Page 1

Agenda
Planning Committee
Date:  Wednesday, 5 June 2024
___________________________________________________________________
Time:  10.00 
___________________________________________________________________
Venue:  Civic Space, Council Offices, 16 Church Street, Dumbarton, G82 1QL.
___________________________________________________________________
Contact:   Email: Nicola Moorcroft, Committee Officer
nicola.moorcroft@west-dunbarton.gov.uk
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Planning Committee as detailed above.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Ian Dickson
Councillor Daniel Lennie
Provost Douglas McAllister
Councillor June McKay
Councillor Karen Murray Conaghan
Councillor Chris Pollock
Councillor Hazel Sorrell
Councillor Sophie Traynor
All other Councillors for information
Date of Issue: 23 May 2024
Page 2

Page 3

PLANNING COMMITTEE
WEDNESDAY, 5 JUNE 2024
AGENDA
1 APOLOGIES
2 DECLARATIONS OF INTEREST
Members are invited to declare if they have any interests in the items of
business on this agenda and the reasons for such declarations.
3 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
4 MINUTES OF PREVIOUS MEETING  5 - 19
Submit for approval, as a correct record, the Minutes of the Meeting of the
Planning Committee held 8 May 2024. 
5 PLANNING APPLICATIONS
Submit reports by the Chief Officer – Regulatory and Regeneration in respect
of the following Planning applications:-
(a) DC23/086/FUL: Erection of new activity centre incorporating 21 - 31
a community hub and bicycle workshop, together with associated 
works at South Canal Bank, Sylvania Way, South Clydebank by West
Dunbartonshire Council.
(b) DC23/039/FUL: Installation of driveway (Retrospective) 33 - 38
at 49 Briar Drive, Clydebank G81 3HT by Mr Steven Messenger.
6 MASTERPLAN CONSENT AREAS - STATEMENT OF 39 - 42
CONSIDERATION 
Submit report by the Chief Officer – Regulatory and Regeneration seeking
agreement to issue the Statement of Consideration in relation to Masterplan
Consent Areas.
Page 3

Page 4

Page 4

Page 5

PLANNING COMMITTEE
At a Meeting of the Planning Committee held in the Council Chambers, Clydebank
Town Hall, 5 Hall Street, on Wednesday, 8 May 2024 at 10.00 a.m.
Present: Provost Douglas McAllister and Councillors Gurpreet Singh
Johal, Daniel Lennie, June McKay, Karen Murray Conaghan,
Lawrence O’Neill and Sophie Traynor.
Attending: James McColl, Development Management Team Leader;
Cameron Clow, Policy Planning Officer; Matthew Spurway,
Development Planning and Place Officer; Nigel Ettles, Principal
Solicitor and Nicola Moorcroft, Committee Officer.
Apologies: Apologies for absence were intimated on behalf of Councillors
Ian Dickson, Chris Pollock and Hazel Sorrell.
Councillor Lawrence O’Neill in the Chair
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Planning Committee held on 17 April 2024 were
submitted and approved as a correct record.
NOTE OF VISITATIONS
A Note of Visitations carried out on 15 April 2024, a copy of which forms Appendix 1
hereto, was submitted and noted.
ITEM 4
Page 5

Page 6

SCOTTISH GOVERNMENT CONSULTATIONS: INVESTING IN PLANNING;
MASTERPLAN CONSENT AREAS; AND DEVELOPMENT PLAN AMENDMENTS 
A report was submitted by the Chief Officer – Regulatory and Regeneration seeking
agreement to submit responses to various Scottish Government consultations on
proposed planning regulations and changes to how the planning system is
resourced. 
After discussion and having heard the Policy Planning Officer and the Development
Planning and Place Officer in further explanation and in answer to Members’
questions, the Committee agreed the proposed Council responses set out in
Appendix 1 of the report (Investing in Planning: Consultation), Appendix 2 of the
report (Masterplan Consent Areas Regulations: Consultation) and Appendix 3 of the
report (Development Plan Amendment Regulations: Consultation). 
CONSTRUCTION AND OPERATION OF A 560MW BATTERY ENERGY
STORAGE SYSTEM WITH ASSOCIATED INFRASTRUCTURE, SUBSTATION,
SECURITY FENCING, CCTV, SECURITY LIGHTING AND LANDSCAPING ON
LAND AT COCHNO ROAD, BEARSDEN, EAST DUNBARTONSHIRE -
SECTION36 APPLICATION TO SCOTTISH GOVERNMENT ENERGY CONSENTS
UNIT REF: ECU00004982 
A report was submitted by the Chief Officer – Regulatory and Regeneration to agree
a response to a consultation received from the Scottish Government Energy
Consents Unit, on behalf of the Scottish Ministers, regarding a proposal for the
construction and operation of a 560MW Battery Energy Storage System, with
associated infrastructure, substation, security fencing, CCTV, security lighting and
landscaping. 
Chair invited Councillor Gordon Scanlan, on behalf of Kilpatrick Ward, to join the
meeting. Councillor Scanlan was heard in relation to his and the residents of the
area, concerns regarding this development. 
Provost Douglas McAllister moved that in addition to the recommendation to object
to the development, West Dunbartonshire Council request Scottish Ministers conduct
a full Public Inquiry, held in Clydebank, prior to making a decision regarding this
development. 
After discussion and having heard the Development Management Team Leader in
further explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to object to the above development and that the response contained in
Appendix 2 hereto forms this Council’s formal response to the proposal; and 
(2) that West Dunbartonshire Council request Scottish Ministers conduct a full
Public Inquiry, held in Clydebank, prior to making a decision regarding this
development. 
Page 6

Page 7

The meeting closed at 10.48 a.m. 
Page 7

Page 8

APPENDIX 1 
PLANNING COMMITTEE 
NOTE OF VISITATIONS – 15 APRIL 2024 
Present: Councillors Karen Murray Conaghan and Chris Pollock. 
Attending: Pamela Clifford, Planning, Building Standards and
Environmental Health Manager and James McColl,
Development Management Team Leader. 
SITE VISITS 
Site visits were undertaken in connection with the undernoted planning applications:- 
Site of former Carless Oil Terminal, Erskine Ferry Road, Old Kilpatrick by Malin
Group 
DC23/211/PPP: Proposed construction of Marine Technology Park comprising
industrial units for marine engineering, fabrication, research and development, and
associated uses; along with site access and associated infrastructure (in principle)
by Malin Property Group. 
57B Broomhill Crescent, Bonhill, Alexandria 
DC23/120/FUL: Erection of decking (retrospective) by Mr John Graham
Page 8

Page 9

APPENDIX 2 
Appendix 2 – West Dunbartonshire Consultation Response to Scottish
Government Energy Consents Unit. 
Section 36 application ref: ECU00004982 - Construction and operation of a
560MW Battery Energy Storage System with associated infrastructure,
substation, security fencing, CCTV, security lighting and landscaping on Land
at Cochno Road, Bearsden, East Dunbartonshire - project name Whitehall
BESS. 
West Dunbartonshire Council objects to the above proposal as neighbouring
Planning Authority.  Full details of the Council’s consideration of the development
proposal are set out below. 
Context 
An application has been made to the Scottish Ministers under Section 36 of the
Electricity Act 1989 (as amended) for the construction and operation of a battery
energy storage facility with a maximum power output of 560 megawatt.  The
application site is located within the East Dunbartonshire local authority area and the
assessment of the application proposal is undertaken via the Scottish Government
Energy Consents Unit.  West Dunbartonshire Council has been consulted as
neighbouring planning authority with the application site lying generally to the north
of the local authority boundary. 
Site description and development proposal 
Extending to approximately 29 hectares, the proposed site is situated on land at
Whitehall Farm, Cochno Road, East Dunbartonshire.  The site lies immediately north
and east of the local authority boundary which follows the line of Cochno Road at
this location.  The site itself is located within the open countryside comprising part of
the Green Belt as defined by the adopted East Dunbartonshire Local Development
Plan 2.  To the south, the site is bound by Cochno Road with Whitehill Farm located
directly adjacent to the southeast of the site.  To the west, the site is bound by
Cochno Road along its southern extent before following the general line of Lower
Stourfold Glen.  The northern and eastern boundaries of the site generally cut across
open land before following the existing tree line to Cochno Road.  The nearest
residential properties within West Dunbartonshire are the houses directly opposite
the site at Edinbarnet, Cochno Road.  Properties at Craigton Street, Burnbrae Street,
Craighaw Street and Field Road lie around 170 metres from the southernmost
boundary of the proposed site.  Loansdean, Cochno Road is around 200 metres
from the site. 
The proposal is for a 560 MW Battery Energy Storage Facility with associated
infrastructure.  It is indicated that the development would have an operational
lifespan of 40 years.  The proposed development would comprise a number of
containerised units to house battery energy storage systems and associated
ancillary infrastructure.  Each container will have the appearance of a standard metal
Page 9

