WEST DUNBARTONSHIRE COUNCIL 
Report by Planning, Building Standards and Environmental Health Manager 
Planning Committee: 4th June 2025 
DC24/091/FUL: Further application under Section 42 to not comply with condition
11 of planning permission DC21/115/FUL at Queens Quay Full Dev
Site, Cart Street, Clydebank by Clydeside Regeneration Limited 
1. REASON FOR REPORT 
1.1 The planning application which seeks to vary a condition attached to a previous
planning permission and the proposal is a national development as set out in the
Schedule to the Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009 as the application site sits within the Clyde Mission area as set out
in National Planning Framework 4. Under the terms of the approved Scheme of
Delegation, it therefore requires to be considered by the Planning Committee before
being determined by the Council. 
2. RECOMMENDATION 
2.1 That the Planning Committee hears the applicant and those who have made
representations and refers the application to Full Council for determination with a
preliminary recommendation, based on the information considered to date, that it be
approved, subject to the conditions in Section 9 below 
3. DEVELOPMENT DETAILS 
3.1  The site comprises the Queens Quay Masterplan area consisting of 23ha. The extent
of the masterplan area lies to the south of Clydebank Town Centre on the north bank
of the River Clyde, which was previously John Brown & Co shipyard. Planning
permission in principle was granted (DC15/234) for mixed use development including
residential (including affordable/community housing), retail (Class 1), financial/service
(Class 2), restaurant (Class 3), public house, office (Class 4), hotel (Class 7), care
home (Class 8), health centre (Class 10), assembly and leisure (Class 11) uses, with
associated car parking, access road, quay wall improvements and landscaping in
March 2016. The approved Masterplan and Design Framework seeks to redevelop the
area through a residential-led, mixed-use development which re-integrates the
waterfront with the wider Clydebank area. 
3.2 Significant process has been made on the re-development of the site with the spine
road infrastructure and the works around the basin now complete and in place.
Planning permission was granted for the erection of a new health and care centre in
May 2018 (DC16/244) and permission for the erection of 146 flatted dwellings and 4
commercial units was granted in March 2019 (DC18/272). In January 2018, planning
permission was granted for the erection of a water source heat pump energy centre
(DC17/231). The new Clydebank Care Home and Energy Centre have been completed
and the Health and Care Centre as well as 146 affordable homes. In addition, in 2021
planning permission was also granted for a Section 42 application (DC21/115/FUL) to
vary Condition no. 1 (development phasing), Condition no. 3 (Design Codes reference)
and Condition no. 27 (Bird Hazard Management Plan) of permission DC15/234. 
ITEM 5a

Page 2

3.3 This current application seeks permission to modify the terms of condition 11, which
was attached to application DC21/115/FUL. Condition 11 of application DC21/115/FUL
reads as follows: 
All applications for the approval of matters specified in conditions shall comply with the
recommendations of the Flood Risk Assessment (October 2015), that is, land raising
of low-lying areas of the site to above the 1 in 200 year plus climate change flood level
(set at 5.1m AOD), and finished floor levels of all buildings are to be set to at least
0.6m above the 1 in 200 year plus climate change flood level at 5.7m AOD. All
development shall be implemented in accordance with these details. 
3.4 The applicant has proposed an amended change in wording as follows: 
All applications for the approval of matter specified in conditions shall comply with the
recommendations of the Flood Risk Assessment (October 2015), that is, land raising
of low-lying areas of the site to above the 1 in 200 year plus climate change flood level
(set at 5.1m AOD) and finished floor levels of all buildings are to be set at least 0.6m
above the 1 in 200 year plus climate change floor level at 5.7m AOD EXCEPT on the
site frontage shown on Goodsons Plan 12745-GOO-XX-XX-DDR-C-520600, where
the finished floor level will be set at 6.1m AOD. All development shall be implemented
in accordance with these details. 
4. CONSULTATIONS 
4.1  West Dunbartonshire Council Roads Service (Flooding)
No objections. It is noted that the Flood Risk Assessment (October 2015) used
UKCP09 with 20% for Climate Change allowance for the finished floor levels.
Recommend that the finished floor levels are checked against the current Climate
Change Allowances for the Clyde region using UKCP18 predictions for this site. 
4.2 Scottish Environment Protection Agency (SEPA)
Initially provided a holding objection and requested further information relating to an
update to the flood risk area and minimum Finished Floor Level as well as an update
of the proposal to ensure compensation for any additional loss of floodplain capacity.
Once further information was provided SEPA confirmed that they would have no
objection if the wording were updated to reflect the updated flood level of 5.4m AOD
and FFL of 6.1m AOD across the whole site. 
5. REPRESENTATIONS 
5.1 Seven objections were received from neighbouring residents. The full details are
contained within the planning file and are available for public viewing. However, the
key points of objection can be summarised as follows: 
Traffic 
• There is currently a high level of traffic on Dumbarton Road. 
Construction
• Concerns relating to noise from the development when working from home and
within garden grounds 
• Noise, piling and general pollution may occur during construction and have an
adverse impact on local residents 
• Previous construction works have caused cracks to appear in neighbouring
buildings.

