Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
5 March 2025 
SUPPLEMENTARY PACK 1 
SPECIAL ARGYLL AND BUTE COUNCIL - ON A HYBRID BASIS IN THE COUNCIL
CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS on FRIDAY, 7 MARCH
2025 at 1:00 PM 
I enclose herewith amended appendices for items 3(b) (Appendix 1 - Hub North Scotland Site
Selection and Engagement Report (February 2025) - costs redacted) and 3(c) (Appendix 1 -
Hub North Scotland Site Selection and Engagement Report (February 2025) - with costs)
which should replace those previously issued with the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
AMENDED APPENDICES 
3. LEARNING ESTATE INVESTMENT PROGRAMME (LEIP) - MULL CAMPUS -
PREFERRED SITE RECOMMENDATION 
(b) Appendix 1 - Hub North Scotland Site Selection and Engagement Report
(February 2025) - costs redacted (Pages 3 - 54) 
E1  (c) Appendix 1 - Hub North Scotland Site Selection and Engagement Report
(February 2025) - with costs (Pages 55 - 106) 
The Council will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraphs are:- 
E1 Paragraph 8  The amount of any expenditure proposed to be incurred by the authority
under any particular contract for the acquisition of property or the supply of goods or
services.
Public Document Pack

Page 2

Paragraph 9  Any terms proposed or to be proposed by or to the authority in the course of
negotiations for a contract for the acquisition or disposal of property or the supply of goods
or services. 
Argyll and Bute Council 
Contact: Hazel MacInnes, Senior Committee Officer  Tel:01546 604269

Page 3

Classification: OFFICIAL 
North Schools Programme
Mull Campus – Site Selection
Site Analysis Report 
06 February 2025
Prepared by:  Scott Adams, Project Director 
Page 3 Agenda Item 3b

Page 4

1 
Classification: OFFICIAL
Contents
1.0 Executive Summary .................................................................................................................................... 1
2.0 Report ........................................................................................................................................................... 1
2.1 Scope of Works ....................................................................................................................................... 1
2.2 Community Engagement ......................................................................................................................... 1
2.3 Call for Sites ............................................................................................................................................ 1
2.3.1 Long List .......................................................................................................................................... 1
2.3.2 Short List ......................................................................................................................................... 3
3.0 Site Analysis ................................................................................................................................................ 4
3.1 Site 1 – Existing Tobermory School ........................................................................................................ 6
3.1.1 Deliverability .................................................................................................................................... 6
3.1.2 Educational Impact ......................................................................................................................... 8
3.1.3 Community and Place ..................................................................................................................... 9
3.1.4 Accessibility & Transport ............................................................................................................... 11
3.1.5 Sustainability ................................................................................................................................. 13
3.1.6 Affordability ................................................................................................................................... 14
3.1.7 Risk ............................................................................................................................................... 16
3.2 Site 2 – Craignure .................................................................................................................................. 17
3.2.1 Deliverability .................................................................................................................................. 17
3.2.2 Educational Impact ....................................................................................................................... 19
3.2.3 Community and Place ................................................................................................................... 20
3.2.4 Accessibility & Transport ............................................................................................................... 22
3.2.5 Sustainability ................................................................................................................................. 26
3.2.6 Affordability ................................................................................................................................... 26
3.2.7 Risk ............................................................................................................................................... 28
3.3 Site 3 – Garmony ................................................................................................................................... 29
3.3.1 Deliverability .................................................................................................................................. 29
3.3.2 Educational Impact ....................................................................................................................... 30
3.3.3 Community and Place ................................................................................................................... 32
3.3.4 Accessibility & Transport ............................................................................................................... 32
3.3.5 Sustainability ................................................................................................................................. 36
3.3.1 Affordability ................................................................................................................................... 36
3.3.2 Risk ............................................................................................................................................... 38
Page 4

Page 5

2 
Classification: OFFICIAL
3.4 Site 4 – South Tobermory ...................................................................................................................... 39
3.4.1 Deliverability .................................................................................................................................. 39
3.4.2 Educational Impact ....................................................................................................................... 41
3.4.3 Community and Place ................................................................................................................... 42
3.4.4 Accessibility & Transport ............................................................................................................... 43
3.4.5 Sustainability ................................................................................................................................. 46
3.4.6 Affordability ................................................................................................................................... 46
3.4.7 Risk ............................................................................................................................................... 48
4.0 Appendices ................................................................................................................................................ 49
Appendix A – Engagement Report ................................................................................................................. 49
Appendix B – Long List Report ....................................................................................................................... 49
Appendix C – Short List Site Layouts ............................................................................................................. 49
Appendix D – Existing Utilities Report ............................................................................................................ 49
Appendix E – Desktop Geotechnical Report................................................................................................... 49
Appendix F – Flooding and Drainage Report.................................................................................................. 49
Appendix G – Place Plans .............................................................................................................................. 49
Appendix H – Transport Review ..................................................................................................................... 49
Appendix I –   Site Abnormals Cost ................................................................................................................ 49
Appendix J – Wayleaves, Legal and Site Acquisition Risk ............................................................................. 49
Appendix K – Integrated Impact Assessment Report ..................................................................................... 49
Appendix L – Valuation Report ....................................................................................................................... 49 
Page 5

