Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 5th November 2025
DC25/012/FUL: Construction of a new full-size 3G synthetic pitch including
drainage, floodlighting & fencing at Argyll Park, Argyle Street,
Alexandria by West Dunbartonshire Council.
1. REASON FOR REPORT
1.1 The application has been subject to a substantial body of objection. Under the
terms of the approved Scheme of Delegation, it therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission subject to the conditions set out in Section 9 below.
3. DEVELOPMENT DETAILS
3.1 The application relates to a site within Argyll Park which is located on Argyle
Street in Alexandria. Argyll Park has a range of existing sports facilities including
tennis courts, grass football pitches, a synthetic pitch, a bowling club, a changing
pavilion and a play park. The application site itself is known as “pitch 1” and is
located between the car park which is accessed from Heather Avenue and the
existing synthetic pitch which was granted planning permission in 2015.
3.2 The proposed works include:
 The replacement of the existing grass pitch with a full-size 3G synthetic pitch
measuring 97m by 56m with a 1.5m hardstanding spectator area.
 The erection of a 6-column LED floodlighting system measuring 15m in
height.
 Drainage works.
 The erection of perimeter fencing measuring 3m in height and extending to
5m in heigh behind the goal ends.
 The erection of 3m high, solid acoustic fencing at goal ends.
3.3 The proposed hours of use contained within the Design and Access Statement
are Monday to Sunday, 8am until 10pm.
ITEM 5a

Page 2

4. CONSULTATIONS
4.1 West Dunbartonshire Council Roads Service
No objections subject to conditions relating to mechanical road brush to be
provided; no deliveries during the period of construction between 8.30am and
9.00am and 2.30pm and 3.30pm due to proximity to a school; and banksmen to
be used for deliveries for ingress and egress.
4.2 West Dunbartonshire Council Environmental Health Service
No objections subject to conditions relating to the hours of operation of the facility
including the flood lighting, the acoustic fence, construction hours, vehicle
delivery times during construction, contaminated land and dust.
4.3 West Dunbartonshire Council Roads Service (Flooding)
No objections
5. REPRESENTATIONS
5.1 Six objections were received to the application. The detail of each objection is
available for public viewing in the electronic planning file for the application. The
concerns raised in the objections can be summarised as follows:
Parking
 There is a parking issue, particularly when there are tournaments on.
Flood Lighting
 The floodlight pitch is in operation until 10pm.
 The floodlights may shine into homes.
Noise
 Balls hitting the fence is annoying.
 There is an existing 3G pitch with floodlights and associated noise,
shouting, swearing and general anti-social behaviour.
 Another pitch would double the noise and anti-social behaviour.
Other Concerns
 Queries relating to the number of trees to be felled
 Views will be of a fence rather than a park
 The park should be maintained for all rather than for footballers
 People are using the pitch without permission and children are there
without supervision.
5.2 The points and concerns raised in the objections are considered in Section 7
below.