Page 3

Ecology and biodiversity
• The development will impact upon ecology and wildlife including Skylark, deer and
rabbits.
• Concerns for contamination of the current water sources and the possible
contamination of the ecosystem.
• There are trees on the application site which may be removed. 
Other matters
• There is no information on what is proposed to be built on site and no details of
building elevations and materials 
• Residents view of the waterfront will be lost
• The development may result in an increase in rodents 
• Concerns regarding the impact on property values 
• The application site comprises a green area which will be lost.
• Concerns regarding arrangements for the increase of water and drainage, with
existing drains already clogged.
• The development may exacerbate current problems with heating and water.
• Land at Cable Depot Road should be developed rather than this site.
• Affordable housing and a development for the community should be proposed for
the site. 
The concerns raised shall be considered in the appraisal in the Section 7 below. 
6. ASSESSMENT AGAINST THE DEVELOPMENT PLAN 
6.1 This application, submitted under Section 42 of the Town and Country Planning
Scotland Act 1997 (as amended), seeks to vary the terms of condition 11 of planning
permission DC21/115/FUL which itself varied planning permission in principle
DC15/234. Annex H of Scottish Government Circular 3/2022 – Development
Management Procedures sets out that in determining Section 42 applications, planning
authorities may only consider the issue of the conditions to be attached to any resulting
permission. However, as the effect of granting this Section 42 application will see the
planning permission renewed, the Planning Authority is entitled to look at the principle
of development in the light of any material change in the Development Plan policies.
Whilst the adopted Local Plan and proposed Local Development Plan 2 were both in
place at the time the last Section 42 application (DC21/115/FUL) was considered and
effectively renewed the permission in being granted, National Planning Framework 4
has become part of the development plan since this previous application. It is therefore
appropriate to consider the principle of the development with reference to the
development plan. 
National Planning Policy 4
6.2 The site is within the ‘Clyde Mission’ area, identified as one of eighteen National
Developments with National Planning Framework 4 which recognises that significant
land assets are under-utilised across the Clyde, (including waterfront sites such as
Queens Quay) and that longstanding inequality, in relation to poor environment and
health outcomes require to be tackled as a national priority. The Clyde Mission
designation aims to repurpose and reinvigorate vacant and derelict land as well as
adapting the area to the impacts of climate change, where nature-based solutions
would be particularly supported. Delivery of the development proposals for the site
would support the objectives of this national development.

Page 4

6.3 Policy 1 relates to tackling the climate and nature crises and states that when
considering all development proposals significant weight will be given to the global
climate and nature crises. Policy 2 also relates to the climate in the form of climate
mitigation and adaptation and states development proposals will be sited and designed
to minimise lifecycle greenhouse gas emissions as far as possible and development
proposals will be sited and designed to adapt to current and future risks from climate
change. Policy 3’s intent is to protect biodiversity, reverse biodiversity loss, deliver
positive effects from development and strengthen nature networks. Subject to a variety
a matters being addressed by condition, the proposal would have a neutral impact in
respect of Policies 1, 2 and 3. 
6.4 Policy 7 states that development proposals with a potentially significant impact on
historic assets or places will be accompanied by an assessment which is based on an
understanding of the cultural significance of the historic asset and/or place. A variety
of listed buildings lie in the vicinity of the site including the Category A listed Titan
crane. In previously granting planning permission for the site, it was concluded there
was no adverse impact and this position remains. Policy 9 relates to brownfield, vacant
and derelict land and empty buildings and states that development proposals that will
result in the sustainable reuse of brownfield land including vacant and derelict land and
buildings, whether permanent or temporary, will be supported. The redevelopment of
this large brownfield site is this supported by the Policy. Policy 11 supports
development proposals for all forms of renewable, low-carbon and zero emissions
technologies. 
6.5 Development proposals will be designed to improve the quality of an area whether in
urban or rural locations and regardless of scale as per Policy 14. Policy 15 relates to
local living and 20-minute neighbourhoods. Development proposal will contribute to
local living including, where relevant, 20-minute neighbourhoods. The application site
is located in a central, accessible urban area near a wide range of facilities and
transport connections. Future applications for matters specified by condition for the
detail of the development on site will ensure proposals are acceptable with reference
to the existing settlement pattern, and the level and quality of interconnectivity of the
proposed development with the surrounding area, including local access to affordable
and accessible housing options, ability to age in place and housing diversity. There is
thus no conflict with these Policies. 
6.6 Policy 16 relates to quality homes. Part (a) states that Development proposals for new
homes on land allocated for housing in LDPs will be supported. This site is for identified
under the adopted and proposed plans and is therefore supported under this Policy. 
6.7 Policy 22 - Flood risk and water management states that proposals will not increase
the risk of surface water flooding to others, or itself be at risk; manage all rain and
surface water through sustainable urban drainage systems (SUDS) and seek to
minimise the area of impermeable surface. The proposal has no objections from SEPA
and as such there is no conflict with the policy. 
6.8 Policy 23 relates to Health and safety. Part (e) states that development proposals that
are likely to raise unacceptable noise issues will not be supported. No concerns arise
in respect of this policy. Policy 28 relates to Retail and states that development
proposals for retail (including expansions and changes of use) will be consistent with
the town centre first principle. 
6.9 With appropriate planning conditions, the proposed development is supported by all
policies of NPF4 and is assessed fully in Section 7 below.

