Agenda 
Planning Committee 
Date:  Wednesday, 6 August 2025
___________________________________________________________________ 
Time:  10.00 a.m.
___________________________________________________________________ 
Venue:  Council Chambers, Clydebank Town Hall, 5 Hall Street, 
Clydebank G81 1UB
_________________________________________________________________ 
Contact:    Nicola Moorcroft, Committee Officer
Email: nicola.moorcroft@west-dunbarton.gov.uk         
committee.admin@west-dunbarton.gov.uk 
Dear Member 
Please attend a meeting of the Planning Committee as detailed above.   
The business is shown on the attached agenda. 
Yours faithfully 
PETER HESSETT 
Chief Executive 
Page 1

Page 2

Distribution:-
Councillor Lawrence O’Neill (Chair)
Councillor Gurpreet Singh Johal (Vice Chair)
Councillor Kevin Crawford
Councillor Ian Dickson
Councillor David McBride
Councillor Fiona Hennebry
Provost Karen Murray Conaghan
Councillor Lauren Oxley
Councillor Hazel Sorrell
Councillor Clare Steel 
All other Councillors for information 
Date of Issue: 24 July 2025 
Page 2

Page 3

PLANNING COMMITTEE 
WEDNESDAY, 6 AUGUST 2025 
AGENDA 
1 APOLOGIES 
2 DECLARATIONS OF INTEREST 
Members are invited to declare if they have any interests in the items of
business on this agenda and the reasons for such declarations. 
3 OPEN FORUM 
The Committee is asked to note that no open forum questions have been
submitted by members of the public. 
4 MINUTES OF PREVIOUS MEETING       5 - 18 
Submit for approval, as a correct record, the Minutes of Meeting of the
Planning Committee held on 4 June 2025. 
5 PLANNING APPLICATION       19 - 33
Submit report by the Planning, Building Standards and Environmental Health
Manager, in respect of the following Planning application:-   
DC25/076/FUL: Section 42 Application to vary Condition 12 - Working Hours
(Amendment to DC24/081/Ful) at Artizan Centre College Way, Dumbarton by
West Dunbartonshire Council. 
6 
APPLICATION DC22/245/FUL 
SCOTTISH MINISTERS DECISION ON PLANNING                         35 - 37 
Submit report by the Planning, Building Standards and Environmental Health
Manager providing an update on Planning Application DC22/245/FUL which
was referred to the Scottish Ministers. 
7/ 
Page 3

Page 4

7 NATIONAL PLANNING IMPROVEMENT FRAMEWORK  39 - 116 
Submit report by the Planning, Building Standards and Environmental Health
Manager providing an update on recent work undertaken by the Planning
Service in relation to the National Planning Improvement Framework and the
endorsement by the National Planning Improvement Team of the
Performance Assessment and Improvement Plan. 
8 DC25/019/S36: BATTERY ENERGY STORAGE FACILITY  
CONSISTING OF COMPOUND OF BATTERIES AND 
ASSOCIATED ELECTRICAL EQUIPMENT, STORES, ACCESS 
TRACK, BUILDINGS, FENCING, POND, BUNDS AND NEW 
PLANTING AT BRAIDFIELD ROAD, HARDGATE, CLYDEBANK 
BY BRAIDFIELD BATTERY STORAGE LIMITED  
117 - 143 
Submit report by the Planning, Building Standards and Environmental Health
Manager seeking agreement for a response to a consultation received from
the Scottish Government Energy Consents Unit on behalf of the Scottish
Ministers regarding a proposed battery energy storage system with a
generating capacity of up to 100 megawatts. 
9 DC23/223/S36: PROPOSED WIND FARM DEVELOPMENT  145 - 202
COMPRISING UP TO TEN WIND TURBINES OF 
APPROXIMATELY 7 MEGAWATTS (MW) EACH, WITH A 
MAXIMUM BLADE TIP HEIGHT OF UP TO 250M, AND BATTERY 
ENERGY STORAGE SYSTEM (BESS) WITH A CAPACITY UP TO 
20 MW AT THE SITE OF THE PROPOSED VALE OF LEVEN 
WINDFARM, KILPATRICK HILLS, EAST OF ALEXANDRIA BY 
VALE OF LEVEN WIND FARM LIMITED   
Submit report by the Planning, Building Standards and Environmental Health
Manager seeking agreement on an updated consultation response following
the receipt of a revised proposal reducing the height of the proposed turbines
together with updated supporting documents from the Scottish Government
Energy Consents Unit, on behalf of the Scottish Ministers, in connection with a
proposed wind farm development comprising up to ten wind turbines of
approximately 7 megawatts (MW) each, with a maximum blade tip height of
up to 250m, and Battery Energy Storage System (BESS) with a capacity up to
20 MW at the Site of the Proposed Vale of Leven Windfarm, Kilpatrick Hills,
East of Alexandria by Vale of Leven Wind Farm Limited. 
Page 4

Page 5

PLANNING COMMITTEE 
At a Meeting of the Planning Committee held in the Civic Space, 16 Church Street,
Dumbarton on Wednesday, 4 June 2025 at 10.00 a.m. 
Present: Councillors Ian Dickson, Gurpreet Singh Johal, Lawrence
O’Neill, Chris Pollock and Clare Steel. 
Attending: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Michael McDougall, Manager of
Legal Services; and Nicola Moorcroft, Committee Officer. 
Apologies: Apologies for absence were intimated on behalf of Provost
Karen Murray Conaghan and Councillors Fiona Hennebry, David
McBride, Hazel Sorrell and Sophie Traynor. 
Councillor Lawrence O’Neill in the Chair 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of the Planning Committee held on 16 April 2025 were
submitted and approved as a correct record. 
PLANNING APPLICATIONS 
A report was submitted by the Chief Officer - Regulatory and Regeneration in
respect of the following Planning applications:- 
ITEM 4
Page 5

Page 6

DC24/091/FUL: Further application under Section 42 to not comply with condition 11
of planning permission DC21/115/FUL at Queens Quay Full Dev Site, Cart Street,
Clydebank by Clydeside Regeneration Limited. 
The Development Management Team Leader was heard in further explanation and in
answer to Members’ questions. 
After discussion and having heard the Development Management Team Leader in
further explanation and in answer to Members’ questions, the Committee agreed to
refer the application to Full Council for determination, with a preliminary
recommendation, based on the information considered to date, that it be approved,
subject to the conditions as detailed within Appendix 1 hereto. 
DC24/197/FUL: Amendment to Condition 2 and Condition 14 of permission
DC20/253 in relation to proposed site at Landfill Site at Auchincarroch Road,
Jamestown, Alexandria by Barr Environmental Ltd. 
The Development Management Team Leader was heard in further explanation of the
report. 
The Committee agreed to grant planning permission for this Section 42 application,
subject to the conditions as detailed within Appendix 2 hereto. 
CONSULTATION ON PROPOSED PAYPHONE REMOVALS 
A report was submitted by the Chief Officer - Regulatory and Regeneration setting
out the Council’s response to a consultation from BT Openreach on the proposed
removal of various public telephone boxes in West Dunbartonshire. 
After discussion and having heard the Planning and Building Standards Manager and
the Development Management Team Leader in further explanation and in answer to
Members’ questions, the Committee agreed to offer no objection to the removal of all
13 payphones, as listed in paragraph 3.3 of the report. 
The meeting closed at 10.21 a.m. 
Page 6

Page 7

APPENDIX 1 
DC24/091/FUL: Further application under Section 42 to not comply with
condition 11 of planning permission DC21/115/FUL at Queens Quay Full Dev
Site, Cart Street, Clydebank by Clydeside Regeneration Limited. 
GRANT full planning permission subject to the following conditions:- 
1. For the avoidance of doubt, Phase 1 works relate to any works associated
with the spine road, road improvements, quay walls, and public realm. The
linear park will be completed following completion of the relevant residential
phase to which it relates with the pocket parks and basin play park to be
completed within a timescale agreed with the Planning Authority, all identified
on annotated masterplan E2604.Sk001revJ received on 22nd June 2021 in
connection with planning application DC21/115/FUL. 
Reason: To provide clarity and to ensure the conditions relate to the correct
phasing. 
2. Prior to commencement of any development on site, further applications for
the approval of matters specified below shall be obtained from the planning
authority. Applications shall include: 
a) site layout plans showing the position of all buildings, roads, footpaths,
parking areas, walls, fences and landscaping;
b) block and layout plans and elevations of each building, showing
dimensions and palettes of external materials;
c) landscape and streetscape plans showing the location and species of all
proposed trees, shrubs, hedges, palettes of hard landscaping materials and
street furniture;
d) details of existing and proposed ground levels, and finished floor levels,
relating to a clearly identified fixed datum point;
e) a detailed report on the extent, scale and nature of any contamination of
the site; and
f) a detailed remediation scheme detailing the measures necessary to bring
the site to a condition suitable for the intended use. 
Reason: To ensure full details are provided for each aspect of the
development. 
3. As part of any application(s) for approval of matters specified in conditions,
and with regard to the requirements of condition 2 above, the design and
layout of development parcels shall comply with the design principles/intents
set out in sections 05 and 06 of the Design & Access Statement (Rev C,
March 2016), the accompanying Framework Drawing No. P(0) 003 Rev E (or
any subsequent amendments thereto), and the approved Design Codes for
Page 7

Page 8

Queens Quay (approved September 2020) unless otherwise agreed in writing
by the Planning Authority. 
Reason: To ensure the design principles agreed in these documents form part
of the consideration of any subsequent planning applications. 
4.  At the same time as the submission of the first commercial use application
(excluding any district heating system) a mini masterplan shall be submitted
for the mixed used area coloured yellow on Drawing No. P(0) 003 rev E
(including building plots, design principles and a parking strategy) for the
further approval of the Planning Authority. 
Reason: In order to allow consideration of the proposed mix of uses, and to
ensure consistency of design standards across the site and that a parking
strategy is considered early in the design process. 
5. As part of any application(s) for the approval of matters specified in conditions
for Phase 1 works, and notwithstanding the requirements of condition 2c)
above, details of the landscaping strategy for the spine road, linear park and
pocket parks shall include: 
a) location and species of all proposed trees, shrubs, hedges;
b) palettes of hard landscaping materials, street furniture and play equipment;
c) identify potential locations for public art; and
d) the means of management and maintenance of the landscaping and public
open space. 
Reason: To ensure full details are submitted for further consideration. 
6.  No development (other than the spine road works, road improvement works,
quay wall works, public realm works, health and care site works and
investigative works, but excluding the linear and pocket parks) shall
commence on site until such time as a site-wide water environment
investigation and assessment has been submitted to and approved in writing
by the Planning Authority. The report shall be prepared by a suitably qualified
person and as a minimum shall include the following: 
a) Suitable and sufficient monitoring from across the site in order to identify
the extent, scale and nature of contamination with regards to the water
environment.
b) An appropriate level of assessment that identifies the key receptors and the
significance of any pollutant linkages found to be present.
c) Should a significant pollutant linkage be identified on the site then a site
wide preliminary remedial options appraisal is to be provided that
demonstrates whereabouts on the site remediation is considered likely. 
Any measures identified in the report shall be implemented as approved
within a timescale agreed with the Planning Authority. 
Page 8

Page 9

Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
7. No development (other than the spine road works, road improvement works,
quay wall works, public realm works, health and care site works and
investigative works, but excluding the linear and pocket parks) shall
commence on site until such time as a site wide assessment of the underlying
ground gas regime has been submitted to and approved in writing by the
Planning Authority. The report shall be prepared by a suitably qualified person
and as a minimum shall include the following: 
a) Suitable and sufficient monitoring from across the site in order to assess
the ground gas conditions that currently exist under the site.
b) A strategy confirming that and detailing how the monitoring of ground gas
boreholes will continue throughout the various development phases. It should
also refer to the future method of reporting to the Planning Authority as the
development progresses.
c) A preliminary assessment of the implications of the existing ground gas
conditions on the proposed mixed-use development. 
Any measures identified in the report shall be implemented as approved
within a timescale agreed with the Planning Authority. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
8. As part of any application(s) for the approval of matters specified in
conditions, Noise Impact Assessments for each development parcel shall be
carried out to assess the potential impacts of noise from sources including
road traffic, air traffic, plant equipment and entertainment noise and submitted
for the further approval of the Planning Authority. 
Reason: In order to avoid disturbance to residential properties. 
9. Prior to the reuse of material from the onsite spoil mounds and/or the
importation of any material onto the site, details of the source of the material
and associated test results to demonstrate its suitability for use shall be
submitted to the Planning Authority for approval. In addition to this and in
accordance with BS3882:2015, the material shall also be free from metals,
plastic, wood, glass, tarmac, paper and odours associated with contaminated
soils. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
10. No development shall commence until the developer submits an
archaeological mitigation strategy for the further approval of the Planning
Authority. Thereafter the developer shall ensure that the approved strategy is
fully implemented in accordance with the recommendations set out in sections
8.339 – 8.353 of the Environmental Statement approved under planning
Page 9

Page 10

permission DC15/234 and that all recording and recovery of archaeological
resources within the development site is undertaken in agreement with the
Planning Authority and West of Scotland Archaeology Service. 
Reason: The site is of archaeological significance and the strategy will set out
the general scope of mitigation work to be followed before and during
development but allow the detailed preparation of more detailed Written
Schemes of Investigation to be brought forward for approval as each
development parcel becomes imminent. 
11. All applications for the approval of matters specified in conditions shall include
land raising of low-lying areas of the site to above the 1 in 200 year plus
climate change flood level (set at 5.4m AOD), and finished floor levels of all
buildings are to be set to at least 0.6m above the 1 in 200 year plus climate
change floor level at 6.1m AOD. All development shall be implemented in
accordance with these details. 
Reason: To mitigate against the risk from flooding by the adjacent River
Clyde. 
12. As part of the approval of matters specified in conditions, each development
parcel shall comply with the recommendations of the Drainage Impact
Assessment (Rev B, October 2015) with details of the means of disposal of
surface water, foul sewage and a Sustainable Urban Drainage Scheme to be
submitted for the further approval of the Planning Authority. 
Reason: To ensure an appropriate means of drainage for the site. 
13. The number of dwelling units consented for the site shall not exceed 1,056
units unless otherwise first agreed in writing by the Planning Authority. 
Reason: In order to ensure that the density of development is appropriate to
the site and that the number of dwelling units does not exceed the figure upon
which the Transport Assessment was based without proper consideration of
any resultant implications. 
14. Prior to the commencement of development, a strategy detailing the
implementation of community/affordable housing provision within the site shall
be submitted for the further approval of the Planning Authority. 
Reason: In order to ensure the provision of an appropriate level of social
housing. 
15. As part of the Phase 1 application for the approval of matters specified in
conditions, a Construction and Environmental Management Plan shall be
submitted for the further approval of the Planning Authority in consultation
with NatureScot. It shall: 
a) detail measures to screen the development in terms of noise and visual
disturbance from the Inner Clyde SPA, Ramsar site and SSSI;
Page 10

Page 11

b) detail measures to limit pollution to the Inner Clyde SPA, Ramsar site and
SSSI;
c) identify those works that are likely to have significant potential for visual
and noise disturbance, such as piling. 
No works which are identified as likely to have a significant potential for visual
and/or noise disturbance shall be carried during the main wintering period
(September to early April). The Construction and Environmental Management
Plan shall be implemented within a timescale agreed with the Planning
Authority. 
Reason: In order to minimise the risk of the development giving rise to
adverse impacts upon the protected Inner Clyde SPA, Ramsar site and SSSI. 
16. As part of the Phase 1 application for the approval of matters specified in
conditions, a detailed Recreation and Access Management Plan which details
measures to limit potential disturbance to the north shore of the Inner Clyde
SPA, Ramsar site and SSSI from increased access to the river shall be
submitted for the further approval of the Planning Authority and implemented
within a timescale agreed with the Planning Authority. 
Reason: In order to minimise the risk of the development giving rise to
adverse impacts upon the protected Inner Clyde SPA, Ramsar site and SSSI. 
17. As part of the Phase 1 application for the approval of matters specified in
conditions, the applicant shall submit a Sustainable Transport Strategy which
shall include details of: 
a) bus integration into the site;
b) walking routes to/from the site;
c) location of bus stops;
d) green travel plans; and
e) initiatives towards encouraging bus services into the site. 
The recommendations of the Sustainable Transport Strategy shall require to
be implemented in accordance with an agreed phasing plan within a timescale
agreed with the Planning Authority. 
Reason: To deliver effective, efficient and integrated transport for the site that
does not have a detrimental impact on the sustainability of the existing town
centre. 
18.  As part of any application for approval of matters specified in conditions, a
Travel Plan shall be submitted to and approved by the Planning Authority
detailing the opportunities for sustainable travel to and from that development
parcel. 
Reason: To promote sustainable means of transport and to reduce reliance
on the car.
Page 11

Page 12

19. As part of the Phase 1 application for the approval of matters specified in
conditions, the following shall be included: 
a) details of parking provision for visitors to the Titan Crane and the riverside
walkway; and
b) details of the new signal-controlled junction and realignment of Cable
Depot Road (section 9.14 of the Transport Assessment (October 2015).
c) These works shall be implemented as approved as part of the Phase 1
works to the site. 
Reason: To ensure that the development is provided with adequate parking
facilities in order to minimise the incidence of roadside parking which would
be a danger to other road users. 
20.  Prior to any part of the development site being occupied or otherwise being
brought into use, the works recommended in the Transport Assessment
(October 2015) to realign Ailsa Road (section 9.12) and carry out layout
improvements to Cart Street/Glasgow Road junction (section 9.23) shall be
implemented as approved. 
Reason: To ensure that the development is provided with adequate parking
facilities in order to minimise the incidence of roadside parking which would
be a danger to other road users. 
21. As part of any application(s) for the approval of matters specified in
conditions, parking spaces shall be provided in accordance with the Council’s
adopted parking standards, and no building shall be occupied until its parking
facilities have been completed. 
Reason: To ensure that the development is provided with adequate parking
facilities in order to minimise the incidence of roadside parking which would
be a danger to other road users. 
22. As part of any application(s) for the approval of matters specified in
conditions, each residential unit shall be provided with a secure covered
bicycle storage facility at ground floor level. Each non-residential development
shall have adequate secure covered cycle storage for staff in addition to
adequate securable covered cycle facilities for visitors/customers. 
Reason: To encourage the use of sustainable forms of travel and to
discourage crime by providing secure facilities. 
23. The amount of retail floor space permitted is 3,000m² (gross). Any unit trading
primarily in convenience goods shall not exceed 1,000m². Any unit trading in
comparison goods shall not exceed 250m². Proposals to exceed these floor
space thresholds shall be the subject of a separate planning application and
retail statement for the further approval of the Planning Authority. 
Reason: To limit the impact of the development on Clydebank town centre to
the levels tested in the Planning and Retail Statement (GVA James Barr,
Page 12

Page 13

October 2015), and to ensure that a convenience store is included in the
development which is of a size to increase choice within Clydebank. 
24.  As part of any application(s) for the approval of matters specified in conditions
details of soft and water landscaping works shall be submitted to and
approved in writing by the Planning Authority in consultation with Glasgow
Airport. Details must comply with Advice Note 3 “Potential Bird Hazards from
Amenity Landscaping & Building Design”. These details shall include: 
• The species, number and spacing of trees and shrubs
• Details of any water features
• Drainage details including SUDS – such schemes must comply with Advice
Note 6 “Potential Bird Hazards from Sustainable Urban Drainage Schemes” 
The scheme shall be implemented as approved. 
Reason: To avoid endangering the safe movement of aircraft and the
operation of Glasgow Airport through the attraction of birds and an increase in
the bird hazard risk of the application site. 
25. Any development that would create a roof area greater than 250 square
metres with a roof pitch of less than 15° shall not commence until a Bird
Hazard Management Plan has been submitted to and approved in writing by
the Planning Authority in consultation with Glasgow Airport. The submitted
plan shall include details of the management of the roofs within the site which
may be attractive to nesting, roosting and “loafing” birds. 
The management plan shall comply with Advice Note 8 “Potential Bird
Hazards from Building Design”. 
Reason: To avoid endangering the safe movement of aircraft and the
operation of Glasgow Airport through the attraction of birds and an increase in
the bird hazard risk of the application site. 
26. As part of the first application for the approval of matters specified in
conditions under Condition 2 above, an Energy Strategy for the site shall be
submitted for the approval of the Planning Authority. The Energy Strategy
shall include details for the delivery and implementation of on-site low carbon
and renewable energy solutions, building specific technologies and features
alongside any other measures aimed at increasing energy efficiency on the
site. The approved strategy including any agreed measures shall be
implemented on site and unless otherwise agreed in writing by the Planning
Authority and shall remain in place for the lifetime of the development. Any
modifications or updates required for the approved strategy shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved. All subsequent applications for matters specified by
condition under Condition 2 above shall demonstrate adherence to the agreed
approach. 
Page 13

Page 14

Reason: To ensure the incorporation of low carbon technologies and minimise
greenhouse gas emissions 
27. As part of the first application for the approval of matters specified in
conditions under Condition 2 above, a biodiversity enhancement strategy for
the site shall be submitted for the approval of the Planning Authority. The
biodiversity enhancement strategy shall include details designed to protect
biodiversity, reverse biodiversity loss, deliver positive effects from
development and strengthen nature networks. The approved strategy
including any agreed measures shall be implemented on site and unless
otherwise agreed in writing by the Planning Authority and shall remain in
place for the lifetime of the development. Any modifications or updates
required for the approved strategy shall first be subject to the written approval
of the Planning Authority and implemented thereafter as approved. All
subsequent applications for matters specified by condition under Condition 2
above shall demonstrate adherence to the agreed approach. 
Reason: In the interests of the enhancement of biodiversity and maximising
positive biodiversity benefits. 
Page 14

Page 15

APPENDIX 2 
DC24/197/FUL: Amendment to Condition 2 and Condition 14 of permission
DC20/253 in relation to proposed site at Landfill Site at Auchincarroch Road,
Jamestown, Alexandria by Barr Environmental Ltd. 
GRANT full planning permission subject to the following conditions:- 
1. The development hereby permitted shall ensure for the benefit of the
applicant only, with the final restoration of the site being completed by 30th
June 2026 unless otherwise agreed in writing by the Planning Authority. 
Reason: In order to ensure the timely restoration of the site. 
2. No further landfill material shall be brought on to any part of the site and no
further landfill operations shall take place on any part of the site. 
Reason: To ensure that future works under this permission relate to site
restoration activities only. 
3. At all times during the aftercare period of the site, the restoration of the site
shall be undertaken as indicated in the Environmental Impact Assessment,
dated November 2020, together with all supporting documentation, plans and
details that form part of this application, including amended restoration
masterplan (reference ED13968-005F). 
Reason: To ensure that the development operates in accordance with the
approved details. 
4. Except in the case of emergency, the hours of working of the site shall be
restricted to between the hours of 7.30am to 5.00pm Monday to Saturday only
and not on a Sunday or on a recognised Public Holiday in West
Dunbartonshire without the prior written approval of the Planning Authority
with the exception of essential site maintenance and the maintenance of plant
and machinery. Access to and exit from the site shall be by way of
Auchencarroch Road. 
Reason: In order to minimise disturbance to local resident and to ensure that
the site is accessed in the approved manner. 
5. The site operator shall be responsible for the maintenance of a vehicle
register log book of all deliveries to the site which shall be available for
inspection by the Planning Authority upon request at any time. 
Reason: In order to ensure that the number of vehicle movements and the
volume and type of waste remain within the approved limits. 
Page 15

Page 16

6. The applicant shall be responsible for the collection and disposal of any
windblown material emanating from the area of infill. 
Reason: In order to prevent the operation of the site giving rise to litter, which
would detract from the amenities of the surrounding area. 
7. No burning of materials in connection with the infilling operations shall take
place on or adjoining the site. 
Reason: In order to protect the environment and the amenities of local
residents. 
8. Within 28 days of the date on which planning permission for the development,
hereby approved, is issued, an updated Habitat Management Plan, which
includes details on follow up habitat management, shall be submitted for the
written approval of the Planning Authority. Thereafter, the Plan will be
implemented as approved. 
Reason: In order to ensure that the developer continues to make appropriate
provision for bird life and natural habitat. 
9. The annual monitoring on the progress of the mitigation areas shall be carried
out as required by the Habitat Management Plan and by the applicant or by
any person engaged by them. An annual report will be made available to the
Technical Working Group at least 3 weeks prior to the formal review meeting
of that Group and the annual monitoring report shall be approved by the
Planning Authority. 
Reason: In order to ensure that the mitigation measures are operating
effectively. 
10. All advance works, including habitat translocation to receptor areas for landfill
restoration shall take place outside the bird nesting season (March to July
inclusive) unless a checking survey confirms the absence of nests. The
checking survey shall be carried out at a time and approved in advance by the
Planning Authority. 
Reason: In order to minimise the impact of the development on bird life. 
11. All diversions of watercourses shall follow the details approved in respect of
condition 18 of planning permission DC07/233/FUL. 
Reason: To ensure that works to watercourses are carried out in an
appropriate manner and do not give rise to pollution. 
12. The access track which runs partly through the active landfill and links up with
the track leading to Paper Muir and the western edge of the commercial
forestry plantation shall not be used for the export of timber without the prior
written approval of the Planning Authority. 
Page 16

Page 17

Reason: To ensure that works to watercourses are carried out in an
appropriate manner and do not give rise to pollution. 
13. On completion of the landfill operations, except in so far as may be required
for leachate and gas monitoring, the site shall be cleared of all buildings
(except for the MRF building which will be retained during the aftercare
period), plant and machinery, with details of the phasing of this to be
submitted for the approval of the Planning Authority prior to the cessation of
landfill operations on site. 
Reason: In order to ensure the appropriate restoration of the site upon the
conclusion of the landfill operations. 
14. Unless otherwise approved in writing by the Planning Authority, the MRF
building will be removed from the site at the end of the aftercare period on
01/04/2056. 
Reason: In order to ensure the removal of the building following the
conclusion of the aftercare period. 
15. Appropriate measures to prevent mud, dirt, dust, slurry or stones being
carried onto the highway shall be taken and such steps shall include the
provision and the use of hard standing areas and a wheel wash facility for the
cleaning of all lorries, dump trucks, other heavy vehicles and plant leaving the
site. 
Reason: In order to minimise nuisance to local residents and in the interest of
road safety and to ensure the measures are in accordance with the approved
details. 
16. The access road and public road adjacent to the site shall be kept clear of
mud or other deposited materials at all times by means of mechanical
brushing. 
Reason: In the interests of road safety and the amenities of the area. 
17. Soils to be imported to the site shall share similar profile characteristics as the
soil structure currently on site. Topsoil and sub-soil shall only be stripped
when the soils are sufficiently dry so that when moved, no damage will be
done to the structure of the soils. Apart from the works required to enclose the
site, no operations shall be carried out until the topsoil is fully stripped and
stored in the designated areas within the site. 
Reason: In order to ensure that the soil used in restoration work is appropriate
to the local environment. 
18. Topsoil shall be stripped to full available depth from all areas within the site
except those areas designated in the approved plans as topsoil dumps.
Following topsoil stripping operations from any areas of land, sub-soil shall be
Page 17

Page 18

stripped as a separate operation to a depth, where possible, to achieve topsoil
and sub-soil not less than 0.9 metre at restoration. 
Reason: In order to ensure the retention of soil required for restoration
purposes and to ensure that the soil used in restoration is appropriate to the
local environment. 
19. Topsoil and sub-soil shall be carefully stored in separate dumps and
prevented from mixing. Topsoil dumps shall not exceed 5 metres in height.
Topsoil dumps and sub soil dumps shall be evenly graded and tops shaped to
prevent water ponding. Sub-soil dumps shall not exceed 8 metres in height. 
Reason: In order to ensure the retention of soil required for restoration
purposes and to reduce its impact on the local environment. 
20. In the first available seeding season following their formation, all mounds of
topsoil, sub-soil and soil making materials shall be seeded in grass and shall
be so maintained until the soils are required for use in the restoration of the
site except as may be otherwise agreed with the Planning Authority. 
Reason: In order to ensure the retention of soil required for restoration
purposes, and to ensure that soil is an aesthetically acceptable manner. 
21. All water treatment areas and settlement lagoons shall be enclosed by a one
metre high stock-proof fence and shall be implemented prior to any significant
soil stripping. 
Reason: In order to ensure the timely provision and protection of water
treatment and settlement facilities, in the interests of public safety. 
22. Appropriate precautions shall be taken to prevent the discharge of oil from
fuelling, oil storage, plant maintenance and vehicle wash areas within the site. 
Reason: In order to prevent pollution of the local environment. 
23. Dust monitoring shall be routinely carried out by the applicant and undertaken
using appropriate equipment and recording devices. The results and records
shall be made available to the Planning Authority on a monthly basis during
the operational life of the site. 
Reason: In order to minimise nuisance to local residents and damage to the
environment arising from dust blown from the site. 
24.  Noise monitoring programme shall be undertaken during the operational life of
the site using appropriate equipment and recording devices, the results of
which shall be made available to the Planning Authority on a monthly basis. 
Reason: In order to minimise disturbance to local residents arising from noise
generated at the site
Page 18

Page 19

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 6th August 2025
DC25/076/FUL: Section 42 application to vary Condition 12 - working hours
(Amendment to DC24/081/FUL) at Artizan Centre, College Way,
Dumbarton by West Dunbartonshire Council
1. REASON FOR REPORT
1.1 This application seeks to amend the terms of a condition of a planning application
originally determined by the Planning Committee. It therefore requires to be
determined by the Planning Committee.
2. RECOMMENDATION
2.1 Grant planning permission for this Section 42 application, subject to the conditions
set out in Section 9 below.
2. DEVELOPMENT DETAILS
3.1 The application site is located on College Way within Dumbarton’s Town Centre and
extends to approximately 1 ha. The site is primarily hardstanding and includes a variety
of buildings forming part of the Artizan Shopping Centre, with a few small areas of
grass along the site’s boundary as well as some street trees planted along High-Street,
at the car park on Risk Street Carpark and at Artizan Centre entrance on St Mary’s
Way. A small portion of the south of the development site is located within the
Dumbarton Town Centre Conservation Area boundary, including the buildings fronting
High Street.
3.2 Planning Application DC24/081/FUL covered what will be Phase 1 of a wider re-
development project of the current Artizan Centre site in Dumbarton. The wider
masterplan/development framework is being considered separately via an application
for Planning Permission in Principle (DC24/108/PPP) and comprises a mixed-use
scheme that seeks to redevelop the site and partially repurpose the existing buildings
where possible. The masterplan seeks to create a new high quality permeable public
realm and is intended to contain the following uses: residential; retail (at ground floor
and key corners); leisure/food and beverage and a healthcare facility. West
Dunbartonshire Council successfully applied to the UK Government’s Levelling Up
Fund to tackle the decline of Dumbarton Town Centre and deliver three key projects in
the town, one of which is the Artizan Centre.
3.3 At the November 2024 meeting of the Planning Committee, Members determined to
grant application DC24/081/FUL for façade improvements to existing shopfronts as
well as landscaping and associated infrastructure. The façade improvements
included:
 The removal of the “gateway” canopies at the entrances to the Artizan Centre St
Marys Way. Conservation Area Consent had also already been granted under
application DC24/086/CON for the removal of the canopy at the High Street
which is within the Conservation Area,
ITEM 5
Page 19

Page 20

 Removal of shelter canopies on College Way,
 Upgrade of shelter canopies on High Street with bronze film,
 Partial removal of zinc cladding at upper levels to be replaced with glazed
ceramic tile cladding. This cladding will be similar to what has been approved at
the adjacent Glencairn House,
 Timber cladding at upper levels on High Street to be removed, and replaced with
timber effect cladding panels,
 Painting of concrete at upper-level black,
 Removal of existing light fittings attached to building and replaced with bronze
coloured light fittings,
 One concrete upstand to be cut off at roof line and made good with new capping
piece, and
 All shopfronts including glazing, doorsets and signage to be removed and
replacement black aluminium shopfronts installed.
3.4 The permission also included public realm/landscaping proposals comprising:
 Creation of new square in the location of the buildings currently being removed,
 A shelter structure as a focal point within the new square created via a series of
vertical elements with the inclusion of a sedum roof canopy,
 Enhancement of Collage Way with new high-quality paving and landscaping,
 Open space,
 Play space,
 A feature landscaped area in the form of “maze”.
3.5 This current application seeks to modify the terms of condition 12 which was attached
to application DC24/081/FUL. Condition 12 of application DC24/081/FUL reads as
follows:
During the period of construction, all works and ancillary operations which are
audible at the site boundary (or at such other place(s) as may first be agreed in
writing with the Planning Authority), shall be carried out between the following hours
unless otherwise approved in writing by the Planning Authority:
a. Mondays to Fridays: 0800 – 1800
b. Saturdays: 0800 – 1300
c. Sundays and public holidays: No Working
3.6 The applicant has proposed an amended change in wording as follows:
During the period of construction, all works and ancillary operations which are audible
at the site boundary (or at such other place(s) as may be first agreed in writing with the
Planning Authority) shall be carried out between the hours and programme shown on
the submitted schedule SAV1. Where changes to the programme are required an
amended schedule shall be submitted to the Planning Authority for its information.
4. CONSULTATIONS
4.1 West Dunbartonshire Council Environmental Health Service
Environmental Health are satisfied with the proposed changes to working hours. It
should be noted that the agreed hours include all noise generating activities so works
should have ceased and staff cleared the site (where this generates noise) by the
agreed schedule of hours.
Page 20

Page 21

5. REPRESENTATIONS
5.1 One objection was received. The full details are contained within the planning file and
are available for public viewing. However, the key points of objection can be
summarised as follows:
 The proximity of Lennox Evangelical Church to the site may result in works
disrupting Sunday services between 0930 and 1330.
 The detail of the extended hours proposed is unclear.
The concerns raised shall be considered in the appraisal in the Section 7 below.
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
6.1 This application, submitted under Section 42 of the Town and Country Planning
Scotland Act 1997 (as amended), seeks to vary the terms of condition 12 of planning
permission DC24/081/FUL. Annex H of Scottish Government Circular 3/2022 –
Development Management Procedures sets out that in determining Section 42
applications, planning authorities may only consider the issue of the conditions to be
attached to any resulting permission. However, as the effect of granting this Section
42 application will see the planning permission renewed, the Planning Authority is
entitled to look at the principle of development in the light of any material change in the
Development Plan policies. In this case, the current planning permission for the site
was granted in November 2024, there have been no changes to either the planning
policy position or the circumstances of the application site and works associated with
implementing this permission have not yet commenced on site. Whilst all development
plan policies relevant to the proposed development are highlighted below, a full
detailed reassessment of the proposal is not considered to be required.
National Planning Policy 4
6.2 A small proportion of the site is within the ‘Clyde Mission’ area, identified as one of
eighteen National Developments with National Planning Framework 4 which
recognises that significant land assets are under-utilised across the Clyde, (including
waterfront sites such as Queens Quay) and that longstanding inequality, in relation to
poor environment and health outcomes require to be tackled as a national priority. The
Clyde Mission designation aims to repurpose and reinvigorate vacant and derelict land
as well as adapting the area to the impacts of climate change, where nature-based
solutions would be particularly supported. Whilst the scale of this proposal in itself is
not categorised as a National Development in terms of The Town and Country Planning
(Hierarchy of Developments) (Scotland) Regulations 2009, delivery of the development
proposals for the site would support the objectives of the national development
designation.
6.3 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the global
climate and nature crises. Policy 2 also relates to the climate in the form of climate
mitigation and adaptation and states development proposals will be sited and designed
to minimise lifecycle greenhouse gas emissions as far as possible and development
proposals will be sited and designed to adapt to current and future risks from climate
change. Policy 3’s intent is to protect biodiversity, reverse biodiversity loss, deliver
positive effects from development and strengthen nature networks. Subject to a variety
a matters being addressed by condition, the proposal would have a neutral impact in
respect of Policies 1, 2 and 3.
Page 21

Page 22

6.4 As part of the site is located within a conservation area Policy 7 applies. Development
proposals in or affecting conservation areas will only be supported where the character
and appearance of the conservation area and its setting is preserved or enhanced. A
number of listed buildings are located within the town centre in the vicinity of the site
and Policy 7 further advises that development proposals affecting the setting of listed
building should preserve their character and special architectural and historic interest.
In previously granting planning permission for the site, it was concluded there was no
adverse impact and this position remains.
6.5 Within the Artizan Centre, some of the units are vacant and as such Policy 9
addressing brownfield, vacant and derelict land and empty buildings applies.
Development proposals that will result in the sustainable reuse of brownfield land
including vacant and derelict land and buildings, whether permanent or temporary, will
be supported.
6.5 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale as per Policy 14. Policy 15 relates to
local living and 20-minute neighbourhoods. Development proposal will contribute to
local living including, where relevant, 20-minute neighbourhoods. Consideration will be
given to existing settlement pattern, and the level and quality of interconnectivity of the
proposed development with the surrounding area, including local access to shopping
and playgrounds and informal play opportunities, parks, green streets and spaces.
There is thus no conflict with these Policies.
6.6 Policy 21 which addresses play, recreation and sport encourages, promotes and
facilitates spaces and opportunities for play, recreation and sport. Policy 22 on flood
risk and water management states that proposals will not increase the risk of surface
water flooding to others, or itself be at risk; manage all rain and surface water through
sustainable urban drainage systems (SuDS) and seek to minimise the area of
impermeable surface. The application site is within an area at risk of flooding and falls
into the exemption set out within the Policy relating to redevelopment of an existing
building or site for an equal or less vulnerable use. It remains that as per the Policy
matters relating to flood risk require to be fully considered and understood.
6.7 Policy 21 which addresses play, recreation and sport encourages, promotes and
facilitates spaces and opportunities for play, recreation and sport. Policy 22 on flood
risk and water management states that proposals will not increase the risk of surface
water flooding to others, or itself be at risk; manage all rain and surface water through
sustainable urban drainage systems (SuDS) and seek to minimise the area of
impermeable surface. The application site is within an area at risk of flooding and falls
into the exemption set out within the Policy relating to redevelopment of an existing
building or site for an equal or less vulnerable use and as such there is no conflict with
the policy.
6.8 Policy 23 relates to Health and safety. Part (e) states that development proposals that
are likely to raise unacceptable noise issues will not be supported. Overall, the
proposal including the amended approach to construction hours is acceptable and fully
assessed in Section 7 below. Policy 28 relates to Retail and states that development
proposals for retail (including expansions and changes of use) will be consistent with
the town centre first principle.
6.9 With appropriate planning conditions, it remains that the proposed development is
supported by all policies of NPF4 and is assessed fully in Section 7 below.
West Dunbartonshire Adopted Local Plan 2010
Page 22

Page 23

6.10 Policy UR1 encourages the redevelopment and re-use of underused, vacant and/or
derelict land and buildings for appropriate uses such as housing. Policy GD1 seeks to
ensure that all new development is of a high quality of design and respects the
character and amenity of the area.
6.11 Policy RET5 seeks to improve the environment of the town centres of Alexandria,
Clydebank and Dumbarton and Policy RET6 seeks to protect and enhance the retail
and commercial function by encouraging the improvement of existing retail floorspace.
6.12 Policy DC 2 requires new shopfronts, whether on existing buildings or on new
developments, to be designed in accordance with the Council’s Shop Front Design
Guide for commercial frontages.
6.13 Policy BE1 seeks to ensure that no works adversely affect the appearance and
character of conservation areas and Policy BE2 takes a similar approach in respect of
ensuring that proposals do not adversely affect the setting of any listed buildings.
Policy BE3 encourages and supports the renovation rather than demolition of derelict
properties which are not listed but are considered to contribute to the townscape
character of the surrounding area. Policy B5 advises on development proposals that
impact upon local archaeology and the approach to assessing and recording features.
6.14 Policy R2 states that the Council will have due regard to the provision of open space
as an integral part of proposals. Policy R3 relates to the enhancement of open space
and sports facilities.
6.15 Policy E1 relates to the Council’s biodiversity duty. Policy E5 requires new
development proposals to consider impacts on trees and incorporate suitable tree
planting. Policies F1 and F2 aim to ensure that new development is not at risk from,
and does not increase the risk of flooding, and has suitable SUDS drainage
infrastructure. There is a general presumption against development within the flood
plain. The up-to-date development plan position in flooding is set out within Policy 22
of NPF4 which therefore has primacy in this instance.
6.16 It remains that the proposal overall complies with the relevant policies of the adopted
local plan and is assessed fully in Section 7 below.
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would not
adopt Local Development Plan 2. The Proposed Local Development Plan 2 (LDP2),
incorporating the recommended modifications of the Examination Report received on
22 April 2020, which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore afforded
significant weight in the assessment and determination of planning applications,
subject to compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material consideration.
7.2 Policy CP1 seeks to ensure that all new development will be expected to contribute
towards creating successful places by having regard to the six qualities of a successful
place (distinctive, adaptable, resource efficient, easy to get to/move around, safe and
pleasant, and welcoming). Policy CP2 requires the integration and consideration of
green infrastructure from the outset of the design process through to its maintenance
and stewardship of the resource.
Page 23

Page 24

7.3 Dumbarton Policy 1 High Street and Retail Development supports a more diverse and
vibrant Town Centre and will encourage a range of uses within the Core Town Centre
area where they accord with Policy SC2 of the Plan. Policy SC2 supports a range of
different uses within the core Town Centre where they help to improve the vibrancy of
the Town Centre.
7.4 Policy BE1 takes a similar approach to the adopted Local Plan in respect of
archaeology with Policy BE2 advising on the impact upon the setting of listed buildings.
Due to the location within a conservation area, Policy BE3 applies. Policy BE3 does
states that new development within or affecting a Conservation Area should be of a
high standard of design and enhance the character of the area and should have regard
to the Conservation Area Appraisal for that area.
7.5 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree, water
environment and flooding policies of the adopted Local Plan, although in respect of
flooding, the up-to-date development plan position is set out within Policy 22 of NPF4
which has primacy.
7.6 The Council will actively encourage the temporary greening of any vacant, derelict,
stalled or underused site to improve the contribution to the green infrastructure and to
improve the character and amenity of the particular community or area in accordance
with Policy ENV7. Policy ENV8 relates to air, light and noise pollution and states that
all new development must ensure that significant adverse noise impacts on
surrounding properties and uses are avoided. Policy ENV9 requires developers to
establish the nature of any contamination on any potential development site. Where
contamination is present and risks to key receptors are identified, then remediation will
be required to ensure the site can be made suitable for its future use.
7.7 It is considered that overall, it remains that the proposal complies with the relevant
policies above.
Historic Environment Scotland’s Policy and Guidance
7.8 The Historic Environment Policy for Scotland seeks to ensure that changes to specific
assets and their context are managed in a way that protects the historic environment.
7.9 Historic Environment Scotland’s Managing Change in the Historic Environment
Guidance Note series provides advice and guidance to Planning Authorities
determining applications which affect the historic environment. Guidance Note subjects
relevant to this proposal include setting, external walls, shopfronts and windows.
7.10 The guidance note on ‘Setting’ advises that setting can be important to the way in which
historic structures or places are understood, appreciated and experienced, and
provides guidance on factors to be considered in assessing the impact of a change on
the setting of a historic asset or place. Overall, it is considered that the principle of the
proposal will enhance the setting of the Dumbarton Conservation Area and be to the
benefit of the wider area and therefore have no detrimental effects to any surrounding
Conservation Area or listed buildings.
7.11 The guidance on ‘External Walls’ highlights that the design, materials, method of
construction, colour, texture, detailing and finish typically contribute to the character of
a historic wall. Whilst the buildings of the Artizan themselves are not listed they form a
part of the fabric of the Conservation Area. Shopfronts are highlighted as contributing
to the architectural quality of a building and to the character of a place.
Page 24

Page 25

7.12 Overall, it remains that the proposal overall presents no conflicts with Historic
Environment Scotland’s Policy and Guidance.
7.13 Dumbarton Town Centre Conservation Area Appraisal
Dumbarton Town Centre Conservation Area was designated on 11 October 2019. The
Conservation Area Appraisal notes that the architecture of Dumbarton town centre falls
into a number of distinct eras which can be easily identified by the styles and materials
employed. This creates interest and relieves potential monotony. It is noted that since
the turn of the century, West Dunbartonshire Council has seen the regeneration of the
town centre as a priority, including the Artizan Centre at the heart of the 1960s re-
development which was re-modelled in 2004
7.14 The creation of the Artizan Centre and its redevelopment is noted at several points
throughout the appraisal, with comments made that the re-modelling (and
enlargement) of the Artizan Centre destroyed the 1960s pedestrian route through the
town square to the cinema, housing and station beyond; that there are a number of
unresolved areas behind and near the Artizan Centre that do not aid orientation; and
that there is even a uniformity of scale in the buildings that were delivered as part of
the creation of the Artizan Centre.
7.15 The Dumbarton Town Centre Conservation Area Proposal of 2019 noted that the High
Street Character Area had retained much of its original form in terms of its solid
frontage and retail designation. The lack of quality in shop frontages and signage is
extremely detrimental to the character and townscape of Dumbarton. Many shopfronts
and signage displays on High Street are constructed of non-traditional materials, and
do not reflect the original proportions of traditional shopfronts.
7.16 Open space in the town centre comprises largely of car parks and small pockets of
grass: Dumbarton is well served by places to park and the majority of these are
landscaped with hedge planting and trees (some flowering).
7.17 The appraisal also notes that given the various periods of development evident in the
Dumbarton Town Centre Conservation Area, there is a wide range of building materials
used, not all of which fall under the category of “traditional”. Public realm finishes are
stated to be tidy, albeit clinical.
Creating Places Guidance and Green Network and Green Infrastructure Guidance
7.18 The Creating Places Supplementary Guidance – November 2022 seeks to achieve
high quality development with a design led approach based on a thorough appraisal of
the site and an analysis of its context and sets out that this is expected for all
development proposals.
7.19 The Green Network and Green Infrastructure Supplementary Guidance - November
2022 seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space created.
This will include a focus on biodiversity enhancement.
Assessment of Section 42 applications
7.20 The application is made under section 42 of the Planning Act 1997, which is an
application for planning permission for the development of land but without compliance
with a condition or conditions attached to the original permission. In this case, the
applicant seeks not to comply with the terms of Condition 12 of planning permission
DC24/081/FUL as worded, with alternative wording sought. Condition 12 relates to
working hours. The effect of a Section 42 application, if successful, is to grant planning
permission again for the whole development but with the amended conditions
Page 25

Page 26

replacing those that were issued previously. Planning Authorities, if minded, may
attach new or updated conditions if permission is granted.
Principle of Development
7.21 As noted in paragraph 6.1 above, the principle of development on this site has already
been established through the granting of planning permission DC24/081/FUL. This
permission remains extant and can be implemented as approved. It remains that the
site is located within the defined Dumbarton Town Centre area as well as within the
core Town Centre area. NPF4, the adopted Local Plan and the proposed LDP2 all
promote developments within town centres which increase viability and vitality of the
town centre. The proposals to upgrade shopfronts is well supported by Policy 14 of
NPF4 which requires proposals to improve the quality of an area and regardless of
scale as well as Policy DC 2 of the adopted Local Plan.
7.22 The proposal for public realm works in the form of a shelter structure, play area and
landscaping is also well supported through Policy 15 relating to local living and 20
minute areas as well as Policy 21 relating to the provision of play opportunities. In
addition, Policy ENV7 supports the temporary greening of sites.
7.23 The proposal will support long term town centre regeneration plans for Dumbarton
Town Centre and will complement the proposals for the regeneration of the Glencairn
House. Overall, the principle of the development to upgrade existing shopfronts as well
as the public realm works are appropriate and encouraged within the Town Centre
where this development proposal is located. The proposals will provide significant
enhancement to the area, which in turn will create a more attractive environment which
will potentially encourage people to the Town Centre. Any increase in footfall will have
a positive impact on the overall vitality and viability of the Town Centre. Overall, the
principle of the development remains acceptable and a full, detailed, reassessment of
the wider proposal is not considered to be required.
Hours of working – Condition 12
7.24 The Section 42 application has been submitted to alter Condition 12 so that the hours
of working can be amended from those prescribed within the original condition. In
considering if it is acceptable to amend these working hours there needs to be an
assessment as to the reason the hours were first conditioned and whether these hours
still apply.
7.25 The condition was applied “to ensure that the development does not adversely affect
the amenity of neighbouring properties by creating excessive noise and disturbance at
unsocial hours” and followed advice provided in the consultation response from
Environmental Health. Since the attachment of this condition to the previous granting
of planning permission it has been highlighted by the applicant that in order to ensure
that the businesses within the Artizan centre can remain open and operational during
the construction period, façade improvement works are required to be carried outwith
regular trading hours (i.e. after 5pm). The specific hours of working and timeframes are
included within the schedule provided as part of the application submission (SAV1).
This sets out a programme of works for each section of the site including start and
finish dates together with timings of particular aspects of the works. These timings have
working hours to 11pm for a variety of works including canopy works together with
shopfront replacement works near to residential properties. Other works such as
shopfront works within College Way which are away from residential properties are not
restricted. The programme of works will run until 27/11/26. The application is supported
by a Construction Noise Assessment.
Page 26

