PLANNING COMMITTEE 
At a Meeting of the Planning Committee held in the Civic Space, 16 Church Street,
Dumbarton on Wednesday, 4 June 2025 at 10.00 a.m. 
Present: Councillors Ian Dickson, Gurpreet Singh Johal, Lawrence
O’Neill, Chris Pollock and Clare Steel. 
Attending: Michael Mulgrew, Planning, Building Standards and
Environmental Health Manager; James McColl, Development
Management Team Leader; Michael McDougall, Manager of
Legal Services; and Nicola Moorcroft, Committee Officer. 
Apologies: Apologies for absence were intimated on behalf of Provost
Karen Murray Conaghan and Councillors Fiona Hennebry, David
McBride, Hazel Sorrell and Sophie Traynor. 
Councillor Lawrence O’Neill in the Chair 
DECLARATIONS OF INTEREST 
It was noted that there were no declarations of interest in any of the items of
business on the agenda. 
OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
MINUTES OF PREVIOUS MEETING 
The Minutes of Meeting of the Planning Committee held on 16 April 2025 were
submitted and approved as a correct record. 
PLANNING APPLICATIONS 
A report was submitted by the Chief Officer - Regulatory and Regeneration in
respect of the following Planning applications:-

Page 2

DC24/091/FUL: Further application under Section 42 to not comply with condition 11
of planning permission DC21/115/FUL at Queens Quay Full Dev Site, Cart Street,
Clydebank by Clydeside Regeneration Limited. 
The Development Management Team Leader was heard in further explanation and in
answer to Members’ questions. 
After discussion and having heard the Development Management Team Leader in
further explanation and in answer to Members’ questions, the Committee agreed to
refer the application to Full Council for determination, with a preliminary
recommendation, based on the information considered to date, that it be approved,
subject to the conditions as detailed within Appendix 1 hereto. 
DC24/197/FUL: Amendment to Condition 2 and Condition 14 of permission
DC20/253 in relation to proposed site at Landfill Site at Auchincarroch Road,
Jamestown, Alexandria by Barr Environmental Ltd. 
The Development Management Team Leader was heard in further explanation of the
report. 
The Committee agreed to grant planning permission for this Section 42 application,
subject to the conditions as detailed within Appendix 2 hereto. 
CONSULTATION ON PROPOSED PAYPHONE REMOVALS 
A report was submitted by the Chief Officer - Regulatory and Regeneration setting
out the Council’s response to a consultation from BT Openreach on the proposed
removal of various public telephone boxes in West Dunbartonshire. 
After discussion and having heard the Planning and Building Standards Manager and
the Development Management Team Leader in further explanation and in answer to
Members’ questions, the Committee agreed to offer no objection to the removal of all
13 payphones, as listed in paragraph 3.3 of the report. 
The meeting closed at 10.21 a.m.

Page 3

APPENDIX 1 
DC24/091/FUL: Further application under Section 42 to not comply with
condition 11 of planning permission DC21/115/FUL at Queens Quay Full Dev
Site, Cart Street, Clydebank by Clydeside Regeneration Limited. 
GRANT full planning permission subject to the following conditions:- 
1. For the avoidance of doubt, Phase 1 works relate to any works associated
with the spine road, road improvements, quay walls, and public realm. The
linear park will be completed following completion of the relevant residential
phase to which it relates with the pocket parks and basin play park to be
completed within a timescale agreed with the Planning Authority, all identified
on annotated masterplan E2604.Sk001revJ received on 22nd June 2021 in
connection with planning application DC21/115/FUL. 
Reason: To provide clarity and to ensure the conditions relate to the correct
phasing. 
2. Prior to commencement of any development on site, further applications for
the approval of matters specified below shall be obtained from the planning
authority. Applications shall include: 
a) site layout plans showing the position of all buildings, roads, footpaths,
parking areas, walls, fences and landscaping;
b) block and layout plans and elevations of each building, showing
dimensions and palettes of external materials;
c) landscape and streetscape plans showing the location and species of all
proposed trees, shrubs, hedges, palettes of hard landscaping materials and
street furniture;
d) details of existing and proposed ground levels, and finished floor levels,
relating to a clearly identified fixed datum point;
e) a detailed report on the extent, scale and nature of any contamination of
the site; and
f) a detailed remediation scheme detailing the measures necessary to bring
the site to a condition suitable for the intended use. 
Reason: To ensure full details are provided for each aspect of the
development. 
3. As part of any application(s) for approval of matters specified in conditions,
and with regard to the requirements of condition 2 above, the design and
layout of development parcels shall comply with the design principles/intents
set out in sections 05 and 06 of the Design & Access Statement (Rev C,
March 2016), the accompanying Framework Drawing No. P(0) 003 Rev E (or
any subsequent amendments thereto), and the approved Design Codes for