Page 6

1 
Classification: OFFICIAL
1.0 Executive Summary
As part of the North Schools Programme, hub North Scotland have supported Argyll and Bute Council with 
site selection activities for the proposed 2-18 Mull Campus. This report details the analysis of site-options to
allow for Argyll and Bute Council to undertake a scored evaluation of short-listed sites.
2.0 Report
2.1 Scope of Works
As part of the Site Selection activity we have undertaken the following;
• Outlining site requirements to support a call for sites
• Supporting with the development of evaluation criteria for site selection
• Undertaking screening and assessment of submitted sites for both long-listing and short-listing
• Detailed technical analysis of short-listed sites in order to provide suitable information for Argyll and
Bute Council to score against evaluation criteria
• Community Engagement from 17th-25th September 2024, with output report to capture feedback.
• Integrated Impact Assessments capturing socio-economic impacts of site selection.
• Valuation of short-listed sites.
This report brings together the information gathered and produced during the above activities and is intended
to support informed decision-making in terms of selecting a suitable site for the proposed 2-18 Mull Campus.
2.2 Community Engagement
A Community Engagement exercise was undertaken between the 17th and 25th September in a range of
locations across Mull and Iona, these sessions were set-up to help understand which factors were important to
the Community in selecting a site for the new 2-18 Mull Campus. 
2.3 Call for Sites
Argyll and Bute Council issued a call for sites on 28 August 2024 which outlined the initial criteria for land to
site the proposed Mull Campus. The initial request was for sites to be at least 2.3 hectares and provisions of
as much information as possible to assess the site. Our team undertook an initial screening of each site to
confirm its suitability in terms of area for inclusion within the Long List. 
2.3.1 Long List
Following the Call for Sites a long list was produced which included ten sites to be reviewed for consideration
as to whether they could accommodate the new 2-18 Mull Campus. Our team undertook a high-level review of
each site to consider key constraints such as flood risk, ground conditions, accessibility and site abnormals
which could make the sites prohibitive to development. 
An initial focus was given on suitability of each site to deliver the brief in terms of size, fit and accessibility. The
Architect initially overlaid a footprint for a comparative project on each option to establish how this would fit. It
was then possible to consider how this would sit within a wider site context to deliver an overall site which
would be able to safely operate. 
Our technical team provided commentary relevant to Civil and Structural requirements, such as topographical
and ground condition risks. Some of the sites provided through the Call for Sites were found to have
substantial level changes and contain very poor marsh and peaty ground, making them unsuitable for
development without significant remediation.
Page 6

Page 7

Page 7

Page 8

3 
Classification: OFFICIAL
On conclusion of this exercise it was agreed that three sites, plus the existing Tobermory School site would be
progressed to a short-list for a more detailed site analysis.
Full details of the long-listing review, which includes the high level analysis of each site, along with the existing
Tobermory School site is included in Appendix B
2.3.2 Short List
Following the long list review it was agreed that 4no. sites would be short-listed for detailed analysis. These
are listed as follows;
Site 1 – Existing Tobermory School
Site 2 - Development site, Craignure
Site 3 - Garmony
Site 4 – South Tobermory  
Page 8

Page 9

4 
Classification: OFFICIAL
3.0 Site Analysis
• In order to undertake a comprehensive evaluation of the short-listed sites we worked collaboratively
with Argyll and Bute Council to set-out evaluation criteria consistent with site selection for comparable
projects. This initially focused on key themes of; 
• Deliverability – A technical review of sites to confirm suitability for building of the new Campus. This
was to focus on utilities, ground conditions and flood risk. 
• Education – A look in to how each site could meet educational requirements through a review of
external environments and confirming how each site could cope with adaptation and expansion. Travel
times are also to be included. 
• Community and Place – A view on how each site would impact the region through impact on
residents, families and  staff/pupils. Consideration should also be given to any impact on the local
economy. 
• Accessibility and Transport – An improved understanding around the impacts of travel and transport
against each of the identified sites. This would focus on existing links, including active travel and how
the wider infrastructure network would support access to each site. 
• Sustainability – Consideration around how different sites could have an impact in terms of embodied
carbon through existing structures, whilst also looking at carbon related to travel. 
• Affordability – A review on any site abnormals across various sites, also picking up site acquisition
costs and any revenue implications across sites. 
• Risk – Any consideration around impact to the construction programme, along with any details around
wayleaves, legal restrictions and planning risks. 
Within each of these headings we detailed out information that could be provided to support the evaluation
activity. 
Page 9