Page 27

7. 26 The applicant proposes to vary the condition by way of an update the wording to add
reference the working hours as referenced in the submitted schedule SAV1. In
addition, the applicant has further proposed the wording “Where changes to the
programme are required an amended schedule shall be submitted to the Planning
Authority for its information”. This would mean that any future changes to the agreed
working hours would not have to be approved in writing by the Planning Authority and
would only be provided for information.
7.27 When undertaking the assessment of the proposed variation to Condition 12, Policy
23 of NPF4 is relevant. Policy 23 (Health and Safety) of NPF4 seek to protect people
and places from environmental harm Policy 23-part e) states that development
proposals that are likely to raise unacceptable noise issues will not be supported. The
agent of change principle applies to noise sensitive development. A Noise Impact
Assessment may be required where the nature of the proposal or its location suggests
that significant effects are likely. A Construction Noise Assessment has been
submitted in support of the proposal. This report provides an assessment of the
potential noise impacts between the hours of 17:00 and 03:00 arising from the
proposed works. It is concluded that the application site is within a busy town centre
location and that a variety of works can be undertaken on site into the evening without
the potential for adverse impact upon residential amenity with the town centre.
However, significant nighttime effects on amenity could arise from construction
activities. The submitted working hours schedule proposes that audible works outwith
the site boundary will generally cease by 23:00. It is noted, however, that for some
works such as canopy removal for example, this time is later than the cautionary
approach recommended in the applicant’s Noise Assessment.
7.28 In considering whether the proposed hours of work are acceptable, the application
assessment is guided by the advice in the consultation response from the Council’s
Environmental Health Service. Following full consideration of the proposed working
hours and noting the busy town centre location, Environmental Health offer no
objections on the proposal and are satisfied with the proposed changes to working
hours. It is however noted that that the agreed hours include all noise generating
activities so works should have ceased and staff cleared the site (where this generates
noise) by the agreed schedule of hours. In further assessing the application and as
highlighted in paragraph 7.26 above, the applicant seeks further flexibility in their
proposed condition which would mean that any future changes to the agreed working
hours would not have to be approved in writing by the Planning Authority and would
only be provided for information. This raises the concern that there would be
insufficient control over future changes to the agreed working hours which could have
the potential to adversely impact upon residential amenity. Whilst it is considered
appropriate to allow an element of flexibility for changes and updates to the programme
of works, such changes would require to be agreed by the Planning Authority. In
addition, it is also considered appropriate to retain the ability of the applicant to
undertake works during the standard daytime working hours specified in the original
condition 12 and the applicant’s proposed condition would not permit this. As such, an
alternative wording for the amended condition 12 is recommended as follows:
7.29 “During the period of construction, all works and ancillary operations which are audible
at the site boundary (or at such other place(s) as may be first agreed in writing with the
Planning Authority) shall be carried out between the hours and programme shown on
the submitted schedule SAV1 in addition to the standard working hours of:
 Mondays to Fridays: 0800 - 1800
 Saturdays: 0800 - 1300
Page 27

Page 28

 Sundays and public holidays: No Working
Where changes to the programme are required, an amended schedule shall be
submitted to the Planning Authority prior to the changes being implemented and
approved in writing before their implementation.”
7.30 It is considered that subject to the wording of the condition as set out above, the
development proposal is acceptable with reference to with the adopted Local Plan and
proposed Local Development Plan policies.
Outstanding matters raised in representations
7.31 Considering the objection received, this was in relation to the proposed working hours
disturbing the Sunday services of Lennox Evangelical Church which is located at 2
Risk Street. Whilst some of the works are highlighted as affecting properties on Risk
Street, the church is not specifically noted as being affected. The timings for the works
that affect residents of Risk Street are between 6pm and 11pm and as such do not
affect the Sunday services between 0930 and 1330.
8. CONCLUSION
8.1 The acceptability of the re-development of the site has previously been established
with the granting of planning permission in principle (ref: DC24/081/FUL). This
application is a Section 42 application to vary the terms of condition 12 of planning
application DC24/081/FUL. Following consideration of the applicants proposed
variation to the condition and informed by the consultation responses from the
Council’s Environmental Health Service, it is concluded, subject to the further revised
wording being applied as set out in paragraph 7.29 above, the proposal is in
accordance with Policy 23 of NPF4.
9. CONDITIONS
1. Prior to the commencement of development on site, exact details of all proposed
external materials (inclusive of all hard surfaces), to be used in the development site
shall be submitted to and approved in writing by the Planning Authority. Thereafter,
unless otherwise agreed in writing with the Planning Authority, the development shall
be completed in strict accordance with the approved material details and palette.
Reason: In the interest of visual amenity.
2. Notwithstanding the approved plans, a programme for the implementation and
completion of the soft and hard landscaping works shall be submitted to, and approved
in writing by the Planning Authority. Thereafter the development shall proceed
accordance with the approved details, unless otherwise agreed in writing by the
Planning Authority.
Reason: In the interest of visual amenity.
3. Notwithstanding the approved details, a Tree protection Plan to describe how trees on
site shall be safeguarded through the development process, including details of any
works required to the trees to allow for the construction phase shall be submitted to
and approved in writing by the Planning Authority. Thereafter, unless otherwise agreed
in writing with the Planning Authority, the development shall be completed in strict
accordance with the approved plan.
Page 28

Page 29

Reason: In the interest of visual amenity, protection and enhancement of biodiversity
and tree protection.
4. That any trees, shrubs or areas of grass which die, are removed, damaged or become
diseased within five years of completion of the landscaping shall be replaced within the
following year with others of a similar size and species.
Reason: In the interest of visual amenity and biodiversity.
5. Notwithstanding the approved plans, prior to the installation of the proposed play
equipment, full details of the equipment to be installed and its location shall be provided
to and approved in writing. Thereafter, the play equipment shall be installed as
specified, and remain in place for the lifetime for the development unless otherwise
agree in writing by the Planning Authority.
Reason: To ensure that full details of play equipment are secured.
6. Prior to commencement of any works on site, a site management scheme for
construction traffic shall be submitted to and approved in writing by the Planning
Authority. Thereafter work shall proceed in accordance with the approved scheme
unless otherwise agreed in writing with the Planning Authority.
Reason: In the interest of road safety.
7. a) No development that breaks ground or otherwise involves ground works (other
than investigative work) can take place until such time as a comprehensive site
investigation has been carried out to the appropriate Phase level and submitted
to and approved in writing by the Planning Authority. The investigation shall be
completed by a suitably qualified and competent person and completed in
accordance with advice given in the following:
 Planning Advice Note 33 (2000) and Part IIA of the Environmental
Protection Act 1990 (as inserted by section 57 of the Environment Act
1995)
 BS 10175:2011+A1:2013 – British Standards institution ‘The Investigation
of Potentially Contaminated Sites – Code of Practice’.
 Land Contamination and Development Management -Guidance.
https://www.ep-scotland.org.uk/wp-
content/uploads/2019/09/ConLanDevGuide_12-Aug19-FINAL.pdf
i. If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated, and these linkages must be
subjected to risk assessment. If a Phase 2 investigation is required, then a risk
assessment of all relevant pollution linkages will require to be submitted.
ii. If the risk assessment identifies any unacceptable risks then an appraisal of
remedial options followed by a detailed remediation scheme will be submitted
to and approved in writing by the Planning Authority. No works other than
investigative works shall be carried out on site prior to receipt of the Planning
Authority’s written approval of the remediation scheme.
Page 29

Page 30

Reason: To protect public health and to ensure that the site is suitable for its intended
use.
8. Remediation of the site shall be carried out in accordance with the approved
remediation scheme prior to the proposed development being brought into use. Any
amendments to the approved remediation scheme shall not be implemented unless
approved in writing by the Planning Authority.
On completion of the remediation works, the developer shall submit a verification report
to the Planning Authority, confirming that the works have been carried out in
accordance with the approved remediation scheme and that the works have
successfully reduced the risks to acceptable levels.
Reason: To protect public health and to ensure that the site is suitable for its intended
use.
9. The presence of any previously unexpected contamination that becomes evident
during the development of the site shall be reported to the Planning Authority in writing
within one week, and work on the site shall cease. At this stage, if requested by the
Planning Authority, an appropriate investigation and risk assessment shall be
undertaken and a remediation scheme shall be submitted to and approved by the
Planning Authority prior to the recommencement of site works. The approved details
shall be implemented as approved.
Reason: To protect public health and to ensure that the site is suitable for its intended
use.
10. If there is a requirement to either re-use site won material or to import material then the
assessment criteria and sampling frequency that would adequately demonstrate its
suitability for use shall be submitted to and approved by the Planning Authority prior to
any material being re-used or imported. In addition to this and in accordance with
BS3882:2015 and BS8601:2013, material to be used in the top 300mm shall also be
free from metals, plastic, wood, glass, tarmac, paper and odours. On completion of the
works and at a time and or phasing agreed by the Planning Authority, the developer
shall submit a validation report containing details of the source of the material and
associated test results to demonstrate its suitability for use.
Reason: To protect public health and to ensure that the site is suitable for its intended
use.
11. Unless otherwise approved in writing by the Authority, no development shall
commence on site until such time as a scheme for the control and mitigation of dust
has been submitted to and approved in writing by this Authority. The scheme shall
identify likely sources of dust arising from the development or its construction and shall
identify measures to prevent or limit the occurrence and impact of such dust. The
approved scheme shall thereafter be implemented fully prior to any of the identified
dust generating activities commencing on site and shall be maintained thereafter,
unless otherwise approved by this Authority.
Reason: To minimise the occurrence of dust, in the interests of the amenity of the area.
12. During the period of construction, all works and ancillary operations which are audible
at the site boundary (or at such other place(s) as may be first agreed in writing with the
Planning Authority) shall be carried out between the hours and programme shown on
the submitted schedule SAV1 in addition to the standard working hours of:
Page 30

Page 31

 Mondays to Fridays: 0800 - 1800
 Saturdays: 0800 - 1300
 Sundays and public holidays: No Working
Where changes to the programme are required, an amended schedule shall be
submitted to the Planning Authority prior to the changes being implemented and
approved in writing before their implementation.
Reason: To ensure that the development does not adversely affect the amenity of
neighbouring properties by creating excessive noise and disturbance at unsocial
hours.
13. Prior to any works proposed which break ground or otherwise involves ground works,
the developer shall secure the implementation of a programme of archaeological works
in accordance with a written scheme of investigation which has been submitted to and
approved in writing by the Planning Authority in consultation with the West of Scotland
Archaeology Service. Thereafter the developer shall ensure that the programme of
archaeological works is fully implemented and that all recording and recovery of
archaeological resources within the development site is undertaken to the satisfaction
of the Planning Authority in agreement with the West of Scotland Archaeology Service.
Reason: In the interests of the recording of antiquity.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 6th August 2025
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Service Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix: Location Plan
Background Papers: 1. Application forms and plans
2. Representation
3. Consultation responses
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
Creating Places Guidance (2022)
8. Green Network and Green Infrastructure
Supplementary Guidance (2022)
9. Dumbarton Town Centre Conservation Area Appraisal
10. Historic Environment Policy for Scotland
Page 31

Page 32

11. Historic Environment Scotland Managing Change in
the Historic Environment Guidance Notes on Setting,
External Walls and Shopfronts
12. Planning application DC24/081/FUL
Wards affected: Ward 3 (Dumbarton)
Page 32

Page 33

¯
Reproduced by permission of Ordnance Survey on behalf of HMSO. (C) Crown copyright and database right 23/07/2025.
All rights reserved. West Dunbartonshire OS Licence Number 100020790.
Scale: 1:1,250@A423/07/2025
West Dunbartonshire
Council
16 Church Street
Dumbarton
G82 1QL
DC25/076/FUL - Map ITEM 5 - APPENDIX 1  
Page 33

Page 34

Page 34

Page 35

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 6th August 2025
_____________________________________________________________
Subject:     Planning application DC22/245/FUL – Formation of a dwellinghouse
with the re-establishment of the derelict Ferrydyke cottage into a
family home, involving the renovation of the existing property
inclusive of the construction of a dormer and extension to the rear
together with associated works at Former Ferry Dyke Canal House,
Portpatrick Road, Old Kilpatrick by Mr Farhat Malik.
1. Purpose
The purpose of this report is to update the Committee of the position relating to the
above planning application which was referred to the Scottish Ministers following
Committee determining it was minded to grant planning permission.
2. Recommendations
2.1 It is recommended that the Committee note the decision.
3. Background
3.1 Planning application DC22/245/FUL considered the re-establishment of the derelict
cottage, involving the renovation of the property and the construction of a dormer and
extension to the rear and associated works at the Former Ferry Dyke Canal House on
Portpatrick Road, Old Kilpatrick. The Scottish Environmental Protection Agency
(SEPA) objected to the proposal on flood risk grounds. This was because SEPA
considered the proposed development would put people or property at risk of flooding,
which is contrary to the duties set out under the Flood Risk Management (Scotland)
Act 2009, and the policy principles of National Planning Framework 4.
3.2 In considering the application, the proposal would bring back into use a vacant and
derelict building which is also on the Buildings at Risk Register. Whilst the building
itself is not listed, it has historical context with being the bridge keeper’s cottage,
adjacent to the scheduled monument that is the Forth and Clyde Canal. It has been
suggested through the supporting documents that the area has been problematic for
anti-social behaviour and that the bringing back into use of the cottage would create
natural surveillance to discourage this. The proposed materials proposed are of high
quality and the design is appropriate to the building and its surroundings. However, the
application site sits within an area which is at risk of flooding. As such Policy 22 of
NPF4 applies. This policy only supports development within such areas in certain
circumstances, none of which apply to this site as the previous use as a dwellinghouse
has been abandoned. Through consultation, SEPA objected in principle to the
proposal stating that the proposed development is expected to put people or property
at risk of flooding, which is contrary to the duties set out under the Flood Risk
Management (Scotland) Act 2009, and the policy principles of National Planning
Framework 4.
3.3 In considering this application, Members noted there was no objection from the
Council as local flood authority.  The local members, with a knowledge of the site,
could not recall when the site last flooded. Whilst SEPA described the proposed
ITEM 6
Page 35

Page 36

development as being dangerous it was not explained why that was the case and the
engineer involved with the proposal was satisfied.  It was noted that there would be
access from the towpath in times of flooding.  The elected members, informed by the
submitted flood risk assessment and lack of objection from the local flood authority,
concluded if the development went ahead there would be a greater benefit to the
community in terms of the benefits in addressing a derelict building. Committee
therefore determined that they were minded to grant planning permission against the
Officer’s recommendation.
4. Main Issues
4.1 Following consideration by Committee on 7th August 2024, the planning application
was notified to the Scottish Ministers under the Town and Country Planning
(Notification of Applications) (Scotland) Direction 2009.
4.2 The Scottish Ministers decided that in terms of Section 46 of the Town and Country
Planning (Scotland) Act 1997 to require the application to be referred to the Ministers
for determination.
4.3 The Reporter’s recommendation dated 21st of January specifically reviews flood risk,
impact on open space, biodiversity effects and impact on the historic environment and
townscape character as well as other material considerations. In regard to flood risk
the Reporter concluded that the site is ‘at risk of flooding or in a flood risk area’ and the
proposed residential development would introduce a highly vulnerable use in terms of
flood risk. As such, the proposal would be contrary to NPF4 policy 22 (Flood risk and
water management). The lower ground floor would sit below the predicted future
coastal flood risk level and it has not been demonstrated that safe egress can be
achieved. The proposal therefore has the potential to result in damage to property and
people being trapped and requiring evacuation from the emergency services. The
Reporter considered that the proposed development does not accord overall with the
relevant provisions of the development plan and that there are no material
considerations which would still justify granting planning permission. Therefore, the
Reporter recommend that planning permission was refused.
4.4 On 22nd of May the Planning Authority received notification of the Scottish Minister’s
decision. The Scottish Ministers agree with the Reporter’s conclusion and
recommendation, and refused planning permission for the proposed development.
5. People Implications
5.1 There are no people implications associated with this report.
6. Financial and Procurement Implications
6.1 There are no financial or procurement issues associated with this report.
7. Risk Analysis
7.1 There are no risks associated with this report.
8. Equalities Impact Assessment (EIA)
8.1 There are no equalities issues associated with this report.
Page 36

Page 37

9. Consultation
9.1 Consultation was undertaken during the consideration of the planning application.
10. Strategic Assessment
10.1 The Council’s decision on these planning applications is considered to have been
consistent with the following strategic priorities:
 Our Economy – Strong and Flourishing;
 Our Environment – A Greener Future; and
 Our Communities – Resilient and Thriving.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 6th August 2025
Person to
Contact:
Michael Mulgrew, Planning & Building Standards Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendices: None
Background
Papers:
1. Report to Planning Committee 7th August 2024 - Planning
application - Formation of a dwellinghouse with the re-
establishment of the derelict Ferrydyke cottage into a family home,
involving the renovation of the existing property inclusive of the
construction of a dormer and extension to the rear together with
associated works at Former Ferry Dyke Canal House, Portpatrick
Road, Old Kilpatrick by Mr Farhat Malik.
2. DPEA Case Record –
https://www.dpea.scotland.gov.uk/CaseDetails.aspx?ID=125491
Wards Affected: Ward 6 (Clydebank Waterfront)
Page 37

Page 38

Page 38

Page 39

WEST DUNBARTONSHIRE COUNCIL
Report by the Planning, Building Standards and Environmental Health
Manager
Planning Committee: 6th August 2025
___________________________________________________________________
Subject: National Planning Improvement Framework Update
1. Purpose
1.1 The purpose of this report is to update Planning Committee on the recent
work undertaken by the Planning Service in relation to the National Planning
Improvement Framework and the endorsement by the National Planning
Improvement Team of our Performance Assessment and Improvement Plan.
2. Recommendation
2.1 It is recommended that the Committee notes the outcome of the above
process.
3. Background
3.1 The Planning (Scotland) Act 2019 introduced a new statutory requirement for
a National Planning Improvement Co-ordinator to monitor the performance of
Planning Authorities in the discharge of their functions and to provide advice
to planning authorities on what steps might be taken to improve the
performance.
3.2 The National Planning Improvement Framework (NPIF) has now replaced the
previous Planning Performance Framework (PPF) and requires Planning
Authorities to self-assess themselves against the 12 attributes of a high
performing Planning Authority. In total there are 47 factors/indicators within
those attributes that can be taken account of when scoring against each
attribute. Whilst the statistics of the PPF mainly looked at speed of decision
making, the NPIF looks at a broader range of matters. The assessment is split
into 5 themes, comprising the 12 attributes, as set out in the diagram below.
ITEM 7
Page 39

Page 40

3.3 The self-assessment results in a score of 1-5, as set out in the diagram below.
Scores of 1-2 suggest that we have good practice and we are asked to
provide best practice examples to share with the National Planning
Improvement Team. Scores of 3-5 would suggest that further improvement is
required or a reprioritisation of current improvements.
3.4 All Planning Authorities were split into 3 cohorts and assigned a peer review
partner. We were in the last cohort, cohort 3, and our partner was
Clackmannanshire Council.
4. Main Issues
Performance Assessment
4.1 Preparatory work for the NPIF commenced in December 2024 and was
largely complete by April 2025. As the process is collaborative, the guidance
requires a stakeholder meeting in order to test our draft documents and to
seek feedback from our partners on both our self-assessment and our
identified performance actions. This meeting took place on 15th May 2025 and
included a variety of stakeholders alongside representatives from the Planning
Service, including from Community Councils, Clackmannanshire Council,
consultees, key agencies and a local architect. The National Planning
Improvement Team were also in attendance and the event was facilitated
independently of the Planning Service.
4.2 The stakeholder meeting largely validated and agreed with many aspects of
our performance and scoring but provided constructive feedback on many
areas. A summary of this feedback is included in our final Performance
Assessment at in Appendix 1.
4.3 The agreed scoring of the Planning Authorities performance is summarised
below:
Attribute Score
(1-5)
Summary of reason for score
Page 40

Page 41

1. The Planning
Authority has sufficient
resources and skills to
maximise productivity
3 The service is currently maximising
productivity within available resources, but
further workforce, capacity and budget
planning is required
2. The Planning
Authority has a valued
and supported
workforce
3 The service is currently maximising training
and development opportunities within
existing resources, but further work is
required in line attribute 1 to ensure officers
are supported to carry out their role and
continue their professional development
3. This Planning
Authority has
embedded continuous
improvement
1 Despite resource and system challenges
the service continually seeks ways in which
processes can be streamlined or enhanced
4. This Planning
Authority has sound
governance
3 The service has effective governance
structures; however, these are required to
be reviewed
5. This Planning
Authority has effective
leadership
1 The service has a Chief Planning Officer in
place and supports the culture of
continuous improvement
6. The Planning
Authority has a robust
policy and evidence
base
3 Whilst work is underway to prepare LDP3,
the authority does not have an up-to-date
Development Plan in place
7. The Planning
Authority makes best
use of data and digital
technology
3 The service makes extensive use of digital
data and technology with regards to GIS,
but has significant issues with the back-
office system
8. The Planning
Authority has effective
and efficient decision-
making processes
3 The service has effective and efficient
decision-making processes in many
aspects of Development Management
performance but overall performance could
be further enhanced and the Scheme of
Delegation requires review.
9. The Planning
Authority has good
customer care
3 The service generally provides good
customer service, although it is recognised
that certain areas need improvement based
on formal and informal feedback
10. The Planning
Authority has effective
engagement and
collaboration with
stakeholders and
communities
3 The service generally has effective
engagement and collaboration but have
identified areas where this could be
strengthened
11. The Planning
Authority supports the
delivery of sustainable,
liveable and productive
places
1 The service has been recognised in the
past for its approach to placemaking and
we have a dedicated Placemaking Co-
Ordinator post within the service.
Page 41

Page 42

12. The Planning
Authority supports the
delivery of appropriate
development
2 The service offers 2 different levels of
preapplication advice to prospective
applicants to ensure that they are aware of
development plan requirements and
expectations
Improvement Actions
4.4 The Performance Assessment narrative, and scoring, has then fed into the
development of improvement actions. In conjunction with the stakeholder
group, 11 improvement actions were agreed and these are summarised
below:
 Implement the new back-office document management system and
carry out a full end-to-end review of all workflow processes
 Develop a workforce strategy and service training plan, including any
options/opportunities for restructure of cases for investment
 Complete Scheme of Delegation Review to ensure it is proportionate
 Finalise review of committee and delegated Reports of Handling
templates to ensure that they are proportionate and are clear and easy
to be understood by a variety of audiences
 Produce detailed Team Improvement Plans, focusing on improvements
that increase efficiency, and are clear, including increasing the quality
of our customer communication
 Undertake review of the Development Management and Enforcement
Charters and processes to ensure they remain fit for purpose
 Set up regular agents forum, in conjunction with Building Standards
 Carry out wider service day (with Building Standards and
Environmental Health) to share good practice and workstream updates.
This will inform detailed Team Improvement Plans
 Implement Project Management approach within Development
Management
 Explore how “Added Value” can be better captured and reported on
 Review Development Management conditions
4.5 The Planning Authority also submitted the following Good Practice Examples:
 Attributes 3 and 5 – Culture of Continuous Improvement and
Leadership
 Attribute 7 – Open Space Audit
 Attributes 11 and 12 – Supporting High Quality Development and
Places
National Planning Improvement Team Endorsement
Page 42

Page 43

4.6 On the 13th June, the service received confirmation that the National Planning
Improvement Team had endorsed the Performance Assessment and
Improvement Action Plan. The National Planning Improvement Champion
wrote to the Council’s Chief Executive to inform them of this and that this has
also been submitted to the Minister for Public Finance.
Next steps
4.7 The Planning Service continues to seek opportunities to learn from, and
share, best practice and a number of best practice case studies are available
on the Improvement Service website. Our own performance assessment and
improvement actions will be publicised on our website. We are currently
working with Clackmannanshire Council as they go through their process and
seek to build on past benchmarking sessions with other authorities later this
year.
4.8 Not all identified improvement actions can be delivered immediately, some are
medium and longer term (2-3 years) but progress has already been made in
several areas, including the review of Reports of Handling, implementation of
a project management approach and the implementation of the new back-
office system. The improvement actions are embedded into service
workstreams to ensure their delivery.
4.9 As the NPIF process is much more intensive than the previous PPF, a
complete review of the Performance Assessment and Improvement actions is
not going to be undertaken on an annual basis. Further guidance on year 2 of
the NPIF has recently been issued and will be actioned by the service iun due
course. This will include a check in with our peer review partner authority and
stakeholder group, meet with the National Improvement Team and to provide
updates on progress with our improvement actions.
5. People Implications
5.1 There are no people implications associated with this report.
6. Financial and Procurement Implications
6.1 There are no financial or procurement implications associated with this report.
7. Risk Analysis
7.1 The Planning (Scotland) Act 2019 introduced a new statutory requirement for
a National Planning Improvement Co-Ordinator to monitor the performance of
Planning Authorities in the discharge of their functions and to provide advice
to Planning Authorities on what steps might be taken to improve the
performance. The endorsement by the National Planning Improvement Co-
Ordinator of the authorities Improvement Plan confirms the authority has met
its statutory requirement.
8. Equalities Impact Assessment (EIA)
Page 43

Page 44

8.1 There are no equalities issues associated with this report.
9. Consultation
9.1 Consultation was undertaken during the preparation of the documents, as set
out in section 4.
10. Strategic Assessment
10.1 The authority’s assessment and improvement actions are considered
to be relevant to, and will help deliver, all of the Council’s strategic
priorities:
 Our Communities – Resilient and Thriving
 Our Environment – A Greener Future
 Our Economy – Strong and Flourishing
 Our Council – Inclusive and Adaptable
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 6th August 2025
___________________________________________________________________
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Service Manager, 
Michael.Mulgrew@west-dunbarton.gov.uk
Appendices: Appendix 1: Performance Assessment
Appendix 2: NPIF Improvement Plan
Appendix 3: Good Practice Example (Attributes 3 and 5)
Appendix 4: Good Practice Example (Attribute 7)
Appendix 5: Good Practice Example (Attributes 11 and
12)
Background Papers: None
Wards Affected: All
Page 44

Page 45

1 
NATIONAL PLANNING IMPROVEMENT
FRAMEWORK 
Performance Assessment Template
Cohort 3 
May 2025 
ITEM 7 - APPENDIX 1
Page 45

Page 46

2 
Planning Authority: West Dunbartonshire Council
Lead officer: Michael Mulgrew
Email: development.management@west-
dunbarton.gov.uk
Phone number: 0141 951 7930 
West Dunbartonshire Local Context
West Dunbartonshire Council covers an area of around 98 square miles and serves a population
of approximately 88,000, within a mixed urban and rural area in the west of Scotland. Forming
part of the Glasgow city-region and sitting along the River Clyde, the planning authority area
includes the main urban areas of Clydebank, Dumbarton and the Vale of Leven, and features
such as the Kilpatrick Hills, Forth and Clyde Canal and Antonine Wall. The planning authority
area excludes those parts of West Dunbartonshire within Loch Lomond and the Trossachs
National Park (parts of Balloch and the countryside to the east and west of Loch Lomond). The
National Park Authority produces its own National Planning Improvement Framework. 
Page 46

Page 47

3 
Service Structure
Planning sits within the larger Planning, Building Standards and Environmental Health Service,
which in turn sits within the Regulatory and Regeneration Service. We sit under a Chief Officer
who reports directly to the Chief Executive. 
The service manager covers a wide remit as outlined in the service structure below. The service
is the largest within the Regulatory and Regeneration service by FTE, with 41.9 FTE posts. 
The planning service has undergone a small restructure with the removal of the Team Leader
Development Planning and Place post and the creation of a new Principal Officer post that
covers a wider remit, including management of the Antonine Wall Project Manager and
Development Officer, and the Placemaking Co-Ordinator post. The Planning, Building Standards
and Environmental Health Service Manager also acts as the Chief Planning Officer as required
by the Planning (Scotland) Act 2019. The planning only structure of the service is outlined
below. The service is small but busy, focused on achieving quality placemaking outcomes. 
Page 47

Page 48

4 
Note – Technical Support is a shared resource with Building Standards 
As of 1st May 2025, the service is operating with 2 vacant posts. A Lead Planning Officer post
has been appointed and will be in post by the end of May 2025 and a Support Assistant post is
currently going through the recruitment process. 
Planning Performance Framework 2022/2023
In our last PPF (2023) we noted a number of service improvements for the 2023/2024 period.
An update on progress with these actions are outlined below. 
Improvement Action Progress at January 2025
We will reorganise the Planning and Building
Standards files on the Council’s network.
Action complete
We will implement IDOX Enterprise for
Uniform workflow management system.
Action complete
We will develop a business case for full
IDOX/Uniform document management
system and submit a growth bid for
implementation through the 2024/2025
budget.
Action complete. The Business case was
agreed, and funding secured, in December
2024. Work has commenced to procure and
implement this system.
Hold a Service Day. Action partially complete. A service
improvement plan and team building
afternoon was carried out in February 2025.
This action will be carried forward and
include the wider service, including
Environmental Health.
Page 48

Page 49

5 
Hold a Planning and Building Standards
Forum for users of the service.
Action incomplete. This will be carried
forward.
Review Local Review process and procedures. Action complete
Investigate the possibility of new tablets to
support field work.
Action incomplete. This will be carried
forward into team workplans
Revise the planning application committee
report template.
Action in progress. A revised template is
expected to be in place later this year.
Review the Planning Scheme of Delegation. Action in progress. Early work on a revised
scheme is underway and further engagement
will take place later 2025 with corporate
leadership and elected members.
Review of Committee processes and
procedures.
Action incomplete. This will be carried
forward. 
Progress on service improvement work has been impacted during 2024 due to several
vacancies across the service, including a vacant service manager post between April and August
2024 and a vacant line manager post in Development Planning and Place since February 2024.
Other vacancies over this period included a GIS technician, Support Assistant and a Lead
Planning Officer within Development Management. 
Page 49

Page 50

6 
NPIF Process
Our assessment process included a stakeholder meeting to review our draft assessment, good
practice examples and draft improvement actions. This meeting took place on the 15th May and
all documents were issued 1 week earlier. The meeting took place in person at the Council
Offices. Whilst some attendees unfortunately had to drop out on the day, the workshop was
well attended and collaborative. Attendees are noted below:
Attendees
Alistair Conarty – West Dunbartonshire Community Council Forum / Old Kilpatrick Community
Council
Darius Jack – National Planning Improvement Officer (Improvement Service)
Keith Johnston – Planning and Building Standards Team Leader (Clackmannanshire Council)
Clare Laurenson – Principal Officer Development Planning and Place (West Dunbartonshire
Council)
James McColl – Development Management Team Leader (West Dunbartonshire Council)
Craig McLaren – National Planning Improvement Champion (Improvement Service)
Michael Mulgrew – Planning, Building Standards and Environmental Health Service Manager /
Chief Planning Officer (West Dunbartonshire Council)
Kevin Murphy – Homes for Scotland (written comments only)
Isobel Plunkett – West Dunbartonshire Community Council Forum / Clydebank East Community
Council
Susan Rintoul – National Planning Improvement Project Officer (Improvement Service)
Elaine Troup (Facilitator) - Economic Development Manager (West Dunbartonshire Council)
Mark Walsh – Environmental Health Co-Ordinator (West Dunbartonshire Councill)
Kevin Yoong – Key Agency Representative (Scottish Water)
Louise Ewing – Director Bruach Architects 
Observer/Note Taker
Eva Hutchison – Technical Support officer (West Dunbartonshire Council) 
We extend our thanks again to all those who attended for their time and valuable feedback at
the workshop.
Page 50

Page 51

7 
Overall, attendees agreed with many aspects of our performance and scoring and provided
constructive feedback on many areas. A summary of comments and the Planning Authorities
response is provided in the table below.
Workshop Comment Planning Authority Comments
Communication – Participants agreed this
was important and suggested there should
be an additional action to improve on
community involvement and customer
communication. Make better use of
Community Councils as we have less
resources. Ensure engagement is tailored to
audience and make it as accessible and
simple as possible. 
We agree with these comments, but rather
than an individual action, we believe that the
groups feedback is best represented by
ensuring communication is embedded into
everything we do. As well as being worked
into general workplans, this will also feature
in the Team Improvement Plans, and this has
been specifically highlighted in the
improvement actions. 
Meaning of “Appropriate Development” -
Participants felt that the scoring against
attribute 12, delivery of appropriate
development, does not tie with LRB record.
We note the concerns raised by participants.
The NPIF guidance notes that attribute 12
refers to “The Planning Authority Supports
the Delivery of Consented Development” and
the prompts include, the proportionate use
of Section 75’s and conditions, aswell as
processing agreements and Delivery
programmes. This would appear to be
different from the participants understanding
of the attribute. However, on reflection and
looking at the matter holistically, we have
agreed to amend our scoring from 1 to 2 to
reflect the constructive feedback from the
group. 
Added Value - Participants agreed we
should make the capturing of added value a
higher priority to show how we are working
together to achieve placemaking outcomes
We agree with these comments and have
amended the importance from low to high
and from medium term to short term. 
Training for Elected Members – Participants
supported elected training for members
involved in taking planning decisions. 
Noted.
Better reflect the challenges of the service –
Participants noted that we should be clearer
on the challenges the service faces in terms
of systems and recruitment and retention.
We note the constructive feedback from the
group and the narrative for Attribute 1 has
been amended to reflect this comment. 
Back-office document management –
Participants agreed there were significant
challenges and we should produce guidance
on how we want files submitted.
We note the concerns raised by participants
and we hope this matter will be addressed by
future changes. The NPIF guidance notes that
attribute 7 refers to “The Planning Authority
makes best use of data and digital
Page 51

Page 52

8 
Participants also questioned the scoring for
attribute 7 considering these challenges. 
technology” and the prompts include
encouraging and promoting the use of the e-
development portal and the ability to use
interactive web-mapping, GIS and spatial
data. Whilst we believe that within this
attribute, we are making the best use of data
and digital technology, we do recognise that
there may be a mismatch when considered in
the context of our current back-office system
capabilities and public planning portal. We
have amended this scoring to 3 to better
reflect the feedback of participants, however,
we continue to include our best practice
example in relation to GIS. 
Scheme of Delegation – Participants agreed
with review of Scheme of Delegation and
noted that it is important that Elected
Members are seeing the “right”
applications. Suggestion that Matters
Specified in Conditions Applications are
delegated to officers where the Planning
Permission in Principle has been decided by
Planning Committee.
Feedback noted. 
Team Improvement Plans – Participants
agreed and supported this action but raised
some concerns over the ability to resource
improvements. There may be opportunities
to share training costs with other
authorities. 
We note the feedback from the group. Whilst
it may be challenging, it is nonetheless
important to ensure that the Team
Improvement Plans capture the individual
improvement actions so that they can be
monitored. The plans will be kept up to date
and reflect realistic timescales for
completion. 
Enforcement Charter – Participants agreed
with this action but suggested that the
Development Management Customer
Charter should also be reviewed.
The feedback from the group is noted. Whilst
this would be picked up in the Team
Improvement Plans as part of our process
reviews, we have amended this action to
include the review of the charter. 
Service Day – Participants agreed with this
action but suggested that it needs to add
value to officers and should be followed up
with identified actions. Staff morale was
also discussed as part of this and
participants agreed that it is important to
“celebrate success”. 
Noted.
Page 52

Page 53

9 
Agents forum - Participants agreed this
action and suggested that it should be a 2-
way discussion forum. Participants also
suggested that there should be a parallel
Community Council forum. 
We note the feedback from the group. This
emerged from the communication theme
discussed above. We are embedding clarity
of communication into individual actions in
Team Improvement Plans, and we will
consider this as part of this our normal
engagement actions with Community
Councils and the Community Council forum,
particularly regarding the progression of the
Development Plan. 
Development Management Conditions –
Participants agreed this but suggested that
it should be brought forward given its
importance.
We note the feedback from the group. Whilst
we agree the conditions review is important,
there is national work currently taking place
on standard conditions and the timescale
noted in the action is intended to tie in with
this. This does not mean that improvements
to our conditions will not be made, but
rather that our timescales accord with the
national workstream. 
Page 53

Page 54

10 
A high performing planning authority needs to have the
right number of people to do the work expected of it
with the rights skills set. It also needs to have a strategy
to ensure that it retains and recruits the right staff in
the future. It supports staff to upskill and to be
prepared for changes in policy, legislation, and new
circumstances.
Please consider the following when thinking about this attribute and how you have performed
over the last year:  
• Does the planning authority have the sufficient level of staff to carry out all activities
within the required timeframes?
• Does the planning authority have the ability to carry out all activities within the required
timeframes with its current budget?
• Does the planning authority have the ability to carry out all activities within the required
timeframes with its current income?
• Does the planning authority received responses from consultees within the prescribed
timescale when assessing planning applications?
• Does the planning authority have the ability to access the appropriate advice, expertise,
evidence and data it requires?
Narrative
The Planning Authority has had difficulty regarding recruitment and retention of planners for
several years in common with many other Planning Authorities. There is a nationally recognised
skills shortage, and a government and industry led drive to increase the number of planners
coming into the system is currently under way. 2024 had been a particularly challenging year in
part due to the number of vacancies within the Planning service (Service Manager, Principal
Officer Development Planning and Place, Placemaking Co-Ordinator, Lead Planning Officer, GIS
Officer and Support Assistant), as well as across the wider service in Building Standards and
Environmental Health. Alongside significant system issues, the vacancies placed the service
under considerable pressure. Continued pressure on Local Authority budgets requires difficult
decisions to be made to the way in which all council services are delivered, and planning (along
with the wider service) have not been immune to these pressures. This has resulted in a
ATTRIBUTE 1: THIS PLANNING AUTHORITY HAS SUFFICIENT RESOURCES AND
SKILLS TO MAXIMISE PRODUCTIVITY
Page 54

Page 55

11 
restructure of the planning service and a reduction in headcount over the last few years,
including the removal of enforcement/compliance posts within Development Management and
a Planning Policy Officer post within Development Planning and Place. 
As a smaller authority, the planning service has limited specialised posts, for example there are
no conservation, archaeology, landscape design or tree specialists within the service, due to
cost and insufficient numbers of applications requiring dedicated specialist support. However,
we do have a specialist design post, Placemaking Co-Ordinator. Where other specialised
support is required, this is generally procured externally, and archaeological advice is provided
by the West of Scotland Archaeological Society (WoSAS).
Outwith the planning service, the service has access to specialist advice provided by other parts
of the Council, including, Biodiversity, a Tree Officer (although the planning service processes all
tree work consents), Roads, Flooding and Environmental Health. As with all Council services,
the demands placed on services can result in delays and the service seeks to work proactively
with other services to streamline input when required. Feedback around specific areas of
concern from customers and officers are being taken forward as part of the continual
streamlining of the Development Management process in relation to consultations.
To balance competing demands, the service has sought to maximise income from discretionary
charging and currently charges for a broad range of discretionary activities, such as pre-
application advice, discharge of conditions and non-material variations and the maximum 25%
allowed by regulations for retrospective applications. 
Despite the challenging environment in which the service works, the service provides as an
efficient, clear and proportionate service as possible. A culture of continuous individual,
professional and service improvement is embedded within all parts of the service. 
The table below sets out some key facts about the structure of the service, including the
number of full MRTPI qualified planners. 
Page 55

Page 56

12 
Section Post Type
FTE
Permanent
Posts
Vacancies 
FTE 
MRTPI
Posts
Planning, Building Standards and Environmental Health
Service Manager (Chief Planning Officer) 1 0 1
Development Planning and Place
Principal Officer 1 0 1
Core LDP Team 1 0 1
Placemaking Co-
Ordinator 1 0 1
Special Projects
(Antonine Wall) 1.6 0 0
Development Management Team Leader 1 0 1
Core DM Team 4 1 0
Total 10.6 1 5 
As noted previously, the vacant post outlined above in the Core DM team has been appointed
and will be in post shortly. By the end of May, the planning teams will be fully staffed within the
current structure. 
The current age range of the planning teams is outlined in the graphs below. 
Page 56

Page 57

13 
The analysis of the age range within the service indicates that whilst there are no immediate
issues in terms of succession planning, the service does not currently have any officers in the
under 30 bracket, indicating that perhaps more can be done to encourage younger planners by
exploring opportunities for the introduction of graduate/assistant type posts as part of any
future service redesign. 
An analysis of planning fee income over the period 1st April 2019 until 31st March 2024, shows
an inconsistent fee income, and has ranged from a low of £178,673 in 2020/2021 to a high of
£418,691 in 2023/2024. This reflects the wider economic challenges seen across all Planning
Authorities as well as the influence of overall small numbers of major planning applications. 
The average fee income over this period is £226,012.
Additional unfunded duties arising from the Planning (Scotland) Act 2019 have increased
pressure on limited staff time and resources. The most immediate pressure is within the
Development Planning and Place Team with regards to the preparation of the new
Development Plan. 
Work on the evidence report is underway and the latest Development Plan Scheme, approved
by Planning Committee in December 2024, introduced a 7-month delay to the timetable. Partly
due to more time being required to ensure the evidence report is robust, taking account of
feedback from the DPEA to authorities that have already went through gate check, and partly
due to pressure on existing resources. 
The service is working collaboratively with colleagues across the service contributing to
evidence report work in some way. The current scheme targets submission to gatecheck in July.
This is proving to be challenging, and the service is keeping this target under close review to
Page 57

Page 58

14 
ensure that a robust evidence report is produced prior to submitting. Further updates will be
given to Planning Committee as required to update the scheme. 
The Development Management Team is a small but busy team. The team is set up to be an all-
area general team, with no division by application type or by geographical area. This allows for
a nimble approach to planning applications and ensures that all officers receive a broad range
of applications to support service delivery needs as well as their own professional and personal
development. 
Looking at previous 5-year trends (2019/2020 - 2023/2024), on average, the service annually
determines: 
Development Management performance is mixed, with clear highlights and some areas
identified for improvement. The Scottish Government has set a target that 80% of all local
applications should be determined within 2 months. The service is currently underperforming in
this regard, but broadly comparable to the national average for local applications. The graph
below shows that over the period 1st April 2023 until 31st December 2024, performance has
generally slowed and the 80% target is not being met. For local applications the service was
below the national average of 63.7% for 23/24. The Council has however generally performed
significantly better than the national average for Major applications. 
Page 58

Page 59

15 
Despite the 80% target not being met, the service can demonstrate generally good
performance against the statutory determination periods. Comparing the chart below to the
national average, using this metric, the service is performing well against other authorities. For
23/24 the service was significantly faster at determining major applications than the national
average of 36.1 weeks. Despite a slowdown in the 1st April to 31st December 2024 timescales,
this is still well below this national average. 
In terms of all local applications, again the authority is ahead of the national average of 11.6
weeks for 23/24. 
Page 59

Page 60

16 
The Development Management team are particularly impacted by current back-office
arrangements that are directly resulting in slower performance than the service believes it can
achieve. As the back-office system is split between 2 providers (IDOX for Uniform case
management and Civica for document management) it is increasingly becoming incompatible
with service requirements and is resulting in manual processes and difficulties for both
customers and staff to be able to consistently view full planning files via the planning portal and
document management system. In 2024 the service rolled out Enterprise workflow for Uniform
and this has resulted in improvements to workflow and automation, however, a business case
has been accepted and funding secured for a significant investment in a new document
management system that is fully integrated with the case management system. This will bring
the service into line with other Scottish authorities, and is expected to deliver significant officer,
customer and performance improvements. This will be implemented in stages across
2025/2026. 
As part of this implementation, a full review of all workflows and templates is being undertaken
to implement a lean process environment, remove duplication and utilise the workflow to
enable a more thorough project management approach to development management
applications, including utilisation of measures such as Planning Processing Agreements. This is a
significant commitment by the service and may impact performance in the short term as
resources will be required to be split between day-to-day processing and these wider service
changes, but it is expected to result in longer term process and performance improvements. 
Page 60

Page 61

17 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Does the planning authority have a workforce planning strategy in place?
• Does the planning authority have the ability to support staff development and upskilling
and send staff on relevant courses?
• Does the planning authority have a deliverable commitment to support staff health and
wellbeing?
Narrative
The Planning Authority does not currently have a formal workforce strategy in place. However,
the service sees the value in preparing such a strategy to support the training and development
of existing staff and to also seek to address succession planning and to explore the suitability of
the current structure and the possibility of introducing an alternative staff structure that
supports the development of graduates to gain experience to then qualify to submit for MRTPI
(Chartered) status. This would be done in conjunction with Building Standards. 
Irrespective of a formal strategy, continuous improvement amongst the team is embedded and
officers are encouraged by the Chief Planning Officer and line managers to continue to seek
opportunities for training, development and collaboration. Example events that officers have
ATTRIBUTE 2: THE PLANNING AUTHORITY HAS A VALUED AND SUPPORTED
WORKFORCE
Page 61

Page 62

18 
recently attended include
In addition to the above formal events, officers have carried out some service benchmarking
exercises, in conjunction with Building Standards, with both Argyll and Bute Council and Stirling
Council. 
As outlined above, there has been challenges with recruitment in the past and there is a
national shortage of qualified planners and supporting disciplines. However, the service
remains committed to supporting individuals and the profession and exploring opportunities
regarding the new University of West of Scotland planning course.  All eligible officers are
encouraged to work towards MRTPI status, and the service will support officers to do so. We
have also recently supported a placement from a student from the University of Glasgow who
was studying GIS. They supported the GIS officer and Development Planning and Place projects
that will support LDP Evidence Report workstreams. 
The service is committed to continue working in partnership with HOPS, the RTPI, Scottish
Government and planning universities to support planning as a career choice and to explore
opportunities for mentoring or work experience opportunities that we can offer. 
Staff wellbeing is important to the service. As the service is compact, sudden unplanned
absences or increases in workload can be a source of stress and pressure for staff as it is
difficult to absorb such pressures. All officers are encouraged to be open and honest with their
line manager about their current workload and a collaborative approach to mitigating pressures
Page 62

Page 63

19 
as much as possible is in place with line managers assisting in prioritising tasks in the most
effective manner as the circumstances dictate.  Corporately, the Council has a range of health
and wellbeing supports available and staff are encouraged to make use of these where
appropriate. 
It is recognised however, that despite a proactive approach, at times demand outstrips
resources, and unavoidable pressures and delays will occur. Line managers regularly report to
the Chief Planning Officer emerging issues to ensure high levels of communication and
discussion around ways in which capacity may be unlocked. 
At a corporate level flexible working arrangements are built into contracts and working
arrangements can be tailored to meet particular needs and situations that are balanced to
ensure an appropriate level of service delivery is maintained.
Page 63

Page 64

20 
Improvement Action Plan (People theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
1. The planning authority has sufficient resources and skills to maximise
productivity 
3
The service is currently maximising
productivity within the available resources.
However, further detailed workforce, capacity
and budget planning is required to ensure
that service performance can adequately
respond to both internal and external
pressures on the service.  The workforce
strategy will also require reviewing the
dependencies of other Council services to
support the delivery of both the Development
Plan and the Development Management
process. 
2. The planning authority has a value and supported workforce  3
The service is currently maximising training
and development opportunities within
existing resources. The development of a
workforce strategy will ensure that officers
are supported to carry out their role and their
professional development. 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Page 64

