Democracy Spraffa

Document Pack (Bookmarked) - Planning 16 04 25

West Dunbartonshire Council · 16 April 2025
Back to Planning Committee — 16 April 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda 
Planning Committee 
Date:  Wednesday, 16 April 2025
___________________________________________________________________ 
Time:  10.00 
___________________________________________________________________ 
Venue:  Civic Space, Council Offices, 16 Church Street, Dumbarton G82 1QL
___________________________________________________________________ 
Contact:    Nicola Moorcroft, Committee Officer
Nicola.moorcroft@west-dunbarton.gov.uk  
Committee.admin@west-dunbarton.gov.uk   
Dear Member 
Please attend a meeting of the Planning Committee as detailed above.   
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive 
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Ian Dickson
Councillor David McBride
Councillor Fiona Hennebry
Provost Karen Murray Conaghan
Councillor Chris Pollock
Councillor Hazel Sorrell
Councillor Clare Steel
Councillor Sophie Traynor 
All other Councillors for information 
Date of Issue: 3 April 2025 
Page 2

Page 3

PLANNING COMMITTEE 
WEDNESDAY, 16 APRIL 2025 
AGENDA 
1 APOLOGIES 
2 DECLARATIONS OF INTEREST 
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations. 
3 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
4 MINUTES OF PREVIOUS MEETING         5 - 13 
Submit for approval, as a correct record, the Minutes of Meeting of the
Planning Committee held on 12 February 2025 
5 NOTE OF VISITATIONS                    15  
Submit, for information, a Note of Site Visitations carried out on 10 February
2025. 
6 PLANNING APPLICATION         17 - 33 
Submit report by the Chief Officer - Regulatory and Regeneration in respect of
the following Planning application:- 
DC24/171/FUL: Application under Section 42 of the Town and Country
Planning (Scotland) Act 1997 (as amended) in relation to variation of condition
16 and non-compliance with condition 24 of planning permission
DC23/217/FUL to remove delivery hours restrictions at Land to southeast of
Castle Street, Dumbarton by Aldi Stores Ltd.             
7/ 
Page 3

Page 4

7 WDC CONSULTATION RESPONSE TO SCOTTISH 
GOVERNMENT ENERGY CONSENTS UNIT ON SECTION 36
APPLICATION REF: ECU00004982 
35 - 123 
Submit report by the Chief Officer - Regulatory and Regeneration advising of
West Dunbartonshire Council’s Consultation response to Scottish
Government Energy Consents Unit on Section 36 application ref:
ECU00004982 - Construction and operation of a 560MW Battery Energy
Storage System with associated infrastructure, substation, security fencing,
CCTV, security lighting and landscaping on Land at Cochno Road, Bearsden,
East Dunbartonshire. 
Page 4

Page 5

PLANNING COMMITTEE 
At a Meeting of the Planning Committee held in the Civic Space, 16 Church Street,
Dumbarton on Wednesday, 12 February 2025 at 10.00 a.m. 
Present:   Provost Karen Murray Conaghan and Councillors Lawrence
O’Neill, Chris Pollock, Hazel Sorrell and Sophie Traynor*. 
*Arrived later in the meeting. 
Attending: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Michelle Lynn, Asset Manager; Stephen Balfour, Project
Manager; Ash Hamilton, Planning Officer; Raymond Walsh,
Network Management Co-ordinator; Michael McDougall,
Manager of Legal Services; and Scott Kelly, Committee Officer. 
Apologies: Apologies for absence were intimated on behalf Councillors Ian
Dickson, Gurpreet Singh Johal and David McBride. 
Councillor Lawrence O’Neill in the Chair 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of the Planning Committee held on 11 December 2024 were
submitted and approved as a correct record. 
VARIATION IN ORDER OF BUSINESS 
Councillor O’Neill, Chair, advised the Committee that he would vary the order of
business as hereinafter minuted.
ITEM 4
Page 5

Page 6

NOTE OF VISITATIONS 
A Note of Visitations carried out on 9 December 2024, a copy of which forms
Appendix 1 hereto, was submitted and noted. 
PLANNING APPLICATIONS 
Reports were submitted by the Chief Officer – Regulatory and Regeneration in
respect of the following Planning applications:- 
(a) DC24/181/FUL: Proposed two storey dwellinghouse with associated
parking, landscaping and change of use of land to rear to garden
grounds at 18 Oxhill Road, Dumbarton G82 4DG by Mr Jasbir Singh
Johal. 
Reference was made to a site visit which had been undertaken in respect of
the above application. The Development Management Team Leader was
heard in further explanation and in answer to Members’ questions. 
The Chair invited Mr Ken Plant, the applicant’s agent, to address the
Committee.  Mr Plant was heard in respect of the application and in answer to
Members’ questions. 
The Committee agreed:- 
(1) to grant full planning permission subject to the conditions set out in
section 9 of the report, as detailed within Appendix 2 hereto, and that
authority be delegated to the Planning, Building Standards and
Environmental Health Manager to issue planning permission once the
payment of a green network developer contribution has been secured
through a suitable mechanism; and 
(2) that authority be delegated to the Planning, Building Standards and
Environmental Health Manager to refuse the application should the
aforementioned contribution not be secured within 6 months. 
Note: Councillor Traynor entered the meeting at this point. 
(b) DC24/050/FUL: Alteration and extension to existing hall to facilitate
creation of new cafe area together with formation of raised deck and
hard surfacing, and the installation of access lift at Napier Hall, 312
Dumbarton Road, Old Kilpatrick G60 5JH by Old Kilpatrick Food Parcels. 
Reference was made to a site visit which had been undertaken in respect of
the above application. The Development Management Team Leader and the
Network Management Co-ordinator were heard in further explanation and in
answer to Members’ questions. 
Page 6

Page 7

The Committee agreed to grant full planning permission subject to the
conditions set out in section 9 of the report, as detailed within Appendix 2
hereto. 
PLANNING APPEAL DECISION ON PLANNING APPLICATION DC23/227/FUL 
A report was submitted by the Chief Officer – Regulatory and Regeneration providing
an update on Planning Application DC23/227/FUL (‘Change of use from beauty
salon to three residential flats at nos. 4 - 6 Greenhead Road, Dumbarton G82 1EL by
Mr Sodhi Sing’) which had been referred to the Scottish Ministers following the
Committee having determined that it was minded to grant planning permission. 
After discussion and having heard the Development Management Team Leader in
further explanation, the Committee agreed to note the decision. 
PLANNING APPEAL DECISION ON PLANNING APPLICATION DC23/177/FUL 
A report was submitted by the Chief Officer – Regulatory and Regeneration advising
of the outcome of the appeal to erect at single wind turbine, 30m hub and 43m tip,
the creation of access rack, substation and associated works on land adjacent to
East of Broomhill Wood, Bonhill, Alexandria. 
After discussion and having heard the Lead Planning Officer in further explanation,
the Committee agreed to note the outcome of the appeal. 
STREET NAMING BANK PROPOSALS 
A report was submitted by the Chief Officer – Regulatory and Regeneration providing
additional names to the street name bank for new developments across West
Dunbartonshire. 
After discussion and having heard the Planning, Building Standards and
Environmental Health Manager in further explanation and in answer to Members’
questions, the Committee agreed to approve the list of street names set out in
Appendix 1 to the report, subject to the names ‘Slant’ and ‘Fiddle’ being removed
from the Clydebank section, in order to expand the existing street name bank to
allocate to upcoming developments. 
ANTONINE WALL PROJECT UPDATE REPORT AND FUTURE PROPOSALS 
A report was submitted by the Chief Officer – Regulatory and Regeneration advising
of the outcome of the recent funding application to the National Lottery Heritage
Fund (NLHF) to take forward phase 2 of the project and its implications for the
Antonine Wall project generally, and in particular for West Dunbartonshire Council as
lead authority. 
Page 7

Page 8

After discussion and having heard the Planning, Building Standards and
Environmental Health Manager, and the Project Manager, in further explanation and
in answer to a Member’s question, the Committee agreed 
(1) to note the outcome of the funding application; 
(2) to note the decision of the Antonine Wall Steering Group to pursue option 3 as
outlined in section 4.7 of the report; and 
(3) to follow the decision of the Steering Group and that West Dunbartonshire Council
would continue to act as lead authority until 30 September 2025. 
The meeting closed at 10.50 a.m. 
Page 8

Page 9

APPENDIX 1 
PLANNING COMMITTEE 
NOTE OF VISITATION – 9 DECEMBER 2024 
Present: Provost Karen Murray Conaghan   
Attending: James McColl - Development Management Team Leader 
SITE VISIT 
Site visits were undertaken in connection with the undernoted planning applications:- 
68 Glasgow Road, Dumbarton G82 1HQ
DC24/123/FUL: Change of use from butcher shop (Class 1A) to fish and chip shop
(hot food takeaway - Sui Generis) together with installation of flue by Glasgow AP. 
4 - 6 Greenhead Road, Dumbarton G82 1EL
DC23/227/FUL: Change of use from beauty salon to three residential flats by Mr
Sodhi. 
Page 9

Page 10

APPENDIX 2 
DC24/181/FUL: Proposed two storey dwellinghouse with  associated parking,
landscaping and change of use of land to rear to garden grounds at 18 Oxhill
Road, Dumbarton G82 4DG by Mr Jasbir Singh Johal. 
GRANT full planning permission subject to the following conditions:- 
1.  Prior to the commencement of development on site, exact details of all
proposed external materials (inclusive of all hard surfaces), to be used in the
development site shall be submitted to and approved in writing by the
Planning Authority. Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved material details and palette. 
Reason: In the interest of visual amenity. 
2. Prior to the commencement of development on site, a detailed boundary
treatment and hard and soft landscaping plan, including timescales for
implementation shall be submitted to and approved in writing by the Planning
Authority. This plan shall include details of tree loss, replacement planting and
root protection measures to safeguard existing trees. Thereafter, unless
otherwise agreed in writing with the Planning Authority, the development shall
be completed in strict accordance with the approved plans. 
Reason: In the interest of visual amenity, protection and enhancement of
biodiversity and tree protection. 
3. Prior to the commencement of development on site, a Biodiversity
Enhancement Plan setting out how the proposal enhances biodiversity
beyond the current baseline, together with the implementation on site, shall be
submitted to and approved in writing by the Planning Authority. All measures
shall then be implemented as approved. Thereafter, unless otherwise agreed
in writing with the Planning Authority, the development shall be completed in
accordance with the approved plan. 
Reason: In the interest of biodiversity. 
4. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
Reason: In the interest of visual amenity and biodiversity. 
5. That prior to the commencement of works on site, full details of the proposed
drainage regime inclusive of calculations and overland flow details shall be
submitted to and approved in writing by the Planning Authority. The drainage
regime shall then be implemented and maintained thereafter. For the
avoidance of doubt, the drainage regime shall be implemented
Page 10

Page 11

commensurately with the construction of the houses it serves and all surface
water shall be intercepted within the site on completion of development. 
Reason: To ensure adequate drainage of the site. 
6. That prior to the occupation of any house, the off-street parking provision
hereby approved shall be completed and be available for use by residents of
the associated house. The off-street parking provision shall then remain
unobstructed and available for use by residents of the associated house at all
times thereafter. 
Reason: To ensure adequate parking provision is in place for development. 
7. Prior to the occupation of the houses hereby permitted, the developer shall
install the necessary infrastructure to enable the full development and all
associated properties to be connected to the existing fibre optic network,
where available in West Dunbartonshire, and in accordance with the relevant
telecommunications provider’s standards. 
Reason: To ensure compliance with Policy CON4 of the West Dunbartonshire
Proposed Local Development Plan (2020) and in the interests of securing the
facilities to support communities. 
8. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
 Mondays to Fridays: 0800 – 1800
 Saturdays: 0800 – 1300
 Sundays and public holidays: No Working 
Reason: To ensure that the development does not adversely affect the
amenity of neighbouring properties by creating excessive noise and
disturbance at unsocial hours. 
DC24/050/FUL: Alteration and extension to existing hall to  facilitate creation of
new cafe area together with formation of raised deck and hard surfacing, and
the installation of access lift at Napier Hall, 312 Dumbarton Road, Old
Kilpatrick G60 5JH by Old Kilpatrick Food Parcels. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of development on site, exact details of all
proposed external materials shall be submitted to and approved in writing by
the Planning Authority. Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved material details and palette.
Page 11

Page 12

Reason: In the interest of visual amenity. 
2. Prior to the commencement of development on site, full details of all hard
surfaces, including boundary treatments, shall be submitted for the further
written approval of the Planning Authority. The development shall thereafter
proceed in accordance with the approved details. 
Reason: In the interest of visual amenity. 
3. The external decking area hereby approved to the eastern side of the building
shall only be used between the hours of 8am to 8pm daily, unless otherwise
first agreed in writing by the Planning Authority. 
Reason: To safeguard local residential amenity and avoid disturbance to
residential properties. 
4. That unless otherwise first agreed in writing and prior to the commencement
of any development on site, a detailed specification in respect of the
collection, treatment and disposal of cooking odours and pollutants be
submitted to and approved in writing by the Planning Authority. For the
avoidance of doubt, the system shall utilise the discharge flue to the rear
elevation hereby approved. The system shall then be installed as approved,
inclusive of discharge flue, prior to the commencement of any cooking which
discharges via the flue hereby permitted and retained as approved at all times
thereafter. 
Reason: To ensure that the development does not adversely affect the
amenity of neighbouring properties by way of odour nuisance. 
5. Prior to the commencement of works on site, full details of how the extract
ventilation system will be suitably insulated or isolated to minimise noise and
vibration transmission to the building structure shall be submitted to and
approved in writing by the Planning Authority. Works shall then proceed as
approved and be retained as approved at all times thereafter during the
lifetime of the use to the satisfaction of the Planning Authority, unless
otherwise first agreed in writing by the Planning Authority. 
Reason: To ensure that the development does not adversely affect the
amenity of neighbouring properties by creating excessive noise or vibration. 
6. Noise from the ventilation system hereby approved shall not give rise to a
noise level within any dwelling or other noise sensitive building assessed with
the windows open in excess of the equivalent to Noise Rating Curve 35,
between 07:00 and 20:00 hours, and Noise Rating Curve 25 at all other times,
unless otherwise agreed in writing by the Planning Authority. 
Reason: To ensure that the development does not adversely affect the
amenity of neighbouring properties by creating excessive noise nuisance. 
Page 12

Page 13

7. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
 Mondays to Fridays: 0800 – 1800
 Saturdays: 0800 – 1300
 Sundays and public holidays: No Working 
Reason: To ensure that the development does not adversely affect the
amenity of neighbouring properties by creating excessive noise and
disturbance at unsocial hours. 
Page 13

Page 14

Page 14

Page 15

PLANNING COMMITTEE 
NOTE OF VISITATIONS – 10 FEBRUARY 2025 
Present: Councillors Fiona Hennebry (second site only), Lawrence
O’Neill, Chirs Pollock and Clare Steel.   
Attending: James McColl, Development Management Team Leader and Amy
Melkevik, Lead Planning Officer. 
SITE VISITS 
Site visits were undertaken in connection with the undernoted planning applications:- 
18 Oxhill Road, Dumbarton G82 4DG 
DC24/181/FUL: Proposed two storey dwellinghouse with associated parking,
landscaping and change of use of land to rear to garden grounds by Mr Jasbir Singh
Johal. 
Napier Hall, 312 Dumbarton Road, Old Kilpatrick G60 5JH 
DC24/050/FUL: Alteration and extension to existing hall to facilitate creation of new
cafe area together with formation of raised deck and hard surfacing, and the installation
of access lift at Napier Hall, 312 Dumbarton Road, Old Kilpatrick G60 5JH by Old
Kilpatrick Food Parcels. 
ITEM 5
Page 15

Page 16

Page 16

Page 17

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 16th April 2025
DC24/171/FUL:      Application under Section 42 of the Town and Country
Planning (Scotland) Act 1997 (as amended) in relation
for variation of condition 16 and non-compliance with
condition 24 of planning permission DC23/217/FUL to
remove delivery hours restrictions at land to south
east of Castle Street, Dumbarton by Aldi Stores Ltd.
1. REASON FOR REPORT
1.1 This application seeks the variation of a condition and the non-compliance with
a condition associated with a planning permission previously agreed by the
Planning Committee (ref: DC23/217/FUL). Under the terms of the approved
Scheme of Delegation, it therefore requires to be determined by the Planning
Committee.
2. RECOMMENDATION
2.1 Grant planning permission for this Section 42 application subject to the
conditions set out in Section 9 below.
3. DEVELOPMENT DETAILS
3.1 This application relates to a part of the former Allied Distillers site on the south
side of Castle Street, Dumbarton. The site has been previously cleared of all
buildings and consists of hardcore surface. It extends to approximately 0.75ha.
It is bounded by a terrace of tenement properties in Castle Terrace to the north,
the A-listed building of the Scottish Maritime Museum to the east (with the
Morrisons supermarket petrol station and its car park beyond that neighbouring
building) and the remainder of the former Allied Distillers site to the west and
south-west, which currently houses a Lidl store with the associated car park. To
the south-west of the site, the tidal basin and a residential development site can
be found. Vehicular access to the site is from Castle Street and is shared with
the adjacent retail store.
3.2 The site was previously a part of a larger site which was subject to a planning
application DC17/230 for the erection of retail development comprising seven
retail units including a food store, with associated infrastructure works including
a new access, car parking and landscaping. This was granted by the Planning
Committee in May 2018. The eastern part of the previous site where the two of
the retail units with the associated parking were to be located is the site subject
to the current application. Following the approval of the previous application,
only one of the approved retail units has been constructed and occupied (Lidl)
ITEM 6
Page 17

Page 18

in the western half of the previous site, with the eastern part remaining
undeveloped. On account of the previously granted proposal being partly
implemented, planning permission DC17/230 remains extant and the
development could be completed.
3.3 In September 2024, planning permission was granted (ref: DC23/217/FUL) for
an alternative retail development to that previously consented through
permission DC17/230. The new proposal will have a gross floor area (GFA) of
approximately 1,931m², of which 1,344m² would be retail space. The structure
will form a foodstore (Use Class 1A), with the prospective occupier indicated to
be Aldi.  The development would consist of a detached supermarket with
associated parking and landscaping.
3.4 Condition 16 of the Planning Permission (ref: DC23/217/FUL) states that:
No commercial vehicle making deliveries to or collecting material from the
development shall enter or leave the site before 0800 or after 1800.
3.5 The applicant seeks to vary Condition 16 to clarify that this restriction is
imposed only during the construction period. The proposed variation to
Condition 16 as suggested by the applicant reads as follows:
During construction, no commercial vehicle making deliveries to or collecting
material from the development shall enter or leave the site before 0800 or after
1800.
3.6 Condition 24 of the Planning Permission (ref: DC23/217/FUL) states that:
Prior to the commencement of development on site, a Delivery Management
Plan shall be submitted to and approved in writing by the Planning Authority.
Deliveries to the foodstore shall only occur between the hours of 0700 hours
and 2300 hours. All deliveries and other servicing of the site shall then be
undertaken in accordance with the approved Delivery Management Plan at all
times thereafter.
3.7 The applicant seeks the non-compliance with Condition 24 to allow a 24 hour
delivery model to the store to be built on the site. The applicant believes that the
condition is neither ‘necessary’, nor ‘reasonable’, in reference to the six criteria
set out in Planning Circular 4/1998. The applicant has submitted a Noise
Impact Assessment (NIA) in support of the application and, based on the
findings, the applicant considers that due to the existing levels of background
noise being higher than any noise generated on the site, including deliveries, at
any time throughout the night no disturbance will occur.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Environmental Health Service offers no objection
noting that the request for non-compliance with Condition 24 is supported by a
noise impact assessment which concludes that that there would be no adverse
impact from plant or delivery noise from the operation of this development. The
Page 18

Page 19

noise impact assessment included various operational procedures that were
designed to reduce the noise impact from nighttime deliveries. These
procedures should be incorporated into a service delivery noise management
plan and submitted in support of the application. A condition is recommended in
this respect.
5. REPRESENTATIONS
5.1 No representations received.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
6.1 This application, submitted under Section 42 of the Town and Country Planning
Scotland Act 1997 (as amended), seeks the seeks to vary the terms of
condition 16 and the non-compliance with condition 24 of planning permission
DC23/217/FUL. The principle of development on this site has, however,
already been established through the granting of this planning permission.
Annex H of Scottish Government Circular 3/2022 – Development Management
Procedures sets out that in determining Section 42 applications, planning
authorities may only consider the issue of the conditions to be attached to any
resulting permission. Whilst the effect of granting a Section 42 application is
that a new planning permission is established, the current planning permission
for the site was granted in September 2024, there have been no changes to
either the planning policy position or the circumstances of the application site,
and works have not yet commenced on site. Whilst all development plan
policies relevant to the proposed development are highlighted below, the
principle of the development does not require a full reassessment against these
policies.
National Planning Policy 4 (NPF4)
6.2 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises.
6.3 Policy 3 seeks to protect biodiversity and deliver positive effects from
development, requiring that local development includes appropriate measures
to conserve, restore and enhance biodiversity. It is noted that measures should
be proportionate to the nature and scale of development.
6.4 Policy 6 aims to protect and expand forests, woodland and trees. It advises that
proposals will not be supported where they result in the loss of ancient
woodlands, ancient and veteran trees, or individual trees of high biodiversity
value. Where woodland is removed, compensatory planting is expected to be
delivered. 
6.5 Policy 7 aims to protect and enhance historic environment assets and places,
with proposals affecting scheduled monuments only supported where direct
impacts on the integrity and setting of scheduled monuments are avoided or
exceptional circumstances have been demonstrated to justify the impacts on
the monument and any impacts have been minimised.
Page 19

Page 20

6.6 Policy 13 supports proposals where they provide direct, easy, segregated and
safe links to local facilities via walking, wheeling and cycling networks and are
accessible by public transport.
6.7 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale, as per Policy 14.
Policy 15 relates to local living and 20-minute neighbourhoods, with
development proposals required to contribute to both, where relevant, through
local access to a wide range of facilities and activities, including lifelong
learning and recreation facilities
6.8 Under part (f) of Policy 19, proposals for buildings that will be occupied by
people will be supported where they are designed to promote sustainable
temperature management, for example by prioritising natural or passive
solutions such as siting, orientation, and materials.
6.9 Green infrastructure is considered through Policy 20. Proposals that result in
fragmentation or net loss of existing green infrastructure will only be supported
where it can be demonstrated that this would not result in or exacerbate a
deficit in green infrastructure provision, and the overall integrity of the network
will be maintained.
6.10 Policy 21 seeks to promote and facilitate spaces and opportunities for play,
recreation and sport. It advises that development proposals likely to be
occupied or used by children and young people will be supported where they
incorporate well designed, good quality provision for play, recreation, and
relaxation that is proportionate to the scale and nature of the development and
existing provision in the area.
6.11 Policy 22 addresses flood risk and water management, stating that proposals
will not increase the risk of surface water flooding to others, or itself be at risk;
manage all rain and surface water through sustainable urban drainage systems
(SUDS), and seek to minimise the area of impermeable surface. The
application site is within an area at risk of flooding. However, notwithstanding
the objection from SEPA, the proposal the proposal is considered to fall within
at least one of the exemptions set out within the Policy.
6.12 Policy 27 seeks to promote and facilitate development in our city and town
centres, advising that proposals that enhance and improve the vitality and
viability of city, town and local centres, including proposals that increase the
mix of uses, will be supported.
6.13 Whilst the granting of an application made under Section 42 of the Town and
Country Planning (Scotland) Act 1997 application would have the effect of
granting a new planning permission for the site, there are no changes to the
development proposal and no changes to the position relating to the above
policies since the original grant of planning permission and a further
assessment of the policies above is not required. 
Page 20