Page 5

West Dunbartonshire Adopted Local Plan 2010 
6.10 The application site is identified as a regeneration priority, and under Policy RP1 there
is support for the redevelopment of underused, vacant and derelict land. The majority
of the proposal site is identified as housing development opportunities and Policy H1
identifies the site for private sector housing development with an indicative capacity of
1028 units and Policy H3 identifies the site for social rented housing development with
an indicative capacity of 60 units. 
6.11 Design and layout considerations are set out in Policy GD1 which outlines that all new
development is expected to be of high-quality design and to respect the character and
amenity of the area in which it is located. Proposals are required to be considered
against a list of development control criteria. Policy H4 outlines requirements of new
housing developments in relation to design standards and Policy GN1 requires
consideration of the impact of development on the Green Network. Policy BE2 aims to
ensure that in relation to any works affecting a listed building or its setting, its
appearance, character and setting is not adversely affected and Policy BE4 presents
the Titan Crane as a Listed Building opportunity where its proposed leisure/ tourism
uses (already implemented) should be compatible with surrounding land uses. Policy
R2 provides detail on the open space provision expected as part of a proposal. Policy
R5 requires developers of waterfront sites to provide paths to and along the riverbank.
In accordance with Policy DC3, development within the safeguarding zone around
Glasgow Airport, should not affect the operational integrity or safety of the airport. In
previously granting planning permission for the site it was concluded the development
was acceptable with reference to the above policies and this position remains. 
6.12 In respect of retail activities proposed, Policy RET1 requires a sequential approach to
site selection for new retail, commercial leisure, cultural and public service
development. Policy RET2 requires that consideration be given to the availability of
expenditure in the catchment to support the development, the impact on the vitality
and viability of town centres, whether the development addresses any quantitative or
qualitative deficiencies in retail provision, and other technical, accessibility and
environmental matters. In previously granting planning permission for the site it was
concluded the development was acceptable with reference to the above policies and
this position remains. 
6.13 Policy T1 supports measures to provide sustainable transport modes including
footpaths, cycle routes and improved access to public transport. Policy T2 states that
the Council will identify opportunities for access improvements to Regeneration
Priorities. Policy T4 requires development sites to be well integrated into walking,
cycling and public transport routes. Significant new development is to be accessible to
public transport networks and developer contributions will be required where such
development is shown to impact on public transport infrastructure. There is no change
to this position since the previous grant of planning permission. 
6.14 Policy E2A states that development likely to have a significant effect on a Natura 2000
site will be subject to an appropriate assessment. Where an assessment is unable to
conclude that a development will not adversely affect the integrity of the site
development will only be permitted where: there is no alternative solutions; there are
imperative reasons of overriding public interest. Policy E2B states that development
that affects an SSSI will only be permitted where an appraisal demonstrates: the
objectives of the designated area and the overall integrity of the area would not be
compromised; or any significant adverse effects are clearly outweighed by social or
economic benefits of national importance. In this instance the Natura 2000 site is the
Inner Clyde SPA. This was fully assessed in previously granting planning permission.

Page 6

6.15 Policies F1 states that the Council will resist development that is likely to increase the
risk of flooding or are located in a functional flood plain. Policy F2 requires inclusion of
sustainable urban drainage. Policy F3 states that the Council will use the standards of
flood protection set out in Scottish Planning Policy. The up-to-date development plan
position in flooding is set out within Policy 22 of NPF4 which therefore has primacy in
this instance. 
6.16  Planning permission in principle has previously been granted for the site and it remains
that proposal overall complies with the policies of the adopted local plan and is
assessed fully in Section 7 below. 
7. ASSESSMENT AGAINST MATERIAL CONSIDERATIONS 
West Dunbartonshire Local Development Plan (LDP2) Proposed Plan
7.1 On 15 March 2023, the Planning Committee took a decision that the Council would not
adopt Local Development Plan 2. The Proposed Local Development Plan 2 (LDP2),
incorporating the recommended modifications of the Examination Report received on
22 April 2020, which were accepted by the Planning Committee of 19 August 2020,
remains the Council’s most up to date spatial strategy and is therefore afforded
significant weight in the assessment and determination of planning applications,
subject to compatibility with NPF4. The Scottish Ministers’ Direction relating to the
adoption of LDP2, dated 18 December 2020, is also a material consideration. 
7.2 Through Policy Queens Quay Policy 1 land to the West of Garth Drive, known as Plots
4 and 5, will continue to be supported for Business, Industrial, Commercial and
Restaurant uses. Hotel or commercial leisure uses will also be considered in this area
where the criteria in Policy E2 are met. The development of the site is supported by
these policies. 
7.3 Policy CP1 seeks to ensure that all new development will be expected to contribute
towards creating successful places by having regard to the six qualities of a successful
place (distinctive, adaptable, resource efficient, easy to get to/move around, safe and
pleasant, and welcoming). Policy CP2 requires the integration and consideration of
green infrastructure from the outset of the design process through to its maintenance
and stewardship of the resource. The proposal offers no conflict with the six qualities
of successful places. 
7.4 Policy H2 states that sites in Schedules 2 and 3 are reserved for new housing
development. Policy H4 relates to residential amenity. The policy states that the
Council will protect, preserve and enhance the residential character and amenity of
existing residential areas at all times. No residential amenity concerns arise. 
7.5 Policy SC1 Sequential Approach and Policy SC5 Ancillary Retail Uses relate to retail
and state that proposals for retail, commercial and leisure investment, and other key
Town Centre uses, should align with the sequential approach and that development
proposals that incorporate or assist in the delivery of ancillary and compatible uses,
which enhance the sustainability and vitality of the community, will be supported where
it can be demonstrated that they meet a local need, complement the primary use and
have no negative impact on the network of centres 
7.6 Policy BE2 relating to Listed Buildings states that development that would adversely
affect the special interest, character or setting of a listed building will not be permitted
unless it can be clearly demonstrated and it meets certain criteria. The proposal is
acceptable with reference to this policy.

