Balloch & Haldane Local Place Plan
March 2026 Balloch & Haldane Place Plan
June 2026
ITEM 7 - APPENDIX 1

Page 2

If you have difficulties accessing this document,
please contact Nick Wright: 07900 334110
nick@nickwrightplanning.co.uk  
Acknowledgments
This Plan was initiated by Balloch and Haldane
Community Council, who would like to thank the
many local residents, community organisations,
businesses and schools who contributed to its
preparation.  Without your ideas and suggestions,
there would be no Plan.
We are grateful to Loch Lomond and the
Trossachs National Park and West
Dunbartonshire Council, whose financial support
enabled the Plan to be prepared - specifically, the
community engagement activities described in
section 3 and assistance from independent
planner/facilitator Nick Wright. 2nd June 2026

Page 3

Contents
1 Introduction and vision p3 
Our vision for Balloch & Haldane p4 
About this Plan p6
2 About Balloch and Haldane p8 
History p8 
Community life p10 
Economy p10
3 Our aspirations  p11 
Community Action Plan 2014 p11 
Other community engagement since 2014 p12
Community engagement for this Plan p12
4 Policy context p14 
National Planning Framework 4 p14 
The Place Principle p14 
National Park Partnership Plan p15 
Local Development Plans p16 
Other plans and strategies p17
5 Strategic principles p18
6 Actions p19 
1   Loch Lomond: the jewel in the crown p21 
2   Gateway Centre p22 
3   Loch Lomond Shores p23 
4   Pierhead p24 
5   River Leven p25 
6   Drumkinnon Wood p26 
7   West Riverside & Pier Road p27 
8   Old station building & station plaza p29 
9   Village centre p30 
10   Moss o’Balloch p31 
11   Balloch Castle Country Park p32 
12   Dereliction & decay p34 
13   Infrastructure & safety p36 
14   Path network p37 
15    Landscape setting p38 
16    Community life p39 
17    Public transport p40 
18    Destination marketing p41
7 Next steps p42 
Balloch 2030 p42 
Planning policy & development management p43
Maps
1    Balloch & Haldane in context   p5
2    Place Plan boundary   p7
3    LDP coverage p15
4    Actions p20
5  Drumkinnon Wood p26
6 Landscape setting p38
Appendices (online)
1  Report of November 2025 events                  
& online survey
2 Report of March-April 2026 draft Plan
consultation

Page 4

1  Introduction
Our vision for Balloch and Haldane
This is a Local Place Plan with a difference. 
More than just a plan, it is a manifesto for
revitalising the busiest gateway to one of
Scotland’s most iconic places: Loch Lomond. 
And, critically, the manifesto places
community wealth-building and the
National Park’s aims at the heart of that
future vision.
Why should a community-led plan have such high
ambition?  Because we as a community have
struggled with a lack of prosperity and
opportunity for decades, in common with the rest
of the Vale of Leven community.  According to the
Scottish Government, Balloch is amongst the most
deprived areas in Scotland.
Many of our residents fall within Scotland’s
bottom 10% in terms of poverty and deprivation.
Yet a key to unlock greater prosperity and
opportunity lies on our doorstep, in the form of
Loch Lomond and the National Park - as the Map 1
on the next page indicates.
The Scottish Government’s recent decision to
uphold the National Park’s refusal of the Lomond
Banks commercial leisure proposal in the heart of
our community is a welcome sign that the tide is
turning.  We believe that the focus must now
switch to delivering National Planning Framework
4, the National Park’s four statutory aims and
Partnership Plan outcomes, and the new
Community Wealth Building (Scotland) Act.  That
is why community wealth-building and nature
restoration are placed at the core of this Plan.  
The Plan outlines the steps for this special place to
become a truly world-class experience that Scots
and Scotland can be proud of - rather than the
current state of affairs which is, frankly,
underwhelming. 
Although the Plan emphasises sensitive
development of the visitor economy, that does not
mean that the local community will be sidelined. 
The opposite is true.  Implementing the steps in
the Plan, in the way that it describes, will deliver
our community aspirations. That includes more
jobs and opportunities, improved community
facilities (such as a community hub), enhanced
public services, and better green spaces.
We cannot deliver this plan on our own, nor
should we.  Whilst it is a plan for our community, it
is also a plan for one of Scotland’s most famous
visitor destinations, at the busiest gateway to our
most visited National Park.  Implementing it
should be a collaborative effort, in line with the
Scottish Government’s Place Principle (see
section 7).
Every partner will profit.  The public sector will
achieve multiple economic, environmental and
social policy objectives.  The private sector will
grow.  And we as a local community will finally see
long-standing persistent problems being tackled. 
The prize of working together is immense - not
just for the local community, but for Scotland.

Page 5

Map 1  Balloch & Haldane in context

Page 6

About this Plan
Geographically, the area covered by this Plan
corresponds with Balloch and Haldane
Community Council area (see Map 2 overleaf).
This Local Place Plan is a vision for the “place” that
is Balloch and Haldane as a whole, covering all its
aspects.  That means it is not just about buildings,
development and land use - the physical things
that are traditionally the concern of statutory
town planning.  It also brings together other
elements that make a successful place, including
social and economic issues, as summarised in the
Scottish Government’s Place Standard.
The aims of the Plan are to:
• Support community action - for example,
helping us to access funding and resources
(including windfarm community benefit funding)
by evidencing community support and links to
national policy agendas (see diagram on right).
• Improve public services - as an evidence base to
inform decision-making on transport, planning,
facilities, infrastructure and other services.
• Demonstrate consensus - on agreed community
priorities, so that we can quickly move to action
when resources and support become available.
Our vision for the community’s future is earlier in
this section.  Strategic principles and the actions
required to realise that vision are covered in
sections 5 and 6.  What needs to happen next to
implement the Plan is in section 7.  
Section 2 contains basic facts and figures about
Balloch and Haldane.  Section 3 summarises our
community aspirations, including information
about the community engagement to prepare the
Plan.  Section 4 contains a summary of the wider
local and national policy context.   
How the Local Place Plan
brings together community
and government aspirations

Page 7

Map 2  Local Place Plan boundary

Page 8

2  About Balloch and Haldane
Balloch, Haldane and Jamestown are an
integral part of the Vale of Leven: a
community within a community.  Although
our strategic importance between the
Highlands and Lowlands goes back many
centuries, our population only really began
to expand significantly in the 20th century
on the back of tourism and industry. 
Industry may have less of a presence now
than a century ago, but tourism remains an
economic mainstay.
Balloch and Haldane Community Council area
encompasses the communities of Balloch,
Haldane and Jamestown plus small areas of
countryside to the east and west (see Map 2 on
page 7). It includes the southern arm of Loch
Lomond from Balloch Park around to Cameron
House, stopping short of Duck Bay, including the
outflow of the River Leven.
History
Balloch has for centuries occupied a strategic
location, a relatively safe crossing point over the
River Leven where it flows out of Loch Lomond, at
the transition from the rugged Highlands to the
fertile Lowlands.  The original Balloch Castle dates
from 1238 and was the home of the Earls of
Lennox.  It is now a ruin within Balloch Park, the
landscaped grounds of the nineteenth century
castle, which is also referred to as Balloch Castle.
For centuries, cattle were driven down the banks
of Loch Lomond from the Highlands.  Balloch
become an important staging post after around
1770, when the shift of the main market from
Crieff to Falkirk increased the number of cattle
crossing the Leven in Balloch.
The arrival of the railway and steamships on the
loch in the 19th century paved the way for the
growth of tourism and Balloch’s growth in the mid
20th century.  The now-demolished silk factory
(now Drumkinnon Gate on Balloch Road) was a
major industrial presence from around 1930 to
1980.  The village grew rapidly after World War
Two, led by the construction of the Haldane estate
from the 1950s.

