) and Nicola
Moorcroft, Committee Officer. 
Apologies for absence were intimated on behalf Provost
Douglas McAllister and Councillors Karen Murray Conaghan
and Chris Pollock
Councillor Lawrence O’Neill in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Planning Committee held on 14 June 2023 were
submitted and approved as a correct record.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
ITEM 4
Page 5

Page 6

NOTE OF SITE VISITATIONS
A Note of Visitations carried out on 12 June 2023, a copy of which forms Appendix 1
hereto, was submitted and noted.
PLANNING APPLICATIONS
A report was submitted by the Planning, Building Standards and Environmental
Health Manager – in respect of the following Planning application:-
DC22/190/FUL - Erection of single wind turbine, 30m hub and 43m tip, access
track, substation, agricultural shed and associated works at Land to East of
Broomhill Wood, Bonhill, Alexandria by Mr Harris Smith.
Reference was made to a site visit that had been undertaken in respect of the above
application. The Planning, Building Standards and Environmental Health Manager
and the Development Management Team Leader were heard in further explanation
of the report and in answer to Members’ questions.
The Chair invited Mr David Bole, objector, to address the Committee. Mr Bole was
heard in support of his objections and in answer to Members’ questions. 
The Chair invited Mr Harry Scammell, objector, to address the Committee. Mr
Scammell was heard in support of his objections and in answer to Members’
questions. 
The Chair invited Mr Robert Goodall, objector, on behalf of Beechwood and
Wheatcroft Residents Association to address the Committee. Mr Goodall was heard
in support of the objections from Beechwood and Wheatcroft Residents Association
and in answer to Members’ questions. 
After discussion and having heard the Development Management Team Leader, in
further explanation, and in answer to Members’ questions, the Committee agreed to
refuse planning permission for the reasons set out in Section 9 of the report, as
detailed within Appendix 2 hereto.
CLYDEBANK BUSINESS PARK PLANNING GUIDANCE
A report was submitted by the Planning, Building Standards and Environmental
Health Manager seeking approval to consult on draft Planning Guidance relating to
Clydebank Business Park.
After discussion and having heard the Planning and Building Standards and
Environmental Health Manager, in further explanation, and in answer to Members’
questions, the Committee agreed to approve the publication of the draft, Clydebank
Business Park Planning Guidance in Appendix 1 of the Report, for consultation for
a12-week period.
Page 6

Page 7

EFFECTIVE COMMUNITY ENGAGEMENT IN LOCAL
PLANNING GUIDANCE
A report was submitted by the Planning, Building Standards and Environmental
Health Manager seeking agreement to submit a response to the Scottish
Government Consultation on Effective Community Engagement in Local Planning
Guidance .
After discussion and having heard the Planning and Building Standards and
Environmental Health Manager in further explanation, and in answer to Members’
questions, the Committee agreed the proposed Council response set out in
Appendix 1 of the Report.
STREET NAMES FOR HOUSING DEVELOPMENT AT GLASGOW ROAD –
MILL ROAD, CLYDEBANK
A report was submitted by the Planning, Building Standards and Environmental
Health Manager seeking approval to allocate two new street names within the new
housing development at Mill Road/Glasgow Road, Clydebank.
After discussion and having heard the Planning and Building Standards
Environmental Health Manager, in further explanation, and in answer to Members’
questions, the Committee agreed to delegate the decision on the two new street
names, within the new housing development at Mill Road/Glasgow Road,
Clydebank, to the Convenor,the Planning and Building Standards Environmental
Health Manager, in conjunction with Ward Councillors and in consultation with
Clydebank East Community Council. The decision as to the agreed street names to
be reported to the next meeting of the Planning Committee.
CONSULTATION ON SCOTTISH GOVERNMENT REVIEW OF PERMITTED
DEVELOPMENT RIGHTS – PHASE 3
A report was submitted by the Planning, Building Standards and Environmental
Health Manager regarding the above.
After discussion and having the Planning, Building Standards and Environmental
Health Manager regarding the above in further explanation, and in answer to
Members’ questions, the Committee agreed the proposed Council responses set out
in Appendix 1 of the Report.
The meeting closed at 11.25 a.m.
Page 7

Page 8

APPENDIX 1 
PLANNING COMMITTEE 
NOTE OF VISITATIONS – 12 JUNE 2023 
Present:   Councillors Jim Bollan (first site only), Karen Conaghan, Chris Pollock,
and Gurpreet Singh Johal. 
Attending: Pamela Clifford - Planning, Building Standards and Environmental
Health Manager and James McColl - Development Management Team
Leader. 
SITE VISITS 
Site visits were undertaken in connection with the undernoted planning applications:- 
Land at Mixed Use Development Site, Mitchell Way, Alexandria 
DC22/201/FUL - Erection of Class 1 foodstore and associated access, parking,
landscaping and associate works access, parking, landscaping and associated other
works by Lidl Great Britain Limited. 
Kilmalid, Stirling Road, Dumbarton G82 2SS 
DC22/156/FUL - Relocation and reconfiguration of current car parking area, new
employee vehicular entry and exit access routes from existing roundabout, relocated
on-site lorry parking, rerouted internal access roads and associated works by Chivas
Brothers Ltd. 
Page 8

Page 9

APPENDIX 2   
DC22/190/FUL - Erection of single wind turbine, 30m hub and 43m tip, access
track, substation, agricultural shed and associated works at Land to East of
Broomhill Wood, Bonhill, Alexandria by Mr Harris Smith. 
It has not been demonstrated that the proposed agricultural shed is being provided in
association with an agricultural land holding, nor has the nature of any farming
operation at this location been quantified. Therefore, it cannot be concluded that the
proposed shed is specifically required to support agriculture at this green belt and
the shed would result in unjustified sporadic development within the green belt
location. It is thus not a form of development that is supported in the green belt by
Policy 8 – Green Belts of the National Planning Framework 4, Policy GB1 – Green
Belt of the adopted West Dunbartonshire Local Development Plan, Policy GB1 –
Greenbelt and Countryside of the proposed West Dunbartonshire Local
Development Plan 2.
Page 9

Page 10

Page 10

Page 11

PLANNING COMMITTEE
NOTE OF VISITATION – 31 JULY 2023
Present: Councillor Ian Dickson
Attending: James McColl, Development Management Team Leader and
Amy Melkevik, Lead Planning Officer.
SITE VISIT
A site visit was undertaken in connection with the undernoted planning application:-
Land to East of Broomhill Wood, Bonhill, Alexandria
DC22/190/FUL - Erection of single wind turbine, 30m hub and 43m tip, access track,
substation, agricultural shed and associated works by Mr Harris Smith.
ITEM 5
Page 11

Page 12

Page 12

Page 13

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee:  20th September 2023
_____________________________________________________________
DC23/098/FUL: New build education and community campus
comprising new early years, primary schools,
Additional Support Needs unit, library and community
facilities together with associated parking, sports
facilities and landscaping at St Joseph’s Primary
School, Faifley Road, Clydebank, by West
Dunbartonshire Council
1. REASON FOR REPORT
1.1  The application proposal comprises a major development as defined by
the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009. Under the terms of the approved Scheme of
Delegation, it therefore requires to be determined by the Planning
Committee. 
2. RECOMMENDATIONS
2.1 Grant planning permission subject to the further conditions detailed in
Section 9 below. 
3. DEVELOPMENT DETAILS
3.1  The application site comprises St Joseph’s RC Primary School and
associated grounds, and is located in Faifley Rd, Faifley. The site is on
the opposite side of the road from St Joseph’s Roman Catholic Church
and east of the Faifley Knowes. It occupies an area of approximately
21,891sqm in the shape of a diamond. The north-eastern perimeter of
the site faces onto Faifley Rd at Lawmuir Cres, with  three vehicular
access points providing access to the current school’s car parks and
grounds. To the north of the site lies the former janitor’s house once
associated with the school, beyond which there is an area of open space
bounded from the north by Faifley Rd which curves and continues west
at this point. The north-western perimeter is alongside the area of
greenspace which continues in the southern direction along Abbeylands
Rd to join Knowes Woodlands. The south-western boundary is along the
edge of the residential area formed of Langfaulds Cres and Hart St, while
the south-eastern perimeter meets with the rear gardens of the
residential properties at Quarryknow and Abercorn Streets. In addition
to the existing school building, the site has a number of hardstanding
areas including parking and a play areas around the school building.  The
site is relatively level with its elevation increasing slightly towards its rear
ITEM 6a
Page 13

Page 14

at the southern corner of the plot. An established group of trees along
the south eastern perimeter facing onto the rear curtilages of the
properties in Quarryknow and Abercorn Streets can be found.
Otherwise, the remainder of the site is grassed. 
3.2 The proposal is for a new educational and community campus on the
current St Joseph’s site which will replace the current buildings and will
co-locate St Joseph's RC Primary, Edinbarnet Primary and Lennox Early
Years, Auchnacraig Early Years together with community facilities to
replace the Skypoint Centre and a new library. 
3.3 The current school buildings at St Joseph’s and Edinbarnet require to be
renewed due to their condition and will be replaced with new accessible
campus  that is designed to deliver the Curriculum for Excellence. The
Skypoint Centre, also located in Faifley, which provides local community
services, is under-utilised, and has reached the end of its serviceable
lifespan. The new facility will be a significant investment by the Council
in the area and will provide a service hub for the local community. The
proposed new campus will be  designed and built   to  passivhaus  design
standards. This will  significantly reduce ongoing maintenance and
running costs of the existing separate facilities and it will provide a
response to the Scottish Government’s Climate Change Bill to target net-
zero carbon emissions by cutting greenhouse gas emissions against the
2045 target set by the government. 
3.4 The various facilities would be contained within a single new building to
be constructed to the south west of the existing school building. The
footprint of the new building, predominantly L-shaped, would measure
approximately 3,321sqm. It will be three storeys in height at the highest
point which will allow for greater outdoor space for play and learning and
the intended community facilities. A new temporary area of hardstanding
will be built in the east of the site; as the project progresses through its
phases, an all-weather sports pitch measuring 1,962sqm and an
adjacent multi-use sports pitch (MUGA) measuring 318.5sqm
playground area will be constructed  during the latter phases of the
development . The building design is contemporary and features
pronounced massing, spread over three levels overall across the north-
western half of the complex, and a single level across the south-eastern
half. When viewed from the west and the east, the massing and the
shape of the building is softened by the stepped roof level arrangement.
Quality materials have been proposed with natural facing brick and
sinusoidal metal cladding, perforate aluminium panels and flat metal
cladding, as well as  aluminium curtain walling and aluminium glazed
windows and glazed and solid doors.   
3.5 The campus will provide a progression of learning up through the
building and provide a number of community facilities. In terms of the
specific layout, the following will be found within the proposal:
Page 14

Page 15

 Ground floor: Community facilities space (incl. meeting room),
school and community library, school office, conference and
multipurpose rooms, dining space with the associate kitchen
facilities and various stores to serve to campus, an assembly
hall/gymnasium with the associated changing and storage facilities,
school teaching and nurture rooms. Moreover, the south-eastern
wing of this floor will feature the Early Learning Centre to consist of,
staff room and associated storage rooms, dedicated playrooms for
the 0-2, 2-3 and 3-5yrs age groups and the associated dining and
food preparation area, toilet and boot room as well as guest and
quiet rooms.
 First floor: Primary 1 and 2-3 Learning Zones with the associated
Music Room and stores and external terrace and internal flexible
teaching spaces,  ERS training suites, meeting rooms, ASN teaching
spaces with a kitchenette and a dining space and the associated
changing facilities and cloak rooms with bathrooms. 
 Second floor: Primary 4-7 Learning Zones with the associated
facilities and stores and external terrace and internal flexible
teaching spaces, nurture rooms and a conference/multipurpose
office, ASN teaching spaces with a kitchenette and a dining space
and the associated changing facilities and cloak rooms with
bathrooms, and staff rooms with a shared kitchen and workbases
and dedicated toilets. 
3.6 The new build  will be delivered in distinct Phases as a “tandem-build”
with  the existing St Joseph’s school buildings remaining  operational
during the Phase 1 works. Solid Hoarding delineation will be introduced
to live school boundary with fencing to alternative perimeters. Separate
vehicular and pedestrian access/egress points will be introduced to
ensure the school and  construction site can operate independently. To
protect the site throughout the build, it will be monitored remotely through
newly introduced security CCTV, including outwith live operational hours
of the site. The phasing submitted with the application suggests that,
subject to the necessary permissions, the project is scheduled to
commence in November 2023 with an outline duration of 27 months. 
3.7 Once the new building is completed and occupied, the existing school
building will be demolished and parking provision and a drop-off area for
the site will be constructed in its place, with access from Faifley Rd. The
car park will contain  95 parking spaces and  six disabled parking spaces
with the associated footway access will be built. Twelve  of the spaces
will provide electric vehicle (EV) charging facilities, with another  38
spaces having capacity for future conversion to accommodate additional
EV parking requirement. 
3.8 Spaces for outdoor learning, socialising and physical activity are
proposed and would be located to the rear of the newly built campus,
overlooking the rear curtilages of the residential area south of the site.
The area would include natural play and interactive equipment, a
playground over an area of hard surfacing to feature painted on play area
Page 15

Page 16

markings, and the separated area closest to the rear elevation of the
campus with sections dedicated for the particular age groups (0 -5yrs)
and external dining areas with seating. 
3.9 In support of the proposal the applicant has submitted a range of
supporting documentation and information including a series of Ground
Investigation reports and Remediation Strategy, Air Quality Impact
Assessment, GPR and Topographical Statement, Proposed Phasing
and Phasing Narrative documents, Transport Statement and Travel Plan
Framework, Design and Access Statement, Landscape Design and
Access Statement, Pre-application Consultation Report, Proposed
Floodlighting, Ecological Constraints and Preliminary Roost
Assessment, Development Drainage Impact Assessment, Tree Survey,
Bat Survey, solar/overshadowing assessment and Noise Impact
Assessment ..  
4.  CONSULTATIONS 
4.1 West Dunbartonshire Council Roads Service has no objection in respect
of roads and parking matters, together with flooding. 
4.2 West Dunbartonshire Council Environmental Health Service has no
objection subject to conditions relating to noise, delivery times, hours of
work during construction, piling method statement provision,
contaminated land remediation works implementation and unexpected
contamination, validation of soils, dust control and control of light from
outdoor facilities. 
4.3 Scottish Water has no objection to the proposed development. 
4.4  West of Scotland Archaeological Service has no objection to the
proposal subject to a condition regarding the implementation of a
programme of archaeological works. 
4.5 Glasgow Airport has no objection to the proposal subject to conditions
relating to a Bird Hazard Management Plan and soft landscaping in
relation to bird hazards. 
4.6  West Dunbartonshire Council Biodiversity Officer has no objection.
Points relating to the  ecology report and further bat surveys, biodiversity
enhancements and landscaping proposals can be addressed by
conditions. 
4.7 West Dunbartonshire Council Greenspace has  no objection but points
relating to the size of the community allotment area, the location of the
sports pitches and planting proposals are highlighted and are addressed
in Section 7 of the report. 
Page 16

Page 17

5.  REPRESENTATIONS 
5.1  No representations have been received. 
6.  ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
6.1   National Planning Policy 4 
National Planning Framework 4 (NPF4) was adopted by the Scottish
Ministers on 13th of February 2023 and now forms part of the
Development Plan. 
6.2  Policy 1 relates to tackling the climate and nature crises and states that
when considering all development proposals significant weight will be
given to the global climate and nature crises. Policy 2 also relates to the
climate in the form of climate mitigation and adaptation and states
development proposals will be sited and designed to minimise lifecycle
greenhouse gas emissions as far as possible and development
proposals will be sited and designed to adapt to current and future risks
from climate change. 
6.3  As a part of the site would be brownfield following demolition of the
existing primary school , Policy 9 – Brownfield, vacant and derelict land
and empty buildings applies. Development proposals that will result in
the sustainable reuse of brownfield land including vacant and derelict
land and buildings, whether permanent or temporary, will be supported. 
6.4 Policy 13 supports proposals to improve, enhance or provide active
travel infrastructure, public transport infrastructure or multi-modal hubs.
This includes proposals for electric vehicle charging infrastructure. 
6.5  Development proposals will be designed to improve the quality of an
area whether in urban or rural locations and regardless of scale as per
Policy 14. Policy 15 relates to local living and 20 minute neighbourhoods.
Development proposal will contribute to local living including, where
relevant, 20 minute neighbourhoods. Consideration will be given to
existing settlement pattern, and the level and quality of interconnectivity
of the proposed development with the surrounding area, including local
access to affordable and accessible housing options, ability to age in
place and housing diversity. 
6.6   Under part (f) of Policy 19 proposals for buildings that will be occupied
by people will be supported where they are designed to promote
sustainable temperature management, for example by prioritising
natural or passive solutions such as siting, orientation, and materials. 
6.7 Green infrastructure is considered through Policy 20. Proposals that
result in fragmentation or net loss of existing green infrastructure will only
be supported where it can be demonstrated that the proposal would not
result in or exacerbate a deficit in green infrastructure provision, and the
overall integrity of the network will be maintained. 
Page 17

Page 18

6.8 Policy 22 Flood risk and water management states that proposals will :
not increase the risk of surface water flooding to others, or itself be at
risk; manage all rain and surface water through sustainable urban
drainage systems (SUDS), and seek to minimise the area of
impermeable surface. Policy 23 does not support proposals which are
likely to raise unacceptable noise issues. Policy 24 supports proposals
that incorporate appropriate, universal, and future-proofed digital
infrastructure. 
6.9 The proposal is considered to be in accordance with these policies as
discussed in Section 7 below. 
West Dunbartonshire Local Plan 2010
6.10   Policy PS1 supports the continued use of the site as a public service.
This policy also seeks to protect amenity of surrounding
neighbourhoods. Policy GD1 outlines the need for all new development
to be of a high design quality. Policy H5 safeguards and where possible
enhances the character and amenity of existing residential area. Policy
T1 and T4 requires sites to be integrated with sustainable travel. Policy
E1 relates to the Councils Biodiversity duty and Policy E5 requires new
development proposals to consider impacts on trees and incorporate
suitable tree planting. Policies F1 and F2 aim to ensure that new
development is not at risk from, and does not increase the risk of
flooding, and has suitable SUDS drainage infrastructure. Policy DC7
supports the inclusion of on-site micro-renewable technologies. 
6.11 The proposal is considered to be in accordance with these policies as
discussed in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15th March 2023, the Planning Committee took a decision that the
Council would not adopt Local Development Plan 2. The Proposed Local
Development Plan 2 (LDP2), incorporating the recommended
modifications of the Examination Report received on 22 April 2020,
which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore
afforded significant weight in the assessment and determination of
planning applications, subject to compatibility with NPF4. The Scottish
Ministers’ Direction relating to the adoption of LDP2, dated 18 December
2020, is also a material consideration. 
7.2     The site is also identified in this plan as being within an existing
neighbourhood where policy H4 seeks to protect residential areas from
any development which would adversely affect its amenity. Policies CP1,
CP2 and CP4 are all related to enhancing the quality of design and
improving green infrastructure across West Dunbartonshire. Policy
CON1 requires proposals to be in accordance with designing streets
Page 18

Page 19

guidance and promotes sustainable forms of transportation and active
travel. Policy ENV8 requires developments to address air quality, lighting
and noise as part of the planning process, whilst policy ENV9 requires
all potentially contaminated sites to be remediated where necessary to
ensure that the site is suitable for the intended use. 
7.3 RE4 encourages micro-generation and heat recovery technologies
within or associated with individual properties and Policy RE5 relates to
low and zero carbon buildings and states that new buildings should
conform to the sustainability standards. Policies ENV1, ENV4, and
ENV6 are all similar to the ecology and tree, water environment and
flooding policies of the adopted Local Plan 
7.4 The proposal is considered to be in accordance with all of the above 
policies for the reasons discussed below. 
Creating Places Guidance and Green Network and Green Infrastructure
Guidance
7.5 The Creating Places  Guidance – November 2022 seeks to achieve high
quality development with a design led approach based on a thorough
appraisal of the site and an analysis of its context, and sets out that this
is expected for all development proposals. The proposal has been
informed by a comprehensive pre-application as encourage by the
guidance and has been considered by the Place and Design Panel. This
has resulted in a development proposal that achieves a high quality
design that responds to the local context and accords with the approach
set out in the Guidance. 
7.6 The Green Network and Green Infrastructure  Guidance - November
2022 seeks to ensure that landscaping and green infrastructure is
integrated into the proposal as part of the setting and curtilage of the
new building. This will include a focus on biodiversity enhancement and
also the creation of a community growing space. The proposal accords
with the approach set out in the Guidance. 
Principle of Development
7.7 The site is currently occupied and is situated within a well-established
predominantly residential area. The adopted Local Plan specifically
supports the continued use of the site as a public service. The
sustainable re-use of brownfield land and previously developed sites is
supported through Policy 9 of NPF4. It is acknowledged that the site is
currently occupied and the existing buildings are in use as a school. It is
therefore not currently vacant or derelict, nor are the existing buildings
disused. With the site being re-developed on a tandem build basis, on
the completion and occupation of the new building, the existing building
will be vacated. The existing building will at that point become redundant
and be demolished to allow the second phase of the development to
commence. The re-use of the previously developed site overall is
supported.  Whilst Policy 12 sets a clear preference for the re-use of the
existing buildings, it is accepted that the existing building on site are in
Page 19

Page 20

poor condition and have become life expired, as have the
buildings/facilities on other sites in Faifley  that the new facility will
replace. 
7.8 The site has been used as a primary school for many years. The
proposal would result in the continuation of this educational use and
would replace the existing building and facilities , with high quality
modern educational facilities. The proposal involves the co-location of
Edinbarnet Primary School , St Joseph’s RC Primary School , Education
Resource Centre (currently located at Edinbarnet), Early Learning and
Childcare Centre  Provision (Auchnacraig/Lennox), Additional Support
Needs  Facility (currently at St Joseph’s RC Primary School), along with
creation of a  new Community Library and a community space, leading
to a more efficient grouping of these facilities within the community.
Whilst the site currently contains only a single school, it is considered
that the site is large enough to accommodate all of these uses and that
the principle of redeveloping the site as a new educational campus is
acceptable. 
7.9 As such, the principle of the development of the site for new school and
community complex is supported on this site by planning policy.   
Site Layout, Design and Appearance
7.10  The building is sensitively located within the site so as not to over
dominate surrounding residential streets and the Faifley Road
thoroughfare. To the north end of the site, a new school frontage and
public zone faces towards the centre Faifley Road and would provide a
welcoming arrival point via the proposed entrance plaza. Another
potential entry point for pedestrians may be formed at the north-western
part of the plot from Faifley Knowes. Convenient and accessible parking
and drop-off provision is provided at this location; separation of
staff/visitor parking along with EV charging facilities is provided within
the site. Access to the playground for school and the campus building
itself will be via the main gate and the aforementioned plaza to Faifley
Road. It is considered that this will reactivate this important part of
Faifley, adding a focal point to this part of Faifley Road. Towards the
north-east of the site would be a new fenced all-weather sports and
MUGA pitches with proposed community allotment separating the
former from the street level. This would create a strong boundary and
screening from the residential properties beyond. In the south-eastern
corner of the site, closest to Hart St, a forest school with a habitat zone
and associated trail would be formed to provide areas for forest school
type outdoor activities. Overall, it is considered that the proposed layout
is well considered and sensitive to surrounding uses. Spaces for outdoor
learning, socialising and physical activity including the variety of sports
pitches, open and informal areas, natural play equipment, seating and
community allotment space to grow fruit and vegetables are to be
provided and will create a stimulating variety of settings with differing
characters which is supported.  
Page 20

Page 21

7.11 The building is of a striking and contemporary design and  provides a
landmark feature in this part of Faifley. It utilises a limited palette of high
quality, durable and robust materials; it is a refined and appropriate form
within its context. The  proposed materials  have been inspired by the
Cochno Stone  which  is a large cup and ring marked rock at Auchnacrig
Faifley  The proposed clay brick  has a very natural look with the use of
earthy tones.  This will  result in is a bold statement building that rises
three storeys thus providing prominence in the local community.  It is of
a  greater  height  than that of the existing school building, which is
reflective of the intended amalgamation of schools and learning centres
and a variety of community services however the three storey building 
does not overdominant the site or the relationship to the adjacent
residential properties.   Staggered roof terraces on either end of the
edifice reduce the overall building mass and create a visually interesting
building. The terraces will maximise natural daylight and ventilation deep
into the building  and provide views out to the south, including the tree-
covered landscape of the Faifley Knowes. They will also provide
educational benefits with external learning and teaching directly
accessible from internal learning and teaching zones. In contrast to the
brickwork, a light weight cladding is proposed to the upper levels and is
to be finished in a warm metallic copper  tone  which aim to celebrate
the new campus, creating a landmark for Faifley and again influenced
by the Cochno Stone.   Equally proportioned cladding panels and glazing
are designed to create a consistent rhythm to the façade. Overall, the
proposed building is considered to be of a high quality and modern
design which will provide a centrepiece for this part of West
Dunbartonshire and contribute to  and encourage the  wider regeneration
of Faifley. The bold design will continue the high standard set by other
school facilities within West Dunbartonshire (for example the recently
built Renton Campus). 
Low carbon design and technologies
7.12 One of the key elements of the design proposals is the low energy
strategy the new building will adopt.  Passive design principles will
ensure that the development is not only low energy standard but also
maximises visual and thermal comfort for users. The building will be
designed with enhanced fabric thermal performance including high
levels of insulation and airtightness together with shading canopies, low
energy lighting, air source heat pump and photovoltaic panels.  Such an
approach ensures that the proposal minimises greenhouse emissions
and incorporates low carbon infrastructure and thus embraces the
requirements  and aspirations set out by NPF4 and contributes towards
the Council meeting their net zero targets. . 
Residential amenity 
7.13 The new school building has been sensitively sited to ensure an
adequate degree of separation with the closest residential properties to
the north east and south west and to ensure the building is not
overbearing or creating adverse overshadowing or overlooking. This
Page 21

Page 22

separation ranges from 25 metres to 35 metres at the closest points. A
solar assessment considering potential overshadowing was carried out
as part of the assessment of the application and shows that there would
be no unacceptable overshadowing of these properties. 
7.14 Schools by their nature are busy locations which generate a lot of activity
at either end of the school day, and noise from children playing outdoors
at intervals/ lunchtime is inevitable. However, the site has operated as a
primary school for many years and the proposed increase in the size of
the school is not considered to significantly increase the impact on
nearby residents. 
7.15 Noise from the proposed sports pitch is considered in the applicant’s
noise impact assessment and it is noted that noise impact increases
after 8pm when ambient noise levels reduce and that limitations on the
use of the pitch may be necessary from around 8pm to 9pm. An acoustic
barrier is recommended as are vibration reducers to reduce ball impact
noise. The Council’s Environmental Health Service offers no objections
on the ground of noise subject to conditions relation to noise mitigation
and hours of operation which would require in the use of the pitch
ceasing at 8pm. Considering the wider site, further mitigation in respect
of plant and equipment can also be addressed by condition. 
7.16 Turning to the floodlighting of the proposed pitch, Environmental Health
are content that providing the floodlighting is not used after 10pm, no
adverse disturbance would be caused to nearby residential property
from obtrusive lighting. As the pitch will be restricted to 8pm to address
noise concerns, the floodlighting will not be in use after this time. 
7.17 Any development site whilst under  construction  will produce an element
of short term noise and disruption, the Council’s Environmental Health
Service highlight the requirement that the construction of the
development is undertaken in a way that ensures that adjacent
residential amenity is not adversely affected. A range of conditions are
recommended and it is considered appropriate to attach these. These
include restricting working hours to 8am to 6pm Monday to Friday and
8am to 1pm on Saturdays. Conditions relating to piling and dust control
are also recommended. 
Ecology  
7.18 There are no environmental designations covering any part of the site
nor are there any in the surrounding area. A preliminary ecological
appraisal inclusive of preliminary bat roost assessment has been
undertaken to inform the application proposal. A small watercourse is
noted to the north of the site but this is unlikely to provide for suitable
use by otters due to its screened and culverted character. The school
building have been assessed as having moderate potential to host
roosting bats but negligible suitability for winter hibernation. No trees
were found to have suitable roost features. No field signs of badger were
identified and it is noted that the buildings and vegetation on site may
Page 22