Page 7

7.7 Policies GI2 and GI4 relate to green infrastructure. Policy GI2 requires new
development to meet with the open space standards set out within the policy. 
7.8 Policies ENV1, ENV4, and ENV6 are all similar to the ecology and tree, water
environment and flooding policies of the adopted Local Plan, although in respect of
flooding, the up-to-date development plan position is set out within Policy 22 of NPF4
which has primacy. Subject to conditions, there is no conflict with these policies. 
7.9 Policies ENV8 relates to Air, Light and Noise Pollution and Policy ENV9 Contaminated
Land. Policy CON1 requires development proposals to accord with Designing Streets,
the National Roads Development Guidelines, and be in alignment with the provisions
of the Regional and Local Transport Strategies. Developments which do not meet
these requirements will not be acceptable unless sufficient justification has been
provided to demonstrate why a departure from these strategies is required. No
concerns arise in respect of the relevant matters. 
7.10 It is considered that overall and subject to conditions, the application proposal being
assessed complies with the relevant policies above. 
Creating Places Guidance and Green Network and Green Infrastructure Guidance
7.11 The Creating Places Supplementary Guidance – November 2022 seeks to achieve
high quality development with a design led approach based on a thorough appraisal of
the site and an analysis of its context and sets out that this is expected for all
development proposals and it is considered this is achieved. No conflicts therefore
arise with the guidance. 
7.12 The Green Network and Green Infrastructure Supplementary Guidance - November
2022 seeks to ensure that the proposal also integrates landscaping and green
infrastructure as part of the setting of the new development and open space created.
This will include a focus on biodiversity enhancement. 
Assessment of Section 42 applications
7.13 As set out in paragraph 6.1 above, in determining a Section 42 application, planning
authorities are normally limited to considering the matter of the conditions to be
attached to any resulting permission. A Planning Authority may grant the permission
subject to conditions differing from those subject to which the previous permission was
granted or the Planning Authority may decide that the permission should be subject to
the same conditions as originally granted. The former decision would result in the grant
of a new permission with different conditions, and the latter decision would result in the
refusal of the application, and no new permission would be granted. 
7.14 The most recent permission (DC21/115/FUL) for the site expired following the
submission of this application and cannot be implemented. The courts have provided
guidance on such situations. As the practical effect of a refusal of this Section 42
application will in effect mean that the development would not be capable of being
progressed, the Planning Authority is entitled to look at the principle of development in
the light of any material change in the Development Plan policies. This is the case
even when Section 42 stipulates that ‘only the question of the conditions’ shall be
considered. 
7.15 The context of this particular case is that DC21/115/FUL was determined by the
Planning Committee in June of 2021 under the adopted Local Plan (2010) and the
proposed Local Development Plans 1 and 2. Since then National Planning Framework
(NPF) 4 has been adopted as part of the development plan. Proposed Local

Page 8

Development Plan 1 no longer forms a material planning consideration however
proposed Local Development Plan 2 remains the Council’s most up to date spatial
strategy, subject to compatibility with NPF4. 
7.16 The 1997 Act requires that when making decisions under that Act it is necessary to
have regard to the Development Plan and make decisions that accord with it unless
material considerations indicate otherwise. It is therefore necessary to consider the
principle of development, consider how it complies with current policy, and consider
whether the application should be refused, or approved with amended, or new,
planning conditions. 
Principle of Development
7.17 Since the planning consent to which the condition applies can no longer be
implemented, the effect of granting this Section 42 application means that a new
planning permission will be granted. The Planning Authority is therefore required to
consider the principle of development in the light of any material change in the
Development Plan policies. 
7.18 The site is part of an allocation for housing in both the adopted Local Plan and
proposed Local Development Plan 2 with a retail allocation also in the adopted Local
Plan and mixed-use development in the proposed Local Development Plan 2. Queens
Quay is the largest and most significant regeneration opportunity in West
Dunbartonshire, covering an area of 41 hectares to the south of Clydebank Town
Centre and fronting onto the River Clyde. It lies within the Clydebank Waterfront
Strategic Economic Investment Location which supports the key sectors of business
and financial services, as well as life sciences. The development of this site is
consistent with the both the adopted Local Plan, proposed Local Development Plan 2
and NPF4 of providing housing and business in sustainable locations through urban
consolidation and utilising brownfield land thereby reducing the need to encroach onto
greenfield sites and maximising sustainability benefits. 
7.19 It is therefore considered that there continues to be support within both the adopted
and proposed plans for housing and mixed-use development in this location and is
consistent with policies outlined above. Whilst concerns are raised in the objections
received in respect of the development of the site and concerns specific to traffic, Noise
and ecology, such matters were fully considered in previously granting planning
permission in principle. Contrary to the objections received, the application site does
not comprise an area of greenspace Overall, the principle of the development remains
acceptable. 
Flood risk and water management 
7.20 The Section 42 application has been submitted to alter Condition 11 so that figures
noted in the original condition relating to land raising and floor level can be amended.
To assess if it is acceptable to amend these figures there needs to be an assessment
as to the reason the figures were first conditioned and whether or not these figures still
apply. 
7.21 The condition was applied as “the site is at risk from flooding by the adjacent River
Clyde”. Since the attachment of this condition to the previous granting of planning
permission in principle in 2016, there has been a change in policy position in that
National Planning Framework 4 has been introduced. Through policy 22 of NPF4, there
has been a shift to promoting an avoidance as a first principle and reducing the
vulnerability of existing and future development to flooding. In addition, updated flood
modelling for the Clyde area is now available.