Page 65

21 
Improvement Action
What action will you take?
What will the outcome be?
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Implement the new back-
office document
management system and
carry out a full end-to-end
review of all workflow
processes
Chief Planning Officer,
Development
Management Team
Leader, Technical
Support Co-Ordinator
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX and
ICT, a project board will be
established. 
Develop a workforce strategy
and service training plan,
including any
options/opportunities for
restructure or cases for
investment 
Chief Planning Officer High Medium term Chief Officers for relevant
service areas, finance and
organisational
development and People
and Change partner. 
Page 65

Page 66

22 
A high performing planning authority has a positive
culture through ensuring it has sound governance,
effective leadership and a commitment to continuous
improvement. The authority has an identified chief
planner, who is supported by a strong leadership group
to advise on decision-making, policy and operational
management.
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Has the planning authority undertaken an annual assessment of its performance and
acted upon areas previously identified as in need of improvement?
• Has the planning authority achieved recognition at relevant awards or through
performance accreditation frameworks?
• Has the planning authority engaged in peer review, good practice exchange or
improvement activities?
• Has the planning authority addressed any complaints upheld by the Scottish Public
Services Ombudsman and have evidence of this and that it has learned from valid cases? 
Narrative
The service regularly undertakes assessment of processes and current processes. This was
previously mostly done through the Planning Performance Framework, and we continue to
report on performance 6 monthly to the Scottish Government
As a result of continuous improvement, a number of actions are underway to improve
performance, customer experience and reporting. Workstreams and actions recently
implemented or underway include:
➢ Revised templates for both committee and delegated reports of handling to remove
duplication and to make them clearer and more concise
➢ Revised decision notice templates and the introduction of a cover letter to highlight
the legislative requirements to ensure that conditions are discharged, and the
required notices are completed (Notification of Initiation of Development and
Notification of Completion of Development)
➢ A revised document naming protocol to improve clarity of the application casefile
ATTRIBUTE 3: THIS PLANNING AUTHORITY HAS EMBEDDED CONTINOUS
IMPROVEMENT.
Page 66

Page 67

23 
➢ Enterprise digital workflow introduced and there is an ongoing commitment to
refining processes where possible in advance of full IDOX integration
➢ Procedure notes completed for Technical Support Team processes
➢ Updating the Development Planning webpages to improve visibility of work related to
the next Development Plan
➢ Cleansing of internal file drive folder structure
➢ Planning and Building Standards will take part in the trial of sharepoint in advance of a
wider Council rollout 
Officers regularly engage with authorities across Scotland to share knowledge and practice
exchange via several routes. The Chief Planning Officer is the current Junior Vice Chair of the
Development Planning Sub-committee of HOPS, and The Principal Officer Development
Planning and Place provides additional representation on this committee and an officer sits on
the Climate Change Energy and Resources Committee. The service is also represented on
Mineral Officers Working Group. The Development Management Team Leader represents the
service on the Development Management Sub-Committee. Alongside these formal committees,
officers regularly make use of the KHUB HOPS forum. 
West Dunbartonshire forms part of the wider Glasgow City Region, formally the Clydeplan
Strategic Development Planning area, and continues to take part in regional working, with
representation at both strategic Chief Officer and officer levels. 
The Council has a robust 2 stage complaints process. By its nature, planning processes can often
result in dissatisfaction regarding an application processing or outcome or how an objection has
been handled. The Council has a written procedure for dealing with complaints and the
escalation to stage 2 where complaints cannot be addressed at a service level.  Over the period
1st April 2023 – 31st December 2024, 4 complaints were escalated to the SPSO, however in all
cases the complaints were not taken forward by them. The service is committed to learning
from any feedback provided by the SPSO or others that we can action to improve the service. 
Page 67

Page 68

24 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Does the planning authority have an effective scheme of delegation in place?
• Have all councillors who exercise a planning function undergone statutory training and
is there is evidence of ongoing training for members?
• Have more than x % of officer recommendations have been overturned by councillors at
committee or Local Review Body.
Narrative
The planning service’s current scheme of delegation is due to be refreshed this year as it is
more than 5 years old and is required to be updated. The scheme is generally considered to
have been effective to balance the need for efficient decision making and ensuring elected
members have sufficient oversight of planning applications and policy formation. However, as it
has been some time since the scheme was updated and there has been significant changes to
the Development Plan system and pressures on the planning service, the review will consider
what changes may be required to the scheme to ensure it remains proportionate and effective
and allows the best use of time and resources by both officers and elected members. 
All non-delegated development management applications and development planning matters
are reported to a single Planning Committee, comprising of a cross-party representation of 10
of the Council’s 22 elected members. The Local Review Body sits separately from Planning
Committee but consists of the same members. 
All members have access to specific planning training, whether they sit on Planning Committee
or not and a refresher course was offered in December 2024. Committee overturns of officer's
recommendation are quite low, with 92% of officer's recommendations being accepted by
members. In comparison, over the same period, members sitting as the Local Review Body
overturned 100% of all delegated decisions where a review had been sought. Whilst this is quite
a high rate, the number of overall applications considered by the LRB, is a low figure, compared
to the number of applications. 
ATTRIBUTE 4: THE PLANNING AUTHORITY HAS SOUND GOVERNANCE 
Page 68

Page 69

25 
The Local Review Body data can be contrasted with DPEA data. Whilst numbers of appeals for
planning applications and enforcement notice appeals are low, DPEA have dismissed the
appeals in both cases. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Does the planning authority have an identified Chief Planning Officer in place?
ATTRIBUTE 5: THE PLANNING AUTHORITY HAS EFFECTIVE LEADERSHIP  
Page 69

Page 70

26 
• Does the Chief Planning Officer advise on corporate decision making and policy within
the broader organisation?  
• Is the planning authority's Chief Planning Officer a member of the Royal Town Planning
Institute?
• Does the Chief Planning Officer advise and support external bodies through engagement
in organisations’ committees, advisory groups or working groups?  
• Does the planning authority have a strong leadership team that supports a culture of
continuous improvement? 
Narrative 
The Planning, Building Standards and Environmental Health Service Manager carries out the
Chief Planning Officer function. The Chief Planning Officer is supported by the Principal Officer
Development Planning and Place and the Development Management Team Leader, both MRTPI
qualified. The Chief Planning officer is MRTPI qualified and has over 11 years’ experience in
Local Government Planning Authorities, across both Development Planning and Development
Management. 
As noted in attribute 3, the Chief Planning Officer regularly inputs into work by HOPS and the
Improvement Service and is the current Junior Vice Chair of the Development Planning Sub-
Committee. They also collaborate and engage with regional authorities through the Glasgow
City Region working arrangements. 
Whilst not a Chief Officer in terms of the Council’s organisation structure, the Chief Planning
Officer provides strategic planning support to the Council’s Chief Officers and Chief executive to
encourage and support the integration of corporate and service level outcomes with good
placemaking outcomes and to promote the value of the planning service across the Council.
They sit on a variety of project boards providing high visibility of the planning service, for
example the City Deal project board for the Exxon development site and the Housing
Emergency Action Plan Project Board. 
The Chief Planning Officer meets with the Chief Officer Regulatory and Regeneration
individually, and collectively with the other service managers, monthly to discuss wider service
and corporate issues. Within the service, the Chief Planning Officer mirrors this approach with a
programme of formal monthly catch ups, individually and collectively, with the Principal
Officers for Environmental Health and Development Planning and Place, the Development
Management and Building Standards Team Leaders and Technical Support Co-ordinator. These
meetings focus on day-to-day issues as well as having a focus on service improvement
workstreams. These formal catch ups are supplemented by regular informal catch ups on
specific issues with officers at all levels. 
Page 70

Page 71

27 
Improvement Action Plan (Culture theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
3. This Planning Authority has embedded continuous improvement  1
Despite resource and system challenges, the
service continually seeks ways in which
processes can be streamlined or enhanced
and this approach is embedded into all
service workstreams.
4. This Planning Authority has sound governance 3
The service has effective governance
structures; however, these are required to be
reviewed
5. This Planning Authority has effective leadership 1
The service has a Chief Planning Officer in
place and supports the culture of continuous
improvement 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Complete review of Scheme
of Delegation to ensure it is
proportionate 
Chief Planning Officer /
Development
Management Team
Leader
High Short term Chief Planning Officer,
Legal Manager, Chief
Officer Regulatory and
Regeneration and Elected
Members
Page 71

Page 72

28 
Implement the new back-
office document
management system and
carry out a full end-to-end
review of all workflow
processes
Chief Planning Officer /
Development
Management Team
Leader/ Technical
Support Co-Ordinator
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX and
ICT, a project board will be
established. 
Finalise review of committee
and delegated Reports of
Handling Templates to ensure
that they are proportionate
and are clear and easy to be
understood by a variety of
audiences 
Chief Planning Officer /
Development
Management Team
Leader
Medium Short term Chief Planning Officer,
Development Management
Team Leader and
Democratic and
Registration Services
Manager 
Produce detailed team
improvement plans, focusing
on improvements that
increase efficiency and are
clear, including increasing the
quality of our customer
communication   
Chief Planning Officer /
Development
Management Team
Leader/ Principal Officer
Development Planning
and Place / Technical
Support Co-Ordinator  
High Short Term All service staff 
Page 72

Page 73

29 
A high performing planning authority needs to have an
effective local development plan and other strategies in
place to provide a vision for the future of the area. It
needs to be able to set and deliver on policy ambitions
and priorities by clearly informing decision making and
providing certainty and predictability for communities,
developers and investment. The authority’s
development management systems need to be
effective in making the right decisions about
development and be efficient as possible in doing this.
The planning authority makes best use of digital
technology and how it manages and uses data. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Does the planning authority have an up to date Local Development Plan in place and/ or
is on track to adoption?
• Does the planning authority have an up to date Regional Spatial Strategy in place/ or on
track to adoption? 
• Has the planning authority’s Local Development Plan Evidence Report been approved by
the Department of Planning and Environmental Appeals and/ or on track for approval?
• Have the application of the Local Development Plan’s policies been found to be deficient
at appeal or judicial review?
Narrative 
West Dunbartonshire does not have an up-to-date Local Development Plan. The current Local
Plan was adopted in 2010, and the Council does not have an adopted “new-style” Development
Plan. The Council did not adopt Local Development Plan 1, and the Council was under direction
from Scottish Ministers to not adopt the Proposed Local Development Plan 2 unless all required
modifications were implemented. The Council ultimately declined to accept one of the
modifications and therefore did not adopt the plan. The Proposed Plan, as modified, was
published, but not adopted, and as the Council’s most up to date expression of local
development plan policies and spatial strategy, it forms a significant material consideration in
the determination of planning applications. 
ATTRIBUTE 6: THE PLANNING AUTHORITY HAS A ROBUST POLICY AND
EVIDENCE BASE 
Page 73

Page 74

30 
The service is focused on the delivery of Local Development Plan 3 and the most recently
approved Development Plan Scheme (December 2024) programmes adoption of the plan in
January 2028. The evidence report is currently being prepared, with a target for submission to
gatecheck in summer 2025. The current timescale has been extended by a period of 7 months
since the publication of the original Development Plan Scheme, and as outlined above, this is
being kept under review.
In terms of a Regional Spatial Strategy, the Council is working collaboratively within the
Glasgow City Region to produce a regional spatial strategy in the future. In 2020/2021 the
region, under the previous Clydeplan arrangements, collaborated to produce an indicative
Regional Spatial Strategy to input into, what was then, the emerging National Planning
Framework 4. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Has the planning authority encouraged and promoted planning applications to be
submitted through the e-development portal?
• Does the planning authority have a data governance strategy in place for the
management of planning data?
• Does the planning authority have the ability to use interactive web-mapping, GIS and
spatial data?
• Does the planning authority have the ability to use digital approaches to engagement,
including website, social media and other platforms?
Narrative 
The service seeks to direct all applications to the eDevelopment Scotland portal for all
submissions, including post application submission documents. The available data shows that the
service achieves over 90% of all planning application submissions via the portal. 
Whilst not all applications can be made through this portal, the service has online forms that
allow the digital submission of pre-applications, requests for non-material variations and
requests to discharge conditions. The service focuses on the best use of digital technology and
the move to an integrated case management and document management solution will allow
further refinement to our end-to-end digital processes. 
ATTRIBUTE 7: THE PLANNING AUTHORITY MAKES BEST USE OF DATA AND
DIGITAL TECHNOLOGY 
Page 74

Page 75

31 
Whilst there is no corporate level GIS team, the service has a GIS officer who works
collaboratively with other council services to ensure the best use of GIS. At a service level, GIS is
well developed and well-integrated with service procedures. Our GIS system is currently
undergoing a number of updates. It is a key component to the services approach to managing
development plan data and evidence report work. Planning, as part of the wider Planning,
Building Standards and Environmental Health service, has a social media presence on X,
formally Twitter. However, its continued use and value as an engagement tool is under review.
The service regularly liaises with the Council’s corporate communication team to promote
development plan work and in relation to applications that are to be considered by the
Planning Committee. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Does the planning authority planning have the ability to make decisions on planning
applications within the required timeframes?
• Are less than x% of planning decisions overturned at appeal or judicial review?
• Does the planning authority have an up to date Enforcement Charter in place?
• Does the planning authority have the ability to resolve enforcement cases? 
Narrative 
Commentary on planning performance is covered within attribute 1 of this assessment. It is
considered that the service, whilst performing well within the level of resources and IT
challenges, is generally performing slower than the statutory targets. We are however
performing well against national averages. Recruitment into both the Development Planning
and Place, and Development Management teams, and the upcoming investment in IT
infrastructure (covered in attribute 1), alongside the ongoing review of processes and
procedures, are expected to have a positive impact on performance. 
Regarding planning enforcement, our Planning Enforcement Charter was last updated in
December 2022. The charter was due to be renewed by December 2024, however, due to
resource challenges this did not take place. The service expects to have a revised charter in
place by December 2025. Notwithstanding that the charter was not reviewed and republished,
a “light touch” mini review has satisfied the service that the charter remains fit for purpose and
provides clear guidance on how enforcement breaches will be investigated by the authority
until the fuller review later this year. We have clear processes and an electronic form on our
website to submit all enquiries. 
ATTRIBUTE 8: THE PLANNING AUTHORITY HAS EFFECTIVE AND EFFICIENT
DECSION MAKING PROCESSES 
Page 75

Page 76

32 
The service previously had a dedicated 1 FTE enforcement role; however, this resource was
removed in October 2021. All enforcement procedures are carried out by Development
Management case officers. Whilst this works well for reactive planning enforcement, due to
current resources, proactive monitoring is a challenge. However, as noted in other parts of this
assessment, it is hoped that the recent recruitment into the service will improve this situation
and allow for enhancements to the monitoring regime. Enforcement case details from the 1st
April 2023 until 31st December 2024 are noted in the table below. 
Page 76

Page 77

33 
Improvement Action Plan (Tools theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
6. The planning authority has a robust policy and evidence base 3
Whilst work is underway to prepare LDP3, the
authority does not have an up-to-date
Development Plan in place
7. The planning authority makes best use of data and digital technology  3
The service makes extensive use of digital
data and technology with regards to GIS, but
has significant issues with the back office
system
8. The planning authority has effective and efficient decision making
processes 
3
The service has effective and efficient
decision making processes in many aspects of
DM performance but overall performance
could be further enhanced and Scheme of
Delegation requires review 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Implement the new back-
office document
management system and
carry out a full end-to-end
Chief Planning Officer /
Development
Management Team
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX and
Page 77

Page 78

34 
review of all workflow
processes
Leader/ Technical
Support Co-Ordinator
ICT, a project board will be
established. 
Finalise review of committee
and delegated Reports of
Handling Templates to ensure
that they are proportionate
and are clear and easy to be
understood by a variety of
audiences 
Chief Planning Officer /
Development
Management Team
Leader
Medium Short term Chief Planning Officer,
Development Management
Team Leader and
Democratic and
Registration Services
Manager 
Produce detailed team
improvement plans, focusing
on improvements that
increase efficiency and are
clear, including increasing the
quality of our customer
communication 
Chief Planning Officer /
Development
Management Team
Leader/ Principal Officer
Development Planning
and Place / Technical
Support Co-Ordinator  
High Short Term All service staff 
Undertake review of the
Development Management
and Enforcement Charters
and processes to ensure they
remain fit for purpose. 
Development
Management Team
Leader
Medium Short Term Development Management
Team
Page 78

Page 79

35 
A high performing planning authority should ensure a
wide range of people are involved in shaping their
future places. Engagement should be fair and inclusive,
early, collaborative, meaningful and proportionate and
should include difficult to reach groups. The authority
should engage with a wide range of partners at a
national, regional and local level to ensure a joined-up
approach and that links are made across policies and
programmes. The planning authority should
demonstrate good customer care, transparency and
effective communication. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Does the planning authority have the ability to offer pre-application advice where it is
requested?
• Has the planning authority held regular engagement events with developers and
communities?
• Do the results from the customer and stakeholder survey show that customers are
satisfied with the service offer by the planning authority?
Narrative
This narrative is addressed within the narrative for attribute 10. 
ATTRIBUTE 9: THE PLANNING AUTHORITY HAS GOOD CUSTOMER CARE 
Page 79

Page 80

36 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Does the planning authority have a community engagement strategy and infrastructure
in place to ensure engagement is early, collaborative, meaningful and proportionate?
• Has the planning authority undertaken community engagement, for example consistent
and effective use of the Place Standard Tool, to inform decision-making processes?
• Has the planning authority engaged with a good representation of the community
including young people, gypsies and travellers, people with protected characteristics,
including disability, race, age, sex and sexual orientation, and including people from a
range of socio-economic backgrounds?
• Has the planning authority supported the production of Local Place Plans when
requested?
• Do the results from the customer and stakeholder survey show that stakeholders are
satisfied with their collaboration with the planning authority?
Narrative 
West Dunbartonshire Planning Authority places a high value on the front loading of planning
processes through both general and specific pre-application advice. We are committed to
taking a proactive role in supporting the delivery of high-quality development. 
General planning advice is provided by the Technical Support Team, who are the first point of
contact for customers. Where this requires input from a Planning Officer, these are then passed
to them for response. Current workloads do not require us to operate a formal duty officer
process, and all enquiries are shared out amongst available officers. This service formally
operates in line with the standard business hours of the Council; Monday – Thursday, 8.45 –
16.45, and 08.45 - 15.55 on Fridays. Due to flexible working patterns, and that officers may be
out on site, we encourage phone and email enquiries in the first instance to ensure that
customers are helped in the most efficient manner and by the right person. Whilst we do not
hold formal records of how enquiries are received, we would estimate that less than 5% of
enquiries are made in person. 
Bespoke pre-application advice is available and split into 2 different types. The Pre-application
Advice service supports applicants who require guidance for smaller less complex proposals, for
example, change of use or small residential development applications. And the Pre-application
Framework supports larger and more complex developments. The framework approach is led
by our Placemaking Co-Ordinator who supports such developments through the process and
includes review by our Place and Design Panel where appropriate. 
ATTRIBUTE 10: THE PLANNING AUTHORITY HAS EFFECTIVE ENGAGEMENT
AND COLLABORATION WITH STAKEHOLDERS AND COMMUNITIES
Page 80

Page 81

37 
The service has previously identified through the last Planning Performance Framework that we
wanted to hold regular forum sessions, likely alongside Building Standards, with local architects
and agents. The service remains committed to this and aim to carry out such an event in 2025
and then at regular intervals, at least annually, thereafter. 
In terms of community engagement, the Council does have an engagement strategy and the
engagement working group to help guide engagement processes; these have helped to inform
the engagement as set out in the LDP Participation Statement. Early engagement for the
development plan included attending 6 community council meetings to raise awareness of the
start of the new Local Development Plan process. 
To support the evidence gathering consultation, officers organised several webinars with
internal and external partners and stakeholder; attended partners’ meetings and events to
discuss the consultation and held one-to-one meetings with stakeholders where appropriate.
This included the West Dunbartonshire Equalities Forum; Strategic Housing Providers Forum;
Community Council Forum; WDCVS Third Sector Leader’s Forum and the Children’s Right’s
Advisory Board. An online “Tell us about your place” place standard survey was undertaken
with 89 responses, with further responses were received to the children’s and young peoples
versions. The call for evidence survey, which was directed more at stakeholders and partner
organisations received 59 responses across the NPF4 topics, further one-to-one engagement
has sought to fill evidence gaps and ensure that key agencies have all had the opportunity to
engage. 
The Council also commissioned Planning Aid Scotland to support the co-production of an easy
start guide for the preparation of local place plans, which worked with community councils and
other groups to shape the guidance. This used several different engagement methods including,
online and telephone surveys as well as in person and online events to enable groups to engage
in ways that suited the capacity of their volunteers. This process finished with an online launch
and training event to familiarise groups with the guide and the Local Place Plan process. 
The Council Housing service has a monthly Gypsy Traveller Liaison meeting with community
members from the Council’s site at Dennystoun Forge. Officers from the Development Planning
team have also attended this meeting, to raise awareness of the local development plan and to
discuss specific evidence gaps in relation to the need and demand for additional pitches or sites
for Gypsy Travellers. The Gypsy Traveller Liaison Officer has supported us to undertake a survey
of residents of the site as well as members of the community who are not resident of the site to
complete surveys to fill this evidence gap. 
The planning service has not carried out a formal customer satisfaction survey, however the
National Planning Improvement Team carried out a National Customer and Stakeholder
Satisfaction Survey in November 2024. The outcome of this was favourable to the service, and
we performed better on every marker against the national average. On every summary marker
Page 81

Page 82

38 
we achieved at least a 57% favourable response (either good/very good or satisfied/very
satisfied). We look forward to maintaining customer satisfaction as a result of our improvement
actions and engaging further with customers and stakeholders in advance of the next survey
later in 2025. 
Information from customers during the processing of applications, highlights a general
dissatisfaction regarding the availability and stability of the online planning portal. This impacts
negatively on perceptions of the service. As highlighted in the tools theme, the service is
currently working to implement a new full IDOX solution that is expected to improve the
availability and stability of the portal.
Page 82

Page 83

39 
Improvement Action Plan (Engage theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
9. This planning authority has good customer care 3
The service generally provides good customer
service, although it is recognised that certain
areas need improvement based on formal
and informal feedback 
10. The planning authority has effective engagement and collaboration with
stakeholders and communities.
3
The service generally has effective
engagement and collaboration but have
identified areas where this could be
strengthened 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Set up regular agents forum,
in conjunction with Building
Standards
Chief Planning
Officer/Development
Management Team
Leader/ Princiapal
Officer Development
Planning and
Place/Building Standards
Team Leader
Medium Short/Medium
Term
Development
Management,
Development Planning and
Building Standards
Page 83

Page 84

40 
Carry out wider Service Day
(with Building Standards and
Environmental Health) to share
good practice and workstream
updates. This will inform
detailed Team Improvement
Plans 
Chief Planning Officer Medium Short All Service staff 
Page 84

Page 85

41 
A high performing planning authority should
demonstrate place leadership by taking a collaborative
place-based approach in line with the Place Principle. It
should use the Place and Wellbeing Outcomes in
decision-making processes, to achieve the three spatial
principles outlined in NPF4: Sustainable places, where
we reduce emissions, restore and better connect
biodiversity; Liveable places, where we can all live
better, healthier lives; and Productive places, where we
have a greener, fairer and more inclusive wellbeing
economy. The planning authority should seek to ensure
that there are no impediments to delivering agreed
development. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Is the planning authority aware of the Place and Wellbeing Outcomes, the evidence that
sits behind them and is it using them in decision-making processes?
• Has the planning authority identified tools and approaches to delivering sustainable,
liveable and productive places and is implementing them?
Narrative 
The service is aware of the Place and Wellbeing Outcomes and is taking this approach forward
as part of the preparation of the next Local Development Plan. West Dunbartonshire Council
had one of the project towns for the Shaping Places for Wellbeing Project, which sought to
embed the Place and Wellbeing Outcomes within our decision-making processes. The Council
undertook place and wellbeing assessments for a number of strategies and policy documents
and a suite of place and wellbeing outcome briefings was prepared. These briefings are part of
the evidence for the local development plan and have been shared with other services through
the Engagement Working Group. It is intended that a place and wellbeing assessment will be
undertaken for the Proposed Plan, and we continue to embed these processes within our
decision making as part of the placemaking coordinator role. 
ATTRIBUTE 11: THE PLANNING AUTHORITY SUPPORTS THE DELIVERY OF
SUSTAINABLE, LIVEABLE AND PRODUCTIVE PLACES
Page 85

Page 86

42 
Development Management processes naturally involve seeking placemaking outcomes and
seeking better developments above guidance. Whilst added value is captured in Reports of
Handling, the current processes do not allow for the data to be extracted in a quantifiable and
integrable way, so the service is keen to explore this being captured directly within Uniform as
part of our service improvement actions. This will allow the service to report clearly in the
future how we have added value in terms of place and wellbeing outcomes and delivering
sustainable, liveable and productive places within West Dunbartonshire. 
The Local Development Plan 2 Proposed Plan sets out a place focussed spatial strategy which
identifies key areas for regeneration and development within our communities as well as key
assets to be protected and enhanced. These places each have place specific policies and
development strategies to ensure that development brought forward meets the needs of our
communities. While the sustainable, liveable and productive place themes of NPF4 are more
recent than our Proposed Plan, the spatial strategy is a key aspect of our approach to delivering
these places.
Each of the Delivering Our Places areas, identified within the Proposed Plan has a masterplan or
development framework, or has the requirement for a masterplan to be prepared when an
application is brought forward, to ensure that a coherent approach to development is achieved
for these key strategic sites. This has ensured that masterplans have been brought forward as
part of the Planning Permission in Principle applications for the Exxon City Deal and Carless sites
as well as town centre masterplans/development frameworks for Clydebank and Alexandria
town centres. The delivery of these projects are guided by a Project Board including leaders
from key council services and partners where appropriate.
West Dunbartonshire Councils pre-application process and Place and Design Panel are other
key tools which the authority uses to raise the quality of development proposals and deliver
better outcomes for our communities. Through the pre-application process there is the
opportunity to provide early placemaking advice to applicants and incorporate stakeholders
concerns prior to the application being submitted. As well as raising the bar in terms of design
this also front-ends development details, reducing the need for conditions and reducing delays
while discharging these so that development can get started more quickly once approved. 
Page 86

Page 87

43 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
• Has the planning authority provided clear and proportionate expectations of Section 75
agreements and set these out in the LDP and pre-application discussions and they are
concluded within 6 months of resolution to grant?
• Does the planning authority take a proportionate approach to imposing conditions?
• Does the planning authority have an ambitious local housing land requirement that
exceeds the Minimum All Tenure Housing land requirements in NPF4 and is it on track
to support delivery? 
• Are the number of processing agreements the planning authority has agreed with
applicants increasing?
• Does the planning authority have an effective delivery programme in place that
supports the delivery of development on the ground? 
Narrative 
Due to our current developer contributions policy, the service typically relies on Section 69
agreements rather than Section 75 agreements. However, any application that requires a Legal
Agreement is generally expected to be concluded within 6 months of either the officer
recommendation being accepted by an Appointed Officer or Planning Committee. The service
has recently introduced wording to any committee recommendation requiring a legal
agreement that seeks delegation to the Chief Planning Officer to refuse any application subject
to a legal agreement within 6 months of the committee date where there has been no
meaningful progress to completion. This may be formalised as part of the review of the Scheme
of Delegation. Case officers seek to discuss any financial contributions at an early stage of
application processing to reduce any delay, and where possible, this is advised at the
preapplication stage. 
A rolling programme reviewing planning conditions is currently being progressed by the service.
Initially this will involve Environmental Health conditions, and then other types of conditions
will follow. This review is taking place in tandem with other workstreams, including reviewing
the consultation protocol, and is part of a package of measures to improve efficiency and
certainty for both our consultees and customers and to ensure that conditions are
proportionate to the scale and type of development. This will also aid with future monitoring,
discharge and enforcement of conditions. Other measures include exploring publication of new
validation standards to be open and transparent to applicants about what information is
required for assessment and to encourage sufficient information to be submitted, reducing the
need for subsequent conditions. 
ATTRIBUTE 12: THE PLANNING AUTHORITY SUPPORTS THE DELIVERY OF
CONSENTED DEVELOPMENT
Page 87

Page 88

44 
The Council is committed to delivery of development. Within the Council there are several
working groups and project boards to support the delivery of key projects for the authority,
which the planning service supports. These include cross service project boards for the Local
development plan, the Exxon City Deal Project, Queens Quay, Dumbarton Levelling Up Fund
Project as well as the Scottish Marine Technology Park at Carless, in partnership with the
landowner. Officers from across the Council also regularly meet to share practice and insights at
the Engagement Working Group. The Planning, Regeneration, Roads and Asset Management
group, also meets regularly to keep partners aware of the range of projects which may have
impacts across these services. 
As set out in the narrative for attribute 1, currently there is low utilisation of Planning
Performance Agreements, but the service is exploring ways to promote their use further this as
part of the implementation of a project management approach for applications. 
Page 88

Page 89

45 
Improvement Action Plan (People theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
11. The planning authority supports the delivery of sustainable, liveable and
productive places
1
12. This planning authority supports the delivery of appropriate development 2 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Complete review of Scheme
of Delegation to ensure it is
proportionate 
Chief Planning Officer /
Development
Management Team
Leader
High Short term Chief Planning Officer,
Legal Manager, Chief
Officer Regulatory and
Regeneration and Elected
Members
Implement Project
Management approach
within Development
Management 
Chief Planning Officer /
Development
Management Team
Leader
High Short/Medium
term
Development
Management, Technical
Support and and Uniform
Implement the new back-
office document
management system and
carry out a full end-to-end
review of all workflow
processes
Chief Planning Officer,
Development
Management Team
Leader, Technical
Support Co-Ordinator
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX and
ICT, a project board will be
established. 
Page 89

Page 90

46 
Explore how “Added Value”
can be better captured and
reported on
Development
Management Team
Leader
High Short Term Uniform system
Review Development
Management Conditions
Chief Planning Officer /
Development
Management Team
Leader
High Medium Development Management
and other sections of the
Council (e.g. Environmental
Health, Roads etc.) 
Page 90

Page 91

NATIONAL PLANNING IMPROVEMENT FRAMEWORK
IMPROVEMENT ACTION PLAN 2024
West Dunbartonshire Council 
ITEM 7 - APPENDIX 2
Page 91

Page 92

A high performing planning authority needs to have the right number of people to do the work expected of it with
the rights skills set. It also needs to have a strategy to ensure that it retains and recruits the right staff in the future.
It supports staff to upskill and to be prepared for changes in policy, legislation, and new circumstances. 
Attribute  Score  
(1=Making excellent progress, 5= No progress)  
1. The planning authority has sufficient resources and skills to maximise productivity   3
2. The planning authority has a valued and supported workforce   3  
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/ Medium/ Low) and by
when (short/ medium/ long term).    
Improvement Action 
What action will you take? 
What will the outcome be? 
Owner  Importance 
High  
Medium 
Low 
Timescale  
Short term – 1 year 
Medium term – 3 years 
Long term – 3+ years 
Resources 
Implement the new back-office
document management system and
carry out a full end-to-end review of all
workflow processes
Chief Planning
Officer,
Development
Management Team
Leader, Technical
Support Co-
Ordinator
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX and
ICT, a project board will be
established.
Page 92

Page 93

Develop a workforce strategy and
service training plan, including any
options/opportunities for restructure
or cases for investment   
Chief Planning
Officer
High Medium term Chief Officers for relevant
service areas, finance and
organisational development
and People and Change
partner. 
A high performing planning authority has a positive culture through ensuring it has sound governance, effective
leadership and a commitment to continuous improvement. The authority has an identified chief planner, who is
supported by a strong leadership group to advise on decision-making, policy and operational management. 
Attribute  Score  
(1=Making excellent progress, 5= No progress)  
3. This Planning Authority has embedded continuous improvement   1
4. This Planning Authority has sound governance  3
5. This Planning Authority has effective leadership  1  
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/ Medium/ Low) and by
when (short/ medium/ long term).    
Improvement Action 
What action will you take? 
What will the outcome be? 
Owner  Importance 
High  
Medium 
Low 
Timescale  
Short term – 1 year 
Medium term – 3 years 
Long term – 3+ years 
Resources 
Page 93

Page 94

Complete review of Scheme of Delegation to
ensure it is proportionate 
Chief Planning Officer /
Development
Management Team Leader
High Short term Chief Planning Officer,
Legal Manager, Chief
Officer Regulatory and
Regeneration and Elected
Members
Implement the new back-office document
management system and carry out a full end-
to-end review of all workflow processes
Chief Planning Officer /
Development
Management Team
Leader/ Technical Support
Co-Ordinator
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX
and ICT, a project board
will be established.
Finalise review of committee and delegated
Reports of Handling Templates to ensure that
they are proportionate and are clear and easy
to be understood by a variety of audiences
Chief Planning Officer /
Development
Management Team Leader
Medium Short term Chief Planning Officer,
Development
Management Team
Leader and Democratic
and Registration Services
Manager
Produce detailed team improvement plans,
focusing on improvements that increase
efficiency and are clear, including increasing
the quality of our customer communication 
Chief Planning Officer /
Development
Management Team
Leader/ Principal Officer
Development Planning and
Place / Technical Support
Co-Ordinator 
High Short Term All service staff
Page 94

Page 95

A high performing planning authority needs to have an effective local development plan and other strategies in place
to provide a vision for the future of the area. It needs to be able to set and deliver on policy ambitions and priorities
by clearly informing decision making and providing certainty and predictability for communities, developers and
investment. The authority’s development management systems need to be effective in making the right decisions
about development and be efficient as possible in doing this. The planning authority makes best use of digital
technology and how it manages and uses data. 
Attribute  Score  
(1=Making excellent progress, 5= No progress)  
6. The planning authority has a robust policy and evidence base  3
7. The planning authority makes best use of data and digital technology   3
8. The planning authority has effective and efficient decision-making processes   3  
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/ Medium/ Low) and by
when (short/ medium/ long term).    
Improvement Action 
What action will you take? 
What will the outcome be? 
Owner  Importance 
High  
Medium 
Low 
Timescale  
Short term – 1 year 
Medium term – 3 years 
Long term – 3+ years 
Resources 
Implement the new back-office
document management system
and carry out a full end-to-end
review of all workflow
processes
Chief Planning Officer /
Development Management
Team Leader/ Technical
Support Co-Ordinator
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX and
ICT, a project board will be
established.
Page 95

Page 96

Finalise review of committee
and delegated Reports of
Handling Templates to ensure
that they are proportionate and
are clear and easy to be
understood by a variety of
audiences 
Chief Planning Officer /
Development Management
Team Leader
Medium Short term Chief Planning Officer,
Development Management
Team Leader and Democratic
and Registration Services
Manager 
Produce detailed team
improvement plans, focusing on
improvements that increase
efficiency and are clear,
including increasing the quality
of our customer communication 
Chief Planning Officer /
Development Management
Team Leader/ Principal
Officer Development Planning
and Place / Technical Support
Co-Ordinator
High Short Term All service staff
Undertake review of the
Development Management and
Enforcement Charters and
processes to ensure they
remain fit for purpose.
Development Management
Team Leader
Medium Short Term Development Management
Team
Page 96

Page 97

A high performing planning authority should ensure a wide range of people are involved in shaping their future
places. Engagement should be fair and inclusive, early, collaborative, meaningful and proportionate and should
include difficult to reach groups. The authority should engage with a wide range of partners at a national, regional
and local level to ensure a joined-up approach and that links are made across policies and programmes. The planning
authority should demonstrate good customer care, transparency and effective communication. 
Attribute  Score  
(1=Making excellent progress, 5= No progress)  
9. This planning authority has good customer care  3
10. The planning authority has effective engagement and collaboration with
stakeholders and communities. 
3
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/ Medium/ Low) and by
when (short/ medium/ long term).     
Improvement Action 
What action will you take? 
What will the outcome be? 
Owner  Importance 
High  
Medium 
Low 
Timescale  
Short term – 1 year 
Medium term – 3 years 
Long term – 3+ years 
Resources 
Set up regular agents forum, in
conjunction with Building Standards 
Chief Planning
Officer/Development
Management Team
Leader/ Principal Officer
Development Planning
and Place/Building
Standards Team Leader
Medium Short/Medium
Term
Development Management,
Development Planning and
Building Standards
Carry out wider Service Day (with Building
Standards and Environmental Health) to
Chief Planning Officer Medium Short All Service staff
Page 97

Page 98

share good practice and workstream updates.
This will inform detailed Team Improvement
Plans 
A high performing planning authority should demonstrate place leadership by taking a collaborative place-based
approach in line with the Place Principle. It should use the Place and Wellbeing Outcomes in decision-making
processes, to achieve the three spatial principles outlined in NPF4: Sustainable places, where we reduce emissions,
restore and better connect biodiversity; Liveable places, where we can all live better, healthier lives; and Productive
places, where we have a greener, fairer and more inclusive wellbeing economy. The planning authority should seek
to ensure that there are no impediments to delivering agreed development.  
Attribute  Score  
(1=Making excellent progress, 5= No progress)  
11. The planning authority supports the delivery of sustainable, liveable and productive
places 
1
12. This planning authority supports the delivery of appropriate development  2  
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/ Medium/ Low) and by
when (short/ medium/ long term).    
Improvement Action 
What action will you take? 
What will the outcome be? 
Owner  Importance 
High  
Medium 
Low 
Timescale  
Short term – 1 year 
Medium term – 3 years 
Long term – 3+ years 
Resources 
Complete review of Scheme of
Delegation to ensure it is
proportionate 
Chief Planning Officer /
Development
Management Team Leader
High Short term Chief Planning Officer, Legal
Manager, Chief Officer
Regulatory and Regeneration
and Elected Members
Page 98

Page 99

Implement Project
Management approach within
Development Management 
Chief Planning Officer /
Development
Management Team Leader
High Short/Medium term Development Management,
Technical Support and and
Uniform
Implement the new back-office
document management system
and carry out a full end-to-end
review of all workflow
processes
Chief Planning Officer,
Development
Management Team
Leader, Technical Support
Co-Ordinator
High Short term All service staff will be
required to support this
process in some way. In
conjunction with IDOX and
ICT, a project board will be
established.
Explore how “Added Value” can
be better captured and
reported on
Development
Management Team Leader
High Short Term Uniform system
Review Development
Management Conditions
Chief Planning Officer /
Development
Management Team Leader
High Medium Development Management
and other sections of the
Council (e.g. Environmental
Health, Roads etc.) 
Page 99

Page 100

NPIF Good Practice template
Which attributes of a high performing planning authority does this relate
to:
☐Attribute 1: The Planning Authority has sufficient resources and skills to maximise productivity
☐Attribute 2: The Planning Authority has a valued and supported workforce
☒Attribute 3: This Planning Authority has embedded continuous improvement
☐Attribute 4: This Planning Authority has sound governance
☒Attribute 5: This Planning Authority has effective leadership
☐Attribute 6: This Planning Authority has a robust policy and evidence base
☐Attribute 7: This Planning Authority makes best use of data and digital technology
☐Attribute 8: This Planning Authority has effective and efficient decision making processes
☐Attribute 9: This Planning Authority has good customer care
☐Attribute 10: This Planning Authority has effective engagement and collaboration with stakeholders
and communities
☐Attribute 11: This Planning Authority supports the delivery of sustainable, liveable and productive
places
☐Attribute 12: This Planning Authority supports the delivery of consented development 
West Dunbartonshire Council 
Title: Culture of continuous improvement and leadership 
Context 
Ensuring a culture of continuous improvement and being supported by leadership to identify areas for
improvement and empowerment to implement solutions 
What happened?
The service has embedded continuous improvement into everything that we do. As noted in the
performance assessment, the service has generally good performance but has areas for improvement
and is hampered by inefficient back-office systems. 
The service has a Chief Planning Officer who is committed to continuous improvement of planning and
place outcomes, as well as performance outcomes in terms of certainty, speed and efficiency of decision
ITEM 7 -
APPENDIX 3
Page 100

Page 101

making. The Chief Planning Officer function is carried out by the service manager for Planning, Building
Standards and Environmental Health. Whilst a broad remit, the role provides for significant
opportunities to work collaboratively and there is a good degree of synergy within the services. For
example, the Technical Support team is a multi-disciplinary team that supports both planning teams and
Building Standards, whilst Environmental Health is a key consultee for the planning process. 
The Chief Planning Officer is supported in this collaborative approach by the individual Principal Officers,
Team Leaders and Co-Ordinator's and they are empowered to identify areas of improvement and to
work together to achieve this. Individual catch ups take place regularly and meet as a group monthly to
discuss wider service issues. 
This approach extends vertically, both upwards to other Council services, and downwards to individuals
and teams within the service. The Chief Planning Officer, whilst not a formal Chief Officer in terms of the
corporate structure, supports the corporate leadership team on planning matters and sits on a variety of
project boards and has regular catch ups and communications with services across the Council.
A recent example of how continuous improvement is embedded into the team was a joint service
improvement afternoon that was undertaken by the Development Planning and Place, Development
Management, Building Standards and Technical Support teams, facilitated by the service manager. The
goal of this day was to hear more about the challenges individuals, teams and the service as a whole
faced, what worked, what could be improved and their ideas for change. The format of the afternoon
included some fun team building exercises to foster further collaboration across the service.
The event highlighted the following:
What we do well
• Flexible working
• Positive and supportive work culture
• Endurance under pressure
• Embrace change
• Make the best of out dated systems
• Achieve high quality development
Challenges
• Not having appropriate IT systems to help us or our customers
• Providing good customer service in relation to the website and the planning portal
• Failure to attract and retain staff, aswell as delays in recruitment when it is approved
Opportunities
• In service training and sharing of learning, skills and knowledge
• Ensure budgets for known software updates
• To make “Service Days” more regular with guest speakers from other services
• Collate procedural guidance in a central place (handbook) for all processes
• Review processes with increased enterprise usage and future review when IDOX DMS is
implemented
Page 101

Page 102

• Explore technology for site visits and dangerous buildings (e.g. drones, 3D cameras)
• Present our roles, what we do, and what we do not do, to other services such as housing and
the contact centre
• Improve the onboarding process at service level
• Promote continued progressional development and implement “grow your own” staff supports
• Engage more with developers and agents 
Areas of collaboration 
The event was collaborative as all planning, building standards and technical support staff attended.
Whilst faciliated by the service manager, individual groups discussed the issues and themes and
reported back to the wider group. 
What was the overall result?
The event was well received by attendees, noting “the high level of interaction and team building
exercises as a bit of fun.” The event was extremely useful for the service manager and team leaders as it
highlighted the good work already done or in progress and helped to identify areas for further
improvement. The actions and feedback from this event have directly influenced service priorities and
the National Planning Improvement Framework Improvement Actions.  The event was followed up with
a Microsoft Sway document outlining a summary of the event and what had been achieved so far and
what was next. 
Highlights of actions that were noted as being underway at the time included:
• Recruitment underway for vacant posts 
• Supporting officer attendance on the UWS planning course
• Review of Enterprise tasks commenced
• Early work on the review of the Scheme of Delegation
• Review of both delegated and committee Report of Handling templates
• New catch-up schedules with line managers
• 4 weekly meetings with PBS&EH Manager and Princiapal Officers, Team Leaders and Co-
Ordinator's
• Progress with Business Case for full IDOX solution
• prepatory work to support Civica extraction and IDOX integration
• Sharing skills and knowledge events took place with Argyll and Bute and Stirling Council’s 
Page 102

Page 103

Lessons learned
Please detail here what worked well and what did not work and on reflection what you would do in
future under the following headings:
Successes
Officers felt listened to and it was beneficial to hear about what we do well and for self-identification of
where we could improve
Challenges
Many of the desires of the team require a cost, whether that be a financial cost or staff time cost to
implement, which is challenging in the current operating environment. Another challenge arising from
the event is to manage expectations on how quickly identified improvements will happen and to ensure
that these do not just “sit on a shelf” and to show regularly how improvements are being made,
resulting from the event. 
Some areas of frustration were also expressed for matters that lay outwith the control of the service. 
Lessons Learned 
Overall, as the event was well received, it highlighted the determination and desire for change with the
team, and it will be rerun in the future. From a leadership perspective, it also reinforced the positive
benefit of learning from those that are doing the role and getting their collaborative input on how we
could/should change, rather than a top-down approach to service improvement. 
What contribution will it aim to make towards delivering outcomes?
Please tick all the outcomes below that this example aims to works towards. 
NPF4
☒Sustainable places
☒Climate change and nature crisis
☐Climate mitigate and adaptation 
☐Biodiversity 
☐Natural Places 
☐Soils 
☐Forestry, woodland and trees 
☐Historic assets and places 
☒Green belts 
☒Brownfield, vacant and derelict land and empty buildings 
Page 103

Page 104

☐Coast development 
☐Energy 
☐Zero waste 
☐Sustainable transport 
☒Liveable places
☒Design, quality and place 
☒Local living and 20 minute neighbourhoods 
☒Quality homes
☐Rural homes
☐Infrastructure first 
☐Heat and cooling 
☐Blue and green infrastructure 
☐Play, recreation and sport 
☐Flood risk and water management 
☐Health and safety 
☐Digital Infrastructure 
☐Productive places
☐Community Wealth Building
☐Business and industry 
☐City, town, local and commercial centres 
☐Retail 
☐Rural development 
☐Tourism 
☐Culture and creativity 
☐Aquaculture 
☐Minerals 
Place and Wellbeing Outcomes
☒Movement
☒Spaces
☒Resources
☒Civic
Page 104

Page 105

☐ Stewardship 
Contact/ Further details:
Michael Mulgrew – Planning, Building Standards and Environmental Health Service Manager
Michael.mulgrew@west-dunbarton.gov.uk 
Page 105

Page 106

NPIF Good Practice template
Which attributes of a high performing planning authority does this relate
to:
☐Attribute 1: The Planning Authority has sufficient resources and skills to maximise productivity
☐Attribute 2: The Planning Authority has a valued and supported workforce
☐Attribute 3: This Planning Authority has embedded continuous improvement
☐Attribute 4: This Planning Authority has sound governance
☐Attribute 5: This Planning Authority has effective leadership
☐Attribute 6: This Planning Authority has a robust policy and evidence base
☒Attribute 7: This Planning Authority makes best use of data and digital technology
☐Attribute 8: This Planning Authority has effective and efficient decision making processes
☐Attribute 9: This Planning Authority has good customer care
☐Attribute 10: This Planning Authority has effective engagement and collaboration with stakeholders
and communities
☐Attribute 11: This Planning Authority supports the delivery of sustainable, liveable and productive
places
☐Attribute 12: This Planning Authority supports the delivery of consented development 
West Dunbartonshire 
Title: Open Space Audit 
Context 
Section 3 of the Planning (Scotland) Act 2019, introduced a duty for planning authorities to
publish an Open Space Strategy “set out a strategic framework of the planning authority's
policies and proposals as to the development, maintenance and use of green infrastructure in
their district, including open spaces and green networks.” 
One of the requirements of the strategy was that it was to contain an audit of Open Space.
Planning Advice Note 65 recommends that planning authorities should audit sites over 2
hectares. An initial GIS analysis of Ordnance Survey data indicated that over 400 sites in West
Dunbartonshire Council met this threshold.  
ITEM 7 -
APPENDIX 4
Page 106

Page 107

Due to limited resources and the introduction of many new duties and requirements in the
Planning Act, as well as new requirements for local development plans, there was a clear need
for an efficient way to gather and analyse data. 
What happened?
A desktop exercise to reduce the number of sites requiring audit was undertaken by the
planning team's GIS officer. This exercise filtered from the audit sites with a single function, or
sites that were not open to the public. For example, golf courses, playing fields that require a
booking to use, or school playgrounds. This could mostly be done relatively quickly in GIS, using
the ordnance survey open space data, which is classified by the PAN65 typology.    
A survey was produced using Arc GIS Field Maps. This tool combines map data with survey
forms, allowing for map-based data collection in the field using a smartphone app. The survey
was designed to collect data on various aspects of open space, such as connectivity and
accessibility, function, condition and maintenance, placemaking, safety, and biodiversity.
Planning officers carried out the survey by visiting a particular site, selecting it on the map in
the Field Map app, and entering data into the survey form. The app could also be used to adjust
site boundaries to better fit what was on the ground and add new sites that may have been not
have been included in the map data. 
The data was analysed using the ArcGIS Pro Software. ArcGIS Pro provides numerous tools for
data analysis and the ability to join it with other datasets. For example, the "Summarise Within"
tool quickly produces statistical summaries of datasets within different geographical areas. This
functionality allows for easy calculation of the area of open space in electoral wards (as
required by the draft Open Space Strategy Regulations) or within Community Council areas or
settlements, enabling insights at various geographical scales to be easily produced and shared. 
Areas of collaboration 
The Planning Team has a dedicated GIS Officer. Collaboration was needed between GIS and
Planning officers to design and technically implement the survey to ensure data could be
collected easily and accurately.  The survey itself was based on a methodology developed by
North Lanarkshire Council.
Having the data clearly mapped also allowed for collaboration with other stakeholders.
Additional information on the community involvement in different open spaces was collected
through an event with the council’s Biodiversity Network using the maps. 
Page 107

