Democracy Spraffa

Item 5a - DC23.086.FUL - Erection of activity centre on land adjacent to the south bank of the Forth and Clyde Canal Clydebank

West Dunbartonshire Council · 5 June 2024
Back to Planning Committee — 5 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 5th June 2024
DC23/086/FUL: Erection of activity centre incorporating a community hub and
bicycle workshop, together with associated work on land adjacent
to the south bank of the Forth and Clyde Canal, Clydebank by West
Dunbartonshire Council. 
1. REASON FOR REPORT
1.1 The planning application raises issues that in the opinion of the appointed officer
merits the determination of the application by Committee. Under the terms of the
approved Scheme of Delegation, it therefore requires to be determined by the
Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission subject to the conditions set out in Section 9 below.
3. DEVELOPMENT DETAILS
3.1 The application site relates to a 943sqm area of land located adjacent to the South
Bank of the Forth and Clyde Canal and the NCR 7 cycle route, to the south of the
Clyde Shopping Centre, Clydebank. The site is linear in form, slopes gently down
from south to north, and is comprised of amenity grass and 8 trees, most of which
are located along the northern extent. The site also includes 5 sculptured seating
elements. Currently, the site functions as open space and is part of a wider area that
forms the southern canal bank.
3.2 The site is situated within Clydebank Town Centre and surrounded by a mix of uses,
with a church to the south, Clydebank Shopping Centre and amenity greenspace to
the north, Clydebank Bandstand and South Sylvania Way to the west and a walkway
and greenspace to the east. The site of the former Playdrome Leisure Centre, for
which planning permission has been granted for a residential development, lies to the
southeast.
3.3 Planning permission is sought for the development of an activity centre which
includes a community hub and associated kitchen, launderette, coffee hatch, bicycle
store, workshop and landscaping. It is indicated that the Community Hub will host a
range of recreational and educational activities, such as yoga and cooking classes.
The proposed modular building would have a footprint of 234sqm, being 6.7m D x
35m L, with the flat roof rising to a highest point of 3.85m and overhanging the
building footprint by approximately 1.3m on the northern elevation to create a
covered corridor (loggia). The building is comprised of two parts connected by a
roofed external cycle storage area which can be closed off at the sides. A condenser
store is located at the eastern end. All window openings are floor to ceiling, with five
windows and a door proposed on the northern elevation, four windows on the
southern elevation and one window on the western elevation, all of which would be
fitted with folding security shutters. Two skylights are also proposed.
ITEM 5a

Page 2

The building would be comprised of a polished pre-cast concrete base rising to a
highest point of 1m, with the walls finished with a series of metal fins infilled with
perforated 1.5m wide metal mesh panels. The windows would be comprised of
aluminum with the door being metal. The walls, windows and door would be finished
in a powder coated Green RAL 6003 colour. No information has been provided on
the finish of the membrane roof. 
3.4 With respect to the wider site, a hardstanding area is proposed within the northern
half of the western extent, along with a gravel pathway along the eastern and
southern elevations. A wild garden is further proposed adjacent to the southern
elevation. 
3.5 While the application indicates that there would be illuminated signage on the
northern elevation, this will require to be assessed under a separate application for
Advertisement Consent.   
3.6 In support of the proposal, the applicant has submitted a range of documentation and
information, including a Design Statement, Tree Report, and Preliminary Ecological
Appraisal. 
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have no objection to the proposal in
respect of roads and parking together with flooding matters.
4.2 West Dunbartonshire Council Environmental Health Service have no objection,
subject to two conditions on construction and operating hours.
4.3 West Dunbartonshire Council Biodiversity Officer has no objection, subject to two
conditions relating to landscaping and biodiversity enhancement.
4.4 Historic Environment Scotland had initially objected due to the potential impact upon
the canal which is a scheduled monument, but following further consideration the
objection was removed.
5. REPRESENTATIONS
5.1 None received.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
6.1 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the global
climate and nature crises. Policy 2 also relates to the climate in the form of climate
mitigation and adaptation and states development proposals will be sited and
designed to minimise lifecycle greenhouse gas emissions as far as possible and
development proposals will be sited and designed to adapt to current and future risks
from climate change.
6.2 Policy 3 seeks to protect biodiversity and deliver positive effects from development,
requiring that local development includes appropriate measures to conserve, restore
and enhance biodiversity. It is noted that measures should be proportionate to the
nature and scale of development.

