Democracy Spraffa

Item 7 - Appendix 5

West Dunbartonshire Council · 16 April 2025
Back to Planning Committee — 16 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 Bar Lane
York
YO1 6JU
+44 (0)1904 629258 
27 Old Gloucester Street 
London
WC1N 3AX
+44 (0)207 419 5113 
admin@aahplanning.com
www.aahplanning.com 
Dear Energy Consents Unit,
WHITEHALL BATTERY ENERGY STORAGE SYSTEM (BESS) – CONSTRUCTION AND OPERATION OF A 560MW BESS
TOGETHER WITH ASSOCIATED INFRASTRUCTURE, SUBSTATION, SECURITY FENCING, CCTV, SECURITY
LIGHTING AND LANDSCAPING ON LAND NEAR COCHNO ROAD, EAST DUNBARTONSHIRE, G81 5QS. GRID
REFERENCE: X 251107, Y 673995
ECU REFERENCE: ECU00004982
We write with reference to our application under Section 36 of the Electricity Act 1989 for a 560MW BESS with
associated infrastructure on land near Cochno Road, East Dunbartonshire, G81 5QS.
We are aware that West Dunbartonshire Council (WDC) has been consulted as an adjoining authority and that
the authority has provided a formal response as part of this consultation process. WDC considered the proposal
at its meeting of the Planning Committee on 11 December 2024 and resolved to maintain its original objection
(albeit on reduced grounds). 
Having reviewed this further formal response we are of the opinion that only 3 matters form the basis of the
remaining objection which we address separately below.
Green Belt Location
We provide a document “Additional Supporting Statement” dated December 2024 which sets out the prevalent
planning policy context against which BESS development proposals in the Green Belt should be assessed; the
primary locational requirements of BESS development and analysis of the general area around the identified
Point of Connection (POC) substation. This clearly demonstrates that a) BESS development is “essential
infrastructure” for the purposes of applying Green Belt policy and b) no other sites within closer proximity to
the POV are available which are outwith the Green Belt. In this context, the site of the proposed development
is appropriate and fully justified. 
18 December 2024 
Energy Consents Unit
5 Atlantic Quay
150 Broomielaw
Glasgow
G2 8LU          
ITEM 7 - APPENDIX 5

Page 2

Ecology and Environmental Impact
We provide an updated PEA which addresses the concerns raised in relation to impacts outside the application
site. No further impacts have been identified and no additional mitigation is required. We would remind the ECU
that the application has already been the subject of a Screening Request and the development has not been
identified as EIA development. As such the application is not likely to lead to any significant environmental
effects. 
Post-Operational Treatment
WDC maintain an objection on the basis of the lack of detail on de-commissioning proposals when operations
cease on site. In relation to this item, it is common practice that this is dealt with via pre-commencement
planning condition, with detailed decommissioning information and bond to be agreed post-permission but
prior to commencement of development. This is the approach commonly taken by the Energy Consents Unit
(ECU) – see conditions 8 and 9 of the attached BESS decisions (Linwood and Stanely Water). It is clear from the
above that the ECU is happy for a bond and decommissioning details to be agreed post-permission but prior to
commencement of development. Such an approach should be adopted here. 
We assume that the ECU will reconsult WDC and East Dunbartonshire Council on the basis of this information. 
Yours sincerely, 
Rob Crolla B.A (Hons), DipTP, MTP, MRTPI
Development Director 
www.aahconsultants.co.uk 
Enc:  Additional Supporting Statement – December 2024 
Updated PEA 
Example decisions on decommissioning