ARGYLL AND BUTE COUNCIL                            COUNCIL                                                                            
FINANCIAL SERVICES                                          20 DECEMBER 2024 
AUDITED ANNUAL ACCOUNTS FOR THE YEAR ENDED 31 MARCH 2024 
1. INTRODUCTION 
1.1  This report provides Members with an update on the external audit of the Annual
Accounts of the Council for the year ended 31 March 2024. 
1.2 The audit of the annual accounts for the year ended 31 March 2024 is substantially
complete.  However, the external Annual Audit Report identifies some residual matters
that remain outstanding at the time of report preparation.  Mazars has committed to
providing an update in relation to the outstanding matters through issuance of a follow
up letter.  In addition, Mazars have noted that they expect to issue an unqualified
opinion and the draft opinion has been inserted into the Annual Accounts document.   
2. RECOMMENDATION 
2.1 It is recommended that the Council: 
• Note that the audit is substantially complete and that Mazars have advised the
Council that they are expecting to issue an unqualified opinion on the
Council’s Annual Accounts for the year ended 31 March 2024;
• Consider Mazars Annual Audit Report, given in Appendix 2;
• Authorise for issue, the Council’s Audited Annual Accounts for the year ended
31 March 2024, included as Appendix 3, on the basis that no material changes
are anticipated to arise from the follow up letter from Mazars, otherwise the
Audited Annual Accounts would be referred back to Members for approval; and
• Approve for signature the Letter of Representation, included as Appendix 4. 
3. DETAIL 
3.1 Mazars are the Council’s appointed external auditors, with financial year 2023-24 being
year 2 of a 5 year contract period.   
3.2 There has been a significant improvement in the timescale for completion of the audit
from the previous year.  It is anticipated that continuous improvements will be made in
future years towards a target completion date of 30 September. 
3.3 The audit of the annual accounts for the year ended 31 March 2024 is substantially
complete.  However, the external Annual Audit Report identifies some residual matters
that remain outstanding at the time of report preparation.  Mazars has committed to
providing an update in relation to the outstanding matters through issuance of a follow

Page 2

up letter.  In addition, Mazars have noted that they expect to issue an unqualified
opinion and the draft opinion has been inserted into the Annual Accounts document.   
3.4 A copy of the full external Annual Audit Report is included at Appendix 2. The key
messages contained within the report are as follows: 
• Financial Management
- The Council has an appropriate financial management culture in place.
It reviews its system of internal financial control annually. 
- The Council has appropriate budget monitoring and reporting
arrangements in place, with appropriate contingency funds in place
in accordance with policies.
- The Council has appropriate arrangements to prevent and detect fraud
and corruption. 
• Financial Sustainability
- The Council has effective financial planning, with an established
process to ensure there is early engagement of budget proposals. 
• Vision, leadership and Governance
- The Corporate Plan sets a clear vision for the Council for the four-year
period. 
- The Corporate Plan sets out objectives, measures of success and key
commitments under each priority.
- The Council has considered equality outcomes and socio-economic
impacts regarding key decisions.
- The Council has appropriate governance arrangements in place.
- The Council provides councillors with sufficient information to allow
effective scrutiny of its finances and performance. 
• Use of Resources
- The Council’s resource plans are aligned with the Corporate Plan.
- The Council has identified how services will contribute to achievement
of its strategic priorities and objectives.
- The Council consults regularly with service users to understand how it
can meet their needs.
- The Council has clear priorities and suitable arrangements in place to
measure improvement.  
• Best Value
- The Council has a clear vision. 
- The Council has appropriate Governance arrangements in place.
- The Council’s annual business plans, and workforce and digital
strategies are aligned with its corporate plan.
- The Council demonstrates participation in partnerships and
collaborative working.
- The Council knows it needs to work effectively with citizens and
communities to achieve its strategic objectives.
- Actions to reduce inequalities underpin the Council’s priorities and
objectives.

Page 3

3.5  Assuming that there are no further changes to the accounts, the main adjustments, in
addition to some presentational changes, are in respect of accounting for Pensions.  It
has been necessary to restate Pensions Assets, Liabilities and Reserves, to reflect
technical guidance and accounting requirements of IAS19, in respect of the Asset
Ceiling adjustment.  Further details of the impact on the Financial Statements are
provided in Appendix 1. 
3.6 There has been no change to the General Fund balance, as a result of the adjustments
noted in paragraph 3.5 above. 
3.7 Key highlights of the Council’s financial position, based on the draft Audited Annual
Accounts are as follows: 
• An accounting Surplus on Provision of Services for 2023-24 of £9.765m;
• A Revenue Budget underspend for 2023-24 of £1.728m;
• Total Assets less Liabilities as at 31 March 2024 of £522.020m; and
• A General Fund Balance as at 31 March 2024 of £115.741m. 
3.8  The committed funds within the General Fund are £107.443m per the draft Audited
Annual Accounts, leaving an uncommitted General Fund balance of £8.298m as at 31
March 2024.  This equates to 2.9% of the Council's approved budgeted net expenditure
for 2023-24, exceeding the contingency set at 2% of approved budget, as agreed as
part of the 2023-24 budget process. 
3.9 The draft Audited Annual Accounts for the year ended 31 March 2024 are included as
Appendix 3, while the Letter of Representation is given as Appendix 4 to this report. 
3.10  There has been a significant improvement in the timescale for completion of the audit
compared to the previous year.  Whilst this is welcomed, continuous improvement is
still required over future years, in order for the audit to be completed within the target
timescale of 30 September, following the financial year end.  A protracted audit process
can have a detrimental impact in supporting other council priorities, such as the budget
process, over this period.   
4. CONCLUSION 
4.1 This report advises Members on the expected conclusion of the audit of the annual
accounts for the year ended 31 March 2024. The external auditors, Mazars expect to
issue an unqualified opinion and minimal adjustments were made to the unaudited
annual accounts during the audit process. Mazars have issued their Annual Audit
Report for 2023-24, which is predominantly positive. 
5. IMPLICATIONS 
5.1 Policy – None 
5.2 Financial – None, with no impact on the General Fund balance. 
5.3 Legal – Not expected to be any legal issues.

Page 4

5.4 HR – Further pressure placed upon key finance staff in respect of competing priorities
and resourcing challenges, due to the protracted audit process beyond target
completion date of 30 September 2024. 
5.5 Fairer Duty Scotland: 
5.5.1 Equalities – protected characteristics – None
5.5.2 Socio-economic Duty – None
5.5.3 Islands – None 
5.6 Climate Change – None 
5.7 Risk – None known at this time.   
5.8 Customer Service - None 
5.9  The Rights of the Child (UNCRC) - None 
Kirsty Flanagan
Executive Director/ Section 95 Officer
December 2024 
Policy Lead for Finance and Commercial Services: Councillor Ross Moreland                                             
For further information contact: Carolyn Earl, Acting Head of Financial Services 
carolyn.earl@argyll-bute.gov.uk 
APPENDICES
Appendix 1 - Summary of Substantive Audit Changes to Financial Statements for the year
ended 31 March 2024
Appendix 2 - Annual Audit Report 2023-24
Appendix 3 - Argyll and Bute Council draft Audited Annual Accounts for the year ended 31                     
March 2024
Appendix 4 - ISA 580 Letter of Representation

Page 5

Appendix 1
Summary of Substantive Audit Changes to Financial Statements for the year ended 31 March 2024 
Financial Statement / Segment Audited
Accounts
£000s
Unaudited
Accounts
£000s 
Change
£000s 
Comments/Explanation
Comprehensive Income and Expenditure Statement 
To reflect the technical
guidance and accounting
requirements of IAS19 in
respect of Pensions.  A
restatement is required to
reflect the Asset Ceiling
adjustment, which brings
the Pension Asset value
to £nil, after allowing for
the Unfunded Pensions
Obligation/Liability.
Other Comprehensive (Income) and Expenditure
Actuarial (gains) or losses on Pension Assets and Liabilities 164,914 (123,880) 288,794 
Movement in Reserves Statement
Pension Reserve
Other Comprehensive (Income) and Expenditure 164,914 (123,880) 288,794 
Balance Sheet
Long Term Assets
Other Long Term Debtors (Pensions) 0 269,216 (269,216)
Long Term Liabilities
Unfunded Pensions Liability (19,578) 0 (19,578)
Reserves
Pensions Reserve 19,578 (269,216) 288,794 
Note: The above adjustments reflect those within the Council’s (single entity) Financial Statements.  Similar adjustments have also
been made within the Group Financial Statements.

Page 6

Annual Audit Report
Argyll and Bute Council – year ended 31 March 2024
December 2024
Appendix 2

Page 7

Audit and Scrutiny Committee
Argyll and Bute Council
Lochgilphead
Argyll
PA31 8RT
6 December 2024
Forvis Mazars
26 Mosley Street                   
Newcastle upon Tyne 
NE1 1DF
Dear Committee Members and Controller of Audit,
Annual Audit Report – Year ended 31 March 2024
We are pleased to present our Annual Audit Report for the year ended 31 March 2024.
The purpose of this document is to summarise our audit conclusions and findings from our
considerations of the wider scope audit specified in the Code of Audit Practice 2021
namely, financial management; financial sustainability; vision, leadership and governance;
and use of resources to improve outcomes.
The scope of our work, including identified significant audit risks, and other key judgement
areas, was outlined in our Annual Audit Plan, which we presented to you on 13 June 2024.
We have reviewed our Annual Audit Plan and concluded that the significant audit risks and
other key judgement areas set out in that report remain appropriate.
We would like to express our thanks for the assistance of your team during our audit.
If you would like to discuss any matters in more detail, then please do not hesitate to
contact me on 0191 383 6339.
Yours faithfully
Mark Outterside (Director)
Forvis Mazars LLP
Annual Audit Report letter
Forvis Mazars LLP – 26 Mosley Street – Newcastle upon Tyne – NE1 1DF Tel: {0191 383 6339} – www.forvismazars.com/uk
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is a limited liability partnership registered in England and Wales with registered number OC308299 and
with its registered office at 30 Old Bailey, London, EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered Accountants in England and Wales. Details about our audit registration can be viewed at
www.auditregister.org.uk under reference number C001139861. VAT number: GB 839 8356 73

Page 8

3
Contents
01 Executive summary
02 Status of the audit
03 Audit approach
04 Significant findings
05 Internal control conclusions
06 Summary of misstatements
07 Wider Scope
08 Best Value
A Appendix A: Draft management representation letter
B Appendix B: Draft audit report
C Appendix C: Confirmation of our independence
D Appendix D: Other communications
E Appendix E: Wider scope and Best Value ratings
Our reports are prepared in accordance with Terms of Appointment Letter from Audit Scotland dated 18 May 2022 through which the Accounts Commission has appointed us as external auditor of Argyll
and Bute Council (the Council) for financial years 2022/23 to 2026/27. We undertake our audit in accordance with Part VII of the Local Government (Scotland) Act 1973, as amended; and our
responsibilities as set out within Audit Scotland’s Code of Audit Practice 2021.
Reports and letters prepared by appointed auditors and addressed to the Council are prepared for the sole use of the Council and made available to Audit Scotland and the Accounts Commission, the
Controller of Audit. We take no responsibility to any member or officer in their individual capacity or to any other third party.

Page 9

01Executive Summary

Page 10

5
Executive summary
Audit conclusions and significant findings
The detailed scope of our work as your appointed auditor for 2023/24 is set out in Audit
Scotland’s Code of Audit Practice 2021. Our responsibilities and powers are derived
from Part VII of the Local Government (Scotland) Act 1973 and as outlined in our Annual
Audit Plan, our audit has been conducted in accordance with International Standards on
Auditing (UK) and means we focus on audit risks that we have assessed as resulting in a
higher risk of material misstatement.
In section 4 of this report we have set out our conclusions and significant findings from
our audit. This section includes our conclusions on the audit risks and areas of
management judgement in our Annual Audit Plan, which include:
• Management override of controls;
• Valuation of the net defined benefit (liability)/surplus;
• Valuation of property; and
• Accounting for PFI and PPP contracts
Misstatements and internal control recommendations
Section 5 sets out internal control recommendations and section 6 sets out audit
misstatements. Section 7 outlines our work on the Council’s arrangements to achieve
economy, efficiency and effectiveness in its use of resources.
Status and audit opinion
Our audit work in on the financial statements is well progressed. However, we are
finalising work in the areas highlighted in Section 2 of this report.
We will provide an update to you in relation to the significant matters outstanding through
issuance of a follow up letter.
Subject to the satisfactory conclusion of the remaining audit work, we have the following
conclusions:
Audit opinion
We expect to issue an unqualified opinion, without modification, on the
financial statements. Our proposed audit opinion is included in the draft
auditor’s report in Appendix B.
Matters on which we report by exception
We are required by the Accounts Commission to report to you if, during
the course of our audit, we have found that adequate accounting records
have not been kept; the financial statements and the audited part of the
Remuneration Report are not in agreement with the accounting records;
or we have not received all the information and explanations we require
for our audit.
We have nothing to report in respect of these matters.

Page 11

6
Executive summary (continued)
Conclusions from our audit testing and audit opinion (continued)
Other information
We are required to report on whether the other information (comprising of 
Management’s Commentary, Statement of Responsibilities and the
unaudited parts of the Remuneration Report), is materially inconsistent
with the financial statements; is materially inconsistent with our knowledge
obtained in the course of the audit; or is materially misstated.
No inconsistencies have been identified and we expect to issue an
unmodified opinion in this respect.
Management Commentary and Annual Governance Statement
We are required to report on whether the information given in the
Management Commentary and Annual Governance Statement is
consistent with the financial statements; and has been properly prepared
in accordance with the statutory guidance issued under the Local
Government in Scotland Act 2003 and Delivering Good Governance in
Local Government Framework 2016.
We have no matters to report in respect of the Management Commentary
and Annual Governance Statement
Wider powers
Section 101 of the Local Government (Scotland) Act 1973 requires us to
give any person interested, the opportunity to question us about the
accounting records of the Council and to consider any objection made to
the accounts. We did not receive any such correspondence from electors.
Whole of Government Accounts (WGA)
We anticipate completing our work on the Council’s WGA submission, in
line with the Technical Guidance Note TGN/WGA/24, provided by Audit
Scotland. We anticipate reporting that the WGA submission is consistent
with the audited financial statements

Page 12

7
Executive summary (continued)
Best Value and Wider Scope conclusions
As auditors appointed by the Accounts Commission, our wider scope responsibilities are
set out in Audit Scotland’s Code of Audit Practice 2021 and sits alongside Best Value
requirements detailed the Local Government (Scotland) Act 1973. The Code
requirements broaden the scope of the 2023/24 audit and allows us to use a risk-based
approach to report on our consideration of the Council’s performance of best value and
community planning duties and make recommendations for improvement and, where
appropriate, conclude on the Council’s performance.
The Code’s wider scope framework is categorised into four areas:
• financial management;
• financial sustainability;
• vision, leadership and governance; and
• use of resources to improve outcomes.
It remains the responsibility of the Council to ensure proper financial stewardship of
public funds, it complies with relevant legislation, and establishes effective governance of
their activities. The Council is also responsible for ensuring that it establishes
arrangements to secure continuous improvement in performance and, in making those
arrangements, ensures resources are being used to improve strategic outcomes and
demonstrate the economy, efficiency, and effectiveness throughout the use of its
resources. These arrangements should be proportionate to the size and type of the
Council, appropriate to the nature of the Council and the services and functions that it
has been created to deliver.
Wider Scope
We anticipate having no risks in arrangements to report in relation to the
financial management; financial sustainability; vision, leadership and
governance; and use of resources to improve outcomes arrangements
that the Council has in place. 
Further detail on our Wider Scope work is provided in section 7 of this
report including any significant risks identified. 
Best Value
We anticipate having no risks in arrangements to report in relation to the
arrangements that the Council has in place to secure economy,
efficiency and effectiveness in its use of resources. 
Further detail on our Best Value work is provided in section 8 of this
report including any significant risks identified.

Page 13

02Status of the audit

Page 14

9
Status of our audit
Our audit work is substantially complete and there are currently no matters of which we are aware that would require modification of our audit opinion, subject to the satisfactory
resolution of the outstanding matters set out below.
Audit Area and Description of Outstanding Matter Classification
Debtors
Our testing of debtors is substantially complete, a limited number of audit queries remain outstanding. Low
Valuation of the net defined benefit (liability)/surplus
We are finalising our work in this area, including review of the revised disclosures relating to audit adjustments. Medium
Valuation of property, plant and equipment
Our work is substantially complete, and we are finalising our work in this area. Medium
Cash and Bank Balances
We are finalising our work in this area; including receipt of a small number of third-party confirmations. Low
Comprehensive income and expenditure testing
We are working with officers to finalise our income, expenditure and cut-off testing for a limited number of queries. Low
Consolidation process for group accounts
Our work is substantially complete, we are finalising our review of this work. Low
Annual report and accounts and letter of representation
We will complete our final review of the annual report and accounts upon receipt of the final signed version of the
accounts and letter of representation.
Low
Audit quality control and completion procedures
Completion of Manager and Partner review and our quality control processes in respect of the audit.  Review of post
balance sheet events up to the point at which we sign our audit report.
Low
Status
High - Likely to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Medium - Potential to result in a material
adjustment or a significant change to
disclosures in the financial statements.
Low - Not considered likely to result in a
material adjustment or a change to
disclosures in the financial statements.

Page 15

03Audit Approach

Page 16

11
Audit Approach
Changes to our audit approach
There have been no changes to the audit approach we communicated in our Annual
Audit Plan.
Materiality
Our provisional materiality at the planning stage of the audit was set at £9,529k for the
Council and £9,665k for its group using a benchmark of 2% of gross revenue expenditure
at surplus/deficit level. Our Performance materiality was set at £6,670k for the Council
and £6,766k for its group.
Based on the final financial statement figures the final overall materiality we applied was
£9,697k for the Council and £9,810k for its group, final performance materiality: £6,788k
for the Council and £6,867k for its group; final clearly trivial threshold: £291k for the
Council and £294k for its group.
Use of experts
We used our experts to assist us in obtaining sufficient appropriate audit evidence in
relation to specific areas of the accounts. In addition to the experts listed in our Annual
Audit Plan, we used Forvis Mazars’ Real Estate Valuation Team to review the Council’s
valuation methodology on DRC and EUV assets, consider  the Council’s non-revalued
assets methodology on DRC assets and review the Council's approach to non-revalued
EUV assets.
Service organisations
International Auditing Standards (UK) (ISAs) define service organisations as third-party
organisations that provide services to the Council that are part of its information systems
relevant to financial reporting.  We are required to obtain an understanding of the
services provided by service organisations as well as evaluating the design and
implementation of controls over those services. We have not identified any relevant
service organisations.
Charitable Trusts
Our provisional materiality for the charitable trusts was set at £16,318, a single materiality
to reflect that the charitable trusts financial statements are covered by a single audit
opinion. This remains unchanged at final as it was based on the draft financial
statements for 2023/24.
We have provided our consideration of our independence as part of the Council
engagement and Charitable Trust engagement in Appendix C.

Page 17

12
Audit Approach (continued)
Group audit approach
Group component Approach
adopted Key points or matters to report
Argyll and Bute
Integration Joint Board
Specific
procedures.
Our audit of the IJB is underway and we expect there to be
changes to the IJB’s accounts, which will impact on our
work. 
Dunbartonshire and
Argyll & Bute Valuation
Joint Board
Desktop review
procedures.
Our work in this area is ongoing with no key points to report
as at the time of this report.
Live Argyll
Audit of  pension
balances and
disclosures.
Our work in this area is ongoing with no key points to report
as at the time of this report.
Common Good
Accounts N/A N/A
.
Full audit - Performance of an audit of the
component’s financial information prepared for group
reporting purposes using component materiality
Audit of balances and/or disclosures -
Performance of an audit of specific balances and/or
disclosures included in the component’s financial
information prepared for group reporting purposes,
using component materiality
Specific audit procedures - Performance of specific
audit procedures on the component’s financial
information
Review procedures - Review of the component’s
financial information prepared for group reporting
purposes using the component materiality assigned

Page 18

04Significant findings

Page 19

14
Significant findings
Significant findings, including key areas of management judgement
The significant findings from our audit include:
• our audit conclusions regarding significant risks and key areas of management judgement outlined in the Annual Audit Plan;
• our comments in respect of the accounting policies and disclosures that you have adopted in the financial statements. On page 19 we have concluded whether the financial
statements have been prepared in accordance with the financial reporting framework and commented on any significant accounting policy changes that have been made
during the year; and
• any significant difficulties we experienced during the audit.

Page 20

15
Significant findings
Management override of
controls
]
Description of the risk
This is a mandatory significant risk on all audits due to the unpredictable way in which such override could occur.
Management at various levels within an organisation are in a unique position to perpetrate fraud because of their ability to manipulate accounting
records and prepare fraudulent financial statements by overriding controls that otherwise appear to be operating effectively. Due to the unpredictable
way in which such override could occur there is a risk of material misstatement due to fraud on all audits.
How we addressed this risk
We addressed this risk through performing audit work over:
• Accounting estimates impacting amounts included in the financial statements for evidence of management bias;
• Consideration of identified significant transactions outside the normal course of business; and
• Journal entries recorded in the general ledger and other adjustments made in preparation of the financial statements
Audit conclusion
Our work has provided the assurance we sought in each of these areas and as at the time of this report has not highlighted any material issues to bring
to your attention.

Page 21

16
Significant findings (continued)
Valuation of the net defined
benefit (liability)/surplus
]
Description of the risk
As at 31 March 2024, the net defined benefit surplus was £269m (2022/23 - £139m). The valuation of the Council’s net liabilities/assets includes use of
discount rates, inflation rates, mortality rates etc., all of which should reflect the profile of the Council’s employees and other appropriate data.
Due to the high degree of estimation uncertainty associated with the valuations, we have determined there is a significant risk in this area.
How we addressed this risk
We addressed this risk through:
• challenging the reasonableness of the Actuary’s assumptions that underpin the relevant entries made in the financial statements;
• critically assessing the competency, objectivity and independence of the Actuary;
• liaising with the auditors of the Pension Fund to gain assurance that the overall IAS19 procedures and controls in place at the Pension Fund are
operating effectively;
• comparing assumptions to expected ranges; and
• agreeing data in the Actuary’s valuation report for accounting purposes to the relevant accounting entries and disclosures in the Council’s financial
statements.
Audit conclusion
Our work in this area is ongoing and there have been audit adjustments to the financial statements in respect of the asset ceiling, see Section 6.

Page 22

17
Significant findings (continued)
Valuation of property] Description of the risk
The Council held land and buildings (including council dwellings) with a net book value of £457 million at 31 March 2024 (2022-23 £451 million). The
Council has adopted a rolling revaluation model which sees other land and buildings revalued over a five-year cycle. This may result in individual assets not
being revalued for several years. This creates a risk that the carrying value of those assets that have been revalued in year is materially different from the
year end fair value.
Valuations are based on specialist and management assumptions and changes in these can result in material changes to valuations. Due to the high
degree of estimation uncertainty associated with valuations, we have determined there is a significant risk in this area.
How we addressed this risk
We addressed this risk through:
• assessing the scope and terms of engagement with the in-house Valuer;
• assessing the competence, skills and objectivity of the in-house Valuer;
• assessing how management use the in-house Valuer’s report to value land and buildings included in the financial statements;
• testing the accuracy of the data used in valuations;
• challenging the Council and in-house Valuer’s assumptions and judgements applied in the valuations;
• reviewing the valuation methodology used, including the appropriateness of the valuation basis;
• considering the reasonableness of the valuation by comparing the valuation output with market intelligence;
• testing a sample of revaluations in the year, by agreeing the revaluations recorded in the Annual Accounts to the in-house valuer’s reports. As part of this
testing, we checked whether the movements have been accounted for in accordance with the Code;
• challenging management’s assessment for those assets not subject to valuation in the year;
• for those valued on Existing Use Value on a market comparable basis, we checked market movements to assess the materiality of potential movement
for 2023/24; and
• for those valued on a Depreciated Replacement Cost basis, which would be impacted by changes in build costs during the year, we tested
management’s analysis of changes in the Build Costs Information Service (BCIS) index and assessed any decisions management made in this regard.
Audit conclusion
Except for the work highlighted in section 2 of this report, our work in this area is substantially complete, and we do not expect to report any material issues
for your attention. As this is a significant risk area, we have had detailed discussion with management and there has been additional audit focus on
assumptions around indexation and inputs used in valuation such as property areas, in arriving at this conclusion.

Page 23

18
Significant findings (continued)
Accounting for PFI and
PPP contracts
]
Description of the management judgement and enhanced risk
The Council currently operates three Private Finance Initiative (PFI), or similar, contracts which are accounted for as Service Concession arrangements
under IFRIC12 – Service Concession Arrangements.
The Council has determined that in the case of the Schools NPDO contract and the new Schools DBFM contract, the Council has control over the services
provided through use of the schools and that a qualifying asset has been created. Therefore, the assets are included on the Council’s Balance Sheet along
with a finance lease liability.
The Council also operates a Waste Management PPP contract. In this case the Council determined that a “qualifying asset” has not been created and that
the Council does not have significant control over the services being provided. Therefore, the asset has not been included on the Council’s Balance Sheet
and payments to the contractor are charged to the appropriate service line within the Comprehensive Income and Expenditure Account.
The method of accounting for PFI and PP assets can be complex and involves management judgement as set out in Note 3 to the financial statements.
Therefore, there is a potential risk of material misstatement if the Council fails to appropriately account for these assets.
How our audit addressed this area of management judgement
We addressed this risk through:
• reviewing the Council’s adopted approach for accounting for its PFI arrangements;
• reviewing any changes from prior years to the long-term financial model used;
• critically reviewing the assumptions made by management; and
• assessing the completeness and accuracy of disclosures.
Audit conclusion
Our work has provided the assurance we sought in each of these areas and as at the time of this report has not highlighted any material unadjusted issues
to bring to your attention.

Page 24

19
Significant findings (continued)
Qualitative aspects of the Council's accounting practices
We have reviewed the Council's accounting policies and disclosures and concluded they
comply with the CIPFA/LASAAC Code of Practice on Local Authority Accounting in the
United Kingdom 2023/24, as amended by the Update to the Code and Specifications for
Future Codes for Infrastructure Assets, published in November 2022, appropriately
tailored to the Council's circumstances.
The Draft accounts were approved for issue by the Council on 27 June 2024. We
reviewed the approved draft accounts, and they were of a good quality.
Significant matters discussed with management
During our audit we communicated the following significant matter to management:
Audit of areas with Complex Accounting Estimates
As outlined in the previous section, we discussed with management valuation of defined
benefit liability/assets as this material item of account, includes several complex
estimations and judgments.
As part of our work, we obtained assurance from the pension fund auditor over the
controls relating to the accuracy of data used by the actuary. The pension fund auditor,
identified an understatement of private equity, debt infrastructure and direct portfolio
assets in the Strathclyde Pension Fund annual accounts.  We therefore quantified the
potential impact on the Council, based on its share of pension assets included in the total
pension fund assets.  This resulted in an estimated unadjusted uncertainty totalling
£3,295k, as included in section 6 of this report.
From the work of the pension fund auditor, we also noted that although we requested
assurance on benefits paid during the year no assurance was provided on this. We
therefore performed alternative procedures by directly testing data obtained from the
Pension Fund and identified a difference above our clearly trivial threshold but below our
performance materiality between the benefits paid amount in the unaudited financial
statements disclosure notes and that provided by the Pension Fund, which we
challenged management on and received a satisfactory explanation hence have not
included this in section 6 of this report.
During the course of the audit we have had the full co-operation of management. Due to
ongoing audit work, the Council was unable to meet the submission date of 30
September 2024, specified in the Local Authority Accounts (Scotland) Regulations 2014,
for approval of its audited annual accounts. Forvis Mazars has discussed the implications
of this with Audit Scotland who confirmed there are no consequences for the Council.

Page 25

20
Significant findings (continued)
Wider responsibilities – statutory reporting
The 1973 Act allows any persons interested to inspect the accounts to be audited and the underlying accounting records of the Council. The act also allows any persons interested to
object to the accounts. No such objections have been raised.
We are required to notify the Controller of Audit when circumstances indicate that a statutory report may be required.
• Section 102(1) of the 1973 Act allows us to prepare a report to the Commission about the Council's accounts; matters that have arisen during the audit that should be brought to
the attention of the public; or the performance of the Council in their duties relating to Best Value and community planning.
• Section 102(3) of the 1973 Act allows us to make a special report to the Commission if an item of account is contrary to law; there has been a failure on someone’s part to bring
into account a sum which ought to have been brought into account; a loss has been incurred or deficiency caused by the negligence or misconduct of a person, or by the failure of
a body to carry out a duty imposed on them by any enactment; or a sum which ought to have been credited or debited to one account of a body has been credited or debited to
another account and the body has not taken, or is not taking, steps to remedy the matter.
• Section 97A of the 1973 Act allows us to undertake or promote comparative and other studies to make and publish recommendations for the securing by local government bodies
of Best Value, improving economy, efficiency and effectiveness in the provision of services by local government bodies and improving the financial or other management of local
government bodies.
Reporting to the NAO in respect of Whole of Government Accounts consolidation data
The NAO, as group auditor, requires us to complete the WGA Assurance Statement in respect of its consolidation data. We will submit this information to the NAO upon completion of
our audit.

Page 26

05Internal control conclusions

Page 27

22
Internal control conclusions
Overview of engagement
As part of our audit, we obtained an understanding of Council’s internal control
environment and control activities relevant to the preparation of the financial statements,
which was sufficient to plan our audit and determine the nature, timing, and extent of our
audit procedures. Although our audit was not designed to express an opinion on the
effectiveness of Council’s internal controls, we are required to communicate to the Audit
and Scrutiny Committee any significant deficiencies in internal controls that we identified
in during our audit.
Deficiencies in internal control
A deficiency in internal control exists if:
• A control is designed, implemented, or operated in such a way that it is unable to
prevent, detect, and/ or correct potential misstatements in the financial statements;
or
• A necessary control to prevent, detect, and/ or correct misstatements in the financial
statements on a timely basis is missing
The purpose of our audit was to express an opinion on the financial statements. As part
of our audit, we have considered Council’s internal controls relevant to the preparation of
the financial statements to design audit procedures to allow us to express an opinion on
the financial statements, but not for the purpose of expressing an opinion on the
effectiveness of Council’s internal controls or to identify any significant deficiencies in
their design or operation.
The matters reported in this section of our report are limited to those deficiencies and
other control recommendations that we have identified during our normal audit
procedures and which we consider to be of sufficient importance to merit being reported.
If we had performed more extensive procedures on internal control, we might have
identified more deficiencies to report or concluded that some of the reported deficiencies
need not in fact have been reported.
Our comments in this section should not be regarded as a comprehensive record of all
deficiencies that may exist or improvements that could be made.
The deficiencies Council’s internal controls that we have identified as at the date of this
report are in set out on the following pages.
Significant deficiencies in internal control
A significant deficiency in internal control is one which, in our professional judgement,
has the potential for financial loss, damage to reputation, or a loss of information which
may have implications on the achievement of business strategic objectives. Our view is
that observations categorised as a significant deficiency is of sufficient importance to
merit the attention of the Audit and Scrutiny Committee.
We have not identified any significant deficiencies in the Council’s internal controls as at
the date of this report.
Other observations
We also record our observations on the Council’s internal controls where, in our
professional judgement, there is a need to strengthen internal control or enhance
business efficiency that do not constitute significant deficiencies in internal control but
which we view as being important for consideration by management.

Page 28

23
Internal control conclusions (continued)
Other observations (continued)
Our other internal control observations, as at the date of this report, are set out in this section. These have been reported to management directly and have been included in this report
for your information.
Whether internal control observations merit attention by the Audit and Scrutiny Committee and/ or management is a matter of professional judgment, taking into account the risk of
misstatement that may arise in the financial statements as a result of those observations.
Other deficiencies in internal control
In our view, there is a need to address the deficiencies in internal control set out in this section (which are not deemed to be significant deficiencies) to strengthen internal control or
enhance business efficiency. Our recommendations should be actioned by management in the near future.
Description of deficiency - Property Plant and Equipment Valuation Reconciliations – Brought Forward from Prior Year
The Council has improved its reconciliations in regard to results of revaluation exercises and summaries in that it now prepares and maintains a file reconciling  the results of the inhouse
valuation process undertaken under Programme 1 and Programme 2 to the associated disclosure note in the financial statements. Nonetheless, there is scope to improve the
reconciliations further by maintaining clear records on how area inputs are recorded as in some instances these details were difficult to agree to the underlying records.
Potential effects
The lack of this reconciliation contributed to making this audit area time consuming to reconcile the area values in the valuation reports with the underlying supporting documents for
instance the maps and architects’ area schedules. This also led to additional requests being made during the audit process.
Recommendation
As regular practice, management should prepare and maintain a reconciliation of the results of any revaluation exercises conducted with the fixed asset registers/general ledger and
maintain summaries that agree as appropriate including to the underlying supporting records such as maps and architects’ plans.
Management response
Council finance and property officers welcome the opportunity for continuous improvement and will consider these comments for future years, continuing to build on the process
improvements already introduced in this area.

Page 29

24
Internal control conclusions (continued)
Other recommendations on internal control
In our view, internal control should be strengthened in these additional areas when practicable.
Description of observation – Dormant/Inactive Bank Accounts
We noted that the Argyll and Bute Council administers numerous bank accounts, several of which were dormant during the period. From our audit testing, it is not clear whether these
accounts are actively monitored, due to the low level of activity in each.
Potential effects
Bank statements should be obtained and reconciliations performed for all bank accounts, including those with zero balances and little or no activity, by a member of the finance group
who does not have access to withdraw from the accounts. These reconciliations should be independently reviewed by a person independent of the reconciliation process. Maintaining
and monitoring dormant/inactive accounts uses resources that could be better used elsewhere and may present an opportunity for the account to be used for inappropriate or fraudulent
purposes.
Recommendation
A review of open bank accounts should be carried out periodically to identify dormant accounts. Any accounts that are no longer required should be closed as soon as possible.
Management response
There is an operational requirement for the council to hold a range of bank accounts for treasury management purposes, in order to limit its exposure to credit or counter-party risk.  The
Creditworthiness approach, set out within the approved Annual Investment Strategy 2024/25, limits the level of investments held with any one counter-party (generally banks or financial
institutions) or country.  As such, the council requires sufficient flexibility to manage its day-to-day cashflow requirements, whilst having regard to the investment priorities of security,
liquidity and return.  The deals offered in the market by any given bank on any given day can vary and subsequent to satisfying, firstly the priority of security and then liquidity, the council
would look to maximise the return on cash balances invested.  Management does not consider the holding of bank accounts that have been dormant during the period to present an
issue with the control environment, rather it is an operational necessity to provide flexibility to support the effective delivery of treasury management activities and compliance with the
approved Investment Strategy.

Page 30

25
Internal control conclusions (continued)
Other recommendations on internal control (continued)
In our view, internal control should be strengthened in these additional areas when practicable.
Description of observation – Inconsistency in Related Party Records
Our testing on related parties identified that one Policy Lead for Health and Social Care is disclosed in the Senior Councillors Remuneration in the accounts but not on the website of the
Council.
Potential effects
Inconsistent related party information could be misleading to users of the financial statements/members of the public who access the Council’s website for accountability.
Recommendation
Management should perform an exercise regularly to ensure that there is consistency of disclosure between the financial statements’ information and the Council website.
Management response
Management accepts that process improvements could be made to minimise the risk of any future discrepancies.   Action will be taken to ensure that information is disclosed
consistently between the annual accounts  and the Council website, through performing regular reconciliations.

Page 31

26
Internal control conclusions (continued)
Follow up on previous internal control points
We set out below an update on internal control points raised in the prior year.
Description of deficiency – Errors in Exit Packages
Our testing of payroll identified one exit packages that had errors on the redundancy request forms and amounts per workings. The differences were likely due to the two information
systems used by the Council that is the HR system and the redundancy forms which would have been signed prior to the member leaving.
Potential effects
Amounts paid out to former staff may be inaccurate and could lead to complaints and further action by affected staff and reputational risk for the Council.
Recommendation
Management should use one system (HR system) for the calculation of exit packages.
2023/24 update
No significant matters noted in this regard in 2023/24.

Page 32

27
Internal control conclusions (continued)
Follow up on previous internal control points (continued)
Description of deficiency – Related Parties Declarations
Our testing of payroll identified several Annual Declaration forms for the Councillors had not been signed and the form initially submitted for audit had no dates, signatures. As the audit
progressed more forms were subsequently obtained and provided to us.
Potential effects
Councillors/management not acting in the best interest of Council or with conflicts of interest may not be identified in a timely manner.
Recommendation
Management should establish and improve the procedures around annual declaration forms for related party transactions and work closely with Councillors and other relevant related
parties to ensure the declarations are appropriately completed and signed off, in a timely manner.
2023/24 update
All the Annual Declaration Forms in 2023/24 were signed and contained the expected information. Resolved.

Page 33

06Summary of misstatements

Page 34

29
Summary of misstatements
We set out below and on the following pages a summary of the misstatements we identified during our audit, above the trivial threshold for adjustment of £291k for the Council and
£294k for its group.
The first table in this section sets out the misstatements we identified which management has assessed as not being material, individually or in aggregate, to the financial
statements and does not plan to adjust. The second table outlines the misstatements we identified that have been adjusted by management.
Our overall materiality, performance materiality, and clearly trivial (reporting) threshold were reported in our Annual Audit Plan, issued on 24 May 2024. Any subsequent changes to
those figures are set out in the section 3 of this report.
We will issue a follow up letter to this report, should we need to report any issues arising from the work highlighted in section 2 of this report.

Page 35

30
Summary of misstatements
Unadjusted misstatements
Management has assessed the misstatements in the table below as not being material, individually or in aggregate, to the financial statements and does not plan to adjust. We only
report to you unadjusted misstatements that are either material by nature or which exceed our reporting threshold.
Details of adjustment CIES CIES Balance Sheet Balance Sheet
Blank Dr (£ ‘000) Cr (£ ‘000) Dr (£ ‘000) Cr (£ ‘000)
Dr: Pension Asset
Cr: CIES Remeasurement of net defined liability/ (surplus)
To adjust for an error identified by the Strathclyde Pension Fund external auditor,
apportioned to the Council, due to the understatement of private equity, debt
infrastructure and direct portfolio assets in the Strathclyde Pension Fund annual
accounts.
3,297
3,297
Dr: Gross Expenditure
Cr:Gross Income
To adjust for an error on internal recharges which had not been adjusted for in the
gross income and expenditure figures. 
1,553
1,553
Aggregate effect of unadjusted misstatements 1,553 4,850 3,297 -
We will obtain written representations confirming that, after considering the unadjusted misstatements, both individually and in aggregate, in the context of the financial statements taken
as a whole, no adjustments are required.

Page 36

31
Summary of misstatements (continued)
Adjusted misstatements
The misstatements in the table below have been adjusted by management. We report all individual misstatements above our reporting threshold that we identify during our audit
and which management had adjusted and any other misstatements we believe the Audit and Scrutiny Committee should be made aware of.
Details of adjustment CIES CIES Balance Sheet Balance Sheet
Blank Dr (£ ‘000) Cr (£ ‘000) Dr (£ ‘000) Cr (£ ‘000)
Dr: Pension Reserve
Cr: Pension Asset
Cr: Pension Obligation
To adjust for the effects of the asset ceiling which brings the balance on the balance
sheet to £Nil value instead of the current value of £269,219k which had not
considered the effects of the asset ceiling.
288,794
269,216
19,578
Aggregate effect of adjusted misstatements - - 288,794 288,794

Page 37

32
Summary of misstatements (continued)
Disclosure misstatements
We identified the following disclosure misstatements during our audit that have been corrected by management:
• Remuneration report:- The Council has amended the employee's remuneration to include the taxable benefit values for the VIVUP (employee benefits platform) salary sacrifice
scheme as result of the confirmations received relating to the Optional Remuneration Arrangements (OPRA) rules which states that the agreements include the employees tax
liability.  The Council changed the draft accounts and added 2 new personnel of the over £50k list and made changes for the 4 other employees on the list who moved to the next
banding.
• The amount originally disclosed for Note 15.2 relating to the rolling valuation programme increased by £3,514k following audit testing.
• Note 27.2 Financial instruments was amended to increase the loans and receivables amount from £46,423k to £55,333k. Also updated the Charging Care Home Fees for
consistency with related disclosures.
• Note 29 Provisions and Management Commentary - disclosure narrative amended to elaborate on withheld sums.
There were several other minor adjustments for disclosure, consistency or presentational issues made to the annual report and financial statements.
We identified the following disclosure misstatements during our audit that have not been corrected by management:
• The Statement of Cashflows was presented in a manner slightly inconsistent with established practice, in that the movements in operating cash flow were represented in the
direction opposite to the expectation for example increase in debtors represented as a positive cash flow movement rather than negative.
We will obtain written representations confirming that, after considering the unadjusted disclosure misstatements, both individually and in aggregate, in the context of the annual
report and financial statements taken as a whole, no adjustments are required.

Page 38

07Wider scope

Page 39

Commentary on Wider Scope
Overall Summary

Page 40

35
Commentary on Wider Scope
Wider scope summary
As auditors appointed by the Accounts Commission, our wider scope responsibilities are set out in the Code of Audit Practice 2021 and sits alongside Best Value requirements detailed
in the Local Government (Scotland) Act 1973. The Code requirements broaden the scope of the 2023/24 audit and allow us to use a risk-based approach to report on our consideration
of the Council’s performance of best value and community planning duties and make recommendations for improvement and, where appropriate, conclude on the Council’s
performance.
The Code’s wider scope framework is categorised into four areas:
• financial management;
• financial sustainability;
• vision, leadership and governance; and
• use of resources to improve outcomes.
Overall summary by reporting criteria
Subject to the satisfactory conclusion of the remaining audit work, we have the following conclusions:
Blank
Reporting criteria Commentary
page reference Identified risks? Actual risks identified? Other recommendations made?
Financial management 38 No No No
Financial sustainability 41 Yes – see risk 1 on page 42 No No
Vision, leadership and
governance 44 No No No
Use of resources to improve
outcomes 47 No No No

Page 41

Commentary on Wider Scope
Financial management
Financial management is concerned with financial capacity,
sound budgetary processes and whether the control
environment and internal controls are operating effectively.

Page 42

37
Financial management
Significant Risks and our overall assessment
We have not identified any significant risks in arrangements as part of our continuous planning procedures.
Area assessed Our findings Our judgements Risks identified
Financial management
culture The Council has approved a Local Code of Corporate Governance. This sets
out its commitment to achieving good governance. The Code covers how the
Council will manage risks and its performance through robust internal control
and strong public financial management.  As reported in the prior year, the
Council has a system of internal control which is designed to manage risk to a
reasonable level.
The Council has an established medium-term budget (MTFP) process which is
designed to keep Members fully informed on changes to assumptions and
pressures that affect future year estimates.  The plan is updated on a regular
basis and reported to each Policy and Resources Committee.
The MTFP is part of a Strategic Planning Framework, and our work confirms
that arrangements were in place that: link the financial plan to the Council’s
objectives to ensure the priorities are delivered; scrutinise the MTFP; and
record key assumptions with each savings plan being risk assessed.
Our review of Policy and Resource Committee minutes provides assurance
that the Council monitors and identifies mitigations to manage any changes in
demand and assumptions in the MTFP.  The Council also has an established
risk management framework (risk matrix), with regular reviews and reporting to
the Policy and Resources Committee.
The Council has an
appropriate financial
management culture
in place. It reviews its
system of internal
financial control
annually.
No significant issues identified.

Page 43

38
Financial management
Area assessed Our findings Our judgements Risks identified
Accountability Officers regularly presented financial performance reports to the Policy and
Resources Committee during 2023/24 to update members on the Council’s
position against budget and the progress of savings programmes. The reports
provide sufficient detail for Council members to effectively scrutinise the
Council’s finances.
The officers presented the 2024/25 budget to the Council in February 2024.
The budget included previously agreed savings of £93,000 in 2024/25, rising
to £1.957m by 2028/29. In order to balance the budget, with a £10.167m
budget gap forecast for 2024/25, the main measures employed by the Council
include operational and policy cost savings across service areas and an
inflationary increase to fees and charges.
In response to the pressures on the capital programme, officers have reviewed
the earmarked balances and have agreed to release a total of £2.212m. This
release is intended to help address some of the shortfall in the capital
programme. After cost adjustments, the total gap within the capital programme
forecast at  2026/27 is £29.843m per the Budget outlook.
The Council’s general fund reserves at 31 March 2023 were £86.4m. The
Council has a policy of holding a minimum uncommitted balance of 2% of its
budgeted annual net expenditure. There was a revised contingency of circa.
£6m of free reserves per the budgeting pack for 2024/25 and the annual
accounts. Using the final net expenditure for March 2024, this represents a
balance which is over 2% of annual net expenditure.
The Council has
appropriate budget
monitoring and
reporting
arrangements in
place, with
appropriate
contingency funds in
place in accordance
with policies.
No significant issues identified.
Our overall assessment

Page 44

39
Financial management (Continued)
Area assessed Our findings Our judgements Risks identified
Arrangements to
prevent and detect
fraud, error and
other irregularities,
bribery and
corruption
The Council has established arrangements for preventing and detecting fraud and corruption. These
include:
• Whistleblowing policy
• Anti-fraud strategy
• Codes of conduct for councillors and officers.
The Council has a dedicated counter-fraud team which sits within its internal audit function to investigate
fraudulent claims covering tenancy, procurement, council tax reduction, Scottish Welfare Fund, social care,
employee, insurance, council tax exemptions and discounts and blue badges. Individuals can report
concerns by phone, email or through an online form on the Council’s website.  In 2023/24 the Counter
Fraud team reported to the Audit and Scrutiny Committee with quarterly updates. They reported on
continuous monitoring activities including employee expense claims, with no significant issues or fraud
incidents noted indicating any significant weakness in arrangements.
The Council also takes part in the National Fraud Initiative (NFI). An NFI check was performed in the
2022/23 Financial year, with none being performed in 2023/24. The council was able to clear all 1,281
matches in the prior year, with zero frauds being identified.
The Council has established staff polices including 
• Public interest disclosure policy; and
• Code of Conduct, which is based on the Nolan Principles of Public Life.
The Council has an in-house internal audit team. The Internal Audit Plan and Head of Internal Audit Report
is reviewed by the Council’s Audit and Scrutiny Committee, with quarterly reports being provided,  to
determine the priorities of the internal audit activity, consistent with the Council’s goals. Internal audit
updates show progress is on track and the council’s arrangements are deemed satisfactory.
The Council has
appropriate
arrangements to prevent
and detect fraud and
corruption.
No significant
issues identified.
Our overall assessment

Page 45

Commentary on Wider Scope
Financial sustainability
Financial sustainability looks forward to the medium and
longer term to consider whether the body is planning
effectively to continue to deliver its services or the way in
which they should be delivered.

Page 46

41
Financial sustainability
Significant risks
We have outlined below the significant risks in arrangements that we have identified as part of our continuous planning procedures, and the work undertaken to respond to each of
those risks. 
Blank Significant Risk in Arrangements Identified Work undertaken and the results of our work
1 Financial Sustainability
Councils continue to face significant financial
challenges with
pressures on funding and increasing demand for
services.
Budget estimates after the revised assumptions in
October 2024 give an anticipated in-year budget gap
of £9.147m for 2025/26, rising to a cumulative budget
gap of £28.565m by the end of 2029/30 based upon a
‘midrange’ scenario. The Council’s ‘worst case’
scenario highlights a potential £93.220m cumulative
budget gap by the end of 2029/30.
In common with many local authorities the estimated
budget gaps, highlighted in the Council’s analysis
represent a potential risk in relation to financial
sustainability, which could on the future provision of
services in the Council’s area.
Work undertaken
We reviewed the Council’s:
• medium to long term financial strategy;
• financial position and track record in delivering planned recurrent and non-recurrent savings in 2023/24;
• financial performance in 2023/24 and updates to its financial planning during the year, including the implications for
general reserves balances;
• regular reporting to members on financial performance, savings plans and financial risks; and
• progress in developing plans to address future year budget gaps.
Results of our work
Our review of minutes and supporting papers has confirmed medium-term financial planning arrangements have
remained in place in 2023/24.  In our assessment, we have considered the prior budget outlook, covering 2023/24-
2027/28, and the updated Medium Term Financial Plan  (MTFP) from the Policy and Resource Committee meeting in
August 2024, covering 2025/26-2029/30.
We have considered the Council’s performance in delivering it’s MTFP, including any identified saving targets.
Savings targets were set in the February 2024 committee meeting. However, the Council does not have a dedicated
savings plan document, these are only drawn up at the operational level although they do not feed into a larger,
aggregated savings plan. We recommend that the Council implements a ‘savings plan’ document which tracks a
range of saving options to ensure effective monitoring and decision making can take place.
As in the previous year, we have confirmed that there has been regular monitoring of the Council’s financial position
throughout the year, which included arrangements to routinely update the MTFP, enabling the Council to respond to
any identified financial challenges during the life of the plan. In addition, quarterly performance reports for four area
committees within Argyll & Bute are reported to the Policy and Resources Committee.