Page 3

6.3 Policy 6 aims to protect and expand forests, woodland and trees. It advises that
proposals will not be supported where they result in the loss of ancient woodlands,
ancient and veteran trees, or individual trees of high biodiversity value. Where
woodland is removed, compensatory planting is expected to be delivered.  
6.4 Policy 7 aims to protect and enhance historic environment assets and places, with
proposals affecting scheduled monuments only supported where direct impacts on
the integrity and setting of scheduled monuments are avoided or exceptional
circumstances have been demonstrated to justify the impacts on the monument and
any impacts have been minimised. 
6.5 Policy 12 relates to waste and advises that development proposals will set out how
much waste the proposal is expected to generate and how it will be managed. 
6.6 Policy 13 supports proposals where they provide direct, easy, segregated and safe
links to local facilities via walking, wheeling and cycling networks and are accessible
by public transport.
6.7 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale, as per Policy 14. Policy 15 relates to
local living and 20 minute neighbourhoods, with development proposals required to
contribute to both, where relevant, through local access to a wide range of facilities
and activities, including lifelong learning and recreation facilities
6.8 Under part (f) of Policy 19, proposals for buildings that will be occupied by people will
be supported where they are designed to promote sustainable temperature
management, for example by prioritising natural or passive solutions such as siting,
orientation, and materials.
6.9 Green infrastructure is considered through Policy 20. Proposals that result in
fragmentation or net loss of existing green infrastructure will only be supported where
it can be demonstrated that this would not result in or exacerbate a deficit in green
infrastructure provision, and the overall integrity of the network will be maintained. 
6.10 Policy 21 seeks to promote and facilitate spaces and opportunities for play,
recreation and sport. It advises that development proposals likely to be occupied or
used by children and young people will be supported where they incorporate well
designed, good quality provision for play, recreation, and relaxation that is
proportionate to the scale and nature of the development and existing provision in the
area.
6.11 Policy 22 addresses flood risk and water management, stating that proposals will not
increase the risk of surface water flooding to others, or itself be at risk; manage all
rain and surface water through sustainable urban drainage systems (SUDS), and
seek to minimise the area of impermeable surface. 
6.12 Policy 23 aims to safeguard people from environmental harm and promote and
facilitate development that improves health and wellbeing. Development proposals
that will have positive effects on health will be supported. Policy 24 supports
proposals that incorporate appropriate, universal, and future-proofed digital
infrastructure.

