Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 6th August 2025
DC25/076/FUL: Section 42 application to vary Condition 12 - working hours
(Amendment to DC24/081/FUL) at Artizan Centre, College Way,
Dumbarton by West Dunbartonshire Council
1. REASON FOR REPORT
1.1 This application seeks to amend the terms of a condition of a planning application
originally determined by the Planning Committee. It therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission for this Section 42 application, subject to the conditions
set out in Section 9 below.
2. DEVELOPMENT DETAILS
3.1 The application site is located on College Way within Dumbarton’s Town Centre and
extends to approximately 1 ha. The site is primarily hardstanding and includes a variety
of buildings forming part of the Artizan Shopping Centre, with a few small areas of
grass along the site’s boundary as well as some street trees planted along High-Street,
at the car park on Risk Street Carpark and at Artizan Centre entrance on St Mary’s
Way. A small portion of the south of the development site is located within the
Dumbarton Town Centre Conservation Area boundary, including the buildings fronting
High Street.
3.2 Planning Application DC24/081/FUL covered what will be Phase 1 of a wider re-
development project of the current Artizan Centre site in Dumbarton. The wider
masterplan/development framework is being considered separately via an application
for Planning Permission in Principle (DC24/108/PPP) and comprises a mixed-use
scheme that seeks to redevelop the site and partially repurpose the existing buildings
where possible. The masterplan seeks to create a new high quality permeable public
realm and is intended to contain the following uses: residential; retail (at ground floor
and key corners); leisure/food and beverage and a healthcare facility. West
Dunbartonshire Council successfully applied to the UK Government’s Levelling Up
Fund to tackle the decline of Dumbarton Town Centre and deliver three key projects in
the town, one of which is the Artizan Centre.
3.3 At the November 2024 meeting of the Planning Committee, Members determined to
grant application DC24/081/FUL for façade improvements to existing shopfronts as
well as landscaping and associated infrastructure. The façade improvements
included:
 The removal of the “gateway” canopies at the entrances to the Artizan Centre St
Marys Way. Conservation Area Consent had also already been granted under
application DC24/086/CON for the removal of the canopy at the High Street
which is within the Conservation Area,
ITEM 5

Page 2

 Removal of shelter canopies on College Way,
 Upgrade of shelter canopies on High Street with bronze film,
 Partial removal of zinc cladding at upper levels to be replaced with glazed
ceramic tile cladding. This cladding will be similar to what has been approved at
the adjacent Glencairn House,
 Timber cladding at upper levels on High Street to be removed, and replaced with
timber effect cladding panels,
 Painting of concrete at upper-level black,
 Removal of existing light fittings attached to building and replaced with bronze
coloured light fittings,
 One concrete upstand to be cut off at roof line and made good with new capping
piece, and
 All shopfronts including glazing, doorsets and signage to be removed and
replacement black aluminium shopfronts installed.
3.4 The permission also included public realm/landscaping proposals comprising:
 Creation of new square in the location of the buildings currently being removed,
 A shelter structure as a focal point within the new square created via a series of
vertical elements with the inclusion of a sedum roof canopy,
 Enhancement of Collage Way with new high-quality paving and landscaping,
 Open space,
 Play space,
 A feature landscaped area in the form of “maze”.
3.5 This current application seeks to modify the terms of condition 12 which was attached
to application DC24/081/FUL. Condition 12 of application DC24/081/FUL reads as
follows:
During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following hours
unless otherwise approved in writing by the Planning Authority:
a. Mondays to Fridays: 0800 – 1800
b. Saturdays: 0800 – 1300
c. Sundays and public holidays: No Working
3.6 The applicant has proposed an amended change in wording as follows:
During the period of construction, all works and ancillary operations which are audible
at the site boundary (or at such other place(s) as may be first agreed in writing with the
Planning Authority) shall be carried out between the hours and programme shown on
the submitted schedule SAV1. Where changes to the programme are required an
amended schedule shall be submitted to the Planning Authority for its information.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Environmental Health Service
Environmental Health are satisfied with the proposed changes to working hours. It
should be noted that the agreed hours include all noise generating activities so works
should have ceased and staff cleared the site (where this generates noise) by the
agreed schedule of hours.