Page 47

42
Financial sustainability
Significant risks - continued
Blank Significant Risk in
Arrangements Identified Work undertaken and the results of our work
1 Results of our work
In June 2024, the 2023/24 Revenue Outturn Report presented to the Council highlighted a net overspend of £1.0 million (Excluding Loans
Fund) against the net budget, representing 0.42% of the net budget. We have considered the Council’s performance in delivering its savings
targets within the context of the MTFP and we recognise saving plans are an ongoing and iterative process, developed by officers and agreed
by Members based on the latest information. The savings target for 2023/24 was £9.348 million from 20 savings options. Of this, the council
achieved 97.9% of the savings totalling £9.152 million.
Savings options totalling £4.194 million were included in the Budget Update report presented to the Policy and Resources Committee on 7
December 2023. These savings have been refined, and additional savings options have been identified, bringing the overall value of savings
options to £4.974 million in the 2024/25 budget, which is 1.6% of the £311.468 million budgeted expenditure requirement for 2024/25. 
Our review of the MTFPs issued over the current reporting period, provides assurance that forecasts are based on prudent assumptions
including the Council’s latest understanding of future government funding arrangements, local revenue assumptions, service demand and other
costs pressures. Arrangements for identifying and delivering savings include a timetable for consultation with stakeholders ahead of approval
before each financial year. The Council is not forecasting the use of reserves to support the delivery of a balanced budget; and we note the
Council’s level of reserves do allow some flexibility, with a 2% General Fund contingency in place.  Useable reserves have increased from
£93.775m at 31 March 2023 to £121.701m at 31 March 2024. These reserves provide some mitigation against future financial challenges;
however, the use of reserves cannot be relied on to provide a long-term solution to funding gaps. Therefore, all future income streams need to
be considered in detail by the Council to mitigate future challenges, including reviewing Council Tax raising powers. 
We also note the plan is predicated by the application of £2m from the Strathclyde Pension Fund reduction in rates in 2024/25 and by the
amount in both 2025-26 and 2026-27.
In October 2024, the Council reported its financial position as at 31 August 2024/25, confirming it has achieved 84% (£5.431 million) of its
saving total (£6.466 million).

Page 48

43
Financial sustainability
Significant risks - continued
Blank Significant Risk in Arrangements Identified Work undertaken and the results of our work
1 Results of our work
The net capital expenditure for 2023-24 amounted to £37.860m, exceeding the annual budget of £33.166m.
This budget was adjusted during the year to account for previously agreed slippages, accelerations, and
virements. Consequently, there was a year-end overspend of £4.694m, representing 14.15%. The main
ongoing projects are the Helensburgh Waterfront, Dunoon STEM Hub and CHORD Rothesay, with a
combined overspend on these projects of £5.854m.
While we recognise there is some uncertainty in the financial position of the Council, consistent with the
overall situation of other entities in the Public Sector, our work did not identify any evidence to indicate a
significant weakness in the Council’s arrangements to mitigate these risks.

Page 49

44
Financial sustainability (continued)
Our overall assessment
Area assessed Our findings Our judgements Risks identified
Financial
planning Officers present four financial updates a year to Council meetings. These provide an update on the
financial challenges facing the Council and estimated revenue budget gaps under best case, worst
case and mid-range scenarios. Scenarios are based on financial planning assumptions that are
updated by officers on an ongoing basis.
The Council faces a very challenging financial position. Its mid-range case scenario from the
Budgeting pack for 2024/25, after some assumptions on future years options, but before the 2024/25
budget was approved, projects the following in-year budget gaps:
£6.583 million in 2025/26
£5.550 million in 2026/27
£3.858 million in 2027/28
£5.200 million in 2028/29
In order to  mitigate the above, the Council regularly communicates with the Scottish Government to
secure funding and also performs regular budget setting annually, with cost savings being presented
to the Policy & Resource Committee.
The Council established a cross-party budget working group to ensure that there is early
engagement and consensus on budget proposals. The Council previously approved a Council Tax
increase of 10% for Argyll and Bute area for 2024/25 to enable sustainability of provision of services
but after consideration froze Council tax in line with the Scottish Government’s Council Tax freeze
direction and support.
The Council faces challenges in delivering its capital programme due to a reduction in General
Capital Grant settlement, as it has fallen by £3.428 million in annual funding from total funding of
£12.262 million in 2019-20. After cost adjustments, the total gap within the capital programme
forecast out to 2026/27 is £29.843m. To address this, among the mitigation measures the Council
considers periodically is deferral of capital spending.
The Council has effective
financial planning, with an
established process to
ensure there is early
engagement with relevant
stakeholders on budget
proposals. Councillors and
officers should continue
working together to make
the difficult decisions to
respond to the Council’s
challenging financial
position. The Council
should also continue to
make efforts to collect all
outstanding taxes due.
No significant issues
identified.

Page 50

Commentary on Wider Scope
Vision, leadership and governance
Vision, Leadership and Governance is concerned with the
effectiveness of scrutiny and governance arrangements,
leadership and decision making, and transparent reporting of
financial and performance information.

Page 51

46
Vision, leadership and governance
Significant risks and our overall assessment
We have identified one significant risks in arrangements as part of our continuous planning procedures.
Area assessed Our findings Our judgements Risks identified
Clarity of plans to
implement the vision The Council adopted its Strategic Plan 2023 – 2027,
known as the Corporate Plan. This sets a clear vision
and key commitments for the Council over the period.
The Council’s priorities for 2023 to 2027 are
categorised under the themes of:
• Education;
• Roads, Amenities and Infrastructure;
• Potential and Growth - turning opportunities into
reality; and
• Partnership and Action - everyone has a part to play
in Argyll and Bute's success.
We note that the Strategic plan along with other policy
documents are undergoing revision due to a change in
leadership following a successful political challenge to
the previous administration. These are yet to be
released. Several reviews are planned and scheduled
to be completed prior to March 2025, and these should
consider any changes in strategic direction.
The Corporate Plan sets a vision for the Council for
the four-year period. This focuses on working with
residents, communities, and businesses to deliver
the best possible services and targeting resources
to those most in need. These are reported within
the Council Annual Report in the form of Corporate
outcome indicators across seven areas. This report
is yet to be released for 2023/24, although for
2022/23 a total of 39 Indicators were above target
or on track out of a total of 47 outcome indicators
and from discussions with management a similar
outcome is expected in 2023/24.
The Council’s leadership should ensure that any 
revisions to the Corporate Plan maintain the clarity
of vision, and that these changes are
communicated effectively for understanding of staff
across the Council for effective implementation.
One risk has been identified relating to
the adoption of new corporate plan along
with other strategic documents such as a
performance improvement framework.
There is a risk that future strategic
documents will be inconsistent with other
related policy documents, adversely
impacting the clarity of the Council's
vision.

Page 52

47
Vision, leadership and governance
Significant risks and our overall assessment
We have identified one significant risks in arrangements as part of our continuous planning procedures.
Area assessed Our findings Our judgements Risks identified
Strategy and priorities The Council has described what success will look like for each
of its objectives within the Corporate Plan, including measures
of success for each priority and setting out key commitments.
Details on activity, for each financial year, against the Council
priorities will be set out in a new Annual Business Plan. This
new document replaces the former annual Service Plans to
bring more focus and scrutiny on the delivery and performance
of the organisation against its priorities. This has been
developed and linked to other documents such as the
workforce plan and operational workforce plans. 
The Corporate Plan measures are based on improving key
performance indicators over the four years of the plan. Services
are responsible for setting targets for these measures in
delivery plans and regularly monitoring and reporting progress.
The Council makes use of equality impact assessments in any
key decisions that may change service delivery and impact
communities or employees. The council considers 'Fairer
Scotland Duty' implications in each paper brought to the Full
council or Policy and Resource committee. This includes
considering the impact of decisions/ events on equality and
socio-economic factors.
The Corporate Plan sets out objectives,
measures of success and key commitments
under each priority.
The Council has considered equality
outcomes and socio-economic impacts
regarding key decisions.
No significant issues identified.

Page 53

48
Vision, leadership and governance (continued)
Our overall assessment (continued)
Area assessed Our findings Our judgements Risks identified
Governance
arrangements The Council’s governance arrangements are centred on
Council meetings, service committees and the Audit and
Scrutiny Committee.
Council and Audit and Scrutiny Committee meetings are
well attended by councillors and papers are subject to a
good level of scrutiny.
Council and committee meeting papers and minutes are
available on the Council’s website and meetings are open
to the public. Deputations can be heard at meetings of the
Council and its principal committees.  In addition, the
Council Area Committees have a standing agenda item
for Public Questions to be put and answered.
The Council has appropriate
governance arrangements in place.
We found evidence of effective
scrutiny and challenge, and
transparent decision making at
Council and Audit Committee
meetings.
No significant issues identified.
Financial and
performance information Officers present regular financial updates and budgetary
control reports to Council meetings. The budgetary
control reports provide an update on the general services
revenue budget and the Council’s capital programme.
These reports include additional information on budget
variances and updates on the progress of agreed
savings.
The Council reports progress against delivery plans to
councillors through its service committees. These reports
show the performance of each service against its
performance indicator targets and progress in delivering
agreed actions.
The Council provides councillors with
sufficient information to allow effective
scrutiny of its finances and
performance. The Council’s annual
performance report is clearly
presented and accessible.
No significant issues identified.

Page 54

Commentary on Wider Scope
Use of resources to improve outcomes
Audited bodies need to make best use of their resources to
meet stated outcomes and improvement objectives, through
effective planning and working with strategic partners and
communities. This includes demonstrating economy,
efficiency, and effectiveness through the use of financial and
other resources and reporting performance against
outcomes.

Page 55

50
Use of resources to improve outcomes
Significant risks and our overall assessment
We have not identified any significant risks in arrangements as part of our continuous planning procedures.
Area assessed Our findings Our judgements Risks identified
Resources deployed to
improve strategic
outcomes
The Council has a workforce planning process in place.
It covers the strategic and team specific levels. This
includes a risk matrix to identify areas of priority.
Workforce issues appear on risk registers where
appropriate and action plans are also in place. The
strategic workforce plan is being integrated into the new
people strategy to create a single delivery plan.
Strategic priorities are subject to change due to new
leadership and upcoming publication of new corporate
plan and Performance Excellence Project scheduled for
March 2025 implementation.
The Council’s resource plans are
aligned with the Corporate Plan. It can
demonstrate budget decisions which
reflected its strategic priorities in
2023/24 and reflects its strategic
priorities in 2024/25.
No significant issues identified.

Page 56

51
Use of resources to improve outcomes (continued)
Our overall assessment (Continued)
Area assessed Our findings Our judgements Risks identified
Needs of service users
being met The Council’s delivery plans set out how it will achieve its strategic priorities.
There is a Council-wide annual business plan as opposed to individual
service delivery plans. Within this, the Council consults with stakeholders
including the Scottish Government to maximise funding, for 2023/24 this
included an action to secure Home Energy Efficiency Programmes Scotland
(HEEPS) funding for council led schemes.
The Council also utilises local contractors for development works and involve
residents and other stakeholders in the design and consultation process, an
example of this was the Tobermory wall and rails.
The Annual Business Plan sets out the strategic priorities for all services and
demonstrates how they align with the Council’s priorities and the Local
Outcomes Improvement Plan.
The Council, through its Annual
Business Plan, has identified
how services will contribute to
achievement of its strategic
priorities and objectives. The
Council consults regularly with
service users to understand
how it can meet their needs.
No significant issues identified.
Arrangements to deliver
continuous
improvements in priority
services
The Council’s corporate plan sets clear objectives and highlights the services
it plans to prioritise. This plan measures are based on improving key
performance indicators over the four years of the plan. Service lines are
responsible for setting targets for these measures in delivery plans and
regularly monitoring and reporting progress. This is done as part of the
budget setting process and the savings updates presented to the Audit and
Scrutiny committee. For instance, the Budgeting pack for 2024/25 was taken
to Council in Feb 24. This includes an example of a Savings options for
various service delivery areas. The relevant service leader provides
commentary on potential savings options with associated risks and mitigating
factors.
The Council has clear priorities
and suitable arrangements in
place to measure improvement.
The Council is looking at
opportunities to make
efficiencies through service
innovation.
No significant issues identified.

Page 57

08Best Value

Page 58

53
Best Value
Best Value summary
Under the Code of Audit Practice, the audit of Best Value is fully integrated within our annual audit work. We are required to assess the seven Best Value themes at the Council
over the period of the audit appointment. We have used a risk-based approach that is proportionate to the size and type of the body, to assess whether the Council has made
proper arrangements for securing Best Value and is complying with its community planning duties. We have also followed up on previously reported Best Value findings and have
assessed the pace and depth of improvement implemented by the Council.
At least once every five years, the Controller of Audit will report to the Accounts Commission on the Council’s performance in meeting its Best Value duties. We conduct thematic
reviews as directed by the Accounts Commission. In 2023/24 this will be about workforce innovation. The Council is not included in the second year of the programme which runs
from October 2023 to August 2024.
Performance Audit and Best Value staff also prepare a report for the Controller of Audit using information and judgements on the pace and depth of continuous improvement
reported in this Annual Audit Report. The Council is not included in the first year of the programme which runs from October 2023 to August 2024.
At the planning stage of the audit, we undertook work to understand the arrangements that the Council has in place under each of the reporting criteria and we considered whether
there were any risks to our audit in those arrangements. We have kept our understanding of arrangements under review and updated our risk assessment throughout the audit to
reflect emerging issues that may suggest significant risks in arrangements exist. The following slides outline the work that we have undertaken for each of the seven Best Value
themes and any improvements or risks in arrangements that have been identified as part of our assessment. We have reported recommendations for the risks identified.

Page 59

54
Best Value (continued)
Overall summary by reporting criteria
From the satisfactory conclusion of our audit work, we have the following conclusions:
Blank
Reporting criteria Commentary
page reference Identified risks? Actual risks identified? Other recommendations made?
Best Value 57 No No No
Effectiveness of
performance reporting 60 No Yes – see page 56 Yes – see page 56
Thematic reviews 62 No No No
Statutory Performance
Indicators 67 No No No

Page 60

55
Best Value (continued)
Significant risks and our overall assessment of the Best Value themes
We have not identified any significant risks in arrangements as part of our continuous planning procedures.
Best Value theme Our findings Our judgements Service improvement
considerations Risks identified
Vision and
leadership Our 2023/24 wider scope work considered:
• How clear is the new Council vision and
its priorities?
• Overall, how effective has the leadership
been (political and officer) in setting clear
priorities and a sustainable approach to
delivering them? See page 48.
The Council has a clear vision
with three outward facing
priorities and one inward
looking.
The Council needs to maintain
effective leadership to continue
to achieve its priorities and to
make the difficult decisions to
respond to its challenging
financial position. The Council
needs to revisit its Corporate
Plan in line with the new
political leadership having
assumed office in 2024.
None identified. No significant issues identified.

Page 61

56
Best Value (continued)
Our overall assessment of the Best Value themes (continued)
Best Value theme Our findings Our judgements
Service
improvement
considerations
Risks identified
Governance and
accountability Our 2023/24 wider scope work considered:
• Whether the Council can demonstrate that its
governance arrangements are appropriate and
operating effectively?
• Is there evidence of effective scrutiny, challenge and
transparency on decision making at governance
committees?
See page 40.
The Council has appropriate governance
arrangements in place. We found evidence
of effective scrutiny and challenge, and
transparent decision making at Council and
Audit Committee meetings.
None identified. No significant issues
identified.
Effective use of
resources Our 2023/24 wider scope work considered:
• How good are the delivery plans and is there
alignment of financial, workforce, asset and digital
plans with the Council’s priorities?
See Page 52.
The Council’s annual business plans, and
workforce and digital strategies are aligned
with its corporate plan. It can demonstrate
2023/24 budget decisions which reflected
its strategic priorities.
None identified. No significant issues
identified.
Partnerships and
collaborative
working
Our 2023/24 Best Value Thematic work considered:
• In what areas the council has implemented shared
services with other councils and partners?
• To what extent the council delivers functions through
its communities, the third sector, private sector or
other providers?
See Page 52.
The council participates in joint training and
service delivery alongside other local
government bodies, in addition to a joint
transformation programme with SOLACE.
The council also collaborates and delivers
services via its subsidiary, LiveArgyll.
None identified. No significant issues
identified.

Page 62

57
Best Value (continued)
Our overall assessment of the Best Value themes (continued)
Best Value theme Our findings Our judgements Service improvement
considerations Risks identified
Working with
communities Our 2023/24 wider scope work considered:
• How effectively have the views of citizens
and communities been reflected in the
priorities and decisions taken by the Council?
See Page 53.
The Council knows it needs to work
effectively with citizens and communities
to achieve its strategic objectives.
Community budgeting and participatory
budgeting are two ways it is involving
local people in decision making. Equality
and Social-economic surveys also
involve communities in the decision-
making process for changes to service
delivery.
None identified. No significant issues identified.
Sustainability We did not assess this theme in 2023/24 N/A N/A N/A
Fairness and
equality Our 2023/24 wider scope work considered:
• Do strategic plans demonstrate a clear
approach to improving inequality outcomes?
See Page 48.
Actions to reduce inequalities underpin
the Council’s priorities and objectives.
The Council is focussing on providing
support to communities affecting by the
cost-of-living crisis.
None identified. No significant issues identified.

Page 63

58
Best Value (continued)
Effectiveness of performance reporting
Effective performance management arrangements should be in place to promote the effective use of the local authority’s resources. Performance is systematically measured across
all areas of activity, and performance reports are regularly scrutinised by managers and elected members. The performance management system is effective in addressing areas of
underperformance, identifying the scope for improvement and agreeing remedial action.
We have outlined below a summary of what the Council is reporting in relation to service performance including the Council’s assessment of progress against its service priority
measures and reporting on its relative performance (from the Local Government Benchmarking Framework and other information used locally).
Effectiveness
of performance
reporting theme
Our findings Our judgements Our conclusions Risks identified
Effective
performance
management
The Council uses the Performance Improvement Framework
(PIF) to ensure performance is integral to the work of Council
and is linked to the strategic corporate plan and overarching
mission of the council.
As a result of the elections and newly appointed administration,
there are several changes anticipated to the strategic plans
including a new corporate plan and priorities, and a revised
performance improvement framework.
The Council continue to pursue performance improvement
activities and are in the process of reviewing the approach to
self-assessment. As part of this, A template has been
developed to evaluate the Council's performance in relation to
meeting corporate objectives and key performance indicators,
cost of delivering services and customer satisfaction.
The Council issues Quarterly Area Committee Performance
Reports, looking at performance in the four administrative areas
across the Council.
Each of the Area Committee
performance reports directly link
and assess Corporate outcomes
laid out in the corporate plan,
showing clear links to overall
strategy with comparisons, status
trackers and targets vs actuals.
A template has been developed
to evaluate the Council's
performance in relation to
meeting corporate objectives and
key performance indicators, cost
of delivering services and
customer satisfaction. However,
this is yet to be fully implemented.
It is not clear from review of the
Corporate plan and other
strategic documents that clear
KPIs have been implemented
and are regularly monitored to
assess the effectiveness of
performance.
We recommend that the
Council ensure new strategic
plans and documents interlink
and contain clear KPIs that can
be used in regular reviews by
Those Charged With
Governance (TCWG) to assess
internal performance.
There is a risk that the
performance within the
Council is not reliably
monitored, and internal
or external threats may
not be identified or
mitigated.

Page 64

59
Best Value (continued)
Effectiveness of performance reporting (continued)
Improvement plans reflect a pace and depth of improvement that will lead to the realisation of the local authority’s priorities and the long-term sustainability of services. The Council
should demonstrate a trend of improvement over time in delivering its strategic priorities.
We have outlined below our assessment on whether the Council can demonstrate a trend of improvement over time in delivering its priorities.
Effectiveness
of performance
reporting theme
Our findings Our judgements Our conclusions Risks identified
Improvement
plans The recent elections and change in administration of the
Council has meant that there are planned changes to key
policy and strategy documents other than the improvement
plans, including the strategic corporate plan.
The previous Corporate Improvement Plan (CIP) ended in
2022, and a new CIP is currently being developed as part of
the Performance Excellence Project. The Council continued
to report progress on its BV Action plan to Audit and
Scrutiny Committee (ASC). This new plan will align with the
Corporate Plan and support the  new Council priorities
which we expect will be brought forward by the new
Administration in autumn 2024.
Progress is reported annually to the Audit and Scrutiny
Committee, for example in March 2024 the Corporate
Improvement Plan Updated was presented to the ASC,
highlighting continuous improvement activities including the
Chief Executive’s Connect for Success Change
Programme-Connect for Success-My Council Works that
sets the strategic thematic goals for corporate improvement
activities.
There is currently a large
gap between the prior
improvement plan which
came to an end in 2022
and implementation of an
updated version, which
has yet to be published. It
will be implemented
during the 2024/25 year.
This represents a two-
year gap in a Corporate
improvement plan, which
is detrimental to the
council's ability to set and
monitor its Strategic goals
against KPI’s over time.
As there are no clear KPIs
assessed over time the
pace and depth of
improvements are difficult
to determine.
We recommend that the
Council ensures the CIP is
implemented in a timely
manner.  We also suggest
that there are links to
workforce planning and
other key strategy
documents to ensure
coherency across the
Council.
There is a risk that the Council is
unable to accurately track progress
towards the Connect for Success
themes as there is no finalised 
Improvement plan in place. It is difficult
to assess whether improvements are
being made, and the Council may not
be able to identify areas that are falling
behind in either pace or depth.

Page 65

60
Best Value (continued)
Thematic reviews
The Accounts Commission reports nationally on thematic aspects of local government bodies’ approaches to, and performance in, meeting their Best Value and community
planning duties. As appointed auditors of the Council we are required to report on Best Value and related thematic work as prescribed by the Accounts Commission. For the
thematic work in 2023/24, we are required to carry out an overview of workforce innovation. As part of this review, we are required to report on the areas documented in the table
below. The full thematic review report for the Council can be found on Audit Scotland’s Website.
Thematic themes Our findings Our judgements Risks identified
Workforce strategy and
priorities The council has implemented an up-to-date people
strategy, containing 5 key strategic themes with a focus
on attracting and retaining talent. A strategic workforce
plan is in place till 2028 demonstrating a medium-term
outlook on potential threats.
At the operational level, workforce planning is
performed at the managerial level which is beneficial as
greater insights into resourcing can be achieved from
first-hand experience in the day-to-day operations of
the council.
The 'connect for success' model included within the
corporate plan is linked to the People Strategy, where
each commitment is linked to a 'Connect for Success'
theme.
There is a clear attempt to link
resourcing with the needs of the council
per the corporate plan. A medium-term
outlook up until 2028 demonstrates
reasonable consideration for the future,
although the new leadership and
upcoming changes to key strategy
documents such as the corporate plan
further necessitate regular monitoring
and reviews of the workforce plans to
ensure they are consistent with the
council's overall corporate plan.
There is a risk surrounding the implementation of
the updated corporate plan and that it might not link
to the existing workforce strategy and the Medium-
term Budget outlook and financial plans.
The council should ensure that regular reviews and
monitoring of workforce plans are performed so it is
consistently aligned with the overall strategy of the
council.

Page 66

61
Best Value (continued)
Thematic reviews (continued)
Equality and Socio-Economic Impact Assessments | Argyll and Bute Council
Equality and Socio-Economic Impact Assessments | Argyll and Bute Council
Thematic themes Our findings Our judgements Risks identified
Digital technology and
the workforce The council has taken advantage of digital technology
to enhance productivity and reduce burden on human
resources, for instance the council implemented
collaborated with Education Services to digitalise and
streamline registration and enrolment. This is to be
further enhanced in 2024/25 with robotic updates via an
integration into the SEEMIS Education system.
The council was selected to participate in the National
Records of Scotland paperless registration service,
highlighting the Council's willingness to embrace digital
transformation. Cost savings have also been realised
through recurring reduced mileage being claimed due
to continued homeworking and flexible working policies
which were implemented in recent years.
We are satisfied with the steps being taken to improve
productivity and efficiency through digital technology and
implementation of new software/ data management
systems.
We have confirmed that the Council engage staff and
communities when changing service delivery, considering
the impact of digital exclusion and service accessibility.
This is done through Equality and  Socio-economic Impact
Assessments (EQSIA) – available on the public domain on
the councils website: Equality and Socio-Economic Impact
Assessments | Argyll and Bute Council.
No significant issues identified.
Flexible working and
other innovative staff
deployment
The Council released a Hybrid and Flexible work policy
in the 23/24 Financial year. Flexible working
arrangements have been in place within the council for
several years and the policy around this is continually
reviewed and updated to reflect changes in services
and the environment.
The council has gathered feedback from Trade union
and employee feedback discussions and are
undertaking a first-year review of the Flexible working
policy, scheduled for release in December 2024.
The Council does not participate in the 4-day working
week and we consider this appropriate due to the nature of
the services being provided and continued reliance on its
operation by taxpayers and service users.
The outcomes from the flexible working policy review
should be assessed and integrated going forward. We
would recommend that regular monitoring of this is
performed, beyond this first-year review. We are satisfied
with the current steps being taken and note this as a point
forward to consider in 24/25 once the review is finalised.
No significant issues identified.

Page 67

62
Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Developing future skills
and capacity The strategic workforce plan references reducing the
budget for the workforce in the long term, with the
utilisation of technology compensating for the reduced
human resource.
The ‘Growing Our own’ (GOO) framework was
implemented to ensure future recruitment into the
council, it is a tool available to managers to support a
pipeline of talent into the workforce. It includes
development via Work Experience, Student
Sponsorship, Trainees, Apprenticeships etc.
The council is appropriately considering the balance
between temporary and permanent staff, and the
increased costs that come along with a higher ratio of
temporary staff compared to permanent.
Confirmed the Council is developing the capability of its
workforce and is implementing modern agile work policies
to enhance the capacity and skills of its workforce whilst
also allocating them to specific areas.
Reviews are planned to take place in the upcoming year
before March 2025. We would look to revisit these in
2024/25 to determine results of these surveys and
managements response.
No significant issues identified.

Page 68

63
Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Joint workforce
arrangements across
services and partners
The Council participates in joint training and service delivery
alongside other local government bodies in Scotland. The
council is also involved in a joint transformation programme
with SOLACE which aims to transition local government to a
new service delivery model.
The council delivers reciprocal training between all councils,
with qualified coaches delivering these sessions. This
encourages strengthening of working relationships between
local government.
Workforce trends outlined in the Strategic Workforce Planning
Priorities show that temporary and casual staff have increased
in recent years at around 16% of the workforce. Additionally,
60% of temporary staff  leave before the end of their contract.
This is being addressed in the Agile workforce plan, which aims
to bring in greater hybrid/ flexible working arrangements
promote more permanent positions.
The Council should consider how it can improve
employee retention and reduce the 60% of
temporary staff ending their contract early. A high
turnover and tendency for agency recruitment may
lead to higher costs and reduced quality of
services.
The Agile Workforce plan is still in its early phase
and as such we cannot determine how effective
these working arrangements will be in changing the
workforce trends. . The Council has plans to
monitor and review the plans and these are
scheduled alongside their review of the Hybrid and
Flexible working policy, which is to be done
annually at present.
Yes – Risk identified relating to
the increase in temporary and
casual staff alongside high
turnover rate before contracts
end, in specific, hard to recruit
service areas.

Page 69

64
Best Value (continued)
Thematic reviews (continued)
Thematic themes Our findings Our judgements Risks identified
Measuring the impact of
workforce planning Workforce planning actions laid out in the workforce planning risk
matrix are monitored regularly on a quarterly basis. Operational line
managers raise key concerns and suggestions which are taken to a
workforce planning risk matrix.
The council has several reviews targeted for completion within the
24/25 Financial year, these include:
- A review of Flexible working policy
- Regular quarterly reviews of Health of the Organisation ( HOO)
reports
- A review of the impact of the Council’s AB365 programme is
underway
- A Digital skills survey is to be repeated before March 2025
These contain key metrics and quantitative statistics for the chosen
department/ Directorate compared to the council as a whole.
Confirmed HOO Reports are used to monitor
and inform workforce planning, with a section
in the report relating to the delivery of a
workforce plan. Council’s approach to
workforce planning is actively being updated
based on feedback to ensure that regular
tracking of actions can be achieved. We will
follow-up on these reviews in the following
financial year once they have been
completed.
No significant issues noted.

Page 70

65
Best Value (continued)
Statutory Performance Indicators
We are required to report on the Council’s effectiveness and appropriateness of arrangements in place for complying with the Direction issued in December 2021, including the
balance and timeliness of reporting to members along with its accessibility for citizens and communities.
The table below details our overall assessment of the Council’s statutory performance indicators arrangements:
Council Annual Reports | Argyll and Bute Council
Council’s
arrangements Our findings Our judgements Risks identified
Statutory Performance
Indicator 1: Improving
local services and local
outcomes
Statutory Performance Indicator (SPI) 1 requires a council to report its
performance in improving local public services and progress against
agreed desired outcomes
The Council’s website includes a section with information to help the public
measure its performance. The website contains details on the nature of
reports prepared and the frequency of preparation. It also contains links to
strategic and area committee reports, as well as annual performance
reports and the customer service charter and annual audit reports.
The Council reports progress against its annual business plan to
councillors. Progress is reported semi-annually to the Audit and Scrutiny
Committee, and quarterly to Area Committees.
On an annual basis, an annual performance review is undertaken by each
service and an annual performance report is prepared and presented to
the Council. For the 2023/24 financial year this is scheduled to be
published in December 2024, as such information has not yet been
released for 23/24. The prior year report can be found with others online:
Council Annual Reports | Argyll and Bute Council. 
The Council has appropriate
arrangements in place for
complying with SPI 1.
No significant issues identified.

Page 71

66
Best Value (continued)
Statutory Performance Indicators
We are required to report on the Council’s effectiveness and appropriateness of arrangements in place for complying with the Direction issued in December 2021, including the
balance and timeliness of reporting to members along with its accessibility for citizens and communities.
The table below details our overall assessment of the Council’s statutory performance indicators arrangements:
Best Value 3 Report | Argyll and Bute Council
Best Value 3 Report | Argyll and Bute Council
Council’s
arrangements Our findings Our judgements Risks identified
Statutory Performance
Indicator 2:
Demonstrating Best
Value
SPI 2 requires a council to report its own assessment
and audit, scrutiny and inspection body assessments of
how it is performing against its duty of Best Value, and
how it has responded to these assessments.
The Council’s website includes a section on quarterly
and annual reporting, which includes links to external
audit reports.
The Council’s website also includes its action plans in
response to assessments made by audit, scrutiny and
inspection bodies within the performance and
improvement section of the website, for example its
action plan on the previous Best Value Report 2020,
which can be found online at: Best Value 3 Report |
Argyll and Bute Council.
The Council is compliant with SPI 2, as
audit reports and assessments of the
council are attached and accessible to
the public on their website.
No significant issues identified.

Page 72

Appendices
A: Draft management representation letter
B: Draft audit report
C: Confirmation of our independence
D: Other communications
E: Wider scope and Best Value ratings

Page 73

68
Appendix A: Draft management representation letter
Mark Outterside
Forvis Mazars
The Corner
Bank Chambers
26 Mosley Street
Newcastle upon Tyne
NE1 1DF
DD/MM/2024
Dear Mark
Argyll and Bute Council - Audit for the Year Ended 31 March 2024
This representation letter is provided in connection with your audit of the financial statements of Argyll and Bute Council (the Council) and its group for the year ended 31 March 2024 for the purpose
of expressing an opinion as to whether the financial statements give a true and fair view in accordance with the Part VII of the Local Government (Scotland) Act 1973 and UK adopted international
accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24 (the 2023/24 Code).
I confirm that the following representations are made on the basis of enquiries of management and staff with relevant knowledge and experience (and, where appropriate, inspection of supporting
documentation) sufficient to satisfy myself that I can properly make each of the following representations to you.
My responsibility for the financial statements and accounting information
I believe that I have fulfilled my responsibilities for the true and fair presentation and preparation of the financial statements in accordance with the Part VII of the Local Government (Scotland) Act
1973 and UK adopted international accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24 (the 2023/24 Code).
My responsibility to provide and disclose relevant information
I have provided you with:
• access to all information of which I am aware that is relevant to the preparation of the financial statements such as records, documentation and other material;
• additional information that you have requested from us for the purpose of the audit; and
• unrestricted access to individuals within the Council you determined it was necessary to contact in order to obtain audit evidence.
I confirm as Section 95 Officer that I have taken all the necessary steps to make me aware of any relevant audit information and to establish that you, as auditors, are aware of this information.
As far as I am aware there is no relevant audit information of which you, as auditors, are unaware.
Accounting records
I confirm that all transactions undertaken by the Council have been properly recorded in the accounting records and are reflected in the financial statements. All other records and related information,
including minutes of all management and Board meetings, have been made available to you.

Page 74

69
Appendix A: Draft management representation letter
Accounting policies
I confirm that I have reviewed the accounting policies applied during the year in accordance with International Accounting Standard 8 and consider these policies to faithfully represent the effects of
transactions, other events or conditions on the Council’s financial position, financial performance and cash flows.
Accounting estimates, including those measured at fair value
I confirm that the methods, significant assumptions and the data used by the Council in making the accounting estimates, including those measured at fair value are appropriate to achieve recognition,
measurement or disclosure that is in accordance with the applicable financial reporting framework.
Contingencies
There are no material contingent losses including pending or potential litigation that should be accrued where:
• information presently available indicates that it is probable that an asset has been impaired, or a liability had been incurred at the balance sheet date; and
• the amount of the loss can be reasonably estimated.
There are no material contingent losses that should be disclosed where, although either or both the conditions specified above are not met, there is a reasonable possibility that a loss, or a loss
greater than that accrued, may have been incurred at the balance sheet date.
There are no contingent gains which should be disclosed.
All material matters, including unasserted claims, that may result in litigation against the Council have been brought to your attention. All known actual or possible litigation and claims whose effects
should be considered when preparing the financial statements have been disclosed to you and accounted for and disclosed in accordance with the Part VII of the Local Government (Scotland) Act
1973 and UK adopted international accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24 (the 2023/24 Code). 
Laws and regulations
I confirm that I have disclosed to you all those events of which I are aware which involve known or suspected non-compliance with laws and regulations, together with the actual or contingent
consequences which may arise therefrom.
We have complied with all aspects of contractual agreements that would have a material effect on the accounts in the event of non-compliance.

Page 75

70
Appendix A: Draft management representation letter
Fraud and error
I acknowledge my responsibility as Section 95 Officer for the design, implementation and maintenance of internal control to prevent and detect fraud and error. I have disclosed to you:
• all the results of my assessment of the risk that the financial statements may be materially misstated as a result of fraud;
• all knowledge of fraud or suspected fraud affecting the Council involving:
▪management and those charged with governance;
▪employees who have significant roles in internal control; and
▪others where fraud could have a material effect on the financial statements.
I have disclosed to you all information in relation to any allegations of fraud, or suspected fraud, affecting the Council's financial statements communicated by employees, former employees, analysts,
regulators or others.
Related party transactions
I confirm that all related party relationships, transactions and balances, have been appropriately accounted for and disclosed in accordance with the Part VII of the Local Government (Scotland) Act
1973 and UK adopted international accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24 (the 2023/24 Code).
I have disclosed to you the identity of the Council’s related parties and all related party relationships and transactions of which I are aware.
Future commitments
I am not aware of any plans, intentions or commitments that may materially affect the carrying value or classification of assets and liabilities or give rise to additional liabilities.
Ultimate parent company
I confirm that the ultimate parent company for Argyll and Bute Council and its Group is the Scottish Government.
Other Matters
I confirm in relation to the following matters that:
• COVID-19 – I have assessed the continued impact of the COVID-19 Virus pandemic on the Council and the financial statements and those of the Group, including the impact of mitigation
measures and uncertainties, and am satisfied that the financial statements and supporting notes fairly reflect that assessment.
• Ukraine – I confirm that I have carried out an assessment of the potential impact of the continued conflict in Ukraine on the Council and its Group and there is no significant impact on the Council’s
operations from restrictions or sanctions in place.
• RAAC – I confirm the Council has assessed the potential impact of Reinforced Autoclaved Aerated Concrete on the Council, and whether there are indications of a need for an impairment of the
Council’s property, plant and equipment balances. I confirm there are no such indications of impairment in those assets.
Going concern
To the best of my knowledge there is nothing to indicate that the Council and its Group will not continue as a going concern in the foreseeable future. The period to which I have paid particular
attention in assessing the appropriateness of the going concern basis is not less than twelve months from the date of approval of the accounts.

Page 76

71
Appendix A: Draft management representation letter
Performance related allocations
I confirm that I am not aware of any reason why the Council’s funding allocation limits would be changed.
Subsequent events
I confirm all events subsequent to the date of the financial statements and for which the Part VII of the Local Government (Scotland) Act 1973 and UK adopted international accounting standards, as
interpreted and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24 (the 2023/24 Code), require adjustment or disclosure have been adjusted or disclosed.
Should further material events occur after the date of this letter which may necessitate revision of the figures included in the financial statements or inclusion of a note thereto, I will advise you
accordingly.
Annual Governance Statement
I am satisfied that the Annual Governance Statement fairly reflects the Council and its Group's risk assurance and governance framework, and I confirm that I am not aware of any significant risks that
are not disclosed within the Annual Governance Statement.
Annual Report
The disclosures within the Annual Report and the Remuneration Report fairly reflect my understanding of the Council and its Group’s financial and operating performance over the period covered by
the financial statements.
Unadjusted misstatements
I confirm that the effects of the unadjusted misstatements are immaterial, both individually and in aggregate, to the financial statements as a whole.
Yours sincerely
Kirsty Flanagan
Section 95 Officer

Page 77

72
Appendix B: Draft audit report
Independent auditor’s report to the members of Argyll and Bute Council and the Accounts Commission
Report on the audit of the financial statements
Opinion on the financial statements
We certify that we have audited the financial statements in the annual accounts of Argyll and Bute Council and its group for the year ended 31 March 2024 under Part VII of the Local Government
(Scotland) Act 1973. The financial statements comprise the Statement of Comprehensive Income and Expenditure, the Balance Sheet, the Statement of Movement in Reserves, the Cash Flow
Statement and notes to the financial statements, including significant accounting policies, the Group Statement of Comprehensive Income and Expenditure, the Group Balance Sheet, the Group
Statement of Movement in Reserves, the Group Cash Flow Statement and notes to the group financial statements, including material accounting policy information. The financial reporting framework
that has been applied in their preparation is applicable law and UK adopted international accounting standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in the
United Kingdom 2023/24 (the 2023/24 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the Council and its group as at 31 March 2024 and of its income and expenditure of the Council and its group for the year then ended;
• have been properly prepared in accordance with UK adopted international accounting standards, as interpreted and adapted by the 2023/24 Code; and
• have been prepared in accordance with the requirements of the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local Government in
Scotland Act 2003.
Basis for opinion
We conducted our audit in accordance with applicable law and International Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts Commission
for Scotland. Our responsibilities under those standards are further described in the auditor’s responsibilities for the audit of the financial statements section of our report. We were appointed by the
Accounts Commission on 18 May 2022. Our period of appointment is five years, covering 2022/23 to 2026/27. We are independent of the Council and its group in accordance with the ethical
requirements that are relevant to our audit of the financial statements in the UK including the Financial Reporting Council’s Ethical Standard, and we have fulfilled our other ethical responsibilities in
accordance with these requirements. Non-audit services prohibited by the Ethical Standard were not provided to the Council and its group. We believe that the audit evidence we have obtained is
sufficient and appropriate to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the preparation of the financial statements is appropriate.
Based on the work we have performed, we have not identified any material uncertainties relating to events or conditions that, individually or collectively, may cast significant doubt on the Council and
its group’s ability to continue to adopt the going concern basis of accounting for a period of at least twelve months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the Council and its group’s current or future financial sustainability. However, we report on the Council’s arrangements for
financial sustainability in a separate Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of material misstatement that we identified and our judgements thereon.

Page 78

73
Appendix B: Draft audit report
Responsibilities of the Section 95 Officer and the Audit and Scrutiny Committee for the financial statements
As explained more fully in the Statement of Responsibilities, the Section 95 Officer is responsible for the preparation of financial statements, that give a true and fair view in accordance with the
financial reporting framework, and for such internal control as the Section 95 Officer determines is necessary to enable the preparation of financial statements that are free from material misstatement,
whether due to fraud or error.
In preparing the financial statements, the Section 95 Officer is responsible for assessing each year the Council and its group’s ability to continue as a going concern, disclosing, as applicable, matters
related to going concern and using the going concern basis of accounting unless there is an intention to discontinue the operations of the Council and its group.
The Audit and Scrutiny Committee is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s
report that includes our opinion. Reasonable assurance is a high level of assurance but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the decisions
of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design procedures in line with our responsibilities outlined above to detect material misstatements in
respect of irregularities, including fraud. Procedures include:
• using our understanding of the local government sector to identify that the Local Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and the Local
Government in Scotland Act 2003 are significant in the context of the Council and its group;
• inquiring of the Section 95 Officer as to other laws or regulations that may be expected to have a fundamental effect on the Council and its group;
• inquiring of the Section 95 Officer concerning the Council’s policies and procedures regarding compliance with the applicable legal and regulatory framework;
• discussions among our audit team on the susceptibility of the financial statements to material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which our procedures are capable of detecting irregularities, including fraud, is affected by the inherent difficulty in detecting irregularities, the effectiveness of the Council and its group’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that result from error as fraud may involve collusion, intentional omissions, misrepresentations, or the
override of internal control. The capability of the audit to detect fraud and other irregularities depends on factors such as the skilfulness of the perpetrator, the frequency and extent of manipulation, the
degree of collusion involved, the relative size of individual amounts manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is located on the Financial Reporting Council's website http://www.frc.org.uk/auditorsresponsibilities. This
description forms part of our auditor’s report.

Page 79

74
Appendix B: Draft audit report
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In our opinion, the audited parts of the Remuneration Report have been properly prepared in accordance with The Local
Authority Accounts (Scotland) Regulations 2014.
Other information
The Section 95 Officer is responsible for the other information in the annual accounts. The other information comprises the Management Commentary, Annual Governance Statement, Statement of
Responsibilities and the unaudited part of the Remuneration Report.
Our responsibility is to read all the other information and, in doing so, consider whether the other information is materially inconsistent with the financial statements or our knowledge obtained in the
course of the audit or otherwise appears to be materially misstated. If we identify such material inconsistencies or apparent material misstatements, we are required to determine whether this gives
rise to a material misstatement in the financial statements themselves. If, based on the work we have performed, we conclude that there is a material misstatement of this other information, we are
required to report that fact. We have nothing to report in this regard.
Our opinion on the financial statements does not cover the other information and we do not express any form of assurance conclusion thereon except on the Management Commentary and Annual
Governance Statement to the extent explicitly stated in the following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year for which the financial statements are prepared is consistent with the financial statements and that report has been
prepared in accordance with statutory guidance issued under the Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial year for which the financial statements are prepared is consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report are not in agreement with the accounting records; or
• we have not received all the information and explanations we require for our audit.
We have nothing to report in respect of these matters.

Page 80

75
Appendix B: Draft audit report
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the wider scope responsibilities specified in the Code of Audit Practice, including those in respect of Best Value, are set
out in our Annual Audit Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with paragraph 108
of the Code of Audit Practice, we do not undertake to have responsibilities to members or officers, in their individual capacities, or to third parties.
Mark Outterside
For and on behalf of Forvis Mazars LLP
Forvis Mazars LLP
26 Mosley Street
Newcastle upon Tyne
NE1 1DF
XXXX December 2024

Page 81

76
Appendix C: Confirmation of our independence
We communicate any matters which we believe may have a bearing on our independence or the
objectivity of Forvis Mazars LLP and the audit team. As part of our ongoing risk assessment, we
monitor our relationships with you to identify any new actual or perceived threats to our
independence within the regulatory or professional requirements governing us as your auditors.
We confirm that no new threats to independence have been identified since issuing our Annual
Audit Plan and therefore we remain independent.

Page 82

77
Appendix C: Confirmation of our independence (continued)
Fees for work as the Council’s auditor
We reported our proposed fees for the delivery of our work under the Code of Audit
Practice in our Annual Audit Plan presented to the Audit and Scrutiny Committee in
June 2024. Having substantially completed our work for the 2023/24 financial year,
we can confirm that our fees are as follows:
Area of work 2023/24 fees 2022/23 fees
Auditor remuneration £251,690 £237,440
Pooled costs £9,170 £0
Contribution to PABV costs £63,850 £57,770
Audit support costs £0 £9,000
Sectoral cap adjustment (£110) (£2,030)
Additional fees in respect of testing
required to reflect the transition to a
new ledger in 2022/23 0 £4,225
Total fees £324,600 £310,465
Fees for other work
We confirm that we have not undertaken any non-audit services for the Council in the
year.
Fees for audit of Charitable Trusts
The audit fee in table above does not include the cost of auditing the Council’s 7
Scottish Charity Regulator (OSCR) registered charitable trusts. We propose setting a
fee for the audit of these of £9,000 (2022/23 fees were £6,500).
Services provided to other entities within the Council's group
In addition, to auditing the Council’s 7 charitable trusts mentioned above, we are
providing audit services to the following entities in the Council's group:
• Argyll and Bute Integration Joint Board (total fee of £33,360)
• Dunbartonshire and Argyll & Bute Valuation Joint Board (total fee of £9,320).
• Live Argyll (total fee of £18,200)

Page 83

78
Appendix D: Other communications
Blank
Other communication Response
Compliance with Laws
and Regulations
We have not identified any significant matters involving actual or suspected non-compliance with laws and regulations.
We will obtain written representations from management that all known instances of non-compliance or suspected non-compliance with laws and
regulations whose effects should be considered when preparing financial statements have been disclosed.
External confirmations We did not experience any issues with respect to obtaining external confirmations.
Related parties
We did not identify any significant matters relating to the audit of related parties.
We will obtain written representations from management confirming that:
a. they have disclosed to us the identity of related parties and all the related party relationships and transactions of which they are aware; and
b. they have appropriately accounted for and disclosed such relationships and transactions in accordance with the requirements of the applicable
financial reporting framework.
Going Concern
We have not identified any evidence to cause us to disagree with the Section 95 Officer that the Council will be a going concern, and therefore we
have not identified any evidence to cause us to consider that the use of the going concern assumption in preparation of the financial statements is
not appropriate.
We will obtain written representations from management, confirming that all relevant information covering a period of at least 12 months from the
date of approval of the financial statements has been taken into account in assessing the appropriateness of the going concern basis of preparation
of the financial statements.

Page 84

79
Appendix D: Other communications (continued)
Blank
Other communication Response
Subsequent events
We are required to obtain evidence about whether events occurring between the date of the financial statements and the date of the auditor’s report
that require adjustment of, or disclosure in, the financial statements are appropriately reflected in those financial statements in accordance with the
applicable financial reporting framework.
We will obtain written representations from management that all events occurring subsequent to the date of the financial statements and for which
the applicable financial reporting framework requires adjustment or disclosure have been adjusted or disclosed.
Matters related
to fraud
We have designed our audit approach to obtain reasonable assurance whether the financial statements as a whole are free from material
misstatement due to fraud. In addition, we have assessed the adequacy of the Council’s arrangements for preventing and detecting fraud or other
irregularities as part of the wider scope audit and concluded that they are sufficiently designed and implemented.
We will obtain written representations from management, and where appropriate the Audit and Scrutiny Committee, confirming that:
a) they acknowledge their responsibility for the design, implementation and maintenance of internal control to prevent and detect fraud;
b) they have disclosed to the auditor the results of management’s assessment of the risk that the financial statements may be materially misstated
as a result of fraud;
c) they have disclosed to the auditor their knowledge of fraud or suspected fraud affecting the entity involving:
i. Management;
ii. Employees who have significant roles in internal control; or
iii. Others where the fraud could have a material effect on the financial statements; and
d) they have disclosed to the auditor their knowledge of any allegations of fraud, or suspected fraud, affecting the entity’s financial statements
communicated by employees, former employees, analysts, regulators or others.

Page 85

80
Appendix D: Other communications (continued)
Blank
Other communication Response
National Fraud
Initiative
The National Fraud Initiative (NFI) in Scotland is a counter-fraud exercise led by Audit Scotland and overseen by the UK’s Cabinet Office, designed
to prevent and detect fraud. The NFI uses data analytics to compare information held on individual by different public bodies to highlight the
existence of fraud or error.
The Council has received matches for investigation in 2023 which are required to be investigated by 30 September 2023. We have monitored the
Council’s participation and progress during the 2023/24 audit. During the 22/23 NFI exercise, the Council received a total of 48 reports containing
1,783 matches. Using a risk-based approach, the Council investigated 71.8% of the matches. A further 2,557 matches were made within council tax
registers that form the basis of the Council Tax recheck and related work carried out by the Councils Counter Fraud Team on the back of the NFI
matching in this area.
The 22/23 investigation continued beyond 30 September 2023 therefore we continued to monitor the Council’s participation and progress during
2023/24 and found that 1,188 of the matches identified were cleared, with 93 data errors.

Page 86

81
Appendix E: Wider scope and Best Value ratings
We need to gather sufficient evidence to support our commentary on the Council’s arrangements and to identify and report on any risks. We will carry out more detailed work where we
identify significant risks. Where significant risks are identified we will report these to the Council and make recommendations for improvement. In addition to local risks, we consider
challenges that are impacting the public sector as a whole.
We have assigned priority rankings to each of the risks identified to reflect the importance that we consider each poses to your organisation and, hence, our recommendation in terms of
the urgency of required action. The table below describes the meaning behind each rating that we have awarded to each wider scope area based on the work we have performed.
Rating Description
Level 1
The identified risk and/or significant deficiency is critical to the business processes or the
achievement of business strategic objectives. There is potential for financial loss, damage to
reputation or loss of information. The recommendation should be taken into consideration by
management immediately.
Level 2
The identified risk and/or significant deficiency may impact on individual objectives or business
processes. The audited body should implement the recommendation to strengthen internal
controls or enhance business efficiency. The recommendations should be actioned in the near
future.
Level 3
The identified risk and/or significant deficiency is an area for improvement or less significant. In
our view, the audited body should action the recommendation, but management do not need to
prioritise.