Page 3

6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Framework 4 (NPF4)
6.1 Policy 1 aims to tackle the climate and nature crises by requiring that significant
weight be given to these issues when considering all development proposals.
Policy 2 relates to the climate in the form of climate mitigation and adaptation,
while Policy 3 seeks to protect biodiversity, reverse biodiversity loss, and deliver
positive effects from development and strengthen nature networks. Overall, the
proposal provides an improved sports facility, within a park which provides
extensive sports and play facilities and as such is considered a sustainable
location. No biodiversity matters arise. It is considered that the nature and scale
of development proposal would have a neutral effect in respect of Policies 1, 2
and 3.
6.2 Policy 14 aims to promote and facilitate well designed development that makes
successful places by taking a design-led approach and applying the place
principle. Criterion (d) states that proposals which are detrimental to the amenity
of the surrounding area or inconsistent with the six qualities of successful places
will not be supported. Policy 15 relates to local living and 20-minute
neighbourhoods and supports local access to sport and recreation facilities. The
proposal complies with the above policies as the proposal will contribute towards
local living without significant adverse effects on local amenity, this issue is
discussed in detail in Section 7 below.
6.3 Policy 21 aims to encourage, promote and facilitate spaces and opportunities for
play, recreation and sport. The proposal is for the enhancement of an existing
sports facility and as such in in line with the aims of the policy.
6.4 Policy 23 aims to protect people and places from environmental harm and
encourage, promote and facilitate development that improves health and
wellbeing. Criterion (a) supports development proposals that will have positive
effects on health, including proposals that incorporate opportunities for exercise.
Criterion (e) advises that development proposals which are likely to raise
unacceptable noise issues will not be supported. The proposal is considered
acceptable with reference to this policy as, a sports facility will be provided, and
no unacceptable noise issues are predicted to be created. This issue is
discussed further in Section 7 below.
6.5 Having assessed the proposal with reference to NPF4, it is considered that the
proposal accords with the policies, subject to conditions.
West Dunbartonshire Adopted Local Plan 2010
6.6 Policy GD1 seeks to ensure that all new development enhances the Plan area
and environmental quality in general through an emphasis on high quality design.
Proposals are required to meet a number of criteria, including the need to be
appropriate to the local area in terms of land use and layout and design; be
energy efficient and meet the roads, parking and access requirements of the
Council. It is considered that the development is appropriate for the location and
in addition no objections from consultees have been received. This issue is
discussed further in Section 7 below.

Page 4

6.7 The character and amenity of existing residential areas, identified on the
Proposals Map, will be safeguarded and where possible enhanced in accordance
with Policy H5. This includes proposals needing to reflect the character of the
surrounding area in terms of scale, density, design and materials; the need to
retain trees; and the requirement to avoid over development which would have
an adverse effect on local amenity, access and parking or would be out of scale
with surrounding buildings. As discussed below, it is considered that the
development is appropriate for the location and in addition no objections from
consultees have been received.
6.8 Policy E 1 relates the Council’s biodiversity duty. No biodiversity matters arise.
6.9 The site is located with an area identified as open space and as such, Policy R1
applies. Policy R1 states that developments on existing sports pitches shall not
be redeveloped except in certain circumstances. This includes where the playing
field which would be lost as a result of the proposed development would be
replaced by a new playing field of comparable or greater benefit for sport and in a
location which is convenient for its users or the upgrading of an existing playing
field to provide a better quality facility, either within the same site or at another
location which is convenient for its users and which maintains or improves the
overall playing capacity in the area. Policy R3 relates to the enhancement of
open space and sports facilities and supports the upgrade recreation facilities as
and when resources allow. The proposal is for the existing pitch to be replaced
with a synthetic, all-weather pitch with lighting which will increase the times which
the facility can be used. As such the proposal is considered to be in accordance
with the policies.
6.10 Policy F2 requires the drainage of development proposals to satisfy the principles
of Sustainable Urban Drainage Systems (SUDS) and comply with the guidance
in the “Sustainable Urban Drainage Systems (SUDS) Design Manual for
Scotland and Northern Ireland” published by the Sustainable Urban Drainage
Scottish Working Party. The proposal includes drainage and is considered to be
acceptable.
6.11 Having assessed the proposal with reference to the adopted Local Plan, it is
considered that the proposal accords with the policies, subject to conditions.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council
would not adopt Local Development Plan 2. The Proposed Local Development
Plan 2 (LDP2), incorporating the recommended modifications of the Examination
Report received on 22 April 2020, which were accepted by the Planning
Committee of 19 August 2020, remains the Council’s most up to date spatial
strategy and is therefore afforded significant weight in the assessment and
determination of planning applications, subject to compatibility with NPF4. The
Scottish Ministers’ Direction relating to the adoption of LDP2, dated 18 December
2020, is also a material consideration.