Page 3

5. REPRESENTATIONS
5.1 One objection was received. The full details are contained within the planning file and
are available for public viewing. However, the key points of objection can be
summarised as follows:
 The proximity of Lennox Evangelical Church to the site may result in works
disrupting Sunday services between 0930 and 1330.
 The detail of the extended hours proposed is unclear.
The concerns raised shall be considered in the appraisal in the Section 7 below.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
6.1 This application, submitted under Section 42 of the Town and Country Planning
Scotland Act 1997 (as amended), seeks to vary the terms of condition 12 of planning
permission DC24/081/FUL. Annex H of Scottish Government Circular 3/2022 –
Development Management Procedures sets out that in determining Section 42
applications, planning authorities may only consider the issue of the conditions to be
attached to any resulting permission. However, as the effect of granting this Section
42 application will see the planning permission renewed, the Planning Authority is
entitled to look at the principle of development in the light of any material change in the
Development Plan policies. In this case, the current planning permission for the site
was granted in November 2024, there have been no changes to either the planning
policy position or the circumstances of the application site and works associated with
implementing this permission have not yet commenced on site. Whilst all development
plan policies relevant to the proposed development are highlighted below, a full
detailed reassessment of the proposal is not considered to be required.
National Planning Policy 4
6.2 A small proportion of the site is within the ‘Clyde Mission’ area, identified as one of
eighteen National Developments with National Planning Framework 4 which
recognises that significant land assets are under-utilised across the Clyde, (including
waterfront sites such as Queens Quay) and that longstanding inequality, in relation to
poor environment and health outcomes require to be tackled as a national priority. The
Clyde Mission designation aims to repurpose and reinvigorate vacant and derelict land
as well as adapting the area to the impacts of climate change, where nature-based
solutions would be particularly supported. Whilst the scale of this proposal in itself is
not categorised as a National Development in terms of The Town and Country Planning
(Hierarchy of Developments) (Scotland) Regulations 2009, delivery of the development
proposals for the site would support the objectives of the national development
designation.
6.3 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the global
climate and nature crises. Policy 2 also relates to the climate in the form of climate
mitigation and adaptation and states development proposals will be sited and designed
to minimise lifecycle greenhouse gas emissions as far as possible and development
proposals will be sited and designed to adapt to current and future risks from climate
change. Policy 3’s intent is to protect biodiversity, reverse biodiversity loss, deliver
positive effects from development and strengthen nature networks. Subject to a variety
a matters being addressed by condition, the proposal would have a neutral impact in
respect of Policies 1, 2 and 3.

