Democracy Spraffa

Item 8 - S36 Consultation DC25.019.S36

West Dunbartonshire Council · 14 January 2026
Back to Planning Committee — 14 January 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 14th January 2026
_____________________________________________________________
DC25/019/S36: Battery energy storage facility consisting of compound of
batteries and associated electrical equipment, stores, access
track, buildings, fencing, pond, bunds and new planting at
Braidfield Road, Hardgate, Clydebank by Braidfield Battery
Storage Limited
1. REASON FOR REPORT
1.1 To agree the Council’s response to a consultation received from the Scottish
Government Energy Consents Unit on behalf of the Scottish Ministers regarding a
proposed battery energy storage system with a generating capacity of up to 100
megawatts. Given the nature of the proposal, this requires to be agreed by Planning
Committee.
2. RECOMMENDATION
2.1 It is recommended that the Committee agrees the position set out in Section 10 of this
report and submit this report to the Scottish Ministers as presenting the Council’s full,
formal response to the consultation advising of the Council’s objection based on the
application submission as it stands.
3. BACKGROUND
3.1 The Scottish Ministers have received an application under Section 36 of the Electricity
Act 1989 for the construction and operation of a battery energy storage system (BESS)
with a generating capacity of up to 100 megawatts (MW) on a site at Braidfield Farm,
Clydebank. The application site is located within the West Dunbartonshire local
authority area however, the assessment of the submitted application is undertaken via
the Scottish Government Energy Consents Unit for the Scottish Ministers. In Scotland,
any proposal to construct and operate an onshore electricity generating station with a
capacity of over 50 megawatts (as is the case with this proposal) requires the consent
of Scottish Ministers under Section 36 of the Electricity Act. Such applications are
processed on behalf of the Scottish Ministers by the Scottish Government Energy
Consents Unit. Due to the Scottish Ministers being the decision makers,
representations from members of the public and other agencies are made directly to
the Energy Consents Unit. The application is referred to under the project name of the
Braidfield BESS. The location of the site is shown in Appendix 1.
3.2 A date of 19th January 2026 has been agreed with the Scottish Government Energy
Consents Unit for the submission of the Council’s consultation response. The
application documents are available to view via the Energy Consents Unit website at
www.energyconsents.scot and by searching the project name ‘Braidfield’.
3.3 The Council is a formal consultee in this process. In procedural terms, the Council as
Planning Authority requires to provide a response to the Scottish Ministers. In this
regard, the Council in response to the consultation can:
ITEM 8

Page 2

(i) Offer no objection to the Section 36 application as submitted; or
(ii) Offer no objections subject to the imposition of appropriate conditions and/or
legal obligations it considers necessary to make the development acceptable;
or
(iii) Object to the application, stating the grounds on which objection is made.
3.4 Should the Scottish Ministers be disposed to grant a Section 36 consent for the
proposed development, the Town and Country Planning (Scotland) Act allows the
Scottish Ministers to direct that planning permission for that development and any
ancillary development shall be deemed to be granted.
4. DEVELOPMENT DETAILS
4.1 The application site is situated to the to the east of Braidfield Farm, Clydebank and
extends to approximately 2.13 hectares (excluding access track from Braidfield Farm).
Whilst in close proximity to the urban area, the site itself lies within open countryside
comprising part of the Green Belt as defined by both the adopted West Dunbartonshire
Local Plan and proposed Local Development Plan 2. To the west, the site is defined
by an existing rough track which forms part of Core Path 150. To the north, south and
east, the site adjoins existing grazing land. A private section of Braidfield Road leading
from the existing steading to the development is also included within the application
site. Excluding the access road, the site boundaries are defined by a combination of
existing hedgerows and post and wire fencing. Currently the land is utilised as a
paddock for grazing horses. The main part of the site (excluding the access road) is
positioned around 150 metres from the farmhouse at Braidfield Farm and around 250
metres from the next closest residential properties at Braidfield Road, Braidfield Grove
and Strathdee Avenue. The Antonine Wall is located 130 metres to the north of the site
and the site itself lies wholly within the Antonine Wall buffer zone, which is identified
along much of the Wall, protecting its setting.
4.2 The proposal is for a 100MW Battery Energy Storage System facility and associated
infrastructure. Whilst supporting documents reference the eventual decommissioning
of the site, the expected operational period is not clear.  The proposed development
would comprise 108 battery units and 135 power convertors. The battery units will take
the form of metal units not dissimilar in appearance to a shipping container and would
be 8.5 metres by 1.7 metres by 1.8 metres high. They would be designed with vents
for cooling. Power convertors would be sited by each group of batteries and take the
form of a series of metal cabinets. Transformers would also be positioned adjacent to
the power convertors and take the form of large items of electrical equipment to a
height of around 3 metres. A total of 27 transformers is proposed. It is further proposed
to erect a control room to house a variety of equipment. This would be designed with
a flat roof and extend to around 13 metres by 6 metres by 4 metres high. The
transmission area would feature a similar building together with an electrical
transformer, electrical disconnector and associated equipment with a height of up to 7
metres. Two storage containers are also proposed to house spares and equipment.
These will be 8.5 metres by 1.7 metres by 1.8 metres high.
4.3 The site will be enclosed by a two-metre-high weldmesh fence with barbed top and it
is indicated that this would be situated behind a hedgerow. Security cameras to a
height of 4 metres will be provided. No permanently illuminated nighttime lighting is
proposed with external lighting indicated to be for use during maintenance in the hours
of darkness only. Infrared security lighting will be provided but this is not visible to the
eye. The site will be levelled, and landscape bunds are proposed wrapping around the
southern, western and northern boundaries of the compound. These are indicated to
be between 1 and 3 metres in height. Drainage will be addressed via a sustainable

Page 3

drainage scheme (SuDS) employing a gravity-based outflow to a nearby existing
drainage ditch which subsequently drains to Cleddans Burn. The existing farm track
from Braidfield Farm is included in the application site and it is indicated this will be
refurbished in unbound material. Tracks within the site will be formed in aggregate.
Parking and turning will be provided for any maintenance vehicles visiting the site.
4.4 New planting is proposed as part of the development with the applicant indicating that
this will create new biodiversity habitat and also form a screening function which will
compliment the existing retained hedgerows. It is indicated that this planting will
comprise a mix of predominantly native hedgerow and broadleaf species together with
areas of wildflower meadow. The applicant indicates that the final landscaping plan
would be agreed with the Council prior to construction in the event that consent was
granted.
4.5 The applicant sets out that a 50MW capacity facility was originally considered for the
site, expecting to connect at the Kilbowie Grid Supply Point on Milton Mains Road, at
the voltage of 33kV. However, the Distribution Network Operator could not
accommodate this and an alternative 132kV connection was offered at Windyhill
Substation around 1.5kms to the northeast of the site, and this dictated a change in
site capacity to 100MW. It is indicated that the development would connect to Windyhill
Substation via buried cables although the grid connection does not form part of this
application.
4.6 The proposal is informed by a range of supporting documentation including a planning
statement, design and access statement, landscape report with associated figures and
viewpoints, drainage report, ecology report, biodiversity report, heritage report and
noise assessment.
5. CONSULTATIONS
5.1 The Council is a consultee in the Section 36 application process and therefore
consultation by the Council is limited to Council Services. However, a summary of the
wider consultation responses received by the Scottish Government Energy Consents
Unit is also included below, as these are also relevant to the assessment of the
proposal to inform the response by the Council.
West Dunbartonshire Council consultation replies:
West Dunbartonshire Council (Roads Service) (roads, traffic and flooding matters)
5.2 No objections on roads or flooding grounds. The requirement for notification of the
commencement of works, abnormal load movements and pre and post development
inspections of the public road network are identified by Roads, together with the
requirement to ensure road sweeping if required, that surface water is not discharged
to the public road and that the access to the site is hard surfaced for the first 12 metres
and that any gates are set back from the public road by at least 12 metres.
West Dunbartonshire Council (Environmental Health Service)
5.3 No objections. A range of matters are recommended to be addressed by condition
including a variety of matters relating to the construction phase inclusive of hours of
works and also in respect of possible site contamination and ground conditions
together with conditions relating to noise matters during the operational phase of the
development.