Page 9

7. 22 The applicant proposed to update the wording of the condition to add reference the
site frontage where the proposed finished floor level will be set at 6.1m AOD. This
would mean the rest of the condition originally added would be maintained with the rest
of the site sitting at 5.07m AOD. SEPA were consulted on the application and initially
objected to the proposal requesting further information from the applicant. When this
was provided, SEPA suggested that the objection would be maintained unless the
condition was further reworded to ensure that finished floor levels were set at 6.1m
AOD across the whole of the site. The applicant has confirmed that this would be
acceptable by them and as such the condition has been further reworded to include
this recommendation by SEPA. 
7.23 As such, it is recommended that the condition read as follows: 
“All applications for the approval of matters specified in conditions shall include land
raising of low-lying areas of the site to above the 1 in 200 year plus climate change
flood level (set at 5.4m AOD), and finished floor levels of all buildings are to be set to
at least 0.6m above the 1 in 200 year plus climate change floor level at 6.1m AOD. All
development shall be implemented in accordance with these details.” 
7.24  When undertaking the assessment of the proposed variation to Condition 11, Policy
22 of NPF4 is relevant. Policy 22 (Flood risk and water management) of NPF4 seeks
to strengthen resilience to flood risk by promoting avoidance as a first principle and
reducing the vulnerability of existing and future development to flooding. Policy 22
states that development proposals at risk of flooding or in a flood risk area will only be
supported in certain circumstances, including the redevelopment of previously used
sites in built up areas where the LDP has identified a need to bring these into positive
use and where proposals demonstrate that long - term safety and resilience can be
secured in accordance with relevant SEPA advice. In such cases, it will be
demonstrated by the applicant that: all risks of flooding are understood and addressed;
there is no reduction in floodplain capacity, increased risk for others, or a need for
future flood protection schemes; the development remains safe and operational during
floods; flood resistant and resilient materials and construction methods are used; and
future adaptations can be made to accommodate the effects of climate change. The
Council’s Road Service offer no objections on flooding grounds but highlight the
updated climate modelling. SEPA offer no objection to the proposal. However, in order
to take account of the updated climate and flood modelling, the granting of this
application requires to be subject of the condition set out in paragraph 7.23 above. It
is considered that subject to this condition the development proposal is acceptable with
reference to with the adopted Local Plan and proposed Local Development Plan
policies and with the increased flood resilience resulting from the additional
conditioned requirements and the more compliant with Policy 22 of NPF4. 
Outstanding matters raised in representations 
7.25 Considering the outstanding points within the objections not already covered in the
assessment above, whilst an element of disruption can be expected during the
construction phase, this can be mitigated against through a Construction
Environmental Management Plan and this is recommended to be addressed by
condition. Damage to neighbouring properties would be a civil matter between the
parties involved. This application relates to a planning permission in principle and as
such the detail of the development including layout, design and drainage will be
addressed via future applications for the approval of matters specified by condition.
Loss of view, the reduction in property value and concerns regarding rodents are not
material planning considerations and there is nothing to suggest the development
would result in adverse issues relating to heating and hot water.