Page 4

6.4 As part of the site is located within a conservation area Policy 7 applies. Development
proposals in or affecting conservation areas will only be supported where the character
and appearance of the conservation area and its setting is preserved or enhanced. A
number of listed buildings are located within the town centre in the vicinity of the site
and Policy 7 further advises that development proposals affecting the setting of listed
building should preserve their character and special architectural and historic interest.
In previously granting planning permission for the site, it was concluded there was no
adverse impact and this position remains.
6.5 Within the Artizan Centre, some of the units are vacant and as such Policy 9
addressing brownfield, vacant and derelict land and empty buildings applies.
Development proposals that will result in the sustainable reuse of brownfield land
including vacant and derelict land and buildings, whether permanent or temporary, will
be supported.
6.5 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale as per Policy 14. Policy 15 relates to
local living and 20-minute neighbourhoods. Development proposal will contribute to
local living including, where relevant, 20-minute neighbourhoods. Consideration will be
given to existing settlement pattern, and the level and quality of interconnectivity of the
proposed development with the surrounding area, including local access to shopping
and playgrounds and informal play opportunities, parks, green streets and spaces.
There is thus no conflict with these Policies.
6.6 Policy 21 which addresses play, recreation and sport encourages, promotes and
facilitates spaces and opportunities for play, recreation and sport. Policy 22 on flood
risk and water management states that proposals will not increase the risk of surface
water flooding to others, or itself be at risk; manage all rain and surface water through
sustainable urban drainage systems (SuDS) and seek to minimise the area of
impermeable surface. The application site is within an area at risk of flooding and falls
into the exemption set out within the Policy relating to redevelopment of an existing
building or site for an equal or less vulnerable use. It remains that as per the Policy
matters relating to flood risk require to be fully considered and understood.
6.7 Policy 21 which addresses play, recreation and sport encourages, promotes and
facilitates spaces and opportunities for play, recreation and sport. Policy 22 on flood
risk and water management states that proposals will not increase the risk of surface
water flooding to others, or itself be at risk; manage all rain and surface water through
sustainable urban drainage systems (SuDS) and seek to minimise the area of
impermeable surface. The application site is within an area at risk of flooding and falls
into the exemption set out within the Policy relating to redevelopment of an existing
building or site for an equal or less vulnerable use and as such there is no conflict with
the policy.
6.8 Policy 23 relates to Health and safety. Part (e) states that development proposals that
are likely to raise unacceptable noise issues will not be supported. Overall, the
proposal including the amended approach to construction hours is acceptable and fully
assessed in Section 7 below. Policy 28 relates to Retail and states that development
proposals for retail (including expansions and changes of use) will be consistent with
the town centre first principle.
6.9 With appropriate planning conditions, it remains that the proposed development is
supported by all policies of NPF4 and is assessed fully in Section 7 below.
West Dunbartonshire Adopted Local Plan 2010

Page 5

6.10 Policy UR1 encourages the redevelopment and re-use of underused, vacant and/or
derelict land and buildings for appropriate uses such as housing. Policy GD1 seeks to
ensure that all new development is of a high quality of design and respects the
character and amenity of the area.
6.11 Policy RET5 seeks to improve the environment of the town centres of Alexandria,
Clydebank and Dumbarton and Policy RET6 seeks to protect and enhance the retail
and commercial function by encouraging the improvement of existing retail floorspace.
6.12 Policy DC 2 requires new shopfronts, whether on existing buildings or on new
developments, to be designed in accordance with the Council’s Shop Front Design
Guide for commercial frontages.
6.13 Policy BE1 seeks to ensure that no works adversely affect the appearance and
character of conservation areas and Policy BE2 takes a similar approach in respect of
ensuring that proposals do not adversely affect the setting of any listed buildings.
Policy BE3 encourages and supports the renovation rather than demolition of derelict
properties which are not listed but are considered to contribute to the townscape
character of the surrounding area. Policy B5 advises on development proposals that
impact upon local archaeology and the approach to assessing and recording features.
6.14 Policy R2 states that the Council will have due regard to the provision of open space
as an integral part of proposals. Policy R3 relates to the enhancement of open space
and sports facilities.
6.15 Policy E1 relates to the Council’s biodiversity duty. Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable tree
planting. Policies F1 and F2 aim to ensure that new development is not at risk from,
and does not increase the risk of flooding, and has suitable SUDS drainage
infrastructure. There is a general presumption against development within the flood
plain. The up-to-date development plan position in flooding is set out within Policy 22
of NPF4 which therefore has primacy in this instance.
6.16 It remains that the proposal overall complies with the relevant policies of the adopted
local plan and is assessed fully in Section 7 below.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would not
adopt Local Development Plan 2. The Proposed Local Development Plan 2 (LDP2),
incorporating the recommended modifications of the Examination Report received on
22 April 2020, which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore afforded
significant weight in the assessment and determination of planning applications,
subject to compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material consideration.
7.2 Policy CP1 seeks to ensure that all new development will be expected to contribute
towards creating successful places by having regard to the six qualities of a successful
place (distinctive, adaptable, resource efficient, easy to get to/move around, safe and
pleasant, and welcoming). Policy CP2 requires the integration and consideration of
green infrastructure from the outset of the design process through to its maintenance
and stewardship of the resource.