Page 5

7.2 Policy CP1 requires new development to take a design-led approach to creating
sustainable places, which put the needs of people first and demonstrates the six
qualities of successful places. The proposal is considered to appropriately located
and designed and as such is in accordance with the policy.
7.3 Policy H4 aims to protect, preserve and enhance the residential character and
amenity of existing residential areas, including a presumption against the
establishment of non-residential uses within, or in close proximity of residential
areas, which would potentially be detrimental to local amenity, or which would
cause unacceptable disturbance to local residents. Further to the detailed
assessment set out below, it is considered that the proposal will not have a
significant adverse effects on amenity. The proposal therefore complies with the
above Policy.
7.4 Policy GI1 states that playing fields and sports pitches should not be developed
upon apart from in certain circumstances. This includes where a new or
upgraded playing field of comparable or greater benefit for sport is provided in a
location which is convenient for its users and which maintains or improves the
overall playing field capacity in the area. The new facility is to be provided on the
site of the existing facility and as such is considered to be in accordance with the
policy.
7.5 Policy ENV8 relates to light and noise. All development proposals shall
incorporate design measures which minimise or reduce light pollution. All new
development must also ensure that significant adverse noise impacts on
surrounding properties and uses are avoided. Conditions are proposed which
ensure the proposal is in accordance with the policy. 
7.6 Having assessed the proposal with reference to the proposed Local
Development Plan 2, it is considered that the proposal accords with the policies,
subject to conditions.
Principle of Development
7.7 The application site is located in an existing park with various other sports
facilities surrounding. The area is identified in both the adopted Local Plan and
the proposed Local Development Plan 2 as an area of open space. The proposal
is to upgrade the existing sports facility from a grass pitch to a 3G synthetic pitch
with associated fencing and floodlighting. The proposal to upgrade the sports
facility maintains the open space and upgrades the existing sports provision. As
such the proposal is in accordance with the policies relating to sports facilities
and open space and is in principle acceptable in this location.
Design, Appearance and Visual Amenity
7.8 The proposal is of a standard design for sports facilities of this type with the
existing, adjacent synthetic pitch also having fencing and floodlights. The fencing
around the existing pitch is 5m in height with 15m high floodlights. The current
proposal includes fencing of differing heights and designs. At the goal ends there
will be 5m high twin wire fencing as well as a 3m high, solid acoustic fence
located just behind this. To the sides of the pitch, it is proposed to have 3m high
twin wire fencing. Whilst the addition of a 3m high solid fence will have a visual
impact on the park, it is considered that on balance the proposal is acceptable.

Page 6

This is due to the requirement of the acoustic fence in relation to noise and
neighbouring properties. The 15m high floodlights will not be out of place within
the park due to the existing floodlights being of the same height. Overall, it is
considered that the design and appearance of the sports facility is acceptable
within the park.
Roads and parking
7.9 In considering the impact upon roads, traffic flow, parking and general road
safety, the application site is situated within an existing park. There are a number
of bus stops on Argyle Street, Govan Drive, North Main Street, Heather Avenue
and Colquhoun Drive, with a number of bus routes serving the area. Balloch
Train Station is an approximate 12-minute walk away also. There is an adjacent
car park accessed from Heather Avenue. The assessment of roads and parking
matters is principally guided by the consultation response from the Council’s
Roads Service. The Council’s Roads Service provided no objection to the
proposal subject to conditions to address a variety of matters during the
construction phase of the development. These relate to a mechanical road brush
being provided; no deliveries between 8.30am and 9.00am and 2.30pm and
3.30pm due to proximity to a school; and banksmen being used for delivery
access and egress. No concerns have been raised in regard to traffic and
parking issues and no conditions are recommended by Roads in respect of the
operation of the completed development. As such, the proposal is not considered
to have an adverse impact upon the traffic and parking of the town centre area. It
is recommended that the granting of any permission includes conditions relating
to delivery times during construction and the use banksmen.
Residential Amenity
7.10 The proposal has residential properties located to the north on Argyle Street as
well as to the south on Heather Avenue. It is accepted that any development
project will generate an element of noise and activity during construction, and this
cannot be a determining factor in the assessment of the application. However,
subject to the conditions recommended by Environmental Health, including those
in respect of construction hours and dust control, a suitable level of residential
amenity will be maintained during the construction phase. Between the proposed
facility and Argyle Street are other sports pitches and courts and between the
residential properties on Heather Avenue and the proposal is a line of trees and a
road. Whilst it is accepted that the proposed upgrade has the potential to cause
noise, the noise impact assessment has concluded that subject to the installation
of an acoustic fence no unacceptable noise disturbance will be created. The
Council’s Environmental Health Service were consulted on the application and
have no objections to the proposal subject to conditions. As such it is
recommended that any granting of permission should include a condition to
ensure the acoustic barrier is erected and maintained for the lifetime of the
development. In addition, a condition is recommended in order to limit the times
when the facility can be operated in order to protect residential amenity. There
are conflicting details provided within the Noise Impact Assessment (NIA) and
the Design Statement as to the proposed operational hours. Environmental
Health have recommended that the hours proposed within the NIA be
conditioned in order to protect residential amenity.