Page 87

Contact
Forvis Mazars
www.auditregister.org.uk
Forvis Mazars LLP is the UK firm of Forvis Mazars Global, a leading global professional services network. Forvis Mazars LLP is
a limited liability partnership registered in England and Wales with registered number OC308299 and with its registered office at
30 Old Bailey, London, EC4M 7AU. Registered to carry on audit work in the UK by the Institute of Chartered Accountants in
England and Wales. Details about our audit registration can be viewed at www.auditregister.org.uk under reference number
C001139861. VAT number: GB 839 8356 73
© Forvis Mazars 2024. All rights reserved.
Contact information
Mark Outterside
Audit Director
Tel: +44 191 383 6339
mark.outterside@mazars.com

Page 88

Argyll and Bute Council
Comhairle Earra Ghàidheal agus Bhòid  
Audited Annual Accounts
For the year ended 31 March 2024
Appendix 3

Page 89

FRONT COVER PICTURE: HELENSBURGH WATERFRONT DEVELOPMENT

Page 90

LANGUAGE OPTIONS 
If you would like this document in another language or format, or if you require the
services of an interpreter, please contact us. 
Financial Services
Argyll and Bute Council
Kilmory
Lochgilphead
Argyll
PA31 8RT 
Tel: 01546 605522

Page 91

ANNUAL ACCOUNTS CONTENTS 
www.argyll-bute.gov.uk   ________________________________________________    Page 1 
Page
Management Commentary 4-26
Statement of Responsibilities for the Annual Accounts 27
Annual Governance Statement 28-41
The Remuneration Report 42-50 
Statement of Comprehensive Income and Expenditure 51-52
Balance Sheet 53-54
Statement of Movement in Reserves – Movement in 2023-24 55-56
Statement of Movement in Reserves – Comparative Movement in 2022-23 57-58
Cash Flow Statement 59
Notes to the Financial Statements (See Page 2-3) 60-124
Council Tax Income Account 125
Notes to the Council Tax Income Account 126
Non Domestic Rate Income Account 127
Notes to the Non Domestic Rate Income Account 128
Group Accounts - Introduction 129
Group Statement of Comprehensive Income and Expenditure 130
Group Balance Sheet 131-132
Group Statement of Movement in Reserves – Movement in 2023-24 133
Group Statement of Movement in Reserves – Comparative Movement 2022-23
Group Cash Flow Statement
134 
135
Notes to the Group Financial Statements 136-140
Independent Auditors Report 141-144     
Glossary of Terms
Appendix A: Trade Union Facility Time Statement 2023-24 
145-146
147-148

Page 92

Notes to the Financial Statements Contents 
www.argyll-bute.gov.uk   ________________________________________________    Page 2 
P
Note No Page
1 Summary of Significant Accounting Policies 60-73
2 Accounting Standards Issued But Not Yet Adopted 73
3 Critical Judgements in Applying Accounting Policies 73-74
4 Assumptions Made About the Future and Other Major Sources of
Estimation Uncertainty
74-76
5 Expenditure and Funding Analysis 77-80 
6 General Fund Reserves 81-82
7 Supplementary Notes to the Statement of Comprehensive Income
and Expenditure
83-84
8 Other Operating Income and Expenditure 84
9 Agency Services 84
10 Community Care and Health (Scotland) Act 2002 85
11 Fees Payable to External Auditors 85
12 Waste Management Public Private Partnership 86
13 Grant Income 86
14 Related Parties 87-88
15 Property, Plant and Equipment 89-94
16 Heritage Assets 94
17 Intangible Assets      95
18 Investment Property      96
19 Schools Built under Public Private Partnership Contracts (PPP)               96-99
20 Operating Leases 100
21 Finance Leases 100-101
22 Long Term Debtors 102
23 Debtors 102
24 Assets Held for Sale 103
25 Cash and Cash Equivalents 103
26 Creditors 104
27 Financial Instruments Disclosures 104-107
28 Other Liabilities     108

Page 93

Notes to the Financial Statements Contents 
www.argyll-bute.gov.uk   _______________________________________________ Page 3 
Note No Page 
29 Provisions                                                                                              108-109
30 Capital Grants Received in Advance                                                            109
31 Defined Benefit Pension Schemes 110-117
32 Unusable Reserves 117-118
33 Usable Reserves                                                                                    118-119
34 Contingent Liabilities                                                                              119-120
35 Termination Benefits        120
36 Trust Funds and Other Third Party Funds 121
37 Common Good Funds 121-122
38 Tax Incremental Financing (TIF) Projects                                                     122
39 Cash Flow Statement – Operating Activities 123
40 Cash Flow Statement – Investing Activities 123
41 Cash Flow Statement – Financing Activities 124

Page 94

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 4 
1.   INTRODUCTION
Welcome to the financial statements for Argyll and Bute Council and its group for the year ended 31 March
2024.  The statements have been compiled in accordance with the Code of Practice on Local Authority
Accounting in the United Kingdom (the Code).  This commentary outlines the key messages regarding the
performance of the Council over the 2023-24 financial year as well as providing an indication of risks and
issues which may impact upon the Council in the future.  
2. PROFILE OF ARGYLL AND BUTE COUNCIL  
The report starts with outlining some key facts about Argyll and Bute.

Page 95

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 5 
3. VISION AND PRIORITIES
The Council has a new 5 year Corporate Plan for the period 2023-2027 and also an Annual Business
Plan. This new document replaces the former annual Service Plans to bring more focus and scrutiny on
the delivery and performance of the organisation against its priorities. This delivers on the
recommendation in our Best Value Audit to make the link between priorities and performance clearer.  
The Council’s vision is: 
We have a vision for a successful, vibrant Argyll and Bute with a growing population and a thriving
economy. A place where people want to come to live, to work and to do business as a result of action to
combat and reverse decline. We see the potential for thriving local economies that support our rich mix
of remote, rural and island communities. Communities which also benefit from services that work –

Page 96

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 6 
where we make the best use of all of our resources so that our core business as a council is as effective
as possible. 
We want Argyll and Bute’s communities to be on a level playing field with others around the country –
that is why we will campaign for equity for our communities on issues like fair funding, coping with
challenges like the cost of living, and securing digital access and physical access to other opportunities.
We will do our utmost to ensure that local voices and needs are taken into account in national decision-
making. 
We recognise that the cost of living crisis will affect countless households in Argyll and Bute. We want to
play a part in responding to that and mitigating the impact on our communities’ overall wellbeing and
future success. 
We see our council and our communities working together in playing our part and making our
contributions to wider priorities like climate change, economic growth, strong local governance and more
– using our strong track record in partnership working, at all levels, to secure the best possible
outcomes. 
Our Priorities for the Council Term 2022 to 2027 are shaped around delivering this vision for Argyll and
Bute, our people, our success and our future. 
At the Council meeting on 25 April 2024 there was a change in political management arrangements and
therefore a new Corporate Plan for the period 2024-2028 will be prepared and presented to Council with
updated priorities during 2024-25.  Details on activity, for each financial year, against the Council
priorities will be set out in a new Council Annual Business Plan which will also be presented to Council
at the same time.   
The Argyll and Bute Community Planning Partnership (CPP) brings together local public services with
communities they service, and provides a focus for partnership working that targets specific local
circumstances. Partners work together to improve local services and to ensure that they meet the needs
of local people, especially those who need the services most.  The Argyll and Bute Outcome
Improvement Plan has been in place for the last 10 years and had six key outcomes: 
• Our economy is diverse and thriving
• We have an infrastructure that supports sustainable growth,
• Education skills and training maximise opportunities for all,
• Children and young people have the best possible start,
• People live active, healthier and independent lives,
• People will live in safe and stronger communities. 
The Argyll and Bute CPP has completed its community engagement on identifying the priorities for the
next 10 years (2024 – 2034) and these are:
1. Transport Infrastructure,
2. Housing,
3. Community Wellbeing. 
Argyll and Bute Council will continue to be a leading partner in the partnership and ensure that the
priorities of the CPP and the Council are aligned.

Page 97

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 7 
Some of our achievements, and the challenges we faced, in relation to the Council’s agreed
Corporate Outcomes are highlighted below. 
Our economy is diverse and thriving
Ardrishaig North Public Realm Project
It was a long term aspiration of local residents and community organisations in Ardrishaig to see spaces
be made more attractive including provision of better space for community events, improvements to the
car parks and upgrading of the paths and landscaping.
As part of an ambitious capital regeneration programme to help stimulate further public and private sector
investment, works within Ardrishaig began in August 2022 and were certified as complete during 2023-24.
These works included:
• A new lochside viewing area with additional seating and art work;
• Alterations to the north car park including an expansion of disabled parking;
• New artwork on the canal embankment;
• Reconfiguration of the memorial garden to include new seating areas, picnic benches and a
path;
• Improved accessibility for the Argyll Sea Kayak Trail making it easier for kayakers to go
between Loch Fyne and the Crinan Canal; 
We have an infrastructure that supports sustainable growth
Developing Infrastructure for Drones
In 2023, the Council won the COSLA Excellence Award for innovation due to its work developing
infrastructure and service change by using drones.  The Council worked with Skyports (an
international drone company) to develop a deliverable school meal delivery system using drone
technology. This culminated in a successful pilot flight, which delivered school meals from Oban
Airport to Lochnell Primary School, enabling proof of concept to be delivered. Argyll and Bute’s island
and remote schools can often struggle to recruit catering staff and travel times to supply perishable
goods can be long using roads and ferries.  Drones potentially offer a low carbon and quicker
alternative to traditional transport. 
Planning permission has now been granted to establish a permanent Oban Drone Facility to enable
commercial deliveries in the area, with schools meals continuing to be a pilot test subject.

Page 98

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 8 
Funding has now been secured to establish this
and the project is a component part of development
of a new business park at Oban Airport. This will be
the first permanent Drone Facility in the UK. This
ensures that it is a sustainable delivery mechanism
for the school meals and other service in the future.
The Council has also been awarded £250K from
the Regulator’s Pioneer Fund for the development
of the UAV logistics hub, based at Oban Airport, to
serve the islands, building on the pilot approach. 
Weather Incident 
During October 2023 Argyll and Bute suffered extensive storm damage and a major incident was
declared within the Council area. The flooding resulted in substantial damage to bridges and a number
of landslides which disrupted the roads network and cut off some areas altogether. Transport
connections in and out of Argyll and Bute were severely compromised and for a period of time all of
the trunk roads and many of the local roads were impassible. A number of helicopter evacuations took
place and reception centres were set up in the immediate aftermath.
This incident was unprecedented and every effort was made to re-open roads when safe to do so
however some routes required more considerable remedial action. Works carried out were extensive
with dozens of locations requiring attention from simple cleansing of a small drain to significant
landslides requiring temporary roads to be created and full bridge replacements. Furthermore, to
ensure all children in the impacted areas were able to attend school transport via boat was arranged.       
Road Safety Improvements
During 2023-24 the Councils Network and Standards team secured £0.270m of funding from the
National Road Safety Improvement Fund. This has allowed a number of safety improvements to our
roads and footways including:
• Village gateways at Clynder, Kilcreggan, Rosneath and Garelochhead including coloured
surfacing at access points and speed roundels.

Page 99

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 9 
• Two new sections of footway at School Street, Bowmore with improved drainage, road
markings and street lighting.
• Carriageway widening and footway construction at Millpark Road, Oban including
improvements to drainage, road markings and street lighting.
• Provision of new footway in Taynuilt resulting in a safe route for school children to utilise.       
Education skills and training maximise opportunities for all
Inclusion and Equality
Argyll and Bute Council is investing more than £1.7 million over the next few years to establish four
new Learning Centres in its schools so that children and young people with more complex Additional
Support Needs (ASN) can benefit from enhanced and specialist support. This decision means that the
Council will create dedicated primary Learning Centre provision in south Kintyre, cross-sector provision
on Mull and Islay, as well as an additional Learning Centre targeted at secondary learners in
Helensburgh and Lomond. The new Learning Centres at Castlehill Primary and Islay High School are
scheduled to open in August 2024. 
The new facilities will include:
• Breakout quiet rooms
• Low stimulus and high stimulus sensory rooms
• Changing facilities with specialist equipment to meet specific physical needs
• Accessible teaching and outdoor spaces 
This development offers an exciting new opportunity for staffing as well. The teachers will work as
part of a team to support children with severe and complex learning needs and/or complex
medical/health needs. An important part of their role will involve planning and delivering
individualised/elaborated curricula for children with a wide range of needs. Working with colleagues
in other establishments and partner agencies will form an important part of their role too. ASN
Assistants will also be recruited in the coming months to support teaching staff based in the new
Learning Centre to deliver individualised/elaborated curricula and help the children and young people
to develop vital life-skills.  
The new Learning Centres will support all learners to achieve their potential right here in Argyll and
Bute.

Page 100

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 10 
Care Experienced Children and Young People (CECYP)
The Care Experienced Education Team (CEET) team were part of the Developing the Young
Workforce Conference and attended alongside our care experienced Vice Chair of the Corporate
Parenting Board along with some of our Oban based care experienced young people.  We delivered
a Raising Awareness session to approximately 120 delegates to discuss how to support a care
experienced young person in the workplace.  Feedback collated to date has been positive with some
employers indicating a commitment to action. 
Following a successful application, the Virtual School for CECYP has received a £1000 Award from
the Argyll Community Housing Association (ACHA) 10th Anniversary Legacy School Awards
Scheme.  This will be used to support a new initiative for care experienced young people moving
schools.  Each CECYP person who moves school, within the authority or joins from out with the
authority, will receive an ‘Always Belong’ box of resources.  This project will begin in the 2024 – 25
academic year by listening to our current CECYP suggestions of what should be in the box. 
To date, we remain at zero care experienced children and young people excluded in this academic
year.  This can be attributed to a robust exclusion policy, an ongoing commitment from staff across
our settings and a clear vision of inclusion from senior leaders across our Education Service. 
The Care Experience Education Team and
Argyll and Bute Councils Chief Officers
Group both achieved the We Promise Award
being the first team in Scotland and first senior
Council team in Scotland respectively to achieve
this award. 
MCR Pathways
In session 2023/24, the MCR Pathways Programme was established in three Argyll and Bute
secondary schools: Hermitage Academy, Dunoon Grammar School and Oban High School. This
programme addresses the gap in life-chances and educational outcomes, between care experienced
young people and their peers through a school- based mentoring programme. 
An MCR Pathways Co-ordinator was appointed in each school. Each school contributed £12,000 to
the overall cost of Co-ordinator recruitment (£35,309 per school, including on-costs), with the
remainder being sourced internally by the Education Service.   
All other central costs for the running of the programme (around £28,000 per school) were covered
by Scottish Government funding. Such government funding is secure until the end of the 2025/26
session for the three above schools which commenced the MCR Pathways programme in August
2023. 
In year 1, the MCR Pathways programme in all three schools has been highly successful, with all
targets met or exceeded, and positive feedback provided by young people, mentors, Co-ordinators
and MCR Pathways. 
Discussion with MCR Pathways has confirmed the possibility of expanding the MCR Pathways
Programme to a further three schools in 2024/25: Rothesay Joint Campus, Lochgilphead Joint
Campus and Campbeltown Grammar School.

Page 101

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 11 
Children and young people have the best possible start
Childcare provision
Our delivery trial of purchase-able childcare for working parents in some remote and rural communities,
continues to support new parents return to work. On Bute, where an acute lack of childcare affected a
growing number of parents return to work after childbirth, this provision is now being permanently
delivered, as a result of building renovations to the Joint Campus. In its early stages, this provision will
support increasing numbers of the islands parents engage in work or training opportunities, supporting
the economic sustainability of young families
Developing the Young Workforce (DYW) 
The second annual DYW Argyll & Bute Conference took place in May, in the Corran Halls, Oban.
The purpose of the conference was to promote and celebrate the range of agencies and partnerships
participating in preparing young people for the world of work, and the scope of activities and
initiatives involved in doing so. This year’s conference had a particular focus on meeting the needs of
and providing opportunities for the young people who need them most. The day itself involved
around 100 delegates made up of Education colleagues, Community Learning and Development,
Skills Development Scotland, employers, Third Sector partners and other agencies and organisations
contributing to the DYW agenda across Argyll & Bute. 
Key elements of the conference included
presentations from Who Cares? Scotland,
Inspiralba, and a series of interactive
workshops for delegates to take part in. The
highlight of the day for many was the
contributions from young people who were able
to address first-hand how delegates could
improve further their offering for young people
across the region. The day culminated in a
keynote speech from the Minister for Higher
and Further Education, Graeme Dey MSP.
Feedback from the event has been
overwhelmingly positive with plans already being made for next year. 
People Live Active Healthier and Independent Lives 
Active Travel App 
In 2023/24, through funding from Smarter Choices Smarter Places, Argyll and Bute Council worked
with the Heart of Argyll Wildlife Organisation and Aerial Digital to create a walking and cycling app for
Mid Argyll. The app ‘Discover Dalriada Mid Argyll’ has been downloaded more than 250 times since
its launch in April 2024. 
The app is designed to encourage people to get out and explore the Mid Argyll area through a series
of self-guided walking, wheeling and cycling trails with each trail highlighting and providing additional
information on a range of points of interest that can be seen along the trail.

Page 102

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 12 
The app also includes an ‘Eye Spy’ fun family challenge
game. 
The Discover Dalriada Mid Argyll app is the latest in a series
of active travel apps that have been developed over recent
years and there are now active travel apps for: 
• Campbeltown
• Dunoon
• Helensburgh
• Mid-Argyll
• Oban
• Rothesay 
Food for Thought
Two schools were successful in Food for Thought grants. Gigha pupils planted and harvested their
own produce and also used the grant to set up poultry farming (hens). Their produce is being used
within school and community. Additional workshops for families were provided by a nutritionist to
develop community knowledge of healthy recipes with locally available, affordable produce. A further
session was provided for the community with the Gigha Foodies Group which allowed everyone on
the island to access the knowledge of a professional nutritionist to help plan and make simple yet
nutritious meals with ingredients which can be grown locally/purchased affordably.   
Funds in Ardrishaig have supported the purchase and use of gardening resources and materials to
develop growth of food on school grounds. This is being used to learn about healthy eating and
supports the sale of school-produce within the local community. 
People will live in safer and stronger communities 
Mentors In Violence Prevention (MVP)
The Mentors In Violence Prevention (MVP) programme has continued to be developed across our
secondary schools. The Programme is a mentor based programme that addresses gender based
violence.  This work continues to be an important part of the Violence Against Women and Girls
Project.  In November 23, a further 17 staff were trained, including partner agencies.  This has
increased engaged schools from 3 to 7.  This exceeds our target for school engagement within our
development plan.  The work continues to bring together engagement from partners such as Police
Scotland and Argyll & Bute Rape Crisis.  Our aim for the next academic session would be to ensure
engagement across all secondary schools and build capacity within our training team.

Page 103

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 13 
4. FINANCIAL PERFORMANCE 2023-24 
The Council has a robust financial reporting
framework in place and a comprehensive monitoring
pack is prepared and presented to every Policy and
Resources Committee.  This includes reports on the
revenue budget, capital plan, financial risks, treasury
monitoring, reserves and balances and delivery of
any previously agreed savings.  The financial
framework is shown on the left. 
Revenue:  Outturn against Budget
The performance against budget for financial year 2023-24, after adjusting for automatic and proposed
earmarked reserve proposals, was an overall underspend of £1.728m, 0.55% as summarised in the table
below.  (The corresponding position for 2022-23 was an underspend of £3.273m, 1.06%.) 
2023-24 Final Revenue Budget Outturn 
Actuals
Budget Variance
Percentage Adjusted for
Automatic
Earmarkings
(Overspend)
Underspend  
£000 £000 £000 %
Chief Executive's Unit 1,155 1,161 6 0.53%
Executive Director (Douglas Hendry) 139,308 139,999 691 0.49%
Executive Director (Kirsty Flanagan) 58,610 57,258 (1,352) (2.36%)
Weather related incident costs (not
covered by Bellwin Scheme) 839 0 (839) 0.0%
Joint Boards 1,319 1,396 77 5.56%
Other 11,584 11,584 0 0.0%
Service Concessions (40,869) (40,489) 380 (0.94%)
Social Work 77,605 77,605 0 0.0%
Net Expenditure 249,551 248,514 (1,037) (0.42%)
Total Funding 314,827 314,794 33 0.01%
OVERSPEND PRIOR TO LOANS
FUND    (1,004)  (0.32%)
Loans Fund 8,615 14,547 5,932 40.78%
UNDERSPEND BEFORE
EARMARKINGS   4,928 1.57%
Proposed Unspent Budget Earmarking
Proposals   (3,200) 
UNDERSPEND AFTER PROPOSED
EARMARKINGS   1,728 0.55%

Page 104

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 14 
Within the Chief Executive’s Unit (Community Planning) there was a small underspend resulting within
travel codes due to staff travel costs coming in under budget due to increased digital working and less face
to face meetings. 
Within the remit of Executive Director Douglas Hendry (Education, Legal and Regulatory Services and
Commercial Services), there was an overall underspend due to: 
• Receipt of one-off historic water rate refunds.
• Staffing underspends due to delays in recruitment and staffing underspends within Cleaning,
Early Learning and Childcare and Legal and Regulatory Support.
• Underspends within the Scheme of Devolved School Management where previous carry forwards
were not fully utilised. 
Within the remit of Executive Director Kirsty Flanagan (Roads and Infrastructure, Development and
Economic Growth, Customer Support Services and Financial Services) there was an overall overspend
due to: 
• Reduction in income within Piers and Harbours
• Additional fleet costs across the service
• Increased staff costs for Pupil Transport
• An unrealised Depot saving
• Increased electricity costs for street lighting
• Additional Car Parking maintenance costs
• Reduction in TRO income in Roads. 
There were also costs relating to a significant weather incident that occurred during 2023-24 that could
not be claimed through the Scottish Government’s Bellwin scheme which resulted in an overspend. 
Social Work, managed by the Health and Social Care Partnership, reported an overspend of £0.165m as
a result of ongoing demand for older people care services, both residential and non-residential. Per
CIPFA/LASAAC Guidance in prior years an earmarking relating to the HSCP was recognised as a
creditor on the Council’s balance sheet making the funds available to Social Work to spend in future
years, therefore this over spend has been drawn down from the creditor balance. 
There is a favourable year-end position in relation to Council Tax of which was due to Council Tax debt
recovery after court summons being higher than anticipated. 
There was an underspend within the Loans Fund due to a number of reasons but largely as a result of
effective Treasury Management which saw increased levels of interest received on investments
combined with reduced borrowing costs which resulted in an improved position in excess of £3m
compared to previous year. Significant slippage in the capital programme in 2022-23 resulted in lower
principal repayments in 2023-24 than anticipated and there was also a one-off gain of £0.870m as a
result of a discount received on the early repayment of loans.   
In 2023-24 the Council adopted the financial flexibility introduced by the Scottish Government relating to
two service concession contracts for NPDO and DBFM schools which allowed the associated borrowing
to be accounted for over the life of the asset as opposed to the life of the contract (see note 6.2 for
further detail). This resulted in a one-off retrospective gain of £36.038m and gain in 2023-24 of £4.831m.
As part of the 2024-25 budget setting process Council agreed to transfer £0.380m from the Service
Concessions gain to the General Fund hence there is an underspend in 2023-24 relating to this that will
increase the General Fund.

Page 105

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 15 
The overall favourable position for Departmental and Central Expenditure Budgets due to the
underspend within the Loans Fund has provided the opportunity to earmark unspent budget for specific
purposes aligned to the objectives, priorities and targets of the Council. 
Delivery of 2023-24 Agreed Savings
The Council has been required to make significant
budget savings for a number of years in order to
ensure it responds to continued funding reductions,
rising cost pressures and complies with its
statutory requirement to set a balanced budget
whilst meeting the needs of local residents.   
Budget savings of £9.348m (20 saving options)
were agreed for 2023-24. These, and savings
agreed in previous years which had to be delivered
in 2023-24 totalling £0.031m (3 saving options),
were monitored throughout the year.  The chart on
the right shows the overall delivery of savings and
any shortfall was absorbed within departmental
resources as is evidenced from the overall
departmental underspends. Some of these saving
options were non- recurring in nature (£2.581m). 
Capital:  Outturn against Budget 
The net 2023-24 capital expenditure was £37.860m compared to an annual budget of £33.166m,
(adjusted during the year for previously agreed slippages, accelerations and virements) giving rise to a
year end overspend of £4.694m (14.15%).  There are a number of under and (overspends) within the
outturn position, the most significant are noted below:

Page 106

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 16 
Project (Over)/Under
Spend (£m)
Explanation
Roads
Reconstruction
0.507 Funding received late in 2023-24 so carried forward into 2024-25 when
spend will be incurred.
Oban High School
Replacement
0.406 Ongoing negotiations with contractor have delayed final payments and
retention invoices which are outstanding.
Shared Offices 0.372 Delays in expenditure as only minor works have been carried out to
offices during 2023-24 due to office rationalisation project.
Town Centre Funds (0.350) External funding will not be received until works are complete. Overall
the project is within budget.
Harbour Investment
Programme
(0.408) Reversal of previous slippage - consultancy work at Fionnphort and Port
Askaig concluded earlier than previously anticipated. Overall the project
is within budget.
Kilmory Business
Park
(0.432) Delays in invoicing due to legal requirements resulting in delays in
receiving external funding. Overall the project is within budget.
Environmental
Projects Income
(0.500) External funding will not be received until works are complete which
creates an in year variance. Overall the project is within budget.
CHORD – Rothesay
Income
(1.435) External funding will not be received until works are complete which
creates an in year variance. Overall the project is within budget.
Dunoon STEM Hub
Income
(2.050) Project has been delayed due ongoing discussions regarding the location
of the STEM Hub and budgeted income will not be received until the
project is complete. Overall the project is within budget.
Helensburgh
Waterfront Income
(2.369) Timing of receipt of funding causing 2023-24 variance which will be
received in 2024-25. Overall the project is within budget. 
After accounting for previously agreed slippages, the total slippage in the capital programme in 2023-24
was £23.143m.  In 2023-24 capital expenditure across Scotland’s councils continues to be impacted by
increased inflation rates and shortages in construction materials, affecting both cost and delivery
plans.  There are also elements of slippage that can be attributed to incorrect profiling of spend at the
start of the financial year as opposed to delays in the programme. 
There are 169 projects within the Capital Plan:  143 of the projects are complete or on track and 26 are
off track but recoverable as a result of the slippage mentioned previously within the capital programme.
There are no projects off track that are not recoverable. 
Health and Social Care Partnership (HSCP)
The Argyll and Bute Integration Joint Board (IJB) with responsibility for Social Work and a range of health
services was established and came into effect on 1 April 2016.  The Council approved the 2023-24
budget on 23 February 2023 and the amount approved for Social Work services transferring to the
Integration Joint Board for 2023-24 was £76.253m.  The budget figures quoted in the previous outturn
table include in-year adjustments.
In terms of the outturn position, the HSCP has reported an underspend for 2023-24 of £2.889m and
there is no debt outstanding to the Council. The Council has a creditor totalling £3.389m on its balance
sheet in relation to earmarked reserves which the Council holds on behalf of the HSCP. The earmarked
balance comprises £0.791m of Scottish Government funding for a range of specific Scottish Government
Initiatives, £0.630m of general reserves and £1.968m for service transformation and infrastructure
investment.

Page 107

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 17 
5. FINANCIAL STATEMENTS 
Comprehensive Income and Expenditure Statement (CIES)
The CIES shows the accounting cost of providing services rather than the amount to be funded from
taxation. Councils raise taxation to cover expenditure in accordance with regulations; this may be
different from the accounting cost. The taxation position is shown in the Movement in Reserves
Statement.
The Council is required to make various statutory accounting adjustments to the net cost of services as
reported in the budgetary outturn in order to comply with the Code of Practice for Local Authority
Accounting in the United Kingdom 2023-24.  These accounting adjustments include depreciation, loans
fund principal repayment and accrued holiday leave not taken by 31 March 2024.  Internal income also
requires to be removed between segments within the CIES.   
Reconciliation of CIES to Revenue Budget Outturn
A reconciliation of the Surplus on the Provision of Services of £9.765m as noted in the CIES to the
revenue budget outturn of £1.728m underspend is shown below.   
Reconciliation of CIES to Revenue Budget Outturn 
£000 £000
Surplus/(Deficit) on Provision of Services   9,765
Remove statutory adjustments that don't feature in budget outturn:    
Depreciation 25,732  
Impairment of Assets charged to services (2,576)  
Capital Funding (23,550)  
CFCR (1,616)  
Pension Adjustment (6,322)  
Statutory Repayment of Debt (7,696)  
Repayment of Finance Leases (5,280)  
Transfers to/from Other Statutory Reserves (77)  
Service Concessions 40,869 
Other Adjustments 136      
19,620
Movement In General Fund Balance   29,385
Adjust for earmarkings:    
Released sums earmarked to service budgets 2023-24 27,286  
Supplementary estimates agreed during 2023-24 9 
Revenue Budget 23-24 – transferred to General Fund (19)  
Contributions to earmarked reserves 2023-24 (54,933)      
(27,657)
Revenue Budget Underspend/(Overspend)   1,728

Page 108

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 18 
Balance Sheet
The Balance Sheet summarises the Council’s assets and liabilities as at 31 March 2024 and explanatory
notes are provided.   The net worth of the Council has increased by £143.744m from £667.070m as at 31
March 2023 to £810.814m as at 31 March 2024.   The major changes are set out in the table below. 
Main Balance Sheet Changes 
31/03/2023
£000
31/03/2024
£000
Change
£000
Main Reason
Long Term
Assets
886,601 769,486 (117,115) Largely due to the decrease in the value of the
pension debtor partially offset by increase in the
value of revalued assets.
Current
Assets
90,693 58,539 (32,154) Reduction in cash balances in comparison to
previous year due to the early repayment of long-
term loans and funding the capital programme
through cash balances as opposed to taking out
new long-term borrowing.
Current
Liabilities
(68,592) (72,853) (4,261) Small increases in short term creditors and short-
term borrowing.
Long Term
Liabilities
(241,632) (233,152) 8,480 Reduction in long-term borrowing due to the early
repayment of loans during the year and increase in
the value of unfunded pension liabilities.
Total 667,070 522,020 (145,050) 
Provisions  
The Council has provisions totalling £4.520m on the Balance Sheet as detailed in Note 29 to the
Accounts.  The larger provisions, those £0.250m or over, are summarised below.
• £2.740m for landfill sites.  A provision for landfill sites was created in 2014-15 reflecting the Council’s
liability for restoration and ongoing maintenance in respect of landfill sites operated by the Council at
Glengorm, Gartbreck and Gott Bay.  These have been provided for based on the net present value of
estimated future costs. 
• £1.025m for NPDO and Hub DBFM Payments.  This provision is held in relation to disputed
performance deductions and unbilled utility costs.   
Pension Asset
The Council is required to account for its share of the Strathclyde Pension Fund assets and liabilities. 
The information included in the Accounts is provided by the Pension Fund actuaries following the annual
valuation of the Fund.  
The Council’s share of the assets of the Strathclyde Pension Fund have been assessed on an actuarial
basis using the projected unit method, an estimate of the pensions that will be payable in future years
dependent on the assumptions about mortality rates, salary levels etc.  The asset relates to benefits
earned by existing or previous employees up to 31 March 2024. 
There has been a decrease in the pension valuation asset from £139.014m in 2022-23 to £0m in 2023-
24. This is as a result of the application of an asset ceiling applied in accordance with the requirements
of IAS19.

Page 109

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 19 
The pension liability or asset can fluctuate significantly year on year.  The table below shows the pension
liability or asset over the last three years. Further detail on the pension estimates are included within
Note 31.
Pension (Liability)/Asset at the end of the financial year 
2021-22
£000
2022-23
£000
2023-24
£000
Pension Asset 4,634 139,014 0 
Borrowing  
During 2022-23 the Council’s external borrowing reduced by £23.037m from £143.973m as at 31 March
2023 to £120.936m as at 31 March 2024.  The reduction was due to the early repayment of long term
loans during the year in order to receive a discount and achieve an overall treasury gain.  
The Council was under borrowed by £68m at 31 March 2024.  This was due to the early repayment of
loans, minimal new long term borrowing taken out and slippage within the capital programme. 
The Council’s 2023-24 ‘Treasury Management Strategy and Annual Investment Strategy’ was approved
at the full Council meeting on 23 February 2023 and outlines the Council’s capital prudential and treasury
indicators. 
Statement of Movement in Reserves
This Statement shows the movement on the different reserves held by the Council, analysed into usable
reserves (resource backed reserves which can be used to fund expenditure) and unusable reserves
(required purely for accounting purposes and are not backed by resources).
The balance of unusable reserves has decreased by £172.976m from £573.295m as at 31 March 2023
to £400.319m as at 31 March 2024.  The main reason for this movement is the decrease in the pensions
reserve noted earlier in this commentary plus smaller accounting adjustments required through the
Capital adjustment account and revaluation reserve.
The balance of usable reserves has increased by £27.926m from £93.775m as at 31 March 2023 to
£121.701m as at 31 March 2024.  This is due to an increase in the General Fund of £29.385m offset by
smaller reductions in the Capital Fund outlined in Note 34.1 and the Repairs and Renewals Fund
outlined in Note 34.2.   
In respect of the General Fund Balance movement, there has been an increase of £29.385m from a
balance of £86.356m to £115.741m and the detail on the movement in the balance is summarised within
the table below.   
Movement on General Fund Balance  
£000
Balance on General Fund 31 March 2023 86,356
Revenue Budget 2023-24 – transfer to General Fund 19
Released sums earmarked to service budgets 2023-24 (27,286)
Contributions to earmarked reserves 2023-24 – Service Concessions 35,658
Contributions to earmarked reserves 2023-24 - Other 19,275
Supplementary Estimate (8)
Overall budget underspend as noted above 1,728

Page 110

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 20 
Rounding (1)
Balance on General Fund 31 March 2024 115,741 
General Fund Balance
The chart below shows what is included within the General Balance as at 31 March 2024 with a comparison
to the position as at 31 March 2023. 
General Fund Balances as at 31 March 2023 and 31 March 2024 
An analysis of the earmarked balances are shown in the chart below. 
Earmarked Balances held in the General Fund as at 31 March 2024 
Group Accounts 
The Group accounts include Dunbartonshire and Argyll & Bute Valuation Joint Board as an Associate, as
the Council have “significant influence” over their financial and operating policies.  Live Argyll is a wholly
owned subsidiary of Argyll and Bute Council and is consolidated within the group accounts on a line by
line basis.

Page 111

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 21 
In addition, the Council’s Common Good Funds have been fully consolidated into the Group Accounts
and Note 37 gives further details on the Council’s Common Good Funds. 
The effect of inclusion of the Associates, Subsidiary and Common Good Funds on the Group Balance
Sheet is to increase both reserves and net worth by £21.472m. This gives an overall net asset position
for the Group of £543.492m, a decrease of £143.800m from the previous year.  The most significant
decrease is in the pension position of £158.592m partially offset by an increase in non-current assets as
a result of revaluations. 
The Argyll and Bute Integration Joint Board has responsibility for all health and social care functions
relating to adults and children and will oversee the strategic planning and budgeting of these, together
with corresponding service delivery for the residents of Argyll and Bute.  Argyll and Bute Council
contributed £77.605m towards the Argyll and Bute Integration Joint Board in the 2023-24 financial year.
All transactions are accounted for and shown within the single entity statements and the IJB are treated
as a Joint Venture within the Group Accounts therefore a share of their overall surplus and net assets
have been recognised in the Group Statements. 
6. KEY FINANCIAL INDICATORS
The financial indicators outlined below have been developed to assist the reader in assessing the
performance by the Council over the last financial year and the affordability of its ongoing commitments.
Key Financial Indicators
Financial Indicator 2022-23 2023-24 Comment
Unallocated General
Fund Balance as a
proportion of next
year’s Annual
Budgeted Net
Expenditure
2.44% 2.75% Reflects the level of funding available to manage
financial risk/unplanned expenditure.  This includes
the 2% contingency.  The 2023-24 position is
slightly more than 2022-23 which confirms there
are sufficient reserves to meet any unplanned
expenditure.
Movement in the
Unallocated General
Fund Balance
(£0.6m) £1.06m Reflects the extent to which the Council is using its
Unallocated General Fund Balance (excluding
contingency). An increase in the 2023-24 balance
to offset the reduction in the previous year and
provide a degree of stability in the Council’s
financial position.
In-year Council Tax
collection rate
96.82% 96.34% Reflects the Council's effectiveness in collecting
Council Tax debt compared to a target of 96%. 
The target continues to be exceeded.
Ratio of Council Tax
Income to Overall
Level of Funding
17.76% 19.9% Reflects the capacity of the Council to vary
expenditure by raising Council Tax income.  
Actual Outturn
compared to
budgeted
expenditure
£3.273m 
1.06%
£1.728m 
0.55%
A measure of how the final outturn compares to the
budgeted position. The surplus is a reflection of the
effectiveness of the Council’s financial
management particularly the Loans Fund.
Capital Financing
Requirement (CFR)
for the current year
£291.782m  £332.394m Measurement of requirement to borrow for capital
purposes.  The increase in 2023-24 reflects writing
back the overpayment of the debt element of
Service Concession arrangements in prior years.
External Debt Levels
for the current year
£142.536m £119.407m Actual borrowing for capital investment levels.
Reduction in 2023-24 due to the early repayment of

Page 112

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 22 
Financial Indicator 2022-23 2023-24 Comment
long term loans at a discounted rate to achieve a
treasury gain and minimal need to borrow due to
slippage in the capital programme and cash
balances.
Ratio of financing
costs to net revenue
stream
6.26% 2.74% Measures the percentage of income that has been
committed towards meeting the costs of borrowing.
The more income needed to fund financing costs
the less that is available to meet other revenue
expenditure. The ratio has dropped in 2023-24 as
we have repaid long term borrowing during the
year, used cash balances to fund the capital
programme and delayed taking any new borrowing
where possible while interest rates were high.
There will be a need to increase borrowing again in
the future and this ratio will rise again. 
7. OUTLOOK
A five year financial outlook informing Council of the estimated budget gap covering the period 2024-25
to 2028-29 using best case, worse case and mid-range scenarios was kept up to date during 2023-24
and presented to the Policy and Resources Committee in May, August, October and December 2023.  
Preparing any forward looking financial outlook is challenging due to the levels of uncertainty, for
example the level of Scottish Government Grant, the impact of rising inflation and the uncertainty of pay
awards being agreed before the budget setting process. The assumptions used to inform the outlook are
reviewed, updated and reported regularly.  The Council has a strong track record in financial
management as recognised by previous years annual external audit reports and the Council’s Best Value
report issued in May 2020.  The chart below shows the cumulative budget gap over the next five years
as reported to the Policy and Resources Committee on 9 May 2024.
Cumulative Budget Gap 2025-26 to 2029-30 as reported on 9 May 2024 
Budget Strategy
A Budget Approach report was presented to Policy and Resources Committee on 11 May 2023 where it
was agreed that a cross party Budget Working Group (BWG) be established comprising six elected 
members from the administration, three elected members from the opposition and two Trade Union
representatives. The BWG’s role was to engage with officers and provide a sounding board to assist in

Page 113

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 23 
the development and identification of savings options. 
During 2023-24 the Council sought the views of the Community on high level priorities for the budget via
a budget simulator. A report outlining the feedback from this consultation was presented to Policy and
Resources Committee on 12 October 2023. This exercise allowed Elected Members to take into account
the views of the Community when considering and preparing the budget for 2024-25. 
A further budget update report was presented to Policy and Resources Committee on 7 December 2023
which set out the latest financial position, initial savings options and other pressures that may have to be
considered as part of the budget setting process. 
The BWG met on 18 September 2023, 9 November 2023 and 18 January 2024. During these meetings
Members were presented with the findings from the consultation, updates on the financial position and
savings options identified by officers. 
The Council continues to be committed to developing multi-year savings proposals with a focus on longer
term planning.  As part of the 2023-24 budget setting process savings that required more detailed work
that could be considered in future years were also identified and these are already being explored as part
of a pipeline of savings for future years. These include detailed reviews of the Roads and Infrastructure
and Education Services. 
Preparation is already well underway for the 2025-26 budget setting process and a report on the
proposed approach will be presented to Council on 27 June 2024. This includes a proposal to once again
create a cross party BWG.  There is no doubt that bridging the budget gap both in 2025-26 and future
years will be extremely challenging.  The budget gap is calculated using a number of assumptions and
there are three areas where a change to the assumptions could have the biggest impact on the
estimates: 
1. Scottish Government Grant – within the mid-range scenario, a 0.5% decrease has been assumed
which is similar to the reduction in 2024-25.  Every 1% change is circa £1.4m.  
2. Council Tax – within the mid-range scenario, a 5% increase has been assumed on the basis that the
majority of Councils increased their Council Tax by at least 5% in 2023-24 prior to the freeze in 2024-
25. This is an officer assumption, as this is a matter for Council to agree. Every 1% change is circa
£600k. 
3. Pay Award – within the mid-range scenario, a 2% increase has been assumed.  Every 1% change is
circa £1.7m. 
As previously noted, the budget outlook is extremely challenging and this is made more so by the ring-
fenced and directed spend by Scottish Government resulting in the budget where the Council is able to
exercise any control being a lot smaller.  It is hoped that the Verity House agreement may bring
opportunities for the un-ring-fencing of some areas of budget. 
Furthermore, in April 2024 a new Provost and Leader of the Council were appointed which was followed
by changes in Members of the administration. The new administration are currently considering their
priorities which could have an impact on decisions made as part of the budget setting process. 
Cost of Living Crisis
The ‘cost of living crisis’ refers to the fall in ‘real’ disposable incomes (that is, adjusted for inflation and
after taxes and benefits) that the UK has experienced since late 2021. It is being caused predominantly
by high inflation outstripping wage and benefit increases.  
Despite some stabilisation efforts, the persistent economic pressures are affecting both individuals and
Council services significantly. The Council continues to see significant increases in all areas of supplies,
but specifically in utilities, food and fuel costs and it will be extremely challenging to contain spending

Page 114

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 24 
within current resources. The Council remains committed to addressing these challenges through
strategic planning and support initiatives for individuals. 
Rural Growth Deal  
Our £70m Rural Growth Deal is about turning economic potential into a successful future for Argyll and
Bute. It is about investing in initiatives that will turn the area’s fantastic natural resources and business
innovation into a thriving local economy.  The Council signed the Heads of Terms in February 2021 and
is working on producing the full deal documentation, which includes a business case for each of the
themes within the deal.  The deal was due to be signed on 7 June 2024 by the Council and both the
Scottish and UK Governments but due to the calling of the UK General Election this has had to be
postponed. 
The project themes in the deal are as follows: 
Marine Tourism/Place Programme including the Rothesay Pavilion at Full Business Case
Low Carbon Economy - Islay
Rural Skills Accelerator
Housing – Isle of Mull and Isle of Islay 
Clyde Engineering & Innovation Centre
West Coast UAV 
Marine Aquaculture Programme. 
Regular updates on progress are posted on the website, see link: Rural Growth Deal (argyll-bute.gov.uk). 
UK Government Levelling Up Agenda
Levelling Up Fund
The Levelling Up Partnership funding was announced by the UK Government in the 2023 Autumn
Statement and Argyll and Bute has been allocated up to £20m of Levelling Up Partnership funding.  The
process to choose the final projects is different to previous Levelling Up funding rounds and is very much
driven by the UK Government.  It was originally envisaged that a long list of projects would be identified
by May 2024 with a short list by mid-July 2024.  Business cases would then be developed by the UK
Government with a final decision made in September 2024.  There will be a degree of public consultation
led by the UK Government and the final decision on the successful projects will lie with the Secretary of
Stage (not the Council).  It is unclear how the General Election will impact on these timescales.  In terms
of the kind of projects, it very much follows the Levelling Up Agenda, that is business, transport
connectivity, community safety, skills and education and housing.  
Shared Prosperity Fund (UKSPF)
The UKSPF is a successor to the previous EU structural funds, it is viewed as a central pillar of the UK
Government’s Levelling Up agenda. The overarching aim of the UKSPF is to build pride in place and
increase life chances across the UK.
The project / programme activities outlined in the Argyll and Bute UKSPF Investment Plan are all aligned
to three key investment priorities: communities and place; supporting local business; and people and
skills, where each priority has predefined interventions, outputs and outcomes. In addition to core
UKSPF monies, the investment plan includes a focus on ring-fenced ‘Multiply’ funding to support the
delivery of an area-based adult numeracy programme. 
Argyll and Bute Council received an allocation from the UKSPF of just under £4.5m to support delivery
over three financial year, specifically the final three months of 2022-23 and the next two financial years,
2023-24 and 2024-25, until the end of March 2025. 
There are 21 projects funded under the Core UKSPF and another three projects support by the Multiply

Page 115

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 25 
programme (also part of the UKSPF £4.5m allocation). 
Aligned to UK Government guidance, any underspend for 2023/24 has been carried over and reprofiled
for 2024/25. It is anticipated that the full allocation will be spent by the end of March 2025.
Learning Estate Investment Programme
The Councils bid to the Scottish Governments Learning Estate Investment Programme (LEIP) for funding
for a new school campus on Mull was successful. While this is good news and will provide welcome
investment in the school estate it does come with a financial pressure that is required to be funded if the
project is to proceed. 
The Scottish Government will fund up to 50% of eligible costs therefore the Council will be required to
fund circa £20m prior to any associated borrowing costs. A Members seminar was held on the 12 April
2024 and a report subsequently presented to Council on 25 April 2024 outlining the financial, economic,
community and educational implications of the proposed campus. Members agreed that up to £5m from
the previously agreed earmarked LEIP funding could be used to commence the Business Case,
undertake engagement exercises, commence the site selection process and establish governance
arrangements. To progress with the project beyond this point Members will consider the capital and
revenue budget provision required as part of the budget setting process. 
Risks
The Council’s Strategic Management Team (SMT) actively manage strategic risks via a six monthly
review of the Strategic Risk Register (SRR) which adopts established risk management arrangements
including reviewing current mitigating measures and identifying key actions to further mitigate them.
These actions are designed to be consistent with the work required to deliver services which are aligned
to the Council’s objectives through the Council’s strategic and service plans.  Furthermore departmental
management teams review their operational risk registers (ORR) on a quarterly basis with all red risks
identified in ORRs being reported to the SMT to ensure they are sighted on all emerging high priority
risks. 
The SRR currently has 13 strategic risks which are categorised using a RAG (Red, Amber, Green)
Status based on the residual impact and likelihood of crystallisation after accounting for mitigation
measures.  There are currently four risks classified as red as set out in the diagram below which also
summarises the current mitigating actions.   These are issues that the Council continues to manage
through programmes of work such as the Rural Growth Deal, and the Levelling Up Fund, also the
progression of a new Waste Strategy with a particular focus on the 2025 ban on Biodegradable Municipal
Waste, reviewing contingency plans and disaster recovery plans in relation to Cyber Security and
addressing the Housing Emergency through a Housing Strategy and Investment Plan.