Page 4

Biodiversity Officer
5.4 No objections. The applicant’s submissions, methodology and approach undertaken is
accepted and it is specifically noted that additional caution has been taken in respect
of the camera monitoring. A cautionary position in respect of watervole is
recommended. The Preliminary Ecological Appraisal dating from 2022 is noted as
being longer than is usually accepted for such to remain accurate in its findings and it
is recommended that the document is updated. The proposed biodiversity
enhancements are accepted and welcomed. 
Scottish Government Energy Consent Unit consultation replies:
West of Scotland Archaeology Service
5.5 The proposal would be located around 130m to the south of the line of the Antonine
Wall itself but would be wholly located within the buffer area defined in relation to the
monument in the World Heritage Site designation. It is agreed that the development
would be unlikely to have direct impacts on the World Heritage Site, at least in terms
of archaeological material present along the line of the wall itself, though there would
be a clear potential for sub-surface archaeological material to survive in the area
adjacent to the frontier.
5.6 The proposal would introduce a new modern element into the setting of the monument.
There are concerns as to whether the visualisations submitted provide an adequate
picture of the degree to which the proposal would be visible from the World Heritage
Site.  It is advised that the applicant should be asked to provide at least one additional
visualisation taken from the line of the Antonine Wall in the area immediately to the
north of the of the site.
5.7 In the event that the Energy Consents Unit intends to grant permission, a condition
should be attached to secure completion of the programme of mitigation works set out
in the Heritage Assessment
Historic Environment Scotland
5.8 Initially objected noting that the application did not include an appropriate heritage-led
analysis of the setting and potential impacts on the setting of the Antonine Wall World
Heritage Site and scheduled monument Antonine Wall and fortlet, 950m W to 335m
ENE of Cleddens (SM6836), and that there was insufficient information to adequately
assess the impact of the proposals.
5.9 Whilst the applicant has not provided an updated Heritage Impact Assessment
following the submission of revised planting proposals, a site visit, updated plans and
submitted visualisations have allowed HES to carry out their own assessment of the
impacts of the proposed development on the setting of the Antonine Wall WHS and
scheduled monument.
5.10 The proposed development is unlikely to appear in views as you travel along this
section of the WHS and scheduled monument, and therefore the revised proposals
would not interfere with how the WHS is understood as a linear monument and can be
appreciated in the landscape.  It is concluded that key views and relationships would
be retained.
5.11 It is confirmed that the proposal would not have a significant adverse impact the
integrity of setting of the scheduled monument (SM6836) and Antonine Wall WHS to
such a level that HES would object. Conditions are recommended in relating to the
planting proposals.

Page 5

NatureScot
5.12 No negative impacts on national or international protected areas are anticipated from
the proposed development. With the proposed mitigation and enhancement measures
recommended in the Preliminary Ecological Assessment and biodiversity report in
place, the proposal will not give rise to adverse impacts on any natural heritage
interests of national or international importance. Pre-construction surveys may be
required to ascertain the presence of protected species. Further general advice is
provided in the response.
East Dunbartonshire Council
5.13 No objection.
Glasgow City Council
5.14 No objection.
Scottish Forestry
5.15 The site map shows that the development site is primarily an area of pasture
surrounded by hedging with a few trees contained within. The proposal does not
appear to include any permanent removal of trees. New woodland planting as
proposed is welcomed. It is expected that all trees and woodland on the site be
protected. If trees are to be permanently removed, conditions relating to compensatory
planting are recommended.
Coal Authority
5.16 There are no records of the presence of any coal mining features within the site which
may pose a risk to surface stability. No objections
Ministry of Defence (MOD)
5.17 No objections
BT
5.18 This proposal should not cause interference to BT’s current and presently planned
radio network. No objections.
Scottish Environmental Protection Agency (SEPA)
5.19 No objections.
Scottish Water
5.20 No objections
Office for Nuclear Regulation
5.21 No comments to make on the proposal
HSE
5.22 The development is not located in any consultation zones and does not comprise
hazardous substances. No further comments on the proposal. 
NATS
5.23 No objections.
SGN
5.24 No objection.

Page 6

Transport Scotland
5.25 Based on the review undertaken, there is no objection to the development in terms of
potential environmental impacts on the trunk road network. Conditions are required in
respect of a variety of matters including matters relating to abnormal roads on the trunk
road network and the requirement for a Construction Traffic Management Plan.
Glasgow Airport
5.26 No objections subject to conditions relating to details of soft and water landscaping and
a bird hazard management plan.
Parkhall Community Council
5.27 The Community Council object to the proposal for a variety of reasons. These include
fire risk, concerns regarding ground stability from historic mining, road access and use
of residential streets to access the site, and that the route of the connector to the
Windyhill Substation not having been finalised.
Linvale and Drumry Community Council
5.28 The Community Council object to the proposal for a variety of reasons. These include
the facility not being required and BESS applications being oversubscribed, safety
concerns regarding hydrogen fluoride, fire safety concerns, noise and pollution to local
residents, traffic, visual impact, impacts upon wildlife and local biodiversity.
6. REPRESENTATIONS
6.1 At the time of writing, the Scottish Government’s Energy Consents Unit have advised
that 2581 representations have been received in connection with the proposal. 25 of
these are in support and 256 are in objection. However, the Energy Consents Unit
further advises that a number of these submissions were late and it will be up to the
Scottish Ministers as to whether any late submissions are taken into account. Copies
of these representations are provided on the Energy Consents Unit website case file
however the points raised can be summarised as follows:
In objection
 The proposal does not accord with the development plan
 There are no known grid stability issues that the proposal requires to address
 The development will adversely impact upon the Antonine Wall, the setting of the
roman frontier and associated archaeology
 Loss of view would occur
 Impact upon good quality agricultural land
 Lithium battery storage systems are hazardous and present a fire risk with
associated pollution.
 Safety hazards have not been fully considered
 There is no suitable access to the site for heavy vehicles
 The development of the site will cause two years of local disruption,
 Local businesses will see a drop in trade resulting from disruption associated with
the development
 The development may prevent local inward investment
 No local employment will create during the operational period
 No community benefit is proposed
 The development is speculative
 The grid connection works will cause considerable local disruption
 The proposal is unacceptably close to local schools and residents
 Community health, safety and wellbeing will be adversely impacted upon
 The use of Core Paths will be lost during construction

Page 7

 Supporting documents are inaccurate and misleading
 Press advertisements were not in prominent locations in the local press
 Neighbour notification was not undertaken
 The content of the consultations responses from SEPA and HSE are not
acceptable
 Concerns regarding the integrity of the applicant
In Support
 The development would be good for the area
 cheaper electricity may result
 Environmental benefits would occur
 The development would benefit the local community and support children’s futures
 The aim for sustainable places to be created will be supported
 The development will lower carbon impact and reduce the use of fossil fuels
 local authorities require to support renewable energy
 Jobs will be provided by the development
 The banking of renewable electricity generation energy should be supported
6.2 Whilst many of the points raised both in objection and in support are considered as
part of the Council’s wider assessment of the proposal as set out in Section 8 below, it
is for the Scottish Ministers as the determining authority to consider the representations
submitted to them.
7. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
7.1 NPF4 aims to create places in line with six overarching spatial principles, including the
Just Transition and Rebalanced Development. The Just Transition directs
development towards achieving the transition to net zero in a way that is inclusive and
fair. Rebalanced Developments directs development to areas of past decline, which
would include West Dunbartonshire, given the de-industrialisation that has taken place
in the area. While these are high level principles, they are cross cutting and NPF4
contains a clear steer that outcomes of Policy 1, Policy 2, Policy 11 and Policy 25 are
interlinked.
7.2 Strategic Renewable Electricity Generation and Transmission Infrastructure is a
Scotland wide national development (National Development 3), making it a clear
priority across Scotland. Regional Spatial Priorities for the Central Region also direct
development to “provide net zero energy solutions” and to “build community wealth to
overcome disadvantage”. These high level aims and connections between policies
should be considered by the decision maker.
7.3 Policy 1 gives significant weight to the climate and nature crisis, with an intended Policy
outcome of being zero carbon and nature positive. Renewables, including onshore
wind and battery storage, are considered an important part of Scotland’s approach to
meeting its carbon emission reduction targets. Policy 2 requires development to
minimise the lifecycle greenhouse gas emissions of development as far as possible. A
development that relates to renewable energy development draws strong support from
these policies.
7.4 Policy 3 requires development to contribute to biodiversity enhancement, including the
restoration of degraded habitat and improving connections between them. As a
national development part b) of the Policy applies. Part d) of this Policy also applies,
requiring the planning and design of development to minimise adverse impacts,

Page 8

including cumulative impacts, of the development on biodiversity and the natural
environment. The approach to biodiversity enhancement accords with this Policy.
7.5 Policy 4‘s intent is to protect, restore and enhance natural assets making best use of
nature-based solutions. Development which impacts upon landscape designations or
nature conservation and protected species is not supported if significant effects would
occur. It is concluded that the proposal does not conflict with this Policy
7.6 Policy 5 relates to soils and Policy 6 supports proposals that enhance, expand or
improve woodland and tree cover. The development is considered acceptable with
reference to these policies.
7.7 Policy 7 requires development with potential impacts on historic assets or place to be
accompanied by an assessment of that asset or place, including cumulative impacts.
With the potential to impact upon the Antonine Wall World Heritage Site part l) of the
Policy is of particular relevance as this requires development proposals to protect and
preserve the historic asset. There are serious concerns in terms of the impact upon the
setting of Wall, and the proposal cannot be held to be supported by this Policy.
7.8 Proposals within a Green Belt are covered in Policy 8. Development proposals within
a Green Belt designated within the LDP will only be supported in a limited set of
circumstances including for essential infrastructure. The proposal falls into the
definition of essential infrastructure. However, it is not considered that the applicant
has sufficiently demonstrated that there are no sites outside the Green Belt for this
development and this conflicts with the requirements of the Policy.
7.9 Policy 11 relates to energy, and the Policy intent is to encourage, promote and facilitate
all forms of renewable energy development onshore and offshore. This includes
energy generation, storage, new and replacement transmission and distribution
infrastructure and emerging low-carbon and zero emissions technologies including
hydrogen and carbon capture utilisation and storage (CCUS). Part a) supports
proposals for renewable technologies, including battery storage under section iii.
7.10 Part c) of Policy 11 requires renewable development to maximise economic impact,
including local and community socio-economic benefits. Part e) of the Policy requires
the project design and mitigation to address a number of issues. In considering the
impacts significant weight is placed on the contribution of the proposal to greenhouse
gas emission reduction targets. Impacts to be addressed are:
i. impacts on communities and individual dwellings, including, residential amenity
and visual.
ii. significant landscape and visual impacts.
iii. public access, including impact on long distance walking and cycling routes and
scenic routes.
iv. impacts on aviation and defence interests including seismological recording.
v. impacts on telecommunications and broadcasting installations, particularly
ensuring that transmission links are not compromised.
vi. impacts on road traffic and on adjacent trunk roads, including during
construction.
vii. impacts on historic environment.
viii. effects on hydrology, the water environment and flood risk.
ix. biodiversity including impacts on birds.
x. impacts on trees, woods and forests.
xi. proposals for the decommissioning of developments, including ancillary
infrastructure, and site restoration.