Page 21

6.14 Policy 23 is however relevant to the assessment of this application as this aims
to safeguard people from environmental harm including ensuring that
development proposal do not result in unacceptable noise issues. Subject to
the imposition of a condition requiring a service delivery noise management
plan, there will be no adverse noise impact to any residential properties and no
conflict with this policy.
West Dunbartonshire Adopted Local Plan 2010
6.15 The site is located within Dumbarton Town Centre, which is identified under
Policy RP1 as a regeneration priority area where the Council will support the
redevelopment of underused or vacant land in order that development
opportunities that continue the process of urban renewal are brought forward.
Policy GD2 supports redevelopment opportunities and specifically identifies
this site as suitable for a mixed use development comprising retail, residential
and public services.
6.16 Policy RET1 requires the adoption of a sequential approach to site selection for
new retail development. The application site is located within a defined town
centre, which is the first preference for new retail developments. Policy RET2
requires proposals for any significant retail developments within the town
centre to be assessed against certain criteria, including: whether the proposal
is supported by the relevant catchment area; impact on the vitality and viability
of existing centres; accessibility by public transport; impact on the surrounding
environment; quality of design; whether there are any significant infrastructural
implications; and the contribution the development would make to remedying
any quantitative or qualitative deficiencies in the existing retail provision. Policy
RET5 seeks to improve the environment of Dumbarton Town Centre and
requires that any development at Dumbarton Waterfront take due cognisance
of any relevant design guides for this area.
6.17 Policies F1, F2 and F3 relate to flooding and drainage and aim to ensure that
new development is not at risk of flooding, does not increase the risk of flooding
elsewhere and has suitable drainage infrastructure which includes SUDS
measures. There is a general presumption against development within the
flood plain. The up-to-date development plan position in flooding is set out
within Policy 22 of NPF4 which therefore has primacy in this instance. Policy
BE2 relates to listed buildings and seeks to prevent any development which
would detract from the appearance, setting or character of a listed building.
6.18 Policy T1 and T4 require sites to be integrated with sustainable travel. Policy
E1 relates to the Council’s Biodiversity duty and Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable
tree planting.
6.19 There are no changes to the development proposal and no changes to the
position relating to the above policies since the original grant of planning
permission and a further assessment of the Local Plan policies above is not
required. 
Page 21

Page 22

6.20 Policy GD1 seeks to ensure that all new development is of a high quality of
respects the character and amenity of the area in which it is located. Policy H5
seeks to safeguards residential amenity. Subject to the imposition of a
condition requiring a service delivery noise management plan, there will be no
adverse amenity impact arising from noise disturbance to any residential
properties and no conflict with these policies.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration, although it does not directly
affect the development proposal under consideration.
7.2 The application site forms part of the Dumbarton Town Centre and Waterfront
‘Changing Place’ and is specifically identified as suitable for a mixed-use
development including retail and residential elements. The preferred strategy is
for retail and commercial uses at ground floor level along Castle Street in order
to provide an active street frontage and improve links between High Street and
St James Retail Park.  It also emphasises that throughout the development
site, green space creation will be an important consideration, as is the provision
of public access along the entire waterfront. The route of the proposed Lomond
Canal should also be protected from incompatible development. 
7.3 Policy CP2 requires the integration and consideration of green infrastructure
from the outset of the design process through to its maintenance and
stewardship of the resource.
7.4 Policy SC1 supports proposals for retail development in the network of centres
which accord with the strategy, role and functions of centres. Town centres are
the preferred location for all retail proposals. The proposed development
complies with the requirements of Policy SC1.
7.5 The adjacent River Leven is a Local Nature Conservation Site, and Policy GN3
does not support development which would adversely affect the integrity of
sites designated for nature conservation or harms protected species. The
proposal complies with Policy GN3.  Policy GN6 seeks to protect and improve
the quality and enjoyment of the water environment whilst Policy GN8 expects
developments to enhance active travel connectivity within the green network,
particularly where this would create routes to and along waterways. The
proposed development is considered to comply with these policies and this is
discussed below.
Page 22

Page 23

7.6 Policy BE2 relates to listed buildings and aims to prevent any development
occurring which would detract from the special interest, setting or detrimentally
affect the character of a listed building. The proposed development is not
considered to be contrary to the Policy BE2.
7.7 Policy SC1 advises that proposals for retail, commercial and leisure
investment, and other key Town Centre uses, should align with the sequential
approach and the preferred uses set out in Table 5. Developments are directed
sequentially to Town Centres in the first instance.
7.8 Policies ENV1, ENV4, ENV 5 and ENV6 are all similar to the ecology, tree,
water environment and flooding policies of the adopted Local Plan. The up-to-
date development plan position in flooding is set out within Policy 22 of NPF4
which therefore has primacy in this instance. Policy H4 seeks to protect,
preserve and enhance residential amenity and residential character and
amenity of existing residential areas at all times. In this regard and in the
context of this application, there will be a general presumption against the
establishment of non-residential uses within, or in close proximity to, residential
areas which potentially have detrimental effects on local amenity or which
cause unacceptable disturbance to local residents. Policy ENV8 requires
developments to address air quality, lighting and noise as part of the planning
process.
7.9 Policy RE4 encourages micro-generation and heat recovery technologies
within or associated with individual properties, with Policy RE5 advising that
new buildings are required, as far as possible, to integrate low and/or zero
carbon generating technologies. 
7.10 There are no changes to the development proposal and no changes to the
position relating to the above policies since the original grant of planning
permission and a further assessment of the policies within proposed LDP2 is
not required. 
7.11 Policy CP1 seeks to ensure that development is of a high quality, adaptable
and designed to be suitable for a mix of occupants. It indicates that all new
development will be expected to contribute towards creating successful places
by having regard to the six qualities of a successful place. Policy H4 seeks to
safeguards residential amenity and Policy ENV8 seeks to ensure that adverse
impacts from noise do not occur to neighboring property. Subject to the
imposition of a condition requiring a service delivery noise management plan,
there will be no adverse amenity impact arising from noise disturbance to any
residential properties and no conflict with these policies.
Principle of Development and Section 42 applications
7.12 As noted in paragraph 6.1 above, the principle of development on this site has
already been established through the granting of planning permission
DC23/217/FUL and this does not require to be reassessed. The previous
planning application was subject of an objection from the Scottish
Environmental Protection Agency (SEPA). As the Council was minded to grant
planning permission, the application was referred to the Scottish Ministers who
Page 23

Page 24

did not call in the application for their own determination. As this proposal only
relates to conditions controlling deliveries to the site both during the
construction and operational phases of the development and as SEPA
previously raised no concerns relating to such matters, there was no
requirement to consult SEPA. Accordingly, there would be no requirement to
refer the application to the Scottish Ministers if the Council determined to grant
planning permission.
7.13 This application considers only the proposed variation to Condition 16 and non-
compliance with Condition 24 of the planning permission granted in terms of
the potential impact on the residential developments surrounding the site,
including the site south of the proposed development where there is a
residential development allocation (H2(18)) in proposed LDP2 with an extant
planning permission in place for residential development dating from 2006.
Delivery Vehicles – Time Restrictions – Condition 16
7.14 It is accepted that the construction phase of the foodstore will produce an
element of short-term noise and disruption. The consultation response from the
Council’s Environmental Health Service for the original planning application
highlights the requirement for the construction of the development to be
undertaken in a way that ensures that adjacent residential amenity is not
adversely affected, which was secured through condition.
7.15 As part of the planning permission (ref: DC23/217/FUL), Condition 16 was
attached to ensure that delivery or collection materials to and from the
development by commercial vehicles shall does not occur before 0800 or after
1800.
7.16 While it is noted that the intention of the above condition is to restrict
movements of commercial vehicles serving the site during the construction
phase which is often more intense than during the operation phase, it is
acknowledged that the wording of the condition may leave room for
misinterpretation and be taken to mean any deliveries to the site, including post
-construction phase. While the aspect of delivery times to the completed
foodstore is controlled separately through Condition 24 (also subject to this
application), it is noted that if the above misinterpretation was to be applied, the
current wording of Condition 16 could result in confusion. 
7.17 The applicant seeks to provide greater clarity regarding construction related
deliveries. The wording of the proposed variation to Condition 16 is:
During construction, no commercial vehicle making deliveries to or collecting
material from the development shall enter or leave the site before 0800 or after
1800.
7.18 The proposed variation to Condition 16 provides clarity that it relates to the
construction phase of the development as was the original intention of the
condition, and the variation is considered acceptable. 
Page 24

Page 25

Store Delivery Management Plan and Hours – Condition 24
7.19 The development of a foodstore approved through decision DC23/217/FUL
was assessed in terms of its impact on the amenity of both existing residential
properties immediately north of the site, as well as the area south of which is
identified as a residential development allocation in proposed Local
Development Plan 2. This allocation forms the later phases of a residential
development granted planning permission in 2006 through planning application
DC03-284. This consent remains extent due to the construction of earlier
phases of the wider development and can be implemented as approved.  
7.20 Residential amenity was fully considered in the assessment of the planning
application for the foodstore. It was acknowledged that while the development
will undoubtedly bring additional activity to the area, it is unlikely to result in any
noise or activity beyond that typically found in a Town Centre during the day,
nor is it expected that any disturbance would occur beyond that which would
occur should the previously consented retail development on the site (planning
permission DC17/230 which remains extant) be constructed. In granting
planning permission for the site (ref: DC23/217/FUL), it was concluded that to
prevent conflict with future residential development as already consented on
the adjacent residential development allocation, and nighttime disturbance to
residents, a condition was attached which prevents deliveries occurring
between the hours of 11pm to 7am. This condition also included a requirement
for a delivery management plan to be submitted and agreed.
7.21 The applicant seeks the non-compliance with Condition 24 to allow a 24 hour
delivery model to the store to be built on the site. This is the delivery model
operated by the applicant across their wider retail operation.  Whilst the
applicant considers that the condition as applied is neither ‘necessary’, nor
‘reasonable’, the condition as applied was both necessary and reasonable in
seeking to protect residential amenity and mitigate against nighttime noise
disturbance arising from deliveries. This application is accompanied by a Noise
Impact Assessment (NIA) which assesses the noise from the proposed
foodstore, inclusive of delivery noise. The NIA concludes that there would be
no adverse impact from plant or delivery noise from the operation of this
development. In respect of delivery noise, it is concluded that the servicing of
the store can be completed on a 24 hours basis without giving rise to any loss
of amenity to adjacent residents in either existing or consented properties.
However, for nighttime deliveries, it is identified that various operational
procedures designed to reduce the noise impact from nighttime deliveries
should be implemented. The Council’s environmental Health Service has
considered the NIA and accepts the findings. The requirement for mitigation in
terms of operational procedures is noted and it is recommended that these are
incorporated into a service delivery noise management plan and this be
secured by condition.
7.22 Given that the applicant has now demonstrated via the submitted NIA that
servicing and delivery can be carried out on a 24 hours basis without giving rise
to any loss of amenity, it is concluded that the non-compliance with condition 24
in respect of the restriction on nighttime servicing and deliveries is acceptable.
However, to ensure the mitigation in terms of operational procedures for
Page 25

Page 26

nighttime deliveries as recommended in the NIA it is considered appropriate to
attach a condition requiring the submission of a service delivery noise
management plan. The applicant has provided examples of such plans
submitted in respect of similar planning conditions for developments elsewhere
and the same approach would be supported here.
8. CONCLUSION
8.1 The acceptability of the re-development of the site is already established, with
the granting of planning permission (ref: DC23/217/FUL) and there is no
change to the planning policy position or circumstances of the site since the
previous grant of planning permission. This Section 42 application considers
the proposed variation to Condition 16 and non-compliance with Condition 24
of the planning permission. The proposed variation to condition 16, is
acceptable as it provides clarity to its purpose and applicability to the
construction phase only.
8.2 Following consideration of the submitted NIA, it is concluded that the non-
compliance with condition 24 to allow nighttime deliveries is acceptable.
However, to ensure the mitigation in terms of operational procedures for
nighttime deliveries as recommended in the NIA, a condition is appropriate to
require the submission of a service delivery noise management plan in order to
safeguard against nighttime disturbance to nearby residents.
8.3 As the effect of granting planning permission for a Section 42 application is
such that a new and separate standalone permission exists for the
development and given that the development has not commended on site, all
other conditions associated with the planning permission (DC23/217/FUL) are
re-imposed to this permission.
9. CONDITIONS
1. Prior to the commencement of development on site, exact details and
samples of all proposed external materials shall be submitted to and
approved in writing by the Planning Authority. Thereafter, the development
shall be completed in strict accordance with the approved material details
and palette unless otherwise first agreed in writing by the Planning Authority.
Reason: In the interests of visual amenity.
2. Prior to the commencement of development on site, full details of all hard
surfaces shall be submitted for the further written approval of the Planning
Authority. The development shall thereafter proceed in accordance with the
approved details.
Reason: In the interests of visual amenity.
3. Prior to the commencement of development on site, details of the design and
location of all bin stores, cycle storage, street furniture, trolley parking and
lighting shall be submitted for the further written approval of the Planning
Page 26

Page 27

Authority and shall be implemented as approved. The development shall
thereafter be completed in accordance with the approved details prior to any
of the foodstore becoming operational unless otherwise first agreed in writing
by the Planning Authority.
Reason: In the interests of visual amenity.
4. That unless an alternative approach is otherwise first agreed in writing by the
Planning Authority, all recommendations set out within the Level 3 Flood Risk
Assessment dated 5th April 2024 and submitted in association with planning
application DC23/217/FUL shall be incorporated into the development to the
satisfaction of the Planning Authority.
Reason: In the interests of protection of the development from flooding and in
accordance to the Flood Risk Assessment recommendations.
5. Notwithstanding condition 4 above and prior to the commencement of
development on site, full details of a flood mitigation and evacuation plan for
the development shall be submitted for the written approval of the Planning
Authority. Thereafter, the flood mitigation and evacuation plan shall be
adhered to at all times, unless otherwise agreed with the Planning Authority.
Reason: To ensure the implementation of measures to mitigate against flood
risk.
6. The approved hard and soft landscaping and all associated approved
planting details shall be implemented within a timescale to be agreed with the
Planning Authority prior to the commencement of works on site.
Reason: To ensure the implementation of the approved landscaping scheme
in the interests of visual amenity.
7. Prior to the commencement or works on site and notwithstanding the
approved plans, a detailed management and maintenance scheme for the
proposed landscaping shall be submitted to and agreed in writing by the
Planning Authority. For the avoidance of doubt, the scheme shall include a
minimum of one clean out per year from October to January of the hereby
proposed bird boxes and detailed of the maintenance of the wildflower areas.
The plan shall thereafter implemented in perpetuity, unless otherwise agreed
with the Planning Authority.
Reason: To ensure the maintenance of the approved landscaping scheme in
the interests of visual amenity and enhancement of biodiversity.
8. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species.
Reason: To ensure the retention of the approved landscaping scheme in the
interests of visual amenity and protection of biodiversity enhancement.
Page 27

Page 28

9. Notwithstanding the approved plans, prior to the commencement of any
works on site, full details of the incorporation of low and/or zero carbon
technologies shall be submitted to and approved in writing by the Planning
Authority. Thereafter the development shall be undertaken in accordance
with the approved details unless otherwise first agreed in writing by the
Planning Authority.
Reason: To ensure the incorporation of low or zero carbon generating
technologies into the development in order to minimise carbon emissions.
10. All recommendations within the Preliminary Ecological Appraisal dated
October 2023 submitted in association with planning application
DC23/217/FUL shall be implemented in full to the satisfaction of the Planning
Authority.
Reason: In the interest of the protection of ecology and biodiversity.
11. Notwithstanding condition 10 above, no works shall commence on site during
the months of March to August (inclusive) until a full nesting bird survey is
undertaken, the methodology and findings of which shall be submitted to and
approved by the Planning Authority. For the avoidance of doubt, this survey
shall be conducted within 48 hours of the commencement of any works.
Reason: In the interest of the protection of and avoidance of disturbance to
nesting birds.
12. Notwithstanding the approved plans, detail of access points for hedgehogs
shall be included on any boundary fencing treatment, details of which shall be
submitted to and approved in writing by the Planning Authority. Thereafter,
the access points shall be maintained for the duration of the existence of the
development.
Reason: In the interest of the protection of and avoidance of disturbance to
hedgehog.
13. Prior to the commencement of the hereby approved works, further survey
shall be carried out to establish if the redshank bird species is present on site
or in its vicinity. Thereafter, and notwithstanding the approved plans, details
of screening of the site and any other appropriate mitigation measures during
the works phase to avoid displacement of the redshank birds and any other
relevant species of wild animals shall be submitted to and approved in writing
by the Planning Authority. Thereafter, the approved screening shall be in
place and maintained for the duration of the works.
Reason: In the interest of the protection of and avoidance of disturbance to
Redshank.
14. Development shall not commence until a Bird Hazard Management Plan has
been submitted to and approved in writing by the Planning Authority in
Page 28

Page 29

consultation with Glasgow Airport. The submitted plan shall include details of:
 Management of any flat / shallow pitched / green roofs on buildings
within the site which may be attractive to nesting, roosting and 'loafing'
birds. The management plan shall comply with Advice Note 8:
"Potential Bird Hazards from Building Design".
 The Bird Hazard Management Plan shall be implemented as
approved and on completion of the development shall remain in force
for the lifetime of the development. No subsequent alterations to the
plan are to take place unless first submitted to and approved in writing
by the Planning Authority in consultation with Glasgow Airport.
Reason: In the interests of the safe movement of aircraft and the operation of
Glasgow Airport.
15. All plant and equipment (including any ventilation system) to be installed or
operated shall be enclosed, attenuated and/or maintained such that any
noise therefrom shall not exceed International Standards Organisation (ISO)
Noise Rating 35 between 0700 and 2300 hours daily, within any nearby
residential property, with windows slightly open for ventilation, when
measured and/or calculated and plotted on an ISO rating curve chart.
Reason: To ensure a reasonable control of noise levels, which may be
emitted from adjacent land uses and in the interests of safeguarding
residential amenity.
16. During construction, no commercial vehicle making deliveries to or collecting
material from the development shall enter or leave the site before 0800 or
after 1800.
Reason: To minimise noise and disturbance to nearby residents at unsocial
hours during the construction phase.
17. During the period of construction, all works and ancillary operations which
are audible at the site boundary (or at such other place(s) as may first be
agreed in writing with the Planning Authority), shall be carried out between
the following hours unless otherwise approved in writing by the Planning
Authority:
 Mondays to Fridays: 0800 - 1800
 Saturdays: 0800 – 1300
 Sundays and public holidays: No working
Reason: To minimise noise and disturbance to neighbouring
residents/occupants during construction.
18. No piling works shall be carried out until a method statement has been
submitted to and approved in writing by the Planning Authority. This
statement shall include an assessment of the impact of the piling on
Page 29

Page 30

surrounding properties, taking into account the guidance contained in BS
6472: 1984 'Evaluation of Human Response to Vibration in Buildings'. It shall
detail any procedures which are proposed to minimise the impact of noise
and vibration on the occupants of surrounding properties. This statement
shall be prepared by a suitably qualified person, and the piling works shall
thereafter be carried out in accordance with the approved method statement.
Reason: To minimise noise and disturbance to neighbouring
residents/occupants during construction.
19. No development (other than investigative works) shall commence on site
until such time as a detailed remediation scheme for the site has been
submitted to and approved in writing by the Planning Authority. The scheme
shall be prepared by a suitably qualified person and shall detail the measures
necessary to bring the site to a condition suitable for the intended use by
removing unacceptable risks to human health, buildings and other property,
and the natural and historical environment. The scheme shall include details
of all works to be undertaken, the remediation objectives and criteria, a
timetable of works and/or details of the phasing of works relative to the rest of
the development, and site management procedures. The scheme shall
ensure that upon completion of the remediation works the site will not qualify
as contaminated land under Environmental Protection Act 1990 Part IIA in
relation to the intended use of the land after remediation.
Reason: To protect public health and to ensure that the site is suitable for its
intended use.
20. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease. At this
stage, if requested by the Planning Authority, an appropriate investigation
and risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works. The approved details shall be implemented
as approved.
Reason: To protect public health and to ensure that the site is suitable for its
intended use.
21. If there is a requirement to either re-use site won material or to import
material then the assessment criteria and sampling frequency that would
adequately demonstrate its suitability for use shall be submitted to and
approved by the Planning Authority prior to any material being re-used or
imported. In addition to this and in accordance with BS3882:2015 and
BS8601:2013, material to be used in the top 300mm shall also be free from
metals, plastic, wood, glass, tarmac, paper and odours. On completion of the
works and at a time and or phasing agreed by the Planning Authority, the
developer shall submit a validation report containing details of the source of
the material and associated test results to demonstrate its suitability for use.
Page 30

Page 31

Reason: To protect public health and to ensure that the site is suitable for its
intended use.
22. Unless otherwise approved in writing by the Planning Authority, no
development shall commence on site until such time as a scheme for the
control and mitigation of dust has been submitted to and approved in writing
by this Authority. The scheme shall identify likely sources of dust arising from
the development or its construction, and shall identify measures to prevent or
limit the occurrence and impact of such dust. The approved scheme shall
thereafter be implemented fully prior to any of the identified dust generating
activities commencing on site and shall be maintained thereafter, unless
otherwise approved by this Authority.
Reason: To minimise the occurrence of dust, in the interests of the amenity of
the area.
23. Prior to the commencement of development on site an air quality impact
assessment in accordance with the Environmental Protection UK guidance
document "Guidance on land - use planning and development control:
Planning for air quality January 2017" shall be submitted to and approved by
the Planning Authority. The findings of the assessment shall be implemented
prior to the development commencing on site or within a timescale agreed by
the Planning Authority.
Reason: To safeguard public health and the amenity of the surrounding area.
24. Prior to the commencement of development on site, a Service Delivery Noise
Management Plan shall be submitted to and agreed in writing by the Planning
Authority. The Plan shall include the procedures and mitigation measures to
control noise from all service delivery operations of the store inclusive of
nighttime deliveries during the hours of 11pm to 7am. The approved Service
Delivery Noise Management Plan shall then be implemented and followed at
all times during the operation of the store, unless otherwise first agreed in
writing by the Planning Authority.
Reason: To safeguard the amenity of the surrounding residential
developments.
25. Notwithstanding the approved plans and prior to the commencement of
development on site, final details of the foul and surface water drainage
system shall be submitted for the written approval of the Planning Authority.
The drainage system shall incorporate the principles of Sustainable Drainage
Systems (SuDS) within its design, and thereafter shall be implemented prior
to the occupation of the foodstore hereby permitted.
Reason: To ensure adequate drainage for the development hereby
approved.
26. That all surface water shall be intercepted within the site both during
construction and on completion of the development and full details of
Page 31