Page 23

provide opportunities for nesting birds. The appraisal identifies the need
for a minimum of two bat activity surveys within the bat activity season
(May to August inclusive) to determine the presence of bats. 
7.19 As bats are a European Protected Species (EPS) addressing protected
species by suspensive conditions is not an appropriate approach when
it comes to establishing the potential impact on EPS as it must be
ascertained whether protected species are on site and what the
implications of this might be before considering whether to approve a
planning application. In this case, the roost potential of the building have
been established. The demolition of the buildings on site will be the last
phase of the development and likely commence late 2025. Activity
surveys will therefore be required during the 2025 survey season.
Notwithstanding this, a single dusk activity survey has been undertaken
to provide details on bat activity within the area. The ecologist advises
that there were no bats emerging from the buildings. However, there
were foraging and commuting behaviour of soprano pipistrelles along
the treelines and the surrounding building. This ensures that the
application determination is based on an informed position relating to bat
activity. A condition requiring a minimum of two activity surveys [dusk
and dawn] in the survey season prior to the demolition of the buildings
can be addressed by condition. This is considered an appropriate
approach given that the building is still occupied and that preliminary bat
surveys have been undertaken which gives a baseline for future bat
surveys.   
7.20 A variety of further recommendations are contained within the
preliminary ecological appraisal including Tool Box Talks for contractors,
root protection areas for trees, tree and vegetation removal to be avoided
outwith the bird nesting season, and biodiversity enhancement
measures. These matters can be addressed by condition. The Council’s
Biodiversity Officer also offers no objections in respect of the proposal in
respect of ecological impact or the findings of the ecological appraisal
although highlights the requirement for a precautionary position relating
to possible presence of bats. The biodiversity enhancements identified
in the landscaping proposals are welcomed.   
Trees and Landscaping
7.21 A variety of trees exist within the site. The function of these trees was to
provide part of the landscape setting of the school that currently occupies
the site. The trees  are not protected. It is accepted that seven individual
trees and a dense grouping to the eastern boundary are to be removed
to accommodate the development. It is not considered that they are
significant specimens and new tree planting is provided as part of the
new development. The Council’s Biodiversity Officer advises that the lost
trees should be replaced at a ratio of 2:1 and the landscape plan
suggests that will be the case but no planting schedule is provided. This
can be addressed by condition. 
Page 23

Page 24

7.22 The greenspace within the site forms part of the curtilage of the existing
school and not open space provided for the purposes or recreation or
forming part of the wider green network. 
7.23 Considering landscaping and outside space, a high quality approach is
taken with an arrival plaza from Faifley Road creating a sense of arrival
with a combination of hard and soft landscaping.  Screening trees and
shrub planting will soften the car park to the front of the building. Within
the playground, a high quality outdoor learning environment will be
created with varying landscape elements including mounds and
undulating terrain, natural play areas, native tree planting, and wildflower
meadow planting. A specific Additional Support Needs garden area will
be provided including a sensory garden. To Faifley Road, a community
growing space / allotment will be provided, and will be well positioned to
become a focus for the community. Whilst the Council’s Greenspace
Team highlight concerns that this area is too small if it is to be a
replacement for the allotments at Skypoint, the requirement for the
retention of the existing allotments at Skypoint would be a matter to be
considered in any proposals to re-develop the Skypoint  site. The
landscaping approach is also designed to enhance biodiversity. The final
planting schedule can be addressed by condition and will allow the
schedule to be agreed with the Council’s Biodiversity Officer, The
Council’s wider Greenspace Team and Glasgow Airport. 
Traffic, Parking and Road Safety
7.24 A remodelled vehicular and public access to the campus is proposed
accessing from Faifley Rd. This area will comprise 95 parking bays of
which six are disabled bays. 54 of the parking spaces are accessed via
a separate entrance/exit and would be dedicated to staff only; the
remainder are mixed staff/visitor spaces, accessed via the secondary
egress point along the front perimeter of the site in Faifley Rd. This level
of car parking provision is acceptable to the Council’s Roads Service.
Electric vehicle charging points are included in the proposal, with 12
spaces served within the visitor car park. Cycle parking would also be
provided in the form of 50 covered cycle spaces, 10 covered scooter
spaces and 26 uncovered cycle stands within main public plaza (located
close to building so there is natural surveillance). Overall, this provides
a total of 76 cycles and 10 scooter spaces.   
7.25 While an acceptable provision of parking is to be provided, the school is
located in the heart of the community it serves, and is  in close proximity
to the established bus stops in Faifley Rd and walking distance of the
bus turning circle/terminal on the corner of Faifley Rd and the A810
Duntocher Rd .It is intended that the new campus will be  accessed by 
walking, wheeling and cycling by the local community and this will further
be in keeping with reducing the carbon footprint of the new campus.   The
proximity of the established residential areas currently served by the
existing school, Edinbarnet  Primary School  and the various learning
and community facilities currently scattered across Faifley, and the
ready availability of the bus services should encourage walking, cycling
Page 24

Page 25

and use of public transport to travel to the new campus. A transport
statement has been provided in support of the proposal and this sets out
a variety of recommendations which are incorporated into the design. It
is recommended that a staff travel plan be developed and this can be
addressed by condition. A dedicated service vehicle access area along
the north-western perimeter of the site has been provided for collection
of refuse and deliveries. This will ensure there is no conflict with traffic
flows and service vehicles will not need to enter the school ground. 
7.26  The access, parking and servicing arrangements are all considered to
be acceptable. 
Flooding and Drainage
7.27 With respect to flooding and drainage, no flood risk assessment was
required due to the site being outwith any areas of flood risk within the
current SEPA maps. The Council’s Roads Service is content that there
is no requirement for a flood risk assessment. In terms of drainage, the
application submission is informed by a drainage impact assessment
together with full details of the proposed drainage regime and surface
water flow pathways. Final details and implementation on site can be
addressed by condition. 
Other technical issues 
7.28   A ground investigation report and remediation strategy have been
submitted in support of the proposal and Environmental Health raise no
concerns. Conditions are recommended to ensure the implementation
of the remediation strategy and also to address the presence of any
unexpected contamination. A condition is also recommended in respect
ensuring the suitability of either re-using site won material or importing
material to the site. Scottish Water offer no objections noting sufficient
capacity in the local network for the development. 
7.29 West of Scotland Archaeological Service (WOSAS) advises on a
programme of archaeological works and this can be addressed by
condition. 
Place and Design Panel and Elected Member Briefing
7.30 The applicant and their project team engaged in a pre-application
framework process with West Dunbartonshire Council Planning between
August 2022 and March 2023. Four meetings were held in which
comments were made by the Planning Service which are reflected in the
submitted design. The design proposal was also reviewed by the
Council’s Place and Design Panel in October 2022 The Panel
commended the aspiration to deliver a Passivhaus standard building on
what is a constrained site. Credit was also given to the proposals overal
with the ‘campus concept’ being welcomed. The panel noted the
constraints of the site but welcomed the large entrance plaza. The Panel
also considered the proposed buildings to respond sensitively to the
location and supported the approach to the architectural language and
Page 25

Page 26

proposed material palette. The Panel considered that that the southern
elevation could do more to announce itself as a key destination. The
Panel also considered that the proposal should seek to maximise active
travel connections and seek to promote a modal shift to reduce reliance
on the private car. The comments of the panel were taken into account
in concluding the final design.   
7.31 In developing the proposal, engagement workshops were held by the
project team involving education, community and library teams. An
online briefing was held on 15th February 2023 attended by 25 people,
with a further community event held at Skypoint on 23rd February 2023
attended by 33 people. Two public consultation events were held as part
of the statutory pre-application process at Edinbarnet Primary School on
22nd February 2023, which 34 people attended, and St Joseph’s Primary
School on 7th March 2023, which 43 people attended. The project team
also undertook a presentation to school staff on 26th April 2023. The
applicant’s pre-application consultation report highlights that general
feedback was very positive with the key themes from the events being
access, parking and boundary treatments. 
7.32 An Elected Members briefing was held on 1st June 2023 where the
project team presented the proposals to Elected Members. The
proposals were well received by Members with  comments  that further
discussion was required about the community facilities to be  sited in the
new campus to ensure they met  requirements for  existing community
facilities which exist in Skypoint. 
8.  CONCLUSION 
8.1 A high quality primary and early education and community facilities will
be provided on a site which has a long history of use for educational
purposes and is therefore consistent with all relevant planning policies.
The new school campus has been designed and positioned to provide a
civic presence within the Faifley community and will enhance the setting
this part of Faifley.  It has been designed to a very high standard and its
bold design and use of quality materials will provide a landmark
presence. It has been designed to ensure that it does not impact on the
amenity of adjacent residential properties. 
8.2 The proposal will result in a high quality new educational and community 
facility that presents no conflict with the policy requirements of NPF4, the
adopted Local Plan and the proposed Local Development Plan and it will 
support the continued  regeneration of the wider Faifley area. 
9.  CONDITIONS 
1. The external materials to be used in the construction of the building
hereby permitted shall accord with the details set out on approved
drawing FC-HML-01-ZZ-D-A-48100 Rev PO3 and no substitutes shall
be used without the prior written agreement of the Planning Authority. 
Page 26

Page 27

2. Further to Condition 1 above, prior to the approved brickwork associated
with the building hereby permitted being constructed  on site, a sample
panel of this brickwork shall be constructed on site in order for it and the
associated mortar to be reviewed, inspected and approved in writing by
the Planning Authority. Thereafter, unless otherwise agreed in writing
with the Planning Authority, the development shall be completed in strict
accordance with the approved brick details. 
3. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the
Planning Authority. The development shall thereafter be completed in
accordance with the approved details prior to the occupation of any unit
within the development. 
4. The phasing of the development shall be undertaken in accordance with
the phasing details hereby approved and following the commencement
of works on site, the development phasing will be undertaken on a
continuous basis until completion, unless otherwise first agreed in writing
by the Planning Authority. 
5. Notwithstanding the approved plans, all recommendations within the
Ecological Constraints Survey and Preliminary Bat Roost Assessment
dated 1st December 2022 shall be followed. Further survey work
undertaken shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of any works on site and
implemented as approved. 
6. Notwithstanding condition 5 above and for the absolute avoidance of
doubt, a minimum of two bat activity surveys (dusk and dawn) shall be
undertaken in the activity season immediately preceding the demolition
of the existing building on site. The survey results shall be submitted to
and approved in writing by the Planning Authority prior to any demolition
commencing on site.   
7. Notwithstanding condition 5 above, no site clearance works shall be
undertaken during any phase during the bird-nesting season March to
September inclusive unless first agreed in writing by the Planning
Authority. For the avoidance of doubt, any such agreement will require
a full nesting bird survey prior to the commencement of works on site,
the methodology and findings of which shall be submitted to the Planning
Authority. 
8. The approved hard and soft landscaping and all associated approved
planting details shall be implemented within a timescale to be agreed
with the Planning Authority prior to the commencement of works on site.. 
9. Notwithstanding the approved  plans, full details of the proposed planting
schedule, inclusive of proposed tree planting on a two for one basis
relative to those being removed, shall be submitted to and approved in
Page 27

Page 28

writing by the Planning Authority prior to the commencement of  any
works on site and shall be implemented with a timescale to be agreed
with the Planning Authority. 
10. That any trees, shrubs or areas of grass which die, are removed,
damaged or become diseased within five years of completion of the
landscaping shall be replaced within the following year with others of a
similar size and species. 
11. That full details of maintenance and management for the landscaping
approved shall be submitted to and approved in writing by the Planning
Authority prior to the occupation of the new building hereby permitted.
Management and maintenance shall commence upon completion of the
landscaping. 
12. Details of the management and operation of the community allotments
shall be submitted to and approved by the Planning Authority prior to the
occupation of the new building hereby permitted. Management and
operation shall then be undertaken in accordance with the approved
details at all times thereafter. 
13. Notwithstanding the submitted details, that prior to the commencement
of works on site, a final drainage regime inclusive of maintenance
arrangements shall be submitted to and approved in writing by the
Planning Authority. The drainage regime shall then be implemented and
maintained thereafter. For the avoidance of doubt, the drainage regime
shall be implemented commensurately with the construction of the
development. 
14. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
measures to ensure that surface water run-off is contained within the site
shall be submitted to and approved in writing ty the Planning Authority
prior to the commencement of any works on site. The measures shall be
implemented and maintained as approved. 
15. That prior to the commencement of works on site, a bird hazard
management plan shall be submitted to and approved in writing by the
Planning Authority in consultation with Glasgow Airport. The submitted
plan shall include: 
 Management of any flat / shallow pitched / green roofs on
buildings within the site which may be attractive to nesting,
roosting and loafing of birds. The management plan shall comply
with Advice Note 8: Potential Bird Hazards from Building Design 
The Bird Hazard Management Plan shall be implemented as approved
and on completion of the development shall remain in force for the
lifetime of the development. No subsequent alterations to the plan are to
Page 28

Page 29

take place unless first submitted to and approved in writing by the
Planning Authority in consultation with Glasgow Airport. 
16. No development shall take place until full details of soft and water-
landscaping works have been submitted to and approved in writing by
the Planning Authority. Details shall comply with Advice Note 3: Potential
Bird Hazards from Amenity Landscaping and Building Design. These
details shall include the species, number and spacing of shrubs and
trees
. 
No subsequent alterations to the approved landscaping scheme are to
take place unless submitted to and approved in writing by the Planning
Authority in consultation with Glasgow Airport. The scheme shall also be
implemented as approved. 
17. The noise mitigation requirements detailed in the Noise Impact
Assessment – Report no. 7355-05-00 Rev 00 and Report no. 7355-04-
00 dated 7 June 2023 and 3 May 2023 relating to plant and mechanical
services and sport pitch shall be implemented in full, namely: 
 The roof top plant compounds shall have compliant plant screens
as barriers that is having no gaps at the foot or between panels
and a lifetime surface density of 10kg/m2. 
 The sports pitch shall not be used outwith the hours of 8am to
8pm daily.
 The sports pitch shall have  rubber vibration reducers between
the weldmesh fencing panels to reduce ball impact noise.
18. All plant and equipment (including any ventilation system) to be installed
or operated  shall be enclosed, attenuated and/or maintained such that
any noise there from shall not exceed International Standards
Organisation (ISO) Noise Rating 35 between 0700 and 2300 hours daily,
within any nearby residential property, with windows slightly open for
ventilation, when measured and/or calculated and plotted on an ISO
rating curve chart. 
19. In the event that the sports pitch floodlighting requires to operate outwith
the hours of 8am to 8pm   of use of the sports pitch set out in condition
17 above, it shall be switched off by 10pm. 
20. During the period of construction, all works and ancillary operations
which are audible at the site boundary (or at such other place(s) as may
first be agreed in writing with the Planning Authority), shall be carried out
between the following hours unless otherwise approved in writing by the
Planning Authority: 
 Mondays to Fridays: 0800 – 1800
 Saturdays: 0800 – 1300
Page 29

Page 30

 Sundays and public holidays: No Working 
21. No commercial vehicle making deliveries to or collecting material from
the development during construction shall enter or leave the site before
0800 or after 1800. 
22. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority. This
statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS
6472: 1984 ‘Evaluation of Human Response to Vibration in Buildings’. It
shall detail any procedures which are proposed to minimise the impact
of noise and vibration on the occupants of surrounding properties. This
statement shall be prepared by a suitably qualified person, and the piling
works shall thereafter be carried out in accordance with the approved
method statement. 
23. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in
writing by this Authority. The scheme shall identify likely sources of dust
arising from the development or its construction, and shall identify
measures to prevent or limit the occurrence and impact of such dust.
The approved scheme shall thereafter be implemented fully prior to any
of the identified dust generating activities commencing on site and shall
be maintained thereafter, unless otherwise approved by this Authority. 
24. The approved remediation scheme shall be carried out in accordance
with its terms prior to the commencement of development other than that
required to carry out remediation, unless otherwise agreed in writing by
the Planning Authority. The Planning Authority shall be notified in writing
of the intended commencement of remediation works not less than 14
days before these works commence on site. Upon completion of the
remediation works and prior to the site being occupied, a verification
report which demonstrates the effectiveness of the completed
remediation works shall be submitted to and approved in writing by the
Local Planning Authority. 
25. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the
Planning Authority in writing within one week, and work on the site shall
cease. At this stage, if requested by the Planning Authority, an
appropriate investigation and risk assessment shall be undertaken and
a remediation scheme shall be submitted to and approved by the
Planning Authority prior to the recommencement of site works. The
approved details shall be implemented as approved. 
26. If there is a requirement to either re-use site won material or to import
material then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and
Page 30

Page 31

approved by the Planning Authority prior to any material being re-used
or imported. In addition to this and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm shall also be free
from metals, plastic, wood, glass, tarmac, paper and odours. On
completion of the works and at a time and or phasing agreed by the
Planning Authority, the developer shall submit a validation report
containing details of the source of the material and associated test
results to demonstrate its suitability for use. 
27. That prior to the new building being brought into use, a Travel Plan for
the site shall be undertaken and submitted to and approved in writing by
the Planning Authority.  This shall include what initiatives will be brought
forward in the future to ensure the achievement of a meaningful switch
away from the private car inclusive of staff travel. Any agreed actions
and measures shall be implemented.  
No development shall commence within the development site outlined in
red on the approved plan until the developer has secured the
implementation of a programme of archaeological works in accordance
with a written scheme of investigation which has been submitted by the
applicant, agreed with West of Scotland Archaeological Service and
approved by the Planning Authority,. Thereafter the developer shall
ensure that the programme of archaeological works is fully implemented
and that all recording and recovery or archaeological resources within
the development site is undertaken.   
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 20th September 2023    
______________________________________________________________ 
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager  
Pamela.Clifford@west-dunbarton.gov.uk 
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk 
Appendix:   Location Plan 
Page 31

Page 32

Background Papers:  
1. Application forms and plans;
2. Consultation responses;
3. National Planning Framework 4
4. West Dunbartonshire Local Plan 2010;
5. West Dunbartonshire Local Development
Plan Proposed Plan;
6. Creating Places Guidance (2022) 
7. Green Network and Green Infrastructure
Guidance (2022); 
Wards affected:  Ward 4 – Kilpatrick 
Page 32

Page 33

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 31/08/2023.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:2,500@A431/08/2023
DC23/098/FUL - Location PlanWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
Page 33

Page 34

Page 34

Page 35

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 20th September 2023
DC23/083/FUL: Residential development of 27 affordable housing units
comprising; 10 townhouses, 8 cottage flats (including 2
wheelchair accessible cottage flats); and 9 flats with associated
landscaping, amenity space and parking on the former site of
Faifley Bowling Club, Abbeylands Road, Clydebank by Knowes
Housing Association
1. REASON FOR REPORT
1.1 The planning application raises issues that in the opinion of the appointed
officer merits the determination of the application by Committee. Under the
terms of the approved Scheme of Delegation, it therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission subject to the conditions set out in Section 9
below. 
3. DEVELOPMENT DETAILS
3.1 The application site extends to 1.03ha and is located to the south of Abbeylands
Road in Clydebank. The site, which was formerly in use as Faifley Bowling
Club, is comprised of two bowling greens, a pavilion building and a tennis court.
The bowling club closed in 2012 due to low usage. 
3.2     There is a significant gradient across the site, which has three distinct levels.
From the northern boundary situated at street level, an embankment drops
approximately 3m southwards to the upper level which includes the pavilion,
with the bowling greens situated on a mid-level approximately 2.3m below. The
site drops a further 3.8m towards the southern boundary. With Abbeylands
Road rising in height as it moves west to east, the level changes between the
road and the site also increase, with the largest changes outlined above located
at the eastern end of the site. There is a total level change of approximately
5.3m at the western end of the site. The former bowling greens and tennis court
are separated by embankments and hedges, with access via staircases on the
eastern and western sides of the pavilion building. Retaining walls are evident
to the west of the staircase and to the south of the pavilion. A variety of trees
are located along the site boundaries, which are enclosed by perimeter fencing.
A sewer line is located along the west boundary. 
ITEM 6b
Page 35

Page 36

3.3 The site is situated within a well-established residential area and bounded by
Abbeylands Road to the north, which connects with a variety of secondary
roads in the wider residential area. Two storey terraced housing is located along
the northern and southern side of the road, with Faifley Knowes Woodlands to
the south.
3.4 Planning permission is sought for the development of 27 no. affordable housing
units and associated landscaping, amenity space and parking. The
development comprises six blocks of two or three storeys and a range of
dwelling types and sizes as detailed below:
• 4 no. x  2 bed terraced houses
• 3 no. x 4 bed spilt level townhouses
• 3 no. x 3 bed spilt level townhouses
• 2 no. x 1 bed cottage flats
• 2 no. x 2 bed cottage flats
• 4 no. x 3 bed cottage flats
• 6 no. x 1 bed flats within a  flatted block
• 3 no. x 2 bed flats within a flatted block
3.5 The redevelopment of the site will include the demolition of the single storey
pavilion building that formed a part of the former bowling club and is located in
the north east part of the site. A community garden / growing space is proposed
as part of the development where the pavilion is currently located.  
3.6 The development is comprised of eight house types across two and three storey
blocks. External materials for the buildings include a light buff multi brick, light
buff soldier course, with light coloured fibre cement panels around some of the
aluminium windows. Light coloured Juliet aluminium balconies are proposed on
all upper floors, with concrete tiles and PV panels on the pitched roofs (the
flatted block has a mono pitched roof). The townhouses will feature in curtilage
driveways, with the remaining properties served by off street parking areas on
the southern side of the service road. A single vehicular access is proposed
within the northwest corner of the site. A SuDS pond is proposed within the
south eastern extent of the site. 
3.7 The proposed development has been developed in accordance with the
principles of Housing for Varying Needs. In addition to two wheelchair
accessible properties within Blocks 3 and 4, the proposal includes barrier free
access to all houses and surrounding environment, sufficient space around
internal and common doors to facilitate easy access for residents and visitors
in wheelchairs and those who may use other mobility aids. All ground floor units
are also capable of future adaptations. 
3.8 The proposal features a variety of open and amenity green space. This is
principally comprised of community gardens, allotments and a play area within
the north east part of the site, along with several shared open spaces and
extensive areas of informal amenity space within the southern and western
boundaries. 
Page 36

Page 37

3.9 With respect to soft landscaping, it is proposed to plant 43 new trees, along with
native woodland planting within the northern and eastern boundaries of the
community space and significant areas of wildflower meadow planting across
the site. 
3.10 In support of the proposal, the applicant has submitted a range of supporting
documentation and information, including a Design and Access Statement,
Tree Report, Site Investigation Report, Preliminary Ecological Appraisal, Water
Vole Survey, Flood Risk Assessment and drainage details. 
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have no objection to the proposal
in respect of roads and parking together with flooding matters. 
4.2 West Dunbartonshire Council Environmental Health Service have no objection   
subject to conditions relating to unexpected contamination, soils, construction               
hours, delivery times, dust control and piling methods 
4.3 West Dunbartonshire Council Biodiversity Officer has no objections but has
requested that further information is provided, specifically a Biodiversity
Enhancement Plan, Landscape Plan and a refreshed Water Vole Survey. 
4.4 West Dunbartonshire Council Greenspace has no objections but requested
further information on the management and maintenance of the proposal. 
4.5 SportScotland, Scottish Water and West of Scotland Archaeological Service
have no objections to the proposed development. 
5. REPRESENTATIONS 
5.1 Six representations were received, with five objecting to the proposal and one
supporting it. The detail of each submitted representation is available in the
electronic planning file for the application and available for public viewing. The
points raised in objection can, however, be summarised as follows: 
• Concerns that the height and type of housing proposed is significantly
higher than the surrounding homes. 
• Concern that the proposal would increase on street parking along
Abbeylands Road and thereby exacerbate an existing issue whereby
cars are sometimes unable to pass.  
• Would pose a safety risk as more parked cars on Abbeylands Road
increases the likelihood of emergency vehicles being unable to pass. 
• Concern about impacts on local deer and other wildlife on or around
the site. 
• Concern that noise, dust and debris arising from the construction phase
will have negative effects on amenity.
• Loss of privacy. 
• Light disturbance from headlights to property located directly across
from the proposed access to the site. 
Page 37

Page 38

• Reduction in property value.
• Loss of view. 
5.2     The points raised in support of the proposal were that Faifley is small and more            
social housing is needed. 
5.3 The matters raised above are considered and addressed in Section 7 below. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Policy 4
6.1 National Planning Framework 4 (NPF4) was adopted by the Scottish Ministers
on 13th of February 2023 and now forms part of the Development Plan.  
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises. Policy 2 also relates to the climate in the form
of climate mitigation and adaptation and states development proposals will be
sited and designed to minimise lifecycle greenhouse gas emissions as far as
possible and development proposals will be sited and designed to adapt to
current and future risks from climate change. 
6.3 Policy 3 seeks to protect biodiversity and deliver positive effects from
development. It requires that local development will include appropriate
measures to conserve, restore and enhance biodiversity. It is noted that
measures should be proportionate to the nature and scale of development. 
6.4 Policy 6 aims to protect and expand forests, woodland and trees. It advises that
proposals will not be supported where they result in the loss of ancient
woodlands, ancient and veteran trees, or individual trees of high biodiversity
value. Where woodland is removed, compensatory planting is expected to be
delivered. 
6.5 Policy 9 relates to brownfield, vacant and derelict land and empty buildings,
with development proposals for the reuse of vacant land being supported,
taking into account their suitability for conversion to other uses. 
6.6 Policy 12 relates to waste and advises that development proposals, including
residential, will set out how much waste the proposal is expected to generate
and how it will be managed. 
6.7 Policy 13 supports proposals to improve, enhance or provide active travel
infrastructure, public transport infrastructure or multi-modal hubs. This includes
proposals for electric vehicle charging infrastructure. 
6.8 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale, as per Policy 14.
Policy 15 relates to local living and 20 minute neighbourhoods. Development
proposals will contribute to local living including, where relevant, 20 minute
neighbourhoods. Consideration will be given to existing settlement pattern, and
Page 38

Page 39

the level and quality of interconnectivity of the proposed development with the
surrounding area, including local access to affordable and accessible housing
options, ability to age in place and housing diversity. 
6.9 Policy 16 relates to quality homes. Part (c) supports proposals for new homes
that improve affordability and choice. This includes a range of size of homes.
Part (e) supports proposals for new homes where they make provision for
affordable homes to meet an identified need. Part (f) states that development
proposals for new homes on land not allocated for housing in the LDP will only
be supported in limited circumstances where: the proposal is supported by an
agreed timescale for build-out; the proposal is otherwise consistent with the
plan spatial strategy and other relevant policies including local living and 20
minute neighbourhoods; and the proposal is for the delivery of less than 50
affordable homes as part of a local authority supported affordable housing plan. 
6.10 Under part (f) of Policy 19, proposals for buildings that will be occupied by
people will be supported where they are designed to promote sustainable
temperature management, for example by prioritising natural or passive
solutions such as siting, orientation, and materials. 
6.11 Green infrastructure is considered through Policy 20. Proposals that result in
fragmentation or net loss of existing green infrastructure will only be supported
where it can be demonstrated that the proposal would not result in or
exacerbate a deficit in green infrastructure provision, and the overall integrity of
the network will be maintained. 
6.12 Policy 21 relates to play, recreation and sport. It advises that development
proposals which result in the loss of outdoor sports facilities will only be
supported in certain circumstances, including where it can be demonstrated
that there is a clear excess of provision to meet current and anticipated demand
in the area, and that the site would be developed without detriment to the overall
quality of provision.    
6.13 Policy 22 - Flood risk and water management states that proposals will: not
increase the risk of surface water flooding to others, or itself be at risk; manage
all rain and surface water through sustainable urban drainage systems (SUDS),
and seek to minimise the area of impermeable surface. Policy 23 does not
support proposals which are likely to raise unacceptable noise issues. Policy
24 supports proposals that incorporate appropriate, universal, and future-
proofed digital infrastructure. 
6.14 The proposed development is supported by NPF4 and is assessed fully in
Section 7 below. 
West Dunbartonshire Adopted Local Plan 2010 
6.15 Policy UR1 encourages the redevelopment and re-use of underused, vacant
and/or derelict land and buildings for appropriate uses, such as housing. Policy
RD1 gives preference to residential development on brownfield sites within the
urban area rather than on greenfield land. 
Page 39