Page 116

Management Commentary 
www.argyll-bute.gov.uk   _______________________________________________ Page 26 
8. CONCLUSION
The Council has continued to have good financial planning arrangements in place in 2023-24.  We have
managed the continued inflationary pressures and taken the opportunity to repay borrowing at a discount
which helped ensure that we operated within budget in 2023-24.   The utilisation of the Service
Concession flexibility has allowed us to earmark funds to address Council priorities and therefore not put
further pressure on the budget position. It is recognised that ongoing real term reductions in Scottish
Government core revenue grant continues to present significant financial challenges for all local
authorities, however, our council is in a strong position to manage the financially challenging times.
The Council are committed to deliver the best services to the people of Argyll and Bute within the
available resources.   
9. ACKNOWLEDGEMENTS
We would take this opportunity to acknowledge the significant effort in producing the Annual Accounts
and to record our thanks to both Elected Members and staff for their continued hard work and support. 
Councillor Jim Lynch  Pippa Milne    Kirsty Flanagan
Leader    Chief Executive   Section 95 Officer
20 December 2024   20 December 2024   20 December 2024  
•Maximise external funding
•Rural Growth Deal
•Levelling Up Fund
•UK Shared Propsperity Funding Investment Plan
Population,
Infrastructure and
Economic Decline
•Developing options for new Waste Strategy
•Planning for impact of Bio-degradable Municipal Waste Ban 2025
•Planning for impact of Scottish Deposit Return SchemeWaste Management
•Contingency Planning
•Raising Cyber Security awareness
•Disaster Recovery Plan
•Work with Scottish Government Cyber Resilience Team
Cyber Security
•Housing Strategy and Investment Plan
•Housing Delivery Group
•Islands Programme Award of Funding for worker accomodation
Housing Availability

Page 117

Statement of Responsibilities for the Annual Accounts 
www.argyll-bute.gov.uk   _______________________________________________ Page 27 
THE AUTHORITY'S RESPONSIBILITIES 
The Council is required:
• to make arrangements for the proper
administration of its financial affairs and to
ensure that one of its officers has the
responsibility for the administration of those
affairs (Section 95 of the Local Government
(Scotland) Act 1973).  In this Authority, that
officer is the Executive Director;
• to manage its affairs to secure economic,
efficient and effective use of resources and
safeguard its assets;
• to ensure the Annual Accounts are prepared in
accordance with legislation (The Local
Authority Accounts (Scotland) Regulations
2014), and so far as is compatible with that
legislation, in accordance with proper
accounting practices (section 12 of the Local
Government in Scotland Act 2003);
• to approve the Annual Accounts for signature. 
Councillor Jim Lynch  
Leader  
20 December 2024 
SECTION 95 OFFICER RESPONSIBILITIES
The Section 95 Officer is responsible for the
preparation of the Council's Annual Accounts in
accordance with proper practices as required by
legislation and as set out in the CIPFA/LASAAC Code
of Practice on Local Authority Accounting in the United
Kingdom (The Code).
In preparing the Annual Accounts, the Section 95
Officer has:
• selected suitable accounting policies and
applied them consistently;
• made judgements and estimates on a
reasonable basis;
• complied with legislation;
• complied with the Local Authority Accounting
Code of Practice 2023-24 (in so far as it is
compatible with legislation).
The Section 95 Officer has also:
• kept adequate accounting records which were
up to date;
• taken reasonable steps for the prevention and
detection of fraud and other irregularities. 
I certify that the Annual Accounts give a true and fair
view of the financial position of the Council and its
group at the reporting date and the transactions of the
Council and its group for the year ended 31 March
2024. 
Kirsty Flanagan
Section 95 Officer
20 December 2024

Page 118

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 28 
1. BACKGROUND AND SCOPE OF RESPONSIBILITY 
Argyll and Bute Council’s (the Council) governance framework includes the systems, processes and
culture by which the Council is controlled, engages with communities and monitors the achievement
of strategic objectives. The Council conducts its business in accordance with the law and proper
standards. The Council has a duty to make arrangements to secure continuous improvement in the
way in which its functions are exercised, having regard to the economic, efficient and effective use of
public money. 
The system of internal control is a key part of the framework and is designed to manage risk to an
acceptable level.   
In discharging these responsibilities, the Council has put in place proper arrangements for the
governance of its affairs and the stewardship of the resources at its disposal. The Council has
approved and adopted a Local Code of Corporate Governance (the Code) which is consistent with
the principles and requirements of the CIPFA/SOLACE revised Framework for ‘Delivering Good
Governance in Local Government. This Statement explains how the Council has complied with the
Code and meets the requirements of current good practice. 
2. THE GOVERNANCE FRAMEWORK
The Code details how the Council will demonstrate compliance with the fundamental principles of
corporate governance for public sector bodies.  The seven key principles of our governance
arrangements in 2023/24 are described in the Code, along with our supporting principles and key
aspects of our arrangements to ensure compliance. 
1. Behaving with integrity, demonstrating strong commitment to ethical values, and
respecting the rule of law.
We have four values, which underpin all that we do and provide a sound basis to achieve
transformation to ensure we meet the challenges of the future and deliver quality services. These
values are that we have a workforce which is: 
Caring  Committed  Collaborative  Creative  
The Council has developed a change programme ‘Connect for Success’ with the seven principles –
One Council One Place Approach, Purpose and Mission Focus, Employee Empowerment, Data and
Evidence Driven Decision Making, Learning Council, Agile and Maximise Opportunities that
Technology Offers - Connect for Success 
We have developed and communicated an Ethical Framework within the Council's Constitution,
which defines standards of behaviour for Members and staff. Protocols for Member/Officer relations
are also detailed within the Constitution.   
The Councillors’ Code of Conduct is set out at a national level, applying to all members in Scottish
local authorities and is incorporated into the Council’s Constitution as part of the ethical framework
which also includes a protocol for the Monitoring Officer. A Register of Members Interests is publicly
available for inspection. In addition, the Constitution has a section on conduct at meetings and
meeting agendas require declarations of interest to be made where appropriate. Standing orders for
meetings are included within the Council’s constitution and training and support is provided to
members on their role in Council committees. 
Anti-fraud and whistleblowing policies are in place and the Council has adopted the Scottish Public
Services Ombudsman’s (SPSO’s) Model Complaints Handling Procedure.

Page 119

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 29 
The Council complies with CIPFA’s Statement on the Role of the Chief Financial Officer in Local
Government. 
In addition, Professional advice on the discharge of statutory social work duties is provided to the
Council by the Chief Social Work (CSWO). 
A structure of governance and framework across our day to day activities and which supports
accountability, control, risk management and appropriate overview of the Council are outlined in the
diagram below:

Page 120

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 30 
Decision Making /
Procedural
Council and
Committee Structure
Council and
Committee Terms of
Reference
Council and
Committee Standing
Orders
Scheme of Delegated
Functions
Standing Orders
Relating to Contracts
Councillor's Code of
Conduct
Corporate Governance
Executive Leadership
Team and Senior
Management Team
Risk Management
Integrity
HR and Individual
Capability
Strategic Planning
Performance
Management
Framework
Community Planning
and Empowerment
Stakeholder
Engagement
Financial Governance
Internal Control
ALEO Governance
Scheme of Delegation
ALEO Governance
Framework
Risk and Governance
Reporting
Financial and
Operational
Performance
ALEO Risk Register
Asset Governance
Corporate Asset
Management Strategy
Corporate Asset
Managment Plan and
Capital Plan
Records Management
Information
Management and
Security
Local Development
Plan
ICT and Digital
Strategy
Major
Programmes/Projects
Capital Investment
Programme
Conservation Area
Regeneration Scheme
(CARS) Projects
Campbeltown,
Helensburgh, Oban,
Rothesay & Dunoon
(CHORD) Projects
Marine Asset
Management Plan
Rural Growth Deal
Annual Status and
Options Report
External and Internal Audit and other regulatory inspections
Constitution, Governance, Risk Management and Accountability

Page 121

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 31 
2. Ensuring openness and comprehensive stakeholder engagement.
We have established clear channels of communication with the community and other stakeholders through
our Communication Strategy.  Key mechanisms include:
Consultation Diary 
The Council has developed a consultation section on its website which hosts all consultations run by the
Council and includes a section which publicises the results and/or outcome of the consultation and the
resultant decisions that have been taken, showing how they were informed by the consultation process.
This is part of our commitment to You Said, We Did information sharing for the public. Consultations
provide communities with an opportunity to get involved with wide ranging aspects of the council’s work
and life in Argyll and Bute. 
These include for example, play park funding, active travel routes, primary school consultations, and the
council’s customer service strategy. 
Keep in the Loop Service  
Over 10,870 customers currently subscribe to receive notifications across the range of services. 
'Myaccount' is a secure sign-in service for accessing online public services in Scotland. It provides the
ability to set up an online account and use it to access a growing range of online public services,
Scotland-wide, including Argyll and Bute Council. Currently 16,744 customers up from 15,399 last year
have signed up to this service and it allows customers to access and personalise their interaction with
the Council on a range of services. 
Public Performance Reporting
The Council’s website makes all performance information available to the public. This includes information
on performance scorecards, budgets and other service related information. This promotes open
accountability to the public for its performance against agreed policies and standards. As part of phase
two of the performance excellence project a review of the council's approach to public performance
reporting is being undertaken.
Accessibility
In 2023/24 75% of 593,362 customer interactions through the council’s Customer Engagement Team
were made using digital self-service. This very high proportion is because of the scope and quality of the
digital services provided. In order to ensure maximum accessibility for everyone and meet our equalities
responsibilities, the Council’s website was upgraded to the latest software version Drupal 10 and its
content refreshed to meet the new international WCAG2.2 standard. 
In March 2024 it scored 98% in the UK Independent Silktide accessibility score, rating it the 37th highest
ranking Council in the UK. In addition the Reachdeck supported access tool was added to the website to
give read aloud and translation help to users seeking such additional assistance and our 24/7 automated
telephone service was used 46,942 times by those customers who struggle with online digital services.
Community Engagement 
To support strengthening communities, community empowerment and engagement the council has in
place: 
• An officer Community Engagement Strategy Group to oversee the development and implementation
of the council’s internal Engagement Strategy; advising on best practice in engagement tools and
techniques, supporting skills development and capacity within the council to effectively engage with
communities. On this group sit those officers with expertise in engagement including those from
Corporate Communications and the Communities & Partnership Team. The Councils
Communications Team has developed an engagement app for services to use, and the council’s
Communities & Partnership Team has resources and expertise to support hard to reach groups,

Page 122

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 32 
community organisations and remote communities to have a voice in decision making. 
• A Community Development service, with a focus on improving active citizenship and capacity
building through best practice in community development through a responsive and effectively
targeted programme of Community Development support internally to the council and externally
within communities across Argyll and Bute.
• A range of training and resources to help build the knowledge, skills and confidence of community
groups
• Funding support to help empower community organisations to take forward priority projects and
activities in their area: Monthly funding alert | Argyll and Bute Council (argyll-bute.gov.uk)
• Resourcing community council liaison activities, including training and support activity, which helps to
build the capacity of community councils.  
The Council also has a statutory lead role to ensuring Community Learning and Development provision
in Argyll and Bute is set out in an Argyll and Bute Community Learning and Development Strategic Plan,
and this is delivered through its collaboration with its Arms-length External Organisation (ALEO) partner
Live Argyll.
The Council continues to promote the Community-led action plan toolkit (developed in partnership with
Scottish Community Development Centre) to help support communities interested in developing a local
Community-led Action Plan. The Council also provides support for communities interested in
development a Place Plan: Local Place Plans | Argyll and Bute Council (argyll-bute.gov.uk)
The Council directly resources the management of the Community Planning Partnership (CPP) to bring
partners together, including community, to deliver on the Outcome Improvement Plan. It actively seeks to
ensure that young people are engaged in Community Planning and has implemented the following:
• The 3 local Members of the Scottish Youth Parliament (MSYP's) attend the Community Planning
Partnership Management Committee meetings on a rotational basis.  
• The Area Community Planning Groups (ACPG) invite members of local Youth Forums to attend
meetings when they are held in their local areas & information is passed on to young people by
Youth Workers who are kept updated on any developments. 
• The revised Scheme of Establishment for Community Councils outlines the requirement to
encourage young people to attend and participate in community council meetings” and the age to
become a Community Councillor was lowered to be 16 to encourage more young people to
become involved.
Council/Committee Meetings
Meetings are always held in public, unless one of the statutory exemptions in the Local Government
(Scotland) Act 1973, schedule 7A applies to the content of the report. Agendas for and minutes of meetings
are detailed on the Council’s website. When schedule 7A applies papers are adjusted to ensure that the
maximum amount of content is in the public domain.
The Council’s Constitution defines the roles and responsibilities of the administration, committees, scrutiny
and officer functions, with clear delegation arrangements and protocols for effective communication. 
The Standards Commission Advice Note for Councillors on Distinguishing between their Strategic Role
and any Operational Work has previously been included in an Elected Member Seminar and is hosted on
the Members Resource page on the Hub for ease of reference.

Page 123

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 33 
3. Defining outcomes in terms of sustainable economic, social, and environmental benefits.
Our Corporate plan sets out our, and our community planning partner’s, vision for Argyll and Bute’s
economic success to be built on a growing population. It also defines our mission “To make Argyll and
Bute a place people choose to live, learn, work and do business” and establishes our outcomes, priorities
and approach to delivering on our shared ambition with our community partners.
We have a Performance Improvement Framework (PIF) that ensures performance is integral to the work
of the Council.  The PIF is focused not just on measuring what we do but on measuring the difference we
make in terms of our outcomes.   
Asset management planning and capital investment is structured to consider and balance the combined
economic, social and environmental impact of policies and plans when taking decisions about service
provision. The Council has put arrangements in place to comply with key elements of the Community
Empowerment Act.
In determining how services and other courses of action should be planned and delivered the Council is
increasingly engaging with internal and external stakeholders. Community benefit is an important
consideration in the procurement of goods and services.
The Council has acknowledges the effects of the ‘Cost of Living’ within Argyll and Bute and during
2023/2024 client gain achieved by the Flexible food and Fuel fund  project reached £3.8 million. This
project, supporting the most vulnerable low income households and those using foodbanks in our area to
access short-term grants to cover the cost of food and fuel in the short term. In the longer term support
through the provision benefit maximisation, money advice and energy advice services is provided by third
sector partner agencies. 
In addition, this year the Council has issued 1,300 Scotland Loves Local Gift Cards to low income
households in the year ensuring the £110,000 loaded onto the gift cards is spent in Island based local
businesses in Argyll and Bute. The Council and the Third Sector Interface is supporting the Poverty
Alliance on a project entitled “Taking Action on Rural Poverty” which is looking at new ways of addressing
rural poverty in Argyll and Bute by reducing the rural poverty premium.  
The Council has also provided a one-stop-shop webpage where individuals and families can access
energy advice, money advice and links to the services the Council provides in this area and those provided
by third sector partner organisations.
In 2022/23 Argyll & Bute Council recorded its lowest level of operational carbon emissions since reporting
commenced in 2015/16 via the Public Bodies Climate Change Duties. This represents a reduction of
12,952 tCO2e (tonnes of carbon dioxide equivalent), approximately 33% against baseline figures. Work
continues across Council services to reduce our emissions and support our journey to net zero including
the transition to energy efficient LED streetlighting, moving to electric or hybrid fleet vehicles, and
increasing diversion of waste from landfill.
Integrated impact assessments as well as environmental, sustainability and island implications are
considered during the decision making process to promote fair access to services.
4. Determining the interventions necessary to optimise the achievement of the intended
outcomes.
Decision makers receive detailed information indicating how intended outcomes would be achieved
together with the implications associated with the proposals covering financial, risks and mitigations,
integrated impact assessment, acting sustainably, carbon management, island proofing, and changes to
schemes, by way of the compulsory sections of the Committee report.
The Council’s Executive Leadership Team (ELT) meet regularly with the administration to discuss their
key priorities and requirements for decision making in addition there is regular survey and feedback on
their needs and a regular review of governance arrangements to ensure that decision making is fully
supported.

Page 124

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 34 
In determining how services and other courses of action should be planned and delivered the Council is
increasingly engaging with internal and external stakeholders. Community benefit is an important
consideration in the procurement of goods and services.
The Council fosters effective relationships, collaborative working and contractual arrangements with
other public, private, and voluntary organisations in delivering services that meet the needs of the local
community as stated in the Council’s Corporate Plan 
5. Developing the entity’s capacity, including the capability of its leadership and the individuals
within it.
Elected Member Development
The Council has signed up to the Improvement Service’s Continuing Professional Development
Framework for Elected Members. All Elected Members are provided with opportunities to progress
personal development plans so that individual training needs and aspirations are identified and support
provided as appropriate. This is complemented by a comprehensive seminar and workshop programme
which addresses a wide range of topics and strategic issues. Additional training was undertaken by
Elected Members in relation to the technology, knowledge and skills necessary to support the transition
to a virtual environment including webcasting of strategic Committee meetings and the operation of
meetings on a hybrid basis, enabling a mixed attendance of members being physically or virtually
present.             
Officer Development
The Council supports officer development through a structured approach, driven by the values set out in
the Corporate Plan and a behavioural competency framework.
The Council has Argyll and Bute Manager and Leadership Programmes, which ensure that all employees
who have management responsibilities are knowledgeable and effective in delivering services within the
priority management policies and procedures of the Council, including finance, performance and people
management. The Leadership Programme ensures that senior and aspiring leaders in the organisation
have support to develop their leadership behaviours and to improve their overall impact and performance
across the organisation. 
6. Managing risks and performance through robust internal control and strong public financial
management. 
Internal Financial Control
Our standing orders, financial instructions, scheme of delegation and supporting procedure notes/manuals
clearly define how decisions are taken and the processes and controls in place to manage risks. These
are reviewed and updated on an annual basis. We ensure compliance with relevant laws and regulations,
internal policies and procedures, and that expenditure is lawful. The Council’s Monitoring Officer advises
on compliance with our policy framework, ensuring that decision making is lawful and fair. Furthermore
the Council has a designated Data Protection Officer and all services have Information Asset Registers
along with appropriate guidance on how data should be managed.
Our financial management arrangements conform to the CIPFA Statement on the Role of the Chief
Financial Officer and we ensure that our independent Audit and Scrutiny Committee undertakes the core
functions identified in CIPFA’s Audit Committees – Practical Guidance for Local Authorities. 
The Council has a proactive, holistic approach to tackling fraud, theft, corruption and crime, as an integral
part of protecting public finances, safeguarding assets, and delivering services effectively. It is based upon
the national counter fraud standard CIPFA’s Code of Practice on ‘Managing the Risk of Fraud and
Corruption’.
The Council has a system of internal financial control designed to manage risk to a reasonable level. It is
based on a framework of regular management information, financial regulations, administrative

Page 125

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 35 
procedures (including segregation of duties), management supervision, and a system of delegation and
accountability. 
Development and maintenance of the system is undertaken by officers within the Council and the named
bodies mentioned below. 
Internal Financial Controls and Prevention  Are these in Place?
Comprehensive budget systems 
Financial and budget monitoring systems 
Financial and Performance reporting systems 
Clearly defined Capital Expenditure guidelines 
Project Management processes and disciplines 
An effective Internal Audit Section 
An effective Counter Fraud Team 
Internal controls cannot eliminate risk of failure to achieve policies, aims and objectives and can
therefore only provide reasonable and not absolute assurance of effectiveness. 
This annual review also covers the other bodies whose activities are incorporated into our Group Accounts
and reliance is placed on the formal audit opinion contained in the financial statements of each individual
body.
• Dunbartonshire and Argyll and Bute Valuation Board
• Live Argyll
• Argyll and Bute Integration Joint Board
The Council’s risk management processes are well developed. In particular the:
• Strategic Risk Register is updated twice a year and approved by the SMT
• Chief Executive presents the Strategic Risk Register to the Audit and Scrutiny Committee on an
annual basis
• Operational Risk Registers are updated quarterly by departmental management teams.
• Internal Audit will perform an audit of compliance with risk management arrangements every three
years.
• The CIA performs an annual strategic risk assurance mapping exercise. 
7. Implementing good practices in transparency, reporting, and audit to deliver effective
accountability 
Internal Audit 
The Council and its Group bodies have internal audit functions, which operate to Public Sector Internal
Audit Standards. The work of internal audit is informed by an analysis of the risk to which the Council and
its Group bodies are exposed, with annual internal audit plans prepared based on that analysis. The
Council's Audit and Scrutiny Committee endorses the preparation methodology and annual internal audit
plan and monitors the performance of Internal Audit in completing the plan. In addition, the Council has
developed a hybrid meeting facility enabling physical and virtual attendance at meetings with a public
broadcast function so that members of the public can see and hear meetings of the Council’s strategic
committees’ live increasing openness and transparency.

Page 126

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 36 
The Chief Internal Auditor (CIA) provides the Audit and Scrutiny Committee with an annual report on
internal audit activity in the Council and an opinion of the assurance can be taken regarding the systems
of governance and internal control and whether they are operating effectively. This is an independent and
objective opinion of the CIA based on work carried out in conformance with the Public Sector Internal Audit
Standards to fulfil statutory Internal Audit provision.
Internal audit provides members and management of the Council with independent assurance on risk
management, internal control and corporate governance processes. External audit has, and continues to,
use the work of internal audit. 
The Annual Accounts and Report sets out the financial position in accordance with relevant accounting
regulations. 
Review of the Adequacy of Effectiveness of the Council’s Governance Framework 
Work to deliver Argyll and Bute’s Covid Recovery Strategy and Action plan continued in 2023/24 with the
same governance arrangements. Full details of the action plan is detailed in the document “Recovery,
Renew and Restart”, which was approved by Councils Economic, Development and Infrastructure
Committee.   
The Council has appropriate management and reporting arrangements to enable it to satisfy itself that its
approach to corporate governance is adequate and effective in practice. The legislative framework of local
government defines a number of posts which are primary to the Council’s governance
arrangements.  These include the Chief Executive, Pippa Milne fulfilling the role of Head of Paid Service.
As Monitoring Officer, the Executive Director Douglas Hendry: 
• oversees the implementation of the Code and monitoring its operation
• reports annually to the Council on compliance with the Code and any changes required to
maintain it and ensure its effectiveness.
Specific responsibilities are assigned to the Executive Director Kirsty Flanagan as the Council’s Chief
Financial Officer (S95 Officer), to ensure that public funds are properly accounted for.  In recognition of the
significant role that the Chief Financial Officer has in relation to financial performance and the financial
control environment, CIPFA has set out key principles that define the core activities and behaviours that
belong to the role.  These include, being a key member of the Leadership Team, being actively involved in
and influencing decision making, and leading the delivery of good financial management across the whole
organisation. The Council have appointed a Data Protection Officer in line with the requirements of the UK-
General Data Protection Regulations and the Data Protection Act 2018.
Covid Recovery Progress Report 2023/24
The Argyll and Bute Overarching Recovery Group (formed to lead this process with specific thematic
groups focused on Council recovery, building back stronger communities, economic and social recovery,
infrastructure and transportation, financial management and public health) continues to have an overview
of the Councils Covid Recovery Strategy and critical themes, although the majority of the actions have
either been completed or been mainstreamed into other strategic or operational plans. Key updates are as
follows:
a) Economic and Social Recovery: Issues and actions are incorporated within the Councils Economic
Strategy
b) Building Back Stronger Communities. Issues and actions are incorporated within the Corporate
Community Planning priorities
c) Our Modern Workspaces program. The Council have established hybrid working across its
activities and Our Modern Workspace project aims to look at how we use offices on a town by town
basis and take into account the needs of employees and members of the public, as well as any
opportunities for working more closely with partners. Good progress is being made to develop Hub
buildings and reducing heating and maintenance costs and our huge portfolio of buildings.

Page 127

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 37 
d) The Joint Health Protection Plan, agreed by Argyll and Bute Council, Highland Council and NHS
Highland, sets out the public health arrangements for the management and control of public health
incidents and outbreaks, together with detailing our collective public health priorities for 2023-25. 
FINANCIAL SUSTAINABILITY 
It is anticipated the Scottish public sector will continue to face a very challenging short and medium term
financial outlook with uncertainty over the level of Scottish Government funding. The one year financial
settlements do not provide any degree of medium term certainty and ring-fencing of monies and
additional policy commitments which are not always fully funded limit financial flexibility and create
additional financial pressures. 
In June 2023 the Verity House agreement was signed by representatives from Scottish Local
Government and Scottish Government which signified a shared vision for a more collaborative approach
to delivering our Services. This agreement included a commitment to improve engagement on budgetary
matters and provide more flexibility to Local Authorities by baselining specific grants to allow them to be
utilised on local priorities. It has been disappointing to note that very little has changed in light of this
agreement with no engagement with Local Authorities prior to the Council Tax freeze announcement for
2024-25. 
The financial outlook continues to be impacted by higher levels of inflation than pre-COVID which results
in significant price increases as well as ongoing disruptions to the supply chain and longer lead in times.
Tender prices are substantially higher than in previous years meaning a reduced level of Service can be
provided for the same amount of money. 
The Council continues to provide financial estimates for future years with their medium term financial
outlook covering a five year window to provide a longer term view of the Council’s estimated budget gap.
Preparing any forward looking financial outlook is challenging due to the levels of uncertainty however
the assumptions are reviewed regularly and updated with the outlook prepared to reflect a best case,
worst case and mid-range scenario. 
The Council has a strong track record in financial management as recognised by previous year’s annual
external audit reports and the Council’s Best Value report issued in May 2020. The Best Value report
also recognises that the Council’s medium to long term financial strategy helps support financial planning
arrangements. In addition to providing revenue and capital projections the Strategy also sets out the
position in relation to the Council’s general fund reserve, the approach to managing the financial impact
of inflationary pressures, approach to Treasury Management and the strategy to address budget gaps. 
HEALTH AND SOCIAL CARE INTEGRATION
The Argyll and Bute IJB has been established as a separate legal entity from Argyll and Bute Council and
NHS Highland, with its own board of governance.  The IJB comprises eight voting members with four
Elected Members nominated by Argyll and Bute Council and four Board members from NHS Highland.  In
addition there are a number of non-voting appointees representing other sectors and stakeholder groups,
such as the Third Sector, Independent Sector, Patients and Service Users, Carers and Staff.  
The arrangements for the operation, remit and governance of the IJB are set out in the Argyll and Bute
Integration Scheme which has been prepared and approved by Argyll and Bute Council and NHS
Highland. It has also been approved by the Scottish Government. The IJB, via a process of delegation
from the Health Board and Local Authority as outlined in the Scheme of Integration has responsibility for
the planning, resourcing and operational delivery of all health and social care services within Argyll and
Bute.

Page 128

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 38 
The Council places reliance on the IJB’s framework of internal controls and similarly the IJB places reliance
on the procedures, policies and operational systems of the Council and the Health Board. The IJB operates
within an established procedural framework. The roles and responsibilities of board members and officers
are defined within Standing Orders, the Integration Scheme, Financial Regulations and Standing Financial
Instructions.
The IJB has proportionate internal audit arrangements in place to provide independent assurance on risk
management, corporate governance and the system of internal control.   A risk based internal audit plan
developed and commissioned for 2023/24 and the IJB’s internal auditor has issued a formal annual report
providing their independent opinion on the effectiveness of the IJB’s risk management, internal control
and governance processes. The overall conclusion of the Internal Auditor is to provide a satisfactory level
of assurance on the adequacy of internal controls and governance arrangements within the IJB. 
During 2023-24 the IJB has progressed a number of initiatives to develop its governance arrangements
including improving the use of Directions and the implementation of the integrated performance
management system. It has also focused upon re-mobilising services following the pandemic, refreshing
its service transformation program and progressing strategic development projects. It has focused on
taking action to manage strategic risks during the year. However, it is acknowledged that budgetary
challenges have resulted in some key capital projects and business case development work being paused.
The financial position of the HSCP has also remained stable. It repaid all of the debt it owed to the Council
in 2021/22 and reported an underspend against its approved budget in 2023/24. The operating
environment going forward is very challenging as funding allocations have not kept pace with cost and
demand increases. The impact of an increasing older population with on-going recruitment constraints
and workforce shortages is adding to the challenge. The HSCP is working to address its workforce gaps
throughout the area and across many professions in a variety of ways. For example, it is seeking to
address key worker accommodation shortages in partnership with the Council, Shelter and the Social
Housing Sector and is constantly trying new approaches to attract workers from outside Argyll & Bute.
The new Health and Care Staffing act will also be progressively implemented throughout 2024/25 which
places additional duties upon the IJB to monitor, manage and report upon its staffing levels and risks.
These risks and challenges are particularly acute in many of our rural and island communities which are
experiencing increasing costs along with very small scale, lifeline services which are become ever more
difficult to sustain or operate in a financially efficient way. 
The IJB approved a budget for 2024/25 which indicates that additional funding from NHS Highland may
be required, although it is likely that any actual gap can be funded by the allocation of HSCP reserves.
The budget is also dependent upon the allocation of non-recurring pension fund savings held by Argyll &
Bute Council. The management of longer-term financial sustainability is a priority and service change and
transformation plans aimed at addressing this require to be developed, consulted upon and implemented
during the course of 2024/25 and 2025/26. The delivery of the short term savings plan is a priority for the
HSCP particularly as it seeks to manage down spend on expensive agency and locum staff whilst
maintaining the safety of services.
UPDATE ON AREAS FOR DEVELOPMENT IDENTIFIED IN PREVIOUS ANNUAL
GOVERNANCE STATEMENTS
The 2022/23 Annual Governance Statement identified a number of areas for further development. A
summary update for each area is provided in the table below.

Page 129

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 39 
Area 2023/24 Update
Continue to engage with the Scottish
Government, other local authorities
and our Waste PPP contractor to
determine the most efficient and
effective way of ensuring the Council
can provide a waste solution which
complies with the 2025 Bio-
degradable Municipal Waste Ban 
We continue to pursue Scottish Government for either a
derogation or financial contribution of circa £1.5M to
enable the Waste PPP contract to be accommodated
alongside the 2025 BMW ban. At the time of writing (30
April 2024) we are still awaiting final confirmation from
Scottish Government although given the passage of time
we are now working on the basis that a derogation will not
be approved and are progressing discussions with Renewi
for MBT plants to be converted to Waste Transfer Stations
for use from January 2026 onwards, earlier if practical.
Further enhance reporting of
workforce planning to the Strategic
Management Team 
Workforce planning conversations took place with
Managers during January - March and operational
workforce plans are now being finalised for reporting to
SMT. Absence data is being included in the workforce
planning risk matrix to improve reporting to SMT. Progress
against actions outlined within operational workforce plans
will now be reported through regular Health of the
Organisation reporting to Department Management Teams
and SMT. The council approved its revised People
Strategy and updated strategic workforce planning
priorities in February. All strategic workforce planning
actions will be included in the annual People Strategy
delivery plan.
Continue to Improve quality and
accuracy of asset information which
will benefit asset valuations,
calculations for utilities costs and
asset management 
A further 57 condition surveys (7 within the school estate
and 50 within the non-school estate) and in accordance
with the Scottish Government’s Core Fact of Condition
were commissioned in 2023/24 and output will be
delivered in 2024/25. Additionally records were updated
through inspections and measurements undertaken as
part of the ongoing rolling programme of asset valuations.
Develop data/analytics business
intelligence tool 
The council is taking a two-pronged approach to building
its capacity for business intelligence, within the framework
of its new data strategy and action plan (2024-28)
approved by SMT in October 2023:
a) Microsoft PowerBI – PowerBI is one of the
products in the Microsoft 365 (M365) productivity
suite and includes some familiar aspects of
Microsoft Excel but with much greater capacity to
combine and visualise data from multiple sources.
Since the council has a long-term plan for the
adoption and utilisation of M365 it is the logical
tool for data visualisation and analysis. 
b) The data platform – The “minimum viable product”
(MVP) version of this was launched on 26/3/24
and is now available for staff to use. The Data
Platform will be essential to allowing
“democratised” access to data for use in PowerBI
report building by services themselves. The Data
Platform will also allow for access to datasets to
be controlled and managed by a robust
permissions framework; ensure consistent
application of data quality, ethics and standards;
and enable the FAIR Principles of making data
Findable, Accessible, Interoperable and Re-
usable.

Page 130

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 40 
Complete review of performance
management 
Phase one of the Performance Excellence Project is now
complete with the following deliverables:
- Reduced set of Corporate Outcome Indicators to review
and report on long term trends and progress against
targets
- Decommissioning of Pyramid and development of new
Area Scorecards using MS365. 
- Development of a new Corporate Plan and Business
Plan setting out elected members overall priorities and the
activities and projects that will deliver on these.
- Design and Pilot of a new approach to Self-Assessment
which has been piloted at team level and thematic level. 
Phase Two of the project has been scoped and is now
underway. Phase two of the project will involve redesign
the council Performance Improvement Framework with
workstreams covering planning, design of performance
dashboards and the council's approach to public
performance reporting.
Complete the External Quality
Assessment Framework 
The External Quality Assessment was undertaken and
reported to the Audit and Scrutiny Committee. The findings
were that the Internal Audit service are fully compliant with
the Public Sector Internal Audit Standards in all 14 areas
of assessment. Two minor recommendations were made
and have been fully actioned. 
ISSUES FOR FURTHER DEVELOPMENT 
The review of governance and internal control has identified the following areas for consideration during
2024/25, particularly in the context of continuous improvement within the Council:
• Preparation for the implementation of the Visitor Levy in 2026 - Work with the Digital Office,
improvement Service, City of Edinburgh and Highland Council on the development of a new
digital platform for the billing and collection of the new levy. (Head of Financial Services/Head of
Development and Economic Growth – March 2025).
• Preparation for new processes being implemented including the practice around Initial Referral
Discussions relating to child protection, there will be a need to audit and develop practice further
and the development of an action plan based on the findings will help improvement and the need
to consider the staffing structures which support this vital area of work. (Head of Children,
Families and Justice – March 2025)
• Housing Emergency declared by the Council in June 2023 - Utilise outputs from the Housing
Summit held, to develop a multi-stakeholder Action Plan, and synthesise the relative elements of
this into a revised Local Housing Strategy Action Programme. (Head of Development and
Economic Growth – March 2025)
• The revaluation of properties for building insurances purposes - Estates will undertake a
revaluation programme for the general portfolio, together with a programme of recorded
inspections of vacant properties. (Head of Commercial services March 2025)
• Publication of the Annual Procurement Report for the Council – This will promote our obligations
set out in the Procurement Regulations. (Head of Legal and Regulatory Support – March 2025)
• The Licensing Board will undertake a review of its Licensing Policy statement as required in terms
of the Licensing (Scotland) Act 2005. (Head of Legal and Regulatory Support – March 2025)
• The use of Cloud Storage – Following results of the Internal Audit, put in place actions to ensure
optimum, appropriate and secure use of cloud storage is applied across all applications. (Head of
Customer Support Services – March 2025)
• Further enhance school engagement with national programmes and community partnership

Page 131

Annual Governance Statement 
www.argyll-bute.gov.uk   _______________________________________________ Page 41 
approaches supporting young people to build their confidence, increase mental health
awareness and promote diversity. (Head of Education, Performance & Improvement – March
2025). 
CONCLUSION 
The conclusion from the review activity outlined above and our opinion is that reasonable assurance can
be placed upon the adequacy and effectiveness of Argyll and Bute Council’s systems of internal control
and governance. Although areas for further improvement have been identified, the annual review
demonstrates sufficient evidence that the Council’s Local Code of Corporate Governance is operating
effectively and that the Council complies with that Local Code in all significant respects. Systems are in
place to regularly review and improve governance and systems of internal control. 
Councillor Jim Lynch  Pippa Milne    Kirsty Flanagan
Leader    Chief Executive   Section 95 Officer
20 December 2024   20 December 2024   20 December 2024

Page 132

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 42 
BACKGROUND
The Local Authority Accounts (Scotland) Regulations 2014 (SSI No.2014/200) require local authorities in
Scotland to prepare a Remuneration Report as part of the annual statutory accounts. All information
disclosed in the tables in this Remuneration Report were audited by Forvis Mazars LLP. All other sections
within the Remuneration Report were reviewed by Forvis Mazars LLP to ensure it is consistent with the
Financial Statements. 
REMUNERATION POLICY AND ARRANGEMENTS
Councillors
The remuneration of councillors is regulated by the Local Governance (Scotland) Act 2004
(Remuneration) Regulations 2007 (SSI No 2020/26). The Regulations provide for the grading of
councillors for the purposes of remuneration arrangements. There are 4 grades of councillor in each local
authority for the purposes of payment of remuneration, the Leader of the Council; the Civic Head
(Provost); senior councillors; and councillors. The Leader of the Council and the Provost cannot be the
same person for the purposes of payment of remuneration. A senior councillor is a councillor who holds
a significant position of responsibility in the Council’s political management structure.
The Regulations also provide for the banding of local authorities. Argyll and Bute is in Band B and the
Council has determined the level of remuneration for councillors within that banding. The salary that is to
be paid to the Leader of the Council is set out in the Regulations. For 2023-24 the salary for the Leader of
Argyll and Bute Council is £40,205. The Regulations permit the Council to remunerate one civic head. The
Regulations set out the maximum salary that may be paid to that civic head. The Council’s civic head is
the Provost and their remuneration is set at £30,154 which is the maximum allowed for local authorities in
Band B.
The Regulations also set out the remuneration that may be paid to senior councillors in addition to the
Leader and Civic Head and the total number of senior councillors the Council may have. The maximum
yearly amount that may be paid to a senior councillor is 75% of the total yearly amount payable to the
Leader of the Council. The total yearly amount payable by the Council for remuneration of all its senior
councillors shall not exceed £0.352m. The Council is able to exercise local flexibility in the determination
of the precise number of senior councillors up to a maximum of 14 and their salary within these maximum
limits. The Council’s policy is to pay a salary of £30,154 to each appointed policy lead. Chairs of Area
Committees without a policy lead remit are paid a salary of £24,081.
In 2023-24, Argyll and Bute Council had 11 senior councillors in the administration (excluding the Provost
and the Leader). The total salary remuneration for senior councillors (excluding the Provost and the
Leader) during 2023-24 was £0.313m. The Regulations also permit the Council to pay contributions or
other payments as required to the Local Government Pension Scheme in respect of those councillors who
elect to become councillor members of the pension scheme.
Senior Employees
The salary of senior employees is set by reference to national arrangements as well as local decisions on
management structures and their associated remuneration levels. The Scottish Joint Negotiating
Committee (SJNC) for Local Authority Services (Chief Officials) sets the salary levels for the Chief
Executives of Scottish Local Authorities and also sets out the spinal column salary points for Chief Officers
which local authorities can utilise in setting the salary levels for posts within their authority. Circular 2023
IR 11.23b sets the amount of salary for the Chief Executive of Argyll and Bute Council for 2023-24. The
salaries of Executive Directors are paid at SCP 43 with Heads of Service being paid at SCP 29.

Page 133

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 43 
COUNCILLORS’ REMUNERATION
Councillors’ payments are made in accordance with the Local Governance (Scotland) Act 2004
(Remuneration) Regulations 2007 and The Local Government (Allowances and Expenses) (Scotland)
Regulations 2007.
The total amount of councillors’ remuneration paid by the Council during the year was: 
2022-23 2023-24
Actual Members Allowances Actual
£'000 £'000
476 Basic Councillor Salaries 464
66 Leader and Provost's Salary 70
258 Senior Councillor Salaries 313
29 Other Expenses and Allowances paid to Members 25
829 Total Allowances 872 
The annual return of councillors’ salaries and expenses for 2023-24 is available for any member of the
public to view at all Council libraries and public offices during normal working hours. It is also available
on the Council’s website at http://www.argyll-bute.gov.uk/council-and-government/councillors-
and- community-councillors.

Page 134

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 44 
SENIOR COUNCILLORS’ REMUNERATION
Additional disclosures are required for senior councillors’ remuneration. Senior councillors’ remuneration
is in accordance with the Local Governance (Scotland) Act 2004 (Remuneration) Regulations 2007 which
for the purpose of remuneration, grades Councillors as either the Leader of the Council, The Civic Head
(Provost), senior Councillors or Councillors. Details of senior Councillors’ remuneration are as follows:
2022-23
Total
Remuneration Senior Members Responsibility
Salary, Fees
and
Allowances
Taxable
Expenses
Total
Remuneration
£ £ £ £
18,059             Councillor Garret Corner Chair of Mid Argyll, Kintyre & the Islands Area
Committee from 24-11-22 24,054         - 24,054            
24,932             Councillor Maurice Corry Provost from 19-05-22 30,120         - 30,120            
38,254             Councillor Robin Currie Leader from 24-10-20 and Policy Lead for Strategic
Development from 24-11-22 40,160        -                40,160            
28,648             Councillor Kieron Green Policy Lead for Planning & Regulatory Services from
19-05-22 30,120        -                30,120            
24,932             Councillor Amanda
Hampsey Policy Lead for Care Services from 19-05-22 30,120         - 30,120            
24,932             Councillor Andrew Kain Policy Lead for Roads and Transport and Chair of
Oban, Lorn & the Isles Area Committee from 19-05-22 30,120         - 30,120            
22,675             Councillor James Lynch Leader of the Largest Opposition Group from 19-05-22 24,054         - 24,054            
27,554             Councillor Liz McCabe
Policy Lead for Islands and Business Development
and Chair of Bute & Cowal Area Committee from 19-05-
22
30,120         - 30,120            
28,648             Councillor Yvonne
McNeilly Policy Lead for Education 30,120        -                30,120            
24,932             Councillor Ross
Moreland
Policy Lead for Climate Change and Environment
Services from 19-05-22 30,120         - 30,120            
28,648             Councillor Gary Mulvaney Depute Leader from 26-09-19 and Policy Lead for
Finance and Commercial Services from 19-05-22 30,120        -                30,120            
22,675             Councillor Gemma
Penfold
Chair of Helensburgh & Lomond Area Committee from
19-05-22 24,054         - 24,054            
14,692             Councillor Alastair
Redman
Policy Lead for Economic Growth and Corporate
Services from 24-11-22 30,120        -                30,120            
2023-24
Senior Councillors’ remuneration in the tables above does not include non-taxable expenses.
The values in the table above relate to the actual payments made during 2023-24 which differ slightly from
those stated on page 42 due to timing differences in regards to payroll.  There is no compensation/loss of
office payments within the period and there were no benefits or bonuses paid during the year.

Page 135

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 45 
EMPLOYEES’ REMUNERATION
The Regulations require that local authorities provide an analysis of the number of employees whose
remuneration in the year was £50,000 or more, including those classified as senior employees who are
subject to separate disclosure requirements. The definition of remuneration includes all sums paid to or
receivable by an employee, expense allowances chargeable to tax and the monetary value of benefits
received other than in cash. This definition therefore includes all payments made to the employee in respect
of agreed employment terminations or retirements. However, employer pension contributions are excluded
from the definition.
Readers should be aware when making comparisons between years that, due to contractual incremental
pay increases, the number of employees covered by this disclosure will increase each year. In addition,
payments made in respect of agreed employment terminations or retirements can also distort the number
and/or banding of employees.
The number of employees whose remuneration, excluding employer pension contributions and including
redundancy/retirement payments, was £50,000 or more in bands of £5,000 was: 
Total 652330
£115,000 - £119,999 3-
£140,000 - £144,999 1-
£120,000 - £124,999 --
£135,000 - £139,999 -1
£125,000 - £129,999
£130,000 - £135,000 -
£105,000 - £109,999 1-
£110,000 - £114,999 -2
-
£95,000 -  £99,999 -1
£85,000 -  £89,999 131
£90,000 -  £94,999 21
Range 2023-242022-23
£ Number of OfficersNumber of Officers
£80,000 -  £84,999
£50,000 -  £54,999 303136
£60,000 -  £64,999 7864
£55,000 - £59,999 10783
9 7
--
£65,000 -  £69,999 7619
£75,000 -  £79,999 173
£70,000 -  £74,999 439
£100,000 - £104,999 11

Page 136

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 46 
SENIOR EMPLOYEES’ REMUNERATION
The table below provides details of the remuneration paid to the Council’s senior employees. This is
defined by the regulations as; 
• someone who has responsibility for the management of the organisation, 
• occupy a position which is politically restricted, or
• any additional employee whose annual remuneration is £150,000 or more (remuneration includes
salary, non-cash benefits and any lump sum payment for loss of employment) 
The following table sets out the remuneration disclosures for 2023-24 for senior officers:
Total
Remuneration
2022-23 Post Holder
Salary
(Including
Fees and
Allowances)
Taxable
Expenses
Total
Remuneration
2023-24
£ £ £ £
138,877            Chief Executive - Pippa Milne 143,625       510                 144,135           
112,406            Executive Director - Douglas Hendry 118,208       443                 118,651           
112,160           Executive Director, Section 95 Financial Officer - Kirsty
Flanagan 118,064       573                 118,637           
84,180              Head of Children and Families and Criminal Justice
(Section 3 Social Work Officer) - David Gibson 89,237          89,237             
The following table sets out the remuneration disclosures for 2023-24 for Live Argyll: 
Total
Remuneration
2022-23
Post Holder
Salary
(Including
Fees and
Allowances)
Taxable
Expenses
Total
Remuneration
2023-24
£ £ £ £
84,180              Live Argyll General Manager (Subsidiary of Argyll & Bute
Council) - Kevin Anderson 89,237          -                  89,237

Page 137

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 47 
PENSION BENEFITS
Pension benefits for councillors and local government employees are provided through the Local
Government Pension Scheme (LGPS).
Councillors’ pension benefits are based on career average pay. A Councillor’s pay for pension purposes
for each year or part year ending 31 March (other than the pay in the final year commencing 1 April) is
increased by the increase in the cost of living, as measured by the appropriate index (or indices) between
the end of that year and the last day of the month in which their membership of the scheme ends. The total
of the revalued pay is then divided by the period of membership to calculate the career average pay. This
is the value used to calculate the pension benefits.
Local government employees had a final salary pension scheme prior to 1 April 2015. This means that
pension benefits are based on the final year’s pay and the number of years that person has been a member
of the scheme. As of 1 April 2015, local government employees are now part of a defined benefit pension
scheme worked out on a career average basis. Benefits accumulated are calculated using pensionable
pay each scheme year, rather than final salary. All benefits accumulated prior to 1 April 2015 are protected.
A five-tier contribution system is in place with contributions from scheme members based on how much
pay falls into each tier. This is designed to give more equality between the costs and benefits of scheme
membership.
The tiers and members contribution rates for 2023-24 are as follows: 
Whole time pay Contribution
Rate
2023-24
On earnings up to and including £25,300 5.50%
On earnings above £25,301 and up to £31,000 7.25%
On earnings above £31,001 and up to £42,500 8.50%
On earnings above £42,501 and up to £56,600 9.50%
On earnings of £56,601 and above 12.00% 
From 1 April 2015, if a person works part-time their contribution is worked out on their part-time pay rate
for the job. Prior to this, if a person worked part-time, their contribution rate was worked out on the whole-
time pay rate for the job with actual contributions paid on actual pay earned.
There is no automatic entitlement to a lump sum. Members may opt to give up (commute) pension for a
lump sum up to the limit set by the Finance Act 2004.
From 1 April 2015, benefits are calculated on the basis of a revalued annual pension built up of 1/49th of
pensionable pay each year, plus inflation to keep up with the cost of living. Prior to this date, the accrual
rate guaranteed a pension based on 1/60th of final pensionable salary and years of pensionable service.
Prior to 2009 the accrual rate guaranteed a pension based on 1/80th and a lump sum based on 3/80th of
final pensionable salary and years of pensionable service.
The value of the accrued benefits has been calculated on the basis of the age at which the person will first
become entitled to receive a full pension on retirement without reduction on account of its payment at that
age; without exercising any option to commute pension entitlement into a lump sum; and without any
adjustment for the effects of future inflation.

Page 138

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 48 
SENIOR COUNCILLORS’ PENSION BENEFITS
The pension entitlements for senior councillors for the year to 31 March 2024 are shown in the table below,
together with the contribution made by the Council to each senior Councillor’s pension during the year.
The pension benefits shown relate to the benefits that the individual has accrued as a consequence of
their relevant local government service and not just their current appointment.
In-year pension
contributions
Accrued
pension
benefits Senior Members
In-year
pension
contributions
Accrued
pension
benefits
£ £'000 £ £'000
3,485                 -                    Councillor Garret Corner Pension 4,642             1                    
-                   Lump Sum -                     
4,812                 1                   Councillor Maurice Corry Pension 5,813             1                    
-                   Lump Sum -                     
7,383                 8                   Councillor Robin Currie Pension 7,751             10                  
1                  Lump Sum 1                    
5,529                 4                   Councillor Kieron Green Pension 5,813             5                    
Lump Sum -                     
4,812                 1                   Councillor Amanda Hampsey Pension 5,813             1                    
-                   Lump Sum -                     
4,812                 1                   Councillor Andrew Kain Pension 5,813             1                    
-                   Lump Sum -                     
4,376                 2                   Councillor James Lynch Pension 4,642             3                    
-                   Lump Sum -                     
5,318                 1                   Councillor Liz McCabe Pension 5,813             2                    
-                   Lump Sum -                     
5,529                 3                  Councillor Yvonne McNeilly Pension 5,813             4                    
Lump Sum -                     
4,812                 -                    Councillor Ross Moreland Pension 5,813             1                    
-                   Lump Sum -                     
5,529                 8                   Councillor Gary Mulvaney Pension 5,813             9                    
2                  Lump Sum 2                    
4,376                 1                   Councillor Gemma Penfold Pension 4,642             1                    
-                   Lump Sum -                     
2,836                 2                  Councillor Alastair Redman Pension 5,813             1                    
Lump Sum -                     
For the year to 31 March
2023
For the year to 31 March
2024

Page 139

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 49 
SENIOR EMPLOYEES’ PENSION BENEFITS
The pension entitlements for senior employees for the year to 31 March 2024 are shown in the table below,
together with the contribution made by the Council to each senior employee’s pension during the year.
The pension benefits shown relate to the benefits that the individual has accrued as a consequence of
their relevant local government service and not just their current appointment.
In-year pension
contributions
Accrued
pension
benefits Senior Officers
In-year
pension
contributions
Accrued
pension
benefits
£ £'000 £ £'000
26,709              70                 Pension 27,699           75                  
111              Lump Sum 111               
21,495              66                 Pension 22,786           70                  
112              Lump Sum 112               
21,495              37                 Pension 22,786           41                  
32                Lump Sum 32                 
16,247              8                 
Head of Children and Families and
Criminal Justice (Section 3 Social Work
Officer) - David Gibson
Pension 17,223           40                 
Lump Sum -                     
For the year to 31 March
2023
For the year to 31 March
2024
Chief Executive - Pippa Milne
Executive Director - Douglas Hendry
Executive Director, Section 95 Financial
Officer - Kirsty Flanagan
Live Argyll Senior Employees’ Pension Benefits
In-year pension
contributions
Accrued
pension
benefits Senior Officers
In-year
pension
contributions
Accrued
pension
benefits
£ £'000 £ £'000
16,247              33                Pension 17,223           37                  
38                Lump Sum 40                 
For the year to 31 March
2024
Live Argyll General Manager (Subsidiary
of Argyll & Bute Council) - Kevin
Anderson
For the year to 31 March
2023

Page 140

The Remuneration Report 
www.argyll-bute.gov.uk   _______________________________________________ Page 50 
EMPLOYEE EXIT PACKAGES
The numbers of exit packages with cost per band for compulsory and other redundancies are set
out in the table below:
Exit Package Cost
Band
No £ No £ No £ No £ No £ No £
1    4,038       2     30,305     3   34,343     £0 - £20,000 2   13,896     -    -                2   13,896    
1    38,924     2     55,403     3   94,327     £20,001 - £40,000 -    -                -    -                -    -               
-    -                £40,001 - £60,000 -    -                -    -                -    -               
1     88,038     1   88,038     £60,001 - £80,000 -    -                -    -                -    -               
-    -                £80,001 - £100,000 -    -                -    -                -    -               
1    137,037   1     106,165   2   243,202   £100,001 - £150,000 1   134,437   1   127,350   2   261,787  
1    161,869   1   161,869   £150,001 - £200,000 -    -                -    -                -    -               
4 341,868 6 279,911 10 621,779 3 148,333 1 127,350 4 275,683
2022-23 2023-24
Compulsory
Redundancies
Other
Departures Total Compulsory
Redundancies
Other
Departures Total
For the purposes of this note, Exit Packages include:
• Redundancy payment;
• Strain on the fund cost (the amount which the Council is required to pay to the pension
fund because the employee has retired before the assumed retirement age);
• Added Years Lump Sum (the amount which the Council pays to the individual in a one-off
lump sum, according to the compensatory added years awarded – maximum three years);
and
• A capitalised value of the recurring Compensatory Added Years payment. This represents
the amount which the Council has to pay to the pension fund because the employee has
retired with enhanced service (maximum three years). This amount is paid on an annual
basis once a person has left employment with the Council and is therefore a notional cost
at 31 March 2024.
Termination costs for all Council employees who have accepted redundancy by 31 March 2024
are recognised in the Exit Packages note in 2023-24, or in previous financial years.  The total
cost recognised in the Exit Packages note in 2023-24 is £0.276m for 4 employees and in 2022-
23 was £0.622m for 10 employees.
The supplementary Termination Benefits Note 35 provides more information. 
FACILITY TIME STATEMENT
Under the Trade Union (Facility Time Publication Requirements) Regulations 2017, the Council is
required to collect and publish data in relation to its usage and spend of trade union facility time
in respect of employees who are trade union representatives. Full details for the period 1 April
2023 to 31 March 2024 are attached at Appendix A.