Page 32

measures to ensure that surface water run-off is contained within the site
shall be submitted to and approved in writing to the Planning Authority prior to
the commencement of any works on site. The measures shall be
implemented and maintained as approved.
Reason: To ensure adequate drainage for the development hereby
approved and prevent surface water runoff to neighbouring land.
27. The foodstore shall not be brought into use until the vehicle parking spaces
associated with it have been provided within the site in accordance with the
approved plans. The spaces shall thereafter be kept available for parking at
all times.
Reason: To ensure appropriate parking provision for the use hereby
approved.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 16th April 2025
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager
michael.mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team
Leader
james.mccoll@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Consultation responses
3. National Planning Framework 4
4. West Dunbartonshire Local Plan 2010
5. Proposed West Dunbartonshire Local
Development Plan 2 2020, as amended
6. Planning applications DC17/230, DC23/217/FUL
Wards affected: Ward 3 (Dumbarton)
Page 32

Page 33

¯ 
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 23/07/2024.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
West Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL     02/04/2025 Scale: 1:1,323@A4    
ITEM 6 - APPENDIX 1
Page 33

Page 34

Page 34

Page 35

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 16th April 2025
___________________________________________________________________
Subject: Construction and operation of a 560MW Battery Energy Storage
System with associated infrastructure, substation, security fencing,
CCTV, security lighting and landscaping on Land at Cochno Road,
Bearsden, East Dunbartonshire - Section 36 application to Scottish
Government Energy Consents Unit ref: ECU00004982
1. Purpose
1.1 To agree a further updated consultation response following the receipt of further and
updated details from the Scottish Government Energy Consents Unit, on behalf of the
Scottish Ministers, in connection with a proposal for the construction and operation of a
560MW Battery Energy Storage System with associated infrastructure, substation,
security fencing, CCTV, security lighting and landscaping on land within the East
Dunbartonshire Council area.
2. Recommendations
2.1 It is recommended the Committee agrees that the Council provides a further updated
consultation response advising that the previous concerns have been addressed and
that there is no longer an objection to the proposal as neighbouring Planning Authority
based on the assessment of the matters specified in the response contained in
Appendix 1, and that this response is submitted to form the Council’s further updated
position on the proposal. 
3. Background
3.1     The Scottish Ministers received an application under section 36 of the Electricity Act
1989 for the construction and operation of a battery energy storage facility with a
maximum power output of 560 megawatt. The application site is located within the
East Dunbartonshire local authority area, however the assessment of the submitted
application is undertaken via the Scottish Government Energy Consents Unit for the
Scottish Ministers.  West Dunbartonshire Council were consulted as neighbouring
planning authority with the application site lying generally to the north of the local
authority boundary. The application is referred to under the project name of Whitehall
BESS. The location of the site is shown in Appendix 2.
3.2 The proposal was considered by the Planning Committee on 8th May 2024 and the
Council issued a consultation response to the Scottish Ministers on 13th May 2024.
The Council objected to the proposal due to the concerns relating to the Green Belt
location of the development, visual impact, impact upon ecology, biodiversity and
protected species, potential impact upon the users of the core path network, potential
impact upon adjacent residential amenity and the failure to provide a decommissioning
and restoration scheme. The Council did not consider that the benefits of the proposed
development outweigh any adverse impacts to the adjacent West Dunbartonshire
area.
ITEM 7 
Page 35

Page 36

3.3    Following the submission of the Council’s objection, a revised proposal together with a
range of additional and updated supporting documents have been submitted to the
Scottish Ministers. These details included a revised site layout, revised equipment
details, revised planting layout, a Landscape Statement, an updated Landscape and
Visual Assessment, an updated Noise Impact Assessment and an Archaeological
Investigation. Following consideration of the revised proposal by the Council’s
Planning Committee on 11th December 2024, the Council issued an updated
consultation response on to the Scottish Ministers on 13th December 2024. In the
updated consultation response, the Council considered that some aspects of the
concerns which formed part of the original objection had been addressed, including
visual impact and the impact upon residential amenity. However, the Council
considered that the applicant failed to address other concerns relating to the Green
Belt location of the development, impact upon ecology, biodiversity and protected
species and the failure to provide a decommissioning and restoration scheme.
3.4 In response to the Council’s updated consultation maintaining the objection on the
points above, further supporting information has been received from the applicant in
respect of the locational need for the Green Belt location together with an updated
Preliminary Ecological Appraisal. The applicant also provides clarification on the
approach to de-commissioning and restoration proposals. A date of 18th April 2025 has
been agreed with the Scottish Government Energy Consents Unit for the submission
of the Council’s further updated consultation response.  The application documents
are available to view via the Energy Consents Unit website:
https://www.energyconsents.scot and the following direct link:  Scottish Government -
Energy Consents Unit - Application Details . The additional details submitted are not
available via the above link and are attached in appendices 5 to 7.
4. Main Issues
4.1   The site is situated on land at Whitehall Farm, Cochno Road, East Dunbartonshire and
extends to approximately 29 hectares. It is located immediately north and east of the
local authority boundary which follows the line of Cochno Road at this location. The
site itself is located within the open countryside comprising part of the Green Belt as
defined by the adopted East Dunbartonshire Local Development Pan 2. To the south,
the site is bound by Cochno Road with Whitehill Farm located directly adjacent to the
southeast of the site. To the west, the site is bound by Cochno Road along its southern
extent before following the general line of Lower Stourfold Glen. The northern and
eastern boundaries of the site generally cut across open land before following the
existing tree line to Cochno Road. The nearest residential properties within West
Dunbartonshire are the houses directly opposite the site at Edinbarnet, Cochno Road.
Properties at Craigton Street, Burnbrae Street, Craighaw Street and Field Road lie
around 170 metres from the southernmost boundary of the proposed site. Loansdean,
Cochno Road is around 200 metres from the site.
4.2   The proposal is for a 560 MW Battery Energy Storage Facility with associated
infrastructure. It is indicated that the development would have an operational lifespan
of 40 years. The proposed development would comprise a number of containerised
units to house battery energy storage systems and associated ancillary infrastructure.
Each container will have the appearance of a standard metal ISO/shipping container,
and it is indicated these will be soundproof. The containers would likely be finished in
dark grey or green and would be prefabricated off-site. The containers would be
accessed via an external galvanised metal open grid walkway supported by stairs and
railings. The dimensions of the containers have been amended from being 2.6m x
2.4m x 12.2m, to being 2.9m x 2.4m x 6.1m (height x depth x width). Power conversion
Page 36

Page 37

system units are of the same size and take a similar appearance. The equipment will
be provided in 64 banks of 6 units. It remains that the proposal will feature a control
room, sub-station compound, sub-station building. Separate switchgear compounds
are no longer proposed. The access point to the development also remains located on
Cochno Road, to the western edge of the site.
4.3    Battery Energy Storage Solutions provide a means of allowing for the storage of
energy at times when generating stations are working at full capacity which can then
be released when additional power is needed within the grid during peak times or
when energy generation has dropped. As more energy sources are now renewable,
such as wind and solar, balancing generation versus demand is a critical issue for grid
stability. In short, the proposed battery takes in generated electricity when there is a
surplus and stores it until there is a demand for electricity which can be released to
meet this demand.
4.4 Appendix 1 comprises the recommended updated consultation response.  There is no
change to the position of National Planning Framework (NPF) 4 since the Council’s
previous consultation response and it remains that NPF4 sets out the long-term vision
for the development of Scotland through the National Spatial Strategy. NPF4 aims to
meet Scotland’s climate ambition which will require a rapid transformation across all
sectors of the economy and society. This proposal constitutes a National Development
as it supports renewable electricity generation, repowering, and expansion of the
electricity grid under National Development 3: Strategic Renewable Electricity
Generation and Transmission Infrastructure. NPF4 recognises that additional
electricity generation from renewables and electricity transmission capacity of scale is
fundamental to achieving a net zero economy.  Whilst the Council considers that the
proposal could therefore be held to support the overarching aims of the NPF4 to
achieve net zero targets and provide a stable domestic energy supply, it must be
ensured that such development happens in the right place. Therefore, it must be
assessed if there are any potential adverse impacts upon West Dunbartonshire
resulting from the proposed development which would be outweighed by any benefits.
4.5 In originally considering the proposal, it was concluded that no concerns arose in
respect of matters relating to the impact upon the Kilpatrick Hills, flood risk, roads, and
traffic, built and cultural heritage, and health and safety. There is no change to this
position which remains as per the original consultation response issued. 
4.6 Following consideration of the original proposal, concerns did arise in respect of the
Green Belt location of the development, visual impact, impact upon ecology,
biodiversity and protected species, potential impact upon the users of the core path
network, potential impact upon adjacent residential amenity and the failure to provide a
decommissioning and restoration scheme and these points formed the basis of the
Council’s objection as agreed by Committee on 8th May 2024. A revised proposal
together with a range of additional and updated supporting documents was
subsequently submitted to the Scottish Ministers. It was considered that this revised
proposal satisfactorily addressed the concerns relating to landscape and visual
impact, residential amenity and the impact upon the core path network and, as agreed
by Committee on 11th December 2024, the Council’s objection on these matters was
removed. However, the applicant failed to address other concerns the Council
maintained its objection in respect of concerns relating to the Green Belt location of the
development, impact upon ecology, biodiversity and protected species and the failure
to provide a decommissioning and restoration scheme. The additional and updated
details from the applicant seeks to address these remaining concerns.
Page 37

Page 38

4.7 Considering the Green Belt location, the applicant has provided additional details to
justify the Green Belt location and set out why there are no suitable sites for this
development outwith the Green Belt. The Green Belt location is required to take
advantage of the availability of a grid connection at Windyhill sub-station. The distance
of such developments from the grid connection is also an important consideration as
the level of efficiency of the site reduces the further away from the connection it lies.
Accordingly, the applicant has identified a 1.1km search area from the available
connection in which no suitable sites exist outwith the Green Belt. It is now considered
that the Green Belt location has been adequately justified, there are no suitable sites
outwith the Green Belt which can take advantage of this connection and the impact
within the Green Belt can be considered acceptable with reference to Policy 8 of
NPF4.
4.8 Turning to the impact upon ecology, biodiversity and protected species, the applicant’s
preliminary ecological appraisal failed to identify the adjacent Local Nature
Conservation Site within West Dunbartonshire and assess the potential cross
boundary impact upon ecology, biodiversity and protected species within West
Dunbartonshire. It therefore could not be concluded that adverse impacts would not
occur within the West Dunbartonshire area.  The applicant has now provided an
updated Preliminary Ecological Appraisal which has been considered by the Council’s
Biodiversity Officer and now satisfactorily considers the adjacent LNCS within West
Dunbartonshire and assesses the potential cross boundary impact upon ecology,
biodiversity and protected species within West Dunbartonshire. It can therefore be
concluded that significant adverse impacts should not occur within the West
Dunbartonshire area. Whilst it is expected that the Scottish Ministers fully consider the
appropriateness of the proposed planting and landscape mitigation within the site to
ensure that it compliments the surrounding area, it is concluded that the proposal can
now considered acceptable with reference to Policies 3, 4 and 11(e)(ix) of NPF4.
4.9 In response to the concerns raised regarding the lack of any details relating to the
decommissioning and restoration of the site, the applicant has set out that that is
common practice for decommissioning of the site to be addressed by condition with
detailed decommissioning information and a restoration bond to be agreed prior to the
commencement of any works on site. Examples of other, similar development
proposals which have consented by the Scottish Ministers within Renfrewshire are
given and these take such an approach. A recently consented development in
Inverclyde also takes the same approach.  Whilst the preference remains for the
approach to decommissioning and site restoration to be provided upfront with the
detail and implementation of the de-commissioning and restoration scheme then
addressed by condition, it is accepted that this is at odds with the established
approach to other similar developments. It is therefore accepted that the
decommissioning and site restoration can be secured by condition and any such
condition(s) must be suitably robust to ensure the complete removal of all aspects of
the development and the restoration of the landform within the site to its original profile.
A further condition can also ensure early decommissioning should the site cease to
export electricity to the grid for in excess of 12 months. A financial provision to provide
sufficient funds for the decommissioning and restoration of the site should such be
required must also be secured. With such an approach, it is considered the
development meets the requirements Policy 11(e)(xi) of NPF4.
5.   People Implications
5.1     None.
Page 38

Page 39

6.    Financial and Procurement Implications
6.1     There are no financial or procurement implications in terms of this report.
7.     Risk Analysis
7.1      No risks have been identified.
8.     Equalities Impact Assessment (EIA)
8.1     Not required.
9.     Environmental Sustainability
9.1 Matters relating to environmental sustainability are fully considered via the
application assessment.
10. Consultation
10.1 Responsibility for wider consultation on the submitted application rests with the
Scottish Ministers and Energy Consents Unit as part of the application process.
11. Strategic Assessment
11.1 The following strategic priorities of the Council are relevant:
 Our Communities - Resilient and Thriving
 Our Environment - A Greener Future
 Our Economy - Strong and Flourishing 
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 16th April 2025
Person to Contact: Michael Mulgrew, Planning & Building Standards Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix 1: Council’s further Consultation Response
Appendix 2: Location Plan
Appendix 3:
Appendix 4:
Council’s original response of 13th May 2024
Council’s updated response of 13th December 2024
Appendix 5: Applicant’s covering letter
Appendix 6: Applicant’s additional supporting statement
Appendix 7: Applicant’s updated preliminary ecological appraisal
Page 39

Page 40

Background Papers: 1. Application documents
2. National Planning Framework 4
3. Adopted East Dunbartonshire Local Development Plan 2
4. Planning Committee Report dated 11th May 2024
5. Planning Committee Report dated 11th December 2024
Wards affected: Adjacent to Ward 4 (Kilpatrick)
Page 40

Page 41

Section 36 application ref: ECU00004982 - Construction and operation of a 560MW
Battery Energy Storage System with associated infrastructure, substation, security
fencing, CCTV, security lighting and landscaping on Land at Cochno Road, Bearsden,
East Dunbartonshire - project name Whitehall BESS.
Having fully reviewed the additional and updated details submitted, West Dunbartonshire
Council is now able to provide a further updated consultation response which no longer raises
an objection to the above proposal as neighbouring Planning Authority. Full details of the
Council’s consideration of the additional and updated details proposal are set out below.
Context
An application has been made to the Scottish Ministers under Section 36 of the Electricity Act
1989 (as amended) for the construction and operation of a battery energy storage facility with
a maximum power output of 560 megawatt. The application site is located within the East
Dunbartonshire local authority area and the assessment of the application proposal is
undertaken via the Scottish Government Energy Consents Unit. West Dunbartonshire Council
was previously consulted as neighbouring planning authority with the application site lying
generally to the north of the local authority boundary. Following consideration of the proposal
by the Council’s Planning Committee on 8th May 2024, the Council issued a consultation
response to the Scottish Ministers on 13th May 2024.
The Council objected to the proposal due to the concerns relating to the Green Belt location of
the development, visual impact, impact upon ecology, biodiversity and protected species,
potential impact upon the users of the core path network, potential impact upon adjacent
residential amenity and the failure to provide a decommissioning and restoration scheme. The
Council did not consider that the benefits of the proposed development outweigh any adverse
impacts to the adjacent West Dunbartonshire area.
Following the submission of the Council’s objection, a revised proposal together with a range
of additional and updated supporting documents was submitted to the Scottish Ministers.
These details included a revised site layout, revised equipment details, revised planting
layout, a Landscape Statement, an updated Landscape and Visual Assessment, an updated
Noise Impact Assessment and an Archaeological Investigation. Following consideration of the
revised proposal by the Council’s Planning Committee on 11th December 2024, the Council
issued an updated consultation response on to the Scottish Ministers on 13th December 2024.
In the updated consultation response, the Council considered that some aspects of the
concerns which formed part of the original objection had been addressed, including visual
impact and the impact upon residential amenity. However, the Council considered that the
applicant failed to address other concerns relating to the Green Belt location of the
development, impact upon ecology, biodiversity and protected species and the failure to
provide a decommissioning and restoration scheme.
Following the submission of the Council’s updated consultation response, further supporting
information has been received from the applicant in respect of the need for the Green Belt
location together with an updated Preliminary Ecological Appraisal. The applicant also
provides clarification on the approach to de-commissioning and restoration proposals. The
Council has reviewed the further supporting information relating to the proposal as set out
below. For the avoidance of doubt, this updated response is based solely on the further
supporting information emailed to the Council on 15th January 2025.
ITEM 7 - APPENDIX 1
Page 41

Page 42

This updated response requires to be read in conjunction with both the Council’s original
consultation response dated 13th May 2024 and updated second response dated 13th
December 2024. The Council’s position in relation to the impact upon the Kilpatrick Hills, traffic
and road safety, flood risk, built and cultural heritage, and health and safety was set out in the
response dated 13th May 2024. Whilst there was no objection from the Council in respect of
these matters, a number of points were highlighted and the position regarding these matters
stand. In the response dated 13th December, the Council was able to remove its objection
relating to landscape and visual impact, residential amenity and the impact upon the core path
network, but highlighted a number of points and again, the position regarding these matters
also stand. It remains that if the Scottish Ministers were minded to grant consent, the Council
would expect the Council’s comments to be taken into account.
This updated response focuses on the Council’s previous points of objection relating to the
Green Belt location of the development, impact upon ecology, biodiversity and protected
species and the failure to provide a decommissioning and restoration scheme.
Site description and development proposal
There is no change to the application site or the detail of the proposal since the Council’s most
recent response of 13th December 2024.  It remains that the site extends to approximately 29
hectares and is situated on land at Whitehall Farm, Cochno Road, East Dunbartonshire. The
site lies immediately north and east of the local authority boundary which follows the line of
Cochno Road at this location. The site itself is located within the open countryside comprising
part of the Green Belt as defined by the adopted East Dunbartonshire Local Development Pan
2. To the south, the site is bound by Cochno Road with Whitehill Farm located directly adjacent
to the southeast of the site. To the west, the site is bound by Cochno Road along its southern
extent before following the general line of Lower Stourfold Glen. The northern and eastern
boundaries of the site generally cut across open land before following the existing tree line to
Cochno Road. The nearest residential properties within West Dunbartonshire are the houses
directly opposite the site at Edinbarnet, Cochno Road. Properties at Craigton Street, Burnbrae
Street, Craighaw Street and Field Road lie around 170 metres from the southernmost
boundary of the proposed site. Loansdean, Cochno Road is around 200 metres from the site.
The proposal is for a 560 MW Battery Energy Storage Facility with associated infrastructure. It
is indicated that the development would have an operational lifespan of 40 years. It remains
that as per the original proposal, the development would comprise a number of containerised
units to house battery energy storage systems and associated ancillary infrastructure. Each
container will have the appearance similar to ISO/shipping container and would likely be
finished in dark grey or green and would be prefabricated off-site. The containers would be
accessed via an external galvanised metal open grid walkway supported by stairs and railings
and include external air conditioning units. The equipment will be provided in 64 banks of 6
units and the development will feature a control room, sub-station compound, sub-station
building. Separate switchgear compounds are no longer proposed. The access point to the
development also remains located on Cochno Road, to the western edge of the site.
Appraisal
This application has been submitted to the Scottish Government under Section 36 of the
Electricity Act 1989, as it is development with a generating capacity of over 50MW. Under the
terms of Section 25 of the Town and Country Planning (Scotland) Act 1997, all applications
must be determined in accordance with the development plan unless material considerations
indicate otherwise. In this instance, the application is made under the Electricity Act 1989 and
therefore the Development Plan does not have the primacy in the determination of the
application.  As highlighted in previous responses it does, however, provide a basis for the
Page 42

Page 43

assessment of this proposal and it is established practice to take the development plan into
account in such decisions. The development plan comprises National Planning Framework 4
and adopted East Dunbartonshire Local Development Plan 2.
Principle of Development
There is no change to the position of National Planning Framework (NPF) 4 since the
Council’s previous consultation response and it remains that NPF4 sets out the long-term
vision for the development of Scotland through the National Spatial Strategy. NPF4 aims to
meet Scotland’s climate ambition which will require a rapid transformation across all sectors of
the economy and society.
As set out in the previous responses, the Council considers that the proposal could be held to
support the overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply, but it must be ensured that such development happens in the right
place. Therefore, it must be assessed if there are any potential adverse impacts upon West
Dunbartonshire resulting from the proposed development which would be outweighed by any
benefits. Policy 11(e) of NPF4 sets out in detail the matters for the project design and
mitigation to address.
Location within the Green Belt
In originally considering the proposal, it was noted that the site is situated within the Green
Belt to the north of the settlement of Faifley. Policy 8 of NPF4 sets out the types of
development that are supported within the Green Belt locations. This includes essential
infrastructure, and proposals that relates to the distribution and transmission of electricity grid
networks fall under this definition. However, Policy 8 is clear that for development proposals in
Green Belt locations, the purpose of the Green Belt must not be undermined.
Policy 8 further requires that the reasons why the Green Belt location is essential must be
provided together with why the development cannot be provided on a site outwith the Green
Belt. It was previously acknowledged that the site has been chosen due to it’s proximity to
appropriate grid connections. It is accepted that there is a requirement for battery storage sites
to be located close to a viable grid connection with sufficient capacity to import and export
power. In this case, while this is accepted from a technical perspective and the proximity of the
site to both the Drumchapel sub-station and Windyhill sub-station which lie 3.17kms and 560m
to the south east respectively is acknowledged, the Council was of the view that the applicant
failed to provide any analysis of other site options that were considered outside of the Green
Belt and why it was not possible to locate them in an alternative place. Accordingly, it therefore
could not be concluded that no other suitable sites are available in a location outwith the
Green Belt.
In support of the proposal, the applicant has provided an additional supporting statement
focusing on the location and siting of the development within the Green Belt. The applicant
sets out that the distribution and transmission of electricity grid networks fall under the
definition of essential infrastructure in NPF4 and this definition has been determined to include
battery energy storage systems. This is not disputed and it is acknowledged that essential
infrastructure is a type of development which can be supported, in principle, within the Green
Belt as set out in the Council’s previous responses. The applicant further sets out that Battery
Energy Storage developments have very specific locational requirements, which severely
limits where they can be sited. It is advised that battery energy storage systems must be
located within proximity of a viable grid connection that has sufficient capacity to import and
export the power that will be stored by the development. Suitable points of connection include
a sub-station or an overhead power line, however, the applicant advises that the ability to find
connections with sufficient capacity is severely limited and not every sub-station has the
capacity for such a connection. The applicant goes on to advise that in many cases, the work
Page 43