Page 40

6.16 Policy H4 sets out standards expected of residential development, requiring
high quality design in the range of house types and sizes and in terms of form,
layout and materials. Policy H5 safeguards and where possible enhances the
character and amenity of existing residential area. Policy GD1 seeks to ensure
that all new development is of a high quality of design and respects the
character and amenity of the area. 
6.17 Policy R1 relates to the retention of existing open space. It includes a
presumption against development which adversely affects the use, character
or amenity of areas of functional and valued open space, or which are capable
of being brought into functional use to meet an identified need. Developments
on existing open space will be considered against the existing or potential future
use, quality, function and value of the open space and the sufficiency of
provision of the facility type in the local area. Developments on existing sports
pitches are only supported where a variety of circumstances are met. 
6.18 Policy R2 specifies the open space provision required for all developments.
Assessment of open space requirements has been undertaken against the
more updated “Green Network and Green Infrastructure Guidance (2022)” in
Section 7 below. Policy GN1 promotes and protects the Green Network. 
6.19 Policy T1 and T4 requires sites to be integrated with sustainable travel. Policy
E1 relates to the Council’s Biodiversity duty and Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable
tree planting. Policies F1 and F2 aim to ensure that new development is not at
risk from, and does not increase the risk of flooding, and has suitable SUDS
drainage infrastructure. Policy DC7 supports the inclusion of on-site micro-
renewable technologies. 
6.20 The proposal complies with the policies of the adopted local plan and is
assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration. 
7.2 Policy CP1 seeks to ensure that housing is of a high quality, adaptable and is
designed to be suitable for a mix of occupants. It indicates that all new
development will be expected to contribute towards creating successful places
by having regard to the six qualities of a successful place (distinctive,
adaptable, resource efficient, easy to get to/move around, safe and pleasant,
Page 40

Page 41

and welcoming). Policy CP2 requires the integration and consideration of green
infrastructure from the outset of the design process through to its maintenance
and stewardship of the resource. Policy CP4 relates to enhancing the quality of
design through the Council’s Place and Design Panel. 
7.3 Policy H2 supports new housing development on sites in Schedules 2 and 3.
This site is included on Schedule 3. Policy H4 of the LPD2 relates to residential
amenity. The policy states that the Council will protect, preserve and enhance
the residential character and amenity of existing residential areas at all times. 
7.4 Policy GI1 relates to open space and outdoor sports facilities. It notes that
playing fields and sports pitches should not be developed upon except where;
the proposed development is ancillary to the principal use of the site as a 
playing field or involves a minor part of the playing field which would not affect             
its use and potential for sport and training; or a new or upgraded playing field 
of comparable or greater benefit for sport is provided in a location which is 
convenient for its users and which maintains or improves the overall playing               
field capacity in the area. 
7.5 Policies GI2 and GI4 relate to green infrastructure. Policy GI2 requires new
development to meet with the open space standards set out within the policy.
It is noted that the policy sets a higher open space standard to that of the
adopted Local Plan. Policy ENV1 requires that all new development should
enhance biodiversity as part of the green network, in accordance with Policy
CP2 and the above supplementary guidance.   
7.6 Policy CON1 requires that significant travel generating uses are designed to
encourage sustainable transport. Policy CON3 encourages improvements to
core paths and the development of new core paths and Policy CON4 sets out
a need for all developments to install sufficient broadband provisions. 
7.7 Policy ENV8 requires developments to address air quality, lighting and noise
as part of the planning process, whilst policy ENV9 requires all potentially
contaminated sites to be remediated where necessary to ensure that the site is
suitable for the intended use. 
7.8 Policies ENV1, ENV4, and ENV6 are all similar to the ecology, tree, water
environment and flooding policies of the adopted Local Plan. Policy CP2
requires the integration and consideration of green infrastructure from the
outset of the design process through to its maintenance and stewardship of the
resource. 
7.9 RE4 encourages micro-generation and heat recovery technologies within or
associated with individual properties and Policy RE5 relates to low and zero
carbon buildings and states that new buildings should conform to the
sustainability standards. 
7.10 It is considered that the application proposal being assessed complies with the
relevant policies above as set out in the assessment below. 
Page 41

Page 42

Creating Places Planning Guidance and Green Network and Green
Infrastructure Planning Guidance
7.11 The Creating Places Guidance – November 2022 seeks to achieve high quality
development with a design led approach based on a thorough appraisal of the
site and an analysis of its context, and sets out that this is expected for all
development proposals. The proposal has been informed by a comprehensive
pre-application as encouraged by the guidance and has been considered by
the Place and Design Panel. This has resulted in a development proposal that
achieves a high quality design that responds to the local context and accords
with the approach set out in the Guidance. 
7.12 The Green Network and Green Infrastructure Guidance - November 2022
seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space
created. This will include a focus on biodiversity enhancement and also the
creation of a community growing space. The on-site provision follows the
Guidance in respect of residential development proposals. The open space also
integrates with the wider green network adjacent, inclusive of pathway
connections. The proposal accords with the approach set out in the Guidance. 
Principle of Development
7.13 The proposed development is situated on a vacant brownfield site. As such, it
is supported by Policy 16 of NPF4, which promotes the sustainable re-use of
brownfield land. It is further supported by Policy UR1 of the Local Plan which
aims to redevelop underused and vacant land, and Policy RD1 which gives
preference to residential development on brownfield sites within the urban area.   
7.14 Policy H2 supports the development of sites identified in Schedule 3, with Policy
16 also supporting proposals for new homes on land allocated for housing. The
proposal is supported by both policies as the site is identified in the proposed
LDP2 as a residential development opportunity for affordable housing on
Schedule 3 ref: H2(63). 
7.15  Although the application site is no longer in active use as a bowling club, its last
use was as an outdoor sports facility. Within the adopted Local Plan, the site is
identified as an area of open space on the Proposals Map. Policy 21 of NPF4
sets out strict criteria in respect of considering whether a proposal which would
result in the loss of an outdoor sports facility could be supported. This includes
situations where there is a clear excess of provision to meet current and
anticipated demand in the area, and that the site would be developed without
detriment to the overall quality of provision. Policy R1 of the adopted Local Plan
takes a similar position. As such, the loss of this use requires to be assessed.
Whilst identified as open space in the adopted Local Plan, the site comprised a
local sporting facility rather than recreational open space. In the proposed Local
Development Plan 2, the site is identified as a residential development
opportunity. In identifying the site as a development opportunity it is therefore
clear that the site is considered to no longer function as open space. This,
together with the extensive open space available within the adjacent Faifley
Knowes and the contribution this area makes to the wider green network means
that it can be concluded that there is sufficient provision of open space within
Page 42

Page 43

the locality. Notwithstanding this, the proposal provides a variety of open and
amenity green space. This is principally comprised of community gardens,
allotments and a play area within the north east part of the site, along with
several shared open spaces and extensive areas of informal amenity space
within the southern and western boundaries. 
7.16 Turning to the use of the site as an outdoor sporting facility, it is understood that
the bowling club closed in 2012 due to low usage and, having become disused,
was subsequently identified as a housing site in the proposed LDP2. The
assessment of the loss of the outdoor sporting facility, which requires to balance
the conflicting positions of the adopted and proposed Development Plans, is
informed by a consultation response from SportsScotland. SportScotland have
considered the proposal in the context of Policy 21 of NPF4, noting the closure
of the bowling club was due to dwindling membership. They have in turn
consulted with Bowls Scotland who raised no concerns. The response goes on
to advise there is currently good capacity for new members in the four nearest
alternative blowing clubs, which are less than two miles from the Faifley Bowling
Club site and accordingly it is considered that the site could be developed
without detriment to the overall quality of provision in the local area. In light of
this, SportScotland raise no objection. It can therefore be concluded that there
is satisfactory provision of bowling facilities within the locality and the
development of the site would not be to the detriment of overall provision. The
proposal therefore does not conflict with Policy 21 of NPF4 and Policy R1 of the
adopted Local Plan in this respect.   
7.17 Whilst Policy GI1 of the proposed Local Development Plan 2 takes a stronger
position in respect of the loss of such facilities, the site is identified as a
residential development opportunity within the same plan and therefore no
further assessment against Policy GI1 is required. 
7.18 The principle of development for housing on the site is therefore established
and considered to be fully compatible with the surrounding locality.   
Site Layout, Design and Appearance
7.19 New residential layouts require to be well designed, take cognisance of the
setting into which they are introduced and provide a high quality environment
of well-designed buildings in a setting of gardens and open space whilst
recognising the impact on existing neighbouring properties. The surrounding
locality is largely based on a low density approach, with two storey terraced
housing located to the east and west of the site on the southern side of
Abbeylands Road, and along the northern side of the road. Flatted blocks are
located further west along Abbeylands Road. The proposed development
follows the overall theme and pattern of development in the locality whilst
providing a wider range of housing sizes and it is considered that the density of
development is compatible with the character and amenity of the wider adjacent
residential areas. The proposal makes provision for varying housing needs, with
two wheelchair accessible properties within Blocks 3 and 4, barrier free access
to all houses and surrounding environment, sufficient space around internal and
common doors to facilitate easy access for residents and visitors in wheelchairs
Page 43

Page 44

and those who may use other mobility aids. All ground floor units are also
capable for future adaptations. 
7.20 The proposed layout and design of the site responds to the difference in levels
between the site, Abbeylands Road and the existing housing along it. In order
to create a development which provides continuity with the existing
arrangement, a mix of two and three storey buildings are proposed. When
viewed in the context of the disparity in levels, this mix broadly mimics the height
of the existing housing along the road. While one of the objections raised
concern that the housing is significantly higher than the existing two storey
terraced housing, it is noted that the proposed townhouses are split level, with
the northern elevation facing the road being two storey and only the southern
elevation being 3 storey. In addition to the scale of the buildings, a number of
design features have been used to ensure that the townhouses relate positively
to the existing position. These features include the use of contemporary style
dormers on the northern elevation to give the appearance of a more domestic
two storey arrangement, and the stepped roof pattern which reflects the levels
changes along the road. The townhouses, in conjunction with the proposed
community gardens to the east also create an active frontage onto Abbeylands
Road. The layout, along with the use of active gables, ensures that the
development is outward looking and that all open and amenity spaces are
overlooked. The provision of low level walls around the private rear gardens of
the townhouses, cottage flats and terraced housing also increases community
interaction and encourages observation and ownership of the shared spaces.
Within the lower level, the three storey flatted block forms an anchor and
creates an opening for public space and the route to Faifley Knowes woodland. 
7.21 The mix of two and three storey blocks and house types will assist in creating
visual interest within the development. While elevations share a material and
proportional language, there is variety within this to add further diversity to the
development. Visual interest is further enhanced by the use of a stepped roof
arrangement that reflects the sloping nature of Abbeylands Road. The
proposed layout has made the most of the site layout and levels and its
topographical character and what is proposed successfully integrates into the
wider residential area. The built ratio of each plot accords with the requirements
of the Council’s Creating Places Guidance (2022) and this ensures a suitable
level of garden ground and associated private amenity space is provided for
new residents. 
7.22 Turning to the proposed materials, the new buildings will be finished externally
in facing brick and a concrete tile roof. Samples have not been provided in
advance of the determination of the application. In the absence of material
samples, the final choice of external materials can be addressed by condition,
and the condition will require a quality clay brick to be proposed. This will ensure
consistency with the established approach taken on other sites where the use
of high quality materials has been proposed to ensure the best possible
development. 
7.23 The proposed houses will also feature solar panels incorporated into the roof
covers and this ensures the incorporation of zero carbon generating
Page 44

Page 45

technologies into the development which in turn reduces greenhouse gas
emissions and responds to the climate emergency. 
7.24 Overall, it is considered that the proposal will create a well-designed and
integrated development which will address the six qualities of successful places
by having a distinctive identity, forming safe streets, having quality green
infrastructure, using high quality materials and being sustainable, all complying
with policies GD1, DS1 and CP1 of the adopted and proposed Plans alongside
the Creating Places Guidance (2022). 
Residential Amenity
7.25 Whilst a number of objections raised concerns about impacts on residential
amenity, it is considered that the proposal would have no significant effects in
this respect. The layout, scale and massing proposed relative to the proximity
of existing housing raises no concerns with respect to privacy, overshadowing
or overbearing effects. While noting the specific concern raised about the
impacts that vehicles entering and exiting the access road would have on the
amenity of the existing properties opposite, this is a common arrangement
within a residential area. While the development will undoubtedly bring
additional activity to the area, the occupation of new dwellings is not expected
to cause any noise or activity beyond that typically found in a residential area.
Although it is accepted that any construction site will produce an element of
short term noise and disruption, the Council’s Environmental Health Service
highlight the requirement to require that the construction of the development is
undertaken in a way that ensures that adjacent residential amenity is not
adversely affected and this can be addressed by condition. 
Trees, open space and landscaping 
7.26 The last use of the site for outdoor sports and the open space designation in
the adopted Local Development Plan are addressed in paragraphs 7.15 - 7.17
above. A variety of trees exist within the site and, as noted in the Tree Report
submitted with the application, it is acknowledged that none of these are
protected, ancient or veteran or trees. The function of many of these trees was
to provide part of the landscape setting of the Bowling Club. Some of the trees
are in poor condition and the correct course of action is removal regardless of
any development proposals. It is also desirable to remove Ash trees due to the
threat of dieback. It is accepted that other trees are removed to accommodate
the development. Due to the presence of trees either on or in close proximity to
the developable areas of the site, it is proposed to remove 21 trees.
Compensatory planting is proposed at a ratio of 2:1, with 43 new trees with 12-
14cm girth to be planted. In addition, native woodland planting is proposed
along the northern and eastern boundaries of the community space. An
indicative list of tree species have been identified. The Council’s Biodiversity
Officer has requested that a detailed Soft Landscaping Plan be provided to
ensure appropriate mitigation for the proposed tree loss, which can be
addressed through condition. 
7.27 With respect to open space provision within the new development, the proposal
provides a hierarchy of spaces. This is comprised of community gardens, a play
area and allotments on a graded area of open space within the north east of
Page 45

Page 46

the site. It is noted that the proposal sets out an indicative design for the
community spaces, with the final design, management and maintenance to be
developed through community consultation during the construction phase. As
this approach will ensure that the community spaces reflect and meet the needs
of the local community, it is supported and can be secured through condition.
Two further areas of open space are provided between the blocks of cottage
flats and between the terraced housing and the flatted block. In addition, two
areas of formal amenity space are located adjacent to the eastern elevation of
the flatted block, with the SuDS area and extensive areas within the southern
and western boundaries providing further informal amenity space. In total, the
proposal provides in excess of 5300sqm of open space within the site boundary
comprising a variety of forms which is significantly more than the 1620sqm
required for this scale of development by Policy GI2 of the proposed LDP2 and
importantly goes someway in compensating for the loss of open space
associated with the bowling club. It is noted that the open space areas are well
connected by pedestrian paths, one of which also links to the Faifley Knowes
Woodland open space to the south.   
7.28 The landscaping strategy includes a variety of plants, flowers and trees to
encourage wildlife and biodiversity to the site, along with a management and
maintenance plan. While this is acceptable in principle, it is noted that the
species identified are indicative. In light of this, the Council’s Biodiversity Officer
has requested a detailed soft landscaping plan be provided. Variety is also
proposed to the hard landscaped areas through a mix of materials. As noted
above, new tree planting is proposed throughout the development. The overall
approach to open space provision and planting is considered appropriate and
the request for a detailed soft landscaping plan can be addressed by condition.             
7.29 Overall, the quality and range of open spaces will likely all contribute to the
overall success of the transformation of the now vacant site. The approach to
and provision of open space within the development also presents no conflicts
with the Council’s  Green Network and Green Infrastructure Guidance which
seeks to ensure that development proposals positively contribute to the
provision and enhancement of open spaces and the wider green network. 
Traffic, parking and road safety
7.30 A number of objections raised concerns that the proposal would result in
increased parking along Abbeylands Road, with knock on adverse effects for
resident’s safety and emergency vehicle access. Parking provision is provided
on a 115% basis, i.e. 31 parking spaces for 27 dwellings, and the Councils
Roads Service is happy with this arrangement. The Roads Service also raised
no concerns with respect to parking on Abbeylands Road. In light of this, it is
considered that the proposal would not adversely affect the existing parking
situation along Abbeylands Road. With respect to the type of parking to be
provided, Blocks 1 and 2 have in curtilage parking, with the rest of the
residential units provided for by on street parking along the southern side of the
street serving the development. Each wheelchair unit has its own designated
parking space an appropriate distance from the property. Cycle parking is also
proposed. 
Page 46

Page 47

7.31 In terms of pedestrian movements, the proposed layout provides varied means
of moving through the site, with a primary pedestrian route along the street
pavement serving the development, a secondary pedestrian route from
Abbeylands Road through the community space and shared open space with
onward access to the Knowes woodland, and a wandering route which includes
the community spaces, play area, two greenspaces and the Suds area within
the eastern extent of the site. A public pavement is located along the southern
side of Abbeylands Road, which connects east and west to surrounding areas.   
Transport, connectivity and permeability
7.32 The wider area is well served by public transport, with bus stops on Milldam
Road and Hardgate roundabout, which are a 5min and 10min walk respectively
from the proposed development site, providing services to local destinations
and Glasgow. The Hardgate Local Centre is also within a 10min walk. It is
therefore concluded that the development is provided in an appropriate location
within an established settlement accessible by means other than the private
car. It is considered appropriate for a travel information pack which encourages
reduced dependency on the private car by highlighting the location of local
amenities, public transport services and active travel routes to be provided to
the residents of the new dwellings. This can be addressed by condition. 
Flooding and drainage
7.33 With respect to flooding and drainage, the applicant has submitted a flood risk
assessment in support of the application. The application is below the threshold
for SEPA to be consulted and accordingly the assessment is guided by the
advice of the Council’s Roads Service who have advised that there is no flood
risk to the development or resulting from the development. The drainage
strategy submitted with the application comprises separate storm and foul water
sewer runs located with the new road carriageway. Foul water from the
development will be collected via a new foul water sewer and discharged to the
existing foul sewer local adjacent to the site’s western boundary. Surface water
run-off from the new development will be collected and treated via an end of
line SuDS basin located within the south east extent of the site. While the
proposed drainage arrangements are acceptable in principle, further detailed
information on the methodology and calculations, together with surface flow
pathways, is required to confirm acceptability. This matter can be addressed
through condition.   
Ecology
7.34 The preliminary ecological appraisal submitted with the application found that
the habitats on the site were of low ecological importance overall. Suitability for
nesting birds was found, with a number of measures to avoid and mitigate any
impacts identified. While the appraisal found some suitability for water vole, a
follow up survey found no evidence of water vole presence. The Council’s
Biodiversity Officer has, however, requested that the water vole survey be
refreshed as evidence of water vole presence has since be found in close
proximity to the site. While the preliminary appraisal found that the clubhouse
building had moderate bat roost suitability, two follow up bat activity surveys
found that no bats were using potential roost features. Specific methods for the
demolition of the building were identified. Habitats suitable for badgers were
Page 47

Page 48

found and a pre-commencement badger survey was recommended. Finally,
actions for the removal and management of invasive non-native species and
fox occurring within the site were identified, and a number of biodiversity
mitigation or enhancement measures suggested. The Council’s Biodiversity
Officer has no objection to the Preliminary Ecological Appraisal, but requests
that a Biodiversity Enhancement Plan be provided. The recommendations of
the preliminary appraisal and the bat activity surveys, including further surveys,
can be addressed through condition. 
Cultural Heritage
7.35 West of Scotland Archaeological Service (WOSAS) advises that no
archaeological features are identified within the site and previous development
will likely have removed any potential for significant sub-surface archaeology.
Archaeological work is not identified as being required.  The potential impact
on the setting of the Antonine Wall is also noted, but this is some 570 metres
from the site and WOSAS consider that the new buildings will be viewed in the
context of the wider urban area. No concerns therefore arise. 
Waste Provision
7.36 The houses and cottage flats have in curtilage bin stores, with the flatted block
having its own designated communal bin store. 
Other Technical matters 
7.37 With respect to the re-use of a brownfield site, a Site Investigation Report, which
includes remedial measures for contaminated land, is acceptable to the
Council’s Environmental Health Service. In further considering the consultation
response from Environmental Health, this does not highlight any concerns over
and above the standard need for conditions to address unexpected land
contamination, validation of soils, construction operating hours, delivery vehicle
times, dust control, and piling method statement, all of which can be addressed
through condition. Scottish Water have raised no objection. It is noted that there
is currently capacity in the Burnocks Water Treatment Works and the Dalmuir
PFI Waste Water Treatment works. 
Other Matters raised in representations
7.38 With respect to other issues raised in the objections and not already assessed
above, it was highlighted that the proposal would result in a loss of view and
loss of property value. It is noted that both these issues are not material
planning considerations and do not therefore form part of this assessment.   
Pre-application Consultation and Place and Design Panel 
7.39 The applicant and their project team engaged in a pre-application framework
process with West Dunbartonshire Council Planning Service between October
2022 and February 2023. Four meetings were held in which comments were
made by the Planning Service which are reflected in the submitted design. The
design proposal was also reviewed by the Council’s Place and Design Panel in
November 2022. The panel commended the provision of a mix of housing
typologies within the proposal, noting that this would support a sustainable
proposal. It was further acknowledged that the proposal responded to adjacent
housing. The significant area of community open space provision, as well as
Page 48

Page 49

provide a route through the site connecting Abbeylands Road into Faifley
Knowes, was welcomed with the Panel highlighting how the design could
further evolve by exploring how building design and massing could aid in
signalling a hierarchy of spaces and route to Faifley Knowes. The Panel also
encouraged further consideration of how the impact on the vehicle
infrastructure could be reduced and pedestrian movement prioritised. The
comments of the panel were taken into account in concluding the final design.   
8. CONCLUSION
8.1 The proposed redevelopment of this former bowling club and green for 27
affordable residential units of 1, 2, 3 and 4 bedroom accommodation is
welcomed. The site is within an existing residential area and, subject to the
appropriate use of conditions, the proposed development is acceptable. The
layout and design of the development has been developed to ensure that it
integrates with the existing residential form as well as creating a high quality
development which enhances the local residential area as well as
improvements to the footpath and greenspace networks. The development will
provide high quality housing with good connections to the surrounding area and
wider green network. The provision of a community garden and enhanced open
space will not only benefit this development but the wider area. 
8.2 The proposal will result in a high quality residential development that presents
no conflict with the policy requirements of NPF4, the adopted Local Plan and
the proposed Local Development Plan.
9. CONDITIONS 
1. Prior to the commencement of development on site, exact details, specifications
and samples of all proposed external materials to be used for the houses within
the development site shall be submitted to and approved in writing by the
Planning Authority. For the avoidance of doubt, all facing bricks to be used shall
be good quality clay bricks. Thereafter, unless otherwise agreed in writing with
the Planning Authority, the development shall be completed in strict accordance
with the approved material details and palette. 
2. Further to Condition 1 above, prior to the approved brickwork associated with
any house being constructed or installed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details. 
3. That prior to the commencement of works on site full details of the timescale
for the phasing of the development shall be submitted to and approved in writing
by the Planning Authority. Works shall then proceed as approved unless an
alternative timescale is first agreed in writing by the Planning Authority. 
Page 49

Page 50

4. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority. The development shall thereafter be proceed in accordance with the
approved details. 
5. Prior to the commencement of development on site, a detailed soft landscaping
plan shall be submitted to and approved in writing by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved plan. 
6. Prior to the commencement of development on site, a Biodiversity
Enhancement Plan setting out how the proposal enhances biodiversity beyond
the current baseline, together with the implementation on site, shall be
submitted to and approved in writing by the Planning Authority. All measures
shall then be implemented as approved. Thereafter, unless otherwise agreed
in writing with the Planning Authority, the development shall be completed in
accordance with the approved plan. 
7. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site. 
8. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
9. Full details of the form, management, operation and timescale for completion
on site of the community allotments, community gardens and play space or any
alternative form of community space developed following the results of a
community consultation shall be submitted to and approved by the Planning
Authority prior to the occupation of the first dwellinghouse hereby permitted.
Management and operation shall then be undertaken in accordance with the
approved details at all times thereafter. 
10. In addition to the water survey submitted with the application, a follow up water
vole survey shall be undertaken and submitted to and approved in writing by
the Planning Authority. All recommendations shall then be implemented as
approved. 
11. All recommendations within the Preliminary Ecological Appraisal dated 18th
May 2023, the Bat Activity Surveys dated July 20223, shall be implemented.
This shall include all required further survey work identified as being required
for badgers.  This further survey work undertaken shall be submitted to and
approved in writing by the Planning Authority prior to the commencement of
any works on site and implemented as approved. 
12. Prior to the commencement of development on site, details of the design and
location of cycle storage shall be submitted for the further written approval of
the Planning Authority and the development shall thereafter be completed in
accordance with the approved details prior to the occupation of any housing
Page 50

Page 51

unit within the development, unless otherwise agreed in writing with the
Planning Authority. 
13. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course. 
14. That within 4 weeks of the last of the houses hereby permitted being completed,
all roads and footways within the application site shall be completed to a final
wearing course. 
15. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house.
The off-street parking provision shall be then remain unobstructed and available
for use by residents of the associated house at all times thereafter. 
16. All on street parking and visitor parking spaces shall be formed
commensurately with the development of the houses that they serve. 
17. That prior to the commencement of works on site, full details of the proposed
drainage regime inclusive of calculations and overland flow details shall be
submitted to and approved in writing by the Planning Authority. The drainage
regime shall then be implemented and maintained thereafter. For the avoidance
of doubt, the drainage regime shall be implemented commensurately with the
construction of the houses it serves. 
18. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of measures
to ensure that surface water run-off is contained within the site shall be
submitted to and approved in writing to the Planning Authority prior to the
commencement of any works on site. The measures shall be implemented and
maintained as approved. 
19. No site clearance works shall be undertaken during the bird nesting season
March to September inclusive unless first agreed in writing by the Planning
Authority. For the avoidance of doubt, any such agreement will require a full
nesting bird survey prior to the commencement of works on site, the
methodology and findings of which shall be submitted to and approved by the
Planning Authority and shall be implemented as approved. 
20. Prior to the commencement of development on site, details of the location and
design of electric charging points/units and associated infrastructure and
ducting to serve the development shall be submitted to and approved in writing
by the Planning Authority. The approved car charging points/units/ducting and
associated infrastructure shall thereafter be installed in accordance with the
approved details at a timescale agreed by the Planning Authority and
maintained at all times thereafter. 
21. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network, where
Page 51

Page 52

available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
22. Prior to the commencement of works on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets shall be submitted to and
approved in writing by the Planning Authority. Development shall then proceed
as approved.   
23. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority. Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall be
provided to new residents. 
24. Prior to the commencement of any works on site, full details of the incorporation
of photovoltaic panels shall be submitted to and approved in writing by the
Planning Authority. Thereafter the development shall be undertaken in
accordance with the approved details. 
25. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease. At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works. The approved details shall be implemented as
approved. 
26. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours. 
On completion of the works and at a time and/or phasing agreed by the
Planning Authority, the developer shall submit a validation report containing
details of the source of the material and associated test results to demonstrate
its suitability for use. 
27. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following
hours unless otherwise approved in writing by the Planning Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
Page 52

Page 53

28. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the control
and mitigation of dust has been submitted to and approved in writing by this
Authority. The scheme shall identify likely sources of dust arising from the
development or its construction, and shall identify measures to prevent or limit
the occurrence and impact of such dust. The approved scheme shall thereafter
be implemented fully prior to any of the identified dust generating activities
commencing on site and shall be maintained thereafter, unless otherwise
approved by this Authority. 
29. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800. 
30. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority. This statement
shall include an assessment of the impact of the piling on surrounding
properties, taking into account the guidance contained in BS 6472: 1984
‘Evaluation of Human Response to Vibration in Buildings’. It shall detail any
procedures which are proposed to minimise the impact of noise and vibration
on the occupants of surrounding properties. This statement shall be prepared
by a suitably qualified person, and the piling works shall thereafter be carried
out in accordance with the approved method statement. 
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 20th September 2023 
Person to Contact: Pamela Clifford Planning,  Building Standards and
Environmental Health Manager 
Pamela.Clifford@west-dunbarton.gov.uk 
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk 
Appendix: Location Plan   
Background Papers: 1.  Application forms and plans 
2.  Consultation responses 
3.  Representations
Page 53

