Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 12th February 2025
_____________________________________________________________
DC23/177/FUL: Planning appeal decision - Erection of single wind turbine, 30m hub
and 43m tip, access track, substation and associated works on land
adjacent to East of Broomhill Wood, Bonhill, Alexandria.
1. Purpose
1.1 The purpose of this report is to advise the Committee of the outcome of the appeal to
erect at single wind turbine measuring 30m to the up and 43m to blade tip, creation of
access rack, substation and associated works at the above address.
2. Recommendation
2.1 It is recommended that the Committee note the outcome of the appeal.
3. Background
3.1 In April 2015, the Planning Committee were minded to grant planning permission for
the same proposal (DC14/210) subject to the conclusion of a legal agreement to
ensure that a suitable financial bond is put in place to cover restoration liabilities for the
site and the community benefit contribution. The financial bond was never concluded
and with a lack of any progress over an extended period, the application was
considered withdrawn in March 2021.
3.2 In August 2023, the Planning Committee refused planning permission
(DC22/190/FUL) for the erection of a single wind turbine, 30m hub and 43m tip, access
track, substation, agricultural shed and associated works on the grounds that it has not
been demonstrated that the proposed agricultural shed was being provided in
association with an agricultural land holding, nor had the nature of any farming
operation at this location been quantified. Therefore, it could not be concluded that the
proposed shed was specifically required to support agriculture at this green belt and
the shed would result in unjustified sporadic development within the green belt
location. It is thus not a form of development that is supported in the green belt
policies.
3.3 A further planning application (DC23/177/FUL) was submitted which sought to
address the previous reasons for refusal with the removal of the agricultural shed. This
application was refused by the Planning Committee as it was considered that the
proposal would result in the siting of a wind turbine which would have a detrimental
impact upon visual amenity, the proposal did not protect or improve the Green Network
and that the proposal would have an unacceptable impact upon the trees which line
the proposed access route. As such the proposal was not supported by National
Planning Framework 4, the adopted Local Plan or proposed Local Development Plan
2.
4. Main Issues
ITEM 9

Page 2

4.1 Following the refusal of planning permission, the applicant submitted an appeal to the
Directorate for Planning and Environmental Appeals.
4.2 Following a full assessment, the Reporter dismissed the appeal and refused planning
permission on 3rd December 2024. In doing so, the Reporter found the main issues to
be the impacts on landscape character and visual amenity and development within the
green belt.
4.3 In assessing the impact on landscape character and visual amenity, the Reporter
accepted that the proposed turbine is small in scale and that the proposed track and
substation and other ancillary works would not be of a significant scale of
development. However, the Reporter considered the visual effects at the various
viewpoints as well as the views to the protected landscape are particularly sensitive.
Consequently, the visual impact of even a small turbine would be significant. The
Reporter considered that the proposed development would have a significant adverse
effect on the landscape character of the Local Landscape Area given its incongruity, its
prominence in views from the south and west, and its impact on the perception of the
landscape’s naturalness. For these reasons, the Reporter found the proposal to be
contrary to part d) of Policy 4 of NPF4 and to Policy DC 6 of the adopted Local Plan.
4.4 Turning to the Green Belt location of the development, the Reporter further considered
that the incompatibility of the proposal with the surrounding established countryside
and landscape character, and the adverse effect on the setting of Dumbarton and the
integrity of the Local Landscape Area would be contrary to the green belt purpose of
protecting the setting of settlements. For these reasons, the Reporter consider that on
balance the proposal would not be supported overall by Policy 8 of NPF4.
Furthermore, as a consequence of the detrimental effect to the green belt and
Kilpatrick Hills as an important component of the green network, it would be contrary to
Policy GN 1 (Green Network) of the adopted Local Plan.
4.5 The Reporter concluded that the development did not accord overall with the relevant
provisions of the development plan and that there were no other material
considerations which would justify granting planning permission.
5. People Implications
5.1 There are no people implications associated with this report.
6. Financial and Procurement Implications
6.1 There are no financial or procurement issues associated with this report.
7. Risk Analysis
7.1 There are no risks associated with this report.
8. Equalities Impact Assessment (EIA)
8.1 There are no equalities issues associated with this report.
9. Consultation
9.1 Consultation was undertaken during the consideration of the planning application.
10. Strategic Assessment

Page 3

10.1 The appeal decision is considered to have been consistent with the following
strategic priorities:
 Our Environment in ensuring the local environment is protected, enhanced and
valued.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 12th February 2025
______________________________________________________________
Person to
Contact:
Michael Mulgrew, Planning & Building Standards Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix: None
Background
Papers:
1. Planning Committee report – DC23/177/FUL
2. Planning appeal decision -  PPA-160-2041 -
https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=125214