Page 9

Construction of the Haldane estate also blurred
the boundary with Jamestown, previously a
separate settlement in its own right.  Jamestown’s
earlier character as a fishing village was
transformed in the 19th century with the growth
of industrial textile printing.  Jamestown
effectively became a company town, with a
population of over 2,000 by the start of the 20th
century.  Since closure of the printing works in the
mid 20th century, much industry has disappeared
and been replaced by housing.
Thanks to the Vale of Leven Heritage Project for
much of the information in this section.  Find out
more on their website: www.valeofleven.org.uk 
River Leven & Balloch Bridge looking north, 1927
Copyright HES www.trove.scot/image/1256155 
Jamestown, 1927  Copyright HES
www.britainfromabove.org.uk/image/SPW019596
Old postcard of the corner of Balloch Rd / Dalvait Rd 
Courtesy of www.valeofleven.org.uk/balloch4.html 
Old postcard from Balloch Bridge towards Loch Lomond 
Courtesy of www.valeofleven.org.uk/balloch.html
Balloch Park & the Pierhead, with the Vale beyond; 1949 
Copyright HES www.britainfromabove.org.uk/image/SAW026583

Page 10

Community life
Today, Balloch and Haldane are home to around
6,000 people (source: 2022 census), who form
part of the wider community of the Vale of Leven
with a total population of around 22,000. 
Tullichewan and Alexandria lie immediately to the
south of the Community Council area; beyond
them are Renton and Bonhill. 
Balloch and Haldane have a number of community
facilities including a small supermarket, primary
schools, parks, library, churches, pharmacy, pubs,
cafes and railway station.  The community is
reliant on the larger towns of Alexandria and
Dumbarton for other facilities including
secondary schools, larger supermarkets, hospital,
health centres and community centres.
Many of Balloch and Haldane’s population are in
Scotland’s bottom 10% in terms of poverty and
deprivation, as the map from the latest Scottish
Index of Multiple Deprivation (2020) shows. 
People living in darker red areas are significantly
more deprived than the Scottish average, whilst
those in darker blue areas are significantly less
deprived.  
West Dunbartonshire as a whole has the sixth
worst life expectancy of all 32 Scottish local
authorities (source: National Records of Scotland)
and the second worst projected population
decline of all 32 Scottish local authorities for the
10 years to 2032 - one of only eight local authority
areas to have projected population decline
(source: National Records of Scotland). 
Economy
Our location as the gateway to Loch Lomond,
Argyll and the Highlands, together with easy
access Glasgow and the Central Belt by road and
rail, means that over 1 million visitors each year
enjoy what Balloch has to offer each year.  Such
high numbers mean that much of our economy is
geared towards visitors - including loch cruises,
shops, cafes, pubs and restaurants, both in the
village centre and at the Loch Lomond Shores
complex built in the 1990s.  
The number of visitors creates both opportunities
and pressures for the community.  For example,
the visitor economy supports a greater number of
cafes, restaurants and visitor facilities than might
be expected in a typical community of Balloch’s
size.  But many of these additional business
opportunities are hospitality-related and tend to
create jobs which are seasonal, low-paid or
insecure, and the sheer number of visitors in peak
periods brings challenges including transport
infrastructure and visitor management. 
Scottish Index of Multiple Deprivation mapping for
Balloch & Haldane and the Vale of Leven 
Courtesy of www.simd.scot

Page 11

3 Our aspirations
Our aspirations have been remarkably
consistent over the years, right back to our
2014 Community Action Plan.  Successive
community engagement exercises have
underlined the need for action on the local
economy, the visitor experience,
infrastructure, environment and what would
now be called community wealth-building. 
Consistency gives clarity, but it also
generates frustration.  Our biggest
aspiration now is for action.
This section explains the community engagement
upon which this Plan is based.  It refers to:
• The 2014 Community Action Plan.
• Two other major consultation exercises
undertaken since then which have fed into this
Plan - the 2016 “charrette” and a major
consultation survey in 2024-25.
• Dedicated engagement undertaken in
connection with the Plan itself. 
The panel on the right contains an at-a-glance
summary of things that residents consistently call
for.
Consistent messages from              
the local community
• Better recreation and youth facilities
• Improved infrastructure, paths, transport and
public toilets
• Revitalised parks and community spaces
• Restoration of Balloch Castle and protection
of natural assets
• A more diverse and resilient local economy
• Action on litter, antisocial behaviour and
declining facilities
• A positive alternative to past large-scale
private developments
Community Action Plan 2014
Back in 2014, we as a community produced
Balloch and Haldane Community Action Plan.  It
had four main themes:
• Sport, recreation and local environment
• Improve our local infrastructure
• Young people, safety and the local economy
• Develop the visitor experience
Under those four headings, the plan identified ten
priority actions:
• Improved range of recreational facilities
• Improved quality of the local environment
• Maintained and improved public transport links
• Better roads paths and services
• Better provision of activities for young people
• Maintain police presence
• Develop training and employment opportunities
• Better promotion of the area and its activities
• Renovation of key local landmarks
• Increased range of tourist attractions & events

Page 12

Other community
engagement since 2014
Other major community engagement undertaken
in Balloch and Haldane since the Community
Action Plan have provided valuable data for this
new Plan:  
• Balloch community survey 2024-25:
undertaken by Loch Lomond South Community
Development Trust in connection with the
Lomond Banks commercial leisure development
proposals at West Riverside, this community
survey received approximately 340 responses
from local residents offering suggestions of
what the community needs.  The survey results
offer a wealth of recent detail to complement
the community engagement work undertaken
directly for the Place Plan.
• Balloch “charrette” 2016: a series of design-led
public workshops (known as a “charrette”) and
other community engagement to identify
actions for the local community and visitor
economy.  A summary of the extensive
community engagement undertaken can be seen
on pages 12 to 18 of the charrette report.  The
work was commissioned by the National Park
and local authority, and led by 7N Architects. 
Community engagement for
this Plan
A decade on from the Community Action Plan, our
starting point to prepare its replacement - this
Local Place Plan - was to ask ourselves a question. 
Are the Community Action Plan’s priorities still
the right things to focus on? 
During late 2025 and early 2026, three phases of
activity allowed the local community to answer
that question and shape the Plan.
Phase 1: Ideas and aspirations
November 2025 to February 2026: find out
people’s aspirations for Balloch & Haldane in
various different ways - community drop-ins, a
community survey, dedicated website
www.planballochhaldane.net, activities with
young people, a business event, one-to-one
discussions with community groups and
businesses
Phase 2: Draft Plan
March 2026: publish draft Plan for everyone to
check, based on the aspirations and issues that
emerged during the first stage
Phase 3: Final Plan
April 2026: update the Plan based on
everyone’s feedback, before the Community
Council submits it to the National Park and
West Dunbartonshire Council for ‘registration’
as a Local Place Plan
Phase 1: Ideas and aspirations
Community drop-in events took place in Balloch
and Haldane on the 28th-29th November 2025. 
They were promoted by leafletting all households,
posters, social media, email contact lists, press
coverage and local what’s on websites.  People
were asked:
• What’s great about the community, and what’s
not so great.
• Their suggestions for the future, using the last
community-led plan in 2014 as a starting point.
• Their fears for the future.
• What needs to happen where, using a giant map.
The questions in the first three bullet points could
also be answered in an online survey open until
the end of December 2025.  At the November
community events, people were also able to make
suggestions on a giant map. 
You can read summaries and full transcriptions of
everyone’s comments on the Place Plan website at
www.planballochhaldane.net and in Appendix 1. 
The results make for fascinating reading. 
Haldane Youth Services, December 2025 (see next page)
Comments on the giant map