Page 9

xii. the quality of site restoration plans including the measures in place to safeguard
or guarantee availability of finances to effectively implement those plans.
xiii. cumulative impacts.
It is concluded that the proposal can be justified against the above criteria as fully
assessed in Section 8 of this report.
7.11 Policy 12 requires development to reduce, reuse or recycle materials in line with the
waste hierarchy. It also supports developments that enable materials and components
to be disassembled and reused at the end of their life and Policy 13 supports
development where it is demonstrated that transport requirements satisfactorily
addressed. No concerns arise in respect of these policies.
7.12 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale as per Policy 14. Development
proposals that are poorly designed, detrimental to the amenity of the surrounding area
or inconsistent with the six qualities of successful places, will not be supported in
accordance with Policy 14. No concerns arise in respect of this Policy.
7.13 Policy 18’s intent is to encourage, promote and facilitate an infrastructure first approach
to land use planning, which puts infrastructure considerations at the heart of
placemaking. Energy supplies and energy generation are included in the definition of
infrastructure and Policy 22 relates to flooding. The development is acceptable with
reference to these policies.
7.14 Policy 23 protects people and places from environmental harm, mitigates risks arising
from safety hazards. Part e) notes that development proposals that are likely to raise
unacceptable noise issues will not be supported. It is considered that no unacceptable
noise impacts would occur.
7.15 Alongside part c) of Policy 11, Policy 25 makes community benefit a material
consideration in planning decision. Part a) of the Policy sets out that community benefit
can include “improving community resilience and reducing inequalities; increasing
spending within communities; ensuring the use of local supply chains and services;
local job creation; supporting community led proposals, including creation of new local
firms and enabling community led ownership of buildings and assets.” The construction
and decommissioning of the development present supply chain opportunities for
business and could potentially contribute to local economic activity.
7.16 The matters relevant to the assessment against the above policies are addressed in
detail in Section 8 below. Based on that assessment, it is concluded that the proposal
is not in accordance with NPF4 with specific reference to Policy 8.
West Dunbartonshire Local Plan (2010)
7.17 The application site is located in the Green Belt and Policy GB1 states that within the
areas of Green Belt there will be a general presumption against development other
than certain exemptions. This includes where there is a specific locational requirement
and established need for the development and it cannot be accommodated on an
alternative site. It has not been fully demonstrated that this development cannot be
accommodated on an alternative site out with the Green Belt.
7.18 Policy DC6 relates to renewable energy proposals and states that development will be
permitted where it can be established without unacceptable detriment to the
landscape, natural and build heritage, sport and recreation interests and local amenity.

Page 10

The proposal can be accepted with reference to these matters as further assessed in
Section 8 below
7.19 Policy E1 states that the Council will further the conservation of biodiversity. Policy E3A
states that the Council will seek to maintain and enhance the environmental resources
of the Plan area by protection of habitats, species and natural features which are
vulnerable and/or specifically protected, including Local Nature Conservation Sites. It
also states that proposals should not have an adverse effect on the integrity or
character of Local Nature Conservation Sites and that satisfactory arrangements for
habitat creation/site enhancement elsewhere should be made to compensate where
development would cause the total or partial loss of a Local Nature Conservation Site.
Policy SUS1 states that all development should seek to conserve and enhance
environmental resources and ensure environmental impact is minimised. Policy E9
seeks to ensure that development proposals do not adversely impact upon landscape
character. The proposal is acceptable with reference to this Policy. 
7.20 Policy GD1 seeks to ensure that all new development is of a high quality of design and
respects the character and amenity of the area. The proposal can be accepted with
reference to this Policy.
7.21 Policy DC3 states that within the Glasgow Airport Safeguarding Zone, development
which adversely affects the operational integrity or safety of the airport will not normally
be permitted. No concerns arise in this respect.
7.22 Policy BE5 relates to Scheduled Ancient Monuments and other Archaeological sites.
The Council will resist any development proposals that would have an adverse impact
on or affect the setting of a Scheduled Ancient Monument, or upon other nationally or
locally important archaeological sites. Policies BE6A and BE6B, relating to the
Antonine Wall and Antonine Wall buffer zone respectively, combine to presume against
development which would have an adverse impact upon the Wall. Taking account of
the response from WoSAS and HES, it is concluded that significant concerns in respect
of the impact upon the Wall and its setting would not arise.
7.23 Policy GN1 seeks to promote, protect and improve the Green Network. It states that
development which is detrimental to the green network will be considered contrary to
the Plan, and that new development should contribute positively to the protection and
improvement of the green network. No concerns arise in respect of this Policy.  Policy
RSA1 relates to conserving the landscape quality of the Kilpatrick Hills and again, no
concerns arise.
7.24 Policies F1 and F2 aim to ensure that new development is not at risk from, and does
not increase the risk of flooding, and has suitable SUDS drainage infrastructure. There
is a general presumption against development within the flood plain. The up-to-date
development plan position in flooding is set out within Policy 22 of NPF4 which
therefore has primacy in this instance.
7.25 The matters relevant to the assessment against the above policies are addressed in
detail in Section 8. Taking that assessment into account it is concluded that the
proposal is contrary to adopted Local Plan with reference to Policy GB1.

Page 11

8. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
8.1 On 15 March 2023, the Planning Committee took a decision that the Council would not
adopt Local Development Plan 2. The Proposed Local Development Plan 2 (LDP2),
incorporating the recommended modifications of the Examination Report received on
22 April 2020, which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore afforded
significant weight in the assessment and determination of planning applications,
subject to compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material consideration, although
it does not directly affect the development proposal under consideration.
8.2 Policy GB1 restricts development in the Green Belt to a limited number of
circumstances. This includes with infrastructure with a specific locational need. It has
not been demonstrated that this development cannot be accommodated on an
alternative site. Policy RE1 requires renewable energy developments to be compatible
with the surrounding area and for the development to meet all other policy
requirements. It cannot be held that the proposal us supported by this Policy given the
conflict with Policy GB1.
8.3 Policy ENV1 sets the approach towards development in relation to nature conservation
and biodiversity. Policy ENV2 relates to landscape character. Development proposals
should be sited and designed to relate to the local landscape character of the area and
ensure that the integrity of this landscape character is maintained and, where
appropriate, enhanced. Policy ENV4 relates to forestry, trees and woodland. The loss
or fragmentation of long-established woodland, high conservation value or areas
covered by tree preservation orders will only be supported where any significant
adverse effects are clearly outweighed by significant social or economic benefits. The
proposal can be considered acceptable with reference to this Policy. Policy KH1 seeks
to protect the Kilpatrick Hills Local Landscape Area but as the development is not within
this designation, no matters arise in respect of this Policy.
8.4 Policy ENV5 mainly focusses on water courses and water bodies. Policy ENV8
requires minimisation or adequate mitigation of any air light and noise pollution
resulting from development. Policies ENV9 and ENV10 address contaminated land
and unstable land respectively. The development is acceptable in this regard.
8.5 Policy H4 of the LDP2 relates to residential amenity. The Policy states that the Council
will protect, preserve and enhance the residential character and amenity of existing
residential areas at all times. In this regard, there will be a general presumption against
the establishment of non-residential uses within, or in close proximity to, residential
areas which potentially have detrimental effects on local amenity, or which cause
unacceptable disturbance to local residents. No concerns arise in this respect.
8.6 Policy CON3 is not supportive of development which disrupts or adversely impacts on
any existing or potential core path, right of way, bridle path, or footpath, including off-
path access rights, used by the general public for recreational or other purposes. No
core paths will be interrupted by the development. Visual impacts to core path users
are assessed separately but are considered acceptable.
8.7 Policy BE1 states that unscheduled archaeological sites should be preserved in-situ
where possible. Where not possible, provision should be made by the developer to
undertake the excavation, recording analysis, publication and archiving of the
archaeological remains. This Policy also advises that where a scheduled monument or