Page 4

Queens Quay (approved September 2020) unless otherwise agreed in writing
by the Planning Authority. 
Reason: To ensure the design principles agreed in these documents form part
of the consideration of any subsequent planning applications. 
4.  At the same time as the submission of the first commercial use application
(excluding any district heating system) a mini masterplan shall be submitted
for the mixed used area coloured yellow on Drawing No. P(0) 003 rev E
(including building plots, design principles and a parking strategy) for the
further approval of the Planning Authority. 
Reason: In order to allow consideration of the proposed mix of uses, and to
ensure consistency of design standards across the site and that a parking
strategy is considered early in the design process. 
5. As part of any application(s) for the approval of matters specified in conditions
for Phase 1 works, and notwithstanding the requirements of condition 2c)
above, details of the landscaping strategy for the spine road, linear park and
pocket parks shall include: 
a) location and species of all proposed trees, shrubs, hedges;
b) palettes of hard landscaping materials, street furniture and play equipment;
c) identify potential locations for public art; and
d) the means of management and maintenance of the landscaping and public
open space. 
Reason: To ensure full details are submitted for further consideration. 
6.  No development (other than the spine road works, road improvement works,
quay wall works, public realm works, health and care site works and
investigative works, but excluding the linear and pocket parks) shall
commence on site until such time as a site-wide water environment
investigation and assessment has been submitted to and approved in writing
by the Planning Authority. The report shall be prepared by a suitably qualified
person and as a minimum shall include the following: 
a) Suitable and sufficient monitoring from across the site in order to identify
the extent, scale and nature of contamination with regards to the water
environment.
b) An appropriate level of assessment that identifies the key receptors and the
significance of any pollutant linkages found to be present.
c) Should a significant pollutant linkage be identified on the site then a site
wide preliminary remedial options appraisal is to be provided that
demonstrates whereabouts on the site remediation is considered likely. 
Any measures identified in the report shall be implemented as approved
within a timescale agreed with the Planning Authority.

Page 5

Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
7. No development (other than the spine road works, road improvement works,
quay wall works, public realm works, health and care site works and
investigative works, but excluding the linear and pocket parks) shall
commence on site until such time as a site wide assessment of the underlying
ground gas regime has been submitted to and approved in writing by the
Planning Authority. The report shall be prepared by a suitably qualified person
and as a minimum shall include the following: 
a) Suitable and sufficient monitoring from across the site in order to assess
the ground gas conditions that currently exist under the site.
b) A strategy confirming that and detailing how the monitoring of ground gas
boreholes will continue throughout the various development phases. It should
also refer to the future method of reporting to the Planning Authority as the
development progresses.
c) A preliminary assessment of the implications of the existing ground gas
conditions on the proposed mixed-use development. 
Any measures identified in the report shall be implemented as approved
within a timescale agreed with the Planning Authority. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
8. As part of any application(s) for the approval of matters specified in
conditions, Noise Impact Assessments for each development parcel shall be
carried out to assess the potential impacts of noise from sources including
road traffic, air traffic, plant equipment and entertainment noise and submitted
for the further approval of the Planning Authority. 
Reason: In order to avoid disturbance to residential properties. 
9. Prior to the reuse of material from the onsite spoil mounds and/or the
importation of any material onto the site, details of the source of the material
and associated test results to demonstrate its suitability for use shall be
submitted to the Planning Authority for approval. In addition to this and in
accordance with BS3882:2015, the material shall also be free from metals,
plastic, wood, glass, tarmac, paper and odours associated with contaminated
soils. 
Reason: To protect public health and to ensure that the site is suitable for its
intended use. 
10. No development shall commence until the developer submits an
archaeological mitigation strategy for the further approval of the Planning
Authority. Thereafter the developer shall ensure that the approved strategy is
fully implemented in accordance with the recommendations set out in sections
8.339 – 8.353 of the Environmental Statement approved under planning