Page 13

Young people took part in a number of dedicated
activities including with Haldane Youth Services,
Balloch Primary School, St Kessogs Primary
School, Vale of Leven Academy, and Balloch and
Haldane pupils at Our Lady and St Patricks High
School.  Each included asking the young people
their suggestions about the future of the
community; ideas from some of these sessions are
shown on the maps below (also available at
www.planballochhaldane.net).
The activities in Balloch Primary School and Vale
of Leven Academy were co-ordinated with an
ongoing three year initiative being undertaken by
the non-denominational cluster schools in the
Vale of Leven, called Your Vale, Your Future. 
Phase 2: Draft Plan
The draft Plan based on the information gathered
in Phase 1 was published for public feedback
during March and April 2026 on the dedicated
website www.planballochhaldane.net and in
Balloch Library.  A drop-in event took place in
March 2026 to launch the draft.  Like the
November 2025 events, it was promoted by
leafletting all households, posters, social media,
email contact lists, press and what’s on websites. 
Phase 3: Final Plan
Feedback on the draft Plan, with explanations of
how it influenced the final Plan, was published
(see Appendix 2) in advance of the Community
Council considering the Plan for registration.  Flyer for the draft plan
Suggestions made on maps at youth and community events  
Click on maps to see larger versions

Page 14

4  Policy context
Local Place Plans are required to “have
regard to” national and local policy
contained in National Planning Framework 4
and Local Development Plans.  This section
summarises key highlights from these
documents and other relevant plans and
strategies.
(Local Place Plans are also required to have regard
to Locality Plans where they exist.  There is no
Locality Plan covering Balloch and Haldane.)
The content of the documents described in this
section has been taken into account in developing
the Plan’s vision, priorities, aims and actions,
alongside the community issues and aspirations
summarised in section 2.
National Planning
Framework 4
National Planning Framework 4 (NPF4, 2023)
contains national planning policies for the
creation of Sustainable, Liveable and Productive
Places.
Balloch and Haldane are located in the ‘Central’
region described in Part 3 of NPF4.  A number of
elements are worth quoting as context for this
Local Place Plan (emphasis added):
• “The National Park will continue to support the
quality of life and health of the urban population
and its future priorities include new
infrastructure provision to provide a quality
visitor experience and support people to
connect with nature, as well as a greener
tourism sector supported by innovative low
carbon transport solutions. Long distance active
travel and rail routes have untapped potential to
provide sustainable tourism solutions.” (page
132)
• “...requires a concerted effort to develop
networks of places that meet the principles of
local living and 20 minute neighbourhoods [see
NPF4 Policy 15], and with fair access to a range
of services that support sustainable living.
Planning should focus on revitalising cities and
towns at scale… This should incorporate
networks of natural spaces and blue and green
infrastructure, to create health and wellbeing
benefits, increase resilience to climate change
and support the growth of green job
opportunities.” (page 132)
• “...opportunities for investment and
development should be designed to maximise
economic, social and environmental wellbeing,
rather than focusing on growth alone. A planned
approach can help to target future development
in areas of significant economic disadvantage so
that new and better jobs are more fairly
distributed to help address national, regional
and more localised inequality.” (page 134)
• “Town centres throughout this area will also
play a critical role in driving a new economic
future. The recent town centre review highlights
opportunities to expand the range of services
and facilities they offer, reuse redundant
buildings and provide new homes for a wide
range of people. This in turn will ensure their
crucial role in defining our sense of place is
protected and enhanced, future proofing a key
asset for Scotland as a whole.” (page 135)
The Place Principle
The Scottish Government’s Place Principle is,
according to the Scottish Government, “the
overarching context for place-based working in
Scotland”.  The Principle was adopted by the
Scottish Government and local authorities to
guide collaborative working by the public sector,
service providers and communities (see section 7). 
NPF4

Page 15

Local Development Plans
Whilst national planning policy is set by
NPF4, local planning policy is contained in
Local Development Plans (LDPs).  Balloch
and Haldane is split between two LDPs:
Loch Lomond and the Trossachs LDP and
West Dunbartonshire LDP.  
The boundary between the two LDPs runs
largely along the A811, with Haldane and
Jamestown being covered by West
Dunbartonshire LDP.  Map 3 shows the
boundary of between the two LDPs that
cover the Local Place Plan area, focussing
on the central part of the village.
Both LDPs were prepared before NPF4. 
Work is underway on their replacements,
and section 7 of this Plan contains
suggestions for those reviews.  
The Scottish Government has stated in its
transitional arrangements that NPF4
should take priority in instances of
conflicting policy between LDPs and
NPF4.
Map 3  LDP coverage

Page 16

West Dunbartonshire Local
Development Plan
West Dunbartonshire LDP 2 covers most of the
Local Place Plan area south of the A811.  It was
largely completed in 2020 and is the most up-to-
date spatial strategy supported by the Council
(although the 2010 Local Plan remains the
statutory local development plan).
LDP2 Vale of Leven proposals map is on the
Council’s website here  (15mb PDF).  It includes:
• Protection of existing areas of open space.
• Housing / business use near Levenbank Terrace.
• Housing on a brownfield site on Jamestown
Main Street opposite Levenbank Road.
• Local Nature Conservation Site along the Leven.
• Undeveloped rural land to the east and west of
the settlement, either side of the Vale,
designated as Green Belt or Countryside (see
pages 56-57 of the LDP).
• The Kilpatrick Hills to the east of the Vale
protected as a Local Landscape Area and
identified as Countryside.
Work is underway on a replacement LDP.  Our
suggestions for that are contained in section 7.
Loch Lomond and the Trossachs
Local Development Plan
Loch Lomond and the Trossachs LDP was adopted
in 2016.  It covers those parts of the National Park
that lie within the Local Place Plan area, mostly
north of the A811.
Proposals for Balloch are largely contained on
pages 53-55 of the LDP, which can be seen online
on the National Park authority’s website here.  In
summary, proposals include improving the visitor
experience at West Riverside, the old station
building, the Moss o’Balloch, Balloch Castle and
Park, and Woodbank House.  More details can be
seen in the LDP itself.
Work is underway on a replacement LDP.  Our
suggestions for that are contained in section 7.
National Park     
Partnership Plan
Loch Lomond and the Trossachs National Park
Partnership Plan 2024-29 is the overarching plan
for the National Park Authority, setting the
priorities for the authority’s work and plans
(including its new Local Development Plan which
is under preparation).
The Partnership Plan recommits to sustainable
visitor management with the goal of “transforming
the National Park into a more sustainable, low
carbon visitor destination, where people from all
backgrounds have a high-quality experience and
feel connected to nature. Communities would see
fewer negative impacts from tourism on their
daily lives, while tourism and hospitality
businesses thrive, and nature recovers more
rapidly in less visited areas.”
It contains nine outcomes which to be achieved by
2045.  All are shown on the next page; those which
are most relevant for Balloch and Haldane are
highlighted in bold.