Page 54

4.  National Planning Framework 4 
5.  West Dunbartonshire Local Plan 2010 
6.  Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended 
7. ‘Green Network and Green Infrastructure’
Planning Guidance (2022) 
8. Creating Places Planning Guidance (2022) 
Wards affected: Ward  4 - Kilpatrick 
Page 54

Page 55

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 31/08/2023.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:1,250@A431/08/2023
DC23/083/FUL - Location PlanWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
Page 55

Page 56

Page 56

Page 57

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 20th September 2023
DC23/102/FUL: Proposed erection of 26 dwellings with associated ancillary
development at Development Site, Pappert, Bonhill,
Alexandria by West Dunbartonshire Council 
1. REASON FOR REPORT
1.1 The planning application raises issues that in the opinion of the appointed
officer merits the determination of the application by Committee. Under the
terms of the approved Scheme of Delegation, it therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission subject to the conditions set out in Section 9
below. 
3. DEVELOPMENT DETAILS
3.1 The application site is located within the Bonhill area of Alexandria and extends
to 1.36 hectares. The site’s northern, eastern and southern boundaries adjoin
the street of Pappert which takes the form of a loop road through the locality
with a variety of secondary roads, spurs and cul-de-sacs. Adjacent residential
properties take the form of two storey terraced dwellings, all of a similar design.
The western boundary of the site is adjacent to an area of mature tree planting
and beyond that, the street of Redburn. As well as the residential properties of
Pappert, to the north and east there are community facilities in the form of a
playground and a blaes sports pitch. 
3.2 The site was cleared following the demolition of the flatted blocks a number of
years ago. With the exception of two parking areas which are remnants from
these previous housing developments, the site has re-naturalised over time and
is now covered with unmaintained grass, areas of dense vegetation and a
variety of immature trees. An area of maintained grassland lies to the northern
part of the site. Of the two parking areas, the lower area is well used and has a
well maintained surface. The upper area is roughly surfaced and there is little
use. 
3.3 There is a steep gradient across the site with a drop of approximately 20 meters
from east to the west. The top half of the site is fully enclosed with a brick and
metal railing fence, likely remaining from the previous development on the site.
A footpath crosses the site diagonally connecting from the upper part of Pappert
to the overbridged at Redburn and this footpath forms part of the core path
ITEM 6c
Page 57

Page 58

network. A network of other paths connecting to the residential terraces
surround the site. 
3.4  Planning permission is sought for the construction of 26 no. houses and
associated works. The development comprises of a range of dwelling sizes as
detailed below: 
• 3 no. x 3-bedroom terraced Passivhaus standard houses
• 6 no. x 3-bedroom semi-detached houses
• 4 no. x 4-bedroom semi-detached and terraced houses
• 1 no. x 4-bedroom semi-detached house
• 3 no. x 4-bedroom terraced cottage flats
• 6 no. x 1-bedroom terraced cottage flats
• 3 no. x 3-bedroom terraced Passivhaus standard houses 
Three of the proposed properties have been designed to be wheelchair
accessible with the remaining properties all including a ground floor bedroom
to allow for future adaptability for tenants. 
3.5 The development will comprise seven different house types all of which will be
two storey. External materials are proposed to comprise interlocking concrete
roof tiles, a combination of facing bricks together with dark grey uPVC windows
and doors. Each property will feature in curtilage driveway parking and a private
front and rear garden area. Rear gardens will be defined by 1800mm high
timber slatted fences. Due to the levels on site there are two timber crib walls
proposed within the centre of the site in order to create the two platforms. The
walls extend to a height of 4.15 metres and 4.7 metres respectively at the
highest points. Two further crib walls are located to the rear of blocks 9 and 10
to height of 2.6 metres and 1.5 metres respectively. 
3.6 There are two existing vehicular access points on Pappert from which it is
proposed to extend access from into the site. These will form upper and lower
platforms from which the proposed new houses will be accessed. The existing
levels prohibit the formation of a road which runs from east to west to access
the site connecting the new streets and therefore two turning heads are
proposed. The turning heads have been proposed over existing wayleaves to
maximise the area of the site available for the development of houses and
landscaped green space. Each dwellinghouse is proposed to have its own
dedicated parking space with additional visitor parking spaces located
throughout the development. 
3.7 The proposed development will connect to the existing path network. It will,
however, impact upon the core path crossing the site from the north-east to the
south-west and it is therefore proposed to divert it. The proposed diverted core
path omits the section of path across the centre of the site, in favour of a new
footpath connection adjacent to the proposed road at the east of the site at a
gradient of 1:30. From there, the route utilises the existing stepped path at the
north boundary of the site, connecting to a new stepped path adjacent to the
play area. This proposed core path route features 41m of stepped path within
Page 58

Page 59

the site boundary and no sections of ramped path with a gradient of 1:12 or
steeper. 
3.8 The proposal features open and amenity green space. This is principally
comprised of a large graded area of open space to the north of the site and a
large flat area of open space over the location of the attenuation tank, totalling
an area in excess of 2500sqm. Additionally, a section of woodland planting is
proposed through the centre of the site as part of the green network within the
site. 
3.9 In support of the proposal the applicant has submitted a range of supporting
documentation and information including a Supporting Planning Statement,
Design and Access Statement, Transport Statement, Tree Report, Ecology
Report, Landscape Design Statement and Engineering Statement.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have no objection to the proposal
in respect of roads and parking together with flooding matters. 
4.2 West Dunbartonshire Council Environmental Health Service have no objections
subject to conditions relating to noise from air source heat pumps, construction
noise, contaminated land, dust control and waste. 
4.3 West Dunbartonshire Council Biodiversity Officer has no objections to the
proposal and welcome the various elements to provide mixed habitat features
and trees retained where possible. Due to the high mobility of badgers a pre-
construction survey is recommended as a condition. All recommendations in
section 5 of the Preliminary Ecological Appraisal should be conditioned. 
4.4 Scottish Water have no objections to the proposed development. 
4.5 West Dunbartonshire Council Greenspace have no objections to the submitted
plans in relation to the core path and access. 
5. REPRESENTATIONS 
5.1 None received. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Policy 4
6.1 National Planning Framework 4 (NPF4) was adopted by the Scottish Ministers
on 13th of February 2023 and now forms part of the Development Plan.  
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises. Policy 2 also relates to the climate in the form
of climate mitigation and adaptation and states development proposals will be
sited and designed to minimise lifecycle greenhouse gas emissions as far as
Page 59

Page 60

possible and development proposals will be sited and designed to adapt to
current and future risks from climate change. 
6.3  As the site has been previously developed, Policy 9 addressing brownfield,
vacant and derelict land applies. Development proposals that will result in the
sustainable reuse of brownfield land including vacant and derelict land and
buildings, whether permanent or temporary, will be supported. 
6.4 Policy 13 supports proposals to improve, enhance or provide active travel
infrastructure, public transport infrastructure or multi-modal hubs. This includes
proposals for electric vehicle charging infrastructure. 
6.5 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale as per Policy 14.
Policy 15 relates to local living and 20 minute neighbourhoods. Development
proposal will contribute to local living including, where relevant, 20 minute
neighbourhoods. Consideration will be given to existing settlement pattern, and
the level and quality of interconnectivity of the proposed development with the
surrounding area, including local access to affordable and accessible housing
options, ability to age in place and housing diversity. 
6.6 Policy 16 relates to quality homes. Part (c) supports proposals for new homes
that improve affordability and choice. This includes a range of size of homes.
Part (e) supports proposals for new homes where they make provision for
affordable homes to meet an identified need. Part (f) states that development
proposals for new homes on land not allocated for housing in the LDP will only
be supported in limited circumstances where: the proposal is supported by an
agreed timescale for build-out; the proposal is otherwise consistent with the
plan spatial strategy and other relevant policies including local living and 20
minute neighbourhoods; and the proposal is for the delivery of less than 50
affordable homes as part of a local authority supported affordable housing plan. 
6.7  Under part (f) of Policy 19 proposals for buildings that will be occupied by people
will be supported where they are designed to promote sustainable temperature
management, for example by prioritising natural or passive solutions such as
siting, orientation, and materials. 
6.8 Green infrastructure is considered through Policy 20. Proposals that result in
fragmentation or net loss of existing green infrastructure will only be supported
where it can be demonstrated that the proposal would not result in or
exacerbate a deficit in green infrastructure provision, and the overall integrity of
the network will be maintained. 
6.9  Policy 22 - Flood risk and water management states that proposals will not
increase the risk of surface water flooding to others, or itself be at risk; manage
all rain and surface water through sustainable urban drainage systems (SUDS),
and seek to minimise the area of impermeable surface. Policy 23 does not
support proposals which are likely to raise unacceptable noise issues. Policy
24 supports proposals that incorporate appropriate, universal, and future-
proofed digital infrastructure.
Page 60

Page 61

6.10 The proposed development is supported by NPF4 and is assessed fully in
Section 7 below. 
West Dunbartonshire Adopted Local Plan 2010 
6.11  Policy UR1 encourages the redevelopment and re-use of underused, vacant
and/or derelict land and buildings for appropriate uses such as housing. Policy
RD1 give preference to residential development on brownfield sites within the
urban area rather than on greenfield land. 
6.12 Policy H3 supports social housing opportunities on sites identified in Schedules
H3 and H4. Policy H4 sets out standards expected of residential development,
requiring high quality design in the range of house types and sizes and in terms
of form, layout and materials. Policy H5 safeguards and where possible
enhances the character and amenity of existing residential area. Policy GD1
seeks to ensure that all new development is of a high quality of design and
respects the character and amenity of the area. 
6.13 Under Policy R1 there is a presumption against development which adversely
affects the use, character or amenity of functional and valuable open space.
Policy R2 specifies the open space provision required for all developments.
Assessment of open space requirements has been undertaken against the
more updated “Our Green Network” Planning Guidance (2015) in Section 7
below. Policy R5 protects Core Paths and Rights of Way and Policy GN1
promotes and protects the Green Network including core paths. 
6.14  Policy T1 and T4 requires sites to be integrated with sustainable travel. Policy
E1 relates to the Councils biodiversity duty and Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable
tree planting. Policies F1 and F2 aim to ensure that new development is not at
risk from, and does not increase the risk of flooding, and has suitable SUDS
drainage infrastructure. Policy DC7 supports the inclusion of on-site micro-
renewable technologies. 
6.15  The proposal complies with the policies of the adopted local plan and is
assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration. 
Page 61

Page 62

7.2 Policy CP1 seeks to ensure that housing is of a high quality, adaptable and is
designed to be suitable for a mix of occupants. It indicates that all new
development will be expected to contribute towards creating successful places
by having regard to the six qualities of a successful place (distinctive,
adaptable, resource efficient, easy to get to/move around, safe and pleasant,
and welcoming). Policy CP2 requires the integration and consideration of green
infrastructure from the outset of the design process through to its maintenance
and stewardship of the resource. 
7.3  Policy H4 relates to residential amenity. The policy states that the Council will
protect, preserve and enhance the residential character and amenity of existing
residential areas at all times. 
7.4 Policies GI2 and GI4 relate to green infrastructure. Policy GI2 requires new
development to meet with the open space standards set out within the policy.
Where a development has difficulty providing these standards on site, or where
a relaxation of the standards can be justified, developers will require to accord
with Policy GI4 and provide a contribution towards the types of projects outlined
within the policy and detailed in the Green Network and Green Infrastructure
Supplementary Guidance. GI4 sets out the requirements for Developer
contributions. 
7.5 Policy CON1 requires that significant travel generating uses are designed to
encourage sustainable transport. CON3 encourages improvements to core
paths and the development of new core paths and Policy CON4 sets out a need
for all developments to install sufficient broadband provisions. 
7.6 Policy ENV8 requires developments to address air quality, lighting and noise
as part of the planning process, whilst policy ENV9 requires all potentially
contaminated sites to be remediated where necessary to ensure that the site is
suitable for the intended use. 
7.7 RE4 encourages micro-generation and heat recovery technologies within or
associated with individual properties and Policy RE5 relates to low and zero
carbon buildings and states that new buildings should conform to the
sustainability standards. 
7.8 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree, water
environment and flooding policies of the adopted Local Plan. Policy CP2
requires the integration and consideration of green infrastructure from the
outset of the design process through to its maintenance and stewardship of the
resource. 
7.9 It is considered that the application proposal being assessed comply with the
relevant policies above as set out in the following assessment. 
Page 62

Page 63

Creating Places Guidance and Green Network and Green Infrastructure
Guidance
7.10 The Creating Places Supplementary Guidance – November 2022 seeks to
achieve high quality development with a design led approach based on a
thorough appraisal of the site and an analysis of its context, and sets out that
this is expected for all development proposals. The proposal has been informed
by a comprehensive pre-application as encourage by the Guidance. This has
resulted in a development proposal that achieves a high quality design that
responds to the local context and accords with the approach set out in the
Guidance. 
7.11 The Green Network and Green Infrastructure Supplementary Guidance -
November 2022 seeks to ensure that the proposal also integrates landscaping
and green infrastructure as part of the setting of the new development and open
space created. This will include a focus on biodiversity enhancement. The on-
site provision follows the Guidance in respect of residential development
proposals. The open space also integrates with the wider green network
adjacent inclusive of pathway connections. The proposal accords with the
approach set out in the Guidance.  
Principle of Development
7.12 The site is a brownfield site within a well-established residential area but is not
specifically identified in either the adopted Local Plan (LP) the proposed Local
Development Plan 2 (LDP2) as a residential development opportunity. Whilst
not identified as a development opportunity, the sustainable re-use of
brownfield land is supported through Policy 9 of NPF4. Policy 16 also supports
that development proposals for new homes on land not allocated for housing
where they are supported by an agreed timescale for build-out and that the
proposal is for the delivery of less than 50 affordable homes as part of a local
authority supported affordable housing plan. A timescale for the build-out can
be addressed via condition. In any case, it is acknowledged that the proposal
has gained funding through the Vacant and Derelict Land Fund and as such
there are certain targets which will require to be met in order to utilise the
funding. 
7.13 The proposal to redevelop underused and vacant land is also supported by
Policy UR1 of the Local Plan together with Policy RD1 which sets out a
preference for residential development on brownfield sites. Whilst Policy H3
supports social housing opportunities on sites identified in Schedules H3 and
H4, it does not preclude the development of other sites where appropriate.
Policy H2 of proposed LDP2 also supports new housing development on sites
in Schedules 2 and 3. Like the adopted Plan, this Policy also does not preclude
the development of other sites where appropriate. 
7.14 As such, the principle of the development of the site for new housing is
supported on this site. 
Site Layout, Design and Appearance
7.15 New residential layouts require to be well designed, take cognisance of the
setting into which they are introduced and provide a high quality environment
Page 63

Page 64

of well-designed buildings in a setting of gardens and open space whilst
recognising the impact on existing neighbouring properties. The surrounding
locality is based on an approach of mostly terraced homes situated within
individual curtilages, in a setting which includes open space and a variety of
interconnecting pathways. The proposed development follows the overall
theme and pattern of development in the locality whilst providing a wider range
of housing sizes and it is considered that the density of development is
compatible with the character and amenity of the wider adjacent residential
area. 
7.16 It is recognised that the layout requires to be designed to respond to the
constraints of the site, inclusive of steeply sloping levels. There are two existing
vehicular access points which form a continuation of Pappert housing
development and therefore extending these existing points and centring the
proposed dwellings around them responds to and strengthens the established
pattern of development. Considering design, the proposed buildings are all two
storeys with a variety of different house types which will assist in creating visual
interest within the development. This visual interest is enhanced further by the
use of stepped terraces and by levels created by the topography of the site.
The proposed houses will be of a modern design and it is considered that this
approach will enhance and contribute positively to the aesthetic of the area.
The houses will also feature solar panels incorporated into the roof covers and
some properties will include air source heat pumps. The proposed layout has
responded to, and made the most of the site layout and levels and its
topographical character and what is proposed successfully integrates into the
wider residential area. The built ratio of each plot accords with the requirements
of the Council’s Creating Places Guidance (2022) and this ensures a suitable
level of garden ground and associated private amenity space is provided for
new residents. 
7.17 The proposed houses have been developed in accordance with the principles
of Housing for Varying Needs. This incorporates: barrier free access to all
houses and cottage flats, sufficient space around internal and common doors
to facilitate east access for residents and visitor in wheelchairs and those who
may use other mobility aids; self-contained wheelchair adaptable flat types on
the ground floor of cottage flats; fully accessibly kitchens and en-suite
bathrooms within wheelchair accessible units to ensure maximum flexibility in
tenancy. The approach will have a positive benefit in terms of available
affordable housing stock and is supported. 
7.18 Turning to the proposed materials, the new houses will be finished externally in
facing brick and a concrete tile roof. The facing brick details submitted by the
applicant comprise light and darker brown tones. The suggested bricks are,
however, pressed concrete bricks and not good quality clay bricks. The use of
concrete bricks would not provide a high quality visual appearance and this
material would be to the detriment of the wider development. The use of such
a material is also at odds with the established approach taken on other sites
where the use of high quality materials has been proposed to ensure the best
possible development. In the absence of acceptable materials having been
Page 64

Page 65

proposed, the final choice of external materials can be addressed by condition
and the condition will require a quality clay brick to be proposed. 
7.19 In further considering the appearance of the new development, it is
acknowledged that street furniture can have an adverse visual impact and dilute
the quality of the appearance of the development if not carefully considered. It
is therefore appropriate to attach a condition requiring full details of the siting
and position of items such as telecommunications cabinets and grit bins. 
7.20 Overall, subject to the final choice of external materials, it is considered that the
proposal will create a well-designed and integrated development which will
address the six qualities of successful places by having a distinctive identity,
forming safe streets, having quality green infrastructure, using high quality
materials and being sustainable, all complying with policies GD1, DS1 and CP1
of the adopted and proposed Plans alongside the Residential Development
Design Guidance. 
Low carbon design and technologies
7.21 One of the key elements of the design proposals is the low energy strategy all
dwellings will adopt. The levels of sustainability are defined within the Scottish
Building Regulations and the proposals aim for active silver and net zero units.
All buildings will have photovoltaic panels and the net zero units take the
proposed sustainability a step further with enhanced thermal envelope as well
as air source heat pumps. The remaining units will be designed to meet the
Passive House Design Criteria which is not only low energy standard but also
a comfort standard. Passive Houses utilise enhanced thermal insulation, triple
glazing, ventilation with heat recovery, air tightness and are thermal bridge free.
By applying these principles, Passive Houses are not only highly energy
efficient with a very low heat demand but also offer improved comfort to their
occupants by having a high indoor air quality and improved thermal comfort as
external surface temperatures are as close to the internal air temperature as
possible. Such an approach ensures that the proposal minimises greenhouse
emissions and incorporates low carbon infrastructure and thus embraces the
requirements set out by NPF4. The low carbon approach incorporating new
homes to the Passivehaus standard was also key in securing the Vacant and
Derelict Land funding that has allowed the development to be brought forward. 
Residential Amenity
7.22 It has been some time since the proposed site has been utilised as a residential
site and in the meantime the site has renaturalised. Whilst the new development
may introduce new houses in closer proximity to existing properties than the
previous buildings on site, these new buildings do not have the scale and
massing of the flatted blocks which existed previously. Whilst a number of plots
adjoin the existing garden boundaries of houses to the south of the
development site they will not be dominant, and the gable ended windows
which face onto the gardens are not for habitable rooms. It is further considered
that there is no adverse impact on daylight or sunlight to the nearest houses
will occur due to the separation distances proposed. Window to window
relationships within the development itself are also acceptable. Whilst the
development will undoubtedly bring additional activity to the area, the
Page 65

Page 66

occupation of new dwellings is not expected to cause any noise or activity
beyond that typically found in a residential area. Whilst it is accepted that any
construction site will produce an element of short term noise and disruption, the
Council’s Environmental Health Service highlight the requirement that the
construction of the development is undertaken in a way that ensures that
adjacent residential amenity is not adversely affected. A range of conditions are
recommended and it is considered appropriate to attach these. These include
restricting working hours to 8am to 6pm Monday to Friday and 8am to 1pm on
Saturdays. Conditions relating to piling and dust control are also recommended. 
Trees, landscaping and open space
7.23 A variety of trees exist within the site. These are in the form of the existing
shelterbelt to the west of the site as well as self-seeded sapling trees throughout
the site. They are not protected by a Tree Protection Order. Some of the trees
are Ash trees affected by die back and the appropriate course of action is to
remove them. It is accepted that other trees are removed to accommodate the
development. It is not considered that they are significant specimens and new
tree planting is provided at a rate of two for one (i.e. seventy two new trees
proposed) as part of the new development. 
7.24 The landscaping strategy includes a variety of plants, flowers and trees to
encourage wildlife and biodiversity to the site. In terms of hard landscaping
areas, variety is also proposed with a mix of materials. New tree planting is also
proposed throughout the development. In respect of the planting strategy, the
Council’s Biodiversity Officer highlights that the street trees and ornamental
planting proposals for birch and whitebeam account for the majority of trees
throughout the streetscape of the development. Being mindful of the various
tree diseases that have required to be managed, it is advised by the Biodiversity
Officer that it would be a better option to include a variety of tree types
throughout the development to provide additional resistance to disease and
climate change. As such a condition is recommended for the submission of
further planting details. The overall approach to open space provision and
planting is considered appropriate and the implementation and maintenance
can be addressed by condition together with the recommendations of the
Council’s Biodiversity Officer in respect of the planting schedule. 
7.25 The majority of the open ground within this site was formed following the
demolition of the previous flatted blocks a number of years ago. The function of
this open area was to provide an acceptable appearance in the absence of any
immediate redevelopment proposals for the site at the time. It is recognised that
this area was never originally set out as part of the open space provision within
the locality. Within the adopted Local Plan, a small part of the site is designated
as open space. This has however, not been brought forward into the proposed
LDP2. The part of the site that is designated as open space is a triangle of land,
extending down from the playground to the north. This parcel of land is not
developed for housing as part of the proposal and will form part of the wider
open space land landscaping proposals for the site, which will enhance the
quality of open space within the locality. As such the ground remains
undeveloped and so the use, character and amenity of this specific aspect of
the open space is not adversely impacted. An area of maintained grassland is
Page 66

Page 67

adjoining the terraced block to the north of the site. Whilst the development
does encroach into this area, any impact is outweighed by the enhancements
that will occur to the green network locally as a result of the landscaping
proposals associated with this development. 
7.26 In respect of open space within the proposed development, this is principally
comprised of a large graded area of open space to the north of the site and
large flat area of open space over the location of the attenuation tank. In terms
of the requirements of Policy GI2 of proposed Local Development Plan 2
together with the Our Green Network guidance, the required greenspace for the
number of bedrooms provided within the overall development of this site is
1755sqm. The greenspace for this site provided well exceeds this required
number and therefore the level of green space provided by the development is
acceptable. It is noted that the site is also well served by existing play facilities.
It is in direct proximity of two dedicated plan areas – a fenced blaes pitch on the
eastern boundary and a mulit-use games area to the north, although these are
not included in the site boundary. 
7.27 Overall, there is no unacceptable impact on existing open space and the quality
and range of open spaces will all contribute to the overall success of the
transformation of this vacant site. 
Impact on the Core Path network
7.28 Core path 145 crosses the site from the north-east to the south-west connecting
from the upper part of Pappert to the overbridged at Redburn. The current path
is of slabbed construction made up of sections of long steps and variously
graded ramped paths. In considering options for the core path, a retained path
running through the central spine of the development between the rear fence
lines of the dwellings was considered. Retaining a realigned path through the
centre of the site would result in a pathway running between rear fences and
retaining walls and this would lack passive surveillance and also potentially
result in overlooking and privacy implications for the new dwellings which sit
below. An alternative approach which seeks to locally divert the core path was
brought forward and it is proposed that the core path will now run along the
northern boundary of the site, and then travel through the western spur of the
development and reconnect into the existing path network. The Council’s
Greenspace Service offer no objections to this approach from an access
perspective. Notwithstanding stepped nature of some of the path on the
diverted route, the existing core path already features steps. It is considered
that the proposed approach allows for the suitable diversion of the core path in
accordance with Policy CON3 of proposed Local Development Plan 2 which
balances the retention of the core path route whilst allowing for the
development. The formal diversion of the existing path will be addressed via
the relevant provisions in the Planning Legislation following the grant of
planning permission. 
Traffic, parking and road safety
7.29 The applicant has submitted a Transport Statement in support of the proposal.
Given the scale of the proposed development, there is no need for a full
Page 67

Page 68

Transport Assessment. The Council’s Roads Service have no objections to the
proposal on roads and parking grounds.  
7.30 In terms of parking, twenty seven parking spaces are provided within the
curtilage of the properties as well as a further eight visitor parking spaces within
the development. Two existing parking areas are found within the site dating
from the previous flatted development. The upper area is roughly surfaced and
sees little use, and no concerns arise from its loss. The lower area is well used
by adjacent residents and has a well maintained surface. To the north-west of
the site, an additional thirteen car parking spaces have been provided to
compensate for the loss of this existing parking area and continue to provide
parking for existing residents of Pappert. A further four overspill visitor parking
spaces for the new development are also proposed on Pappert. This totals fifty
two vehicle parking spaces created. This is considered acceptable. The
provision of electric vehicle charging infrastructure can be addressed by
condition. 
7.31 It is noted that twenty six affordable houses is expected to generate between
ten and fifteen traffic movements an hour during the weekday peak traffic
periods. These flows would be insignificant in relation to surrounding traffic
flows. Also noted within Transport Statement is that it would be prudent to agree
a site traffic management scheme for the development during construction. This
would help alleviate any issues created by the construction of the development
within the existing residential area and will be addressed by condition. 
7.32 In terms of pedestrian movements, there are existing pedestrian facilities along
all the surrounding roads in the vicinity of the proposed development. There are
also new pedestrian and cycle routes incorporated within the proposed scheme.
The Statement also notes that cycle parking should be at a rate of one space
per flat and this has not been shown on the drawings. It is recommended any
granting of permission should include a condition requiring details of cycle
storage to be submitted and approved prior to any houses being occupied. 
Sustainable Transport
7.33  A number of secondary roads connect the site via the surrounding housing
neighbourhoods to the primary road of O’Hare/Redburn and the wider area.
The closest bus stops to the site are on O’Hare (400m), Redburn (300m) and
Braehead (150m). Advertised weekday bus services from these stops include
the 206 Service which operates every 15 minutes and the 207 Service which
provides an additional hourly service both of which go via Alexandria which has
a railway connection. Alexandria Train Station itself is some 1.5 miles from the
site. It is therefore concluded that the development is provided in an appropriate
location within an established settlement accessible by means other than the
private car. It is recommended within the Transport Statement that a travel
information pack which encourages reduced dependency on the private car by
highlighting the location of local amenities, public transport services and active
travel routes to be provided to the residents of the new dwellings. This can be
addressed by condition. 
Page 68