Page 10

5 
Classification: OFFICIAL
The Strategic Board for the 2-18 Mull Campus project agreed the following Evaluation Criteria; 
The X in the ‘Report Reference’ above is to be replaced with the number for each site as follows;
1 – Existing Tobermory School
2 – Development Site, Craignure
3 - Garmony
4 – South Tobermory 
This numbering links to the relevant sections within this report. 
Criteria Category Report Reference Evaluation Criteria Supplementary Appendix
3.X.1.1 Utility infrastructure - capacity and need for any diversions Appendix D
3.X.1.2 Ground conditions Appendix E
3.X.1.3 Topography Appendix E
3.X.1.4 Flood risk Appendix F
3.X.1.5 Site abnormals -
3.X.1.6 Habitat constraints -
3.X.2.1 Is the site capable of accommodating the brief in full? -
3.X.2.2 Quality of external environment to support outside learning, sports activities etc -
3.X.2.3 Does the site provide capacity for future expansion? -
3.X.2.4 Travel times for ELC and primary school pupils Appendix H
3.X.2.5 Travel times for staff and secondary school pupils Appendix H
3.X.2.6 Access and connectivity to good community facilities and services Appendix H
3.X.3.1 Impact on family life Appendix K
3.X.3.2 Equitable - unites north & south of island Appendix K
3.X.3.3 Sustain and support local economy Appendix K
3.X.3.4 Impact of construction activities on existing school/ residential areas -
3.X.4.1 Good public transport links to site and location Appendix H
3.X.4.2 Existing safe active travel links to site Appendix H
3.X.4.3 Number of user journeys - bus, car, pedestrian (Pupil/ staff mode split) Appendix H
3.X.4.4 Potential impact on public transport network Appendix H
3.X.4.5 Ability of existing (wider) roads infrastructure to service site Appendix H
3.X.4.6 Trips with complex dependencies/ multiple stages and modes of travel Appendix H
3.X.5.1 Potential for re-use of existing infrastructure and buildings (embodied carbon) -
3.X.5.2 Carbon impact of travel (travel distances and mode of transport) Appendix H
3.X.6.1 Costs associated with site abnormals Appendix I
3.X.6.2 Potential acquisition/disposal costs Appendix L
3.X.6.3 Other (revenue) cost implications e.g. pupil transport -
3.X.7.1 Wayleaves, legal restrictions and site acquisition risk Appendix J
3.X.7.2 Construction Programme risk -
3.X.7.3 Planning designation and sensitive receptors -
Education
Risk
Affordability
Sustainability
Accessibility & Transport
Deliverability
Community and Place
Page 10

Page 11

6 
Classification: OFFICIAL
3.1 Site 1 – Existing Tobermory School
3.1.1 Deliverability
3.1.1.1 Utility Infrastructure – capacity and need for any diversions
Re-use of the existing school site for the New Mull Education Campus benefits from having existing Utilities
infrastructure connectivity supporting the function of the existing school.
Whilst existing connections exist, further engagement will be necessary with Utilities companies in respect of
any anticipated increased capacities, particularly in relation to electrical infrastructure. 
We are advised that the existing school has an authorised capacity of 31kVA but that should be nearer
230kVA. Argyle and Bute Council are in the process of requesting an uplift in authorised capacity to reflect the
current maximum demand.
From the record information we can establish that utilities infrastructure is not present across the area
proposed for the new school.
There is however a strategy to be developed to maintain utilities to the existing school whilst the new school is
constructed. It is anticipated that within that strategy existing Utilities diversions/ protection will be necessary
that will affect Electricity, Water and Communications Infrastructure.
Potential for positive Business Case for future connection of Net Zero heat networks
The existing school site is located in the heart of the most populated settlement on Tobermory. Having the
ability to connect the school in an area with the greatest population mass would be advantageous and could
also be supported by potentially introducing waste heat energy into the network from businesses such as
Tobermory Distillery.
3.1.1.2 Ground Conditions
Based on desk study review only, it is envisaged that within Site 1 where raised beach deposits of sand and
gravel are recorded to be present a shallow pad or traditional strip foundation design would be suitable. If
softer material than expected is encountered a trench fill solution could potentially be adopted. Compressible
superficial deposits are unlikely to be present onsite, indicated by the successful construction of the existing
school building and associated infrastructure. If made ground is encountered at significant depths within the
Site 1 boundary, related to historical quarries and construction on Site, the extraction of contaminated material
would be required prior to forming foundations, or potentially piled foundations would be required.
If bedrock is present at shallow depths, it is envisaged strip or pad foundations could be utilised bearing
directly onto bedrock.
The above is based on reasonable assumptions from published information only, and would require to be
confirmed following completion of a targeted intrusive ground investigation campaign.
The suitability of deposits underlying Site 1 are unknown and therefore the deposits earthworks suitability for
reuse cannot be speculated upon prior to an intrusive ground investigation.
No site or laboratory testing information is currently available with regards to the strength, density, water
content and compressibility.  It is therefore recommended that an intrusive ground investigation including in-
situ testing and sampling for laboratory testing is conducted to fully assess the reusability characteristics of the
underlying geology.
Page 11