Page 10

ISO/shipping container and it is indicated these will be soundproof.  The containers
would be arranged in parallel banks, and would likely be finished in dark grey or
green and would be prefabricated off-site.  The containers would be accessed via an
external galvanised metal open grid walkway supported by stairs and railings.  The
dimensions of the containers would be approximately 2.6m x 2.4m x 12.2m (height x
depth x width).  The containers together with other equipment will be placed on
concrete plinths.  In the submitted documents that concrete will be installed in a
manner which can be removed at the end of the development’s life cycle, to return
the land to agricultural use.  The proposal would see 224 containers in total.  It is
further indicated that there will be 1 inverter per container and 1 transformer per 2
containers giving a total of 224 inverters and 112 transformers, arranged in formation
alongside the containers.  The transformers and inverters will measure
approximately 2.7m x 1.4m x 2.6m, and 2.3m x 1.4m x 1.5m respectively. 
Underground cables would connect the facility to the grid off-site at Drumchapel and
Windyhill substations.  A substation measuring 3.9m x 3.7m x 13.6m is to be located
in the located to the south of the site.  All structures and development as laid out
above will be enclosed within an acoustic fence, proposed to stand at 4m high. 
A 4m wide access road will be installed, with the proposed access point to Cochno
Road located on the western edge of the site.  It is indicated that landscape
proposals for the site will seek to enhance existing landscape features, screen views
of the battery containers and enhance biodiversity. 
Battery Energy Storage Solutions provide a means of allowing for the storage of
energy at times when generating stations are working at full capacity which can then
be released when additional power is needed within the grid during peak times or
when energy generation has dropped.  As more energy sources are now renewable,
such as wind and solar, balancing generation versus demand is a critical issue for
grid stability.  Battery storage allows energy to be stored during peak renewable
generation periods and released when demand outstrips generation.  In short, the
proposed battery takes in generated electricity when there is a surplus and stores it
until there is a demand for electricity which can be released to meet this demand. 
The applicant has submitted a number of supporting documents with the application
to the Energy Consents Unit, including a supporting planning statement, design and
access statement, flood risk assessment, historic environment assessment,
preliminary ecological appraisal, transport statement, noise impact assessment,
battery safety management plan and landscape and visual impact assessment. 
Appraisal 
This application has been submitted to the Scottish Government under Section 36 of
the Electricity Act 1989, as it is development with a generating capacity of over
50MW.  Under the terms of Section 25 of the Town and Country Planning (Scotland)
Act 1997, all applications must be determined in accordance with the development
plan unless material considerations indicate otherwise.  In this instance, the
application is made under the Electricity Act 1989 and therefore the Development
Plan does not have the primacy in the determination of the application.  It does,
however, provide a basis for the assessment of this proposal and it is established
practice to take the development plan into account in such decisions.  The
Page 10

Page 11

development plan comprises National Planning Framework 4 and adopted East
Dunbartonshire Local Development Plan 2. 
Principle of Development
National Planning Framework 4 (NPF4) sets out the long-term vision for the
development of Scotland through the National Spatial Strategy.  NPF4 aims to meet
Scotland’s climate ambition which will require a rapid transformation across all
sectors of the economy and society.  This proposal constitutes a National
Development as it supports renewable electricity generation, repowering, and
expansion of the electricity grid under National Development 3: Strategic Renewable
Electricity Generation and Transmission Infrastructure.  NPF4 recognises that
additional electricity generation from renewables and electricity transmission
capacity of scale is fundamental to achieving a net zero economy.  Policy 1 states
that there is a need to encourage, promote and facilitate development that
addresses the global climate emergency and nature crisis, whilst Policy 2 seeks to
encourage, promote and facilitate development that minimises emissions and adapts
to the current and future impacts of climate change.  The electricity transmitted for
storage within the proposed batteries will have come from a mixture of renewable
and non-renewable sources with the purpose of the batteries to ensure there is
always grid stability.  As renewable energy becomes more prevalent, grid stability
becomes a significant issue due to the intermittent nature of renewable energy
generation. 
Whilst the Council considers that the proposal could therefore be held to support the
overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply, it must be ensured that such development happens in the
right place.  Therefore, it must be assessed if there are any potential adverse
impacts upon West Dunbartonshire resulting from the proposed development which
would be outweighed by any benefits.  Policy 11(e) of NPF4 sets out in detail the
matters for the project design and mitigation to address. 
Landscape and Visual Impact and impact on the Green Belt
The site is situated within the Green Belt to the north of the settlement of Faifley. 
Policy 8 of NPF4 sets out the types of development that are supported within the
Green Belt locations.  This includes essential infrastructure and proposals that
relates to the distribution and transmission of electricity grid networks fall under this
definition.  However, Policy 8 is clear that for development proposals in Green Belt
locations, the purpose of the Green Belt must not be undermined.  Policy 11
additionally seeks to encourage, promote, and facilitate all forms of renewable
energy development, including energy storage and distribution infrastructure.  The
policy sets out a range of criteria that proposals should be assessed against to
ensure the impact of the project design and mitigation is addressed.  This includes
ensuring there is no adverse impact on landscape and visual impact. 
Policy 8 requires that the reasons why the Green Belt is essential must be provided
together with why the development cannot be provided on a site outwith the Green
Belt.  The applicant advises that the site has been chosen due to it’s proximity to
appropriate grid connections.  While this is accepted from a technical perspective,
the applicant has not provided any analysis of other site options that were
considered outside of the Green Belt and why it was not possible to locate them in
Page 11

Page 12

an alternative place.  It therefore cannot be concluded that no other suitable sites are
available in a location outwith the Green Belt. 
Policy 8 further requires that proposals must be compatible with the established
countryside and landscape and be designed to ensure that it is of an appropriate
scale, massing and external appearance to minimise visual impact upon the Green
Belt.  That a development of this nature would have a visual impact is not in doubt. 
The applicant’s Landscape and Visual Impact Assessment (LVIA) acknowledges that
the baseline landscape character of the site would be altered as a result of the
proposed development bringing adverse effects on landscape character, during both
the construction and operation phases.  It is identified in the LVIA that the
development would introduce built elements which would be evident in its immediate
landscape setting.  The Council is concerned at the potential for the industrial
character of the development and the harm to the visual harm to the locality,
resulting in the industrialisation of the Green Belt at this location.  Whilst the
proposed landscape mitigation is acknowledged, the site is in close proximity to the
settlement boundary of Faifley and visually, the development will likely be viewed in
the context of the adjacent settlement.  It will likely have negative impacts on
landscape and natural setting of the Green Belt, potentially having an adverse visual
impact.  Whilst the development is identified as being temporary, there are no details
of decommissioning or restoration.  With a possible development lifespan of up to 40
years, any impacts from the operational phase of the development will occur over a
long period of time. 
The Council is of the view that the applicant has not demonstrated that there are no
other suitable sites are available in a location outwith the Green Belt.  The Council
also considers that the industrial character of the development will result in visual
harm to the locality resulting in the industrialisation of the Green Belt.  This would not
be acceptable.  The development cannot, therefore, be held to be supported by
Policies 8(a)(ii) and 11(e)(ii) of NPF4. 
Impact upon the Kilpatrick Hills
Notwithstanding visual impact considerations within the Green Belt, the potential
impact on the landscape character and features of the Kilpatrick Hills Local
Landscape Area (LLA) must also be considered.  The proposed site is approximately
270m away from the boundary of the LLA.  The ‘Statement of Importance’, which is
the evidence underpinning the LLA explains that the lower slopes of the Kilpatrick
Hills contribute to its setting, by acting as an important landscape buffer.  The
designation contains areas of lower slopes to protect the setting of the hills, meaning
the proposed development site is removed from this buffer. 
The theoretical zone of visibility in the applicant’s LVIA does include southern areas
of the LLA.  One of the special landscape qualities of the LLA is the long views
across the Glasgow conurbation, which emphasise the contrast between remote
uplands and developed lowlands.  Visually intrusive development between the
conurbations and the Kilpatrick Hills could erode this special quality.  The LVIA
assesses that there would be negligible impact stating the development is unlikely to
be visible from the viewpoint.  Further, the tree screening mitigation would further
reduce the visibility once established. 
Page 12