Page 4

6.13 Policy 27 seeks to promote and facilitate development in our city and town centres,
advising that proposals that enhance and improve the vitality and viability of city,
town and local centres, including proposals that increase the mix of uses, will be
supported.
6.14 The proposed development is supported by NPF4 and is assessed fully in Section 7
below. 
West Dunbartonshire Adopted Local Plan 2010  
6.15 Policy GD1 seeks to ensure that all new development is of a high quality of design
and respects the character and amenity of the local area. 
6.16 Policy RET 5 advises that applications for non-retail uses within the designated town
centres will be favourably considered where they contribute to the vitality and viability
of the town centre and do not conflict with other Local Plan policies. 
6.17 Policy R1 relates to the retention of existing open space. It includes a presumption
against development which adversely affects the use, character or amenity of areas
of functional and valued open space. Developments on existing open space will be
considered against the existing or potential future use, quality, function and value of
the open space and the sufficiency of provision of the facility type in the local area. 
6.18 Policy T1 and T4 require sites to be integrated with sustainable travel. Policy E1
relates to the Council’s Biodiversity duty and Policy E5 requires new development
proposals to consider impacts on trees and incorporate suitable tree planting.
Policies F1 and F2 aim to ensure that new development is not at risk from, and does
not increase the risk of flooding, and has suitable SUDS drainage infrastructure.
Policy DC7 supports the inclusion of on-site micro-renewable technologies. 
6.19 Policy BE 5 advises that the Council will resist any development proposals that would
have an adverse impact on or affect the setting of a Scheduled Ancient Monument,
unless a number of criteria are met. 
6.20 Policy R 4 seeks to ensure that new development on or adjacent to the Forth and
Clyde Canal is compatible and appropriate, with Policy R 4C encouraging
recreational activities adjacent to the canal. Policy R 4F notes that development of
canal-side sites should, wherever possible, be oriented towards and integrate with
the canal, overlook the canal to provide a supervised edge and provide direct access
to the existing canal side paths.
6.21 The proposal complies with the policies of the adopted local plan and is assessed
fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would
not adopt Local Development Plan 2. The Proposed Local Development Plan 2
(LDP2), incorporating the recommended modifications of the Examination Report
received on 22 April 2020, which were accepted by the Planning Committee of 19
August 2020, remains the Council’s most up to date spatial strategy and is therefore
afforded significant weight in the assessment and determination of planning
applications, subject to compatibility with NPF4. The Scottish Ministers’ Direction
relating to the adoption of LDP2, dated 18 December 2020, is also a material
consideration.

Page 5

7.2 Policy CP1 seeks to ensure that development is of a high quality, adaptable and
designed to be suitable for a mix of occupants. It indicates that all new development
will be expected to contribute towards creating successful places by having regard to
the six qualities of a successful place (distinctive, adaptable, resource efficient, easy
to get to/move around, safe and pleasant, and welcoming). Policy CP2 requires the
integration and consideration of green infrastructure from the outset of the design
process through to its maintenance and stewardship of the resource. 
7.3 Clydebank Policy 1 advises that the Council will encourage proposals adjacent to the
Forth and Clyde Canal which introduce a mixture of uses associated with a leisure
and evening economy, such as recreational activities. These uses will be supported
where they will help to transform this area into a well-used multi-functional Town
Centre that extends a range of activities into the evening and makes the Canal a
focal point for activity, whilst also being complimentary to existing Town Centre uses.
In line with this, the Clydebank Town Centre Development Strategy supports the
transformation of the area around the Forth and Clyde Canal into a focal point and
multi-functional area for recreation which connects people again with the Canal.
Policy FCC1 advises that development alongside the Forth & Clyde Canal should
enhance this green network asset. Development that would have an adverse impact
on the canal or its setting will not be permitted. 
7.4 Policy SC1 advises that proposals for retail, commercial and leisure investment, and
other key Town Centre uses, should align with the sequential approach and the
preferred uses set out in Table 5, which includes Class 11 – Assembly and Leisure.
Developments are directed sequentially to Town Centres in the first instance. 
7.5 Policy GI1 relates to open space and outdoor sports facilities. It advises that
development which would result in the loss of open space which is, or has the
potential to be, of quality and value will not be permitted unless provision of 
additional open space of equal or enhanced quality and value is provided. 
7.6 Policy BE1 advises that where development would adversely affect a scheduled
monument or the integrity of the setting of a scheduled monument, permission would
only be granted in exceptional circumstances.
7.7 Policy CON4 sets out a need for all developments to install sufficient broadband
provisions. 
7.8 Policies ENV1, ENV4, ENV 5 and ENV6 are all similar to the ecology, tree, water
environment and flooding policies of the adopted Local Plan. Policy ENV8 requires
developments to address air quality, lighting and noise as part of the planning
process. 
7.9 Policy RE4 encourages micro-generation and heat recovery technologies within or
associated with individual properties, with Policy RE5 advising that new buildings are
required, as far as possible, to integrate low and/or zero carbon generating
technologies.  
7.10 It is considered that the application complies with the relevant policies above, as set
out in the assessment below. 
Creating Places Planning Guidance and Green Network and Green Infrastructure
Planning Guidance