Page 108

What was the overall result?
Open space audit data was input directly into the council's GIS platform and ready for analysis
with only minor adjustments needed to correct any inconsistencies within the data. 
The result was the creation of spatial data which enabled the qualities of open spaces to be
visualised, spatially analysed and combined with other data sets. 
Lessons learned
Successes
The Field Maps Application allows users to input information directly into the GIS platform
without the need for further manual data entry or manipulation. This enables the council to
move seamlessly from data collection to data analysis without additional steps, saving valuable
time. 
ArcGIS Pro allowed data analysis to be undertaken relatively quickly.  
Once the data was collected it could be combined with other data sets. For example, nature
network or flood risk map data could be used to identify what open spaces provide multiple
benefits, or have the potential to, and meeting the cross cutting aims of National Planning
Framework 4. 
Challenges
At the time of data collection, the government had not provided regulations or further
guidance on Open Space Strategies. This gave some uncertainty to the methodology, however
discussion with other planning authorities to compare methods was helpful in providing some
confidence.    
A small error in setting up one of the survey fields meant that a workaround was needed to
collect that piece of data. 
Lessons Learned 
Page 108

Page 109

The survey form was created in advance using an existing GIS map and it is important to check
the survey form thoroughly and test it before data collection begins, as the form cannot be
easily changed once data entry has started. 
Using tools like Field Maps can improve data collection and make it easier to create or add to
spatial data sets. This saves time and allows for easy spatial analysis and combination with
other data sets. 
What contribution will it aim to make towards delivering outcomes?
Please tick all the outcomes below that this example aims to works towards. 
NPF4
☒Sustainable places
☒Climate change and nature crisis
☒Climate mitigate and adaptation 
☒Biodiversity 
☐Natural Places 
☐Soils 
☐Forestry, woodland and trees 
☐Historic assets and places 
☐Green belts 
☐Brownfield, vacant and derelict land and empty buildings 
☐Coast development 
☐Energy 
☐Zero waste 
☐Sustainable transport 
☐Liveable places
☐Design, quality and place 
☒Local living and 20 minute neighbourhoods 
☐Quality homes
☐Rural homes
☐Infrastructure first 
☐Heat and cooling 
☒Blue and green infrastructure 
☒Play, recreation and sport 
Page 109

Page 110

☐Flood risk and water management 
☐Health and safety 
☐Digital Infrastructure 
☐Productive places
☐Community Wealth Building
☐Business and industry 
☐City, town, local and commercial centres 
☐Retail 
☐Rural development 
☐Tourism 
☐Culture and creativity 
☐Aquaculture 
☐Minerals 
Place and Wellbeing Outcomes
☐ Movement
☐ Spaces
☐ Resources
☐ Civic
☐ Stewardship 
Contact/ Further details:
Cameron Clow – Planning Policy Officer 
Cameron.Clow@west-dunbarton.gov.uk 
Page 110

Page 111

NPIF Good Practice template
Which attributes of a high performing planning authority does this relate
to:
☐Attribute 1: The Planning Authority has sufficient resources and skills to maximise productivity
☐Attribute 2: The Planning Authority has a valued and supported workforce
☐Attribute 3: This Planning Authority has embedded continuous improvement
☐Attribute 4: This Planning Authority has sound governance
☐Attribute 5: This Planning Authority has effective leadership
☐Attribute 6: This Planning Authority has a robust policy and evidence base
☐Attribute 7: This Planning Authority makes best use of data and digital technology
☐Attribute 8: This Planning Authority has effective and efficient decision making processes
☐Attribute 9: This Planning Authority has good customer care
☐Attribute 10: This Planning Authority has effective engagement and collaboration with stakeholders
and communities
☒Attribute 11: This Planning Authority supports the delivery of sustainable, liveable and productive
places
☒Attribute 12: This Planning Authority supports the delivery of consented development 
West Dunbartonshire Council 
Title: Supporting High Quality Development and Places 
Context 
West Dunbartonshire Council is committed to create places for people, spaces for investment and
destinations to enjoy – ensuring that all new development enhances and protects our great places,
strengthens existing communities, as well as creating new and distinctive places. To support this
aspiration, the spatial strategy is focused on the delivery of significant regeneration areas and other key
sites within our already established urban areas. Sustainable and high quality placemaking is at the heart
of this strategy and is a key priority for the Council. 
West Dunbartonshire Councils pre-application process and Place and Design Panel are other key tools
which the authority uses to raise the quality of development proposals and deliver better outcomes for
our communities. Through the pre-application process there is the opportunity to provide early
placemaking advice to applicants and incorporate stakeholders concerns prior to the application being
submitted. As well as raising the bar in terms of design this also front-ends development details,
ITEM 7 -
APPENDIX 5
Page 111

Page 112

reducing the need for conditions and reducing delays while discharging these so that development can
get started more quickly once approved.
The Council recognises the importance of continually improving its service offer, in order to take a more
proactive role in supporting the delivery of high-quality developments. By acknowledging that early and
effective consultation is essential to this aspiration, the Pre-Application Framework has been developed
as a critical tool in helping to support applicants through this process. 
What happened?
The Council recognises that developments can be uniquely complex and often involve different services
from both within and outwith the Council. The Pre-Application Framework has been established in order
to provide a bespoke pre-application process; one which reflects the changing needs of different
applications.
The options for pre-application have been simplified into two distinct routes – Pre-Application Advice
and Pre-Application Framework. Upon receipt of a pre-application enquiry the Council recommends
which route is most appropriate and provides relevant information and guidance to the applicant team
based on the type, scale and complexity of the proposal. 
The Pre-Application Framework provides a realistic timeframe for planning and resourcing the pre-
application discussions, with the aim of agreeing a submission date and facilitating a streamlined and
effective planning application process. The Applicant and the Council agree that the timetable may be
subject to change which is kept under review as the project moves forward.
A designated member of the Applicant’s team, in conjunction with the Council Case Officer, convene
meetings, organise agendas and produce minutes to be agreed by the Project Team. Information is
shared between parties in good time in order to facilitate necessary input to the process as a whole. The
Pre-Application Framework process does not give a guarantee of planning permission, and it does not
prejudice the outcome of the planning application or the impartiality of the Council in exercising its
statutory duties as local planning authority. 
Areas of collaboration 
Place and Design panel
The Place and Design Panel was established in 2018 as an innovative vehicle to assist the Council in
achieving better places and improving the design quality of the built environment in West
Dunbartonshire. Since its inception, it has supported the progression of a number of key regeneration
sites, playing a key role in raising the quality of development which embraces the Government’s place-
Page 112

Page 113

based approach. The Place and Design Panel now sits within the new Pre-Application Framework as a
key opportunity to provide additional expert advice to inform the planning process. 
By offering advice to applicants and council officers during the pre-application process, the panel
supports planning officers and the planning committee in securing delivery of high-quality developments
and the creation of exceptional places. It is vital for applicant teams and developments proposals to
ensure that the Place and Design Panel are brought into the application discussion at the correct stage –
the framework ensures that this is achievable and provides clarity to all involved. A report of the panel
discussion is created with the necessary action points clearly defined in order to feed into the next
phase of the Pre-Application Framework.
Elected Members Briefing
For some applications of a significant scale, complexity or of local interest an Elected Members briefing
may be necessary as part of the Pre-Application Framework. The briefings are an important tool to allow
early engagement by developers with Elected Members in order to identify key and significant local
issues at an early stage of the planning process. It enables Elected Members to be better informed of
developments that will subsequently be presented to the Planning Committee and helps to give a
degree of certainty and confidence to applicants by identifying key and local issues earlier in the
process. The Elected Members briefing is open to all Elected Members and not just Elected Members
that sit on the Planning Committee. 
What was the overall result?
Please provide details of the overall outputs and outcomes you hope to achieve and how this
contributes towards improvement. 
The objective of the Pre-Application Framework is one of co-operation and consistency throughout the
negotiation, and for discussion relating to the pre-application process to provide a degree of certainty of
intended outcomes and improve the quality of the project, leading to an effective and efficient quality
planning decision.
The key benefits of using the pre-application framework are to enable the local planning authority and
applicant to:
• Set out an efficient, transparent and solution focused process for determining complex planning
applications;
• Agreement of relevant timescales, actions and resources for handling applications;
• Enabling joint working between the applicant and local planning authority, including
engagement strategies for other parties such as statutory consultees, Councillors, the Place and
Design panel and other stakeholders. 
Page 113

Page 114

Lessons learned
Successes
The shift to a formalised framework provides a more structured, transparent and predictable process for
applicants and officers alike, clearly setting out expectations from the outset.
Integrating the Place and Design Panel into the process helps to ensure that the Panel can influence
proposals at an early stage in the process, before key design decisions have been fixed.
Applicants benefit from early identification of design constraints, technical considerations and
stakeholder concerns, which reduces delays and uncertainty later in the planning process. Front loading
the detail can also allow for a reduced number or scope of planning conditions allowing for quicker site
starts following approval.
Challenges
Some applicants have been reluctant to engage with the process or seek to minimise their engagement
with it, for example opting for the lower-cost pre-application advice when a full framework is
recommended by officers. We will continue to communicate the value of early and full engagement with
the pre-application process with applicants.
While the process has improved outcomes, there is a considerable additional administrative burden
placed on officers, brought about by the expanded and more formalised process. Current resourcing
pressures throughout council services mean that stakeholder services are not always able to meet the
timeframes required by the framework, or unable to meet with applicants to work through particular
issues. Development of a consultation protocol is a key area of work which will help to facilitate
stakeholder input in the future.
Lessons Learned 
The introduction of the formal pre-application process and framework has had key benefits for
applicants and officers in terms of producing better design and place outcomes for development. We
will continue to refine the process and the operation of the place and design panel so that they can
continue to provide the right balance of certainty and flexibility to meet the needs of applicants and
officers. Development of a Stakeholder protocol and a membership and skills survey of the place and
design panel will be key steps for improving this work.  
What contribution will it aim to make towards delivering outcomes?
NPF4
☒Sustainable places
☒Climate change and nature crisis
☒Climate mitigate and adaptation 
☒Biodiversity 
☐Natural Places 
Page 114

Page 115

☐Soils 
☐Forestry, woodland and trees 
☒Historic assets and places 
☐Green belts 
☐Brownfield, vacant and derelict land and empty buildings 
☐Coast development 
☐Energy 
☐Zero waste 
☒Sustainable transport 
☒Liveable places
☒Design, quality and place 
☒Local living and 20 minute neighbourhoods 
☒Quality homes
☐Rural homes
☐Infrastructure first 
☒Heat and cooling 
☒Blue and green infrastructure 
☒Play, recreation and sport 
☒Flood risk and water management 
☐Health and safety 
☐Digital Infrastructure 
☒Productive places
☐Community Wealth Building
☒Business and industry 
☒City, town, local and commercial centres 
☐Retail 
☐Rural development 
☐Tourism 
☐Culture and creativity 
☐Aquaculture 
☐Minerals 
Place and Wellbeing Outcomes
☒Movement
Page 115

Page 116

☒Spaces
☒Resources
☒Civic
☒Stewardship 
Contact/ Further details:
Mathew Spurway – Placemaking Co-Ordinator
matthew.spurway@west-dunbarton.gov.uk 
Page 116

Page 117

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 6th August 2025
_____________________________________________________________
DC25/019/S36: Battery energy storage facility consisting of compound of
batteries and associated electrical equipment, stores, access
track, buildings, fencing, pond, bunds and new planting at
Braidfield Road, Hardgate, Clydebank by Braidfield Battery
Storage Limited
1. REASON FOR REPORT
1.1 To agree the Council’s response to a consultation received from the Scottish
Government Energy Consents Unit on behalf of the Scottish Ministers regarding a
proposed battery energy storage system with a generating capacity of up to 100
megawatts. Given the nature of the proposal, this requires to be agreed by Planning
Committee.
2. RECOMMENDATION
2.1 It is recommended that the Committee agrees the position set out in Section 10 of this
report and submit this report to the Scottish Ministers as presenting the Council’s full,
formal response to the consultation advising of the Council’s objection based on the
application submission as it stands.
3. BACKGROUND
3.1 The Scottish Ministers have received an application under Section 36 of the Electricity
Act 1989 for the construction and operation of a battery energy storage system (BESS)
with a generating capacity of up to 100 megawatts (MW) on a site at Braidfield Farm,
Clydebank. The application site is located within the West Dunbartonshire local
authority area however, the assessment of the submitted application is undertaken via
the Scottish Government Energy Consents Unit for the Scottish Ministers. In Scotland,
any proposal to construct and operate an onshore electricity generating station with a
capacity of over 50 megawatts (as is the case with this proposal) requires the consent
of Scottish Ministers under Section 36 of the Electricity Act. Such applications are
processed on behalf of the Scottish Ministers by the Scottish Government Energy
Consents Unit. Due to the Scottish Ministers being the decision makers,
representations from members of the public and other agencies are made directly to
the Energy Consents Unit. The application is referred to under the project name of the
Braidfield BESS. The location of the site is shown in Appendix 1.
3.2 A date of 12th September 2025 has been agreed with the Scottish Government Energy
Consents Unit for the submission of the Council’s consultation response. The
application documents are available to view via the Energy Consents Unit website at
www.energyconsents.scot and by searching the project name ‘Braidfield’.
3.3 The Council is a formal consultee in this process. In procedural terms, the Council as
Planning Authority requires to provide a response to the Scottish Ministers. In this
regard, the Council in response to the consultation can:
ITEM 8
Page 117

Page 118

(i) Offer no objection to the Section 36 application as submitted; or
(ii) Offer no objections subject to the imposition of appropriate conditions and/or
legal obligations it considers necessary to make the development acceptable;
or
(iii) Object to the application, stating the grounds on which objection is made.
3.4 Should the Scottish Ministers be disposed to grant a Section 36 consent for the
proposed development, the Town and Country Planning (Scotland) Act allows the
Scottish Ministers to direct that planning permission for that development and any
ancillary development shall be deemed to be granted.
4. DEVELOPMENT DETAILS
4.1 The application site is situated to the to the east of Braidfield Farm, Clydebank and
extends to approximately 2.13 hectares (excluding access track from Braidfield Farm).
Whilst in close proximity to the urban area, the site itself lies within open countryside
comprising part of the Green Belt as defined by both the adopted West Dunbartonshire
Local Plan and proposed Local Development Plan 2. To the west, the site is defined
by an existing rough track which forms part of Core Path 150. To the north, south and
east, the site adjoins existing grazing land. A private section of Braidfield Road leading
from the existing steading to the development is also included within the application
site. Excluding the access road, the site boundaries are defined by a combination of
existing hedgerows and post and wire fencing. Currently the land is utilised as a
paddock for grazing horses. The main part of the site (excluding the access road) is
positioned around 150 metres from the farmhouse at Braidfield Farm and around 250
metres from the next closest residential properties at Braidfield Road, Braidfield Grove
and Strathdee Avenue. The Antonine Wall is located 130 metres to the north of the site
and the site itself lies wholly within the Antonine Wall buffer zone which is identified
along much of the Wall, protecting its setting.
4.2 The proposal is for a 100MW Battery Energy Storage System facility and associated
infrastructure. Whilst supporting documents reference the eventual decommissioning
of the site, the expected operational period is not clear.  The proposed development
would comprise 108 battery units and 135 power convertors. The battery units will take
the form of metal units not dissimilar in appearance to a shipping container and would
be 8.5 metres by 1.7 metres by 1.8 metres high. They would be designed with vents
for cooling. Power convertors would be sited by each group of batteries and take the
form of a series of metal cabinets. Transformers would also be positioned adjacent to
the power convertors and take the form of large items of electrical equipment to a
height of around 3 metres. A total of 27 transformers are proposed. It is further
proposed to erect a control room to house a variety of equipment. This would be
designed with a flat roof and extend to around 13 metres by 6 metres by 4 metres high.
The transmission area would feature a similar building together with an electrical
transformer, electrical disconnector and associated equipment with a height of up to 7
metres. Two storage containers are also proposed to house spares and equipment.
These will be 8.5 metres by 1.7 metres by 1.8 metres high.
4.3 The site will be enclosed by a two metre high weldmesh fence with barbed top and it
is indicated that this would be situated behind a hedgerow. Security cameras to a
height of 4 metres will be provided. No permanently illuminated nighttime lighting is
proposed with external lighting indicated to be for use during maintenance in the hours
of darkness only. Infrared security lighting will be provided but this is not visible to the
eye. The site will be levelled and landscape bunds are proposed wrapping around the
southern, western and northern boundaries of the compound. These are indicated to
be between 1 and 3 metres in height. Drainage will be addressed via a sustainable
Page 118

Page 119

drainage scheme (SuDS) employing a gravity based outflow to a nearby existing
drainage ditch which subsequently drains to Cleddans Burn. The existing farm track
from Braidfield Farm is included in the application site and it is indicated this will be
refurbished in unbound material. Tracks within the site will be formed in aggregate.
Parking and turning will be provided for any maintenance vehicles visiting the site.
4.4 New planting is proposed as part of the development with the applicant indicating that
this will create new biodiversity habitat and also form a screening function which will
compliment the existing retained hedgerows. It is indicated that this planting will
comprise a mix of predominantly native hedgerow and broadleaf species together with
areas of wildflower meadow. The applicant indicates that the final landscaping plan
would be agreed with the Council prior to construction in the event that consent was
granted.
4.5 The applicant sets out that a 50MW capacity facility was originally considered for the
site, expecting to connect at the Kilbowie Grid Supply Point on Milton Mains Road, at
the voltage of 33kV. However, the Distribution Network Operator could not
accommodate this and an alternative 132kV connection was offered at Windyhill
Substation around 1.5kms to the northeast of the site, and this dictated a change in
site capacity to 100MW. It is indicated that the development would connect to Windyhill
Substation via buried cables although the grid connection does not form part of this
application.
4.6 The proposal is informed by a range of supporting documentation including a planning
statement, design and access statement, landscape report with associated figures and
viewpoints, drainage report, ecology report, biodiversity report, heritage report and
noise assessment.
5. CONSULTATIONS
5.1 The Council is a consultee in the Section 36 application process and therefore
consultation by the Council is limited to Council Services. However, a summary of the
wider consultation responses received by the Scottish Government Energy Consents
Unit is also included below, as these are also relevant to the assessment of the
proposal to inform the response by the Council.
West Dunbartonshire Council consultation replies:
West Dunbartonshire Council (Roads Service) (roads, traffic and flooding matters)
5.2 No objections on roads or flooding grounds. The requirement for notification of the
commencement of works, abnormal load movements and pre and post development
inspections of the public road network are identified by Roads, together with the
requirement to ensure road sweeping if required, that surface water is not discharged
to the public road and that the access to the site is hard surfaced for the first 12 metres
and that any gates are set back from the public road by at least 12 metres.
West Dunbartonshire Council (Environmental Health Service)
5.3 No objections. A range of matters are recommended to be addressed by condition
including a variety of matters relating to the construction phase inclusive of hours of
works and also in respect of possible site contamination and ground conditions
together with conditions relating to noise matters during the operational phase of the
development.
Page 119

Page 120

Biodiversity Officer
5.4 No objections. The applicant’s submissions, methodology and approach undertaken is
accepted and it is specifically noted that additional caution has been taken in respect
of the camera monitoring. A cautionary position in respect of watervole is
recommended. The Preliminary Ecological Appraisal dating from 2022 is noted as
being longer than is usually accepted sur such to remain accurate in its findings and it
is recommended that the document is updated. The proposed biodiversity
enhancements are accepted and welcomed. 
Scottish Government Energy Consent Unit consultation replies:
West of Scotland Archaeology Service
5.5 The proposal would be located around 130m to the south of the line of the Antonine
Wall itself but would be wholly located within the buffer area defined in relation to the
monument in the World Heritage Site designation. It is agreed that the development
would be unlikely to have direct impacts on the World Heritage Site, at least in terms
of archaeological material present along the line of the wall itself, though there would
be a clear potential for sub-surface archaeological material to survive in the area
adjacent to the frontier.
5.6 The proposal would introduce a new modern element into the setting of the monument.
There are concerns as to whether the visualisations submitted provide an adequate
picture of the degree to which the proposal would be visible from the World Heritage
Site.  It is advised that the applicant should be asked to provide at least one additional
visualisation taken from the line of the Antonine Wall in the area immediately to the
north of the of the site.
5.7 In the event that the Energy Consents Unit intends to grant permission, a condition
should be attached to secure completion of the programme of mitigation works set out
in the Heritage Assessment
Historic Environment Scotland
5.8 The application does not include an appropriate heritage-led analysis of the setting and
potential impacts on the setting of the Antonine Wall World Heritage Site and
scheduled monument Antonine Wall and fortlet, 950m W to 335m ENE of Cleddens
(SM6836). It is recommended that a detailed appraisal of the setting of these historic
assets and the key elements of this setting which contribute to the cultural significance
of the historic assets is undertaken. This should consider how the whole development,
including proposed tree planting, could impact the authenticity and integrity of the
setting of the World Heritage site and its Outstanding Universal Values, and its
scheduled monuments. Further visualisations should be provided to assist with the
written assessment.
5.9 At present, there is insufficient information to adequately assess the impact of the
proposals, and to allow advise to be provided that will in turn allow the Energy
Consents Unit to reach a fully informed decision on the application. Therefore, there is
an objection to the application because it may raise historic environment issues of
national interest.
NatureScot
5.10 No negative impacts on national or international protected areas are anticipated from
the proposed development. With the proposed mitigation and enhancement measures
recommended in the Preliminary Ecological Assessment and biodiversity report in
place, the proposal will not give rise to adverse impacts on any natural heritage
interests of national or international importance. Pre-construction surveys may be
Page 120

Page 121

required to ascertain the presence of protected species. Further general advice is
provided in the response.
East Dunbartonshire Council
5.11 No objection.
Glasgow City Council
5.12 No objection.
Scottish Forestry
5.13 The site map shows that the development site is primarily an area of pasture
surrounded by hedging with a few trees contained within. The proposal does not
appear to include any permanent removal of trees. New woodland planting as
proposed is welcomed. It is expected that all trees and woodland on the site be
protected. If trees are to be permanently removed, conditions relating to compensatory
planting are recommended.
Coal Authority
5.14 There are no records of the presence of any coal mining features within the site which
may pose a risk to surface stability. No objections
Ministry of Defence (MOD)
5.15 No objections
BT
5.16 This proposal should not cause interference to BT’s current and presently planned
radio network. No objections.
Scottish Environmental Protection Agency (SEPA)
5.17 No objections.
Scottish Water
5.18 No objections
Office for Nuclear Regulation
5.19 No comments to make on the proposal
HSE
5.20 The development is not located in any consultation zones and does not comprise
hazardous substances. No further comments on the proposal. 
NATS
5.21 No objections.
SGN
5.22 No objection.
Transport Scotland
5.23 Based on the review undertaken, there is no objection to the development in terms of
potential environmental impacts on the trunk road network. Conditions are required in
respect of a variety of matters including matters relating to abnormal roads on the trunk
road network and the requirement for a Construction Traffic Management Plan.
Page 121

Page 122

Glasgow Airport
5.24 No objections subject to conditions relating to details of soft and water landscaping and
a bird hazard management plan.
Parkhall Community Council
5.25 The Community Council object to the proposal for a variety of reasons. These include
fire risk, concerns regarding ground stability from historic mining, road access and use
of residential streets to access the site, and that the route of the connector to the
Windyhill Substation not having been finalised.
Linvale and Drumry Community Council
5.26 The Community Council object to the proposal for a variety of reasons. These include
the facility not being required and BESS applications being oversubscribed, safety
concerns regarding hydrogen fluoride, fire safety concerns, noise and pollution to local
residents, traffic, visual impact, impacts upon wildlife and local biodiversity.
6. REPRESENTATIONS
6.1 At the time of writing, the Scottish Government’s Energy Consents Unit have advised
that 315 representations have been received in connection with the proposal. 25 of
these are in support and 290 are in objection. However, the Energy Consents Unit
further advises that a number of these submissions were late and it will be up to the
Scottish Ministers as to whether any late submissions are taken into account. Copies
of these representations are provided on the Energy Consents Unit website case file
however the point raised can be summarised as follows:
In objection
 The proposal does not accord with the development plan
 There are no known grid stability issues that the proposal requires to address
 The development will adversely impact upon the Antonine Wall, the setting of the
roman frontier and associated archaeology
 Loss of view would occur
 Impact upon good quality agricultural land
 Lithium battery storage systems are hazardous and present a fire risk with
associated pollution.
 Safety hazards have not been fully considered
 There is no suitable access to the site for heavy vehicles
 The development of the site will cause two years of local disruption,
 Local businesses will see a drop in trade resulting from disruption associated with
the development
 The development may prevent local inward investment
 No local employment will created during the operational period
 No community benefit is proposed
 The development is speculative
 The grid connection works will cause considerable local disruption
 The proposal is unacceptably close to local schools and residents
 Community health, safety and wellbeing will be adversely impacted upon
 The use of Core Paths will be lost during construction
 Supporting documents are inaccurate and misleading
 Press advertisements were not in prominent locations in the local press
 Neighbour notification was not undertaken
 The content of the consultations responses from SEPA and HSE are not
acceptable
Page 122

Page 123

 Concerns regarding the integrity of the applicant
In Support
 The development would be good for the area
 cheaper electricity may result
 Environmental benefits would occur
 The development would benefit the local community and support children’s futures
 The aim for sustainable places to be created will be supported
 The development will lower carbon impact and reduce the use of fossil fuels
 local authorities require to support renewable energy
 Jobs will be provided by the development
 The banking of renewable electricity generation energy should be supported
6.2 Whilst many of the points raised both in objection and in support are considered as
part of the Council’s wider assessment of the proposal as set out in Section 8 below, it
is for the Scottish Ministers as the determining authority to consider the representations
submitted to them.
7. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
7.1 NPF4 aims to create places in line with six overarching spatial principles, including the
Just Transition and Rebalanced Development. The Just Transition directs
development towards achieving the transition to net zero in a way that is inclusive and
fair. Rebalanced Developments directs development to areas of past decline, which
would include West Dunbartonshire, given the de-industrialisation that has taken place
in the area. While these are high level principles, they are cross cutting and NPF4
contains a clear steer that outcomes of Policy 1, Policy 2, Policy 11 and Policy 25 are
interlinked.
7.2 Strategic Renewable Electricity Generation and Transmission Infrastructure is a
Scotland wide national development (National Development 3), making it a clear
priority across Scotland. Regional Spatial Priorities for the Central Region also direct
development to “provide net zero energy solutions” and to “build community wealth to
overcome disadvantage”. These high level aims and connections between policies
should be considered by the decision maker.
7.3 Policy 1 gives significant weight to the climate and nature crisis, with an intended Policy
outcome of being zero carbon and nature positive. Renewables, including onshore
wind and battery storage, are considered an important part of Scotland’s approach to
meeting its carbon emission reduction targets. Policy 2 requires development to
minimise the lifecycle greenhouse gas emissions of development as far as possible. A
development that relates to renewable energy development draws strong support from
these policies.
7.4 Policy 3 requires development to contribute to biodiversity enhancement, including the
restoration of degraded habitat and improving connections between them. As a
national development part b) of the Policy applies. Part d) of this Policy also applies,
requiring the planning and design of development to minimise adverse impacts,
including cumulative impacts, of the development on biodiversity and the natural
environment. The approach to biodiversity enhancement accords with this Policy.
7.5 Policy 4‘s intent is to protect, restore and enhance natural assets making best use of
nature-based solutions. Development which impacts upon landscape designations or
Page 123

Page 124

nature conservation and protected species is not supported if significant effects would
occur. It is concluded that the proposal does not conflict with this Policy
7.6 Policy 5 relates to soils and Policy 6 supports proposals that enhance, expand or
improve woodland and tree cover. The development is considered acceptable with
reference to these policies.
7.7 Policy 7 requires development with potential impacts on historic assets or place to be
accompanied by an assessment of that asset or place, including cumulative impacts.
With the potential to impact upon the Antonine Wall World Heritage Site part l) of the
Policy is of particular relevance as this requires development proposals to protect and
preserve the historic asset. There are serious concerns in terms of the impact upon the
setting of Wall and the proposal cannot be held to be supported by this Policy.
7.8 Proposals within a Green Belt are covered in Policy 8. Development proposals within
a Green Belt designated within the LDP will only be supported in a limited set of
circumstances including for essential infrastructure. The proposal falls into the
definition of essential infrastructure. However, it is not demonstrated that there are no
sites outside the Green Belt for this development and that visual impacts are
minimised. The proposal cannot be held to be acceptable with reference to this Policy.
7.9 Policy 11 relates to energy and the Policy intent is to encourage, promote and facilitate
all forms of renewable energy development onshore and offshore. This includes
energy generation, storage, new and replacement transmission and distribution
infrastructure and emerging low-carbon and zero emissions technologies including
hydrogen and carbon capture utilisation and storage (CCUS). Part a) supports
proposals for renewable technologies, including battery storage under section iii.
7.10 Part c) of Policy 11 requires renewable development to maximise economic impact,
including local and community socio-economic benefits. Part e) of the Policy requires
the project design and mitigation to address a number of issues. In considering the
impacts significant weight is placed on the contribution of the proposal to greenhouse
gas emission reduction targets. Impacts to be addressed are:
i. impacts on communities and individual dwellings, including, residential amenity
and visual.
ii. significant landscape and visual impacts.
iii. public access, including impact on long distance walking and cycling routes and
scenic routes.
iv. impacts on aviation and defence interests including seismological recording.
v. impacts on telecommunications and broadcasting installations, particularly
ensuring that transmission links are not compromised.
vi. impacts on road traffic and on adjacent trunk roads, including during
construction.
vii. impacts on historic environment.
viii. effects on hydrology, the water environment and flood risk.
ix. biodiversity including impacts on birds.
x. impacts on trees, woods and forests.
xi. proposals for the decommissioning of developments, including ancillary
infrastructure, and site restoration.
xii. the quality of site restoration plans including the measures in place to safeguard
or guarantee availability of finances to effectively implement those plans.
xiii. cumulative impacts.
Page 124

Page 125

Concerns arise in respect of a number of these criteria as fully assessed in Section 8
of this report.
7.11 Policy 12 requires development to reduce, reuse or recycle materials in line with the
waste hierarchy. It also supports developments that enable materials and components
to be disassembled and reused at the end of their life and Policy 13 supports
development where it is demonstrated that transport requirements satisfactorily
addressed. No concerns arise in respect of these policies.
7.12 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale as per Policy 14. Development
proposals that are poorly designed, detrimental to the amenity of the surrounding area
or inconsistent with the six qualities of successful places, will not be supported in
accordance with Policy 14. As it is not demonstrated that visual impacts are fully
addressed, the proposal cannot be considered to support the six qualities of successful
places.
7.13 Policy 18’s intent is to encourage, promote and facilitate an infrastructure first approach
to land use planning, which puts infrastructure considerations at the heart of
placemaking. Energy supplies and energy generation are included in the definition of
infrastructure and Policy 22 relates to flooding. The development is acceptable with
reference to these policies.
7.14 Policy 23 protects people and places from environmental harm, mitigates risks arising
from safety hazards. Part e) notes that development proposals that are likely to raise
unacceptable noise issues will not be supported. It is considered that no unacceptable
noise impacts would occur.
7.15 Alongside part c) of Policy 11, Policy 25 makes community benefit a material
consideration in planning decision. Part a) of the Policy sets out that community benefit
can include “improving community resilience and reducing inequalities; increasing
spending within communities; ensuring the use of local supply chains and services;
local job creation; supporting community led proposals, including creation of new local
firms and enabling community led ownership of buildings and assets.” The construction
and decommissioning of the development presents supply chain opportunities for
business and could potentially contribute to local economic activity.
7.16 The matters relevant to the assessment against the above policies are addressed in
detail in Section 8 below. Based on that assessment, it is concluded that the proposal
is not in accordance with NPF4.
West Dunbartonshire Local Plan (2010)
7.17 The application site is located in the Green Belt and Policy GB1 states that within the
areas of Green Belt there will be a general presumption against development other
than certain exemptions. This includes where there is a specific locational requirement
and established need for the development and it cannot be accommodated on an
alternative site. It has not been demonstrated that this development cannot be
accommodated on an alternative site.
7.18 Policy DC6 relates to renewable energy proposals and states that development will be
permitted where it can be established without unacceptable detriment to the
landscape, natural and build heritage, sport and recreation interests and local amenity.
With concerns regarding the impact upon the Antonine Wall World Heritage site and
given it has not been demonstrated that the visual impacts have been minimised, the
proposal is not supported by this Policy.
Page 125

Page 126

7.19 Policy E1 states that the Council will further the conservation of biodiversity. Policy E3A
states that the Council will seek to maintain and enhance the environmental resources
of the Plan area by protection of habitats, species and natural features which are
vulnerable and/or specifically protected, including Local Nature Conservation Sites. It
also states that proposals should not have an adverse effect on the integrity or
character of Local Nature Conservation Sites and that satisfactory arrangements for
habitat creation/site enhancement elsewhere should be made to compensate where
development would cause the total or partial loss of a Local Nature Conservation Site.
Policy SUS1 states that all development should seek to conserve and enhance
environmental resources and ensure environmental impact is minimised. Policy E9
seeks to ensure that development proposals do not adversely impact upon landscape
character. Given it has not been demonstrated that the visual impacts have been
minimised, it cannot be concluded there is no impact upon landscape character at a
local level and the proposal is not supported by Policy E9. 
7.20 Policy GD1 seeks to ensure that all new development is of a high quality of design and
respects the character and amenity of the area. Again, the concerns regarding visual
impacts not having been demonstrated to have been minimised result in conflict with
this Policy.
7.21 Policy DC3 states that within the Glasgow Airport Safeguarding Zone, development
which adversely affects the operational integrity or safety of the airport will not normally
be permitted. No concerns arise in this respect.
7.22 Policy BE5 relates to Scheduled Ancient Monuments and other Archaeological sites.
The Council will resist any development proposals that would have an adverse impact
on or affect the setting of a Scheduled Ancient Monument, or upon other nationally or
locally important archaeological sites. Policies BE6A and BE6B, relating to the
Antonine Wall and Antonine Wall buffer zone respectively, combine to presume against
development which would have an adverse impact upon the Wall. With concerns
regarding the impact upon the Antonine Wall World Heritage site and given it has not
been demonstrated that the visual impacts have been minimised, the proposal is not
supported by this Policy.
7.23 Policy GN1 seeks to promote, protect and improve the Green Network. It states that
development which is detrimental to the green network will be considered contrary to
the Plan, and that new development should contribute positively to the protection and
improvement of the green network. No concerns arise in respect of this Policy.  Policy
RSA1 relates to conserving the landscape quality of the Kilpatrick Hills and again, no
concerns arise.
7.24 Policies F1 and F2 aim to ensure that new development is not at risk from, and does
not increase the risk of flooding, and has suitable SUDS drainage infrastructure. There
is a general presumption against development within the flood plain. The up-to-date
development plan position in flooding is set out within Policy 22 of NPF4 which
therefore has primacy in this instance.
7.25 The matters relevant to the assessment against the above policies are addressed in
detail in Section 8. Taking that assessment into account it is concluded that the
proposal is contrary to adopted Local Plan.
Page 126

Page 127

8. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
8.1 On 15 March 2023, the Planning Committee took a decision that the Council would not
adopt Local Development Plan 2. The Proposed Local Development Plan 2 (LDP2),
incorporating the recommended modifications of the Examination Report received on
22 April 2020, which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore afforded
significant weight in the assessment and determination of planning applications,
subject to compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material consideration, although
it does not directly affect the development proposal under consideration.
8.2 Policy GB1 restricts development in the Green Belt to a limited number of
circumstances. This includes with infrastructure with a specific locational need. It has
not been demonstrated that this development cannot be accommodated on an
alternative site. Policy RE1 requires renewable energy developments to be compatible
with the surrounding area and for the development to met all other policy requirements.
It cannot be held that the proposal us supported by this Policy.
8.3 Policy ENV1 sets the approach towards development in relation to nature conservation
and biodiversity. Policy ENV2 relates to landscape character. Development proposals
should be sited and designed to relate to the local landscape character of the area and
ensure that the integrity of this landscape character is maintained and, where
appropriate, enhanced. Policy ENV4 relates to forestry, trees and woodland. The loss
or fragmentation of long-established woodland, high conservation value or areas
covered by tree preservation orders will only be supported where any significant
adverse effects are clearly outweighed by significant social or economic benefits.
Given it has not been demonstrated that the visual impacts have been minimised, it
cannot be concluded there is no impact upon landscape character at a local level and
the proposal is not supported by Policy ENV2. Policy KH1 seeks to protect the
Kilpatrick Hills Local Landscape Area but as the development is not within this
designation, no matters arise in respect of this Policy.
8.4 Policy ENV5 mainly focusses on water courses and water bodies. Policy ENV8
requires minimisation or adequate mitigation of any air light and noise pollution
resulting from development. Policies ENV9 and ENV10 address contaminated land
and unstable land respectively. The development is acceptable in this regard.
8.5 Policy H4 of the LDP2 relates to residential amenity. The Policy states that the Council
will protect, preserve and enhance the residential character and amenity of existing
residential areas at all times. In this regard, there will be a general presumption against
the establishment of non-residential uses within, or in close proximity to, residential
areas which potentially have detrimental effects on local amenity or which cause
unacceptable disturbance to local residents. No concerns arise in this respect.
8.6 Policy CON3 is not supportive of development which disrupts or adversely impacts on
any existing or potential core path, right of way, bridle path, or footpath, including off-
path access rights, used by the general public for recreational or other purposes. No
core paths will be interrupted by the development. Visual impacts to core path users
are assessed separately.
8.7 Policy BE1 states that unscheduled archaeological sites should be preserved in-situ
where possible. Where not possible, provision should be made by the developer to
undertake the excavation, recording analysis, publication and archiving of the
Page 127

Page 128

archaeological remains. This Policy also advises that where a scheduled monument or
the integrity of its setting would be adversely affected, permission would only be
granted in exceptional circumstances. Policy AW1 does not support development that
would have an adverse impact upon the Antonine Wall or its setting. With concerns
regarding the impact upon the Antonine Wall World Heritage site and given it has not
been demonstrated that the visual impacts have been minimised, the proposal is not
supported by these polices.
8.8 Policy CP1 requires new development to take a design led approach to creating
sustainable places which puts the needs of people first and demonstrate the six
qualities of successful places. As it is not demonstrated that visual impacts are fully
addressed, the proposal cannot be considered to support the six qualities of successful
places.
8.9 Policy CP2 requires all development to demonstrate that green infrastructure has been
integrated into the design approach from the outset. Development that would adversely
impact on the operations of Glasgow Airport or would be adversely affected by aircraft
noise will not be permitted in accordance with Policy E7. No concerns arise in respect
of these policies.
8.10 Policies ENV5 and ENV6 are similar to the water environment and flooding policies
of the adopted Local Plan, although in respect of flooding, the up-to-date
development plan position is set out within Policy 22 of NPF4 which has primacy.
8.11 The matters relevant to the assessment against the above policies are addressed in
detail below. It is concluded that the proposal is not in accordance with proposed Local
Development Plan 2.
Renewable Energy Local Development Plan (Proposed Plan) Planning Guidance
November 2016
8.12 This guidance is written in the context of proposed Local Development Plan 1 together
with Scottish Planning Policy (SPP), both of which no longer form a material
consideration in the assessment of planning applications. The document does not
address battery storage proposals and Policy 11 of NPF4 has primacy over this
guidance.
Frontiers of the Roman Empire (Antonine Wall) Planning Guidance
8.13 This guidance sets out the approach and procedure for assessing development
affecting the World Heritage Site and also the criteria which will be applied in
determining applications for development along the line of, and within the setting and
vicinity of the World Heritage Site. The Guidance sets out that the impacts of
development may be physical upon the fabric of the monument, they may impact upon
the setting of the wall where development will harm the character of the landscape
around the world heritage site or be cumulative which adds to the existing negative
effects of past or current developments thereby creating further and possibly greater
adverse effects.
8.14 With concerns regarding the impact upon the Antonine Wall World Heritage site and
given it has not been demonstrated that the visual impacts have been minimised, the
proposal is not supported by this guidance.
Principle of Development
8.15 National Planning Framework 4 (NPF4) sets out the long-term vision for the
development of Scotland through the National Spatial Strategy. NPF4 aims to meet
Scotland’s climate ambition which will require a rapid transformation across all sectors
Page 128

Page 129

of the economy and society. This proposal constitutes a National Development as it
supports renewable electricity generation, repowering, and expansion of the electricity
grid under National Development 3: Strategic Renewable Electricity Generation and
Transmission Infrastructure.  NPF4 recognises that additional electricity generation
from renewables and electricity transmission capacity of scale is fundamental to
achieving a net zero economy. Policy 1 states that there is a need to encourage,
promote and facilitate development that addresses the global climate emergency and
nature crisis, whilst Policy 2 seeks to encourage, promote and facilitate development
that minimises emissions and adapts to the current and future impacts of climate
change. The electricity transmitted for storage within the proposed batteries will likely
have come from a mixture of renewable and non-renewable sources with the purpose
of the batteries to ensure there is always grid stability. As renewable energy becomes
more prevalent, grid stability becomes a significant issue due to the intermittent nature
of renewable energy generation.
8.16 Policy 11 a) iii of NPF4 specifically supports battery storage energy solutions. NPF4
does not question the nature of the technology or the level of need for it. This general
support facilitates the deployment of renewable energy which in turn will assist in
decarbonising the electricity network. Whilst it can be considered that the proposal
could therefore be held to support the overarching aims of the NPF4 to achieve net
zero targets and provide a stable domestic energy supply, the substantial planning
policy support is not unconditional and it must be ensured that such development
happens in the right place. There is thus a requirement in assessing any such
developments to take into account all relevant considerations and policies. Therefore,
it requires to be assessed if there are any potential adverse impacts arising from the
proposed development which would be outweighed by any benefits. This assessment
can be guided by Policy 11 e) of NPF4, which sets out in detail the matters for the
project design and mitigation to address, together with any other relevant development
plan policies.
8.17 The site is situated within the Green Belt as defined by the adopted Local Plan and
proposed Local Development Plan 2. Policy 8 of NPF4 sets out the types of
development that are supported within Green Belt locations. This includes essential
infrastructure, and proposals that relate to the distribution and transmission of
electricity grid networks fall under this definition. However, Policy 8 is clear that for
development proposals in Green Belt locations the purpose of the Green Belt must not
be undermined. Policy 8 goes on to require that the reasons why the Green Belt
location is essential must be provided together with why the development cannot be
provided on a site outwith the Green Belt. Policy GB1 of both the adopted Local Plan
and proposed Local Development Plan also provide qualified support for development
in the Green Belt where a specific locational requirement is identified.
8.18 The applicant advises that the development requires to be sited where a suitable
electricity connection can be made into a substation with sufficient available capacity.
It is set out that the site has been chosen because it is located between the Kilbowie
and Windyhill substations, has characteristics that make it suitable for development
and is a site where the predicted impacts could be considered to be acceptable. In this
case, the applicant has advised of an offer of a connection at the Windyhill substation
which lies around 1.5km from the site and it is accepted that the closer the point of
connection is, the more efficient the transmission would be and the cabling costs likely
more viable. While this is accepted from a technical perspective, the applicant has not
provided a site selection report or any detailed analysis of alternative options and why
they were discounted. It therefore cannot be considered that the applicant has
demonstrated that no other suitable sites are available in a location outwith the Green
Page 129

Page 130

Belt and it cannot be concluded that the requirements of Policy 8 a) ii are met in this
regard.
8.19 Policy 8 of NPF4 goes on to require that the purpose of the Green Belt at this location
is not undermined by the proposal. The purpose of the Green Belt designation is to
facilitate and promote compact urban growth and ensure that land around urban areas
is used sustainably. It is to further ensure that new development is directed towards
the urban area to support regeneration priorities and protect the risk of settlement
coalescence. The Green Belt designation also supports the protection of landscape
character around settlements. Whilst the proposal would represent an expansion of the
developed area within the Green Belt, it is not considered that it would affect the
strategy of compact urban growth, have an adverse impact on wider regeneration
priorities or result in the settlement coalescence. However, it remains that the
development must not have an adverse visual impact which is to the detriment of local
landscape character and this is considered further below.
Landscape and Visual Impact
8.20 Any development of this nature will have a visual impact and this is not in doubt. The
assessment of landscape and visual effects arising from the development is set out in
the applicant’s landscape and visual appraisal (LVA) which is based on a 2km study
area. The geographical extent to which the development would be visible has been
established by a ‘Zone of Theoretical Visibility’ (ZTV). This was created using mapping
tools to calculate where the development will potentially be visible from in the
surrounding area. The ZTV establishes the locations from which the development may
potentially be visible and where there is no visibility, receptors are discounted from the
assessment. ZTV mapping is presented in the applicant’s submission for the 2km study
areas. Taking into account topography, existing woodland and settlements, theoretical
visibility is likely from the immediate area surrounding the application site, Clydebank
and District Golf Course, sections of the Antonine Wall World Heritage Site and
Scheduled Monument, scattered fragments of the north-eastern and south-eastern
neighbourhoods of Clydebank, Drumry Wood, the A82 corridor and the core path
network, including adjacent to the site. The LVA identified five viewpoints which the
applicant considered to be representative of the range of visual receptors considered
within the study area.
8.21 The majority of the application site lies within the ‘Drumlin Foothills’ landscape
character type (LCT 211) which the submitted LVA considers as the host landscape.
A small part of the site extends into the ‘Urban’ landscape character type (LCT 0). The
Drumlin Foothills comprises an undulating landform created by glacial deposition
subsequently modified by fluvial erosion, small to medium scale landscape with caried
views, human activities such as pastoral farming and golf courses, semi-natural
woodlands along burns, farm woodlands and small plantations. These features all
contribute to a predominantly rural character. The Urban landscape character type
sees various components which typically comprise urban development forming the
underlying character of the landscape. The applicant’s LVA identifies that the Drumlin
Foothills LCT in general to be of medium susceptibility to change although within the
immediate vicinity of the site it is considered to be of low susceptibility of change. The
LVA does not conclude that the value to the landscape into which the development is
proposed is high and it is thus considered that overall, the landscape has a medium
sensitivity to the type of changes proposed.
8.22 The area immediately surrounding the site contains trees and pockets of woodland,
grazing land, farm steadings, golf course and a variety of core paths providing for
recreational walking routes. This results in an area which can be characterised as one
which has a high amenity value with a variety of semi-natural views.  This combination
Page 130