Page 7

7.11 The proposal also includes floodlights, and a Lighting Impact Report has been
provided. Further to the consultation response from Environmental Health, it is
recommended that any granting of permission also limit the hours in which
floodlights can operate to be in line with the hours of operation for the facility in
order to protect the neighbouring residential amenity from unacceptable impacts
from light. Subject to condition, it is considered that the proposal would not have
a significant adverse effect on residential amenity.
Other Matters raised by Consultees
7.12 The Council’s Environmental Health Service were consulted on the application
and had no objections to the proposal subject to conditions. Conditions relating to
the hours of operation, the acoustic fence, construction hours, dust and vehicle
delivery times are discussed above. The further conditions relate to contaminated
land. As such it is recommended that any granting of permission should include
such condition in order to protect public health and to ensure that the site is
suitable for its intended use.
Other Matters raised in representations
7.13 It has been queried how many trees are to be felled for the construction of the
sports facility. The existing trees are shown as being retained on the General
Arrangement Plan. A condition is recommended to ensure that the trees are
protected during the construction phase of the development.
7.14 With respect to the outstanding issues raised in the representations and not
already assessed above, views being altered has been highlighted. Private
individuals do not have a right to a view and as such this is not a material
consideration for the planning application.
7.15 Whilst 3G pitches can be used for a variety of sports including football, rugby,
lacrosse and American football, the pitch proposed is arranged for football and
7v7 football. An objector has stated that the park should be maintained for all
rather than footballers. There is a range of sports facilities available at Argyll Park
and the policies do not limit facilities in accordance with the type of sport to be
played.
7.16 Finally, concerns have been raised regarding the pitch being used without
permission, users gaining access via climbing fences and children accessing the
facility without supervision. Such matters cannot be controlled by the planning
system and as such are not a consideration of the planning application.
8. CONCLUSION
8.1 Overall, the proposal for a full size, 3G pitch will provide opportunities for sport to
be played during times of the year when inclement weather would deem the
natural grass surface unplayable or dangerous. The application site is located
within an existing park which is designated an open space within both the
adopted Local Plan and Proposed Local Development Plan 2. The upgrade of
the existing grass pitch to a synthetic pitch with associated fencing, drainage and
floodlighting is supported in principle in such an area. Whilst the objections
received are acknowledged, there are no material planning considerations that
suggest that planning permission should be refused.