Page 6

7.11 The Creating Places Guidance – November 2022 seeks to achieve high quality
development with a design led approach based on a thorough appraisal of the site
and an analysis of its context and sets out that this is expected for all development
proposals. The Green Network and Green Infrastructure Guidance - November 2022
seeks to ensure that the proposal integrates landscaping and green infrastructure as
part of the setting of the new development and open space created. This will include
a focus on biodiversity enhancement. Following a full assessment, it is concluded
that the proposal presents no conflict with the aims of the guidance. 
Principle of Development
7.12 While the application site is not allocated for a specific use in the Proposals Maps of
the Local Plan and proposed LDP2, it is located in Clydebank Town Centre and
subject to the policy requirements associated with this location. It is considered that a
community focused Activity Hub located adjacent to the Canal would contribute to the
provision of a mix of uses within the Town Centre, thereby improving the vitality and
viability of the Centre. The proposed provision of recreational and educational
opportunities would also promote lifelong learning, health and wellbeing and help
create a multi-functional area that connects people with the Canal. In light of the
above, the principle of development is supported by Policy 15, Policy 21, Policy 23
and Policy 27 of NPF4, Policy RET 5 and Policy R 4C of the Local Plan, and
Clydebank Policy 1, Clydebank Town Centre Development Strategy and Policy SC1
of the proposed LDP2.  
7.13 It is noted that the site, which is comprised of amenity grass, trees and sculptured
seating, has value as open space. While it is not identified as open space in the
Proposals Maps of the Local Plan and proposed LDP2, Policy R 1 and Policy GI1 of
the respective Plans safeguard open space which is, or has the potential to be, of
quality and value. Policy 20 of NPF4 advises that development proposals that result
in the fragmentation or net loss of existing blue and green infrastructure will only be
supported where it can be demonstrated that the proposal would not result in or
exacerbate a deficit in blue or green infrastructure provision, and the overall integrity
of the network will be maintained. With significant areas of similar amenity grassland
located along the canal to the north and east of the application site, it is considered
that the proposal, which would result in approximately a third of the existing open
space being lost, would not result in or exacerbate a deficit in green infrastructure at
this location. It is also considered that a proposal of this nature will enhance facilities
at this location and compliment the wider areas of open and public space that form
this part of the southern canal bank. In this context, the proposal complies with Policy
20 and is acceptable.   
Site Layout, Design and Appearance
7.14 New development requires to be well designed, take cognisance of the setting into
which it is introduced and provide high quality, well designed buildings, whilst
recognising the impact on existing neighbouring properties. 
7.15 The 234sqm building footprint is appropriate relative to the 943sqm site size, with the
single storey scale and linear form aligning with and complimenting the adjacent
cycle path and Canal. The building would have a contemporary and attractive
appearance, with the use of floor to ceiling windows/door, projecting fins infilled with
perforated mesh panels and an overhanding roof providing a good degree visual
diversity and interest. With the front elevation orientated towards the Canal, the
proposal would also provide an active frontage that engages positively with the
Canal. The proposed Green RAL 6003 colour finish would also blend in with the
surrounding greenspace.