Page 10

8. CONCLUSION 
8.1 The acceptability of the re-development of the site has previously been established
with the granting of planning permission in principle (ref: DC15/234) and previous
Section 42 applications (ref: DC21/115/FUL). This application is a Section 42
application to vary the terms of condition 11 of planning application DC21/115/FUL.
Following consideration of the applicants proposed variation to the condition and
informed by the consultation responses from SEPA and the Council’s Road Service, it
is concluded, subject to the further revised wording being applied as set out in
paragraph 7.23 above, the proposal is in accordance with Policy 22 of NPF4. 
8.2 As the effect of granting this Section 42 application is that the previous planning
permission is renewed and a new permission granted, it has been considered whether
any change in any material considerations has occurred since the previous grant of
permission. In this respect, NPF4 is now part of the development plan. Having
assessed the proposal with reference to NPF4, it remains that, subject to the conditions
set out below, it is considered that the proposal is acceptable with reference to the
development plan. All other conditions are re-imposed to this permission together with
additional conditions 26 and 27 to address low carbon energy technologies and
biodiversity to comply with policies 3 – Biodiversity and 11 – Energy of NPF4 
9. CONDITIONS 
1. For the avoidance of doubt, Phase 1 works relate to any works associated with the
spine road, road improvements, quay walls, and public realm. The linear park will be
completed following completion of the relevant residential phase to which it relates with
the pocket parks and basin play park to be completed within a timescale agreed with
the Planning Authority, all identified on annotated masterplan E2604.Sk001revJ
received on 22nd June 2021 in connection with planning application DC21/115/FUL. 
Reason: To provide clarity and to ensure the conditions relate to the correct phasing. 
2 Prior to commencement of any development on site, further applications for the
approval of matters specified below shall be obtained from the planning authority.
Applications shall include: 
a) site layout plans showing the position of all buildings, roads, footpaths, parking
areas, walls, fences and landscaping;
b) block and layout plans and elevations of each building, showing dimensions and
palettes of external materials;
c) landscape and streetscape plans showing the location and species of all proposed
trees, shrubs, hedges, palettes of hard landscaping materials and street furniture; 
d) details of existing and proposed ground levels, and finished floor levels, relating to
a clearly identified fixed datum point;
e) a detailed report on the extent, scale and nature of any contamination of the site;
and
f) a detailed remediation scheme detailing the measures necessary to bring the site
to a condition suitable for the intended use. 
Reason: To ensure full details are provided for each aspect of the development. 
3. As part of any application(s) for approval of matters specified in conditions, and with
regard to the requirements of condition 2 above, the design and layout of development
parcels shall comply with the design principles/intents set out in sections 05 and 06 of
the Design & Access Statement (Rev C, March 2016), the accompanying Framework

Page 11

Drawing No. P(0) 003 Rev E (or any subsequent amendments thereto), and the
approved Design Codes for Queens Quay (approved September 2020) unless
otherwise agreed in writing by the Planning Authority. 
Reason: To ensure the design principles agreed in these documents form part of the
consideration of any subsequent planning applications 
4. At the same time as the submission of the first commercial use application (excluding
any district heating system) a mini masterplan shall be submitted for the mixed used
area coloured yellow on Drawing No. P(0) 003 rev E (including building plots, design
principles and a parking strategy) for the further approval of the Planning Authority. 
Reason: In order to allow consideration of the proposed mix of uses, and to ensure
consistency of design standards across the site and that a parking strategy is
considered early in the design process.  
5. As part of any application(s) for the approval of matters specified in conditions for
Phase 1 works, and notwithstanding the requirements of condition 2c) above, details
of the landscaping strategy for the spine road, linear park and pocket parks shall
include: 
a) location and species of all proposed trees, shrubs, hedges; 
b) palettes of hard landscaping materials, street furniture and play equipment;
c) identify potential locations for public art; and 
d) the means of management and maintenance of the landscaping and public open
space. 
Reason: To ensure full details are submitted for further consideration. 
6. No development (other than the spine road works, road improvement works, quay wall
works, public realm works, health and care site works and investigative works, but
excluding the linear and pocket parks) shall commence on site until such time as a
site-wide water environment investigation and assessment has been submitted to and
approved in writing by the Planning Authority. The report shall be prepared by a
suitably qualified person and as a minimum shall include the following: 
a) Suitable and sufficient monitoring from across the site in order to identify the
extent, scale and nature of contamination with regards to the water environment.
b) An appropriate level of assessment that identifies the key receptors and the
significance of any pollutant linkages found to be present.
c) Should a significant pollutant linkage be identified on the site then a site wide
preliminary remedial options appraisal is to be provided that demonstrates
whereabouts on the site remediation is considered likely. 
Any measures identified in the report shall be implemented as approved within a
timescale agreed with the Planning Authority. 
Reason: To protect public health and to ensure that the site is suitable for its intended
use. 
7. No development (other than the spine road works, road improvement works, quay wall
works, public realm works, health and care site works and investigative works, but
excluding the linear and pocket parks) shall commence on site until such time as a site
wide assessment of the underlying ground gas regime has been submitted to and

Page 12

approved in writing by the Planning Authority. The report shall be prepared by a
suitably qualified person and as a minimum shall include the following: 
a) Suitable and sufficient monitoring from across the site in order to assess the
ground gas conditions that currently exist under the site.
b) A strategy confirming that and detailing how the monitoring of ground gas
boreholes will continue throughout the various development phases. It should also
refer to the future method of reporting to the Planning Authority as the
development progresses.
c) A preliminary assessment of the implications of the existing ground gas conditions
on the proposed mixed-use development. 
Any measures identified in the report shall be implemented as approved within a
timescale agreed with the Planning Authority. 
Reason: To protect public health and to ensure that the site is suitable for its intended
use. 
8. As part of any application(s) for the approval of matters specified in conditions, Noise
Impact Assessments for each development parcel shall be carried out to assess the
potential impacts of noise from sources including road traffic, air traffic, plant
equipment and entertainment noise and submitted for the further approval of the
Planning Authority. 
Reason: In order to avoid disturbance to residential properties. 
9. Prior to the reuse of material from the onsite spoil mounds and/or the importation of
any material onto the site, details of the source of the material and associated test
results to demonstrate its suitability for use shall be submitted to the Planning Authority
for approval. In addition to this and in accordance with BS3882:2015, the material shall
also be free from metals, plastic, wood, glass, tarmac, paper and odours associated
with contaminated soils. 
Reason: To protect public health and to ensure that the site is suitable for its intended
use. 
10. No development shall commence until the developer submits an archaeological
mitigation strategy for the further approval of the Planning Authority. Thereafter the
developer shall ensure that the approved strategy is fully implemented in accordance
with the recommendations set out in sections 8.339 – 8.353 of the Environmental
Statement approved under planning permission DC15/234 and that all recording and
recovery of archaeological resources within the development site is undertaken in
agreement with the Planning Authority and West of Scotland Archaeology Service. 
Reason: The site is of archaeological significance and the strategy will set out the
general scope of mitigation work to be followed before and during development but
allow the detailed preparation of more detailed Written Schemes of Investigation to be
brought forward for approval as each development parcel becomes imminent. 
11. All applications for the approval of matters specified in conditions shall include land
raising of low-lying areas of the site to above the 1 in 200 year plus climate change
flood level (set at 5.4m AOD), and finished floor levels of all buildings are to be set to
at least 0.6m above the 1 in 200 year plus climate change floor level at 6.1m AOD. All
development shall be implemented in accordance with these details.