Page 12

the integrity of its setting would be adversely affected, permission would only be
granted in exceptional circumstances. Policy AW1 does not support development that
would have an adverse impact upon the Antonine Wall or its setting. It is concluded
that significant concerns in respect of the impact upon the Wall and its setting would
not arise.
8.8 Policy CP1 requires new development to take a design led approach to creating
sustainable places which puts the needs of people first and demonstrate the six
qualities of successful places. The development can be accepted with reference to this
Policy
8.9 Policy CP2 requires all development to demonstrate that green infrastructure has been
integrated into the design approach from the outset. Development that would adversely
impact on the operations of Glasgow Airport or would be adversely affected by aircraft
noise will not be permitted in accordance with Policy E7. No concerns arise in respect
of these policies.
8.10 Policies ENV5 and ENV6 are similar to the water environment and flooding policies
of the adopted Local Plan, although in respect of flooding, the up-to-date
development plan position is set out within Policy 22 of NPF4 which has primacy.
8.11 The matters relevant to the assessment against the above policies are addressed in
detail below. It is concluded that the proposal is not in accordance with proposed Local
Development Plan 2 with reference to Policies GB1 and RE1.
Renewable Energy Local Development Plan (Proposed Plan) Planning Guidance
November 2016
8.12 This guidance is written in the context of proposed Local Development Plan 1 together
with Scottish Planning Policy (SPP), both of which no longer form a material
consideration in the assessment of planning applications. The document does not
address battery storage proposals and Policy 11 of NPF4 has primacy over this
guidance.
Frontiers of the Roman Empire (Antonine Wall) Planning Guidance
8.13 This guidance sets out the approach and procedure for assessing development
affecting the World Heritage Site and also the criteria which will be applied in
determining applications for development along the line of, and within the setting and
vicinity of the World Heritage Site. The Guidance sets out that the impacts of
development may be physical upon the fabric of the monument, they may impact upon
the setting of the wall where development will harm the character of the landscape
around the world heritage site or be cumulative which adds to the existing negative
effects of past or current developments thereby creating further and possibly greater
adverse effects.
8.14 As it can be concluded that significant concerns in respect of the impact upon the Wall
and its setting would not arise, the proposal is acceptable with reference to this
guidance.
Principle of Development
8.15 National Planning Framework 4 (NPF4) sets out the long-term vision for the
development of Scotland through the National Spatial Strategy. NPF4 aims to meet
Scotland’s climate ambition which will require a rapid transformation across all sectors
of the economy and society. This proposal constitutes a National Development as it
supports renewable electricity generation, repowering, and expansion of the electricity
grid under National Development 3: Strategic Renewable Electricity Generation and

Page 13

Transmission Infrastructure.  NPF4 recognises that additional electricity generation
from renewables and electricity transmission capacity of scale is fundamental to
achieving a net zero economy. Policy 1 states that there is a need to encourage,
promote and facilitate development that addresses the global climate emergency and
nature crisis, whilst Policy 2 seeks to encourage, promote and facilitate development
that minimises emissions and adapts to the current and future impacts of climate
change. The electricity transmitted for storage within the proposed batteries will likely
have come from a mixture of renewable and non-renewable sources with the purpose
of the batteries to ensure there is always grid stability. As renewable energy becomes
more prevalent, grid stability becomes a significant issue due to the intermittent nature
of renewable energy generation.
8.16 Policy 11 a) iii of NPF4 specifically supports battery storage energy solutions. NPF4
does not question the nature of the technology or the level of need for it. This general
support facilitates the deployment of renewable energy which in turn will assist in
decarbonising the electricity network. Whilst it can be considered that the proposal
could therefore be held to support the overarching aims of the NPF4 to achieve net
zero targets and provide a stable domestic energy supply, the substantial planning
policy support is not unconditional, and it must be ensured that such development
happens in the right place. There is thus a requirement in assessing any such
developments to take into account all relevant considerations and policies. Therefore,
it requires to be assessed if there are any potential adverse impacts arising from the
proposed development which would be outweighed by any benefits. This assessment
can be guided by Policy 11 e) of NPF4, which sets out in detail the matters for the
project design and mitigation to address, together with any other relevant development
plan policies.
8.17 The site is situated within the Green Belt as defined by the adopted Local Plan and
proposed Local Development Plan 2. Policy 8 of NPF4 sets out the types of
development that are supported within Green Belt locations. This includes essential
infrastructure, and proposals that relate to the distribution and transmission of
electricity grid networks fall under this definition. However, Policy 8 is clear that for
development proposals in Green Belt locations the purpose of the Green Belt must not
be undermined. Policy 8 goes on to require that the reasons why the Green Belt
location is essential must be provided together with why the development cannot be
provided on a site outwith the Green Belt. Policy GB1 of both the adopted Local Plan
and proposed Local Development Plan also provide qualified support for development
in the Green Belt where a specific locational requirement is identified.
8.18 The applicant advises that the development requires to be sited where a suitable
electricity connection can be made into a substation with sufficient available capacity.
It is set out that the site has been chosen because it is located between the Kilbowie
and Windyhill substations, has characteristics that make it suitable for development
and is a site where the predicted impacts could be considered to be acceptable. In this
case, the applicant has advised of an offer of a connection at the Windyhill substation
which lies around 1.5km from the site. It is generally accepted that the closer the point
of connection is, the more efficient the transmission would be, the cabling costs would
likely more viable and there would be a reduced likelihood of physical obstacles
preventing a connection being implemented. While this may be accepted from a
technical perspective, it remains that it must be assessed whether the applicant’s 2km
search area is appropriate, how site selection was approached by the applicant and
whether Windyhill is the only grid connection point available to the applicant.
8.19 The applicant has submitted a site selection assessment in support of the proposal to
set out why the Green Belt location is essential and that there are no sites that could

Page 14

accommodate this development out with the Green Belt. This acknowledges that for
proposals of this nature, each developer will have their own site selection criteria,
including distance to the available connection point. The applicant also sets out that
the availability of land is an important limiting factor to site selection. Within the
assessment, there is reference to one other possible site which the applicant notes as
unavailable, although this site is not specifically identified. The site selection
assessment does not provide any detailed comparative analysis of possible sites which
were considered as potentially being capable of accommodating the development
within the 2km radius of the Windyhill substation. The applicant, however, concludes
that that within the 2km search area, there is no land within the built-up area within
West Dunbartonshire, which is largely residential in character, that could be considered
suitable to accommodate this development. There has also been no clear justification
of why a 2km search area was considered appropriate compared to a larger radius.
8.20 Notwithstanding the lack of a detailed analysis by the applicant, it can be generally
accepted that, based on the applicant’s search criteria, there are likely no sites out with
the Green Belt within West Dunbartonshire. However, there has been no assessment
of possible available sites within either the East Dunbartonshire area where the
connection point is located, and the Glasgow City area. A substantial part of the
applicant’s 2km search area lies within East Dunbartonshire and Glasgow City and
reference to Policy 8 a) ii) of NPF4, the test in this case is not whether there are no
sites which are outwith the Green Belt within the West Dunbartonshire area only, the
test is that there are no other suitable sites outwith the Green Belt. Whilst the applicant
sets out the desire to invest within West Dunbartonshire to support the economic
revitalisation of the area, and some support can be given to this goal, this does not
negate the requirement to assess possible available sites within the whole of the
identified search area.
8.21 It is not considered that the applicant’s site selection assessment provides a detailed
analysis of other possible sites which could accommodate this development, why a
2km search area has been chosen in this instance and why the connection point must
be at Windyhill. There has also been no consideration of much of the identified 2km
search area. It therefore cannot be considered that the applicant has demonstrated
that no other suitable sites are available in a location outwith the Green Belt and it
cannot be concluded that the requirements of Policy 8 a) ii, which provides the most
up-to-date position on Green Belt developments, are met in this regard.
8.22 Policy 8 of NPF4 goes on to require that the purpose of the Green Belt at this location
is not undermined by the proposal. The purpose of the Green Belt designation is to
facilitate and promote compact urban growth and ensure that land around urban areas
is used sustainably. It is to further ensure that new development is directed towards
the urban area to support regeneration priorities and protect the risk of settlement
coalescence. The Green Belt designation also supports the protection of landscape
character and setting around settlements. Whilst the proposal would represent an
expansion of the developed area within the Green Belt, it is not considered that it would
affect the strategy of compact urban growth, have an adverse impact on wider
regeneration priorities or result in the settlement coalescence. However, it remains that
the development must not have an adverse visual impact which is to the detriment of
local landscape character and this is considered further below.
Landscape and Visual Impact
8.23 Any development of this nature will have a visual impact, and this is not in doubt. The
assessment of landscape and visual effects arising from the development is set out in
the applicant’s landscape and visual appraisal (LVA) which is based on a 2km study
area. The geographical extent to which the development would be visible has been