Page 69

Flooding and drainage
7.34 With respect to flooding and drainage, no flood risk assessment was required
due to the site being outwith any areas of flood risk within the current SEPA
maps. The Council’s Roads Service is content that there is no flood risk to the
development or resulting from the development. In terms of drainage, SuDS is
incorporated into the development to address surface water, with attenuation
proposed via an underground tanked arrangement. Whilst details of the overall
approach is provided, this is not supported by detailed calculations to allow it to
be concluded that the design capacity is appropriate. Overland flow pathways
are also not provided and it cannot be concluded that any run-off in extreme
events will not impact on either the existing or proposed residential properties.
However, there is no suggestion that a suitable system cannot be provided and
final details can therefore be addressed by condition. 
Ecology
7.35 There are no environmental designations covering any part of the site nor are
there any in the surrounding area. There are also no buildings to be
demolished. The preliminary ecological appraisal does not highlight any
protected species of concern. Whilst the area may support foraging bats, no
further surveys are required. However due to the high mobility of badgers and
presence of suitable foraging habitat, a pre-construction survey is
recommended to be required by condition eight weeks before construction. The
report also highlights the timing of the works to take account of nesting bird
season and this is recommended to be conditioned for any granting of
permission. Further recommendations are contained within the preliminary
ecological appraisal including Tool Box Talks for contractors, root protection
areas for trees, tree and vegetation removal to be avoided outwith the bird
nesting season, methods to avoid injury, obstruction and disturbance of
mammal species, sensitive lighting deigns to avoid affecting foraging or
commuting bats, designs to avoid trapping amphibians and biodiversity
enhancement measures. This will be addressed by condition. The Council’s
Biodiversity Officer also offers no concerns in respect of the proposal in respect
of ecological impact or the findings of the ecological appraisal and welcomes
the inclusion of a variety of features as part of the landscaping scheme which
will provide biodiversity enhancement. 
Other Technical Matters 
7.36 The Council’s Environmental Health Service requested further details of the air
source heat pumps (ASHP) proposed as part of the development. In further
consultation Environmental Heath raised no objection to ASHP and
recommended conditions relating to noise limits at habitable windows as well
as noise validation testing. A ground investigation report has been submitted in
support of the proposal and Environmental Health raise no concerns.
Conditions are recommended to address the presence of any unexpected
contamination and in respect ensuring the suitability of either re-using site won
material or importing material to the site. Scottish Water offer no objection
noting current capacity within the existing network. 
Page 69

Page 70

Pre-application Consultation
7.37 The applicant and their project team engaged in a pre-application framework
process with the Planning Service in March of 2023. Three meetings were held
in which comments were made by the Planning Service which are reflected in
the submitted design. The applicant has also undertaken a community
consultation which was held in conjunction with the Bonhill and Dalmonach
Community Council in May 2023. This meeting was attended by approximately
ten residents. The applicant highlights concerns from neighbouring residents
that the existing path through the site is poorly maintained and collecting mud
off the adjacent hill making it difficult to use. It is considered the diverted core
path route will assist in addressing these concerns. Significant concern was
raised on the level of parking and the removal of existing parking within the
lower part of the site (approximately thirteen spaces). Subsequent to the
meeting, the layout was further revised to increase parking and to compensate
for the removal of the current parking area used for parking. Thirteen additional
bays are now proposed on the site of the former garages (currently scrubland)
to the north west of the site. 
8 CONCLUSION 
8.1 The proposed redevelopment of this former housing site with twenty six
dwellings in a mix of one, two, three and four bedroom affordable homes is
welcomed. The site is within an existing residential area and, subject to the
appropriate use of conditions, the proposed development is acceptable. The
layout and design of the development has been developed to ensure that it
integrates with the existing residential form as well as creating a high quality
development which enhances the local residential area whilst also taking into
consideration the constraints of the site. The development will provide high
quality housing with good connections to the surrounding area and wider green
network. 
8.2 A key element of the development is its low energy strategy, utilising
photovoltaic panels, air source heat pumps and enhanced thermal envelopes
as well as Passive House standards for some dwellings. This together with the
proposed biodiversity enhancement proposals respond to tackling the climate
and nature crisis. Furthermore the development is supported by the Scottish
Government Vacant and Derelict Land Investment Programme and will provide
well insulated affordable houses. 
8.3 The proposal will result in a high quality residential development that presents
no conflict with the policy requirements of NPF4, the adopted Local Plan and
the proposed Local Development Plan. 
9. CONDITIONS 
1. Prior to the commencement of development on site, exact details, specifications
and samples of all proposed external materials to be used within the
development site shall be submitted to and approved in writing by the Planning
Authority. For the avoidance of doubt no consent is granted for the brick
samples submitted prior to determination and all facing bricks to be used shall
Page 70

Page 71

be good quality clay bricks. Thereafter, unless otherwise agreed in writing with
the Planning Authority, the development shall be completed in strict accordance
with the approved material details and palette. 
2. Further to Condition 1 above, prior to the approved brickwork associated with
any house being constructed or installed on site, a sample panel of this
brickwork shall be constructed on site in order for it and the associated mortar
to be reviewed, inspected and approved in writing by the Planning Authority.
Thereafter, unless otherwise agreed in writing with the Planning Authority, the
development shall be completed in strict accordance with the approved brick
details. 
3. That prior to the commencement of works on site, full details of the timescale
for the build-out of the development shall be submitted to and approved in
writing by the Planning Authority. Works shall then proceed as approved unless
an alternative timescale is first agreed in writing by the Planning Authority. 
4. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority. The development shall thereafter be proceed in accordance with the
approved details. 
5. Prior to the commencement of development on site, details of the design and
location of cycle storage shall be submitted for the further written approval of
the Planning Authority and the development shall thereafter be completed in
accordance with the approved details prior to the occupation of any house
within the development, unless otherwise agreed in writing with the Planning
Authority. 
6. Notwithstanding the approved plans, all recommendations within the
Preliminary Ecological Appraisal dated 18th May 2023 shall be followed. This
shall include all required further survey work identified as being required for
badgers. Further survey work undertaken shall be submitted to and approved
in writing by the Planning Authority prior to the commencement of any works on
site and implemented as approved. 
7. Notwithstanding the approved plans and condition 6 above, and prior to the
commencement of works on site, a further submission which demonstrates an
understanding on how the proposal enhances biodiversity beyond the current
baseline including any adjustments to the approved landscaping proposals
together with the implementation on site shall be submitted to and approved in
writing by the Planning Authority. All measures shall then be implemented as
approved. 
8. The approved hard and soft landscaping and all associated approved planting
details shall be implemented within a timescale to be agreed with the Planning
Authority prior to the commencement of works on site. 
9. Notwithstanding the approved plans, an updated planting schedule to
incorporate a variety of tree types throughout the development shall be
Page 71

Page 72

submitted to and approved in writing by the Planning Authority prior to the
commencement of any works on site and shall be implemented with a timescale
to be agreed with the Planning Authority. 
10. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
11. That full details of maintenance and management for the landscaping approved
shall be submitted to and approved in writing by the Planning Authority prior to
the occupation of the first dwellinghouse hereby permitted. Management and
maintenance shall commence upon completion of the landscaping. 
12. Prior to commencement of any works on site, a site management scheme for
construction traffic as recommended within the submitted Transport Statement,
shall be submitted to, and approved in writing by the Planning Authority and
thereafter shall be implemented in accordance with the approved scheme. 
13. That prior to each house hereby permitted being occupied, all new roads and
footways leading to it shall be surfaced to a sealed base course. 
14. That within 4 weeks of the last of the houses hereby permitted being completed,
all roads and footways within the application site shall be completed to a final
wearing course. 
15. That prior to the occupation of any house, the off-street parking provision shall
be completed and be available for use by residents of the associated house.
The off-street parking provision shall then remain unobstructed and available
for use by residents of the associated house at all times thereafter. 
16. The additional parking provided on Pappert shall be constructed and made
available for use by local residents prior to the removal of the existing parking
area opposite no’s 127 to 131 Pappert. 
17. That prior to the commencement of works on site, full details of the proposed
drainage regime inclusive of calculations and overland flow details shall be
submitted to and approved in writing by the Planning Authority. The drainage
regime shall then be implemented and maintained thereafter. For the avoidance
of doubt, the drainage regime shall be implemented commensurately with the
construction of the houses it serves. 
18. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of measures
to ensure that surface water run-off is contained within the site shall be
submitted to and approved in writing ty the Planning Authority prior to the
commencement of any works on site. The measures shall be implemented and
maintained as approved. 
19. Prior to the commencement of development with the site, details of the number,
location and design of electric charging points/units and associated
Page 72

Page 73

infrastructure and ducting to serve the development shall be submitted to and
approved in writing by the Planning Authority. The approved car charging
points/units/ducting and associated infrastructure shall thereafter be installed in
accordance with the approved details in a timescale agreed by the Planning
Authority and maintained at all times thereafter. 
20. Prior to the occupation of the first house within the site, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network, where
available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
21. Prior to the commencement of works on site, details of any street furniture
inclusive of grit bins and telecommunications cabinets shall be submitted to and
approved in writing by the Planning Authority. Development shall then proceed
as approved. 
22. No house shall be occupied until the contents of a Travel Information Pack
which encourages reduced dependency on the private car by highlighting the
location of local amenities, public transport services and active travel routes is
submitted to and approved in writing by the Planning Authority. Thereafter, on
the occupation of each dwelling, the approved Travel Information Pack shall be
provided to new residents. 
23. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease. At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works. The approved details shall be implemented as
approved. 
24. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours. 
25. On completion of the works and at a time and or phasing agreed by the Planning
Authority, the developer shall submit a validation report containing details of the
source of the material and associated test results to demonstrate its suitability
for use. 
26. No development shall take place on site until such time as a noise impact
assessment in respect of the proposed air source heat pumps has been
submitted to and approved in writing by the Planning Authority. This noise
impact assessment shall include an assessment of the potential for the
Page 73

Page 74

proposed heat pumps to cause noise nuisance affecting both the new houses
hereby permitted together with existing adjacent properties. Where potential
noise disturbance is identified, proposals for the attenuation of that noise shall
be submitted to and approved in writing by the Planning Authority. Any such
approved noise attenuation scheme shall be implemented prior to the
development being brought into use and shall thereafter be retained in
accordance with the approved scheme. Should the approved noise attenuation
scheme impose restrictions upon the way in which operations on the site are
carried out, the site shall be operated in this manner unless otherwise approved
in writing by the Planning Authority. The noise impact assessment and any
recommendations in respect of attenuation measures shall be prepared by a
suitably qualified person. 
27. Prior to the site being occupied the applicant shall have a third party
independent verifier submit a verification report to the satisfaction of the
Planning Authority. Compliance with the relevant condition shall be evidenced
in the report. This shall demonstrate that the projections as detailed within
Noise Impact Assessment are reliable and meet with Noise Impact Assessment
condition. 
28. No development shall commence on site until such time as a noise control
method statement for the construction period has been submitted to and
approved in writing by the Planning Authority. This statement shall identify likely
sources of noise (including specific noisy operations and items of
plant/machinery), the anticipated duration of any particularly noisy phases of
the construction works, and details of the proposed means of limiting the impact
of these noise-sensitive properties. The construction works shall thereafter be
carried out in accordance with the approved method statement unless
otherwise approved in writing by the Planning Authority. 
29. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following
hours unless otherwise approved in writing by the Planning Authority: 
• Mondays to Fridays:   0800 – 1800
• Saturdays:     0800 – 1300
• Sundays and public holidays:  No Working 
30. No commercial vehicle making deliveries to or collecting material from the
development during construction shall enter or leave the site before 0800 or
after 1800. 
31. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority. This statement
shall include an assessment of the impact of the piling on surrounding
properties, taking into account the guidance contained in BS 6472: 1984
‘Evaluation of Human Response to Vibration in Buildings’. It shall detail any
procedures which are proposed to minimise the impact of noise and vibration
on the occupants of surrounding properties. This statement shall be prepared
Page 74

Page 75

by a suitably qualified person, and the piling works shall thereafter be carried
out in accordance with the approved method statement. 
32. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the control
and mitigation of dust has been submitted to and approved in writing by this
Authority. The scheme shall identify likely sources of dust arising from the
development or its construction, and shall identify measures to prevent or limit
the occurrence and impact of such dust. The approved scheme shall thereafter
be implemented fully prior to any of the identified dust generating activities
commencing on site and shall be maintained thereafter, unless otherwise
approved by this Authority. 
33. No development shall commence on site until details for the storage and the
collection of waste arising from the development has been submitted to and
approved in writing by the Planning Authority. The agreed details shall be in
place prior the occupation of the first housing unit/property within the site and
thereafter maintained for the lifetime of the development. 
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 20th September 2023 
Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager 
Pamela.Clifford@west-dunbarton.gov.uk 
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk  
Appendix: Location Plan   
Background Papers: 1.  Application forms and plans 
2.  Consultation responses 
3.  National Planning Framework 4 
4.  West Dunbartonshire Local Plan 2010 
5.  Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended 
7. Creating Places Guidance (2022) 
8. Green Network and Green Infrastructure
Supplementary Guidance (2022)   
Wards affected: Ward 2 (Leven) 
Page 75

Page 76

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 31/08/2023.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:2,500@A431/08/2023
DC23/102/FUL - Location PlanWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
Page 76

Page 77

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 20th September 2023
DC23/070/FUL: Change of use from cafe to tyre change garage at 6 Old Street
Duntocher, Clydebank, Alexandria by Mr Peter Ferrier
1. REASON FOR REPORT
1.1 The planning application is subject to a substantial body of objection. Under the
terms of the approved Scheme of Delegation, it therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 Refuse planning permission for the reasons set out in Section 9 of this report.
3. DEVELOPMENT DETAILS
3.1 The application relates to 6 Old Street in Duntocher, Clydebank. The site is
bounded to the north by a car park with bus shelter, beyond which lies the
former Duntocher West United Free Church of Scotland, however this building
is no longer in use. To the east, south and west are residential properties. The
residential properties to the east comprise three storey blocks of flats, to the
south and west is mostly two storey terraced dwellinghouses, the closest of
which has an adjoining boundary with the application site. Directly to the south,
and also with an adjoining boundary, lies a one and a half storey, detached
dwellinghouse. The site measures approximately 348 square metres and the
building was most recently operating at a café, however the café has now
closed. The orientation of the building sees its gable onto Old Street with the
entrance facing the parking area and bus stop. When in operation as a café, an
outdoor seating area was situated adjacent to the gable, between the pavement
and the building. The building is single storey in height with only one window
on the east elevation facing the road. A gated access from Old Street leads to
a rear yard. 
3.2 The application seeks to change the use from a café to a tyre-changing garage.
Externally, the changes to building are limited with the window on the gable
elevation changing to a door and a new refuse store created with timber fence
screen on the side elevation which fronts the carpark. The outdoor seating
enclosure will also be removed. Three car parking spaces are proposed to be
located on the eastern side of the building, accessing from Old Street. No cars
will be brought into the building itself, with all works for tyre fitting to be
undertaken outside. Internally, what was the kitchen would become storage and
a reception is proposed which is accessed via the doorway on the side
elevation. The former café area itself would become an area associated with
ITEM 6d
Page 77

Page 78

the operation of the tyre fitting use. The business in its current location has
three full time members of staff with another person who can work for the
business on occasion i.e. to cover holidays. The proposed move would allow
for an apprentice to be taken on as well as a full time receptionist, bring the
number employed on a full time basis to five. 
3.3 The planning history for the site includes a change of use from an office to a
deli with hot food takeaway which was approved in September of 2015
(application DC15/138) as well as an outside seating area associated to the
café which was approved in June 2017 (application DC17/056). An application
for a change of use of the café to form a dwellinghouse as well as alterations
and extension has also previously been submitted but not determined at this
time due to difficulties in engaging with the agent (application DC22/221/FUL). 
4. CONSULTATIONS 
4.1 West Dunbartonshire Council Environmental Health Service have no objections
subject to a condition for the submission of a noise impact assessment as this
operation is introducing a commercial activity with the potential to generate
noise levels that could have an adverse effect on nearby sensitive receptors. 
4.2 West Dunbartonshire Council Roads Service have no objections to the proposal
on roads or flooding matters. 
5. REPRESENTATIONS 
5.1 Ninety six representations have been received in connection with the proposal.
Eleven are in objection and eighty five are in support. Those in objection to the
application mostly reside locally to the site and those in support of the
application are mostly from a wider area. The full details are contained within
the planning file and are available for public viewing. However, the points raised
in both objection and support can be summarised as follows: 
5.2 Objection
• This is a residential area which is not suitable for this type of business.
• There will be an increase in traffic congestion. 
•  Concerns that the use is near a play park.
• The road infrastructure is not in place to support an industrial business.
• There are sufficient provisions of this type of business in the area.
• The development would be unsightly with hazardous materials and
chemicals.
• There will be an increase in noise.
• There isn’t enough parking in the area currently. 
5.3 Support
• This site has been everything from a tyre garage, to a car garage, to selling
head stones before it was a cafe.
• The café had longer opening hours and more customers so would have more
traffic. 
Page 78

Page 79

• The café was allowed to function without any onsite parking as is proposed
in this application.
• The proposed site is a much safer location to trade from than the existing
site.
• It's a great idea to move the business off the main road
• As it only opens 8am to around 5pm the noise level would be restricted to
the times and no noise at night time.
• There is no problem with residents living near as it would be normal hours of
business.
• Cars get tyres changed and are away so are not parking overnight 
• Clydebank/Duntocher needs these services as seen from the original
premises.
• These services are to the highest standards. 
• This is a valuable, reliable and affordable service to the community.
• This is a long standing local business run by local people.
• They support other local firms.
• Full support should be given to local businesses looking to expand / improve. 
• They will return community value to the entire area.
• The proposal could bring more jobs 
5.4 The matters raised above are considered and addressed in Section 7 below. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
National Planning Policy 4
6.1  National Planning Framework 4 (NPF4) was adopted by the Scottish Ministers
on 13th of February 2023 and now forms part of the Development Plan.  
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises. Policy 2 also relates to the climate in the form
of climate mitigation and adaptation and states development proposals will be
sited and designed to minimise lifecycle greenhouse gas emissions as far as
possible and development proposals will be sited and designed to adapt to
current and future risks from climate change. 
6.3 As the building is currently vacant, Policy 9 which relates to brownfield, vacant
and derelict land, and empty buildings applies. Development proposals for the
reuse of existing buildings will be supported, taking into account their suitability
for conversion to other uses. Policy 12 which considers zero waste also
supports the reuse of existing buildings and infrastructure. 
6.4 Policy 14 requires that development proposals will be designed to improve the
quality of an area whether in urban or rural locations and regardless of scale.
Policy 15 relates to local living and 20 minute neighbourhoods. Development
proposal will contribute to local living including, where relevant, 20 minute
neighbourhoods. Consideration will be given to existing settlement pattern and
the level and quality of interconnectivity of the proposed development with the
surrounding area, including local access to employment. 
Page 79

Page 80

6.5  Policy 23 relates to health and safety. Part (e) states that development
proposals that are likely to raise unacceptable noise issues will not be
supported. A Noise Impact Assessment may be required where the nature of
the proposal or its location suggests that significant effects are likely. 
6.6  As the development is for a Class 5 (General Industrial) use, Policy 26 Business
and industry applies. Policy 26 states that development proposals for business
and industry uses on sites allocated for those uses in the LDP will be supported.
Part (d) also states that development proposals for business, general industrial
and storage and distribution uses outwith areas identified for those uses in the
LDP will only be supported where: it is demonstrated that there are no suitable
alternatives allocated in the LDP or identified in the employment land audit; and
the nature and scale of the activity will be compatible with the surrounding area.
Part (e) also states that development proposals for business and industry will
take into account: impact on surrounding residential amenity and the need for
appropriate site restoration at the end of a period of commercial use. 
6.7  The matters relevant to the assessment against the above policies are
addressed in detail in Section 7 below. It is concluded that the proposal is not
accordance with Policies 9, 23 and 26 of NPF4.  
West Dunbartonshire Adopted Local Plan 2010 
6.8 As stated, the building has become vacant, Policy UR1 - Urban Renewal
applies. The Council, in conjunction with other agencies, will continue to
promote the re-use of land and buildings in the urban area that become vacant,
derelict or underused in order to stimulate the process of urban renewal and
thereby enhance the Plan area as a place to live, work and visit. 
6.9 All new development is expected to be of a high quality of design and to respect
the character and amenity of the area in which it is located in accordance with
Policy GD1. 
6.10  As the proposed use of Class 5 (General Industrial) on a site not designated for
industrial use, Policy LE3 - Industrial & Business Use Development Outwith
Designated Sites applies. Policy LE3 states that proposals for industrial,
business and warehousing developments (Use Class 4, 5 and 6) on sites other
than those identified on the Proposals Map under Policy LE 1 as being existing
or potential employment areas, will require to be justified against the following
criteria: 
• the proposed development could not be accommodated on any other
available industrial/business site in the Plan area;
• there would be significant overall economic benefit to the Plan area; 
• there will be no significant undesirable landscape and amenity impacts; 
• there would be no major infrastructure implications; 
• the site is accessible to public transport, walking and cycling routes; and 
• the proposed development conforms with other Local Plan policies. 
Page 80

Page 81

6.11  Policy H5 relates to development within Existing Residential Areas. The
character and amenity of existing residential areas, identified on the Proposals
Map, will be safeguarded and where possible enhanced. With regard to non-
residential uses, it will be assessed whether they can be considered ancillary
or complementary to the residential area, and would not result in a significant
loss of amenity to the surrounding properties. A significant loss of amenity might
be expected to occur as a result of increased traffic, noise, vibration, smell,
artificial light, litter, hours of operation and general disturbance. 
6.12 The matters relevant to the assessment against the above policies are
addressed in detail in Section 7 below. It is concluded that the proposal is not
in accordance with policies GD1, H5 and LE3 of the adopted Local Plan. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration. 
7.2 Policy H4 of the LPD2 relates to residential amenity. The policy states that the
Council will protect, preserve and enhance the residential character and
amenity of existing residential areas at all times. In this regard, there will be a
general presumption against: b) The establishment of non-residential uses
within, or in close proximity to, residential areas which potentially have
detrimental effects on local amenity or which cause unacceptable disturbance
to local residents. 
7.3 Policy ENV8 relates to air, light and noise pollution. All new development must
ensure that significant adverse noise impacts on surrounding properties and
uses are avoided. 
7.4 Policy E1 supports economic development by directing proposals for business,
industrial, or storage and distribution uses to the sites listed in Schedule 4.
Development of Class 4, 5 and 6 uses within existing business and industrial
areas not listed within Schedule 4, but identified on the Proposals Map, will be
supported by the Council. 
7.5 Policy CP1 requires new development to take a design led approach to creating
sustainable places which puts the needs of people first and demonstrate the six
qualities of successful places. 
7.6 Overall, the proposal is not supported by the policies CP1, H4 and ENV8 of
proposed Local Development Plan 2. 
Page 81

Page 82

Principle of Development
7.7 The site is located within a residential area as defined by both the adopted Local
Plan and proposed Local Development Plan 2. Overall, the area is residential
in character with residential properties immediately to the east, south and west.
Notwithstanding this, a variety of other uses are also found within the vicinity of
the site, mostly located on the A810 Dumbarton Road, and providing local
facilities within the area. These include retail shops, a barbers, a beauticians,
hot food takeaways and public houses. Areas of open space also lie in close
proximity to the site. The proposed site, is however off the main A810 and within
an area more characteristically residential. 
7.8 In assessing whether the principle of the development is acceptable at this
location, Policy 26 Business and industry of NPF4, Policy LE3 of the Local Plan
and Policy E1 of the Local Development Plan 2 all direct industrial uses to
existing industrial sites or sites which have been allocated for industrial uses.
Policy 26 of NPF4 allows for industrial uses outwith the defined areas where it
has been demonstrated that there are no suitable alternatives allocated within
the LDP. Policy LE3 of the adopted Local Plan takes a similar position with this
Policy requiring justification that the proposed development could not be
accommodated on any other available industrial/business site in the Plan area.
Whilst there are no designated industrial sites adjacent to the site itself, there
are multiple sites allocated within the adopted Local Plan and proposed Local
Development Plan 2 within Clydebank. No supporting information has been
submitted in relation to the application in terms of what other sites have been
considered and why the proposal could not be accommodated within an
existing business and industrial area as defined by the adopted Local Plan and
proposed Local Development Plan 2, Policy LE3 also sets out a requirement
that any proposal for a business and industrial use outwith designated areas,
would result in significant overall economic benefit to the plan area. Whilst no
details, figures or supporting documents have been provided by the applicant
to quantify economic benefit, it is acknowledged that the new use will create
local employment and contribute to the local economy. However, due to the
small scale of the proposal, any new employment generated and associated
economic benefit would also be at a small scale and not of a significant level. It
is also noted that the previous use of the premises as a café would have
resulted in a level of economic activity contributing to the area and there is no
evidence to suggest that the introduction of an alternative industrial use would
lead to any significant benefits beyond the previously established position. 
7.9  Whilst the reuse of vacant buildings is supported by Policies 9 and 12 of NPF4,
the former requires that their suitability for the proposed use has to be
considered. The benefits of the re-use of this building require to be weighed
against their suitability for conversion and it does not follow that this Policy
supports new uses within existing buildings where they are not compatible with
established adjacent uses. Policy UR1 of the adopted Local Plan supports the
re-use of vacant buildings in order to stimulate the process of urban renewal, it
is not considered that the re-use of this standalone building would itself
contribute to any wider urban renewal within this locality. 
Page 82

Page 83

Visual Amenity
7.10  In regard to the appearance of the building, there are few external alterations
to the existing building. There are no proposals for permanently sited outdoor
storage and equipment associated with the use which would be to the visual
detriment of the area. As such the proposal will have no unacceptable impact
upon the visual amenity of the area.  
Impact on Residential Amenity
7.11 Residential properties surround the site on three sides, with two properties also
sharing a boundary fence with the site. Policy 26 of NPF4 requires the suitability
of the building for the proposed use to be taken into account and the impact on
residential amenity is a key consideration in this respect. Policy 23 of NPF4
further advises that development proposals that are likely to raise unacceptable
noise issues will not be supported. It is further set out that the agent of change
principle applies to noise sensitive development and that a Noise Impact
Assessment may be required where the nature of the proposal or its location
suggests that significant effects are likely. Policy H5 of the adopted Local Plan
requires that non-residential proposals in residential areas do not have an
adverse impact on residential amenity, with noise specifically highlighted.
Policy GD1 requires proposals to be appropriate in terms of land use. Policy H4
of proposed LDP2 further states that there will be a general presumption
against the establishment of non-residential uses within, or in close proximity
to residential area which potentially have detrimental effects on local amenity
or which cause unacceptable disturbance to local residents. Policy CP1
requires proposal to respond to the established pattern of development. 
7.12 Noise disturbance is raised as a concern in the objections received. The
Council’s Environmental Health Service highlighted that the proposal is
introducing a commercial activity with the potential to generate noise levels that
could have an adverse effect on nearby residential properties. It is recognised
that the nature of the use which would involve fitting of tyres in the open air
would likely create disturbance from noise and activity generated by the use of
machinery as part of the processes for changing tyres. Even if the process of
mounting tyres to wheels was undertaken inside, with vehicles being located
outside it is inevitable that the door of the premises would remain open during
working hours with the associated transference of noise outside. 
7.13 The recent appeal decision in respect of an outdoor tyre fitting use on a nearby
site at the corner of Dumbarton Road and Beeches Road is also noted. Like
this proposal, the appeal site was also opposite residential properties and in
determining the appeal the Reporter consider that the proposed use would
generate noise of a type incongruous with a residential area, different in nature
to that arising from other existing local businesses within the vicinity, and that
residential neighbours would be likely to experience it as disturbance. The
conclusions of the Reporter are material in the consideration of this application
with the location and relationship to existing residential properties being very
similar. The Council’s Environmental Health Service does highlight that a noise
impact assessment could be undertaken to consider noise impact and potential
mitigation further. In the event that the Council had been otherwise minded to
Page 83