Page 13

Reason: To mitigate against the risk from flooding by the adjacent River Clyde. 
12. As part of the approval of matters specified in conditions, each development parcel
shall comply with the recommendations of the Drainage Impact Assessment (Rev B,
October 2015) with details of the means of disposal of surface water, foul sewage and
a Sustainable Urban Drainage Scheme to be submitted for the further approval of the
Planning Authority. 
Reason: To ensure an appropriate means of drainage for the site. 
13. The number of dwelling units consented for the site shall not exceed 1,056 units unless
otherwise first agreed in writing by the Planning Authority. 
Reason: In order to ensure that the density of development is appropriate to the site
and that the number of dwelling units does not exceed the figure upon which the
Transport Assessment was based without proper consideration of any resultant
implications. 
14. Prior to the commencement of development, a strategy detailing the implementation
of community/affordable housing provision within the site shall be submitted for the
further approval of the Planning Authority. 
Reason: In order to ensure the provision of an appropriate level of social housing. 
15. As part of the Phase 1 application for the approval of matters specified in conditions,
a Construction and Environmental Management Plan shall be submitted for the further
approval of the Planning Authority in consultation with NatureScot. It shall: 
a) detail measures to screen the development in terms of noise and visual
disturbance from the Inner Clyde SPA, Ramsar site and SSSI;
b) detail measures to limit pollution to the Inner Clyde SPA, Ramsar site and SSSI;
c) identify those works that are likely to have significant potential for visual and noise
disturbance, such as piling. 
No works which are identified as likely to have a significant potential for visual and/or
noise disturbance shall be carried during the main wintering period (September to early
April). The Construction and Environmental Management Plan shall be implemented
within a timescale agreed with the Planning Authority. 
Reason: In order to minimise the risk of the development giving rise to adverse impacts
upon the protected Inner Clyde SPA, Ramsar site and SSSI. 
16. As part of the Phase 1 application for the approval of matters specified in conditions,
a detailed Recreation and Access Management Plan which details measures to limit
potential disturbance to the north shore of the Inner Clyde SPA, Ramsar site and SSSI
from increased access to the river shall be submitted for the further approval of the
Planning Authority and implemented within a timescale agreed with the Planning
Authority. 
Reason: In order to minimise the risk of the development giving rise to adverse impacts
upon the protected Inner Clyde SPA, Ramsar site and SSSI. 
17. As part of the Phase 1 application for the approval of matters specified in conditions,
the applicant shall submit a Sustainable Transport Strategy which shall include details
of:

Page 14

a) bus integration into the site;
b) walking routes to/from the site;
c) location of bus stops;
d) green travel plans; and
e) initiatives towards encouraging bus services into the site. 
The recommendations of the Sustainable Transport Strategy shall require to be
implemented in accordance with an agreed phasing plan within a timescale agreed
with the Planning Authority. 
Reason: To deliver effective, efficient and integrated transport for the site that does not
have a detrimental impact on the sustainability of the existing town centre. 
18. As part of any application for approval of matters specified in conditions, a Travel Plan
shall be submitted to and approved by the Planning Authority detailing the
opportunities for sustainable travel to and from that development parcel. 
Reason: To promote sustainable means of transport and to reduce reliance on the car. 
19. As part of the Phase 1 application for the approval of matters specified in conditions,
the following shall be included: 
a) details of parking provision for visitors to the Titan Crane and the riverside
walkway; and
b) details of the new signal-controlled junction and realignment of Cable Depot Road
(section 9.14 of the Transport Assessment (October 2015).
c) These works shall be implemented as approved as part of the Phase 1 works to
the site. 
Reason: To ensure that the development is provided with adequate parking facilities
in order to minimise the incidence of roadside parking which would be a danger to other
road users. 
20. Prior to any part of the development site being occupied or otherwise being brought
into use, the works recommended in the Transport Assessment (October 2015) to
realign Ailsa Road (section 9.12) and carry out layout improvements to Cart
Street/Glasgow Road junction (section 9.23) shall be implemented as approved. 
Reason: To ensure that the development is provided with adequate parking facilities
in order to minimise the incidence of roadside parking which would be a danger to
other road users. 
21. As part of any application(s) for the approval of matters specified in conditions, parking
spaces shall be provided in accordance with the Council’s adopted parking standards,
and no building shall be occupied until its parking facilities have been completed. 
Reason: To ensure that the development is provided with adequate parking facilities
in order to minimise the incidence of roadside parking which would be a danger to
other road users. 
22. As part of any application(s) for the approval of matters specified in conditions, each
residential unit shall be provided with a secure covered bicycle storage facility at
ground floor level. Each non-residential development shall have adequate secure