Page 8

Following consideration of the proposal and informed by the consultation
responses from the Council’s Environmental Health Service and Roads Service,
it is concluded that, subject to the conditions below, the proposal is in
accordance with policies set out in National Planning Framework 4, the adopted
Local Plan and proposed Local Development Plan 2.
9. CONDITIONS
1. Prior to the commencement of any works on site, full details of tree protection
measures for all trees within or adjacent to the application site shall be submitted
to and approved in writing by the Planning Authority. The approved measures
shall be erected in accordance with British Standards Recommendations for
trees in Relation to Construction, currently BS 5837:2012, to the satisfaction of
the Planning Authority and not removed during the course of all works in both
implementing the development hereby permitted and during the removal works.
Reason: To ensure the retention of and avoidance of damage to trees during
development and site reinstatement works.
2. Unless otherwise agreed in writing by the Planning Authority, the opening hours
for the sports facility and the use of the associated floodlighting system approved
by this application shall be as set out within the Adnitt Acoustics Scotland, First
Issue Noise Impact Assessment (dated 29 August 2024):
Mondays to Fridays: 0900-2200
Saturdays and Sundays: 0900-2100
Notwithstanding the above hours, all external lighting luminaries shall be turned
off when the sports facility is not in use.
Reason: To ensure that the development does not adversely affect the amenity
of neighbouring properties by creating excessive noise.
3. Prior to commencement of the use, the acoustic barrier as detailed on plans “100
– General Arrangement” and “301 – Fencing Detail” shall be erected. The fence
shall have a minimum mass of 10kg/m2 which can be certified for the lifetime of
the barrier. The fence shall thereafter be maintained for the lifetime of the
development to the satisfaction of the Planning Authority.
Reason: To ensure that the development does not adversely affect the amenity
of neighbouring properties by creating excessive noise.
4. During the period of construction, all works and ancillary operations (including
deliveries) which are audible at the site boundary, shall be carried out between
the following hours unless otherwise approved in writing by the Planning
Authority:
Mondays to Fridays: 0800-1800
Saturday: 0800-1300
Sundays and public holidays: No working

Page 9

Reason: To ensure that the development does not adversely affect the amenity
of neighbouring properties by creating excessive noise and disturbance at
unsocial hours.
5. Unless otherwise agreed in writing, during the period of construction, no
commercial vehicle making deliveries to or collecting material from the
development shall enter or leave the site:
Before 08:00
Between 08:30 and 09:00
Between 14:30 and 16:30
or after 18:00.
A banksman shall be used during the access and egress of all delivery vehicles,
service vehicles and any other vehicles calling at the site.
Reason: To minimise noise and disturbance to nearby residents at unsocial
hours and due to the proximity to a school.
6. The presence of any previously unexpected contamination that becomes evident
during the development of the site shall be reported to the Planning Authority in
writing within one week, and work on the site shall cease. At this stage, if
requested by the Planning Authority, an appropriate investigation and risk
assessment shall be undertaken and a remediation strategy shall be submitted to
and approved by the Planning Authority prior to the recommencement of site
works. The approved details shall be implemented as approved.
Reason: To protect public health and to ensure that the site is suitable for its
intended use.
7. If there is a requirement to either re-use site won material or to import material
then the assessment criteria and sampling frequency that would adequately
demonstrate its suitability for use shall be submitted to and approved by the
Planning Authority prior to any material being re-used or imported. In addition to
this and in accordance with BS3882:2015 and BS8601:2013, material to be used
in the top 300mm shall also be free from metals, plastic, wood, glass, tarmac,
paper and odours.
On completion of the works and at a time and or phasing agreed by the Planning
Authority, the developer shall submit a verification report containing details of the
source of the material and appropriate test results to demonstrate its suitability
for use.
Reason: To protect public health and to ensure that the site is suitable for its
intended use.
8. Unless otherwise approved in writing by the Planning Authority, no development
shall commence on site until such time as a scheme for the control and mitigation
of dust has been submitted to and approved in writing by the Planning Authority.
The scheme shall identify likely sources of dust arising from the development or
its construction, and shall identify measures to prevent or limit the occurrence

Page 10

and impact of such dust. The approved scheme shall thereafter be implemented
fully prior to any of the identified dust generating activities commencing on site
and shall be maintained thereafter, unless otherwise approved by the Planning
Authority.
Reason: To minimise the occurrence of dust, in the interests of the amenity of the
area.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 5th November 2025
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Representations
3. Consultation responses
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
Wards affected: Ward 1 (Lomond)