Page 13

Given that the site is some distance from the designation boundary and visibility is
expected to be low from the LLA, the Council considers that based on the
assessment within the submitted LVIA, it is unlikely there will be an adverse impact
on the Kilpatrick Hills 
Ecology, bi odiversity and protected species
Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects
from development and strengthen nature networks.  Policy 4 seeks to protect,
restore and enhance natural assets, making best use of nature-based solutions.  The
policy is primarily focused on designated areas including sites designated as a local
nature conservation site or landscape area.  Policy 11 also requires biodiversity
impact to be addressed.  The applicant has submitted a preliminary ecological
appraisal in support of the proposal and this primarily assesses impacts upon the
proposed site.  The appraisal does not identify the adjacent Local Nature
Conservation Sites (LNCS) within West Dunbartonshire, as set out on the proposals
map of proposed LDP2.  These comprise of three LNCS areas; Edinbarnet
woodlands and Wester Cochno Parkland both of which area adjacent to the
proposed site, and Wester Cochno Burn. 
The Council’s Biodiversity Officer advises that West Dunbartonshire Council has
undertaken a two year nature restoration project within the area known as
Auchnacraig Estate (which is comprised of the three LNCS above), and on Faifley
Knowes to the south.  Both Auchnacraig and Faifley have now been connected by a
new native woodland which straddles the hillside to the east of Douglas Muir Road. 
This has created an integrated habitat which connects the urban environment to
wider Green Belt and the Kilpatrick Hills LLA.  The Council’s Biodiversity Officer
further advises that to the northwest of the site, Glasgow University at Cochno Farm
have also been carrying out a number of nature restoration works including a large
scale planting programme as well as a private forestry grant development north of
Duntocher.  
Collectively all the work put in by the various agencies in this location has resulted in
landscape and nature restoration around the proposed development site.  Assessing
the potential impact upon the three LNCS making up Auchnacraig Estate,
Auchnacraig wood is a semi-natural broadleaved woodland with a number of veteran
broadleaved and conifer trees.  Parts of the woodland has been established for a
long time, with parts of it thought to be ancient woodland associated with the former
Auchnacraig estate.  Other woodland is younger native broadleaved woodland
planted over the past 20 years.  Diverse semi-natural woodlands of this size and age
are uncommon locally, making this site important for nature conservation.  Its value
is enhanced by the fact that it is located on the fringe of an urban environment where
wildlife habitats tend to be small and of low diversity.  The Council’s Biodiversity
Officer advises that the woodland will have a positive effect on the surrounding
environment as it will provide a reservoir of species which can migrate into
surrounding areas when conditions are suitable. 
The Council’s Biodiversity Officer further advises that a Phase 1 survey carried out at
Auchnacraig recognised the importance of the varied mosaic habitats.  Areas of
wetland pockets were found throughout the Estate.  The Estate features the Cochno
burn from which a wildlife pond is supplied and this has also been restored for
Page 13

Page 14

wildlife as part of the habitat restoration project.  Any proposed development to the
north of the site may have an impact on the hydrology of the LNCS site and this
requires to be assessed. 
Considering specific species, the Council’s Biodiversity Officer advises that evidence
of badger foraging and pine marten scat were found in 2023 surveys.  Herpetofauna
surveys of the pond were undertaken and include common toad in the species list. 
The open mosaic habitat is suitable for hedgehog and previous records of local bat
surveys on the site have found both common and soprano pipistrelles as well as
daubentons.  Previous records of otter and watervole exist for both the Cochno and
Hardgate burns.  Recent watervole surveys have reconfirmed their presence at
Faifley thus the development site requires to be considered for watercourse and
fossorial watervole as they are within the distribution range of the proposed site. 
It is therefore possible that all of the above species found within West
Dunbartonshire to the immediate west and south of the site could potentially be
using the proposed development site.  The Council’s Biodiversity Officer advises that
further species specific surveys require to be carried out in respect of the proposed
development site.  Issues such as adverse noise, vibration, lighting and hydrology
pollution are not discussed in the PEA and also require to be examined. 
In terms of biodiversity enhancement, the proposed area is also a mixed habitat and
wet and marshy sections should not be given over to inappropriate tree planting
under the role of biodiversity enhancement, as these are valuable habitats of their
own accord. 
Overall, the applicant’s preliminary ecological appraisal has been considered by the
Council’s Biodiversity Officer and this fails to identify the adjacent LNCS within West
Dunbartonshire and assess the potential cross boundary impact upon ecology,
biodiversity and protected species within West Dunbartonshire.  It therefore cannot
be concluded that adverse impacts would not occur within the West Dunbartonshire
area.  The Council does not consider that the proposal can be held to be supported
by Policies 3, 4 or 11(e)(ix) of NPF4. 
Residential amenity
There is the potential for amenity impacts to occur to residents within West
Dunbartonshire, with the closest residential properties being at Edinbarnet on
Cochno Road, immediately to the west of the site.  Infrastructure within the site
would be situated around 90 to 100 metres from these properties.  Further properties
lie to the northern edge of Faifley, approximately 170 metres from the proposed site. 
The site equipment itself is around 280 metres these residential properties in Faifley
together with Loansdean on Cochno Road.  The applicant, however, requests micro-
siting of up to 100 metres and this could result in the proposed infrastructure being
substantially closer to nearby properties than the current layout suggests.  The site
entrance will be taken from Cochno Road, opposite the properties at Edinbarnet. 
Policy 11 of NPF4 requires that impacts on communities and individual dwellings
including residential amenity, and noise are addressed.  A noise impact assessment
(NIA) has been submitted in support of the proposal and this has been considered by
the Council’s Environmental Health Service.  A number of points are highlighted with
Page 14

Page 15

respect to the noise impact assessment.  It is noted that the predicted noise is higher
at one receptor during the night but lower at other receptors.  It is questioned
whether this is correct and the cause of this requires to be clarified.  It is further
noted that the noise impact assessment applies a 2dB penalty for tonality being just
perceptible at the receptors.  For cooling plant associated with battery storage an
assessment and discussion of NR curves as per the REHIS development guide
quoted in the Noise Assessment is expected.  In the absence of this, it cannot be
concluded that no adverse impact will occur to residential properties. 
In further assessing the noise assessment, Para 4.6.2 states that mitigation is
required to ensure compliance with the BS4142 assessment for daytime noise.  It is
not clear from the results how this conclusion has been reached and furthermore
there is no discussion or suggestion of suitable mitigation and its predicted
effectiveness.  The Council’s Environmental Health Service note that the applicant
has stated that there should be flexibility around the siting of the equipment within
the site boundary, with micro siting of up to 100 metres.  There is no
acknowledgement of this within the NIA.  Any impacts from different configurations of
equipment requires to be fully discussed and assessed.  In the absence of this, the
Council considers that it is not considered that it has been demonstrated that there
will be no unacceptable impact on neighbouring amenity resulting from the operation
of the development.  It is not therefore considered that the potential impacts from
noise are addressed in accordance with Policy 11(e)(i). 
Any construction project will result in an element of noise and disturbance.  In order
to manage any potential noise disturbance during the construction phase of the
development, in the event that consent was granted, the Councill would seek a that
construction work and any ancillary operations are restricted to between 8am to 6pm
Monday to Friday and 8am to 1pm on Saturday.  No working should be permitted on
Sundays or public holidays, including local holidays within the West Dunbartonshire
Council area. 
Traffic and Road Safety
Policy 11 of NPF4 requires the impacts on road traffic to be appropriately addressed,
including during construction.  Access to the site will be taken from the A811 via
Cochno Road which is partly within the West Dunbartonshire boundary.  The site
access itself will adjoin a West Dunbartonshire section of Cochno Road.  A 24 month
construction phase is identified and the applicant’s transport statement advises that
the construction phase of the development would generate around 109 two-way
movements per day during the first three months (218 individual movements), with
daily movements decreasing thereafter. 
The applicant’s Transport Statement sets out that a review of Cochno Road outlines
how the carriageway has a suitable width to allow for simultaneous two-way
movement, from its junction with the A810 towards the access of Law Farm.  Beyond
this towards the site, Cochno Road is predominantly single track, measuring circa
3.5m width.  There are four formal passing places between the site and the Law
Farm access, which could be used to allow small vehicles to pass in the event of
conflict.  Given the narrow width along sections of Cochno Road, with limited space
to widen the carriageway to provide passing places for HGVs, it is proposed to
stagger arrivals and departures.  A detailed Construction Traffic Management Plan
Page 15

Page 16

(CTMP) would be developed.  It is advised that no HGV movements will occur at the
site during peak hours, in addition to the school closing hour.  It is further advised
that there will be no construction vehicle movements directly to the west of the site
along Cochno Road.  Overall, the applicant does not consider that the proposals
would result in a severe impact upon the local road network.  Once operational, the
applicant anticipates between 10 and 20 vehicle trips to the site per annum. 
The Council’s Roads Service has considered the proposal and does not identify any
issues or objections.  It is noted that a detailed CTMP will be prepared by the
applicant and the Council requests that in the event that the Scottish Ministers were
minded to grant consent, this is conditioned including a requirement for any CTMP to
be agreed with West Dunbartonshire Council due to the proximity of the site to the
Council area and use of the road network within the Council area. 
Impact upon the core path network
Policy 11 of NPF4 requires matters relating to public access including long distance
walking and cycling routes and scenic routes to be suitably addressed.  A variety of
core paths connect Faifley to the open countryside via Cochno Road.  The
applicant’s supporting documents identifies East Dunbartonshire core path ED/153/1
which is located to the south and east of the site and extending northeast from
Cochno Road, noting that only minor visual effects would occur in respect of users of
this core path.  This East Dunbartonshire Core Path connects with the West
Dunbartonshire Core Path network to the opposite side of Cochno Road.  The
applicant’s submission does not consider the impact on the core path network and
connections to the core path network within West Dunbartonshire.  While no routes
are physically interrupted by the proposal, there will be a visual and noise impact to
users of the routes and the character of the routes will be changed.  The Council
considers that there is the potential for there to be adverse visual amenity impacts on
core path users.  Whilst landscape mitigation could seek to reduce the visual impact,
the overall feeling of being in the wider countryside and in ‘nature’ would be lost
should the proposal proceed.  Cochno Road acts as a connection between all of
these routes and the impact of construction traffic to users of these routes has not
been considered or addressed.  The Council does not consider that the potential
impact upon the core path network has been addressed as required of Policy
11(e)(iii). 
Flood risk
Considering matters relating to flood risk, a flood risk assessment has been
submitted in support of the proposal.  This does not identify the site itself as being as
unacceptable risk of flooding.  The proposed development is also not predicted to
increase surface water runoff or flooding to the surrounding catchment.  It is noted
that in a consultation response to the Energy Consents Unit, SEPA offer no objection
on the grounds of flood risk. 
Built and cultural heritage
The application is accompanied by a desk-based assessment of the historic
environment, which identified three heritage assets relevant to West Dunbartonshire:
Edinbarnet House which is a Category B listed building, the Scheduled Monument
Cochno Cup and Ring Marked Stone, and the Antonine Wall World Heritage Site
buffer.  Historic Envirobnment Scotland (HES) in their consultation response to the
Page 16

