Document Pack (Bookmarked) - Planning Committee 11 12 24

West Dunbartonshire Council · 11 December 2024
Back to Planning Committee — 11 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda
Planning Committee
Date:  Wednesday, 11 December 2024
___________________________________________________________________
Time:  10.00 a.m.
___________________________________________________________________
Venue:  Council Chambers, Clydebank Town Hall, 5 Hall Street,
Clydebank G81 1UB
___________________________________________________________________
Contact:   Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Planning Committee as detailed above.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Provost Karen Murray Conaghan
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Ian Dickson
Councillor David McBride
Councillor Chris Pollock
Councillor Hazel Sorrell
Councillor Clare Steel
Councillor Sophie Traynor
All other Councillors for information
Date of Issue: 28 November 2024
Page 2

Page 3

PLANNING COMMITTEE
WEDNESDAY, 11 DECEMBER 2024
AGENDA
1 APOLOGIES
2 DECLARATIONS OF INTEREST
Members are invited to declare if they have any interests in the items of
business on this agenda and the reasons for such declarations.
3 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
4 MINUTES OF PREVIOUS MEETING     5 - 11
Submit for approval, as a correct record, the Minutes of the Meeting of
the Planning Committee held on 13 November 2024.
5 NOTE OF VISITATION  13
Submit, for information, Note of Site Visitation carried out on 11 November
2024.
6 PLANNING APPLICATIONS
Submit reports by the Chief Officer – Regulatory and Regeneration in respect
of the following Planning applications:
(a) DC23/227/FUL: Change of use from beauty salon to 15 - 25
three residential flats by Mr Sodhi.
(b) DC24/123/FUL: Change of use from butcher shop 27 - 39
(Class 1A) to fish and chip shop (hot food takeaway -
Sui Generis) together with installation of flue by Glasgow AP.
Page 3

Page 4

7 WEST DUNBARTONSHIRE COUNCIL CONSULTATION 41 - 54
RESPONSE TO SCOTTISH GOVERNMENT ENERGY 
CONSENTS UNIT ON SECTION 36 APPLICATION
REF: ECU00004982 
Submit report by the Chief Officer – Regulatory and Regeneration seeking
agreement on an updated consultation response following the receipt of
further details and a revised proposal from the Scottish Government Energy
Consents Unit, on behalf of the Scottish Ministers, in connection with a
proposal for the construction and operation of a 560MW Battery Energy
Storage System with associated infrastructure, substation, security fencing,
CCTV, security lighting and landscaping on land within the East
Dunbartonshire Council area.
8 ANNUAL UPDATE TO THE DEVELOPMENT PLAN 55 - 93
SCHEME AND PARTICIPATION STATEMENT.
Submit report by the Chief Officer – Regulatory and Regeneration seeking
approval of the 2023 Development Plan Scheme and Participation
Statement in relation to a new Local Development Plan (LDP3).
__________________________________________________________________
Page 4

Page 5

PLANNING COMMITTEE
At a Meeting of the Planning Committee held in the Civic Space, 16 Church Street,
Dumbarton, on Wednesday, 13 November 2024 at 10.00 a.m.
Present: Provost Karen Murray Conaghan and Councillors Ian Dickson,
Gurpreet Singh Johal, Lawrence O’Neill, Chris Pollock, and
Sophie Traynor.
Attending: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Amy Melkevik, Lead Planning
Officer; Michelle Lynn, Assets Co-Ordinator; Michael McDougall,
Manager of Legal Services and Nicola Moorcroft, Committee
Officer.
Apologies: Apologies for absence were intimated on behalf of Councillors
David McBride, Hazel Sorrell and Clare Steel.
Councillor Lawrence O’Neill in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Planning Committee held on 9 October 2024 were
submitted and approved as a correct record.
NOTE OF VISITATION
A Note of Visitations carried out on 7 October 2024, a copy of which forms Appendix
1 hereto, was submitted and noted.
ITEM 4
Page 5

Page 6

PLANNING APPLICATION 
A report was submitted by the Chief Officer – Regulatory and Regeneration in respect of
the following Planning application:- 
DC24/081/FUL: Façade improvements to shop fronts, landscaping and associated
infrastructure at Artizan Centre, College Way, Dumbarton by West Dunbartonshire
Council. 
Reference was made to a site visit which had been undertaken in respect of the
above application. After discussion and having heard the Planning, Building
Standards and Environmental Health Manager, Development Management Team
Leader and Assets Co-ordinator in further explanation and in answer to Members’
questions, the Committee agreed to grant planning permission subject to the
conditions set out in Section 9 of the report, as detailed within Appendix 2 hereto. 
UPDATE ON PLANNING APPLICATIONS DC23/217/FUL AND DC22/245/FUL 
A report was submitted by the Chief Officer – Regulatory and Regeneration providing an
update on Planning Applications DC23/217/FUL and DC22/245/FUL which had been
referred to the Scottish Ministers. 
After discussion and having heard the Development Management Team Leader in
further explanation and in answer to Members’ questions, the Committee agreed to
note the position regarding Planning Applications DC23/217/FUL and
DC22/245/FUL. 
The meeting closed at 10.23 a.m. 
Page 6

Page 7

APPENDIX 1 
PLANNING COMMITTEE 
NOTE OF VISITATION – 7 OCTOBER 2024 
Present: Councillors Lawrence O’Neill, Clare Steel and Sophie Traynor.   
Attending: Michael Mulgrew - Planning, Building Standards and Environmental
Health Manager, James McColl - Development Management Team
Leader and Amy Melkevik - Lead Planning Officer. 
SITE VISIT 
A site visit was undertaken in connection with the undernoted planning application:- 
29 Roman Hill Road, Hardgate, Clydebank, G81 6NU 
DC24/073/FUL: Demolition of existing dwelling and the construction of two new
dwellings and upgrading of the existing access road to an adopted road by Gerald
Mulhearn. 
Page 7

Page 8

APPENDIX 2 
DC24/081/FUL: Façade improvements to shop fronts, landscaping and associated
infrastructure at Artizan Centre, College Way, Dumbarton by West Dunbartonshire
Council. 
GRANT full planning permission subject to the following conditions:- 
1. Prior to the commencement of development on site, exact details of all
proposed external materials (inclusive of all hard surfaces), to be used in the
development site shall be submitted to and approved in writing by the
Planning Authority.  Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved material details and palette. 
Reason: In the interest of visual amenity. 
2. Notwithstanding the approved plans, a programme for the implementation and
completion of the soft and hard landscaping works shall be submitted to, and
approved in writing by the Planning Authority.  Thereafter the development
shall proceed accordance with the approved details, unless otherwise agreed
in writing by the Planning Authority. 
Reason: In the interest of visual amenity. 
3. Notwithstanding the approved details, a Tree protection Plan to describe how
trees on site shall be safeguarded through the development process,
including details of any works required to the trees to allow for the
construction phase shall be submitted to and approved in writing by the
Planning Authority.  Thereafter, unless otherwise agreed in writing with the
Planning Authority, the development shall be completed in strict accordance
with the approved plan. 
Reason: In the interest of visual amenity, protection and enhancement of
biodiversity and tree protection. 
4. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be
replaced within the following year with others of a similar size and species. 
Reason: In the interest of visual amenity and biodiversity. 
5. Notwithstanding the approved plans, prior to the installation of the proposed
play equipment, full details of the equipment to be installed and its location
shall be provided to and approved in writing.  Thereafter, the play equipment
shall be installed as specified and remain in place for the lifetime for the
development unless otherwise agree in writing by the Planning Authority. 
Reason: To ensure that full details of play equipment are secured. 
Page 8

Page 9

6. Prior to commencement of any works on site, a site management scheme for
construction traffic shall be submitted to and approved in writing by the
Planning Authority.  Thereafter work shall proceed in accordance with the
approved scheme unless otherwise agreed in writing with the Planning
Authority. 
Reason: In the interest of road safety. 
7
a) No development that breaks ground or otherwise involves ground
works (other than investigative work) can take place until such time as
a comprehensive site investigation has been carried out to the
appropriate Phase level and submitted to and approved in writing by
the Planning Authority.  The investigation shall be completed by a
suitably qualified and competent person and completed in accordance
with advice given in the following: 
• Planning Advice Note 33 (2000) and Part IIA of the
Environmental Protection Act 1990 (as inserted by section 57 of
the Environment Act 1995) 
• BS 10175:2011+A1:2013 – British Standards institution ‘The
Investigation of Potentially Contaminated Sites – Code of
Practice’. 
• Land Contamination and Development Management -Guidance. 
https://www.ep-scotland.org.uk/wpcontent/
uploads/2019/09/ConLanDevGuide_12-Aug19-FINAL.pdf 
b) If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated, and these linkages must
be subjected to risk assessment.  If a Phase 2 investigation is required,
then a risk assessment of all relevant pollution linkages will require to
be submitted. 
c) If the risk assessment identifies any unacceptable risks then an
appraisal of remedial options followed by a detailed remediation
scheme will be submitted to and approved in writing by the Planning
Authority.  No works other than investigative works shall be carried out
on site prior to receipt of the Planning Authority’s written approval of
the remediation scheme. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
Page 9

Page 10

8. Remediation of the site shall be carried out in accordance with the approved
remediation scheme prior to the proposed development being brought into
use.  Any amendments to the approved remediation scheme shall not be
implemented unless approved in writing by the Planning Authority.  On
completion of the remediation works, the developer shall submit a verification
report to the Planning Authority, confirming that the works have been carried
out in accordance with the approved remediation scheme and that the works
have successfully reduced the risks to acceptable levels. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
9. The presence of any previously unexpected contamination that becomes
evident during the development of the site shall be reported to the Planning
Authority in writing within one week, and work on the site shall cease.  At this
stage, if requested by the Planning Authority, an appropriate investigation and
risk assessment shall be undertaken and a remediation scheme shall be
submitted to and approved by the Planning Authority prior to the
recommencement of site works.  The approved details shall be implemented
as approved. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
10.  If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported.  In addition
to this and in accordance with BS3882:2015 and BS8601:2013, material to be
used in the top 300mm shall also be free from metals, plastic, wood, glass,
tarmac, paper and odours.  On completion of the works and at a time and or
phasing agreed by the Planning Authority, the developer shall submit a
validation report containing details of the source of the material and
associated test results to demonstrate its suitability for use. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
11. Unless otherwise approved in writing by the Authority, no development shall
commence on site until such time as a scheme for the control and mitigation
of dust has been submitted to and approved in writing by this Authority.  The
scheme shall identify likely sources of dust arising from the development or its
construction and shall identify measures to prevent or limit the occurrence and
impact of such dust.  The approved scheme shall thereafter be implemented
fully prior to any of the identified dust generating activities commencing on site
and shall be maintained thereafter, unless otherwise approved by this
Authority. 
Reason: To minimise the occurrence of dust, in the interests of the amenity of
the area.
Page 10

Page 11

12. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed
in writing with the Planning Authority), shall be carried out between the
following hours unless otherwise approved in writing by the Planning
Authority: 
a. Mondays to Fridays:   0800 – 1800
b. Saturdays:    0800 – 1300
c. Sundays and public holidays: No Working 
Reason: To ensure that the development does not adversely affect the
amenity of neighbouring properties by creating excessive noise and
disturbance at unsocial hours. 
13. Prior to any works proposed which break ground or otherwise involves ground
works, the developer shall secure the implementation of a programme of
archaeological works in accordance with a written scheme of investigation
which has been submitted to and approved in writing by the Planning
Authority in consultation with the West of Scotland Archaeology Service. 
Thereafter the developer shall ensure that the programme of archaeological
works is fully implemented and that all recording and recovery of
archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Reason: In the interests of the recording of antiquity.
Page 11

Page 12

Page 12

Page 13

PLANNING COMMITTEE
NOTE OF VISITATION – 11 NOVEMBER 2024
Present: Councillor Chris Pollock
Attending: Michael Mulgrew - Planning, Building Standards and
Environmental Health Manager, James McColl - Development
Management Team Leader and Amy Melkevik - Lead Planning
Officer. 
SITE VISIT
A site visit was undertaken in connection with the undernoted planning application:-
Artizan Centre, College Way, Dumbarton
DC24/081/FUL: Façade improvements to shop fronts, landscaping and associated
infrastructure by West Dunbartonshire Council.    
ITEM 5
Page 13

Page 14

Page 14

Page 15

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 11th December 2024
DC23/227/FUL: Change of use from beauty salon to three residential flats at
nos. 4 - 6 Greenhead Road, Dumbarton, G82 1EL by Mr Sodhi
Sing
1. REASON FOR REPORT
1.1 The application is subject to an objection from a statutory consultee. Under the
terms of the approved Scheme of Delegation, it therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 That the Committee indicate that it is Minded to Grant planning permission
subject to the conditions set out in Section 9 and delegate authority to the
Planning, Building Standards and Environmental Health Manager to issue the
decision following the satisfactory conclusion of the referral of the planning
application to the Scottish Ministers.
3. DEVELOPMENT DETAILS
3.1 This application relates to a mixed use building situated on the corner of
Greenhead Road and the A814 Glasgow Road, Dumbarton. Whilst the building
in question is commercial in nature, the wider area remains predominantly
residential in character. Originally developed as the headquarters of the
Dumbarton Equitable Cooperative Society Limited, currently, the building is
occupied by a variety of uses, with the ground floor occupied by a pharmacy,
convenience store, hair stylist and café.
3.2 The upper floor, accessed via a stairwell accessible through a door opening
facing Glasgow Road, was until recently occupied by a beauty salon which was
formed out of office space, which was originally allowed through change of use
from flats to offices (planning permission DC02-106). This planning permission
also covered a variety of other works including the formation of a parking area
located to the rear of the property, accessed from Greenhead Road and
consisting of 11 no. spaces.
3.3 The proposal seeks to change the use of the first floor of the building from a
beauty salon to three flatted dwellings, consisting of two 1 bed’s and one 2 bed.
The proposal would result in a repurposing and remodelling of the entirety of
the upper floor of the building, consisting of the nine former treatment rooms
and associated facilities. No external changes or changes to bin storage,
currently within the rear curtilage of the block, are proposed. The ground floor
ITEM 6a
Page 15

Page 16

uses would remain as per the current arrangement. In terms of parking, it is
indicated that the proposed flats would be allocated one parking space each
within the existing car park.
4. CONSULTATIONS
4.1 Scottish Environment Protection Agency have objected to the proposal on flood
risk grounds. This is because the proposal will result in an increased land use
vulnerability in an area which is anticipated to be at high risk of fluvial flooding.
There would be an increase in the number of vulnerable receptors occupying
the area overnight and an increase in flood risk overall. A comprehensive flood
risk assessment considering a variety of scenarios is required.
4.2 West Dunbartonshire Council Roads Service have no objection to the proposal
although note that ideally a parking provision of 150% should be provided and
therefore one additional space is allocated for the development. It is
recommended that the remaining commercial parking spaces are clearly
designated, signed, and if considered appropriate, the residential spaces
should be protected by collapsible bollards to minimise any future issues
arising from the use of the car park.
4.3. West Dunbartonshire Council Roads Service (Flooding) have no objection to
the proposal in respect of with flooding matters.
4.4 West Dunbartonshire Council Environmental Health Service have no objection.
The potential for noise from the commercial uses within the building should be
considered and addressed if required.
5. REPRESENTATIONS
5.1 None.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
6.1 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the
global climate and nature crises. Policy 2 also relates to the climate in the form
of climate mitigation and adaptation and states development proposals will be
sited and designed to minimise lifecycle greenhouse gas emissions as far as
possible and development proposals will be sited and designed to adapt to
current and future risks from climate change. The proposal re-uses an existing
structure as part of the development and, as such, the embodied energy of the
structure remains. The proposal would have a neutral impact in respect of
Policies 1 and 2.
6.2 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield,
vacant and derelict land and empty buildings, and to help reduce the need for
greenfield development. The proposal would result in the suitable re-use of an
existing vacant premises which is supported by the Policy.
Page 16