Page 6

7.3 Dumbarton Policy 1 High Street and Retail Development supports a more diverse and
vibrant Town Centre and will encourage a range of uses within the Core Town Centre
area where they accord with Policy SC2 of the Plan. Policy SC2 supports a range of
different uses within the core Town Centre where they help to improve the vibrancy of
the Town Centre.
7.4 Policy BE1 takes a similar approach to the adopted Local Plan in respect of
archaeology with Policy BE2 advising on the impact upon the setting of listed buildings.
Due to the location within a conservation area, Policy BE3 applies. Policy BE3 does
states that new development within or affecting a Conservation Area should be of a
high standard of design and enhance the character of the area and should have regard
to the Conservation Area Appraisal for that area.
7.5 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree, water
environment and flooding policies of the adopted Local Plan, although in respect of
flooding, the up-to-date development plan position is set out within Policy 22 of NPF4
which has primacy.
7.6 The Council will actively encourage the temporary greening of any vacant, derelict,
stalled or underused site to improve the contribution to the green infrastructure and to
improve the character and amenity of the particular community or area in accordance
with Policy ENV7. Policy ENV8 relates to air, light and noise pollution and states that
all new development must ensure that significant adverse noise impacts on
surrounding properties and uses are avoided. Policy ENV9 requires developers to
establish the nature of any contamination on any potential development site. Where
contamination is present and risks to key receptors are identified, then remediation will
be required to ensure the site can be made suitable for its future use.
7.7 It is considered that overall, it remains that the proposal complies with the relevant
policies above.
Historic Environment Scotland’s Policy and Guidance
7.8 The Historic Environment Policy for Scotland seeks to ensure that changes to specific
assets and their context are managed in a way that protects the historic environment.
7.9 Historic Environment Scotland’s Managing Change in the Historic Environment
Guidance Note series provides advice and guidance to Planning Authorities
determining applications which affect the historic environment. Guidance Note subjects
relevant to this proposal include setting, external walls, shopfronts and windows.
7.10 The guidance note on ‘Setting’ advises that setting can be important to the way in which
historic structures or places are understood, appreciated and experienced, and
provides guidance on factors to be considered in assessing the impact of a change on
the setting of a historic asset or place. Overall, it is considered that the principle of the
proposal will enhance the setting of the Dumbarton Conservation Area and be to the
benefit of the wider area and therefore have no detrimental effects to any surrounding
Conservation Area or listed buildings.
7.11 The guidance on ‘External Walls’ highlights that the design, materials, method of
construction, colour, texture, detailing and finish typically contribute to the character of
a historic wall. Whilst the buildings of the Artizan themselves are not listed they form a
part of the fabric of the Conservation Area. Shopfronts are highlighted as contributing
to the architectural quality of a building and to the character of a place.