Page 84

grant planning permission this could have been requested to provide further
information to inform the application assessment on matters relating to noise. 
7.14  In further considering residential amenity, development proposals should be
designed to improve the quality of an area regardless of scale. Whilst it is
accepted that the last planning use as a café brings people into the area, the
main activity of the café would have been contained within the building. The
proposal for the tyre changing business proposes to use what is currently the
outside seating area for the café to change the tyres and is not contained within
the building itself. The outdoor seating area was previously granted for the café
and as such the associated activity at the front of the building was considered
acceptable. However, the proposed new use has the potential to result in an
increase in noise and activity beyond the previous position as set out above
which would not improve the quality of the area. Also noise activity from an
outside area associated with a café is different in nature from the changing of
tyres which would be a noisy activity due to machinery and equipment involved
in tyre changing as detailed above. 
Parking and Access 
7.15  The proposal provides three additional parking spaces which are to the front of
the building where the outside seating area and access to the rear yard is
currently. The submitted drawings indicate that these spaces would be used for
the changing of tyres. The Council’s Roads Service initially raised concern that
three parking space was not sufficient when there is no internal garage space.
Evidence was requested to demonstrate that the provided spaces was sufficient
for the business. The applicant advises that the three spaces are adequate for
the business as proposed as tyres are repaired/replaced when vehicles arrive
and jobs are not accepted and then left sitting. If a job requires something to be
ordered then customers are asked to return at a later date. It has also been
stated that due to manpower/machinery, only a certain number of tyres can be
repaired/replaced at any one time and a booking system is required. In addition,
the applicant highlighted that the previous use as a café, did not provide any
dedicated parking. In response, the Roads Service have no objections to the
proposal. Whilst the concerns raised in the objections in this regard are
acknowledged, there are thus no issues in respect of road safety which arise
that would justify refusal. 
Other Technical Considerations
7.16 Whilst the SEPA flood maps indicate a localised surface water flood risk in the
vicinity of the site, the site itself is not affected and the Council’s Roads service
offers no objections on flood risk grounds. This proposal for the change of use
of an existing building does not raise any concerns in respect of the climate and
nature crises or climate mitigation or adaption. 
Matters raised in representations
7.17 Turning to the outstanding points raised in the submitted representations which
have not been assessed above. It has been raised in objection that there is a
sufficient provision of this type of business in the area. It has also been raised
in support that Duntocher/Clydebank needs this service. It is however, not the
place of the planning system to inhibit competition and as such this is not a
Page 84

Page 85

justification for the refusal of planning permission. Whilst the possibility of
hazardous materials and chemicals being stored is also raised as a concern,
and any such storage would be of a low level. Some of the letters of support
relate to the high levels of service, reliability, long standing nature and prices of
the business proposed in its current location. Again, these are not material
planning considerations. 
7.18 The letters of support also note that the café had longer opening hours.
Planning application DC15/138 limited that hours of operation for the café from
7am to 6pm, Monday to Saturdays. Whilst no proposed working hours have
been noted as part of the application submission, hours of operation for any
granting of the tyre business would be conditioned. The tyre business creating
less traffic than the café has been highlighted in support. Neither business has
had objections on traffic basis and as such either business would be appropriate
in terms of traffic generation. 
7.19 The improvement in safety from the current location that the applicant runs their
business from resulting from the proposed premises not being located on a
main road has also been noted. Working hours expected being from 8am to
around 5pm and therefore noise not being at night has been highlighted. It is
accepted that the business would be anticipated to run to these standard
working hours, however with residential properties so close in proximity, there
is still the possibility for noise nuisance from this industrial use during the day. 
8. CONCLUSION 
8.1 The proposal would result in the siting of a Class 5 (General Industrial) use
within an existing residential area and not in a business and industrial area. No
supporting information has been submitted in terms of what other sites have
been considered and why the proposal could not be accommodated within an
existing business and industrial area as defined by the adopted Local Plan and
proposed Local Development Plan 2. This results in the proposal not being
supported by Policy 26(d) (i) of NPF4 together with Policy LE 3 of the adopted
West Dunbartonshire Local Plan. Additionally the proposal is not supported be
Policy LE3 of the adopted Local Plan as it is not considered that the proposal
would result in significant overall economic benefit to the area. 
8.2 It is further considered that the proposal is incompatible with established
residential amenity due to the potential for noise disturbance to occur to the
detriment of adjacent residents. The proposal is therefore not acceptable with
reference to Policies 9, 23(e) and 26(d) (ii) of NPF4, Policies GD1, H5 and LE3
of the adopted Local Plan and policies CP1 and H4 of the proposed Local
Development Plan 2. 
9. REASONS FOR REFUSAL 
1. The proposal would result in the siting of a Class 5 (General Industrial) use
– tyre changing garage within an existing residential area. . No supporting
information has been submitted in terms of what other sites have been
considered and why the proposal could not be accommodated within an
Page 85

Page 86

existing business and industrial area as defined by the adopted Local Plan
and proposed Local Development Plan 2. Accordingly the proposal is not
supported by Policy 26(d) (i) of NPF4 together with Policy LE 3 of the
adopted West Dunbartonshire Local Plan. 
2. The proposal would not result in significant overall economic benefit to the
local area and therefore the proposal is not supported by Policy LE3 of the
adopted Local Plan. 
3. The proposal is incompatible with established residential amenity due to the
potential for noise disturbance to occur to the detriment of adjacent
residential properties. The proposal is therefore contrary to Policies, 9, 23(e)
and 26(d)(ii) of NPF4, Policies GD1, H5 and LE3 of the adopted Local Plan
and policies CP1 and H4 of the proposed Local Development Plan 2. 
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager 
Date: 20th September 2023 
Person to Contact: Pamela Clifford, Planning,  Building Standards and
Environmental Health Manager 
Pamela.Clifford@west-dunbarton.gov.uk 
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk 
Appendix: Location Plan   
Background Papers: 1.  Application forms and plans 
2.  Consultation responses 
3.  Representations 
4.  National Planning Framework 4 
5.  West Dunbartonshire Local Plan 2010 
6.  Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended   
Wards affected: Ward 4 (Kilpatrick) 
Page 86

Page 87

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 31/08/2023.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:1,250@A431/08/2023
DC23/070/FUL - Location PlanWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
Page 87

Page 88

Page 88

Page 89

WEST DUNBARTONSHIRE COUNCIL
Report by the Planning, Building Standards and Environmental Health
Manager 
Planning Committee: 20th September 2023
___________________________________________________________________
Subject: Development Plan Update
1. Purpose
1.1 The purpose of this report is to seek approval of a consultation draft
Development Plan Scheme and Participation Statement in relation to a new
Local Development Plan (LDP3).
2. Recommendation
2.1 It is recommended that the Committee agrees the publication of the
consultation draft Development Plan Scheme and Participation Statement set
out in Appendix 1.
3. Background
3.1 The development planning system in Scotland has changed with the
introduction of the development planning provisions of the Planning (Scotland)
Act 2019. The Fourth National Planning Framework (NPF4) has been adopted
by the Scottish Government and now forms part of the development plan for
all planning authorities in Scotland. New style local development plans are to
be prepared, which are to be place-based, people-centred and delivery
focused. They are to be visual plans with the inclusion of a clear spatial
strategy, and a collection of maps, development briefs and masterplans,
instead of lengthy written text and policy. Plans are to be prepared
collaboratively with communities and other stakeholders, with people with
protected characteristics given particular support to engage in the plan
preparation process. The Development Plan Scheme and Participation
Statement is to set out the timeline for preparing new local development plans
and how participation in the preparation of plans will be encouraged.
3.2 The West Dunbartonshire planning authority area excludes that part of West
Dunbartonshire within the Loch Lomond and the Trossachs National Park.
The National Park Authority has responsibility for preparing the Local
Development Plan for that area.
4. Main Issues
Current development plan and planning guidance
4.1 The fourth National Planning Framework (NPF4) was adopted by the Scottish
Government on 13 February 2023 and now forms part of the development
ITEM 7
Page 89

Page 90

plan for West Dunbartonshire (and all other planning authorities in Scotland
including National Park Authorities). As planning applications are to be
determined in accordance with the development plan, unless material
considerations indicate otherwise, NPF4 has an enhanced status in the
determination of planning applications and is the most up to date part of West
Dunbartonshire’s development plan.
4.2 The current adopted local development plan for the West Dunbartonshire
Council planning authority area is the West Dunbartonshire Local Plan 2010.
Although dated, it remains part of the statutory development plan for the West
Dunbartonshire planning authority area, and is still relevant for decision-
making purposes.
4.3 At its meeting of 15th March 2023, the Planning Committee agreed not to
adopt the Proposed West Dunbartonshire Local Development Plan (2020, as
modified). This decision was taken with reference to legal advice received that
there were grounds to legally challenge the adoption of the plan. The
Proposed Local Development Plan incorporating the recommended
modifications of the examination report, as agreed at the 19 August 2020
Planning Committee, remains a material consideration in the determination of
planning applications.
4.4 The Council has a number of planning guidance documents relating to
specific topics or places. These do not form part of the development plan but
do form part of the decision-making process for planning application when
relevant. The planning guidance currently in effect in the West Dunbartonshire
planning authority area is:
• Frontiers of the Roman Empire (Antonine Wall) World Heritage Site
(2022)*
• Clydebank Business Park (2023 draft)*
• Clydebank Town Centre Development Framework (2021)
• Commuted payments for Parking (2015)
• Creating Places (2022)*
• Dumbarton Waterfront Path (2017)
• Green Network and Green Infrastructure (2022)*
• Pay Day lending and Betting Shops (2016)
• Queens Quay Design Codes (2020)
* these planning guidance documents are associated with Proposed West
Dunbartonshire Local Development Plan (2020, as modified)
New Local Development Plan
4.5 The Scottish Government published Local Development Planning Guidance in
May 2023. This sets out guidance on the new development planning system
introduced by the Planning (Scotland) Act 2019 and the publication of the
guidance allows the Council to begin the process of preparing a new local
development plan (LDP3). The Scottish Government expects every planning
authority in Scotland to have a new style local development plan in place by
May 2028, with an expected plan preparation time of 3-4 years. The main
stages in the preparation of the new Local Development Plan are:
Page 90

Page 91

4.6 Development Plan Scheme including Participation Statement – this
document is produced annually and acts as a communication tool for letting
stakeholders know when and how they can get involved in the local
development plan process keep them informed of progress. It sets out the
timetable for the preparation of the local development plan and what is
involved at each stage of the process. The Participation Statement part of the
document sets out how stakeholders are to be involved in the preparation of
the local development plan. It is to include targeted methods to reach under-
represented groups, help to make public participation inclusive, ensure that
wider public engagement directly feeds into the preparation of the local
development plan, and promote proactive engagement at all stages of the
plan’s preparation. In preparing the Development Plan Scheme, a planning
authority are to seek and to have regard to the views of the public as to the
content of the Participation Statement. The Council’s draft Development Plan
Scheme including the Participation Statement is attached for approval at
Appendix 1.
4.7 Evidence Report – the purpose of the Evidence Report is to support the
quality and effectiveness of the Local Development Plan. Its aim is to gather
and use evidence to clearly inform what to plan for before the Proposed Plan
looks at where development should take place. Stakeholders’ views are to be
sought when preparing the Evidence Report. Legislation and guidance sets
out the expected content of the Evidence Report. The Evidence Report must
be approved by the full Council before it is submitted to the Scottish Ministers.
The Evidence Report stage is likely to be the most challenging stage of the
new Local Development Plan process. It is a new requirement and whilst the
Scottish Government promote a proportionate approach, the breadth and
depth of evidence required by Scottish Government Guidance is substantial,
as is the level of engagement required. The Guidance sets out information
likely to be required, and other information planning authorities may wish to
prepare or review, as part of the Evidence Report for 33 different policy areas.
Examples of evidence to be submitted include: information on local sources of
greenhouse gases and local opportunities for greenhouse gas sequestration;
identification of nature networks; green belt review and local landscape
character assessment; urban capacity study; heat network zones; and
community assets and community wealth building priorities. While many
evidence data sources already exist or will be prepared by others, other
evidence will need to be sourced or created primarily for the local
development plan process.
4.8 Gate Check – the assessment of the Evidence Report, most likely by a
Reporter from the Directorate and Environmental Appeals (DPEA), is known
as the Gate Check. The Reporter can decide that there is sufficient
information and the planning authority can move to prepare its Proposed Plan,
or the Reporter may consider there is not sufficient information and provide
recommendations for improving the Evidence Report. The aim of the Gate
Check is to reduce the level of debate at the Examination stage of the plan
preparation process and made for a better evidence-led plan. This Gate
Check is a new requirement of the local development plan preparation
Page 91

Page 92

process and the costs of the Gate Check are to be met by the planning
authority.
4.9 Proposed Plan – the Proposed Plan identifies where new development
should take place and where it should not and articulates the ambitions and
priorities for the future development of the Plan area. The preparation of the
Proposed Plan is to be informed by community engagement and a wide range
of prescribed policy and strategy documents. The Scottish Government
guidance sets out requirements in relation to the form and content of the
Proposed Plan. The Proposed Plan must be approved by the full Council. It
must then be published for consultation. Proposed Plans can be modified after
consultation. 
4.10 Delivery Programme – the Delivery Programme sets out how an authority
proposes to implement its Local Development Plan. A proposed Delivery
Programme must be published with the Proposed Plan, and like the Proposed
Plan it is to be approved by full Council. The Delivery Programme is to be a
corporate document, which can influence the authority’s financial investments,
and support delivery of the Plan’s policies and proposals to achieve Council
priorities. It is to be reviewed and renewed at least every two years.
4.11 Examination – the Examination is the opportunity for independent
consideration on any issues raised during the formal consultation on the
Proposed Plan that have not been resolved through modifications. The
Examination will most likely be undertaken by a Reporter from the Directorate
of Planning and Environmental Appeals, who will determine whether the
Examination should be in public, by hearing or by written submissions. Most
recent Examinations now undertaken primarily by written submission. The
Examination will consider unresolved issues following consultation on the
Proposed Plan and also the consultation and involvement of the public in the
preparation of the Plan. Following the Examination, the Reporter will prepare
a report setting out reasons for their conclusions and recommendations,
including any modifications to the Plan. There are limited circumstances under
which a planning authority can decline a Reporter’s recommendations. These
are that the recommendation would make the Plan inconsistent or
incompatible with the environmental assessment, the National Planning
Framework or Habitat Regulations; or that the recommended modification
could not reasonably have been reached based on the evidence considered in
the course of the Examination. The planning authority are to meet the costs of
the Examination.
4.12 Adoption – adoption is the final stage in the preparation of the Plan and
occurs after the Council has received and considered the Examination report
and any recommendations and modifications it proposes.
Local Development Plan preparation timeline
4.13 The proposed timeline for the preparation of a new Local development Plan
for West Dunbartonshire is as follows and also set out in the draft
Development Plan Scheme in Appendix 1. Legislation stipulates the time line
Page 92

Page 93

be set out on quarters based on a financial year running from April to March.
Estimated months are included below to ease understanding of the timeline.
The timeline is considered challenging but realistic and within the 3-4 year
preparation timeline expected by the Scottish Government, and is similar to a
number of other authorities that have already published their preparation
timelines.
Action Proposed timeline
Publication of draft Development Plan
Scheme/Participation Statement
Quarter 2, 2023/24 (September
2023)
Publication of finalised Development
Plan Scheme and Participation
Statement
Quarter 3, 2023/24 (December 2023)
Publication of Evidence Report and
submission for Gatecheck
Quarter 3, 2024/25 (December 2024)
Publication of Proposed Plan and draft
Delivery Programme
Quarter 4, 2025/26 (January 2026)
Submission of Proposed Plan to the
Scottish Ministers for Examination
Quarter 3, 2026/27 (October 2026)
Expected adoption of Local
Development Plan
Quarter 2, 2027/28 (September
2027)
Associated requirements and impact assessments
4.14 The Planning (Scotland) Act 2019 and associated Regulations set out
requirements for other work to be undertaken in association with the Local
Development Plan process. This includes:
• Open Space Strategy – work has started on the undertaking of open
space audit that will form the basis of this strategy
• Play Sufficiency Assessment
• Forestry and Woodland Strategy
4.15 There are a number of different assessments that must be undertaken to
support the preparation of the Local Development Plan. These are:
• Equalities Impact Assessment
• Public Sector Equality Duty Assessment
• Fairer Scotland Duty Assessment
• Strategic Environmental Assessment
• Habitat Regulations Appraisal
Each of these assessments will also be required for the requirements set out
in paragraph 4.13. Some of these assessments are significant pieces of work
in its own right. The assessments are undertaken and updated throughout the
Plan preparation period as detailed above. 
Local Place Plans
4.16 The Planning (Scotland) Act 2019 includes provision for local communities to
prepare Local Plan Plans. Planning authorities are to take account of any
registered Local Place Plan when preparing its Local Development Plan.
Page 93

Page 94

There is a separate report to the September Planning Committee setting out
the proposed approach to Local Place Plans in West Dunbartonshire planning
authority area.
Participation
4.17 The participation of communities and other stakeholders in the Local
Development Plan process is an important feature of the new planning
system. Although engagement has always been part of the process and
encouraged, there are now much stronger requirements set out in legislation
and guidance, including engagement with specific groups such as children
and young people; disabled people; and Gypsies and Travellers.
4.18 The Participation Statement element of the Development Plan Scheme sets
out how the Council intends to encourage participation in the Local
Development Plan process. A draft Development Plan Scheme is attached at
Appendix 1 for approval, and will be used to seek the views of communities
and other stakeholders on how they want to be involved in the Local
Development Plan process.
5. People Implications
5.1 The Planning (Scotland) Act 2019 introduces significant new requirements for
planning authorities which will have an impact on the workloads, skills and
training requirements of planning staff. The Development Planning and Place
Team within West Dunbartonshire Council, which is responsible for the
preparation of the Local Development Plan and other planning policy related
work, is a small team and meeting the timescales for the preparation of the
new Plan will be challenging.
6. Financial and Procurement Implications
6.1 The costs of the Gate Check and Examination processes are to be met by the
planning authority. Based on previous Examinations, it is estimated these may
cost £30,000 each. A burden bid will be made for a £30,000 budget for each
financial year 2024/25 and 2026/27.
7. Risk Analysis
7.1 Not having an up-to-date local development plan may have an impact on
planning decisions taken by the Council and could result in appeal decisions
being upheld.
7.2 As there is a new Local Development Plan process there is a risk associated
with the proposed timeline, particularly the Evidence Report stage and the
Gate Check as these are new requirements, so there is uncertainty around
how long the preparation and gathering of the necessary evidence will take,
and also around the expectations of the Reporter who will be assigned to
undertake the Gate Check. It would also be preferable for community-
prepared Local Place Plans to be validated in time for them to be reflected in
Page 94

Page 95

the Proposed Plan, but as the timing of these are to be decided by
communities there is no guarantee of this.
8. Equalities Impact Assessment (EIA)
8.1 The Development Plan Scheme and Participation Statement is a
document that sets out how communities will be involved in the preparation of
the Local Development Plan. It includes an emphasis on engaging with people
with protected characteristics and groups that represent them. The document
is published initially as a draft for consultation so that the views of people with
protected characteristics can be sought and engagement with them can be
improved. A summary of the EIA can be found below, with the full assessment
in Appendix 2.
EIA 774: The council will be proactive in engaging with
underrepresented groups in preparing the local development plan. This
will include seeking views on the draft Participation Statement itself to
better understand how to engage with these groups.
9. Consultation
9.1 The draft Development Plan Scheme will be published for consultation
following approval by Planning Committee for an 8 week consultation period
ending on 17 November 2023. This will allow a finalised Development Plan
Scheme to be reported to the December 2023 Planning Committee and to
meet the timelines of the Local Development Plan outlined above.  
9.2 The views of the following teams/services have been sought during the
preparation of this report: Legal, Finance, Communities, and Performance and
Strategy. The views of these and other Council services will also be sought
during the consultation on the draft Development Plan Scheme and
Participation Statement.
11. Strategic Assessment
11.1 The new Local Development is considered to be relevant to, and will
help deliver, all of the Council’s strategic priorities:
• Our Communities – Resilient and Thriving
• Our Environment – A Greener Future
• Our Economy – Strong and Flourishing
• Our Council – Inclusive and Adaptable
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager
Date: 20th September 2023
___________________________________________________________________
Page 95

Page 96

Person to Contact: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager, 
pamela.clifford@west-dunbarton.gov.uk
Alan Williamson, Development Planning & Place Team
Leader
alan.williamson@west-dunbarton.gov.uk
Appendices: Appendix 1: Consultation Draft Development Plan
Scheme and Participation Statement
Appendix 2: Equalities Impact Assessment for
Development Plan Scheme and Participation Statement
Background Papers: None
Wards Affected: All
Page 96

Page 97

West Dunbartonshire Local Development Plan (LDP3)
Draft Development Plan Scheme and Participation Statement
September 2023
ITEM 7 - APPENDIX 1
Page 97

Page 98

Development Plan Scheme
Introduction
Thank you for your interest in West Dunbartonshire’s Development Plan.
This draft Development Plan Scheme explains what a Development Plan is. It sets out what Development Plans are currently active
in West Dunbartonshire and provides an estimated timeline for the preparation of a new Local Development Plan for the West
Dunbartonshire planning authority area. It includes a Participation Statement which sets out how the planning authority (part of the
Council) will involve the community and other stakeholders in the preparation of the new Local Development Plan.
This draft version of the Development Plan Scheme has been published so that you can comment on the estimated timeline for the
preparation of the new Local Development Plan and also comment on how participation in the preparation of the Plan can best be
achieved. It would also be helpful to have your views on whether the purpose of this document and its content is clear. For this
reason there are survey questions included throughout the document that we would welcome your comments on.
What is the Development Plan?
The purpose of the planning system is to manage development and the use of land in the long term public interest. Development and
land use in Scotland is “plan led”, making the Development Plan an important document for decision making. It is a statutory plan
used by planning authorities to make decisions about what development takes place and how land is used in their area.
There are two main parts of the Development Plan. The first is the National Planning Framework. This is prepared by the Scottish
Government, who formally adopted the Fourth National Planning Framework (NPF4) in February 2023. NPF4 contains a spatial
strategy which highlights development areas and types that are of national importance. It also contains a set of policies used by
planning authorities to make planning decisions.
The second part of the Development Plan is the Local Development Plan, prepared by planning authorities. A Local Development
Plan sets out how places will change, importantly identifying where and what development should and should not happen. It is a
more detailed and specific plan for a local area which identifies infrastructure needs, allocates land for development, or for
protection from inappropriate development. Local Development Plans can also contain policies which add greater detail or local
context to policies in NPF4 or to address issues not addressed by NPF4.
Question 1 – does this section clearly explain what the Development Plan is? If not, how could it be improved?
Page 98

Page 99

Current Development Plans and Planning Guidance covering West Dunbartonshire
The West Dunbartonshire Council area is covered by two different planning authorities. The West Dunbartonshire Council planning
authority area covers all of West Dunbartonshire with the exception of that area within the Loch Lomond and the Trossachs
National Park, for which the Park Authority is the planning authority. The Park Authority prepares its own Local Development Plan
and Development Plan Scheme which you can read more about at https://www.lochlomond-trossachs.org/planning/planning-
guidance/.
<insert map of planning authority areas>
West Dunbartonshire’s Development Plan consists of NPF41 and the ‘West Dunbartonshire Local Plan (2010)’2. In addition, the
Council also uses the Proposed West Dunbartonshire Local Development Plan (2020, as modified) as a material consideration in
planning decisions, but as it was not  adopted it is not a part of the statutory Development Plan. 
The Council has a number of planning guidance documents relating to specific topics or places. These do not form part of the
development plan but do form part of the decision-making process for planning application when relevant. A list of current planning
guidance documents is set out in Appendix 1.
To view West Dunbartonshire Council’s current development plan and planning guidance documents, visit Development Plan |
West Dunbartonshire Council (west-dunbarton.gov.uk).
Question 2 – does this question clearly explain the current Development Plan and Planning Guidance coverage in West
Dunbartonshire?
Preparing a new Local Development Plan
The Council has commenced preparation of a new Local Development Plan. This will be a ‘new style’ Local Development Plan,
which will be prepared differently and have a different format, following changes introduced by the Planning (Scotland) Act 2019.
The National Planning Framework (NPF4) now contains the detailed policy framework that was previously set out in old style local 
1 https://www.gov.scot/binaries/content/documents/govscot/publications/strategy-plan/2023/02/national-planning-framework-4/documents/national-planning-
framework-4-revised-draft/national-planning-framework-4-revised-draft/govscot%3Adocument/national-planning-framework-4.pdf
2 https://www.west-dunbarton.gov.uk/council/key-council-documents/local-development-planning/development-
plan/#:~:text=The%20Development%20Plan%20Scheme%20and%20Participation%20Statementsets%20out,the%20preparation%20of%20the%20new%20local%20develop
ment%20plan. 
Page 99

Page 100

development plans. New style local development plans are expected to be place-based, people-centred and delivery-focused. With
regard to format, this means that local development plans are expected to be place-based, visual plans with the inclusion of a clear
spatial strategy, and a collection of maps, development briefs and masterplans, instead of lengthy written text and policy. Plans are
to be prepared collaboratively with communities and other stakeholders, with people with protected characteristics given particular
support to engage in the plan preparation process.
The preparation of the new Plan will follow statutory processes set out in the Planning Act and associated Regulations and
Guidance. The key stages are:
Development Plan Scheme including Participation Statement – this document is produced annually and acts as a
communication tool for letting stakeholders know when and how they can get involved in the local development plan process keep
them informed of progress. It sets out the timetable for the preparation of the local development plan and what is involved at each
stage of the process. The Participation Statement part of the document sets out how stakeholders are to be involved in the
preparation of the local development plan. It is to include targeted methods to reach under-represented groups, help to make public
participation inclusive, ensure that wider public engagement directly feeds into the preparation of the local development plan, and
promote proactive engagement at all stages of the plan’s preparation.
Evidence Report – the purpose of the Evidence Report is to support the quality and effectiveness of the Local Development Plan.
Its aim is to gather and use evidence to clearly inform what to plan for before the Proposed Plan looks at where development
should take place. Stakeholders’ views are to be sought when preparing the Evidence Report.
Gate Check – the assessment of the Evidence Report by a Directorate and Environmental Appeals Reporter is known as the Gate
Check. The Reporter can decide that there is sufficient information and the planning authority can move to prepare its Proposed
Plan, or the Reporter may consider there is not sufficient information and provide recommendations for improving the Evidence
Report. The Gate Check also provides an opportunity for the Reporter to consider and attempt to resolve disputes that may exist
about the evidence submitted. The aim of the Gate Check is to reduce the level of debate at the Examination stage of the plan
preparation process and made for a better evidence-led plan.
Proposed Plan – the Proposed Plan identifies where new development should take place and where it should not and articulates
the ambitions and priorities for the future development of the Plan area. The preparation of the proposed Plan is to be informed by
community engagement and a wide range of other policy and strategy documents. The Scottish Government guidance sets out
Page 100

Page 101

requirements in relation to the form and content of the Proposed Plan. The Proposed Plan is published for consultation, after which
Proposed Plans can be modified.
Delivery Programme – the Delivery Programme sets out how an authority proposes to implement its Local Development Plan. A
proposed Delivery Programme must be published with the Proposed Plan. The Delivery Programme is a corporate document,
which can influence the authority’s financial investments, and support delivery of the Plan’s policies and proposals to achieve
Council priorities. It is to be reviewed and renewed at least every two years.
Examination – the Examination is the opportunity for independent consideration on any issues raised during the formal
consultation on the Proposed Plan that have not been resolved through modifications. The Examination will be undertaken by a
Reporter from the Directorate of Planning and Environmental Appeals. The Examination will consider unresolved issues following
consultation on the Proposed Plan and also the consultation and involvement of the public in the preparation of the Plan. Following
the Examination, the Reporter will prepare a report setting out reasons for their conclusions and recommendations, including
modifications to the Plan.
Adoption – adoption is the final stage in the preparation of the Plan and occurs after the Council has received and considered the
Examination report and any recommendations and modifications it proposes. 
Question 3 – does this section clearly explain the key stages in the preparation of a new Local Development Plan?
The estimated timetable for the preparation of the new Local Development Plan is set out below. Legislation requires for this to be
set out in financial year quarters but the Council has included estimated months to ease understanding of the timetable.
Action Estimated date
Publication of finalised Development Plan
Scheme and Participation Statement
Quarter 3, 2023/24 (December
2023)
Publication of Evidence Report and
submission for Gatecheck
Quarter 3, 2024/25 (December
2024)
Publication of Proposed Plan and Draft
Delivery Programme
Quarter 4, 2025/26 (January 2026)
Submission of Proposed Plan to the
Scottish Ministers for Examination
Quarter 3, 2026/27 (October 2026)
Page 101