Page 17

6.3 Policy 13 supports proposals where they provide direct, easy, segregated and
safe links to local facilities via walking, wheeling and cycling networks and are
accessible by public transport. The application site is located within an
accessible urban location, close to public transport links.
6.4 Development proposals will be designed to improve the quality of an area
whether in urban or rural locations and regardless of scale and support the six
qualities of successful places, as per Policy 14. Policy 15 relates to local living
and 20-minute neighbourhoods, with development proposals required to
contribute to both, where relevant, through local access to a wide range of
facilities and activities, including lifelong learning and recreation facilities. The
proposal offers no conflict with the six qualities of successful places and will
result in new residential flats in an accessible location with a range of shops
and services lying nearby, contributing to a 20 minute neighbourhood
approach. There is thus no conflict with these Policies.
6.5 Policy 16 relates to quality homes, namely it aims to encourage, promote and
facilitate the delivery of more high quality, affordable and sustainable homes, in
the right locations, providing choice across tenures that meet the diverse
housing needs of people and communities across Scotland. Appropriate small
scale proposals within exiting settlements are supported. This proposal is for a
small scale development within an existing settlement and is supported under
this Policy.   
6.6 Policy 22 addresses flood risk and water management, stating that proposals
will not increase the risk of surface water flooding to others, or itself be at risk;
manage all rain and surface water through sustainable urban drainage systems
(SUDS), and seek to minimise the area of impermeable surface. The
application site is within an area at risk of flooding and the proposal does not fall
into any of the exemptions set out within the Policy, resulting in conflict with the
Policy.
6.7 Policy 23 aims to safeguard people from environmental harm and promote and
facilitate development that improves health and wellbeing. The Policy does not
support proposals which would raise unacceptable noise issues. Development
proposals that will have positive effects on health will be supported. No
concerns arise in respect of this policy. 
6.8 The proposed development is supported overall by National Planning
Framework (NPF) 4, although there is conflict with Policy 22. This is assessed
fully in Section 7 below.
West Dunbartonshire Adopted Local Plan 2010
6.9 Policy UR1 encourages the redevelopment and re-use of underused, vacant
and/or derelict land and buildings for appropriate uses such as housing and the
proposal is supported by this Policy. Policy H4 sets out standards expected of
residential development, requiring high quality design in the range of house
types and sizes and in terms of form, layout and materials. No concerns arise in
respect of the relevant matters.
Page 17

Page 18

6.10 The site is located within an existing residential area, which is identified under
Policy H5; the policy stipulates that character and amenity of existing
residential areas, identified on the Proposals Map, will be safeguarded and
where possible enhanced. Any development will also be considered against
the criteria specified in the policy. Policy GD1 seeks to ensure that all new
development is of a high quality of design and respects the character and
amenity of the area in which it is located. Policy R2 specifies the open space
provision required for all developments. Assessment of open space
requirements has been undertaken against the up-to-date “Green Network and
Green Infrastructure Planning Guidance - November 2022” in Section 7 below.
No residential amenity concerns arise and the position relating to open space
provision is assessed in Section 7 below.
6.11 Policies F1, F2 and F3 relate to flooding and drainage and aim to ensure that
new development is not at risk of flooding, does not increase the risk of flooding
elsewhere and has suitable drainage infrastructure which includes SUDS
measures. There is a general presumption against development within the
flood plain. The up-to-date development plan position in flooding is set out
within Policy 22 of NPF4 which therefore has primacy in this instance. 
6.12 The proposal generally complies with the policies of the adopted local plan
although is contrary to the precautionary approach in respect of flooding and is
assessed fully in Section 7 below.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the
Examination Report received on 22 April 2020, which were accepted by the
Planning Committee of 19 August 2020, remains the Council’s most up to date
spatial strategy and is therefore afforded significant weight in the assessment
and determination of planning applications, subject to compatibility with NPF4.
The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration.
7.2 The application site is situated in an area covered by Policy H4 whose aim is to
ensure that the Council will protect, preserve and enhance the residential
character and amenity of existing residential areas at all times. A number of
presumptions apply in the decision making process relating to this policy;
moreover, the policy stipulates that new housing developments will not be
permitted in locations where existing, established adjacent uses are likely to
have an unacceptable impact on the amenity of future residents. No residential
amenity concerns arise.
7.3 Policy CP1 seeks to ensure that development is of a high quality, adaptable
and designed to be suitable for a mix of occupants. It indicates that all new
development will be expected to contribute towards creating successful places
Page 18

Page 19

by having regard to the six qualities of a successful place (distinctive,
adaptable, resource efficient, easy to get to/move around, safe and pleasant,
and welcoming).  Policies GI2 and GI4 relate to green infrastructure. Policy GI2
requires new development to meet with the open space standards set out
within the policy. Where a development has difficulty providing these standards
on site, or where a relaxation of the standards can be justified, developers will
require to accord with Policy GI4 and provide a contribution towards the types
of projects outlined within the policy and detailed in the Green Network and
Green Infrastructure Planning Guidance. GI4 sets out the requirements for
Developer contributions. The proposal offers no conflict with the six qualities of
successful places and the position in respect of open space provision is
assessed in detail below.
7.4 Policy ENV6 takes a similar approach to flooding to that of the adopted Local
Plan although the up-to-date development plan position in flooding is set out
within Policy 22 of NPF4 which therefore has primacy in this instance. Policy
ENV8 requires developments to address air quality, lighting and noise as part
of the planning process.
7.5 It is considered that the application proposal being assessed generally
complies with the relevant policies within proposed Local Development Plan 2,
although it is contrary to the precautionary approach in respect of flooding as
set out in the following assessment.
Creating Places Guidance and Green Network and Green Infrastructure
Guidance
7.6 The Creating Places Supplementary Guidance – November 2022, to support
LDP2 Policy GI4, seeks to achieve high quality development with a design led
approach based on a thorough appraisal of the site and an analysis of its
context and sets out that this is expected for all development proposals. The
guidance primarily relates to new-build proposals and not proposals which
seeks to change the use of an upper floor within an existing building as is the
proposal here. No conflicts therefore arise with the guidance.
7.7 The Green Network and Green Infrastructure Supplementary Guidance -
November 2022 seeks to ensure that proposals also integrates landscaping
and green infrastructure as part of the setting of the new development and
open space created. This proposal relates to the change of use of an upper
floor within an existing building with no amenity or open space created. The
requirement for green network developer contributions is set out. This is fully
assessed below. 
Principle of Development
7.8 The redevelopment of the upper floor of the building into three flats in place of
the previous commercial use is supported by the land use policies in both the
adopted and proposed Plans.  The proposal also returns the upper floor of the
building to residential use, as it was prior to the change of use granted planning
permission in 2002. Redevelopment of vacant properties and enabling of a
variety of residential developments is supported by both national and local
planning policy. It therefore rests to consider whether there are any material
Page 19

Page 20

planning considerations or site constraints which suggest that the
redevelopment proposal for the site would not be acceptable.
Impact on the Existing Neighbourhood
7.9 In assessing the impact of the proposal on the amenity of the area, there are no
external changes proposed to the building, and accordingly no visual impact
arises from the proposal. The position of the building within the street together
with the fact that no new window openings are proposed ensures that no
unacceptable overlooking would occur towards any nearby residential
properties. Any noise and activity from the new flats would be typical of that
expected in a residential area and the previous commercial use of the premises
will already bring activity to this locality.  Overall, it is considered that the
proposal will not result in any impact upon the local area of existing residential
properties. It is also not considered that there is the potential for the proposal to
impact on the operation of the existing businesses within the building.
7.10 It is accepted that the construction phase will produce an element of short-term
noise and disruption, the consultation response from the Council’s
Environmental Health Service does not highlight any requirement for control of
the construction aspect of the redevelopment.
Amenity of New Residents
7.11 Considering the amenity of new residents, it is noted that prior to the change of
use granted in 2002, the upper floor of this building was in residential use, with
established commercial properties below. This proposal would return the upper
floors of the building to the previous residential use. Whilst there is no garden
ground available for the purposes of outdoor recreation for the new residents,
East End Park, which provides for recreation and play provision, lies a short
walk from the site and can be safely accessed via the nearby National Cycle
Route 7. Provision is made within the application site for bin storage for the flats
to be created.
7.12 The area is primarily residential in character with residential properties lying
adjacent in all directions. The proposed flats would, however, be situated
above existing commercial premises and accordingly residents of the new flats
could not reasonably expect the same level of quietude as would be the case
within a wholly residential building. This situation is, however, common place
and residential properties immediately above commercial uses can be found
both nearby on Glasgow Road and within numerous locations across West
Dunbartonshire. There is therefore nothing to suggest that residents would
experience an unacceptable level of amenity. Environmental Health offer no
objection to the proposal. Notwithstanding this, they recommend a cautionary
position is taken in respect of the potential for noise disturbance for residents.
Whilst Environmental Health recommend a full noise impact assessment, it is
considered that such an approach would not be commensurate with the scale
of the proposal and the environment into which it is to be introduced.  The upper
floors of the building were previously in residential use and, as set out above,
there is nothing to suggest that a suitable level of amenity for residential would
not be achieved. Whilst noting the cautionary approach suggested from
Page 20

Page 21

Environmental Health, it is not considered that a NIA is required or justified in
this instance. 
Parking and Transport
7.13 In terms of parking provision, the proposal seeks to utilise existing car park
accessed from Greenhead Road to the rear of the building with one space
within the car park allocated to each of the three proposed flats. Whilst the new
residential use would generate parking demand, the existing commercial use
would also have a demand for parking as would the flats which existed prior to
the commercial use. The Council’s Roads Service offers no objection to the
proposal although note that ideally a parking provision of 150% should be
provided and this would require an additional space being allocated for the
residential development. As the car park is within the planning application site,
the requirement to allocate an additional space to the new residential use can
be addressed by condition as can the recommendation set out by the Roads
Service in respect of providing collapsible bollards to protect the spaces for use
by resident.
7.14 The application site is located within an accessible urban location with several
bus routes serving the area and a railway station nearby. A range of shops and
services also lie nearby contributing to a 20 minute neighbourhood approach. 
Open Space provision
7.15 Policy R2 of the adopted Local Plan advises on open space standards for new
development with Policies GI2 and GI4 of proposed LDP2 providing the up-to-
date position. Any development of new dwellings, even if small scale will be
expected to provide a contribution towards the cost of providing or improving
green infrastructure in the area. Policy GI4 of proposed LDP2 advises that
developer contributions will apply in a number of circumstances including
smaller sites of less than 10 units where provision of green infrastructure is not
possible and where it is not appropriate to meet green infrastructure standards,
such as higher density urban areas. The Green Network and Green
Infrastructure Planning Guidance (2022) advises that if the level of open space
required by Policy GI2 cannot be provided, a financial contribution of £30 per
sqm is required. With one two bedroom flat and two one bedroom flats, open
space of 135 square metres would ordinarily be required. As this cannot be
provided on site, this would result in a contribution of £4,050 being required.
7.16 It is acknowledged that historically the building housed two flats with a total of
six bedrooms and is not a “new build” scenario. Policy G14 notes that this
policy will only be waived in exceptional circumstances, for example, where a
development demonstrates that their development would have exceptional
development costs and/or overriding economic, social or other benefits. On
balance, it is considered that the policy requirement can be waived in this
instance as the change of use to residential is reinstating the buildings previous
original residential use.
Flooding and Drainage
7.17 With respect to flood risk, the site is identified as being at high risk of river
flooding on SEPA’s Flood Maps. Both SEPA and the Council’s Roads Service
Page 21

Page 22

were consulted on the application and requested further details to be
submitted. The applicant subsequently submitted a supporting statement on
flood risk and proposal suitability which acknowledged the potential fluvial flood
risk from Gruggies Burn, but noted that this proposal related to the upper floors
of an existing building within an established urban area and that no additional
flood risk would arise.  Following a reconsultation, the Council’s Road’s Service
offered no further objection. SEPA have maintained their objection and have
sought a comprehensive flood risk assessment for the site. Concern is raised
that the land use vulnerability will increase to a highly vulnerable with the
introduction of three residential properties with overnight accommodation.
7.18 Policy 22 of NPF4 sets out to strengthen resilience to flood risk by promoting
avoidance as a first principle and reducing the vulnerability of existing and
future development to flooding. Development proposals at risk of flooding or in
a flood risk area will only be supported in certain circumstances. These include
for essential infrastructure, for water compatible uses, for development of an
existing building or site for an equal or less vulnerable use; or for the
redevelopment of previously used sites in built up areas where the LDP has
identified a need to bring these into positive use and where proposals
demonstrate that long-term safety and resilience can be secured in accordance
with relevant SEPA advice. The development does not fit into the definitions of
essential infrastructure of a water compatible use as defined within NPF4.
There is an increase in land use vulnerability in terms of SEPA’s classifications
and whilst there is general support for the development of vacant buildings, the
site itself is not identified within the adopted Local Plan or proposed LDP2 as
one to be brought into positive use.
7.19 In their consultation response, SEPA are clear in their concerns regarding the
change in land use vulnerability and that the proposal will result in the
introduction of properties with overnight accommodation. It is further noted that
SEPA’s flood maps are an indicative tool and are based on strategic scale
modelling which are not detailed when it comes to the local scale.  SEPA advise
in their response that despite the residential properties being above the design
flood level, flood waters may encroach up to and around the building itself and
this could pose a risk of damage to the property including external walls and
foundations. The application proposal does not, however, relate to a new
building. It relates to an existing building with no external changes proposed.
The building will be at no more risk from flooding that it is currently and with no
external alterations or increase in building footprint, there is no prospect that
the development will increase flood risk elsewhere. The site also lies within an
established residential area with surrounding residential buildings also being at
risk of flooding.  Based on the SEPA flood maps, this risk includes a variety of
ground floor residential properties over an extensive area together with a
nearby care home. Whilst it is accepted that an island of development would
result in terms of the proposal (i.e. the proposed flats would be surrounded by
flood water, but not flooded themselves) this situation would be no different to
when the upper floor of the building was previously in use as residential flats.
Furthermore, it is anticipated that this would be no different from all other upper
floor properties within the vicinity during a flood event. Whilst overnight
accommodation will be re-established within the building, the increase of those
Page 22

Page 23

residents potentially at risk of flooding within the wider area would be negligible.
It is also noted that the proposal would result in a lesser number of bedrooms in
total across the flats than previously existed prior to the change of use away
from residential in 2002 (six previously with four now proposed). In considering
the proposal and having reviewed the applicant’s supporting statement, the
Council’s Roads Service offer no objection on flood risk grounds.
7.20 It is acknowledged that policies in NPF4 require to be read and applied as a
whole and that conflicts between policies are normal and to be expected. It is
accepted that there is conflict with Policy 22. However, overall, the proposal
would result in the redevelopment of a vacant premises, which historically were
flats, with residential accommodation provided within an existing residential
area and an accessible urban location which supports 20 minute
neighbourhoods. Therefore, considering the proposal as a whole and being
reassured by the lack of objection on flooding grounds by the Council’s Roads
Service, it is considered that the proposal can be supported despite the
objection from SEPA.
7.21 Finally, as the proposal relates to a change of use of existing floorspace with
existing drainage connections, no drainage matters arise. 
8. CONCLUSION
8.1 The proposal would provide an effective use of vacant premises, which
previously were occupied as flats, with residential accommodation provided
within an accessible residential area which supports 20 minute
neighbourhoods. The proposal would also be without any detrimental effects
on local amenity. It is accepted that the site may be at risk of flooding, however
the proposed flats themselves are at the first floor level. The overall increase in
residents within the wider area at flood risk is considered to be negligible and
the proposed flats would be an no greater risk than any other residential
property within the area.
8.2 Despite the conflict with Policy 22 of NPF4, the proposal is, in the whole,
supported by NPF4, together with the adopted Local Plan, the proposed Local
Development Plan 2 and associated Planning Guidance.
9. CONDITIONS
1. That prior to the commencement of development on site, an updated
parking layout shall be submitted to show four parking spaces allocated to
the residential flats hereby permitted.
Reason: To ensure adequate parking provision for the new residential flats
2. That prior to the occupation of the residential flats hereby permitted, the four
parking spaces shall be clearly marked out, fitted with collapsable bollards
and be available for use by new residents. The spaces shall then be
retained as approved and be available for residents of the flats at all times
thereafter to the satisfaction of the Planning Authority. 
Page 23

Page 24

Reason: To ensure the availability of the off-street parking provision for the
residential flats
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 11th December 2024
Person to Contact: Michael Mulgrew, Planning, Building Standards and Environmental Health
Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: james.mccoll@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Consultation responses
3. National Planning Framework 4
4. West Dunbartonshire Local Plan 2010
5. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
6. Creating Places Guidance (2022)
7. Green Network and Green Infrastructure Guidance (2022)
8. Planning application no: DC02-106.
Wards affected: Ward 3 (Dumbarton)
Page 24

Page 25

West Dunbartonshire Council
16 Church Street
Dumbarton
G82 1QL
Reproduced by permission of Ordnance Survey
on behalf of HMSO © Crown copyright and
database right 2015. All rights reserved. Ordnance
Survey Licence number 100020790
Map Register No:
Date: 27 November 2024
DC23/227/FUL Change of use from beauty
salon to three residential
flats
4 - 6 Greenhead Road
Dumbarton
G82 1EL                    
ITEM 6a - APPENDIX 1
Page 25