Page 44

required to upgrade the sub-station can render many schemes unviable. In this case, there is
capacity for a viable connection at the Windyhill sub-station.
The applicant further sets out that where a suitable connection can be found, a number of
other factors require to be taken into consideration. This includes the distance from a sub-
station or connection point as the level of efficiency of the site reduces the further away from
the connection it lies. In addition, land ownership is also a notable consideration as without a
willing landowner, a development cannot take place. The applicant has identified a search
area of a 1.1km radius of the Windyhill sub-station and notes that no sites outwith the Green
Belt are available to allow this grid connection to be utilised.
Having considered the additional information from the applicant, it is identified that the location
of this development is dictated by the available grid connection at Windyhill sub-station and
that no alternative locations outwith the Green Belt are available without requiring a
connection over a large distance. It is therefore accepted that there is a locational requirement
to site the development within this Green Belt location to allow the available grid connection to
be utilised.
Policy 8 of NPF4 goes on to require developments not to undermine the Green Belt, be
compatible with the surrounding landscape, have an appropriate scale, massing and
appearance and ensure no significant long-term impacts. The Council concluded that the
revised proposal considered in it’s consultation response of 13th December was acceptable
with reference to the scale of the development, landscape and visual impact, landscape
screening and the separation from the settlement boundary of Faifley. The Council set out in
the previous response that the development is no longer considered to be viewed in the
context of the adjacent settlement. An industrialisation of the Green Belt at this location was
also not longer of such a concern that an adverse impact will occur to the West
Dunbartonshire Area which outweighs the benefits of the development in respect of the
contribution to renewable energy targets.
Overall, it is considered that the Green Belt location has been adequately justified and the
impact within the Green Belt can be considered acceptable with reference to Policy 8 of NPF4.
Ecology, biodiversity and protected species
Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects from
development and strengthen nature networks.  Policy 4 seeks to protect, restore and enhance
natural assets, making best use of nature-based solutions. The policy is primarily focused on
designated areas including sites designated as a local nature conservation site or landscape
area. Policy 11 also requires biodiversity impact to be addressed. The applicant’s preliminary
ecological appraisal was previously considered by the Council’s Biodiversity Officer and this
failed to identify the adjacent LNCS within West Dunbartonshire and assess the potential
cross boundary impact upon ecology, biodiversity and protected species within West
Dunbartonshire. It therefore could not be concluded that adverse impacts would not occur
within the West Dunbartonshire area.  Accordingly, the Council did not consider that the
proposal could be held to be supported by Policies 3, 4 or 11(e)(ix) of NPF4.
The applicant has provided an updated preliminary ecological appraisal which now considers
the three LNCS within the West Dunbartonshire area adjacent to the site; Wester Cochno
Parkland, Wester Cochno Burn and Edinbarnet Woodland. The appraisal sets out an
understanding of the interest features, species and reasons for the designation together with
the potential cross boundary impacts from the development. The Council’s Biodiversity officer
has considered the updated submission and is satisfied that the three LNCS locations have
now been included and considered and the applicant. The Biodiversity Officer further
acknowledges that consideration has been given to the potential for watervole within
watercourses which was specifically highlighted by the Council in the original consultation
Page 44

Page 45

response, together with a general requirement for pre-construction surveys. It is therefore
considered that the concerns regarding the lack of consideration of the three LNCSs within the
West Dunbartonshire area and potential for cross boundary impacts is addressed.
The original consultation response also set out the advice from the Councils Biodiversity
Officer that West Dunbartonshire Council has undertaken a two year nature restoration project
within the area known as Auchnacraig Estate (which is comprised of the three LNCS above),
and on Faifley Knowes to the south.  Both Auchnacraig and Faifley have now been connected
by a new native woodland which straddles the hillside to the east of Douglas Muir Road.  This
has created an integrated habitat which connects the urban environment to wider Green Belt
and the Kilpatrick Hills LLA. The Council’s Biodiversity Officer further advised that to the
northwest of the site, Glasgow University at Cochno Farm have also been carrying out a
number of nature restoration works including a large scale planting programme as well as a
private forestry grant development north of Duntocher. Collectively all the work put in by the
various agencies in this location has resulted in landscape and nature restoration around the
proposed development site. The woodland will have a positive effect on the surrounding
environment as it will provide a reservoir of species which can migrate into surrounding areas
when conditions are suitable.
Should the Scottish Ministers be minded to grant consent for the development, the Council
requests that they satisfy themselves that the final detail of the proposed landscape mitigation
and planting compliments the work in the surrounding area set out above. This includes
ensuring that in terms of biodiversity enhancement, areas which currently comprise a mixed
habitat and wet and marshy sections are not given over to inappropriate tree planting solely
under the role of biodiversity enhancement, as these are valuable habitats of their own accord.
Overall, the applicant’s updated preliminary ecological appraisal has been considered by the
Council’s Biodiversity Officer and now satisfactorily considers the adjacent LNCS within West
Dunbartonshire and assess the potential cross boundary impact upon ecology, biodiversity
and protected species within West Dunbartonshire. It can therefore now be concluded that
significant adverse impacts should not occur within the West Dunbartonshire area.  The
proposal can therefore be considered acceptable with reference to Policies 3, 4 and 11(e)(ix)
of NPF4.
Site Decommissioning and Restoration
Policy 11(e)(xi) of NPF4 requires matters relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration to be addressed. The applicant has
indicated that the intended lifetime of the proposal is 40 years, after which the facility will be
decommissioned and the land restored to its former state. However, it was identified in the
Council’s previous responses that no other information regarding this has been submitted and
this raised concerns.  
As previously noted, the applicant’s Supporting Statement sets out that at the end of the
operational period the site will be decommissioned and the land restored to it’s former state.
The updated LVIA also advises that following the completion of the operational phase, the
components of the battery storage may be removed and landscape effects potentially
reversed. Whilst there is thus a commitment from the applicant, it remains that there is a
question over the extent of any decommissioning and a clear commitment to the approach to
decommissioning and restoration.
In response to the concerns raised, the applicant has set out that that is common practice for
decommissioning of such sites to be addressed by condition with detailed decommissioning
information and a restoration bond to be agreed prior to the commencement of any works on
site. Examples of other, similar development proposals which have consented by the Scottish
Ministers within Renfrewshire are given, and these take such an approach. The Council
Page 45

Page 46

further notes that for a recently consented development in Inverclyde, the same approach was
also taken. 
It remains the Council’s preference that that given the type of development together with its
size and location, that details of the approach to decommissioning and site restoration is
provided to ensure that the requirements of Policy 11(e)(xi) of NPF4 are met. Thereafter, the
detail and implementation of the decommissioning and restoration scheme can be addressed
by condition. It is, however, accepted that such a position is as odds with the approach taken
by the Scottish Ministers in determining similar developments. It is disappointing that it
appears to be established practice that the approach to decommissioning and site restoration
is addressed by condition rather than being considered up front. 
The Council considers that any restoration scheme would require to be of an extent that
achieves a complete reversal of any landscape harm that occurs.  Given the extensive cut and
fill proposed to accommodate the development, the restoration would require to include
substantial ground works to ensure the restoration of the landform to its original profile
following the removal of all hardstanding, infrastructure and equipment. In the event that the
Scottish Ministers are minded to grant consent for the development, a robust condition(s) to
address all aspects of site decommissioning and restoration would be required, and the
Council would expect any such condition(s) to be clear that the decommissioning and
restoration scheme must ensure the complete removal of all aspects of the development and
the restoration of the landform within the site to its current pre-development profile.
The Council also considers that in the event that the development fails to export electricity to
the grid for a continuous period of 12 months it will be considered to have become redundant
and the components of the development removed and the site restored. In the event that
consent was granted, the Council considers it essential that that this requirement is to be
addressed by a condition.
In the event that the Scottish Ministers were minded to grant consent for the development, the
Council further considers that there is the requirement for a financial bond to ensure sufficient
funds are available to decommission and restore the site. If the developer was to go out of
business with unfinished works potentially being left this can be safeguarded by ensuring that
a bond or other financial provision is to put in place to cover such an eventuality. The bond or
other financial provision would address reinstatement works both in the event of a developer
failing or being unable to complete restoration works together with any failure in the aftercare
arrangements associated with the site restoration.
Whilst the Council’s preference remains for the approach to decommissioning and site
restoration to be provided upfront with the the detail and implementation of the de-
commissioning and restoration scheme then addressed by condition, it is accepted that this is
at odds with the established approach to other similar developments. It is accepted that the
decommissioning and site restoration can be secured by condition. Any such condition(s)
must be suitably robust to ensure that the de-commissioning and site restoration scheme
results in the complete removal of all aspects of the development and the restoration of the
landform within the site to its current pre-development profile. A condition relating to the
decommissioning of the site should it cease to export electricity to the grid for in excess of 12
months is also required as is a bond or other financial provision to provide sufficient funds for
the decommissioning and restoration of the site should such be required. With such an
approach, the Council would consider that the development meets the requirements Policy
11(e)(xi) of NPF4.
Page 46

Page 47

Landscape and Visual Impact, Residential Amenity, and the Impact on the Core Path Network
The Council’s position on these matters remains as per the response dated 13th December
2024.
Impact upon the Kilpatrick Hills, Traffic and Road Safety, Flood Risk, Built and Cultural
Heritage, and Health and Safety
The Council’s position on these matters remains as per the response dated 13th May 2024.
Summary and conclusions
As set out in the Council’s most recent consultation response dated 13th December 2024,
concerns remained in respect of the Green Belt location not being justified, the impact upon
ecology, biodiversity and protected species, and the lack of an approach to de-commissioning
and site restoration. 
Considering the Green Belt location, the applicant has provided additional details to justify the
Green Belt location and why there are no suitable sites for this development outwith the Green
Belt. The Green Belt location is required to take advantage of the availability of a grid
connection at Windyhill sub-station. The distance of such developments from the grid
connection is also an important consideration as the level of efficiency of the site reduces the
further away from the connection it lies. Accordingly, the applicant has identified a 1.1km
search area from the available connection in which no suitable sites exist outwith the Green
Belt. It is now considered that the Green Belt location has been adequately justified, there are
no suitable sites outwith the Green Belt which can take advantage of this connection and the
impact within the Green Belt can be considered acceptable with reference to Policy 8 of NPF4.
Turning to the impact upon ecology, biodiversity and protected species, the applicant’s
updated preliminary ecological appraisal has been considered by the Council’s Biodiversity
Officer and now satisfactorily considers the adjacent LNCS within West Dunbartonshire and
assesses the potential cross boundary impact upon ecology, biodiversity and protected
species within West Dunbartonshire. It can therefore be concluded that significant adverse
impacts should not occur within the West Dunbartonshire area. Whilst it is expected that the
Scottish Ministers fully consider the appropriateness of the proposed planting and landscape
mitigation within the site and ensure that it compliments the surrounding area, the Council is of
the view that the proposal can now considered acceptable with reference to Policies 3, 4 and
11(e)(ix) of NPF4.
Finally, whilst the Council preference remains for the approach to de-commissioning and site
restoration to be provided upfront with the detail and implementation of the de-commissioning
and restoration scheme then addressed by condition, it is accepted that this is at odds with the
established approach to other similar developments. It is accepted that the de-commissioning
and site restoration can be secured by condition and any such condition(s) must be suitably
robust to ensure the complete removal of all aspects of the development and the restoration of
the landform within the site to its current pre-development profile.  A further condition can also
ensure early decommissioning should the site cease to export electricity to the grid for in
excess of 12 months. A financial provision to provide sufficient funds for the decommissioning
and restoration of the site should such be required must also be secured. With such an
approach, the Council would consider that the development meets the requirements Policy
11(e)(xi) of NPF4.
Following a full assessment of the further and updated details relating to the Council’s
outstanding concerns which formed the previous objection, it is concluded that these concerns
have now been addressed satisfactorily.  Whilst the Council no longer objects to the proposal,
Page 47

Page 48

a variety of points are, however, set out in this response together with the two previous
responses dated 13th December 2024 and 13th May 2024 and it is expected that the Scottish
Ministers fully consider and address these in the event that they are minded to grant consent.
For the avoidance of doubt, all three responses require to be read in conjunction with each
other.
Page 48

Page 49

Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 24/04/2024. All rights reserved. West Dunbartonshire OS Licence Number 100020790.
U
Scale: 1:3,000 @a4
24/04/2024Battery Storage Consultation Map -      ITEM 2 - APPENDIX 2 
Page 49

Page 50

Page 50

Page 51

West  Dunbartonshire  Consultation  Response  to  Scottish
Government Energy Consents Unit.
Section 36 application ref: ECU00004982 - Construction and operation of a
560MW Battery Energy Storage System with associated infrastructure,
substation, security fencing, CCTV, security lighting and landscaping on Land
at Cochno Road, Bearsden, East Dunbartonshire - project name Whitehall
BESS.
West Dunbartonshire Council objects to the above proposal as neighbouring
Planning Authority. Full details of the Council’s consideration of the development
proposal are set out below.
Context
An application has been made to the Scottish Ministers under Section 36 of the
Electricity Act 1989 (as amended) for the construction and operation of a battery
energy storage facility with a maximum power output of 560 megawatt. The
application site is located within the East Dunbartonshire local authority area and the
assessment of the application proposal is undertaken via the Scottish Government
Energy Consents Unit. West Dunbartonshire Council has been consulted as
neighbouring planning authority with the application site lying generally to the north of
the local authority boundary.
Site description and development proposal
Extending to approximately 29 hectares, the proposed site is situated on land at
Whitehall Farm, Cochno Road, East Dunbartonshire. The site lies immediately north
and east of the local authority boundary which follows the line of Cochno Road at this
location. The site itself is located within the open countryside comprising part of the
Green Belt as defined by the adopted East Dunbartonshire Local Development Pan 2.
To the south, the site is bound by Cochno Road with Whitehill Farm located directly
adjacent to the southeast of the site. To the west, the site is bound by Cochno Road
along its southern extent before following the general line of Lower Stourfold Glen.
The northern and eastern boundaries of the site generally cut across open land before
following the existing tree line to Cochno Road. The nearest residential properties
within West Dunbartonshire are the houses directly opposite the site at Edinbarnet,
Cochno Road. Properties at Craigton Street, Burnbrae Street, Craighaw Street and
Field Road lie around 170 metres from the southernmost boundary of the proposed
site. Loansdean, Cochno Road is around 200 metres from the site.
The proposal is for a 560 MW Battery Energy Storage Facility with associated
infrastructure. It is indicated that the development would have an operational lifespan
of 40 years. The proposed development would comprise a number of containerised
units to house battery energy storage systems and associated ancillary infrastructure.
Each container will have the appearance of a standard metal ISO/shipping container
and it is indicated these will be soundproof. The containers would be arranged in
parallel banks, and would likely be finished in dark grey or green and would be
ITEM 7 - APPENDIX 3
Page 51

Page 52

prefabricated off-site. The containers would be accessed via an external galvanised
metal open grid walkway supported by stairs and railings. The dimensions of the
containers would be approximately 2.6m x 2.4m x 12.2m (height x depth x width). The
containers together with other equipment will be placed on concrete plinths. In the
submitted documents that concrete will be installed in a manner which can be
removed at the end of the development’s life cycle, to return the land to agricultural
use. The proposal would see 224 containers in total. It is further indicated that there
will be 1 inverter per container and 1 transformer per 2 containers giving a total of 224
inverters and 112 transformers, arranged in formation alongside the containers. The
transformers and inverters will measure approximately 2.7m x 1.4m x 2.6m, and 2.3m
x 1.4m x 1.5m respectively. Underground cables would connect the facility to the grid
off-site at Drumchapel and Windyhill substations. A substation measuring 3.9m x 3.7m
x 13.6m is to be located in the located to the south of the site. All structures and
development as laid out above will be enclosed within an acoustic fence, proposed to
stand at 4m high.
A 4m wide access road will be installed, with the proposed access point to Cochno
Road located on the western edge of the site. It is indicated that landscape proposals
for the site will seek to enhance existing landscape features, screen views of the
battery containers and enhance biodiversity.
Battery Energy Storage Solutions provide a means of allowing for the storage of
energy at times when generating stations are working at full capacity which can then
be released when additional power is needed within the grid during peak times or
when energy generation has dropped. As more energy sources are now renewable,
such as wind and solar, balancing generation versus demand is a critical issue for grid
stability. Battery storage allows energy to be stored during peak renewable generation
periods and released when demand outstrips generation. In short, the proposed
battery takes in generated electricity when there is a surplus and stores it until there is
a demand for electricity which can be released to meet this demand.
The applicant has submitted a number of supporting documents with the application to
the Energy Consents Unit, including a supporting planning statement, design and
access statement, flood risk assessment, historic environment assessment,
preliminary ecological appraisal, transport statement, noise impact assessment,
battery safety management plan and landscape and visual impact assessment.
Appraisal
This application has been submitted to the Scottish Government under Section 36 of
the Electricity Act 1989, as it is development with a generating capacity of over 50MW.
Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. In this instance, the application is made
under the Electricity Act 1989 and therefore the Development Plan does not have the
primacy in the determination of the application.  It does, however, provide a basis for
the assessment of this proposal and it is established practice to take the development
plan into account in such decisions. The development plan comprises National
Planning Framework 4 and adopted East Dunbartonshire Local Development Plan 2.
Page 52

Page 53

Principle of Development
National Planning Framework 4 (NPF4) sets out the long-term vision for the
development of Scotland through the National Spatial Strategy. NPF4 aims to meet
Scotland’s climate ambition which will require a rapid transformation across all sectors
of the economy and society. This proposal constitutes a National Development as it
supports renewable electricity generation, repowering, and expansion of the electricity
grid under National Development 3: Strategic Renewable Electricity Generation and
Transmission Infrastructure.  NPF4 recognises that additional electricity generation
from renewables and electricity transmission capacity of scale is fundamental to
achieving a net zero economy. Policy 1 states that there is a need to encourage,
promote and facilitate development that addresses the global climate emergency and
nature crisis, whilst Policy 2 seeks to encourage, promote and facilitate development
that minimises emissions and adapts to the current and future impacts of climate
change. The electricity transmitted for storage within the proposed batteries will have
come from a mixture of renewable and non-renewable sources with the purpose of the
batteries to ensure there is always grid stability. As renewable energy becomes more
prevalent, grid stability becomes a significant issue due to the intermittent nature of
renewable energy generation.
Whilst the Council considers that the proposal could therefore be held to support the
overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply, it must be ensured that such development happens in the
right place. Therefore, it must be assessed if there are any potential adverse impacts
upon West Dunbartonshire resulting from the proposed development which would be
outweighed by any benefits. Policy 11(e) of NPF4 sets out in detail the matters for the
project design and mitigation to address.
Landscape and Visual Impact and impact on the Green Belt
The site is situated within the Green Belt to the north of the settlement of Faifley. Policy
8 of NPF4 sets out the types of development that are supported within the Green Belt
locations. This includes essential infrastructure and proposals that relates to the
distribution and transmission of electricity grid networks fall under this definition.
However, Policy 8 is clear that for development proposals in Green Belt locations, the
purpose of the Green Belt must not be undermined. Policy 11 additionally seeks to
encourage, promote, and facilitate all forms of renewable energy development,
including energy storage and distribution infrastructure. The policy sets out a range of
criteria that proposals should be assessed against to ensure the impact of the project
design and mitigation is addressed. This includes ensuring there is no adverse impact
on landscape and visual impact.
Policy 8 requires that the reasons why the Green Belt is essential must be provided
together with why the development cannot be provided on a site outwith the Green
Belt. The applicant advises that the site has been chosen due to it’s proximity to
appropriate grid connections. While this is accepted from a technical perspective, the
applicant has not provided any analysis of other site options that were considered
outside of the Green Belt and why it was not possible to locate them in an alternative
place. It therefore cannot be concluded that no other suitable sites are available in a
location outwith the Green Belt.
Page 53

Page 54

Policy 8 further requires that proposals must be compatible with the established
countryside and landscape and be designed to ensure that it is of an appropriate
scale, massing and external appearance to minimise visual impact upon the Green
Belt. That a development of this nature would have a visual impact is not in doubt. The
applicant’s Landscape and Visual Impact Assessment (LVIA) acknowledges that the
baseline landscape character of the site would be altered as a result of the proposed
development bringing adverse effects on landscape character, during both the
construction and operation phases. It is identified in the LVIA that the development
would introduce built elements which would be evident in its immediate landscape
setting. The Council is concerned at the potential for the industrial character of the
development and the harm to the visual harm to the locality, resulting in the
industrialisation of the Green Belt at this location. Whilst the proposed landscape
mitigation is acknowledged, the site is in close proximity to the settlement boundary of
Faifley and visually, the development will likely be viewed in the context of the
adjacent settlement. It will likely have negative impacts on landscape and natural
setting of the Green Belt, potentially having an adverse visual impact. Whilst the
development is identified as being temporary, there are no details of decommissioning
or restoration. With a possible development lifespan of up to 40 years, any impacts
from the operational phase of the development will occur over a long period of time.
The Council is of the view that the applicant has not demonstrated that there are no
other suitable sites are available in a location outwith the Green Belt. The Council also
considers that the industrial character of the development will result in visual harm to
the locality resulting in the industrialisation of the Green Belt. This would not be
acceptable. The development cannot, therefore, be held to be supported by Policies
8(a)(ii) and 11(e)(ii) of NPF4.
Impact upon the Kilpatrick Hills
Notwithstanding visual impact considerations within the Green Belt, the potential
impact on the landscape character and features of the Kilpatrick Hills Local
Landscape Area (LLA) must also be considered. The proposed site is approximately
270m away from the boundary of the LLA. The ‘Statement of Importance’, which is the
evidence underpinning the LLA explains that the lower slopes of the Kilpatrick Hills
contribute to its setting, by acting as an important landscape buffer. The designation
contains areas of lower slopes to protect the setting of the hills, meaning the proposed
development site is removed from this buffer.
The theoretical zone of visibility in the applicant’s LVIA does include southern areas of
the LLA. One of the special landscape qualities of the LLA is the long views across the
Glasgow conurbation, which emphasise the contrast between remote uplands and
developed lowlands. Visually intrusive development between the conurbations and
the Kilpatrick Hills could erode this special quality. The LVIA assesses that there would
be negligible impact stating the development is unlikely to be visible from the
viewpoint. Further, the tree screening mitigation would further reduce the visibility
once established.
Given that the site is some distance from the designation boundary and visibility is
expected to be low from the LLA, the Council considers that based on the assessment
within the submitted LVIA, it is unlikely there will be an adverse impact on the Kilpatrick
Hills
Page 54

Page 55

Ecology, biodiversity and protected species
Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects
from development and strengthen nature networks.  Policy 4 seeks to protect, restore
and enhance natural assets, making best use of nature-based solutions. The policy is
primarily focused on designated areas including sites designated as a local nature
conservation site or landscape area. Policy 11 also requires biodiversity impact to be
addressed.  The applicant has submitted a preliminary ecological appraisal in support
of the proposal and this primarily assesses impacts upon the proposed site. The
appraisal does not identify the adjacent Local Nature Conservation Sites (LNCS)
within West Dunbartonshire, as set out on the proposals map of proposed LDP2.
These comprise of three LNCS areas; Edinbarnet woodlands and Wester Cochno
Parkland both of which area adjacent to the proposed site, and Wester Cochno Burn.
The Council’s Biodiversity Officer advises that West Dunbartonshire Council has
undertaken a two year nature restoration project within the area known as
Auchnacraig Estate (which is comprised of the three LNCS above), and on Faifley
Knowes to the south.  Both Auchnacraig and Faifley have now been connected by a
new native woodland which straddles the hillside to the east of Douglas Muir Road.
This has created an integrated habitat which connects the urban environment to wider
Green Belt and the Kilpatrick Hills LLA. The Council’s Biodiversity Officer further
advises that to the northwest of the site, Glasgow University at Cochno Farm have
also been carrying out a number of nature restoration works including a large scale
planting programme as well as a private forestry grant development north of
Duntocher.
Collectively all the work put in by the various agencies in this location has resulted in
landscape and nature restoration around the proposed development site. Assessing
the potential impact upon the three LNCS making up Auchnacraig Estate,
Auchnacraig wood is a semi-natural broadleaved woodland with a number of veteran
broadleaved and conifer trees. Parts of the woodland has been established for a long
time, with parts of it thought to be ancient woodland associated with the former
Auchnacraig estate. Other woodland is younger native broadleaved woodland planted
over the past 20 years. Diverse semi-natural woodlands of this size and age are
uncommon locally, making this site important for nature conservation. Its value is
enhanced by the fact that it is located on the fringe of an urban environment where
wildlife habitats tend to be small and of low diversity. The Council’s Biodiversity Officer
advises that the woodland will have a positive effect on the surrounding environment
as it will provide a reservoir of species which can migrate into surrounding areas when
conditions are suitable.
The Council’s Biodiversity Officer further advises that a Phase 1 survey carried out at
Auchnacraig recognised the importance of the varied mosaic habitats.  Areas of
wetland pockets were found throughout the Estate.  The Estate features the Cochno
burn from which a wildlife pond is supplied and this has also been restored for wildlife
as part of the habitat restoration project.  Any proposed development to the north of
the site may have an impact on the hydrology of the LNCS site and this requires to be
assessed.
Page 55