Page 17

National Park Partnership Plan:
outcomes
1 A natural carbon sink
Our ecosystems are in good health, helping
Scotland adapt to and mitigate against the
climate crisis with the National Park being an
active, natural carbon sink.
2 A restored landscape for nature
The long-term decline in nature in the
National Park will be halted by 2030 and
there will be widespread restoration by
2040, with an expansion of large-scale,
connected habitat networks where land
management prioritises nature recovery.
3 An exemplar of regenerative land use
The National Park is an exemplar of
regenerative land use delivering a wider
range of private, public and community
benefits.
4 A place for all to enjoy safely &
responsibly
Opportunities for everyone to value and
enjoy the special qualities/ benefits of the
National Park safely.
5 High quality visitor infrastructure &
facilities
People have a high-quality experience
visiting the National Park and are able to 
use great services, facilities and routes with
less impact on nature or contributing to
climate change. Communities see fewer
impacts of tourism on everyday life. Nature is
recovering more rapidly in less visited areas,
where priority has been given to non-
motorised access and recreation activity.
6 An inclusive, low-carbon travel network
The National Park has an efficient, inclusive
rural transport sector, meeting the travel
needs of both visitors and residents alike.
7 A greener & more diverse rural economy
The National Park has a zero carbon and
more diverse rural economy, in which
businesses thrive and the local workforce
has grown through an increase in nature and
climate based green jobs.
8 More resilient rural communities
National Park communities are leading the
way on net zero, nature friendly, living and
working, with their needs being met more
locally supported by a thriving local rural
economy which benefits all.
9 A responsive approach to new
development
New development and infrastructure is more
responsive to the needs of communities, the
rural economy, land use and management,
directly benefitting people, climate and
nature. 
Other plans and strategies
West Dunbartonshire Economic
Development Strategy
This document from 2022 aligns with Scotland’s
National Strategy for Economic Transformation
and Glasgow City Region Economic Strategy.  It
has a number of strategic priorities:
• Stimulating economic investment and growing
the business base
• Establishing an inclusive economy and
supporting people into work
• Creating a prosperous place where people
choose to live, work, visit and invest
• Addressing climate change and supporting a
green recovery
• Building stronger partnerships and new
approaches to delivery
West Dunbartonshire Plan for Place
The Plan for Place for 2017 to 2027 is the
Community Planning Partnership’s Local Outcome
Improvement Plan, a high level plan for delivery of
public services.  Its guiding principles include a
preventative and early intervention approach,
effective community engagement in the planning
and delivery of local services, empowering local
communities, and tackling inequality.  
Scotland’s National Strategy for
Economic Transformation
This Strategy from 2022 sets out how the Scottish
Government will deliver a fairer and greener
economy by fostering community wealth building,
a wellbeing economy, entrepreneurial capacity
(including significantly boosting alternative
business models such as community-owned
businesses), and education and skills.

Page 18

5 Strategic principles 
Three sets of overarching principles should
be applied to the delivery of everything in
the Plan, and to any future proposals which
emerge in response to changing
circumstances after the Plan has been
completed.
They connect the Plan’s vision to its actions,
delivering both community aspirations and wider
policy objectives, as the diagram on the right
demonstrates.
Community wealth building
• Widening access to business, employment,
learning, wellbeing and arts opportunities for
local people in Balloch, Haldane & the Vale.
• Improving attainment levels and pathways 
into learning, skills and employment.
• More opportunities to participate, connect
with & have pride in the local community.
• Make more of local heritage, art, outdoor
recreation and non-motorised water sports.
• Better access to opportunities, facilities and
services without a car.
International reputation and quality
• Gateway to Loch Lomond and the National
Park worthy of its international reputation.
• Better experience, better orientation, better
connections.
• Restoration and quiet enjoyment of nature
and heritage.
• Better stewardship and maintenance of what
we already have.
Working together for common purpose
• Public, private and third sector organisations.
• Commitment to deliver this shared agenda.
• Support each other as partners to deliver the
Plan. 
How the strategic principles
connect the Plan’s vision & actions

Page 19

6 Actions
This section contains eighteen actions which
are designed to deliver the vision contained
in section 1.  They are all based on
community aspirations.
The panel on the right summarises what is
proposed across the actions. 
Map 4 on the next page lists all eighteen actions
and shows where they are located around the
community.
A prosperous, fair community
• More good quality local jobs, skills and
training opportunities
• A stronger, more resilient local economy,
less reliant on low-paid seasonal work
• Support for local enterprises and
community-owned initiatives
A high-quality place to live
• A new community hub and improved spaces
for groups, activities and young people
• Better public services, including transport,
healthcare access and reliable public toilets
• Cleaner streets, safer spaces, and
well-maintained paths and parks
A better visitor experience
• A welcoming village centre with improved
signage, facilities and independent businesses
• Restoration of Balloch Castle and
enhancement of Balloch Castle Country Park
• A shift toward nature-based, low-carbon
tourism befitting our international reputation
A restored natural environment
• Protect, maintain and enhance landscapes and
habitats
• Retention and restoration of Drumkinnon
Woods
• More opportunities for outdoor recreation,
water sports and active travel

Page 20

Map 4  Actions

Page 21

1  Loch Lomond: the jewel in the crown
Ambition
• An environment worthy of Loch Lomond’s
international status, landscape and
biodiversity, and its location as a gateway to
the National Park.
• Easy, convenient, pleasant pedestrian
access to the loch shore for quiet
enjoyment of its outstanding scenery and
nature, with high quality paths and
viewpoints.  
• Transport on the loch from Balloch Bridge
and the Pierhead, linking to Balloch Park
and to visitor destinations and cycle routes
at Luss, Balmaha and beyond.  
• Safe access to the water for non-motorised
water sports and swimming. 
Action
• Adopt the vision and principles outlined in
sections 1 and 5 of this Plan.
• Move powered private craft away from
busy public areas like Pierhead and Balloch
Park, for example to private marinas.
• Upgrade facilities for non-motorised water
sports (e.g. swimming, rowing, kayaking).
• Improve water safety (e.g. signage, safety
equipment, rescue).  
• Explore discounted access to loch activities,
water sports and sailing for local people.
Key players
• National Park  |  Scottish Enterprise  |  West Dunbartonshire Council  |  Scottish Government  | Visit Scotland  | loch users 
Courtesy of Sweeney’s Cruise Company

Page 22

2  Gateway Centre 
Ambition
• Bring this key loch-side building back into
productive use linked to National Park aims,
with free access to at least part of the building.
• For example: national water sports centre of
excellence with focus on opportunities for local
young people; heritage, nature, health and
wellbeing base; enterprise, skills training and
heritage hub; visitor information and
interpretation centre (its original use). 
Action
• Key players should jointly commission a
feasibility study to consider future use,
ownership and management of the building.   
Key players
• National Park
• Scottish Enterprise
• Loch Lomond South Community Development
Trust
• Visit Scotland 
Courtesy of Loch Lomond Watersports

Page 23

3  Loch Lomond Shores
Ambition
• Loch Lomond Shores is struggling as a
sustainable visitor destination.  Its retail and
commercial offer has declined over the years. 
As a significant source of local employment, we
want to see it succeed, with an increase in
footfall and quality going hand-in-hand.  That is
partly the company’s responsibility, but also
depends on implementing other actions in this
Plan (see next column).  
• Make Loch Lomond Shores more part of the
local community - for example, discounted rates
for access and use of facilities by local people,
more community events, more shared action
like a business forum covering Loch Lomond
Shores and the rest of the village. 
• In the medium to long term term, this Plan
proposes a shift from the current commercial,
car-based philosophy to a destination which is
built around landscape, nature and heritage - a
destination which befits the location’s
international status and is in line with the Plan’s
vision / strategic principles and the National
Park’s four aims. 
Action
• Better pedestrian connection with village centre
(see action 7).
• Improve integration and co-ordination with
other local visitor destinations and initiatives:
Pierhead (action 4), village centre (actions 8-9),
Balloch Castle Country Park (actions 10-11),
infrastructure and safety (action 13), path
network (action 14), community facilities (action
16) and public transport (action 17).
• Review the parking regime, including pricing for
locals and greater use of the overflow car park 
(see action 13).  
• Co-ordinated visitor marketing                                  
and management (see action 18).
• Establish a business voice for the village as a
whole, working with village centre / Pierhead
businesses (see actions 9 and 18 and section 6).  
Key players
• Loch Lomond Shores
• National Park
• Scottish Enterprise
• Scottish Government 
Courtesy of Loch Lomond Shores