Page 26

Page 26

Page 27

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 11th December 2024
_____________________________________________________________
DC24/123/FUL: Change of use from butcher shop (Class 1A) to fish and chip
shop (hot food takeaway – Sui Generis) together with
installation of flue at 68 Glasgow Road, Dumbarton, G82 1HQ
by Glasgow AP Ltd
1. REASON FOR REPORT
1.1 The application has been subject of both a substantial body of objection and an
Elected Member request for the proposal to be brought before Planning
Committee. Under the terms of the approved Scheme of Delegation, it therefore
requires to be determined by the Planning Committee.
2. RECOMMENDATION
2.1 Refuse planning permission for the reasons set out in Section 9.
3. DEVELOPMENT DETAILS
3.1 The application relates to a vacant commercial unit situated on the ground floor of
a three-storey tenement style corner block located on the southern side of
Glasgow Road, at the junction with Wallace Street, Dumbarton. The unit, which
has a floor area of approximately 68 square metres, was last in use as a retail shop
(Class 1A) and occupied by a butcher. The front of the unit faces onto Glasgow
Road and has two double windows, a double door and signage for the previous
occupier on the windows and fascia. The rear elevation includes a single door and
two fans/extractors, along with a 3 metre wide stairwell rising to a highest point of
11.2 metres and projecting 3.3 metres. The side elevation facing Wallace Street
includes fascia signage, but no openings. Externally, the upper floors of the
building are comprised of blonde sandstone walls, white uPVC windows and
brown concrete tiles on the hipped roof. The building sits on a wider site of
approximately 307 square metres, with a grassed and hardstanding area to the
rear enclosed by a timber fence on the eastern side. The upper floors of the
building comprise residential flats.
3.2      The application site is located within a Local Centre, as identified in the respective
Proposals Maps of the Local Plan and proposed Local Development Plan 2
(LDP2). The site is further located within the north-west corner of the Knoxland
Conservation Area. It is bounded by ground floor commercial units to the west,
Glasgow Road to the north with residential properties lying to the opposite side of
the road, Wallace Street to the east with a similar tenement style building
comprising ground floor commercial units with flats above to the opposite side of
the junction, and a flatted residential block to the south.  
ITEM 6b
Page 27

Page 28

3.3     It is proposed to:
 Change the use of the unit from a butcher shop (Class 1A) to a hot food
takeaway (Sui Generis).
 Install a flue on the rear elevation, which would project 0.4 metres from
the face of the wall, exit the unit 2.8 metres above ground level and rise
8.5 metres to finish 2.1 metres below the roof pitch.
 Change the colour of the façade from blue to white.
3.4 No information has been provided on the operating hours of the premises.
3.5 The submitted drawings also indicates proposals for the installation of two new 0.5
metre x 0.5 metre projecting signs on the stallrisers at either side of the front
elevation and replacement facia signage to the front and side of the unit. Should
any consent be required for new or replacement signage, this would be addressed
separately via an application for advertisement consent and does not form part of
the assessment of this proposal.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service advise that the proposal cannot be
supported as the required five off-street parking space are not provided. It is noted
that, in the absence of off-street parking, customers are likely to use the nearest on
street provision, which raises safety concerns that are increased by the presence
of the controlled crossing and associated white zig zag situated immediately
outside the unit. The Roads Service advise that Police Scotland share these
concerns.   
4.2 West Dunbartonshire Council Environmental Health Service – No objection,
subject to a condition relating to the ventilation system, specifically the control the
odour, vibration and noise.
5. REPRESENTATIONS
5.1 24 representations were received, with 17 supporting the proposal and 7 objecting.
The detail of each representation is available for public viewing in the electronic
planning file for the application.
5.2 The concerns raised in the objections can be summarised as follows:
Visual Impact
 The architectural integrity of the area is crucial and the addition of a large
flue would significantly alter the appearance of the rear elevation.
 The aesthetically pleasing appearance of the existing shop would be lost if
the proposal goes ahead.
Residential Amenity
 Concern that late operating hours, customer footfall, deliveries, extractor
fans, people slamming car doors and idling cars would result in noise and
Page 28

Page 29

general disturbance to local residents, including those using the shared
rear garden.
 Cooking/fryers would result in odour pollution for local residents.
 Concern that the proposal would result in anti-social behaviour.
Access and Parking
 Lack of parking is already a significant issue for local residents, which has
resulted in cars parking illegally.
 Proposal would increase vehicles/traffic, thereby leading to further
congestion and lack of parking.
 No parking proposed, so staff, customers and delivery drivers would be
parking as close as possible to the premises, resulting in parking safety
concerns for local residents, including children, particularly with a
pedestrian crossing and primary school in close proximity to the
premises.
 Proposal would result in double parking for pickups.
Other Non-Material Planning Issues
 Current owner has a record of unsuccessful fast food businesses in the
local area.
 Concern about adverse impacts on local residents’ ability to get home.
insurance.
 Dumbarton already has two chip shops and many other takeaways.
 Concern that the proposal would adversely impact property values in the
local area.
5.3 The points raised in support of the proposal can be summarised as follows:
Visual Impact
 Confident that the business will fit nicely with its surroundings.
Residential Amenity
 Support the proposal as long as appropriate steps are taken to address
concerns about odour and noise pollution, and waste disposal.
 Modern ventilation systems are quiet and efficient, so odour and noise
disturbance shouldn’t be much of an issue.
Traffic and Parking
 No significant adverse impacts on traffic as most customers would access
the takeaway on foot. Any cars would also not be at the premises for long.
 With sensible signage and management, any parking issues should be
easy to handle.
Economic Benefits
 Would bring much needed footfall, including tourists, to the area, support
local businesses and create jobs.
 Would support businesses to grow in the area, particularly as many shops
and businesses are closing down.
Page 29

Page 30

Other Non-Material Planning Issues
 Would provide more dining options in the local area.
 There are no fish and chip takeaways between Silverton and the Town
Centre.
 Supporting local people to open businesses is a great way to build
communities, resurrect our streets in the town and boost the local
economy.
5.4 The points and concerns raised in the representations, both in support and in
objection are considered in Section 7 below.
6 ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Framework 4 (NPF4)
6.1 Policy 1 aims to tackle the climate and nature crises by requiring that significant
weight be given to these issues when considering all development proposals.
Policy 2 relates to the climate in the form of climate mitigation and adaptation,
while Policy 3 seeks to protect biodiversity, reverse biodiversity loss, and deliver
positive effects from development and strengthen nature networks. Overall, the
proposal re-uses an existing structure as part of the development and, as such, the
embodied energy of the structure remains. No biodiversity matters arise. It is
considered that the nature and small scale of development proposal would have a
neutral effect in respect of Policies 1, 2 and 3.
6.2 Policy 7 seeks to protect and enhance historic environment assets and places. It
advises that development proposals in or affecting conservation areas will only be
supported where the character and appearance of the conservation area and its
setting is preserved or enhanced. The application site is located in the Knoxland
Square Conservation Area, with the rear elevation visible from Wallace Street.
While the proposed flue would therefore be visible, it is noted that flues are also
visible in similar circumstances to the rear of premises either side of the junction of
Victora Street, albeit their position to the respective buildings makes them less
prominent within the Conservation Area than the proposed flue. In this context,
and subject to a condition requiring the flue to have a powder coated colour finish
to match the existing stonework of the rear wall, on balance, it is considered that
the impact on the character and appearance of the Conservation Area would not
be adversely affected.  
6.3 Policy 9 aims to facilitate the reuse of brownfield, vacant and derelict land and
empty buildings, with criterion (d) noting that proposals for the reuse of existing
buildings will be supported, taking into account their suitability for conversion to
other uses. While the proposal would re-use a vacant building which is supported
by the Policy, the proposed use is not considered suitable due to the lack of the
required off-street parking provision and position adjacent to a road junction and
pedestrian crossing, which is discussed further in Section 7 below. As such, the
proposal cannot be considered to be supported by the above Policy.
6.4 Policy 12 relates to waste and advises that development proposals, including
commercial, will set out how much waste the proposal is expected to generate and
how it will be managed. It is expected that the proposal would generate a level of
waste commensurate with a hot food takeaway use. The application notes that the
Page 30

Page 31

proposal will utilise the existing waste collection arrangements, which is
acceptable. 
6.5    Policy 14 aims to promote and facilitate well designed development that makes
successful places by taking a design-led approach and applying the place
principle. Criterion (d) states that proposals which are detrimental to the amenity of
the surrounding area or inconsistent with the six qualities of successful places will
not be supported. Policy 15 relates to local living and 20-minute neighbourhoods.
The proposal complies with the above policies as the shop front alterations raise
no concerns, while a hot food takeaway in this location would contribute towards
local living without significant adverse effects on local amenity, This issue is
discussed in detail in Section 7 below.
6.6    Policy 23 aims to protect people and places from environmental harm, with
criterion (e) advising that development proposals which are likely to raise
unacceptable noise issues will not be supported. The proposal is considered
acceptable with reference to this policy because, while a hot food takeaway would
generate noise through additional traffic, car doors closing and customers talking
outside, this would not constitute a significant increase beyond the existing
position where the premises is already subject to a medium level of ambient noise,
being located in a Local Centre and adjacent to a busy road. This issue is
discussed further in Section 7 below.
6.7 Policy 27 advises that development proposals that enhance and improve the
vitality and viability of city, town and local centres, including proposals that
increase the mix of uses, will be supported. Criterion (b) notes that proposals will
be consistent with the town centre first approach, with commercial uses supported
in existing city, town and local centres. In addition, criterion (d) advises that
proposals for non-retail uses, including hot food takeaways, will not be supported if
further provision would undermine the character and amenity of the area or the
area. The application site is located in a Local Centre and the proposed hot food
takeaway is a Town Centre use which would contribute to the vitality of the Centre.
As such, the proposal is supported by the Policy.
6.8 Having assessed the proposal with reference to NPF4, it is not considered
acceptable with reference to Policy 9.
West Dunbartonshire Adopted Local Plan 2010
6.9 Policy RET1 advises that new retail, commercial leisure, public service
developments and other key town centre uses should adopt a sequential approach
to change or use proposals, in the order of (1) Town Centre sites; (2) Edge of Town
Centre sites; (3) Commercial Centre sites; (4) Out of centre sites. It is noted that
the application unit is located in a Local Centre and the proposed hot food
takeaway is a Town Centre use. In light of this, the proposal is supported.
6.10    Policy H5 aims to safeguard and, where possible, enhance the character and
amenity of existing residential areas identified on the Proposals map. The Policy
notes that non-residential uses could be supported if they can be considered
ancillary or complimentary to the residential area and would not result in a
significant loss of amenity to surrounding properties, in terms of increased traffic,
noise, vibration, smell, artificial light, litter hours of operation and general
Page 31

Page 32

disturbance. While the Proposals Maps of the Local Plan and proposed LDP2
identify the application unit as being within a Local Centre, this policy is relevant as
the upper floors of the application building and those adjacent to it, along with the
building to the south, are comprised of flats. Further to the assessment in Section 7
below, it is considered that the proposed hot food takeaway would not have
significant adverse effects on residential amenity. In light of this, the proposal
complies with Policy H5.
6.11 Policy GD1 seeks to ensure that all new development enhances the Plan area and
environmental quality in general through an emphasis on high quality design.
Proposals are required to meet a number of criteria, including the need to be
appropriate to the local area in terms of land use and layout and design; be energy
efficient and meet the roads, parking and access requirements of the Council.  As
set out in Section 7 below, the proposal fails to provide the five off-street parking
spaces specifically highlighted as being required for this type of development in
the consultation response from the Council’s Roads Service. The proposal is
therefore not supported with reference to this Policy.
6.12 Policy PS 4 requires the provision in all new development of facilities for the
minimisation, separation and collection of different waste streams. The application
notes that the existing waste separation and collection will be utilised, which is
acceptable.
6.13 Policy BE1 aims to ensure that no works adversely affect the appearance and
character of Conservation Areas.  Subject to a condition requiring the finish of the
flue to match the stonework of the rear wall, it is considered that the flue would not
have a detrimental effect on the visual appearance of the building and the
character of the wider Conservation Area.  
6.14    Having assessed the proposal with reference to the adopted Local Plan, it is not
considered acceptable with reference to Policy GD1.  
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would
not adopt Local Development Plan 2. The Proposed Local Development Plan 2
(LDP2), incorporating the recommended modifications of the Examination Report
received on 22 April 2020, which were accepted by the Planning Committee of 19
August 2020, remains the Council’s most up to date spatial strategy and is
therefore afforded significant weight in the assessment and determination of
planning applications, subject to compatibility with NPF4. The Scottish Ministers’
Direction relating to the adoption of LDP2, dated 18 December 2020, is also a
material consideration.
7.2 Policy SC4 advises that non-retail uses, including hot food takeaways, may be
supported within Local Centres providing no adverse impact arise on the nature of
the centre and the character and amenity of the area.  The proposed hot food
takeaway is located in a Local Centre and acceptable with respect to impacts on
the character and amenity of the surrounding area, as discussed in Section 7
below. As such, the proposal is supported.  
Page 32

Page 33

7.3 Policy CP1 requires new development to take a design-led approach to creating
sustainable places, which put the needs of people first and demonstrates the six
qualities of successful places. With the potential for the proposal to affect other
road users and pedestrian safety, impacting upon the operation of the transport
and active travel network, the proposal cannot be held to support the six qualities
of successful places and is therefore not considered acceptable with reference to
this policy.   
7.4 Policy H4 aims to protect, preserve and enhance the residential character and
amenity of existing residential areas, including a presumption against the
establishment of non-residential uses within, or in close proximity of residential
areas, which would potentially be detrimental to local amenity, or which would
cause unacceptable disturbance to local residents. Further to the detailed
assessment set out below, it is considered that a hot food takeaway located in a
Local Centre would not have significant adverse effects on amenity. The proposal
therefore complies with the above Policy.
7.5 Policy ZW1 advising that all development requires to meet the aims of the Zero
Waste Plan and follow the principles of the Waste Hierarchy. The proposal
complies with the policy as the application indicates that the existing waste
arrangements will be utilised. 
7.6 Policy BE3 advises that development which would harm the character or
appearance of a Conservation Area will not be permitted. As discussed in Section
7 below, the proposed flue on the rear elevation would not have a detrimental
effect on the visual appearance of the building and the character of the wider
Conservation Area, subject to a condition requiring the colour finish to match the
existing stonework. In light of this, the proposal does not comply with the policy.
7.7       Having assessed the proposal with reference to proposed Local Development Plan
2, it is not considered acceptable with reference to Policy CP1.  
Historic Environment Scotland’s Policy and Guidance
7.8 The Historic Environment Policy for Scotland seeks to ensure that changes to
specific assets and their context are managed in a way that protects the historic
environment.
7.9 Historic Environment Scotland’s Managing Change in the Historic Environment
Guidance Note series provides advice and guidance to Planning Authorities
determining applications which affect the historic environment, including in
Conservation Areas. The guidance note on External Fixtures indicates that new
external fixtures must be sited to minimise impact upon the architectural integrity
and fabric of the building. It is noted that secondary elevations can often
accommodate new fixtures without significant impact. Noting the location to the
rear, subject to a condition requiring the flue to have a powder coated finish to
match the existing stonework of the rear wall, it is considered that, on balance, the
impact on the character and appearance of the Conservation Area would be
acceptable. The colour change to the shopfront raises no concerns.
Page 33