Page 17

Energy Consents Unit notes that there are no designated heritage assets are located
within the development site application boundary.  HES are therefore satisfied that
there will not be any direct impacts.  HES also specifically consider the potential for
impact on both the Cochno Stone and Antonine Wall buffer zone and conclude that
any impact on their setting is not likely to be significant.  Being guided by the
response from HES, the Council is therefore content that there is no significant
impact on historic assets within or adjacent to West Dunbartonshire.  Potential
archaeological matters within the site would be for the Scottish Ministers to consider. 
Health and safety
The applicant acknowledges that there are potential hazards associated with
HVelectrical systems and BESS facilities, such as a fire and thermal runaway event,
which could result in the formation of harmful gases.  In response to this, an Outline
Safety Management Plan Design has been submitted in support of the proposal. 
This details the operational measures, which will be included to mitigate hazards and
reduce the risks to people and the environment.  The key measures which will be
installed to reduce risk at the BESS include the use of systems to monitor the
operation of the BESS and continuously observe the temperature, voltage and other
process parameters.  These will immediately alert operators to potential issues.  It is
advised that in the event of a problem occurring, battery sections can be readily
isolated automatically.  A fire and gas detection system will be installed alongside
conventional fire, heat and gas detectors, for the early detection of a fire event.  An
automatically operated fire suppression system will also be installed.  It is for the
Scottish Ministers to satisfy themselves that an unacceptable risk does not occur and
to inform this assessment, the Council would expect the Scottish Fire and Rescue
Service to be consulted on the application proposal.  It is noted at the time of writing,
no consultation response is available online from this organisation. 
Site Decommissioning and Restoration
Policy 11(e)(xi) of NPF4 requires matters relating to the decommissioning of
developments, including ancillary infrastructure, and site restoration to be addressed. 
The applicant has indicated that the intended lifetime of the proposal is 40 years,
after which the facility will be decommissioned and the land restored to its former
state.  However no other information regarding this has been submitted.  It is
essential that given the type of development together with its size and location, that
full details of decommissioning and site restoration is provided to ensure that the
requirements of Policy 11(e)(xi) of NPF4 are met. 
In the event that the Scottish Ministers were minded to grant consent for the
development, the Council considers that there is the requirement for a financial bond
to ensure sufficient funds are available to decommission and restore the site.  If the
developer was to go out of business with unfinished works potentially being left this
can be safeguarded by ensuring that a bond or other financial provision is to put in
place to cover such an eventuality.  The bond or other financial provision would
address reinstatement works both in the event of a developer failing or being unable
to complete restoration works together with any failure in the aftercare arrangements
associated with the site restoration.  The Council also considers that in the event that
the development fails to export electricity to the grid for a continuous period of 12
months it will be considered to have become redundant and the components of the
development removed and the site restored.  In the event that consent was granted,
Page 17

Page 18

the Council considers it essential that that this requirement is to be addressed by a
condition. 
Summary and conclusions 
The Council consider that proposals such as this can be held to support the
overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply.  The support as a national development is also
acknowledged.  However, it remains that such development require to be sited in the
right locations and the benefits of such developments require to be balanced with
any potential adverse impacts. 
In considering the proposal, it is concluded that no concerns arise in respect of
matters relating to the impact upon the Kilpatrick Hills, flood risk, roads and traffic,
built and cultural heritage, and health and safety.  However, a variety of concerns do
arise. 
In assessing the Green Belt location to the north of Faifley, the Council is of the view
that the applicant has not demonstrated that there are no other suitable sites
available in a location outwith the Green Belt.  The Council also considers that the
industrial character of the development would be to the visual harm of the locality
resulting in the industrialisation of the Green Belt.  Whilst landscape mitigation is
proposed, any planting would take years to develop and mature, exacerbating the
visual impact within the short to medium term.  This is not considered acceptable or
justified.  The development cannot, therefore, be held to be supported by Policies 8
and 11(e)(i) of NPF4. 
Turning to the impact upon ecology, biodiversity and protected species, the
applicant’s preliminary ecological appraisal fails to identify the adjacent LNCS within
West Dunbartonshire and assess the potential cross boundary impact upon ecology,
biodiversity and protected species within West Dunbartonshire.  It therefore cannot
be concluded that adverse impacts would not occur within the West Dunbartonshire
area.  Turning to the impact on the core path network, while no routes are physically
interrupted by the proposal, there will be a visual and noise impact to users of the
routes and the character of the routes will be changed.  The Council considers that
there is the potential for there to be adverse visual amenity impacts on core path
users.  The overall feeling of being in the wider countryside and outwith the built-up
area would be lost.  Cochno Road also acts as a connection between the various
core path routes at this location and the impact of construction traffic to users of
these routes has not been considered or addressed.  The development cannot,
therefore, be held to be supported by Policies 3, 4 and 11(e)(iii) and (ix) 
With regard to residential amenity, the Council does not consider that it has been
demonstrated beyond doubt that there would be no impact upon residential amenity
within West Dunbartonshire by way of noise.  Finally, the Council considers it
essential that given the type of development together with its size and location, that
full details of de-commissioning and site restoration is provided to ensure that the
requirements of Policy 11(e)(i) of NPF4 are met. 
Page 18

Page 19

West Dumbartonshire Council therefore objects to this proposal due to the above
concerns relating to the Green Belt location of the development, visual impact,
impact upon ecology, biodiversity and protected species, potential impact upon the
users of the core path network, potential impact upon adjacent residential amenity
and the failure to provide a decommissioning and restoration scheme.  The Council
does not consider that the benefits of the proposed development outweigh any
adverse impacts to the adjacent West Dunbartonshire area. 
Page 19

Page 20

Page 20

Page 21

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 5th June 2024
DC23/086/FUL: Erection of activity centre incorporating a community hub and
bicycle workshop, together with associated work on land adjacent
to the south bank of the Forth and Clyde Canal, Clydebank by West
Dunbartonshire Council. 
1. REASON FOR REPORT
1.1 The planning application raises issues that in the opinion of the appointed officer
merits the determination of the application by Committee. Under the terms of the
approved Scheme of Delegation, it therefore requires to be determined by the
Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission subject to the conditions set out in Section 9 below.
3. DEVELOPMENT DETAILS
3.1 The application site relates to a 943sqm area of land located adjacent to the South
Bank of the Forth and Clyde Canal and the NCR 7 cycle route, to the south of the
Clyde Shopping Centre, Clydebank. The site is linear in form, slopes gently down
from south to north, and is comprised of amenity grass and 8 trees, most of which
are located along the northern extent. The site also includes 5 sculptured seating
elements. Currently, the site functions as open space and is part of a wider area that
forms the southern canal bank.
3.2 The site is situated within Clydebank Town Centre and surrounded by a mix of uses,
with a church to the south, Clydebank Shopping Centre and amenity greenspace to
the north, Clydebank Bandstand and South Sylvania Way to the west and a walkway
and greenspace to the east. The site of the former Playdrome Leisure Centre, for
which planning permission has been granted for a residential development, lies to the
southeast.
3.3 Planning permission is sought for the development of an activity centre which
includes a community hub and associated kitchen, launderette, coffee hatch, bicycle
store, workshop and landscaping. It is indicated that the Community Hub will host a
range of recreational and educational activities, such as yoga and cooking classes.
The proposed modular building would have a footprint of 234sqm, being 6.7m D x
35m L, with the flat roof rising to a highest point of 3.85m and overhanging the
building footprint by approximately 1.3m on the northern elevation to create a
covered corridor (loggia). The building is comprised of two parts connected by a
roofed external cycle storage area which can be closed off at the sides. A condenser
store is located at the eastern end. All window openings are floor to ceiling, with five
windows and a door proposed on the northern elevation, four windows on the
southern elevation and one window on the western elevation, all of which would be
fitted with folding security shutters. Two skylights are also proposed.
ITEM 5a
Page 21