Page 24

4  Pierhead & Maid of the Loch
Ambition
• Attractive destination for visitors and locals
alike to enjoy the heritage and magnificent
views of the loch and Ben Lomond, with toilets,
cafe etc.
• A working heritage pier with the Maid of the Loch
open to visitors and, ideally, sailing on the loch.
• A focus on quiet enjoyment - no jet skis and
speedboats.
• More attractive public space, pier and shoreline,
less vehicle dominated with a focus on public
access and enjoyment of the scenery and
heritage.
• Better quality pedestrian and cycling
connections with Loch Lomond Shores, the
village centre and Balloch Castle Country Park
(see actions 3, 7 and 11). 
Action
• Design and implement public realm, pedestrian
access and shoreline improvements around the
Pierhead and towards Drumkinnon Bay and
West Riverside (including managing vegetation
to open up views of the loch) (see action 7).
• Restore public access to the Maid of the Loch - in
the short term as a static heritage attraction
with cafe, and in the medium term to carry
passengers on the loch from the pier.
• Waterbus link across the mouth of the River
Leven to Balloch Castle Country Park.
• Water safety improvements for swimmers,
paddlers and users of non-motorised craft.
• Move jet skis and speedboats away from busy
public areas (Drumkinnon Bay, Pierhead and
Balloch Park), e.g. to private marinas.
• Implement operational improvements for
organisations and users, as initiated by the
National Park and Loch Lomond Rescue Boat.  
• Co-ordinated visitor marketing                                  
and management (see actions 3, 9 and 18).
• Establish a business voice for the village as a
whole, working with Loch Lomond Shores /
village centre businesses (see actions 3 and 18
and section 6).  
Key players
• National Park
• West Dunbartonshire Council
• Loch Lomond Steamship Company
• Wild Highlands Coffee House 
• Loch Lomond Rescue Boat
• Other organisations at the Pierhead

Page 25

5  River Leven 
Ambition
• Safety of passenger vessels, private craft and members of the public.
• Improved public access along river banks, including nature and
heritage interpretation. 
Action
• Water safety improvements: signage/information, lifebelts, escape
ladders. 
• Continue to remove abandoned vessels and retain clear passage for
passenger vessels.  
• Continue to replace swing moorings for private craft with pontoons.
• Lighting along riverside paths and at the Stuckie Bridge (see action 7)
• Power supply and waste management for pontoons.
• Implement the community-led Leven Line access, biodiversity and
heritage improvements. 
• Protect and enhance water quality and protected fish species (e.g.
salmon and trout).
• Explore potential to generate hydropower from River Leven Barrage
below Lomond Bridge.
Key players
• West Dunbartonshire Council
• National Park
• Sweeney’s Cruises
• Balloch, Leven and Sandbarr Cruising Clubs
• Scottish Water
• Sustrans
• Leven Line
• Loch Lomond Angling Improvement Association

Page 26

6  Drumkinnon Wood
Ambition
• This area of Ancient Woodland - meaning
that it been continually wooded since at
least 1750 - has now been saved thanks to
rejection of the Lomond Banks commercial
leisure proposals by the National Park and
the Scottish Government.
• Drumkinnon Wood (see Map 5 adjacent)
should now be retained in perpetuity in
accordance with National Planning
Framework 4: Policy 6, and managed to
maximise nature restoration with
community involvement.
Action
• Active management of the woodland to
ensure its long term retention and to
maximise nature restoration, with
appropriate public access. 
• Agree ownership and management
arrangements with community
participation.  
• Co-ordinate management with other
nearby green spaces, e.g. West Riverside.
Key players
• Scottish Enterprise 
• Woodland Trust
• Loch Lomond South Community
Development Trust
• National Trust for Scotland
• NatureScot
• National Park 
Map 5   
Drumkinnon Wood

Page 27

7  West Riverside & Pier Road 
Ambition
• Rejection of the the inappropriate Lomond
Banks commercial leisure development
proposals by the National Park and the Scottish
Government creates an unmissable opportunity
to improve this long neglected area in line with
this Plan’s vision of nature restoration and
community wealth building.  
• It lies between the River Leven and Pier Road,
extending from near Balloch Road to the
Pierhead.  Largely comprising former rail sidings
and riverside native woodland, much of it was
landscaped after the railway closed in 1986.
• The area is critical - not as a development site,
but as a vital connection between Loch Lomond
Shores / the Pierhead and the village centre,
railway station and Balloch Castle Country
Park.  But the poor quality of paths, signage and
visitor infrastructure means that it functions
more as a barrier than a connection.
• Our alternative scenario revolves around:
‣ Creating an attractive green connection
between the village centre / railway station
and Loch Lomond Shores / the Pierhead for
visitors and residents alike.
‣ Sensitively improving visitor facilities and
views of the river in ways which respect
biodiversity and flood risk.
‣ Enhancing nature and heritage.
Action
• Terminate the conditional missive between
Scottish Enterprise and Flamingoland, and
progress alternative ownership / management
models with community participation, including
Community Asset Transfer. 
• Take forward the West Riverside Walk
proposals from the 2016 Balloch ‘charrette' (see
image overleaf, from pages 33-34 of the 2016
report), to create a visible, safe, well-lit walkway
between the village, Pierhead and Loch Lomond
Shores, with kiosks for cafe, bike hire etc (see
also action 5).
• Improve the non-pedestrian connection
between the railway station, Pierhead and Loch
Lomond Shores along the Pier Road corridor.
For example, electric shuttle bus and trishaws
(see also actions 8 and 17).
• Create high quality, publicly accessible open
space for residents and visitors which respects
the natural environment and becomes flexible,
low-impact venue for community markets,
festivals, pop-up learning spaces, and cultural
events, all developed in line with this Plan’s
strategic principles (see section 5). 
• Create a community-run motorhome aire
behind the old station building (see action 8),
complementing existing higher-spec facility at
Lomond Woods Holiday Park.
Key players
• National Park
• Scottish Enterprise
• West Dunbartonshire Council
• Loch Lomond South Community Development
Trust
• Balloch Cruising Club
• Leven Cruising Club
• Sandbarr Cruising Club
• Sweeney’s Cruises 
above  Current view of West Riverside walkway
below  Proposed view see next page for larger image

Page 28

Visualisation of West Riverside walkway proposal and cafe kiosk 
Courtesy of 7N Architects, from pp33-34 of 2016 report

Page 29

8  Old station building & station plaza
Ambition
• A welcoming hub in the heart of the village
based around the railway station and cruise boat
slipway, including a new community space in the
old station building (vacant tourist information
centre) - similar to Midsteeple Quarter,
Dumfries, funded by Scottish Enterprise’s sister
agency South of Scotland Enterprise
• The old station building brought back into use as
a community hub incorporating visitor
information and enterprise support.  It should
be a welcoming and inclusive space that
supports community development, tourism and
economic growth.
• Signposting and wayfinding to Loch Lomond, the
village centre, Balloch Castle Country Park etc.
• Safe interaction between varied users in a small
area: pedestrians, visitors, cyclists, local
residents, cruise passengers, coaches etc.  
Action
• Complete Community Asset Transfer of old
station building from Scottish Enterprise, and
redevelop as a community-led community/
visitor hub incorporating visitor information and
enterprise support, in line with Loch Lomond
South Community Development Trust proposals
(see action 16). 
• Upgrade passenger cruise facilities as   
proposed by Sweeney’s Cruise Company. 
• Improve signage and wayfinding from station /
old station building to village centre (including
cleaning bridge), public toilets, Balloch Castle
Country Park, Loch Lomond, West Riverside,
Pierhead and Loch Lomond Shores (see action
14).
• Create a community-run motorhome aire
behind the old station building (see action 7),
complementing existing higher-spec facility at
Lomond Woods Holiday Park.
Key players
• National Park
• Scottish Enterprise
• West Dunbartonshire Council
• Sweeney’s Cruise Company
• Loch Lomond South Community Development
Trust
• Sustrans
• Scotrail 
Birnam Arts
Birnam Arts combines community and visitor
facilities in one repurposed historic building in  
the village centre.  For 25 years it has acted as a
community space, visitor destination and a
gateway to Highland Perthshire.  Its much-loved
facilities include the village library, community
spaces, auditorium for music and events, cafe,
gallery, shop, exhibition space and garden.
Image courtesy of Birnam Arts
Example from elsewhere