Page 131

of land uses leads to an area that could be characterised as relatively quiet and of high
amenity value. Despite this proximity to the urban area, the busy A82 Great Western
Road and relatively high density residential areas, the location of the site feels quite
different and separate from this urban area with a predominantly pleasant rural
character. Whilst the site is not formally designated for its landscape character, it is
clear that the area has a distinct local identity which is of high amenity value.
8.23 It is accepted that the proposed development would be unlikely to be seen over
significant distances. It is accepted that both during the construction phase and the
completed development before any proposed landscape mitigation matures has the
potential to have moderate adverse effects. However, these effects will reduce over
time as any landscape mitigation matures. It is accepted that the development would
not be of significant across the Drumlin Foothills LCT as a whole. It is also accepted
that whilst localised views of the site may occur from the urban area and whilst the site
may be visible from elevated location such as the upper floors of the 12 storey flatted
blocks to the south east, the development would not be of significance from these
locations. Notwithstanding the above, the development would be sited within an
existing field and locally, this would result in a significant change to the landscape
pattern which requires further consideration.
8.24 Considering the local landscape impact, the immediately surrounding area is
considered one of high amenity value which can be held to be sensitive to change from
inappropriate development. In terms of mitigation for the visual impact of the
development, the applicant proposes landscaping buffers within the site between the
infrastructure and site boundary. Landscape bunds are also proposed to the north,
west and south of the infrastructure. The proposed levels changes across the site will
result in the equipment sitting below the existing ground level from some locations. A
number of core paths traverse the area with Core Path 149 being located on the
western boundary of the site and Core Path 150 extending from Braidfield Road to
connect with Core Path 149 at the north-western corner of the application site. Core
Path 149 continues north to connect with Core Path 148 which follows the line of the
Antonine Wall from Cleddans Road. It is accepted that Viewpoint 02 from the
applicant’s LVA demonstrates that there will be little notable impact from the
westernmost point of Core Path 148 with no visibility of the equipment. Viewpoint 03 is
taken from the Roman fortlet to the northeast of the site and to the south of Core Path
148 and again demonstrates little impact, albeit this view may change when trees are
not in leaf. Viewpoint 01 looks north from Core Path 149 where it joins the A82. This
shows that the landscape bund will be visible from this location and that this will in time
be screened by new planting. No equipment is visible. Core Path C2 within the
Glasgow City Council is also considered in Viewpoint 04 indicating glimpsed views
prior to new planting maturing. Ther is no objection from Glasgow City Council on
visual impact from the core path network within their area. The conclusions of the LVA
that no significant effects occur and no moderate effects occur after the construction
phase from the chosen viewpoints is accepted.
8.25 However, as noted above, Core Path 149 continues past the development site and is
located on its immediate western boundary. Facing east, Core Path 148 travels
towards the application site, with the site directly in view. Viewpoints from these Core
Paths adjacent to the site are not provided. While no routes are physically interrupted
by the proposal, there will be a visual impact to users of the routes and the character
of the routes will be changed and the effect could be significantly. The Core Path at
this location extends from the urban area and takes an attractive route through rolling
grazing land with various trees and pockets of woodland within the wider landscape.
The experience of the landscape by users of these sections of core path has the
potential to change dramatically given the presence of a development of an industrial
Page 131

Page 132

appearance adjacent to it. Whilst planting and mitigation is proposed, this is only
detailed as a simple narrative in the supporting documentation and inclusion of the
general layout on the proposed site plan. With the proposed native deciduous planting
to screen the development, this would not provide a consistent level of screening
across all seasons. This, together with the absence of any viewpoints being provided
to demonstrate that no adverse effects occur adjacent to the site throughout the
seasons, it cannot be satisfactorily concluded that the development would not have
any adverse local landscape effects.
8.26 Overall, the applicant has failed to demonstrate that the proposal would minimise
landscape and visual impacts within the Green Belt as far as possible as required by
Policy 8 a) ii of NPF4. It also cannot be not be concluded that the proposal is
acceptable with reference to Policies GB1 of both the adopted Local Plan and
proposed Local Development Plan for the same reason, together with Policies DC6
and E9 of the adopted Plan and Policies ENV2 and RE1 of the proposed Plan Whilst
Policy 11(e) ii accepts significant landscape and visual impacts, there is also an
expectation of appropriate design mitigation for these impacts. The extent of the visual
impact on the local landscape and the appropriateness of design mitigation cannot be
fully determined and therefore it cannot be concluded that such impacts are addressed.
Impact upon designated landscapes
8.27 In further assessing landscape and visual impact, consideration must be given to the
potential for any effects on landscape designations. The Kilpatrick Hills Local
Landscape Area (LLA) lies around 2km to the northwest of the site. The applicant’s
LVA considers that analysis of the ZTV indicates theoretical visibility would be possible
from the southeast of the LLA. However, with the screening effect of the urban area
which lies between the site and the LLA boundaries together with topography and
existing vegetation, only an area around Loch Humphrey Burn is considered to provide
visibility of the site.  Given that the site is some distance from the designation boundary
and visibility is expected to be low from the LLA, it is agreed that as per the assessment
within the submitted LVA, any effects would be negligible. Drumry Wood Site of Special
Landscape Importance which is situation approximately 400 metres to the east of the
site within the Glasgow City Council area. Such sites have been identified by  Glasgow
City Council where they contribute to the quality of life of those who live or work in the
City. They include parks, golf courses, countryside and other features that are
important from a visual and landscape perspective. The ZTV identifies that the site will
be theoretically visible from much of the northwest of the Site of Special Landscape
Importance. The LVA predicts that the effects on the Site of Special Landscape
Importance would be negligible. Glasgow City Council have not objected to the
proposal and raise no concerns regarding any potential for impact on the Site. It is not
considered that any concerns arise in respect of the potential for significant effects on
this designation and the conclusions of the LVA are accepted in this regard.
Built and Cultural Heritage
8.28 No listed buildings are located within the site or the surrounding area, nor are there
any conservation areas or garden and designed landscape designations within the
wider area. However, the line of the Antonine Wall lies to the north of the application
site. The application site also lies wholly within the Antonine Wall buffer zone. 
8.29 The Antonine Wall is the most substantial and important Roman monument in
Scotland. Built on the orders of the Emperor Antoninus Pius in the years following 140
AD, it extends for some 60 kilometres across central Scotland from Bo’ness on the
River Forth to Old Kilpatrick on the River Clyde, and marked the north-western frontier
of the Roman Empire. The Antonine Wall is of great significance for a number of
reasons. It represents one of many sections of a massive military system which
Page 132

Page 133

stretched over 5000 km from northern Britain, through Europe to the Black Sea, and
from there to the Red Sea and across North Africa to the Atlantic coast. This frontier
helped to protect and define the Roman Empire. The Antonine Wall was the most
northerly frontier of the Empire, the last of a series of planned frontiers built in the 2nd
Century AD and, at the time, the most complex ever constructed by the Romans. Today
the Wall continues to be subject to considerable development pressures and given its
significance it is imperative that the remaining sections whether visible on the ground
or not are safeguarded from inappropriate development. 
8.30 The Antonine Wall is designated as both a Scheduled Monument and to the north of
the site, the scheduled monument comprises the Antonine Wall and fortlet, 950m W to
335m ENE of Cleddens. In July 2008 the international cultural and archaeological
importance of the Antonine Wall was recognised when the World Heritage Committee
of UNESCO inscribed the site as Scotland’s fifth World Heritage Site (WHS). The
Antonine Wall became an extension of the trans-national Frontiers of the Roman
Empire World Heritage Site which includes Hadrian’s Wall in England and the Upper
Raetian German Limes. The intention is that the WHS will eventually include all
surviving sections of the frontiers of the Romans in Europe, Africa and the Middle East.
With World Heritage Site status comes a commitment to protect the exceptional cultural
significance of the Antonine Wall and Outstanding Universal Values (OUV) for which
the site was inscribed. The site lies approximately 135 metres to the south of the World
Heritage Site and around 375 metres south west of the fortlet.
8.31 As noted in paragraph 8.28 above, the site lies wholly within the Antonine Wall Buffer
Zone. The designation of the buffer zone seeks to protect the important landscape
setting of the Antonine Wall. The Buffer Zone defines a zone where added protection
to the immediate setting of the World Heritage Site is given. Development proposals
within the buffer zone will be given careful consideration to determine whether it is likely
to significantly detract from the Outstanding Universal Value authenticity or integrity of
the Antonine Wall World Heritage Site.
8.32 The Council’s Planning Guidance on the Frontiers of the Roman Empire (Antonine
Wall) sets out the approach and procedure for assessing development affecting the
World Heritage Site and also the criteria which will be applied in determining
applications for development along the line of, and within the setting and vicinity of the
World Heritage Site. The Guidance sets out that the impacts of development may be
physical upon the fabric of the monument, they may impact upon the setting of the wall
where development will harm the character of the landscape around the world heritage
site or be cumulative which adds to the existing negative effects of past or current
developments thereby creating further and possibly greater adverse effects.
8.33 Considering the physical impact, the site is within the buffer zone and the
appropriateness of this location must be assessed. The integrity of the setting of the
WHS and how the Site is understood and appreciated in the landscape are identified
as key aspects which must be considered together with the character of the landscape
in which the World Heritage Site sits. The Guidance sets out a presumption against
development within the Buffer Zone which would have an adverse impact on the WHS
and its setting. Where development is proposed within the buffer zone, the Guidance
sets out that site selection requires to avoid the most sensitive areas and views, be a
well-considered layout of an appropriate design with high quality landscaping.
8.34 The application submission is supported by a Heritage Assessment. Historic
Environment Scotland (HES) have assessed the proposal and in a consultation
response to the Scottish Ministers they have considered the potential impact upon the
World Heritage Site and Scheduled Monument. HES raise significant concerns
Page 133

Page 134

regarding the assessment approach taken to address impacts upon historic assets.
HES are concerned at the approach taken to the assessment of the impact upon
heritage assets. HES advise that the assessment of impacts on setting from a
proposed development on the historic environment, its structures and places, is not
only about the character of the landscape in which they sit, but a more nuanced matter
relating to the way that historic assets are understood, appreciated, and experienced.
Setting can extend beyond the immediate vicinity of a historic asset into a much
broader context and includes both tangible and less tangible elements. A full
understanding of the setting of a historic asset should address all these matters in any
assessment and should draw upon the contribution each element of an asset’s setting
makes to its cultural significance. This would then set out how changes within the
setting of a historic asset can impact on its cultural significance and provide informed
and appropriate measures to address this. This is particularly important where a
development has the potential to impact a WHS. HES are concerned that much of the
setting assessment refers primarily to the landscape character of the area around
Braidfield Farm and does not make an informed analysis of the setting of the WHS and
scheduled monuments, and those elements which contribute to the cultural
significance of these historic assets. This landscape-led approach which continues into
the Heritage Impact Assessment introduces confusion into the approach to
assessment, demonstrated in particular where the description of setting describes the
change in landscape character in the modern period as a series of negative changes,
a result of ‘human intervention and activities’ (HIA, section 6, page 17). This disregards
the fact the Antonine Wall is part of this history of landscape change, with the Wall’s
construction being the result of a major human intervention in the landscape.
8.35 As further set out by HES, the planned layout of the Wall is still apparent in, and has
influences on, the modern landscape. An example of this is the linear route of Cleddans
Road which largely follows the east-west line of the Wall, with Cleddans Farm located
just to the east of the forlet site on the same plateau, as well as the line of hedgerow
which follows the Wall route up to Castle Hill. The applicant’s Assessment considers
that the high level of surrounding development has led to an inconspicuous setting for
the Wall in this area. HES do not agree with this assessment. The World Heritage Site
at Cleddans is located in an area of countryside, on an elevated position which affords
the site superb views in every direction. These views are key to the cultural significance
of the monument, and the outstanding universal value to the WHS are made possible
by the rural and open nature of the setting of the WHS, currently protected by the buffer
zone.
8.36 HES further highlight their significant concerns relating to the proposals to mitigate the
impact of the development through landscaping comprising earthwork bunds and tree
planting This would introduce substantial visual screening to a currently open area of
the setting of the WHS which allows clear views in all directions. Views from, along,
and into the WHS are important in allowing an understanding of its function in the
historic landscape and to an appreciation of its international importance in the modern
landscape.
8.37 Overall, HES consider that the application does not include an appropriate heritage-
led analysis of the setting and potential impacts on the setting of the Antonine Wall
World Heritage Site and scheduled monument and recommend that a detailed
assessment and appraisal is undertaken. The assessment should consider how the
function and meaning of the WHS relates to the landscape, how it can be understood.
appreciated, and experienced, and particularly how this might impact the relationships
between components of the WHS and related sites. In order to gain a thorough
understanding of the impacts of the proposed development on the setting of the historic
assets, further visualisations should be provided to assist with the written assessment.
Page 134

Page 135

As HES consider that there is insufficient information to assess the impact of the
proposals they object to the proposal because it may raise historic environment issues
of national interest.
8.38 Whilst not objecting to the proposal West of Scotland Archaeological Service (WoSAS)
highlight points in respect of the impact upon the WHS and that a new modern element
would be introduced to the setting of the Wall. WoSAS go on to advise on the potential
for sub-surface archaeological material to survive in the area. WoSAS consider,
however, that the mitigation programme proposed in the applicant’s Heritage
Assessment in respect of archaeology is in line with the approach that they would
generally recommend in relation to greenfield developments of this type, and as a
result, it would be acceptable from their perspective. It is recommended that the matter
is addressed by condition should the Scottish Ministers be minded to grant consent.
8.39 It is clear that the proposed development would have the potential to impact upon the
Antonine Wall WHS and Scheduled Monument. The serious concerns of Historic
Environment Scotland in respect of the approach to the assessment and potential
impact upon the historic asset are noted and HES object on this basis. Being guided
by the position of HES, it cannot be concluded that the Antonine Wall WHS and
Scheduled Monument, a key historic asset of national importance would not be
adversely impacted upon and this therefore clearly of significant concern and cannot
be considered acceptable. As it stands, the proposal cannot be considered acceptable
with reference to policies 7 l) and 11 e) vii of NPF4, policies DC6, BE5, BE6A and
BE6B of the adopted Local Plan, Policies BE1 and AW1 of proposed Local
Development Plan 2 together with the Council’s Frontiers of the Roman Empire
(Antonine Wall) Planning Guidance.
8.40 The connection between the proposed site and Windyhill substation does not form part
of this application. However, with the Antonine Wall lying between the site and the
substation it is not clear how a connection could be achieved. The Scottish Ministers
would require to satisfy themselves that a connection to the site could be achieved.
Residential amenity
8.41 Residential amenity can be affected in a variety of ways. This includes noise from
construction and operation of the proposed development together with other
impacts which could arise during the construction phase. Any development will
produce noise during the construction phase and this has to be accepted.
Environmental Health raise the requirement to ensure that the site is managed in such
a way during construction so as not to cause undue disturbance and this could be
addressed by appropriate conditions if required, including relating to hours of work,
construction noise, delivery vehicles and dust. Such an approach would address any
short-term impacts during construction.
8.42 The proposed site is situated outwith the urban area as defined by the adopted Local
Plan and proposed Local Development Plan 2 in a location with a predominantly rural
character. The nearest noise sensitive receptor is the farmhouse at Braidfield
farmhouse approximately 175 metres to the west of the main equipment compound
within the application site. Within the nearby urban area, there are a variety of noise
sensitive receptors including dwellinghouses on Braidfield Road and Strathdee
Avenue approximately 260 metres from the main equipment compound. To the south,
dwellinghouses on Morar Avenue and Morar Place are some 350 metres from the main
equipment compound and also lie on the opposite side of the A82 from the site. St
Peter the Apostle High School also lies to the opposite side of the A82 around 250
metres distant. 
Page 135

Page 136

8.43 Policy 11 (e) i of NPF4 requires that impacts on communities and individual dwellings
including residential amenity, and noise are addressed. A noise impact assessment
(NIA) has been submitted in support of the proposal. The NIA identifies a range of
noise sources from the development including the energy storage units, power
convertors and transformers. It is set out that the type of unit proposed would generate
a typically broadband type of noise which is within strong tonal characteristics. It is set
out that the transformers are tonal and are not predicted to be audible at nearby
receptors. It is advised by the applicant that for procurement and engineering reasons,
it may be necessary to vary the proposed equipment during or after the consenting
process. In the event that alternative equipment is proposed that would give greater
noise impacts at the receptors, then a full noise assessment would be undertaken and
agreed prior to proceeding with that alternative equipment.
8.44 It is accepted that currently there is notable background noise arising from the busy
A82 and general urban activity, as identified in the NIA. It is concluded in the NIA that
the predicted noise arising from the proposed development at the locations set out in
paragraph 8.42 above is below the background daytime noise level and no more than
3 dB above nighttime background levels. The NIA has been considered by the
Council’s Environmental Health Service who conclude that the site could be developed
without adverse impacts occurring. However, given the nature of the type of
development, conditions are recommended in terms of  noise at any dwelling or noise
sensitive building not exceeding particular noise rating curves. A condition requiring a
post development verification report to demonstrate that the projections as detailed
within the NIA are achieved is also recommended.
8.45 Environmental Health further note the applicant’s position that for procurement
reasons, the proposed equipment may be varied following the granting of consent. The
NIA would therefore require to be updated in the context of the final choice of
equipment if different from that which the current NIA is based on to ensure that no
unacceptable impact occurs to residential properties. The requirement for an updated
NIA based on the final choice and specification of equipment and undertaken in
accordance with the relevant guidance could also be addressed by condition should
the Scottish Ministers be minded to grant consent for this development.
8.46 Overall, it is concluded that the site could be developed without giving rise any
unacceptable impacts to residential amenity or having any adverse impact upon the
operation of the nearby high school arising from noise. Accordingly, the proposal would
be considered acceptable with regard to Policies 11 (e) i and 24 of NPF4 together with
policies the relevant policies of the adopted Local Plan and proposed Local
Development Plan 2.
Ecology and Biodiversity
8.47 Policy 3 of NPF4 seeks to protect biodiversity, reverse loss, deliver positive effects
from development and strengthen nature networks.  Policy 4 seeks to protect, restore
and enhance natural assets, making best use of nature-based solutions. The Policy is
primarily focused on designated areas including sites designated as a local nature
conservation site or landscape area. Policy 11 e) ix also requires biodiversity impact to
be addressed.  The applicant has submitted a preliminary ecological appraisal (PEA)
and biodiversity report in support of the proposal and these combine to assess impacts
upon the proposed site. The application site comprises grazing land bound by a variety
of hedgerows inclusive of a small number of trees. Two trees were identified as having
good potential for bat activity, although no tree works are currently proposed. One
mammal hole was identified within he survey area although no badger path to the
entrance was recorded. To further determine possible use by badger, a camera trap
was placed adjacent to the hole entrance. No badger activity was recorded although a
Page 136

Page 137

pair of foxes were observed entering and exiting the hole and triggered the camera on
16 occasions.
8.48 The Council’s Biodiversity Officer has considered the applicant’s submissions and
accepts the methodology and approach undertaken, specifically noting the additional
caution in respect of the camera monitoring. Whilst it is accepted that there are no
watercourses within the site affected by the proposal, the Biodiversity Officer
recommends a cautionary position in respect of watervole, noting that the PEA did not
consider the possibility that watervole could be present in the wider area, including
Cleddans Burn and marshes to the east which have historical records of watervole and
the Hardgate burn to the north has recent surveys with field signs of watervole
confirmed. Whilst there is nothing to suggest an adverse impact on ecology and
protected species, concerns are raised by the Biodiversity Officer in respect of the PEA
dating from 2022. This is longer than is usually accepted for a PEA to still remain
accurate in its findings and it is recommended that the PEA is updated to re-determine
the validity of the current report.  This is especially important given the mobile nature
of the potential wildlife using the site.  It should be re-established that currently there is
no badger activity on the site and watervole could also be considered.
8.49 The Council’s Biodiversity Officer has also considered the biodiversity statement and
notes that enhancement is proposed in respect of a number of habitat improvement
works such as hedgerow gapping, tree retention and planting, wildflower areas, ponds
and bunds, all of which offer potential for biodiversity improvement on the site.  It is
considered that these would also provide an extension to the existing woodland and
wetland habitat to the south west of the site (just east of the Titan Hotel) which is known
to be a biodiverse site.  It would also provide further connectivity to the Cleddans Farm
hedgerows, burn and woodland areas to the east.
8.50 Overall, it is concluded that no adverse impact on ecology, biodiversity and protected
species would arise from the development subject to a requirement to update the PEA
to include updated species surveys for bats, badger and watervole. The biodiversity
enhancement measures are acceptable and would have a positive effect on
biodiversity. The proposal is therefore considered acceptable with reference to Policies
3, 4(d) and 11(e)ix of NPF4 together with Policies E1 and E3A of the Local Plan and
Policy ENV1 of the proposed Plan.
Traffic, Transport and the Impact on the Road Network
8.51 Policy 11 e) vi of NPF4 requires the impacts on road traffic to be appropriately
addressed, including during construction. Access to the site will be taken from
Braidfield Road via Strathdee Avenue, Kilbowie Road (A8014) and Great Western
Road (A82). No transport statement has been submitted by the applicant in support of
the application. The applicant’s planning statement does, however, set out that the
construction phase will involve bringing construction machinery to site, the delivery of
aggregate for the site track, delivery of site components including the battery units and
other equipment and materials. It is further advised that this will require a mixture of
light commercial and HGV loads, together with a small number of abnormal loads
which will be necessary for the main transformer delivery and cranes. No details of
expected vehicle movements during the construction phase are provided nor is the
expected approach to managing construction vehicles. It is, however, advised that a
Construction Traffic Management Plan will be developed and agreed. This would
include the timing of deliveries with respect to busy periods, school times, the routing
of deliveries, measures to ensure the safety and convenience of road and core path
users, appropriate signage, advance notice and contact details for any issues for
residents, identification of a nominated person to whom issues can be referred,
considerate driving, measures to protect the public road from deleterious material from
Page 137

Page 138

the site, procedures to deal with inclement weather and breakdowns, and access for
emergency services.
8.52 The Council’s Roads Service has considered the proposal and does not identify any
issues or objections. The requirement for notification of the commencement of works,
abnormal load movements and pre and post development inspections of the public
road network are identified by roads, together with the requirement to ensure road
sweeping if required, that surface water is not discharged to the public road and that
the access to the site is hard surfaced for the first 12 metres and that any gates are set
back from the public road by at least 12 metres. These matters can be addressed by
condition or via a Construction Traffic Management Plan which can itself be addressed
by condition. Transport Scotland have also considered the proposal and offer no
objections subject to a variety of matters being addressed by condition including
matters relating to abnormal roads on the trunk road network and the requirement for
a Construction Traffic Management Plan addressing a range of matters.
8.53 While the concerns relating to roads and traffic matters highlighted in the objections to
the Scottish Ministers are noted, subject to the matters set out above being addressed
by condition in the event the Scottish Ministers were minded to grant consent for the
development, there is thus no objection to the proposal on roads and traffic grounds
and the proposal is acceptable.
Flooding and Drainage
8.54 Considering matters relating to flood risk, a review of SEPA’s flood risk mapping
concludes that the site is not at risk of flooding from watercourses and whilst localised
areas of surface water flooding are identified on the land surrounding the site, the site
itself it not at risk. A drainage assessment is submitted in support of the proposal and
the development will incorporate Sustainable Drainage Systems (SuDS) to attenuate
run off. The SuDS will comprise an attenuation pond which will discharge to the existing
drainage ditch to the east of the site which itself drains to Cleddans Burn. This will
ensure that no flooding occurs from the site up to and including the 1 in 200 year flood
event plus climate change allowance. The Council’s Roads Service offer no objection
to the proposal on flood risk grounds and in their consultation response to the Energy
Consents Unit, SEPA also offer no objection on the grounds of flood risk. The proposal
is considered acceptable with reference to Policy 22 of NPF4 which has primacy over
the Local Plan and proposed Local Development Plan 2 in respect of the position on
flooding.
Aviation Safety
8.55 Concerns are raised in the objections to the Scottish Ministers in respect of aviation
safety related issues. Glasgow Airport offer no objection to the proposal subject to the
imposition of conditions relating to soft and water landscaping and bird hazard
management. National Air Traffic Services (NATS) also offer no objections to the
proposal. It is therefore not considered that any concerns relating to aviation safety or
the operation of Glasgow Airport arise. The proposal present no conflict with Policy 11
e) iv, Policy DC3 of the adopted Local Plan and Policy E7 of proposed Local
Development Plan 2.
Health and Safety
8.56 The applicant acknowledges that there are potential hazards associated with BESS
facilities and that whilst it is not possible to eliminate all risk, it can be reduced and
managed to an acceptable level and designed to limit the consequences of an event.
No outline safety management plan or battery fire plan have been submitted by the
applicant in support of the proposal although the proximity to Clydebank Fire Station it
highlighted by the applicant.
Page 138

Page 139

8.57 Concerns are raised in the public objections to the Scottish Ministers in respect of site
safety and fire risk. Policy 23 of NPF4 addresses Health and Safety but this does not
cover such developments specifically but rather sets out a requirement for new
development to protect people and places from environmental harm, mitigate risks
arising from safety hazards and encourage, promote and facilitate development that
improves health and wellbeing. Therefore, whilst health and safety is a legitimate
material planning consideration, in considering the development proposal the focus
requires to be on locational, design and layout aspects of the proposal rather than any
concern with the principle of using such technology or the technical design of
equipment, which is controlled by other legislation and industry standards.
8.58 Whilst it is generally accepted that the safe operation of the site is not a planning
consideration, it would be expected that the Scottish Ministers consult the Scottish Fire
and Rescue Service on the proposal and satisfy themselves that an unacceptable risk
does not occur from the development. Notwithstanding this, it is concluded that a
precautionary approach can be reasonably captured through a condition requiring a
detailed Battery Fire Safety Management Plan which includes response, management
and mitigation measures in the event of a fire should the Scottish Ministers be minded
to grant consent for the development.
Decommissioning
8.59 No details are provided by the applicant in respect of the length of the operational
period of the development or the approach to decommissioning. Whilst the preference
would be that the approach to decommissioning and site restoration to be provided
upfront with the detail and implementation of the decommissioning and restoration
scheme then addressed by condition, it is accepted that this is at odds with the
established approach to other similar developments. It is therefore accepted that the
decommissioning and site restoration can be secured by condition and any such
condition(s) must be suitably robust to ensure the complete removal of all aspects of
the development and the restoration of the landform within the site to its original profile.
A further condition can also ensure early decommissioning should the site cease to
export electricity to the grid for in excess of 12 months. A financial provision to provide
sufficient funds for the decommissioning and restoration of the site should such be
required must also be secured. With such an approach, it is considered the
development meets the requirements Policy 11e) xi of NPF4.
Community and Economic Benefit
8.60 Policy 11 c) of NPF4 sets out that development proposals will only be supported where
they maximise net economic impact, including local and community socio-economic
benefits such as employment, associated business, and supply chain opportunities.
Policy 25 addresses the approach to community wealth building. Battery energy
storage makes an indirect but significant contribution to renewable energy generation
targets and greenhouse gas emissions reduction targets, by increasing the productivity
of renewable generators elsewhere on the grid. The provision of a secure electricity
system brings economic benefits across the national economy. The construction and
decommissioning of the development presents supply chain opportunities for business
and could potentially contribute to local economic activity. Whilst the lack of direct
community benefit is highlighted in the objections to the Scottish Ministers, the
provision of a community benefit package is not a material planning consideration and
therefore and therefore would not warrant an objection to the proposal. 
Ground conditions
Page 139

Page 140

8.61 No site investigation has been submitted in support of the application and as such it
has been recommended by Environmental Health that conditions be applied regarding
site investigation. Further conditions in respect of the importation and reuse of soils are
also recommended by Environmental Health. Concerns regarding former mining
activity and associated ground conditions are raised in the objections to the Scottish
Ministers. In a consultation response to the Scottish Ministers, the Coal Authority
confirm that there are no records of any coal mining features within the site which may
pose a risk to surface stability. It is noted that the site does adjoin an area of probably
shallow coal workings but these do not extend to the site. Accordingly the Coal
Authority offer no objection to the proposal.
9. CONCLUSION
9.1 This application has been submitted to the Scottish Government under Section 36 of
the Electricity Act 1989, as it is development with a generating capacity of over 50MW.
Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. In this instance, the application is made
under the Electricity Act 1989 and therefore the Development Plan does not have the
primacy in the determination of the application.  It does, however, provide a basis for
the assessment of this proposal and it is established practice to take the development
plan into account in such decisions. The development plan comprises National
Planning Framework 4 and adopted West Dunbartonshire Local Plan.  Whilst not
adopted, proposed Local Development Plan 2 (LDP2), incorporating the
recommended modifications of the Examination Report received on 22 April 2020,
which were accepted by the Planning Committee of 19 August 2020, remains the
Council’s most up to date spatial strategy and is therefore afforded significant weight
in the assessment and determination of planning applications, subject to compatibility
with NPF4
9.2 The contribution of up to 100mw battery storage capacity in supporting renewable
energy generating capacity, which in turn will assist in decarbonising the electricity
network, draws strong support in term of renewable energy targets and supporting the
overarching aims of NPF4 to achieve net zero targets. The site is situated within the
Green Belt as defined by the adopted Local Plan and proposed Local Development
Plan 2. Policy 8 of NPF4 sets out the types of development that are supported within
the Green Belt locations. This includes essential infrastructure and proposals that
relates to the distribution and transmission of electricity grid networks fall under this
definition. However, Policy 8 is clear that for development proposals in Green Belt
locations, the purpose of the Green Belt must not be undermined. Policy 8 goes on to
require that the reasons why the Green Belt is essential must be provided together with
why the development cannot be provided on a site outwith the Green Belt. Whilst it is
acknowledged that such developments require to be sited where a suitable electricity
connection can be made into a substation with sufficient available capacity, the
applicant has failed to provide a site selection report or any detailed analysis of
alternative site options and why they were discounted. It therefore cannot be
considered that the applicant has demonstrated that no other suitable sites are
available in a location outwith the Green Belt and it cannot be concluded that the
requirements of Policy 8 a) ii are met in this regard.
9.3 Turning to visual impact, Policy 11e) ii of NPF4 explicitly accepts localised significant
landscape and visual impacts and in this respect the position is thus weighted towards
development’s contribution to renewable energy targets. However, this Policy requires
such impacts to be addressed with appropriate design mitigation. Policy 8 a) ii also
requires visual impact within the Green Belt to be minimised as far as possible. It is
Page 140

Page 141

concluded that the applicant has failed to demonstrate that the proposal would
minimise landscape and visual impacts within the Green Belt as far as possible as
required by Policy 8 a) ii of NPF4. With the potential adverse impact on landscape
character at a local level it also cannot be not be concluded that the proposal is
acceptable with reference to Policies GB1 of both the adopted Local Plan and
proposed Local Development Plan, together with Policies DC6 and E9 of the adopted
Plan and Policies ENV2 and RE1 of the proposed Plan Whilst Policy 11 e) ii accepts
significant landscape and visual impacts, there is also an expectation of appropriate
design mitigation for these impacts. The extent of the visual impact on the local
landscape and the appropriateness of design mitigation cannot be fully determined and
therefore it cannot be concluded that such impacts are addressed.
9.4 Considering built and cultural heritage assets, having fully reviewed potential impacts
and being guided by the position in the consultation responses to the Scottish
Ministers, the serious concerns of Historic Environment Scotland in respect of the
approach to the assessment of the impact upon the Antonine Wall  to the north of the
proposed development which comprises both a Scheduled Monument and World
Heritage Site and the potential adverse impact on the integrity of the Wall and its setting
are noted. Historic Environment Scotland object on this basis as the proposal may raise
historic environment issues of national interest. The impact upon the setting of the
world heritage site and scheduled monument, an internationally recognised asset, is
therefore clearly of significant concern and with an objection from the government
agency responsible for the care and promotion of Scotland’s historic environment, the
impact cannot be considered acceptable and is therefore not supported by Policies 7
l) and 11 e) vii of NPF4, policies DC6, BE5, BE6A and BE6B of the adopted Local Plan,
Policies BE1 and AW1 of proposed Local Development Plan 2 together with the
Council’s Frontiers of the Roman Empire (Antonine Wall) Planning Guidance.
9.5 All other matters raised, including those relating to residential amenity, ecology and
biodiversity, impact upon designated landscapes, traffic, transport and the impact upon
the road network, flooding and drainage, aviation, health and safety and ground
conditions are considered to be satisfactorily addressed. None of these matters would
have a significant impact or outweigh the substantial support that applies to renewable
energy projects in national and local planning policy.
9.6 Overall, due to the above concerns relating to the Green Belt location of the
development, visual impact and impact upon built and cultural heritage, based on the
current application submission, it cannot be considered that the benefits of the
proposed development outweigh any adverse impacts.
9.7 It must be noted that should the Planning Committee accept the recommendation to
formally object to the proposed development, this will trigger a Public Local Inquiry in
terms of Section 62 and Schedule 8 of the Electricity Act 1989 unless the Council
subsequently withdraws its objection.
10. COUNCIL’S POSITION ON THE APPLICATION
10.1 It is recommended that this Committee Report is forwarded in full to the Scottish
Ministers as presenting the Council’s full formal response to the consultation and that
it is highlighted that the Council objects to the application for the following reasons:
 The Council objects to the proposal as it has not been demonstrated that no other
suitable sites are available in a location outwith the Green Belt in accordance
with the requirements of Policy 8 a) (ii) of National Planning Framework 4.
Page 141

Page 142

 The Council also objects to the proposal as it has not been demonstrated that
the proposal would minimise landscape and visual impacts within the Green Belt
as far as possible as required by Policy 8 a) (ii) of NPF4 and the potential adverse
impact on landscape character at a local level it cannot be not be concluded that
the proposal is acceptable with reference to Policy 11(e) ii of NPF4, Policies GB1
of both the adopted Local Plan and proposed Local Development Plan, together
with Policies DC6 and E9 of the adopted Plan and Policies ENV2 and RE1 of the
proposed Plan for the same reason.
 The Council also objects to the proposal as it could have a significant adverse
impact upon the setting of the Antonine Wall World Heritage Site and Scheduled
Monument and it would therefore be considered contrary to policies 7 l) and 11
e) vii of NPF4, policies DC6, BE5, BE6A and BE6B of the adopted Local Plan,
Policies BE1 and AW1 of proposed Local Development Plan 2 together with the
Council’s Frontiers of the Roman Empire (Antonine Wall) Planning Guidance.
10.2 Finally it is recommended that, all matters arising in respect of any Public Local Inquiry
are delegated to the Planning, Building Standards and Environmental Health Manager.
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 6th August 2025
______________________________________________________________
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Service Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: james.mccoll@west-dunbarton.gov.uk
Appendix 1: Location Plan
Background Papers: 1. Application documents
2. Consultation responses submitted to the Scottish
Ministers
3. Representations submitted to the Scottish Ministers
4. National Planning Framework 4
5. West Dunbartonshire Local Plan 2010
6. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
7. Frontiers of the Roman Empire (Antonine Wall)
Planning Guidance
8. Renewable Energy Local Development Plan
(Proposed Plan) Planning Guidance November 2016
Wards affected: Ward 4 (Kilpatrick)
Page 142

Page 143

J370/059/26062024
Braidfield
Energy Storage
Location
© Crown Copyright and database right 2024
Ordnance Survey 0100031673
© Copyright LoganPM Ltd 2024
Scale 1:10000 at A3
Drawing number Status
metres
Draft
Project Site
Land at Braidfield Farm,
Braidfield Road, Clydebank
G81 5RA
Note that this area includes
space for landscaping bund
and new planting of trees.
ITEM 8 - APPENDIX 1  
Page 143

Page 144

Page 144

Page 145

WEST DUNBARTONSHIRE COUNCIL
Report by Planning, Building Standards and Environmental Health Manager
Planning Committee: 6th August 2025
___________________________________________________________________
Subject: DC23/223/S36: Proposed wind farm development comprising up to
ten wind turbines of approximately 7 megawatts (MW) each, with a
maximum blade tip height of up to 250m, and Battery Energy
Storage System (BESS) with a capacity up to 20 MW at the Site of
the Proposed Vale of Leven Windfarm, Kilpatrick Hills, East of
Alexandria by Vale of Leven Wind Farm Limited
1. Purpose
1.1 To agree an updated consultation response following the receipt of a revised proposal
reducing the height of the proposed turbines together with updated supporting
documents from the Scottish Government Energy Consents Unit, on behalf of the
Scottish Ministers, in connection with a proposed wind farm development comprising
up to ten wind turbines of approximately 7 megawatts (MW) each, with a maximum
blade tip height of up to 250m, and Battery Energy Storage System (BESS) with a
capacity up to 20 MW at the Site of the Proposed Vale of Leven Windfarm, Kilpatrick
Hills, East of Alexandria by Vale of Leven Wind Farm Limited.
2. Recommendations
2.1 It is recommended that this Committee Report is forwarded to the Scottish Ministers
as presenting the Council’s updated response to the consultation and that it is
highlighted that the Council maintains its objection to the application in respect of the
reasons set out in paragraph 4.21 of this report.
2.2 As per Committee’s previous decision, it is further recommended that all matters
arising in respect of any Public Local Inquiry are delegated to the Planning, Building
Standards and Environmental Health Manager.
3. Background
3.1     The Scottish Ministers received an application under section 36 of the Electricity Act
1989 for the construction and operation of windfarm of up to ten wind turbines of
approximately 7 megawatts each with a maximum blade tip height of up to 250m as
well as a battery storage system (BESS) with a capacity of up to 20 megawatts. The
application site is located within the West Dunbartonshire local authority area however
the assessment of the submitted application is undertaken via the Scottish
Government Energy Consents Unit for the Scottish Ministers. In Scotland, any
proposal to construct and operate an onshore electricity generating station with a
capacity of over 50 megawatts (as is the case with this proposal) requires the consent
of Scottish Ministers under Sections 36 of the Electricity Act. Such applications are
processed on behalf of the Scottish Ministers by the Scottish Government Energy
Consents Unit. Due to the Scottish Ministers being the decision makers,
ITEM 9
Page 145

Page 146

representations from members of the public and other agencies are made directly to
the Energy Consents Unit. The application is referred to under the project name of the
Vale of Leven Windfarm. The location of the site is shown in Appendix 2.
3.2 The proposal was considered by the Planning Committee on 7th August 2024 and the
Council issued a consultation response to the Scottish Ministers on 9th August 2024.
The Council recognised that the contribution of up to 70mw renewable energy
generating capacity, with the potential for an additional 20mw if the applicant proceeds
with the Battery Energy Storage System element of the proposed development, would
draw strong support in term of renewable energy targets and supporting the
overarching aims of NPF4 to achieve net zero targets. Notwithstanding this, by their
very nature wind farms are major pieces of infrastructure which often require exposed
upland sites which tend to be environmentally sensitive and relatively conspicuous
within the landscape. In assessing this particular proposal, it was therefore necessary
for the Council to consider whether the acknowledged impacts upon the environment
and landscape were sufficiently great to outweigh the benefits of expanding renewable
energy generation and/or any economic benefit which would be brought to West
Dunbartonshire.
3.3 In previously considering the proposal, it was recognised that Policy 11 of NPF4 is one
of the primary policies for the assessment of the development type proposed. Wind
farms have the potential to impact on a wide range of features which is evident from
the above assessment. The turbines proposed as part of the Vale of Leven wind farm
were noted as being extremely large with a blade tip height of up to 250m. With a
proposal of this scale, together with associated infrastructure inclusive of Battery
Energy Storage System, significant adverse landscape and visual impacts were
considered inevitable. However, Policy 11(e)ii. of NPF4 explicitly accepts localised
significant landscape and visual impacts and in this respect the position is thus
weighted towards development’s contribution to renewable energy targets.
Notwithstanding this policy position, the Council considered that the proposed
development would have a significant adverse impact upon the landscape and the
visual amenity of the Loch Lomond and the Trossachs National Park, the Loch Lomond
National Scenic Area, and the Kilpatrick Hills Local Landscape Area. It was not
considered that the at the benefits of the development would outweigh these significant
impacts.
3.4 In further considering the proposal, the Council assessed the potential for build and
cultural heritage assets to be impacted upon and concluded that, subject to appropriate
mitigation, there would not be significant detrimental impact on the majority of the
designations and assets. However, the impact upon the setting of the scheduled
monument of Dumbarton Castle/Rock, a national asset, was of significant concern and
it was concluded that the impact cannot be considered acceptable.
3.5 The proposal has the potential to impact upon biodiversity matters including the
designated sites, habitat, peatland, ecology, protected species and ornithology it was
concluded that with suitable mitigation measures. A variety of habitats will be impacted
including blanket bog and wet modified bog. It was considered that subject to suitable
mitigation measures including a habitat management plan together with the following
recommendations from NatureScot, notably with reference to peatland restoration, the
impact of the proposal upon habitats would be acceptable. In terms of protected and
other species, the Council expected that the Scottish Ministers in determining the
application would fully consider the points highlighted by the Council’s Biodiversity
Officer, ensure identified mitigation measures secured, follow the recommendations
set out in NatureScot’s consultation response and require the implementation of a
suitable Habitat Management Plan to ensure any effects of the development are
Page 146

Page 147

minimised. Species protection plans would also be required. With this approach, the
Council concluded the impacts of the proposed development upon protected species
and wider ecology could be considered acceptable. Notwithstanding this, in terms of
the consideration of the impact upon designated sites, the applicant failed to consider
or assess local designations relative to the proposed site. It is identified that there are
five Local Nature Conservation Sites (LNCS) which would be impacted by the
development, either directly or indirectly. It therefore could not be concluded that the
development proposal would not result in any adverse impacts upon locally designated
sites.
3.6 A wide range of other matters were considered as part of the assessment of proposal
including residential amenity, impact upon tourism, aviation safety, electro-magnetic
interference to communications systems, impact upon ttraffic, transport and the road
network, health and safety and decommissioning. In respect of these matters, it was
either concluded that no concerns arose or that any issues arising were matters for the
Scottish Ministers should they be minded to grant consent for the development.
3.7 In submitting a full formal consultation response to the Scottish Ministers, the Council
set out the following position:
 The Council objects to the proposal as the introduction of a wind farm into the
Kilpatrick Hills could have a significant adverse impact upon the National Park /
National Scenic Area together with the Kilpatrick Hills Local Landscape Area.
Accordingly, the proposal is not considered to be supported by Policies 4 and
11(e)ii and iii of NPF4 together with a range of policies within the adopted West
Dunbartonshire Local Plan including GN1, GD1, and DC6. The proposal is also not
supported with reference to Policy KH1 of the Proposed West Dunbartonshire
Local Development Plan 2.
 The Council also objects to the proposed windfarm as it could have a significant
adverse impact upon the setting of Dumbarton Castle as a scheduled monument
and it would therefore be considered contrary to Policies 7 and 11(e)vii of NPF4
together with Policy BE5 of the West Dunbartonshire Local Plan and Policy BE2 of
the proposed Local Development Plan.
 The Council further submits a holding objection to the proposal in respect of the
failure of the applicant to consider or assess local nature conservation site
designations relative to the proposed site. In the absence of this, it therefore cannot
currently be concluded that the development proposal would not result in any
adverse impacts upon locally designated sites in accordance with Policies 3, 4(d)
and 11(e)ix of NPF4 together with Policy E3A if the Local Plan and Policy ENV1 of
the proposed Plan.
3.8 The applicant has submitted a revised development proposal to the Scottish Ministers
which sees the reduction in the tip height of the proposed turbines from 250 metres to
220 metres. No other alteration to the development is proposed by the applicant. In
support of the amended proposal, the applicant has submitted an Additional
Information Report (AIR) which it is advised should be read in conjunction with the
original Environmental Impact Assessment (EIA). The AIR considers and assesses the
difference between the environmental effects assessed in the EIA Report and sets out
the changes to any likely significant effects resulting from the revised proposal.
3.9 The AIR comprises the following: 
Page 147

Page 148

 Volume 1: Written Text – this provides a written update and comprises new
assessment where applicable. It is not set out in the same chapter numbering
format as the original 2023 EIA Report; 
 Volume 2: Figures – updated and/or new figures;
 Volume 3: Additional Information Appendices – updated and/or new technical
appendices to complement the assessments undertaken within Volume 1.
 Addendum to Design Statement.
 Updated Planning & Sustainable Place Statement.
The application documents are available to view via the Energy Consents Unit website:
https://www.energyconsents.scot and the following direct link:  Scottish Government -
Energy Consents Unit - Application Details . A date of 8th August has been agreed with
the Energy Consents Unit for the submission of an updated response.
4. Main Issues
4.1 The application site is located in the western part of the Kilpatrick Hills between Bonhill
and Gartocharn. The nearest settlement to the site is Bonhill, which is located just over
2 km to the west, of the nearest proposed turbine, and approximately 600m to the
northwest of the site boundary and proposed access track. Alexandria and Dumbarton
are approximately 4 km to the west and south-west of the site respectively. The Loch
Lomond and Trossachs National Park and the Loch Lomond National Scenic Area
(NSA) lie a minimum of 1.7 km and 3.5 km respectively to the north of the northern site
boundary.
4.2 The site comprises part of Auchenreoch Muir to the east of Pappert Hill, and primarily
consists of upland open moor which is currently used for sheep grazing. The
topography within the site undulates, and it contains several hills including
Knockshannoch and Hill of Standing Stones. These form part of a gently sloping ridge
of land which drops down from the higher Doughnot Hill and Meikle White Hill (to the
south of the site). This ridge forms the watershed between the Endrick Water (a
tributary of the River Leven) and the River Leven itself. A number of small burns
originate within the site, flowing northeast and west respectively. The surrounding land
comprises open moorland with some patches of coniferous plantation, while
Auchencarroch landfill site borders the site to the northwest. Dumbarton Muir Site of
Special Scientific Interest (SSSI), designated for bog habitats, is located to the east of
the Site. Auchenreoch Glen SSSI, designated for its lowland calcareous grassland and
springs (including flushes), lies to the south-west.
4.3 Except for the reduction in the height of the turbines by 30 metres from 250 metres to
blade tip to 220 metres to blade tip, the development remains as set out in paragraphs
4.3 to 4.13 of the original Committee report (appendix 1). In assessing the amended
proposal and additional and updated supporting documentation, it must be considered
to whether the Council’s previous objections to the proposal have been addressed.
The assessment therefore considers landscape and visual impact, impact on built and
cultural heritage, and biodiversity and ecology.
Landscape and Visual Impact
4.4 It remains that the application site is located around 1.7km from the edge of the
National Park boundary, which is one of only two National Parks in Scotland. In their
consultation responses to the Scottish Ministers, both the National Park Authority and
NatureScot objected to the proposal. Both the National Park Authority and NatureScot
considered that the location, size and scale of the proposed development represents
Page 148

Page 149

a step change in respect of the proximity and prominence of wind farms to the National
Park, and the scale of the wind turbines.
4.5 The AIR submitted by the applicant in support of the amended proposal concludes that
the reduction in the height of the proposed turbines results in a reduction in the vertical
impact of the turbines particularly when they are seen on the skyline and the proportion
of the turbines seen rising above the skyline is reduced and this results in a lesser
impact and improvement in overall appearance from a variety of viewpoints and visual
receptors. It is accepted that any reduction in the height of the proposed turbines has
the potential to reduce the visual impact of the development. However, any reduction
in the impact is considered to be very slight and significant adverse visual effects would
remain including from key viewpoints within the Park such as Conic Hill and from the
Loch itself. It remains that the applicant’s AI identifies significant effects will remain in
respect of two SLQ of the National Park, these being ‘wild and rugged highlands
contrasting with pastoral lowlands’ ‘immensity of loch and landscape’. In their original
consultation responses, both the National Park Authority and NatureScot consider the
applicant’s assessment of the Special Landscape Qualities (SLQ) of the National Park
underplays the significance of effects with concerns regarding potential significant
effects on an additional eight SLQs highlighted across both consultation responses.
4.6 In an updated consultation response, the National Park is of the view that the reduction
in the height of the turbines by 30 metres would only have a very negligible change to
the landscape and visual effects of the proposal. The Park does not concur with the
applicant’s assessment that there will be a considerable reduction in the vertical impact
of the turbines, that there will be an improved relationship between the turbines and
the landform a d there will be a reduction in the perceived scale of the turbines. The
Park considers that the reduction in turbine height does not result in any reduced
visibility from with the national park. NatureScot also note in their update consultation
response that whilst there may be a very marginal reduction in visibility of the proposed
development from within the park, significant adverse effects would remain on the
following SLQs:
 Immensity of Loch and Landscape
 A world-renowned landscape famed for its rural beauty
 Wild rugged highlands contrasting with pastoral lowlands
 Settlement nestled within a vast natural backdrop
 Tranquillity
 The easily accessible landscape splendour
4.7 The applicant’s AIR concludes that the reduction in the height of the proposed turbines
will lessen the visual impact and vertical impact of the turbines. The AIR advises that
the significant effects on two of the Park’s SLQs as predicted by the original EIA would
remain. Notwithstanding this and as concluded in the Council’s previous consultation
response, it is considered that the actual impact will be far greater. This was a view
strongly supported by both NatureScot and the National Park Authority in their
objections to the Scottish Ministers, a position which both organisations advise they
maintain. Being guided by the detailed assessment undertaken by both the National
Park Authority and NatureScot, it is considered that the proposal will have a detrimental
and unacceptable impact due to the significant adverse impacts on the landscape
setting of the National Park and it is concluded that the potentially significant impacts
on the Park resulting from the proposal are not addressed by the reduction in the height
of the turbines by 30 metres.
Page 149