Page 6

permission DC15/234 and that all recording and recovery of archaeological
resources within the development site is undertaken in agreement with the
Planning Authority and West of Scotland Archaeology Service. 
Reason: The site is of archaeological significance and the strategy will set out
the general scope of mitigation work to be followed before and during
development but allow the detailed preparation of more detailed Written
Schemes of Investigation to be brought forward for approval as each
development parcel becomes imminent. 
11. All applications for the approval of matters specified in conditions shall include
land raising of low-lying areas of the site to above the 1 in 200 year plus
climate change flood level (set at 5.4m AOD), and finished floor levels of all
buildings are to be set to at least 0.6m above the 1 in 200 year plus climate
change floor level at 6.1m AOD. All development shall be implemented in
accordance with these details. 
Reason: To mitigate against the risk from flooding by the adjacent River
Clyde. 
12. As part of the approval of matters specified in conditions, each development
parcel shall comply with the recommendations of the Drainage Impact
Assessment (Rev B, October 2015) with details of the means of disposal of
surface water, foul sewage and a Sustainable Urban Drainage Scheme to be
submitted for the further approval of the Planning Authority. 
Reason: To ensure an appropriate means of drainage for the site. 
13. The number of dwelling units consented for the site shall not exceed 1,056
units unless otherwise first agreed in writing by the Planning Authority. 
Reason: In order to ensure that the density of development is appropriate to
the site and that the number of dwelling units does not exceed the figure upon
which the Transport Assessment was based without proper consideration of
any resultant implications. 
14. Prior to the commencement of development, a strategy detailing the
implementation of community/affordable housing provision within the site shall
be submitted for the further approval of the Planning Authority. 
Reason: In order to ensure the provision of an appropriate level of social
housing. 
15. As part of the Phase 1 application for the approval of matters specified in
conditions, a Construction and Environmental Management Plan shall be
submitted for the further approval of the Planning Authority in consultation
with NatureScot. It shall: 
a) detail measures to screen the development in terms of noise and visual
disturbance from the Inner Clyde SPA, Ramsar site and SSSI;

Page 7

b) detail measures to limit pollution to the Inner Clyde SPA, Ramsar site and
SSSI;
c) identify those works that are likely to have significant potential for visual
and noise disturbance, such as piling. 
No works which are identified as likely to have a significant potential for visual
and/or noise disturbance shall be carried during the main wintering period
(September to early April). The Construction and Environmental Management
Plan shall be implemented within a timescale agreed with the Planning
Authority. 
Reason: In order to minimise the risk of the development giving rise to
adverse impacts upon the protected Inner Clyde SPA, Ramsar site and SSSI. 
16. As part of the Phase 1 application for the approval of matters specified in
conditions, a detailed Recreation and Access Management Plan which details
measures to limit potential disturbance to the north shore of the Inner Clyde
SPA, Ramsar site and SSSI from increased access to the river shall be
submitted for the further approval of the Planning Authority and implemented
within a timescale agreed with the Planning Authority. 
Reason: In order to minimise the risk of the development giving rise to
adverse impacts upon the protected Inner Clyde SPA, Ramsar site and SSSI. 
17. As part of the Phase 1 application for the approval of matters specified in
conditions, the applicant shall submit a Sustainable Transport Strategy which
shall include details of: 
a) bus integration into the site;
b) walking routes to/from the site;
c) location of bus stops;
d) green travel plans; and
e) initiatives towards encouraging bus services into the site. 
The recommendations of the Sustainable Transport Strategy shall require to
be implemented in accordance with an agreed phasing plan within a timescale
agreed with the Planning Authority. 
Reason: To deliver effective, efficient and integrated transport for the site that
does not have a detrimental impact on the sustainability of the existing town
centre. 
18.  As part of any application for approval of matters specified in conditions, a
Travel Plan shall be submitted to and approved by the Planning Authority
detailing the opportunities for sustainable travel to and from that development
parcel. 
Reason: To promote sustainable means of transport and to reduce reliance
on the car.