Page 7

While samples of the proposed materials and colour finish have not been provided in
advance of the determination of the application, these can be secured through
condition and subject to approval prior to the commencement of development. 
7.16 It is noted that the application does not include information on the provision of low
and/or zero carbon generating technologies, as required by Policy RE5. This matter
can, however, be addressed through condition.   
7.17 Overall, it is considered that the proposal would create a well-designed development
that addresses the six qualities of successful places by having a distinctive identity,
using high quality materials and being well connected and sustainable. As such, it
complies with Policy 15 of the NPF4 and policies GD1, DS1 and CP1 of the adopted
and proposed Plans, alongside the Creating Places Guidance (2022).
Residential Amenity
7.18 The layout and scale of development proposed relative to the proximity of existing
housing raises no concerns with respect to privacy, overshadowing or overbearing
effects. While the development will undoubtedly bring additional activity to the area, it
is unlikely to result in any noise or activity beyond that typically found in a Town
Centre during the day. It is noted that the Activity Centre will not operate before 9am
or beyond 8pm and a condition can be attached to secure these operating hours.
Although it is accepted that the construction phase will produce an element of short
term noise and disruption, the consultation response from the Council’s
Environmental Health Service highlights the requirement for the construction of the
development to be undertaken in a way that ensures that adjacent residential
amenity is not adversely affected, which can be secured through condition.
Trees, Open Space and Landscaping 
7.19 While the submitted Tree Survey identifies eight trees on the site, comprising 2 Wild
Cherry, 3 Norway Maple, 2 Callery Pear and 1 London Plane, it notes that there are
no ancient or veteran trees on the site. Although six trees would need to be removed
to accommodate the development, the proposal complies with Policy 20 and Policy
ENV4 as no ancient or veteran trees or those covered by a TPO would be removed.
It is noted that, following pre-application discussions, the applicant has included a
wild garden as part of the landscaping in an effort to offset the loss of trees. 
7.20 The proposal would provide approximately 630sqm of open space, comprised of
hardstanding and grassed areas. While a detailed landscaping scheme has not been
submitted, a gravel walkway is proposed adjacent to the eastern and southern
elevations, along with a hardstanding area within the northwest extent and a wild
garden adjacent to the southern elevation. The approach outlined is acceptable in
principle and a detailed landscaping scheme can be secured through condition.    
Traffic, parking and road safety
7.21 The proposal raises no concerns with respect to traffic generation and road safety
due to the scale and nature of the development and the excellent public transport
and active travel connections associated with a Town Centre location.  While no
dedicated parking is proposed, it is considered that there is adequate parking within
this Town Centre location. It is also noted that the consultation response from the
Roads service raised no objection in relation to these issues.   
Transport and Connectivity
7.22 With the site being located in the Town Centre, it is accessible to a wide range of
local services and within a 5 min walk of frequent public transport services to centres
across West Dunbartonshire and beyond to Glasgow and Helensburgh.

Page 8

The site is also located adjacent to the NCR 7 cycle path. It is therefore concluded
that the development is provided in an appropriate location within an established
settlement accessible by means other than the private car. 
Flooding and Drainage
7.23 The proposal raises no concerns with respect to flooding as the site is not identified
as being at risk on SEPA’s Flood Maps. The consultation response from the
Council’s Flooding Officer also raised no objection. In relation to drainage, the
application indicates that foul wastewater would be discharged to the public sewer,
with surface water discharged to the canal. While no detailed information on
drainage, including the use of SUDS, has been provided, this matter can be
addressed through condition. The proposal is therefore acceptable, subject to
condition. 
Ecology
7.24 The preliminary ecological appraisal submitted with the application found that the
habitats on the site were of low conservation value, with no evidence of protected
species and limited scope for nesting birds. The appraisal includes a number of
recommendations, such the minimisation of light spill, which can be secured through
condition. The Council’s Biodiversity Officer has no objection to the Preliminary
Ecological Appraisal, but requests that a detailed Landscaping Scheme and
Biodiversity Enhancement Plan be provided, which can again be secured through
condition.   
Cultural Heritage
7.25 A large portion of the application site is located within the Forth and Clyde Canal
Canal: Old Kilpatrick - Linnvale Scheduled Monument, which includes the canal,
towpath and areas to either side in which traces of activities associated with its
construction and use may survive. While Historic Environment Scotland initially
objected to the proposal due to concerns about the potential adverse effects of the
proposal, the objection was subsequently removed after discussions with the
applicant. In light of this, the proposal is acceptable in this context.    
Waste Provision
7.26 The proposal is expected to generate a level of waste commensurate to a community
facility of the scale proposed. A refuse store is proposed within the eastern corner of
the building, which is acceptable.  
8. CONCLUSION
8.1 The proposal is welcomed and would provide a high quality, community focused
activity centre that would contribute to the mix of uses and vitality of the Town Centre
and help connect people with the canal, without any detrimental effects on local
amenity. 
8.2 The proposal presents no conflict with the policy requirements of NPF4, the adopted
Local Plan, the proposed Local Development Plan 2 and associated Planning
Guidance.
9. CONDITIONS
1. Prior to the commencement of development on site, exact details and samples of all
proposed external materials shall be submitted to and approved in writing by the
Planning Authority. Thereafter, unless otherwise agreed in writing with the Planning