Page 102

Expected adoption of Local Development
Plan
Quarter 2, 2027/28 (September
2027)
Question 4 – does the timeline for the preparation of the new Local Development Plan seem reasonable?
The preparation of the new Local Development Plan will be supported and informed by a number of assessment documents that
will be concurrently prepared. These are:
• Equalities Impact Assessment
• Public Sector Equality Duty Assessment
• Fairer Scotland Duty Assessment
• Strategic Environmental Assessment
• Child Rights and Wellbeing Impact Assessment
• Habitat Regulations Appraisal
Other Plans and Strategies
The Planning (Scotland) Act 2019 introduced the requirement for a number of other plan and strategy documents to inform and
improve the planning system in Scotland. These are:
Local Place Plans – these are community-led plans focused on the development and use of land in the area covered by the Plan.
West Dunbartonshire Council will issue and invitation to communities to prepare Local Place Plans and will set out what assistance
the Council can offer with their preparation. Once prepared, the Council will validate properly-prepared Local Place Plans and take
them into account when preparing the Local Development Plan.
Regional Spatial Strategies – are to be produced by a planning authority, or jointly by a group of planning authorities, and will set
out a long-term spatial strategy in respect of the strategic development of the area it covers. The West Dunbartonshire planning
authority area is likely to be included within a Regional Spatial Strategy covering the Glasgow City-Region area.
Local Place Plans and Regional Spatial Strategies will not be part of the Development Plan but all of these documents will inform
the content of the others.
Page 102

Page 103

<insert diagram>
Open Space Strategy – planning authorities are required to prepare a strategy setting out a strategic framework of policies and
proposals for the development, maintenance and use of green infrastructure, including open spaces and green networks. The
strategy is to contain an audit of existing open space provision and an assessment of current and future requirements. The Council
will consult on the findings of its audit and the Open Space Strategy
Play Sufficiency Assessment – planning authorities are required to assess the sufficiency of play opportunities for children in
preparing the Evidence Report for the Local Development Plan. The Council will consult on its Play Sufficiency Assessment.
As at August 2023, West Dunbartonshire Council has commenced its open space audit including the noting of locations of play
opportunities.
Forestry and Woodland Strategy – planning authorities are to prepare a strategy which identifies woodlands of high nature
conservation, and sets policies and proposals for the development of forestry and woodland, and the protection, enhancement and
expansion of woodlands. The Council will consult on its Forestry and Woodland Strategy.
Question 5 – Does this section clearly explain the other plans and strategies associated with the Local Development
Plan?  
Page 103

Page 104

Participation Statement
Introduction
The Scottish Government intends the preparation of the Local Development Plan to be a collaborative process. Local Development
Plans are expected to be place based, people centred and delivery focussed. The involvement of all stakeholders within the
planning process will be required to achieve this, including:
• local communities;
• services within the council;
• service providers, infrastructure providers and government agencies outside of the council (sometimes referred to as Key
Agencies);
• businesses and other organisations; and
• developers and land and property owners.
The Participation Statement sets out how we will achieve this by identifying who we will include, how we will keep them informed,
how they will be included, what methods we will use to include people, and when engagement will take place.
Who we will include
Legislation requires planning authorities to involve the public at large in preparing a Local Development Plan, however there are
also specific groups that planning authorities need to include, which are:
• children and young people (those under the age of 25);
• people with disabilities;
• Gypsies and Travellers; and
• community councils
•
There are other groups that guidance states should be given support to enage with the Local Development Plan process including
people with protected characteristics (including race, age, sex, and sexual orientation), as well as people from a range of socio-
economic backgrounds.
Children and Young People
There will be three main ways we will include children and young people. We will:
Page 104

Page 105

• engage with the Youth Parliament Representatives for the West Dunbartonshire Planning Area,
• engage with the West Dunbartonshire Youth Council
• engage with schools (including early education, primary, secondary, and special needs schools).
We will also reach out to known youth groups in the area and ask if they are interested in engaging in the Local Development Plan
process
People with disabilities
There are a number of existing disability groups known to the council we will reach out to and request their input to the Local
Development Plan process.
We will also consider the barriers to engaging with people with disabilities and how to overcome them, to provide opportunities to
fully engage. This will include providing information in an accessible format.
Gypsies and Travellers
We will approach existing contacts we have for Gypsy and Traveller communities to discuss their needs.
Community Councils
We will use existing channels of communications to contact active community councils. 
In areas where there are no active community councils we will seek the views of other active community groups in these areas
Question 6 – are there any other specific groups that we should involve or target our consultation at?
How we will keep you informed
We will keep the public up to date by publishing regular updates on the plan preparation milestones listed in the Local Development
Plan Scheme. Updates will be published to the Council website, posted on social media, and circulated via a newsletter for those
who wish to sign up to this. 
Some stages of plan preparation require us to advertise in local newspapers, including 
• inviting communities to make Local Place Plans
• publishing the Proposed Local Development Plan
• advertise the examination of the Local Development Plan
• publishing a report of modifications to the Plan
Page 105

Page 106

• the adoption of the Local Development Plan
We will make key documents available in libraries at the appropriate times, including the Evidence Report and Proposed Local
Development Plan.
How we will involve and collaborate with you
We will use a variety of methods to engage with specific groups as well as the public at large.
We will hold public consultations to collect ideas for and views on proposals within the Local Development Plan, using online survey
tools and public events.
A survey of the Citizens Panel will collect information about places across West Dunbartonshire.
We will hold a ‘Call for Ideas’ consultation for communities, developers and landowners to identify sites for development.
We will work directly with Community Councils and other local community groups to identify key issues and opportunities for their
local area, and to work together on development briefs and masterplans.
One of the most direct ways communities can influence the plan is by making a Local Place Plan. We will invite communities to
make Local Place Plans. The contents of Local Place Plans are decided by their community, and once completed and registered
are incorporated in the Local Development Plan.
The tools, materials, and methods we will use to involve you
A variety of tools and materials will be used to reach as many people as possible and to reduce barriers to participation as far as
possible.
Published information and the proposed plan will be provided in accessible formats. This will include information published online
and in physical information left in public places. 
We will collect ideas and views using the Councils online survey platform ‘Survey 123’.
The place standard tool will help us to collect and focus views about a place. The tool will be used in a variety of formats, including:
in online surveys; at meetings with specific groups, community councils, and community organisations; and at consultation events.
Different versions of the tool will be used in specific context, such as the version for children and young people.
Page 106

Page 107

Question 7 – are there any consultation approaches/techniques you would suggest we should use to improve
engagement in the Local Development Plan process? 
Page 107

Page 108

The table below sets out the different stages of the Local Development Plan and the engagement activity that will be undertaken at
each stage. It has been informed by the Scottish Government consultation draft guidance on ‘Effective Community Engagement in
Local Development Planning’ (May 2023) and is based on the following levels of engagement: inform; consult; involve; collaborate;
and empower.
Local Development Plan
Preparation Stage
Activity Timescale Engagement Activity
Evidence
Gathering
Early
engagement
and data
collection
Publication of Draft
Development Plan
Scheme and
Participation Statement
September>
November 2023
Inform participants (existing and potential of the
publication of the Draft Development Plan Scheme
Participation Statement and involve people and
organisations by seeking and having regard to their
views on the document. 
Publish document on the Council website and make
copies of the document available in the Council
headquarters and libraries. Include survey questions
within document seeking views on format of document
and participation techniques. 
Publish survey/form to allow people and organisations
to register their interest in the Local Development Plan
process. 
Meet with Community Councils and other community
organisations to encourage participation in the Local
Development Plan process and comments on the Draft
Development Plan Scheme and Participation
Statement. Engage with local anchor organisations to fill
gaps where there are no community councils or other
community organisations currently running. 
Engage with youth organisations and representatives
Page 108

Page 109

Local Development Plan
Preparation Stage
Activity Timescale Engagement Activity
on the best way to engage children and young people in
the Local Development Plan process 
Engage with disability and carers community groups on
the best ways to enable participation 
Engage Gypsies and Travellers groups on best ways to
enable participation 
Contact known community groups/organisations
(including those of protected characteristics) and West
Dunbartonshire CVS to invite expression of interest in
taking part in plan preparation, and for views on how to
engage 
Inform other Council services and Key Agencies of the
proposed Local Development Plan timeline.
Issue invite to
participate in Local
Development Plan
process
September 2023 Inform participants in previous Local Development Plan
process of new process and encourage registration and
participation. Create online form to enable registration. 
Establish new Local Development Plan participant
database.
Invite communities to
prepare Local Place
Plans and support their
preparation
September 2023
(ongoing)
Inform community organisations that they are invited to
prepare a Local Place Plan, as means to involve
communities in the preparation of the Local
Development Plan. Empower communities to decide on
the content of their Local Place Plans. 
Page 109

Page 110

Local Development Plan
Preparation Stage
Activity Timescale Engagement Activity
Publish invitation to prepare Local Place Plans on the
Council website and social media. Place posters in
public buildings. Send direct invitation to groups who
may have an interest in preparing a Local Place Plan,
and promote through West Dunbartonshire CVS.
Advise community organisations of the type of Council
support that will be available to them to prepare Local
Place Plans.
Meet with Community Councils and other community
organisations to encourage preparation of Local Place
Plans.
Publication of finalised
Development Plan
Scheme and
Participation Statement
December 2023 Inform of publication through website, social media,
and direct communication with registered participants.
Publish document on the Council website and make
copies of the document available in the Council
headquarters and libraries.
Preparation of
Evidence Report
September
2023>November
2024
Involve participants in the creation of the Evidence
Report. Inform participants on how their views were
sought and taken into account
Incorporate results of previous engagement exercises
where relevant (e.g. Citizens Panel responses)
Undertake Place Standard Consultation to assess place
quality and collect ideas for improvement. Distribute to
general public online through website and social media.
Distribute to citizens panel 
Page 110

Page 111

Local Development Plan
Preparation Stage
Activity Timescale Engagement Activity
Engage with children and young people through
schools, Youth Council, Youth Parliament, and other
young people's organisations. Use childrens/young
persons’ versions of Place Standard Tool.
Engage people with disabilities. Options include
establish disabled working group like with LDP2, and
undertaking events/workshops with BSL interpreters
available. 
Work with Key and Government Agencies, city-region
organisations, Health and Social Care Partnership, etc
to identify best available evidence.
Publication of Evidence
Report and submission
to Scottish Minister for
Gate Check
December 2024 Inform of publication of Evidence Report through
website, social media and direct communication with
registered participants.
Publish document on the Council website and make
copies of the document available in the Council
headquarters and libraries.
Gate Check December
2024> Spring
2025
The person appointed to undertake the Gate Check
may consult with certain stakeholders either in writing
or through a hearing.
Plan
Preparation
Proposed
Plan
Preparation of
Proposed Local
Development Plan and
Draft Delivery
Programme
January 2024>
December 2025
Involve and collaborate with participants in the
preparation of the Proposed Local Development Plan.
Undertake a ‘Call for Ideas’ consultation. Promote this
through an online survey, making use of mapping tools
if available, and face-to-face events with community
councils and other community groups. The ‘Call for
Page 111

Page 112

Local Development Plan
Preparation Stage
Activity Timescale Engagement Activity
Ideas’ will also provide land and property owners and
the development industry the opportunity to suggest
sites for development. 
Hold discussions with groups that have prepared or are
preparing Local Place Plans to consider how the
Proposed plan can deliver or reflect the content and
aspirations of Local Place Plans. 
Develop masterplans and site briefs with communities,
developers, landowners and key agencies and share
potential content of the Proposed Plan as it becomes
available allowing participants the chance to influence it
before it is formally published in the Proposed Plan. 
Identify potential areas of conflict and make use of
mediation if this is likely to help resolve or reduce
dispute between different parties. 
Liaise with organisations who will be identified for the
delivery of actions set out in the Draft Delivery
Programme.
Consultation Consultation on
Proposed Local
Development Plan and
Draft Delivery
Programme
January 2026>
March 2026
Inform participants of the publication of the Proposed
Local Development Plan and Draft Delivery Programme
and consult with them on its content. 
Publish notice in local newspaper and on Council
website informing that the Proposed Local Development
Plan and Draft Delivery Programme has been published 
Page 112

Page 113

Local Development Plan
Preparation Stage
Activity Timescale Engagement Activity
Publish documents on the Council website and make
copies of the document available in the Council
headquarters and libraries. 
Notify the owner, lessee or occupiers of sites and
neighbouring land that may be affected by development
proposals set out in the Plan. 
Meet with Community Councils and other community
organisations to encourage participation in the
Proposed Local Development Plan consultation
process.
Examination Preparation of
‘Summary of
Unresolved Issues’’
April 2026>
October 2026
Although there is no formal engagement at this stage of
the process, the Council may make use of mediation if
this is likely to help resolve or reduce dispute between
different parties.
Modify Proposed Local
Development Plan
following consultation
April 2026>
October 2026
Inform communities of modifications made in response
to representations made on the Proposed Plan.
Submission of
Proposed Local
Development Plan for
Examination
October 2026 Inform anyone who made representations on the
Proposed Plan about the upcoming Examination and
also advertise the Examination in a local newspaper, in
local public libraries, and on Council website and social
media.  
Examination October
2026>June
2027
The person appointed to undertake the Examination
may consult with stakeholders to seek further
information on a submitted representation. 
Page 113

Page 114

Local Development Plan
Preparation Stage
Activity Timescale Engagement Activity
The appointed person will publish the Examination
Report and notify anyone who made an unresolved
representation.
Delivery Adopted
Plan
Adopt the Local
Development Plan
September 2027 Inform participants of the adoption of the Local
Development Plan. 
Publish the adopted Local Development Plan on the
Council website and make copies available in local
public libraries. 
Notify participants, including those who made a
representation on the Proposed Local Development
Plan or Examination. 
Place an advertisement in a local newspaper stating
where the adopted Plan can be viewed.
Delivery
Programme
Publish the Delivery
Programme
December 2027 Inform participants of the publication of the Delivery
Programme. 
Publish the Delivery Programme on the Council website
and make copies available in local public libraries
Monitoring
and Delivery
Publish information on
monitoring and delivery
Ongoing Publish an updated Delivery Programme at least every
two years and make available on Council website and
local public libraries. 
Publish annual land use survey information on Council
website. 
Page 114

Page 115

Question 8 – is the above table helpful in setting out the Local Development Plan process and how we will engage at each
stage?
Impact assessments
The preparation of the Local Development Plan is to be supported and informed by a number of assessment documents. These
documents have engagement requirements, which are summarised in the table below which has been lifted from the consultation
draft Scottish Government guidance on Effective Community Engagement in Local Development Planning.
Assessment Level Engagement needs and timing
Strategic
Environmental
Assessment
Inform
Consult
Legal requirement for ‘early and effective’ public engagement. Engagement is focused on the
Environmental Report consultation, but earlier engagement is recommended.
A Post Adoption Statement is prepared, published and advertised to inform people about how the
assessment findings and comments received on the proposed plan and Environmental Report have
been taken into account.
Habitat
Regulations
Appraisal
Inform No requirement for public engagement. Report to be published at the proposed plan stage to inform
people of the appraisal.
Public Sector
Equality Duty
Assessment
Inform
Involve
The timing of the publication of the assessment could usefully be set out in the Development Plan
Scheme.
Proportionate involvement is needed throughout the process, from the early preparation stage to its
delivery.
The planning authority should publish the assessment findings on their website to inform
stakeholders about it.
Legally the results should be published within a reasonable period, and guidance suggests this
should be as soon as possible after the decision to implement (adopt) the policy is taken.
Fairer
Scotland Duty
Assessment
Inform
Involve
It is important to involve relevant communities through the stages of assessment.
The assessment should be published to inform people about how socio-economic disadvantage is
being considered.
Page 115

Page 116

Child Rights
and Wellbeing
Impact
Assessment
Inform
Consult
Involve
Opportunities to involve people may arise at both the evidence gathering and proposed plan stages. 
The assessment requires an explanation of consultation with stakeholders - including children and
young people. 
Publication informs people of the outcome of the
assessment. 
Contact and follow us
The Development Planning and Place team can be contacted:
By e-mail at lsp@west-dunbarton.gov.uk
By telephone on 07990 426481
In writing to Development Planning & Place team, Planning & Building Standards, 16 Church Street, Dumbarton, G82 1QL
You can follow us on Twitter/X - @wdcplanning
Please register your interest in the Local Development Plan process at <Achieve Form link to be inserted>  
Page 116

Page 117

Appendix 1 – Planning Guidance and other useful information
LDP2 Planning Guidance
▪ Antonine Wall, 2022
▪ Clydebank Business Park Planning Guidance, 2023
(Draft)
▪ Creating Places, 2022
▪ Green Network & Green Infrastructure, 2022
Other Planning Guidance
▪ Clydebank Town Centre Development Framework, 2021
▪ Commuted Payments for Parking 2015
▪ Dumbarton Waterfront Path Planning Guidance, 2017
▪ Pay Day Lending & Betting Shops, 2016
▪ Renewable Energy, 2016
▪ Queens Quay Design Codes, 2020.
Developer Contributions
▪ Procedure for monitoring, requesting and allocating
developer contributions (2022)
▪ Allocation of green network developer contributions
(2022)
Other Useful Information
▪ Alexandria Streetscape Design Guide, 2007
▪ Alexandria Town Centre Masterplan, 2008
▪ Alexandria Town Centre Masterplan, 2021
▪ Balloch Charrette Report, 2016
▪ Bowling Basin Charrette Report 2014
▪ Clyde Riverside Masterplan, 2000
▪ Clydebank Design Guidelines (Page and Park), 2003
▪ Clydebank Town Centre Charrette report, 2015
▪ Dumbarton Town Centre Public Realm Design Guide,
2001
▪ Dumbarton Town Centre & Waterfront – Revised Urban
Strategy, 2014
▪ Dumbarton Rock & Castle Charrette Report, 2015
▪ Kilpatrick Hills Local Landscape Area: Statement of
Importance, 2015
Page 117

Page 118

AssessmentNo 774 Owner alan.williamson
Resource
Regeneration,
Environment
and Growth
Service/Establishment Regeneration
First Name Surname Job title
Head Officer Alan Williamson Development Planning &Place Team Leader
(include job titles/organisation)
Members Cameron Clow, Pamela Clifford
(Please note: the word 'policy' is used as shorthand for stategy policy function
or financial decision)
Policy Title Development Plan Scheme and Participation Statement
The aim, objective,purpose and intended out come of policy
This document sets out the timeline for the preparation of a new Local
Development Plan and how the Council will encourage particpation.
Service/Partners/Stakeholders/service users involved in the development
and/or implementation of policy.
Communities Team Performance and Strategy Team
Does the proposals involve the procurement of any goods or
services? Yes
If yes please confirm that you have contacted our procurement
services to discuss your requirements. No
SCREENING
You must indicate if there is any relevance to the four areas
Duty to eliminate discrimination (E), advance equal
opportunities (A) or foster good relations (F) Yes
Relevance to Human Rights (HR) Yes
Relevance to Health Impacts (H) Yes
Relevance to Social Economic Impacts (SE) Yes
Who will be affected by this policy?
Communities, businesses and organisations operating within West Dunbartonshire. People who
work in and visit West Dunbartonshire. Property owners and developers.
Who will be/has been involved in the consultation process?
Residents of West Dunbartonshire and businesses and organisations active or with an interest in
West Dunbartonshire.
Please outline any particular need/barriers which equality groups may have in relation to
this policy list evidence you are using to support this and whether there is any negative
impact on particular groups.
Needs Evidence Impact
Age
Young people should
be engaged in the
Local Development
Plan process. The
needs of older
people and their
carers should be
addressed by the
Planning is
concerned with the
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
There is a statutory
requirement for
young people and
children to be
engaged in the Local
Development Plan
process, and for a
statement to be
ITEM 7 - APPENDIX 2
Page 118

Page 119

Local Development
Plan.
account how people
use places
differently, for
example depending
on age and degree of
personal mobility.
prepared setting out
the steps taken, and
how views have
been taken into
account. The
Participation
Statement highlights
the requirement to
engage with children
and young people
and seeks views on
how to do this.
Consultation on the
associated Play
Sufficiency
Assessment will be
particularly relevant
for children and
young people. The
needs of older
people, including for
housing, will be
consulted on as part
of the Local
Development Plan
process.
Cross Cutting
Disability
Disabled people and
their carers should
be engaged in the
Local Development
Plan process.
Planning is
concerned with the
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on the degree of
personal mobility
and how places can
affect people's
health and
wellbeing. Though
planning may have
focussed on issues
around barriers to
mobility, it should
also include
consideration of
people with mental
health needs and
There is a statutory
requirement for
disabled people to
be engaged in the
Local Development
Plan process, and for
a statement to be
prepared setting out
the steps taken, and
how views have
been taken into
account.
Page 119

Page 120

those living with
dementia.
Social & Economic
Impact
People from
disadvantaged
communities should
be able to
participate in the
Local Development
Plan process.
There is a spatial
element to socio
economic
deprivation and
development. For
example more
deprived people are
more likely to live
near vacant or
derelict land than
less deprived people.
The consultation will
target residents and
resident groups in
disadvantaged areas.
Sex
People of different
sex should be able to
participate in the
Local Development
Plan process
Planning is
concerned with
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on their sex.
Organisations such
as The World Bank
have noted in
general, ‘cities work
better for
heterosexual, able-
bodied, cisgender
men than they do for
women, girls, sexual
and gender
minorities, and
people with
disabilities’.
Consultation will be
monitored to ensure
that it is being
directed
Gender Reassign
Transgender people
should be able to
participate in the
Local Development
Plan process
Transgender people
may not feel
comfortable
attending
consultation events.
Consultation events
should be
welcoming for all
and online
consultation will be
available.
Health
People in poor
health should be
able to engage in the
Local Development
Plan process
Health and
wellbeing is
significantly
impacted by where
people live by, for
example, access to
services, greens
space and air
Groups representing
people in ill health
and carers will be
contacted as part of
the consultation
process.
Page 120

Page 121

quality. This cross
cuts with social and
economic issues as
more deprived
communities have
worse health
outcomes
Human Rights
In line with the UN
Convention on
Rights of the Child
children and young
people should be
able to participate in
the Local
Development Plan
Process. The human
rights act gives
people the right to
freedom of
expression, freedom
from discrimination,
and freedom to
enjoy property.
Article 8 also
protects
participation
Children and young
people tend to be an
under represented
group in
consultation and
engagement.
Scottish
governments impact
assessment on NPF4
noted that
opportunities to
participate in the
planning system will
help to uphold
human rights.
In line with
statutory duties in
relation to
engagement with
Children and Young
people, the
participation
statement sets out
how we will engage
with these groups. In
line with the
statutory duty to
engage with the
public at large and
certain under
represented groups
we will enable
people to express
their views on the
preparation of the
development plan.
Marriage & Civil
Partnership
Pregnancy &
Maternity
Pregnant women
and the parents of
very young children
should be able to
participate in the
Local Development
Plan process
There is
considerable
evidence of
beneficial effects of
access to green
space for the health
of pregnant women.
Specifically, studies
in Europe showed
positive associations
between access to
nearby green space
and both reduced
blood pressure and
reduced depression
in pregnant women,
with a stronger
effect for reduced
depression in
disadvantaged
groups. Research
also shows that
access to green
Pregnancy and
maternity will not be
monitored as part of
equality monitoring,
so relevant groups
can be targetted
during consultation,
for example pre and
post natal groups
and health workers.
Page 121

Page 122

space in close
proximity to the
homes of pregnant
women was
positively associated
with birth weight.
Birth weight is a
useful indicator of
health in early life:
low birth weight is
one of the major
predictors of
neonatal and infant
mortality, as well as
long-term adverse
effects in childhood
and beyond. Recent
studies also found a
positive association
between residential
greenness measured
and birth weight.
Race
People of all races
should be able to
participate in the
Local Development
Plan process.
People who do not
have English as a
first language may
not be aware of the
Local Development
Plan process or
understand its
significance for the
area. They may
struggle to submit
consultation
responses. Gypsy
and Traveller groups
have
There is a statutory
requirement for
Gypsy and Traveller
groups to be
engaged in the Local
Development Plan
process, and for a
statement to be
prepared setting out
the steps taken, and
how views have
been taken into
account.
Religion and Belief
People of different
religions and beliefs
should be able to
participate in the
Local development
Plan process and
have their views
taken into account.
Local groups will be
contacted as part of
the consultation
process.
The wide approach
and proactive
support should
support
participation.
Sexual Orientation
People of all sexual
orientation should
be able to
participate in the
Local Development
Plan process
It has been
suggested that there
is a spatial
dimension to where
the LGBT
community lives in
Scotland, with a
focus of the
community in large
If there is a small
LGBT population
within West
Dunbartonshire, this
could impact on
hearing voices from
that community.
Consultation will be
monitored to
Page 122

Page 123

urban areas. This
has, for example,
potential
implications for
effective
engagement with the
community.
attempt to ensure
particpation from
that community is
achieved.
Actions
Policy has a negative impact on an equality group,but is still to be implemented, please
provide justification for this.
Will the impact of the policy be monitored and reported on an ongoing bases?
Yes, equalities information of all LDP participants will be monitored. Where gaps exist, action will
be taken to address them.
Q7 What is you recommendation for this policy?
Intoduce
Please provide a meaningful summary of how you have reached the recommendation
EIA 774: The council will be proactive in engaging with under represented groups in preparing the
local development plan. This will include seeking views on the draft Participation Statement itself to
better understand how to engage with these groups.
Page 123

Page 124

Page 124

Page 125

WEST DUNBARTONSHIRE COUNCIL
Report by the Planning, Building Standards and Environmental Health
Manager 
Planning Committee: 20th September 2023
___________________________________________________________________
Subject: Local Place Plans
1. Purpose
1.1 The purpose of this report is to seek approval of an approach to Local Place
Plans which will deliver new duties arising from the Planning (Scotland) Act
2019.
2. Recommendation
2.1 That the Committee agrees the approach to Local Place Plans as set out in
this report and gives authority to officers to issue the invitation to prepare
Local Place Plans to communities.
2.2  That the Committee notes that officers will submit a burden item for members
consideration in setting the 2024-25 budget for the preparation of Local Place
Plans.
3. Background
3.1 The Planning (Scotland) Act 2019 give new powers to communities to prepare
Local Place Plans for their area, as well as placing associated duties on
Planning Authorities. Local Place Plans are community led plans which set
out proposals for the development and use of land. A Local Place Plan, must
be prepared by a Community Council or another Community Controlled Body,
as defined by the Community Empowerment Act.
3.2 The Town and Country Planning (Local Place Plans) (Scotland) Regulations
2021 set out the requirements which communities must fulfil when preparing a
Local Place Plan. This includes matters to which a community body must
have regard; the form and content of a Local Place Plan; steps required to be
taken before submission of a Local Place Plan; and information to be
submitted with a Local Place Plan.
3.3 The following duties arise for the Council; to invite this form of participation; to
maintain a register of Local Place Plans; and take account of Local Place
Plans when preparing Local Development Plans. This report sets out how the
Council will meet these duties and the support that the Council will give to
communities to better enable them to fulfil the requirements for preparing a
Local Place Plan.
4. Main Issues
ITEM 8
Page 125

Page 126

Invitation to Prepare Local Place Plans
4.1 The Council is required to issue an invitation to prepare Local Place Plans. In
line with Scottish Government’s guidance a stand-alone invitation to prepare a
Local Place Plan will be placed on the Council website, email, public notice
and social media will be used to inform community bodies of the invitation.
The invitation will set out the link to the Local Development Plan preparation
process, and timeframes which are set out within the Development Plan
Scheme and Participation Statement which are also being considered at the
September Planning Committee. The invitation will also set out what
assistance is available to groups which wish to prepare a Local Place Plan.
4.2 Community groups are likely to require more than one year to prepare a Local
Place Plan. It is noted that community groups are required to define the area
covered by their Local Place Plan and indicate this on a map. It is not required
that this follow any predefined area, such as a Community Council boundary,
and it is possible for different groups to prepare separate Local Place Plans
covering the same area. In these circumstances, the Council would
encourage groups to work together to prepare a single plan.
4.3 It is not known how many community groups will want to prepare a Local
Place Plan, although some have already expressed an interest. The invitation
would request that community groups get in touch with Planning Services if
they are considering to start the process, so as to gauge the level of interest.
4.4 The Council will commission consultants to prepare a “how to guide”, graphics
and template to support the plan making process. The consultants will work
with groups interested in preparing a Local Place Plan to ensure that the “how
to guide” meets their needs. In addition, the following assistance would be
offered to all community groups by the Council:
• Provision of mapping or access to facilities with which to prepare maps.
• Key Documents would be provided on the Local Place Plan pages of the
Council website, and any group which comes forward would be provided
with those which are required to be considered to meet the legislative
requirements.
• A start up meeting would be offered to any group coming forward to talk
though the legislative requirements, explain the support that is on offer
and discuss any further requirements.
• When the community group has a draft plan, the planning service would
coordinate responses on the draft Local Place Plan from relevant Council
services.
Page 126