Page 8

19. As part of the Phase 1 application for the approval of matters specified in
conditions, the following shall be included: 
a) details of parking provision for visitors to the Titan Crane and the riverside
walkway; and
b) details of the new signal-controlled junction and realignment of Cable
Depot Road (section 9.14 of the Transport Assessment (October 2015).
c) These works shall be implemented as approved as part of the Phase 1
works to the site. 
Reason: To ensure that the development is provided with adequate parking
facilities in order to minimise the incidence of roadside parking which would
be a danger to other road users. 
20.  Prior to any part of the development site being occupied or otherwise being
brought into use, the works recommended in the Transport Assessment
(October 2015) to realign Ailsa Road (section 9.12) and carry out layout
improvements to Cart Street/Glasgow Road junction (section 9.23) shall be
implemented as approved. 
Reason: To ensure that the development is provided with adequate parking
facilities in order to minimise the incidence of roadside parking which would
be a danger to other road users. 
21. As part of any application(s) for the approval of matters specified in
conditions, parking spaces shall be provided in accordance with the Council’s
adopted parking standards, and no building shall be occupied until its parking
facilities have been completed. 
Reason: To ensure that the development is provided with adequate parking
facilities in order to minimise the incidence of roadside parking which would
be a danger to other road users. 
22. As part of any application(s) for the approval of matters specified in
conditions, each residential unit shall be provided with a secure covered
bicycle storage facility at ground floor level. Each non-residential development
shall have adequate secure covered cycle storage for staff in addition to
adequate securable covered cycle facilities for visitors/customers. 
Reason: To encourage the use of sustainable forms of travel and to
discourage crime by providing secure facilities. 
23. The amount of retail floor space permitted is 3,000m² (gross). Any unit trading
primarily in convenience goods shall not exceed 1,000m². Any unit trading in
comparison goods shall not exceed 250m². Proposals to exceed these floor
space thresholds shall be the subject of a separate planning application and
retail statement for the further approval of the Planning Authority. 
Reason: To limit the impact of the development on Clydebank town centre to
the levels tested in the Planning and Retail Statement (GVA James Barr,

Page 9

October 2015), and to ensure that a convenience store is included in the
development which is of a size to increase choice within Clydebank. 
24.  As part of any application(s) for the approval of matters specified in conditions
details of soft and water landscaping works shall be submitted to and
approved in writing by the Planning Authority in consultation with Glasgow
Airport. Details must comply with Advice Note 3 “Potential Bird Hazards from
Amenity Landscaping & Building Design”. These details shall include: 
• The species, number and spacing of trees and shrubs
• Details of any water features
• Drainage details including SUDS – such schemes must comply with Advice
Note 6 “Potential Bird Hazards from Sustainable Urban Drainage Schemes” 
The scheme shall be implemented as approved. 
Reason: To avoid endangering the safe movement of aircraft and the
operation of Glasgow Airport through the attraction of birds and an increase in
the bird hazard risk of the application site. 
25. Any development that would create a roof area greater than 250 square
metres with a roof pitch of less than 15° shall not commence until a Bird
Hazard Management Plan has been submitted to and approved in writing by
the Planning Authority in consultation with Glasgow Airport. The submitted
plan shall include details of the management of the roofs within the site which
may be attractive to nesting, roosting and “loafing” birds. 
The management plan shall comply with Advice Note 8 “Potential Bird
Hazards from Building Design”. 
Reason: To avoid endangering the safe movement of aircraft and the
operation of Glasgow Airport through the attraction of birds and an increase in
the bird hazard risk of the application site. 
26. As part of the first application for the approval of matters specified in
conditions under Condition 2 above, an Energy Strategy for the site shall be
submitted for the approval of the Planning Authority. The Energy Strategy
shall include details for the delivery and implementation of on-site low carbon
and renewable energy solutions, building specific technologies and features
alongside any other measures aimed at increasing energy efficiency on the
site. The approved strategy including any agreed measures shall be
implemented on site and unless otherwise agreed in writing by the Planning
Authority and shall remain in place for the lifetime of the development. Any
modifications or updates required for the approved strategy shall first be
subject to the written approval of the Planning Authority and implemented
thereafter as approved. All subsequent applications for matters specified by
condition under Condition 2 above shall demonstrate adherence to the agreed
approach.