Page 15

established by a ‘Zone of Theoretical Visibility’ (ZTV). This was created using mapping
tools to calculate where the development will potentially be visible from in the
surrounding area. The ZTV establishes the locations from which the development may
potentially be visible and where there is no visibility, receptors are discounted from the
assessment. ZTV mapping is presented in the applicant’s submission for the 2km study
areas. Taking into account topography, existing woodland and settlements, theoretical
visibility is likely from the immediate area surrounding the application site, Clydebank
and District Golf Course, sections of the Antonine Wall World Heritage Site and
Scheduled Monument, scattered fragments of the north-eastern and south-eastern
neighbourhoods of Clydebank, Drumry Wood, the A82 corridor and the core path
network, including adjacent to the site. The LVA identified five viewpoints which the
applicant considered to be representative of the range of visual receptors considered
within the study area.
8.24 The majority of the application site lies within the ‘Drumlin Foothills’ landscape
character type (LCT 211) which the submitted LVA considers as the host landscape.
A small part of the site extends into the ‘Urban’ landscape character type (LCT 0). The
Drumlin Foothills comprises an undulating landform created by glacial deposition
subsequently modified by fluvial erosion, small to medium scale landscape with caried
views, human activities such as pastoral farming and golf courses, semi-natural
woodlands along burns, farm woodlands and small plantations. These features all
contribute to a predominantly rural character. The Urban landscape character type
sees various components which typically comprise urban development forming the
underlying character of the landscape. The applicant’s LVA identifies that the Drumlin
Foothills LCT in general to be of medium susceptibility to change although within the
immediate vicinity of the site it is considered to be of low susceptibility of change. The
LVA does not conclude that the value to the landscape into which the development is
proposed is high, and it is thus considered that overall, the landscape has a medium
sensitivity to the type of changes proposed.
8.25 The area immediately surrounding the site contains trees and pockets of woodland,
grazing land, farm steadings, golf course and a variety of core paths providing for
recreational walking routes. This results in an area which can be characterised as one
which has a high amenity value with a variety of semi-natural views.  This combination
of land uses leads to an area that could be characterised as relatively quiet and of high
amenity value. Despite this proximity to the urban area, the busy A82 Great Western
Road and relatively high-density residential areas, the location of the site feels quite
different and separate from this urban area with a predominantly pleasant rural
character. Whilst the site is not formally designated for its landscape character, it is
clear that the area has a distinct local identity which is of high amenity value.
8.26 It is accepted that the proposed development would be unlikely to be seen over
significant distances. It is accepted that both during the construction phase and the
completed development before any proposed landscape mitigation matures has the
potential to have moderate adverse effects. However, these effects will reduce over
time as any landscape mitigation matures. It is accepted that the development would
not be of significant across the Drumlin Foothills LCT as a whole. It is also accepted
that whilst localised views of the site may occur from the urban area and whilst the site
may be visible from elevated location such as the upper floors of the 12 storey flatted
blocks to the southeast, the development would not be of significance from these
locations. Notwithstanding the above, the development would be sited within an
existing field and locally, this would result in a significant change to the landscape
pattern which requires further consideration.

Page 16

8.27 Considering the local landscape impact, the immediately surrounding area is
considered one of high amenity value which can be held to be sensitive to change from
inappropriate development. In terms of mitigation for the visual impact of the
development, the applicant proposes landscaping buffers within the site between the
infrastructure and site boundary. Landscape bunds are also proposed to the north,
west and south of the infrastructure. The proposed levels change across the site will
result in the equipment sitting below the existing ground level from some locations. A
number of core paths traverse the area with Core Path 149 being located on the
western boundary of the site and Core Path 150 extending from Braidfield Road to
connect with Core Path 149 at the north-western corner of the application site. Core
Path 149 continues north to connect with Core Path 148 which follows the line of the
Antonine Wall from Cleddans Road. It is accepted that Viewpoint 02 from the
applicant’s LVA demonstrates that there will be little notable impact from the
westernmost point of Core Path 148 with no visibility of the equipment. Viewpoint 03 is
taken from the Roman fortlet to the northeast of the site and to the south of Core Path
148 and again demonstrates little impact, albeit this view may change when trees are
not in leaf. Viewpoint 01 looks north from Core Path 149 where it joins the A82. This
shows that the landscape bund will be visible from this location and that this will in time
be screened by new planting. No equipment is visible. Core Path C2 within the
Glasgow City Council is also considered in Viewpoint 04 indicating glimpsed views
prior to new planting maturing. Ther is no objection from Glasgow City Council on
visual impact from the core path network or any other vantage points within their area.
The conclusions of the LVA that no significant effects occur and no moderate effects
occur after the construction phase from the chosen viewpoints is accepted.
8.28 However, as noted above, Core Path 149 continues past the development site and is
located on its immediate western boundary. Facing east, Core Path 148 travels
towards the application site, with the site directly in view. While no routes are physically
interrupted by the proposal, there will be a visual impact to users of the routes, and the
character of the routes will be changed and the effect could be significant. The Core
Path at this location extends from the urban area and takes an attractive route through
rolling grazing land with various trees and pockets of woodland within the wider
landscape. The experience of the landscape by users of these sections of core path
has the potential to change dramatically given the presence of a development of an
industrial appearance adjacent to it. No viewpoint from the Core Paths adjacent to the
site was initially provided by the applicant. A viewpoint (Viewpoint 01a) facing east on
Core Path 148 towards the junction with Core Path 149, adjacent to the northwestern
end of the site has now been provided. The visuals provided for this additional
viewpoint show that by year 10, the development would be relatively well screened by
the proposed landscaping. However, the development will not be screened in its
entirety to the point that users of the core path would be oblivious to its presence.
Whilst planting and mitigation is proposed as shown in the visuals, this is only detailed
as a simple narrative in the supporting documentation and inclusion of the general
layout on the proposed site plan. Utilising native deciduous planting to screen the
development would also not result in there being a consistent level of screening across
all seasons. The landscaping will also take time to mature, and the development will
be notable within the landscape for users of the adjacent routes in the early years,
potentially affecting the understanding of the area forming part of the green belt and
introducing a more urban form of development.  However, on balance and accepting
an initial impact prior to the landscape mitigation establishing, it is concluded that it has
been demonstrated that the proposal would overall seek to minimise localised visual
impact.
8.29 Policy 11(e) ii of NPF4 accepts significant landscape and visual impacts.
Notwithstanding this, there is also an expectation of appropriate design mitigation for

Page 17

these impacts. Policy 8 a) ii also requires that the proposal minimises landscape and
visual impacts within the Green Belt as far as possible. Whilst it is accepted that there
will be a localised visual impact and that the development will be noticed by users of
the adjacent Core Paths, the overall character of the routes will not be changed to such
as extent that the development is considered unacceptable in this respect.  The final
detail of the landscape mitigation together with the implementation, retention and
maintenance of this will be of particular importance in ensuring the visual impacts are
minimised in the long term. These details can, however, be secured by condition.
Overall, it is concluded that the landscape impacts arising from the development are
not to such an extent to warrant an objection from the Council.
Impact upon designated landscapes
8.30 In further assessing landscape and visual impact, consideration must be given to the
potential for any effects on landscape designations. The Kilpatrick Hills Local
Landscape Area (LLA) lies around 2km to the northwest of the site. The applicant’s
LVA considers that analysis of the ZTV indicates theoretical visibility would be possible
from the southeast of the LLA. However, with the screening effect of the urban area
which lies between the site and the LLA boundaries together with topography and
existing vegetation, only an area around Loch Humphrey Burn is considered to provide
visibility of the site.  Given that the site is some distance from the designation boundary
and visibility is expected to be low from the LLA, it is agreed that as per the assessment
within the submitted LVA, any effects would be negligible. Drumry Wood Site of Special
Landscape Importance which is situation approximately 400 metres to the east of the
site within the Glasgow City Council area. Such sites have been identified by Glasgow
City Council where they contribute to the quality of life of those who live or work in the
City. They include parks, golf courses, countryside and other features that are
important from a visual and landscape perspective. The ZTV identifies that the site will
be theoretically visible from much of the northwest of the Site of Special Landscape
Importance. The LVA predicts that the effects on the Site of Special Landscape
Importance would be negligible. Glasgow City Council have not objected to the
proposal and raise no concerns regarding any potential for impact on the Site. It is not
considered that any concerns arise in respect of the potential for significant effects on
this designation and the conclusions of the LVA are accepted in this regard.
Built and Cultural Heritage
8.31 No listed buildings are located within the site or the surrounding area, nor are there
any conservation areas or garden and designed landscape designations within the
wider area. However, the line of the Antonine Wall lies to the north of the application
site. The application site also lies wholly within the Antonine Wall buffer zone. 
8.32 The Antonine Wall is the most substantial and important Roman monument in
Scotland. Built on the orders of the Emperor Antoninus Pius in the years following 140
AD, it extends for some 60 kilometres across central Scotland from Bo’ness on the
River Forth to Old Kilpatrick on the River Clyde and marked the north-western frontier
of the Roman Empire. The Antonine Wall is of great significance for a number of
reasons. It represents one of many sections of a massive military system which
stretched over 5000 km from northern Britain, through Europe to the Black Sea, and
from there to the Red Sea and across North Africa to the Atlantic coast. This frontier
helped to protect and define the Roman Empire. The Antonine Wall was the most
northerly frontier of the Empire, the last of a series of planned frontiers built in the 2nd
Century AD and, at the time, the most complex ever constructed by the Romans. Today
the Wall continues to be subject to considerable development pressures and given its
significance it is imperative that the remaining sections whether visible on the ground
or not are safeguarded from inappropriate development.