Page 30

9  Village centre
Ambition
• The bustling commercial heart of the
community: more activity and colour, fewer
empty units, better facilities, and greater range,
quality and interest for locals and visitors alike.
• Better connected to the railway station, Loch
Lomond Shores / Pierhead and Balloch Castle
Country Park.
Action
• Improve signage and wayfinding between village
centre and public toilets, the railway station,
Balloch Castle Country Park, Loch Lomond,
West Riverside, Pierhead and Loch Lomond
Shores (see action 14).
• Ensure public toilets are consistently open
consistently, with improved disabled access and
better signposting from the village centre (see
action 16).
• Bring empty ground floor units opposite Balloch
House into beneficial community use.  For
example, a short-term lease as temporary
community space pending conversion of old
station building or shops/offices (see actions 8
and 16).
• Establish a business voice for the village as a
whole, working with Loch Lomond Shores/
Pierhead businesses (see actions 3, 4 and 18).
• Co-ordinated marketing and management (see
action 18). 
Key players
• National Park
• West Dunbartonshire Council
• Local businesses 
above  Closed public toilets at bus station 
below  Empty units opposite Balloch House
Image courtesy of Google Streetview
left  
Colourful banners  on Balloch 
main street to celebrate the 
local community, 2025

Page 31

10  Moss o’Balloch
Ambition
• Turn this much loved but underused space into a
park with planting, community gardening,
recreation facilities and event space.
• Bring back the Highland Games!
• Improve connections to the loch and Balloch
Castle Country Park, for example by opening up
views of the loch through selective thinning of
vegetation. 
Action
• Design/feasibility study to upgrade the grassy
areas between the play area and the slipway /
second car park. 
• Programme events and activities year-round to
increase footfall and support the local economy.
• Selective thinning of vegetation on west side to
open up view of river towards the loch and
mountains.
• Signage from car parks and play area to public
toilets (see actions 14 and 16).
Key players
• West Dunbartonshire Council
• National Park
• Balloch Castle Country Park Regeneration
Group
Colquhoun Square, Helensburgh
Redesigned high quality public space with hard
surfaces for markets & outdoor events, gardens,
free outdoor museum, seats and traffic calming
Balloch Highland Games, Moss o’Balloch 
Courtesy of West Dunbartonshire Council Images courtesy of Helensburgh Festivals
Example from elsewhere

Page 32

11  Balloch Castle Country Park
With over two hundred acres of woodland, parkland, burns,
beaches and not one but two castles, all situated on the bonnie
banks of the world-famous Loch Lomond, Balloch Park is a huge
asset.  
Loved by locals and visitors alike, with 1.2 million visiting each
year, it offers medieval and 19th century castles and a historic
designed landscape; a huge range of woodlands and habitats,
including red squirrels; stunning views over Loch Lomond; access
to the loch; and a proud cultural history of the local community
and people of Glasgow securing the Park for public benefit in
1916.
Yet despite it being a much-loved destination for visitors and
locals, there is an air of jeopardy over the Park.  Public spending
cuts mean that the local authority struggles to keep on top of
investment. 
Images courtesy of Balloch Castle Country Park Regeneration Group

Page 33

Ambition
• A key element of Balloch’s gateway to Loch
Lomond and the National Park, and a
destination in its own right for visitors & locals.
• Significant heritage asset with an important role
to play in the identity, wellbeing and long-term
economic potential of the community.
• Repair and reopen the A-Listed historic 19th
castle for income-earning facilities for visitors
and locals. For example: restaurant, education,
residential/holiday accommodation.
• Conserve the Park’s rich biodiversity and
habitats, including managing invasive species.
• Improved connections and marketing.
• Enhanced interpretation, education and
information around the Park.
• Income-earning activities in the Park, sensitively
managed and located, to complement the
existing slipway cafe. 
• Overall, a long-term, co-ordinated, place-based,
partnership approach that prevents further
deterioration, and balances heritage and nature
conservation with community benefit,
environmental stewardship, and sensitive
economic activity.
Action
• Prepare 10 year masterplan and investment
plan for the Park, involving a full-time paid
project manager.
• Information displays about the Park in the
entrance foyer to the castle’s public toilets.
• More “forest school” use as an outdoor
classroom for local children.
• Repairs and upgrades to the walled garden,
promoting traditional skills and training.
• Implement Woodland Management Plan
• Conversion of North and South Lodges to
residential accommodation or holiday lets.
• Better signage to the Park (see action 14).
• Electric shuttle bus to village centre, Pierhead
and Loch Lomond Shores (see action 17).
• Better promotion of the Park on trains, in
Glasgow, at Glasgow Airport etc (see action 18).
Key players
• West Dunbartonshire Council
• Glasgow City Council
• National Park
• Historic Environment Scotland
• Balloch Castle Country Park Regeneration
Group
• Loch Lomond South Community Development
Trust
• Balloch and Haldane Community Council 
Chatelherault Country Park
Chatelherault Country Park masterplan was
prepared by South Lanarkshire Council in 2025. 
The 10 year vision seeks significant investment in
the Country Park, which receives 0.8 million
visitors annually.  Plans include enhanced visitor
centre cafe and conference area, heritage repairs
to Listed Buildings, path, play and landscape
upgrades. Implementation will proceed in phases
as funding becomes available.
Beckenham Place Park
Beckenham Place Park in Lewisham has been
upgraded with major renovation works since the
mid 2010s thanks to a partnership between local
government, funders and the community.
The works included restoration of parkland,
gardens, water bodies, buildings, nature & paths.  
The Park was relaunched in 2019 with a
community event attended by 7,000 people. 
There is now a busy events programme and
restoration work continues. 
Examples from elsewhere
Image courtesy of Scottish Construction Now
Image courtesy of Lewisham Council

Page 34

12  Dereliction & decay
Ambition
• Bring derelict and vacant sites back into use,
favoured uses being housing for young or
vulnerable people, community facilities and
enterprise space (e.g. for young people).
• See Map 4 (page 20) for locations (also Balloch
Castle North and South Lodge, see action 11).
Key players
• Landowners / developers
• West Dunbartonshire Council
• National Park
• Loch Lomond South Community Dev’t Trust
Old station building 
This prominent building - formerly
VisitScotland’s visitor information centre - has
lain vacant for a number of years.  It needs
significant overdue maintenance. The building
should be brought into community ownership
& repurposed as a community hub with visitor
information/enterprise support (see action 8).
Balloch Castle
This Category “A” Listed building has been
closed to the public for a number of years, and
is surrounded by temporary security fencing
because of its deteriorating condition.  It is the
centrepiece of Balloch Castle Country Park, a
key component of Balloch’s visitor interest
with 800,00 visitors a year.  The building needs
to be repaired and brought back into
sustainable use before it deteriorates any
further (see action 11).
Woodbank House
A once-handsome Georgian mansion built in
1776, and a popular hotel in the the 20th
century, this Category ‘A’ Listed Building was
burnt out in 1996 and has been neglected
since.  It is on the Buildings at Risk Register and
identified in the Loch Lomond and the
Trossachs LDP as development site VE4. 
The 2016 Balloch charrette (page 53)
proposed restoration of the House funded and
“enabled” in part by sensitive development in
its grounds. 
We would like to see the Listed Building
restored to its former glory before any other
"enabling" development in its grounds, which
should also take account of flooding issues on
Old Luss Road. 
Image courtesy of Balloch Castle Country Park
Regeneration Group
Image courtesy of Hole Ousia