Page 34

Principle of Development
7.10 The application site is located in a Local Centre as defined by both the Adopted
Local Plan and proposed LDP2, and a hot food takeaway is considered to be a
Town Centre use appropriate for such locations. As such, the proposed use is
supported in principle. However, whilst there may be no policy reason which
suggests the principle of the proposal is unacceptable, it remains that a full
assessment of all material considerations would be required to determine
acceptability.      
Design, Appearance and Visual Amenity
7.11 The proposed change to the façade colour of the shopfront from blue to white is
not considered likely to have a significant visual impact in the context of the
existing building. The proposed flue, however, which would rise 8.5 metres up the
rear elevation and be clearly visible from Wallace Street, would be prominent
feature, particularly when viewed from a southern approach. In light of this, and in
the context of the buildings’ location within a Conservation Area, it is considered
that the proposal has the potential to have a detrimental effect on the visual
appearance of the building, the character of the local area and wider Conservation
Area. The proposed flue therefore requires careful consideration.   
7.12 The tenement block on Glasgow Road, which includes the application unit, was
included in the Knoxland Conservation Area following a boundary review
undertaken as part of the 2017 Conservation Area Appraisal. This review
recommended that the block should be included in the Conservation Area as its
tenement design reflected that found in the wider Conservation Area, as defined in
2017. Notwithstanding the fact that the advice within the appraisal is based on the
original Conservation Area boundaries and not the expanded boundary within
which the application site is located, the approach set out is considered relevant to
the wider Conservation Area. With respect to the assessment of new development
and building alterations, the appraisal states that particular attention should be
paid to a number of requirements, including the need to not to impinge on the
setting of existing buildings, use materials which are high quality, durable and
which complement the muted palette of materials traditionally found in the
Conservation Area. The flue is situated to the rear and it therefore has no impact
upon the principle elevation of the building, nor the side elevation which fronts the
road. It is situated to the rear where such infrastructure can more readily be
accommodated without adverse visual impact. It is noted, however, that the rear
elevation of the building and the proposed flue would be clearly visible from
Wallace Street. However, it is also noted that flues are already visible in similar
circumstances to the rear of premises either side of the junction of Victora Street,
albeit their position to the respective buildings makes them less prominent within
the Conservation Area than the proposed flue. The flue would also not be
sustained within a key view within the Conservation Area, but rather to the
periphery.
7.13 In this context, and subject to a condition requiring the flue to have a powder
coated finish to match the existing stonework of the rear wall, it is considered that,
on balance, the impact on the character and appearance of the Conservation Area
would be acceptable.
Page 34

Page 35

Roads and parking
7.14 In considering the impact upon roads, traffic flow, parking and general road safety,
the assessment is principally guided by the consultation response from the
Council’s Roads Service. With regard to parking, the Roads Service have advised
that the proposed hot food takeaway would be an intensification of use beyond the
existing retail shop, which is subject to a parking requirement of two off-street
spaces. The Roads Service have advised that five off-street parking spaces would
be required for a hot food takeaway in order for customers vehicles to be suitably
accommodated. As no off-street parking is proposed, the Road Service advise that
they cannot support the proposal as customers are likely to use the nearest on
street provision, which raises safety concerns that are increased by the presence
of the controlled crossing and associated white zig zag situated immediately
outside the premises. It was noted by the Roads Service in their consultation
response that Police Scotland share these concerns. In response to Roads’
objection, the applicant has noted that a hot food takeaway, including deliveries to
the site, would generate no more or less traffic than the existing butchers or any
Class 1A shop.
7.15 While it is accepted that the nature of the site means it is not possible to provide off
-street parking for the hot food takeaway, it is also noted that the existing Class 1A
uses in this Local Centre do not provide off-street parking or have the capacity to
do so. In this context, it must therefore be considered whether there are specific
characteristics of the proposed use and/or application site which mean the lack of
off-street parking is unacceptable in this case. In the supporting submission, the
applicant further considers that any existing parking issue and associated safety
concerns would persist if a Class 1A shop was to operate from the business. It is
further noted by the applicant that signs are in place adjacent to the premises to
ensure that drivers do not park on the corner and it is a police matter if these are
not adhered too, not a planning matter. In considering the proposal, it is accepted
that the hot food takeaway will provide for local customers who would likely walk to
the premises. However, those who do not reside in close proximity may drive to the
premises. It is also noted that hot food takeaways can involve a significant home
delivery operation for orders received via online platforms, and this could result in
further vehicle movements with delivery drivers calling at the premises. Hot food
takeaways can therefore attract a high proportion of car-borne and short-stay
customers. When calling at the premises, both customers and delivery drivers may
be tempted to park for short periods to quickly pop in and out of the hot food
takeaway premises. This could result in parking at the junction or in close proximity
to the nearby pedestrian crossing. The concerns raised by the Roads Service
indicate the possibility of such obstructive parking within the vicinity of the
premises with specific reference to the pedestrian crossing. This could adversely
affect other road users and pedestrian safety, impacting upon the operation of the
transport and active travel network.  While the absence of off-street parking in a
Local Centre where no such parking is available is not a reason for refusal on its
own, it is clear that the increased level of traffic and parking generated by the
proposed use, in conjunction with a controlled crossing and associated white zig
zag situated immediately outside the premises, raises significant road and
pedestrian safety concerns, which are unacceptable with reference to the
proposed use within this specific premises. 
Page 35

Page 36

7.16 A lack of parking facilities for hot food takeaways, as is the case here, also has the
potential to have an adverse impact on the amenity of the surrounding area. The
increased demand for on-street parking associated with the use may result in
customers and delivery drivers parking in adjacent residential streets. This would
include Wallace Street which is already very heavily parked.  The peak activity
periods for takeaways generally occurs in the evenings which differs from the retail
shop use of the premises, and will coincide with times when the demand for
general on-street parking is generally at its highest. A hot food takeaway at this
location, with no off-street parking provision, could therefore exacerbate any
parking problems in this location. The Roads Service are clear in their concerns
regarding the proposal resulting from the lack of off-street parking provision and
the potential implications in respect of parking and road safety, and recommend
that the application is refused. Following a full consideration of the potential issues
in this respect, there is nothing to suggest that it would be appropriate to take a
position contrary to the advice of the Roads Service and the proposal cannot be
held to be acceptable with reference to parking and roads matters.
Residential Amenity
7.17 A number of the objections raised concerns about adverse impacts on the
residential amenity of the flats situated above and adjacent to the premises,
particularly in relation to noise and odour disturbance and waste disposal. While it
is accepted that the proposed use would generate noise through additional traffic,
car doors opening/closing and customers talking outside etc, this would not result
in a significant increase beyond the existing position, where the premises is
already subject to a medium level of ambient noise due to its location in a Local
Centre and adjacent to a busy road. It requires to be accepted that whilst those
living within or adjacent to local shopping centres may benefit from the close
proximity of services, they cannot expect the same level of quietude as a wholly
residential area. With respect to odour and noise nuisance related to the proposed
ventilation system, it is noted that the consultation response from Environmental
Health raised no objection, subject to a condition relating to noise levels from the
extraction system and requires the system to incorporate systems to reduce the
emission of odours and pollutants. As such, it is considered that the proposal
would not have a significant adverse effect on residential amenity.
Other Matters raised in representations.
7.18 With respect to the outstanding issues raised in the representations and not
already assessed above, several representations supported the proposal because
it would increase the range of takeaway options in the local area, while one of the
objections noted that there is already sufficient provision of hot food takeaways in
Dumbarton. While there is a role for planning in assessing the impact proposals
would have on the vitality, viability, amenity and character of the local centre, the
level of provision required to meet the demand for a particular use is a commercial
matter and therefore not a material consideration in the assessment of planning
applications. Whilst other hot food takeaways can be found nearby, a clustering of
such uses does not occur.
7.19 It is noted that some of the representations in support of the proposal highlight its
economic benefits, including job creation. While it is considered that the proposal
would generate a limited degree of economic activity in the area, this is not
considered to be a determining factor in this instance.
Page 36

Page 37

7.20 While there are concerns that the applicant has an unsuccessful record of fast-
food businesses and the proposal would devalue house prices and make it more
difficult for local residents to access home insurance, these are not material
planning considerations and do not, therefore, form part of this assessment.
7.21 It is noted that concerns are raised with respect to anti-social behaviour. These
concerns must be treated as speculative in nature as no evidence has been
provided to support the view that such effects would worsen as a direct result of
the proposal.
8. CONCLUSION
8.1 The application site is located in a Local Centre, where the proposed use is
supported, in principle. Subject to a condition in respect of the final finish to the
external flue, the visual impact to the existing building and wider Conservation
Area would be acceptable.  However, the proposal fails to provide the required
level of off-street parking, which has the potential to result in additional on-street
parking demand, obstructive parking and congestion within what is a heavily
parked area. This has the potential to adversely impact upon road and pedestrian
safety and the Council's Roads Service recommend that the application be
refused for this reason. The proposed use cannot be considered acceptable with
reference to Policy 9 of NPF4, Policy GD1 of the adopted West Dunbartonshire
Local Plan and Policy CP1 of proposed Local Development Plan 2.
9. REASONS FOR REFUSAL
1. The absence of off-street parking for the proposed use within the premises subject
of this application has the potential to result in additional on-street parking
demand, obstructive parking and congestion within what is a heavily parked area,
to the detriment of road and pedestrian safety. The proposal is therefore not
supported by Policy 9 of NPF4 and Policy GD1 of the adopted West
Dunbartonshire Local Plan. and Policy CP1 of proposed Local Development Plan
2.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 11th December 2024
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
Page 37

Page 38

2. Representations
3. Consultation responses
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
7. Historic Environment Policy for Scotland
8. Historic Environment Scotland Managing Change in
the Historic Environment Guidance Notes on External
Fixings
9. Knoxland Square Conservation Area Appraisal
Wards affected: Ward 3 (Dumbarton)
Page 38

Page 39

West Dunbartonshire Council
16 Church Street
Dumbarton
G82 1QL
Reproduced by permission of Ordnance Survey
on behalf of HMSO © Crown copyright and
database right 2015. All rights reserved. Ordnance
Survey Licence number 100020790
Map Register No:
Date: 27 November 2024
DC24/123/FUL Change of use from
butcher shop (Class 1A)  to
fish and chip shop
(hotfood takeaway - sui
generis) together with
installation of flue
68 Glasgow Road
Dumbarton
G82 1HQ
ITEM 6b - APPENDIX 1
Page 39

Page 40

Page 40

Page 41

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 11th December 2024
___________________________________________________________________
Subject: Construction and operation of a 560MW Battery Energy Storage
System with associated infrastructure, substation, security fencing,
CCTV, security lighting and landscaping on Land at Cochno Road,
Bearsden, East Dunbartonshire - Section 36 application to Scottish
Government Energy Consents Unit ref: ECU00004982
1. Purpose
1.1 To agree an updated consultation response following the receipt of further details and
a revised proposal from the Scottish Government Energy Consents Unit, on behalf of
the Scottish Ministers, in connection with a proposal for the construction and operation
of a 560MW Battery Energy Storage System with associated infrastructure, substation,
security fencing, CCTV, security lighting and landscaping on land within the East
Dunbartonshire Council area.
2. Recommendations
2.1 It is recommended that the Committee agrees to maintain an objection to the above
development in respect of matters specified in the response contained in Appendix 1,
and that this response is submitted to form the Council’s updated position on the
proposal. 
3. Background
3.1 The Scottish Ministers received an application under section 36 of the Electricity Act
1989 for the construction and operation of a battery energy storage facility with a
maximum power output of 560 megawatt. The application site is located within the
East Dunbartonshire local authority area, however the assessment of the submitted
application is undertaken via the Scottish Government Energy Consents Unit for the
Scottish Ministers.  West Dunbartonshire Council were consulted as neighbouring
planning authority with the application site lying generally to the north of the local
authority boundary. The application is referred to under the project name of Whitehall
BESS. The location of the site is shown in Appendix 2.
3.2 Following consideration of the proposal by the Planning Committee on 11th May 2024,
the Council issued a consultation response to the Scottish Ministers on 13th May 2024.
The Council objected to the proposal due to the concerns relating to the Green Belt
location of the development, visual impact, impact upon ecology, biodiversity and
protected species, potential impact upon the users of the core path network, potential
impact upon adjacent residential amenity and the failure to provide a decommissioning
and restoration scheme. The Council did not consider that the benefits of the proposed
development outweigh any adverse impacts to the adjacent West Dunbartonshire
area.
ITEM 7
Page 41

Page 42

3.3    Following the submission of the Council’s objection, a revised proposal together with a
range of additional and updated supporting documents have been submitted to the
Scottish Ministers. These details include a revised site layout, revised equipment
details, revised planting layout, a Landscape Statement, an updated Landscape and
Visual Assessment, an updated Noise Impact Assessment and an Archaeological
Investigation. A date of 13th December 2024 has been agreed with the Scottish
Government Energy Consents Unit for the submission of the Council’s updated
consultation response.  The application documents are available to view via the
Energy Consents Unit website: https://www.energyconsents.scot and the following
direct link:  Scottish Government - Energy Consents Unit - Application Details The
Council’s original consultation response can also be viewed within the case file at this
link. 
4. Main Issues
4.1   The site is situated on land at Whitehall Farm, Cochno Road, East Dunbartonshire and
extends to approximately 29 hectares. It is located immediately north and east of the
local authority boundary which follows the line of Cochno Road at this location. The
site itself is located within the open countryside comprising part of the Green Belt as
defined by the adopted East Dunbartonshire Local Development Pan 2. To the south,
the site is bound by Cochno Road with Whitehill Farm located directly adjacent to the
southeast of the site. To the west, the site is bound by Cochno Road along its southern
extent before following the general line of Lower Stourfold Glen. The northern and
eastern boundaries of the site generally cut across open land before following the
existing tree line to Cochno Road. The nearest residential properties within West
Dunbartonshire are the houses directly opposite the site at Edinbarnet, Cochno Road.
Properties at Craigton Street, Burnbrae Street, Craighaw Street and Field Road lie
around 170 metres from the southernmost boundary of the proposed site. Loansdean,
Cochno Road is around 200 metres from the site.
4.2   The proposal is for a 560 MW Battery Energy Storage Facility with associated
infrastructure. It is indicated that the development would have an operational lifespan
of 40 years. The proposed development would comprise a number of containerised
units to house battery energy storage systems and associated ancillary infrastructure.
Each container will have the appearance of a standard metal ISO/shipping container,
and it is indicated these will be soundproof. The containers would likely be finished in
dark grey or green and would be prefabricated off-site. The containers would be
accessed via an external galvanised metal open grid walkway supported by stairs and
railings. The dimensions of the containers have been amended from being 2.6m x
2.4m x 12.2m, to being 2.9m x 2.4m x 6.1m (height x depth x width). Power conversion
system units are of the same size and take a similar appearance. No updated
description of the equipment to be located on site has been provided. However, from
the updated site plan, it is clear that the equipment will be provided in 64 banks of 6
units. It remains that the proposal will feature a control room, sub-station compound,
sub-station building. Separate switchgear compounds are no longer proposed. The
access point to the development also remains located on Cochno Road, to the western
edge of the site.
4.3    Battery Energy Storage Solutions provide a means of allowing for the storage of
energy at times when generating stations are working at full capacity which can then
be released when additional power is needed within the grid during peak times or
when energy generation has dropped. As more energy sources are now renewable,
such as wind and solar, balancing generation versus demand is a critical issue for grid
stability. In short, the proposed battery takes in generated electricity when there is a
Page 42

Page 43

surplus and stores it until there is a demand for electricity which can be released to
meet this demand.
4.4 Appendix 1 comprises the recommended updated consultation response.  There is no
change to the position of National Planning Framework (NPF) 4 since the Council’s
previous consultation response and it remains that NPF4 sets out the long-term vision
for the development of Scotland through the National Spatial Strategy. NPF4 aims to
meet Scotland’s climate ambition which will require a rapid transformation across all
sectors of the economy and society. This proposal constitutes a National Development
as it supports renewable electricity generation, repowering, and expansion of the
electricity grid under National Development 3: Strategic Renewable Electricity
Generation and Transmission Infrastructure. NPF4 recognises that additional
electricity generation from renewables and electricity transmission capacity of scale is
fundamental to achieving a net zero economy.  Whilst the Council considers that the
proposal could therefore be held to support the overarching aims of the NPF4 to
achieve net zero targets and provide a stable domestic energy supply, it must be
ensured that such development happens in the right place. Therefore, it must be
assessed if there are any potential adverse impacts upon West Dunbartonshire
resulting from the proposed development which would be outweighed by any benefits.
4.5 In considering the proposal previously, it was concluded that no concerns arose in
respect of matters relating to the impact upon the Kilpatrick Hills, flood risk, roads, and
traffic, built and cultural heritage, and health and safety. There is no change to this
position which remains as per the original consultation response issued. 
4.6 In originally considering the proposal, it was concluded that the applicant did not
demonstrate that there are no other suitable sites available in a location outwith the
Green Belt. The applicant has not considered or addressed the Council’s previous
point of objection relating to the failure to demonstrate that there are no other suitable
sites available for such a development in a location outwith the Green Belt. If an
alternative location was available, no landscape and visual impact would result in the
proposed location, regardless of whether any visual impact could be considered
acceptable.
4.7 It was also considered that the industrial character of the development will result in
visual harm to the locality resulting in the industrialisation of the Green Belt and that
this would not be acceptable. In an effort to address the potentially adverse visual
impact resulting from the development, a revised site layout which reduces footprint
and massing of the development has been submitted by the applicant. The revised site
layout also moves the developed area away from the site boundaries and sensitive
visual receptors, including nearby residential properties in Faifley to the south.
Additional landscape mitigation is proposed in the form of extensive planting. Policy
11(e)(ii) of NPF4 explicitly accepts localised significant landscape and visual impacts
and in this respect the position is thus weighted towards the development’s
contribution to renewable energy targets. Whilst landscape and visual impacts will still
arise from the revised proposal, the reduced development footprint, enhanced
landscape mitigation and additional separation from the settlement boundary of Faifley
reduces the impact. The development is no longer considered to be viewed in the
context of the adjacent settlement and an industrialisation of the Green Belt at this
location is no longer of such a concern that an adverse impact will occur to the West
Dunbartonshire Area which outweighs the benefits of the development in respect of
the contribution to renewable energy targets. It is concluded that the previous point of
objection in relation to landscape and visual impact has been addressed.
Page 43