Page 10

Reason: To ensure the incorporation of low carbon technologies and minimise
greenhouse gas emissions 
27. As part of the first application for the approval of matters specified in
conditions under Condition 2 above, a biodiversity enhancement strategy for
the site shall be submitted for the approval of the Planning Authority. The
biodiversity enhancement strategy shall include details designed to protect
biodiversity, reverse biodiversity loss, deliver positive effects from
development and strengthen nature networks. The approved strategy
including any agreed measures shall be implemented on site and unless
otherwise agreed in writing by the Planning Authority and shall remain in
place for the lifetime of the development. Any modifications or updates
required for the approved strategy shall first be subject to the written approval
of the Planning Authority and implemented thereafter as approved. All
subsequent applications for matters specified by condition under Condition 2
above shall demonstrate adherence to the agreed approach. 
Reason: In the interests of the enhancement of biodiversity and maximising
positive biodiversity benefits.

Page 11

APPENDIX 2 
DC24/197/FUL: Amendment to Condition 2 and Condition 14 of permission
DC20/253 in relation to proposed site at Landfill Site at Auchincarroch Road,
Jamestown, Alexandria by Barr Environmental Ltd. 
GRANT full planning permission subject to the following conditions:- 
1. The development hereby permitted shall ensure for the benefit of the
applicant only, with the final restoration of the site being completed by 30th
June 2026 unless otherwise agreed in writing by the Planning Authority. 
Reason: In order to ensure the timely restoration of the site. 
2. No further landfill material shall be brought on to any part of the site and no
further landfill operations shall take place on any part of the site. 
Reason: To ensure that future works under this permission relate to site
restoration activities only. 
3. At all times during the aftercare period of the site, the restoration of the site
shall be undertaken as indicated in the Environmental Impact Assessment,
dated November 2020, together with all supporting documentation, plans and
details that form part of this application, including amended restoration
masterplan (reference ED13968-005F). 
Reason: To ensure that the development operates in accordance with the
approved details. 
4. Except in the case of emergency, the hours of working of the site shall be
restricted to between the hours of 7.30am to 5.00pm Monday to Saturday only
and not on a Sunday or on a recognised Public Holiday in West
Dunbartonshire without the prior written approval of the Planning Authority
with the exception of essential site maintenance and the maintenance of plant
and machinery. Access to and exit from the site shall be by way of
Auchencarroch Road. 
Reason: In order to minimise disturbance to local resident and to ensure that
the site is accessed in the approved manner. 
5. The site operator shall be responsible for the maintenance of a vehicle
register log book of all deliveries to the site which shall be available for
inspection by the Planning Authority upon request at any time. 
Reason: In order to ensure that the number of vehicle movements and the
volume and type of waste remain within the approved limits.

Page 12

6. The applicant shall be responsible for the collection and disposal of any
windblown material emanating from the area of infill. 
Reason: In order to prevent the operation of the site giving rise to litter, which
would detract from the amenities of the surrounding area. 
7. No burning of materials in connection with the infilling operations shall take
place on or adjoining the site. 
Reason: In order to protect the environment and the amenities of local
residents. 
8. Within 28 days of the date on which planning permission for the development,
hereby approved, is issued, an updated Habitat Management Plan, which
includes details on follow up habitat management, shall be submitted for the
written approval of the Planning Authority. Thereafter, the Plan will be
implemented as approved. 
Reason: In order to ensure that the developer continues to make appropriate
provision for bird life and natural habitat. 
9. The annual monitoring on the progress of the mitigation areas shall be carried
out as required by the Habitat Management Plan and by the applicant or by
any person engaged by them. An annual report will be made available to the
Technical Working Group at least 3 weeks prior to the formal review meeting
of that Group and the annual monitoring report shall be approved by the
Planning Authority. 
Reason: In order to ensure that the mitigation measures are operating
effectively. 
10. All advance works, including habitat translocation to receptor areas for landfill
restoration shall take place outside the bird nesting season (March to July
inclusive) unless a checking survey confirms the absence of nests. The
checking survey shall be carried out at a time and approved in advance by the
Planning Authority. 
Reason: In order to minimise the impact of the development on bird life. 
11. All diversions of watercourses shall follow the details approved in respect of
condition 18 of planning permission DC07/233/FUL. 
Reason: To ensure that works to watercourses are carried out in an
appropriate manner and do not give rise to pollution. 
12. The access track which runs partly through the active landfill and links up with
the track leading to Paper Muir and the western edge of the commercial
forestry plantation shall not be used for the export of timber without the prior
written approval of the Planning Authority.