Page 35

Commercial units, Balloch Road
The empty ground floor units opposite Balloch
House have never been occupied and should
be brought into use.  For example, a short-term
lease as community space pending conversion
of old station building (see actions 8 and 16).
Former Balloch Library 
The former library on Carrochan Road has
been demolished since the photograph was
taken. Planning consent has been granted for
residential development on the cleared site.
East of Levenbank Terrace
Vacant ground east of Levenbank Terrace,
allocated for new housing in West Dun. Local
Development Plan (site H2(30)). 
Elmtree House, Dalvait Road
Ground floor and adjacent gap site.
Former Stables Bar/restaurant
Site of demolished premises on Carrochan Rd.
Former Jamestown            
Parish Church
Situated prominently on Jamestown’s Main
Street between Balloch and Bonhill, the church
was built in the late 1860s and closed in 2019.
Former Rowantree Tavern
Opposite the former Parish Church (above) on
Jamestown’s Main Street, this pub has been
closed for a decade or more. 
Image courtesy of Thomson Property Image courtesy of Google Maps
Image courtesy
of Google Maps
Image courtesy of Google Maps
Image courtesy
of Google Maps

Page 36

13  Infrastructure & safety
Ambition
• Our infrastructure should be able to handle the
pressure placed on it by residents and visitors.
• Tackle perennial issues of anti-social behaviour
during warm summer weather.
Action
• Tackle congestion and parking issues linked to
seasonal visitor traffic, before further significant
development takes place - particularly A82
Stoneymollan roundabout, A811 / Loch Lomond
Shores (LLS) roundabouts, and availability of
Loch Lomond Shores overflow car park for free
public use (see action 3).
• Continue to implement and review Operation
Balloton to manage peak influxes of summer
visitors. 
• Consider one-way traffic along Balloch Road
from rail station to bus station (see image above
right) - to reduce traffic, improve safety, ease
congestion, reduce pollution & provide space for
outdoor seats etc
• Address outstanding infrastructure
maintenance issues such as Pier Road (flooding
and lighting), Stuckie Bridge (lighting),
Mollanbowie Estate (road surfaces), Ballagan
Burn (erosion by former library).
• Put in place a strategy to improve litter
management, which should include bin provision
and maintenance. 
Key players
• Landowners
• West Dunbartonshire Council
• National Park
• Loch Lomond Shores
• Scottish Enterprise
• Transport Scotland 
A811/ LLS roundabout  courtesy of Robert Mair
Balloch Road courtesy of Google Maps
A82 at a standstill  courtesy of Dumbarton Reporter

Page 37

14  Paths & signage
Ambition
• Being able to move around the community easily
and safely without a car is essential for residents
and visitors alike.  It is a vital part of community
life and our role as an international visitor
destination.
• Paths that are well-maintained, accessible and
safe.
• Clear signage to link up different parts of the
community for locals and visitors.
• A heritage/nature trail within the village and
extending to other destinations, such as the
John Muir Way and the Leven Line towpath to
Alexandria. 
Action
• Design and implement signage and wayfinding
strategy, connecting Balloch Park, public toilets,
the village centre, railway station, Pierhead,
Loch Lomond Shores and the Vale of Leven.
• Create nature/heritage trails using local path
network, including the River Leven towpath /
Leven Line (see action 5), in Balloch Park (see
action 11), the National Cycle Network, John
Muir Way, Three Lochs Way, Core Paths in West
Dunbartonshire and the National Park, and
other paths and trails in and around Balloch and
Haldane. 
• Improvements should include drainage and
surfacing, lighting, signage and waymarking,
interpretation, promotion and organised walks. 
Key players
• Landowners
• West Dunbartonshire Council
• National Park
• Walk Wheel Cycle Trust (formerly Sustrans)

Page 38

15  Landscape setting
Ambition
• Protecting the community’s landscape setting is
vital to delivering the vision in section 1.  This
will involve action on the hills and muirs above
the Vale, next to our Community Council area.
Action
• No new residential development on Green Belt
or Countryside outwith the built-up area, except
development sites already allocated in existing
Local Development Plans.  
This request includes the fields between
Mollanbowie Road and Stirling Road, and
extends beyond the Local Place Plan /
Community Council boundary, which is close to
the built-up area on the east side (see Map 4,
page 20).
This is to avoid damaging the community’s
landscape setting and because of concerns over
sewerage capacity and public services
(particularly health care).
• Any new windfarms should provide community
benefit in the form of an ownership share rather
than grant funding. 
• New windfarm developments should not
adversely affect the skyline and setting of the
community’s location as a gateway to the
National Park and Loch Lomond.  
This includes the hills and muirs east and west of
the Vale of Leven, and the hills forming the
skyline around Loch Lomond when viewed from
Balloch (see Map 6 on right).  
Please note that this request relates to land
outwith the Place Plan area in West
Dunbartonshire, Argyll and Bute, and Loch
Lomond and the Trossachs National Park).
Key players
• West Dunbartonshire Council
• National Park
• Argyll and Bute Council
• Balloch and Haldane Community Council
• Landowners 
Map 6  
Landscape setting

Page 39

16  Community life  
Ambition
• A multipurpose community centre which can
provide indoor space for people of all ages to
gather and meet, activities, and groups.  We do
not have a building that fulfils those essential
purposes. 
• A thriving and well-supported eco-system of
voluntary community groups to sustain
community life.
• More opportunities for young people, to build
on the excellent Your Vale, Your Future 3-year
initiative led by Vale of Leven Academy and its
feeder schools.  This could include, for example,
involving young people from Haldane Youth
Services and schools working with the
Community Development Trust and Community
Council to establish a Youth Forum for young
people to shape their future; and a youth space
and cinema nights in the proposed new
community centre.
• Accessible, reliable, signposted network of
public toilets, given our status as an
international tourist destination.  The toilets at
the bus station are too often closed and have
poor disabled access.
• Resolving issues with the provision of
healthcare / patient care at the Vale of Leven
Hospital, our main primary healthcare location
(in Alexandria).
• Upgrade play areas.
Action
• Implement proposal for community hub in the
old station building incorporating visitor
information and enterprise support (see action
1.8).  Other possible temporary locations
include one or more empty units on Balloch
Road opposite Balloch House (see actions 9 and
12), or the Gateway Centre at Loch Lomond
Shores (see action 2).
• Move to more stable financial support for local
community organisations which provide
essential services, for example 3-5 year funding
packages for organisations like Haldane Youth
Services, Dumbarton District Women’s Aid,
Lomond Community Pantry, Loch Lomond
Rescue Boat, Loch Lomond South Community
Development Trust and others.
• Establish Balloch and Haldane Youth Forum or
similar to create more opportunities for young
people to shape their future. 
• Retain and upgrade toilets in terms of
accessibility, opening times and signposting,
particularly those at the bus station near the
village centre.
• Continue to improve services and facilities at
Vale of Leven Hospital.
• Rolling programme of play area upgrades
throughout the community.
Key players
• West Dunbartonshire Council
• West Dunbartonshire CVS
• Loch Lomond South Community Dev’t Trust
• Balloch and Haldane Community Council
• Vale of Leven Trust
• National Park
• NHS Greater Glasgow and Clyde
• West Dunbartonshire Health and Social Care
Partnership 
above  Vale of Leven Hospital  courtesy of wfmillar
below  Haldane Youth Services  see page 13

Page 40

17  Public transport 
Ambition and action
• Safe, convenient bus connections between
Balloch and Haldane, to the rest of the Vale,
Dumbarton, Clydebank and Glasgow for
essential daily needs, including evenings and
weekends for the night-time and weekend
economies.
• More reliable and better quality rail service.
• Tackling anti-social behaviour on buses and
trains.
• Electric shuttle bus linking Balloch Castle
Country Park, village centre, Pierhead and Loch
Lomond Shores.
Key players
• West Dunbartonshire Council
• SPT
• Scotrail
• National Park
• Police Scotland /                   
British Transport Police 
Image courtesy of Daily Record