Page 15

covered cycle storage for staff in addition to adequate securable covered cycle facilities
for visitors/customers. 
Reason: To encourage the use of sustainable forms of travel and to discourage crime
by providing secure facilities. 
23. The amount of retail floor space permitted is 3,000m² (gross). Any unit trading primarily
in convenience goods shall not exceed 1,000m². Any unit trading in comparison goods
shall not exceed 250m². Proposals to exceed these floor space thresholds shall be the
subject of a separate planning application and retail statement for the further approval
of the Planning Authority. 
Reason: To limit the impact of the development on Clydebank town centre to the levels
tested in the Planning and Retail Statement (GVA James Barr, October 2015), and to
ensure that a convenience store is included in the development which is of a size to
increase choice within Clydebank. 
24. As part of any application(s) for the approval of matters specified in conditions details
of soft and water landscaping works shall be submitted to and approved in writing by
the Planning Authority in consultation with Glasgow Airport. Details must comply with
Advice Note 3 “Potential Bird Hazards from Amenity Landscaping & Building Design”.
These details shall include: 
• The species, number and spacing of trees and shrubs
• Details of any water features
• Drainage details including SUDS – such schemes must comply with Advice Note
6 “Potential Bird Hazards from Sustainable Urban Drainage Schemes” 
The scheme shall be implemented as approved. 
Reason: To avoid endangering the safe movement of aircraft and the operation of
Glasgow Airport through the attraction of birds and an increase in the bird hazard risk
of the application site. 
25. Any development that would create a roof area greater than 250 square metres with a
roof pitch of less than 15° shall not commence until a Bird Hazard Management Plan
has been submitted to and approved in writing by the Planning Authority in consultation
with Glasgow Airport. The submitted plan shall include details of the management of
the roofs within the site which may be attractive to nesting, roosting and “loafing” birds.
The management plan shall comply with Advice Note 8 “Potential Bird Hazards from
Building Design”. 
Reason: To avoid endangering the safe movement of aircraft and the operation of
Glasgow Airport through the attraction of birds and an increase in the bird hazard risk
of the application site. 
26.  As part of the first application for the approval of matters specified in conditions under
Condition 2 above, an Energy Strategy for the site shall be submitted for the approval
of the Planning Authority. The Energy Strategy shall include details for the delivery and
implementation of on-site low carbon and renewable energy solutions, building specific
technologies and features alongside any other measures aimed at increasing energy
efficiency on the site. The approved strategy including any agreed measures shall be
implemented on site and unless otherwise agreed in writing by the Planning Authority
and shall remain in place for the lifetime of the development. Any modifications or

Page 16

updates required for the approved strategy shall first be subject to the written approval
of the Planning Authority and implemented thereafter as approved. All subsequent
applications for matters specified by condition under Condition 2 above shall
demonstrate adherence to the agreed approach. 
Reason: To ensure the incorporation of low carbon technologies and minimise
greenhouse gas emissions 
27. As part of the first application for the approval of matters specified in conditions under
Condition 2 above, a biodiversity enhancement strategy for the site shall be submitted
for the approval of the Planning Authority. The biodiversity enhancement strategy shall
include details designed to protect biodiversity, reverse biodiversity loss, deliver
positive effects from development and strengthen nature networks. The approved
strategy including any agreed measures shall be implemented on site and unless
otherwise agreed in writing by the Planning Authority and shall remain in place for the
lifetime of the development. Any modifications or updates required for the approved
strategy shall first be subject to the written approval of the Planning Authority and
implemented thereafter as approved. All subsequent applications for matters specified
by condition under Condition 2 above shall demonstrate adherence to the agreed
approach. 
Reason: In the interests of the enhancement of biodiversity and maximising positive
biodiversity benefits. 
Michael Mulgrew
Planning, Building Standards and Environmental Health Manager 
Date: 4th June 2025 
Person to Contact: Michael Mulgrew, Planning & Building Standards Manager 
Email: Michael.Mulgrew@west-dunbarton.gov.uk   
James McColl, Development Management Team Leader 
Email: James.McColl@west-dunbarton.gov.uk  
Appendix: Location Plan   
Background Papers: 1.  Application forms and plans 
2.  Representation 
3.  Consultation responses 
4.  National Planning Framework 4 
5.  West Dunbartonshire Local Plan 2010 
6.  Proposed West Dunbartonshire Local Development
Plan 2 2020, as amended 
7. Creating Places Guidance (2022) 
8. Green Network and Green Infrastructure Guidance
(2022) 
9. Planning applications DC15/234 and DC21/115/FUL   
Wards affected: Ward 6 (Clydebank Waterfront)