Page 150

National Scenic Areas (NSA)
4.8 Loch Lomond NSA is located within National Park. Whilst it was previously accepted
that the proposed wind farm would not be visible from large parts of the NSA, the
Council’s previous consultation response concluded that would be highly visible from
some of the most important, iconic and popular areas within the NSA. It was
considered that due to the extent of the area that the wind farm will be visible from and
the importance of these locations such as on the Loch itself, Balmaha Harbour and
Luss within the NSA, the proposal would impact upon this area. With the concerns
regarding the impact upon the National Park itself, it follows that there were also
concerns regarding the potentially detrimental and unacceptable impact on the
landscape setting of Loch Lomond NSA. As the significant adverse impacts on the
landscape setting of the Park are not addressed by the amended proposal reducing
the height of the turbines, it must be concluded that the concerns regarding the
potentially detrimental and unacceptable impact on the landscape setting of Loch
Lomond NSA remain.
Kilpatrick Hills
4.9 The proposed windfarm is located within the Kilpatrick Hills Local Landscape Area
(LLA) which will result in direct changes to the landscape. Within West Dunbartonshire,
the following special landscape qualities of the Kilpatrick Hills are identified as being of
special interest: Strong sense of remoteness, wildness and open horizons; Distinctive
landforms; and A unique diversity of views. The proposed wind farm will be located
within the Kilpatrick Hills LLA and will result in direct changes to the landscape. The
site is readily visible from a wide area and the EIA concludes that there would be
significant effects on these SLQs. Whilst the reduction in the height of the turbines may
reduce the visibility of the turbines within the LLA, it is considered that this would be
negligible. It remains that the turbines would continue to be located within the LLA and
the visual impact would be significant. The AI acknowledges that significant effects on
the SLQs of the LLA would remain despite the amended proposal.
4.10 Even with the 30 metres height reduction, the scale of the turbines proposed is such
that there are no existing features in the landscape which are of a similar size or scale.
At 220 metres in height, the proposed turbines will be a dominant feature within the
LLA, particularly from areas close to the turbine locations. This includes Doughnot Hill
where the turbines will remain a very significant feature. It remains that the overall
experience of recreational receptors at Doughnot Hill and the surrounding area would
be significantly changed by the development with the overall sense of isolation being
lost. The AIR confirms that the significant effects at Doughnot Hill (viewpoint 1) remain
despite the amended proposal. The Kilpatrick Hills are a key backdrop which help to
define the identity of nearby settlements and provide a setting for the nearby nationally
important landscapes. Given the Kilpatrick Hills are visible across a large part of the
southern extent of the National Park and National Scenic Area and the contribution
they make to the setting of these areas, it remains that locating a windfarm within the
Kilpartick Hills would have a significant impact on their setting and the setting of nearby
designations.
Built and Cultural Heritage
4.11 It remains that no historic buildings or monuments are located within the site, although
it does contain areas of archaeological interest. With the extension of Dumbarton
Castle / Rock, whilst there is the potential for the development to impact upon a variety
of scheduled monuments, category A listed buildings and Garden and Designed
Landscapes which lie in the vicinity of the site, it was concluded that no impact where
of such significance as to warrant an objection. Historic Environment Scotland (HES)
in their original consultation response noted that the EIA recognises that the presence
of turbines in views of Dumbarton Castle from the south would challenge the
Page 150

Page 151

dominance of the monument. The EIA went on to suggest that views of the Castle from
the south would only be impacted across a relatively small area and subsequently
concludes that the proposed development would result in an adverse effect which is
not significant. HES did not agree with this assessment and considered the impact to
be underestimated.
4.12 The AIR further considers the impact upon Dumbarton Castle in detail and includes a
new viewpoint from Westferry which lies approximately 1 mile to the east of Langbank.
The applicant sets out that there are several historic images of Dumbarton Castle
which depict views looking towards the monument from the south of the River Clyde,
however, it is the view from Westferry that most closely resembles the portrayal of
Dumbarton Castle in many of these illustrations, not the view in which the monument
would be backdropped by the proposed turbines as it would appear from Langbank.
Whilst it is accepted that there are locations and viewpoints where the turbines would
not impact on the key views towards and the setting of Dumbarton Castle, it remains
that that it is considered that proposed development would have a significant adverse
impact on the setting of the monument, adversely affecting key views from directly to
its south with the turbines appearing above and being framed in wider views of
monument. In some of these key views from the south the turbines would appear
directly behind the monument creating a very large visual distraction and become the
most dominant features in these views. The reduction in the height of the turbines does
not address this impact. HES advise in their further consultation response that they do
not consider that the revised proposal would mitigate the significant adverse impacts
on the integrity of the setting of Dumbarton Castle and their objection is maintained.
Being guided by the position of HES, the impact upon the setting of Dumbarton Castle
as a scheduled monument and key historic national asset within West Dunbartonshire
is therefore clearly remains of significant concern.
Designated sites, habitat, ecology and biodiversity
4.13 Subject to suitable mitigation measures being secured in respect of a variety of
matters, the Scottish Ministers ensuring that proposed biodiversity enhancement
proposals are both secured and appropriate if minded to grant the proposed
development and the expectation that the Scottish Ministers in determining the
application will fully consider the points highlighted by the Council’s Biodiversity
Officer, the Council was largely content that no adverse impacts would occur.
However, the applicant failed to consider or assess local designations relative to the
proposed site. It was identified that there are five Local Nature Conservation Sites
(LNCS) which would be impacted by the development, either directly or indirectly.
These are Murroch Glen, Blairvault Burn and Pappert Muir, Auchenreoch Muir, Bonhill
Muir and Pappert Hill, and West Dumbarton Muir. In the absence of any consideration
of these sites, it therefore could not be concluded that the development proposal would
not result in any adverse impacts upon locally designated sites.
4.14 The Council’s Biodiversity Officer has considered the applicant’s additional and
updated information which now includes an assessment of the effects on the five
LNCS. Three were scoped out of the assessment as it was not considered there was
any potential to be impacted with the remaining two sites (Auchenreoch Muir and West
Dumbarton Muir), which cover the main footprint of the development and access route,
being scoped in and their important ecological features examined. The assessment
concludes that the effects for both sites are minor adverse and not significant. The
Council’s Biodiversity Officer offers no disagreement with this conclusion. However,
the Biodiversity Officer goes on to highlight that there are direct and indirect habitat
losses to both LNCS including the loss of blanket bog on West Dumbarton Muir. The
impact upon habitat including blanket bog was fully considered in the Council’s original
assessment (paragraphs 8.59 to 8.64 of appendix 2) and it was concluded that subject
Page 151

Page 152

to suitable mitigation measures including a habitat management plan together with the
following the recommendations from NatureScot being followed, specifically with
reference to peatland restoration, and the Scottish Ministers ensuring that the impact
upon peatland is fully understood taking account of the comments of the Council’s
Biodiversity Officer and minimised as much as possible, the impact of the proposal
upon habitats would likely be acceptable.
4.15 It can therefore be concluded that the applicant has now adequately considered local
designations, and it has been demonstrated that subject to suitable mitigation, adverse
impacts would not occur.
Conclusions
4.16 It was previously acknowledged that the contribution of up to 70mw renewable energy
generating capacity, with the potential for an additional 20mw if the applicant proceeds
with the Battery Energy Storage System element of the proposed development, would
draw strong support in term of renewable energy targets and supporting the
overarching aims of NPF4 to achieve net zero targets. Notwithstanding this, by their
very nature wind farms are major pieces of infrastructure which often require exposed
upland sites which tend to be environmentally sensitive and relatively conspicuous
within the landscape.
4.17 In further considering the impacts it was previously concluded that the proposed
development would have a significant adverse impact upon the landscape and the
visual amenity of the Loch Lomond and the Trossachs National Park, the Loch Lomond
National Scenic Area, and the Kilpatrick Hills Local Landscape Area. Loch Lomond
and the surrounding area is a landscape asset of national importance, which is
currently relatively unspoiled by major man-made development within the landscape.
Whilst it is proposed to reduce the height of the turbines by 30 metres, it remains that
the turbines would be extremely large and occupy a prominent position within the
setting of the National Park. Any reduction in the impact arising from the 30 metre
height reduction is considered to be very slight and it remains that the proposal would
result in the introduction of a significant man-made element on the horizon could
significantly detract from the setting of the National Park / National Scenic Area, the
Lomond and the Trossachs National Park being only one of two National Parks in
Scotland. Both the National Park Authority and NatureScot continue to object to the
proposal on this basis and do not consider that the amended proposal addresses their
concerns. Despite the amended proposal, it is also considered that it remains the
proposed wind farm would also detract from the sense of remoteness and wildness
provided by the Kilpatrick Hills and locating a wind farm in this location would have a
significant impact on their setting. The existing landscape affords the opportunity for
recreational use and users of existing paths for example and the wider landscape will
also experience a significant and adverse impact which is not addressed by the
amended proposal.
4.18 The revised proposal is not considered to address the Council’s previous objection in
respect of the significant impacts upon the National Park, National Scenic Area
together with the Kilpatrick Hills Local Landscape Area.  It remains that it is not
considered that the benefits of the development would outweigh these significant
impacts. Accordingly, the proposal is not considered to be supported by Policies 4 and
11(e)ii and iii of NPF4 together with a range of policies within the adopted West
Dunbartonshire Local Plan including GN1, GD1, and DC6. The proposal is also not
supported with reference to policy KH1 of the Proposed West Dunbartonshire Local
Development Plan 2. Whilst Policy RE2 of the proposed Plan relates to the Spatial
Page 152

Page 153

Framework for Wind Energy and would previously have been relevant, it conflicts with
the approach set out in Policy 11 of NPF4. Policy 11 of NPF4 therefore has primacy.
4.19 The impact upon the setting of the scheduled monument of Dumbarton Castle/Rock,
which is a national asset, was also previously of significant concern. Notwithstanding
the revised proposal reducing the height of the turbines and the additional assessment
of the potential impact upon the setting of the Castle/Rock, it remains that that it is
considered that proposed development would have a significant adverse impact on the
Historic Environment Scotland advise in a further consultation response that they do
not consider the reduction in the height of the turbines would mitigate the significant
adverse impacts on the integrity of the setting of Dumbarton Castle. With a continuing
objection from the government agency responsible for the care and promotion of
Scotland’s Historic Environment, it remains that the impact cannot be considered
acceptable and is therefore not supported by Policies 7 and 11(e)vii of NPF4 together
with Policy of the West Dunbartonshire Local Plan and Policy BE1 of the proposed
Local Development Plan.
4.20 In terms of the previous concerns regarding the failure of the applicant to consider or
assess local nature designations relative to the proposed site, the Council’s
Biodiversity Officer has reviewed the additional information provided by the applicant
and is satisfied that the AIR adequately considers local nature conservation
designations and with suitable mitigation, any impacts can be considered acceptable.
It can therefore now be concluded that the proposal is acceptable with reference to
Policies 3, 4(d) and 11(e)ix of NPF4 together with Policy E3A if the Local Plan and
Policy ENV1 of the proposed Plan. The previous holding objection in this regard is now
addressed.
The Council’s updated position on the application
4.21 It is recommended that this Committee Report is forwarded to the Scottish Ministers
as presenting the Council’s updated response to the consultation and that it is
highlighted that the Council maintains its objection to the application in respect of the
following reasons:
 The Council maintains its objection to the proposal as the introduction of a wind
farm into the Kilpatrick Hills could have a significant adverse impact upon the
National Park / National Scenic Area together with the Kilpatrick Hills Local
Landscape Area. Accordingly, the proposal is not considered to be supported by
Policies 4 and 11(e)ii and iii of NPF4 together with a range of policies within the
adopted West Dunbartonshire Local Plan including GN1, GD1, and DC6. The
proposal is also not supported with reference to Policy KH1 of the Proposed West
Dunbartonshire Local Development Plan 2.
 The Council also maintains its objection to the proposed windfarm as it could have
a significant adverse impact upon the setting of Dumbarton Castle as a scheduled
monument and it would therefore be considered contrary to Policies 7 and 11(e)vii
of NPF4 together with Policy BE5 of the West Dunbartonshire Local Plan and
Policy BE2 of the proposed Local Development Plan.
5.   People Implications
5.1     None.
6.    Financial and Procurement Implications
Page 153

Page 154

6.1 Financial implications may arise in respect of costs associated with defending the
Council’s position at a Public Local Inquiry.
7.     Risk Analysis
7.1      No risks have been identified.
8.     Equalities Impact Assessment (EIA)
8.1     Not required.
9.     Environmental Sustainability
9.1 Matters relating to environmental sustainability are fully considered via the
application assessment.
10. Consultation
10.1 Responsibility for wider consultation on the submitted application rests with the
Scottish Ministers and Energy Consents Unit as part of the application process.
11. Strategic Assessment
11.1 The following strategic priorities of the Council are relevant:
 Our Communities - Resilient and Thriving
 Our Environment - A Greener Future
 Our Economy - Strong and Flourishing 
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager
Date: 6th August 2025
Person to Contact: Michael Mulgrew, Planning, Building Standards and
Environmental Health Service Manager
Email: Michael.Mulgrew@west-dunbarton.gov.uk
James McColl, Development Management Team Leader
Email: James.McColl@west-dunbarton.gov.uk
Appendix 1: Report to Planning Committee dated 7th August 2024
Appendix 2: Location Plan
Background Papers: 1. Application documents
2. National Planning Framework 4
3. West Dunbartonshire Local Plan 2010
4. Proposed West Dunbartonshire Local Development Plan
2 2020, as amended
Page 154

Page 155

5. Kilpatrick Hills Local Landscape Area – Statement of
Importance
6. Renewable Energy Local Development Plan (Proposed
Plan) Planning Guidance November 2016
7. Naturescot - Decommissioning and Restoration Plans for
Wind Farms Guidance
8. Scottish Government Draft Planning Guidance:
Biodiversity
9. Scottish Government’s Policy on Control of Woodland
Removal
Wards affected: Ward 2 (Leven)
Page 155

Page 156

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory and Regeneration
Planning Committee: 7th August 2024
_____________________________________________________________
DC23/223/S36: Proposed wind farm development comprising up to ten wind
turbines of approximately 7 megawatts (MW) each, with a
maximum blade tip height of up to 250m, and Battery Energy
Storage System (BESS) with a capacity up to 20 MW at the Site of
the Proposed Vale of Leven Windfarm, Kilpatrick Hills, East of
Alexandria by Vale of Leven Wind Farm Limited.
1. REASON FOR REPORT
1.1 To agree the Council’s response to a consultation received from the Scottish
Government Energy Consents Unit on behalf of the Scottish Ministers regarding a
proposed wind farm development comprising up to ten wind turbines of approximately
7 megawatts (MW) each, with a maximum blade tip height of up to 250m, and Battery
Energy Storage System (BESS) with a capacity up to 20 MW. Given the nature of the
proposal, this requires to be agreed by Planning Committee.
2. RECOMMENDATION
2.1 It is recommended that the Committee agrees the position set out in Section 10 of this
report and submit this report to the Scottish Ministers as presenting the Council’s full,
formal response to the consultation advising of the Council’s objection.
3. BACKGROUND
3.1 The Scottish Ministers received an application under section 36 of the Electricity Act
1989 for the construction and operation of windfarm of up to ten wind turbines of
approximately 7 megawatts each with a maximum blade tip height of up to 250m as
well as a battery storage system (BESS) with a capacity of up to 20 megawatts. The
application site is located within the West Dunbartonshire local authority area however
the assessment of the submitted application is undertaken via the Scottish
Government Energy Consents Unit for the Scottish Ministers. In Scotland, any
proposal to construct and operate an onshore electricity generating station with a
capacity of over 50 megawatts (as is the case with this proposal) requires the consent
of Scottish Ministers under Sections 36 of the Electricity Act. Such applications are
processed on behalf of the Scottish Ministers by the Scottish Government Energy
Consents Unit. Due to the Scottish Ministers being the decision makers,
representations from members of the public and other agencies are made directly to
the Energy Consents Unit. The application is referred to under the project name of the
Vale of Leven Windfarm. The location of the site is shown in Appendix 1.
3.2 A date of 12th August 2024 has been agreed with the Scottish Government Energy
Consents Unit for the submission of the Council’s consultation response. The
application documents are available to view via the Energy Consents Unit website via
the following link: Scottish Government - Energy Consents Unit - Application Details.
3.3 The Council is a formal consultee in this process. In procedural terms, the Council as
Planning Authority, requires to provide a response to the Scottish Ministers. In this
regard, the Council in response to the consultation can:
ITEM 9 - APPENDIX 1
Page 156

Page 157

(i) Offer no objection to the Section 36 application as submitted; or
(ii) Offer no objections subject to the imposition of appropriate conditions and/or
legal obligations it considers necessary to make the development acceptable;
or
(iii) Object to the application, stating the grounds on which objection is made.
3.4 Should the Scottish Ministers be disposed to grant a Section 36 consent for the
proposed development, the Town and Country Planning (Scotland) Act allows the
Scottish Ministers to direct that planning permission for that development and any
ancillary development shall be deemed to be granted.
4. DEVELOPMENT DETAILS
4.1 The application site is located in the western part of the Kilpatrick Hills between Bonhill
and Gartocharn. The nearest settlement to the site is Bonhill, which is located just over
2 km to the west, of the nearest proposed turbine, and approximately 600m to the
northwest of the site boundary and proposed access track. Alexandria and Dumbarton
are approximately 4 km to the west and south-west of the site respectively. The Loch
Lomond and Trossachs National Park and the Loch Lomond National Scenic Area
(NSA) lie a minimum of 1.7 km and 3.5 km respectively to the north of the northern site
boundary.
4.2 The site comprises part of Auchenreoch Muir to the east of Pappert Hill, and primarily
consists of upland open moor which is currently used for sheep grazing. The
topography within the site undulates, and it contains several hills including
Knockshannoch and Hill of Standing Stones. These form part of a gently sloping ridge
of land which drops down from the higher Doughnot Hill and Meikle White Hill (to the
south of the site). This ridge forms the watershed between the Endrick Water (a
tributary of the River Leven) and the River Leven itself. A number of small burns
originate within the site, flowing northeast and west respectively. The surrounding land
comprises open moorland with some patches of coniferous plantation, while
Auchencarroch landfill site borders the site to the northwest. Dumbarton Muir Site of
Special Scientific Interest (SSSI), designated for bog habitats, is located to the east of
the Site. Auchenreoch Glen SSSI, designated for its lowland calcareous grassland and
springs (including flushes), lies to the south-west.
4.3 The proposal would involve the following works:
 10 wind turbines up to 250m to blade tip and each with an output of approximately
7 megawatts (MW), giving a total output of up to 70 MW;
 Hardstanding areas at the base of each turbine, with a total permanent area of
approximately 7,800 sqm;
 Site entrance and access track up to 9.2km in length from the south-west, via a
new road through Murroch Farm, accessed from a new junction on the A813
Stirling Road, adjacent to the Aggreko Lomondgate facility in Dumbarton;
 Sub- station / control building with parking and welfare facilities;
 A network of on-site access tracks and up to 4 associated watercourse crossings:
 Transformers and underground cables to connect the turbines to the onsite
substation;
 Telecommunications equipment;
 Temporary construction compounds and laydown area;
 Three borrow pits which take the form of small quarries used to obtain rock for
construction of the wind farm;
Page 157

Page 158

 Battery Energy Storage System (BESS) with a capacity up to 20 MW.
4.4 The ten proposed turbines would be three bladed, horizontal axis turbines, each with
a nominal rated capacity of 7MW and a rotor diameter of 172m. All of the turbines
would be located on ground at elevations of between 220m and 304m Above Ordnance
Datum (AOD). The solid, tubular towers would be constructed from steel and the
blades would be made from reinforced composite materials such as fibreglass, all
finished in a mid-grey tone consistent with more recently constructed turbines.
4.5 Each turbine would sit on a concrete base roughly 28m in diameter with a circular or
octagonal plan shape. Should geotechnical investigations demonstrate that the
required bearing capacities are not achievable, then a piled foundation design is
proposed to be adopted using the same overall design footprint. For the purposes of
the Environmental Impact Assessment Report, a maximum (worst-case) scenario for
turbine foundations of a 3 – 4m depth has been assumed. Adjacent to the foundation,
an area of hardstanding of approximately 80m by 40m with a 6m wide track running
along the length of the hardstanding would be required adjacent to each turbine as a
platform for cranes to lift the turbine components into position. In addition to the
hardstanding for the main assembly crane, up to two additional temporary crane pads
may be required for crane assembly. Each turbine would be expected to have an
associated transformer, located either internally or externally to the turbine. External
transformers are proposed to be located within weather-proof housing, which would
have indicative dimensions of 5.5m by 5.5m by 3m. Transformer housing would be
colour finished to blend in with the surrounding landscape.
4.6 The entrance to the proposed development site for vehicles delivering both
construction materials and turbine components, such as tower sections and blades,
would be from a new road, via Murroch Farm, to the south-west of the Site. The road
would be accessed from a new junction on the A813 Stirling Road, roughly opposite
the Aggreko Building. From A813, the access track would be approximately 2 km in
length until reaching the first wind turbine. Internally to the site, access tracks are
proposed to be generally unpaved (stone surface) and of a minimum of 5.5m running
width, with a 1m shoulder verge to either side and 2:1 side slopes. The tracks could be
up to 7m wide on bends. Approximately 9.2km of new access track would be required
for construction. Five turning heads of sufficient size to accommodate articulated
vehicles would are also proposed. Some further widening would be necessary along
the access track route to allow for passing places/temporary lay down areas, with the
locations subject to detailed design post-consent. In general terms, the construction
method would see topsoil, including peat, being removed and stored adjacent to the
construction area until required for reinstatement. The requirements for access track
drainage would be determined at detailed design stage and onsite during construction.
The access tracks would have a suitable cross-fall to drain run-off and, where gradients
are present, lateral drains would intercept any flow along the road. Where ground
conditions are of a permeable nature, swales would be utilised alongside the access
tracks to allow natural filtering of surface water into the ground. Where areas are less
free draining, land drains or drainage ditches would be installed as topography and
ground conditions dictate. Drainage filters would be installed at suitable locations to
remove silts from the run-off. Post construction, the vegetated turf layer would be used
for reinstatement. This would allow re-establishment of natural vegetation to the area.
4.7 The proposed development would require a total of 92,622 cubic metres of aggregate
to construct new tracks, hardstanding areas for cranes and to lay the turbine
foundations. This is expected to be won from up to three onsite borrow pits. However,
the Environmental Impact Assessment assesses a worst-case scenario and considers
the scenario where 50% of the track and hardstanding aggregate would be brought in
Page 158

Page 159

from off-site sources, such as local quarries. Locations for up to three borrow pits have
been sited in areas with low peat measurements and rock exposure. It is not proposed
to retain any of the new proposed borrow pits post-construction. Materials are available
locally so any requirement for rock aggregate during the operational phase would be
met from those sources. Rock extraction from borrow pits by means of blasting
operations is not anticipated.
4.8 The sub-station compounds will be split into two separate compounds with a separate
control building in each compound. The substation compounds would measure
approximately 100m x 75m and be enclosed by palisade type fencing.
4.9 It is further proposed to co-locate a battery energy storage facility in the position of one
of the construction compounds and this would remain for the lifetime of the
development. Whilst only indicative details are provided at this stage, it is anticipated
this element of the proposal will comprise a lithium-ion battery technology solution, with
modular elements comprising circa 14 battery housings such as standard ISO
containers measuring 2.6 metres by 16.1 metres with associated heating, ventilation
and air-condition systems together with associated inverters, transformers, switchgear
and metering. Given only indicative designs have been provided, the final design would
require to be agreed.
4.10 The construction phase of the development is estimated to take approximately 21
months. The proposed development will have an operational life of 40 years, after
which it would be decommissioned, and the turbines would be dismantled and
removed. During decommissioning the turbines would be dismantled and removed,
along with any associated above ground electrical equipment. Underground cables
and access tracks would be left in place and foundations would be removed to a depth
of 0.5m below ground level to avoid environmental impacts from deeper removal.
4.11 In terms of the planning history of the site, in 2012 planning permission (reference
DC12/028) was applied for the erection of ten wind turbines (max hub height 79m and
max blade tip height 120m) with a total installed capacity of around 20MW and
associated works including the erection of a meteorological mast, control building,
ancillary infrastructure, temporary ground works and construction compound. In 2013
the West Dunbartonshire Council’s Planning Committee refused permission for the
application which is sited within the same area as the current proposal but with a
different access route. Reasons for refusal were due to the significant adverse visual
and landscape impact on the Kilpatrick Hills Regional Scenic Area/Local Landscape
Area, the significant adverse visual and landscape impact on the setting of Loch
Lomond and the Trossachs National Park and the Loch Lomond National Scenic Area
and a conflict with aviation safeguarding criteria which could endanger aviation safety.
4.12 In order to more accurately gauge the wind speed and direction at the application site,
an anemometer mast of up to 100m in height was approved for a period of 5 years by
the Council’s Local Review Body in February 2024.
4.13 The proposal is informed by an Environmental Impact Assessment (EIA) together with
a range of associated supporting documentation. This addresses a range of matters
including Landscape and Visual Impact, Ecology, Ornithology, Geology, Hydrology
and Peat, Archeology and Cultural Heritage, Traffic and Transport, Noise, Socio
Economics, Aviation, Shadow Flicker and Population and Human Health.
Page 159

Page 160

5. CONSULTATIONS
5.1 The Council is a consultee in the Section 36 application process and therefore
consultation by the Council is limited to Council Services. However, a summary of the
wider consultation responses received by the Scottish Government Energy Consents
Unit is also included below, as these are also relevant to the assessment of the
proposal to inform the response by the Council.
West Dunbartonshire Council consultation replies:
West Dunbartonshire Council (Roads Service) (roads, traffic and flooding matters)
5.2 The location appears acceptable subject to conditions relating to the proposed junction
design, gates, surface water, mechanical brush, wheel washing facilities, signage, the
design, location and construction of the relocated bus bay and pre and post
development inspections of the A813 from its junction with the A82 to Lionsgate
Roundabout.
5.3 The location of the proposed development is at the source of several watercourses
and tributaries. Two of these have been identified on the SEPA flood maps as medium
to high risk for fluvial flooding within West Dunbartonshire. These are the Carrochan
Burn and Gruggies Burn which have both flooded downstream of the site in recent
years. It is also within the catchment for the Loch Lomond via the Gallangad Burn. If
permission is given the applicant would need to prove that the proposed development
would not increase the flood risk downsteam along the watercourses mentioned. West
Dunbartonshire Council is currently promoting a Flood Alleviation Scheme for the
Gruggies Burn.
West Dunbartonshire Council (Environmental Health Service)
5.4 It is highlighted that predictions of the operational noise levels have been based on the
candidate turbine being the Vestas 172.2MW but the test results for this specific turbine
are not yet available and representative noise data has been adopted from similar
Vestas V136 turbine. Environmental Health would request that any noise impact
assessment is updated based on the actual wind turbines proposed. Full details would
be required on the Battery Energy Storage Facilities (BESS) to allow full comments to
be provided. If blasting was proposed, further detailed information will be required prior
to any blasting on site.
5.5 Conditions are recommended relating to updating the report that determines the
impact of noise from the turbines on nearby dwellings and any noise sensitive
premises, the investigation of noise complaints, construction hours, delivery vehicles
times, submission of a noise control method statement, noise attenuation for plant and
machinery and shadow flicker.
Biodiversity Officer
5.6 A variety of matters are highlight with reference to the proposed development. It is
noted that protected and sensitive habitats which have been recorded on the site of
the windfarm including blanket bog, wet modified bog, acid neutral flush and wet heath.
There is no mention or consideration made to the five local designation on the
proposed site. No specific species protection plans are included for the 15 species
recorded within the vicinity of the proposed development as part of the mitigation
proposals. There are Breeding snipe close to proposed locations of turbines 1,2,5 and
6. Black Grouse lek site is only 300m from proposed battery storage area and this is
against the recommended distance of at least 500m. A number of raptor species have
been identified using the site through the ornithology studies.
Page 160

Page 161

5.7 It is considered that a peatland restoration programme on the vast swathes of class 2
peatlands would be more impactful in terms of the net zero commitments and would
provide an abundance of biodiversity benefit whilst keeping the landscape character of
the Kilpatrick Hills intact. There is no data for the 0.5m – 1m depth which is the national
standard set by Naturescot to determine deep peat. The developer has instead only
given peat depths of over 1m. T2 is on class 2 peat, T4 on class 1 peat.
Extensive hard standing turbine footprints removing habitat. Naturescot estimate of
18% habitat loss –regardless of mitigation / enhancements.
5.8 There are large swathes of natural priority habitat types that are untouched. It is the
value of the habitat and the vast open space of the Kilpatrick Hills that allows it to host
such valuable species, many of which are of conservation concern. Opening up of
access over this land will change the recreational value of this site. This additional
disturbance could include additional walkers, cyclists, trail bikes and dogs onto the site
which would reduce its value as an open habitat and breeding site for ground nesting
birds.
5.9 In terms of enhancement, 90ha of peatland restoration is offered by developer but it is
noted that the Naturescot response requires nearer to 200ha to fit current guidance.
The peatland action grant system could offer biodiversity benefit without loss of the
18% habitat and therefore the proposed development is not the only route to provide
improved peatland habitat enhancements. Native woodland planting areas are
proposed outside of development site boundary and could also lead to self-seeding on
the adjacent SSSI which should remain as calcareous grassland. The proposed new
blocks of woodland planting could be detrimental to proposed calcareous grassland
management - seem to be on wetland flush areas. The Biodiversity Enhancement
Management Plan should include detailed management plan for all protected species
on site.
5.10 West Dunbartonshire Council (Economic Development)
The sensitivities around visual impact and the adjacency to the National Park are
understood but it is believed they are countered by the positive environmental and
economic impacts both locally and wider. West Dunbartonshire Council has a statutory
duty to deliver on the Scottish Government’s target of Net Zero by 2045. Significant
investment both in resource and funding is required to achieve this. There is limited
budget within the public sector to deliver actions at the pace and scale required and
other investment, such as that from the private sector, will be essential for success.
5.11 The Vale of Leven windfarm proposal has the potential to provide significant funding
through two channels, Community benefit packages; and/or Shared ownership.
5.12 Although community benefit is not a mandatory requirement, during initial discussions
the developer had indicated that they would provide this at or above the minimum
recommended by the Scottish Government. This would equate to £350,000 per year.
Where and how the funds are invested is the decision of the local affected community
and has the potential to have a significant impact.
5.13 In addition to community benefit, although more complex to set up, shared ownership
is a further potential revenue stream that could benefit the local community and provide
much needed funding for Climate Change Action Plan and Local Heat and Energy
Efficiency Strategy initiatives. Following initial discussions, the developer has indicated
that up to 15% could be available for shared ownership.
Page 161

Page 162

Scottish Government Energy Consent Unit consultation replies:
West of Scotland Archaeology Service
5.14 Construction of the turbines and their associated infrastructure is likely to have both a
direct impact on heritage features present within the development area itself, and an
indirect effect on the settings of sites present in the surrounding landscape.
5.15 Direct impacts are generally concluded within the EIA to not be significant, a position
that appears to have been reached on the basis that all of these features can be
considered to be of negligible or minor importance. There are a number of features
that are present within the 50m micrositing tolerance of the proposed development,
including a burial cairn, an enclosure, an area of lime kilns and a turf structure. The
EIA considers all of these assets to be of low or local importance and therefore
concludes that any adverse effects on them resulting from physical impacts during the
construction phase would not be significant. The exception to this is the burial cairn,
which is considered to be of medium or regional importance; and states that without
mitigation, any adverse effect resulting from a physical impact during construction-
phase may be of up to moderate significance.
5.16 It is difficult to see how the effect of the proposed wind farm on the settings of sites in
the surrounding landscape could be reduced or mitigated without substantial redesign
to the location of the development or the height of the turbines. Recommend that any
granting of permission should include a condition relating to a programme of
archaeological works in accordance with a written scheme of investigation within the
red line boundary.
BT
5.17 The project indicated should not cause interference to BT’s current and presently
planned radio network.
Joint Radio Company (JRC)
5.18 No potential problems foreseen based on known interference scenarios and the data
provided.
Met Office
5.19 The proposal falls within the 20 km consultation zone of our meteorological radar at
Holyhead. The turbines in the design freeze layout are below the beam of the radar
and will not have any adverse impact.
Ministry of Defence (MOD)
5.20 Subject to a variety of conditions, the MOD has no objection to the proposed
development.
Glasgow Prestwick Airport
5.21 The airport no longer has any safeguarding concerns over Vale of Leven Wind Farm
and would have no objection to the development.
Office for Nuclear Regulation (ONR)
5.22 No comment on this proposed development as it does not lie within a consultation zone
around a GB nuclear site.
Scottish Water
5.23 No objection to the proposed development; however, the applicant should be aware
that this does not confirm that the proposed development can currently be serviced.
Page 162

Page 163

Crown Estates Scotland.
5.24 The assets of Crown Estate Scotland are not affected by this proposal and we
therefore have no comments to make.
East Dunbartonshire Council
5.25 No objection to the proposed development.
Royal Society for the Protection of Birds (RSPB)
5.26 It is agreed that there will be no significant impact on of the Loch Lomond Special
Protection Area, and the Endrick Mouth and Islands SSSI in terms of protected bird
species.
5.27 If the application is to be consented, the RSPB recommend the finalised Biodiversity
Enhancement Management Plan and corresponding biodiversity net gain should be
secured by suitably worded conditions.
SEPA
5.28 Based on the information available, SEPA have no objection. However, it is advised
that if consent is to be given, this should be subject to conditions relating to a finalised
Peat Management Plan, a finalised Biodiversity Enhancement Management Plan, a
final Construction Environmental Management Plan, and micro siting. If these will not
be applied, then this response would require to be considered as an objection.
Peat management (Consultant Response)
5.29 The results of the likelihood assessment show the significant majority of site to be of
negligible likelihood of peat slide (72% of probe locations) with only 1% recording
medium likelihood and no areas of high likelihood.
5.30 Communities have been discounted as being at risk of peat landslide due to distance
from infrastructure and there are no roads/dwellings/other infrastructure within
influencing distance. Four areas at a medium risk of peat instability were considered
to have a potential impact on the proposed development’s infrastructure but were
downgraded to Insignificant following more detailed review.
5.31 Mitigation is provided in section 7.0 of the PLHRA document. There is no extensive
evidence for past peat instability on-site therefore a more generic and infrastructure
specific mitigation and best practice is provided. This is supported by discussion of
mitigation for each area of medium “risk” considered to influence the development.
Overall, the mitigation presented is considered appropriate.
Scottish Forestry
5.32 It is clear that the proposed development will have a direct, though limited, impact on
woodland interest. The access track for the proposed development will impact a small
area (approximately 0.06ha) of woodland, resulting in the felling of up to 28
mature/semi-mature beech (Fagus sylvatica) hedgerow trees and 3 mature Downy
Birch (Betula pubescens) to facilitate construction of the track. Conditions are
recommended relating to compensatory planting.
Transport Scotland
5.33 It is noted that the use of a blade lifter is identified at the start of the Transport
Assessment, but it appears that the swept paths have been run with a standard trailer.
The use of a scissor lift adaptor is identified as being required at certain locations to
elevate the blade tip to allow loads to over sail various obstructions without the need
for intrusive ground works. In addition, it should be noted that if Blade Lifter
technology/scissor lift technology is to be utilised on the trunk road, significant work
Page 163

Page 164

will be required in order to satisfy Transport Scotland that the proposals can work
technically, and do not represent any risk to the safe and efficient operation of the trunk
road network. Transport Scotland will require a detailed methodology to be provided,
with a technical approval process followed thereafter (with no guarantee of approval).
This is to include a risk assessment, method statements and additional information as
requested by Transport Scotland. Conditions and informatives are recommended for
any granting of permission.
Inverclyde Council
5.34 Whilst the Scottish Government is keen for more renewable developments to be
established to meet the target of net zero emissions by 2045, they do have to be in the
right location and at the right scale to ensure that other assets are not lost in the
process. The views outwards from Inverclyde are important to both tourists and
residents alike. They are an environmental and scenic tourism resource. Inverclyde
Council would wish to see these views retained and is concerned the proposed
development would impact on them to their detriment. The turbines that are proposed
are more than twice the size of those at Corlic Hill above Greenock and would, be out
of scale with the surrounding topography to the extent it would impact negatively on
the views from Inverclyde and from the Firth of Clyde.
National Air Traffic Services (NATS)
5.35 Object until mitigation proposals become more mature. The developer states (13.6.21)
that the development “would be likely to cause false plots to be generated” on the
radars at Lowther, Cumbernauld, Glasgow NASR-10 and Terma. Whilst NATS could
take issue with the classification of this impact as “moderate” they are pleased to note
the intention (13.7.4) to “agree appropriate means of technical mitigation of the
proposed development’s effects” and NATS will continue to work with the applicant
with the goal, which is seen as realistic.
Glasgow Airport
5.36 The proposed development has been examined from an aerodrome safeguarding
perspective and could conflict with safeguarding criteria. Accordingly, a more detailed
assessment requires to be undertaken regarding the potential impact on Glasgow
Airport. Glasgow Airport therefore, submit a holding objection until they are able to
advise of the results of their investigations.
Scotways
5.37 This application should not be considered as suitable for what is an open moorland
landscape in the vicinity of a National Park. They have grave concerns regarding the
direct impact on recreational amenity both within, and in the vicinity of, the application
site and the change in the character of the landscape that this proposal would bring.
On this basis, and for positioning of a turbine in close proximity to a core path Scotways
objects to this development.
Historic Environment Scotland (HES)
5.38 HES object to the development because the proposals would have a significant
adverse impact on the integrity of the setting of Dumbarton Castle scheduled
monument. These impacts would be of a severity that raises issues of national interest.
The proposals therefore do not align with national policy as set out in the Historic
Environment Policy for Scotland (HEPS) and the National Planning Framework
(NPF4).
NatureScot
5.39 The location, size and scale of the proposed development represents a step change
in proximity and prominence of wind farms on the southern area of the Loch Lomond
Page 164

Page 165

and Trossachs National Park. NatureScot consider that the proposal would have
significant adverse effects on six of the Special Landscape Qualities (SLQs) of the
National Park and as such that the objectives of the designation and overall integrity
of the area would be compromised. NatureScot advise that the proposed development
may therefore not meet Policy 4 (c) of National Planning Framework 4 (NPF4) due to
the adverse impact upon the National Park and National Scenic Area. In NatureScot’s
view these effects cannot be readily mitigated. NatureScot therefore object to this
proposal.
5.40 NatureScot agree with the applicant’s assessment that various designated sites,
including European sites and Sites of Special Scientific Interest (SSSIs), will not be
adversely affected.
Loch Lomond and the Trossachs National Park
5.41 The National Park Authority objects to the proposal for a variety of reasons as follows.
Given the extremely large turbine size, the proposed development would often appear
dominant or very prominent in the backdrop to the southern part of Loch Lomond and
its associated rural setting. With a very intrusive and industrial appearance, the
turbines would considerably detract from, contrast with and often compromise a very
large number of Special Landscape Qualities and key characteristics that are integral
to defining this iconic part of the National Park. The views and visual amenity of a very
large number of visitors and residents of several settlements would be subject to
widespread significant visual effects. Parts of at least (approximately) 75km of
nationally important recreational routes would be subject to significant visual impacts.
The proposed development would compromise the objectives of the National Park
designation and its overall integrity. The proposed development would conflict with
national and local landscape-related policy.
Kilmaronock Community Council (KCC)
5.42 The Community Council object to the proposal for a variety of reasons. These include
that the energy that could be generated is insignificant to the national strategy as
detailed in UK’s Energy Security Plan. The scale of the development is too high for its
location and will result in an adverse visual impact. The proposal will result in the
destruction of nationally designated peat bogland and have a negative impact on
biodiversity (especially during construction). Biodiversity enhancement would not
result from the proposal. The proximity to housing and impact upon property values is
raised as is light pollution from the aviation lights.
Balloch and Haldane Community Council
5.43 The Community Council object to the proposal due to the proximity to the National
Park. This is contrary to the policy position within NPF4.
6. REPRESENTATIONS
6.1 A review of the Scottish Government’s Energy Consents Unit website case file for this
application has shown that 49 representations have been received from third parties,
39 are in objection, 8 are in support and 2 which highlight points of concern but do not
specifically express either being in objection or in support of the proposal.
Representations have been received from local residents, visitors to the area, Friends
of Loch Lomond and The Trossachs, the Woodland Trust, Strathavan Airfield Ltd, Pam
Gosal MSP and Jackie Baillie MSP.
Page 165

Page 166

6.2 The letters of objection raise issues relating to the summarised points as follows:
Visual impacts
 Concerns over landscape and visual impacts, noting the scale of turbines would
dominate the landscape and skyline and would also require visible aviation
lighting.
 The height of the turbines makes them amongst the tallest proposed for an
onshore wind farm in the UK.
 Concerns regarding the spatial density of the proposed windfarm
 Particular concerns regarding the detrimental impact on the setting of the National
Park.
 Residential visual amenity impact.
Impact upon Heritage
 Heritage impacts including on Dumbarton Castle.
Aviation matters
 Proximity to Glasgow Airport flightpaths.
 Concern on impact on Glasgow Airport’s SVFR corridor and that a typical light
aircraft in bad weather, using SVFR, at 60 knows would be just 15 seconds flying
 Serious concern raised about the turbulence plume.
Trees and woodland
 There will be a loss of two veteran beech trees noted as alongside loss of 0.06
hectares (ha) of Barr Wood an area of woodland designated on NatureScot’s
Ancient Woodland Inventory
 Concerns about potential indirect impacts on Lang Craigs and other areas of
ancient and long-established woodland in the locality that may be subject to
increased recreational pressures and resulting deterioration.
Residential amenity
 Concerns regarding noise impacts.
 Concerns regarding shadow flicker.
 Concerns for potential vibrations being emitted.
 The development ignores the 2km separation guidelines between windfarms and
residential properties.
Health and safety
 Safety concerns in relation to the BESS including fire risk.
 Concerns regarding the impacts on physical and mental health.
Ecology and biodiversity
 Damage done to habitats of animals.
 All except T5, T8 and T9 appear to be on areas of peat.
Other matters
 There is no benefit to community.
 The developer is from Ireland and therefore the “profits” will not be in the local
area.
 Tourism is one of the main employers and will be compromised.
 Precedent will be set for further development.
 The output is small compared to the need for energy generation.
Page 166

Page 167

 No need for the proposal given the constrained operation of wind farms currently
and economic costs to consumers through constraint payments.
6.3 The letters of support raise issues relating to the summarised points as follows:
Energy generation benefits
 The proposal will maximise renewable energy sources.
 Land-based wind power and energy storage systems are the cheapest and most
readily available technologies for rapidly decarbonising the atmosphere and
improving the country’s energy security.
 The National Park area possesses a unique combination of advantages for
renewable energy production, storage and distribution.
 The project will produce enough electricity to power approximately 50,000 average
UK homes.
 The project will make a significant contribution to UK and Scottish Government
emission reduction targets.
 It a highly suitable wind turbine site.
Access improvements
 Improved access would lead to an increase in recreational use.
Economic and community benefits
 “Community Benefit” funds which may arise from such developments being
applied to help provide for the preservation, promotion and appreciation of the
special qualities of the Parks and their surrounding areas, thereby benefiting
nature, visitors, communities and businesses.
 The proposed wind farm will create jobs for the local area.
Other matters
 These turbines will in no way detract from their surroundings.
 They will not in any sense impact on the majority of people’s enjoyment of the
area.
 There are various measures being proposed to improve the environment on the
moorland area which will have further local benefits.
 The proposed site for the windfarm on bleak moorland and is currently seldom
visited as it has poor access.
 People are also very adaptable and quickly get used to new features.
6.4 Whilst many of the points raised both in objection and in support are considered as
part of the Council’s wider assessment of the proposal as set out in Section 8 below, it
is for the Scottish Ministers as the determining authority to consider the representations
submitted to them.
7. ASSESSMENT AGAINST THE DEVELOPMENT PLAN
National Planning Policy 4
7.1 NPF4 aims to create places in line with six overarching spatial principles, including the
Just Transition and Rebalanced Development. The Just Transition directs
development towards achieving the transition to net zero in a way that is inclusive and
fair. Rebalanced Developments directs development to areas of past decline, which
would include West Dunbartonshire, given the de-industrialisation that has taken place
in the area. While these are high level principles, they are cross cutting and NPF4
contains a clear steer that outcomes of Policy 1, Policy 2, Policy 11 and Policy 25 are
interlinked.
Page 167

Page 168

7.2 Strategic Renewable Electricity Generation and Transmission Infrastructure is a
Scotland wide national development (National Development 3), making it a clear
priority across Scotland. Regional Spatial Priorities for the Central Region also direct
development to “provide net zero energy solutions” and to “build community wealth to
overcome disadvantage”. These high level aims and connections between policies
should be considered by the decision maker.
7.3 Policy 1 gives significant weight to the climate and nature crisis, with an intended policy
outcome of being zero carbon and nature positive. Renewables, including onshore
wind and battery storage, are considered an important part of Scotland’s approach to
meeting its carbon emission reduction targets. Policy 2 requires development to
minimise the lifecycle greenhouse gas emissions of development as far as possible.
An important element in the case of this development is the location of the turbines and
infrastructure, and borrow pits, relative to the location of peat and other carbon rich
soils.
7.4 Policy 3 requires development to contribute to biodiversity enhancement, including the
restoration of degraded habitat and improving connections between them. As a
national development part b) of the policy applies. Part d) of this policy also applies,
requiring the planning and design of development to minimise adverse impacts,
including cumulative impacts, of the development on biodiversity and the natural
environment.
7.5 Policy 4‘s intent is to protect, restore and enhance natural assets making best use of
nature-based solutions. Part a) of the policy does not support development where the
type, location or scale will have a significant effect on an unacceptable effect on the
natural environment. Part b) of the policy, sets out a requirement for an appropriate
assessment. Part c) of the policy sets out the limited criteria in which development will
be acceptable where it will affect a National Park, National Scenic Area, SSSI or
National Nature Reserve. While the proposal is not within the Loch Lomond and the
Trossachs National Park it will be visible from the National Park. Part d) of the policy
identifies the limited circumstances where development within local landscape
designations and nature conservation sites are acceptable. Which are: i. The
objectives of designation and the overall integrity of the areas will not be compromised;
or ii. Any significant adverse effects on the qualities for which the area has been
designated are clearly outweighed by social, environmental or economic benefits of at
least local importance.
7.6 Policy 5 relates to soils. Part a) of this policy addresses the need to avoid and minimise,
in line with the mitigation hierarchy, disturbance to soil and undeveloped land to protect
it from erosion, compaction and sealing. Part c) ii. of this policy enables the
development of renewable energy generation on carbon rich soils where it optimises
the contribution to greenhouse gas emissions. Part d) of this policy requires developers
to undertake assessments of the depth, condition and quality of carbon rich soils,
effects of development on the peatland and the net effects on climate emissions and
loss of carbon. Policy 6 supports proposals that enhance, expand or improve woodland
and tree cover. Part b) of the policy states that loss of ancient woodland, veteran trees,
or woodland of high biodiversity value is not supported.
7.7 Policy 7 requires development with potential impacts on historic assets or place to be
accompanied by an assessment of that asset or place, including cumulative impacts.
There are a number of non-designated heritage assets within the site boundary,
including archaeological remains meaning that part o) of the policy applies. At a
Page 168