Page 22

The building would be comprised of a polished pre-cast concrete base rising to a
highest point of 1m, with the walls finished with a series of metal fins infilled with
perforated 1.5m wide metal mesh panels. The windows would be comprised of
aluminum with the door being metal. The walls, windows and door would be finished
in a powder coated Green RAL 6003 colour. No information has been provided on
the finish of the membrane roof. 
3.4 With respect to the wider site, a hardstanding area is proposed within the northern
half of the western extent, along with a gravel pathway along the eastern and
southern elevations. A wild garden is further proposed adjacent to the southern
elevation. 
3.5 While the application indicates that there would be illuminated signage on the
northern elevation, this will require to be assessed under a separate application for
Advertisement Consent.   
3.6 In support of the proposal, the applicant has submitted a range of documentation and
information, including a Design Statement, Tree Report, and Preliminary Ecological
Appraisal. 
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service have no objection to the proposal in
respect of roads and parking together with flooding matters.
4.2 West Dunbartonshire Council Environmental Health Service have no objection,
subject to two conditions on construction and operating hours.
4.3 West Dunbartonshire Council Biodiversity Officer has no objection, subject to two
conditions relating to landscaping and biodiversity enhancement.
4.4 Historic Environment Scotland had initially objected due to the potential impact upon
the canal which is a scheduled monument, but following further consideration the
objection was removed.
5. REPRESENTATIONS
5.1 None received.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
6.1 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the global
climate and nature crises. Policy 2 also relates to the climate in the form of climate
mitigation and adaptation and states development proposals will be sited and
designed to minimise lifecycle greenhouse gas emissions as far as possible and
development proposals will be sited and designed to adapt to current and future risks
from climate change.
6.2 Policy 3 seeks to protect biodiversity and deliver positive effects from development,
requiring that local development includes appropriate measures to conserve, restore
and enhance biodiversity. It is noted that measures should be proportionate to the
nature and scale of development.
Page 22

Page 23

6.3 Policy 6 aims to protect and expand forests, woodland and trees. It advises that
proposals will not be supported where they result in the loss of ancient woodlands,
ancient and veteran trees, or individual trees of high biodiversity value. Where
woodland is removed, compensatory planting is expected to be delivered.  
6.4 Policy 7 aims to protect and enhance historic environment assets and places, with
proposals affecting scheduled monuments only supported where direct impacts on
the integrity and setting of scheduled monuments are avoided or exceptional
circumstances have been demonstrated to justify the impacts on the monument and
any impacts have been minimised. 
6.5 Policy 12 relates to waste and advises that development proposals will set out how
much waste the proposal is expected to generate and how it will be managed. 
6.6 Policy 13 supports proposals where they provide direct, easy, segregated and safe
links to local facilities via walking, wheeling and cycling networks and are accessible
by public transport.
6.7 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale, as per Policy 14. Policy 15 relates to
local living and 20 minute neighbourhoods, with development proposals required to
contribute to both, where relevant, through local access to a wide range of facilities
and activities, including lifelong learning and recreation facilities
6.8 Under part (f) of Policy 19, proposals for buildings that will be occupied by people will
be supported where they are designed to promote sustainable temperature
management, for example by prioritising natural or passive solutions such as siting,
orientation, and materials.
6.9 Green infrastructure is considered through Policy 20. Proposals that result in
fragmentation or net loss of existing green infrastructure will only be supported where
it can be demonstrated that this would not result in or exacerbate a deficit in green
infrastructure provision, and the overall integrity of the network will be maintained. 
6.10 Policy 21 seeks to promote and facilitate spaces and opportunities for play,
recreation and sport. It advises that development proposals likely to be occupied or
used by children and young people will be supported where they incorporate well
designed, good quality provision for play, recreation, and relaxation that is
proportionate to the scale and nature of the development and existing provision in the
area.
6.11 Policy 22 addresses flood risk and water management, stating that proposals will not
increase the risk of surface water flooding to others, or itself be at risk; manage all
rain and surface water through sustainable urban drainage systems (SUDS), and
seek to minimise the area of impermeable surface. 
6.12 Policy 23 aims to safeguard people from environmental harm and promote and
facilitate development that improves health and wellbeing. Development proposals
that will have positive effects on health will be supported. Policy 24 supports
proposals that incorporate appropriate, universal, and future-proofed digital
infrastructure.
Page 23

Page 24

6.13 Policy 27 seeks to promote and facilitate development in our city and town centres,
advising that proposals that enhance and improve the vitality and viability of city,
town and local centres, including proposals that increase the mix of uses, will be
supported.
6.14 The proposed development is supported by NPF4 and is assessed fully in Section 7
below. 
West Dunbartonshire Adopted Local Plan 2010  
6.15 Policy GD1 seeks to ensure that all new development is of a high quality of design
and respects the character and amenity of the local area. 
6.16 Policy RET 5 advises that applications for non-retail uses within the designated town
centres will be favourably considered where they contribute to the vitality and viability
of the town centre and do not conflict with other Local Plan policies. 
6.17 Policy R1 relates to the retention of existing open space. It includes a presumption
against development which adversely affects the use, character or amenity of areas
of functional and valued open space. Developments on existing open space will be
considered against the existing or potential future use, quality, function and value of
the open space and the sufficiency of provision of the facility type in the local area. 
6.18 Policy T1 and T4 require sites to be integrated with sustainable travel. Policy E1
relates to the Council’s Biodiversity duty and Policy E5 requires new development
proposals to consider impacts on trees and incorporate suitable tree planting.
Policies F1 and F2 aim to ensure that new development is not at risk from, and does
not increase the risk of flooding, and has suitable SUDS drainage infrastructure.
Policy DC7 supports the inclusion of on-site micro-renewable technologies. 
6.19 Policy BE 5 advises that the Council will resist any development proposals that would
have an adverse impact on or affect the setting of a Scheduled Ancient Monument,
unless a number of criteria are met. 
6.20 Policy R 4 seeks to ensure that new development on or adjacent to the Forth and
Clyde Canal is compatible and appropriate, with Policy R 4C encouraging
recreational activities adjacent to the canal. Policy R 4F notes that development of
canal-side sites should, wherever possible, be oriented towards and integrate with
the canal, overlook the canal to provide a supervised edge and provide direct access
to the existing canal side paths.
6.21 The proposal complies with the policies of the adopted local plan and is assessed
fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would
not adopt Local Development Plan 2. The Proposed Local Development Plan 2
(LDP2), incorporating the recommended modifications of the Examination Report
received on 22 April 2020, which were accepted by the Planning Committee of 19
August 2020, remains the Council’s most up to date spatial strategy and is therefore
afforded significant weight in the assessment and determination of planning
applications, subject to compatibility with NPF4. The Scottish Ministers’ Direction
relating to the adoption of LDP2, dated 18 December 2020, is also a material
consideration.
Page 24

Page 25

7.2 Policy CP1 seeks to ensure that development is of a high quality, adaptable and
designed to be suitable for a mix of occupants. It indicates that all new development
will be expected to contribute towards creating successful places by having regard to
the six qualities of a successful place (distinctive, adaptable, resource efficient, easy
to get to/move around, safe and pleasant, and welcoming). Policy CP2 requires the
integration and consideration of green infrastructure from the outset of the design
process through to its maintenance and stewardship of the resource. 
7.3 Clydebank Policy 1 advises that the Council will encourage proposals adjacent to the
Forth and Clyde Canal which introduce a mixture of uses associated with a leisure
and evening economy, such as recreational activities. These uses will be supported
where they will help to transform this area into a well-used multi-functional Town
Centre that extends a range of activities into the evening and makes the Canal a
focal point for activity, whilst also being complimentary to existing Town Centre uses.
In line with this, the Clydebank Town Centre Development Strategy supports the
transformation of the area around the Forth and Clyde Canal into a focal point and
multi-functional area for recreation which connects people again with the Canal.
Policy FCC1 advises that development alongside the Forth & Clyde Canal should
enhance this green network asset. Development that would have an adverse impact
on the canal or its setting will not be permitted. 
7.4 Policy SC1 advises that proposals for retail, commercial and leisure investment, and
other key Town Centre uses, should align with the sequential approach and the
preferred uses set out in Table 5, which includes Class 11 – Assembly and Leisure.
Developments are directed sequentially to Town Centres in the first instance. 
7.5 Policy GI1 relates to open space and outdoor sports facilities. It advises that
development which would result in the loss of open space which is, or has the
potential to be, of quality and value will not be permitted unless provision of 
additional open space of equal or enhanced quality and value is provided. 
7.6 Policy BE1 advises that where development would adversely affect a scheduled
monument or the integrity of the setting of a scheduled monument, permission would
only be granted in exceptional circumstances.
7.7 Policy CON4 sets out a need for all developments to install sufficient broadband
provisions. 
7.8 Policies ENV1, ENV4, ENV 5 and ENV6 are all similar to the ecology, tree, water
environment and flooding policies of the adopted Local Plan. Policy ENV8 requires
developments to address air quality, lighting and noise as part of the planning
process. 
7.9 Policy RE4 encourages micro-generation and heat recovery technologies within or
associated with individual properties, with Policy RE5 advising that new buildings are
required, as far as possible, to integrate low and/or zero carbon generating
technologies.  
7.10 It is considered that the application complies with the relevant policies above, as set
out in the assessment below. 
Creating Places Planning Guidance and Green Network and Green Infrastructure
Planning Guidance
Page 25