Page 56

Considering specific species, the Council’s Biodiversity Officer advises that evidence
of badger foraging and pine marten scat were found in 2023 surveys.  Herpetofauna
surveys of the pond were undertaken and include common toad in the species list.
The open mosaic habitat is suitable for hedgehog and previous records of local bat
surveys on the site have found both common and soprano pipistrelles as well as
daubentons. Previous records of otter and watervole exist for both the Cochno and
Hardgate burns.  Recent watervole surveys have reconfirmed their presence at Faifley
thus the development site requires to be considered for watercourse and fossorial
watervole as they are within the distribution range of the proposed site.
It is therefore possible that all of the above species found within West Dunbartonshire
to the immediate west and south of the site could potentially be using the proposed
development site. The Council’s Biodiversity Officer advises that further species
specific surveys require to be carried out in respect of the proposed development site.
Issues such as adverse noise, vibration, lighting and hydrology pollution are not
discussed in the PEA and also require to be examined.
In terms of biodiversity enhancement, the proposed area is also a mixed habitat and
wet and marshy sections should not be given over to inappropriate tree planting under
the role of biodiversity enhancement, as these are valuable habitats of their own
accord.
Overall, the applicant’s preliminary ecological appraisal has been considered by the
Council’s Biodiversity Officer and this fails to identify the adjacent LNCS within West
Dunbartonshire and assess the potential cross boundary impact upon ecology,
biodiversity and protected species within West Dunbartonshire. It therefore cannot be
concluded that adverse impacts would not occur within the West Dunbartonshire area.
The Council does not consider that the proposal can be held to be supported by
Policies 3, 4 or 11(e)(ix) of NPF4.
Residential amenity
There is the potential for amenity impacts to occur to residents within West
Dunbartonshire, with the closest residential properties being at Edinbarnet on Cochno
Road, immediately to the west of the site. Infrastructure within the site would be
situated around 90 to 100 metres from these properties. Further properties lie to the
northern edge of Faifley, approximately 170 metres from the proposed site. The site
equipment itself is around 280 metres these residential properties in Faifley together
with Loansdean on Cochno Road. The applicant, however, requests micro-siting of up
to 100 metres and this could result in the proposed infrastructure being substantially
closer to nearby properties than the current layout suggests. The site entrance will be
taken from Cochno Road, opposite the properties at Edinbarnet.
Policy 11 of NPF4 requires that impacts on communities and individual dwellings
including residential amenity, and noise are addressed. A noise impact assessment
(NIA) has been submitted in support of the proposal and this has been considered by
the Council’s Environmental Health Service. A number of points are highlighted with
respect to the noise impact assessment. It is noted that the predicted noise is higher at
one receptor during the night but lower at other receptors. It is questioned whether this
is correct and the cause of this requires to be clarified. It is further noted that the noise
impact assessment applies a 2dB penalty for tonality being just perceptible at the
Page 56

Page 57

receptors. For cooling plant associated with battery storage an assessment and
discussion of NR curves as per the REHIS development guide quoted in the Noise
Assessment is expected. In the absence of this, it cannot be concluded that no
adverse impact will occur to residential properties.
In further assessing the noise assessment, Para 4.6.2 states that mitigation is
required to ensure compliance with the BS4142 assessment for daytime noise. It is
not clear from the results how this conclusion has been reached and furthermore there
is no discussion or suggestion of suitable mitigation and its predicted effectiveness.
The Council’s Environmental Health Service note that the applicant has stated that
there should be flexibility around the siting of the equipment within the site boundary,
with micro siting of up to 100 metres. There is no acknowledgement of this within the
NIA. Any impacts from different configurations of equipment requires to be fully
discussed and assessed. In the absence of this, the Council considers that it is not
considered that it has been demonstrated that there will be no unacceptable impact on
neighbouring amenity resulting from the operation of the development. It is not
therefore considered that the potential impacts from noise are addressed in
accordance with Policy 11(e)(i).
Any construction project will result in an element of noise and disturbance. In order to
manage any potential noise disturbance during the construction phase of the
development, in the event that consent was granted, the Councill would seek a that
construction work and any ancillary operations are restricted to between 8am to 6pm
Monday to Friday and 8am to 1pm on Saturday. No working should be permitted on
Sundays or public holidays, including local holidays within the West Dunbartonshire
Council area.
Traffic and Road Safety
Policy 11 of NPF4 requires the impacts on road traffic to be appropriately addressed,
including during construction. Access to the site will be taken from the A811 via
Cochno Road which is partly within the West Dunbartonshire boundary. The site
access itself will adjoin a West Dunbartonshire section of Cochno Road.  A 24 month
construction phase is identified and the applicant’s transport statement advises that
the construction phase of the development would generate around 109 two-way
movements per day during the first three months (218 individual movements), with
daily movements decreasing thereafter.
The applicant’s Transport Statement sets out that a review of Cochno Road outlines
how the carriageway has a suitable width to allow for simultaneous two-way
movement, from its junction with the A810 towards the access of Law Farm. Beyond
this towards the site, Cochno Road is predominantly single track, measuring circa
3.5m width. There are four formal passing places between the site and the Law Farm
access, which could be used to allow small vehicles to pass in the event of conflict.
Given the narrow width along sections of Cochno Road, with limited space to widen
the carriageway to provide passing places for HGVs, it is proposed to stagger arrivals
and departures. A detailed Construction Traffic Management Plan (CTMP) would be
developed. It is advised that no HGV movements will occur at the site during peak
hours, in addition to the school closing hour. It is further advised that there will be no
construction vehicle movements directly to the west of the site along Cochno Road.
Overall, the applicant does not consider that the proposals would result in a severe
Page 57

Page 58

impact upon the local road network. Once operational, the applicant anticipates
between 10 and 20 vehicle trips to the site per annum.
The Council’s Roads Service has considered the proposal and does not identify any
issues or objections. It is noted that a detailed CTMP will be prepared by the applicant
and the Council requests that in the event that the Scottish Ministers were minded to
grant consent, this is conditioned including a requirement for any CTMP to be agreed
with West Dunbartonshire Council due to the proximity of the site to the Council area
and use of the road network within the Council area.
Impact upon the core path network
Policy 11 of NPF4 requires matters relating to public access including long distance
walking and cycling routes and scenic routes to be suitably addressed. A variety of
core paths connect Faifley to the open countryside via Cochno Road. The applicant’s
supporting documents identifies East Dunbartonshire core path ED/153/1 which is
located to the south and east of the site and extending northeast from Cochno Road,
noting that only minor visual effects would occur in respect of users of this core path.
This East Dunbartonshire Core Path connects with the West Dunbartonshire Core
Path network to the opposite side of Cochno Road. The applicant’s submission does
not consider the impact on the core path network and connections to the core path
network within West Dunbartonshire. While no routes are physically interrupted by the
proposal, there will be a visual and noise impact to users of the routes and the
character of the routes will be changed. The Council considers that there is the
potential for there to be adverse visual amenity impacts on core path users. Whilst
landscape mitigation could seek to reduce the visual impact, the overall feeling of
being in the wider countryside and in ‘nature’ would be lost should the proposal
proceed.  Cochno Road acts as a connection between all of these routes and the
impact of construction traffic to users of these routes has not been considered or
addressed. The Council does not consider that the potential impact upon the core path
network has been addressed as required of Policy 11(e)(iii).
Flood risk
Considering matters relating to flood risk, a flood risk assessment has been submitted
in support of the proposal. This does not identify the site itself as being as
unacceptable risk of flooding. The proposed development is also not predicted to
increase surface water runoff or flooding to the surrounding catchment. It is noted that
in a consultation response to the Energy Consents Unit, SEPA offer no objection on
the grounds of flood risk.
Built and cultural heritage
The application is accompanied by a desk-based assessment of the historic
environment, which identified three heritage assets relevant to West Dunbartonshire:
Edinbarnet House which is a Category B listed building, the Scheduled Monument
Cochno Cup and Ring Marked Stone, and the Antonine Wall World Heritage Site
buffer. Historic Envirobnment Scotland (HES) in their consultation response to the
Energy Consents Unit notes that there are no designated heritage assets are located
within the development site application boundary. HES are therefore satisfied that
there will not be any direct impacts. HES also specifically consider the potential for
impact on both the Cochno Stone and Antonine Wall buffer zone and conclude that
any impact on their setting is not likely to be significant. Being guided by the response
Page 58

Page 59

from HES, the Council is therefore content that there is no significant impact on
historic assets within or adjacent to West Dunbartonshire. Potential archaeological
matters within the site would be for the Scottish Ministers to consider.
Health and safety
The applicant acknowledges that there are potential hazards associated with HV
electrical systems and BESS facilities, such as a fire and thermal runaway event,
which could result in the formation of harmful gases. In response to this, an Outline
Safety Management Plan Design has been submitted in support of the proposal. This
details the operational measures, which will be included to mitigate hazards and
reduce the risks to people and the environment. The key measures which will be
installed to reduce risk at the BESS include the use of systems to monitor the
operation of the BESS and continuously observe the temperature, voltage and other
process parameters. These will immediately alert operators to potential issues. It is
advised that in the event of a problem occurring, battery sections can be readily
isolated automatically. A fire and gas detection system will be installed alongside
conventional fire, heat and gas detectors, for the early detection of a fire event. An
automatically operated fire suppression system will also be installed. It is for the
Scottish Ministers to satisfy themselves that an unacceptable risk does not occur and
to inform this assessment, the Council would expect the Scottish Fire and Rescue
Service to be consulted on the application proposal. It is noted at the time of writing, no
consultation response is available online from this organisation.
Site Decommissioning and Restoration
Policy 11(e)(xi) of NPF4 requires matters relating to the decommissioning of
developments, including ancillary infrastructure, and site restoration to be addressed.
The applicant has indicated that the intended lifetime of the proposal is 40 years, after
which the facility will be decommissioned and the land restored to its former state.
However no other information regarding this has been submitted. It is essential that
given the type of development together with its size and location, that full details of de-
commissioning and site restoration is provided to ensure that the requirements of
Policy 11(e)(xi) of NPF4 are met.
In the event that the Scottish Ministers were minded to grant consent for the
development, the Council considers that there is the requirement for a financial bond
to ensure sufficient funds are available to decommission and restore the site. If the
developer was to go out of business with unfinished works potentially being left this
can be safeguarded by ensuring that a bond or other financial provision is to put in
place to cover such an eventuality. The bond or other financial provision would
address reinstatement works both in the event of a developer failing or being unable to
complete restoration works together with any failure in the aftercare arrangements
associated with the site restoration. The Council also considers that in the event that
the development fails to export electricity to the grid for a continuous period of 12
months it will be considered to have become redundant and the components of the
development removed and the site restored. In the event that consent was granted,
the Council considers it essential that that this requirement is to be addressed by a
condition.
Page 59

Page 60

Summary and conclusions
The Council consider that proposals such as this can be held to support the
overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply. The support as a national development is also
acknowledged. However, it remains that such development require to be sited in the
right locations and the benefits of such developments require to be balanced with any
potential adverse impacts.
In considering the proposal, it is concluded that no concerns arise in respect of
matters relating to the impact upon the Kilpatrick Hills, flood risk, roads and traffic, built
and cultural heritage, and health and safety. However, a variety of concerns do arise.
In assessing the Green Belt location to the north of Faifley, the Council is of the view
that the applicant has not demonstrated that there are no other suitable sites available
in a location outwith the Green Belt. The Council also considers that the industrial
character of the development would be to the visual harm of the locality resulting in the
industrialisation of the Green Belt. Whilst landscape mitigation is proposed, any
planting would take years to develop and mature, exacerbating the visual impact
within the short to medium term. This is not considered acceptable or justified. The
development cannot, therefore, be held to be supported by Policies 8 and 11(e)(i) of
NPF4.
Turning to the impact upon ecology, biodiversity and protected species, the applicant’s
preliminary ecological appraisal fails to identify the adjacent LNCS within West
Dunbartonshire and assess the potential cross boundary impact upon ecology,
biodiversity and protected species within West Dunbartonshire. It therefore cannot be
concluded that adverse impacts would not occur within the West Dunbartonshire area.
Turning to the impact on the core path network, while no routes are physically
interrupted by the proposal, there will be a visual and noise impact to users of the
routes and the character of the routes will be changed. The Council considers that
there is the potential for there to be adverse visual amenity impacts on core path
users. The overall feeling of being in the wider countryside and outwith the built-up
area would be lost. Cochno Road also acts as a connection between the various core
path routes at this location and the impact of construction traffic to users of these
routes has not been considered or addressed. The development cannot, therefore, be
held to be supported by Policies 3, 4 and 11(e)(iii) and (ix)
With regard to residential amenity, the Council does not consider that it has been
demonstrated beyond doubt that there would be no impact upon residential amenity
within West Dunbartonshire by way of noise. Finally, the Council considers it essential
that given the type of development together with its size and location, that full details of
de-commissioning and site restoration is provided to ensure that the requirements of
Policy 11(e)(i) of NPF4 are met.
West Dunbartonshire Council therefore objects to this proposal due to the above
concerns relating to the Green Belt location of the development, visual impact, impact
upon ecology, biodiversity and protected species, potential impact upon the users of
the core path network, potential impact upon adjacent residential amenity and the
failure to provide a decommissioning and restoration scheme. The Council does not
Page 60

Page 61

consider that the benefits of the proposed development outweigh any adverse impacts
to the adjacent West Dunbartonshire area.
Page 61

Page 62

Section 36 application ref: ECU00004982 - Construction and operation of a
560MW Battery Energy Storage System with associated infrastructure,
substation, security fencing, CCTV, security lighting and landscaping on Land
at Cochno Road, Bearsden, East Dunbartonshire - project name Whitehall
BESS.
Having fully reviewed the updated and revised details submitted, West Dunbartonshire
Council maintains an objection to the above proposal as neighbouring Planning Authority.
Full details of the Council’s consideration of the updated development proposal are set out
below.
Context
An application has been made to the Scottish Ministers under Section 36 of the Electricity Act
1989 (as amended) for the construction and operation of a battery energy storage facility with
a maximum power output of 560 megawatt. The application site is located within the East
Dunbartonshire local authority area and the assessment of the application proposal is
undertaken via the Scottish Government Energy Consents Unit. West Dunbartonshire Council
was previously consulted as neighbouring planning authority with the application site lying
generally to the north of the local authority boundary. Following consideration of the proposal
by the Council’s Planning Committee on 11th May 2024, the Council issued a consultation
response to the Scottish Ministers on 13th May 2024.
The Council objected to the proposal due to the concerns relating to the Green Belt location of
the development, visual impact, impact upon ecology, biodiversity and protected species,
potential impact upon the users of the core path network, potential impact upon adjacent
residential amenity and the failure to provide a decommissioning and restoration scheme. The
Council did not consider that the benefits of the proposed development outweigh any adverse
impacts to the adjacent West Dunbartonshire area.
Following the submission of the Council’s objection, a revised proposal together with a range
of additional and updated supporting documents have been submitted to the Scottish
Ministers. These details include a revised site layout, revised equipment details, revised
planting layout, a Landscape Statement, an updated Landscape and Visual Assessment, an
updated Noise Impact Assessment and an Archaeological Investigation.
The Council has reviewed the updated details and proposal as set out below. The Council
notes that a variety of supporting documents have not been updated to take account of the
revised proposal including the applicant’s design statement and supporting planning
statement. An updated description of the development has not been set out and as no
documents have been superseded within the online case file, the Council does not consider it
to be clear what the proposal currently comprises. The updated Landscape and Visual Impact
submission has been Emailed to the Council but at the time of writing does not form part of the
online case file. Its status is therefore uncertain.
For the avoidance of doubt, this updated response is based solely on the updated submission
and documents received since the Council’s previous response was issued on 13th May 2024,
including the Landscape and Visual Impact Assessment received by Email.
ITEM 7 - APPENDIX 4
Page 62

Page 63

This updated response requires to be read in conjunction with the Council’s original
consultation response dated 13th May 2024. There is no change to the in relation to the impact
upon the Kilpatrick Hills, traffic and road safety, flood risk, built and cultural heritage, and
health and safety. Whilst there was no objection from the Council in respect of these matters, a
number of points were highlighted and the position regarding these matters stand. It remains
that if the Scottish Ministers were minded to grant consent, the Council would expect the
Council’s comments to be taken into account. This updated response focuses on the Council’s
previous points of objection relating to the Green Belt location of the development, visual
impact, impact upon ecology, biodiversity and protected species, potential impact upon the
users of the core path network, potential impact upon adjacent residential amenity and the
failure to provide a decommissioning and restoration scheme.
Site description and development proposal
There is no change to the application site itself and it remains that this extends to
approximately 29 hectares and is situated on land at Whitehall Farm, Cochno Road, East
Dunbartonshire. The site lies immediately north and east of the local authority boundary which
follows the line of Cochno Road at this location. The site itself is located within the open
countryside comprising part of the Green Belt as defined by the adopted East Dunbartonshire
Local Development Pan 2. To the south, the site is bound by Cochno Road with Whitehill Farm
located directly adjacent to the southeast of the site. To the west, the site is bound by Cochno
Road along its southern extent before following the general line of Lower Stourfold Glen. The
northern and eastern boundaries of the site generally cut across open land before following
the existing tree line to Cochno Road. The nearest residential properties within West
Dunbartonshire are the houses directly opposite the site at Edinbarnet, Cochno Road.
Properties at Craigton Street, Burnbrae Street, Craighaw Street and Field Road lie around 170
metres from the southernmost boundary of the proposed site. Loansdean, Cochno Road is
around 200 metres from the site.
The proposal is for a 560 MW Battery Energy Storage Facility with associated infrastructure. It
is indicated that the development would have an operational lifespan of 40 years. It remains
that as per the original proposal, the development would comprise a number of containerised
units to house battery energy storage systems and associated ancillary infrastructure. Each
container will have the appearance similar to ISO/shipping container and would likely be
finished in dark grey or green and would be prefabricated off-site. The containers would be
accessed via an external galvanised metal open grid walkway supported by stairs and railings
and include external air conditioning units. The dimensions of the containers have been
amended from being 2.6m x 2.4m x 12.2m,  to being 2.9m x 2.4m x 6.1m (height x depth x
width). Power conversion system (PCS) units are of the same size and take a similar
appearance.
No updated description of the equipment to be located on site has been provided. However,
from the updated site plan, it is clear that the equipment will be provided in 64 banks of 6 units.
It remains that the proposal will feature a control room, sub-station compound, sub-station
building. Separate switchgear compounds are no longer proposed. The access point to the
development also remains located on Cochno Road, to the western edge of the site.
In an effort to reduce the potential for adverse landscape and visual impacts and address the
concerns raised in the consultation responses, the applicant has revised the proposed site
layout. The revised site layout reduces the overall development footprint by utilising a more
efficient  battery system and also a reduction in the developed footprint of the sub-station area.
The revised site layout increases the offsets of the development from the site boundary and
this allows for additional landscape buffers ranging from 30 metres to 65 metres in depth, with
built elements and fence lines set well back from the edge of the site. This allows the applicant
to propose additional mitigation planting proposals in an attempt to screen the development
Page 63

Page 64

within the landscape from those to the south and south east of the site, including those utilising
the core path to the east of the site.
Appraisal
This application has been submitted to the Scottish Government under Section 36 of the
Electricity Act 1989, as it is development with a generating capacity of over 50MW. Under the
terms of Section 25 of the Town and Country Planning (Scotland) Act 1997, all applications
must be determined in accordance with the development plan unless material considerations
indicate otherwise. In this instance, the application is made under the Electricity Act 1989 and
therefore the Development Plan does not have the primacy in the determination of the
application.  It does, however, provide a basis for the assessment of this proposal and it is
established practice to take the development plan into account in such decisions. The
development plan comprises National Planning Framework 4 and adopted East
Dunbartonshire Local Development Plan 2.
Principle of Development
There is no change to the position of National Planning Framework (NPF) 4 since the
Council’s previous consultation response and it remains that NPF4 sets out the long-term
vision for the development of Scotland through the National Spatial Strategy. NPF4 aims to
meet Scotland’s climate ambition which will require a rapid transformation across all sectors of
the economy and society. This proposal constitutes a National Development as it supports
renewable electricity generation, repowering, and expansion of the electricity grid under
National Development 3: Strategic Renewable Electricity Generation and Transmission
Infrastructure.  NPF4 recognises that additional electricity generation from renewables and
electricity transmission capacity of scale is fundamental to achieving a net zero economy.
Policy 1 states that there is a need to encourage, promote and facilitate development that
addresses the global climate emergency and nature crisis, whilst Policy 2 seeks to encourage,
promote and facilitate development that minimises emissions and adapts to the current and
future impacts of climate change. The electricity transmitted for storage within the proposed
batteries will have come from a mixture of renewable and non-renewable sources with the
purpose of the batteries to ensure there is always grid stability. As renewable energy becomes
more prevalent, grid stability becomes a significant issue due to the intermittent nature of
renewable energy generation.
As set out in the previous response, the Council considers that the proposal could be held to
support the overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply, but it must be ensured that such development happens in the right
place. Therefore, it must be assessed if there are any potential adverse impacts upon West
Dunbartonshire resulting from the proposed development which would be outweighed by any
benefits. Policy 11(e) of NPF4 sets out in detail the matters for the project design and
mitigation to address.
Landscape and Visual Impact and impact on the Green Belt
In originally considering the proposal, it was noted that the site is situated within the Green
Belt to the north of the settlement of Faifley. Policy 8 of NPF4 sets out the types of
development that are supported within the Green Belt locations. This includes essential
infrastructure, and proposals that relates to the distribution and transmission of electricity grid
networks fall under this definition. However, Policy 8 is clear that for development proposals in
Green Belt locations, the purpose of the Green Belt must not be undermined. Policy 11
additionally seeks to encourage, promote, and facilitate all forms of renewable energy
development, including energy storage and distribution infrastructure. The Policy sets out a
Page 64