Page 7

7.12 Overall, it remains that the proposal overall presents no conflicts with Historic
Environment Scotland’s Policy and Guidance.
7.13 Dumbarton Town Centre Conservation Area Appraisal
Dumbarton Town Centre Conservation Area was designated on 11 October 2019. The
Conservation Area Appraisal notes that the architecture of Dumbarton town centre falls
into a number of distinct eras which can be easily identified by the styles and materials
employed. This creates interest and relieves potential monotony. It is noted that since
the turn of the century, West Dunbartonshire Council has seen the regeneration of the
town centre as a priority, including the Artizan Centre at the heart of the 1960s re-
development which was re-modelled in 2004
7.14 The creation of the Artizan Centre and its redevelopment is noted at several points
throughout the appraisal, with comments made that the re-modelling (and
enlargement) of the Artizan Centre destroyed the 1960s pedestrian route through the
town square to the cinema, housing and station beyond; that there are a number of
unresolved areas behind and near the Artizan Centre that do not aid orientation; and
that there is even a uniformity of scale in the buildings that were delivered as part of
the creation of the Artizan Centre.
7.15 The Dumbarton Town Centre Conservation Area Proposal of 2019 noted that the High
Street Character Area had retained much of its original form in terms of its solid
frontage and retail designation. The lack of quality in shop frontages and signage is
extremely detrimental to the character and townscape of Dumbarton. Many shopfronts
and signage displays on High Street are constructed of non-traditional materials, and
do not reflect the original proportions of traditional shopfronts.
7.16 Open space in the town centre comprises largely of car parks and small pockets of
grass: Dumbarton is well served by places to park and the majority of these are
landscaped with hedge planting and trees (some flowering).
7.17 The appraisal also notes that given the various periods of development evident in the
Dumbarton Town Centre Conservation Area, there is a wide range of building materials
used, not all of which fall under the category of “traditional”. Public realm finishes are
stated to be tidy, albeit clinical.
Creating Places Guidance and Green Network and Green Infrastructure Guidance
7.18 The Creating Places Supplementary Guidance – November 2022 seeks to achieve
high quality development with a design led approach based on a thorough appraisal of
the site and an analysis of its context and sets out that this is expected for all
development proposals.
7.19 The Green Network and Green Infrastructure Supplementary Guidance - November
2022 seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space created.
This will include a focus on biodiversity enhancement.
Assessment of Section 42 applications
7.20 The application is made under section 42 of the Planning Act 1997, which is an
application for planning permission for the development of land but without compliance
with a condition or conditions attached to the original permission. In this case, the
applicant seeks not to comply with the terms of Condition 12 of planning permission
DC24/081/FUL as worded, with alternative wording sought. Condition 12 relates to
working hours. The effect of a Section 42 application, if successful, is to grant planning
permission again for the whole development but with the amended conditions

Page 8

replacing those that were issued previously. Planning Authorities, if minded, may
attach new or updated conditions if permission is granted.
Principle of Development
7.21 As noted in paragraph 6.1 above, the principle of development on this site has already
been established through the granting of planning permission DC24/081/FUL. This
permission remains extant and can be implemented as approved. It remains that the
site is located within the defined Dumbarton Town Centre area as well as within the
core Town Centre area. NPF4, the adopted Local Plan and the proposed LDP2 all
promote developments within town centres which increase viability and vitality of the
town centre. The proposals to upgrade shopfronts is well supported by Policy 14 of
NPF4 which requires proposals to improve the quality of an area and regardless of
scale as well as Policy DC 2 of the adopted Local Plan.
7.22 The proposal for public realm works in the form of a shelter structure, play area and
landscaping is also well supported through Policy 15 relating to local living and 20
minute areas as well as Policy 21 relating to the provision of play opportunities. In
addition, Policy ENV7 supports the temporary greening of sites.
7.23 The proposal will support long term town centre regeneration plans for Dumbarton
Town Centre and will complement the proposals for the regeneration of the Glencairn
House. Overall, the principle of the development to upgrade existing shopfronts as well
as the public realm works are appropriate and encouraged within the Town Centre
where this development proposal is located. The proposals will provide significant
enhancement to the area, which in turn will create a more attractive environment which
will potentially encourage people to the Town Centre. Any increase in footfall will have
a positive impact on the overall vitality and viability of the Town Centre. Overall, the
principle of the development remains acceptable and a full, detailed, reassessment of
the wider proposal is not considered to be required.
Hours of working – Condition 12
7.24 The Section 42 application has been submitted to alter Condition 12 so that the hours
of working can be amended from those prescribed within the original condition. In
considering if it is acceptable to amend these working hours there needs to be an
assessment as to the reason the hours were first conditioned and whether these hours
still apply.
7.25 The condition was applied “to ensure that the development does not adversely affect
the amenity of neighbouring properties by creating excessive noise and disturbance at
unsocial hours” and followed advice provided in the consultation response from
Environmental Health. Since the attachment of this condition to the previous granting
of planning permission it has been highlighted by the applicant that in order to ensure
that the businesses within the Artizan centre can remain open and operational during
the construction period, façade improvement works are required to be carried outwith
regular trading hours (i.e. after 5pm). The specific hours of working and timeframes are
included within the schedule provided as part of the application submission (SAV1).
This sets out a programme of works for each section of the site including start and
finish dates together with timings of particular aspects of the works. These timings have
working hours to 11pm for a variety of works including canopy works together with
shopfront replacement works near to residential properties. Other works such as
shopfront works within College Way which are away from residential properties are not
restricted. The programme of works will run until 27/11/26. The application is supported
by a Construction Noise Assessment.