Page 13

Reason: To ensure that works to watercourses are carried out in an
appropriate manner and do not give rise to pollution. 
13. On completion of the landfill operations, except in so far as may be required
for leachate and gas monitoring, the site shall be cleared of all buildings
(except for the MRF building which will be retained during the aftercare
period), plant and machinery, with details of the phasing of this to be
submitted for the approval of the Planning Authority prior to the cessation of
landfill operations on site. 
Reason: In order to ensure the appropriate restoration of the site upon the
conclusion of the landfill operations. 
14. Unless otherwise approved in writing by the Planning Authority, the MRF
building will be removed from the site at the end of the aftercare period on
01/04/2056. 
Reason: In order to ensure the removal of the building following the
conclusion of the aftercare period. 
15. Appropriate measures to prevent mud, dirt, dust, slurry or stones being
carried onto the highway shall be taken and such steps shall include the
provision and the use of hard standing areas and a wheel wash facility for the
cleaning of all lorries, dump trucks, other heavy vehicles and plant leaving the
site. 
Reason: In order to minimise nuisance to local residents and in the interest of
road safety and to ensure the measures are in accordance with the approved
details. 
16. The access road and public road adjacent to the site shall be kept clear of
mud or other deposited materials at all times by means of mechanical
brushing. 
Reason: In the interests of road safety and the amenities of the area. 
17. Soils to be imported to the site shall share similar profile characteristics as the
soil structure currently on site. Topsoil and sub-soil shall only be stripped
when the soils are sufficiently dry so that when moved, no damage will be
done to the structure of the soils. Apart from the works required to enclose the
site, no operations shall be carried out until the topsoil is fully stripped and
stored in the designated areas within the site. 
Reason: In order to ensure that the soil used in restoration work is appropriate
to the local environment. 
18. Topsoil shall be stripped to full available depth from all areas within the site
except those areas designated in the approved plans as topsoil dumps.
Following topsoil stripping operations from any areas of land, sub-soil shall be

Page 14

stripped as a separate operation to a depth, where possible, to achieve topsoil
and sub-soil not less than 0.9 metre at restoration. 
Reason: In order to ensure the retention of soil required for restoration
purposes and to ensure that the soil used in restoration is appropriate to the
local environment. 
19. Topsoil and sub-soil shall be carefully stored in separate dumps and
prevented from mixing. Topsoil dumps shall not exceed 5 metres in height.
Topsoil dumps and sub soil dumps shall be evenly graded and tops shaped to
prevent water ponding. Sub-soil dumps shall not exceed 8 metres in height. 
Reason: In order to ensure the retention of soil required for restoration
purposes and to reduce its impact on the local environment. 
20. In the first available seeding season following their formation, all mounds of
topsoil, sub-soil and soil making materials shall be seeded in grass and shall
be so maintained until the soils are required for use in the restoration of the
site except as may be otherwise agreed with the Planning Authority. 
Reason: In order to ensure the retention of soil required for restoration
purposes, and to ensure that soil is an aesthetically acceptable manner. 
21. All water treatment areas and settlement lagoons shall be enclosed by a one
metre high stock-proof fence and shall be implemented prior to any significant
soil stripping. 
Reason: In order to ensure the timely provision and protection of water
treatment and settlement facilities, in the interests of public safety. 
22. Appropriate precautions shall be taken to prevent the discharge of oil from
fuelling, oil storage, plant maintenance and vehicle wash areas within the site. 
Reason: In order to prevent pollution of the local environment. 
23. Dust monitoring shall be routinely carried out by the applicant and undertaken
using appropriate equipment and recording devices. The results and records
shall be made available to the Planning Authority on a monthly basis during
the operational life of the site. 
Reason: In order to minimise nuisance to local residents and damage to the
environment arising from dust blown from the site. 
24.  Noise monitoring programme shall be undertaken during the operational life of
the site using appropriate equipment and recording devices, the results of
which shall be made available to the Planning Authority on a monthly basis. 
Reason: In order to minimise disturbance to local residents arising from noise
generated at the site