Page 65

range of criteria that proposals should be assessed against to ensure the impact of the project
design and mitigation is addressed. This includes ensuring there is no adverse impact on
landscape and visual impact.
Policy 8 requires that the reasons why the Green Belt is essential must be provided together
with why the development cannot be provided on a site outwith the Green Belt. It was
previously acknowledged that the site has been chosen due to it’s proximity to appropriate grid
connections. It is accepted that there is a requirement for battery storage sites to be located
close to a viable grid connection with sufficient capacity to import and export power. In this
case, while this is accepted from a technical perspective and the proximity of the site to both
the Drumchapel sub-station and Windyhill sub-station which lie 3.17kms and 560m to the
south east respectively is acknowledged, the applicant has not provided any analysis of other
site options that were considered outside of the Green Belt and why it was not possible to
locate them in an alternative place. No additional supporting documentation has been
submitted by the applicant in this respect. It therefore remains that it cannot be concluded that
no other suitable sites are available in a location outwith the Green Belt.
Policy 8 further requires that proposals must be compatible with the established countryside
and landscape and be designed to ensure that it is of an appropriate scale, massing and
external appearance to minimise visual impact upon the Green Belt. In assessing the original
proposal, the Council considered that the industrial character of the development will result in
visual harm to the locality resulting in the industrialisation of the Green Belt and that this would
not be acceptable.
In an effort to address the potentially adverse visual impact resulting from the development, a
revised site layout which reduces footprint and massing of the development has been
submitted by the applicant. The revised site layout also moves the developed area away from
the site boundaries and sensitive visual receptors, including nearby residential properties in
Faifley to the south. Additional landscape mitigation is proposed in the form of extensive
planting. It remains, however, that a development of this nature would have a visual impact
sand this is not in doubt. The applicant has provided a Landscape Statement together with an
updated Landscape and Visual Impact Assessment (LVIA) which is reflective of the revised
proposal. It remains that the area is identified as currently having a rural characteristic with
significant woodland vegetation, notably including linear bands of trees and woodland
associated with local watercourses and burns, together with blocks of woodland. Despite the
amended proposal, the applicant’s updated LVIA acknowledges that the baseline landscape
character of the site would still be altered as a result of the proposed development and this
would have an impact upon landscape character, during both the construction and operation
phases.
The Council was previously concerned at the potential for the industrial character of the
development and the harm to the visual harm to the locality, resulting in the industrialisation of
the Green Belt at this location. Whilst the proposed landscape mitigation was acknowledged,
the site is in close proximity to the settlement boundary of Faifley and visually, the
development as previously proposed would likely have been viewed in the context of the
adjacent settlement.
The revised proposal sees a reduction in the development footprint within the wider
application site. The applicant’s updated LVIA notes that approximately 6 hectares of the wider
site will be developed, with the remaining 75% of the site retained as green infrastructure. The
battery storage infrastructure will be surrounded in its entirety with new native woodland
planting and this will create a significant visual buffer once established, and link to other
woodland areas in the vicinity of the site. To the south and southwest of the site open areas will
be retained and seeded with a mix of grasses and wildflowers. New hedgerow planting will be
Page 65

Page 66

provided to Cochno Road together with a stone wall. Hedgerow planting is also proposed to
an open section of the eastern boundary along the core path.
It remains the case that landscape and visual impacts will occur during the construction phase
and this is accepted. During the early years of the operational phase, the new landscape
works will not yet be established and there will be limited screening of the site.
Notwithstanding this, the reduction in the development area will ensure that the visual impact
within the landscape at this time is reduced in comparison to the original proposal. The LVIA
identifies that by 15 years, planting will have established providing screening of the
development within the wider landscape. Where views are still available, the development
would be seen with a well wooded backdrop.
Policy 11(e)(ii) of NPF4 explicitly accepts localised significant landscape and visual impacts
and in this respect the position is thus weighted towards development’s contribution to
renewable energy targets. As more energy sources are now renewable, such as wind and
solar, balancing generation versus demand is a critical issue for grid stability. Battery storage
solutions such as this proposal allows energy to be stored during peak renewable generation
periods and released when demand outstrips generation, thus contributing to renewable
energy targets. Whilst landscape and visual impacts will still arise from the revised proposal,
the reduced development footprint, enhanced landscape mitigation and additional separation
from the settlement boundary of Faifley reduces the impact. The development is no longer
considered to be viewed in the context of the adjacent settlement and an industrialisation of
the Green Belt at this location is not longer of such a concern that an adverse impact will occur
to the West Dunbartonshire Area which outweighs the benefits of the development in respect
of the contribution to renewable energy targets.
The Council does, however, expect that in the event that the Scottish Ministers are minded to
grant consent, robust conditions are applied to ensure the implementation, retention and
maintenance of the planting and landscape mitigation proposed. 
Notwithstanding the updated position relating to the potential for landscape and visual impact,
it remains that the applicant has not considered or addressed the Council’s previous point of
objection relating to the failure to demonstrated that there are no other suitable sites available
for such a development in a location outwith the Green Belt. If an alternative location was
available, no landscape and visual impact would result in the proposed location. Accordingly,
the development cannot currently be held to be supported by Policy 8(a)(ii) of NPF4.
Ecology, biodiversity and protected species
Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects from
development and strengthen nature networks.  Policy 4 seeks to protect, restore and enhance
natural assets, making best use of nature-based solutions. The policy is primarily focused on
designated areas including sites designated as a local nature conservation site or landscape
area. Policy 11 also requires biodiversity impact to be addressed. The applicant’s preliminary
ecological appraisal was previously considered by the Council’s Biodiversity Officer and this
failed to identify the adjacent LNCS within West Dunbartonshire and assess the potential
cross boundary impact upon ecology, biodiversity and protected species within West
Dunbartonshire. It therefore could not be concluded that adverse impacts would not occur
within the West Dunbartonshire area.  Accordingly, the Council did not consider that the
proposal could be held to be supported by Policies 3, 4 or 11(e)(ix) of NPF4.
No updated surveys or information have been received in respect of the points raised in the
Council’s previous consultation response and the position of the previous response with
respect to ecology, biodiversity and protected species and potential impact within the West
Dunbartonshire Area remains.
Page 66

Page 67

Residential amenity
As per the previous response, there is the potential for amenity impacts to occur to residents
within West Dunbartonshire. The revised site layout results in the developed area being
marginally further away from the closest residential properties being at Edinbarnet on Cochno
Road together with properties in Faifley.
Policy 11 of NPF4 requires that impacts on communities and individual dwellings including
residential amenity, and noise are addressed. A noise impact assessment (NIA) was
submitted in respect of the original proposal and this was considered by the Council’s
Environmental Health Service. A number of points and inadequacies were highlighted in
respect of the noise impact assessment and it could not be concluded that no adverse impact
would occur to residential properties. The proposed micro siting of up to 100 metres was not
acknowledged within the NIA and there was no consideration of the impacts from different
configurations of equipment. The Council could not conclude that it had been demonstrated
that there would be no unacceptable impact on neighbouring amenity resulting from the
operation of the development and raised concerns in this respect.
An updated Noise Impact Assessment has been submitted. This has been reviewed by the
Council’s Environmental Health Service who advise that they are happy to accept the findings
of the report and that noise disturbance would not occur and no noise mitigation is necessary.
It is further noted that the NIA no longer refers to any flexibility in the layout of siting of the units
within the development. Accordingly, the development requires to be completed in the same
configuration as was used to model the noise data (i.e. the updated site layout on which the
revised NIA was based). It is noted that as the applicant’s planning supporting statement has
not yet been updated to take into account the revised proposal and still makes reference to
micro-siting of up to 100 metres. The Council advises that there requires to be an updated
submission which removes this reference.
As with any modelled noise data for an NIA, Environmental Health recommend post
installation verification checks that the actual noise levels correlate with what was modelled.
The Council would request such an approach is required via condition in the event that the
Scottish Ministers are minded to grant consent. The Council’s position in respect of hours of
work during the construction phase remains as per the original response.
Impact upon the core path network
Policy 11 of NPF4 requires matters relating to public access including long distance walking
and cycling routes and scenic routes to be suitably addressed. The Council’s previous
response noted that a variety of core paths connect Faifley to the open countryside via
Cochno Road. The applicant’s supporting documents identified that East Dunbartonshire core
path ED/153/1 which is located to the south and east of the site and extending northeast from
Cochno Road, noting that only minor visual effects would occur in respect of users of this core
path. This East Dunbartonshire Core Path connects with the West Dunbartonshire Core Path
network to the opposite side of Cochno Road. The applicant’s submission did not consider the
impact on the core path network and connections to the core path network within West
Dunbartonshire. While no routes are physically interrupted by the proposal, there is the
potential for visual and noise impact to users of the routes,  and a change to the character of
the routes.
With the reduction in the developed area of the site together with additional landscape
mitigation proposed, it is considered that the visual amenity impacts on core path users would
now be acceptable. It remains, however, that Cochno Road acts as a connection between all
of the core path routes at this location and there is still no consideration of the impact of
construction traffic to users of these routes. A robust construction traffic management plan
which has a specific focus on the impact upon all users of Cochno Road including those
connecting between core path routes would be required, with safe routes established for such
Page 67

Page 68

connections during construction. In the event the Scottish Ministers were minded to grant
consent for the development, the Council considers that such an approach is imperative to
allow it to be concluded that the potential impact upon the core path network has been
addressed as required by Policy 11(e)(iii).
Site Decommissioning and Restoration
Policy 11(e)(xi) of NPF4 requires matters relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration to be addressed. The applicant has
indicated that the intended lifetime of the proposal is 40 years, after which the facility will be
decommissioned and the land restored to its former state. However, it was noted in the
Council’s previous response that no other information regarding this has been submitted.
It remains that no additional details relating to decommissioning has been provided. The
applicant’s Supporting Statement sets out that at the end of the operational period the site will
be decommissioned and the land restored to it’s former state. The updated LVIA advises that
following the completion of the operational phase, the components of the battery storage may
be removed and landscape effects potentially reversed, and this leaves a question over the
extent of any decommissioning. Whilst it is accepted that the provision and implementation of
a detailed restoration scheme could be addressed by an appropriate legal agreement or
condition, the Council remains concerned at the lack of a clear commitment in respect of the
decommissioning and restoration of the site, and an overall approach for this. The Council
considers that any restoration scheme would require to be of an extent that achieves a
complete reversal of any landscape harm that occurs.  Given the extensive cut and fill
proposed to accommodate the development, the restoration would require to include
substantial ground works to ensure the restoration of the landform to its original profile
following the removal of all hardstanding, infrastructure and equipment. The Council considers
that it is essential that given the type of development together with its size and location, that
details of the approach to de-commissioning and site restoration is provided to ensure that the
requirements of Policy 11(e)(xi) of NPF4 are met.
It remains that in the event that the Scottish Ministers were minded to grant consent for the
development, the Council considers that there is the requirement for a financial bond to
ensure sufficient funds are available to decommission and restore the site. If the developer
was to go out of business with unfinished works potentially being left this can be safeguarded
by ensuring that a bond or other financial provision is to put in place to cover such an
eventuality. The bond or other financial provision would address reinstatement works both in
the event of a developer failing or being unable to complete restoration works together with
any failure in the aftercare arrangements associated with the site restoration. The Council also
considers that in the event that the development fails to export electricity to the grid for a
continuous period of 12 months it will be considered to have become redundant and the
components of the development removed and the site restored. In the event that consent was
granted, the Council considers it essential that that this requirement is to be addressed by a
condition.
Impact upon the Kilpatrick Hills, Traffic and Road Safety, Flood Risk, Built and Cultural
Heritage, and Health and Safety
The Council’s position on these matters remains as per the response dated 13th May 2024.
Summary and conclusions
In the original consultation response, the Council set out that it considered that that proposals
such as this can be held to support the overarching aims of the NPF4 to achieve net zero
targets and provide a stable domestic energy supply. The support as a national development
is also acknowledged. However, it remains that such development require to be sited in the
Page 68

Page 69

right locations and the benefits of such developments require to be balanced with any
potential adverse impacts. A variety of concerns did arise.
A revised proposal with updated LVIA has been submitted by the applicant. Following full
consideration, it is concluded that whilst landscape and visual impacts will still arise from the
revised proposal, the reduced development footprint, enhanced landscape mitigation and
additional separation from the settlement boundary of Faifley reduces the impact. The
development is no longer considered to be viewed in the context of the adjacent settlement
and an industrialisation of the Green Belt at this location is not longer of such a concern that an
adverse impact will occur to the West Dunbartonshire Area which outweighs the benefits of
the development in respect of the contribution to renewable energy targets. It remains that the
applicant has not considered or addressed the Council’s previous point of objection relating to
the failure to demonstrated that there are no other suitable sites available for such a
development in a location outwith the Green Belt. If an alternative location was available, no
landscape and visual impact would result in the proposed location. Accordingly, the
development cannot currently be held to be supported by Policy 8(a)(ii) of NPF4.
Turning to the impact upon ecology, biodiversity and protected species, no updated surveys or
information have been received in respect of the points raised in the previous consultation
response and the position of the previous response with respect to ecology, biodiversity and
protected species and potential impact within the West Dunbartonshire area. It therefore
remains that it cannot be concluded that adverse impacts would not occur within the West
Dunbartonshire area. The development cannot, therefore, be held to be supported by Policies
3, 4 and 11(e)(iii)(ix).
Considering the impact on the core path network, with the reduced development footprint
together with enhanced landscape mitigation, it is considered that the visual amenity impacts
on core path users would now be acceptable. It remains that Cochno Road acts as a
connection between the various core path routes at this location and the impact of
construction traffic to users of these routes has not been considered or addressed. However,
the Council could accept this matter being addressed as part of a comprehensive construction
traffic management plan in the event that consent was to be granted.
With regard to residential amenity, the Council considers that the updated NIA now
demonstrates that there will be no impact upon residential amenity within West
Dunbartonshire by way of noise. This is based on the position of the NIA which no longer
refers to any flexibility in the layout of siting of the units within the development. Accordingly,
the development requires to be completed in the same configuration as was used to model the
noise data (i.e. the updated site layout on which the revised NIA was based. 
Finally, it remains that the Council considers it essential that given the type of development
together with its size and location, that details of de-commissioning and site restoration are
provided to ensure that the requirements of Policy 11(e)(i) of NPF4 are met. There are no
further submissions in this respect since the Council’s previous response.
Some aspects of the Council’s concerns which formed part of the previous objection have
been addressed, including visual impact and the impact upon residential amenity. However,
the applicant has failed to address other concerns and West Dunbartonshire Council therefore
maintains its objection to this proposal with reference to the above concerns relating to the
Green Belt location of the development, impact upon ecology, biodiversity and protected
species and the failure to provide a decommissioning and restoration scheme.
Page 69

Page 70

1 Bar Lane
York
YO1 6JU
+44 (0)1904 629258 
27 Old Gloucester Street 
London
WC1N 3AX
+44 (0)207 419 5113 
admin@aahplanning.com
www.aahplanning.com 
Dear Energy Consents Unit,
WHITEHALL BATTERY ENERGY STORAGE SYSTEM (BESS) – CONSTRUCTION AND OPERATION OF A 560MW BESS
TOGETHER WITH ASSOCIATED INFRASTRUCTURE, SUBSTATION, SECURITY FENCING, CCTV, SECURITY
LIGHTING AND LANDSCAPING ON LAND NEAR COCHNO ROAD, EAST DUNBARTONSHIRE, G81 5QS. GRID
REFERENCE: X 251107, Y 673995
ECU REFERENCE: ECU00004982
We write with reference to our application under Section 36 of the Electricity Act 1989 for a 560MW BESS with
associated infrastructure on land near Cochno Road, East Dunbartonshire, G81 5QS.
We are aware that West Dunbartonshire Council (WDC) has been consulted as an adjoining authority and that
the authority has provided a formal response as part of this consultation process. WDC considered the proposal
at its meeting of the Planning Committee on 11 December 2024 and resolved to maintain its original objection
(albeit on reduced grounds). 
Having reviewed this further formal response we are of the opinion that only 3 matters form the basis of the
remaining objection which we address separately below.
Green Belt Location
We provide a document “Additional Supporting Statement” dated December 2024 which sets out the prevalent
planning policy context against which BESS development proposals in the Green Belt should be assessed; the
primary locational requirements of BESS development and analysis of the general area around the identified
Point of Connection (POC) substation. This clearly demonstrates that a) BESS development is “essential
infrastructure” for the purposes of applying Green Belt policy and b) no other sites within closer proximity to
the POV are available which are outwith the Green Belt. In this context, the site of the proposed development
is appropriate and fully justified. 
18 December 2024 
Energy Consents Unit
5 Atlantic Quay
150 Broomielaw
Glasgow
G2 8LU          
ITEM 7 - APPENDIX 5  
Page 70

Page 71

Ecology and Environmental Impact
We provide an updated PEA which addresses the concerns raised in relation to impacts outside the application
site. No further impacts have been identified and no additional mitigation is required. We would remind the ECU
that the application has already been the subject of a Screening Request and the development has not been
identified as EIA development. As such the application is not likely to lead to any significant environmental
effects. 
Post-Operational Treatment
WDC maintain an objection on the basis of the lack of detail on de-commissioning proposals when operations
cease on site. In relation to this item, it is common practice that this is dealt with via pre-commencement
planning condition, with detailed decommissioning information and bond to be agreed post-permission but
prior to commencement of development. This is the approach commonly taken by the Energy Consents Unit
(ECU) – see conditions 8 and 9 of the attached BESS decisions (Linwood and Stanely Water). It is clear from the
above that the ECU is happy for a bond and decommissioning details to be agreed post-permission but prior to
commencement of development. Such an approach should be adopted here. 
We assume that the ECU will reconsult WDC and East Dunbartonshire Council on the basis of this information. 
Yours sincerely, 
Rob Crolla B.A (Hons), DipTP, MTP, MRTPI
Development Director 
www.aahconsultants.co.uk 
Enc:  Additional Supporting Statement – December 2024 
Updated PEA 
Example decisions on decommissioning
Page 71

Page 72

1 Bar Lane
York
YO1 6JU
+44 (0)1904 629258 
27 Old Gloucester Street 
London
WC1N 3AX
+44 (0)207 419 5113 
admin@aahplanning.com
www.aahplanning.com 
Dear Energy Consents Unit,
WHITEHALL BATTERY ENERGY STORAGE SYSTEM (BESS) – CONSTRUCTION AND OPERATION OF A 560MW BESS
TOGETHER WITH ASSOCIATED INFRASTRUCTURE, SUBSTATION, SECURITY FENCING, CCTV, SECURITY
LIGHTING AND LANDSCAPING ON LAND NEAR COCHNO ROAD, EAST DUNBARTONSHIRE, G81 5QS. GRID
REFERENCE: X 251107, Y 673995
ECU REFERENCE: ECU00004982
We write with reference to our application under Section 36 of the Electricity Act 1989 for a 560MW BESS with
associated infrastructure on land near Cochno Road, East Dunbartonshire, G81 5QS.
We are aware that West Dunbartonshire Council (WDC) has been consulted as an adjoining authority and that
the authority has provided a formal response as part of this consultation process. WDC considered the proposal
at its meeting of the Planning Committee on 11 December 2024 and resolved to maintain its original objection
(albeit on reduced grounds). 
Having reviewed this further formal response we are of the opinion that only 3 matters form the basis of the
remaining objection which we address separately below.
Green Belt Location
We provide a document “Additional Supporting Statement” dated December 2024 which sets out the prevalent
planning policy context against which BESS development proposals in the Green Belt should be assessed; the
primary locational requirements of BESS development and analysis of the general area around the identified
Point of Connection (POC) substation. This clearly demonstrates that a) BESS development is “essential
infrastructure” for the purposes of applying Green Belt policy and b) no other sites within closer proximity to
the POV are available which are outwith the Green Belt. In this context, the site of the proposed development
is appropriate and fully justified. 
18 December 2024 
Energy Consents Unit
5 Atlantic Quay
150 Broomielaw
Glasgow
G2 8LU
ITEM 7 - APPENDIX 6
Page 72

Page 73

Ecology and Environmental Impact
We provide an updated PEA which addresses the concerns raised in relation to impacts outside the application
site. No further impacts have been identified and no additional mitigation is required. We would remind the ECU
that the application has already been the subject of a Screening Request and the development has not been
identified as EIA development. As such the application is not likely to lead to any significant environmental
effects. 
Post-Operational Treatment
WDC maintain an objection on the basis of the lack of detail on de-commissioning proposals when operations
cease on site. In relation to this item, it is common practice that this is dealt with via pre-commencement
planning condition, with detailed decommissioning information and bond to be agreed post-permission but
prior to commencement of development. This is the approach commonly taken by the Energy Consents Unit
(ECU) – see conditions 8 and 9 of the attached BESS decisions (Linwood and Stanely Water). It is clear from the
above that the ECU is happy for a bond and decommissioning details to be agreed post-permission but prior to
commencement of development. Such an approach should be adopted here. 
We assume that the ECU will reconsult WDC and East Dunbartonshire Council on the basis of this information. 
Yours sincerely, 
Rob Crolla B.A (Hons), DipTP, MTP, MRTPI
Development Director 
www.aahconsultants.co.uk 
Enc:  Additional Supporting Statement – December 2024 
Updated PEA 
Example decisions on decommissioning
Page 73

Page 74

Preliminary Ecological
Appraisal (PEA)
Drumchapel 
Ref: RDECO00078/208/01/D
Date: 13.12.24
Prepared For:
GPC 013 Ltd 
Prepared By:
Dawn Thompson BSc (Hons) MCIEEM MECW
Rhys Newell ACIEEM
Helen Crossley BSc (Hons) MCIEEM 
ITEM 7 - APPENDIX 7
Page 74

Page 75

Preliminary Ecological Appraisal (PEA)  Page 2 of 32   
Copyright © 2024 
This report has been prepared for the exclusive use of GPC 013 Ltd. The report shall not be distributed
or made available to any other company or person without the knowledge and written consent of GPC
013 Ltd or R & D Ecology Ltd. 
No part of this document may be reproduced or altered without the prior written approval of R & D
Ecology Ltd. 
Page 75

Page 76

Preliminary Ecological Appraisal (PEA)  Page 3 of 32   
Contents
1. Executive Summary ......................................................................................................................... 4
2. Introduction .................................................................................................................................... 5
Background ......................................................................................................................................... 5
Site Description ................................................................................................................................... 5
Scope of the Assessment ..................................................................................................................... 5
Statement of Authority ....................................................................................................................... 6
3. Legislation, Policy and Guidance ..................................................................................................... 7
Legislation and Policy .......................................................................................................................... 7
Guidance Documents .......................................................................................................................... 8
4. Methodology ................................................................................................................................. 10
Study Areas........................................................................................................................................ 10
Desk Study ......................................................................................................................................... 10
Field Survey ....................................................................................................................................... 11
Limitations ......................................................................................................................................... 13
5. Baseline Conditions ....................................................................................................................... 14
Designated Sites ................................................................................................................................ 14
Habitats ............................................................................................................................................. 17
Species............................................................................................................................................... 24
6. Conclusion and Recommendations ............................................................................................... 28
Designated Sites ................................................................................................................................ 28
Habitats ............................................................................................................................................. 28
Species............................................................................................................................................... 29
7. Appendices .................................................................................................................................... 32
Appendix A – Maps ............................................................................................................................ 32
Appendix B – Biological Records ........................................................................................................ 32
Appendix C – Site Photographs ......................................................................................................... 32 
Page 76