Page 18

8.33 The Antonine Wall is designated as both a Scheduled Monument and to the north of
the site, the scheduled monument comprises the Antonine Wall and fortlet, 950m W to
335m ENE of Cleddens. In July 2008 the international cultural and archaeological
importance of the Antonine Wall was recognised when the World Heritage Committee
of UNESCO inscribed the site as Scotland’s fifth World Heritage Site (WHS). The
Antonine Wall became an extension of the trans-national Frontiers of the Roman
Empire World Heritage Site which includes Hadrian’s Wall in England and the Upper
Raetian German Limes. The intention is that the WHS will eventually include all
surviving sections of the frontiers of the Romans in Europe, Africa and the Middle East.
With World Heritage Site status comes a commitment to protect the exceptional cultural
significance of the Antonine Wall and Outstanding Universal Values (OUV) for which
the site was inscribed. The site lies approximately 135 metres to the south of the World
Heritage Site and around 375 metres southwest of the fortlet.
8.34 As noted in paragraph 8.28 above, the site lies wholly within the Antonine Wall Buffer
Zone. The designation of the buffer zone seeks to protect the important landscape
setting of the Antonine Wall. The Buffer Zone defines a zone where added protection
to the immediate setting of the World Heritage Site is given. Development proposals
within the buffer zone will be given careful consideration to determine whether it is likely
to significantly detract from the Outstanding Universal Value authenticity or integrity of
the Antonine Wall World Heritage Site.
8.35 The Council’s Planning Guidance on the Frontiers of the Roman Empire (Antonine
Wall) sets out the approach and procedure for assessing development affecting the
World Heritage Site and the criteria which will be applied in determining applications
for development along the line of, and within the setting and vicinity of the World
Heritage Site. The Guidance sets out that the impacts of development may be physical
upon the fabric of the monument, they may impact upon the setting of the wall where
development will harm the character of the landscape around the world heritage site
or be cumulative which adds to the existing negative effects of past or current
developments thereby creating further and possibly greater adverse effects.
8.36 Considering the physical impact, the site is within the buffer zone, and the
appropriateness of this location must be assessed. The integrity of the setting of the
WHS and how the Site is understood and appreciated in the landscape are identified
as key aspects which must be considered together with the character of the landscape
in which the World Heritage Site sits. The Guidance sets out a presumption against
development within the Buffer Zone which would have an adverse impact on the WHS
and its setting. Where development is proposed within the buffer zone, the Guidance
sets out that site selection requires to avoid the most sensitive areas and views, be a
well-considered layout of an appropriate design with high quality landscaping.
8.37 The application submission is supported by a Heritage Assessment. Historic
Environment Scotland (HES) assessed the proposal and initially objected noting that
the application did not include an appropriate heritage-led analysis of the setting and
potential impacts on the setting of the Antonine Wall World Heritage Site and
scheduled monument, and that there was insufficient information to adequately assess
the impact of the proposals.
8.38 The planned layout of the Wall is still apparent in, and has influences on, the modern
landscape. An example of this is the linear route of Cleddans Road which largely
follows the east-west line of the Wall, with Cleddans Farm located just to the east of
the forlet site on the same plateau, as well as the line of hedgerow which follows the
Wall route up to Castle Hill. The World Heritage Site at Cleddans is located in an area
of countryside, on an elevated position which affords the site superb views in every

Page 19

direction. These views are key to the cultural significance of the monument, and the
outstanding universal value to the WHS are made possible by the rural and open
nature of the setting of the WHS, currently protected by the buffer zone.
8.39 In their original consultation response, HES advised that the assessment of impacts
on setting from a proposed development on the historic environment, its structures and
places, is not only about the character of the landscape in which they sit, but a more
nuanced matter relating to the way that historic assets are understood, appreciated,
and experienced. Setting can extend beyond the immediate vicinity of a historic asset
into a much broader context and includes both tangible and less tangible elements. A
full understanding of the setting of a historic asset should address all these matters in
any assessment and should draw upon the contribution each element of an asset’s
setting makes to its cultural significance. This would then set out how changes within
the setting of a historic asset can impact on its cultural significance and provide
informed and appropriate measures to address this. This is particularly important
where a development has the potential to impact a WHS.
8.40 Following the objection from HES, the applicant has reviewed the planting proposals
and provided updated details and visualisations in support of the proposal. In their
further consultation response, HES note that whilst the applicant has not provided an
updated Heritage Impact Assessment, a site visit, updated plans and submitted
visualisations have allowed HES to carry out their own assessment of the impacts of
the proposed development on the setting of the Antonine Wall WHS and scheduled
monument. HES are now satisfied that the key views to the south and south-west
towards the River Clyde, and in the direction of Old Kilpatrick, will not be obstructed by
the development, including the proposed landscaping and planting. HES also consider
that due to the sloping topography of the development site and the location of the
development to the west of a small hill south of the fortlet at Cleddans, the proposals
would not appear to be dominant or distracting in views from the fortlet. HES further
consider that the proposals are also unlikely to draw focus or distract from views down
into the fortlet at Cleddans and this section of the frontier from Castle Hill to the east,
and any glimpsed views from the fort at Goldenhill to the west. Additionally, HES
consider the proposed development is unlikely to appear in views as you travel along
this straight section of the WHS and scheduled monument, and therefore the revised
proposals would not interfere with how the WHS is understood as a linear monument
and can be appreciated in the landscape. They are thus content that key views and
relationships would be retained.
8.41 Overall, HES have fully assessed the proposal in the context of the revised details and
additional information, and now conclude that the proposed development, including the
planting proposals, would not have a significant adverse impact the integrity of setting
of the scheduled monument and Antonine Wall WHS, to a level as such that would
warrant an objection. Conditions to address securing the planting proposals to ensure
that the final details of these do not disrupt the setting of the Wall are recommended.
8.42 Whilst not objecting to the proposal West of Scotland Archaeological Service (WoSAS)
highlight points in respect of the impact upon the WHS and that a new modern element
would be introduced to the setting of the Wall. WoSAS go on to advise on the potential
for sub-surface archaeological material to survive in the area. WoSAS consider,
however, that the mitigation programme proposed in the applicant’s Heritage
Assessment in respect of archaeology is in line with the approach that they would
generally recommend in relation to greenfield developments of this type, and as a
result, it would be acceptable from their perspective. It is recommended that the matter
is addressed by condition should the Scottish Ministers be minded granting consent.

Page 20

8.43 It is clear that the proposed development would have the potential to impact upon the
Antonine Wall WHS and Scheduled Monument. Whilst Historic Environment Scotland
initially objected, they are now able to conclude that there would not be a significant,
adverse impact upon the Antonine Wall WHS and Scheduled Monument to together
with the integrity of the setting of the Wall to the point that an objection would be
warranted.  Following a full assessment of the potential impact upon this asset, there
is nothing to suggest that an alternative position to HES, who have considered the
Council’s published guidance in their assessment of the proposal, should be taken or
that there would be any additional concerns at a local level.  The proposal is therefore
considered acceptable with reference to policies 7 l) and 11 e) vii of NPF4, policies
DC6, BE5, BE6A and BE6B of the adopted Local Plan, Policies BE1 and AW1 of
proposed Local Development Plan 2 together with the Council’s Frontiers of the
Roman Empire (Antonine Wall) Planning Guidance.
8.44 The connection between the proposed site and Windyhill substation does not form part
of this application. However, with the Antonine Wall lying between the site and the
substation it is not clear how a connection could be achieved. The Scottish Ministers
would require satisfying themselves that a connection to the site could be achieved.
Residential amenity
8.45 Residential amenity can be affected in a variety of ways. This includes noise from
construction and operation of the proposed development together with other
impacts which could arise during the construction phase. Any development will
produce noise during the construction phase, and this has to be accepted.
Environmental Health raise the requirement to ensure that the site is managed in such
a way during construction so as not to cause undue disturbance and this could be
addressed by appropriate conditions if required, including relating to hours of work,
construction noise, delivery vehicles and dust. Such an approach would address any
short-term impacts during construction.
8.46 The proposed site is situated outwith the urban area as defined by the adopted Local
Plan and proposed Local Development Plan 2 in a location with a predominantly rural
character. The nearest noise sensitive receptor is the farmhouse at Braidfield
farmhouse approximately 175 metres to the west of the main equipment compound
within the application site. Within the nearby urban area, there are a variety of noise
sensitive receptors including dwellinghouses on Braidfield Road and Strathdee
Avenue approximately 260 metres from the main equipment compound. To the south,
dwellinghouses on Morar Avenue and Morar Place are some 350 metres from the main
equipment compound and also lie on the opposite side of the A82 from the site. St
Peter the Apostle High School also lies to the opposite side of the A82 around 250
metres distant. 
8.47 Policy 11 (e) i of NPF4 requires that impacts on communities and individual dwellings
including residential amenity, and noise are addressed. A noise impact assessment
(NIA) has been submitted in support of the proposal. The NIA identifies a range of
noise sources from the development including the energy storage units, power
convertors and transformers. It is set out that the type of unit proposed would generate
a typically broadband type of noise which is within strong tonal characteristics. It is set
out that the transformers are tonal and are not predicted to be audible at nearby
receptors. It is advised by the applicant that for procurement and engineering reasons,
it may be necessary to vary the proposed equipment during or after the consenting
process. In the event that alternative equipment is proposed that would give greater
noise impacts at the receptors, then a full noise assessment would be undertaken and
agreed prior to proceeding with that alternative equipment.