Page 44

4.8 Turning to the impact upon ecology, biodiversity and protected species, the applicant’s
preliminary ecological appraisal failed to identify the adjacent Local Nature
Conservation Site  within West Dunbartonshire and assess the potential cross
boundary impact upon ecology, biodiversity and protected species within West
Dunbartonshire. It therefore could not be concluded that adverse impacts would not
occur within the West Dunbartonshire area.  No updated surveys or information have
been received in respect of the points raised in the Council’s previous consultation
response and the position of the previous response with respect to ecology,
biodiversity and protected species and potential impact within the West
Dunbartonshire Area remains.
4.9 Considering the impact on the core path network, there was previous concern that
while no routes are physically interrupted by the proposal, there will be a visual and
noise impact to users of the routes and the character of the routes will be changed.
With the reduction in the developed area of the site together with additional landscape
mitigation proposed, it is considered that the visual amenity impacts on core path
users would now be acceptable and this concern is addressed. It remains that Cochno
Road acts as a connection between the various core path routes at this location and
the impact of construction traffic to users of these routes has not been considered or
addressed. However, this matter being addressed as part of a comprehensive
construction traffic management plan in the event that consent was to be granted
could be accepted. 
4.10 With regard to residential amenity, it could not previously be demonstrated beyond
doubt that there would be no impact upon residential amenity within West
Dunbartonshire by way of noise. The updated Noise Impact Assessment (NIA) now
demonstrates that there will be no impact upon residential amenity within West
Dunbartonshire by way of noise. This is based on the position of the NIA which no
longer refers to any flexibility in the layout of siting of the units within the development.
Accordingly, this point of objection is now satisfactorily addressed.
4.11 Finally, it remains that the Council considers it essential that given the type of
development together with its size and location, that details of de-commissioning and
site restoration are provided to ensure that the requirements of Policy 11(e)(i) of NPF4
are met. There have been no further submissions in this respect since the Council’s
previous response.
5. People Implications
5.1 None.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications in terms of this report.
7. Risk Analysis
7.1 No risks have been identified.
8. Equalities Impact Assessment (EIA)
8.1 Not required.
Page 44

Page 45

9. Environmental Sustainability
9.1 Matters relating to environmental sustainability are fully considered via the
application assessment.
10. Consultation
10.1 Responsibility for wider consultation on the submitted application rests with the
Scottish Ministers and Energy Consents Unit as part of the application process.
11. Strategic Assessment
11.1 The following strategic priorities of the Council are relevant:
 Our Communities - Resilient and Thriving
 Our Environment - A Greener Future
 Our Economy - Strong and Flourishing
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 11th December 2024
Person to Contact: Michael Mulgrew, Planning & Building Standards Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix 1: Council’s further Consultation Response
Appendix 2: Location Plan
Background Papers: 1. Application documents
2. National Planning Framework 4
3. Adopted East Dunbartonshire Local Development Plan 2
4. Planning Committee Report dated 11th May 2024
5. Council’s Consultation response dated 13th May 2024.
Wards affected: Adjacent to Ward 4 (Kilpatrick)
Page 45

Page 46

ITEM 7 – APPENDIX 1
Section 36 application ref: ECU00004982 - Construction and operation of a
560MW Battery Energy Storage System with associated infrastructure,
substation, security fencing, CCTV, security lighting and landscaping on Land
at Cochno Road, Bearsden, East Dunbartonshire - project name Whitehall BESS.
Having fully reviewed the updated and revised details submitted, West Dunbartonshire Council
maintains an objection to the above proposal as neighbouring Planning Authority. Full details
of the Council’s consideration of the updated development proposal are set out below. 
Context
An application has been made to the Scottish Ministers under Section 36 of the Electricity Act
1989 (as amended) for the construction and operation of a battery energy storage facility with
a maximum power output of 560 megawatt. The application site is located within the East
Dunbartonshire local authority area and the assessment of the application proposal is
undertaken via the Scottish Government Energy Consents Unit. West Dunbartonshire Council
was previously consulted as neighbouring planning authority with the application site lying
generally to the north of the local authority boundary. Following consideration of the proposal
by the Council’s Planning Committee on 11th May 2024, the Council issued a consultation
response to the Scottish Ministers on 13th May 2024. 
The Council objected to the proposal due to the concerns relating to the Green Belt location
of the development, visual impact, impact upon ecology, biodiversity and protected species,
potential impact upon the users of the core path network, potential impact upon adjacent
residential amenity and the failure to provide a decommissioning and restoration scheme. The
Council did not consider that the benefits of the proposed development outweigh any adverse
impacts to the adjacent West Dunbartonshire area.
Following the submission of the Council’s objection, a revised proposal together with a range
of additional and updated supporting documents have been submitted to the Scottish
Ministers. These details include a revised site layout, revised equipment details, revised
planting layout, a Landscape Statement, an updated Landscape and Visual Assessment, an
updated Noise Impact Assessment and an Archaeological Investigation. 
The Council has reviewed the updated details and proposal as set out below. The Council
notes that a variety of supporting documents have not been updated to take account of the
revised proposal including the applicant’s design statement and supporting planning
statement. An updated description of the development has not been set out and as no
documents have been superseded within the online case file, the Council does not consider it
to be clear what the proposal currently comprises. The updated Landscape and Visual Impact
submission has been Emailed to the Council but at the time of writing does not form part of
the online case file. Its status is therefore uncertain. 
For the avoidance of doubt, this updated response is based solely on the updated submission
and documents received since the Council’s previous response was issued on 13th May 2024,
including the Landscape and Visual Impact Assessment received by Email. 
This updated response requires to be read in conjunction with the Council’s original
consultation response dated 13th May 2024. There is no change to the in relation to the impact
upon the Kilpatrick Hills, traffic and road safety, flood risk, built and cultural heritage, and health
Page 46

Page 47

and safety. Whilst there was no objection from the Council in respect of these matters, a
number of points were highlighted and the position regarding these matters stand. It remains
that if the Scottish Ministers were minded to grant consent, the Council would expect the
Council’s comments to be taken into account. This updated response focuses on the Council’s
previous points of objection relating to the Green Belt location of the development, visual
impact, impact upon ecology, biodiversity and protected species, potential impact upon the
users of the core path network, potential impact upon adjacent residential amenity and the
failure to provide a decommissioning and restoration scheme. 
Site description and development proposal 
There is no change to the application site itself and it remains that this extends to
approximately 29 hectares and is situated on land at Whitehall Farm, Cochno Road, East
Dunbartonshire. The site lies immediately north and east of the local authority boundary which
follows the line of Cochno Road at this location. The site itself is located within the open
countryside comprising part of the Green Belt as defined by the adopted East Dunbartonshire
Local Development Pan 2. To the south, the site is bound by Cochno Road with Whitehill Farm
located directly adjacent to the southeast of the site. To the west, the site is bound by Cochno
Road along its southern extent before following the general line of Lower Stourfold Glen. The
northern and eastern boundaries of the site generally cut across open land before following
the existing tree line to Cochno Road. The nearest residential properties within West
Dunbartonshire are the houses directly opposite the site at Edinbarnet, Cochno Road.
Properties at Craigton Street, Burnbrae Street, Craighaw Street and Field Road lie around 170
metres from the southernmost boundary of the proposed site. Loansdean, Cochno Road is
around 200 metres from the site. 
The proposal is for a 560 MW Battery Energy Storage Facility with associated infrastructure.
It is indicated that the development would have an operational lifespan of 40 years. It remains
that as per the original proposal, the development would comprise a number of containerised
units to house battery energy storage systems and associated ancillary infrastructure. Each
container will have the appearance similar to ISO/shipping container and would likely be
finished in dark grey or green and would be prefabricated off-site. The containers would be
accessed via an external galvanised metal open grid walkway supported by stairs and railings
and include external air conditioning units. The dimensions of the containers have been
amended from being 2.6m x 2.4m x 12.2m,  to being 2.9m x 2.4m x 6.1m (height x depth x
width). Power conversion system (PCS) units are of the same size and take a similar
appearance. 
No updated description of the equipment to be located on site has been provided. However,
from the updated site plan, it is clear that the equipment will be provided in 64 banks of 6 units.
It remains that the proposal will feature a control room, sub-station compound, sub-station
building. Separate switchgear compounds are no longer proposed. The access point to the
development also remains located on Cochno Road, to the western edge of the site. 
In an effort to reduce the potential for adverse landscape and visual impacts and address the
concerns raised in the consultation responses, the applicant has revised the proposed site
layout. The revised site layout reduces the overall development footprint by utilising a more
efficient  battery system and also a reduction in the developed footprint of the sub-station area.
The revised site layout increases the offsets of the development from the site boundary and
this allows for additional landscape buffers ranging from 30 metres to 65 metres in depth, with
built elements and fence lines set well back from the edge of the site. This allows the applicant
to propose additional mitigation planting proposals in an attempt to screen the development
within the landscape from those to the south and south east of the site, including those utilising
the core path to the east of the site. 
Page 47

Page 48

Appraisal 
This application has been submitted to the Scottish Government under Section 36 of the
Electricity Act 1989, as it is development with a generating capacity of over 50MW. Under the
terms of Section 25 of the Town and Country Planning (Scotland) Act 1997, all applications
must be determined in accordance with the development plan unless material considerations
indicate otherwise. In this instance, the application is made under the Electricity Act 1989 and
therefore the Development Plan does not have the primacy in the determination of the
application.  It does, however, provide a basis for the assessment of this proposal and it is
established practice to take the development plan into account in such decisions. The
development plan comprises National Planning Framework 4 and adopted East
Dunbartonshire Local Development Plan 2. 
Principle of Development
There is no change to the position of National Planning Framework (NPF) 4 since the Council’s
previous consultation response and it remains that NPF4 sets out the long-term vision for the
development of Scotland through the National Spatial Strategy. NPF4 aims to meet Scotland’s
climate ambition which will require a rapid transformation across all sectors of the economy
and society. This proposal constitutes a National Development as it supports renewable
electricity generation, repowering, and expansion of the electricity grid under National
Development 3: Strategic Renewable Electricity Generation and Transmission Infrastructure. 
NPF4 recognises that additional electricity generation from renewables and electricity
transmission capacity of scale is fundamental to achieving a net zero economy. Policy 1 states
that there is a need to encourage, promote and facilitate development that addresses the
global climate emergency and nature crisis, whilst Policy 2 seeks to encourage, promote and
facilitate development that minimises emissions and adapts to the current and future impacts
of climate change. The electricity transmitted for storage within the proposed batteries will
have come from a mixture of renewable and non-renewable sources with the purpose of the
batteries to ensure there is always grid stability. As renewable energy becomes more
prevalent, grid stability becomes a significant issue due to the intermittent nature of renewable
energy generation. 
As set out in the previous response, the Council considers that the proposal could be held to
support the overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply, but it must be ensured that such development happens in the right
place. Therefore, it must be assessed if there are any potential adverse impacts upon West
Dunbartonshire resulting from the proposed development which would be outweighed by any
benefits. Policy 11(e) of NPF4 sets out in detail the matters for the project design and mitigation
to address. 
Landscape and Visual Impact and impact on the Green Belt
In originally considering the proposal, it was noted that the site is situated within the Green
Belt to the north of the settlement of Faifley. Policy 8 of NPF4 sets out the types of development
that are supported within the Green Belt locations. This includes essential infrastructure, and
proposals that relates to the distribution and transmission of electricity grid networks fall under
this definition. However, Policy 8 is clear that for development proposals in Green Belt
locations, the purpose of the Green Belt must not be undermined. Policy 11 additionally seeks
to encourage, promote, and facilitate all forms of renewable energy development, including
energy storage and distribution infrastructure. The Policy sets out a range of criteria that
proposals should be assessed against to ensure the impact of the project design and
mitigation is addressed. This includes ensuring there is no adverse impact on landscape and
visual impact. 
Page 48

Page 49

Policy 8 requires that the reasons why the Green Belt is essential must be provided together
with why the development cannot be provided on a site outwith the Green Belt. It was
previously acknowledged that the site has been chosen due to it’s proximity to appropriate
grid connections. It is accepted that there is a requirement for battery storage sites to be
located close to a viable grid connection with sufficient capacity to import and export power.
In this case, while this is accepted from a technical perspective and the proximity of the site to
both the Drumchapel sub-station and Windyhill sub-station which lie 3.17kms and 560m to the
south east respectively is acknowledged, the applicant has not provided any analysis of other
site options that were considered outside of the Green Belt and why it was not possible to
locate them in an alternative place. No additional supporting documentation has been
submitted by the applicant in this respect. It therefore remains that it cannot be concluded that
no other suitable sites are available in a location outwith the Green Belt. 
Policy 8 further requires that proposals must be compatible with the established countryside
and landscape and be designed to ensure that it is of an appropriate scale, massing and
external appearance to minimise visual impact upon the Green Belt. In assessing the original
proposal, the Council considered that the industrial character of the development will result in
visual harm to the locality resulting in the industrialisation of the Green Belt and that this would
not be acceptable. 
In an effort to address the potentially adverse visual impact resulting from the development, a
revised site layout which reduces footprint and massing of the development has been
submitted by the applicant. The revised site layout also moves the developed area away from
the site boundaries and sensitive visual receptors, including nearby residential properties in
Faifley to the south. Additional landscape mitigation is proposed in the form of extensive
planting. It remains, however, that a development of this nature would have a visual impact
sand this is not in doubt. The applicant has provided a Landscape Statement together with an
updated Landscape and Visual Impact Assessment (LVIA) which is reflective of the revised
proposal. It remains that the area is identified as currently having a rural characteristic with
significant woodland vegetation, notably including linear bands of trees and woodland
associated with local watercourses and burns, together with blocks of woodland. Despite the
amended proposal, the applicant’s updated LVIA acknowledges that the baseline landscape
character of the site would still be altered as a result of the proposed development and this
would have an impact upon landscape character, during both the construction and operation
phases. 
The Council was previously concerned at the potential for the industrial character of the
development and the harm to the visual harm to the locality, resulting in the industrialisation
of the Green Belt at this location. Whilst the proposed landscape mitigation was
acknowledged, the site is in close proximity to the settlement boundary of Faifley and visually,
the development as previously proposed would likely have been viewed in the context of the
adjacent settlement. 
The revised proposal sees a reduction in the development footprint within the wider application
site. The applicant’s updated LVIA notes that approximately 6 hectares of the wider site will be
developed, with the remaining 75% of the site retained as green infrastructure. The battery
storage infrastructure will be surrounded in its entirety with new native woodland planting and
this will create a significant visual buffer once established, and link to other woodland areas in
the vicinity of the site. To the south and southwest of the site open areas will be retained and
seeded with a mix of grasses and wildflowers. New hedgerow planting will be provided to
Cochno Road together with a stone wall. Hedgerow planting is also proposed to an open
section of the eastern boundary along the core path. 
Page 49