Page 141

Statement of Comprehensive Income and Expenditure 
www.argyll-bute.gov.uk   _______________________________________________________________________________________  Page 51 
Gross
Expenditure
Gross
Income
Net
Expenditure
Gross
Expenditure
Gross
Income
Net
Expenditure
£'000 £'000 £'000 Service Note £'000 £'000 £'000
26,810        18,209        8,601           Chief Executive and Financial Services 1,281          95               1,186          
Executive Director Douglas Hendry
436             -             436              Executive Director 427             -              427             
33,399        4,250         29,149         Commercial Services 23,010        3,857          19,153         
106,026      13,620        92,406         Education 114,124      13,202        100,922       
15,942        4,371         11,571         Legal and Regulatory Support 17,520        4,241          13,279         
Executive Director Kirsty Flanagan
418             -             418              Executive Director 242             -              242             
Financial Services 25,613        18,639        6,974          
11,859        674            11,185         Customer Support Services 12,165        534             11,631         
25,256        14,380        10,876         Development and Economic Growth 23,138        13,849        9,289          
71,971        24,491        47,480         Roads and Infrastructure 75,990        29,300        46,690         
-              -              
174,434      94,948        79,486         Social Work 181,285      103,209       78,076         
9,897          2,303         7,594           Other Non-Departmental Costs 10,075        678             9,397          
476,448    177,246    299,202     Net Cost of Services 484,870    187,604     297,266     
2022-23 2023-24

Page 142

Statement of Comprehensive Income and Expenditure 
www.argyll-bute.gov.uk   _______________________________________________________________________________________  Page 52 
Other Operating Income and Expenditure:
(437)             Net (Gain)/loss on Disposal of Long Term Assets (262)            
1,643           Other Operating Income and Expenditure 8 1,670          
1,206        Total Other Operating Income and Expenditure 1,408       
Financing and Investment Income and Expenditure:
10,514         Interest Payable and Similar charges 14,037         
(2,966) Interest and Investment Income (4,779)         
141              Net Pension Interest Expense (6,596)         
7,689        Total Financing and Investment Income and Expenditure 2,662       
Taxation and Non-Specific Grant Income:
(191,775) General Government Grants (187,193)      
(22,549) Government Capital Grants and Other Capital Contributions 13 (23,550)        
(33,179) Non-domestic Rates Redistribution (37,645)        
(647)             Non-domestic Rates TIF (804)            
(53,900) Council Tax Income (61,909)        
(302,050) Total Taxation and Non-Specific Grant Income (311,101)  
6,047 (Surplus)/Deficit on Provision of Services 7.1 (9,765)      
(21,104) (Surplus)/Deficit on revaluation of Long Term Assets (10,097)        
(154,350)      Other Post Employment Benefits (Pensions) 31.2 164,914       
(175,454)  Other Comprehensive Income and Expenditure 154,817   
(169,407)  Total Comprehensive Income and Expenditure 145,052     
This statement shows the accounting cost in the year of providing services in accordance with generally accepted accounting practices, rather than the amount
to be funded from taxation. Councils raise taxation to cover expenditure in accordance with regulations; this may be different from the accounting cost. The
taxation position is shown in the Statement of Movement in Reserves.

Page 143

Balance Sheet 
www.argyll-bute.gov.uk   _________________________________________________ Page 53 
£'000 £'000 Note £'000 £'000
Long Term Assets
Property Plant & Equipment 15
451,018   - Other Land and Buildings 457,369  
10,872     - Vehicles, Plant, Furniture and Equipment 11,012    
235,076   - Infrastructure Assets 239,372  
8,892       - Community Assets 9,110      
3,286       - Surplus Assets 4,620      
21,440     - Assets Under Construction 35,724    
730,584      Total Property Plant & Equipment 757,207     
2,345         Heritage Assets 16 2,569         
733            Intangible Assets 17 888           
2,553         Investment Property 18 2,514         
5,492         Long Term Investments 27 492           
5,880         Long-Term Debtors 22 5,816         
139,014      Other Long Term Debtors (Pensions) 31 -                
886,601    Total Long Term Assets 769,486   
Current Assets
1,130       Inventories 1,043      
27,186     Short Term Debtors (Net of Impairment) 23 38,368    
1,554       Assets Held for Sale 24 1,619      
60,000     Short Term Investments 27,500    
823         Cash and Cash Equivalents 25 (9,991)     
90,693      Total Current Assets 58,539     
Current Liabilities
(11,818)    Short-term Borrowing 27 (13,478)   
(50,044)    Short-term Creditors 26 (52,374)   
(1,450)      Provisions 29 (1,665)     
(5,280)      Other Short Term Liabilities 28 (5,336)     
(68,592)    Total Current Liabilities (72,853)    
Long-term Liabilities
(132,155)  Borrowing Repayable within a Period in Excess
of 12 Months
27 (107,458) 
(107,033)  Other Long-term liabilities 28 (101,697) 
-              Other Long-term liabilities (Pensions) 31 (19,578)   
(2,444)      Provisions 29 (2,855)     
-              Capital Grant Receipts in Advance 30 (1,564)     
(241,632)  Total Long-term Liabilities (233,152)  
667,070    Total Assets less Liabilities 522,020   
31 March 202431 March 2023

Page 144

Balance Sheet 
www.argyll-bute.gov.uk   _________________________________________________ Page 54 
The Balance Sheet is a snapshot of the value as at the 31 March 2024 of the assets and liabilities
recognised by the Council. The net assets of the Council (assets less liabilities) are matched by the
reserves held by the Council. Reserves are reported as follows:
• Unusable Reserves: are reserves that the Council is not able to use to provide services.
This category of reserves includes reserves that hold unrealised gains and losses (for
example the revaluation reserve), where amounts would only become available to provide
services if the assets are sold and reserves that hold timing differences shown in the
Movement in Reserves Statement line “Adjustments between accounting basis and funding
basis under regulations”.
• Usable Reserves: are reserves that the Council may use to provide services, subject to the
need to maintain a prudent level of reserves and statutory limitations on their use (for
example the capital receipts reserve that may only be used to fund capital expenditure or
repay debt). 
The Unaudited Annual Accounts were issued on 27 June 2024 and the Audited Annual Accounts were
authorised for issue on 20 December 2024. 
Kirsty Flanagan
Section 95 Officer
20 December 2024
£'000 £'000 Note £'000 £'000
Unusable Reserves 32
174,952   - Revaluation Reserve 180,661  
268,788   - Capital Adjustment Account 249,093  
(1,871)      - Financial Instruments Adjustment Account (1,585)     
139,014   - Pensions Reserve (19,578)   
(7,588)      - Accumulated Absences Account (8,272)     
573,295    400,319   
Usable Reserves 33
4,503       - Capital Funds 3,197      
2,916       - Repairs and Renewals Funds 2,763      
86,356     - General Fund Balance 115,741  
93,775      121,701   
667,070    Total Reserves 522,020   
31 March 202431 March 2023

Page 145

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 55 
Unusable Reserves (Note 32)
Movements in 2023-24
General Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves Total Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 31 March 2023 (86,356)      (2,916)     (4,503)    (93,775)      (174,952)     (268,788)   (139,014)       1,871       7,588      (573,295)    (667,070)       
(Surplus)/Deficit on Provision of Services (9,765)           (9,765)                              -   (9,765)               
Other Comprehensive Income and Expenditure -                 (10,097)         164,914           154,817       154,817            
Retrospective adjustment to the statutory
repayment of debt for service concession
arrangements - permitted flexibility
(36,038)        (36,038)         36,038 36,038         -                     
Total Comprehensive Income and
Expenditure (45,803)      -          -        (45,803)      (10,097)      36,038      164,914        -          -         190,855     145,052        
Adjustments between accounting basis and
funding basis under regulations:
Disposal of Assets 99                  (99)             
Amortisation of Intangible Assets -                 -                                 -                            -  
Depreciation of Non-current Assets (21,443)        (21,443)         21,443                  21,443                          -  
Impairment of Non-current Assets 2,576            2,576            (2,576)                    (2,576)                         -  
Capital Grants and Contributions credited to the
Comprehensive Income and Expenditure
Statement
23,550          23,550          (23,550)              (23,550)                         -  
Capital Expenditure Charged to the General Fund 1,616            1,616            (1,616)                    (1,616)                         -  
Net Gain or Loss on Sale of Non-current Assets 262               (671)        (409)              409                             409                          -  
Amount by which finance costs calculated in
accordance with the Code are different from the
amount of finance costs calculated in
accordance with statutory requirements
286               286                (286)                         (286)                         -  
Employee Benefits (684)              (684)              684                           684                          -  
Amount by which pension costs calculated in
accordance with the Code are different from the
contributions due under pension scheme
regulations
6,322 6,322            (6,322)                         (6,322)                         -  
Usable Reserves (Note 33)

Page 146

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 56 
Unusable Reserves (Note 32)
Movements in 2023-24
General Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves Total Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Statutory Repayment of Debt - Loans Fund
Advances 7,696            7,696            (7,696)                    (7,696)                         -  
Statutory Repayment of Debt - Finance Leases 48                  48                  (48)                              (48)                         -  
Statutory Repayment of Debt - NPDO Finance
Lease Liability
5,232            5,232            (5,232)                    (5,232)                         -  
In year adjustment to the statutory repayment of
debt for service concession arrangements -
permitted flexibility
(4,831)           (4,831)           4,831                      4,831                          -  
Total Statutory Adjustments 20,630       -          (671)      19,959       99              (14,134)     (6,322)           (286)         684        (19,959)      -               
Net (Increase)/Decrease before Transfers
to Other Statutory Reserves (25,173)      -          (671)      (25,844)      (9,998)        21,904      158,592        (286)         684        170,896     145,052        
Transfer to/from Other Statutory Reserves 77                  153            1,977      2,207            (2,207)                    (2,207)                         -  
Adjustments permitted by Accounting Standards
for depreciation that is related to the revaluation
balance rather than historic cost
(4,289)           (4,289)           4,289                        4,289                          -  
(Increase)/Decrease in Year (29,385)      153         1,306     (27,926)      (5,709)        19,697      158,592        (286)         684        172,976     145,052        
Balance at 31 March 2024 Carried Forward (115,741)    (2,763)     (3,197)    (121,701)     (180,661)     (249,093)   19,578          1,585       8,272      (400,319)    (522,020)       
Other Transfers required by Statute
Usable Reserves (Note 33)
Other Transfers
This Statement shows the movement in the 2023-24 financial year on the different reserves held by the Council, analysed into ‘Usable Reserves’ (i.e. those that
can be applied to fund expenditure or reduce local taxation) and “Unusable Reserves”. The ‘(Surplus)/Deficit on the Provision of Services’ line shows the true
economic cost of providing the Council’s services, more details of which are shown in Comprehensive Income and Expenditure Statement. These are different
from the statutory amounts required to be charged to the General Fund Balance for Council Tax setting purposes. The ‘Net (Increase)/Decrease before Transfers
to Other Statutory Reserves’ line shows the Statutory General Fund Balance before any discretionary transfers to or from earmarked reserves undertaken by
the Council.

Page 147

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 57 
Unusable Reserves (Note 32)
Comparative Movements in 2022-23
General
Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves
Total
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 31 March 2022 (96,081)  (2,682)    (4,414)   (103,177)   (157,644)  (241,331)   (4,634)      2,198       6,928      (394,483)  (497,660)  
(Surplus)/Deficit on Provision of Services 6,047      6,047 -             6,047
Other Comprehensive Expenditure and Income (21,104)     (154,350)    (175,454)   (175,454)
Total Comprehensive Expenditure and
Income 6,047 -        -        6,047 (21,104)    -           (154,350)   -          -          (175,454)  (169,407)
Adjustments between accounting basis and
funding basis under regulations:
Disposal of Assets
173            (173)
Amortisation of Intangible Assets -                              -                     -  
Depreciation and of Non-current Assets (20,947)  (20,947)      20,947       20,947                   -  
Impairment of Non-current Assets (3,128)     (3,128)         3,128         3,128                   -  
Capital Grants and Contributions credited to the
Comprehensive Income and Expenditure
Statement
22,549    22,549        (22,549) (22,549)                  -  
Capital Expenditure Charged to the General
Fund 2,938      2,938          (2,938) (2,938)                  -  
Net Gain or Loss on Sale of Non-current Assets 437         (568) (131)            131             131                   -  
Amount by which finance costs calculated in
accordance with the Code are different from the
amount of finance costs calculated in
accordance with statutory requirements
327         327             (327) (327)                  -  
Employee Benefits (660)        (660)            660             660                   -  
Amount by which pension costs calculated in
accordance with the Code are different from the
contributions due under pension scheme
regulations
(19,970) (19,970)      19,970 19,970                  -  
Usable Reserves (Note 33)

Page 148

Statement of Movement in Reserves 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 58 
Unusable Reserves (Note 32)
Comparative Movements in 2022-23
General
Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total Usable
Reserves
Revaluation
Reserve
Capital
Adjustment
Account
Pensions
Reserve
Financial
Instrument
Adjustment
Account
Accumu-
lated
Absences
Account
Total
Unusable
Reserves
Total
Reserves
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Statutory Repayment of Debt - Loans Fund
Advances 20,317    20,317        (20,317) (20,317)                  -  
Statutory Repayment of Debt - Finance Leases 46            46                (46) (46)                  -  
Statutory Repayment of Debt - NPDO Finance
Lease Liability
5,070      5,070          (5,070) (5,070)                  -  
Total Statutory Adjustments 6,979    -        (568)      6,411       173         (26,887)     19,970      (327)         660         (6,411)     -          
Net (Increase)/Decrease before Transfers
to Other Statutory Reserves 13,026   -        (568)      12,458      (20,931)    (26,887)     (134,380)   (327)         660         (181,865)  (169,407)  
Transfer to/from Other Statutory Reserves 322         (234)        480         568             (568) (568)                  -  
Adjustments permitted by Accounting
Standards for depreciation that is related to the
revaluation balance rather than historic cost
(3,623)     (3,623)         3,623         3,623
-  
(Increase)/Decrease in Year 9,725    (234)      (88)        9,403       (17,308)    (27,455)     (134,380)   (327)         660         (178,810)  (169,407)  
Balance at 31 March 2023 Carried
Forward (86,356)  (2,916)    (4,503)   (93,775)     (174,952)  (268,788)   (139,014)   1,871       7,588      (573,295)  (667,070)  
Other Transfers required by Statute
Usable Reserves (Note 33)
Other Transfers
This Statement shows the movement in the 2022-23 financial year on the different reserves held by the Council, analysed into ‘Usable Reserves’ (i.e. those that
can be applied to fund expenditure or reduce local taxation) and “Unusable Reserves”. The ‘(Surplus)/Deficit on the Provision of Services’ line shows the true
economic cost of providing the Council’s services, more details of which are shown in Comprehensive Income and Expenditure Statement. These are different
from the statutory amounts required to be charged to the General Fund Balance for Council Tax setting purposes. The ‘Net (Increase)/Decrease before Transfers
to Other Statutory Reserves’ line shows the Statutory General Fund Balance before any discretionary transfers to or from earmarked reserves undertaken by
the Council.

Page 149

Cash Flow Statement 
www.argyll-bute.gov.uk   ______________________________________________ Page 59 
The Cash Flow Statement shows the changes in cash and cash equivalents of the Council during the
reporting period. The statement shows how the Council generates and uses cash and cash equivalents
by classifying cash flows as operating, investing and financing activities. The amounts of net cash flow
arising from operating activities is a key indicator of the extent to which the operations of the Council are
funded by way of taxation and grant income or from the recipients of services provided by the Council.
Investing activities represent the extent to which cash outflows have been made for resources which are
intended to contribute to the Council’s future service delivery. Cash flows arising from financing activities
are useful in predicting claims on future cash flows by providers of capital (i.e. borrowing) to the Council.
2022-23 2023-24
£'000 Note £'000
6,047       Net (Surplus)/Deficit on the Provision of Services (9,765)     
(21,310)     Adjustments to net surplus or deficit on the provision of services for
non-cash movements 21,585      
5,955        Adjustments for items included in the net surplus or deficit on the
provision of services that are investing and financing activities 10,294      
(9,308)     Net Cash Flows from Operating Activities 39 22,114     
(14,323)     Net Cash Flows from Investing Activities 40 (38,637)     
42,536      Net Cash Flows from Financing Activities 41 27,337           
18,905 Net (Increase)/Decrease in Cash and Cash
Equivalents 10,814     
(19,728)     Cash and Cash Equivalents at the beginning of the Reporting
Period (823)          
(823)        Cash and Cash Equivalents at the end of the
Reporting Period
25 9,991

Page 150

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 60 
1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
1.1 General Principles
The Annual Accounts summarise the Council’s transactions for the 2023-24 financial year and its
position at the year-end of 31 March 2024. The Council must ensure that its Annual Accounts are
prepared in accordance with The Local Authority Accounts (Scotland) Regulations 2014, which section
12 of the Local Government in Scotland Act 2003 require to be prepared in accordance with proper
accounting practices. These practices primarily comprise the Code of Practice on Local Authority
Accounting in the United Kingdom 2023-24, supported by International Financial Reporting Standards
(IFRS) and statutory guidance issued under section 12 of the 2003 Act.
The accounts have been prepared under the historic cost convention, other than changes resulting from
the revaluation of certain categories of non-current assets and financial instruments, and on a going
concern basis.
The accounting policies adopted are set out below and have been applied consistently throughout the
year in dealing with any items that are considered material to the accounts.
1.2 Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when cash payments are made or
received. In particular:
• Revenue from contracts with service recipients, whether for services or the provision of goods,
is recognised when (or as) the goods or services are transferred to the service recipient in
accordance with the performance obligations in the contract.
• Supplies are recorded as expenditure when they are consumed – where there is a gap between
the date supplies are received and their consumption; they are carried as inventories on the
Balance Sheet.
• Expenses in relation to services received (including services provided by employees) are
recorded as expenditure when the services are received rather than when payments are made.
• Interest receivable on investments and payable on borrowings is accounted for respectively as
income and expenditure on the basis of the effective interest rate for the relevant financial
instrument rather than the cash flows fixed or determined by the contract.
• Where revenue and expenditure have been recognised but cash has not been received or paid,
a debtor or creditor for the relevant amount is recorded in the Balance Sheet. Where debts may
not be settled, the balance of debtors is written down and a charge made to revenue for the
income that might not be collected.
1.3 Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty
of notice of not more than 24 hours. Cash equivalents are investments that mature in three months or
less from the date of acquisition and that are readily convertible to known amounts of cash with
insignificant risk of change in value.
In the Balance Sheet and Cash Flow Statement, cash and cash equivalents are shown net of bank
overdrafts that are repayable on demand and form an integral part of the Council’s cash management.
1.4 Prior Period Adjustments, Changes in Accounting Policies, Estimates and Errors
Prior period adjustments may arise as a result of a change in accounting policies or to correct a material
error. Changes in accounting estimates are accounted for prospectively, i.e. in the current and future
years affected by the change and do not give rise to a prior period adjustment.
Changes in accounting policies are only made when required by proper accounting practices or the

Page 151

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 61 
change provides more reliable or relevant information about the effect of transactions, other events and
conditions on the Council’s financial position or financial performance. Where a change is made, it is
applied retrospectively by adjusting opening balances and comparative amounts for the prior period as
if the new policy had always been applied.Material errors discovered in prior period figures are corrected
retrospectively by amending opening balances and comparative amounts for the prior period.
1.5 Charges to Revenue for Non-Current Assets
Services, support services and trading accounts are debited with the following amounts to record the
cost of holding non-current assets during the year:
• Depreciation attributable to the assets used by the relevant service.
• Revaluation and impairment losses on assets used by the service where there are no
accumulated gains in the Revaluation Reserve against which the losses can be written off.
• Amortisation of intangible fixed assets attributable to the service.
The council is not required to raise Council Tax to fund depreciation, revaluation and impairment losses
or amortisation. However, it is required to make an annual contribution from revenue towards the
reduction in its overall borrowing requirement equal to an amount calculated on a prudent basis
determined by the Council in accordance with the Statutory Repayment of Loans Fund Advances.
Depreciation, revaluation and impairment losses and amortisation are therefore replaced by Loans Fund
principal repayments in the General Fund Balance by way of an adjusting transaction within the Capital
Adjustment Account in the Movement in Reserves Statement for the difference between the two.
1.6 Employee Benefits
1.6.1 Benefits Payable during Employment
Short-term employee benefits are those due to be settled wholly within 12 months of the year-end. They
include such benefits as wages and salaries, paid annual leave, paid sick leave and non-monetary
benefits (e.g. cars) for current employees. These benefits are recognised as an expense for services in
the year in which employees render service to the Council. An accrual is made for the cost of holiday
entitlements earned by employees but not taken before the year-end which employees can carry forward
into the next financial year. The accrual is made at the wage and salary rates applicable in the following
accounting year, being the period in which the employee takes the benefit. The accrual is charged to
the Surplus or Deficit on the Provision of Services, but then reversed out through the Movement in
Reserves Statement so that holiday entitlements are charged to revenue in the financial year in which
the holiday absence occurs.
1.6.2 Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to terminate an
officer’s employment before the normal retirement date or an officer’s decision to accept voluntary
redundancy. They are charged on an accruals basis to the appropriate service segment in the
Comprehensive Income and Expenditure Statement at the earlier of when the Council can no longer
withdraw the offer of those benefits or when the Council recognised costs for a restructuring.
Where termination benefits involve the enhancement of pensions, statutory provisions require the
General Fund Balance to be charged with the amount payable by the Council to the pension fund or
pensioner in the year, not the amount calculated according to the relevant accounting standards. In  the
Movement in Reserves Statement, appropriations are required to and from the Pensions Reserve to
remove the notional debits and credits for pension enhancement termination benefits  and replace them
with debits for the cash paid to the pension fund and pensioners and any such amounts payable but
unpaid at the year-end.

Page 152

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 62 
1.6.3 Post-Employment Benefits
The Council participates in two separate pension schemes:
• The Scottish Teachers’ Pension Scheme administered by the Scottish Government.
• The Local Government (Scotland) Pensions Scheme administered by the Strathclyde Pension
Fund.
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned while
employees work for the Council.
However, the arrangements for the teachers’ scheme mean that liabilities for these benefits cannot
ordinarily be identified specifically to the Council. The scheme is therefore accounted for as if it were a
defined contribution scheme. No liability for future payments of benefits is recognised in the Balance
Sheet and the Education Services line in the Comprehensive Income and Expenditure Statement is
charged with the employer’s contributions payable to the Teachers’ Pension Scheme in the year.
Local Government Pension Scheme
The Local Government Pension Scheme is accounted for as a defined benefits scheme:
• The liabilities of the Strathclyde Pension Fund attributable to the Council are included in the
Balance Sheet on an actuarial basis using the projected unit method – i.e. an assessment of the
future payments that will be made in relation to retirement benefits earned to date by employees,
based on assumptions about mortality rates, employee turnover rates and projected earnings for
current employees.
• Liabilities are discounted to their value at current prices, using a discount rate of 4.8% (based on
the indicative rate of return on a “high quality corporate bond of equivalent term and currency to
the liability” (as measured by the yield on iBoxx Sterling Corporates Index, AA over 15 years)).
• The assets of the Strathclyde Pension Fund attributable to the Council are included in the
Balance Sheet at their fair value:
▪ quoted securities – current bid price
▪ unquoted securities – professional estimate
▪ unitised securities – current bid price
▪ property – market value
The change in the net pension’s liability is analysed into the following components:
• Service cost comprising:
▪ Current service cost – the increase in liabilities as a result of years of service earned
this year - allocated in the Comprehensive Income and Expenditure Statement to the
services for which the employees worked.
▪ Past service cost – the increase in liabilities as a result of a scheme amendment or
curtailment whose effect relates to years of service earned in earlier years, debited
to the Surplus or Deficit on the Provision of Services in the Comprehensive Income
and Expenditure Statement.
▪ Net interest on the net defined benefit liability (asset), i.e. net interest expense for the
Council – the change during the period in the net defined benefit liability (asset) that
arises from the passage of time charged to the Financing and Investment Income and
Expenditure line of the Comprehensive Income and Expenditure Statement. This is
calculated by applying the discount rate used to measure the defined benefit
obligation at the beginning of the period to the net defined benefit liability (asset) at

Page 153

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 63 
the beginning of the period, taking into account any changes in the net defined liability
(asset) during the period as a result of contribution and benefit payments.
• Re-measurements comprising:
▪ The return on plan assets – excluding amounts included in the net interest on the net
defined benefit liability (asset), charged to the Pension Reserve as Other
Comprehensive Income and Expenditure.
▪ Actuarial gains and losses – changes in the net pensions liability that arise because
events have not coincided with assumptions made at the last actuarial valuation or
because the actuaries have updated their assumptions, charged to the Pensions
Reserve.
▪ Contributions paid to the Strathclyde Pension Fund – cash paid as employer’s
contributions to the pension fund in settlement of liabilities; not accounted for as an
expense.
In relation to retirement benefits, statutory provisions require the General Fund Balance to be charged
with the amount payable by the Council to the pension fund or directly to pensioners in the year, not the
amount calculated according to the relevant accounting standards. In the Movement in Reserves
Statement, this means that there are transfers to and from the Pensions Reserve to remove the notional
debits and credits for retirement benefits and replace them with debits for the cash paid to the pension
fund and pensioners and any such amounts payable to the fund but unpaid at the year-end. The negative
balance that arises on the Pensions Reserve thereby measures the beneficial impact to the General
Fund of being required to account for retirement benefits on the basis of cash flows rather than as benefits
earned by employees.
1.6.4 Post Employment Discretionary Benefits
The Council also has restricted powers to make discretionary awards of retirements benefits in the event
of early retirements. Any liabilities estimated to arise as a result of an award to any member of staff
(including teachers) are accrued in the year of the decision to make the award and accounted for using
the same policies as are applied to the Local Government Pension Scheme.
1.7 Events after the Reporting Period
Events after the Balance Sheet date are those events, both favourable and unfavourable, that occur
between the end of the reporting period and the date when the Annual Accounts are authorised for
issue. Two types of events can be identified:
• Those that provide evidence of conditions that existed at the end of the reporting period – the
Annual Accounts are adjusted to reflect such events.
• Those that are indicative of conditions that arose after the reporting period – the Annual
Accounts are not adjusted to reflect such events, but where a category of events would have a
material impact, disclosure is made in the notes of the nature of the events and their estimated
financial effect.
Events taking place after the date of authorisation for issue are not reflected in the Annual Accounts.
1.8 Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when the Council becomes party to the
contractual provisions of a financial instrument and initially measured at fair value and carried at their
amortised cost. Annual charges to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement for interest payable are based on the carrying value
of the liability, multiplied by the effective rate of interest for the instrument. The effective interest rate is
the rate that exactly discounts estimated future cash payments over the life of the instrument to the
amount at which it was originally recognised.

Page 154

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 64 
For most of the borrowings that the Council has, this means that the amount presented in the Balance
Sheet is the outstanding principal repayable (plus accrued interest) and interest charged to the
Comprehensive Income and Expenditure Statement is the amount payable for the year according to the
loan agreement.
Gains and losses on the repurchase or early settlement of borrowing are credited and debited to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement in the year of repurchase/settlement. However, where repurchase has taken place as part of
the restructuring of the loan portfolio that involves the modification or exchange of existing instruments,
the premium or discount is respectively deducted from or added to the amortised cost of the new or
modified loan and the write-down to the Comprehensive Income and Expenditure Statement is spread
over the life of the loan by an adjustment to the effective interest rate.
Where premiums and discounts have been charged to the Comprehensive Income and Expenditure
Statement, regulations allow the impact on the General Fund Balance to be spread over future years.
The Council has a policy of spreading the gain/loss over the term that was remaining on the loan against
which the premium was payable or discount receivable when it was repaid. The reconciliation of amounts
charged to the Comprehensive Income and Expenditure Statement to the net charge required against
the General Fund Balance is managed by a transfer to or from the Financial Instruments Adjustment
Account in the Movement in Reserves Statement.
1.9 Financial Assets
Financial assets are classified based on a classification and measurement approach that reflects the
business model for holding the financial assets and their cashflow characteristics. There are three main
classes of financial assets measured at:
• Amortised cost
• Fair value through profit or loss, and
• Fair value through other comprehensive income
The Council’s business model is to hold investments to collect contractual cash flows. Financial assets
are therefore classified as amortised cost, except for those whose contractual payments are not solely
payment of principal and interest (i.e. where the cash flows do not take the form of a basic debt
instrument).
Financial Assets Measured at Amortised Cost
Financial assets measured at amortised cost are recognised on the Balance Sheet when the Council
becomes a party to the contractual provisions of a financial instrument and are initially measured at  fair
value. They are subsequently measured at their amortised cost. Annual credits to the Financing and
Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement for
interest receivable are based on the carrying amount of the asset multiplied by the effective rate of
interest for the instrument. For most of the financial assets held by the Council, this means that the
amount presented in the Balance Sheet is the outstanding principal receivable (plus accrued interest)
and interest credited to the Comprehensive Income and Expenditure Statement is the amount receivable
for the year in the loan agreement.
Financial Assets Measured at Fair Value through Profit or Loss
Financial assets that are measured at fair value through profit or loss are recognised on the Balance
Sheet when the Council becomes a party to the contractual provisions of a financial instrument and are
initially measured and carried at fair value. Fair value gains and losses are recognised as they arrive in
the Surplus or Deficit on the Provision of Services.
The fair value measurements of the financial assets are based on the following techniques:
• Instruments with quoted market prices – the market price

Page 155

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 65 
• Other instruments with fixed and determinable payments – discounted cash flow analysis
The inputs to the measurement techniques are categorised in accordance with the following three levels:
• Level 1 inputs – quoted prices (unadjusted) in active markets for the identical assets that the
Council can access at the measurement date.
• Level 2 inputs – inputs other than quoted prices included within Level 1 that are observable for
the asset, either directly or indirectly.
• Level 3 inputs – unobservable inputs for the asset.
Any gains and losses that arise on the derecognition of the asset are credited or debited to the Financing
and Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement.
Expected Credit Loss Model
The Council recognises expected credit losses on all of its financial assets held at amortised cost, either
on a 12-month or lifetime basis. The expected credit loss model also applies to lease receivables and
contract assets. Only lifetime losses are recognised for trade receivables (debtors) held by the Council.
1.10 Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third-party contributions
and donations are recognised as due to the Council when there is reasonable assurance that:
• The Council will comply with the conditions attached to the payments; and
• The grants or contributions will be received.
Amounts recognised as due to the Council are not credited to the Comprehensive Income and
Expenditure Statement until conditions attached to the grant or contribution have been satisfied.
Conditions are stipulations that specify that the future economic benefits or service potential embodied
in the asset in the form of the grant or contribution are required to be consumed by the recipient as
specified, or future economic benefits or service potential must be returned to the transferor.
Monies advanced as grants and contributions for which conditions have been satisfied are carried in the
Balance Sheet as creditors. When conditions are satisfied, the grant or contribution is credited to the
relevant service line (attributable revenue grants and contributions) or Taxation and Non-Specific Grant
Income and Expenditure (non-ringfenced revenue grants and all capital grants) in the Comprehensive
Income and Expenditure Statement.
Where capital grants are credited to the Comprehensive Income and Expenditure Statement, they are
reversed out of the General Fund Balance in the Movement in Reserves Statement. Where the grant
has yet to be used to finance capital expenditure, it is posted to the Capital Grants Unapplied Account.
Where it has been applied, it is posted to the Capital Adjustment Account. Amounts in the Capital Grants
Unapplied Account are transferred to the Capital Adjustment Account once they have been applied to
fund capital expenditure.
1.11 Heritage Assets
The main heritage assets held by the Council are two art collections, an archaeology collection and a
historic jail and courthouse which is operated as a “living” museum. The “Argyll Collection” is an art
collection which was set up to provide the young people of Argyll and Bute with direct access to a wide
range of quality art recognising that they had limited access to museums and galleries. In addition, the
Council holds other works of art which are held at various libraries and the Campbeltown Museum.
Heritage Assets are recognised and measured (including the treatment of revaluation gains and losses)
in accordance with the Council’s accounting policies on property, plant and equipment. However, some
of the measurement rules are relaxed in relation to heritage assets as detailed below.
The Council’s main heritage assets are accounted for as follows:

Page 156

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 66 
The Art Collections
The collections cover a range of media including acrylic, charcoal, embroidery, engraving, etching,
gouache, lithography, oil, pastel, pencil, procion dye, screenprint, monoprint, watercolour, woodcut,
ceramic, bronze and woodcarving. These items are reported in the Balance Sheet at insurance valuation
which is based on market values. These valuations are updated periodically. The assets within the art
collections are deemed to have indeterminate lives and a high residual value; hence the Council does
not consider it appropriate to charge depreciation.
Acquisitions are made by purchase or donation. Acquisitions are initially recognised at cost and
donations are recognised at valuation with valuations provided by external valuers and with reference
to appropriate commercial markets using the most relevant and recent information from sales at
auctions.
Inveraray Jail and Courthouse and “Other” Historic Buildings
The building is owned by Argyll and Bute Council and leased out to an organisation which runs it as a
“living museum”. The building is valued in accordance with the Council’s property, plant and equipment
policy. Other buildings included in this category are McCaig’s Folly in Oban, the Argyll Mausoleum and
Castle Lodge in Dunoon.
Archaeology and “Other” Museum Exhibits
The Council has obtained specialist valuations for the archaeology collection held within Campbeltown
Museum which covers a range of objects including swords, bones, pottery, stone and leather remains.
Similar to the Art Collections, these items are reported in the Balance Sheet at insurance valuation which
is based on market values. These valuations will be updated periodically. The assets within the collection
are deemed to have indeterminate lives and a high residual value; hence the Council does not consider
it appropriate to charge depreciation.
Heritage Assets – General
The carrying amounts of heritage assets are reviewed where there is evidence of impairment for heritage
assets, e.g. where an item has suffered physical deterioration or breakage or where doubts arise as to
its authenticity. Any impairment is recognised and measured in accordance with the Council’s general
policies on impairment (see note 1.19.3 in this summary of significant accounting policies). The proceeds
of any disposals are accounted for in accordance with the Council’s general provisions relating to the
disposal of property, plant and equipment. Disposal proceeds are disclosed separately in the notes to
the financial statements and are accounted for in accordance with statutory accounting requirements
relating to capital expenditure and receipts (see note 1.19.4 in this summary of significant accounting
policies).
1.12 Intangible Assets
Expenditure on non-monetary assets that do not have physical substance but are controlled by the
Council as a result of past events (e.g. software licences) is capitalised when it is expected that future
economic benefits or service potential will flow from the intangible asset to the Council.
Expenditure on the development of websites is not capitalised if the website is solely or primarily
intended to promote or advertise the Council’s goods or services.
Intangible assets are measured initially at cost. Amounts are not revalued, as the fair value of the assets
held by the Council cannot be determined by reference to an active market. The depreciable amount of
an intangible asset is amortised over its useful life to the relevant service lines in the Comprehensive
Income and Expenditure Statement. An asset is tested for impairment whenever there is an indication
that the asset might be impaired – any losses recognised are posted to the relevant service lines in the
Comprehensive Income and Expenditure Statement. Any gain or loss arising on the disposal or
abandonment of an intangible asset is posted to the Other Operating Expenditure line in the
Comprehensive Income and Expenditure Statement.

Page 157

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 67 
Where expenditure on intangible assets qualifies as capital expenditure for statutory purposes,
amortisation, impairment losses and disposal gains and losses are not permitted to have an impact on
the General Fund Balance. The gains and losses are therefore reversed out of the General Fund
Balance in the Movement in Reserves Statement and posted to the Capital Adjustment Account.
1.13 Interests in Companies and Other Entities
The Council has material interests in companies and other entities that have the nature of subsidiaries,
associates or joint ventures and requires to prepare Group Accounts. In the Council’s own single entity
accounts, the interests in companies and other entities are recorded as financial assets at cost, less any
provision for losses.
1.14 Inventories
Inventories are included in the Balance Sheet at the lower of cost and net realisable value. The cost of
inventories is assigned using the weighted average costing formula.
1.15 Investment Properties
Investment properties are those that are used solely to earn rentals and/or for capital appreciation. The
definition is not met if the property is used in any way to facilitate the delivery of services or production
of goods or is held for sale.
Investment properties are measured initially at cost and subsequently at fair value, being the price that
would be received to sell such an asset in an orderly transaction between market participants at the
measurement date. As a non-financial asset, investment properties are measured at highest and best
use. Properties are not depreciated but are revalued annually according to market conditions at the
year-end. Gains and losses on revaluation are posted to the Financing and Investment Income and
Expenditure line in the Comprehensive Income and Expenditure Statement. The same treatment is
applied to gains and losses on disposal.
Rentals received in relation to investment properties are credited to the Financing and Investment
Income line and result in a gain for the General Fund Balance. However, revaluation and disposal gains
and losses are not permitted by statutory arrangements to have an impact on the General Fund Balance.
The gains and losses are therefore reversed out of the General Fund Balance in the Movement in
Reserves Statement and posted to the Capital Adjustment Account.
1.16 Leases
Leases are classified as finance leases where the terms of the lease transfer substantially all the risks
and rewards incidental to ownership of the property, plant or equipment from the lessor to the lessee.
All other leases are classified as operating leases.
Where a lease covers both land and buildings, the land and buildings elements are considered
separately for classification.
Arrangements that do not have the legal status of a lease but convey a right to use an asset in return
for payment are accounted for under this policy where fulfilment of the arrangement is dependent on the
use of specific assets.
1.16.1 The Council as Lessee
a) Finance Leases
Property, plant and equipment held under finance leases is recognised on the Balance Sheet at the
commencement of the lease at its fair value measured at the lease’s inception (or the present value of
the minimum lease payments, if lower). The asset recognised is matched by a liability for the obligation
to pay the lessor. Initial direct costs of the Council are added to the carrying amount of the asset.
Premiums paid on entry into a lease are applied to writing down the lease liability.

Page 158

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 68 
Lease payments are apportioned between:
• A charge for the acquisition of the interest in the property, plant or equipment – applied to write
down the lease liability, and
• A finance charge (debited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement).
Property, plant and equipment recognised under finance leases is accounted for using the policies
applied generally to such assets, subject to depreciation being charged over the lease term if this is
shorter than the asset’s estimated useful life.
The Council is not required to raise Council Tax to cover depreciation or revaluation and impairment
losses arising on leased assets. Instead, a prudent annual contribution is made from revenue funds
towards the deemed capital investment in accordance with statutory requirements. Depreciation and
revaluation and impairment losses are therefore substituted by a revenue contribution in the General
Fund Balance, by way of an adjusting transaction with the Capital Adjustment Account in the Movement
in Reserves Statement for the difference between the two.
b) Operating Leases
Rentals paid under operating leases are charged to the Comprehensive Income and Expenditure
Statement as an expense of the services benefiting from use of the leased property, plant or equipment.
Charges are made on a straight-line basis over the life of the lease, even if this does not match the
pattern of payments (e.g. there is a rent-free period at the commencement of the lease).
1.16.2 The Council as Lessor
a) Finance Leases
Where the Council grants a finance lease over a property or an item of plant and equipment, the relevant
asset is written out of the Balance Sheet as a disposal. At the commencement of the lease, the carrying
amount of the asset in the Balance Sheet (whether property, plant and equipment or assets held for
sale) is written off to the Other Operating Expenditure line in the Comprehensive Income and
Expenditure Statement as part of the gain or loss on disposal. A gain, representing the Council’s net
investment in the lease, is credited to the same line in the Comprehensive Income and Expenditure
Statement also as part of the gain or loss on disposal (i.e. netted off against the carrying value of the
asset at the time of disposal), matched by a lease (long-term debtor) asset in the Balance Sheet.
Lease rentals receivable are apportioned between:
• A charge for the acquisition of the interest in the property – applied to write down the lease
debtor (together with any premiums received); and
• Finance income (credited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement).
The gain credited to the Comprehensive Income and Expenditure Statement on disposal is not permitted
by statute to increase the General Fund Balance and is required to be treated as a capital receipt. Where
a premium has been received, this is posted out of the General Fund Balance to the Capital Receipts
Reserve in the Movement in Reserves Statement. When the future rentals are received, the element for
the capital receipt on disposal of the asset is used to write down the debtor. At this point, the deferred
capital receipts are transferred to the Capital Receipts Reserve.
The written-off value of disposals is not a charge against Council Tax, as the cost of fixed assets is fully
provided for under separate arrangements for capital financing. Amounts are appropriated to the Capital
Adjustment Account from the General Fund Balance in the Movement in Reserves Statement.

Page 159

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 69 
b) Operating Leases
Where the Council grants an operating lease over a property or an item of plant or equipment, the asset
is retained in the Balance Sheet. Rental income is credited to the relevant Service lines in the
Comprehensive Income and Expenditure Statement, with the exception of rental income from
investment property which is credited to Interest and Investment Income. Credits are made on a straight
line basis over the life of the lease, even if this does not match the pattern of payments (e.g. there is a
premium paid at the commencement of the lease). Initial direct costs incurred in negotiating and
arranging the lease are added to the carrying amount of the relevant asset and charged as an expense
over the lease term on the same basis as rental income.
1.17 Overheads and Support Services
The costs of overheads and support services are not charged to service segments in accordance with
the Council’s arrangements for accountability and financial performance.
1.18 Assets Held for Sale
Property, plant and equipment are classified as Assets Held for Sale when the following criteria are
met:
• The property is available for immediate sale in its present condition.
• The sale must be highly probable; and an active programme to locate a buyer and complete
the plan must have been initiated.
• The asset must be actively marketed for sale at a price that is reasonable in relation to its
current fair value.
• The sale should be expected to qualify for recognition as a completed sale within one year
(although events or circumstances may extend the period to complete the sale beyond one
year).
When these criteria are met, assets within the category of Property, Plant and Equipment will be
reclassified as Assets Held for Sale.
1.19 Property, Plant and Equipment
Assets that have physical substance and are held for use in the production or supply of goods or
services, for rental to others, or for administrative purposes that are expected to be used during more
than one financial year are classified as Property, Plant and Equipment.
1.19.1 Recognition
Expenditure on the acquisition, creation, or enhancement of Property, Plant and Equipment is
capitalised on an accruals basis, provided that it is probable that the future economic benefits or service
potential associated with the item will flow to the Council and the cost of the item can be measured
reliably. Expenditure that maintains but does not add to an asset’s potential to deliver future economic
benefits or service potential (i.e. repairs and maintenance) is charged as an expense when it is incurred.
1.19.2 Measurement
Assets are initially measured at cost, comprising:
• The purchase price.
• Any costs attributable to bringing the asset to the location and condition necessary for it to be
capable of operating in the manner intended by management.
• The initial estimate of the costs of dismantling and removing the item and restoring the site on
which it is located.
The Council does not capitalise borrowing costs incurred while assets are under construction.

Page 160

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 70 
The cost of assets acquired other than by purchase is deemed to be its fair value, unless the acquisition
will not increase the cash flows of the Council. In the latter case, the cost of the acquisition is the carrying
amount of the asset given up by the Council.
Donated assets are measured initially at fair value. The difference between fair value and any
consideration paid is credited to the Taxation and Non-Specific Grant Income line of the Comprehensive
Income and Expenditure Statement, unless the donation has been made conditionally. Until conditions
are satisfied, the gain is held in the Donated Assets Accounts. Where gains are credited to the
Comprehensive Income and Expenditure Statement, they are reversed out of the General Fund Balance
to the Capital Adjustment Account in the Movement in Reserves Statement.
Assets are then carried in the Balance Sheet using the following measurement bases:
• Infrastructure, community assets and assets under construction – depreciated historical cost.
• Council offices – current value, determined as the amount that would be paid for the asset in its
existing use (existing use value – EUV).
• School buildings – current value, but because of their specialist nature, are measured at
depreciated replacement cost which is used as an estimate of current value.
• Surplus assets – the current value measurement base is fair value, estimated at highest and
best use from a market participant’s perspective.
• All other assets – current value, determined as the amount that would be paid for the asset in
its existing use (existing use value – EUV).
Where there is no market-based evidence of current value because of the specialist nature of an asset,
depreciated replacement cost (DRC) is used as an estimate of current value.
Where non-property assets have short useful lives or low values (or both), depreciated historical cost is
used as a proxy for current value.
Assets included in the Balance Sheet at current value are revalued sufficiently regularly to ensure that
their carrying amount is not materially different from their current value at the year-end, but as a minimum
every five years. Increases in valuations are matched by credits to the Revaluation Reserve to recognise
unrealised gains. Exceptionally, gains might be credited to the Surplus or Deficit on the Provision of
Services where they arise from the reversal of an impairment loss previously charged to a service.
Where decreases in value are identified, they are accounted for by:
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains).
• Where there is no balance in the Revaluation Reserve or an insufficient balance, the carrying
amount of the asset is written down against the relevant service line(s) in the Comprehensive
Income and Expenditure Statement.
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007, the date of its formal
implementation. Gains arising before that date have been consolidated into the Capital Adjustment
Account.
1.19.3 Impairment
Assets are assessed at each year-end as to whether there is any indication that an asset may be
impaired. Where indications exist and any possible differences are estimated to be material, the
recoverable amount of the asset is estimated and, where this is less than the carrying amount of the
asset, an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for by:

Page 161

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 71 
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains)
• Where there is no balance in the Revaluation Reserve or an insufficient balance, the carrying
amount of the asset is written down against the relevant service lines in the Comprehensive
Income and Expenditure Statement.
Where an impairment loss is reversed subsequently, the reversal is credited to the relevant service lines
in the Comprehensive Income and Expenditure Statement, up to the amount of the original loss, adjusted
for depreciation that would have been charged if the loss had not been recognised.
1.19.4 Disposals and Non-current Assets Held for Sale
When it becomes probable that the carrying amount of an asset will be recovered principally through a
sale transaction rather than through its continuing use, it is reclassified as an Asset Held for Sale. The
asset is re-valued immediately before reclassification and then carried at the lower of this amount and
fair value less costs to sell. Where there is a subsequent decrease to fair value less costs to sell, the
loss is posted to the Other Operating Expenditure line in the Comprehensive Income and Expenditure
Statement. Gains in fair value are recognised only up to the amount of any previous losses recognised
in the Surplus or Deficit on the Provision of Services. Depreciation is not charged on Assets Held for
Sale.
Assets that are to be abandoned or scrapped are not reclassified as Assets Held for Sale.
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance Sheet
(whether Property, Plant and Equipment or Assets Held for Sale) is written off to the Other Operating
Expenditure line in the Comprehensive Income and Expenditure Statement as part of the gain or loss on
disposal. Receipts from disposals (if any) are credited to the same line in the Comprehensive Income
and Expenditure Statement also as part of the gain or loss on disposal (i.e. netted off against the carrying
value of the asset at the time of disposal). Any revaluation gains accumulated for the asset in the
Revaluation Reserve are transferred to the Capital Adjustment Account.
Disposal receipts are categorised as capital receipts. All capital receipts are credited to the Capital
Receipts Reserve, and can then only be used for new capital investment. Receipts are appropriated to
the Reserve from the General Fund Balance in the Movement in Reserves Statement.
The written-off value of disposals is not a charge against Council Tax, as the cost of non-current assets
is fully provided for under separate arrangements for capital financing. Amounts are appropriated to the
Capital Adjustment Account from the General Fund Balance in the Movement in Reserves Statement.
1.19.5 Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets by the systematic allocation of
their depreciable amounts over their useful lives. An exception is made for assets without a determinable
finite useful life (i.e. land and certain community assets) and assets that are not yet available for use
(i.e. assets under construction).
Where an asset has major components whose cost is significant in relation to the total cost of the item,
the components are depreciated separately.
Revaluation gains are also depreciated, with an amount equal to the difference between current value
depreciation charged on assets and the depreciation that would have been chargeable based on their
historical cost being transferred each year from the Revaluation Reserve to the Capital Adjustment
Account.
1.20 Private Finance Initiative (PFI) and Similar Contracts
PFI contracts are agreements to receive services, where the responsibility for making available the
property, plant and equipment needed to provide the services passes to the PFI contractor. As the
Council is deemed to control the services that are provided under its PFI schemes and as ownership of

Page 162

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 72 
the property, plant and equipment will pass to the Council at the end of the contracts for no additional
charge, the Council carries the assets used under the contracts on the Balance Sheet.
The original recognition of these assets at fair value was balanced by the recognition of a liability for
amounts due to the scheme operator to pay for the capital investment.
Non-current assets recognised on the Balance Sheet are revalued and depreciated in the same way as
Property, Plant and Equipment owned by the Council.
The amounts payable to the PFI operators each year are analysed into five elements:
• Fair value of the services received during the year - debited to the relevant service in the
Comprehensive Income and Expenditure Statement.
• Finance Cost – this is calculated by applying the implicit interest rate in the lease to the
opening lease liability for the period, this is debited to the Financing and Investment Income
and Expenditure line in the Comprehensive Income and Expenditure Statement.
• Contingent rent – increases in the amount to be paid for the property arising during the
contract, debited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement.
• Payment towards liability – applied to write down the Balance Sheet liability towards the PFI
operator (the profile of write-downs is calculated using the same principles as for a finance
lease).
• Lifecycle replacement costs – proportion of the amounts payable is posted to the Balance
Sheet as a prepayment and then recognised as additions to Property, Plant and Equipment
when the relevant works are eventually carried out.
1.21 Provisions and Contingent Liabilities 
1.21.1 Provisions
Provisions are made where an event has taken place that gives the Council a legal or constructive
obligation that probably requires settlement by a transfer of economic benefits or service potential, and
a reliable estimate can be made of the amount of the obligation. For instance, the Council may be
involved in a court case that could eventually result in a settlement or the payment of compensation.
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income and
Expenditure Statement in the year that the Council becomes aware of the obligation, and measured at
the best estimate at the Balance Sheet date of the expenditure required to settle the obligation, taking
into account relevant risks and uncertainties.
When payments are eventually made, they are charged to the provision set up in the Balance Sheet.
Estimated settlements are reviewed at the end of each financial year and where it becomes more likely
than not that a transfer of economic benefits will not now be required (or a lower settlement than
anticipated is made), the provision is reversed and credited back to the relevant service.
Where some or all of the payment required to settle a provision is expected to be recovered from another
party (e.g. from an insurance claim), this is only recognised as income for the relevant service if it is
virtually certain that reimbursement will be received if the obligation is settled.
1.21.2 Contingent Liabilities
A contingent liability arises where an event has taken place that gives the Council a possible obligation
whose existence will only be confirmed by the occurrence or otherwise of uncertain future events not
wholly within the control of the Council. Contingent liabilities also arise in circumstances where a
provision would otherwise be made but either it is not probable that an outflow of resources will be
required or the amount of the obligation cannot be measured reliably.
Contingent liabilities are not recognised in the Balance Sheet but disclosed in a note to the accounts.