Page 21

8.48 It is accepted that currently there is notable background noise arising from the busy
A82 and general urban activity, as identified in the NIA. It is concluded in the NIA that
the predicted noise arising from the proposed development at the locations set out in
paragraph 8.42 above is below the background daytime noise level and no more than
3 dB above nighttime background levels. The NIA has been considered by the
Council’s Environmental Health Service who conclude that the site could be developed
without adverse impacts occurring. However, given the nature of the type of
development, conditions are recommended in terms of noise at any dwelling or noise
sensitive building not exceeding particular noise rating curves. A condition requiring a
post development verification report to demonstrate that the projections as detailed
within the NIA are achieved is also recommended.
8.49 Environmental Health further note the applicant’s position that for procurement
reasons, the proposed equipment may be varied following the granting of consent. The
NIA would therefore require to be updated in the context of the final choice of
equipment if different from that which the current NIA is based on to ensure that no
unacceptable impact occurs to residential properties. The requirement for an updated
NIA based on the final choice and specification of equipment and undertaken in
accordance with the relevant guidance could also be addressed by condition should
the Scottish Ministers be minded granting consent for this development.
8.50 Overall, it is concluded that the site could be developed without giving rise any
unacceptable impacts to residential amenity or having any adverse impact upon the
operation of the nearby high school arising from noise. Accordingly, the proposal would
be considered acceptable with regard to Policies 11 (e) i and 24 of NPF4 together with
policies the relevant policies of the adopted Local Plan and proposed Local
Development Plan 2.
Ecology and Biodiversity
8.51 Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects
from development and strengthen nature networks.  Policy 4 seeks to protect, restore
and enhance natural assets, making best use of nature-based solutions. The Policy is
primarily focused on designated areas including sites designated as a local nature
conservation site or landscape area. Policy 11 e) ix also requires biodiversity impact to
be addressed.  The applicant has submitted a preliminary ecological appraisal (PEA)
and biodiversity report in support of the proposal, and these combine to assess impacts
upon the proposed site. The application site comprises grazing land bound by a variety
of hedgerows inclusive of a small number of trees. Two trees were identified as having
good potential for bat activity, although no tree works are currently proposed. One
mammal hole was identified within he survey area although no badger path to the
entrance was recorded. To further determine possible use by badger, a camera trap
was placed adjacent to the hole entrance. No badger activity was recorded although a
pair of foxes were observed entering and exiting the hole and triggered the camera on
16 occasions.
8.52 The Council’s Biodiversity Officer has considered the applicant’s submissions and
accepts the methodology and approach undertaken, specifically noting the additional
caution in respect of the camera monitoring. Whilst it is accepted that there are no
watercourses within the site affected by the proposal, the Biodiversity Officer
recommends a cautionary position in respect of watervole, noting that the PEA did not
consider the possibility that watervole could be present in the wider area, including
Cleddans Burn and marshes to the east which have historical records of watervole and
the Hardgate burn to the north has recent surveys with field signs of watervole
confirmed. Whilst there is nothing to suggest an adverse impact on ecology and
protected species, concerns are raised by the Biodiversity Officer in respect of the PEA

Page 22

dating from 2022. This is longer than is usually accepted for a PEA to still remain
accurate in its findings and it is recommended that the PEA is updated to re-determine
the validity of the current report.  This is especially important given the mobile nature
of the potential wildlife using the site.  It should be re-established that currently there is
no badger activity on the site and watervole could also be considered.
8.53 The Council’s Biodiversity Officer has also considered the biodiversity statement and
notes that enhancement is proposed in respect of a number of habitat improvement
works such as hedgerow gapping, tree retention and planting, wildflower areas, ponds
and bunds, all of which offer potential for biodiversity improvement on the site.  It is
considered that these would also provide an extension to the existing woodland and
wetland habitat to the southwest of the site (just east of the Titan Hotel) which is known
to be a biodiverse site.  It would also provide further connectivity to the Cleddans Farm
hedgerows, burn and woodland areas to the east.
8.54 Overall, it is concluded that no adverse impact on ecology, biodiversity and protected
species would arise from the development subject to a requirement to update the PEA
to include updated species surveys for bats, badger and watervole. The biodiversity
enhancement measures are acceptable and would have a positive effect on
biodiversity. The proposal is therefore considered acceptable with reference to Policies
3, 4(d) and 11(e)ix of NPF4 together with Policies E1 and E3A of the Local Plan and
Policy ENV1 of the proposed Plan.
Traffic, Transport and the Impact on the Road Network
8.55 Policy 11 e) vi of NPF4 requires the impacts on road traffic to be appropriately
addressed, including during construction. Access to the site will be taken from
Braidfield Road via Strathdee Avenue, Kilbowie Road (A8014) and Great Western
Road (A82). No transport statement has been submitted by the applicant in support of
the application. The applicant’s planning statement does, however, set out that the
construction phase will involve bringing construction machinery to site, the delivery of
aggregate for the site track, delivery of site components including the battery units and
other equipment and materials. It is further advised that this will require a mixture of
light commercial and HGV loads, together with a small number of abnormal loads
which will be necessary for the main transformer delivery and cranes. No details of
expected vehicle movements during the construction phase are provided nor is the
expected approach to managing construction vehicles. It is, however, advised that a
Construction Traffic Management Plan will be developed and agreed. This would
include the timing of deliveries with respect to busy periods, school times, the routing
of deliveries, measures to ensure the safety and convenience of road and core path
users, appropriate signage, advance notice and contact details for any issues for
residents, identification of a nominated person to whom issues can be referred,
considerate driving, measures to protect the public road from deleterious material from
the site, procedures to deal with inclement weather and breakdowns, and access for
emergency services.
8.56 The Council’s Roads Service has considered the proposal and does not identify any
issues or objections. The requirement for notification of the commencement of works,
abnormal load movements and pre and post development inspections of the public
road network are identified by roads, together with the requirement to ensure road
sweeping if required, that surface water is not discharged to the public road and that
the access to the site is hard surfaced for the first 12 metres and that any gates are set
back from the public road by at least 12 metres. These matters can be addressed by
condition or via a Construction Traffic Management Plan which can itself be addressed
by condition. Transport Scotland have also considered the proposal and offer no
objections subject to a variety of matters being addressed by condition including

Page 23

matters relating to abnormal roads on the trunk road network and the requirement for
a Construction Traffic Management Plan addressing a range of matters. Whilst not set
out in the applicant’s submission, there is the possibility that equipment would require
to be replaced from time to time, or that a wider midlife equipment replacement
programme would be required. A condition can ensure that suitable traffic
management plans are agreed for such events. 
8.57 While the concerns relating to roads and traffic matters highlighted in the objections to
the Scottish Ministers are noted, subject to the matters set out above being addressed
by condition in the event the Scottish Ministers were minded to grant consent for the
development, there is thus no objection to the proposal on roads and traffic grounds
and the proposal is acceptable.
Flooding and Drainage
8.58 Considering matters relating to flood risk, a review of SEPA’s flood risk mapping
concludes that the site is not at risk of flooding from watercourses and whilst localised
areas of surface water flooding are identified on the land surrounding the site, the site
itself it not at risk. A drainage assessment is submitted in support of the proposal, and
the development will incorporate Sustainable Drainage Systems (SuDS) to attenuate
run off. The SuDS will comprise an attenuation pond which will discharge to the existing
drainage ditch to the east of the site which itself drains to Cleddans Burn. This will
ensure that no flooding occurs from the site up to and including the 1 in 200-year flood
event plus climate change allowance. The Council’s Roads Service offer no objection
to the proposal on flood risk grounds and in their consultation response to the Energy
Consents Unit, SEPA also offer no objection on the grounds of flood risk. The proposal
is considered acceptable with reference to Policy 22 of NPF4 which has primacy over
the Local Plan and proposed Local Development Plan 2 in respect of the position on
flooding.
Aviation Safety
8.59 Concerns are raised in the objections to the Scottish Ministers in respect of aviation
safety related issues. Glasgow Airport offer no objection to the proposal subject to the
imposition of conditions relating to soft and water landscaping and bird hazard
management. National Air Traffic Services (NATS) also offer no objections to the
proposal. It is therefore not considered that any concerns relating to aviation safety or
the operation of Glasgow Airport arise. The proposal presents no conflict with Policy
11 e) iv, Policy DC3 of the adopted Local Plan and Policy E7 of proposed Local
Development Plan 2.
Health and Safety
8.60 The applicant acknowledges that there are potential hazards associated with BESS
facilities and that whilst it is not possible to eliminate all risk, it can be reduced and
managed to an acceptable level and designed to limit the consequences of an event.
No outline safety management plan or battery fire plan have been submitted by the
applicant in support of the proposal although the proximity to Clydebank Fire Station is
highlighted by the applicant.
8.61 Concerns are raised in the public objections to the Scottish Ministers in respect of site
safety and fire risk. Policy 23 of NPF4 addresses Health and Safety but this does not
cover such developments specifically but rather sets out a requirement for new
development to protect people and places from environmental harm, mitigate risks
arising from safety hazards and encourage, promote and facilitate development that
improves health and wellbeing. Therefore, whilst health and safety are a legitimate
material planning consideration, in considering the development proposal the focus
requires to be on locational, design and layout aspects of the proposal rather than any