Page 12

7 
Classification: OFFICIAL
It is highlighted that the presence of an igneous dyke (olivine) on the site may result in ‘hard-dig’ / possible
need for blasting to facilitate excavation dependant on depth to rock and site levels.
3.1.1.3 Topography
Topography imposes constraints on the existing school site, both within the grounds, and on the approaches
to it. The existing school boundary area is elevated above land to the south, west and east, with land
continuing to rise to the north, where residential properties overlook the school grounds. This present access
challenges when approaching from west, east or south, with the only level route into the site coming from the
northern edge.
Within the school site, the ground slopes from north to south, with significant level changes which impact on
the suitability of the existing buildings on site. All accommodate multiple levels internally to deal with the level
changes. To avoid decant, developable land is restricted to the eastern part of the site, which comprises the all
weather pitch and grass area to its south. This zone is surrounded by level changes - the eastern edge of the
site drops down significantly to the level of the children’s play park. Land to the south drops steeply, while
there is rocky ground to the north of this area as the land rises.
The topography will impact on development primarily in the extent of useable external space available, and
accessible routes being limited to coming in from the northern edge. The area of land comprising the pitch and
grass area would allow an accessible, two storey solution to be built on site with limited or no internal level
changes, as well as a 7 aside pitch.
3.1.1.4 Flood Risk
The SEPA flood map indicates that Site 1 is not impacted by flooding from high tides or storm surges, or from
fluvial flooding from nearby watercourses. 
Scottish Water’s infrastructure records indicate that a 228mm diameter vitrified clay combined sewer is located
on Erray Road to the north, the likely location of an existing connection to the public sewer network. A 152mm
diameter combined sewer is also location on Western Road at its eastern boundary. 
Scottish Water would need to confirm in a Pre-Development Enquiry response that there is sufficient capacity
in their network to service the development of a new Education Campus. This can be offset by understanding
what the current flow rate from the existing school provides. 
There is no public surface water drainage shown on the Scottish Water infrastructure records within the
boundaries of the site. There are also no watercourses in the vicinity of the site which surface water runoff
could be discharged to. It is therefore considered that the surface water runoff from the existing school facility
must be conveyed to the existing public combined sewer network or drained into soakaways or to a
combination of these drainage options.
Scottish Water will only allow surface water from new development to discharge to the combined sewer
network under exceptional circumstances. It is therefore not expected that surface water runoff from any
redevelopment of the site will be permitted to be conveyed to the existing combined sewer network. However,
if the site currently benefits from a surface water connection to the combined sewer and it can be shown that
the amount of hardstanding has not been increased and is attenuated, a connection to the combined sewer
may be possible. They may also require use of raingardens/bio retention zones and green roofs to be
appropriately considered as well as potential for rainwater harvesting. 
The requirement to infiltrate surface water runoff to the subsoils will be dependent on Scottish Water
permission to discharge surface water to the existing sewers and the rate of any allowance.
Page 12