Page 163

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 73 
1.22 Reserves
Reserves are created by appropriating amounts out of the General Fund Balance in the Movement in
Reserves Statement. When expenditure to be financed from a reserve is incurred, it is charged to the
appropriate service in that year to score against the Surplus/Deficit on the Provision of Services in the
Comprehensive Income and Expenditure Statement. The reserve is then appropriated back into the
General Fund Balance in the Movement in Reserves Statement so that there is no net charge against
Council Tax for the expenditure.
Certain reserves are kept to manage the accounting processes for non-current assets, financial
instruments and retirement benefits and do not represent usable resources for the Council – these
reserves are explained in the relevant policies above and Note 32 to the accounts.
1.23 VAT
Income and expenditure excludes any amounts related to VAT, as all VAT collected is payable to HM
Revenue and Customs and VAT paid is recoverable.
2. ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED
The standards introduced by the 2024-25 Code where disclosures are required in the 2023-24 financial
statements in accordance with the requirements of paragraph 3.3.4.3 of the code are: 
• IFRS 16 Leases which is applicable from 1st April 2024. This also includes amendments in
respect of Lease Liability in a Sale and Leaseback transaction.
• IAS 1 – Classification of Liabilities as Current or Non-current and Non-current Liabilities with
Covenants.
• IAS 12 – International Tax Reform
• IAS 7 and IFRS 7 – Supplier Finance Arrangements
It is anticipated that only IFRS16 will have a material impact in future years on the Financial Statements
as the standard will require the Council to recognise the majority of its current operational leases on the
balance sheet, eliminating the distinction between operating and finance leases. This will lead to the
capitalisation of right-of-use assets and corresponding lease liabilities increasing the value of assets
and liabilities on the balance sheet. On the Comprehensive Income and Expenditure Statement,
operational lease expenses will be replaced by depreciation charges for the right-of-use assets and
interest on the lease liability. This change will enhance transparency and comparability of financial
statements, providing a clearer picture of the Council’s obligations and resources. To implement the
IFRS16, the Council will review and evaluate the operational leases it has in place, update its accounting
policies to accommodate the requirements of IFRS16 and will redesign its internal processes and
procedures for starting and ending leases.
There will be no material impact in future years from the adoption of these amendments in relation to
IAS 1, IAS 12 and IAS 7.
CIPFA/LASAAC has agreed to defer the implementation of IFRS 16 Leases until 1 April 2024. 
3. CRITICAL JUDGEMENTS IN APPLYING ACCOUNTING POLICIES
In applying the accounting policies set out in Note 1, the Council has had to make certain judgements
about complex transactions or those involving uncertainty about future events. Where a critical
judgement has been made this is referred to in the relevant note to the core financial statements;
however a summary of those with the most significant effect is detailed below:
• There is a high degree of uncertainty about future levels of funding for local government.
However, the Council has determined that this uncertainty is not yet sufficient to provide an
indication that the assets of the Council might be impaired as a result of a need to close facilities
and reduce levels of service provision.

Page 164

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ______________________________________________ Page 74 
• The Council currently operates three Private Finance Initiative (PFI), or similar, contracts which
are accounted for as Service Concession arrangements under IFRIC12 – Service Concession
Arrangements. The Council has determined that in the case of the Schools NPDO contract and
the new Schools DBFM contract, the Council has control over the services provided through use
of the schools and that a qualifying asset has been created. The appropriate accounting treatment
is to bring the assets “on Balance Sheet” along with a finance lease liability.
• The Council also operates a Waste Management Public Private Partnership (PPP) contract. In
this case the Council determined that a “qualifying asset” had not been created and that the
Council did not have significant control over the services being provided. The appropriate
accounting treatment was therefore determined to be “off Balance Sheet” and that payments to
the contractor are charged to the appropriate service line within the Comprehensive Income and
Expenditure Account.
• The Council has considered its exposure to possible losses and made adequate provision where
it is probable that an outflow of resources will be required and the amount of the obligation can
be measured reliably. Where it has not been possible to measure the obligation, material
contingent liabilities have been disclosed in Note 34.
• Unused holiday entitlement earned at 31 March 2024 but not taken at that date has been
quantified on the basis of a 5% sample of all non-term time Council employees. The calculation
in respect of unused holidays for term time staff in schools is based on actual leave entitlement
as at 31 March and no estimation is required for these staff. The liability shown in the 2023-24
financial statements in respect of the holiday pay accrual is £8.272m.
4. ASSUMPTIONS MADE ABOUT THE FUTURE AND OTHER MAJOR SOURCES OF
ESTIMATION UNCERTAINTY
The financial statements contain estimated figures that are based on assumptions made by the Council
about which there is a degree of uncertainty. Estimates are made taking into account historical
experience, current trends and other relevant factors. However, because balances cannot be
determined with certainty, actual results could be materially different from the assumptions and
estimates.
The items in the Council’s Balance Sheet at 31 March 2024 for which there is a significant risk of material
adjustment in the forthcoming financial year are outlined in the table that follows:

Page 165

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 75 
Item Uncertainties Effect if Actual Results Differ from Assumptions 
Property, Plant and Equipment Assets are depreciated over useful lives that are
dependent on assumptions about the level of
repairs and maintenance that will be incurred in
relation to individual assets. The current
economic climate makes it uncertain that the
Council will be able to sustain its current spending
on repairs and maintenance, bringing into doubt
the useful lives.
If the useful life of assets is reduced, depreciation increases and the
carrying amount of the assets falls.
It is estimated that the annual depreciation charge for buildings would
increase by £1.142m for every year that useful lives had to be reduced.
Rolling Programme Valuation The Council employs professional valuers who
are registered with the Royal Institution of
Chartered Surveyors. These valuers carry out
regular reviews of the assets reported in the
Balance Sheet and any significant changes in
value are processed as an asset revaluation or
impairment. These valuations are based on their
professional opinion using available market
information at the time of assessment. Due to the
high number of assets, a rolling programme of
asset valuations has been established for many
years, with the aim of revaluing one fifth of the
portfolio each financial year which is made up of
various asset types. This is in addition to those
assets which are valued annually; Surplus
Assets, Investment Properties, Held for Sale
assets and those where capital spend has
exceeded £0.1m in the current year.
This carries inherent risk that assets not revalued in-year have been
subject to material changes in value particularly if affected by external
factors such as inflation. 
The highest risk in this respect relates to assets valued using the
depreciated Replacement Cost (DRC) method, which for Argyll & Bute
Council includes schools. To mitigate this risk, a desktop assessment
was undertaken for 2023-24 to estimate the potential increase in value
of our assets valued using depreciated replacement cost using BCIS
indices. As the BCIS indices have not increased materially, the impact
on these assets was not deemed to be material so no adjustment was
made. 
Consideration will be given on an annual basis to those assets which
may have material impairment.

Page 166

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 76 
Pensions Asset Estimation of the net asset to pay pensions
depends on a number of complex judgements
relating to the discount rate used, the rate at
which salaries are projected to increase,
changes in retirement ages, mortality rates and
expected returns on pension fund assets. A firm
of consulting actuaries is engaged to provide the
Council with expert advice about the
assumptions to be applied. 
The effects on the net pension’s liability of changes in individual
assumptions can be measured. The sensitivities regarding the
principal assumptions used to measure the scheme liabilities are set
out as follows:  
Sensitivities at
31 March 2024
Approximate %
Increase to
Employer
Liability
Approximate
monetary
amount
£’000
0.1% decrease in real
discount rate 2% 10,827
1 Year increase in the member
life expectancy 4% 26,766
0.1% increase in salary
increase rate 0% 1,409
0.1% increase in pension
increase rate 2% 9,594

Page 167

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 77 
5.1 EXPENDITURE AND FUNDING ANALYSIS
Net
Expenditure
Chargeable to
the General
Fund
Adjustments
between the
Funding and
Accounting
Basis        
(Note 5.2)
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement
Net
Expenditure
Chargeable to
the General
Fund
Adjustments
between the
Funding and
Accounting
Basis       
(Note 5.2)
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement
£'000 £'000 £'000 Service £'000 £'000 £'000
7,538             1,063             8,601                 Chief Executive and Financial Services 1,161             25                  1,186                
Executive Director Douglas Hendry
366                70                  436                   Executive Director 421                6                    427                  
10,616            18,533           29,149               Commercial Services 12,232            6,921             19,153              
95,943            (3,537)            92,406               Education 104,697          (3,775)            100,922            
9,860             1,711             11,571               Legal and Regulatory Support 12,259            1,020             13,279              
Executive Director Kirsty Flanagan
369                49                  418                   Executive Director 237                5                    242                  
-                 -                 -                    Financial Services 6,885             89                  6,974                
8,139             3,046             11,185               Customer Support 9,403             2,228             11,631              
9,070             1,806             10,876               Development and Economic Growth 8,904             385                9,289                
31,855            15,628           47,480               Roads and Infrastructure 33,981            12,709            46,690              
73,976            5,510             79,486               Social Work 77,137            939                78,076              
8,226             (632)               7,594                 Other Non-Departmental Costs 11,109            (1,712)            9,397                
255,958      43,247        299,202         Net Cost of Services 278,426        18,840          297,266          
2022-23 2023-24

Page 168

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 78 
(246,231)         (46,924)          (293,155)            Other Income and Expenditure (307,811)         780                (307,031)           
9,727          (3,677)         6,047              (Surplus) / Deficit (29,385)       19,620        (9,765)           
(96,081) Opening General fund Balance (86,356)
9,727             Plus (Surplus) or Deficit on General Fund Balance (29,385)          
(86,356)       Closing General Fund Balance (115,741)     
The Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources (government grants, council tax and business rates)
by local authorities in comparison with those resources consumed or earned by authorities in accordance with generally accepted accounting practices. It also
shows how this expenditure is allocated for decision making purposes between the council’s services. Income and expenditure accounted for under generally
accepted accounting practices is presented more fully in the Comprehensive Income and Expenditure Statement.

Page 169

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 79 
5.2 EXPENDITURE AND FUNDING ANALYSIS RECONCILIATION
This note provides a reconciliation of the main adjustments to Net Expenditure Chargeable to the General Fund to arrive at the amounts in the Comprehensive
Income and Expenditure Statement.
Adjustments for
Capital
Purposes      
Note (i)
Net change for
Pension
Adjustments
Note (ii)
Capital
element of
Schools NPDO
payment         
Note (iii)
Other
Adjustments 
Note (iv)
Total
Adjustments
£'000 £'000 £'000 £'000 £'000
Chief Executive and Financial Services -                       16                    -                       9                      25
Executive Director (Douglas Hendry)
Executive Director (Douglas Hendry) -                       7                      -                       (1)                     6
Commercial Services 1,960                163                  -                       4,798                6,921
Education 3,888                443                  -                       (8,106)               (3,775)
Legal and Regulatory Support 3,387                74                    (5,232)               2,791                1,020
Executive Director (Kirsty Flanagan)
Executive Director (Kirsty Flanagan) -                       5                      -                       -                       5
Financial Services 89                    89
Head of Customer Support 1,752                129                  -                       347                  2,228
Head of Development and Economic Growth 344                  149                  -                       (108)                 385
Roads and Infrastructure 10,977              341                  -                       1,391                12,709
Social Work 806                  545                  -                       (412)                 939
Other Non-Departmental Costs -                       (1,687)               -                       (25)                   (1,712)
23,114            274                 (5,232)             684                 18,840           
Other Income and Expenditure 2,956                (6,596)               4,831                (411)                 780                 
26,070            (6,322)             (401)                273                 19,620           
Net Cost of Services
Difference between General Fund Surplus and
Comprehensive Income and Expenditure Statement
(Surplus)/Deficit
Adjustments from General Fund to arrive at the Comprehensive
Income and Expenditure Statement amounts
Adjustments between Funding and Accounting Basis 2023-24

Page 170

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 80 
(i) Adjustments for Capital Purposes
This column adds in depreciation and impairment and revaluation gains and losses in the services line, and for:
• Other operating expenditure – adjusts for capital disposals with a transfer of income on disposal of assets and the amounts written off for those
assets.
• Taxation and non-specific grant income and expenditure – capital grants are adjusted for income not chargeable under generally accepted
accounting practices. Revenue grants are adjusted from those receivable in the year to those receivable without conditions or for which conditions
were satisfied throughout the year. The Taxation and Non Specific Grant Income and Expenditure line is credited with capital grants receivable in
the year without conditions or for which conditions were satisfied in the year.
• Financing and investment income and expenditure – the statutory charges for capital financing (loans fund advances) and other revenue
contributions are deducted from other income and expenditure as these are not chargeable under generally accepted accounting practices.
(ii) Net change for the Pensions Adjustments
Net change for the removal of pension contributions and the addition of IAS 19 Employee Benefits pension related expenditure and income:
• For services this represents the removal of the employer pension contributions made by the Council as allowed by statute and the replacement with
current service costs and past service costs.
• For Financing and investment income and expenditure – the net interest on the defined benefit liability is charged to the Comprehensive Income
and Expenditure Statement.
(iii) Capital element of schools NPDO payment
• This is the capital cost of the annual payment to the schools NPDO operator and represents repayment of the Balance Sheet liability rather than a
charge to Comprehensive Income and Expenditure Statement.
(iv) Other Adjustments
• For Financing and investment income and expenditure the other differences column recognises adjustments to the General Fund for the timing
differences for premiums and discounts.
• For services an adjustment is made for the accrual of holiday pay and other similar entitlements, this is required under generally accepted accounting
principles but the impact on the General Fund is mitigated by statute which allows the impact to be reversed out through the Movement in Reserves
Statement.

Page 171

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 81 
6.1 GENERAL FUND RESERVES
The Council has ring-fenced £107.443m of the balance on the General Fund.
Ring-fenced Balances
Balance                    
1 April 2023 Funds Used
Contributions
to/from
Funds
New
Earmarking
agreed     
2023-24
New
Earmarking
at end of
2023-24
Balance                   
31 March
2024
£'000 £'000 £'000 £'000 £'000 £'000
Strategic Housing Fund (Revenue from Additional Council
Tax on Second Homes) 7,247            (1,057)           2,575            8,765         
Investment in Affordable Housing 3,163            (139)              3,024         
Capital Projects 16,059          (12,379)         2,327            2,509            29,442          37,958       
Lochgilphead and Tarbert Regeneration 1,460            (410)              1,050         
Support for Rural Growth Deal 756               (215)              541            
Asset Management 2,098            (28)               (2,070)           -            
Piers and Harbours Investment Fund 2,789            1,336            4,125         
Scottish Government Initiatives 2,834            (1,274)           1,219            2,779         
CHORD 378               (89)               120               409            
Devolved School Management Scheme (DSM) 1,394            (1,300)           645               739            
Energy Efficiency Fund 218               20                238            
Unspent Budget Required for Existing Legal Commitments 476               (476)              -            
Unspent Third Party Contributions 13,179          (5,937)           5,016            3,528            15,786       
Contributions Carried Forward 265               (44)               233               454            
Other Previous Council Decisions 3,808            (513)              845               4,140         
Redundancy Reserve 1,578            (115)              1,500            2,963         
Connect for Success Fund 1,426            (745)              681            
One Council Property 566               (566)              -            
Fleet - Timing Delay 658               (174)              484            
Hermitage Park 19                37                56             
Electric Vehicle Chargers 17                (17)               -            
Priorities Investment Fund -               4,742            4,742         
COVID-19 5,512            -               (5,512)           -            
Unspent Budget Carried Forward 13,566          (2,989)           (931)              173               8,690            18,509       
Total Ring-fenced 79,466          (27,286)         (2,351)           2,682            54,932          107,443     
Contingency 5,691                             -  348                  -               -  6,039         
Unallocated 1,199                             -  1,530            (470)                               -  2,259         
Total General Fund Balance 86,356          (27,286)         (473)              2,212            54,932          115,741

Page 172

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 82 
The contingency balance of £6.039m is 2% of the Council’s budgeted net expenditure for 2023-24. 
6.2   Service Concessions   
During 2022/23 the Scottish Government announced revised regulations in relation to the treatment of service concessions: Local government finance
circular 10/2022 - finance leases and service concession arrangements. The council currently operates two service concessions in relation to its Public
Private Partnerships (PPP) and Design, Build, Finance, Maintain (DBFM) arrangements both within Education. 
The revised regulations allow for the debt costs associated with these schemes to be written off over the expected lives of the respective assets rather
than over the contract period of each arrangement. This ensures repayments are aligned to the period over which benefit flows from the asset and
provides scope to realign debt costs to reflect the asset lives. 
The cumulative value of the liability charged to the General Fund prior to applying the permitted flexibility was £43.376m up to and including the
financial year 2023-24. After applying the permitted flexibility, there is a one-off historical debt cost saving of £36.038m and in year savings of £4.831m
resulting in an overall benefit in 2023-24 of £40.869m. 
This saving has been earmarked for specific council priorities and has been included in Note 6.1 with balances allocated as detailed below: 
Reserve Description Amount
Allocated
£'000
Capital Projects 24,666
Priorties Investment Fund 4,742
Unspent Budget Carryied Forward 6,630
Total Allocation 36,038

Page 173

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ____________________________________________________________________________________ Page 83 
7 SUPPLEMENTARY NOTES TO THE STATEMENT OF COMPREHENSIVE INCOME AND EXPENDITURE 
7.1 Expenditure and Income Analysed by Nature
Council’s expenditure and income is analysed as follows: 
2022-23 Expenditure/Income 2023-24
£'000 £'000
Expenditure
196,213 Employee benefits expenses 195,129
178,016 Other services expenses 189,024
74,391 Contribution to Argyll and Bute Integration Joint Board 77,604
27,828 Depreciation, amortisation, impairment 23,113
10,655 Interest payments 7,441
1,253 Precepts and levies 1,254
390 Other operating expenditure 416
(437) Net Loss/(Gain) on the disposal of assets (262)
488,309 Total Expenditure 493,719
Income
(102,855) Fees, charges and other service income (110,000)
(74,391) Income to fund social care services (Argyll and Bute Integration Joint Board) (77,604)
(2,966) Interest and investment income (4,779)
(87,726) Income from council tax and non-domestic rates (100,358)
(214,324) Government grants and contributions (210,743)
(482,262) Total Income (503,484)
6,047 (Surplus)Deficit on the Provision of Services (9,765)

Page 174

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 84 
7.2 Revenue from Contracts with Service Recipients
2022-23
Actual
2023-24
Actual
£'000 £'000
32,900    34,201       
32,900  34,201     
Revenue from contracts with service recipients
Total Included in Comprehensive Income and
Expenditure Statement 
8 OTHER OPERATING INCOME AND EXPENDITURE
The expenditure of £1.670m shown in the Other Operating Income and Expenditure line on the
Statement of Comprehensive Income and Expenditure can be analysed as follows:
2022-23 2023-24
Actual Other Operating Income and Expenditure Actual
£'000 £'000
1,253          Dunbartonshire and Argyll & Bute Valuation Joint Board Requisition 1,254           
(20)              Equal Pay Settlements and Legal Costs -               
410             Other Operating Income and Expenditure not attributable to Services 416              
1,643 Total 1,670             
9 AGENCY SERVICES
The Council bills and collects non-domestic rates on behalf of the Scottish Government from ratepayers
situated within Argyll and Bute. The Council also bills and collects, along with its own council tax,
domestic water and sewerage charges on behalf of Scottish Water. In addition, the Council received
funding from the UK Government to help people who met the Government’s eligibility criteria to pay their
home energy bills. The Council had no discretion over the terms of the funding and could not use it for
service delivery. This means the Council acted as agent only and the grant funding received and paid
out are not included in the Council's reserves, CIES or Balance Sheet. In some cases, an administration
grant was awarded to the Council to facilitate these payments. This is accounted for as operational
income and expenditure and not disclosed here. 
2022-23 2023-24
Actual Actual
£'000 £'000
33,179 Scottish Government - Contributions (to)/from the non-domestic rates pool 37,645
15,106 Domestic water and sewarage charges collected 15,830
(15,106) Domestic water and sewarage charges paid over to Scottish Water (15,830)
265 Service income from Scottish Water for collection of domestic water and sewerage 367
7 Service income BID levy - Dunoon 8
7 Service income BID levy - Oban 7
7 Service income BID levy - Bute 7
(714) Scottish Child Payment - amount paid out -
714 Scottish Child Payment - amount received from the Scottish Government -
(73) BIES Energy Grant - amount paid out (373)
73 BIES Energy Grant - amount received from the Scottish Government 373
(167) COVID - Financial Hardship and Self-Isolation grants paid out -
167 COVID - Financial Hardship and Self-Isolation funding received from Scottish Government -
33,465 Total 38,034
Agency Income

Page 175

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 85 
10 COMMUNITY CARE AND HEALTH (SCOTLAND) ACT 2002
From 1 April 2016 health and social care services were fully integrated as part of the new Health and
Social Care Partnership.
During 2023-24 the Partnership included provision of services to older people, supporting people with a
learning disability and provision of support to adults who have a mental health difficulty.
Budgets are currently aligned which means that each Partner organisation holds their own element of
the budget and records the income and expenditure that relates to the part of the service for which they
are responsible.
During 2023-24 income received by the Council from this source amounted to £7.811m and the related
expenditure was £10.953m. This can be analysed as follows: 
Income Expenditure Income Expenditure
£'000 £'000 Purpose of Services £'000 £'000
3,300 5,402 Care of the Elderly 3,464            5,658          
2,914 3,615 Provision of Services for People with Learning Disabilities 2,945            3,787          
1,380 1,527 Provision of Services for People with Mental Health Needs 1,402            1,508          
7,594 10,544 7,811            10,953        
833 833
8,427 11,377 TOTAL 7,811            10,953        
Additional Covid Response Funding received via NHS for
2022-23
2022-23 2023-24
11 FEES PAYABLE TO EXTERNAL AUDITORS
In 2023-24 the following fees relating to external audit and inspection were incurred alongside comparative
figures for 2022-23: 
2022-23 2023-24
£'000 £'000
310 Fees payable to External Auditors with regard to external audit services carried 325
out by the appointed Auditor
310 Total Remuneration 325
Auditor's Remuneration
The figure above excludes fees for the audit of the Council’s charitable trusts. 
Forvis Mazars LLP did not undertake any non-audit work in 2022-23 or 2023-24.

Page 176

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 86 
12 WASTE MANAGEMENT PUBLIC PRIVATE PARTNERSHIP
The Council has entered into a Public Private Partnership for the provision of its waste disposal service.
This agreement requires the provider to upgrade or replace three waste disposal sites, two transfer
stations and five civic amenity sites. In addition, the provider will also provide composting facilities to
meet waste diversion targets. When the agreement ends in September 2026, during financial year 2026-
27, the provider will hand back to the Council the waste disposal facilities with a remaining life of 5 years.
The Council has paid a service charge of £7.268m which represents the value of the service provided
from 1 April 2023 to 31 March 2024 (£6.514m for 2022-23). Under the agreement the Council is
committed to paying the following sums: 
Future Repayment Periods £'000
2024-2025 6,956
2025-2026 7,108
2026-2027 2,336
Total 16,400 
The average service charge equates to £5.180m per annum over the life of the contract. 
13 GRANT INCOME
The Council credited the following grants to the Comprehensive Income and Expenditure Statement:
2022-23 Grant Income 2023-24
£'000 £'000
Credited to Taxation and Non Specific Grant Income
191,265 Revenue Support Grant 187,193
33,179 Non Domestic Rates 37,645
344 Specific Capital Grant 96
19,187 General Capital Grant 22,347
44 Heritage Lottery Fund -
728 Scottish Timber Transport Strategy 791
1,353 Scottish Government -
90 Strathclyde Partnership for Transport (SPT) 90
55 Revenue Contribution to Capital Projects 100
748 Other Grants 126
246,993 Total 248,388
Credited to Services
12,869 Scottish Government Specific Grants 12,555
809 General Capital Grant - Private Sector Housing Improvement Grants 855
16,581 Housing Benefit Subsidy 16,443
14,787 Other Revenue Government Grants 21,243
45,046 Total 51,096

Page 177

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 87 
14 RELATED PARTIES
The Council is required to disclose material transactions with related parties – bodies or individuals that
have the potential to control or influence the Council or to be controlled or influenced by the Council.
Disclosure of these transactions allows readers to assess the extent to which the Council might have
been constrained in its ability to operate independently or might have secured the ability to limit another
party’s ability to bargain freely with the Council.
The aim of the Financial Reporting Standard dealing with Related Parties is to highlight instances where
influence and control has been exercised over an external organisation by the Council, and where an
elected member, their close family or someone in their household, has the ability to exercise the
influence or control. Elected members and Senior Officers have completed a signed declaration on
Related Party Interests and these have been used to compile this disclosure.
14.1 Scottish Government
The Scottish Government has effective control over the general operations of the Council – it is
responsible for providing the statutory framework, within which the Council operates, provides the
majority of its funding in the form of grants and prescribes the terms of many of the transactions that the
Council has with other parties (e.g. council tax bills, housing benefits). Grants received from government
departments are set out in Note 13 – Grant Income. 
14.2   Members
Members of the council have direct control over the Council’s financial and operating policies. The total
of members’ allowances paid in 2023-24 is shown in the Remuneration Report.
During the year there were two organisations in which members had a significant interest and where the
total of transactions exceeded £10,000. 
2022-23
Expenditure
2023-24
Expenditure
£'000 Transactions in which Members have a significant interest £'000
21 Argyll and Bute Rape Crisis 0
81 S & C Crawford Building Contractors Ltd 337
69 Bookfan Ltd Trading as South Peak Services 81
171 Total 418

Page 178

Notes to the Financial Statements 
www.argyll-bute.gov.uk   _________________________________________________ Page 88 
14.3 Other Related Bodies
This category relates to transactions with entities which are controlled or significantly influenced by the
Council.
During the year transactions with other related bodies were as follows:
2022-23
Expenditure
2023-24
Expenditure
£'000 Related Bodies £'000
4,197 Transactions with related bodies during the year totalled 4,418
Of these, transactions with the following exceeded £10,000:
210 ACHA 48
579 Dunbritton Housing Association Limited 590
34 LINK Group Ltd 30
96 West Highland Housing Association Ltd 312
14 Fyne Homes 26
548 Oban and Lorn Community Enterprise - Atlantis Leisure 606
100 Islay and Jura Community Enterprise 141
70 Mid Argyll Community Enterprise 110
73 Scotland Excel 65
97 Argyll and Bute Citizens Advice Bureaux 55
227 Bute Advice 182
- Kintyre Recycling 10
92 SEEMIS 104
178 Argyll and the Isles Coast & Countryside Trust 200
411 Carr Gomm 429
127 Argyll & Bute Women's Aid 132
241 Argyll & Bute Care & Repair 252
161 HELP 168
97 COSLA 71
411 Strathclyde Passenger Transport 416
204 Strathclyde Concessionary Travel Scheme 209
60 Glengorm Partnership -
- Group Recycling in Argyll & Bute (GRAB) 73
91 North West Mull Community Woodland Company -
41 Mull & Iona Community Trust (MICT) 148
4,162           Total 4,377           
Given the relationships the Council has with other organisations and partners it is possible that some
related party transactions may exist. However, the purpose of the requirement to complete the disclosure
is to provide additional information to the users of the Annual Accounts and, by declaring possible
instances, there is no suggestion that any inappropriate transactions have taken place. 
Please refer to Group Accounts on pages 128 to 139.

Page 179

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ___________________________________________________________________________________ Page 89 
15 PROPERTY, PLANT AND EQUIPMENT
15.1 Movement in Property, Plant and Equipment 
Other Land
& Buildings
Vehicles
Plant &
Equipment
Community
Assets
Surplus
Assets
Assets Under
Construction
Total
2023-24
Infrastructure
Assets
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost or Valuation
At 1 April 2023 453,644     46,440       8,901          3,283         21,440          533,708     
Additions 8,483         3,177         218             (18)            15,117          26,977       12,309          
Additions financed under a new leasing arrangement -               
5,217         653            5,870        
813            69             882           
Derecognition - Disposals (1,552)        (1,552)       
Assets reclassified (to)/from Held for Sale (539)           630            91             
Other movements in cost or valuation (833)             (833)           833               
At 31 March 2024 467,618     48,065       9,119          4,617         35,724          565,143     
Depreciation and Impairments
At 1 April 2023 (2,626)        (35,568)      (9)                3               -                  (38,200)     
(13,802)      (3,037)        (16,839)      (8,846)           
4,125         16             4,141        
2,037         2,037        
-               
-               
1,552         1,552        
Derecognition - Other 17             (16)            1              
-               
At 31 March 2024 (10,249)    (37,053)    (9)               3              -                  (47,308)   
Balance Sheet amount at 31 March 2024 457,369   11,012     9,110         4,620       35,724        517,835    239,372      
Balance Sheet amount at 31 March 2023 451,018   10,872     8,892         3,286       21,440        495,508    235,076      
Movements in 2023-24
Revaluation increases/(decreases) recognised in the Revaluation
Reserve
Revaluation increases/(decreases) recognised in the
Surplus/Deficit on the Provision of Services
Depreciation Charge for 2023-24
Depreciation written out to the Revaluation Reserve
Depreciation written out to the Surplus/Deficit on the Provision of
Services
Impairment losses/(reversals) recognised in the Revaluation
Reserve
Impairment losses/(reversals) recognised in the Surplus/Deficit on
the Provision of Services
Derecognition - Disposals
Other movements in depreciation and impairment

Page 180

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ___________________________________________________________________________________ Page 90 
Other Land
& Buildings
Vehicles
Plant &
Equipment
Community
Assets
Surplus
Assets
Assets Under
Construction
Total
2022-23
Infrastructure
Assets
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Cost or Valuation
At 1 April 2022 428,437     44,428       7,463          1,405         35,344          517,077     
Additions 8,671         2,024         1,438          283            10,212          22,628       13,110          
Additions financed under a new leasing agreement -                -                -                 - -                  -               
2,499         1,237         3,736        
(8,252)        (18)            -                  (8,270)       
Derecognition - Disposals (1,451)        (12)            -                (1,463)        Derecognition - Other -               
Assets reclassified (to)/from Held for Sale (376)           376            -               
Other movements in cost or valuation 24,116       -                -                (24,116)         -               
At 31 March 2023 453,644     46,440       8,901          3,283         21,440          533,708     
Depreciation and Impairments
At 1 April 2022 (13,585)      (32,630)      (9)                3               -                  (46,221)     
(13,068)      (2,944)        (16,012)      (8,512)           
17,284       17,284      
5,300         5,300        
1,443         6               1,449        
-                -               
At 31 March 2023 (2,626)      (35,568)    (9)               3              -                  (38,200)   
Balance Sheet amount at 31 March 2023 451,018   10,872     8,892         3,286       21,440        495,508    235,076      
Balance Sheet amount at 31 March 2022 414,852   11,798     7,454         1,408       35,344        470,856    230,478      
Comparative Movements in 2022-23
Revaluation increases/(decreases) recognised in the Revaluation
Reserve
Revaluation increases/(decreases) recognised in the
Surplus/Deficit on the Provision of Services
Depreciation Charge for 2022-23
Depreciation written out to the Revaluation Reserve
Other movements in depreciation and impairment
Impairment losses/(reversals) recognised in the Surplus/Deficit on
the Provision of Services
Derecognition - Disposals

Page 181

Notes to the Financial Statements 
www.argyll-bute.gov.uk   ___________________________________________________________________________________ Page 91 
As permitted by Finance Circular 09-2022 the council has adopted both Statutory Override 1 & 2 relating to infrastructure assets which allow for the following; 
Statutory Override 1: For accounting periods commencing from 1 April 2021 until 31 March 2024 a local authority is not required to report the gross cost and
accumulated depreciation for infrastructure assets. 
Statutory Override 2: For accounting periods commencing 1 April 2010 until 31 March 2024 the carrying amount to be derecognised in respect of a replaced
part of an infrastructure asset is to be taken and accounted for as a nil amount. No subsequent adjustment shall be made to the carrying amount of the asset
with respect to that part.

Page 182

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 92 
15.2 Valuation of Property, Plant and Equipment
IAS 16 – Property, Plant and Equipment has been adapted for the public sector by IPSAS 17 – Property,
Plant and Equipment. Under IPSAS 17 each category of Property, Plant and Equipment is valued as
follows:
• Infrastructure, community assets and assets under construction are valued at historical cost.
• Vehicles, plant and equipment are valued at depreciated historical cost as a proxy for current value.
• All other classes of assets are valued at current value. Where there is no market based evidence
of current value because of the specialist nature of the asset and the asset is rarely sold then an
estimate of current value is made using a depreciated replacement cost approach.
The Council carries out a rolling programme that ensures that all Property, Plant and Equipment required
to be measured is re-valued at least every five years. 
Assets identified as Corporate Surplus Assets are valued in accordance with IFRS 13 - Fair Value
Measurement. The Balance Sheet value of Corporate Surplus assets at 31 March 2024 was £4.620m.
Corporate Surplus assets are valued at their fair value on 31 March each year. Level 2 or 3 inputs were
used for most Corporate Surplus asset valuations. 
Revaluations of Council owned land and property were carried out at 31 March 2024 in accordance with
the Council’s rolling programme of revaluations. The revaluations have been carried out in house by the
Council’s Estates Service. Valuations of land and buildings were carried out in accordance with the
methodologies and basis for estimation set out in the professional standards of the Royal Institution of
Chartered Surveyors. For assets not valued in-year a desktop assessment was undertaken for 2023-24 to
estimate the potential increase in value of those assets valued using depreciated replacement cost using
BCIS indices. As the BCIS indices have not increased materially, the impact on these assets was not
deemed to be material so no adjustment was made. 
The following table shows the progress of the Council’s rolling programme for the revaluation of Other
Land and Buildings: 
Estates
Valuation
Desktop
Valuation
Current
Valuation
£'000 £'000 £'000
31 March 2024 135,773     135,773      
31 March 2023 179,234     5,007         184,241      
31 March 2022 38,954       3,335         42,289        
31 March 2021 50,140       3,164         53,304        
31 March 2020 39,207       2,555         41,762        
Total Cost or Valuation 443,308   14,061     457,369    
Other Land & BuildingsValued at Current Value as at:

Page 183

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 93 
15.3  Depreciation
The following useful lives and depreciation rates have been used in the calculation of depreciation:
•  Buildings – straight-line allocation over the useful life of the property as estimated by the valuer
(20 to 60 years)
•  Infrastructure – straight-line allocation over 40 – 60 years
•  Vessels – straight line allocation over 25 years
•  Vehicles, Plant and Equipment - straight-line allocation over the useful life of the asset as
determined by a suitably qualified officer (5 to 20 years) 
15.4  Summary of Capital Expenditure and Financing
Capital expenditure involves the creation of assets, the benefit of which will be available to future rates
and Council taxpayers. It is financed from borrowing, capital receipts and capital grants. The cost of
the asset is effectively borne over a period of years. In 2023-24 total spending on capital projects was
£40.094m. 
2022-23 2023-24
£'000 £'000
307,100          Opening Capital Financing Requirement 291,782     
Capital Investment:
8,543                Property Plant and Equipment: Other Land and Buildings 8,483           
2,024                Vehicles, Plant, Furniture and Equipment 3,177           
13,110              Infrastructure Assets 12,309         
1,438                Community Assets 218              
283                   Surplus Assets (18)              
10,212              Assets Under Construction 15,117         
128                  
Property Plant and Equipment
acquired under Finance Leases: Other Land and Buildings - DBFM Schools -                  
246                   Heritage Assets 224              
174                   Intangible Assets 202              
12                    Investment Assets 382              
Assets Held for Sale
36,170            Total Capital Investment 40,094       
Sources of Finance:
-                       Capital Receipts -                  
(22,549)             Government Grants (23,550)        
(2,938)               Capital Financed from Current Revenue (1,616)          
(4,276)               Net Borrowing (6,111)          
(16,041)             Earmarked Reserves (1,532)          
(5,116)               Assets Aquired under Finance Leases/Schools NPDO (5,280)          
(568)                  Capital Receipts transferred to/(from) Capital Fund (2,207)          
-                       Service Concessions 40,869         
-                       Other (55)              
(51,488)           Total Funding 518            
291,782          Closing Capital Financing Requirement 332,394

Page 184

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 94 
15.5 Commitments under Capital Contracts
At 31 March 2024, the Council had commitments on capital contracts of £6.236m. This expenditure will
be funded from a combination of Government Grants, borrowing and income from selling assets and
contributions from Revenue Accounts. Similar commitments at 31 March 2023 were £13.745m. The
major commitments are:
Commitments Under Capital Contracts 2023-24
£'000
Tigh-A-Rudha Care Home - Internal Upgrade 1,859       
Kilmory Business Park 979          
Lochgilphead Community Education Centre 513          
The Moat Centre - Electrical Upgrade 473          
St Andrews Primary School - Window Upgrade 358          
Port Charlotte Primary School - Electrical Works 306          
Riverside Leisure Centre - Health Suite Upgrade 280          
Helensburgh and Lomond Civic Centre - Occupation Certificate Work 267          
Dalmally Primary School - Internal Upgrade 193          
North Bute Primary School - Staff Toilet Alterations 150          
Other projects each less than £0.150m in value 858          
Total Capital Commitments 6,236       
16 HERITAGE ASSETS
The main heritage assets held by the Council are two art collections, an archaeology collection and
Inveraray Jail and Courthouse. The Council holds other heritage assets which are not valued and shown
on the Balance Sheet. Further details on the council’s heritage assets policy can be found in note 1.11. 
Reconciliation of the carrying value of heritage assets held by the Council: 
Art
Collections
Heritage
Property Total
£'000 £'000 £'000
Cost or Valuation
Net Book Value at 1 April 2023 1,600         745            2,345        
Additions -                224            224           
Disposals -                - -               
Revaluations -                - -               
Impairment Losses/(Reversals) recognised in the Revaluation Reserve -                -                -               
-                -                -               
At 31 March 2024 1,600        969           2,569       
Movements in 2023-24
Transfer from Assets Under Construction

Page 185

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 95 
17 INTANGIBLE ASSETS
Intangible assets comprise software licences and carbon reduction commitment allowances purchased
in advance. Purchased software licences are shown at cost and this cost is charged to the relevant
service lines within the Comprehensive Income and Expenditure Statement over the economic life of
the licences, assessed as five years.
The movement in intangible assets during the year was:
£'000 £'000
Cost or Valuation
At 1 April 2023 2,449              2,449             
Additions 202                 202                
Disposals -                     -                    
Revaluations -                     -                    
Reclassifications -                     -                    
At 31 March 2024 2,651            2,651           
Amortisation and Impairments
At 1 April 2023 (1,716)             (1,716)            
Charge for 2023-24 (47)                 (47)                
Disposals -                     -                    
At 31 March 2024 (1,763)           (1,763)          
Balance Sheet amount at 31 March 2024 888               888              
Balance Sheet amount at 31 March 2023 733               733              
Movements in 2023-24
Purchased
Software
Licences
Total
Intangible
Assets
Total
Intangible
Assets
Comparative Movements in 2022-23
£'000 £'000
Cost or Valuation
At 1 April 2022 2,275              2,275             
Additions 174                 174                
Disposals -                     -                    
Revaluations -                     -                    
Reclassifications -                    
At 31 March 2023 2,449            2,449           
Amortisation and Impairments
At 1 April 2022 (1,671)             (1,671)            
Charge for 2022-23 (45)                 (45)                
Disposals -                     -                    
At 31 March 2023 (1,716)           (1,716)          
Balance Sheet amount at 31 March 2023 733 733              
Balance Sheet amount at 31 March 2022 604               604              
Purchased
Software
Licences

Page 186

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 96 
18 INVESTMENT PROPERTY
Investment property has been accounted for in accordance with IAS 4 - Investment Property, except
where interpretations or adaptations to fit the public sector are detailed in the Code. The definition of an
investment property in the context of the public sector is one that is used solely to earn rentals or for
capital appreciation or both.
The value of investment property is initially measured at cost and thereafter measured at fair value. The
fair value of investment property reflects market conditions at 31 March 2024. Revaluations of
investment properties were carried out at 31 March 2024 in house by the Estates Service. 
18.1 Movement in Investment Property
The movement in investment property during 2023-24 was:
Investment
Properties
£'000
Cost or Valuation
At 1 April 2023 2,553           
Acquisitions 382              
Disposals -                  
Net Gains/Losses from fair value adjustments (42)               
Transfers (379)             
At 31 March 2024 2,514          
Movements in 2023-24
18.2 Investment Property Income and Expenditure
The following items of income and expenditure have been accounted for in the Financing and Investment
Income and Expenditure line in the Comprehensive Income and Expenditure Statement: 
2022-23 2023-24
£'000 £'000
141                     Rental income from investment property 144             
(4)                        Direct operating expenses arising from investment property -                 
137                    144             
19 SCHOOLS BUILT UNDER PUBLIC PRIVATE PARTNERSHIP CONTRACTS (PPP)
Argyll and Bute Council have two schemes:
Schools Non-Profit Distributing Organisation (NPDO)
During 2007-08 two secondary schools, two joint campuses and one primary campus, developed as
part of the Non-Profit Distributing Organisation (NPDO) variant of a Public Private Partnership (PPP),
became operational. When the agreement ends in 2035 the provider will hand the five school complexes
back to the Council.
Schools Hub Design, Build, Finance and Maintain Contract (DBFM)
Campbeltown and Oban High Schools have been built under this type of arrangement which reached
Financial Close in March 2016.