Page 77

Preliminary Ecological Appraisal (PEA)  Page 4 of 32   
1. EXECUTIVE SUMMARY
1.1. A Preliminary Ecological Appraisal (PEA) has been undertaken for the proposed development
at lands near Concho Road, East Dumbartonshire. The aims of this report are to provide a
current baseline of the Application Site, identify any actual or potential habitat and species
constraints pertinent to the Development, and outline recommendations for avoidance,
mitigation, compensation (where necessary) and enhancement for ecology.
1.2. All surveys and assessments have been undertaken with the relevant best practice guidance,
including guidance set out by the Chartered Institute of Ecology and Environmental
Management (CIEEM). 
1.3. The Proposed Development does not lie within or adjacent to any statutory designated
environmental sites. Within 15km of the Application Site there are four Natura 2000
designated sites; one SAC and three SPAs. Within 5km of the Application Site there are twelve
other environmental designated sites; seven SSSIs, one Ramsar, three LNRs and one CP.
1.4. An extended phase 1 habitat survey was undertaken on 21st June 2023, which identified
eleven habitat types within the survey area. Habitats include (but not limited to) B2.2 Semi-
improved neutral grassland, B4 Improved grassland, A1.1.1 Semi-natural broad-leaved
woodland, B5 Marshy grassland, A2.1 Continuous scrub, A2.2 Scattered scrub, A3.1 Scattered
broadleaved trees and G2 Running water.
1.5. During the site visit, the habitats were assessed for their potential to support protected and
notable species present within the local area. 
1.6. From the current survey findings and the information collected during the desk-based
assessment, it is considered that with the implementation of the recommended measures
outlined within this report, no significant negative impacts will occur for protected or notable
habitats/species.
1.7. The creation of drystone walls, log piles and/or bug box/hotels and implementation of wildlife
boxes including bird and bat boxes within the woodland area would lead to a biodiversity gain. 
Page 77

Page 78

Preliminary Ecological Appraisal (PEA)  Page 5 of 32   
2. INTRODUCTION
BACKGROUND
2.1. R & D Ecology Ltd. have been appointed by GPC 013 Ltd (the “Applicant”) to undertake a
Preliminary Ecological Appraisal (PEA) for a proposed battery storage development (the
“Proposed Development”) on lands near Concho Road, East Dumbartonshire, G81 5QS (the
“Application Site”).
SITE DESCRIPTION
2.2. The site comprises of agricultural grass fields with woodland and scrub, with the adjacent
landscape also comprising of similar habitats. Waterways are present to the east, west and
south of the Site Boundary, which provides hydrological connectivity with the wider
landscape.
SCOPE OF THE ASSESSMENT
2.3. Preliminary Ecological Appraisal (PEA) is the term used to describe a rapid assessment of the
ecological features present, or potentially present, within a site and its surrounding area (the
zone(s) of influence in relation to a specific project. 
2.4. The key objectives of a PEA are to:
▪  identify the likely ecological constraints associated with a project; 
▪ identify any mitigation measures likely to be required;  
▪ identify any additional surveys that may be required to inform an Ecological Impact
Assessment (EcIA); and 
▪ identify the opportunities offered by a project to deliver ecological enhancement. 
Page 78

Page 79

Preliminary Ecological Appraisal (PEA)  Page 6 of 32   
STATEMENT OF AUTHORITY
2.5. Dawn Thompson is an experienced ecologist with over sixteen years of experience in
ecological surveys and assessments and holds a BSc (Hons) in Environmental Biology. Dawn is
a full member of the Chartered Institute of Ecology and Environmental Management (CIEEM),
and the Association of Environmental Clerks of Works (AECoW). Dawn has experience in
undertaking and managing a range of surveys including badger, otter, ornithological, and
other protected/notable species. Dawn also has also undertaken various assessments
including Ecological Impacts Assessments, Natura Impact Assessments / Appropriate
Assessments, extended phase 1 habitat, for a large number of projects. These numerous
projects include a variety of developments such as renewables, residential, mixed-use, utility,
roads and flood prevention schemes. Dawn is experienced in Geographical Information
Systems (GIS) and regularly uses QGIS to produce maps for reports and surveying. Dawn is
also a qualified tree climber for undertaking aerial preliminary roost assessments within trees. 
2.6. Rhys Newell has over six years ecological surveying experience, including red squirrel, badger,
otter, beaver, breeding birds, bats and phase 1 habitat surveys. Rhys is an associate member
of the Chartered Institute of Ecology and Environmental Management (CIEEM). Projects that
Rhys has worked on include a flood prevention scheme, renewables, residential and
commercial developments. Rhys has experience of Geographical Information Systems (GIS)
and regularly uses QGIS to produce maps for reports and surveying and has completed a
course in advanced thermal imaging techniques. Rhys is a qualified tree climber for
undertaking aerial preliminary roost assessments within trees.
2.7. Helen Crossley has a BSc (Hons) in Botany and is a full member of the Chartered Institute of
Ecology and Environmental Management (CIEEM). Helen has varied experience in ecology
and environmental management gained from working for an environmental consultancy and
her own company. This has involved conducting; botanical surveys including: Phase 1 habitat,
National Vegetation Classification (NVC), condition assessments and vascular plant surveys;
protected species surveys: bat, badger, great crested newt, otter, water vole and red squirrel;
herbivore impact assessment surveys and working as an Ecological Clerk of Works (ECoW).
Report production includes; survey reports for extended Phase 1 and NVC, Ecological Impact
Assessments (EcIA), habitat management plans and feasibility studies. Helen has experience
of various Geographical Information Systems (GIS) and regularly uses QGIS to produce maps
for reports and surveying. 
Page 79

Page 80

Preliminary Ecological Appraisal (PEA)  Page 7 of 32   
3. LEGISLATION, POLICY AND GUIDANCE
LEGISLATION AND POLICY
3.1. This ecological assessment has been undertaken with regard appropriate legislation:
▪ Wildlife and Countryside Act 19811
▪ The Conservation (Natural Habitats, &c.) Amendment (Scotland) Regulations 20192
▪ Invasive Non-native Species (EU Exit) Scotland (Amendment etc.) Regulations3
▪ Nature Conservation (Scotland) Act 20044
▪ Environment Act 19955
▪ Conservation of Badgers Act 1992 (as amended)6
▪ Nature Conservation (Scotland) Act 20047;
▪ The Wildlife and Natural Environment (Scotland) Act 20118;
▪ The Water Environment and Water Services (Scotland) Act 20039 (as amended) (WEWS);
▪ Land Use Strategy for Scotland (2011)10
▪ National Planning Framework 411; and
▪ The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 201712. 
1 Available at: http://www.legislation.gov.uk/ukpga/1981/69 
2 Available at: https://www.legislation.gov.uk/ssi/2019/64/introduction/made 
3 Available at: https://www.legislation.gov.uk/ssi/2020/473/contents/made 
4 Available at: https://www.legislation.gov.uk/asp/2004/6/contents?text=nature%20conservation#match-1 
5 Available at: https://www.legislation.gov.uk/ukpga/1995/25/contents?text=Environment%20Act%20#match-1 
6 Available at: https://www.legislation.gov.uk/ukpga/1992/51/contents?text=badgers#match-1 
7Available at: http://www.legislation.gov.uk/asp/2004/6/contents 
8 Available at: http://www.legislation.gov.uk/asp/2011/6/contents/enacted 
9 Available at: http://www.legislation.gov.uk/asp/2003/3/contents 
10 Available at: http://www.scotland.gov.uk/topics/environment/countryside/landusestrategy 
11 National Planning Framework 4 - gov.scot (www.gov.scot)
12 Available at: http://www.legislation.gov.uk/ssi/2017/102/contents/made 
Page 80

Page 81

Preliminary Ecological Appraisal (PEA)  Page 8 of 32   
GUIDANCE DOCUMENTS
BS 42020:2013 Biodiversity13
3.2. The British Standards Institute has published BS 42020:2013 Biodiversity. Code of Practice for
Planning and Development which offers a coherent methodology for biodiversity
management. This document seeks to promote transparency and consistency in the quality
and appropriateness of ecological information submitted with planning applications and
applications for other regulatory approvals. 
3.3. BS 42020:2013 cites CIEEM EcIA Guidelines as the acknowledged reference on ecological
impact assessment. These guidelines are consistent with the British Standard on Biodiversity,
which provides recommendations on topics such as professional practice, proportionality,
pre-application discussions, ecological surveys, adequacy of ecological information, reporting
and monitoring.
CIEEM Guidelines
3.4. The Chartered Institute of Ecology and Environmental Management (CIEEM) have produced
guidance on Preliminary Ecological Appraisal14 (PEA), and Ecological Report Writing15.
3.5. A Preliminary Ecological Appraisal (PEA) is the term used to describe a rapid assessment of
the ecological features present, or potentially present, within a site and its surrounding area
(the zone(s) of influence in relation to a specific project. A PEA normally comprises a desk
study and an extended phase 1 habitat survey.
Other Guidelines / Documents
▪ Handbook for Phase 1 Habitat Survey16
▪ Bat Surveys for Professional Ecologists: Good Practice Guidelines (3rd Edition)17; 
▪ Legally protected species UK18
▪ Bat Roosts in Trees19
▪ Birds of Conservation Concern UK20 
13 BS 42020:2013 Biodiversity. Code of practice for planning and development
14 CIEEM (2017) Guidelines for Preliminary Ecological Appraisal.
15 CIEEM (2017) Guidelines for Ecological Report Writing
16 JNCC (2003) Handbook for Phase 1 Habitat Survey – a technique for environmental audit. JNCC, Peterborough
17 Collins, J. (2016). Bat Surveys for Professional Ecologists: Good Practice Guidelines17 (3rd edition). Bat Conservation Trust
18 http://jncc.defra.gov.uk/page-3415
19 BTHK (2018) Bat Roosts in Trees – A Guide to Identification and Assessment for Tree-Care and Ecology Professionals.
20 http://www.rspb.org.uk/wildlife/birdguide/status_explained.aspx
Page 81

Page 82

Preliminary Ecological Appraisal (PEA)  Page 9 of 32   
▪ Monitoring the Otter Lutra Lutra21
▪ Surveying for Badgers – Good Practice Guidelines22
▪ Surveying for Red Squirrels23
▪ The Water Vole Mitigation Handbook24
▪ Surveying for Pine Marten25
▪ The Eurasian Beaver Handbook26
▪ UK BAP Mammals: Interim Guidance for Survey Methodologies, Impact Assessment and
Mitigation 27
▪ Developing with Nature Guidance28 
21 Chanin, P. (2003). Monitoring the Otter Lutra Lutra. Conserving Natura 2000 Rivers, Monitoring Series (No. 10).
22 Scottish Badgers (2018) Surveying for Badgers – Good Practice Guidelines
23 Gurnell J, et al (2009). Forestry Commission Practice Note 11. Forestry Commission, Edinburgh.
24 Dean, M., Strachan, R. Gow, D. and Andrews, R. (2016). The Water Vole Mitigation Handbook (Mammal Society Mitigation Guidance Series).
25 UK BAP Mammals: Intrim Guidance for Survey Methodologies, Impact Assessment and Mitigation (2012)   
26 Cmpbell-Palmer et al. (2016) The Eurasian Beaver Handbook – Ecology and Management of Castor fiber
27 Wheeler et al. (2012) UK BAP Mammals: Interim Guidance for Survey Methodologies, Impact Assessment and Mitigation
28 NatureScot (2023) Develioping with Nature Guidance - Developing with Nature guidance | NatureScot
Page 82

Page 83

Preliminary Ecological Appraisal (PEA)  Page 10 of 32   
4. METHODOLOGY
STUDY AREAS
4.1. Various ecological study areas (ESA) have been assessed during different sections of this PEA
for the Proposed Development, following standard best practice measures. Each study area
is outlined within Table 4-1 below. 
Table 4-1: Study Areas 
Zone of Influence Distance from Application Site
Natura 2000 designated sites 15km
All other designated sites 5km
Biological Records 2km
Phase 1 Habitat Survey Application Site
Species Scoping Survey 50m
4.2. The study areas are considered to be sufficient to cover the potential zone of influence (ZoI)
of the Proposed Development. 
DESK STUDY
4.3. A desk-based assessment was undertaken on 14th June 2023 to collate available ecological
information for the Application Site and the surrounding area. This included a search of
statutory designated sites within a 5km radius of the Proposed Development, including: Sites
of Special Scientific Interest (SSSIs), Special Protection Areas (SPAs), Special Areas of
Conservation (SACs), National Nature Reserves (NNRs), RAMSAR Sites and Local Nature
Reserves (LNRs). In addition, all Natura 2000 designates sites (SPAs and SACs) have been
included within 15km of the Application Site. The descriptions of each of these sites was
obtained utilising the NatureScot website29. 
4.4. National Biodiversity Network (NBN) Gateway website30 was also searched for historical
species records within 2km of the Proposed Development on 14th June 2023. 
29 NatureScot SiteLink. Available at: https://sitelink.nature.scot/home
30 Available at: Explore Your Area | NBN Atlas 
Page 83

Page 84

Preliminary Ecological Appraisal (PEA)  Page 11 of 32   
FIELD SURVEY
Phase 1 Habitat Survey
4.5. An extended phase 1 habitat survey was undertaken on the 21st June 2023 by Helen Crossley
BSc (Hons) MCIEEM. This survey covered all land within the Application Site and wider land
ownership (the ecological survey area). Survey work was carried out in accordance with the
Joint Nature Conservation Committee (JNCC) guidelines in order to produce a phase 1 habitat
map, which is contained within Figure 3, Appendix A of this document. Target notes have
been used to highlight features of importance, and habitats too small to clearly demonstrate
on the map. 
4.6. This habitat classification method provides a standardised system to record and map semi-
natural vegetation and other wildlife habitats to assess the potential importance for nature
conservation. 
Ground Water Dependant Terrestrial Ecosystems 
4.7. The Functional Wetland Typology manual was reviewed to aid in the identification of wetland
habitats which are reliant on ground water and surface water. Any wetland habitat observed
within the ESA was assessed to determine whether it was a Ground Water Dependant
Terrestrial Ecosystem (GWDTE). 
Species Scoping Survey
4.8. The potential for supporting protected, rare or notable species within each of the habitats
was noted.
4.9. In the context of this report, rare, protected, or otherwise notable species of flora or fauna
were those considered to meet any of the following criteria: 
▪ Species protected by UK or European legislation;  
▪ UK Post 2010 UK Biodiversity Framework priority species or Local Biodiversity Action Plan
(LBAP) species; 
▪ Nationally rare or nationally scarce species; 
▪ Species of Conservation Concern (e.g. JNCC Red List, RSPB/BTO Red or Amber Lists).
4.10. The Wildlife and Countryside Act (1981) as amended, makes it an offence to release or allow
to escape into the wild any animal, plant or micro-organism not ordinarily resident in the UK
(as listed in Schedule 9 of the Act). Plant species listed in Schedule 9 were searched for during
Page 84

Page 85

Preliminary Ecological Appraisal (PEA)  Page 12 of 32   
the survey. Examples include species such as giant hogweed (Heracleum mantegazzianum),
Japanese knotweed (Fallopia japonica) and Himalayan balsam (Impatiens glandulifera).
4.11. Table 4-2 below outlines the relevant habitat and field signs that indicate the presence of
protected or notable species within the survey area. 
Table 4-2: Indicative Habitats and Field Signs 
Species Indicative Habitat(s) Field Signs
Bats
Roosts – trees, buildings,
bridges, caves, etc.
Foraging habitats – woodland,
hedgerow, water bodies,
parkland, grassland etc. 
In or on potential roost sites:
droppings stuck to walls, urine
spotting in roof spaces, oil from fur
staining round roost entrances,
feeding remains (e.g. moth wings
under a feeding perch).
Badger Found in most rural and many
urban habitats. 
Excavations and tracks, sett
entrances, latrines, hairs, well-worn
paths, prints, scratch marks on trees.
Otter Watercourses and adjacent
habitats.
Holts, above ground resting places,
prints, spraints, slide marks into
watercourses, feeding signs (e.g. fish
bones). 
Beaver Water courses and adjacent
habitats. 
Lodge, dam, feeding signs, felled
trees, prints and trails.
Water vole Water bodies/water courses.
Burrow entrances, prints, distinctive
latrine areas, feeding signs (cropped
‘grazing lawns’ on water’s edge).
Red squirrel Woodland. Dreys, feeding remains. 
Pine marten Woodland. Dens, scats, footprints. 
Reptiles Rough grassland, log and
rubble piles. Shedded skins.
Great crested
newt
Ponds within 500 m of suitable
habitat within the Application
Site. Suitable (terrestrial)
habitat includes rough
grassland, scrub and woodland,
log and rubble piles and other
debris, animal burrows. 
No specific field signs. 
Page 85

Page 86

Preliminary Ecological Appraisal (PEA)  Page 13 of 32   
Birds
Trees, hedgerows, woodland,
grassland, scrub and buildings
etc. 
Nests, feathers, egg shells. 
Freshwater
pearl muscles Waterways.  Suitable substrate. 
Salmonids
and other
fish species
Waterways.  Suitable substrate. 
LIMITATIONS 
4.12. Results of the assessment undertaken are representative of the time that surveying was
undertaken. 
4.13. The absence of records returned during the data search does not necessarily indicate absence
of a species/habitat from an area, but rather that these have not been recorded or are
perhaps under-recorded within the search area. 

4.14. An Extended Phase 1 habitat survey does not aim to produce a full botanical or faunal species
list or provide a full protected species survey but, enables competent ecologists to ascertain
an understanding of the ecology of the Application Site in order to: 
▪ Broadly identify the nature conservation value of a site and preliminary assess the
significance of any potential impacts on habitat/species recorded; and/or
▪ Confirm the need and extent of any additional specific ecological surveys that are
required to identify the true nature conservation value of a site. 

4.15. All surveys were undertaken in suitable weather conditions, during the appropriate survey
seasons.
4.16. No other limitations were encountered, or assumptions made during either the desk study or
the field survey and it is considered that with the access gained and recording undertaken an
accurate assessment of the site’s ecological value has been made. 
Page 86

Page 87

Preliminary Ecological Appraisal (PEA)  Page 14 of 32   
5. BASELINE CONDITIONS
STATUTORY DESIGNATED SITES 
5.1. The Proposed Development does not lie within or adjacent to any statutory designated
environmental sites. Within 15km of the Application Site there are four Natura 2000
designated sites; one SAC and three SPAs. Within 5km of the Application Site there are twelve
other environmental designated sites; seven SSSIs, one Ramsar, three LNRs and one CP.
5.2. Each of these sites are outlined in Table 5-1 below and can be found in Figure 2, Appendix A.
The site descriptions are derived from the original site citations available from NatureScot,
and the Joint Nature Conservation Committee (JNCC).
Table 5-1 Designated Sites
Site Name Qualifying/Notable Features
Distance
and
Direction
Connectivity
Manse Burn
SSSI
▪  Permian – Carboniferous
Fish/Amphibia
1.45km SE No
Garscadden
Wood LNR
▪ Purple hairstreak butterfly
▪ Common woodland birds
▪ Roe deer
▪ Red fox
▪ Bluebell
1.49km SE No
Kilmardinny
Loch LNR
▪ Habitat mosaic (wet & dry
woodland & grassland)
3.24km E No
Mugdock CP ▪ Woodland 3.28km NE No
Craigallian
Marshes SSSI ▪ Flood-plain fen 3.28km NE No
Mugdock
Wood SSSI
▪ Beetle assemblage
▪ Lowland dry heath
3.35km NE No
Page 87

Page 88

Preliminary Ecological Appraisal (PEA)  Page 15 of 32   
Inner Clyde
SPA
▪ Redshank (Tringa tetanus), non-
breeding
3.84km SW No
Inner Clyde
Ramsar
▪ Redshank (Tringa tetanus), non-
breeding
3.84km SW No
Inner Clyde
SSSI
▪ Cormorant (Phalacrocorax carbo),
non-breeding
▪ Eider (Somateria mollissima), non-
breeding
▪ Goldeneye (Bucephala clangula),
non-breeding
▪ Oystercatcher (Haematopus
ostralegus), noon-breeding
▪ Red-breasted merganser (Mergus
serrator), non-breeding 
▪ Red-throated diver (Gavia stellata),
non-breeding
▪ Redshank (Tringa tetanus), non-
breeding
▪ Salmarsh
3.88km SW Yes 
Loch
Humphrey
Burn SSSI
▪ Palaeozoic palaeobotany  4.07km W No
The Saltings
LNR
▪ Regenerated woodland and
meadow, noted for its wetland
habitats
▪ Orchids
▪ Common blue damselflies and
common hawk dragonflies
4.47km W No
Page 88

Page 89

Preliminary Ecological Appraisal (PEA)  Page 16 of 32   
▪ Peacock and orange-tip butterflies
▪ Birds including cormorant, swan,
grey heron, curlew and
oystercatcher
Dumbrock
Loch
Meadows
SSSI
▪ Lowland neutral grassland 4.52km NE No
Dumbarton
Muir SSSI
▪ Upland habitat
▪ Raised bog
4.64km
NW No
Black Cart SPA
▪ Whooper swan (Cygnus cygnus),
non-breeding
6.04km SW No
Endrick Water
SAC
▪ Atlantic salmon (Salmo salar)
▪ Brook lamprey (Lampetra planeri)
▪ River lamprey (Lampetra fluviatillis)
10.68km N No
Loch Lomond
SPA
▪ Capercaillie (Tetrao urogallus),
breeding
▪ Greenland white-fronted goose
(Anser albifrons flavirostris), non-
breeding
14.55km
NW No
5.3. Where connectivity does not exist, there are no pathways for impacts. Therefore, only those
designated sites with connectivity to the Application Site outlined above have been
considered further in this assessment. 
Non-Statutory Designated Sites
5.4. Within 1km of the Application Site there are three non-statutory designed sites; Wester
Cochno Parkland LNCS, Edibarnet Woodland LNCS and Wester Cochno Burn LNCS. Please
refer to Figure 4, Appendix A for locations of each LNCS. 
Page 89

Page 90

Preliminary Ecological Appraisal (PEA)  Page 17 of 32   
5.5. Each of these designated sites falls within West Dumbartonshire Council. There are no non-
statutory designed sites within the 1km study area present within East Dumbartonshire
Council.
Wester Cochno Parkland LNCS
5.6. Interest features: Old trees and common wildlife 
5.7. Species rarity: common and widespread species  
5.8. Reason for selection: central connection between Edinbarnet Wood and Wester Cochno
Burn, which together make viable area of woodland and associated agricultural habitats.
Extremely accessible to local residents.
Edibarnet Woodland LNCS
5.9. Interest features: common wildlife and old trees
5.10. Species rarity: common woodland species  
5.11. Reason for selection: good for general wildlife, and accessible to residents 
Wester Cochno Burn LNCS
5.12. Interest features: Woodland, old trees and common wildlife
5.13. Species rarity: common and widespread species  
5.14. Reason for selection: good for general wildlife, and accessible to residents 
HABITATS 
5.15. An extended phase 1 habitat survey was undertaken on 21st June 2023, which identified
eleven habitat types within the survey area, each of these are outlined below along with other
relevant target notes. In addition, the phase 1 habitat map is shown within Figure 3, Appendix
A. 
Page 90