Page 41

18  Destination marketing
Ambition
• Co-ordinated year-round destination marketing
for everything the village has to offer, to replace
the recently terminated Love Loch Lomond
branding.
• Establish a voice for the local business
community, including the village centre, Loch
Lomond Shores / Pierhead and other parts of
the village.
Action
• Develop destination marketing strategy  to
replace the now-ceased Love Loch Lomond,
covering:
‣ The whole community.
‣ Events programming.
‣ Year-round visitor offer.
‣ Social media.
‣ Visitor information at key locations including
Glasgow city centre stations, Glasgow Airport,
and brown signage on trunk road network (out
of date for Balloch).
• Establish a business forum open to all
businesses in Balloch - from homeworkers to
large companies, from Haldane to Cameron
House - to act as a forum for discussion, a voice
for local business, and potentially to organise
destination marketing.  
Key players
• Local businesses
• National Park
• West Dunbartonshire Council
• Visit Scotland
• Historic Environment Scotland
• Scotrail
• Transport Scotland
• Glasgow Airport

Page 42

7 Next steps
This Local Place Plan has set out a vision
and actions for the renewal of Balloch
and Haldane in ways which will benefit
not only the local community, but also
the Vale of Leven, Loch Lomond and the
Trossachs National Park, and Scotland
as an international visitor destination.
Turning this Plan into reality will need
everyone to work together for common
purpose.  If we don’t do that, the Plan
simply will not happen.  But the prize is
immense.
The Scottish Government’s February 2026
decision to uphold the National Park’s
rejection of the Lomond Banks commercial
leisure proposals represents an opportunity
for all of us.  It opens the door to a future for
Balloch and Haldane which is in tune with the
National Park’s statutory aims, national
planning policy, the government’s community
wealth building agenda, and community
aspirations for sustainable locally-led
solutions.  Everybody wins.
The first step is for us all to establish a way of
working together.

Page 43

Balloch 2030
The one thing that needs to happen to trigger this
Plan’s implementation is to establish a strategic
delivery group - to which we’ve given the working
title of Balloch 2030.  
Membership of the group needs to encompass
public, private and community organisations
referred to throughout this Plan - including the
National Park, West Dunbartonshire Council,
Scottish Enterprise, Loch Lomond South
Community Development Trust, Balloch and
Haldane Community Council, and Balloch Castle
Country Park Regeneration Group as a minimum. 
Other organisations could be involved too, for
example young people (through local schools and/
or Haldane Youth Services) and the business
forum proposed in action 3.3.
The role of the group should be to champion,
monitor and be accountable for overall delivery of
this Plan.  It should act as a leadership group
rather than an executive group, supporting and
challenging each other to secure the necessary
resources and support to deliver the actions in the
Plan. Part of that should be to support each other
to gain more resources and capacity, particularly
volunteer-run community bodies who need paid
support.
The group should operate according to the ethos
of the Place Principle (see section 4), placing the
Plan and its delivery at the forefront of place-
based collaborative delivery.
Planning policy and
development management
Not all of this Plan’s aspirations relate to statutory
land use planning.  But it does contain some
proposals which we hope will be supported by the
National Park and West Dunbartonshire Council
(a) as they prepare their new Local Development
Plans and (b) in determining planning applications
and exercising other regulatory powers.
Suggestions for the new Local Development Plans
are summarised in the table on the next page,
which includes reasons as required by Schedule
19 of the Planning (Scotland) Act 2019.

Page 44

Suggestions for Local Development Plans     LLT LDP = Loch Lomond & Trossachs Local Development Plan         WD LDP = West Dunbartonshire Local Development Plan
Suggestion Reasons LLT LDP WD LDP Details
A Embed this Plan’s vision and strategic principles in both Local
Development Plans
To deliver NPF4, the National Park’s statutory aims,
and the Scottish Government’s community wealth
building agenda
✅ ✅ Sections 1
and 5
B Identify Gateway Centre at Loch Lomond Shores as priority for
reuse for visitor or community purposes
To help deliver the National Park Partnership Plan’s
outcomes ✅ Action 2
C Long-term aspiration to repurpose Loch Lomond Shores towards a
destination built around landscape, natural and heritage
To reflect the sharpened focus on tackling climate
change in NPF4 and the National Park Partnership
Plan’s outcomes
✅ Action 3
D Implement Pierhead public realm, pedestrian access and shoreline
improvements and towards Drumkinnon Bay and West Riverside
To help deliver the National Park Partnership Plan’s
outcomes ✅ Action 4
E Improved public access along River Leven banks, including nature
and heritage interpretation
To help deliver the National Park Partnership Plan’s
outcomes and improve public access ✅ ✅ Action 5
F Explore potential to generate hydropower from River Leven
Barrage below Lomond Bridge
To contribute to tackling the climate emergency ✅ ✅ Action 5
G Retain and enhance Drumkinnon Woods To deliver NPF4 and the National Park Partnership
Plan’s outcomes ✅ Action 6
H Designate West Riverside and Pier Road as an attractive green
connection between the village centre / railway station and Loch
Lomond Shores / the Pierhead, sensitively improving visitor
facilities and views of the river in ways which respect biodiversity
and flood risk, and enhancing nature and heritage
To deliver NPF4 and the National Park Partnership
Plan’s outcomes ✅ Action 7
I Identify land immediately north of the old station building for a
community-led motorhome aire
To improve visitor accommodation and generate
community income ✅ Actions 7-8
J Repurpose old station building as a community hub incorporating
visitor information and enterprise support
To provide much-needed community space and
visitor information ✅ Actions 8
and 16
K Improve interaction between transport modes at rail station /
cruise boat slipway
To improve safety ✅ Action 8

Page 45

L Temporary use of vacant ground floor units at Balloch Road as
community space
To provide much-needed community space and
visitor information ✅ Action 19
M Improve Moss o’Balloch as a flexible public space To improve the local economy ✅ Action 10
N Restoration and enhancement of Balloch Castle Country Park,
including heritage and nature conservation
To help deliver the National Park Partnership Plan’s
outcomes ✅ Action 11
O Identify key derelict sites and buildings to be brought back into use To conserve the historic environment, improve
health and wellbeing, and support the local economy ✅ ✅ Action 12
P Improve traffic management around the A82 Stoneymollan
roundabout and A811 McDonalds roundabouts
To tackle congestion, improve health and wellbeing,
and support the local economy ✅ Action 13
Q No new residential development on Green Belt or Countryside
outwith the built-up area, except development sites already
allocated in existing Local Development Plans.  This request
extends beyond the Local Place Plan / Community Council
boundary, which is very close to the built-up area on the east side. 
To avoid damaging the community’s landscape
setting and because of concerns over sewerage
capacity and public services (particularly health care)
✅ ✅ Action 15
R Any new windfarms should provide community benefit in the form
of an ownership share rather than grant funding
To support community development and
implementation of this Plan ✅ ✅ Action 15
S New windfarm developments should not adversely affect the
skyline and setting of the community’s location as a gateway to the
National Park and Loch Lomond, including the hills and muirs east
and west of the Vale of Leven, and the hills forming the skyline
around Loch Lomond when viewed from Balloch (see Map 5, p.38).
To protect the National Park against adverse impacts
as required by NPF4 Policy 11(d) and Policy 4, and to
apply the precautionary principle as required by
NPF4 Policy 4(e)
✅ ✅ Action 15
T Retain and enhance public toilets at the Pierhead, bus station and
Balloch Castle
To support the local economy and for health and
wellbeing ✅ Action 16
Suggestion Reasons LLT LDP WD LDP Details