Page 187

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 97 
Campbeltown Grammar School Construction Phase 1 was completed on 19 February 2018 and
provided a new secondary school for pupils aged between 12 and 18. The new school has capacity for
500 pupils and replaces the existing Campbeltown Grammar School on the current school site at
Hutcheon Road, Campbeltown. Phase 2 which included the demolition of the existing school buildings,
provision of a car park, landscaping and 3G artificial turf pitch was completed during 2018-19.
Oban High School Construction Phase 1 was completed on 5 April 2018 and provided a new secondary
school for pupils between 12 and 18. The new school has capacity for 1300 pupils and replaces the
existing Oban High School, on the current school site at Soroba Road, Oban. Phase 2 included the
demolition of the existing school buildings, provision of a car park, landscaping and a pedestrian footway
with lighting from the new school facilities to the grass pitches owned by the Council at Glencruitten,
Oban was completed during 2018-19.
19.1 Assets Held under Schools NPDO and DBFM Contracts
Five schools were constructed under the Schools NPDO Contract; Hermitage Academy, Dunoon
Grammar, Lochgilphead Joint Campus, Rothesay Joint Campus and Oban Primary Campus. The
construction costs of the buildings, adjusted for revaluations on 31 March 2024 and depreciation to date
are included as part of Operational Land and Buildings.
As noted above, two schools were completed under the Schools DBFM Contract. Oban High School
and Campbeltown Grammar have been included within Operational Land & Buildings. 
Schools
DBFM - Other
Land &
Buildings
Schools
NPDO - Other
Land &
Buildings
Total
Schools Built
under PFI
Contracts
£'000 £'000 £'000
Cost or Valuation
At 1 April 2023 71,539           134,178         205,717       
Additions at Cost -                    -                    -                 
Transfers -                    -                    -                 
Revaluations 5,066             -                    5,066          
At 31 March 2024 76,605         134,178       210,783     
Depreciation and Impairments
At 1 April 2023 -                    -                    -                 
Charge for 2023-24 (2,457)            (3,355)            (5,812)         
Transfers -                    -                    -                 
Revaluations 2,457             -                    2,457          
At 31 March 2024 -                   (3,355)          (3,355)        
Balance Sheet amount at 31 March 2024 76,605         130,823       207,428     
Balance Sheet amount at 31 March 2023 71,539         134,178       205,717     
Movements in 2023-24

Page 188

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 98 
Schools
DBFM - Other
Land &
Buildings
Schools
NPDO - Other
Land &
Buildings
Total
Schools Built
under PFI
Contracts
£'000 £'000 £'000
Cost or Valuation
At 1 April 2022 66,018           136,962         202,980       
Additions at Cost 128               -                    128             
Transfers -                    -                    -                 
Revaluations 5,393             (2,784)            2,609          
At 31 March 2023 71,539         134,178       205,717     
Depreciation and Impairments
At 1 April 2022 -                    -                    -                 
Charge for 2022-23 (2,186)            (3,162)            (5,348)         
Transfers -                    -                    -                 
Revaluations 2,186             3,162             5,348          
At 31 March 2023 -                   -                   -                 
Balance Sheet amount at 31 March 2023 71,539         134,178       205,717     
Balance Sheet amount at 31 March 2022 66,018         136,962       202,980     
Comparative Movements in 2022-23
19.2 Schools NPDO and DBFM Finance Lease Liability
The finance lease liability arising from the Schools NPDO and DBFM contracts are as follows: 
Schools
DBFM
Schools
NPDO
Total
Schools
Finance
Lease
Liability
£'000 £'000 £'000
Balance at 1 April 2023 (51,876)          (59,338)          (111,214)      
Additions -                    -                    -                 
Repayments 1,970             3,262             5,232          
Prior year repayment adjustment -                    -                    -                 
Schools Finance Lease
Liability at 31 March 2024 (49,906)        (56,076)        (105,982)    
Split:
Obligations payable within 1 year (1,990)            (3,298)            (5,288)         
Obligations payable after 1 year (47,916)          (52,778)          (100,694)      
Schools Finance Lease
Liability at 31 March 2024 (49,906)        (56,076)        (105,982)    
Movements in 2023-24

Page 189

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 99 
Schools
DBFM
Schools
NPDO
Total
Schools
Finance
Lease
Liability
£'000 £'000 £'000
Balance at 1 April 2022 (53,876)          (62,408)          (116,284)      
Additions -                    -                    -                 
Repayments 2,000             3,070             5,070          
Prior year repayment adjustment -                    -                 
Schools Finance Lease
Liability at 31 March 2023 (51,876)        (59,338)        (111,214)    
Split:
Obligations payable within 1 year (1,970)            (3,262)            (5,232)         
Obligations payable after 1 year (49,906)          (56,076)          (105,982)      
Schools Finance Lease
Liability at 31 March 2023 (51,876)        (59,338)        (111,214)    
Comparative Movements in 2022-23
19.3 Payments due to Operator under Schools NPDO Contract
The Council is committed to paying the following sums under the Schools NPDO contract:
Future Repayment Periods Lifecycle
Costs
Payment of
Interest
Service
Charges
Total
Payments
£'000 £'000 £'000 £'000
2024 - 2025 631               5,796             7,032           16,757     
2025 - 2029 2,593             20,035           29,716          69,220     
2029 - 2034 4,072             13,592           42,567          91,891     
2034 - 2035 318               717               4,301           9,577       
Total 7,614             40,140           83,616          187,445   
Repayment
of Liability
£'000
16,876       
31,660       
4,241        
56,075       
3,298           
19.4 Payments due to Operator under Schools DBFM Contract
The Council is committed to paying the following sums under the Schools DBFM contract: 
Future Repayment Periods Payment of
Interest
Service
Charges
Total
Payments
£'000 £'000 £'000
2024 - 2025 2,168             1,211             5,369          
2025 - 2029 7,888             4,641             20,947         
2029 - 2034 8,066             7,789             26,911         
2034 - 2039 2,471             11,773           27,817         
2039 - 2043 1,716             5,601             22,186         
Total 22,309           31,015           103,230        49,906       
Repayment
of Liability
£'000
8,418        
11,056       
1,990        
13,573       
14,869

Page 190

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 100 
20 OPERATING LEASES
20.1 Operating Leases – Amounts Paid to Lessors
The Council uses land, buildings, vehicles, plant and equipment financed under the terms of an
operating lease. The amounts paid under these arrangements were as follows: 
2022-23 2023-24
£'000 £'000
552           Land and Buildings 1,223        
1,407        Vehicles 1,577        
180           Plant and Equipment 181           
2,139       Total 2,981         
20.2 Assets Held Under Operating Leases
The Council was committed at 31 March 2024 to making payments of £2.061m under operating leases
comprising the following elements:
Other
Land and
Buildings
Vehicles,
Plant and
Equipment
Other Land
and
Buildings
Vehicles,
Plant and
Equipment
£'000 £'000 £'000 £'000
213 184 Due within 1 year 485            222           
691 162 Due between 1 and 5 years 481            114           
1,479 5 Due after 5 years 759            -               
2,383 351 Value at 31 March 1,725        336          
31st March 2023 31st March 2024
21 FINANCE LEASES
21.1 Finance Leases – Amounts Paid to Lessors
During 2017-18 the Council purchased a new cremator for Cardross Crematorium under a finance lease
arrangement. The amount paid under this arrangement in 2023-24 was as follows: 
2022-23 2023-24
£'000 £'000
63             Plant and Equipment 63             
63            Total 63             
21.2 Assets Held Under Finance Leases
Assets purchased under a finance lease are included within the assets of the Council and
depreciated over the life of the asset as follows: 
2022-23 2023-24
£'000 Vehicles, Plant and Equipment £'000
376           Value at 1 April 325           
-               Additions -               
(51)            Depreciation (51)            
325          Value at 31 March 274

Page 191

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 101 
21.3 Finance Lease Liability
The Council was committed at 31 March 2024 to making payments of £0.301m under finance leases
comprising the following elements:
Movements in 2023-24
£'000
Balance at 1 April 2023 (349)          
Additions -               
Repayments 48             
Finance Lease Liability at 31 March 2024 (301)        
Split:
Obligations payable within 1 year (63)            
Obligations payable between 1 and 5 years (251)          
Obligations payable after 5 years (29)            
Finance Lease Obligations at 31 March 2024 (343)        
Less Interest element of lease 42             
Finance Lease Liability at 31 March 2024 (301)         
Comparative Movements in 2022-23
£'000
Balance at 1 April 2022 (396)          
Additions -               
Repayments 47             
Finance Lease Liability at 31 March 2023 (349)        
Split:
Obligations payable within 1 year (63)            
Obligations payable between 1 and 5 years (251)          
Obligations payable after 5 years (92)            
Finance Lease Obligations at 31 March 2023 (406)        
Less Interest element of lease 57             
Finance Lease Liability at 31 March 2023 (349)

Page 192

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 102 
22 LONG TERM DEBTORS 
31st March
2023
31st March
2024
£'000 £'000
12             House Loans 11             
750           Waste PPP Historic Contamination Fund 750           
1,801        Charging Orders - Care Home Fees 2,099        
3,024        Strategic Housing Fund Loans to Registered Social Landlords 2,879        
293           Other Long Term Debtors 77             
5,880       Total Long Term Debtors 5,816         
23 DEBTORS 
£'000 £'000 £'000 £'000
18,990           Arrears of Local Taxation 20,310    
(16,844)          Less: Impairment of Bad Debts (17,776)   
2,146            2,534      
435               Housing Benefits Overpayments 375         
(299)              Less: Impairment of Bad Debts (277)        
136              98           
3,382             Debtor Accounts 4,586      
(1,172)            Less: Expected Credit Loss (1,121)     
2,210            3,465      
2,742           
Net Debtor to Scottish Government for Non
Domestic Rates 1,670      
4,316             VAT Recoverable from HMRC 2,807      
139             
Strategic Housing Fund Loans due within 1
Year 145         
7,456             Accrued Income 14,576    
8,041             Other Debtors 13,073    
27,186        Total Debtors 38,368   
31 March 202431 March 2023

Page 193

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 103 
24 ASSETS HELD FOR SALE
The movement in assets held for sale was:
2022-23 2023-24
£'000 £'000
1,509        1,554      
17              286          
-                 Additions -              
84              Revaluation losses -              
60              Revaluation gains 189          
-                Impairment losses -              
-                Assets declassified as "Held for Sale" (Property, Plant and Equipment) -              
(116)           Assets Sold (410)         
1,554        Balance Sheet amount at 31st March 2024 1,619       
Balance Sheet amount at 1st April 2023 
Assets newly classified as "Held for Sale" (Property, Plant  and Equipment)
Movements
25 CASH AND CASH EQUIVALENTS
The balance of Cash and Cash Equivalents is made up of the following elements:
31 March
2023
31 March
2024
£'000 £'000
4              3             
(218)           Cash in transit 794          
1,976        Short term deposits with banks 633          
6,850        Short term deposits in Money Market Funds 1,400       
(7,789)       Bank Current Accounts (12,821)    
823         Total Cash and Cash Equivalents (9,991)     
Cash held by the Authority

Page 194

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 104 
26 CREDITORS
31 March
2023
31 March
2024
£'000 £'000
11,707          Accrued Payrolls and Superannuation 9,174       
3,092            Accrued Employer's National Insurance Contributions and PAYE 3,495       
7,588            Accrual for Short Term Accumulating Absences 8,272       
96                 Creditors System Liability (19)           
9,095            Accrued Expenditure 10,774     
5,006            Health and Social Care Partnership Creditor 3,389       
1,022            RCGF Grant Income 2,060       
854               Trust Funds 901          
-                   Net Creditor to Scottish Government for Non Domestic Rates 1,408       
11,584          Other Creditors 12,920     
50,044         Total Creditors 52,374     
27 FINANCIAL INSTRUMENTS DISCLOSURES
27.1 Types of Financial Instruments
Accounting regulations require the “Financial Instruments” (investment, lending and borrowing of the
Council) shown on the balance sheet to be further analysed into various defined categories. The
investments, lending and borrowing disclosed in the Balance Sheet are made up of the following
categories of “Financial Instruments”:
Long Term Current Long Term Current
£'000 £'000 £'000 £'000
Investments and Lending
11,372      78,669               Financial Assets at Amortised Cost 6,308            48,810         
Borrowing
239,187     58,190               209,151         63,406         
31 March 202431 March 2023
Financial Liabilities at
amortised cost 
27.2 Fair Value of Assets and Liabilities Carried at Amortised Cost
Financial assets (represented by lending and receivables) and financial liabilities (represented by
borrowings) are carried in the Balance Sheet at amortised cost. Their fair value can be assessed by
calculating the present value of the cash flows that will take place over the remaining period of the
instrument, using the following assumptions:
• Estimated interest rates at 31 March 2024 for loans from the PWLB were taken from the
appropriate interest rate notice and for other loans receivable and payable from market rates
obtained by our treasury advisors.
• No early repayment or impairment is recognised.
• Where an instrument will mature in the next 12 months, the carrying amount is assumed to
approximate to fair value.
• The fair value of trade and other receivables is taken to be the invoiced or billed amount.
The fair values are calculated as follows:

Page 195

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 105 
Carrying
Amount Fair Value
Carrying
Amount Fair Value
£'000 £'000 £'000 £'000
Lending
90,041      90,041               Financial Assets at Amortised Cost 55,118          55,118         
Borrowing
297,377 315,566 Financial Liabilities 272,557         272,797        
31 March 2023 31 March 2024
The fair value is greater than the carrying amount because the Council’s lending figure includes a
number of loans where the interest rate receivable is higher than the rates available for similar loans at
the Balance Sheet date. The commitment to receive interest above the current market rates increases
the amount the Council would receive if it agreed the early repayment of loans.
27.3 Gains and Losses on Financial Instruments
There are no gains and losses recognised in the Comprehensive Income and Expenditure Statement in
relation to Financial Instruments.
27.4 Nature and Extent of Risks arising from Financial Instruments
The Council’s management of treasury risks actively works to minimise the Council’s exposure to the
unpredictability of financial markets and to protect the financial resources available to fund services. The
Council has fully adopted CIPFA’s Code of Treasury Management Practices and has written principles
for overall risk management as well as written policies and procedures covering specific areas such as
credit risk, liquidity risk and market risk.
27.5 Credit Risk
Credit risk arises from the short-term lending of surplus funds to banks, money market funds, building
societies and other local authorities as well as credit exposures to the Council’s customers. It is the
policy of the Council to place deposits only with a limited number of high quality banks and money market
funds whose credit rating is independently assessed as sufficiently secure by the Council’s treasury
advisers and to restrict lending to a prudent maximum amount for each institution.
The following analysis summarises the Council’s potential maximum exposure to credit risk, based on
past experience and current market conditions. No credit limits were exceeded during the financial year
and the Council expects full repayment on the due date of deposits placed with its counterparties.
Amount at      
31 March 2024
Historical
Experience of
Non-payment
adjusted for
Market
Conditions at
31 March 2024
Estimated
Maximum
Exposure to
Default and
Uncollectability
£'000 % £'000
2,033            -                -                Deposits with Banks and Money Market
Funds 
The information in respect of the Council’s debtors can be found in Notes 22 and 23. The Debtor
Accounts represents the amounts owed by the Council’s customers; Other Debtors include prepaid
expenditure, accrued income and money owed to the Council in respect of projects being carried out under
partnerships where the Council is the lead partner. The bad debt provision shown in Note 23 represents
the Council’s assessment of the likely recoverability of the debt outstanding.
The credit risk around unprovided for debt is considered to be low. Debtors relate to the normal business

Page 196

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 106 
of the Council and credit is issued on the Council’s standard credit terms. There are no significant
amounts past due but not impaired where recoverability is considered to be an issue.
27.6 Liquidity Risk
The Council’s main source of borrowing is the Treasury’s Public Works Loans Board (PWLB). There is
no significant risk that the Council will be unable to raise finance to meet its commitments under Financial
Instruments. The Council has safeguards in place to ensure that a significant proportion of its borrowings
does not mature for repayment at any one time in the future to reduce the financial impact of re-
borrowing at a time of unfavourable interest rates. The Council’s policy is to ensure that not more than
30% of the loans are due to mature within any financial year through a combination of prudent planning
of new loans taken out and, where it is economic to do so, making early repayments.
The maturity analysis of financial liabilities is as follows:
31 March
2023
31 March
2024
£'000 £'000
63,958      Less than one year 63,404         
5,357        Between one and two years 7,219           
19,048      Between two and five years 25,773         
209,014     More than five years 176,161        
297,377     272,557        
Maturity analysis of financial liabilities
All other amounts due to the Council for council tax, non-domestic rates and other income are due to be
paid in less than one year.
27.7 Market Risk
Changes in market interest rates influence the interest payable on borrowings and on interest receivable
on surplus funds invested. For example, a rise in interest rates would mean an increase in the interest
charged on borrowing at variable rates and an increased cost to the taxpayer. An increase in interest
rates would also mean an increase in the income received on lending at variable rates and a reduction
in cost for the taxpayer.
Changes in market rates also affect the notional “fair value” of lending and borrowing. For example, a
rise in interest rates would reduce the “fair value” of both lending and borrowing at fixed rates. Changes
in “fair value” of lending and borrowing do not impact upon the taxpayer and are confined to prescribed
presentational aspects in the Accounts.
The Council has a variety of strategies for managing the uncertainty of future interest rates and the
financial impact on the Council.
It is the policy of the Council to limit its exposure to variable rate borrowing to a maximum of 30% of
what it borrows.
During periods of falling rates and where it is economically advantageous to do so, the Council will
consider the repayment and restructuring of fixed interest rate debt.
The Council takes daily advice from its specialist treasury advisers and actively monitors changes in
interest rates to inform decisions on the lending of surplus funds, new borrowings and restructuring of
existing borrowings.
Any potential for a financial impact on the Council is also significantly limited by the Scottish
Government’s grant distribution mechanism that automatically adjusts for changes in interest rates in
the Government Grant support the Council receives for “loan charges”.
To illustrate the impact of changes in interest rates upon the Council, the following table shows the
financial effect if rates had been 1% higher at 31 March 2024, with all other variables held constant:

Page 197

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 107 
31 March
2024
Impact on tax-payer £'000
Increase on interest payable on variable rate borrowings 53                
Increase in interest receivable on variable rate lending -                  
Increases in government grant receivable for “loan charges” -                  
Net effect on Statement of Comprehensive Income & Expenditure 53                
31 March
2024
Other accounting presentational changes £'000
13,965          A decrease in the “fair value” of fixed rate borrowing
(disclosure confined to the notes to the financial statements)
The impact of a 1% fall in the interest rates would be as above but with the changes being reversed.
27.8 Price Risk
The Council has no investment classified as “available-for-sale”.
27.9 Foreign Exchange Risk
The Council does not lend or borrow in foreign currencies and has no exposure to gains or losses arising
from movements in exchange rates.
27.10 Short-Term Deposits
The short-term deposits arise as a result of the timing of expenditure and associated income and
movements in fund and revenue balances. The Council adopts a proactive but prudent approach to its
Treasury Management operations, which are governed by the fully revised edition of CIPFA’s Code of
Practice on Treasury Management.
31 March
2023
31 March
2024
£'000 £'000
8,826        Banks and Money Market Funds 2,033             
27.11 Soft Loans
The Council has no material soft loans at 31 March 2024, on which no interest was being charged. 
27.12 Short-Term Borrowing
The Common Good and the various Trust Funds administered by the Council had monies temporarily
invested with the Council’s loans fund during the year. The amounts at 31 March 2024 are shown in the
table below. Further details of the nature and amounts of the funds of the Common Good and Trust
Funds are shown in Notes 36 and 37.
31 March
2023
31 March
2024
£'000 £'000
144           Common Good 157              
854           Trust Funds 901

Page 198

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 108 
28 OTHER LIABILITIES
Other liabilities consist of liabilities which by arrangement are payable at some point in the future or paid
off by an annual sum over a period of time. Other liabilities total £107.033m as at 31 March 2024 and
comprise the following:
Opening
Balance      
1 April 2024
Movement
in Year
Closing
Balance         
31 March
2024
£'000 £'000 £'000
(349)           48             (301)           
(111,214)     5,232        (105,982)     
(750)           -               (750)           
Total Other Liabilities (112,313) 5,280        (107,033)     
Split:
Short Term Liabilities (due within 1 year) (5,336)         
Long Term Liabilities (due after 1 year) (101,697)     
Total Other Liabilities (107,033)     
Movements in 2023-24
Finance Lease Liability (See note 21.3)
Schools Finance Lease Liability (See note 19.2)
Land Contamination 
29 PROVISIONS
Opening
Balance      
1 April
2023
Additional
Provision
Amounts
Used
Unused
Amounts
Reversed
Closing
Balance at
31 March
2024
£'000 £'000 £'000 £'000 £'000
(13)            (13)           
Employee Settlement Provision (51)            51             -              
SRC Intromissions (19)            19             -              
SW - Mull Homecare Backdated Pay (13)            (13)           
(108)          (7)             (115)         
(53)            16             (37)           
Service Choices Redundancy Costs (16)            (137)          14             2              (137)         
(2,336)       (404)          (2,740)      
(237)          (44)            37             (244)         
Litigation Claims (196)          (196)         
Insurance Excess Provision -               -              
(865)          (487)          195           132           (1,025)      
Total Provisions (3,894) (1,092)     279          187          (4,520)    
Split:
Short Term Provisions (due within 1 year) (1,665)      
Long Term Provisions (due after 1 year) (2,855)      
Total Other Liabilities (4,520)    
NPDO and Hub DBFM Payments
Equal Pay Claims
Commercial Rent Balances
Income due to Registered Social Landlords
Landfill Sites - Restoration and Aftercare Costs
Utilities Provision
A provision was created at the end of 2005-06 in relation to employees in catering, cleaning and home
care services who had not accepted the Council’s equal pay settlement. There may be further
outstanding claims where the settlement amount cannot be estimated reliably enough to provide for the
costs.

Page 199

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 109 
The Council reduced the discount on Council Tax from second homes to 10% during 2005-06. The
additional Council Tax income invoiced during 2023-24 amounted to £2.575m; this amount is to be paid
to registered social landlords to invest in social housing. A provision for cash not yet collected has been
created amounting to £0.115m.
There is a provision for Commercial Rents where arrangements have been put in place for repayment
over a number of years. The provision reflects the uncertainty of collection of the debt.
Liabilities have arisen in respect of employees who will be made redundant as a result of savings options
agreed. The cost for any employee, whose contract has been terminated on or before 31 March 2024
has been incurred in year. For the employees who have confirmed acceptance of redundancy but have
left or are leaving after 31 March 2024, a provision of £0.137m has been created.
A provision for landfill sites was created in 2014-15 reflecting the Council’s liability for restoration and
ongoing maintenance in respect of landfill sites operated by the Council, at Glengorm, Gartbreck and
Gott Bay. The landfills sites were revalued at 31 March 2024 and the provision for restoration and
aftercare increased to £2.740m. These have been provided for based on the net present value of
estimated future costs.
The utilities provision was created during 2011-12 to cover a potential liability in relation to discrepancies
in charges for utility costs, £0.044m has been reversed during 2023-24 and a further £0.037m additional
provision has been added resulting in a total provision of £0.244m.
A legal litigation provision was created in 2020-21 as the Council is currently involved in several ongoing
cases that will incur costs into future years.  The provision is based on sums invoiced and anticipated
future costs.
The NPDO provision for withheld sums from the Unitary Charge paid to ABC Schools relates to unbilled
utility costs, Authority related damage and contract variations. The HUB DBFM provision for withheld
sums from the Monthly Service Payment paid to Hub North Scotland (O&C) Ltd relates to unbilled
Authority related damage and contract variations. 
30 CAPITAL GRANTS RECEIVED IN ADVANCE 
A Capital Grant of £1.564m was received in advance for 2023-24 in respect of the Cuan Sound/Jura
Ferry Programme.
Opening
Balance      
1 April
2023
Capital
Grants
Received
Amounts
Used
Closing
Balance         
31 March
2024
£'000 £'000 £'000 £'000
-               1,564        1,564       
-               -               -              
Total Other Liabilities -            1,564        -            1,564       
Split:
Capital Grant Receipts in Advance (due within 1 year) -              
Capital Grant Receipts in Advance (due after 1 year) 1,564       
Total Other Liabilities 1,564       
HITRANS

Page 200

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 110 
31 DEFINED BENEFIT PENSION SCHEMES
Participation in Pension Schemes
As part of the terms and conditions of employment of its officers, the Council makes contributions
towards the cost of post-employment benefits. Although these benefits will not actually be payable until
employees retire, the Council has a commitment to make the payments (for those benefits) and to
disclose them at the time that employees earn their future entitlement.
The Council participates in two separate pension schemes which meet the needs of employees in
particular services. Both schemes provide members with defined benefits related to pay and service.
The schemes are as follows:
Teachers
The Scottish Teachers’ Superannuation Scheme is an unfunded scheme administered by the Scottish
Government. This means that liabilities for the benefits provided cannot be identified by the Council. The
scheme is therefore accounted for as if it were a defined contribution scheme where no liability for future
payments of benefits is recognised in the balance sheet and revenue accounts are charged with the
employer’s contributions payable to the Scottish Government in the year.
Local Government Pension Scheme
This is administered by Strathclyde Pension Fund – this is a funded defined benefit final salary scheme,
meaning that the Council and employees pay contributions into a fund, calculated at a level intended to
balance the pension’s liabilities with investment assets. The contributions are based on rates determined
by the Fund’s professionally qualified actuary and based on triennial valuations of the Fund.
The principal risks to the Council of the scheme are the longevity assumptions, statutory changes to
the scheme, changes to inflation, bond yields and the performance of the equity investments held by
the scheme. These are mitigated to a certain extent by the statutory requirements to charge to the
General Fund the amounts due by statute as described in the accounting policies note.
Legal and Regulatory Uncertainty – Virgin Media vs NTL Pension Trustees II Limited
In June 2023, the High Court (Virgin Media Limited v NTL Pension Trustees II Limited) ruled that
amendments to certain defined benefit pension schemes were void if they were not accompanied by
section 37 actuarial certificates. The Court of Appeal rejected an appeal of this decision in July 2024. The
Local Government Pension Scheme is affected by this ruling. 
The Government Actuary’s Department is the actuary for the Local Government Pension Scheme and
has so far failed to evidence that section 37 certificates are in place for all amendments.  Work is ongoing
to discover whether the evidence exists. Until this work is complete, it is not possible to conclude whether
there is any impact on the value of retirement benefits under IAS26 or if it can be reliably estimated. 
Although this is the current position in law, the Government is being lobbied to make a change to the
regulations which would retrospectively validate amendments which would otherwise be void because of
a failure to have obtained section 37 certificates. The Government has an existing power to make the
necessary regulations but not yet said whether it will do anything. There is also the possibility that Virgin
Media could seek permission to appeal to the Supreme Court. Developments are being monitored. In the
current circumstances, it is not considered necessary to make any allowance for the potential impact of
the Virgin Media case in the disclosure of the value of retirement benefits in the financial statements.
31.1 Accrued Pensions Contribution
Due to the timing of salary processing, not all employee and employer contributions have been paid to
the pension schemes by the 31 March 2024. These payments have been accrued and are included
within the creditors figure on the Balance Sheet. These have been paid during April 2024. The amounts
are as follows:
• Local Government Pension Scheme – £2.040m

Page 201

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 111 
• Teachers’ Scheme – £1.304m
31.2 Transactions in Respect of the Local Government Pensions Scheme
The latest formal valuation of the Strathclyde Pension Fund for funding purposes was at 31 March 2020.
The independent actuaries appointed by the Council are Hymans Robertson and they have assumed
that employees have continued to earn new benefits on the same basis as the latest formal valuation
and that the employer’s pensionable payroll over the year to 31 March 2024 remains substantially stable
with new entrants replacing any leavers.
We recognise the cost of retirement benefits in the Net Cost of Services when they are earned by
employees, rather than when the benefits are eventually paid as pensions. However, the charge we are
required to make against Council Tax is based on the cash payable in the year, so the real cost of
retirement benefits is reversed out of the General Fund via the Movement in Reserves Statement. 
The following transactions have been made in the Comprehensive Income and Expenditure Statement
and the General Fund via the Movement in Reserves Statement during the year: 
2022-23 2023-24
£'000 £'000
36,689        Current Service Cost 19,119          
637             Past Service Cost (Including Curtailments) -                   
37,326      Net Cost of Services 19,119         
141             Net Interest Expense (11,307)         
-                 Interest on the Effect of IAS 19 Asset Ceiling 4,711            
37,467      12,523         
37,377        Return on Assets (excluding amounts included in net interest) (43,972)         
46,257        Other Experience (see note (i) below) 56,060          
(337,163)     Change in Financial and Demographic Assumptions (32,078)         
-                 Reversal of 2022-23 IAS 19 Asset Ceiling and Interest Adjustment (103,890)        
99,179        IAS 19 Asset Ceiling Adjustment 288,794         
(116,883)   177,437       
Statement of Movement in Reserves:
(19,970)     6,322           
17,497      Employer's Contributions Payable to the Scheme 18,845         
Comprehensive Income and Expenditure Statement:
Cost of Services:
Total Post Employment Benefit Charged to the Surplus or Deficit
on the Provision of Services
Other Post Employment Benefit Charged to the Comprehensive
Income and Expenditure Statement
Total Post Employment Benefits Charged to the Comprehensive
Income and Expenditure Statement
Reversal of net charges made to the Surplus or Deficit for the Provision
of Services for post employment benefits in accordance with the Code
Actual Amount charged against the General Fund Balance for
pensions in the year:
Service cost comprising:

Page 202

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 112 
(i) A measure of the difference between actual experience and that expected based upon a set of actuarial assumptions,
during the period between two actuarial valuation dates, as determined in accordance with a particular cost method.
(ASOP No. 4) 
31.3 Assets and Liabilities in Relation to Post-Employment Benefits
Reconciliation of present value of the scheme liabilities (defined benefit obligation): 
Reconciliation of fair value of the scheme (plan) assets:
2022-23 2023-24
£'000 £'000
875,876    861,065       
Re-measurement (Gains) and Losses:
(37,377)       Expected Rate of Return on Pension Fund Assets 43,972          
-                 Actuarial (Gains) and Losses (1,455)           
23,634        Interest Income on Plan Assets 40,760          
17,497        Employers Contributions 18,845          
4,833          Contributions by Scheme Participants 5,280            
(23,398)       Estimated Benefits Paid (30,102)         
861,065    Fair Value of Employer Assets at 31 March 24 938,365       
Fair Value of Employer Assets at 1 April 23
The expected return on scheme assets is determined by considering the expected returns available on
the assets underlying the current investment policy. Expected yields on fixed interest investments are
based on gross redemption yields as at the Balance Sheet date. Expected returns on equity investments
reflect long-term real rates of return experienced in the respective markets. An asset ceiling adjustment
was included in 2022-23 and 2023-24 to ensure compliance with IAS 19 which limits the measurement
of a net defined benefit asset to the lower of the surplus in the defined benefit plan and the asset ceiling.
The asset ceiling is defined as the present value of any economic benefits available in the form of refunds
from the plan or reductions in future contributions to the plan. 
2022-23 2023-24
£'000 £'000
871,242    622,872       
36,689        19,119          
637             -                   
23,775        29,453          
4,833          5,280            
(311,081)     2,949            
(23,398)       (30,102)         
602,697    649,571       
20,175        19,578          
622,872    669,149       
Defined Benefit Obligation at 1 April 23
Defined Benefit Obligation at 31 March 24
Present Value of Unfunded Liabilities
Defined Benefit Obligation at 31 March 24
Re-measurement (Gains) and Losses
Contributions by Scheme Participants
Interest Cost
Past Service Costs including Curtailments
Current Service Cost
Estimated Benefits Paid

Page 203

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 113 
31.4 Pensions Assets and Liabilities Recognised in the Balance Sheet
2022-23 2023-24
£'000 Local Government Pension Scheme £'000
(602,697)     Present Value of Funded Liabilities (649,571)        
861,065      Fair Value of Employer Assets 938,365         
(99,179)       IAS19 Asset Ceiling Adjustment (288,794)        
159,189    Surplus/(Deficit) in the Scheme -                  
(20,175)       Present Value of Unfunded Liabilities (19,578)         
139,014    Net Surplus/(Deficit) in the Scheme (19,578)         
The liabilities show the underlying commitments that the Council has in the long run to pay post-
employment (retirement) benefits.

Page 204

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 114 
31.5 Analysis of Pension Fund’s Assets
Argyll and Bute Council’s share of the Pension Fund’s assets at 31 March 2024 comprised: 
2022-23 2023-24
£'000 £'000
16,312        Cash and Cash Equivalents 17,395          
Equity Instruments (by industry type)
38,629        Consumer 43,350          
48,013        Manufacturing 54,078          
4,310          Energy and Utilities 8,511            
18,331        Financial Institutions 26,936          
30,629        Health and Care 25,047          
29,776        Information Technology 31,804          
-             Other -                
169,688      Sub-total Equity Instruments 189,726         
Bonds (by sector)
-             Corporate -                
-             Government -                
-             Sub-total Bonds -                
Real Estate
70,994        UK Property 73,783          
-             Overseas Property -                
70,994        Sub-total Real Estate 73,783          
211,640      Private Equity (All) 224,026         
Investment Funds and Unit Trusts
285,352      Equities 323,600         
99,304        Bonds 109,461         
336             Commodities 374               
5,529          Infrastructure -                
1,911          Other -                
392,432      Sub-total Investment Funds and Unit Trusts 433,435         
Derivatives
(1)               Forward Foreign Exchange Contracts -                
-             Other -                
(1)               Sub-total Derivatives -                
861,065    Total Assets 938,365

Page 205

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 115 
2022-23           2023-24
£'000 Fair Value of Pension Fund Assets       £'000           
Equity Securities            
168,144    Quoted in an Active Market               189,520 
1,544   
Not Quoted in an Active
Market                     206 
169,688  Sub-total Equity Securities               189,726 
31.6 Basis for Estimating Assets and Liabilities
The Council’s share of the liabilities of Strathclyde Pension Fund have been assessed on an actuarial
basis using the projected unit method, an estimate of the pensions that will be payable in future years
dependent on the assumptions about mortality rates, salary levels, etc.
The principal assumptions used by the actuary have been:
2022-23 2023-24
Years Mortality assumptions Years
19.3 Longevity at 65 for current pensioners: Men 20.0              
22.2 Women 22.7              
20.5 Longevity at 65 for future pensioners: Men 20.9              
24.2 Women 24.7              
2022-23 2023-24
% Financial Assumptions %
3.0% Rate of Inflation (CPI) 2.8%
3.7% Rate of Increase in Salaries 3.5%
3.0% Rate of Increase in Pensions (CPI) 2.8%
4.8% Rate for discounting scheme liabilities 4.8%
2022-23 2023-24
% Long-term Expected Rate of Return on Assets in the Fund %
4.8% Equity Investments 4.8%
4.8% Bonds 4.8%
4.8% Property 4.8%
4.8% Cash 4.8% 
An allowance is included for future retirements to elect to take 50% of the maximum additional tax-
free cash up to HMRC limits for pre-April 2009 service and 75% of the maximum tax-free cash for post-
April 2009 service.
For sensitivity analysis on the net pension asset please see Note 4 on page 76.

Page 206

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 116 
31.7 Asset and Liability Matching (ALM) Strategy
The main fund (Fund 1) of Strathclyde Pension fund does not have an asset and liability matching
strategy (ALM) as this is used mainly by mature funds. The Fund does match, to the extent possible,
the types of assets invested to the liabilities in the defined benefit obligation. As is required by the
pensions and investment regulations, the suitability of various types of investment has been
considered, as has the need to diversify investments to reduce the risk of being invested into too
narrow a range.
31.8 Impact on the Council’s Cash Flow
The objectives of the Fund are to keep employers’ contributions at as constant a rate as possible. The
Fund has agreed a strategy to achieve a funding rate of 100% in the longer term. The Scheme is a
multi-employer defined benefit plan and employers’ contributions have been determined so that
employee and employer rates are standard across all participating Local Authorities. Employer’s
contributions have been set at 6.5% for 2024-2025.
The total contributions expected to be made to the Local Government Pension Scheme by the Council
in the year to 31 March 2025 is £5.780m. This is based on an assumed pensionable payroll of
£88.926m.
The assumed weighted average duration of the defined benefit obligation for the Council falls into the
“Medium” duration category which is between 17 and 23 years (this is different from the mortality
assumptions quoted in the table above in “Basis for Estimating Assets and Liabilities”). 
31.9 Teachers Pensions – Administered By Scottish Public Pensions Agency
Teachers employed by the Council are members of the Scottish Teachers’ Superannuation Scheme,
administered by the Scottish Public Pensions Agency. The Scheme is an unfunded statutory public
service pension scheme with benefits underwritten by the UK Government. The Scheme is financed
by payments from employers and from those current employees who are members of the Scheme
and paying contributions at progressively higher marginal rates based on pensionable pay, as
specified by the regulations.
Employers currently pay a contribution rate of 23% - about two thirds of the cost of an individual's
pension. This took effect from 1 September 2019.
The Council has no liability for other employers’ obligations to the multi-employer scheme. As the
scheme is unfunded there can be no deficit or surplus to distribute on the wind-up of the Scheme or
withdrawal from the Scheme.
The scheme is an unfunded multi-employer defined benefit scheme. It is accepted that the scheme
can be treated for accounting purposes as a defined contribution scheme in circumstances where the
Authority is unable to identify its share of the underlying assets and liabilities of the scheme.
At the last valuation a shortfall of £1.3 billion was identified in the notional fund which will be repaid by
a supplementary rate of 4.5% of employers’ pension contributions for fifteen years from 1 April 2015.
This contribution is included in the 23% employers’ contribution rate.
As a proportion of the total contributions into the Teachers’ Pension Scheme during the year ended
31 March 2024, the council’s own contributions equate to 1.53%.

Page 207

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 117 
9,853          Amount Paid Over (£'000) 10,779 
23.00% Rate of Contribution (%) 23.00%
508             Amount of Added Years Awarded by the Council (£'000) 507      
2023-242022-23
The contributions due to be paid to the Teacher’s Scheme by the Council in the next financial year are
estimated to be £12.707m. 
32 UNUSABLE RESERVES
Movements in the Council’s unusable reserves are detailed in the Statement of Movement in
Reserves.
32.1 Revaluation Reserve
The Revaluation Reserve contains the gains made by the Council arising from increases in the value of
its Property, Plant and Equipment. The balance is reduced when assets with accumulated gains are:
• Revalued downwards or impaired and the gains are lost
• Used in the provision of services and the gains are consumed through depreciation, or
• Disposed of and the gains are realised.
The reserve contains only revaluation gains accumulated since 1 April 2007, the date that the Reserve
was created. Accumulated gains arising before that date are consolidated into the balance on the Capital
Adjustment Account.
32.2 Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different arrangements
for accounting for the consumption of non-current assets and for financing the acquisition, construction
or additions to those assets under statutory provisions. The Account is debited with the cost of
acquisition, construction or subsequent costs as depreciation, impairment losses and amortisations
which are charged to the Comprehensive Income and Expenditure Statement (with reconciling postings
from the Revaluation Reserve to convert current and fair value figures to a historical cost basis). The
Account is credited with the amounts set aside by the Council as finance for the costs of acquisition,
construction and subsequent costs.
The Account contains accumulated gains and losses on Investment Properties.
The Account also contains revaluation gains accumulated on Property, Plant and Equipment before 1
April 2007, the date the Revaluation Reserve was created to hold such gains.
32.3 Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing differences arising from the different
arrangements for accounting for income and expenses relating to certain financial instruments and for
bearing losses or benefiting from gains per statutory provisions. The Council uses the Account to
manage premiums paid on the early redemption of loans. Premiums are debited to the Comprehensive
Income and Expenditure Statement when they are incurred, but reversed out of the General Fund
Balance to the Account in the Movement in Reserves Statement. Over time, the expense is posted back
to the General Fund Balance in accordance with statutory arrangements for spreading the burden on
Council Tax.

Page 208

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 118 
32.4 Pensions Reserve
The Pensions Reserve absorbs the timing differences arising from the different arrangements for
accounting for post-employment benefits and for funding benefits in accordance with statutory
provisions. The Council accounts for post-employment benefits in the Comprehensive Income and
Expenditure Statement as the benefits are earned by employees accruing years of service, updating the
liabilities recognised to reflect inflation, changing assumptions and investment returns on any resources
set aside to meet the costs. However, statutory arrangements require benefits earned to be financed as
the Council makes employer’s contributions to pension funds. The Pensions Reserve shows a negative
position at the end of 2023-24 due to the impact of the inclusion of the asset ceiling to meet the
requirements of IAS 19. 
32.5 Accumulated Absences Account
The Accumulated Absences Account absorbs the differences that would otherwise arise on the General
Fund Balance from accruing for compensated absences earned but not taken in the year, e.g. annual
leave entitlement carried forward at 31 March. Statutory arrangements require that the impact on the
General Fund Balance is neutralised by transfers to or from the Account. 
33 USABLE RESERVES
Movements in the Council’s usable reserves are detailed in the Statement of Movement in
Reserves. 
33.1 Capital Funds
The Council holds two funds which make up the Capital Funds total in the Statement of Movement in
Reserves, these are:
Usable Capital Receipts Reserve
During the 2006-07 financial year, and prior to the transfer of the Council’s housing stock during
November 2006, the receipts from the sale of council houses were transferred to the Usable Capital
Receipts Reserve. The amounts held in this reserve can only be used for social housing capital
expenditure.
Capital Fund
During the 2007-08 financial year the Council established a Capital Fund under Section 22 of Schedule
3 of the Local Government (Scotland) Act 1975. All receipts from capital disposals are to be paid into
this fund with effect from 14 February 2008.
The movement in the Usable Capital Receipts Reserve and Capital Fund are as follows:
Usable
Capital
Receipts
Reserve
Capital    
Fund
Total     
Capital
Funds
£'000 £'000 £'000
Balance at 1 April 2023 2,935        1,568         4,503       
Proceeds of Disposals -                 671             671            
Transfer to Capital Adjustment Account -                 (2,207)          (2,207)        
Contribution to Capital Fund From Revenue -                 -                  -                
Interest Earned 145             85               230            
Balance at 31 March 2024 3,080        117            3,197       
Movements in 2023-24

Page 209

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 119 
33.2 Repairs and Renewals Fund
The movement in the Education Repairs and Renewals Fund is as follows:
Balance at
1 April
2023
Contribution
from
Revenue
Interest
Earned
Contribution
to Revenue
Balance at
31 March
2024
£'000 £'000 £'000 £'000 £'000
Education 2,916          (860)            135             572             2,763         
Total 2,916        (860)           135           572            2,763       
Movements in 2023-24
34 CONTINGENT LIABILITIES
34.1 Equal Pay Claims
The Council settled a number of equal pay claims during 2017-18, however there are a small number
remaining where the outcome of the applications are unknown and there is insufficient information to
allow the potential cost of these claims to be provided for. There is also the potential for other equal pay
claims whose costs may be met by the Council.
34.2 Goodwin Judgement
The Social Security Act 1986 introduced changes to survivor pensions which resulted in most public
service pension schemes providing survivor benefits to widowers (male survivors in opposite-sex
marriages) based on the female spouse’s service from 6 April 1988 onwards. Since the introduction of
civil partnerships and same sex marriages, public service pension schemes have provided survivor
benefits in respect of both which have been in line with those paid to widowers. An employment tribunal
(the Goodwin case) concluded on 30 June 2020 that a female member in an opposite sex marriage is
treated less favorably than a female in a same sex marriage or civil partnership, and that treatment
amounts to direct discrimination on grounds of sexual orientation. Where schemes contain provisions
deemed discriminatory, those provisions must be dis-applied as being contrary to the non-discrimination
rule set out in section 61 of the Equality Act 2010. In light of this ruling the Chief Secretary to the Treasury
has confirmed that amendments would be made to the Teachers’ Pension Scheme and other public
service pension schemes so that “surviving male same-sex and female same-sex spouses and civil
partners will, in certain cases, receive benefits equivalent to those received by widows of opposite sex
marriages” 
There is still uncertainty surrounding the potential remedy to the Goodwin judgement however the
Council’s actuaries have estimated the potential impact of implementing a solution to correct the past
underpayment of spouses’ benefits to be circa 0.1% of gross obligations. This would amount to £0.669m
at 0.1% for the Council.  As there is still uncertainty over the remedy and the potential impact no provision
has been made in the accounts at the current time. 
34.3 SRC Intromissions 
The Local Government (Transitional Financial Provisions) (Scotland) Order 1996, ‘the Order’ provided for
the appointment of Glasgow City Council (GCC), as the relevant Accounting Authority for residual matters
relating to the former Strathclyde Regional Council (SRC), on behalf of the successor authorities. This
places a duty on GCC to account to successor authorities in respect of all expenditure and income
attributable to its duties as Accounting Authority, to be shared across successor authorities on a Council
Tax Band D Equivalent basis. 
Actual claims to date have already been accounted for within the financial statements however an

Page 210

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 120 
exercise has now been completed by GCC to collate known information in relation to any outstanding ex-
SRC cases. This information and information already known to GCC was identified within the claims
management system giving a total of 256 outstanding claims at this time. All outstanding claims has been
assigned an estimated cost, however they have not yet been subject to any due diligence by the council’s
claim team and must therefore be considered notional. The actual settlement value remains uncertain
until the legal/settlement process has been completed. 
34.4 Other Legal Challenges
There may be other legal challenges on-going which could result in future liabilities. 
35 TERMINATION BENEFITS 
A number of savings options have been agreed at Council budget meetings to balance the Council budget.
A number of these savings options were reliant on a reduction in the Councils staffing levels.  The Council
had forewarning of the level of savings required to balance the budget and had previously asked all Council
employees to express an interest in voluntary redundancy. As a result of the budget savings options
approved by the Council a number of employees have had their redundancy application accepted. 
Redundancy costs have been incurred by the Council since the 2010-11 financial year in relation to the
budget savings agreed. In each year, provision was made within the financial year for the costs of all
employees who had accepted redundancy or where redundancy was probable as at 31 March ending that
year, including accounting for costs for employees who confirmed redundancy by 31 March but left or were
leaving after this date.   
Termination costs for all Council employees who have accepted redundancy by 31 March 2024 are
recognised in the Exit Packages note in 2023-24, or in previous financial years.  The total cost recognised
in the Exit Packages note in 2023-24 is £0.276m for 4 employees and in 2022-23 was £0.622m for 10
employees.  These costs are detailed further in the Remuneration Report on page 50. 
The reduction in the staffing establishment includes posts from all services across the Council and
reductions were in line with the savings agreed by the Council. There will be further redundancy costs
incurred as the Council is required to make further savings to balance the budget in future years and the
council have earmarked monies from the loans fund one-off reprofiling gain.

Page 211

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 121 
36 TRUST FUNDS AND OTHER THIRD PARTY FUNDS
The Council acts as sole or custodian trustee for 57 trust funds. The funds do not represent assets of
the Council, and as such have not been included in the Balance Sheet.
Funds for which the Council act as sole trustee:
Income Expenditure Net Assets Reserves
£'000 £'000 £'000 £'000
23              17               707             707            
3                3                 67              67              
35              -                 1,208          1,208          
22              16               470             470            
Total Trust Funds 83             36              2,452        2,452        
Argyll Education Trust
GM Duncan Trust
MacDougall Trust
Various Other Trust Funds
Argyll Education Trust: this is made up of a number of small trusts to award prizes, bursaries, etc. to
pupils and ex-pupils of schools within the former Argyll County Council area. GM Duncan Trust: for the
provision of fuel, clothing and foodstuffs for the needy of Campbeltown. MacDougall Trust: for the
provision of sheltered housing on the Ross of Mull.
Further information on the Trust Funds, administered by the Council, can be obtained from Financial
Services within the Chief Executive’s Unit.
A number of the trust funds administered by the Council are charitable trusts and as such are required
to comply with current Office of the Scottish Charities Regulator (OSCR) financial reporting
requirements. Arrangements have been put in place to ensure that all charities administered by the
Council comply and will continue to comply with these requirements. 
37 COMMON GOOD FUNDS
The Council administers the Common Good Accounts for the former Burghs of Oban, Campbeltown,
Rothesay, Dunoon, Lochgilphead, Inveraray, Cove and Kilcreggan. The figures below summarise the
aggregate income and expenditure for the year as well as providing a snapshot picture of the assets
and liabilities at 31 March 2024. The Common Good Funds are for the benefit of the geographical areas
of the former burghs. Further information on the Common Good Funds can be obtained from Financial
Services. 
37.1 Common Good Income and Expenditure Account for the year ended 31 March 2024 
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
£'000 £'000 £'000 £'000 £'000 £'000
258        74          332        Expenditure 129        54          183       
(57)         (42)         (99)         Income (232)       (150)       (382)      
201       32         233       (Surplus)/Deficit for the Year (103)      (96)        (199)     
2022-23 2023-24

Page 212

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 122 
37.2 Common Good Balance Sheet at 31 March 2024 
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
Oban
Common
Good
Other
Common
Goods
Total
Common
Good
£'000 £'000 £'000 £'000 £'000 £'000
5,711      319        6,030      Tangible Fixed Assets 5,622     319        5,941    
1,939      1,148      3,087      Investments 2,113     1,252     3,365    
147        183        330        Current Assets 171        176        347       
(15)         -         (15)         Current Liabilities (21)         (1)           (22)        
7,782    1,650    9,432    Total Assets less Liabilities 7,885    1,746    9,631   
5,711      323        6,034      Revaluation Reserve 5,620     323        5,943    
2,071      1,327      3,398      Common Good Fund 2,263     1,423     3,686    
7,782    1,650    9,432    Total Net Worth 7,883    1,746    9,629   
2022-23 2023-24
38 TAX INCREMENTAL FINANCING (TIF) PROJECTS 
The Council entered into an agreement with the Scottish Government in May 2014 in respect of the Lorn
Arc Tax Incremental Finance (TIF) scheme. This agreement essentially allows for the repayment of debt
arising from infrastructure investment from incremental Non-Domestic Rates (NDR) revenue. 
The assets to be funded by the TIF project largely comprise public realm and infrastructure
improvements within the Lorn Arc area of Oban. The project is for 25 years, with the first material capital
investment incurred during the financial year ended 31 March 2015. 
During the TIF project period, the Council is entitled to retain the TIF revenue from its NDR revenue, a
pro-rata amount of NDR equal to the amount (if any) by which the collected amount exceeds the
collectable amount. The Council is required to apply 100% of the TIF revenue towards repayment of the
TIF debt. If all projects are delivered and debt is fully paid, the Council can retain 50% of the TIF revenue
for further infrastructure investment until the end of the TIF period. 
Net capital expenditure incurred in the year to 31 March 2024, to be funded from borrowing, in respect
of TIF assets totalled £0.016m (2022-23 £0.023m). This is reflected in the “Summary of Capital
Expenditure and Financing” outlined within Note 15.4. The total TIF debt to be repaid over the project
period, in respect of investment to 31 March 2024, has been calculated in accordance with finance
circular No. 4/2014 at £1.027m (2022-23 £1.011m).
There is a retention of £0.804m of TIF income during 2023-24 (2022-23 £0.623m) to repay the notional
borrowing for TIF. Principal sums accumulated by 2023-24 amount to £0.139m (2022-23 £0.137m) and
cumulative interest £0.118m (2022-23 £0.117m) resulting in a net cumulative surplus of £2.551m (2022-
23 £1.749m) which will be used to pay down TIF debt per the TIF agreement and the balance of £1.663m
will be placed in earmarked reserves to be used in future years to repay debt costs.

Page 213

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 123 
39 CASH FLOW STATEMENT – OPERATING ACTIVITIES
The Net Cash Flows for Operating Activities can be reconciled to the Net (Surplus)/Deficit on the
Provision of Services as follows:
2022-23 2023-24
£'000 £'000
6,047        Net (Surplus)/Deficit on Provision of Services (9,765)      
3,356        Statutory Adjustments through Statement of Movement in Reserves 16,341     
322           Transfer to/from Other Statutory Reserves 77            
288           Increase/(Decrease) in Inventories (87)           
6,355        Increase/(Decrease) in Debtors 12,763     
(6,503)       (Increase)/Decrease in Creditors and Provisions (3,246)      
(16,041)     Earmarked Reserves (1,532)      
(2,938)       Capital Financed from Current Revenue (1,616)      
(4,277)       Loans Fund Repayments (6,111)      
(1,872)       Other Revenue Adjustments 4,996       
(21,310)     21,585     
11,071      Non Cash Capital 10,743     
(5,116)       Capital Element of Finance Lease Payments (449)         
5,955        10,294     
(9,308)       Net Cash Flows from Operating Activities 22,114     
6,742        Interest Paid on Borrowings 5,097       
8,887        Interest Paid on Finance Leases 8,599       
(748)          Interest Received on Bank Deposits (3,469)      
14,881      Net Cash Outflow from Servicing of Finance 10,227     
Adjustments to Net (Surplus)/Deficit on the Provision of Service for Non
Cash Movements:
Adjustments for items included in the Net (Surplus)/Deficit on the
Provision of Services that are Investing and Financing Activities:
The cash flows for Operating Activities include the following items:
40 CASH FLOW STATEMENT – INVESTING ACTIVITIES
The cash flows for Investing Activities include the following items:
2022-23 2023-24
£'000 £'000
25,659      25,221     
(17,500)     (37,500)    
(568)          (671)         
(21,914)     (25,687)    
(14,323)     Net Cash Outflow from Investing Activities (38,637)    
Purchase of Property, Plant and Equipment, Investment Property and
Intangible and Heritage Assets
Proceeds from the Sale of Property, Plant and Equipment and Investment
Property
Other Receipts from Investing Activities
Investments made/(disposed of) during year

Page 214

Notes to the Financial Statements 
www.argyll-bute.gov.uk  ______________________________________________ Page 124 
41 CASH FLOW STATEMENT – FINANCING ACTIVITIES
The cash flows for Financing Activities include the following items: 
2022-23 2023-24
£'000 £'000
(35,228)     (31,128)    
2,021        (1,072)      
5,116        5,280       
70,627      54,257     
42,536      Net Cash (Inflow)/Outflow from Financing Activities 27,337     
Cash Payments for the Reduction of the Outstanding Liabilities relating to
Finance Leases and on Balance Sheet PFI Contracts
Other Receipts from Financing Activities
Repayments of Short and Long Term Borrowing
Cash Receipts of Short and Long Term Borrowing

Page 215

Council Tax Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 125 
The Council Tax Income Account shows the gross income raised from council tax levied and deductions
made under the Local Government Finance Act 1992. The resultant net income is transferred to the
Comprehensive Income and Expenditure Statement of the Council. 
2022-23 2023-24
Actual Actual
£'000 £'000
72,340    Gross Council Tax Levied and Contributions in Lieu excluding RSL Second
Home Additional Income 76,511
Less:
(13,269)   Other Discounts and Reductions (14,008)
(4,300)     Cost of living contribution  (grant funded) -
(1,411)     Provision for Bad and Doubtful Debts (1,490)
53,360  Total 61,013
540        Adjustment to Previous Years' Community Charge and Council Tax 896
53,900  Transfers to General Fund 61,909

Page 216

Notes to the Council Tax Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 126 
1. CALCULATION OF THE COUNCIL TAX
Dwellings are valued by the Assessor and placed within a valuation band ranging from the lowest “A” to
the highest “H”. The Council Tax charge is calculated using the Council Tax Base, Band D equivalent
as below. This value is then decreased or increased dependent upon the band of the dwelling. The
charge for each band for 2023-24 was as follows:
Band Valuation Band £ per year
A Up to £27,000 986.13
B £27,001 - £35,000 1,150.49
C £35,001 - £45,000 1,314.84
D £45,001 - £58,000 1,479.20
E £58,001 - £80,000 1,943.50
F £80,001 - £106,000 2,403.70
G £106,001 - £212,000 2,896.77
H Over £212,000 3,624.04
6/9
7/9
8/9
9/9
473/360
585/360
705/360
882/360
Ratio Band D
2. CALCULATION OF THE COUNCIL TAX BASE 2023-24 
Council Tax Base A B C D E F G H Total
Total Number of Properties 7,447 10,136 9,564 6,415 7,769 4,520 3,035 258 49,144
Less - 1,036 792 1,003 534 637 271 167 52 4,491
- 932 1,145 821 494 471 229 123 6 4,220
Effective Number of Properties 5,479 8,199 7,740 5,388 6,661 4,021 2,746 201 40,434
Band D Equivalent Factor (ratio) 67% 78% 89% 100% 131% 163% 196% 245%
3,653 6,377 6,880 5,388 8,752 6,533 5,378 491 43,452
Add Contribution in lieu in respect of Class 18 dwellings (Band D Equivalent) 518
Nominal Tax Yield 43,970
Less Provision for Council Tax Reduction Scheme 9.08% 3,994
Council Tax Base 2023-24 - Number of Band D equivalents 39,976
Exemptions /
Deductions
Adjustment for Single
Chargepayers
Band D Equivalent Number of
Properties

Page 217

Non Domestic Rate Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 127 
The Non-Domestic Rate Income Account is an agent’s statement that reflects the statutory obligation
for billing authorities to maintain a separate Non-Domestic Rate Account. The statement shows the
gross income from the rates and deductions made under the Local Government (Scotland) Act 1975 as
amended by the Local Government Finance Act 1992 on non-domestic property. The net income is paid
to the Scottish Government as a contribution to the national non-domestic rate pool.
2022-23 2023-24
Actual Actual
£'000 £'000
56,489    Gross rates levied and Contributions in Lieu 68,224
Less:
(17,430)   Reliefs and other deductions (21,766)
-         Payment of Interest -        
(391)       Write-off of Uncollectable Debts and Allowance for Impairment (464)
38,668  Total Net Non-Domestic Rate Income 45,994
(3,487)     Adjustments for prior years (858)      
-         Business Rate Incentivisation Scheme (BRIS) NDR Income Retained -
(647)       Tax Incremental Finance (TIF) Scheme NDR Income Retained (804)
34,534  Contribution to National Non-Domestic Rate Pool 44,332
(1,355)     Difference between Distributable and Contributable NDR Income amounts (6,687)
33,179  Distribution from Non-Domestic Rate Pool credited to
Comprehensive Income and Expenditure Statement 37,645

Page 218

Notes to the Non Domestic Rate Income Account 
www.argyll-bute.gov.uk  ______________________________________________ Page 128 
1. ANALYSIS OF RATEABLE VALUES
2022-23 2023-24
£ £
9,490,265 Industrial and freight transport subjects 11,125,355
74,472,465
Miscellaneous including Telecomms, Rail, Gas and Electricity
Companies 87,231,569
Commercial subjects:
13,921,035  Shops 16,202,980
5,773,370  Offices 6,187,070
8,818,450  Hotels, Boarding Houses etc. 13,919,931
1,916,145  Others 2,395,685
114,391,730 Total Rateable Value 137,062,590   
2. NON-DOMESTIC RATE CHARGE 
2022-23 2023-24
Pence Pence
49.8p Rate Per Pound 49.8p
1.3p
Supplementary Rate Per Pound for Properties between £51,000 and
£95,000 1.3p
2.6p Supplementary Rate Per Pound for Properties over £95,000 2.6p 
3. CALCULATION OF RATE CHARGE FOR EACH PROPERTY
The rates charge for each subject is determined by the rateable value placed upon it by the Assessor
multiplied by the Rate per £ announced each year by the Government.