Page 9

Authority, the development shall be completed in strict accordance with the approved
material details and palette.
2. Prior to the commencement of development on site, full details of all hard surfaces
shall be submitted for the further written approval of the Planning Authority. The
development shall thereafter proceed in accordance with the approved details.
3. Prior to the commencement of development on site, a detailed soft landscaping plan
shall be submitted to and approved in writing by the Planning Authority. Thereafter,
unless otherwise agreed in writing with the Planning Authority, the development shall
be completed in strict accordance with the approved plan.
4. Prior to the commencement of development on site, a Biodiversity Enhancement
Plan setting out how the proposal enhances biodiversity beyond the current baseline,
together with the implementation on site, shall be submitted to and approved in
writing by the Planning Authority. Thereafter, unless otherwise agreed in writing with
the Planning Authority, the development shall be completed in accordance with the
approved plan.
5. The approved hard and soft landscaping and all associated approved planting details
shall be implemented within a timescale to be agreed with the Planning Authority
prior to the commencement of works on site.
6. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be replaced
within the following year with others of a similar size and species.
7. All recommendations within the Preliminary Ecological Appraisal dated August 2022
and hereby approved, shall be implemented in full to the satisfaction of the Planning
Authority.
8. That prior to the commencement of works on site, full details of the proposed
drainage regime, inclusive of calculations and overland flow details, shall be
submitted to and approved in writing by the Planning Authority. The drainage regime
shall then be implemented and maintained as approved at all times thereafter.
9. That all surface water shall be intercepted within the site both during construction and
on completion of the development and full details of measures to ensure that surface
water run-off is contained within the site shall be submitted to and approved in writing
to the Planning Authority prior to the commencement of any works on site. The
measures shall be implemented and maintained as approved.
10. Prior to the operation of the Activity Centre, the developer shall install the necessary
infrastructure to enable the development to be connected to the existing fibre optic
network, where available in West Dunbartonshire, and in accordance with the
relevant telecommunications provider’s standards.
11. Prior to the commencement of any works on site, full details of the incorporation of
low and/or zero carbon technologies shall be submitted to and approved in writing by
the Planning Authority. Thereafter the development shall be undertaken in
accordance with the approved details.
12. The development hereby approved shall only operate between the hours of 9am-8pm
Mon-Fri, unless otherwise agreed in writing by the Planning Authority.

Page 10

13. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following hours
unless otherwise approved in writing by the Planning Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
Alan Douglas
Chief Officer – Regulatory and Regeneration
Date: 5th June 2024
Person to Contact: James McColl, Development Management Team Leader
James.McColl@west-dunbarton.gov.uk 
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Consultation responses
3. National Planning Framework 4
4. West Dunbartonshire Local Plan 2010
5. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
6. ‘Green Network and Green Infrastructure’ Planning
Guidance (2022)
7. Creating Places Planning Guidance (2022)
Wards affected: Ward 5 (Clydebank Central)