Page 50

It remains the case that landscape and visual impacts will occur during the construction phase
and this is accepted. During the early years of the operational phase, the new landscape works
will not yet be established and there will be limited screening of the site. Notwithstanding this,
the reduction in the development area will ensure that the visual impact within the landscape
at this time is reduced in comparison to the original proposal. The LVIA identifies that by 15
years, planting will have established providing screening of the development within the wider
landscape. Where views are still available, the development would be seen with a well wooded
backdrop. 
Policy 11(e)(ii) of NPF4 explicitly accepts localised significant landscape and visual impacts
and in this respect the position is thus weighted towards development’s contribution to
renewable energy targets. As more energy sources are now renewable, such as wind and
solar, balancing generation versus demand is a critical issue for grid stability. Battery storage
solutions such as this proposal allows energy to be stored during peak renewable generation
periods and released when demand outstrips generation, thus contributing to renewable
energy targets. Whilst landscape and visual impacts will still arise from the revised proposal,
the reduced development footprint, enhanced landscape mitigation and additional separation
from the settlement boundary of Faifley reduces the impact. The development is no longer
considered to be viewed in the context of the adjacent settlement and an industrialisation of
the Green Belt at this location is not longer of such a concern that an adverse impact will occur
to the West Dunbartonshire Area which outweighs the benefits of the development in respect
of the contribution to renewable energy targets. 
The Council does, however, expect that in the event that the Scottish Ministers are minded to
grant consent, robust conditions are applied to ensure the implementation, retention and
maintenance of the planting and landscape mitigation proposed.   
Notwithstanding the updated position relating to the potential for landscape and visual impact,
it remains that the applicant has not considered or addressed the Council’s previous point of
objection relating to the failure to demonstrated that there are no other suitable sites available
for such a development in a location outwith the Green Belt. If an alternative location was
available, no landscape and visual impact would result in the proposed location. Accordingly,
the development cannot currently be held to be supported by Policy 8(a)(ii) of NPF4. 
Ecology, biodiversity and protected species
Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects from
development and strengthen nature networks.  Policy 4 seeks to protect, restore and enhance
natural assets, making best use of nature-based solutions. The policy is primarily focused on
designated areas including sites designated as a local nature conservation site or landscape
area. Policy 11 also requires biodiversity impact to be addressed. The applicant’s preliminary
ecological appraisal was previously considered by the Council’s Biodiversity Officer and this
failed to identify the adjacent LNCS within West Dunbartonshire and assess the potential cross
boundary impact upon ecology, biodiversity and protected species within West
Dunbartonshire. It therefore could not be concluded that adverse impacts would not occur
within the West Dunbartonshire area.  Accordingly, the Council did not consider that the
proposal could be held to be supported by Policies 3, 4 or 11(e)(ix) of NPF4. 
No updated surveys or information have been received in respect of the points raised in the
Council’s previous consultation response and the position of the previous response with
respect to ecology, biodiversity and protected species and potential impact within the West
Dunbartonshire Area remains. 
Residential amenity
As per the previous response, there is the potential for amenity impacts to occur to residents
within West Dunbartonshire. The revised site layout results in the developed area being
Page 50

Page 51

marginally further away from the closest residential properties being at Edinbarnet on Cochno
Road together with properties in Faifley. 
Policy 11 of NPF4 requires that impacts on communities and individual dwellings including
residential amenity, and noise are addressed. A noise impact assessment (NIA) was submitted
in respect of the original proposal and this was considered by the Council’s Environmental
Health Service. A number of points and inadequacies were highlighted in respect of the noise
impact assessment and it could not be concluded that no adverse impact would occur to
residential properties. The proposed micro siting of up to 100 metres was not acknowledged
within the NIA and there was no consideration of the impacts from different configurations of
equipment. The Council could not conclude that it had been demonstrated that there would be
no unacceptable impact on neighbouring amenity resulting from the operation of the
development and raised concerns in this respect. 
An updated Noise Impact Assessment has been submitted. This has been reviewed by the
Council’s Environmental Health Service who advise that they are happy to accept the findings
of the report and that noise disturbance would not occur and no noise mitigation is necessary.
It is further noted that the NIA no longer refers to any flexibility in the layout of siting of the
units within the development. Accordingly, the development requires to be completed in the
same configuration as was used to model the noise data (i.e. the updated site layout on which
the revised NIA was based). It is noted that as the applicant’s planning supporting statement
has not yet been updated to take into account the revised proposal and still makes reference
to micro-siting of up to 100 metres. The Council advises that there requires to be an updated
submission which removes this reference. 
As with any modelled noise data for an NIA, Environmental Health recommend post
installation verification checks that the actual noise levels correlate with what was modelled.
The Council would request such an approach is required via condition in the event that the
Scottish Ministers are minded to grant consent. The Council’s position in respect of hours of
work during the construction phase remains as per the original response. 
Impact upon the core path network
Policy 11 of NPF4 requires matters relating to public access including long distance walking
and cycling routes and scenic routes to be suitably addressed. The Council’s previous
response noted that a variety of core paths connect Faifley to the open countryside via Cochno
Road. The applicant’s supporting documents identified that East Dunbartonshire core path
ED/153/1 which is located to the south and east of the site and extending northeast from
Cochno Road, noting that only minor visual effects would occur in respect of users of this core
path. This East Dunbartonshire Core Path connects with the West Dunbartonshire Core Path
network to the opposite side of Cochno Road. The applicant’s submission did not consider the
impact on the core path network and connections to the core path network within West
Dunbartonshire. While no routes are physically interrupted by the proposal, there is the
potential for visual and noise impact to users of the routes,  and a change to the character of
the routes. 
With the reduction in the developed area of the site together with additional landscape
mitigation proposed, it is considered that the visual amenity impacts on core path users would
now be acceptable. It remains, however, that Cochno Road acts as a connection between all
of the core path routes at this location and there is still no consideration of the impact of
construction traffic to users of these routes. A robust construction traffic management plan
which has a specific focus on the impact upon all users of Cochno Road including those
connecting between core path routes would be required, with safe routes established for such
connections during construction. In the event the Scottish Ministers were minded to grant
consent for the development, the Council considers that such an approach is imperative to
Page 51

Page 52

allow it to be concluded that the potential impact upon the core path network has been
addressed as required by Policy 11(e)(iii). 
Site Decommissioning and Restoration 
Policy 11(e)(xi) of NPF4 requires matters relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration to be addressed. The applicant has
indicated that the intended lifetime of the proposal is 40 years, after which the facility will be
decommissioned and the land restored to its former state. However, it was noted in the
Council’s previous response that no other information regarding this has been submitted. 
It remains that no additional details relating to decommissioning has been provided. The
applicant’s Supporting Statement sets out that at the end of the operational period the site will
be decommissioned and the land restored to it’s former state. The updated LVIA advises that
following the completion of the operational phase, the components of the battery storage may
be removed and landscape effects potentially reversed, and this leaves a question over the
extent of any decommissioning. Whilst it is accepted that the provision and implementation of
a detailed restoration scheme could be addressed by an appropriate legal agreement or
condition, the Council remains concerned at the lack of a clear commitment in respect of the
decommissioning and restoration of the site, and an overall approach for this. The Council
considers that any restoration scheme would require to be of an extent that achieves a
complete reversal of any landscape harm that occurs.  Given the extensive cut and fill
proposed to accommodate the development, the restoration would require to include
substantial ground works to ensure the restoration of the landform to its original profile
following the removal of all hardstanding, infrastructure and equipment. The Council considers
that it is essential that given the type of development together with its size and location, that
details of the approach to de-commissioning and site restoration is provided to ensure that the
requirements of Policy 11(e)(xi) of NPF4 are met. 
It remains that in the event that the Scottish Ministers were minded to grant consent for the
development, the Council considers that there is the requirement for a financial bond to ensure
sufficient funds are available to decommission and restore the site. If the developer was to go
out of business with unfinished works potentially being left this can be safeguarded by
ensuring that a bond or other financial provision is to put in place to cover such an eventuality.
The bond or other financial provision would address reinstatement works both in the event of
a developer failing or being unable to complete restoration works together with any failure in
the aftercare arrangements associated with the site restoration. The Council also considers
that in the event that the development fails to export electricity to the grid for a continuous
period of 12 months it will be considered to have become redundant and the components of
the development removed and the site restored. In the event that consent was granted, the
Council considers it essential that that this requirement is to be addressed by a condition. 
Impact upon the Kilpatrick Hills, Traffic and Road Safety, Flood Risk, Built and Cultural
Heritage, and Health and Safety 
The Council’s position on these matters remains as per the response dated 13th May 2024. 
Summary and conclusions 
In the original consultation response, the Council set out that it considered that that proposals
such as this can be held to support the overarching aims of the NPF4 to achieve net zero
targets and provide a stable domestic energy supply. The support as a national development
is also acknowledged. However, it remains that such development require to be sited in the
right locations and the benefits of such developments require to be balanced with any potential
adverse impacts. A variety of concerns did arise. 
Page 52

Page 53

A revised proposal with updated LVIA has been submitted by the applicant. Following full
consideration, it is concluded that whilst landscape and visual impacts will still arise from the
revised proposal, the reduced development footprint, enhanced landscape mitigation and
additional separation from the settlement boundary of Faifley reduces the impact. The
development is no longer considered to be viewed in the context of the adjacent settlement
and an industrialisation of the Green Belt at this location is not longer of such a concern that
an adverse impact will occur to the West Dunbartonshire Area which outweighs the benefits
of the development in respect of the contribution to renewable energy targets. It remains that
the applicant has not considered or addressed the Council’s previous point of objection
relating to the failure to demonstrated that there are no other suitable sites available for such
a development in a location outwith the Green Belt. If an alternative location was available, no
landscape and visual impact would result in the proposed location. Accordingly, the
development cannot currently be held to be supported by Policy 8(a)(ii) of NPF4. 
Turning to the impact upon ecology, biodiversity and protected species, no updated surveys
or information have been received in respect of the points raised in the previous consultation
response and the position of the previous response with respect to ecology, biodiversity and
protected species and potential impact within the West Dunbartonshire area. It therefore
remains that it cannot be concluded that adverse impacts would not occur within the West
Dunbartonshire area. The development cannot, therefore, be held to be supported by Policies
3, 4 and 11(e)(iii)(ix). 
Considering the impact on the core path network, with the reduced development footprint
together with enhanced landscape mitigation, it is considered that the visual amenity impacts
on core path users would now be acceptable. It remains that Cochno Road acts as a
connection between the various core path routes at this location and the impact of construction
traffic to users of these routes has not been considered or addressed. However, the Council
could accept this matter being addressed as part of a comprehensive construction traffic
management plan in the event that consent was to be granted. 
With regard to residential amenity, the Council considers that the updated NIA now
demonstrates that there will be no impact upon residential amenity within West Dunbartonshire
by way of noise. This is based on the position of the NIA which no longer refers to any flexibility
in the layout of siting of the units within the development. Accordingly, the development
requires to be completed in the same configuration as was used to model the noise data (i.e.
the updated site layout on which the revised NIA was based.   
Finally, it remains that the Council considers it essential that given the type of development
together with its size and location, that details of de-commissioning and site restoration are
provided to ensure that the requirements of Policy 11(e)(i) of NPF4 are met. There are no
further submissions in this respect since the Council’s previous response. 
Some aspects of the Council’s concerns which formed part of the previous objection have
been addressed, including visual impact and the impact upon residential amenity. However,
the applicant has failed to address other concerns and West Dunbartonshire Council therefore
maintains it’s objection to this proposal with reference to the above concerns relating to the
Green Belt location of the development, impact upon ecology, biodiversity and protected
species and the failure to provide a decommissioning and restoration scheme. 
Page 53

Page 54

Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 24/04/2024. All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Battery Storage Consultation Map
U
Scale: 1:3,000 @a4
24/04/2024
I  T E M  7  -  A P P E N D I X   2
Page 54

Page 55

WEST DUNBARTONSHIRE COUNCIL
Report by the Planning, Building Standards and Environmental Health
Manager
Planning Committee: 11th December 2024
___________________________________________________________________
Subject: Local Development Plan and Local Place Plan Update
1. Purpose
1.1 The purpose of this report is to seek approval of the 2023 Development Plan
Scheme and Participation Statement in relation to a new Local Development
Plan (LDP3).
2. Recommendation
2.1 It is recommended that the Committee approves the updated Development
Plan Scheme and Participation Statement set out in Appendix 1 and note that
once approved it will be submitted to the Scottish Ministers and published on
the Council’s website.
3. Background
3.1 The development planning system in Scotland has changed with the
introduction of the development planning provisions of the Planning (Scotland)
Act 2019. The Development Plan Scheme is produced annually and acts as a
communication tool for letting stakeholders know when and how they can get
involved in the local development plan. It sets out the timetable for the
preparation of the local development plan and what is involved at each stage
of the process. The Participation Statement part of the document sets out how
stakeholders are to be involved in the preparation of the local development
plan. It is to include targeted methods to reach under-represented groups,
help to make public participation inclusive, ensure that wider public
engagement directly feeds into the preparation of the local development plan,
and promote proactive engagement at all stages of the plan’s preparation.
ITEM 8
Page 55

Page 56

4. Main Issues
Development Plan Scheme
4.1 The previous Development Plan Scheme, containing the Participation
Statement, was approved by planning committee on the 6th of December 2023
which was then published on the Council website and submitted to Scottish
Ministers. Appendix 1 contains the updated Development Plan Scheme and
Participation Statement for 2024
.
4.2 The most significant change to the updated Development Plan Scheme is the
expected timescales for each stage of plan preparation and adoption of the
plan. The updated scheme incorporates an additional seven months to
prepare the Evidence Report and consequential delay to later stages. The
table below shows the key stages of plan preparation, the timetable in the
previous and updated development plan schemes.
Action 2023 timeline Proposed 2024 timeline
Publication of
finalised/updated
Development Plan
Scheme and
Participation
Statement
Quarter 3, 2023/24
(December 2023)
Quarter 3, 2024/25
(December 2024)
Publication of
Evidence Report and
submission for
Gatecheck
Quarter 3, 2024/25
(December 2024)
Quarter 2, 2025/26
(July 2025)
Publication of
Proposed Plan and
draft Delivery
Programme
Quarter 4, 2025/26
(January 2026)
Quarter 2, 2026/27
(August 2026)
Submission of
Proposed Plan to the
Scottish Ministers for
Examination
Quarter 3, 2026/27
(October 2026)
Quarter 1, 2027/28
(May 2027)
Expected adoption of
Local Development
Plan
Quarter 2, 2027/28
(September 2027)
Quarter 1, 2028/29
(April 2028)
4.3 The change to the timetable allows further time to prepare the evidence
report. The majority of the development Plan Scheme remains unchanged as
it still serves its purpose in explaining the development plan process.
4.4 The additional time is required to ensure that the evidence report is robust and
to carry out further consultation with key stakeholders. The additional time is
also required to due a workload pressure within the Development Planning
Team arising from an existing and upcoming vacancy that will reduce capacity
in the team by 66% in the short term until recruitment is undertaken.
Page 56

Page 57

4.5 The 7-month delay to the programme is significant, and pushes the date of
adoption from September 2027 to April 2028. However, the anticipated date of
adoption is still within the required 5 year period of the publishing of the
regulations, i.e. May 2028.
Participation Statement
4.6 The Participation Statement has been updated to state the engagement the
Development Planning and Place team has undertaken so far. No other
changes have been proposed to future activities or engagement types. Key
actions include
 Undertaking an evidence audit and engaging stakeholders through a
Call for Evidence consultation.
 Carrying out a Place Standard survey to enable communities to provide
feedback about places they live, work and visit.
 Published An Easy Read Guide to preparing local place plans.
4.6 The following actions are ongoing to engage stakeholders
 Analysing the results of the Call for Evidence and Tell Us About Your
Place consultations. The results will be published in due course.
 Following up internal and external stakeholders for further discussions
about evidence
 Engaging children and young people
 Engaging with the gypsie and traveller community
Local Place Plans
4.7 The invitation to prepare Local Place Plans was issued to organisations and
individuals in the Local Development Plan participant database on 16 October
2023. A public notice was also placed in the Clydebank Post and Lennox
Herald on 25 October and 31 October respectively. A Local Place Plan
webpage has also been created at https://www.west-
dunbarton.gov.uk/council/key-council-documents/local-development-
planning/local-place-plans. The work to prepare a West Dunbartonshire
focussed ‘How-to’ guide to encourage and assist local communities to prepare
a Local Place Plan. was completed in June. The guide was launched at an
online webinar which was attended by community councillors, and the
guidance is available to view on the above Local Place Plans page.
4.8 To date, Old Kilpatrick Community Council and the community in Dumbarton
West (via the Corra Foundation) have expressed an interest in preparing a
Local Place Plan. Previous community engagement in Dumbarton East and
Alexandria also indicated interest in preparing a Local Place Plan.
Kilmaronock Community Council has produced a draft Local Place Plan in
response to the National Park Authority invitation to prepare Local Place
Plans , and this has been validated by the National Park Authority. The
Kilmaronock Local Place Plan does not contain proposals relating to West
Dunbartonshire Council’s Planning Authority, and the Community Council
have not requested that it be validated by the Council; the Local Place Plan
has been shared with other Council services for noting..
Page 57