Page 26

7.11 The Creating Places Guidance – November 2022 seeks to achieve high quality
development with a design led approach based on a thorough appraisal of the site
and an analysis of its context and sets out that this is expected for all development
proposals. The Green Network and Green Infrastructure Guidance - November 2022
seeks to ensure that the proposal integrates landscaping and green infrastructure as
part of the setting of the new development and open space created. This will include
a focus on biodiversity enhancement. Following a full assessment, it is concluded
that the proposal presents no conflict with the aims of the guidance. 
Principle of Development
7.12 While the application site is not allocated for a specific use in the Proposals Maps of
the Local Plan and proposed LDP2, it is located in Clydebank Town Centre and
subject to the policy requirements associated with this location. It is considered that a
community focused Activity Hub located adjacent to the Canal would contribute to the
provision of a mix of uses within the Town Centre, thereby improving the vitality and
viability of the Centre. The proposed provision of recreational and educational
opportunities would also promote lifelong learning, health and wellbeing and help
create a multi-functional area that connects people with the Canal. In light of the
above, the principle of development is supported by Policy 15, Policy 21, Policy 23
and Policy 27 of NPF4, Policy RET 5 and Policy R 4C of the Local Plan, and
Clydebank Policy 1, Clydebank Town Centre Development Strategy and Policy SC1
of the proposed LDP2.  
7.13 It is noted that the site, which is comprised of amenity grass, trees and sculptured
seating, has value as open space. While it is not identified as open space in the
Proposals Maps of the Local Plan and proposed LDP2, Policy R 1 and Policy GI1 of
the respective Plans safeguard open space which is, or has the potential to be, of
quality and value. Policy 20 of NPF4 advises that development proposals that result
in the fragmentation or net loss of existing blue and green infrastructure will only be
supported where it can be demonstrated that the proposal would not result in or
exacerbate a deficit in blue or green infrastructure provision, and the overall integrity
of the network will be maintained. With significant areas of similar amenity grassland
located along the canal to the north and east of the application site, it is considered
that the proposal, which would result in approximately a third of the existing open
space being lost, would not result in or exacerbate a deficit in green infrastructure at
this location. It is also considered that a proposal of this nature will enhance facilities
at this location and compliment the wider areas of open and public space that form
this part of the southern canal bank. In this context, the proposal complies with Policy
20 and is acceptable.   
Site Layout, Design and Appearance
7.14 New development requires to be well designed, take cognisance of the setting into
which it is introduced and provide high quality, well designed buildings, whilst
recognising the impact on existing neighbouring properties. 
7.15 The 234sqm building footprint is appropriate relative to the 943sqm site size, with the
single storey scale and linear form aligning with and complimenting the adjacent
cycle path and Canal. The building would have a contemporary and attractive
appearance, with the use of floor to ceiling windows/door, projecting fins infilled with
perforated mesh panels and an overhanding roof providing a good degree visual
diversity and interest. With the front elevation orientated towards the Canal, the
proposal would also provide an active frontage that engages positively with the
Canal. The proposed Green RAL 6003 colour finish would also blend in with the
surrounding greenspace.  
Page 26

Page 27

While samples of the proposed materials and colour finish have not been provided in
advance of the determination of the application, these can be secured through
condition and subject to approval prior to the commencement of development. 
7.16 It is noted that the application does not include information on the provision of low
and/or zero carbon generating technologies, as required by Policy RE5. This matter
can, however, be addressed through condition.   
7.17 Overall, it is considered that the proposal would create a well-designed development
that addresses the six qualities of successful places by having a distinctive identity,
using high quality materials and being well connected and sustainable. As such, it
complies with Policy 15 of the NPF4 and policies GD1, DS1 and CP1 of the adopted
and proposed Plans, alongside the Creating Places Guidance (2022).
Residential Amenity
7.18 The layout and scale of development proposed relative to the proximity of existing
housing raises no concerns with respect to privacy, overshadowing or overbearing
effects. While the development will undoubtedly bring additional activity to the area, it
is unlikely to result in any noise or activity beyond that typically found in a Town
Centre during the day. It is noted that the Activity Centre will not operate before 9am
or beyond 8pm and a condition can be attached to secure these operating hours.
Although it is accepted that the construction phase will produce an element of short
term noise and disruption, the consultation response from the Council’s
Environmental Health Service highlights the requirement for the construction of the
development to be undertaken in a way that ensures that adjacent residential
amenity is not adversely affected, which can be secured through condition.
Trees, Open Space and Landscaping 
7.19 While the submitted Tree Survey identifies eight trees on the site, comprising 2 Wild
Cherry, 3 Norway Maple, 2 Callery Pear and 1 London Plane, it notes that there are
no ancient or veteran trees on the site. Although six trees would need to be removed
to accommodate the development, the proposal complies with Policy 20 and Policy
ENV4 as no ancient or veteran trees or those covered by a TPO would be removed.
It is noted that, following pre-application discussions, the applicant has included a
wild garden as part of the landscaping in an effort to offset the loss of trees. 
7.20 The proposal would provide approximately 630sqm of open space, comprised of
hardstanding and grassed areas. While a detailed landscaping scheme has not been
submitted, a gravel walkway is proposed adjacent to the eastern and southern
elevations, along with a hardstanding area within the northwest extent and a wild
garden adjacent to the southern elevation. The approach outlined is acceptable in
principle and a detailed landscaping scheme can be secured through condition.    
Traffic, parking and road safety
7.21 The proposal raises no concerns with respect to traffic generation and road safety
due to the scale and nature of the development and the excellent public transport
and active travel connections associated with a Town Centre location.  While no
dedicated parking is proposed, it is considered that there is adequate parking within
this Town Centre location. It is also noted that the consultation response from the
Roads service raised no objection in relation to these issues.   
Transport and Connectivity
7.22 With the site being located in the Town Centre, it is accessible to a wide range of
local services and within a 5 min walk of frequent public transport services to centres
across West Dunbartonshire and beyond to Glasgow and Helensburgh. 
Page 27

Page 28

The site is also located adjacent to the NCR 7 cycle path. It is therefore concluded
that the development is provided in an appropriate location within an established
settlement accessible by means other than the private car. 
Flooding and Drainage
7.23 The proposal raises no concerns with respect to flooding as the site is not identified
as being at risk on SEPA’s Flood Maps. The consultation response from the
Council’s Flooding Officer also raised no objection. In relation to drainage, the
application indicates that foul wastewater would be discharged to the public sewer,
with surface water discharged to the canal. While no detailed information on
drainage, including the use of SUDS, has been provided, this matter can be
addressed through condition. The proposal is therefore acceptable, subject to
condition. 
Ecology
7.24 The preliminary ecological appraisal submitted with the application found that the
habitats on the site were of low conservation value, with no evidence of protected
species and limited scope for nesting birds. The appraisal includes a number of
recommendations, such the minimisation of light spill, which can be secured through
condition. The Council’s Biodiversity Officer has no objection to the Preliminary
Ecological Appraisal, but requests that a detailed Landscaping Scheme and
Biodiversity Enhancement Plan be provided, which can again be secured through
condition.   
Cultural Heritage
7.25 A large portion of the application site is located within the Forth and Clyde Canal
Canal: Old Kilpatrick - Linnvale Scheduled Monument, which includes the canal,
towpath and areas to either side in which traces of activities associated with its
construction and use may survive. While Historic Environment Scotland initially
objected to the proposal due to concerns about the potential adverse effects of the
proposal, the objection was subsequently removed after discussions with the
applicant. In light of this, the proposal is acceptable in this context.    
Waste Provision
7.26 The proposal is expected to generate a level of waste commensurate to a community
facility of the scale proposed. A refuse store is proposed within the eastern corner of
the building, which is acceptable.  
8. CONCLUSION
8.1 The proposal is welcomed and would provide a high quality, community focused
activity centre that would contribute to the mix of uses and vitality of the Town Centre
and help connect people with the canal, without any detrimental effects on local
amenity. 
8.2 The proposal presents no conflict with the policy requirements of NPF4, the adopted
Local Plan, the proposed Local Development Plan 2 and associated Planning
Guidance.
9. CONDITIONS
1. Prior to the commencement of development on site, exact details and samples of all
proposed external materials shall be submitted to and approved in writing by the
Planning Authority. Thereafter, unless otherwise agreed in writing with the Planning
Page 28