Page 9

7. 26 The applicant proposes to vary the condition by way of an update the wording to add
reference the working hours as referenced in the submitted schedule SAV1. In
addition, the applicant has further proposed the wording “Where changes to the
programme are required an amended schedule shall be submitted to the Planning
Authority for its information”. This would mean that any future changes to the agreed
working hours would not have to be approved in writing by the Planning Authority and
would only be provided for information.
7.27 When undertaking the assessment of the proposed variation to Condition 12, Policy
23 of NPF4 is relevant. Policy 23 (Health and Safety) of NPF4 seek to protect people
and places from environmental harm Policy 23-part e) states that development
proposals that are likely to raise unacceptable noise issues will not be supported. The
agent of change principle applies to noise sensitive development. A Noise Impact
Assessment may be required where the nature of the proposal or its location suggests
that significant effects are likely. A Construction Noise Assessment has been
submitted in support of the proposal. This report provides an assessment of the
potential noise impacts between the hours of 17:00 and 03:00 arising from the
proposed works. It is concluded that the application site is within a busy town centre
location and that a variety of works can be undertaken on site into the evening without
the potential for adverse impact upon residential amenity with the town centre.
However, significant nighttime effects on amenity could arise from construction
activities. The submitted working hours schedule proposes that audible works outwith
the site boundary will generally cease by 23:00. It is noted, however, that for some
works such as canopy removal for example, this time is later than the cautionary
approach recommended in the applicant’s Noise Assessment.
7.28 In considering whether the proposed hours of work are acceptable, the application
assessment is guided by the advice in the consultation response from the Council’s
Environmental Health Service. Following full consideration of the proposed working
hours and noting the busy town centre location, Environmental Health offer no
objections on the proposal and are satisfied with the proposed changes to working
hours. It is however noted that that the agreed hours include all noise generating
activities so works should have ceased and staff cleared the site (where this generates
noise) by the agreed schedule of hours. In further assessing the application and as
highlighted in paragraph 7.26 above, the applicant seeks further flexibility in their
proposed condition which would mean that any future changes to the agreed working
hours would not have to be approved in writing by the Planning Authority and would
only be provided for information. This raises the concern that there would be
insufficient control over future changes to the agreed working hours which could have
the potential to adversely impact upon residential amenity. Whilst it is considered
appropriate to allow an element of flexibility for changes and updates to the programme
of works, such changes would require to be agreed by the Planning Authority. In
addition, it is also considered appropriate to retain the ability of the applicant to
undertake works during the standard daytime working hours specified in the original
condition 12 and the applicant’s proposed condition would not permit this. As such, an
alternative wording for the amended condition 12 is recommended as follows:
7.29 “During the period of construction, all works and ancillary operations which are audible
at the site boundary (or at such other place(s) as may be first agreed in writing with the
Planning Authority) shall be carried out between the hours and programme shown on
the submitted schedule SAV1 in addition to the standard working hours of:
 Mondays to Fridays: 0800 - 1800
 Saturdays: 0800 - 1300