Page 13

8 
Classification: OFFICIAL
The appropriate form of SUDS for redevelopment of the site will depend on the method of surface water
disposal. Irrespective of the actual form of the SUDS, a significant proportion of the lowest lying area of the
site will require to be allocated for the SUDS and this will place a constraint the development proposals.
3.1.1.5 Site Abnormals
The key abnormal issues for the existing school site are taking into account the requirement for a tandem
build, which will necessitate a phased approach, which will have an impact on programme duration and prelim
costs. 
The area of the site where it is proposed to build the new campus is also designated as King George V land,
with a presumption that it is retained for outdoor use. While there would still be an overall balance in the
amount of external space provided as part of a new campus, consultation with Fields in Trust will be required
to ensure the proposals are acceptable.
It is also anticipated there will be a need for retention to the southern edge of the parking area and newly
formed 7 aside all weather pitch.
3.1.1.6 Habitat Constraints  
All sites will require to have habitat and ecological surveys carried out as a matter of course as part of
statutory approvals process to identify any protected and invasive species present. From a walkover of the
existing school site, the potential for significant habitat impact would appear to be limited, though it is worth
noting existing structures increases the possibility of bat roosting.
3.1.2 Educational Impact
3.1.2.1 Is the site capable of accommodating the brief in full?
The site area is 2.3 ha. but the existing school must remain in operation during the construction stage, which
limits the area of land available for locating the school. There is sufficient space on site to accommodate the
new campus brief over two storeys and the levels of parking and servicing required, although parking areas
will require significant regrading. Bus drop off may potentially need to maintain the current situation of 14m
buses parking on adjacent streets depending on how drop off is prioritised against providing external space.
The other limitation of the site is the inability to accommodate a full size 100m x 60m all weather pitch, and the
extent of external learning and social space. A seven aside all weather pitch could be accommodated on site.
3.1.2.2 Quality of external environment to support outside learning
The BB103 maximum and minimum areas for the pupil roll of the proposed Mull 2-18 campus (31 ELC
children, 90 primary learners and 177 secondary learners) is 21,374sqm – 22,847sqm. The existing school
site is 23,000sqm. External space is limited on site, although there still exists scope to create external learning
environments, the majority enjoying a southerly aspect. The location of the new building as a result of keeping
the existing school in operation means that external space will wrap around parking areas, which is less than
optimal. The site has limited potential for a quality external learning environment.
3.1.2.3 Does the site provide capacity for future expansion?
While the site is constrained, and the area of development restricted to the western part of the site due to the
need to keep the existing school operational, there is scope to plan for modest future expansion to the east.
This future expansion could extend to two additional standard sized classrooms, one at ground and one at first
floor, plus ancillary areas. Locating the expansion at the east allows building servicing to remain operational
during any future extension construction period.
Page 13

Page 14

Page 14

Page 15

10 
Classification: OFFICIAL
enjoy family life if they are required to board on the mainland from Monday to Friday. Many respondents have
raised concerns about the impact this has on young people during their teenage years which is a significant
developmental period. 
Many members of the community have referenced Article 9 – Children should not be separated from their
parents in relation to the current scenario where children from the Ross of Mull are required leave their family
homes weekly to board on the mainland in order to attend Oban High School. Many argue that secondary-
school aged children are entitled to remain with their families during the week and the current catchment
provision does not allow for this. A central site option could allow greater choice for pupils and families living in
the Ross of Mull to attend secondary school on the island which would allow children to more fully enjoy all
aspects of family life during their time at secondary school. 
• While the premise of citing Article 9 is important, the Article legally does not apply to the current
proposals. However, that should not invalidate the concerns of children, young people and their
families who wish to avoid boarding on the mainland as part of the decision-making process. Equitable
– best access for as many as possible 
Further details can be found in the Integrated Impact Assessment Report within Appendix K
3.1.3.2 Equitable – unites north & south of island
Retaining education provision in Tobermory would positively impact pupils, families and community members
currently utilising the existing Site through the re-provision of enhanced and contemporary facilities. This could
also encourage population retention and growth in the area.
However, there would be no additional benefit to families living in the South West of Mull, who would likely
continue with status quo education arrangements for local primary schooling and off-island secondary-school
attendance. This option poses the continued risk of depopulation with the South West of Mull, where families
may make decisions to relocate on the basis of their child’s education and to avoid the possibility weekly
boarding on the mainland.
Site 01 - Tobermory will retain familiar travel patterns as current conditions would largely be unchanged. It is
conveniently located within walking distance for most existing housing in Tobermory with 90% of pre-5 and
primary school pupils currently living within a 5-minute walking distance as highlighted in Appendix H.
Constraints have been noted for the site whereby access for larger vehicles such as HGVs and buses may be
challenging.
3.1.3.3 Sustain and support local economy
An Economic Impact Assessment has been prepared, this outlines that if the campus was located in
Tobermory, the economic benefit would be £3,147,000 higher than would be the case if the campus was built
in a central island location. 
This assessment takes into account investment stimulus acknowledging that schools influence the
attractiveness of an area for potential residents and therefore the value of future housing developments.
The full Economic Impact Assessment is included in Appendix K.
3.1.3.4 Impact of construction activities on existing school/ residential facilities
The existing school is located on central Tobermory, with residential streets to the north on Erray Road and
Western Road, and the residential back lane to the south. Back Brae has less residential properties, but falls
Page 15