Page 127

• Pre-validation check would be offered to give communities an opportunity
to undertake any outstanding processes which would be required to
ensure a Local Place Plan is valid prior to formal submission.
4.5 The Council may be able to offer other assistance to groups, however due to
resource implications, and dependent on the level of interest, these may not
be able to be provided to every group. Interested groups will be asked to
submit an expression of interest for further support within the invitation. The
following would be outlined within the invitation as additional supports which
we may be able to offer.
• Start-up funding (The Draft ‘How to’ Guide indicates that there are
essential expenses of between £500 and £1000 which will arise in the
preparation of a Local Place Plan).
• Support to form a “community-controlled body” as defined by the
Community Empowerment Act.
• Printed mapping and materials
• Subscriptions to Online platforms such as Placebuilder and Community
Map Scotland.
• Training in for example facilitation, engagement or the Place Standard.
• Assistance to apply for funding opportunities for professional/consultancy
support
Validation
4.6 The Council, as Planning Authority, is required to validate Local Place Plans
which meet paragraphs 1(4) and 2(1) of Schedule 19 of the Planning
(Scotland) Act.
4.7 Validation of submitted Local Place Plans will be undertaken by officers in the
Development Planning and Place team of Planning Services. The validation
only considers the requirements of legislation and is not based on the content
of the Local Place Plans. Officers would submit recommendations in relation
validation of a Local Place Plan to Planning Committee for approval.
4.8 An explanation is required to be provided to groups when a Local Place Plan
is not considered valid. Officers would aim to support communities to meet the
requirements for validation before recommending that a Local Place Plan is
not valid to the Planning Committee.
4.9 The planning service will share draft Local Place Plans for consultation with
relevant services prior to submission for validation. Where a validated Local
Place Plan includes proposals which relate to other Council services the
validated Local Place Plan will be shared with the relevant service for their
consideration. 
Page 127

Page 128

Register of Local Place Plans
4.10 The Planning Authority will maintain a register of valid Local Place Plans,
which will be available to view by the public in person and on a website
maintained for that purpose. It is anticipated that this will follow the form of
other planning registers and be hosted on the Council website and
Geographical Information System (GIS). This would include the map showing
the land to which Local Place Plans relate as well as copies of Local Place
Plans and accompanying documents, including the validation report. 
Preparation of Local Development Plan
4.11 The Council is also required to take into account any registered Local Place
Plans when preparing the Local Development Plan. The Development Plan
Scheme, Participation Statement, and invitation to prepare Local Place Plans
set out the timescales in which will allow sufficient time for Local Place Plans
to be prepared, validated, and considered before the Proposed Local
Development Plan is published. It is anticipated that Local Place Plans can
take up to 1 year to produce.
4.12 Members of the Development Planning and Place team will provide a
response to valid Local Place Plans, setting out how the Local Place Plan has
been considered when preparing the Local Development Plan. Where the
Local Place Plan has been submitted during an early stage of the Local
Development Plan preparation this will be provided as a background report to
the Proposed Local Development Plan. Local Place Plans which are validated
after Proposed Local Development Plan publication would be responded to as
part of the Local Development Plan Examination process.
5. People Implications
5.1 It is difficult (at this time) to quantify the Council resources required to support
a successful Local Place Plan programme. It is for communities to decide if
they want to do one, the timing of it, and the geography and content of it. The
plans are to be community-led, but different communities are likely to require
different levels of support from the Council. Beyond the invitation and
validation of Local Place Plans, there is likely to be a call on the time of staff
within the Planning and Communities teams to support the development of
Local Place Plans. It is anticipated that this new requirement of the Planning
(Scotland) Act 2019 is likely to place additional resource requirements on both
the Planning and Communities teams. 
5.2 It is anticipated that Local Place Plans will include proposals which go beyond
the definition of development and would not be considered within the Local
Development Plan. These will be passed to the relevant services for
consideration. 
6. Financial and Procurement Implications
Page 128

Page 129

6.1 It is considered that consultancy support would be beneficial in encouraging
the preparation of Local Place Plans, particularly through ensuring they are
communicated and consulted on as effectively as possible, and presented in a
manner that is likely to be understood by the communities they cover and able
to effectively influence the future development of the area (and potentially the
services that affect it). 
6.2 As detailed above it is difficult to determine how many communities will come
forward to prepare Local Place Plans and to determine the support they will
require. However once invitations are issued it will be clearer the interest from
community groups and the likely costs. Officers will submit a proposal as a
burden item for Members consideration in setting the 2024/25 budget. In the
meantime, the commissioning of consultants to prepare a “how to guide”,
graphics and template to support the plan making process will be met within
the existing Planning and Building Standards budget. 
7. Risk Analysis
7.1 Failure to meet the duties arising from the Planning (Scotland) Act 2019
places the Council at risk of legal challenge.
7.2 The Council is required to consider validated Local Place Plans in preparing
the next Local Development Plan. It would be preferable for community
prepared Local Place Plans to be validated in time for them to be reflected in
the Proposed Plan, but as the timing of these are to be decided by
communities there is no guarantee of this.
8. Equalities Impact Assessment (EIA)
8.1 Equalities Impact Assessment 778 is attached as Appendix 1 to this report.
The EqIA sets out a recommendation to introduce the policy within the
following summary: We will pro-actively engage with groups which are under-
represented in the Local Development Plan preparation process. Potential
impacts are detailed in the EIA in terms of equality and human rights as they
relate to participation.
9. Environmental Sustainability
9.1 The Local Development Plan and any proposals arising from Local Place
Plans will be subject to a strategic environmental assessment.
10. Consultation
10.1 Issuing the invitation to prepare Local Place Plans is a key consultation stage
of preparing the next Local Development Plan.  The Development Plan
Scheme and Participation Statement will be consulted on for a period of 8
weeks if approved.
Page 129

Page 130

10.2 The views of the Communities team has been sought during the preparation
of this report.
11. Strategic Assessment
11.1 Local Place Plans are considered to be relevant to, and will help
deliver, all of the Council’s strategic priorities:
• Our Communities – Resilient and Thriving
• Our Environment – A Greener Future
• Our Economy – Strong and Flourishing
• Our Council – Inclusive and Adaptable
Pamela Clifford 
Planning, Building Standards and Environmental Health Manager
Date: 20th September 2023
___________________________________________________________________
Person to Contact:
Appendices:
Background Papers:
Pamela Clifford, Planning, Building Standards and
Environmental Health Manager, 
pamela.clifford@west-dunbarton.gov.uk
Alan Williamson, Development Planning & Place Team
Leader
alan.williamson@west-dunbarton.gov.uk
Appendix 1 - Equalities Impact Assessment 778
Planning (Scotland) Act 2019
https://www.legislation.gov.uk/asp/2019/13/section/14/en
acted
Town and Country Planning (Local Place Plans)
(Scotland) Regulations 2021
https://www.legislation.gov.uk/ssi/2021/353/introduction/
made
Circular 1/2022: Local Place Plans
https://www.gov.scot/binaries/content/documents/govsco
t/publications/advice-and-guidance/2022/01/circular-1-
2022-local-place-plans/documents/circular-1-2022-local-
place-plans/circular-1-2022-local-place-
plans/govscot%3Adocument/circular-1-2022-local-place-
plans.pdf
Page 130

Page 131

Wards Affected: All
Page 131

Page 132

AssessmentNo 778 Owner mspurway
Resource
Regeneration,
Environment
and Growth
Service/Establishment Regeneration
First Name Surname Job title
Head Officer Matthew Spurway Development Planning &Place Officer
(include job titles/organisation)
Members Cameron Clow, Pamela Clifford
(Please note: the word 'policy' is used as shorthand for stategy policy
function or financial decision)
Policy Title Local Place Plans
The aim, objective,purpose and intended out come of policy
The purpose of this report is to seek approval of an approach to Local
Place Plans which will deliver new duties arising from the Planning
(Scotland) Act 2019, which amended the Town and Country Planning
(Scotland) Act 1997. Local Place Plans offer the opportunity for a
community led, but collaborative, approach to influencing the
preparation of the Local Development Plan. The approach in this report
sets out how the Council will deliver its duties in relation to this
legislation and the support that will be offered to communities wishing
to prepare local place plans.
Service/Partners/Stakeholders/service users involved in the
development and/or implementation of policy.
Communities Team
Does the proposals involve the procurement of any goods or
services? Yes
If yes please confirm that you have contacted our
procurement services to discuss your requirements. No
SCREENING
You must indicate if there is any relevance to the four areas
Duty to eliminate discrimination (E), advance equal
opportunities (A) or foster good relations (F) Yes
Relevance to Human Rights (HR) Yes
Relevance to Health Impacts (H) Yes
Relevance to Social Economic Impacts (SE) Yes
Who will be affected by this policy?
Communities and organisations operating within West Dunbartonshire. People who
work in and visit West Dunbartonshire. Property owners and developers.
Who will be/has been involved in the consultation process?
Local Place Plans must be prepared by a community council or a community controlled
body as defined by the community empowerment act. The community body is required
to include a statement of the level and nature of support for the Local Place Plan as well
as the basis on which the community body has reached that view. The consultation
requirements for community bodies are not otherwise prescriptive in nature. The
support set out in this policy and guidance it proposes to prepare will seek to encourage
community bodies to ensure participation and the proposals that they bring forward
represent a wide range of the community.
ITEM 8 - APPENDIX 1
Page 132

Page 133

Please outline any particular need/barriers which equality groups may have in
relation to this policy list evidence you are using to support this and whether
there is any negative impact on particular groups.
 
Needs Evidence Impact
Age
Planning is
concerned with the
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on age and degree of
personal mobility.
Scottish Councillors
2017-22
(Improvement
Service, 2018)
shows the age
breakdown of
councillors who
responded to the
Improvement
Service survey. The
majority (60.1%)
were aged between
50 and 69 years old,
whereas only 17%
were aged below 40.
The average age of
councillors who
responded to the
survey was 53 years
old. A Fairer
Scotland for Older
People: framework
for action (Scottish
Government, 2019)
tells us that older
people want action
to ensure they have
access to
opportunities to
remain actively
engaged with, and
involved in, their
communities. The
Scottish Household
Survey: Annual
Report 2019
(Scottish
Government, 2020)
notes that nearly 9
in 10 adults (88 per
cent) in Scotland use
the internet either
for work or personal
use, a steady
increase over time
from 65 per cent in
2007. Notably, there
has been a
significant increase
The evidence would
suggest that
consideration is
made of putting
provisions in place
which encourage
engagement with
older people and
that their
aspirations relating
to the development
and use of land are
expressed through
the proposals that
are contained in the
LPP. It should be
recognised that
there should be a
range of engagement
practices which
reflect older people's
disproportionate use
of the internet.
Evidence would also
suggest that there
may be barriers to
children and young
people’s
engagement. This
highlights the need
for suportive
guidance which
provides the scope
for community
bodies to seek the
views of children
and young people
and reflect these
views in their
proposals on the
development and
use of land.
Page 133

Page 134

in internet use
amongst older adults
aged 60+ (from 29
per cent to 66 per
cent). There are
lower rates of
internet use among
older adults than
among younger
adults. In 2019,
almost all (99 per
cent) adults aged 16-
24 reported using
the internet
compared to 43 per
cent of those aged
75+. The equivalent
report published in
2019 noted that
almost nine in 10
adults (87 per cent)
aged 75 and above
said they felt a very
strong or fairly
strong sense of
belonging to their
community,
compared to just
over seven in ten (73
per cent) of those
aged between 16
and 24. Evidence
relating to the age
characteristic relates
primarily to older
people's aspirations
to remain active in
their communities.
There is additionally
evidence around
older people's
disproportionate use
of the internet. The
Planning Places
Survey Report
(Scottish
Government 2017)
concluded that the
majority of young
people felt they
should be involved
in planning in their
local area and that
Page 134

Page 135

their local councils
should look at ways
to support children
and young people to
do this. A specific
question was asked
about whether LPPs
would be a good
thing. 104 young
people answered
this question with
88% of young
people saying yes,
that ‘LPPs’ would be
a good thing. When
asked what would
help you get
involved in
preparing one of
these plans, there
were 76 answers to
this question. Many
of the responses
mentioned that if
there were local
community meetings
where they were
provided with lots of
information this
would help them to
get involved. Also, if
they knew that their
opinions would be
taken seriously and
listened to and not
just used to ‘tick a
box.’ Many also felt
that if the
opportunity to get
involved was linked
into their time at
school, this would
help.
Cross Cutting Need to take account
of intersectionality
People can and do
belong to multiple
groups. WD
Equalities Forum
(WDEF) brings
together multiple
groups. WDEF in the
past has contributed
to our Local Housing
Strategy, Local
Information to
WDEF is likely to
work well to raise
awareness. The
Council will seek to
use the use the
communicating
effectively guidance
when preparing and
publicising the
Page 135

Page 136

Transport Strategy,
Equality plans etc.
invitation as well as
the how to guide.
The consultants
preparing he how to
guide will be
required to follow
this guidance and
the council will
encourage its use
through the
guidance and
support that we are
offering to
communities.
Disability
As with the age
characteristic,
planning is
concerned with
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on the degree of
personal mobility
and how places can
affect people's
health and
wellbeing.
Census data from
2011 reports that
the proportion of
people in Scotland
with a long-term
activity-limiting
health problem or
disability was 20%.
A higher proportion
of women than men
were limited in their
day-to-day activities
by a long-term
health problem or
disability. The 2018
Improvement
Service Survey noted
that the proportion
of councillors who
had a physical or
mental health
condition or illness
lasting or expected
to last 12 months or
more was
comparable with the
Scottish population.
A Fairer Scotland for
Disabled People:
delivery plan (2016)
sets out active
participation as one
of its five ambitions -
disabled people can
participate as active
citizens in all aspects
of daily and public
life in Scotland.
Disabled people are
The evidence would
suggest that
consideration is
made of putting
provisions in place
which encourage
engagement with
disabled people and
that their
aspirations relating
to the development
and use of land are
expressed through
the proposals that
are contained in the
LPP. It should be
recognised that
there should be a
range of engagement
practices which
reflect disabled
people's
disproportionate use
of the internet.
Page 136

Page 137

keen to be involved
in shaping the places
that they stay, but
that there can be
barriers to that
engagement.
Supercharged: A
human catastrophe
(2020) prepared by
the Glasgow
Disability Alliance
calls for the lived
experience of
disabled people to
be embedded in
redesign of public
spaces and town
planning. It goes on
to state that through
inclusive digital and
offline engagement
and capacity
building, disabled
people’s aspirations
should be raised,
providing
opportunities to
fulfil their potential,
and strengthen
participation and
democracy. As
reported in the
National
Performance
Framework -
disability
perspective: analysis
(2021) disabled
people were slightly
less likely than non-
disabled people to
agree with the
statement 'I can
influence decisions
affecting my local
area' With regard to
the priorities for
disabled people, the
particular issue of
accessible housing
supply has been
raised, including
through calls for the
Page 137

Page 138

needs of groups such
as older and
disabled people to
be explicitly
considered at every
stage of the
development of
National Planning
Framework 4 and
the other policies
and strategies that
will sit alongside it.
Housing and other
issues were raised in
Inclusion Scotland's
Disabled People’s
Views of the Fairer
Scotland For
Disabled People
Delivery Plan
(2020). It set out
that almost half
(43%) of people said
the accessibility of
places had stayed
the same, around a
third (31%) said
they had got worse,
16% said they had
got better and 10%
said they were not
sure. The issues for
disabled people
were 1. There is not
enough accessible
housing and
disabled people are
still living in
unsuitable
accommodation
which does not meet
their needs. 2.
Transport is
inaccessible and
unreliable. Disabled
people are still
unable to use public
transport in a
consistent way. 3.
The built
environment is often
inaccessible and
initiatives like
Page 138

Page 139

‘shared spaces’ and
others which
promote active
travel have had
particular
detrimental impacts
on disabled people.
The Scottish
Household Survey:
Annual Report 2019
(2020) noted that
seventyone per cent
of adults who have
some form of
limiting long-term
physical or mental
health condition or
illness reported
using the internet,
lower than for those
who have some form
of non-limiting
condition or illness
(90 per cent) and
those who have
none (94 per cent).
The Royal Town
Planning Institute's
practice advice:
Mental Health and
Planning (2020)
notes four key
themes for places:
Green, Active, Pro-
social and Safe. The
Coronavirus (COVID-
19): health and
social impact
assessment (2020)
noted that digital
exclusion is also an
issue for people with
learning disabilities
as they may not have
access to or be able
to effectively access
online support and
services and connect
with friends and
family.
Social & Economic
Impact
Planning is
concerned with
creation of better
Evidence from
England's
experience with
The evidence would
suggest that the
invitation and
Page 139

Page 140

places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently,
regardless of their
social or economic
status
Nieghbourhood
plans, suggests that
more affluent
communities are
more likely to seek
to prepare local
place plans.
support offered
should seek to
ensure that all
communities are
given the
opportunity to
prepare local place
plans.
Sex
Planning is
concerned with
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on their sex.
The responses to the
Improvement
Service survey13 of
councilors (2018)
indicated a gender
imbalance among
councillors, with
65.7% describing
themselves as male,
compared with
32.6% female, and
1% ‘In another way’.
Research from
200424 would
suggest that women
were slightly more
likely than men to
become involved in
the planning
process. This was
focussed on
development
management. The
Scottish household
survey: Key Findings
report25 from 2020
outlined that over
three-quarters (78
per cent) of adults
felt a very or fairly
strong sense of
belonging to their
neighbourhood. It
also noted that older
people and women
were more likely to
report a strong
sense of belonging to
their
neighbourhood. The
First Minister’s
National Advisory
The evidence would
suggest that
consideration is
made of putting
provisions in place
which encourage
engagement and that
people's aspirations
relating to the
development and
use of land are
expressed through
the proposals that
are contained in the
LPP. It should be
recognised that
there should be a
range of engagement
practices which
reflect particular
barriers to
engagement which
are based on a
person's sex.
Page 140

Page 141

Council on Women
and Girls 2019
Report and
Recommendations2
6 (2020) noted that:
- Women have better
cultural
participation and
sense of community
belonging. Women
are somewhat more
likely than men to
say that they have a
very strong feeling
of belonging to their
community (38% vs
34%). - More women
(28%) than men
(25%) volunteer for
groups or
organisations. -
Women are much
less likely to feel safe
walking alone in
their neighbourhood
after dark (66% vs
89% of men). There
are examples of
where women's
stories are used to
illustrate how
people use their
neighbourhoods. For
example, Margaret's
Journey in Glasgow
City Council's
Liveable
Neighbourhoods27
document (2021).
The Royal Town
Planning Institute's
Women in Planning
(Part II)28 (2021)
provides a narrative
around the impact of
the planning
profession on the
day-to-day lives of
women. Many of the
study respondents
appeared to agree
that inequalities
associated with
Page 141

Page 142

women’s movement
through, and
enjoyment of, the
built environment
stem from society’s
car dependency.
With the design of
cities principally
focused around
creating and
improving road
infrastructure for
the private motor
vehicle, this not only
presents problems
for the walkability
and safety of
neighbourhoods, but
also for women’s
access to
employment and
educational
opportunities with
implications on
career advancement
Study respondents
also reported safety
concerns with
respect to public
transport, lack of
public surveillance
in town centres, and
inadequate street
lighting that make
the built
environment
awkward for
women. In addition
to safety concerns,
lack of locally
accessible
employment
opportunities,
childcare facilities,
public transport
services, public toilet
facilities, as well as
inadequate
pedestrian
infrastructure were
frequently cited by
study respondents
as significant
Page 142

Page 143

barriers to women’s
access to equal
opportunities in the
built environment.
This was particularly
the case for those
with caring
responsibilities.
Gender Reassign
Planning is
concerned with
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on their Gender or
Reassignment.
Limited evidence,
but under-
representation is
considered a
possibility.
We will encourage
an inclusive
approach to
engaging with all
groups through the
guidance and
support that we
offer to
communities.
Health
As with the age
characteristic,
planning is
concerned with
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on the degree of
personal mobility
and how places can
affect people's
health and
wellbeing.
Census data from
2011 reports that
the proportion of
people in Scotland
with a long-term
activity-limiting
health problem or
disability was 20%.
A higher proportion
of women than men
were limited in their
day-to-day activities
by a long-term
health problem or
disability. The 2018
Improvement
Service Survey noted
that the proportion
of councillors who
had a physical or
mental health
condition or illness
lasting or expected
to last 12 months or
more was
comparable with the
Scottish population.
The Scottish
Household Survey:
Annual Report 2019
(2020) noted that
The evidence would
suggest that
consideration is
made of putting
provisions in place
which encourage
engagement with
disabled people and
that their
aspirations relating
to the development
and use of land are
expressed through
the proposals that
are contained in the
LPP. It should be
recognised that
there should be a
range of engagement
practices which
reflect people with
limiting long-term
physical or mental
health condition or
illness's
disproportionate use
of the internet.
Page 143

Page 144

seventyone per cent
of adults who have
some form of
limiting long-term
physical or mental
health condition or
illness reported
using the internet,
lower than for those
who have some form
of non-limiting
condition or illness
(90 per cent) and
those who have
none (94 per cent).
The Royal Town
Planning Institute's
practice advice:
Mental Health and
Planning (2020)
notes four key
themes for places:
Green, Active, Pro-
social and Safe.
Human Rights
Using the
perspective of the
UNCRC is good
practice to help
include Children and
Young People.
Article 8 ECHR This
includes a right to
participate in
essential economic,
social, cultural and
leisure activities. In
some circumstances,
public authorities
may need to help
you enjoy your right
to a private life,
including your
ability to participate
in society.
Our approach will be
informed by Human
Rights
considerations
noted.
In Council
communications in
relation to Local
Place Plans, such as
the invitation and
"how to guide" we
will commit to
ensuring that the
requirements of
UNCRC and support
good practice in this
regard through
guidance.
Marriage & Civil
Partnership
Pregnancy &
Maternity
Planning is
concerned with
creation of better
places. This requires
development that
can accommodate
future changes of
There is limited
evidence in this
regard, but it is
considered likely
that maternity
and/or pregnancy
may impact on
We will encourage
an inclusive
approach to
engaging with all
groups through the
guidance and
support that we
Page 144

Page 145

use, taking into
account how people
use places
differently, for
example depending
on whether they are
pregnant or their
maternity status.
peoples ability to
participate in some
engagement
processes.
offer to
communities.
Race
Evidence below
relating to the race
characteristic relates
primarily to people's
aspirations to
maintain active
engagement in their
communities. It also
notes that there is a
spatial dimension to
where people live in
Scotland.
Data from the 2011
Census would
suggest that around
four per cent of
people in Scotland
were from minority
ethnic groups - an
increase of two
percentage points
since 2001. Council
areas with large
cities had the
highest proportion
of their population
from a minority
ethnic group: 12 per
cent in Glasgow City,
8 per cent in City of
Edinburgh and
Aberdeen City and 6
per cent in Dundee
City. In addition,
0.8% of the
population in rural
areas were from an
ethnic minority
background. Census
data also shows that,
with regard to the
Gypsy / Traveler
community there are
spatial variations
across Scotland. Just
over 4,000 people in
Scotland identified
in the 2011 census
that their ethnic
group was ‘White:
Gypsy/Traveller’
and this represented
0.1 per cent of the
population.
However, it has been
suggested that this is
likely to
The evidence would
suggest that
consideration is
made of putting
provisions in place
which encourage
engagement and that
people's aspirations
relating to the
development and
use of land are
expressed through
the proposals that
are contained in the
LPP. It should be
recognised that
there should be a
range of engagement
practices which
reflect particular
barriers to
engagement which
are based on a
person's race. The
range of such
practices will
depend on local
circumstances.
Page 145

Page 146

underestimate the
Gypsy/Traveller
population due to a
range of issues such
as reluctance of
individuals to
identify as
Gypsy/Traveller and
challenges accessing
the population living
on sites and by the
roadside. The
highest proportion
of the community
reside in the Perth
and Kinross Council
area. Much of the
evidence around the
aspirations of
Gypsy/Travellers
has related to the
voices of
Gypsy/Traveller
children being
engaged in decision-
making. We also
know that many
Gypsy/Travellers
prefer to live on
private sites, which
can help support
their independence,
self-sufficiency and
security. But they
have often found it
difficult to access the
planning system and
get the appropriate
permission to
develop their own
sites. Making
provision for the
development of
private sites can
help
Gypsy/Travellers to
maintain their
traditional lifestyle.
White councillors
are over represented
in the 2018
Improvement
Service survey
Page 146

Page 147

(98%), compared
with 96% in the
Scottish population.
Planning Advice
Note 3/2010:
Community
Engagement
recognises that an
understanding is
needed about the
support particular
individuals or
groups require to
help them engage. It
notes that the needs
of minority groups
should be
accommodated
where possible,
including the
opportunity to
access information
in alternative
formats such as the
provision of
information in
alternative
languages.
Religion and Belief
It is considered that
there may be some
cross cutting impact
in relation to race or
ethnicity.
Planning Advice
Note 3/2010:
Community
Engagement
recognises that an
understanding is
needed about the
support particular
individuals or
groups require to
help them engage. It
notes that the needs
of minority groups
should be
accommodated
where possible,
including the
opportunity to
access information
in alternative
formats such as the
provision of
information in
alternative
languages.
We will encourage
an inclusive
approach to
engaging with all
groups through the
guidance and
support that we
offer to
communities.
Page 147

Page 148

Sexual Orientation
Planning is
concerned with
creation of better
places. This requires
development that
can accommodate
future changes of
use, taking into
account how people
use places
differently, for
example depending
on their sexual
orientation.
Data in Sexual
Orientation in
Scotland 2017:
summary of
evidence base29
would suggest that
there are in the
region of 2% of
people in Scotland
who identify as
LGBO (Lesbian, Gay,
Bisexual, Other).
Spatially, the above
summary of
evidence considered
that access to the
community may be
one reason why a
higher proportion of
LGBO people live in
urban areas.
Compared with the
Scottish population
the councillors who
responded to the
2018 Improvement
Service survey13
had more diverse
sexual orientations
(Scotland’s People
Annual Report:
Results from the
2016 Scottish
Household Survey).
5.6% of councillors
who responded
identify as
gay/lesbian and
1.5% identify as
bi/bisexual,
compared with 1.1%
and 0.4% of the
Scottish population.
As a whole,
Consultation on the
Modernisation of the
Planning System
with ‘seldom heard’
Groups30 (2009)
suggested that this
group had no special
needs or
requirements when
The evidence would
suggest that
consideration is
made of putting
provisions in place
which encourage
engagement and that
people's aspirations
relating to the
development and
use of land are
expressed through
the proposals that
are contained in the
LPP.
Page 148

Page 149

it came to planning
with their views
representative of the
general population.
However, more
recent research and
guidance including
in the World Bank’s
Handbook for
Gender-Inclusive
Urban Planning and
Design31 (2020)
suggests that our
understanding of the
needs of
marginalised groups
is developing.
Actions
Policy has a negative impact on an equality group,but is still to be implemented,
please provide justification for this.
Will the impact of the policy be monitored and reported on an ongoing bases?
Local Place Plans, prepared by communities must be accompanied by a statement in
relation to the consultation which has been undertaken by the community body. This
statement is one of the accompanying documents which must be recorded in the register
of local place plans. When preparing the Local Development Plan, the Council will
consider the extent to which a Local Place Plan is representative of local views, and seek
to ensure that a wide range of views are consulted on proposals.
Q7 What is you recommendation for this policy?
Intoduce
Please provide a meaningful summary of how you have reached the
recommendation
EIA 778: We will pro-actively engage with groups which are under-represented in the
Local Development Plan preparation process. Potential impacts are detailed in the EIA in
terms of equality and human rights as they relate to participation.
Page 149