Page 91

Preliminary Ecological Appraisal (PEA)  Page 18 of 32   
5.16. Habitats present within the survey area are summarised within Table 5-2 below. 
Table 5-2 Summary of Habitats Recorded
Phase 1 Habitat  Habitat Area Species Present Other Observations
B2.2 Semi-improved
neutral grassland
6, 8, 12, 17,19,
31
Dominant species:
Yorkshire fog, common
bent, tufted hair-grass
Other species:
Broad-leaved dock,
soft rush, field
speedwell, creeping
buttercup, common
mouseear, common
ragwort,
pineappleweed,
common sorrel. 
Habitat structure:
Grazed grass, very
short.
Grass dominated,
area 6 has had
muck spreading
Animal
associations:
Amphibians,
ground nesting
birds
Management
practices: Fertiliser
improvement
24
Dominant species:
Tufted hair-grass, soft
rush
Other species:
Brooklime, sheeps
sorrel, marsh thistle,
lady’s smock, field
horsetail, field
woodrush, meadow
sweet, ragged robin,
common sedge, sharp
flowered rush, devil’s
bit scabious. 
Habitat structure:
Very wet area, with
channels
dominated by
rushes, great
variety if
herbaceous plants
Animal
associations:
Amphibians,
ground nesting
birds
Management
practices:             
None
3, 11, 18, 20, 28
Dominant species:
Tufted hair-grass, soft
rush
Other species:
Habitat structure:
Wet area
dominated by
tufted hair-grass.
Page 91

Page 92

Preliminary Ecological Appraisal (PEA)  Page 19 of 32   
Creeping buttercup,
Yorkshire fog, creeping
thistle, broad-leaved
dock, ribwort plantain,
daisy, common nettle
Animal
associations:   
Cattle moving
freely, ground
nesting birds
Management
practices:            
None
B4 Improved
grassland 
Dominant species:
Yorkshire fog,
perennial rye grass,
common bent,
meadow foxtail, sweet
vernal grass.
Other species:
Broad-leaved dock,
creeping buttercup,
field speedwell,
common mouseear. 
Habitat structure:
Grass ley
Animal
associations: None
Management
practices:                 
Has been partly cut
A1.1.1 Semi-natural
broad-leaved
woodland
1, 5, 10
Dominant species:
Beech, sycamore,
hawthorn, silver birch,
common lime, ash,
wych elm, sessile oak,
rhododendron
Other species:
Holly, wild cherry,
rowan, alder. Ground
flora a mix of grasses
herbs, fern and
mosses. Greater
knapweed, broad-
leaved willowherb,
common male fern,
cow parsley, herb
Robert, common
hogweed, creeping
thistle, Yorkshire fog,
cocksfoot, meadow
Habitat structure:
Trees generally
young 10-20m tall,
some natural
regeneration of
ash. Trees generally
in good condition,
very few old trees.
Animal
associations:       
Low roosting
potential for bats,
although good for
feeding and
commuting.
Nesting birds, small
mammals, deer.
Management
practices:            
None
Page 92

Page 93

Preliminary Ecological Appraisal (PEA)  Page 20 of 32   
buttercup, daisy,
ground elder, sweet
vernal grass, raspberry,
foxglove, dog violet,
bramble.
7, 26, 29
Dominant species:
Silver birch, sycamore
Other species:
Rowan, hawthorn, ash,
Scots pine. Ground
flora less diverse than
other areas of
woodland, mostly
grasses. Common bent,
Yorkshre fog,
cocksfoot, foxglove. 
Habitat structure:
More open
woodland, young
trees 10-20m tall.
Animal
associations:        
Low bat roost
potential, good for
feeding and
commuting bats.
Nesting birds, small
mammals and deer
Management
practices:          
None, cattle roam
freely in area
B5 Marshy grassland 2, 9, 13, 19
Dominant species:
Soft rush
Other species:
Tufted hair-grass,
creeping thistle,
Yorkshire fog, Creeping
soft grass, marsh
thistle, broadleaved
dock, lady’s smock,
common sedge, sharp
flowered rush 
Habitat structure:
Wetter areas
where there is no
sign of grazing
although lots of
trampling by cattle.
Animal
associations: 
Amphibians,
grazing cattle
Management
practices:                      
None seen
A2.1 Continuous
scrub
14, 16, 21, 23,
25
Dominant species:
Gorse. Area 23 has
more goat willow and
hawthorn as the
dominant species
Habitat structure:
Scrub mostly of
gorse but with the
odd tree. 
Page 93

Page 94

Preliminary Ecological Appraisal (PEA)  Page 21 of 32   
Other species:
Brambles, elderflower,
goat willow, hawthorn,
silver birch, field
forget-me-not,
meadow vetchling,
broad-leaved
willowherb, tormentil
Animal
associations:
Badger, nesting
birds
Management
practices:             
None
A2.2 Scattered scrub 15, 22, 27
Dominant species:
Gorse
Other species:
Creeping thistle, tufted
hair-grass, soft rush,
foxglove, common
bent, Broad-leaved
dock. 
Habitat structure:
Scattered gorse in
semi-improved
grassland
Animal
associations:
Badger nesting
birds
Management
practices:           
None, cattle moving
freely.
A3.1 Scattered
broadleaved trees 30
Dominant species:
Silver birch
Other species:
Blueberry, Yorkshire
fog, tormentil, marsh
thistle, tufted hair-
grass 
Habitat structure:
Scattered trees
with a more heathy
ground flora
Animal
associations:
Badgers, possible
feeding for bats,
nesting birds, small
mammals, reptiles,
amphibians
Management
practices:             
None
G2 Running water Target Note 1
Dominant species: No
vegetation in channel
Habitat structure:
2-3m wide, up to
40cm deep,
medium flow,
bottom of sand
gravel, cobbles
Page 94

Page 95

Preliminary Ecological Appraisal (PEA)  Page 22 of 32   
boulders, banks
varying up to 1m
from horizontal to
90°. Banks with
broad-leaved
woodland and
grassy understorey.
Animal
associations: Good
commuting route
for otters and
possible resting
places, potentially
small fish,
amphibians in
wider area. Possible
feeding and
commuting route
for bats.
Management
practices: None
seen
J2.5 Wall Target Notes 2,
3 & 6
Please refer to the
relevant Target Notes
below
-
J2.2.2 Species-poor
Defunct Hedge
Target Notes 4
& 5
Please refer to the
relevant Target Notes
below
-
J2.4 Fence N/A N/A N/A
Target Notes
5.17. Table 5-3 outlines target notes recorded during the extended phase 1 habitat survey. 
Table 5-3 Summary Target Notes
Target Note Description
1
Habitat: Running water
Dominant species: No vegetation in channel
Page 95

Page 96

Preliminary Ecological Appraisal (PEA)  Page 23 of 32   
Habitat structure: 2-3m wide, up to 40cm deep, medium flow,
bottom of sand gravel, cobbles boulders, banks varying up to 1m
from horizontal to 90°. Banks with broad-leaved woodland and
grassy understorey.
Animal associations: Good commuting route for otters and
possible resting places, potentially small fish, amphibians in wider
area. Possible feeding and commuting route for bats.
Management practices: None seen
2
Habitat: Wall 
Dominant species: Hawthorn, grasses including sweet vernal
grass, creeping soft-grass, mosses Polytrichum piliferum,
Rhytidiadelphus loreus, Calliergonella cuspidata, Polpody and lady
fern.
Other species: In the water channel: water forget-me-not, soft
rush, marsh willowherb, common nettle, cleavers
Habitat structure: Old wall covered in vegetation with line of
hawthorn growing on top and a wet ditch running down one side.
Animal associations: Potential shelter for reptiles and small
mammals, wet ditch good for amphibians.
Management practices: None
3
Habitat: Wall
Dominant species: None
Habitat structure: Old stone wall, in good repair
Animal associations: Good for sheltering reptiles and small
mammals
Management practices: None
4
Habitat: Hedge
Dominant species: Hawthorn
Habitat structure: Old hedge formed by hawthorn along line of old
wall. 
Animal associations: Nesting birds
Management practices: None
5
Habitat: Hedge
Dominant species: Hawthorn
Habitat structure: Remnants of hedge, a few straggly hawthorn.
Animal associations: None
Page 96

Page 97

Preliminary Ecological Appraisal (PEA)  Page 24 of 32   
Management practices: None
6
Habitat: Wall with scattered trees
Dominant species: Sycamore, beech, Scots pine
Habitat structure: Old wall which is mostly overgrown with a line
of scattered trees on top.
Animal associations: Resting place for reptiles and small
mammals.
Management practices: None 
Ground Water Dependant Terrestrial Ecosystems (GWDTEs)
5.18. It is considered that from the baseline data collected during the habitat survey, and he site
topography, the areas of B5 Marshy grassland are not GWDTEs, but are present due to surface
waters shedding from adjacent land. 
SPECIES
5.19. Please refer to Table 7-1, Appendix B for Summary of Biological Records. 
Flora
Desk-based
5.20. Records of invasive non-native species (INNS) within the study area were returned by the data
search.
Field survey
5.21. Rhododendron is a dominant species within the area of semi-natural broad-leaved woodland.
No other INNS were recorded within the survey area during the recent ecological survey. 
Invertebrates
Desk-based
5.22. A number of local biodiversity action plan priority invertebrate species within the wider area
were returned by the desk-based study, including ringlet, small pearl-bordered fritillary and
common blue butterfly.  
Page 97

Page 98

Preliminary Ecological Appraisal (PEA)  Page 25 of 32   
Field survey
5.23. Although no notable invertebrate species were observed during the extended phase 1 habitat
survey, the mosaic of habitats within the Site Boundary offer potential to support a variety of
invertebrate species. 
Amphibians & Reptiles 
Desk-based
5.24. Records of common toad, common frog and palmate newt were returned during the data
search. As reptiles and amphibians are often under-recorded, an absence of records does not
confirm an absence of species within the local area.
Field survey
5.25. The mosaics of habitats including the semi-improved neutral grassland, marshy grassland,
scattered trees with ground vegetation, water, wall and hedgerow offer suitable habitat to
support a variety of herptile species. 
Birds
Desk-based
5.26. Records of a variety of species associated with farmland, grassland and woodland were
returned during the data search.  
Field survey
5.27. Habitats within the survey area including grassland, scrub and woodland all offer potential to
support nesting birds. 
Mammals
Badger
Desk-based
5.28. No records of badger were returned during the data search. 
Page 98

Page 99

Preliminary Ecological Appraisal (PEA)  Page 26 of 32   
Field survey
5.29. Although the woodland and grassland areas are suitable to support badgers; no evidence of
badger activity was noted. 
Otter
Desk-based
5.30. Records of otter within the local area were returned by the data search. 
Field survey
5.31. The waterways to the east, west and south of the Site Boundary offer connectivity between
the Site and the wider aquatic environment including lochs, ponds, burns and rivers. The
grassland and woodland also offers suitable foraging habitat for this species. 
Water Vole
Desk-based
5.32. Records of water vole were returned during the desk-based assessment. 
Field survey
5.33. No evidence of water vole was noted within the survey area; however, the waterways and
wet grassland offer potential to support this species. 
Bats
Desk-based
5.34. No records of bats were returned within the study area. An absence of records does not
confirm an absence of bat species within the local area, as these species are often under-
recorded.
Field survey
5.35. The Site generally offer low potential for rooting bats; however, suitable foraging and
commuting habitat is abundant within the Site and adjacent landscape. 
Page 99

Page 100

Preliminary Ecological Appraisal (PEA)  Page 27 of 32   
Other Mammals
Desk-based
5.36. Records of pine marten, and hedgehog were returned during the desk-based assessment. 
Field survey
5.37. No suitable den sites for pine marten were noted within the survey area.
5.38. The mosaic of grassland, hedgerow and woodland offer potential to support hedgehog. 
Page 100

Page 101

Preliminary Ecological Appraisal (PEA)  Page 28 of 32   
6. CONCLUSION AND RECOMMENDATIONS
DESIGNATED SITES 
Statutory
6.1. Of the 16 statutory environmental designated sites within the study areas, only one has
connectivity with the Site Boundary; Inner Clyde SSSI (ornithological only). 
Inner Clyde SSSI
6.2. Inner Clyde SSSI has a separation distance of approximately 3.88km from the Site Boundary,
with red-throated diver being the only qualifying species likely to regularly commute 3.88km
from the SSSI boundary. However, as the habitats within the Site Boundary are sub-optimal
for this species, it is considered that red-throated diver will not be present onsite, and
therefore not impacted by the Proposed Development. 
Non-Statutory
6.3. The three LNCS adjacent to the Application Site have been designated for supporting local
wildlife, including common flora and fauna species. 
6.4. Measures have been outlined within this report to protect the local biodiversity during the
construction and operational phases of the Proposed Development, which will also protect
these LNCS and associated wildlife. These measures include pre-commencement ecological
surveys to update the baseline data at the time of construction, to allow for additional
appropriate mitigation measure to be implemented (if required).
HABITATS 
6.5. It is recommended that the areas of woodland should be avoided during the design of the
Proposed Development, and that appropriate root protection zones are implemented around
the woodland (or trees) directly adjacent to the final design layout.
6.6. The improved grassland areas are of the lowest ecological value within the Site Boundary.
Any works within close proximity to the waterways within the Site Boundary should be
protected during the construction phase, in accordance with best practice guidance, to
prevent contamination of the aquatic environment.   
Page 101

Page 102

Preliminary Ecological Appraisal (PEA)  Page 29 of 32   
SPECIES
Flora
6.7. Rhododendron is an invasive non-native species, and the removal of this species onsite
encouraged. The disposal of the INNS plant material and contaminated soils should be
undertaken appropriately in accordance with current legislation and best practice measures.
6.8. The removal of this species would open up the ground layer within the woodland, allowing
for natural regeneration of native species, which would lead to a positive impact for local
biodiversity.
Invertebrates
6.9. It is recommended that the final design seeks to minimise the loss of semi-improved neutral
grassland and wet grassland to retain habitat for a variety of invertebrate species. Retaining
the woodland areas will also benefit invertebrate species onsite.
6.10. Creation of log piles and/or bug box/hotels onsite would be beneficial to invertebrate species.  
Amphibians & Reptiles
6.11. Retaining woodland, drystone walls, and minimising loss of semi-improved neutral grassland
and wet grassland would be beneficial for herptile species.
6.12. As the current sward height within the Site offers potential shelter for herptiles, appropriate
cutting is important to prevent injury to these species.
6.13. For tall grass, a first cut should be undertaken to 25cm, and then a second cut down to 10cm
(or required height). Cutting should work in a general direction towards the Site Boundary to
allow for any individuals to be flushed towards the safety of this area.
6.14. Creation of drystone walls along the development boundary would also be beneficial for
herptiles and other small animals.  
Birds
6.15. Given the presence of nesting habitat within and directly adjacent to the Application Site, it is
recommended that where works commence during the nesting season (March to August
inclusive) a pre-commencement breeding bird check should be undertaken by a suitable
experienced ecologist a maximum of 48-hours prior to works commencing (including site
preparation works).
Page 102

Page 103

Preliminary Ecological Appraisal (PEA)  Page 30 of 32   
6.16. Installation of bird boxes within the woodland area or scattered trees would be beneficial to
many bird species.  
Mammals
Badger
6.17. From the current survey findings, it is considered that the Proposed Development is unlikely
to impact upon this species. However, badger are highly mobile and can excavate setts in
relatively short periods of time. As suitable habitat is present within the Site Boundary, pre-
commencement badger surveys are recommended. 
Otter
6.18. No signs of otter were observed during the field survey. However, the Site Boundary, and
adjacent waterways may offer foraging habitat for otter commuting throughout the area. A
pre-commencement otter survey is recommended.
6.19. The loss of grassland directly under the footprint of the Proposed Development is not
considered significant loss to otter, as this is abundant in the local area. 
Water Vole
6.20. From the current baseline data, it is anticipated that the Proposed Development will not
impact upon this species. 
6.21. Where the final development layout lies within 10m of waterways, a pre-commencement
water vole survey is recommended.
Bats
6.22. It is recommended that the areas of woodland should be avoided during the design of the
Proposed Development, which will retain suitable foraging and commuting habitat for bat
species within the area.
6.23. The direct loss of habitat within the Site Boundary will not significantly impact bat species as
this habitat is available in the wider landscape. 
6.24. Installing bat boxes within the woodland areas would be beneficial to bat species due to the
lack of roosting opportunities onsite. 
Page 103

Page 104

Preliminary Ecological Appraisal (PEA)  Page 31 of 32   
Other Mammals
6.25. The current sward height within the Application Site offers potential shelter for hedgehog. If
this area of grassland is left unmanaged prior to works commencing, maintaining a tall sward,
appropriate cutting is important to prevent injury to this species.
6.26. For tall grass, a first cut should be undertaken to 25cm, and then a second cut down to 10cm
(or required height). Cutting should work in a general direction towards the site boundaries
to allow for any individuals to be flushed towards the safety of this area.
Biodiversity Enhancements
6.27. As detailed above, biodiversity enhancements that should be considered onsite include the
creation of drystone walls, log piles and/or bug box/hotels and implementation of wildlife
boxes including bird and bat boxes within the woodland area. 
Page 104

Page 105

Preliminary Ecological Appraisal (PEA)  Page 32 of 32   
7. APPENDICES
APPENDIX A – MAPS
Figure 1 – Site Location Map
Figure 2 – Environmental Designations
Figure 3 – Habitat Map
Figure 4 – LNCS map
APPENDIX B – BIOLOGICAL RECORDS
APPENDIX C – SITE PHOTOGRAPHS 
Page 105

Page 106

Site Boundary
Legend
Page 106

Page 107

Site Boundary
5km buffer
15km buffer
SPA to 15km
SAC to 15km
SSSI to 5km
Ramsar to 5km
LNR to 5km
CP to 5km
Legend
Page 107

Page 108

R & D Ecology Ltd
M: 07758376812
E: info@randdecology.co.uk
W:www.info@randdecology.co.uk
Drawing Number: 78/208/3/B
Date: 10.07.23
Created By: DT
Land Near Concho Road
Phase 1 Habitat Map
Figure 3
Site boundary
TN locations
A1.1.1 - Semi-atural broadleaved woodland
A2.1 - Dense scrub
A2.2 - Scattered scrub
A3.1 - Broadleaved scattered trees
B2.2 - Semi-improved neutral grassland
B4 - Improved grassland
B5 - Marshy grassland
G2 - Running water
J2.2.2 - Species-poor native defunct hedge
J2.4 - Fence
J2.5 - Wall
Legend
TN1
TN2
TN3 TN4
TN5
TN6
Area 1
Area 2
Area 3
Area 4
Area 5
Area 6
Area 7
Area 25
Area 8
Area 16
Area 9
Area 17
Area 19
Area 10
Area 11
Area 31
Area 18
Area 20
Area 24
Area 12
Area 21
Area 13
Area 14
Area 15
Area 22
Area 23
Area 26
Area 28
Area 27
Area 29
Area 30
Page 108

Page 109

Page 109

Page 110

Preliminary Ecological Appraisal      
APPENDIX B – BIOLOGICAL RECORDS
Table 7-1: Summary of Biological Records 
Species
Records of
Species within
Study Area
Potential for
Species within
Proposed
Development
Evidence of
Species
Observed
within the ESA
Mammals
European water vole Arvicola
amphibius Yes Yes No
Beaver Castor fiber No No No
Hedgehog Erinaceus europaeus Yes Yes No
Wild cat Felis silvestrus No No No
Brown hare Lepus europaeus No Yes No
Otter Lutra Lutra Yes Yes No
Pine marten Martes martes Yes No No
Common pipistrelle Pipistrellus
pipistrellus No Yes No
Soprano pipistrelle Pipistrellus
pygmaeus No Yes No
Daubenton’s bat Myotis daubentonii No Yes No
Brown long-eared bat Plecotus auritus No Yes No
Red squirrel Sciurus vulgaris No Yes No
Grey squirrel Sciurus carolinensis Yes Yes No
Amphibians 
Common toad Bufo bufo Yes Yes No
Common frog Rana temporaria Yes Yes No
Palmate Newt Lissotriton helveticus Yes Yes No
Smooth newt Lissotriton vulgaris No Yes No
Page 110

Page 111

Preliminary Ecological Appraisal      
Great crested Newt Triturus cristatus No Yes No
Reptiles
Common lizard Zootoca vivipara No Yes No
Slowworm Anguis fragilis No Yes No
Adder Vipera berus No Yes No
Grass snake Natrix helvitica No Yes No
Birds
Redpoll Acanthis flammea Yes Yes No
Skylark Alauda arvensis Yes Yes No
Greylag goose Anser anser Yes Yes No
Pink-footed goose Anser
brachyrhynchus Yes Yes No
Meadow pipit Anthus pratensis Yes Yes No
Tree pipit  Anthus trivialis  Yes Yes No
Swift Apus apus Yes Yes No
Yellowhammer Emberiza citirinella Yes Yes No
Swallow Hirundo rustica  Yes Yes No
Linnet Linaria cannabina Yes Yes No
Curlew Numenius arquata Yes Yes No
House sparrow Passer domesticus Yes Yes No
Tree sparrow Passer montanus Yes Yes No
Grey partridge  Perdix perdix Yes Yes No
Starling Sturnus vulgaris Yes Yes No
Song thrush Turdus philomelos Yes Yes No
Mistle thrush Turdus viscivorus Yes Yes No
Lapwing Vanellus vanellus Yes Yes No
Invertebrates
Page 111

Page 112

Preliminary Ecological Appraisal      
Early bumblebee Bombus pratorum Yes Yes No
Common blue Polymmatus icarus Yes Yes No
Green hairstreak Callophrus rubi No Yes No
Small pearl-bordered fritillary Boloria
selene Yes Yes No
Ringlet Aphantopus hyperantus Yes Yes No
Flora
Round-leaved sundew Drosera
rotundifolia Yes Yes No
Giant hogweed Heracleum sphondylium Yes Yes No
Bluebell Hyacinthoides non-scripta Yes Yes No
Himalayan balsam Impatiens
glandulifera Yes Yes No 
Page 112

Page 113

Preliminary Ecological Appraisal      
APPENDIX C – SITE PHOTOGRAPHS 
Photograph 1:  Target Note 1 
Photograph 2: Target Note 2 
Page 113

Page 114

Preliminary Ecological Appraisal      
Photograph 3: Target Note 4 
Photograph 4: Target Note 5 
Page 114

Page 115

Preliminary Ecological Appraisal      
Photograph 5: Target Note 6 
Photograph 6: Area 19 
Page 115

Page 116

Preliminary Ecological Appraisal       
Photograph 7: Area 19 
Photograph 8: Area 4 
Page 116

Page 117

Preliminary Ecological Appraisal       
Photograph 9: Area 4 
Photograph 10: Area 5 
Page 117

Page 118

Preliminary Ecological Appraisal       
Photograph 11: Area 5 
Photograph 12: Area 26 
Page 118

Page 119

Preliminary Ecological Appraisal       
Photograph 13: Area 7 
Photograph 14: Area 14 
Page 119

Page 120

Preliminary Ecological Appraisal       
Photograph 15: Area 14 
Photograph 16: Area 25 
Page 120

Page 121

Preliminary Ecological Appraisal       
Photograph 17: Area 30 
Photograph 18: Area 6 
Page 121

Page 122

Preliminary Ecological Appraisal       
Photograph 19: Area 24 
Photograph 20: Area 24 
Page 122

Page 123

Preliminary Ecological Appraisal       
Photograph 21: Area 20 
Page 123