Page 16

11 
Classification: OFFICIAL
steeply away from the school site to the west. The surrounding streets are narrow, and will present logistical
challenges during the construction phase of the project, with inevitable impact to surrounding residential
properties.
A tandem build will also impact on the daily operations of the school due to the close proximity of construction
activity with associated deliveries and noise. However, a competent contractor can successfully manage
operations on a live school site and mitigate impact with appropriate forward planning.
3.1.4 Accessibility & Transport
3.1.4.1 Good public transport to site and location
Existing Conditions
The morning and afternoon school services current serve the site by way of the bus layby on Erray Road.
Tobermory is additional served throughout the day by the 494 and the 95/495.
Future Conditions
The site could incorporate approximately three bus stances adjacent to the school entrance to enable safe
boarding and disembarkation of pupils. Alternatively, as a result of site constraints, the use of the bus bays on
Erray Road could continue to be utilised, perhaps with some rationalisation or upgrade. 
3.1.4.2 Existing safe active travel links to site
Existing Conditions
Pedestrian facilities are limited to larger residential streets on the adjacent road network such as Erray Road
and Victoria Street. There is also an off-road path between Back Brae and Main Street via Middle Brae and a
set of steps. 
Future Conditions
While infrastructure is currently limited, off-site improvement works would likely be a requirement following the
standard consultation and transport assessment processes. 
3.1.4.3 Number of user journeys – bus, car, pedestrian (Pupil/staff mode split)
As there will be little change to travel characteristics the anticipated mode share for the Tobermory site it has
been assumed the mode share will remain the same as the results of a hands up survey conducted at the
existing Tobermory 2-18 school. For completeness this mode share is presented below;
Page 16

Page 17

Page 17

Page 18

13 
Classification: OFFICIAL
Site 01 Anticipated Bus Network
3.1.4.4 Potential impact on public transport network
As there will be no requirement to amend the bus services associated with school transport there is unlikely to
be any impact, positive or negative, on the wider public transport network.
3.1.4.5 Ability of existing (wider) roads infrastructure to service site
The site is already a part of the established road network and the site’s vehicular access would remain. The
increase in car parking within the site will reduce the instances of on-street car parking occurring on the
adjoining residential streets, in turn making it easier for buses to navigate these streets. 
There can at times be complexities in accommodating and manoeuvring larger vehicles on the site, particularly
when multiple vehicles are present at once. Buses which arrive via Argyll Terrace then have to reverse up
Erray Road with the aid of a banksman.
3.1.4.6 Trips with complex dependencies/multiple stages and modes of travel
Complex dependencies are likely to be broadly similar regardless of the selected site. Further details on this
criterion are provided in Section 9.3 of the Transport Review in Appendix H. For pupils who live remotely from
the main road network and key population centres, an additional leg of their journey will be required to
intersect the bus service. This secondary journey will be facilitated by specific arrangements to them and may
include a taxi or short car trip by a parent/carer.
3.1.5 Sustainability
3.1.5.1 Potential for re-use of existing infrastructure and buildings (embodied carbon)
There are a range of existing buildings on site with the potential for re-use. However, their suitability is
severely impacted by the level changes which occur within most buildings which result in accessibility issues.
The ELC building is more recent than other structures and does have re-use potential with appropriate internal
reconfiguration, although the external spaces would benefit from upgrading and reorientation. The site also
Page 18