Page 10

 Sundays and public holidays: No Working
Where changes to the programme are required, an amended schedule shall be
submitted to the Planning Authority prior to the changes being implemented and
approved in writing before their implementation.”
7.30 It is considered that subject to the wording of the condition as set out above, the
development proposal is acceptable with reference to with the adopted Local Plan and
proposed Local Development Plan policies.
Outstanding matters raised in representations
7.31 Considering the objection received, this was in relation to the proposed working hours
disturbing the Sunday services of Lennox Evangelical Church which is located at 2
Risk Street. Whilst some of the works are highlighted as affecting properties on Risk
Street, the church is not specifically noted as being affected. The timings for the works
that affect residents of Risk Street are between 6pm and 11pm and as such do not
affect the Sunday services between 0930 and 1330.
8. CONCLUSION
8.1 The acceptability of the re-development of the site has previously been established
with the granting of planning permission in principle (ref: DC24/081/FUL). This
application is a Section 42 application to vary the terms of condition 12 of planning
application DC24/081/FUL. Following consideration of the applicants proposed
variation to the condition and informed by the consultation responses from the
Council’s Environmental Health Service, it is concluded, subject to the further revised
wording being applied as set out in paragraph 7.29 above, the proposal is in
accordance with Policy 23 of NPF4.
9. CONDITIONS
1. Prior to the commencement of development on site, exact details of all proposed
external materials (inclusive of all hard surfaces), to be used in the development site
shall be submitted to and approved in writing by the Planning Authority. Thereafter,
unless otherwise agreed in writing with the Planning Authority, the development shall
be completed in strict accordance with the approved material details and palette.
Reason: In the interest of visual amenity.
2. Notwithstanding the approved plans, a programme for the implementation and
completion of the soft and hard landscaping works shall be submitted to, and approved
in writing by the Planning Authority. Thereafter the development shall proceed
accordance with the approved details, unless otherwise agreed in writing by the
Planning Authority.
Reason: In the interest of visual amenity.
3. Notwithstanding the approved details, a Tree protection Plan to describe how trees on
site shall be safeguarded through the development process, including details of any
works required to the trees to allow for the construction phase shall be submitted to
and approved in writing by the Planning Authority. Thereafter, unless otherwise agreed
in writing with the Planning Authority, the development shall be completed in strict
accordance with the approved plan.

Page 11

Reason: In the interest of visual amenity, protection and enhancement of biodiversity
and tree protection.
4. That any trees, shrubs or areas of grass which die, are removed, damaged or become
diseased within five years of completion of the landscaping shall be replaced within the
following year with others of a similar size and species.
Reason: In the interest of visual amenity and biodiversity.
5. Notwithstanding the approved plans, prior to the installation of the proposed play
equipment, full details of the equipment to be installed and its location shall be provided
to and approved in writing. Thereafter, the play equipment shall be installed as
specified, and remain in place for the lifetime for the development unless otherwise
agree in writing by the Planning Authority.
Reason: To ensure that full details of play equipment are secured.
6. Prior to commencement of any works on site, a site management scheme for
construction traffic shall be submitted to and approved in writing by the Planning
Authority. Thereafter work shall proceed in accordance with the approved scheme
unless otherwise agreed in writing with the Planning Authority.
Reason: In the interest of road safety.
7. a) No development that breaks ground or otherwise involves ground works (other
than investigative work) can take place until such time as a comprehensive site
investigation has been carried out to the appropriate Phase level and submitted
to and approved in writing by the Planning Authority. The investigation shall be
completed by a suitably qualified and competent person and completed in
accordance with advice given in the following:
 Planning Advice Note 33 (2000) and Part IIA of the Environmental
Protection Act 1990 (as inserted by section 57 of the Environment Act
1995)
 BS 10175:2011+A1:2013 – British Standards institution ‘The Investigation
of Potentially Contaminated Sites – Code of Practice’.
 Land Contamination and Development Management -Guidance.
https://www.ep-scotland.org.uk/wp-
content/uploads/2019/09/ConLanDevGuide_12-Aug19-FINAL.pdf
i. If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated, and these linkages must be
subjected to risk assessment. If a Phase 2 investigation is required, then a risk
assessment of all relevant pollution linkages will require to be submitted.
ii. If the risk assessment identifies any unacceptable risks then an appraisal of
remedial options followed by a detailed remediation scheme will be submitted
to and approved in writing by the Planning Authority. No works other than
investigative works shall be carried out on site prior to receipt of the Planning
Authority’s written approval of the remediation scheme.