Page 29

Authority, the development shall be completed in strict accordance with the approved
material details and palette.
2. Prior to the commencement of development on site, full details of all hard surfaces
shall be submitted for the further written approval of the Planning Authority. The
development shall thereafter proceed in accordance with the approved details.
3. Prior to the commencement of development on site, a detailed soft landscaping plan
shall be submitted to and approved in writing by the Planning Authority. Thereafter,
unless otherwise agreed in writing with the Planning Authority, the development shall
be completed in strict accordance with the approved plan.
4. Prior to the commencement of development on site, a Biodiversity Enhancement
Plan setting out how the proposal enhances biodiversity beyond the current baseline,
together with the implementation on site, shall be submitted to and approved in
writing by the Planning Authority. Thereafter, unless otherwise agreed in writing with
the Planning Authority, the development shall be completed in accordance with the
approved plan.
5. The approved hard and soft landscaping and all associated approved planting details
shall be implemented within a timescale to be agreed with the Planning Authority
prior to the commencement of works on site.
6. That any trees, shrubs or areas of grass which die, are removed, damaged or
become diseased within five years of completion of the landscaping shall be replaced
within the following year with others of a similar size and species.
7. All recommendations within the Preliminary Ecological Appraisal dated August 2022
and hereby approved, shall be implemented in full to the satisfaction of the Planning
Authority.
8. That prior to the commencement of works on site, full details of the proposed
drainage regime, inclusive of calculations and overland flow details, shall be
submitted to and approved in writing by the Planning Authority. The drainage regime
shall then be implemented and maintained as approved at all times thereafter.
9. That all surface water shall be intercepted within the site both during construction and
on completion of the development and full details of measures to ensure that surface
water run-off is contained within the site shall be submitted to and approved in writing
to the Planning Authority prior to the commencement of any works on site. The
measures shall be implemented and maintained as approved.
10. Prior to the operation of the Activity Centre, the developer shall install the necessary
infrastructure to enable the development to be connected to the existing fibre optic
network, where available in West Dunbartonshire, and in accordance with the
relevant telecommunications provider’s standards.
11. Prior to the commencement of any works on site, full details of the incorporation of
low and/or zero carbon technologies shall be submitted to and approved in writing by
the Planning Authority. Thereafter the development shall be undertaken in
accordance with the approved details.
12. The development hereby approved shall only operate between the hours of 9am-8pm
Mon-Fri, unless otherwise agreed in writing by the Planning Authority.
Page 29

Page 30

13. During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following hours
unless otherwise approved in writing by the Planning Authority:
• Mondays to Fridays: 0800 – 1800
• Saturdays: 0800 – 1300
• Sundays and public holidays: No Working
Alan Douglas
Chief Officer – Regulatory and Regeneration
Date: 5th June 2024
Person to Contact: James McColl, Development Management Team Leader
James.McColl@west-dunbarton.gov.uk 
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Consultation responses
3. National Planning Framework 4
4. West Dunbartonshire Local Plan 2010
5. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
6. ‘Green Network and Green Infrastructure’ Planning
Guidance (2022)
7. Creating Places Planning Guidance (2022)
Wards affected: Ward 5 (Clydebank Central)
Page 30

Page 31

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 22/05/2024.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:1,250@A422/05/2024
DC23/086/FUL - MapWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
ITEM 5a  -  APPENDIX 1
Page 31

Page 32

Page 32

Page 33

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 5th June 2024
_____________________________________________________________
DC23/039/FUL: Installation of driveway (Retrospective) at 49 Briar Drive,
Clydebank by Mr Steven Messenger
1. REASON FOR REPORT
1.1 The application is subject to an objection from another Council Service. Under the
terms of the approved Scheme of Delegation, the application therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 Refuse planning permission for the reasons set out in Section 9.
3. DEVELOPMENT DETAILS
3.1 The application site comprises a residential flat and associated garden ground within
a two storey, four in a block arrangement situated on the western side of Briar Drive
in Clydebank. Externally the flats are finished in a grey render for the external walls
and a grey tiled roof. There are front and rear garden areas for the flatted properties.
The property is situated within a well-established residential area with a variety of
dwellings of a similar design theme lying adjacent.
3.2 A driveway has been created to the front of the flat. The driveway extends across the
whole of the front garden area of the flat measuring approximately 9.6m in width. The
depth of the driveway measures 4.1m within the monoblocked area with a gravelled
sloped area beyond which creates a level platform for the driveway due to the slightly
sloping nature of the site. Both the monoblock and gravel are grey in colour. Two
paths remain on site with the most northern path retaining step-free access to the
properties. The area to the front of the properties was previously grassed with a low-
level hedge as a boundary treatment. As the works have already been carried out,
the application is considered in retrospect.
3.3 An electric vehicle charging point has been attached to the front of the building
however, this in itself does not require the benefit of planning permission.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service object to the proposal on the basis that
the driveway is only 4.1m in depth.
5. REPRESENTATIONS
5.1 Two objections have been received from nearby residents. The full details are
contained within the planning file and are available for public viewing. However, the
concerns raised can be summarised as follows:
ITEM 5b
Page 33

Page 34

• Object on health and safety grounds.
• The permission is retrospective.
• The car will be near the window of neighbouring properties.
• The driveway may restrict parking for other residents.
• The access is communal.
• The disabled parking bay post has been moved.
• The company who installed the driveway is not certified.
• The driveway does not have sufficient foundation and is sinking in places.
• A dropped kerb has not been formed to access the driveway.
• Electric cars are known to go on fire and this constitutes a hazard.
• There is a charging point which has not been checked if it is a fire risk.
The concerns raised shall be assessed in the Section 7 below.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
6.1 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the global
climate and nature crises. Development proposals will be designed to improve the
quality of an area whether in urban or rural locations and regardless of scale as per
Policy 14. Development proposals that are poorly designed, detrimental to the
amenity of the surrounding area or inconsistent with the six qualities of successful
places, will not be supported in accordance with Policy 14. Policy 16 supports
householder development proposals where they do not have a detrimental impact
upon the character of the property and surrounding area, and do not have a
detrimental effect upon neighbouring properties.
6.2 The matters relevant to the assessment against the above policies are addressed in
detail in Section 7 below. Based on that assessment, it is concluded that the proposal
is not in accordance with NPF4.
West Dunbartonshire Local Plan 2010
6.3 Policy GD1 seeks to ensure that all new development is of a high quality of design
and respects the character and amenity of the area. The requirement for proposals to
be appropriate to the local area inclusive of design and the effect on privacy is
highlighted. Considering residential amenity, Policy H5 seeks to protect, preserve,
and enhance the residential character and amenity of existing residential areas at all
times.
6.4 The proposal does not comply with the policies of the adopted Local Plan and is
assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would
not adopt Local Development Plan 2. The Proposed Local Development Plan 2
(LDP2), incorporating the recommended modifications of the Examination Report
received on 22 April 2020, which were accepted by the Planning Committee of 19
August 2020, remains the Council’s most up to date spatial strategy and is therefore
afforded significant weight in the assessment and determination of planning
applications, subject to compatibility with NPF4. 
Page 34

Page 35

The Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18
December 2020, is also a material consideration, although it does not directly affect
the development proposal under consideration.
7.2 Policy CP1 of LDP2 seeks to ensure that all development takes a design lead
approach and seeks to protect and enhance the amenity of existing communities.
Policy H4 sets out that that the Council will protect, preserve, and enhance the
residential character and amenity of existing residential areas at all times. It is
considered that the proposal is not in accordance with the relevant policies of LDP2.
Principle of Development
7.3 The creation of a driveway within the front curtilage of a flatted property situated
within an established residential area is acceptable in principle, subject to all material
considerations being addressed. This type of development is commonly found within
residential areas and with the facility to charge electric vehicles, the proposal would
be considered to, in a small way, support tackling the climate emergency. It therefore
rests to consider if there are any material planning considerations that would result in
the proposal being unacceptable. 
Visual Appearance
7.4 The driveway, whilst wide in nature and covering the whole of the front garden area
of the flat, does not cover the whole of the frontage of the plot. An area of green
remains to the south of the site which is outwith the development area. The colour
and material choices of grey monoblock and gravel are in keeping with the varied
colour palette of the surrounding area, with other monoblocked driveways being
present within close proximity. On balance, it is considered that the visual
appearance of the driveway that has been formed is acceptable within the context of
the area. 
Traffic and Road Safety Matters
7.5 In assessing whether any road safety concerns arise in respect of the driveway that
has been formed, the Council’s Roads Service have been consulted on the
application proposal. The Roads Service have concerns regarding the depth of the
driveway which is 4.1m from the heel of the footway to the rear of the monoblocked
area of the driveway. They consider this to be unacceptable and have objected to the
application on this basis. This is due to 4.1m not being a sufficient depth to park a car
which could result in the footway being obstructed, forcing pedestrians and, in
particular, wheelchair users and those with prams onto the public road. 
7.6 The Road’s Service advise that a minimum driveway length of 5 metres is generally
required to ensure a vehicle does not overhang the footway. This is not achieved by
the driveway already constructed on site. Whilst it is accepted that cars which are
less than 4.1 metres in length are available, family cars generally exceed this
dimension. This includes a Ford Focus at 4.4 metres in length and a Kia Sportage at
4.5 metres in length. It is not considered that a condition restricting the type and
dimension of vehicle that could be parked on the driveway would be reasonable.
Such a condition would also likely be impossible to enforce. Given this and being
guided by the objection from the Council’s Road Service, the proposal is considered
to be unacceptable with reference to the potential implications for pedestrians using
the footway and implications for road safety.
7.7 Concerns are raised in the objections in respect of the implications of the driveway
on the availability of street parking. The Council’s Roads Service, however, does not
object to the proposal on this basis. 
Page 35