Page 19

Page 19

Page 20

Page 20

Page 21

Page 21

Page 22

17 
Classification: OFFICIAL
3.2 Site 2 – Craignure
3.2.1 Deliverability
3.2.1.1 Utility Infrastructure – capacity and need for any diversions
The site is situated to the northern boundary of Craignure and adjacent to Mull and Iona Community Hospital.
The utilities record drawings received show that the proposed site is clear of existing utilities with no
anticipated abnormal costs for diversions within the proposed site.  
Existing Electricity (LV and 11kV), Mains Water and Communications infrastructure exists to the south of the
site and serves the Hospital, Swimming Pool and Hotel to the south as well as residential units. 
On the assumption that capacities are available in the existing infrastructure they would need to be extended
by approximately 400m to reach the proposed new school and will need to be co-ordinated with the proposed
future housing development site arrangement. 
Alternatively, there is potential to connect into the existing infrastructure along the A849  to the west of the site.
Infrastructure would need to extend approx. 400m and may present better opportunities in terms of capacity
availability.
Potential for positive Business Case for future connection of Net Zero heat networks
Opportunities for a supporting a business case at Craignure exist given the close proximity of larger energy
consuming facilities such as the Hospital, Swimming Pool and Hotel. At present heat network support to the
local community near the Craignure site is limited although this may be increased should the proposed future
housing development progress.
3.2.1.2 Ground Conditions
Published mapping indicates raised marine deposits are present within Site 2.  Raised marine deposits
frequently contain soft organic clays which, dependant on thickness, may potentially require more onerous
foundation solutions such as piles, or ground improvement, in place of traditional shallow foundations.   This is
largely speculative however, based on reasonable assumptions from published information only, and would
require to be confirmed following completion of a targeted intrusive ground investigation campaign.
The stratum recorded to underly Site 2 is predominantly Raised Marine and Beach deposits including sands,
gravels, cobles and sites are greater depths. No site or laboratory testing information is currently available with
regards to the strength, density, water content and compressibility.  It is therefore recommended that an
intrusive ground investigation including in-situ testing and sampling for laboratory testing is conducted to fully
assess the reusability characteristics of the underlying geology.
It is highlighted that the presence of olivine basalt below the northern half of the site may result in ‘hard-dig’ /
possible need for blasting to facilitate excavation dependant on depth to rock and site levels.
3.2.1.3 Topography
Topography has limited impact on the proposed development site. The site has a gradual but significant fall
from southeast to northwest, and is bound at the northern corner by a steep level change which rises up to
higher ground at the north, although this step from a natural boundary to the site. The nature of the main fall
across the site is gradual, and would not present a significant issue in developing the new campus. 
Page 22

Page 23

18 
Classification: OFFICIAL
It is anticipated that the site would be formed so that parking and the main school building occupy the lower
portion of the site to the northwest, with the pitch occupying the higher ground to the southeast. External social
space would be used to accommodate the level change in a way which limits the use of any retaining walls. 
Topography will impact on any potential new access road formed from the west however, as the A848 is at a
significantly higher level than the adjacent part of the site. Ensuring appropriate gradients for any new route is
a key consideration.
3.2.1.4 Flood Risk
The SEPA flood map indicates that Site 2 is not impacted by flooding from high tides or storm surges. The
SEPA Flood Map show medium to high risks around the Site 2, but the Site boundary is at "low to no" risk of
surface water flooding. The proposed development should incorporate measures for effective surface water
management. Specifically, it is essential to intercept, treat, and attenuate surface water before it is discharged
in a controlled manner through a new on-site drainage network. Implementing these measures will ensure
compliance with local council policy and contribute to effective flood risk management and water quality
protection.
Scottish Water’s infrastructure records indicate that the nearest location for wastewater disposal is located in
the adjacent housing development in Java Place with 100mm diameter uPVC combined sewers discharging
towards coastal waters. Scottish Water would need to confirm in a Pre-Development Enquiry response that
there is sufficient capacity in their network to service the development of a new Education Campus. 
It should be noted that offsite improvement works may be required to facilitate a connection to the Scottish
Water network but depending on timing, this work may be carried out as part of any planned housing
development surrounding the Site. Placement of carrier drains through adjacent land would need to be
considered so that it does not cause issues for future development if School site is developed in advance of
any housing development. 
There is no public surface water drainage shown on the Scottish Water infrastructure records within the
boundaries of the site. There are also no watercourses in the vicinity of the site which surface water runoff
could be discharged to. 
Scottish Water will only allow surface water from new development to discharge to the combined sewer
network under exceptional circumstances. It is therefore not expected that surface water runoff from any
redevelopment of the site will be permitted to be conveyed to the existing combined sewer network. A new
surface water connection through Java place towards the existing outfall may be considered but again,
depending on timing, a surface water connection may have been made by any planned housing development. 
It should be noted that no records are available for the Mull and Iona Community Hospital surface water
discharge and can be assumed that this infiltrates to the ground. Therefore, an appropriate method for treating
and disposing of surface water from a new facility on the site would need to be established. Further
investigation and consultations are required to establish the feasibility of these options.
The investigations that are required to establish if surface water runoff from proposed development can be
infiltrated into the subsoils will comprise intrusive ground investigation and insitu testing to determine the
suitability of the ground conditions. The requirement to infiltrate surface water runoff to the subsoils will be
dependent on Scottish Water permission to discharge surface water to the existing sewers and the rate of any
allowance.
The appropriate form of SUDS for redevelopment of the site will depend on the method of surface water
disposal. Irrespective of the actual form of the SUDS, a significant proportion of the lowest lying area of the
site will require to be allocated for the SUDS and this will place a constraint the development proposals.
Page 23