Page 12

Reason: To protect public health and to ensure that the site is suitable for its intended
use.
8. Remediation of the site shall be carried out in accordance with the approved
remediation scheme prior to the proposed development being brought into use. Any
amendments to the approved remediation scheme shall not be implemented unless
approved in writing by the Planning Authority.
On completion of the remediation works, the developer shall submit a verification report
to the Planning Authority, confirming that the works have been carried out in
accordance with the approved remediation scheme and that the works have
successfully reduced the risks to acceptable levels.
Reason: To protect public health and to ensure that the site is suitable for its intended
use.
9. The presence of any previously unexpected contamination that becomes evident
during the development of the site shall be reported to the Planning Authority in writing
within one week, and work on the site shall cease. At this stage, if requested by the
Planning Authority, an appropriate investigation and risk assessment shall be
undertaken and a remediation scheme shall be submitted to and approved by the
Planning Authority prior to the recommencement of site works. The approved details
shall be implemented as approved.
Reason: To protect public health and to ensure that the site is suitable for its intended
use.
10. If there is a requirement to either re-use site won material or to import material then the
assessment criteria and sampling frequency that would adequately demonstrate its
suitability for use shall be submitted to and approved by the Planning Authority prior to
any material being re-used or imported. In addition to this and in accordance with
BS3882:2015 and BS8601:2013, material to be used in the top 300mm shall also be
free from metals, plastic, wood, glass, tarmac, paper and odours. On completion of the
works and at a time and or phasing agreed by the Planning Authority, the developer
shall submit a validation report containing details of the source of the material and
associated test results to demonstrate its suitability for use.
Reason: To protect public health and to ensure that the site is suitable for its intended
use.
11. Unless otherwise approved in writing by the Authority, no development shall
commence on site until such time as a scheme for the control and mitigation of dust
has been submitted to and approved in writing by this Authority. The scheme shall
identify likely sources of dust arising from the development or its construction and shall
identify measures to prevent or limit the occurrence and impact of such dust. The
approved scheme shall thereafter be implemented fully prior to any of the identified
dust generating activities commencing on site and shall be maintained thereafter,
unless otherwise approved by this Authority.
Reason: To minimise the occurrence of dust, in the interests of the amenity of the area.
12. During the period of construction, all works and ancillary operations which are audible
at the site boundary (or at such other place(s) as may be first agreed in writing with the
Planning Authority) shall be carried out between the hours and programme shown on
the submitted schedule SAV1 in addition to the standard working hours of:

Page 13

 Mondays to Fridays: 0800 - 1800
 Saturdays: 0800 - 1300
 Sundays and public holidays: No Working
Where changes to the programme are required, an amended schedule shall be
submitted to the Planning Authority prior to the changes being implemented and
approved in writing before their implementation.
Reason: To ensure that the development does not adversely affect the amenity of
neighbouring properties by creating excessive noise and disturbance at unsocial
hours.
13. Prior to any works proposed which break ground or otherwise involves ground works,
the developer shall secure the implementation of a programme of archaeological works
in accordance with a written scheme of investigation which has been submitted to and
approved in writing by the Planning Authority in consultation with the West of Scotland
Archaeology Service. Thereafter the developer shall ensure that the programme of
archaeological works is fully implemented and that all recording and recovery of
archaeological resources within the development site is undertaken to the satisfaction
of the Planning Authority in agreement with the West of Scotland Archaeology Service.
Reason: In the interests of the recording of antiquity.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 6th August 2025
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Service Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Representation
3. Consultation responses
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
Creating Places Guidance (2022)
8. Green Network and Green Infrastructure
Supplementary Guidance (2022)
9. Dumbarton Town Centre Conservation Area Appraisal
10. Historic Environment Policy for Scotland

Page 14

11. Historic Environment Scotland Managing Change in
the Historic Environment Guidance Notes on Setting,
External Walls and Shopfronts
12. Planning application DC24/081/FUL
Wards affected: Ward 3 (Dumbarton)