Page 169

distance of up to 20km from the site are listed buildings, historic battlefields, Gardens
and Designed Landscapes. This means that parts i) and j) also apply.
7.8 Proposals within a greenbelt are covered in Policy 8. The access track for the
development Is located within the green belt. Development proposals within a green
belt designated within the LDP will only be supported in a limited set of circumstances
including for essential infrastructure. The proposal falls into the definition of essential
infrastructure.
7.9 Policy 11 relates to energy and the policy intent is to encourage, promote and facilitate
all forms of renewable energy development onshore and offshore. This includes
energy generation, storage, new and replacement transmission and distribution
infrastructure and emerging low-carbon and zero emissions technologies including
hydrogen and carbon capture utilisation and storage (CCUS). Part a) policy supports
proposals for renewable technologies, including wind farms under part i. and battery
storage under part iii. Wind farm proposals are not supported in National Parks as
stated in part b). The proposal is not within the Loch Lomond and the Trossachs
National Park.
7.10 Part c) of the policy requires renewable development to maximise economic impact,
including local and community socio-economic benefits. Part e) of the policy requires
the project design and mitigation to address a number of issues. In considering the
impacts significant weight is placed on the contribution of the proposal to greenhouse
gas emission reduction targets. Impacts to be addressed are:
i. impacts on communities and individual dwellings, including, residential amenity
and visual.
ii. significant landscape and visual impacts.
iii. public access, including impact on long distance walking and cycling routes and
scenic routes.
iv. impacts on aviation and defence interests including seismological recording.
v. impacts on telecommunications and broadcasting installations, particularly
ensuring that transmission links are not compromised.
vi. impacts on road traffic and on adjacent trunk roads, including during
construction.
vii. impacts on historic environment.
viii. effects on hydrology, the water environment and flood risk.
ix. biodiversity including impacts on birds.
x. impacts on trees, woods and forests.
xi. proposals for the decommissioning of developments, including ancillary
infrastructure, and site restoration.
xii. the quality of site restoration plans including the measures in place to safeguard
or guarantee availability of finances to effectively implement those plans.
xiii. cumulative impacts.
7.11 Policy 12 requires development to reduce, reuse or recycle materials in line with the
waste hierarchy. It also supports developments that enable materials and components
to be disassembled and reused at the end of their life.
7.12 Policy 13-part b) supports development where it is demonstrated that transport
requirements are considered within the sustainable travel and investment hierarchies
and sets out a list of criteria development should comply with. In order to meet these
policy requirements the design of the junction will be required to meet par iv of the
policy, by being designed to incorporate safety measures, including safe crossings and
the reducing the number and speed of vehicles. Part g) of this policy states that
Page 169

Page 170

proposals that have the potential to impact the Strategic Transport Network (which
includes trunk roads in the definition provided in NPF4s glossary) will be fully assessed
with regards to capacity and safety.
7.13 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale as per Policy 14. Development
proposals that are poorly designed, detrimental to the amenity of the surrounding area
or inconsistent with the six qualities of successful places, will not be supported in
accordance with Policy 14.
7.14 Policy 18’s intent is to encourage, promote and facilitate an infrastructure first approach
to land use planning, which puts infrastructure considerations at the heart of
placemaking. Energy supplies and energy generation are included in the definition of
infrastructure. Part a) of the policy states that development proposals which provide
(or contribute to) infrastructure in line with that identified as necessary in LDPs and
their delivery programmes will be supported.
7.15 Policy 22-part a) states that Development proposals at risk of flooding or in a flood risk
area will only be supported in a limited set of circumstances, including for essential
infrastructure where the location is required for operational reasons.
7.16 Policy 23 protects people and places from environmental harm, mitigates risks arising
from safety hazards. Part e) notes that development proposals that are likely to raise
unacceptable noise issues will not be supported.
7.17 Alongside part c) of policy 11, Policy 25 makes community benefit a material
consideration in planning decision. Part a) of the policy sets out that community benefit
can include “improving community resilience and reducing inequalities; increasing
spending within communities; ensuring the use of local supply chains and services;
local job creation; supporting community led proposals, including creation of new local
firms and enabling community led ownership of buildings and assets.”
7.18 Policy 32 is relevant due to the borrow pits included to construct the development. Part
d) of this policy sets out the circumstances under which the sustainable extraction of
minerals will be supported. Part e) of the policy sets out where borrow pits are
supported. This includes that they are time limited, that they comply with the other
criteria within the minerals policy in part d) of the policy, and appropriate restoration
proposals are enforceable.
7.19 The matters relevant to the assessment against the above policies are addressed in
detail in Section 8 below. Based on that assessment, it is concluded that the proposal
is not in accordance with NPF4.
West Dunbartonshire Local Plan (2010)
7.20 The application site is located within the Kilpatrick Hills Local Landscape Area. Whilst
at the time of writing Policy RSA1 related to the former Regional Scenic Area, the
overarching position with remains relevant in conserving the high-quality landscape of
the Kilpatrick Hills as an important Area. There is a general presumption against
proposals that would have an adverse impact on the landscape quality, character,
visual amenity, or nature conservation value of the area.
7.21 Policy DC6 relates to renewable energy proposals and states that development will be
permitted where it can be established without unacceptable detriment to the
landscape, natural and build heritage, sport and recreation interests and local amenity.
Development should be considered against the following criteria: visual impact and
Page 170

Page 171

effect on landscape character, including the landscape character of the Kilpatrick Hills
RSA; nature conservation interests; the historic environment and its setting, including
scheduled ancient monuments; local amenity such as noise, traffic or broadcast
interference; and any cumulative impact.
7.22 Policy E1 states that the Council will further the conservation of biodiversity. Policy E2A
lays out the requirement for development that are likely to have a significant effect on
a Natura 2000 site. Policy E2B sets out the circumstances in which development that
affects a Site of Special Scientific Interest (SSSI) may be permitted. Policy E3A states
that the Council will seek to maintain and enhance the environmental resources of the
Plan area by protection of habitats, species and natural features which are vulnerable
and/or specifically protected, including Local Nature Conservation Sites. It also states
that proposals should not have an adverse effect on the integrity or character of Local
Nature Conservation Sites and that satisfactory arrangements for habitat creation/site
enhancement elsewhere should be made to compensate where development would
cause the total or partial loss of a Local Nature Conservation Site. There are five Local
Nature Conservation Sites (LNCS) which could be impacted by the development,
either directly or indirectly Policy E5 relates to development affecting trees and states
that Development proposals should take account of trees at the beginning of the design
process. Policy SUS1 states that all development should seek to conserve and
enhance environmental resources and ensure environmental impact is minimised.
Policy E9 seeks to ensure that development proposals do not adversely impact upon
landscape character.
7.23 Policy GB 1 - Green Belt The proposal takes access through a section of Green Belt
as designated in both the adopted Local Plan and proposed Local Development Plan
2 and as such Policy GB 1 applies. This policy states that within the areas of Green
Belt there will be a general presumption against development other than certain
exemptions. This includes where there is a specific locational requirement and
established need for the development and it cannot be accommodated on an
alternative site.
7.24 Policy GD1 seeks to ensure that all new development is of a high quality of design and
respects the character and amenity of the area. Policy DC3 states that within the
Glasgow Airport Safeguarding Zone, development which adversely affects the
operational integrity or safety of the airport will not normally be permitted.
7.25 Policy BE2 seeks to ensure the setting of listed buildings is not adversely impacted
upon and Policy BE5 relates to Scheduled Ancient Monuments and other
Archaeological sites. The Council will resist any development proposals that would
have an adverse impact on or affect the setting of a Scheduled Ancient Monument, or
upon other nationally or locally important archaeological sites. Policy BE7 further seeks
to ensure that Gardens and Designed Landscape designations are not adversely
impacted upon.
7.26 Policy GN1 seeks to promote, protect and improve the Green Network. It states that
development which is detrimental to the green network will be considered contrary to
the Plan, and that new development should contribute positively to the protection and
improvement of the green network. The Kilpatrick Hills are recognised as an important
green network resource in West Dunbartonshire owing to their landscape value, the
habitats and species found there and the outdoor recreation opportunities they offer.
7.27 The Council will encourage responsible pedestrian, cycle and horse-riding access,
access to inland waterways, and will pursue opportunities to establish additional paths
in accordance with Policy R5.
Page 171

Page 172

7.28 The matters relevant to the assessment against the above policies are addressed in
detail in Section 8. Taking that assessment into account it is concluded that the
proposal is contrary to adopted Local Plan.
8. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
8.1 On 15 March 2023, the Planning Committee took a decision that the Council would not
adopt Local Development Plan 2. The Proposed Local Development Plan 2 (LDP2),
incorporating the recommended modifications of the Examination Report received on
22 April 2020, which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore afforded
significant weight in the assessment and determination of planning applications,
subject to compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material consideration, although
it does not directly affect the development proposal under consideration.
8.2 Whilst Policy RE2 of the proposed Plan relates to the Spatial Framework for Wind
Energy and would previously have been relevant, it conflicts with the approach set out
in Policy 11 of NPF4. Policy 11 of NPF4 therefore has primacy.
8.3 Any development proposed within the Kilpatrick Hills Local Landscape Area must;
protect and enhance the landscape character; protect and enhance the integrated
network of habitats and important geological features; and protect and enhance the
Hills as an accessible recreation resource in accordance with policy KH1. Policy GB1
restricts development in the green belt to a limited number of circumstances. This
includes with infrastructure with a specific locational need.
8.4 Policy ENV1 sets the approach towards development and designated sites. Policy
ENV2 relates to landscape character. Development proposals should be sited and
designed to relate to the local landscape character of the area and ensure that the
integrity of this landscape character is maintained and, where appropriate, enhanced.
Policy ENV3 restricts development resulting in the disturbance, drainage or excavation
of peat, with the exception of renewable energy where a balance of advantage in terms
of climate mitigation is achieved. Policy ENV4 relates to forestry, trees and woodland.
The loss or fragmentation of long-established woodland, high conservation value or
areas covered by tree preservation orders will only be supported where any significant
adverse effects are clearly outweighed by significant social or economic benefits.
8.5 Policy ENV5 mainly focusses on water courses and water bodies. Hydrology is
important to the upland and peat habitats and so could be considered part of the water
environment. Part d) of the policy addresses minimising pollution of all waterbodies
and ground water resources. Policy ENV8 requires minimisation or adequate
mitigation of any air light and noise pollution resulting from development.
8.6 Policy H4 of the LDP2 relates to residential amenity. The policy states that the Council
will protect, preserve and enhance the residential character and amenity of existing
residential areas at all times. In this regard, there will be a general presumption against
the establishment of non-residential uses within, or in close proximity to, residential
areas which potentially have detrimental effects on local amenity or which cause
unacceptable disturbance to local residents.
Page 172

Page 173

8.7 Policy CON3 is not supportive of development which disrupts or adversely impacts on
any existing or potential core path, right of way, bridle path, or footpath, including off-
path access rights, used by the general public for recreational or other purposes.
8.8 Policy BE1 states that unscheduled archaeological sites should be preserved insitu
where possible. Where not possible, provision should be made by the developer to
undertake the excavation, recording analysis, publication and archiving of the
archaeological remains. Policy BE2 and BE7 take the same position in relation to
Listed Buildings and Garden and Designed Landscapes as the adopted Plan.
Development that would adversely impact on the operations of Glasgow Airport or
would be adversely affected by aircraft noise will not be permitted in accordance with
Policy E7.
8.9 The borrow pits would constitute mineral workings and proposals for new mineral
workings will only be supported under Policy MIN1 where it is demonstrated that there
would be no significant negative impact, either individually or cumulatively, from
mineral workings on: a) The natural environment, including habitat networks, peat and
other carbon rich soils; b) The green network, including path networks; c) Landscape,
including visual impact; d) Built heritage, particularly Scheduled Monuments and other
archaeology; e) Residential amenity and the operation of other businesses; f) Trunk
and Local Road Networks.
8.10 Policy CP1 requires new development to take a design led approach to creating
sustainable places which puts the needs of people first and demonstrate the six
qualities of successful places. Policy CP2 requires all development to demonstrate that
green infrastructure has been integrated into the design approach from the outset.
8.11 The matters relevant to the assessment against the above policies are addressed in
detail below. It is concluded that the proposal is not in accordance with proposed Local
Development Plan 2.
Kilpatrick Hills Local Landscape Area – Statement of Importance
8.12 This Statement of Importance explains the reasons why the Kilpatrick Hills have been
selected for the designation. The special qualities of the Kilpatrick Hills are identified
as being:
 Strong sense of remoteness, wildness and open horizons;
 Distinctive geomorphology and topographical features; and
 A unique diversity of views.
8.13 The impact of the proposed development on these special landscape qualities of the
Kilpatrick Hills is assessed below, and it is concluded that the proposal would
significantly detract from the special qualities of the Local Landscape Area.
Renewable Energy Local Development Plan (Proposed Plan) Planning Guidance
November 2016
8.14 This guidance is written in the context of proposed Local Development Plan 1 together
with Scottish Planning Policy (SPP), both of which no longer form a material
consideration in the assessment of planning applications. This document provides
guidance on planning for wind energy including a Spatial Framework and guidance on
the factors that will be considered in assessing wind energy proposals. The spatial
framework applies to “wind farms” which are defined by the Council as:
 Any development containing a turbine of 50m and above to tip height; or
Page 173

Page 174

 Any development of 3 or more turbines, containing a turbine of 30m above to tip
height.
8.15 As this proposal is for ten turbines and 250m to blade tip it would have fallen within the
threshold for assessment under the spatial framework. However, the Spatial
Framework conflicts with the approach set out in Policy 11 of NPF4. Policy 11 of NPF4
therefore has primacy over this guidance.
8.16 Notwithstanding the above, many of the matters for which guidance is provided remain
relevant to the assessment of a proposal of this nature. This includes considering
matters pertaining to landscape character, forestry and woodland, the water
environment, the path network, built heritage, aviation, residential amenity in respect
of noise, shadow flicker and visual intrusion, economic benefit, contribution towards
renewable energy targets, effect on soils, impact on the road network and
decommissioning. These matters are fully assessed in detail below.
Scottish Government Draft Planning Guidance: Biodiversity
8.17 This guidance sets out the Scottish Ministers’ expectations for implementing NPF4
policies which support the cross-cutting NPF4 outcome ‘improving biodiversity’. Core
principles which can be followed when designing development so that nature and
nature recovery are an integral part of any proposal are laid out within the document.
Biodiversity matters are fully assessed below.
Scottish Government’s Policy on Control of Woodland Removal
8.18 This policy provides a strategic framework for appropriate woodland removal. Whilst
there is a strong presumption in favour of protecting Scotland’s woodland resources it
is also noted that woodland removal, with compensatory planting, is most likely to be
appropriate where it would contribute to a list of outcomes including helping Scotland
mitigate and adapt to climate change. No specific concerns arise with reference to this
policy, and this is a document for the Scottish Ministers to consider in detail with
reference to the proposal.
Principle of Development
8.19 National Planning Framework 4 (NPF4) sets out the long-term vision for the
development of Scotland through the National Spatial Strategy. NPF4 aims to meet
Scotland’s climate ambition which will require a rapid transformation across all sectors
of the economy and society. This proposal constitutes a National Development as it
supports renewable electricity generation, repowering, and expansion of the electricity
grid under National Development 3: Strategic Renewable Electricity Generation and
Transmission Infrastructure. NPF4 recognises that additional electricity generation
from renewables and electricity transmission capacity of scale is fundamental to
achieving a net zero economy. Policy 1 of NPF4 states that there is a need to
encourage, promote and facilitate development that addresses the global climate
emergency and nature crisis, whilst Policy 2 seeks to encourage, promote and facilitate
development that minimises emissions and adapts to the current and future impacts of
climate change. The electricity generated will be from a renewable source with the
additional battery storage element of the proposal additionally ensuring grid stability
given the intermittent nature of renewable energy generation.
8.20 Whilst it can be considered that the proposal could therefore be held to support the
overarching aims of the NPF4 to achieve net zero targets and provide a stable
domestic energy supply, it must be ensured that such development happens in the
right place. There is thus a requirement in assessing any such developments to take
into account all relevant considerations and policies. Therefore, it must be assessed if
there are any potential adverse impacts arising from the proposed development which
Page 174

Page 175

would be outweighed by any benefits. This assessment can be guided by Policy 11(e)
of NPF4 which sets out in detail the matters for the project design and mitigation to
address.
Landscape and Visual Impact: Considerations
8.21 The construction of ten wind turbines each to a height of 250m together with the
associated infrastructure, works and battery storage facility at this location will have a
significant visual impact, and this is not in doubt. The applicant sets out in their
submission that most apparent effects of the development in terms of the visual impact
arise from the presence of the wind turbines which are indicated to be temporary. The
applicant’s position is therefore that the impact is reversible as the turbines would be
removed on decommissioning. However, given that it is anticipated that the operational
lifespan of the development is 40 years, the impacts that will occur are considered to
be long term.
8.22 The geographical extent to which the wind farm would be visible has been established
by a ‘Zone of Theoretical Visibility’ (ZTV). This was created using mapping tools to
calculate where the wind farm will potentially be visible from in the surrounding area,
taking account of topography. The ZTV establishes the locations from which the
turbines may potentially be visible and where there is no visibility, receptors are
discounted from the assessment. ZTV mapping is presented in the applicant’s
submission with both 45km and 20km study areas in order that both the local and wider
context of the proposal can be considered. The ZTV demonstrates that the wind farm,
or parts thereof, would be visible from an extensive area including Dumbarton and the
Vale of Leven, Inverclyde, Renfrewshire, Dunoon, Balfron, Luss and Ben Lomond.
8.23 As part of the EIA, the assessment of landscape and visual effects is informed by a
series of viewpoints that represent visibility from a variety of different vantage points.
These include recognised viewpoints, designated landscapes, settlements and travel
routes. Vantage points within the settlements of Dumbarton and Alexandria, together
with other vantage points within the Authority area including Dumbarton Rock and
Doughnot Hill are assessed as are vantage points which are within the West
Dunbartonshire part of the National Park such as Balloch Castle and a location on the
John Muir Way to the east of Balloch. A range of viewpoints are also provided from the
wider area including south of the River Clyde at Langbank and Port Glasgow as well
as Luss, Conic Hill, Ben Bowie, Beinn Dubh and Ben Lomond. The visibility of the
windfarm from all these locations indicates potential widespread visual impact. It is
acknowledged that photomontages can be influenced by weather conditions, the
position of the camera and the particular details of the lens used, but they are
nevertheless representative overall in terms of the scale and position of the proposed
turbines relative to the landscape and the skyline. The photomontages focus on the
impact arising from the turbines themselves and do not include associated details such
as the access tracks and battery storage facility. 
Landscape and Visual Impact: Impact adjacent to the site
8.24 Doughnot Hill is a high point situated within the Kilpartick Hills, within the Kilpartick Hills
Local Landscape Area (LLA). It is clear from the visuals submitted that the proposed
turbines will be a very significant feature when viewed from this location, with the
application documents noting that they will be approximately 1500m from the summit
(from where the viewpoint is taken) and extend across 47 degrees of the view.
Doughnot Hill and the surrounding landscape features popular recreational walking
routes extending from Overtoun House. These initially follow the core path network
before extending across open countryside and generally gaining in height. The
landscape is characterised by sweeping moorland together with forestry plantations
and Doughnot Hill provides a local destination for the experience of wilderness and
Page 175

Page 176

because of the views from the summit. Panoramic views are provided from this location
across the Kilpatrick Hills and towards the National Park. The applicant recognises that
this viewpoint has a high susceptibility to change as those who experience this view
would be engaging in outdoor recreation and are likely to have a specific focus on the
scenery and surrounding landscape. The EIA identifies that the combination of the high
susceptibility to change of the view and its medium-high value results in a high
sensitivity for this viewpoint.
8.25 The proposed turbines would, on the basis of the applicant’s submitted visuals,
comprise an extremely dominant feature within the landscape at this location. They will
impact upon the views over the local landscape and most notably compromise the
views to the northwest towards Loch Lomond and the wider National Park area. The
overall experience of recreational receptors at Doughnot Hill and the surrounding area
would be significantly changed by the development with the overall sense of isolation
being lost. Whilst not included in the visuals, in addition to the turbines themselves, the
network of tracks together with the battery storage site would introduce further visual
man-made clutter which is not presently experienced in the natural landscape. It is
likely that that similar impacts would be experienced from elsewhere within the
Kilpatrick Hills
8.26 Within the wider landscape, a variety of core paths are found, and these facilitate
recreational use. Many of these extend out from the built-up area where usage is likely
to be high with those from the urban area utilising paths close to home and the
magnitude of change experienced by users is likely to be substantial and the visual
impact high. Scotways objects to application noting the adverse impact on the
recreational amenity of the area.
Landscape and Visual Impact: Impact upon residential properties and settlements
8.27 The applicant identifies 12 residential properties that lie within 2km of the development
site, the closest of which is Braeburn Cottage at 1.77kms. A Residential Visual Amenity
Assessment (RVAA) has been provided by the applicant in respect of these properties.
All but one of these properties are located along Auchencarroch Road to the northwest
of the proposed site. The final property is Highdykes Farm which is accessed from
Broomhill Crescent to the southwest of the site. Properties would experience varying
degrees of visual impact as a result of the proposed wind turbines. Some properties
would experience impacts limited to only a small number of turbines, or parts of
turbines including hubs and some blades whilst other properties, most notably
Highdykes Farm despite not being the closest residential property at 1.86kms away,
would experience views of all turbines and sometimes viewing much of the structures
themselves with limited screening. Properties would also experience nighttime visual
impacts from the visible aviation lighting required on account of the height of the
proposed turbines.
8.28 The RVAA indicates that seven of the 12 properties included are likely to experience a
significant visual effect as a result of the proposed development. Of these seven
properties, one would have a high magnitude of change (Highdykes Farm). The RVAA
found that the effect on this property would not reach the Residential Visual Amenity
Threshold due to the location of the turbines in a peripheral aspect of the view, so that
the key open view from the property would not be directly affected. It has therefore
been concluded that despite the effect of views of the turbines together with the
impacts associated with the visible aviation lighting, this property, as well as others in
West Dunbartonshire, will not experience such impacts as would be described as
exceeding the threshold of residential visual amenity. The battery storage and other
ancillary developments are not of a scale and nature likely to result in any notable
impacts on residential visual amenity.
Page 176

Page 177

8.29 Turning to the impact upon settlements, it is clear that the proposed turbines would
have a visual impact from the built-up area within West Dunbartonshire. Viewpoint 3
considers the impact from a location beside the A82 near Lomondgate on the north-
western edge of Dumbarton. In the submitted EIA, the applicant sets out that the
proposed turbines are 3.8 kms away from this viewpoint and that the urban edge is
characterised by woodland. The majority of nearby views, including views from
properties, are likely to have some degree of screening by vegetation. The EIA
identifies that the effect on this view would be major and significant. This is due to a
combination of the factors that lead to the medium-high magnitude of change on the
view and the high sensitivity of the viewpoint. The proposed turbines would be very
readily apparent at reasonably close proximity with some turbines seen at nearly full
height on the skyline, increasing their vertical impact. The turbines would not be seen
in the context of the elevated and distinctively upland landscape of the Kilpatrick Hills,
but appear at a lower elevation, with the hill landform screened by intervening
woodland. This has the potential to result in a perceived lack of separation, whereby
the turbines appear to be seen in the same context as the viewpoint.
8.30 Viewpoint 5 considers the impact within the Vale of Leven at a location on the A811 in
Alexandria / Balloch and here, the proposed turbines are identified as being 4.3kms
away. This urban area is characterised by trees and woodland, and the majority of
nearby views, including views from properties, are likely to have some degree of
screening or filtering by vegetation as shown in the photomontage. The EIA identifies
that the effect of the turbines on this view would be major and significant due to a
combination of the factors. The Kilpatrick Hills currently provide an undeveloped
backdrop to the largely urban outlook and the proposed development would introduce
large-scale development into this backdrop. The turbines would be seen in the context
of foreground residential development, with which scale contrasts may arise.
8.31 For the previous planning application proposal considered in 2013 it was concluded
that the whilst the location of the wind farm is such that it will be visible from residential
areas of West Dunbartonshire, including Balloch, Alexandria and Dumbarton the
impact on these settlements was not considered to be unacceptable, The current
proposal sees turbines within largely the same location but to a height more than
double that previously proposed (250m compared to 110m previously). It is likely that
for receptors within these settlements, attention will be drawn to the turbines on the hill
to the north and the impact will be notable. Given the height of the turbines now
proposed, it is considered that the scale of the proposal will comprise a considerable
feature which has the potential to impact upon a considerable number of receptors
including both residents together with those visiting and passing through these towns.
8.32 In their consultation response which objects to the proposal, The Loch Lomond and
the Trossachs National Park Authority highlight that the settlements of Balmaha
(viewpoint 17), Croftamie, Drymen (viewpoint 14), Gartocharn and Balloch would be
subject to significant effects. The impact upon the National Park is considered in detail
in paragraphs 8.38 to 8.46 below. Whilst not objecting to the proposal, Inverclyde
Council have expressed significant concern regarding the proposal noting that views
outwards from Inverclyde are important to both tourists and residents alike. They are
an environmental and scenic tourism resource. It is such outlooks that assist Inverclyde
in attracting tourists, both day-trippers and passing through. The views have helped
the area to stage major events such as The Tall Ships Race and provide a backdrop
for the many tourists arriving on cruise ships at Ocean Terminal travelling on to
Glasgow. Inverclyde Council therefore set out the desire for these to view to be
retained and is concerned the proposed development would impact on them to their
detriment. The potential impact upon the timber ponds at Parklea is raised as a
Page 177

Page 178

concern as would the significant impact on the skyline when viewed from Port Glasgow
(viewpoint 18) and Greenock (viewpoint 25). It is concluded by Inverclyde Council that
the proposal would be out of scale with the surrounding topography to the extent it
would impact negatively on the views from Inverclyde and from the Firth of Clyde.
8.33 Overall, it is considered that the proposal has the potential to result in wide ranging
significant and adverse visual impact from a variety of locations.
Landscape and Visual Impact - Landscape Character
8.34 Landscape character is the distinctive pattern of elements that occurs consistently in a
landscape leading to the way that it is perceived. Landscape sensitivity is concerns
with the inherent character of the landscape and the likelihood that this character would
be changed by the introduction of development. Landscape capacity refers to the
degree to which a particular landscape type or area is able to accommodate change
without significant effects on its character, or overall change of landscape character
type. As the ZTV for the proposed development would extend over a wide area, it would
have an impact on numerous different landscapes. The NatureScot 2019 dataset
divides the landscape into tracts that are referred to as landscape character types
(LCTs). Ten LCTs are included in the detailed assessment within the EIA due to level
of influence and visibility of the proposed development. The EIA identifies the vast
majority of the proposed development lies within Rugged Moorland Hills LCT. This
designation covers the southern part of the Kilpatrick Hills, as well as parts of the
Campsies/Kilsyth Hills and Renfrewshire Heights. The proposal would be seen as a
new man-made element within the open hills and may affect the sense of scale of the
landscape.
8.35 The applicant’s EIA sets out that the effects on the Kilpatrick Hills element of Rugged
Moorland Hills LCT would vary. The effect on southern and south-eastern parts are
considered not to be significant due to lack of or very limited visibility and influence of
the proposed development. The EIA does highlight that there would, however, be a
major or major/moderate and significant effect on the Site area itself and the areas in
closer proximity that gain visibility of the majority of the proposal. Whilst the EIA
contends that the “sense of apparent naturalness, wild character and remoteness” of
the northern part of the Kilpatrick Hills has been affected by the Auchencarroch
Recycling and Resource Management Facility, which lies approximately 500m to the
north of the nearest turbine in the proposed development, the Council considers that
this facility does not form a prominent feature within the landscape which impacts upon
the Kilpatrick Hills beyond its immediate setting and the topography of the site reduces
its impact.
8.36 In further considering the range of LCT assessed within the EIA, significant effects
within part of the area are identified within Lowland Hill Fringes – Central, Lowland
Loch Basin – Loch Lomond and the Trossachs, Lowland Loch Basin – Islands, Open
Ridgeland – Glasgow and Clyde Valley, River Valley Farmland and Estates, Rolling
Farmland – Glasgow and Clyde Valley and Rolling Farmland - Loch Lomond and the
Trossachs. In their consultation response, the National Park Authority also highlight
Highland summits and Steep Ridges and Hills LCT noting that as illustrated in
Viewpoint 29 from Ben Lomond the turbines would appear very noticeable in the lower-
lying backdrop to Loch Lomond. The introduction of large-scale industrial infrastructure
would detract from the appreciation of several key characteristics that exhibit a semi-
natural, natural and/or wild and rugged character. Significant effects are predicted on
open parts, including from Ben Lomond.
8.37 It is considered that there would be potential for a significant impact on the character
of the landscape. The scale of the turbines proposed is such that there are no existing
Page 178

Page 179

features in the landscape which are of a similar size or scale. The development
comprises extremely large turbines which are more likely to be suited to areas where
they may benefit from separation distance between communities and sensitive
receptors without exerting an inappropriate influence on the sensitivities of the
Kilpatrick Hills. Inappropriately scaled and sited turbines have the potential to diminish
the apparent scale of landscapes to the detriment of landscape character, and also to
impinge upon the appreciation of the landscape from viewpoints valued for their scenic
qualities.
Landscape and Visual Impact - Loch Lomond and the Trossachs National Park
8.38 The application site is located around 1.7km from the edge of the National Park
boundary, which is one of only two National Parks in Scotland. In their consultation
responses to the Scottish Ministers, both the National Park Authority and NatureScot
object to the proposal. The Park note that it was consulted on the previous proposal
for a wind farm in the Kilpatrick Hills, raising an objection due to the predicted
significant adverse visual impact. The Park specifically note that the turbines now
proposed would be up to 250m to blade tip height which is more than double the height
of the previous proposal. Currently, the closest operational windfarm to the southern
boundary of the National Park, is Corlic Hill/Inverclyde which is 14km southeast and
has 8 turbines which are 110m high to blade tip. Both the National Park Authority and
NatureScot consider that the location, size and scale of the proposed development
represents a step change in respect of the proximity and prominence of wind farms to
the National Park, and the scale of the wind turbines (being more than twice the size
of the closest operational wind farm).
8.39 Although the National Park is not itself a landscape designation, the landscape is one
of the main reasons for which the Loch Lomond and Trossachs area is designated as
a National Park. National Parks are defined as extensive areas of the very highest
value to the nation for their scenery and wildlife, and their cultural value. The Park is
valued for the scenic quality of its landscape due to its diverse landscape character.
Some of the special qualities identified in the Park include diverse landscapes and
diverse experiences, mountains and moorlands. Whilst the Kilpatrick Hills are outwith
the National Park boundary, they contribute to the landscape setting of the National
Park, appearing as a natural landscape boundary close to its southern edge.
NatureScot notes that the size of the proposed turbines and their anticipated
prominence in southward views on the skyline formed by the Kilpatrick Hills would
conflict with the current expansive large scale of the landscape where human elements
are currently small in scale.
8.40 In the consultation response from the National Park Authority it is highlighted that the
Special Landscape Qualities of Loch Lomond and Trossachs National Park Report
2010 commissioned by NatureScot defines special landscape qualities as the
characteristics that, individually or combined, give rise to an area’s outstanding
scenery. The general special landscape qualities which apply to the entire National
Park are:
• A world renowned landscape famed for its natural beauty;
• Tranquillity;
• Wild and rugged highlands contrasting with pastoral lowlands;
• Settlements nestled within a vast backdrop;
• Famous through routes; and
• The easily accessible landscape splendour.
8.41 The applicant’s Landscape and Visual Impact Assessment (LVIA) predicts significant
effects on two Special Landscape Qualities (SLQ) within the National Park. The first of
Page 179

Page 180

these is Wild and rugged highlands contrasting with pastoral lowlands where it is set
out that the proposal would have some effect on the perceived wildness of upland
landscapes. The second is Immensity of loch and landscape where the applicant
judges the effect to significant as while the majority of this SLQ would not be affected,
in areas where they are clearly apparent the turbines can lead to scale comparisons
that alter the baseline perception of the “Immensity of loch and landscape”.
8.42 Both the National Park Authority and NatureScot consider the applicant’s assessment
of the Special Landscape Qualities of the National Park underplays the significance of
effects. In the consultation response, it is set out that National Park Authority’s
Landscape Adviser predicts significant effects on these and an additional eight of the
Special Landscape Qualities as follows:
• A world-renowned landscape famed for its rural beauty
• Settlements nestled within a vast natural backdrop
• Famous through routes/ The easily accessible landscape splendour
• Tranquillity
• Two lochs in one
• A multitude of beautiful islands
• Ben Lomond, widely known, popularly frequented
• Banks of broadleaved woodland
8.43 The Park Authority’s consultation response goes on to set out that with a very intrusive
and industrial appearance, the proposed turbines would significantly detract from,
contrast with and often compromise a very number of Special Landscape Qualities and
key characteristics that are integral to defining this iconic part of the National Park.
“Settlements nestled within a vast natural backdrop” is highlighted as an example in
the response including the southern setting of Loch Lomond and the surrounding rural
landscape. This area has a long and rich history of habitation with houses and other
structures confined to lower-lying land. These settlements are often small-scale,
nestled within the backdrop of vast landforms of mountain, hill, glen and loch. This
gives a strong sense of surrounding, all-enveloping nature which would be
fundamentally compromised by the introduction of highly intrusive turbines. This
includes the settlements of Balmaha, Croftamie, Drymen, Gartocharn and Balloch
which would be subject to significant effects.
8.44 Similarly, “Immensity of loch and landscape”, with Loch Lomond being the largest
expanse of freshwater in Britain with surrounding mountains and hill ranges, the
landscape and sense of place is expansive and large-scale. By comparison, human
made elements appear small and modest, they are barely discernible against the larger
backdrop and substantial horizontal landmass. With the introduction of highly intrusive
turbines, the naturally majestic surroundings where human made elements appear
small and modest would be fundamentally compromised, as would the enjoyment of
the highly scenic setting provided by the wide range of recreational infrastructure
around the loch, affecting the experience of a very large number of people. NatureScot
are also concerned at the impact upon this Special Landscape Quality noting that the
size of the proposed turbines and their anticipated prominence in southward views on
the skyline formed by the Kilpatrick Hills would conflict with the current expansive large
scale of the landscape where human elements are currently small in scale. The effect
would be significant within the southern area of the Park. NatureScot go on to consider
that a further five SLQs would experience significant effects as follows:
 A world-renowned landscape famed for its rural beauty
 Wild rugged highlands contrasting with pastoral lowlands
Page 180

Page 181

 Settlement nestled within a vast natural backdrop
 Tranquillity
 The easily accessible landscape splendour
8.45 The National Park Authority recognise the key strategic role that renewable energy
development has to play in addressing the climate crisis but consider the proposal to
present a significant visual intrusion, including on some of the most iconic views
enjoyed by visitors and our communities. Both the National Park and NatureScot
consider that there would be significant adverse effects on the Special Landscape
Qualities of the National Park and the Landscape Character Types which define what
is so unique about the National Park. The Park Authority also consider that the
proposal will have a significant detrimental effect on a number of settlements in the
National Park and the experience of views of walking routes, road routes and
viewpoints popular with both visitors and residents in the Park. NatureScot go on to
conclude that they consider that the adverse effects from the proposal are unlikely to
be overcome through re-design or removal of turbines.
8.46 Whilst it is accepted that the proposed turbines will not be visible or prominent from
large parts of the Park due to its location and the distances involved, it will be extremely
visible from some of the most important, iconic and popular areas such as from the
Loch itself, Luss, Conic Hill and parts of the West Highland Way. Although the EIA
concludes that only two of the Special Landscape Qualities of the Park will be
significantly affected, it is considered that the actual impact will be far greater and this
view is strongly supported by both NatureScot and the National Park Authority in their
objections to the Scottish Ministers. Being guided by the detailed assessment
undertaken by both the National Park Authority and NatureScot, it is considered that
the proposal will have a detrimental and unacceptable impact due to the significant
adverse impacts on the landscape setting of the National Park and it is concluded that
the potentially significant impacts on the Park resulting from the proposal are not in
doubt.
Landscape and Visual Impact - National Scenic Areas (NSA)
8.47 NSAs are defined as areas of outstanding scenic value in a national context. There are
three NSAs within the 45km ZTV. These are: Kyles of Bute NSA, Loch Lomond NSA
and The Trossachs NSA. The Kyles of Bute NSA lies at least 37km to the west of the
proposal and is shown to gain no theoretical visibility. The Trossachs NSA is at least
23.5km north-north-east and is shown to gain minimal theoretical visibility, restricted to
localised high points, including Ben Venue (Viewpoint 31). These two locations are not
assessed any further in the EIA and there is no objection to this approach. Loch
Lomond NSA is located within National Park.
8.48 Whilst it is accepted that the proposed wind farm would not be visible from large parts
of the NSA, it would be highly visible from some of the most important, iconic and
popular areas within the NSA. It is considered that due to the extent of the area that
the wind farm will be visible from and the importance of these locations such as on the
Loch itself, Balmaha Harbour and Luss within the NSA, With the concerns regarding
the impact upon the National Park itself, it follows that there are also concerns
regarding the potentially detrimental and unacceptable impact on the landscape setting
of Loch Lomond NSA.
Landscape and Visual Impact - Kilpatrick Hills LLA
8.49 The Kilpatrick Hills stretch from Dumbarton and the Vale of Leven in the west to
Strathblane in the east. The rugged upland landscape provides a stunning backdrop
to the settlements which fringe them, including Balloch, Bonhill and Dumbarton. To the
Page 181

Page 182

north of the hills lies the Loch Lomond and the Trossachs National Park. The Kilpatrick
Hills form a distinctive rugged upland landscape, inextricably linked with their
surroundings: ‘borrowed’ views, unique and relatively accessible panoramas, and a
plethora of high-quality vistas, both to and from the Kilpatrick Hills, make the area key
to defining the identity of nearby settlements and in providing a setting for nationally
important landscapes. The local landscape identity of the Kilpatrick Hills is focused
around prominent hills, escarpments, plateau moorland and the abrupt transition from
surrounding urban areas and farmed lower slopes. There is a high perceived quality of
wildness and sense of apparent naturalness and remoteness, particularly in the central
areas of the Kilpatrick Hills, derived in part from the limited visual influence of modern
development, in contrast to nearby urban areas.
8.50 Within West Dunbartonshire, the following special landscape qualities of the Kilpatrick
Hills are identified as being of special interest: Strong sense of remoteness, wildness
and open horizons; Distinctive landforms; and A unique diversity of views. The
proposed wind farm will be located within the Kilpatrick Hills LLA and will result in direct
changes to the landscape. The site is readily visible from a wide area and the EIA
concludes that there would be significant effects on these SLQs. In relation to the first
two SLQs, the influence of the proposal is identified as being more apparent in the
north-western part of the LLA, where the proposal is located and from where it has the
highest level of visibility. In the case of views towards the LLA, views from the area
around the north-western part of the LLA would be most affected. In the case of the
third SLQ, the accessibility of the routes themselves would not be physically affected,
but views from the specific routes would be affected.
8.51 The scale of the turbines proposed is such that there are no existing features in the
landscape which are of a similar size or scale. The proposed turbines will be a
dominant feature within the LLA, particularly from areas close to the turbine locations.
It is therefore likely that the LLA designation, based on the scenic attributes of the area,
will be compromised. The Kilpatrick Hills form a distinctive rugged landscape,
inextricably linked with their surroundings. They are relatively accessible, providing
panoramas and a number of high-quality vistas, both from the LLA including Doughnot
Hill (Viewpoint 1) and to other locations such as the National Park and the Loch
Lomond NSA. They are a key backdrop which helps to define the identity of nearby
settlements and provide a setting for the nearby nationally important landscapes. The
wind farm would detract from the sense of remoteness and wildness provided by the
Kilpatrick Hills. It is considered that locating a wind farm within the Kilpatrick Hills would
have a significant impact on their setting and detract from their uniqueness.
Landscape and Visual Impact - Regional/Country Parks
8.52 Balloch Castle Country Park is situated around 4km from the proposed site. Viewpoint
4 considered the visual impact from the Country Park. The EIA notes that the strong
westwards orientation of landform and extensive woodland cover within the main part
of the Park greatly limits visibility of the proposal with the chosen viewpoint being from
the access road as it will be a view gained by a large number of visitors. The visual
impact from the proposal development at this location is identified as having a
significant effect due to a combination of the factors that lead to the medium-high
magnitude of change on the view and the high sensitivity of the viewpoint. It is noted
that visibility from the main part of the park is identified as being limited. The potential
for impact upon the Balloch Castle Garden and Designed Landscape is discussed
separately at paragraph 8.90.
8.53 The Clyde Muirshiel Regional Park is situated approximately 13km from the proposed
site. Whilst the proposed wind farm may be visible from the Regional Park including
from Misty Law (viewpoint 28), it is concluded in the EIA that the proposal would not
Page 182

Page 183

have direct effects within the Park and would not significantly affect the priorities and
objectives of the Park. It is agreed that it is not considered that there would be any
significant or detrimental impact on the setting or character of the Regional Park.
8.54 The impact upon Mugdock Country Park around 10 km from the proposed site is
considered in the EIA and it is concluded that a combination of limited theoretical
visibility and screening by woodland and forestry within and around the Park would
ensure that actual visibility is likely to be very limited. A viewpoint location was sought
but could not be identified due to lack of visibility. Gleniffer Braes Country Park is some
18km from the application site and is not considered in the EIA. Due to the distance, it
is not considered there would be any potential for any significant impact.
Landscape and Visual Impact – Cumulative Impacts
8.55 The proposal would be the first wind farm development to be located in the Kilpatrick
Hills, so there would be no localised cumulative impacts. The LVIA concludes that
there would be no significant cumulative effects arising either from the combined
effects of all wind farms, including the proposal, or from the addition of the proposal to
other wind farms, and as a result, it would not lead to a perception that views or
landscape character are defined by the presence or influence of more than one wind
farm. It is considered that the site is physically and visually well separated from other
large scale wind farm developments. Overall, no cumulative change of significance is
identified in respect of the Kilpatrick Hills, although the proposal could set a precedent
and could have future cumulative consequences for the Kilpatrick Hills and/or the
National Park through wind turbine developments.
Designated sites
8.56 Whilst there are no statutory nature conservation designations within the site, the
proposed site lies within 100m of two Sites of Special Scientific Interest (SSSI). These
are Dumbarton Muir SSSI to the east and the smaller Auchenreoch Glen SSSI to the
southwest. The EIA sets out that Auchenreoch Glen SSSI is located 68m from the site
boundary and 98m from the route of the proposed access track. Given the distance to
the SSSI and the nature of construction works on the site access, it is not expected
there would be any adverse effects on the qualifying features of this SSSI which
comprise lowland calcareous grassland, and springs (including flushes) and it is
scoped out of the assessment. Dumbarton Muir SSSI is designated for its blanket bog
and raised bog habitats. This SSSI is 75m from the application site and the closest
proposed infrastructure to the SSSI is the turning head to for turbine 4 located 94m
away. The EIA concludes that it is not expected there would be any adverse effects on
the qualifying features of this SSSI. Both SSSIs are scoped out of further assessment.
NatureScot are satisfied that these sites will not be adversely affected by the proposal.
8.57 Five other SSSIs are identified in the EIA as being locations within 5km of the
application site however it is considered that there is no connectivity between t these
designated sites and as such they are scoped-out of the assessment. Endrick Water
Special Area of Conservation (SAC), classified for its salmon, river lamprey and brook
lamprey populations, is 6.8 km downstream of the Proposed Development with partial
hydrological connectivity. Given the distances from the Site the EIA does not anticipate
that any potential effects would materialise on these designated sites, and as such
they are scoped-out of the assessment. NatureScot concludes that they consider it
unlikely that the proposal will have a significant effect on any qualifying interests either
directly or indirectly.
8.58 The Council’s Biodiversity Officer highlights that the applicant fails to consider or
assess local designations relative to the proposed site. It is identified that there are five
Local Nature Conservation Sites (LNCS) which would be impacted by the
Page 183

Page 184

development, either directly or indirectly. These are Murroch Glen, Blairvault Burn and
Pappert Muir, Auchenreoch Muir Bonhill Muir and Pappert Hill, and West Dumbarton
Muir. It therefore cannot be concluded that the development proposal would not result
in any adverse impacts upon locally designated sites.
Habitat
8.59 The proposed site comprises primarily open upland habitats, with blanket bog and
marshy grassland predominant and accounting for over 73% of the application site.
The remaining area is made up of smaller proportions of many other habitat types such
as wet dwarf shrub heath, wet modified bog, acid grassland, flushes and bracken.
Direct impacts upon habitats are those which would arise from the land taken for the
development (i.e. the habitats lost to create turbine bases, tracks, borrow pits etc.),
whereas possible indirect impacts might include changes to hydrology due to site
drainage, pollution of watercourses from spillages or run-off, and fragmentation of
habitats as a result of track construction. The EIA identified that over 10.3 ha of various
habitat types would be directly lost as a result of the proposed development. For the
majority of habitat types, no concerns arise in respect of the potential impact and these
are scoped out.
8.60 One area of ancient woodland falls within the application boundary, and this is
identified as an important ecological feature. The woodland in question is where the
site access is proposed to pass through a narrow strip of woodland known as Barr
Wood. The EIA identifies 0.06hn direct habitat loss to access track infrastructure. The
EIA sets out that the area of ancient woodland to be directly impacted by the
development is primarily comprised of beech with some Scots pine, some immature
birch and a single oak. Due to grazing, there is no underscrub vegetation or
regenerating trees/saplings present. The loss of a narrow of woodland is not
considered by the EIA to lead to any notable potential fragmentation effects. Overall,
the EIA concludes the effect on Ancient Woodland to be minor adverse to not
significant.
8.61 Blanket Bog and Wet Modified Bog are also identified as important ecological features.
The Council’s Biodiversity Officer highlights that Blanket Bog is a priority habitat for
conservation on the Scottish Biodiversity list and also a UK Biodiversity Action Plan
priority habitat for conservation. Blanket bog vegetation coverage is also essential for
the peat development underneath. The proposed development would result in direct
and indirect habitat loss for blanket bog and wet modified bog habitats. Direct loss
would occur in areas where permanent infrastructure such as access tracks, turbine
foundations, and hardstandings are sited on these habitat types. The excavation of
these habitat types for temporary infrastructure would also lead to the losses of blanket
bog and wet modified bog due to the long-term effect on the ecological and
hydrological structure and function of these habitat types. In addition, there may be
indirect losses as a result of drainage around infrastructure and disruption to
hydrological flows and the Council’s Biodiversity Officer highlights that blanket bog is
particularly susceptible to changes in hydrology and any impact for foundations and
access should be approached cautiously. NatureScot consider the loss of blanket bog
and wet modified bog and makes recommendations in respect of the proposed levels
of restoration to achieve offsetting.
8.62 The EIA is informed by a detailed review of the distribution and depth of peat at the
site and the site design has largely avoided areas of deep peat. Where peat would be
encountered by the proposed development, the EIA details that this can be readily
managed and accommodated within the layout without significant environmental
impact. A Peat Management Plan has been submitted by the applicant and this details
how peat and carbon rich resources on site can be safeguarded. No surplus peat would
Page 184