Page 58

4.9 Although they can be prepared at any time, West Dunbartonshire Council has
advised that Local Place Plans should be submitted to the Council for
validation by 30 June 2025 if they are to be taken into account in the
preparation of the new Local Development Plan.
5. People Implications
5.1 There are no people implications associated with this report.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications associated with this report.
7. Risk Analysis
7.1 By finalising the 2024 Development Plan Scheme and Participation Statement
and submitting it to the Scottish Ministers, the Council is meeting its statutory
requirements and setting out its timeline for preparing a new Local
Development Plan. Not having an up-to-date local development plan may
have an impact on planning decisions taken by the Council and could result in
appeal decisions being upheld. The adopted Local Plan is over 14 years old
and Local Development Plan 1 and Local Development Plan 2 have not been
adopted.
7.2 The proposed timeline also allows the authority to comply with the terms of
the Local Development Planning Guidance (2023) which sets out Scottish
Government expectation that ‘new style’ Development Plans are in place
within 5 years of the adoption of the regulations. It is also a requirement of
Section 16(1)(a) of the Planning (Scotland) Act 2019 to as soon as practicable
to prepare a Local Development Plan(s) for all parts of the district. Failure to
comply with Section 16 (1)(a) may result in Scottish Ministers directing the
authority to submit a report to them as to the reasons for such failure.
8. Equalities Impact Assessment (EIA)
8.1 The Equality Impact Assessments for the Development Plan
Scheme/Participation Statement and the Council’s approach to Local Place
plans were reported to the 20 September 2023 Planning Committee.
9. Consultation
9.1 Regulations require communities to have input to the Participation Statement.
This update contains no changes to the engagement methods, or groups to
be engaged, so no additional consultation was required. However the
Participation Statement does provide updates as to what engagement has
taken place, and what has still to be undertaken.
11. Strategic Assessment
Page 58

Page 59

11.1 The new Local Development is considered to be relevant to, and will
help deliver, all of the Council’s strategic priorities:
 Our Communities – Resilient and Thriving
 Our Environment – A Greener Future
 Our Economy – Strong and Flourishing
 Our Council – Inclusive and Adaptable
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 11th December 2024
___________________________________________________________________
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager, 
Michael.Mulgrew@west-dunbarton.gov.uk
Cameron Clow, Development Planning & Place Officer
cameron.clow@west-dunbabarton.gov.uk
Appendices: Appendix 1: Finalised 2023 Development Plan Scheme
and Participation Statement
Background Papers: None
Wards Affected: All
Page 59

Page 60

West Dunbartonshire Local
Development Plan (LDP3)
Development Plan Scheme and Participation Statement
December 2024
ITEM 8 - APPENDIX 1
Page 60

Page 61

Development Plan Scheme
Introduction
Thank you for your interest in West Dunbartonshire’s Development Plan.
This Development Plan Scheme explains what a Development Plan is. It sets out what Development Plans are
currently active in West Dunbartonshire and provides an estimated timeline for the preparation of a new Local
Development Plan for the West Dunbartonshire planning authority area. It includes a Participation Statement which
sets out how the planning authority (part of the Council) will involve the community and other stakeholders in the
preparation of the new Local Development Plan.
What is the Development Plan?
The purpose of the planning system is to manage development and the use of land in the long term public interest.
Development and land use in Scotland is “plan led”, making the Development Plan an important document for
decision making. It is a statutory plan used by planning authorities to make decisions about what development takes
place and how land is used in their area.
There are two main parts of the Development Plan. The first is the National Planning Framework. This is prepared by
The Scottish Government, who formally adopted the Fourth National Planning Framework (NPF4) in February 2023.
NPF4 sets a National Spatial Strategy for Scotland to 2045 identifying areas and types of development that are of
national importance (National Developments) along with regional spatial priorities for five broad regions of Scotland. It
also contains a set of policies used by planning authorities to make planning decisions (National Planning Policy). For
more information, https://www.gov.scot/publications/national-planning-framework-4/
Page 61

Page 62

Development Plan sets out how places will change, importantly identifying where and what development should and
should not happen. It is a more detailed and specific plan for a local area which identifies infrastructure needs,
allocates land for development, or for protection from inappropriate development. Local Development Plans can
also contain policies which add greater detail or local context to policies in NPF4 or to address issues not addressed
by NPF4.
Page 62

Page 63

Current Development Plans and Planning Guidance covering West Dunbartonshire
The West Dunbartonshire Council area is covered by two different planning authorities. The West Dunbartonshire
Council planning authority area covers all of West Dunbartonshire with the exception of that area within the Loch
Lomond and the Trossachs National Park, for which the Park Authority is the planning authority. The Park Authority
prepares its own Local Development Plan and Development Plan Scheme which you can read more about at
https://www.lochlomond-trossachs.org/planning/planning-guidance/.
Figure 1: Local Development Plan areas in West Dunbartonshire
West Dunbartonshire’s Development Plan consists of NPF4 and the West Dunbartonshire Local Plan (2010). In
addition, the Council also uses the Proposed West Dunbartonshire Local Development Plan (2020, as modified) as
a material consideration in planning decisions, but as it was not adopted it is not a part of the statutory Development
Plan.
Page 63

Page 64

part of the development plan but do form part of the decision-making process for planning application when
relevant. A list of current planning guidance documents is set out in Appendix 1.
To view West Dunbartonshire Council’s current development plan and planning guidance documents, visit: Development
Plan | West Dunbartonshire Council (west-dunbarton.gov.uk)
Preparing a new Local Development Plan
The Council has commenced preparation of a new Local Development Plan. This will be a ‘new style’ Local
Development Plan, which will be prepared differently and have a different format, following changes introduced by
the Planning (Scotland) Act 2019. The National Planning Framework (NPF4) now contains the detailed policy
framework that was previously set out in old style local development plans. New style local development plans are
expected to be place-based, people-centred and delivery-focused. With regard to format, this means that local
development plans are expected to be place-based, visual plans with the inclusion of a clear spatial strategy, and a
collection of maps, development briefs and masterplans, instead of lengthy written text and policy. Plans are to be
prepared collaboratively with communities and other stakeholders, with people with protected characteristics given
particular support to engage in the plan preparation process.
Page 64

Page 65

Regulations and Guidance. The key stages are:
Development Plan Scheme including Participation Statement – this document is produced annually and acts as
a communication tool for letting stakeholders know when and how they can get involved in the local development
plan process keep them informed of progress. It sets out the timetable for the preparation of the local development
plan and what is involved at each stage of the process. The Participation Statement part of the document sets out
how stakeholders are to be involved in the preparation of the local development plan. It is to include targeted
methods to reach under-represented groups, help to make public participation inclusive, ensure that wider public
engagement directly feeds into the preparation of the local development plan, and promote proactive engagement
at all stages of the plan’s preparation.
Evidence Report – the purpose of the Evidence Report is to support the quality and effectiveness of the Local
Development Plan. Its aim is to gather and use evidence to clearly inform what to plan for before the Proposed
Plan looks at where development should take place. Stakeholders’ views are to be sought when preparing the
Evidence Report.
Gate Check – the assessment of the Evidence Report by a Directorate and Environmental Appeals Reporter is
known as the Gate Check. The Reporter can decide that there is sufficient information and the planning authority
can move to prepare its Proposed Plan, or the Reporter may consider there is not sufficient information and
provide recommendations for improving the Evidence Report. The Gate Check also provides an opportunity for the
Reporter to consider and attempt to resolve disputes that may exist about the evidence submitted. The aim of the
Gate Check is to reduce the level of debate at the Examination stage of the plan preparation process and made for
a better evidence-led plan.
Proposed Plan – the Proposed Plan identifies where new development should take place and where it should not
and articulates the ambitions and priorities for the future development of the Plan area. The preparation of the
Proposed Plan is to be informed by community engagement and a wide range of other policy and strategy
documents. The Proposed Plan is published for consultation. It is at this stage that representations can be submitted
on the specific topics and proposals of the plan, for example on green belt, built heritage and proposed development
sites. Proposed Plans can be modified following the consultation stage.
Delivery Programme – the Delivery Programme sets out how an authority proposes to implement its Local
Page 65

Page 66

Development Plan. A proposed Delivery Programme must be published with the Proposed Plan. The Delivery
Programme is a corporate document, which can influence the authority’s financial investments, and support delivery
of the Plan’s policies and proposals to achieve Council priorities. It is to be reviewed and renewed at least every two
years.
Examination – the Examination is the opportunity for independent consideration on any issues raised during
Page 66

Page 67

Examination will be undertaken by a Reporter from the Directorate of Planning and Environmental Appeals. The
Examination will consider unresolved issues following consultation on the Proposed Plan and also the
consultation and involvement of the public in the preparation of the Plan. Following the Examination, the
Reporter will prepare a report setting out reasons for their conclusions and recommendations, including
modifications to the Plan.
Adoption – adoption is the final stage in the preparation of the Plan and occurs after the Council has received
and considered the Examination report and any recommendations and modifications it proposes.
Page 67

Page 68

The estimated timetable for the preparation of the new Local Development Plan is set out below. Legislation
requires for this to be set out in financial year quarters but the Council has included estimated months to ease
understanding of the timetable. This timetable differs from last years Development Plan Scheme and allows for an
extra 6 months for the publication of the Evidence Report and Submission to allow for further preparation time.
Table 1: Local Development Plan (LDP3) timeline
Action Estimated date
Publication of updated
Development Plan Scheme
and Participation Statement
Quarter 3, 2024/25
(December 2024)
Publication of Evidence Report
and submission for Gate
Check
Quarter 2, 2025/26
(July 2025)
Publication of Proposed Plan
and Draft Delivery Programme
Quarter 2, 2026/27
(August  2026)
Submission of Proposed Plan
to the Scottish Ministers for
Examination
Quarter 1, 2027/28
(May 2027)
Expected adoption of Local
Development Plan
Quarter 4, 2027/28
(April 2028)
Page 68

Page 69

documents that will be concurrently prepared. These are:
Equalities Impact Assessment - The public sector equality duty stems from the Equality Act 2010 and places a
duty on all public authorities to: eliminate discrimination, harassment and victimisation; advance equality of
opportunity; and foster good relationships with people who share protected characteristics and those who do not.
This assessment will outline how the council will meet this duty through the preparation and content of the Local
Development Plan. Protected characteristics are age, disability, gender reassignment, sex (including pregnancy
and maternity), race, religion and belief, and sexual orientation. The Equalities Impact Assessment will help the
Council consider the effects of the plans proposals on different groups and meet the public sector equality duty.
The assessment will also consider the potential effects on human rights.
Fairer Scotland Duty Assessment - The Fairer Scotland Duty aims to ensure the public sector makes policy
decisions to deliver fairer socio-economic outcomes. This assessment will help the council make a plan which
contributes to reducing socio-economic inequality and deprivation.
Strategic Environmental Assessment - The Strategic Environmental Assessment is a requirement of the
Environmental Assessment (Scotland) Act 2005. Its purpose is to help the Council understand the potential
environmental impacts of the plan and take steps to avoid, mitigate or reduce significant adverse environmental
effects, where possible, or enhance positive ones. This will also help the Council to understand the environmental
context of the area and consider how the plan can achieve better environmental outcomes.
Child Rights and Wellbeing Impact Assessment - The Child Rights and Wellbeing Impact Assessment will help
the council consider the plans effect on the rights and wellbeing of children and whether they are protected and
advanced.
Habitat Regulations Appraisal - The Habitat Regulation Appraisal is a requirement of The Conservation (Natural
Habitats, &c.) Regulations 1994. Its purpose is to identify if the plan will be capable of having adverse effects on
European sites, alone, or in combination with other plans. This will help the council identify impacts on
internationally important habitat and take steps to avoid these impacts.
Page 69

Page 70

The Planning (Scotland) Act 2019 introduced the requirement for a number of other plan and strategy
documents to inform and improve the planning system in Scotland. These are:
Local Place Plans – these are community-led plans focused on the development and use of land in the area
covered by the Plan. West Dunbartonshire Council will issue an invitation to communities to prepare Local
Place Plans and will set out what assistance the Council can offer with their preparation. Once prepared, the
Council will validate properly-prepared Local Place Plans and take them into account when preparing the Local
Development Plan. Additional information on Local Place Plans and a ‘Easy Read’ guide can be found at
https://www.west-dunbarton.gov.uk/council/key-council-documents/local-development-planning/local-place-
plans/.
Regional Spatial Strategies – are to be produced by a planning authority, or jointly by a group of planning
authorities, and will set out a long-term spatial strategy in respect of the strategic development of the area it
covers. The West Dunbartonshire planning authority area is likely to be included within a Regional Spatial
Strategy covering the Glasgow City-Region area.
Page 70

Page 71

Local Place Plans and Regional Spatial Strategies will not be part of the Development Plan but will inform the content
of the Local Development Plan.
Planning Guidance – The Council may prepare non-statutory planning guidance to provide additional and detailed
guidance on certain matters, for example on a specific topic or relating to a specific place.
Open Space Strategy – planning authorities are required to prepare a strategy setting out a strategic
Page 71

Page 72

including open spaces and green networks. The strategy is to contain an audit of existing open space provision
and an assessment of current and future requirements. The Council will consult on the findings of its audit and
the Open Space Strategy.
Play Sufficiency Assessment – planning authorities are required to assess the sufficiency of play
opportunities for children in preparing the Evidence Report for the Local Development Plan. The Council
will consult on its Play Sufficiency Assessment.
(As at 2024 the Council has completed an audit of open spaces and is currently analysing the results. This
information will be used to prepare the Open Space Strategy and Play Sufficiency Assessment.)
Forestry and Woodland Strategy – planning authorities are to prepare a strategy which identifies
woodlands of high nature conservation, and sets policies and proposals for the development of forestry and
woodland, and the protection, enhancement and expansion of woodlands. The Council will consult on its Forestry
and Woodland Strategy.
Page 72

Page 73

Participation Statement
The Scottish Government intends the preparation of the Local Development Plan to be a collaborative process.
Local Development Plans are expected to be place based, people centred and delivery focused. The
involvement of all stakeholders within the planning process will be required to achieve this, including:
 local communities;
 services within the council;
 service providers, infrastructure providers and government agencies outside of the council (sometimes
referred to as Key Agencies);
 businesses and other organisations; and
 developers and land and property owners.
The Participation Statement sets out how we will achieve this by identifying who we will include, how we
will keep them informed, how they will be included, what methods we will use to include people, and when
engagement will take place.
Who we will include
Legislation requires planning authorities to involve the public at large in preparing a Local Development
Plan, however there are also specific groups that planning authorities need to include, which are:
 children and young people (those under the age of 25);
 people with disabilities;
 Gypsies and Travellers; and
 Community Councils
There are other groups that guidance states should be given support to engage with the Local
Development Plan process including people with protected, as well as people from a range of socio-
economic background.
Page 73

Page 74

Children and Young People
There will be three main ways we will include children and young people. We
will:
 engage with the Youth Parliament Representatives for the West Dunbartonshire
Planning Area,
 engage with the West Dunbartonshire Youth Council
 engage with schools (including early education, primary, secondary, and special needs
schools).
We will also reach out to known youth groups in the area and ask if they are interested in engaging in the
Local Development Plan process.
People with disabilities
There are a number of existing disability groups known to the council we will reach out to and request their
input to the Local Development Plan process.
We will also consider the barriers to engaging with people with disabilities and how to overcome them, to
provide opportunities to fully engage. This will include providing information in an accessible format.
Gypsies and Travellers
We will approach existing contacts we have for Gypsy and Traveller communities to discuss their needs.
Community Councils
We will use existing channels of communications to contact active community councils. In areas where there are no active
community councils we will seek the views of other active community groups in these areas
How we will keep you informed
We will keep the public up to date by publishing regular updates on the plan preparation milestones
listed in the Local Development Plan Scheme. Updates will be published to the Council website, posted
on social media, and circulated via a newsletter for those who wish to sign up to this.
Page 74

Page 75

Some stages of plan preparation require us to advertise in local newspapers, including
 inviting communities to make Local Place Plans
 publishing the Proposed Local Development Plan
 advertise the examination of the Local Development
Plan
 publishing a report of modifications to the Plan
 the adoption of the Local Development Plan
We will make key documents available in libraries at the appropriate times, including the Evidence
Report and Proposed Local Development Plan.
How we will involve and collaborate with you
We will use a variety of methods to engage with specific groups as well as the public at large.
We will hold public consultations to collect ideas for and views on proposals within the Local
Development Plan, using online survey tools and public events.
A survey of the Citizens Panel will collect information about places across West Dunbartonshire.
Information about the Citizen’s Panel, including how to get involved, can be found here: Citizens Panel
West Dunbartonshire Council (west-dunbarton.gov.uk)
We will hold a ‘Call for Ideas’ consultation for communities, developers and landowners to identify
sites for development and preservation, as well as other proposals for inclusion in the Local
Development Plan.
We will work directly with Community Councils and other local community groups to identify key
issues and opportunities for their local area, and to work together on development briefs and
masterplans.
One of the most direct ways communities can influence the plan is by making a Local Place Plan.
We have invited communities to make Local Place Plans and we will support communities with
this process. The contents of Local Place Plans are decided by their community, and once
completed and validated are considered when preparing the Local Development Plan.
Page 75