Page 36

The requirement for a footway crossover and dropped kerb or any works to be
undertaken to the public road would be a matter to be addressed by the Roads
Service via separate legislation. The disabled parking bay sign being moved to
accommodate the driveway is not a planning matter. The disabled bay which the sign
relates to remains in place on the street and it is noted the driveway and disabled bay
overlap. This would, however, be a matter to also be addressed by the Roads
Service via separate legislation.
Impact on Residential Amenity
7.8 The driveway is located adjacent to the windows of the downstairs property. Whilst
movement and noise will be brought slightly closer to the property than has been
previously experienced with cars parking on the adjacent road, it is not considered
that this will unacceptably disturb the amenity of the neighbouring property to an
extent that would justify the refusal of the application. The retention of the path
between the driveway and the building provides some separation between the
driveway and the downstairs property. 
7.9 In addition to the road safety matters discussed above, the depth of the driveway
also raises concerns regarding the impact on the wider amenity of the surrounding
residential area and impacts upon the ability for people to easily move around the
area and this is not consistent with the six qualities of successful places. As there is
no space in which to lengthen the driveway within the confines of the site, users of
the pavement may be forced to leave the public footway in order to pass vehicles
overhanging the public footway. 
Representations Received
7.10 Turning to the outstanding points raised in the submitted objections which have not
been assessed above. Many of the points raised in the objection are not material
planning considerations. These include the land being communal, the company who
installed the driveway not being certified and the quality of the work undertaken.
Reference has also been made to a perceived fire risk posed by electric charging
points and/or cars but there is no evidence to suggest that the proposal would
represent a fire risk. The retrospective nature of the application has also been noted;
however, the planning system does allow for retrospective applications, and this
cannot be a determining factor. 
8. CONCLUSION
8.1 This retrospective application for the creation of a driveway raises concerns relating
to the amenity of the surrounding residential area in which users of the footway could
be forced off the public footway due to insufficient parking space within the off-street
area causing vehicles to overhang the footway. This impacts upon the ability for
people to easily move around the area and this is not consistent with the six qualities
of successful places. The Council’s Roads Service have also objected to the
proposal due to 4.1 metre depth of the driveway not being sufficient to park a car on.
This would result in vehicles potentially overhanging and obstructing the footway and
forcing pedestrians, and in particular wheelchair users and those with prams onto the
public road. 
8.2 The proposal is therefore not supported by Policies GD1 and H5 of the adopted West
Dunbartonshire Local Plan, Policies CP1 and H4 of the proposed West
Dunbartonshire Local Development Plan 2 or Policies 14 and 16 of National Planning
Framework 4. 
Page 36

Page 37

9. REASONS FOR REFUSAL
1. The development does not provide sufficient depth in which to park a vehicle off-
street which will result in pedestrians and, in particular, wheelchair users and
those with prams to be unable to use the public footway. As such the
development is contrary to Policy 14 of NPF4, Policy GD1 of the adopted West
Dunbartonshire Local Plan and Policy CP1 of the West Dunbartonshire Local
Development Plan 2 which requires proposals to improve the quality of an area
and to be supported by the six qualities of successful places.
2. The proposal is contrary to Policy 16 of NPF4, Policy H5 of the adopted West
Dunbartonshire Local Plan and Policy H4 of the West Dunbartonshire Local
Development Plan 2 due to the disruption to the residential amenity of the area
resulting from the potential obstruction of the footway.
3. The proposal would potentially bring pedestrians and vehicles into conflict, to the
detriment of road and pedestrian safety.
Alan Douglas
Chief Officer – Regulatory and Regeneration 
Date: 5th June 2024
______________________________________________________________
Person to Contact: James McColl, Development Management Team Leader
James.McColl@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Representations
3. Consultation response
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
Wards affected: Ward 5 (Clydebank Central)
Page 37

Page 38

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 22/05/2024.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:1,250@A422/05/2024
DC23/039/FUL - MapWest Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
ITEM 5b - APPENDIX 1
Page 38

Page 39

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 5th June 2024
_____________________________________________________________
Subject: Masterplan Consent Areas - Statement of Consideration
1. Purpose
1.1 To seek the agreement of the Committee to issue the Statement of
Consideration in relation to Masterplan Consent Areas.
2. Recommendations
2.1 It is recommended that the Committee agree the proposed Council
Statement of Consideration set out at 4.3 below.
3. Background
3.1 The Planning (Scotland) Act 2019 introduced Masterplan Consent Areas
(MCAs) as a new proactive consenting mechanism.
3.2 The Council will in future be able to use prepare Masterplan Consent Area
schemes as part of a placemaking approach to planning and consenting. It
is a new way for the Council to shape new development in our area –
enabling the type and quality of development we wish to come forward
through a consenting masterplan, and to support delivery of development
that can support local needs, priorities and outcomes.
3.3 Unlike planning applications which are typically led by a developer, the
preparation of MCA schemes will be led by the planning authority, but can
be taken forward through collaboration.
3.4 The new provisions will allow the Council to prepare a MCA ‘Scheme’
setting out for particular places, the detail of what they are giving consent
for, through the MCA scheme. There will be requirements for publicity and
consultation on individual schemes.
ITEM 6
Page 39

Page 40

3.5 MCA schemes can streamline consent, allowing issues to be considered
as part of a joined up approach, they can grant:
• planning permission,
• roads construction consent,
• listed building consent, and
• conservation area consent.
3.6 Within adopted MCA areas, development could be brought forward without
the need for a full application as long as it is in line with the agreed
scheme.
3.7 More details about Masterplan Consent Areas are available in the
Consultation Paper on the draft MCA Regulations – the Scottish
Government’s consultation closed on 22 May 2024, a response to which
was approved by Planning Committee on 8 May 2024.
4. Main Issues
Consideration of the Duty to periodically consider making MCA schemes
4.1 Part 2 of the 2019 Act (Section 15) sets out the legal framework for
preparing MCAs. The full provisions from the Act relating to MCAs and the
associated regulations are not yet in force. We anticipate the MCA
provisions being fully in place later in 2024.
4.2 However, Schedule 5A Paragraph 5 is in force and requires planning
authorities to consider whether it would be desirable to make a scheme for
a part or parts of their district, and to publish a statement as to their
consideration of that, by 25 July 2024.
4.3 As the MCA regulations are not yet in place, we have not yet identified or
assessed potential locations for which it may be desirable to bringing
forward an MCA scheme. We intend to reconsider this once the legal basis
for preparing MCAs is in place.
4.4 The Scottish Government has indicated that MCAs could be used to
support delivery of the local development plan. We will consider whether it
would be desirable to make any Masterplan Consent Areas as part of our
work on delivery linked to the Local Development Plan’s Delivery
Programme.
4.5 This Statement fulfils the Council’s legal requirements under Schedule 5A
Paragraph 5 of the Town and Country Planning (Scotland) Act, as
amended.
Page 40

Page 41

5. People Implications
5.1 There are no personnel issues associated with this report.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications associated with this
report.
7. Risk Analysis
7.1 There are no risks associated with this report.
8. Equalities Impact Assessment (EIA)
8.1 EIA 1009: The statement does not have any relevance to the four areas, it
is screened out as not relevant therefore no EIA is required.
9. Consultation
9.1 Planning officers have discussed the statement with colleagues in
Regeneration and Housing and attended Heads of Planning Scotland
events to discuss the proposed Masterplan Consent Areas Regulations.
10. Strategic Assessment
10.1 Masterplan Consent Areas will be of relevance to the following strategic
priorities:
• A strong local economy and improved employment opportunities –
through setting planning policy for housing and economic development
within a wider framework which has addressing climate change and
nature recovery as primary guiding principles.
• Meaningful community engagement with active empowered and
informed citizens who feel safe and engaged – through setting
guidance for when and how communities should be engaged in the
development planning process.
Page 41

Page 42

Alan Douglas
Chief Officer – Regulatory and Regeneration
Date: 5th June 2024
_________________________________________________________________
Person to Contact: Matthew Spurway, Development Planning & Place
Officer
Matthew.Spurway@west-dunbarton.gov.uk
Appendix: None
Background Papers: Masterplan consent area regulations: consultation 
https://www.gov.scot/publications/masterplan-consent-
areas-consultation-draft-regulations/
Equalities Impact Assessment 1009
Wards Affected: All
Page 42