Page 185

be generated, and the limited volumes of peat generated from the proposed
excavations would be used to reinstate track verges, turbine bases, crane
hardstandings and restoration of onsite borrow pits.
8.63 The Council’s Biodiversity Officer further considers peatland habitat and notes that a
peatland restoration programme on the vast swathes of class 2 peatlands would be
more impactful in terms of net zero commitments and would provide an abundance of
biodiversity benefit whilst retaining the landscape character of the Kilpatrick Hills. The
Biodiversity Officer goes on to highlight that there is no data provided by the applicant
for 0.5m to 1m depth which is the national standard for determining deep peat. Only
peat depths of over 1m have been provided. It is noted that Turbine 2 is to be situated
on Class 2 peat and Turbine 4 on Class 1 peat. An estimate of 18% habitat loss is
noted, regardless of mitigation or enhancements. Nature Scot also highlights the
requirements for greater ambition in terms of the extent of proposed peatland
restoration and make a variety of recommendations in this respect. It is noted that 90ha
of peatland restoration is offered by the applicant but NatureScot highlight that a figure
of 200ha should be sought.
8.64 Overall, it is considered that subject to suitable mitigation measures including a habitat
management plan together with the following the recommendations from NatureScot
being followed, specifically with reference to peatland restoration, and the Scottish
Ministers ensuring that the impact upon peatland is fully understood taking account of
the comments of the Council’s Biodiversity Officer and minimised as much as possible,
the impact of the proposal upon habitats would likely be acceptable.
Protected and other ecological species
8.65 Informed by an initial desk study, a protected species field survey has been
undertaken. The Council’s Biodiversity Officer highlights that the survey work focusses
on ornithology and the various surveys highlight the wealth of the species found within
the Kilpatrick Hills and demonstrate the importance of the vast open habitat that the
species recorded require to support them. No field signs of water vole, pine martin or
red squirrel were found on site. Seven features with the potential for use as holts by
otter were recorded. None of these features fell within 200m of the application
boundary. Several of the burns within the survey area were found to have good
suitability for otter, with trees and gullies providing shelter. Four badger setts were
identified, two outlier setts and two larger ones for which the status could not be
determined. None of the badger setts or signs recorded are within 100m of the
application boundary. Potential feeding signs were recorded within woodland in
Gllangad Glen and along Finland Burn. Pathways used by badgers were recorded in
woodland around Finland Burn and on the edge of Nobleston Wood. A variety of
features offer good suitability for badgers. Turning to reptiles, two common lizard
sightings were recorded, all in the southern part of the survey area. Twelve potential
hibernacula features were also recorded. These were mostly attributed to dry stone
wall features and rock piles. Several of the potential hibernacula features recorded
were within the application boundary. Two mammal holes, one within and one outwith
the application boundary, were identified but no specific signs of protected species
signs were identified, as well as two well-used mammal pathways.
8.66 Considering bats, a preliminary bat roost assessment was undertaken in July 2020 and
March 2022. There were 42 features recorded with potential suitability for roosting
bats, all being tree features. No key features that could support maternity roosts and
significant hibernation and/or swarming sites were recorded within 200m plus rotor
radius of a proposed wind turbine location.
Page 185

Page 186

8.67 In further considering bats, once operational there is a known risk of commuting and
foraging bats colliding with turbine blades and for bats to be affected by barotrauma
when flying in close proximity to moving turbine blades. Bat detectors at 13 locations
within the site were deployed from May to September in 2020 over a total period of 42
days, with bats detected on all of the 42 nights. A total of four bat species and two
genera were recorded for these locations. Clearly bat activity exists within the area and
it is set out in the EIA that mitigation to avoid collisions will include the feathering of
blades whilst idling. The EIA concludes that with proposed mitigation, the effect
significance of bat collision risk is considered minor adverse and not significant.
8.68 The Council’s Biodiversity Officer highlights that a variety of bat species have been
recorded in the area in the last 15 years. NatureScot also consider bats in their
consultation reply and welcome the proposed mitigation. They note there is no mention
of the standard 50m buffer between blade tips and high-value bat habitats, however,
and they recommend that it would be helpful to obtain clarification on whether this this
form of mitigation is also included. NatureScot also recommend that a detailed post-
construction bat monitoring plan should be submitted to and approved by the planning
authority prior to development commencing. Subject to following the recommendations
of NatureScot, the impact upon bats would be considered acceptable.
8.69 Watercourses within the application boundary form tributaries to Murroch Burn to the
south, which feeds into the River Leven and the Clyde estuary, and Gallangad Burn to
the north, feeding into the Endrick Water. The applicant’s protected species survey
noted that consultation with the Loch Lomond Fisheries Trust (LLFT) undertaken as
part of the 2011 Merkins Wind Farm Environmental Statement suggested that although
the watercourses in the north of the Site have connectivity to the River Endrick,
waterfalls in the Finland Burn and the upper reaches of the Catter Burn are likely to act
as a barrier to Atlantic salmon and lamprey. LLFT suggested that only resident brown
trout populations are likely to be present. The River Endrick is over 6.8 km from the
proposed development.
8.70 The Murroch Burn was surveyed and contains populations of both brown trout and
salmon. It is considered that subject to good practice measures to prevent pollution
and changes to hydrology it is considered that the impact on fish life within and
downstream of the site would be minimal. Deer are likely to use the area but effects on
deer are also scoped out of the assessment. With no deer fencing proposed as part of
the development, deer may use and pass through uninhibited with the only potential
disturbance being during the construction phase.
8.71 Considering ecological species in general, the Council’s Biodiversity Officer notes that
the open moorland has been shown by the relevant species surveys to be valuable
wildlife habitat that supports a number of protected ground nesting birds, raptors,
mammals. It is the nature of the undisturbed open ground that contributes to making
the habitat suitable for these species. The suite of upland habitat types found in the
Kilpatrick Hills and the habitat connectivity to the wider landscape is the reason for the
wealth of species found here. Although much of the area has previously been modified
for agriculture and forestry, there are still large swathes of natural priority habitat types
that are untouched, and these must be protected from inappropriate development. It is
the value of the habitat and the vast open space of the Kilpatrick Hills that allows it to
host such valuable species, many of which are of conservation concern. Opening up
of access over this land will change the recreational value of this site. It is likely to be
easier to access from both the main access route and from the northwest in from
Pappert Wood. This additional disturbance, could include additional walkers, cyclists,
trail bikes and dogs onto the site which would reduce its value as an open habitat and
breeding site for ground nesting birds.
Page 186

Page 187

8.72 Overall, it is expected that the Scottish Ministers in determining the application will fully
consider the points highlighted by the Council’s Biodiversity Officer, ensure identified
mitigation measures are taken forward, follow the recommendations set out in
NatureScot’s consultation response and require the implementation of a suitable
Habitat Management Plan to ensure any effects of the development are minimised.
The Councils Biodiversity Officer also specifically highlights the requirement for
species protection plans and these would be expected. With this approach, the impacts
of the proposed development upon protected species and wider ecology could be
considered acceptable. It remains, however, that as highlighted in paragraph 8.58 it
cannot currently be concluded that the development proposal would not result in any
adverse impacts upon locally designated sites Any potential impacts upon ecology
within these would require to be suitably considered and addressed. 
Ornithology
8.73 In order to determine baseline conditions to inform the ornithology impact assessment,
field surveys were undertaken following NatureScot guidance between March 2019 to
August 2022. Data collected between September 2008 to August 2009 for the Merkins
Windfarm proposal was also considered as part of the baseline. A wide range of
species were scoped out from further assessment for a range of reasons where it was
concluded that adverse effects were considered very unlikely. Osprey, Goshawk and
Black Grouse were identified as having potential for significant effects from the
proposal and these were further assessed. In terms of ornithological impact relating to
designated sites, The EIA advises that it was agreed during consultation with
NatureScot that all designated sites, with the exception of the Loch Lomond SPA/
Ramsar site and Endrick Mouth and Islands SSSI can be scoped out due to a lack of
potential connectivity. It is further set out that NatureScot advised that the breeding
capercaillie designated feature of the Loch Lomond SPA should also be scoped out,
leaving the remaining designated feature, non-breeding Greenland white-fronted
goose, to be assessed.
8.74 The habitat within and directly surrounding the proposed development comprises
mainly blanket bog and heather moorland without waterbodies, which is considered to
be of limited suitability to foraging geese. It is also assessed as being likely that the
Loch Lomond SPA and Ramsar site population is relatively sedentary throughout the
winter, and as such, connectivity with the application site, and therefore displacement,
barrier effects or collision impacts are very unlikely. it can be reasonably concluded
that there would be no adverse effects on the integrity of Loch Lomond SPA / Ramsar
site, and no further consideration is required.
8.75 Two pairs of ospreys are identified as breeding in forestland 2.5 km northeast from all
proposed infrastructure. As no turbine locations or infrastructure is situated within
750m of either nest location, construction disturbance will not directly affect osprey
nesting. A BBPP would be in place to ensure that any future osprey breeding activity
is undisturbed during the construction phase. A pair of goshawks are also found to
breed in forestland 2.9 km northeast from all proposed infrastructure. At this distance
the EIA considers it is unlikely that this breeding location would be significantly affected
by construction disturbance. As goshawks breed and forage in woodland, and the
habitat within the Site is primarily composed of blanket bog and heather moorland
without forested areas, it is not likely that goshawk would be directly affected by habitat
loss during construction.
8.76 Baseline surveys in 2009 recorded one black grouse lekking area within the 1.5 km
study area with one lek of up to six males and one female recorded at Auchenreoch
ruins approximately 560m from the nearest proposed turbine (T8) and 300m from the
Page 187

Page 188

proposed construction compound. The Council’s Biodiversity Officer advises that the
Black Grouse lek site is only 300m from proposed battery storage area and this is
against recommended disturbance of a minimum of 500m. Surveys in 2019 recorded
a pair of black grouse flying over Auchenreoch ruins in November and a single male
flying over the site in May, but no lekking birds were recorded in either 2019 or 2022.
The EIA considers that on balance it is likely that the local lek is now extinct, although
it is possible that the site is still occasionally used by foraging or dispersing birds.
Proposed mitigation includes pre-construction surveys and restriction measures within
a BBPP which would avoid disturbance to any lekking or breeding birds, should pre-
construction surveys record them within 750m of planned construction activities,
including the construction compound.
8.77 Considering collision potential during the operational phase, the collision risks for the
three species were assessed as follows:
• Osprey – One bird every 47 years
• Goshawk – One bird every 88 years
• Black Grouse – No collision risk identified
8.78 These risks are statistically insignificant in terms of the bird populations concerned. No
notable concerns are identified in respect of potential displacement although Black
Grouse could be impacted by noise from the sub-station. The EIA advises that there is
little evidence to indicate that any species would be significantly impacted by wind
turbine aviation lighting requirements Overall, the effects are identified as not being
significant.
8.79 NatureScot in their consultation response do not raise notable concerns regarding
Ornithology but make recommendations in respect of Black Grouse and the sub-
station. It is noted that the RSPB offer no objections to the proposal, noting the
biodiversity net gain proposals and recommend that the finalised biodiversity
enhancement management plan is secured by condition. The Council’s Biodiversity
Officer advises that a range of ornithological species are round within the area
including black grouse, goshawk, golden plover, hen harrier, herring, gull, osprey, pink
footed goose. Moorland breeding birds including curlew, snipe and lapwing were also
recorded. Breeding snipe have been recorded close to the positions of turbines 1, 2, 5
and 6. Breeding ground habitat suitability for merlin and hen harrier were also
identified.
8.80 Overall, subject to appropriate mitigation and protection plans being secured in
conjunction with the position set out in paragraph 8.72 above, it is considered that the
impact of the development upon ornithological interests would be acceptable.
Biodiversity Enhancement
8.81 It is expected that wide ranging biodiversity enhancements are embedded into the final
detail of the proposal, if approved. Points with regard to enhancements from peatland
restoration are addressed in paragraphs 8.63 and 8.64 above. The Council’s
Biodiversity Officer highlights that as part of proposed enhancements native woodland
planting areas are proposed outside of development site boundary and this could lead
to self-seeding on the adjacent SSSI which should remain as calcareous grassland.
Woodland block proposals could also be detrimental to proposed calcareous grassland
management and may also impact upon wetland flush areas. A Biodiversity
Management Plan should further include a detailed management plan for all protected
species on site. The Scottish Ministers should ensure that proposed biodiversity
enhancement proposals are both secured and appropriate, if minded to grant the
proposed development.
Page 188

Page 189

Hydrological & Hydrogeological Impact
8.82 It is indicated by the applicant in the EIA that the proposed wind farm layout has been
designed to minimise impacts upon geological, hydrological and hydrogeological
constraints identified, with a variety of design iterations having been considered to
avoid or minimise likely effects. The impacts upon watercourses are considered within
the EIA with proposed mitigation to minimise impact including maintaining a 50m buffer
zone between watercourses and other development. It is set out that in addition to
good construction practices and methodologies, detailed design and construction
practices would need to consider the particular ground conditions and the specific
works at each location throughout the construction period. An experienced and
qualified engineering geologist/geotechnical engineer would also be appointed as a
supervisor. The EIA indicates that measures for dealing with pollution / sediment and
flood risk during construction will be addressed via a Construction Environmental
Management Plan (CEMP) and a site specific drainage plan would be produced. Water
quality monitoring during the construction phase would be undertaken for the surface
water catchments to ensure no adverse impacts. This monitoring scheme would also
allow the quality of water draining toward Dumbarton Muir SSSI and Auchenreoch Glen
SSSI to be assessed and quantified.
8.83 The proposal will incorporate Sustainable Drainage Systems (SuDS) to attenuate run
off and intercept sediment prior to run off entering watercourses. Due to the underlying
geology of the site, there is relatively low infiltration and relatively high run off rates at
present and over the whole of the site the new areas of hardstanding would cover a
minimal proportion of the ground, so it is not considered that there is any likelihood of
causing flooding. Various mitigation measures are proposed to avoid pollution and
sedimentation of the water environment. SEPA do not object to the proposal, provided
that in the event of planning permission being granted, a condition is attached which
requires the submission of a surface water management plan. The Council’s Roads
Service also do not raise an objection on flooding grounds but advise that if permission
is given the applicant would require to demonstrate that the proposed development
would not increase the flood risk downstream. Four new watercourse crossings are
required and it is indicated that the crossings would be designed to pass the 200 year
flood event. During the operational phase routine maintenance of infrastructure is
expected such as maintaining access roads and drainage and carrying out
maintenance of turbines. Should any maintenance be required onsite during the
operational life of the project which would involve construction activities; mitigation
measures would be adhered to along with the measures in the final CEMP to avoid
potential effects. The EIA concludes that no significant residual effects on soils and
peat, geology, surface water or groundwater receptors are predicted during the
construction and operational periods of the development. Overall it is considered that
with appropriate mitigation and the Scottish Ministers addressing a variety of matters
by condition, the impact on hydrology and hydrogeology would be acceptable.
Management of Peat/Soil
8.84 Works within peat bog areas can cause instability within the surrounding peat and
result in peat slides, which seriously degrade peatland habitat. A Peat Landslide and
Hazard Risk Assessment has been prepared by the applicant to assess and show how
peat landslide risk is mitigated. The Assessment sets out the complicated inter-
relationship between all the aspects that have an effect on the stability of peat. The
overall conclusion regarding peat stability is that there are minimal areas of medium
risk of peat instability across the proposed development and most have been avoided
during the design process. Four medium risk areas are identified and for these, a
hazard impact assessment was completed and this concluded that with suitable
mitigation measures, all of the areas can be considered as an insignificant risk.
Page 189

Page 190

Additional mitigation measures are further proposed in the areas where hazards are
identified, despite these hazards being insignificant. This will further reduce the risk. to
further reduce the risk of potential hazards occurring. Mitigation includes an
experienced geologist/geotechnical engineer being appointed to supervise and
provide advice during the setting out, micrositing and construction phases of the
proposed development. Drainage measures which seek to avoid saturation of peat
would also be implemented. The Energy Consents Unit commissioned Ironside Farrar
Ltd to technically assess the Peat Landslide Hazard and Risk Assessment and this
assessment concludes the approach is sufficiently robust in all respects and although
some recommendations may be made for clarity, no further revisions are required.
Based on the information within the EIA Report and taking account of the view
Specialist Consultants, it would appear risk of peat landslide is not likely to be high and
the Council would accept the recommendations made as appropriate and do not raise
any concerns regarding peat landslide hazard risks. It is therefore considered that
subject to the implementation of suitable preventative measures, there should be no
significant impacts on peat stability.
Borrow Pits
8.85 The proposed development would require crushed stone to construct new tracks,
create hardstanding areas for the cranes and lay the turbine foundations. To avoid the
need to bring significant amounts of material to site from elsewhere, which would
greatly increase construction traffic, and includes a proposal to form a number of
borrow pits within the site. Borrow pits are small quarries used to obtain rock for
construction of the wind farm, primarily in the formation of the access tracks. It is not
proposed to retain any of the proposed borrow pits post-construction. Materials are
available locally so any requirement for rock aggregate during the operational phase,
which would likely be minimal, would be met from those sources. The EIA sets out that
it is anticipated that there would be a planning condition imposed upon consent with a
requirement to agree the approach to restoration.
8.86 The application submission does not identify precise locations for the borrow pits at
this stage. It is set out in the application submission that locations for up to three borrow
pits have been identified within identified search areas which have been chosen due
to their low peat measurements and rock exposure. The precise siting and size of
borrow pits could be dealt with by way of a planning condition, but as they are a
significant part of the overall wind farm development proposal it is appropriate to
consider their likely environmental impacts.
8.87 In terms of landscape and visual impacts, this is considered in detail in paragraphs
8.21 to 8.55 above for the development overall. Focusing on the borrow pits, each
borrow pit would cover a relatively small area and it is likely that their visibility would
be reduced by localised screening, topography, the muted colours of the rock, and
horizon effects (i.e. when seen close to the horizon they would be hard to make out
against the bright skyline). It is considered unlikely that there would be any impact on
long-distance views of the site, and the visual impact of the borrow pits would be
relatively minor compared to that of the wind turbines. Whilst the borrow pits could be
visually intrusive depending on the final details on location and size, they would be
most visible during construction, but over time any remaining exposed rock in the
borrow pits would weather and vegetation would become re-established, making the
borrow pits less prominent and more difficult to make out from the access track and
surrounding land. The borrow pits would be seen in the context of other infrastructure
works associated with the wind farm development such as access tracks. Whilst they
would be visible, they would be seen as part of the overall site construction rather than
Page 190

Page 191

as separate developments. The restoration of any borrow pits required on site could
be dealt with by way of a planning condition. Overall, it is considered that the visual
impact of the borrow pits would be acceptable. The ecological and habitat implications
of the development as a whole is already assessed above.
Built and Cultural Heritage
8.88 No historic buildings or monuments are located within the site, although it does contain
areas of archaeological interest. In their consultation response to the Scottish
Ministers, West of Scotland Archaeological Service advises that the construction of the
turbines and their associated infrastructure is likely to have both a direct impact on
heritage features present within the development area itself, and an indirect effect on
the settings of sites present in the surrounding landscape. WOSAS consider that it is
difficult to see how the effect of the proposed wind farm on the settings of sites in the
surrounding landscape could be reduced or mitigated without substantial redesign to
the location of the development or the height of the turbines. They go onto recommend
that any granting of permission include a condition relating to a programme of
archaeological works in accordance with a written scheme of investigation within the
red line boundary. It is considered that the Scottish Ministers require to satisfy
themselves that an appropriately robust approach is taken to securing the required
archaeological works.
8.89 There are a number of scheduled monuments in the vicinity of the site, but there would
be no direct impact on these from construction or operation of the wind farm. There
would be a potential impact upon the setting of the Knockupple, long cairn and the
Lang Cairn, chambered cairn and cairn at Gallangad Muir which are 1.2 km to the east
of the nearest turbine, but whilst noting the potential adverse impact, Historic
Environment Scotland have not objected to the proposal on this basis and it is not
considered that the impact on these scheduled monuments would be unacceptable.
8.90 The wind farm would be visible from the category A listed Balloch Castle and
associated garden and designed landscape which lies 4.28kms from the nearest
turbine and locations which also have views of Balloch Castle such as Duck Bay.
However, it is not considered that there would be a significant detrimental impact on
the setting of the listed building or its associated designed landscape. The category A
listed Overtoun House and associated garden and designed landscape is located 2.5
km south of the nearest proposed turbine. Whilst the wireframe diagrams indicate that
the turbines would potentially be visible from this location, the photomontage indicate
that at ground level these views are entirely screened by existing established
landscape features. However, from the first floor of the building, in which there are
principal rooms, the woodland screening would become less effective and there may
be more visibility of the wind farm. The potential impacts on any important views from
principal rooms has not been considered in the submitted EIA and the Scottish
Ministers would require to satisfy themselves that the potential impacts are understood.
8.91 Historic Environment Scotland (HES) have considered the proposal and in a
consultation response to the Scottish Ministers they have considered the potential
impact upon a variety of scheduled monuments, category A listed buildings and
Garden and designed landscapes in the vicinity of the proposed development on which
the proposals may have an impact. Having taken into account the information provided
in the EIA Report, the supplied visualisations and HES’s own assessment, with the
exception of Dumbarton Castle, the impacts of the proposed development are not
considered to be of such significance as would warrant an objection from Historic
Environment Scotland. HES’s position in this regard is accepted.
Page 191

Page 192

8.92 Considering the impact upon Dumbarton Castle, HES note that the EIA recognises that
the presence of turbines in views of Dumbarton Castle from the south would challenge
the dominance of the monument. The EIA goes on to suggest that views of the Castle
from the south would only be impacted across a relatively small area and subsequently
concludes that the proposed development would result in an adverse effect which is
not significant. HES do not agree with this assessment and consider the impact to be
underestimated. It is considered that proposed development would have a significant
adverse impact on the setting of the monument, adversely affecting key views from
directly to its south. As demonstrated by the visualisations provided in support of the
application, the turbines would appear above and be framed in wider views of
monument. In some of these key views from the south the turbines would appear
directly behind the monument. the turbines would create a very large visual distraction
and become the most dominant features in these views. Consequently, HES consider
the development would significantly and adversely impact on the ability to experience,
understand and appreciate this key feature of the setting of the monument. The scale
of impacts would significantly adversely affect the integrity of the setting of the
monument when viewed from the south and would be of a magnitude to raise issues
of national interest. HES consider the proposed Vale of Leven Wind Farm to be
contrary to national policy as set out in the Historic Environment Policy for Scotland
and NPF4 because of its adverse impact on the integrity of the setting of Dumbarton
Castle. Accordingly, they object to the proposed development.
8.93 It is clear that the proposed development would have the potential to impact upon a
variety of built and cultural heritage designations and assets. Having fully reviewed this
potential and being guided by the position of Historic Environment Scotland and West
of Scotland Archaeological Service, it is considered that there would not be significant
detrimental impact on the majority of the designations and assets. However, the
serious concerns of Historic Environment Scotland in respect of the adverse impact on
the integrity of the setting of Dumbarton Castle are noted and HES object on this basis.
Being guided by the position of HES, the impact upon the setting of Dumbarton Castle
as a scheduled monument and key historic national asset within West Dunbartonshire
is therefore clearly of significant concern and cannot be considered acceptable.
Residential Amenity
8.94 Residential amenity can be affected in a variety of ways. This includes noise from
construction and operation of the proposed windfarm and associated development,
shadow flicker from individual turbines as they rotate and impacts on air quality
affecting adjacent residential areas.
8.95 In first considering air quality, this was scoped out of the EIA as it was not considered
that there was any potential for adverse impacts upon air quality. The Council’s
Environmental Health Service offer no disagreement with this approach. In the event
permission was granted, it would be expected that a Construction Environmental
Management Plan would address any short-term impacts during construction.
8.96 Any development will produce noise during the construction phase and this has to be
accepted. Environmental Health raise the requirement to ensure that the site is
managed in such a way during construction so as not to cause undue disturbance and
this could be addressed by appropriate conditions if required, including relating to
hours of work and construction noise. Considering noise from the operation of the
windfarm itself, there are two distinct types of noise sources within a wind turbine; the
mechanical noise produced by the machine and the aerodynamic noise produced by
the passage of the blades through the air. Noise impact has been assessed in the EIA
and supporting documentation. Noise level monitoring to collect background noise
levels was completed at two properties; Gallangad Lodge 2.4kms from the closest
Page 192

Page 193

turbine and Highdykes Farm 1.8 kms from the closest turbine. A noise monitor at a
third property was removed at the request of the occupants. Informed by this data,
noise modelling of the proposal predicts a negligible impact at noise sensitive
receptors; the effects of the proposals are therefore negligible and not significant.
Therefore, the EIA concludes that the operation of the proposed development would
cause no significant effect and no mitigation would be required.
8.97 The Council’s Environmental Health Service does not object to the proposal but
identifies a number of matters to be further considered and addressed. It is noted that
predictions of the operational noise levels have been based on the candidate turbine
being the Vestas 172.2MW but the test results for this specific turbine are not yet
available and representative noise data has been adopted from similar Vestas V136
turbine. Environmental Health advise on the requirement for the noise impact
assessment to be updated based on the actual wind turbines proposed.
8.98 Environmental Health further consider that an updated report that determines the
impact of noise from the turbines proposed at the development on nearby dwellings
and any noise sensitive premises taking cognisance of the Scottish Government
document Planning Advice Note 1/2011 Planning and Noise and using the principles
set out in the document “The Assessment and rating of Noise from Wind Farms (ETSU-
R-97) is provided. It is identified that the applicant shall ensure that noise associated
with the proposed development shall not exceed 35dB, measured as LA90.10min or
the prevailing background noise level +5dB, during the daytime period and shall not
exceed 43dB measured as LA90.10min or the prevailing background noise level +5dB,
during the nighttime period. It is further advised that the applicant will require to
consider the cumulative effects of any nearby wind turbine developments.
Environmental Health go on to advise that where the tonal noise emitted by the
development exceeds the threshold of audibility by between 2dB and 6.5dB or greater,
then the acceptable noise specified in above, shall be reduced by the penalty level
identified within section 28 of 'The Assessment and rating of Noise from Wind Farms-
ETSU-R-97’. The definition of audibility for the purposes of this condition shall be as
described in ETSU-R-97. The penalty shall only apply at properties where the tonal
noise is measured and shall only relate to the wind speeds at which the tonal noise
occurs at. Environmental Health further consider that a noise assessment to
specifically determine the impact of noise from the proposed Battery Energy Storage
Facilities on nearby dwellings and any noise sensitive premises is required.
8.99 Environmental Health also highlight the requirement for an agreed approach for
assessing noise complaints noise complaint assessment, logging wind speed, wind
direction and power generation data shall be continuously logged and a nominated
person have been submitted in writing to the Planning Authority for the development
who will act as a point of contact for local residents.
8.100 Turning to shadow flicker, it is accepted that if adequate separation is provided
between turbines and nearby dwellings shadow flicker should not be a problem. The
Council’s Environmental Health Service highlight the requirement for a shadow flicker
assessment. The EIA sets out that in line with the Scottish Government guidelines on
shadow flicker assessments, 10 rotor diameters (1.7km) from each proposed wind
turbine has been established as the shadow flicker Study Area. The assessment
identified that no residential dwellings fall within the shadow flicker Study Area and,
therefore, no shadow flicker effects are anticipated on any residential receptors within
the vicinity of the proposed development.
8.101 Overall, subject to the Scottish Ministers ensuring that all matters raised in respect of
noise impact are addressed in the event that they were minded to grant consent, the
Page 193

Page 194

impact upon residential amenity will be acceptable and there are no objections to the
proposal on the impact upon residential amenity.
Impact upon Tourism
8.102 The degree to which wind turbines influence the tourism industry is difficult to quantify.
Some people are not concerned about the appearance of wind farms, with some
people actively liking their appearance, and where wind farms open up public access
to previously inaccessible parts of the countryside, they can themselves generate visits
by walkers and cyclists. On the other hand, some people dislike the appearance of
wind farms either in general or within specific locations, and the construction of a wind
farm may reduce the enjoyment of their visit to the area and make them less likely to
visit again.
8.103 Whilst the precise impact of wind farms on tourism is not known, it is clear that
appropriately sited and scaled developments with limited consequences for landscape
character, scenic quality or major tourism assets have much less potential to influence
the decisions of potential visitors than an inappropriately scaled and sited
development.
8.104 As highlighted above in paragraphs 8.24 and 8.25, Doughnot Hill for example provides
a local destination for the experience of wilderness and because of the views from the
summit. Panoramic views are provided from this location including across Kilpatrick
Hills and towards the National Park. The development of an electricity generating
station on the site will change the very nature of the experience of the landscape that
presently attracts visitors. The applicant’s submission also demonstrates that the wind
farm would be visible from important areas within the National Park, including Conic
Hill, areas around Luss, the Loch itself and Balmaha Harbour. The National Park
designation is an important visitor and tourist attraction and one of only two National
Parks in Scotland. It is reasonable to conclude that the scenic value of the wider area
around West Dunbartonshire, Loch Lomond and the National Park, is significant in
terms of scenic value and tourism importance. It is to be expected that there will be
significant implications for the tourism value of the surrounding area should the
proposal be implemented, given that a significant number of visitors in Scotland are
attracted by the scenic value of the natural landscape. Accordingly, inappropriately
scaled man-made structures and development in a wider panoramic landscape is not
considered to be in the interests of tourism. Whilst there is not a specific objection on
the grounds of tourism impact, it is expected that the Scottish Ministers would require
to satisfy themselves that no adverse impact was to occur and it is expected that this
would be fully considered with reference to the objection from the National Park
Authority.
Aviation Safety
8.105 Aviation related issues are considered in the EIA and it is stated that the applicant is in
dialogue with the relevant stakeholders about appropriate mitigation measures.
Prestwick Airport and the Ministry of Defence offer no objection to the proposal in their
consultation responses to the Scottish Ministers. Glasgow Airport advise that the
proposal could conflict with safeguarding criteria and that a more detailed assessment
requires to be undertaken regarding the potential impact on Glasgow Airport. They
have submitted a holding objection in this respect. National Air Traffic Services (NATS)
object until mitigation proposals become more mature. The Scottish Ministers would
require to satisfy themselves that there was no potential for impact upon aviation safety
and the objection from NATS is addressed and that any potential for impact upon
Glasgow Airport is fully assessed should they be minded to grant consent.
Electro-Magnetic Interference to Communications Systems
Page 194

Page 195

8.106 BT, the Joint Radio Operators and the Met Office offer no objection to the proposal and
there is nothing to suggest that there would be any impacts on any telecommunications
assets.
Traffic, Transport and the Impact on the Road Network
8.107 The proposed development will be accessed via a new access road from the A813
Stirling Road, located immediately to the south of the access junction to Murroch Farm.
The access will take the form of a priority junction which is designed to accommodate
all predicted loads and traffic for both the construction and operational phases of the
development. Considering the impact upon the road network and infrastructure, the
EIA sets out that with the exception of the turbine components, most traffic would be
normal construction plant and include grading tractors, excavators, high-capacity
cranes, forklifts and dumper trucks. Most of this would arrive at the site on low loaders.
It is expected that equipment, cabling and also the battery storage components will
also arrive by HGVs. Whilst it is anticipated that on-site borrow pits will be able to meet
up to 100% of the aggregate requirements, it is indicated any deliveries associated
with concrete materials, such as cement powder, water and sand/aggregates will be
sourced from local concrete suppliers.
8.108 The turbine components will be delivered on a variety of road transport platforms. In
addition to the turbine deliveries, up to two high-capacity erection cranes would be
needed to offload a number of components and erect the turbines. The cranes are
likely to be mobile cranes with a capacity up to 1,000 tonnes that are escorted by boom
and ballast trucks to allow full mobilisation on site. It is anticipated that turbine
components will be delivered by ship to Clydebank with all abnormal load traffic leaving
from Cart Street, Clydebank before travelling to Kilbowie roundabout and then
westwards on the A82 to Lomondgate roundabout before turning onto the A813 Stirling
Road to the site entrance. Whilst an alternative routing, detail and delivery access is
noted in the accompanying Transport Assessment, it is assumed that this does not
reflect the most up-to-date proposal as set out in the EIA itself. It would be expected
the Scottish Ministers to clarify and satisfy themselves of the correct routing, ensuring
up-to-date supporting documents are submitted.
8.109 The peak of construction in terms of vehicular movements is indicated to be up to 116
daily round trip journeys (40 Car/Lights and 76 HGV journeys). This is estimated to
occur in five of the months of the overall 21-month programme. Construction traffic is
generally expected to travel from the south of the site via the A82 and onto the A813
at Lomondgate. The distribution of construction traffic on the road network is indicated
to vary depending on the types of loads being transported. Traffic mitigation measures
identified during the construction period include the preparation of a detailed
Construction Traffic Management Plan. An Abnormal Load Transport Management
Plan, On-site Path Management Plan and Staff Travel Plan will also be prepared. The
EIA concludes that any impacts relate solely to the peak of construction activities and
that the construction period is short lived and the effects transitory in nature. Both
Transport Scotland and the Council’s Roads Service have no objection to the proposal
subject to conditions regarding a variety of issues. There is thus no objection to the
proposal on roads and traffic grounds.
Health and Safety
8.110 Nothing arises in the consultation responses undertaken by the Council or received by
the Energy Consents Unit to suggest that any concerns regarding health and safety
arise. It is for the Scottish Ministers to satisfy themselves that an unacceptable risk
does not occur from the development. With reference to the battery storage element of
the proposal, it would be expected that the Scottish Ministers consult Scottish Fire and
Rescue Service.
Page 195

Page 196

Decommissioning
8.111 Should the Scottish Ministers determine to grant planning permission for this proposal,
it would be expected that a requirement for decommissioning and site restoration
would be expected to be included in the conditions and suitable mechanism for site
restoration, which will be triggered by either the expiry of the permission or if the project
ceases to operate for a specific period. It would be expected that at the end of the
proposal’s operational life the turbines would be decommissioned and principal
elements removed; the site restored to its former use leaving little if any visible trace of
the turbines; the foundations, tracks and hardstandings; the electrical substation
building removed and the battery storage area fully restored with all infrastructure
removed. The approach would be expected to follow the Naturescot -
Decommissioning and Restoration Plans for Wind Farms Guidance
Community and Economic Benefit
8.112 The Applicant is proposing a Community Benefit Fund although full details have not
been provided other than a commitment to offering £5,000 per MW per year in
community benefits across seven Community Council areas. The community benefit
offer from the proposal is indicated to be equivalent to £0.4 million annually, or £14.4
million during a 40-year operational lifetime. The suggested benefit would be in line
with the Scottish Government Good Practice Principles for Community Benefits from
Onshore Renewable Energy Developments which notes the Scottish Government’s
continued promotion of community benefits to the value equivalent to £5,000 per MW
per annum index linked for the operational lifetime of the development.
Notwithstanding this, a community benefit package is not a material planning
consideration as clarified within the Scottish Government Good Practice Principles for
Community Benefits from Onshore Renewable Energy Development.
8.113 The Council’s Economic Development Manager has stated in a consultation response
that if funding was reinvested into energy efficiency and clean heat initiatives in line
with the Local Heat and Energy Efficiency Strategy (LHEES), alternative income
streams such as this will help address fuel poverty at local level. It is accepted,
however, that the use of community benefit funding will be determined by local
communities. The Applicant is also committed to offering shared ownership of the
proposed wind farm, allowing the community the opportunity to invest in and have a
share of the wind farm. The Economic Development Manager has stated in their
consultation response that the developer has indicated that up to 15% could be
available for shared ownership.
8.114 The EIA indicates that the proposed will generate economic benefits, both during its
construction, and during the operation and maintenance phase. During construction
the economic benefits that are expected are £4.2 million Gross Value Added (GVA)
and 54 years equivalent employment in West Dunbartonshire and £20.7 million GVA
and 322 years equivalent employment in Scotland. The operation and maintenance of
the development would bring lesser benefits with £0.4 million GVA and 2 jobs in West
Dunbartonshire and £1.6 million GVA and 17 jobs in Scotland.
8.115 The Council’s Economic Development Manager further advises that that there is the
potential for the Vale of Leven windfarm project to play an important role in
decarbonising West Dunbartonshire and tackling fuel poverty. Ultimately the net
economic benefits would be dependent upon the success or otherwise of the
development and any initiatives and investments made by the Applicant. However, it
is concluded that it likely that the proposed development will provide a net economic
benefit to the local area although this would require to be balanced with any potential
for loss of tourism income.
Page 196

Page 197

9. CONCLUSION
9.1 The approach to the assessment of this proposal reflects the fact that the Council is
not the determining authority but rather a consultee under The Electricity Act 1989.
9.2 This application has been submitted to the Scottish Ministers under Section 36 of the
Electricity Act 1989, as it is a development with a generating capacity of over 50MW.
Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. In this instance, the application is made
under the Electricity Act 1989 and therefore the Development Plan does not have the
primacy in the determination of the application. It does, however, provide a basis for
the assessment of this proposal and it is established practice to take the Development
Plan into account in such decisions. The Development Plan comprises National
Planning Framework 4 and adopted West Dunbartonshire Local Plan 2010. The
proposed West Dunbartonshire Local Development Plan 2020 is the Council’s most
up to date spatial strategy and is therefore also afforded significant weight in the
assessment.
9.3 The contribution of up to 70mw renewable energy generating capacity, with the
potential for an additional 20mw if the applicant proceeds with the Battery Energy
Storage System element of the proposed development, would draw strong support in
term of renewable energy targets and supporting the overarching aims of NPF4 to
achieve net zero targets. Notwithstanding this, by their very nature wind farms are
major pieces of infrastructure which often require exposed upland sites which tend to
be environmentally sensitive and relatively conspicuous within the landscape. In
assessing this particular proposal, it has been necessary to consider whether the
acknowledged impacts upon the environment and landscape are sufficiently great in
this instance to outweigh the benefits of expanding renewable energy generation
and/or any economic benefit which would be brought to West Dunbartonshire.
9.4 Policy 11 of NPF4 is one of the primary policies for the assessment of the development
type proposed. Wind farms have the potential to impact on a wide range of features
which is evident from the above assessment. The turbines proposed as part of the Vale
of Leven wind farm are extremely large with a blade tip height of up to 250m. With a
proposal of this scale, together with associated infrastructure inclusive of Battery
Energy Storage System, significant adverse landscape and visual impacts are
inevitable.
9.5 It is clear that the proposal has the potential to result in wide ranging visual impacts
from a variety of locations. This includes from within existing settlements and it also
follows that the proposed turbines will form a very significant feature within the
landscape surrounding existing settlements. However, Policy 11(e)ii. of NPF4 explicitly
accepts localised significant landscape and visual impacts and in this respect the
position is thus weighted towards development’s contribution to renewable energy
targets. In further considering the impacts It is considered that the proposed
development would have a significant adverse impact upon the landscape and the
visual amenity of the Loch Lomond and the Trossachs National Park, the Loch Lomond
National Scenic Area, and the Kilpatrick Hills Local Landscape Area. Loch Lomond
and the surrounding area is a landscape asset of national importance, which is
currently relatively unspoiled by major man-made development within the landscape.
The large turbines proposed would occupy a prominent position within the setting of
the National Park, and the introduction of a significant man-made element on the
horizon could significantly detract from the setting of the National Park / National
Page 197

Page 198

Scenic Area, the Lomond and the Trossachs National Park being only one of two
National Parks in Scotland. Both the National Park Authority and NatureScot object to
the proposal on this basis. The wind farm would also detract from the sense of
remoteness and wildness provided by the Kilpatrick Hills and locating a wind farm in
this location would have a significant impact on their setting. The existing landscape
affords the opportunity for recreational use and users of existing paths for example and
the wider landscape will also experience a significant and adverse impact. It is not
considered that the benefits of the development would outweigh these significant
impacts upon the National Park / National Scenic Area and the Kilpartick Hills which
form part of the setting of the park. Accordingly, the proposal is not considered to be
supported by Policies 4 and 11(e)ii and iii of NPF4 together with a range of policies
within the adopted West Dunbartonshire Local Plan including GN1, GD1, and DC6.
The proposal is also not supported with reference to policy KH1 of the Proposed West
Dunbartonshire Local Development Plan 2. Whilst Policy RE2 of the proposed Plan
relates to the Spatial Framework for Wind Energy and would previously have been
relevant, it conflicts with the approach set out in Policy 11 of NPF4. Policy 11 of NPF4
therefore has primacy.
9.6 Built and cultural heritage assets would also be impacted. Having fully reviewed this
potential and being guided by the position of the consultation responses to the Scottish
Ministers, it is considered that, subject to appropriate mitigation, there would not be
significant detrimental impact on the majority of the designations and assets. However,
the serious concerns of Historic Environment Scotland in respect of the adverse impact
on the integrity of the setting of Dumbarton Castle are noted and Historic Environment
Scotland object on this basis. The impact upon the setting of the scheduled monument
of Dumbarton Castle/Rock – a national asset is therefore clearly of significant concern
and with an objection from the government agency responsible for the care and
promotion of Scotland’s Historic Environment, the impact cannot be considered
acceptable and is therefore not supported by Policies 7 and 11(e)vii of NPF4 together
with Policy of the West Dunbartonshire Local Plan and Policy BE1 of the proposed
Local Development Plan.
9.7 Biodiversity matters such as the impacts upon designated sites, habitat, peatland,
ecology, protected species and ornithology will be impacted upon by the proposed
development. A variety of habitats will be impacted including blanket bog and wet
modified bog. It is considered that subject to suitable mitigation measures including a
habitat management plan together with the following recommendations from
NatureScot, notably with reference to peatland restoration, the impact of the proposal
upon habitats would be acceptable. In terms of protected and other species, it is
expected that the Scottish Ministers in determining the application will fully consider
the points highlighted by the Council’s Biodiversity Officer, ensure identified mitigation
measures secured, follow the recommendations set out in NatureScot’s consultation
response and require the implementation of a suitable Habitat Management Plan to
ensure any effects of the development are minimised. Species protection plans would
also be required. With this approach, the impacts of the proposed development upon
protected species and wider ecology could be considered acceptable.
9.8 Notwithstanding the above, in terms of the consideration of the impact upon
designated sites, the applicant fails to consider or assess local designations relative to
the proposed site. It is identified that there are five Local Nature Conservation Sites
(LNCS) which would be impacted by the development, either directly or indirectly. It
therefore cannot be concluded that the development proposal would not result in any
adverse impacts upon locally designated sites. Given this, a conclusion with reference
to Policies 3, 4(d) and 11(e)ix of NPF4 together with Policy E3A of the Local Plan and
Policy ENV1 of the Proposed Plan.
Page 198

Page 199

9.9 It is expected that wide ranging biodiversity enhancements are embedded into the final
detail of the proposal and there is the question on whether any proposed biodiversity
enhancements meet the requirements of Policy 3 of NPF4. It will ultimately be for
Scottish Ministers as determining authority to consider this and ensure that conditions
secure the delivery of meaningful biodiversity enhancement and nature networks
across the site. NatureScot’s position that greater ambition is required in terms of the
extent of proposed peatland restoration is specifically noted and it is expected that the
extent of peatland restoration proposed will be considered in detail by the Scottish
Ministers.
9.10 In assessing residential amenity, impacts in respect of residential visual amenity have
been considered and it is concluded these would be acceptable. Impacts in respect of
air quality, noise and shadow flicker have also been considered, informed by the
consultation response from the Council’s Environmental Health Service. Subject to the
Scottish Ministers ensuring that all matters raised in respect of noise impact are
addressed in the event that they were minded to grant consent, the impact upon
residential amenity will be acceptable and there are no objections to the proposal on
the impact upon residential amenity.
9.11 The various consultee responses to both the Scottish Government and the limited
responses to the Council suggest that subject to conditions to address a range of
different matters, the proposed development would not result in any unacceptable
impacts on the remaining matters assessed in this report. The exceptions are currently
NATS and Glasgow Airport whose consultation responses to the Scottish Government
are currently objections. Ultimately, however, Scottish Ministers are the determining
authority in this case and it is for them to consider the consultation responses and how
they wish to address the concerns raised in coming to any conclusion on the
application.
9.12 The planning history of the site is also a relevant consideration. In 2012 planning
permission was applied for the erection of ten wind turbines (max hub height 79m and
max blade tip height 120m) with a total installed capacity of around 20MW and
associated works including the erection of a meteorological mast, control building,
ancillary infrastructure, temporary ground works and construction compound. Whilst
the current proposal is not related to this previous proposal, it is sited within the same
area as the current proposal albeit with a different access route. The application was
considered by Planning Committee and refused due to the significant adverse visual
and landscape impact on the Kilpatrick Hills Regional Scenic Area/Local Landscape
Area, the significant adverse visual and landscape impact on the setting of Loch
Lomond and the Trossachs National Park and the Loch Lomond National Scenic Area.
The National Park Authority note in their objection to the Scottish Ministers that it was
consulted on the previous proposal and raised an objection due to the predicted
significant adverse visual impact. The Park specifically note that the turbines now
proposed would be up to 250m to blade tip height which is more than double the height
of the previous proposal. NatureScot (as Scottish Natural Heritage) also objected to
this previous proposal on the grounds that it would have an adverse impact upon the
integrity of the National Park and Loch Lomond National Scenic Area (NSA).
9.13 Overall, it is considered that there would be a significant adverse impact upon the
National Park / National Scenic Area together with the Kilpatrick Hills Local Landscape
Area. Considering the impact upon the historic environment, the integrity of the setting
of Dumbarton Castle would also be unacceptably impacted upon. The adverse effects
must, however, be weighed against the positive benefits of the proposal. It is accepted
that it likely that the proposed development will provide a net economic benefit to the
Page 199

Page 200

local area and community benefits would also likely be realised. The proposal will also
contribute to renewable energy targets. However, the potential benefits cannot come
at any cost. In respect of the National Park, National Scenic Area and Kilpatrick Hills
Local Landscape Area, significant adverse landscape and visual impacts are likely and
it is concluded that these warrant objection from the Council to the proposal. Historic
Environment Scotland highlight a significant adverse impact upon the setting of
Dumbarton Castle also raises concerns to the point that it is considered that the
potential impact upon this key historic national asset within West Dunbartonshire also
warrants an objection from the Council. Finally, in terms of the potential impact upon
the five Local Nature Conservation Sites (LNCS) which the Council’s Biodiversity
Officer advises has not been considered, a holding objection is warranted pending an
assessment of the impact upon these locally designated sites being provided by the
applicant for review.
9.14 It must be noted that should the Planning Committee accept the recommendation to
formally object to the proposed Vale of Leven Windfarm, this will trigger a Public Local
Inquiry in terms of Section 62 and Schedule 8 of the Electricity Act 1989 unless the
Council subsequently withdraws its objection.
10. COUNCIL’S POSITION ON THE APPLICATION
10.1 It is recommended that this Committee Report is forwarded in full to the Scottish
Ministers as presenting the Council’s full formal response to the consultation and that
it is highlighted that the Council objects to the application for the following reasons:
 The Council objects to the proposal as the introduction of a wind farm into the
Kilpatrick Hills could have a significant adverse impact upon the National Park /
National Scenic Area together with the Kilpatrick Hills Local Landscape Area.
Accordingly, the proposal is not considered to be supported by Policies 4 and
11(e)ii and iii of NPF4 together with a range of policies within the adopted West
Dunbartonshire Local Plan including GN1, GD1, and DC6. The proposal is also not
supported with reference to Policy KH1 of the Proposed West Dunbartonshire
Local Development Plan 2.
 The Council also objects to the proposed windfarm as it could have a significant
adverse impact upon the setting of Dumbarton Castle as a scheduled monument
and it would therefore be considered contrary to Policies 7 and 11(e)vii of NPF4
together with Policy BE5 of the West Dunbartonshire Local Plan and Policy BE2 of
the proposed Local Development Plan.
 The Council further submits a holding objection to the proposal in respect of the
failure of the applicant to consider or assess local nature conservation site
designations relative to the proposed site. In the absence of this, it therefore cannot
currently be concluded that the development proposal would not result in any
adverse impacts upon locally designated sites in accordance with Policies 3, 4(d)
and 11(e)ix of NPF4 together with Policy E3A if the Local Plan and Policy ENV1 of
the proposed Plan.
10.2 Finally it is recommended that, in as far as required, reviewing and responding to any
additional details submitted in respect of the holding objection set out in paragraph
10.01 together with all matters arising in respect of any Public Local Inquiry are
delegated to the Chief Officer - Regulatory and Regeneration.
Page 200

Page 201

Alan Douglas
Chief Officer – Regulatory and Regeneration
Date: 7th August 2024
______________________________________________________________
Person to Contact: James McColl, Development Management Team Leader
Email: james.mcColl@west-dunbarton.gov.uk
Appendix 1: Location Plan
Background Papers: 1. Application documents
2. National Planning Framework 4
3. West Dunbartonshire Local Plan 2010
4. Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended
5. Kilpatrick Hills Local Landscape Area – Statement of
Importance
6. Renewable Energy Local Development Plan
(Proposed Plan) Planning Guidance November 2016
7. Naturescot - Decommissioning and Restoration
Plans for Wind Farms Guidance
8. Scottish Government Draft Planning Guidance:
Biodiversity
9. Scottish Government’s Policy on Control of
Woodland Removal
Wards affected: Ward 2 (Leven)
Page 201

Page 202

ITEM 9 - APPENDIX 2