Page 24

concern with the principle of using such technology or the technical design of
equipment, which is controlled by other legislation and industry standards.
8.62 Whilst it is generally accepted that the safe operation of the site is not a planning
consideration, it would be expected that the Scottish Ministers consult the Scottish Fire
and Rescue Service on the proposal and satisfy themselves that an unacceptable risk
does not occur from the development. Notwithstanding this, it is concluded that a
precautionary approach can be reasonably captured through a condition requiring a
detailed Battery Fire Safety Management Plan which includes response, management
and mitigation measures in the event of a fire should the Scottish Ministers be minded
to grant consent for the development.
Decommissioning
8.63 No details are provided by the applicant in respect of the length of the operational
period of the development or the approach to decommissioning. Whilst the preference
would be that the approach to decommissioning and site restoration to be provided
upfront with the detail and implementation of the decommissioning and restoration
scheme then addressed by condition, it is accepted that this is at odds with the
established approach to other similar developments. It is therefore accepted that the
decommissioning and site restoration can be secured by condition, and any such
condition(s) must be suitably robust to ensure the complete removal of all aspects of
the development and the restoration of the landform within the site to its original profile.
A further condition can also ensure early decommissioning should the site cease to
export electricity to the grid for in excess of 12 months. A financial provision to provide
sufficient funds for the decommissioning and restoration of the site should such be
required must also be secured. With such an approach, it is considered the
development meets the requirements Policy 11e) xi of NPF4.
Community and Economic Benefit
8.64 Policy 11 c) of NPF4 sets out that development proposals will only be supported where
they maximise net economic impact, including local and community socio-economic
benefits such as employment, associated business, and supply chain opportunities.
Policy 25 addresses the approach to community wealth building. Battery energy
storage makes an indirect but significant contribution to renewable energy generation
targets and greenhouse gas emissions reduction targets, by increasing the productivity
of renewable generators elsewhere on the grid. The provision of a secure electricity
system brings economic benefits across the national economy. The construction and
decommissioning of the development present supply chain opportunities for business
and could potentially contribute to local economic activity. Whilst the lack of direct
community benefit is highlighted in the objections to the Scottish Ministers, the
provision of a community benefit package is not a material planning consideration and
therefore and therefore would not warrant an objection to the proposal. 
Ground conditions
8.65 No site investigation has been submitted in support of the application and as such it
has been recommended by Environmental Health that conditions be applied regarding
site investigation. Further conditions in respect of the importation and reuse of soils are
also recommended by Environmental Health. Concerns regarding former mining
activity and associated ground conditions are raised in the objections to the Scottish
Ministers. In a consultation response to the Scottish Ministers, the Coal Authority
confirm that there are no records of any coal mining features within the site which may
pose a risk to surface stability. It is noted that the site does adjoin an area of probably
shallow coal workings, but these do not extend to the site. Accordingly, the Coal
Authority offer no objection to the proposal.

Page 25

9. CONCLUSION
9.1 This application has been submitted to the Scottish Government under Section 36 of
the Electricity Act 1989, as it is development with a generating capacity of over 50MW.
Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. In this instance, the application is made
under the Electricity Act 1989 and therefore the Development Plan does not have the
primacy in the determination of the application.  It does, however, provide a basis for
the assessment of this proposal and it is established practice to take the development
plan into account in such decisions. The development plan comprises National
Planning Framework 4 and adopted West Dunbartonshire Local Plan.  Whilst not
adopted, proposed Local Development Plan 2 (LDP2), incorporating the
recommended modifications of the Examination Report received on 22 April 2020,
which were accepted by the Planning Committee of 19 August 2020, remains the
Council’s most up to date spatial strategy and is therefore afforded significant weight
in the assessment and determination of planning applications, subject to compatibility
with NPF4
9.2 The contribution of up to 100mw battery storage capacity in supporting renewable
energy generating capacity, which in turn will assist in decarbonising the electricity
network, draws strong support in term of renewable energy targets and supporting the
overarching aims of NPF4 to achieve net zero targets. The site is situated within the
Green Belt as defined by the adopted Local Plan and proposed Local Development
Plan 2. Policy 8 of NPF4 sets out the types of development that are supported within
the Green Belt locations. This includes essential infrastructure and proposals that
relates to the distribution and transmission of electricity grid networks fall under this
definition. However, Policy 8 is clear that for development proposals in Green Belt
locations, the purpose of the Green Belt must not be undermined. Policy 8 goes on to
require that the reasons why the Green Belt is essential must be provided together with
why the development cannot be provided on a site outwith the Green Belt. It is
acknowledged that such developments require to be sited where a suitable electricity
connection can be made into a substation with sufficient available capacity. However,
it is not considered that the applicant’s site selection assessment provides a detailed
analysis of other possible sites which could accommodate this development, why the
development must be connected to Windyhill substation, or why a 2km search area
has been chosen in this instance. There has also been no consideration of much of
the identified 2km search area. It therefore cannot be considered that the applicant has
demonstrated that no other suitable sites are available in a location outwith the Green
Belt and it cannot be concluded that the requirements of Policy 8 a) ii are met in this
regard.
9.3 Turning to visual impact which is a key consideration, Policy 11e) ii of NPF4 explicitly
accepts localised significant landscape and visual impacts and in this respect the
position is thus weighted towards development’s contribution to renewable energy
targets. However, this Policy requires such impacts to be addressed with appropriate
design mitigation. Policy 8 a) ii also requires visual impact within the Green Belt to be
minimised as far as possible. Overall, and following a full assessment, it is concluded
that the landscape impacts arising from the development are not to such an extent that
significant concern arises, subject to conditions requiring the landscape mitigation to
be in place.
9.4 The impact upon built and cultural heritage assets is also a significant consideration
with the potential for the development to impact upon the setting of the world heritage
site and scheduled monument, an internationally recognised asset. Having fully

Page 26

reviewed potential impacts and being guided by the position in the consultation
responses to the Scottish Ministers, including that from Historic Environment Scotland
it is concluded that the proposed development, including the planting proposals, would
not have a significant adverse impact the integrity of setting of the scheduled
monument and Antonine Wall WHS, to a level that would be considered unacceptable.
9.5 All other matters raised, including those relating to residential amenity, ecology and
biodiversity, impact upon designated landscapes, traffic, transport and the impact upon
the road network, flooding and drainage, aviation, health and safety and ground
conditions are considered to be satisfactorily addressed. None of these matters would
have a significant impact or outweigh the substantial support that applies to renewable
energy projects in national and local planning policy.
9.6 Overall, due to the above concerns relating to the Green Belt location of the
development, it cannot be considered that the benefits of the proposed development
outweigh any adverse impacts. On balance, the significant concern arising from the
lack of justification from the applicant that the proposed development cannot be
located on a site outwith the Green Belt is not considered to outweigh other policy
support for the proposed development.
9.7 It must be noted that should the Planning Committee accept the recommendation to
formally object to the proposed development, this will trigger a Public Local Inquiry in
terms of Section 62 and Schedule 8 of the Electricity Act 1989 unless the Council
subsequently withdraws its objection, or the applicant subsequently withdraws the
application.
10. COUNCIL’S POSITION ON THE APPLICATION
10.1 It is recommended that this Committee Report is forwarded in full to the Scottish
Ministers as presenting the Council’s full formal response to the consultation and that
it is highlighted that the Council objects to the application for the following reason:
The Council objects to the proposal as it has not been demonstrated that no other
suitable sites are available in a location outwith the Green Belt in accordance with the
requirements of Policy 8 a) (ii) of National Planning Framework 4 and this concern is
not considered to outweigh other policy support for the proposed development.
10.2 Finally it is recommended that, all matters arising in respect of any Public Local Inquiry
are delegated to the Planning, Building Standards and Environmental Health Manager.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 14th January 2026
______________________________________________________________
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Service Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: james.mccoll@west-dunbarton.gov.uk

Page 27

Appendix 1: Location Plan
Background Papers: 1. Application documents
2. Consultation responses submitted to the Scottish
Ministers
3. Representations submitted to the Scottish Ministers
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
7. Frontiers of the Roman Empire (Antonine Wall)
Planning Guidance
8. Renewable Energy Local Development Plan
(Proposed Plan) Planning Guidance November 2016
Wards affected: Ward 4 (Kilpatrick)