Page 219

Group Accounts - Introduction 
www.argyll-bute.gov.uk  ______________________________________________ Page 129 
INTRODUCTION
The Code of Practice on Local Authority Accounting in the United Kingdom 2023-24: Based on
International Financial Reporting Standards, places a requirement on Councils to consider all their
interests in external organisations including limited companies and other statutory bodies. Where the
interest is considered to be material, the Council is required to prepare a full set of group accounts in
addition to those prepared for Argyll and Bute Council. The Group Accounts are designed to show “a
true and fair view” of the financial performance and position of the Council’s Group.
THE GROUP ACCOUNTS
The Group Accounts comprise the following financial statements:
• Group Statement of Comprehensive Income and Expenditure: this statement shows the
accounting cost in the year of providing the Council’s services and its share of the results of its
associates in accordance with International Financial Reporting Standards, rather than the
amount to be funded from taxation. Local authorities raise taxation to cover expenditure in
accordance with regulations, and this is different from the accounting cost. The taxation position
is shown in the Statement of Movement in Reserves.
• Group Balance Sheet: The Balance Sheet is a snapshot of the value at the 31 March 2024 of
the assets and liabilities recognised by the Council and its share of the net assets or liabilities of
its associates and Common Good funds. The net assets of the Council (assets less liabilities)
are matched by the reserves held by the Council. The net investment or liability in its associates
is matched by its share of the reserves of the associates (i.e. its group reserves).
• Group Statement of Movement in Reserves: this statement shows the movement in the year
on the reserves held by the Council plus its share of the reserves of its associates. The Common
Good reserves are also fully consolidated into the Group Accounts. The Council’s reserves are
analysed into those which are “Usable Reserves” (i.e. those that can be applied to fund
expenditure or reduce local taxation) and other reserves. The Council’s share of the reserves of
Associates is an unusable reserve (i.e. it cannot be used to fund expenditure or reduce taxation).
The Council’s Statement of Movement in Reserves gives a more detailed analysis of the
movement in the Council’s usable and unusable reserves during 2023-24.
• Group Cash Flow Statement: The Cash Flow Statement shows the changes in cash and cash
equivalents of the Council and its associates Common Good Funds. The statement shows how
the Group generates and uses cash and cash equivalents by classifying cash flows as operating,
investing and financing activities. The amounts of net cash flow arising from operating activities
is a key indicator of the extent to which the operations of the Group are funded by way of taxation
and grant income or from the recipients of services provided by the Group. Investing activities
represent the extent to which cash outflows have been made for resources which are intended
to contribute to the Group’s future service delivery. Cash flows arising from financing activities
are useful in predicting claims on future cash flows by providers of capital (i.e. borrowing) to the
Group.

Page 220

www.argyll-bute.gov.uk  ____________________________________________________________________________________ Page 130 
Group Statement of Comprehensive Income and Expenditure 
Gross
Expenditure
Gross
Income
Net
Expenditure
Gross
Expenditure
Gross
Income
Net
Expenditure
£'000 £'000 £'000 Service £'000 £'000 £'000
26,810          18,209        8,601             Chief Executive and Financial Services 1,281             95               1,186           
160,700        25,514        135,186         Executive Director - Douglas Hendry 159,449         25,620        133,829        
109,504        39,545        69,959           Executive Director - Kirsty Flanagan 137,148         62,322        74,826         
174,434        94,948        79,486           Health and Social Care Integration 181,285         103,209       78,076         
10,228          2,303          7,925             Other Non-Departmental Costs 9,979             678             9,301           
1,577            (837)            2,414             Associates and Joint Ventures Accounted for on an Equity Basis 1,364             2,716          (1,352)          
483,253      179,682     303,571       Net Cost of Services 490,506       194,640     295,866      
Other Operating Income and Expenditure:
(437)              Net (Gain)/loss on Disposal of Fixed Assets (262)             
1,643             Other Operating Income and Expenditure 1,670           
1,206 Total Other Operating Income and Expenditure 1,408          
Financing and Investment Income and Expenditure:
10,416           Interest Payable and Similar charges 14,037         
(2,966)            Interest and Investment Income (4,881)          
141               Net Pension Interest Expense (6,596)          
7,591 Total Financing and Investment Income and Expenditure 2,560          
Taxation and Non-Specific Grant Income:
(191,775) General Government Grants (187,193)       
(22,549) Government Capital Grants and Other Capital Contributions (23,550)        
(33,826) Non-domestic Rates Redistribution and Retained Non-domestic Rates (TIF & BRIS) (38,449)        
(53,900) Council Tax Income (61,909)        
(302,050) Total Taxation and Non-Specific Grant Income (311,101)    
10,318 (Surplus)/Deficit on Provision of Services (11,267)      
(21,104) (Surplus)/Deficit on revaluation of Fixed Assets (10,097)        
(159,031) Other Post Employment Benefits (Pensions) 165,164        
0 Share of Other Comprehensive Income and Expenditure of Associates and Common Good Funds 2                 
(180,135)      Other Comprehensive Income and Expenditure 155,069      
(169,817)      Total Comprehensive Income and Expenditure 143,802      
2022-23 2023-24

Page 221

Group Balance Sheet 
www.argyll-bute.gov.uk  ________________________________________________ Page 131 
£'000 £'000 £'000 £'000
Long Term Assets
Property Plant & Equipment
451,018    - Other Land and Buildings    457,369
10,872      - Vehicles, Plant, Furniture and Equipment      11,012
235,076    - Infrastructure Assets    239,372
14,922      - Community Assets 15,051     
3,286        - Surplus Assets        4,620
21,440      - Assets Under Construction 35,724     
736,614    Total Property Plant & Equipment 763,148      
2,345        Heritage Assets 2,569         
733          Intangible Assets 888            
2,553        Investment Property 2,514         
5,880        Long-Term Debtors 5,816         
8,579        Long-Term Investments 3,857         
139,014    Other Long-Term Debtors (Pensions) -                
296          Investment in Associates and Joint Ventures 299            
896,014  Total Long Term Assets 779,091    
Current Assets
1,145        Inventories 1,059       
27,256      Short Term Debtors (Net of Impairment) 38,544     
1,554        Assets Held for Sale 1,619       
60,000      Short Term Investments 27,500     
3,279        Cash and Cash Equivalents (7,923)      
8,927        Investment in Associates and Joint Ventures 10,238     
102,161  Total Current Assets 71,037      
Current Liabilities
(11,676)     Short-term Borrowing (13,323)    
(50,725)     Short-term Creditors (53,076)    
(1,450)       Provisions (1,665)      
(5,280)       Other Short Term Liabilities (5,336)      
(45)           Liabilities in Associates and Joint Ventures (6)            
(69,176)   Total Current Liabilities (73,406)     
Long-term Liabilities
(132,155)   Borrowing Repayable within a Period in
Excess of 12 Months
(107,458)  
(107,033)   Other Long-term liabilities (101,697)  
(75)           Other Long-term liabilities (Pensions) (19,578)    
(2,444)       Provisions (2,855)      
-               Capital Grant Receipts in Advance (1,564)      
-               Liabilities in Associates and Joint Ventures (78)          
(241,707) Total Long-term Liabilities (233,230)   
687,292  Total Assets less Liabilities 543,492    
31 March 202431 March 2023

Page 222

Group Balance Sheet 
www.argyll-bute.gov.uk  ________________________________________________ Page 132 
£'000 £'000 £'000 £'000
Unusable Reserves
174,952    - Revaluation Reserve 180,661   
268,788    - Capital Adjustment Account 249,093   
(1,871)       - Financial Instruments Adjustment Account (1,585)      
139,014    - Pensions Reserve (19,578)    
(7,588)       - Accumulated Absences Account (8,272)      
573,295    400,319      
Usable Reserves
4,503        - Capital Funds 3,197       
2,916        - Repairs and Renewals Funds 2,763       
86,356      - General Fund Balance 115,741   
93,775      121,701      
10,791      Group Reserves 11,846        
9,431        Common Good Reserves 9,626         
687,292  Total Reserves 543,492    
31 March 202431 March 2023
The Unaudited Annual Accounts were issued on 27 June 2024 and the Audited Annual Accounts were
authorised for issue on 20 December 2024. 
Kirsty Flanagan
Section 95 Officer
20 December 2024

Page 223

Group Statement of Movement in Reserves 
www.argyll-bute.gov.uk  __________________________________________________________________________________ Page 133 
Movements in 2023-24
General
Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total
Usable
Reserves
Total
Unusable
Reserves
Total
Reserves
of the
Council
Total Live
Argyll
Reserves
Usable
Total Live
Argyll
Reserves
Unusable
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 31 March 2023 (86,356)     (2,916)      (4,503)      (93,775)     (573,295)   (667,070)   (9,103)      (1,689)      -           (9,431)      (687,293)  
(Surplus)/Deficit on Provision of Services (9,765)      -           -           (9,765)      -           (9,765)      (1,352)      49            -           (198)         (11,266)    
Other Comprehensive Income and Expenditure (36,038)     -           -           (36,038)     190,855    154,817    2              250          -           -           155,069   
Total Comprehensive Income and Expenditure (45,803)     -           -           (45,803)     190,855    145,051    (1,350)      299          -           (198)         143,802   
Total Statutory Adjustments (See Page 55 to 56) 20,630      -           (671)         19,959      (19,959)     -           -           -           -           -          
Net (Increase)/Decrease before Transfers to
Other Statutory Reserves (25,173)     -           (671)         (25,844)     170,896    145,051    (1,350)      299          -           (198)         143,802   
Transfer to/from Other Statutory Reserves 77            153          1,977       2,207       (2,207)      -           -           -           -           -           -          
Adjustments permitted by Accounting Standards (4,289)      -           -           (4,289)      4,289       -           -          
(Increase)/Decrease in Year (29,385)     153          1,306       (27,926)     172,976    145,051    (1,350)      299          -           (198)         143,802   
Balance at 31 March 2024 Carried Forward (115,741)   (2,763)      (3,198)      (121,702)   (400,319)   (522,020)   (10,453)     (1,390)      -           (9,629)      (543,492)  
Council's
Share of
Reserves
of
Associates
Total
Common
Good
Reserves
Total
Reserves
Other Transfers required by Statute
Argyll and Bute Council
Usable Reserves

Page 224

Group Statement of Movement in Reserves 
www.argyll-bute.gov.uk  __________________________________________________________________________________ Page 134 
Comparative Movements in 2022-23
General
Fund
Balance
Repairs
and
Renewals
Fund
Capital
Funds
Total
Usable
Reserves
Total
Unusable
Reserves
Total
Reserves
of the
Council
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Balance at 31 March 2022 (96,081)    (2,682)      (4,414)      (103,177)  (394,483)   (497,660)    (11,647)       (2,055)      3,550       (9,664)     (517,476)   
Surplus/(Deficit) on Provision of Services 6,047 - - 6,047 -           6,047        2,416          1,625       -           233        10,321
Other Comprehensive Expenditure and Income - - - - (175,454) (175,454)    128            (4,809)      -           -         (180,136)
Total Comprehensive Expenditure and Income 6,047 -         -         6,047 (175,454) (169,407) 2,544        (3,184)     -          233       (169,815) 
Total Statutory Adjustments (See Page 57 to 58) 6,979      -         (568)       6,411     (6,411)     -           -            3,550      (3,550)     -        -          
Net (Increase)/Decrease before Transfers to
Other Statutory Reserves 13,026    -         (568)       12,458   (181,865) (169,407)  2,544        366         (3,550)     233       (169,815) 
Transfer to/from Other Statutory Reserves 322          (234)         480          568         (568) -               -               -               -              -                 -  
Adjustments permitted by Accounting Standards (3,623)      (3,623)     3,623
(Increase)/Decrease in Year 9,725      (234)       (88)         9,403     (178,810) (169,407)  2,544        366         (3,550)     233       (169,815) 
Balance at 31 March 2023 Carried Forward (86,356) (2,916) (4,503) (93,775) (573,295) (667,070) (9,103) (1,689) 0 (9,431) (687,292)
Other Transfers
Total
Common
Good
Reserves
Total
Reserves
Other Transfers required by Statute
Argyll and Bute Council
Usable Reserves
Council's
Share of
Reserves of
Associates
Total Live
Argyll
Reserves
Usable
Total Live
Argyll
Reserves
Unusable

Page 225

Group Cash Flow Statement 
www.argyll-bute.gov.uk _____________________________________   Page 135 
2022-23 2023-24
£'000 Group Note £'000
10,318     Net Deficit on the Provision of Services (11,267)   
(26,155)     Adjustments to net surplus or deficit on the provision of services for
non-cash movements 26,740      
5,809        Adjustments for items included in the net surplus or deficit on the
provision of services that are investing and financing activities 5,741        
(10,028)   Net Cash OutFlow from Operating Activities 8 21,214     
(13,252)     Investing Activities 9 (37,362)     
42,536      Financing Activities 10 27,350           
19,256 Net (Increase)/Decrease in Cash and Cash
Equivalents 11,202     
(22,535)     Cash and Cash Equivalents at the beginning of the Reporting
Period (3,279)       
(3,279)     Cash and Cash Equivalents at the end of the
Reporting Period 7,923

Page 226

Notes to the Group Financial Statements 
www.argyll-bute.gov.uk _____________________________________   Page 136 
1. GROUP ACCOUNTING POLICIES
The group accounts are prepared in accordance with the policies set out in Note 1 to the Financial
Statements. 
2. COMBINING ENTITIES
The Council has an interest in a number of Associate Entities. For the purposes of consolidation and
incorporation within the Group Accounts recognition has been made of the Council’s significant influence
over Joint Boards and other entities.
The Associates which have been incorporated are:
• Dunbartonshire and Argyll & Bute Valuation Joint Board
Under accounting standards, the Council is required to include the results of the above organisations as
“associates” because it has “significant influence” over their financial and operating policies. The Council
has no shares in or ownership of any of these organisations which are entirely independent of the
Council under law and for taxation.
Live Argyll is a wholly owned subsidiary of Argyll and Bute Council and is consolidated within the group
accounts on a line by line basis.
The accounting period for all entities is 31 March 2024. 
3. NON MATERIAL INTEREST IN OTHER ENTITIES
The Council has an interest in Scotland Excel. Scotland Excel took up the activities of the Authorities
Buying Consortium and similar bodies across the Scottish Local Authority sector on 1 April 2008.
Renfrewshire Council prepare the financial statements for Scotland Excel in its role as lead authority.
Scotland Excel is a not-for-profit organisation funded mainly by the 32 participating Scottish Local
Authorities. The Council contributed £0.065m towards Scotland Excel in the 2023-24 financial year.
The Council also has an interest in the Highlands and Islands Transport Partnership (HITRANS). The
Partnership was established as one of the seven Scottish Regional Transport Partnerships. The
Transport (Scotland) Act 2005 requires these Partnerships to prepare Transport Strategies for their
regions which will enhance economic well-being; promote safety; social inclusion and equal opportunity;
plan for a sustainable transport system; and integrate across boundaries with other partnerships.
The Council has an interest in 57 Trust Funds where it acts as sole or custodian trustee. The funds do
not represent assets of the Council.
These entities are part of the Council’s group for the purposes of Group Accounts. As such it is
recognised that the nature of the relationship with these bodies should be included within these notes.
However, it has been decided that the Council’s share of the net worth of these entities is not material
to a fair understanding of the financial position of the Council, and so they have not been consolidated
into the Group Accounts.
The Council inherited its interest in these entities following the reorganisation of local government in
1996. 
4. ARGYLL AND BUTE INTEGRATION JOINT BOARD
The Argyll and Bute Integration Joint Board was established as a body corporate by order of Scottish
Ministers on 27 June 2015. The partnership between the Council and NHS Highland has been
established in accordance with the provisions of the Public Bodies (Joint Working)(Scotland) Act 2014
and associated Regulations. The Integration Joint Board has responsibility for all health and social care
functions relating to adults and children and will oversee the Strategic Planning and budgeting of these,
together with corresponding service delivery for the residents of Argyll and Bute. The Council contributed

Page 227

Notes to the Group Financial Statements 
www.argyll-bute.gov.uk _____________________________________   Page 137 
£77.604m towards the Argyll and Bute Integration Joint Board in the 2023-24 financial year.
The Council and NHS Highland are required to treat the IJB as a Joint Venture in their annual accounts
and recognise a share of the overall surplus or deficit of the IJB for the year.
5. FINANCIAL IMPACT OF CONSOLIDATION
The effect of inclusion of the Associates, Joint Ventures, Subsidiaries and Common Good Funds on the
Group Balance Sheet is to increase both reserves and net worth by £21.472m. This gives an overall net
asset position for the Group of £543.492m.
All associates and subsidiaries have prepared their accounts on a ‘going concern’ basis. For the Joint
Valuation Board funding arrangements between the Scottish Government and constituent authorities
remains assured. In common with these public bodies, the Council’s Group Accounts have been
prepared on a ‘going concern’ basis as there is no reason to suggest that future funding will not continue.
6. FURTHER DETAILS ON CONSOLIDATION
Live Argyll
Live Argyll was established by Argyll and Bute Council and is limited by guarantee and was fully
incorporated and commenced trading on 2 October 2017. The Trust is a charitable company registered
in Scotland and provides a wide range of services within the Argyll and Bute area including libraries,
leisure facilities, halls, sports development and community centres the assets of which are owned by
the Council. During 2023-24 Argyll and Bute Council paid £3.835m in the form of a Management Fee to
Live Argyll and increased the overall net worth of the Group Balance Sheet by £1.389m. 
The board is made up of 3 independent board members, 3 Councillors and a Trade Union
representative. 
Dunbartonshire and Argyll and Bute Valuation Joint Board
This body was formed in October 1995 at Local Government reorganisation by a Statutory Instrument
and is responsible for the maintenance of the electoral, council tax and non-domestic rates registers for
Argyll and Bute, West Dunbartonshire and East Dunbartonshire Councils. The Board’s running costs
are met by the three Councils. During 2023-24 Argyll and Bute Council contributed £1.254m towards
estimated running costs and accounted for £0.084m of Balance Sheet Liabilities within the Group
Balance Sheet. The accounts of the Board are subject to independent audit and will be available from
the Valuation Joint Board’s website www.saa.gov.uk /dab-vjb/ and West Dunbartonshire Council’s
website https://www.west-dunbarton.gov.uk/council/performance-and-spending/service-
performance/financial-performance/  from 1 July 2023.
The following disclosures are also required for Dunbartonshire and Argyll and Bute Valuation Joint Board
because the Council’s interest exceeds the 25% threshold for accounting purposes:-
2022-23 2023-24
£'m £'m
Argyll and Bute Council has a 44.41% share of:
2.851        Gross Income 2.861         
0.453        Net (Surplus)/Deficit 0.209         
0.668        Long Term Assets 0.675         
0.972        Current Assets 0.670         
(0.101) Liabilities due within one year (0.014)        
Liabilities due over one year
(0.170)       Pension Asset/(Liability) (0.175)        
1.369        Capital and Revenue Reserves 1.156

Page 228

Notes to the Group Financial Statements 
www.argyll-bute.gov.uk _____________________________________   Page 138 
7. REPORTING AUTHORITY ADJUSTMENTS
A number of adjustments are required to the Council’s Statement of Comprehensive Income and
Expenditure (pages 51 to 52) for group accounting purposes. These can be summarised as follows:
• All intra-group transactions have been removed from the Group Accounts as part of
the subsidiary consolidation process.
• The Common Good Funds described in Note 37 of the Notes to the Financial
Statements on pages 120 to 121 have been fully consolidated into the Group
Accounts. This adjustment increases the net assets and reserves of Argyll and Bute
Council’s Group by £9.629m. 
8. PRIOR PERIOD ADJUSTMENTS
Prior period errors are omissions from, and misstatements in, the authorities financial statements for
one or more prior periods arising from a failure to use, or misuse of, reliable information that
a) Was available when the financial statements for those periods were authorized for issue; and 
b) Could reasonably be expected to have been obtained and taken into account in the preparation
and presentation of those financial statements. 
In the 2022-23 Group Financial Statements the final audited accounts were not available for either the
Valuation Joint Board or Live Argyll at the time of publishing the Councils Annual Accounts. These are
now available therefore the 2022-23 Group Accounts have been restated to reflect any changes. The
amendments mainly relate to changes in the Pension Asset/Liability.

Page 229

Notes to the Group Financial Statements 
www.argyll-bute.gov.uk _____________________________________   Page 139 
9. GROUP CASH FLOW STATEMENT – OPERATING ACTIVITIES 
2022-23 2023-24
£'000 £'000
10,318      Net (Surplus)/Deficit on Provision of Services (11,267)    
11,819      Statutory Adjustments through Statement of Movement in Reserves 16,341     
322           Transfer to/from Other Statutory Reserves 77            
(13,230)     Transfer Group Other Comprehensive Income and Expenditure
282           Increase/(Decrease) in Inventories (86)           
6,306        Increase/(Decrease) in Debtors 12,869     
(6,433)       (Increase)/Decrease in Creditors and Provisions (916)         
(16,041)     Earmarked Reserves (1,532)      
(2,938)       Capital Financed from Current Revenue (1,616)      
(2,477)       Loans Fund Repayments (6,111)      
(3,765)       Other Revenue Adjustments 7,714       
(26,155)     26,740     
10,925      Non Cash Capital 11,021     
(5,116)       Capital Element of Finance Lease Payments (5,280)      
5,809        5,741       
(10,028)     Net Cash Flows from Operating Activities 21,214     
6,742        Interest Paid on Borrowings 5,097       
8,887        Interest Paid on Finance Leases 8,599       
(748)          Interest Received on Bank Deposits (3,469)      
14,881      Net Cash Outflow from Servicing of Finance 10,227     
Adjustments to Net (Surplus)/Deficit on the Provision of Service for Non
Cash Movements:
Adjustments for items included in the Net (Surplus)/Deficit on the
Provision of Services that are Investing and Financing Activities:
The cash flows for Operating Activities include the following items:
10. GROUP CASH FLOW STATEMENT – INVESTING ACTIVITIES 
2022-23 2023-24
£'000 £'000
25,637      25,221     
(17,500)     (37,500)    
(568)          (671)         
1,093        1,275       
(21,914)     (25,687)    
(13,252)     Net Cash Outflow from Investing Activities (37,362)    
Investments made/(disposed of) during year
Purchase of Property, Plant and Equipment, Investment Property and
Intangible and Heritage Assets
Net Receipts from Investment in Associates and Joint Ventures
Proceeds from the Sale of Property, Plant and Equipment and Investment
Property
Other Receipts from Investing Activities

Page 230

Notes to the Group Financial Statements 
www.argyll-bute.gov.uk _____________________________________   Page 140 
11. GROUP CASH FLOW STATEMENT – FINANCING ACTIVITIES 
2022-23 2023-24
£'000 £'000
(35,228)     (31,128)    
2,021        (1,072)      
5,116        5,280       
70,627      54,257     
-               13            
42,536      Net Cash (Inflow)/Outflow from Financing Activities 27,350     
Other Payments from Financing Activities
Cash Receipts of Short and Long Term Borrowing
Other Receipts from Financing Activities
Cash Payments for the Reduction of the Outstanding Liabilities relating to
Finance Leases and on Balance Sheet PFI Contracts
Repayments of Short and Long Term Borrowing

Page 231

Independent Auditors Report 
www.argyll-bute.gov.uk _____________________________________   Page 141 
Independent auditor’s report to the members of Argyll and Bute
Council and the Accounts Commission
Report on the audit of the financial statements
Opinion on the financial statements
We certify that we have audited the financial statements in the annual accounts of Argyll and
Bute Council and its group for the year ended 31 March 2024 under Part VII of the Local
Government (Scotland) Act 1973. The financial statements comprise the Statement of
Comprehensive Income and Expenditure, the Balance Sheet, the Statement of Movement in
Reserves, the Cash Flow Statement, the Council Tax Income Account, and the Non-
domestic Rate Account, the Group Statement of Comprehensive Income and Expenditure,
the Group Balance Sheet, the Group Statement of Movement in Reserves, the Group Cash
Flow Statement and notes to the financial statements, including material accounting policy
information. The financial reporting framework that has been applied in their preparation is
applicable law and UK adopted international accounting standards, as interpreted and
adapted by the Code of Practice on Local Authority Accounting in the United Kingdom
2023/24 (the 2023/24 Code). 
In our opinion the accompanying financial statements: 
• give a true and fair view of the state of affairs of the Council and its group as at 31
March 2024 and of its income and expenditure of the Council and its group for the
year then ended; 
• have been properly prepared in accordance with UK adopted international
accounting standards, as interpreted and adapted by the 2023/24 Code; and 
• have been prepared in accordance with the requirements of the Local Government
(Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and
the Local Government in Scotland Act 2003. 
Basis for opinion
We conducted our audit in accordance with applicable law and International Standards on
Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. Our responsibilities under those standards are further
described in the auditor’s responsibilities for the audit of the financial statements section of
our report. We were appointed by the Accounts Commission on 18 May 2022. Our period of
appointment is five years, covering 2022/23 to 2026/27. We are independent of the Council
and its group in accordance with the ethical requirements that are relevant to our audit of the
financial statements in the UK including the Financial Reporting Council’s Ethical Standard,
and we have fulfilled our other ethical responsibilities in accordance with these requirements.
Non-audit services prohibited by the Ethical Standard were not provided to the Council and
its group. We believe that the audit evidence we have obtained is sufficient and appropriate
to provide a basis for our opinion. 
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the preparation
of the financial statements is appropriate.
Based on the work we have performed, we have not identified any material uncertainties
relating to events or conditions that, individually or collectively, may cast significant doubt on
the Council and its group’s ability to continue to adopt the going concern basis of accounting
for a period of at least twelve months from when the financial statements are authorised for
issue.  
These conclusions are not intended to, nor do they, provide assurance on the Council and
its group’s current or future financial sustainability. However, we report on the Council’s

Page 232

Independent Auditors Report 
www.argyll-bute.gov.uk _____________________________________   Page 142 
arrangements for financial sustainability in a separate Annual Audit Report available from the
Audit Scotland website.  
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of material
misstatement that we identified and our judgements thereon.  
Responsibilities of the Section 95 Officer and the Audit and Scrutiny Committee for
the financial statements
As explained more fully in the Statement of Responsibilities, the Section 95 Officer is
responsible for the preparation of financial statements, that give a true and fair view in
accordance with the financial reporting framework, and for such internal control as the
Section 95 Officer determines is necessary to enable the preparation of financial statements
that are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, the Section 95 Officer is responsible for assessing
each year the Council and its group’s ability to continue as a going concern, disclosing, as
applicable, matters related to going concern and using the going concern basis of
accounting unless there is an intention to discontinue the operations of the Council and its
group.
The Audit and Scrutiny Committee is responsible for overseeing the financial reporting
process.
Auditor’s responsibilities for the audit of the financial statements 
Our objectives are to obtain reasonable assurance about whether the financial statements
as a whole are free from material misstatement, whether due to fraud or error, and to issue
an auditor’s report that includes our opinion. Reasonable assurance is a high level of
assurance but is not a guarantee that an audit conducted in accordance with ISAs (UK) will
always detect a material misstatement when it exists. Misstatements can arise from fraud or
error and are considered material if, individually or in the aggregate, they could reasonably
be expected to influence the decisions of users taken on the basis of these financial
statements. 
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We
design procedures in line with our responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include: 
• using our understanding of the local government sector to identify that the Local
Government (Scotland) Act 1973, The Local Authority Accounts (Scotland)
Regulations 2014, and the Local Government in Scotland Act 2003 are significant in
the context of the Council and its group; 
• inquiring of the Section 95 Officer as to other laws or regulations that may be
expected to have a fundamental effect on the Council and its group; 
• inquiring of the Section 95 Officer concerning the Council’s policies and procedures
regarding compliance with the applicable legal and regulatory framework; 
• discussions among our audit team on the susceptibility of the financial statements to
material misstatement, including how fraud might occur; and 
• considering whether the audit team collectively has the appropriate competence and
capabilities to identify or recognise non-compliance with laws and regulations. 
The extent to which our procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the Council
and its group’s controls, and the nature, timing and extent of the audit procedures
performed. 
Irregularities that result from fraud are inherently more difficult to detect than irregularities
that result from error as fraud may involve collusion, intentional omissions,
misrepresentations, or the override of internal control. The capability of the audit to detect

Page 233

Independent Auditors Report 
www.argyll-bute.gov.uk _____________________________________   Page 143 
fraud and other irregularities depends on factors such as the skillfulness of the perpetrator,
the frequency and extent of manipulation, the degree of collusion involved, the relative size
of individual amounts manipulated, and the seniority of those individuals involved. 
A further description of the auditor’s responsibilities for the audit of the financial statements
is located on the Financial Reporting Council's website
http://www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditor’s
report. 
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the
Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In our opinion,
the audited parts of the Remuneration Report have been properly prepared in accordance
with The Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Section 95 Officer is responsible for the other information in the annual accounts. The
other information comprises the Management Commentary, Annual Governance Statement,
Statement of Responsibilities and the unaudited part of the Remuneration Report.
Our responsibility is to read all the other information and, in doing so, consider whether the
other information is materially inconsistent with the financial statements or our knowledge
obtained in the course of the audit or otherwise appears to be materially misstated. If we
identify such material inconsistencies or apparent material misstatements, we are required to
determine whether this gives rise to a material misstatement in the financial statements
themselves. If, based on the work we have performed, we conclude that there is a material
misstatement of this other information, we are required to report that fact. We have nothing
to report in this regard. 
Our opinion on the financial statements does not cover the other information and we do not
express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission. 
Opinions prescribed by the Accounts Commission on the Management Commentary
and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year for which
the financial statements are prepared is consistent with the financial statements and
that report has been prepared in accordance with statutory guidance issued under
the Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial year for
which the financial statements are prepared is consistent with the financial
statements and that report has been prepared in accordance with the Delivering
Good Governance in Local Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report are not in
agreement with the accounting records; or
• we have not received all the information and explanations we require for our audit.
We have nothing to report in respect of these matters. 
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the wider
scope responsibilities specified in the Code of Audit Practice, including those in respect of
Best Value, are set out in our Annual Audit Report.

Page 234

Independent Auditors Report 
www.argyll-bute.gov.uk _____________________________________   Page 144 
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the
Local Government (Scotland) Act 1973 and for no other purpose. In accordance with paragraph 108 of
the Code of Audit Practice, we do not undertake to have responsibilities to members or officers, in their
individual capacities, or to third parties. 
Mark Outterside, Director
For and on behalf of Forvis Mazars LLP 
Bank Chambers
26 Mosley Street
Newcastle upon Tyne
NE1 1DF 
20 December 2024

Page 235

Glossary of Terms 
www.argyll-bute.gov.uk _____________________________________   Page 145 
Existing Use Value. The market value of a particular
Council property, less the difference between the average
rental income between public and private sector properties. 
Expected Rate of Return on Pension Assets. The
average rate of return, including both income and changes
in fair value but net of scheme expenses, expected over
the remaining life of the related obligation on the actual
assets held by the Scheme. 
Fair Value. This is the price at which an asset could be
exchanged in an arm’s length transaction less any grants
receivable towards the purchase or use of the asset. 
Financial Asset. A right to future economic benefits
controlled by the Council that is represented by cash, an
equity instrument of another entity, a contractual right to
receive cash from another entity or a financial right to
exchange financial instruments under conditions that are
potentially favourable to the Council. 
Financial Instrument. Any contract that gives rise to a
financial asset of one entity and financial liability or equity
instrument of another. 
Financial Instruments Adjustment Account. This holds
the accumulated difference between the financing costs
included in the Income and Expenditure Account and the
accumulated financing costs required in accordance with
regulations to be charged to the General Fund Balance. 
Financial Liability. An obligation to transfer economic
benefits controlled by the Council that is represented by a
contractual obligation to deliver cash or another financial
asset to another entity or a contractual obligation to
exchange financial instruments under conditions which are
potentially unfavourable to the Council. 
Financial Reporting Standard (FRS). Financial Reporting
Standards are issued by the Accounting Standard Board
and define proper accounting practice for a given
transaction or event. 
Fixed Assets. Tangible assets that yield benefits to the
Council and the services it provides for a period of more
than one year. 
Gains/losses on settlements and curtailments. The
result of actions to relieve the Council of liabilities or events
that reduce the expected future service or accrual of
benefits of employees. This is charged or credited to Non
Distributed costs in the Comprehensive Income and
Expenditure Statement. 
General Fund Balance. This contains the net surplus on
the provision of Council services combined with any
balances from previous years and any contributions to
other funds or reserves made during the year.
Group Accounts. The purpose of group accounts is to
show the Council’s interest in organisations and companies
within the Financial Statements. The Council’s shares of
the assets and liabilities of these other entities are shown
in the Group Movement in Reserves Statement,
Comprehensive Income and Expenditure Statement and
Group Balance Sheet. 
Government Grants. Assistance by government and inter-
government agencies and similar bodies, whether local,
national or international, in the form of cash or transfers of
assets to an authority in return for past, or future,
compliance with certain conditions relating to the activities
of the Council. 
Heritage Assets. Assets which are intended to be
preserved in trust for future generations because of their
cultural, environmental and historical associations and are
held by the Council of the maintenance of heritage. 
International Accounting Standards (IAS). International
Accounting Standards are issued by the International
Accounting Standards Board and define proper accounting
practice for a given transaction or event. IAS’s take
precedence over other accounting standards in the
hierarchy of technical accounting standards. 
International Public Sector Accounting Standards
(IPSAS), a set of accounting standards issued by the
IPSAS Board for use by public sector entities around the
world in the preparation of financial statements. 
Impairment. A reduction in the value of fixed or financial
asset below the valuation held on the balance sheet. 
Infrastructure Assets. Fixed assets that are inalienable,
expenditure on which is recoverable only by continued use
of the asset created. Examples of infrastructure assets are
highways and footpaths. 
Intangible Assets. Non-financial assets which do not have
physical substance but are identifiable and are controlled
by the Council. 
Interest Cost (Pensions). The expected increase during
the period in the present value of the scheme liabilities
because the benefits are one period closer to settlement. 
Inventories. Inventories may comprise the following:
goods or other assets purchased for re-sale; consumable
stores; raw materials and components purchased for
incorporation into products for sale; products and services
in intermediate stages of completion; long term contract
balances; and finished goods. 
Liquid Resources. Current asset investments that are
readily disposable by the Council without disrupting its
business and are either readily convertible to known
amounts of cash at or close to the carrying amount, or
traded on the active market.

Page 236

Glossary of Terms 
www.argyll-bute.gov.uk _____________________________________   Page 146 
Materiality. Information is included where the information
is of such significance as to justify its inclusion, and
omission or misstatement could, individually or collectively,
influence the decisions or assessments of users made on
the basis of the financial statements. 
National Non-Domestic Rates Pool. All non-domestic
rates collected by Council’s are remitted to the national
pool and, thereafter, distributed to Councils by the Scottish
Government. 
Net Book Value. The amount at which fixed assets are
included in the Balance Sheet, i.e. their historical cost or
current value less cumulative amounts provided for
depreciation. 
Net Realisable Value. The open market value of the asset
in its existing use, or open market value in the case of non-
operational assets, less the expenses to be incurred in
realising the asset. 
Non-Current Assets. Non-current assets are not expected
to be realised within 12 months and are held to provide
future economic benefits to the Council. 
Non-operational assets. Are assets held by the Council
but not directly occupied, used or consumed in the delivery
of services. Examples of non-operational assets are
investment properties and assets that are surplus to
requirements, pending sale or redevelopment. 
Officers’ Remuneration. All sums paid to or receivable by
an employee and sums due by way of expenses
allowances (as far as those sums are subject to UK Income
Tax). 
Operating Leases. A lease other than a finance lease, i.e.
a lease which does not transfer the risks and rewards of
ownership to the lessee. 
Operating Assets. All items which derive from events or
transactions that fall within the ordinary activities of the
Council and which need to be disclosed separately by
virtue of their size or incidence to give fair presentation of
the accounts. 
Past Service Costs (Pensions). The increase in the
present value of the scheme liabilities related to employee
service in prior periods arising in the current period as a
result of the introduction of, or improvement to, retirement
benefits. 
Pensions Reserve. The Pensions Reserve absorbs the
timing differences arising from different arrangements for
accounting for post-employment benefits and for funding
benefits in accordance with statutory provisions. 
Prior Period Adjustments. Those material adjustments
applicable to prior years arising from changes in
accounting policies or from the correction of fundamental
errors. They do not include normal recurring corrections or
adjustments of accounting estimates made in prior years. 
Public Private Partnerships (PPP). Those partnerships
enable the Council to purchase services from the private
sector and pay a fee based on pre-defined output
criteria. The private sector uses this fee to repay loans
taken out to finance the building or refurbishment of the
assets. 
Residual Value. The net realisable value of an asset at
the end of its useful life. 
Related Party Transactions. A related party transaction
is the transfer of assets or liabilities, or the performance
of services by, to or for a related party irrespective of
whether a charge is made. 
Renewal and Repairs fund. This contains funds
credited at the Council’s discretion from the General
Fund and is available for use on capital or revenue
expenditure on Council assets. 
Revaluation Reserve. Records unrealised gains arising
since 1 April 2007 from holding fixed assets not yet
realised through sales. 
Service Expenditure Analysis (SEA). An analysis
which groups together expenditure on services within
headings or divisions as defined in the Service Reporting
Code of Practice (SeRCOP). 
Specific Government Grants. These are grants
received from Central Government in respect of a
specific purpose or service. 
Unusable Reserves. Those reserves which hold
unrealised gains and losses where amounts would only
become available to provide services if the assets are
sold and reserves that hold timing differences. 
Usable Reserve. Those reserves which the Council may
use to provide services, subject to the need to maintain
a prudent level of reserves and any statutory limitations
on their use. 
Useful Life. The period over which the Council will
derive benefits from the use of a fixed asset.

Page 237

www.argyll-bute.gov.uk _____________________________________   Page 147 
Appendix A 
Trade Union Facility Time Statement 2023-24
This information is published under the Trade Union (Facility Time Publication Requirements)
Regulations 2017
Schedule 2 (Regulation 8) 
1. Relevant union officials
Total number of employees who were relevant union officials during the relevant period.
Number of employees who were relevant union
officials during the relevant period
Full time equivalent
employee number
Central Function 21 20.8
Education Function 7 7
Note: The headcount figure for relevant union officials includes all stewards and school-based reps who are elected by
their peers to provide first line support for members.
2. Percentage of time spent on facility time
Number of employees who were relevant union officials employed during the relevant period spent who spent 0%, 1%-
50%, 51% - 99% or 100% of their working hours on facility time. 
Percentage of time Number of employees  
Central Function Education Function
0% 0 3
1% - 50% 19 2
51% - 99% 2 2
100% 0 0

Page 238

www.argyll-bute.gov.uk _____________________________________   Page 148 
3. Percentage of pay bill spent on facility time
The percentage of the total pay bill spent on paying employees who were relevant union officials for facility time
during the relevant period.  
Central
Function
Education
Function
The total cost of facility time £171,701 £71,016
The total pay bill (Finance figures) £123,318,713 £64,175,618
The percentage of the total pay bill
spent on facility time 0.14% 0.11%
4. Paid Trade Union activities 
Percentage of total paid facility time hours spent by employees who were relevant union officials during the relevant
period on paid trade union activities.  
Central
Function
Education
Function
Time spent on paid trade union activities as
percentage of total paid facility time hours
calculated as:
(total hours spent on paid trade union activities
by relevant union officials during the relevant
period ÷ total paid facility time hours) x 100
0% 0%

Page 239

Argyll and Bute Council
Comhairle Earra Gháidheal agus Bhóid
Executive Director (Section 95 Officer): Kirsty Flanagan
Argyll and Bute Council 
Kilmory, Lochgilphead, Argyll PA31 8RT
Tel:  01546 604268
E-mail: Kirsty.Flanagan@argyll-bute.gov.uk
Website: www.argyll-bute.gov.uk
Ask For: Kirsty Flanagan
Our Ref: KF/CE/SS 
Mark Outterside
Forvis Mazars
The Corner
Bank Chambers
26 Mosley Street
Newcastle upon Tyne
NE1 1DF
December 2024
Dear Mark
Argyll and Bute Council - Audit for the Year Ended 31 March 2024
This representation letter is provided in connection with your audit of the financial statements of
Argyll and Bute Council (the Council) and its group for the year ended 31 March 2024 for the
purpose of expressing an opinion as to whether the financial statements give a true and fair
view in accordance with the Part VII of the Local Government (Scotland) Act 1973 and UK
adopted international accounting standards, as interpreted and adapted by the Code of
Practice on Local Authority Accounting in the United Kingdom 2023/24 (the 2023/24 Code).  
I confirm that the following representations are made on the basis of enquiries of management
and staff with relevant knowledge and experience (and, where appropriate, inspection of
supporting documentation) sufficient to satisfy myself that I can properly make each of the
following representations to you.
My responsibility for the financial statements and accounting information
I believe that I have fulfilled my responsibilities for the true and fair presentation and
preparation of the financial statements in accordance with the Part VII of the Local Government
(Scotland) Act 1973 and UK adopted international accounting standards, as interpreted and
adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24
(the 2023/24 Code).  
My responsibility to provide and disclose relevant information
I have provided you with: 
• access to all information of which I am aware that is relevant to the preparation of the
financial statements such as records, documentation and other material;
Appendix 4

Page 240

• additional information that you have requested from us for the purpose of the audit; and
• unrestricted access to individuals within the Council you determined it was necessary to
contact in order to obtain audit evidence.
I confirm as Section 95 Officer that I have taken all the necessary steps to make me aware of
any relevant audit information and to establish that you, as auditors, are aware of this
information.
As far as I am aware there is no relevant audit information of which you, as auditors, are
unaware.
Accounting records
I confirm that all transactions undertaken by the Council have been properly recorded in the
accounting records and are reflected in the financial statements. All other records and related
information, including minutes of all management and Board meetings, have been made
available to you.
Accounting policies
I confirm that I have reviewed the accounting policies applied during the year in accordance
with International Accounting Standard 8 and consider these policies to faithfully represent the
effects of transactions, other events or conditions on the Council’s financial position, financial
performance and cash flows.  
Accounting estimates, including those measured at fair value
I confirm that the methods, significant assumptions and the data used by the Council in making
the accounting estimates, including those measured at fair value are appropriate to achieve
recognition, measurement or disclosure that is in accordance with the applicable financial
reporting framework.
Contingencies
There are no material contingent losses including pending or potential litigation that should be
accrued where:
• information presently available indicates that it is probable that an asset has been impaired,
or a liability had been incurred at the balance sheet date; and
• the amount of the loss can be reasonably estimated.
There are no material contingent losses that should be disclosed where, although either or both
the conditions specified above are not met, there is a reasonable possibility that a loss, or a
loss greater than that accrued, may have been incurred at the balance sheet date.
There are no contingent gains which should be disclosed.
All material matters, including unasserted claims, that may result in litigation against the
Council have been brought to your attention. All known actual or possible litigation and claims
whose effects should be considered when preparing the financial statements have been
disclosed to you and accounted for and disclosed in accordance with the Part VII of the Local
Government (Scotland) Act 1973 and UK adopted international accounting standards, as
interpreted and adapted by the Code of Practice on Local Authority Accounting in the United
Kingdom 2023/24 (the 2023/24 Code).

Page 241

Laws and regulations
I confirm that I have disclosed to you all those events of which I are aware which involve known
or suspected non-compliance with laws and regulations, together with the actual or contingent
consequences which may arise therefrom.
We have complied with all aspects of contractual agreements that would have a material effect
on the accounts in the event of non-compliance. 
Fraud and error
I acknowledge my responsibility as Section 95 Officer for the design, implementation and
maintenance of internal control to prevent and detect fraud and error. I have disclosed to you:
• all the results of my assessment of the risk that the financial statements may be materially
misstated as a result of fraud;
• all knowledge of fraud or suspected fraud affecting the Council involving:
▪ management and those charged with governance;
▪ employees who have significant roles in internal control; and
▪ others where fraud could have a material effect on the financial statements.
I have disclosed to you all information in relation to any allegations of fraud, or suspected fraud,
affecting the Council's financial statements communicated by employees, former employees,
analysts, regulators or others.
Related party transactions
I confirm that all related party relationships, transactions and balances, have been appropriately
accounted for and disclosed in accordance with the Part VII of the Local Government
(Scotland) Act 1973 and UK adopted international accounting standards, as interpreted and
adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2023/24
(the 2023/24 Code).
I have disclosed to you the identity of the Council’s related parties and all related party
relationships and transactions of which I are aware. 
Future commitments
I am not aware of any plans, intentions or commitments that may materially affect the carrying
value or classification of assets and liabilities or give rise to additional liabilities.
Ultimate parent company
I confirm that the ultimate parent company for Argyll and Bute Council and its Group is the
Scottish Government.
Other Matters
I confirm in relation to the following matters that:
• COVID-19 – I have assessed the continued impact of the COVID-19 Virus pandemic on the
Council and the financial statements and those of the Group, including the impact of
mitigation measures and uncertainties, and am satisfied that the financial statements and
supporting notes fairly reflect that assessment.

Page 242

• Ukraine – I confirm that I have carried out an assessment of the potential impact of the
continued conflict in Ukraine on the Council and its Group and there is no significant impact
on the Council’s operations from restrictions or sanctions in place.
• RAAC - I confirm the Council has assessed the potential impact of Reinforced Autoclaved
Aerated Concrete on the Council, and whether there are indications of a need for an
impairment of the Council’s property, plant and equipment balances. I confirm there are no
such indications of impairment in those assets.
Going concern
To the best of my knowledge there is nothing to indicate that the Council and its Group will not
continue as a going concern in the foreseeable future. The period to which I have paid
particular attention in assessing the appropriateness of the going concern basis is not less than
twelve months from the date of approval of the accounts. 
Performance related allocations
I confirm that I am not aware of any reason why the Council’s funding allocation limits would be
changed.
Subsequent events
I confirm all events subsequent to the date of the financial statements and for which the Part VII
of the Local Government (Scotland) Act 1973 and UK adopted international accounting
standards, as interpreted and adapted by the Code of Practice on Local Authority Accounting in
the United Kingdom 2023/24 (the 2023/24 Code), require adjustment or disclosure have been
adjusted or disclosed.
Should further material events occur after the date of this letter which may necessitate revision
of the figures included in the financial statements or inclusion of a note thereto, I will advise you
accordingly.
Annual Governance Statement
I am satisfied that the Annual Governance Statement fairly reflects the Council and its Group's
risk assurance and governance framework and I confirm that I am not aware of any significant
risks that are not disclosed within the Annual Governance Statement. 
Annual Report
The disclosures within the Annual Report and the Remuneration Report fairly reflect my
understanding of the Council and its Group’s financial and operating performance over the
period covered by the financial statements. 
Unadjusted misstatements
I confirm that the effects of the unadjusted misstatements are immaterial, both individually and
in aggregate, to the financial statements as a whole.
Yours sincerely,
Kirsty Flanagan