Page 76

The tools, materials, and methods we will use to involve you
A variety of tools and materials will be used to reach as many people as possible and to reduce
barriers to participation as far as possible.
Published information and the proposed plan will be provided in accessible formats. This will include information
published online and in physical information left in public places.
We will collect ideas and views using the Councils online survey platform ‘Survey 123’.
The Place Standard tool will help us to collect and focus views about a place. The Place Standard
asks people to score and provide commentary about different aspects of a place, such as where they
live or work. This includes questions about green space, traffic and parking, access to services, and
influence over decisions in their place. This will help us to identify the strengths and weaknesses of
places in West Dunbartonshire. The tool will be used in a variety of formats, including: in online
surveys; at meetings with specific groups, community councils, and community organisations; and at
consultation events. Different versions of the tool will be used in specific context, such as the version
for children and young people. Communities making local place plans will be encouraged to make use
of the tool. More information on the tool can be found here: https://www.ourplace.scot/
The table below sets out the different stages of the Local Development Plan and, in more detail, the
engagement activity that will be undertaken at each future stage, and a summary of the engagement
activity to date. It has been informed by the Scottish Government consultation draft guidance on
‘Effective Community Engagement in Local Development Planning’ (May 2023) and is based on the
following levels of engagement: inform; consult; involve; collaborate; and empower.
.
Page 76

Page 77

Table 2: Local Development Plan (LDP3) engagement activity
Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Evidence
Gathering - early
engagement and
data collection
Publication of
Draft
Development
Plan Scheme
and Participation
Statement
September>
November 2023
Inform participants (existing and
potential) of the publication of the
Draft Development Plan Scheme
Participation Statement and
involve people and organisations
by seeking and having regard to
their views on the document.
Publish document on the Council
website and make copies of the
document available in the Council
headquarters and libraries. Include
survey questions within document
seeking views on format of
document and participation
techniques.
Publish survey/form to allow
people and organisations to
register their interest in the Local
Development Plan process.
Meet with Community Councils
and other community organisations
to encourage participation in the
Participants notified and consultation on draft
version held, running from 22 September to
17 November 2023.
The draft Development Plan
Scheme/Participation Statement was
published on 22 September 2023. It was
published online, emailed to registered
participants and made available in local
libraries.
A survey/form to allow people/organisations to
register interest in the Local Development
Plan has been published and remains live.
Ongoing.
Meetings have been held with 4 community
councils (Bonhill and Dalmonach, Dumbarton
East and Central, Linnvale and Drumry, and
Old Kilpatrick) and community representatives
in Dumbarton West.
Ongoing.
Page 77

Page 78

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Local Development Plan process
and comments on the Draft
Development Plan Scheme and
Participation Statement. Engage
with local anchor organisations to
fill gaps where there are no
community councils or other
community organisations currently
running.
Engage with youth organisations
and representatives on the best
way to engage children and young
people in the Local Development
Plan process
Engage with disability and carers
community groups on the best
ways to enable participation
Engage Gypsies and Travellers
groups on best ways to enable
participation
Contact known community
Meetings have been held with staff within the
Communities team to explore the best way of
engaging with children and young people.
Ongoing.
Meetings have been held with the Council’s
Performance and Strategy team to identify
appropriate groups to engage with.
Meeting held with the Dennystoun Forge
residents’ group.
Ongoing
Notified on 22 September 2023.
Page 78

Page 79

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
groups/organisations (including
those of protected characteristics)
and West Dunbartonshire CVS to
invite expression of interest in
taking part in plan preparation, and
for views on how to engage
Inform other Council services and
Key Agencies of the proposed
Local Development Plan timeline.
Evidence
Gathering - early
engagement and
data collection
Issue invite to
participate in
Local
Development
Plan process
September 2023 Inform participants in previous
Local Development Plan process
of new process and encourage
registration and participation.
Create online form to enable
registration.
Establish new Local Development
Plan participant database.
LDP2 participants informed of new LDP3
process and encouraged to register their
interest. Online registration form created.
325 participants registered as at December
2023.
Evidence
Gathering - early
engagement and
data collection
Invite
communities to
prepare Local
Place Plans and
support their
preparation
September 2023
(ongoing)
Inform community organisations
that they are invited to prepare a
Local Place Plan, as means to
involve communities in the
preparation of the Local
Development Plan. Empower
communities to decide on the
content of their Local Place Plans.
Publish invitation to prepare Local
Place Plans on the Council website
Invitation to prepare a Local Place Plan
issued on 16 October 2023 to community
councils, other community groups and local
residents on the participant database.
Ongoing.
Invitation issued on 16 October 2023, on
Council webpage, by email to registered
community groups and promoted on X.
Page 79

Page 80

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
and social media. Place posters in
public buildings. Send direct
invitation to groups who may have
an interest in preparing a Local
Place Plan, and promote through
West Dunbartonshire CVS.
Advise community organisations of
the type of Council support that will
be available to them to prepare
Local Place Plans.
Meet with Community Councils
and other community organisations
to encourage preparation of Local
Place Plans.
Invitation and webpage advises of support
available.
Ongoing.
As at December 2024 Old Kilpatrick
Community Council and the community in
Dumbarton West have expressed interest in
preparing a local place plan.
Evidence
Gathering - early
engagement and
data collection
Publication of
finalised
Development
Plan Scheme
and Participation
Statement
December 2023 Inform of publication through
website, social media, and direct
communication with registered
participants.
Publish document on the Council
website and make copies of the
document available in the Council
headquarters and libraries.
Evidence
Gathering - early
engagement and
data collection
Preparation of
Evidence Report
September
2023>June 2025
Involve participants in the creation
of the Evidence Report. Inform
participants on how their views
were sought and taken into
account
Page 80

Page 81

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Issue a ‘Call for Evidence’ in
relation to a range of relevant
topics. Where appropriate publish
topic papers to support the process
of gathering evidence, identifying
gaps in evidence, and areas on
consensus/difference. If
appropriate, form focus groups to
inform this process.
Incorporate results of previous
engagement exercises where
relevant (e.g. Citizens Panel
responses, previous planning
consultations)
Undertake Place Standard
consultations to assess place
quality and collect ideas for
improvement. Distribute to general
public online through website and
social media. If possible, distribute
to Citizens Panel. If requested,
hold in-person sessions with
community groups.
An audit of available evidence and identified
gaps in evidence has been published. A Call
for Evidence consultation took place between
8th July to 30th of September for stakeholders
and communities to provide further
information and evidence. 58 responses were
received. The outcome of the call for evidence
will be published in due course.
Ongoing.
A Place Standard consultation, titled, Tell us
About Your Place took place between 8th July
to 30th of September. 89 responses were
received. Both Tell Us About your place and
Call For Evidence consultations were
circulated to the Citizens Panel, promoted via
social media, press releases, posters, leaflets
and email circulation. Three drop in events
were held in Clydebank, Alexandria, and
Dumbarton. Results of the consultation will be
published in due course.
Ongoing
Page 81

Page 82

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Engage with children and young
people through schools, Youth
Council, Youth Parliament, and
other young people's
organisations. Use
children’s/young persons’ versions
of Place Standard Tool if this is
supported by young persons’
groups.
Engage people with disabilities,
older people and carers through
already established groups to
identify issues for the Plan and to
check and gather evidence.
Engage with the Dennystoun
Forge residents group to gather
evidence on the requirement for
improved/additional permanent
Gypsy and Traveller
accommodation in West
Dunbartonshire. Use Housing
Ongoing. Approximately a quarter of Tell Us
About Your Place respondents declared a
disability. Planning team promoted the
consultation at the Council’s  Equalities Forum
Discussions are ongoing with Dennystoun
Forge residents with assistance from Housing
services.
Key Agencies, city region organisations, and
Health and Social Care Partnership were
engaged through the call for Evidence. Joint
working will continue as evidence report is
prepared.
Homes for Scotland and individual
development interests responded to the Call
for Evidence consultation. Engagement with
other organisations is ongoing.
Page 82

Page 83

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Services officer to liaise with
transient Gypsy and Traveller
groups.
Seek evidence from Key and
Government Agencies, city-region
organisations, Health and Social
Care Partnership.
Seek evidence from business and
developer stakeholders through
umbrella organisations such as
Homes for Scotland, Scottish
Property Federation and Chamber
of Commerce, and also with
individual businesses/developers
where requested.
Undertake a collaborative
approach to developing site
assessment methodology with
input from Key Agencies,
development industry and
communities.
Seek evidence from local interest
groups for example local
built/natural heritage groups,
Homes for Scotland and some Key Agencies
have provided views on site assessment
methodologies. Production of a methodology
is ongoing,
A number of local interest groups provided
responses to the Call for Evidence. The
Planning team is also involved with the
Councils Biodiversity Partnership.
Page 83

Page 84

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
equestrian groups,
ramblers/walkers.
Evidence
Gathering –
Evidence Report
Publication of
Evidence Report
and submission
to Scottish
Minister for Gate
Check
June 2025 Inform of publication of Evidence
Report through website, social
media and direct communication
with registered participants.
Publish document on the Council
website and make copies of the
document available in the Council
headquarters and libraries.
Evidence
Gathering –
Gate Check
Gate Check June 2025>
Autumn 2025
The person appointed to undertake
the Gate Check may consult with
certain stakeholders either in
writing or through a hearing.
Plan Preparation
– Proposed Plan
Preparation of
Proposed Local
Development
Plan and Draft
Delivery
Programme
July 2025> June
2026
Involve and collaborate with
participants in the preparation of
the Proposed Local Development
Plan.
Undertake a ‘Call for Ideas’
consultation. Promote this through
an online survey, making use of
mapping tools if available, and face
-to-face events with community
councils and other community
groups. The ‘Call for Ideas’ will
also provide land and property
owners and the development
Page 84

Page 85

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
industry the opportunity to suggest
sites for development.
Hold discussions with groups that
have prepared or are preparing
Local Place Plans to consider how
the Proposed plan can deliver or
reflect the content and aspirations
of Local Place Plans.
Develop masterplans and site
briefs with communities,
developers, landowners and key
agencies and share potential
content of the Proposed Plan as it
becomes available allowing
participants the chance to
influence it before it is formally
published in the Proposed Plan.
Identify potential areas of conflict
and make use of mediation if this is
likely to help resolve or reduce
dispute between different parties.
Liaise with organisations who will
be identified for the delivery of
actions set out in the Draft Delivery
Programme.
Page 85

Page 86

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Plan Preparation
- Consultation
Consultation on
Proposed Local
Development
Plan and Draft
Delivery
Programme
July 2026>
September 2026
Inform participants of the
publication of the Proposed Local
Development Plan and Draft
Delivery Programme and consult
with them on its content.
Publish notice in local newspaper
and on Council website informing
that the Proposed Local
Development Plan and Draft
Delivery Programme has been
published
Publish documents on the Council
website and make copies of the
document available in the Council
headquarters and libraries.
Notify the owner, lessee or
occupiers of sites and
neighbouring land that may be
affected by development proposals
set out in the Plan.
Meet with Community Councils
and other community organisations
to encourage participation in the
Proposed Local Development Plan
consultation process.
Page 86

Page 87

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Plan Preparation
- Consultation
Modify Proposed
Local
Development
Plan following
consultation
September 2026>
March 2027
Inform communities of
modifications made in response to
representations made on the
Proposed Plan.
Plan Preparation
- Examination
Preparation of
‘Summary of
Unresolved
Issues’’
September 2026>
March 2027
Although there is no formal
engagement at this stage of the
process, the Council may make
use of mediation if this is likely to
help resolve or reduce dispute
between different parties.
Plan Preparation
- Examination
Submission of
Proposed Local
Development
Plan for
Examination
April 2027 Inform anyone who made
representations on the Proposed
Plan about the upcoming
Examination and also advertise the
Examination in a local newspaper,
in local public libraries, and on
Council website and social media.
Plan Preparation
- Examination
Examination April
2027>December
2027
The person appointed to undertake
the Examination may consult with
stakeholders to seek further
information on a submitted
representation.
The appointed person will publish
the Examination Report and notify
anyone who made an unresolved
representation.
Page 87

Page 88

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Delivery –
Adopted Plan
Adopt the Local
Development
Plan
March 2028 Inform participants of the adoption
of the Local Development Plan.
Publish the adopted Local
Development Plan on the Council
website and make copies available
in local public libraries.
Notify participants, including those
who made a representation on the
Proposed Local Development Plan
or Examination.
Place an advertisement in a local
newspaper stating where the
adopted Plan can be viewed.
Delivery -
Delivery
Programme
Publish the
Delivery
Programme
December 2028 Inform participants of the
publication of the Delivery
Programme.
Publish the Delivery Programme
on the Council website and make
copies available in local public
libraries
Delivery -
Monitoring and
Delivery
Publish
information on
monitoring and
delivery
Ongoing Publish an updated Delivery
Programme at least every two
years and make available on
Council website and local public
libraries.
Page 88

Page 89

Local
Development
Plan
Preparation
Stage
Activity Timescale Engagement Activity Progress at December 2024
Publish annual land use survey
information on Council website.
Page 89

Page 90

Impact assessments
The preparation of the Local Development Plan is to be supported and informed by a number of assessment documents.
These documents have engagement requirements, which are summarised in the table below which has been lifted from
the consultation draft Scottish Government guidance on Effective Community Engagement in Local Development
Planning.
Table 3: Local Development Plan (LDP3) impact assessments
Assessment Level Engagement needs and timing
Strategic
Environmental
Assessment
Inform
Consult
Legal requirement for ‘early and effective’ public engagement. Engagement is focused on the Environmental
Report consultation, but earlier engagement is recommended.
A Post Adoption Statement is prepared, published and advertised to inform people about how the assessment
findings and comments received on the proposed plan and Environmental Report have been taken into
account.
Habitat
Regulations
Appraisal
Inform No requirement for public engagement. Report to be published at the proposed plan stage to inform people of
the appraisal.
Public Sector
Equality Duty
Assessment
Inform
Involve
The timing of the publication of the assessment could usefully be set out in the Development Plan Scheme.
Proportionate involvement is needed throughout the process, from the early preparation stage to its delivery.
The planning authority should publish the assessment findings on their website to inform stakeholders about it.
Legally the results should be published within a reasonable period, and guidance suggests this should be as
soon as possible after the decision to implement (adopt) the policy is taken.
Fairer Scotland
Duty
Assessment
Inform
Involve
It is important to involve relevant communities through the stages of assessment.
The assessment should be published to inform people about how socio-economic disadvantage is being
considered.
Child Rights and
Wellbeing
Impact
Assessment
Inform,
Consult,
Involve
Opportunities to involve people may arise at both the evidence gathering and proposed plan stages.
The assessment requires an explanation of consultation with stakeholders – including children and young
people.
Publication informs people of the outcome of the assessment.
Page 90

Page 91

Contact and follow us
The Development Planning and Place team can be contacted:
 By e-mail at ldp@west-dunbarton.gov.uk
 By telephone on 0141 951 7930
 In writing to Development Planning & Place team, Planning & Building Standards, 16 Church
Street, Dumbarton, G82 1QL
 You can follow us on Twitter/X - @wdcplanning
 Please register your interest in the Local Development Plan process at:
https://arcg.is/5WeK0
Page 91

Page 92

Appendix 1 – Planning Guidance and other useful information
Planning Guidance Other information
LDP2 Planning Guidance
 Antonine Wall, 2022
 Clydebank Business Park Planning Guidance, 2023
 Creating Places, 2022
 Green Network & Green Infrastructure, 2022
 Pay Day Lending & Betting Shops, 2024
Other Planning Guidance
 Clydebank Town Centre Development Framework, 2021
 Commuted Payments for Parking 2015
 Dumbarton Waterfront Path Planning Guidance, 2017
 Pay Day Lending & Betting Shops, 2016
 Renewable Energy, 2016
 Queens Quay Design Codes, 2020
Developer Contributions
 Procedure for monitoring, requesting and allocating
developer contributions (2022)
 Allocation of green network developer contributions
(2022)
Other Useful Information
 Alexandria Streetscape Design Guide, 2007
 Alexandria Town Centre Masterplan, 2008
 Alexandria Town Centre Masterplan, 2021
 Balloch Charrette Report, 2016
 Bowling Basin Charrette Report 2014
 Clyde Riverside Masterplan, 2000
 Clydebank Design Guidelines (Page and Park), 2003
 Clydebank Town Centre Charrette report, 2015
 Dumbarton Town Centre Public Realm Design Guide,
2001
 Dumbarton Town Centre & Waterfront – Revised Urban
Strategy, 2014
 Dumbarton Rock & Castle Charrette Report, 2015
 Kilpatrick Hills Local Landscape Area: Statement of
Importance, 2015
Page 92

Page 93

Page 93