Page 24

Page 24

Page 25

Page 25

Page 26

21 
Classification: OFFICIAL
A central location option would require more children and young people aged 2-18 to undertake longer daily
journeys to school by bus. A number of children and young people in Tobermory Primary and High School
have expressed concerns around the implications of daily travel to a central location and the impact this could
have on their health and wellbeing, including tiredness, ability to concentrate in school and opportunities to be
active either through walking to school or having time to attend afterschool clubs. These impacts could also
have a knock-on effect on pupil’s family lives if they are unable to fully participate in family live due to longer
travel times, feeling tired or not having their needs met in terms of access to leisure, social opportunities and
time to be physically active.
3.2.3.2 Equitable – unites north & south of island
West Mull has experienced a depopulation rate of 8% amongst its 0-15 year old age group while North Mull
has experienced a depopulation rate of 3% in this age group. Comparatively, the South of Mull has seen a
significant increase in population growth for this age group at 36%, while Tobermory has experienced a 15%
increase in this age group.
A centrally located campus is sensitive to the demographic challenges faced by families living in South West
Mull and would benefit families with teenage children attending secondary school in this region. A number of
local families have expressed that attending boarding school on the mainland has negatively impacted their
children and discourages young people from settling back in the local community in adulthood, increasing
worries over depopulation.
A centrally sited option is expected to allow all children on Mull to attend the same high school with reduced
travel times for many pupils in the South and South West of Mull areas and allow for greater socialising
amongst young people on Mull. This could have the potential to strengthen community cohesion amongst
young people and their families leading to positive social benefits for all island communities. It would also
encourage unity between communities in the North and South of Mull.
With a Central site option, there is also the potential for negative demographic implications for those living in
Tobermory which is Mull’s largest settlement area. Views expressed from community members suggest that
families could choose to move away from Tobermory if early years and primary school provision were
removed which could result in depopulation if families choose to leave the island.
Both Site 03 Garmony and Site 04 Craignure would lead to increased travel times, distances and carbon
emissions, particularly if the catchments are expanded to include the Ross of Mull. Average journey times
would increase by approximately 20 minutes for Craignure and 15 minutes for Garmony, necessitating
additional bus services in each case. While Craignure offers some potential for active travel with its proximity
to an 80-unit residential housing allocation, it is noted that improvements would need to be made footways and
cross infrastructure. Garmony lacks nearby housing and has no planned developments at present. There are
also limited benefits from improving footways or crossings on the adjacent highway network at this location.
3.2.3.3 Sustain and support local economy
An Economic Impact Assessment has been prepared, this outlines that if the campus was located in
Tobermory, the economic benefit would be £3,147,000 higher than would be the case if the campus was built
in a central island location. 
This assessment takes into account investment stimulus acknowledging that schools influence the
attractiveness of an area for potential residents and therefore the value of future housing developments.
The full Economic Impact Assessment is included in Appendix K.
Page 26

Page 27

22 
Classification: OFFICIAL
3.2.3.4 Impact of construction activities on existing school/ residential facilities 
Although the Craignure site is open, the site is in close proximity to the Mull and Iona Community Hospital
which would be impacted on by adjacent construction operations, with the close proximity of the helicopter
landing pad requiring pre-construction dialogue with the Air Ambulance service to mitigate the impact of
construction operations. 
Residential properties around Java Place will not be significantly impacted on by site operations as it is highly
likely construction traffic will not access the site along the existing road leading to it.
3.2.4 Accessibility & Transport
3.2.4.1 Good public transport links to site and location
Existing Conditions
The adjacent Mull and Iona Community Hospital is currently served by the service 95 bus. The 96/496
Craignure to Fionnphort service terminates at the nearby ferry terminal. 
Future Conditions
The site would incorporate approximately four bus stances to enable pupils to board and disembark safely.
These bays would ideally be positioned within the site such that bus doors opened directly onto an expansive
pedestrian space, thereby removing the needs for pupils to interact with the car park and other trafficked
spaces.
The primary and secondary school days finish approximately 20 minutes apart. Unlike the morning period,
where buses are only present on site for as long as it takes for pupils to disembark, buses are required to be
present on site in anticipation of the afternoon school bell. This means it is more likely that several buses
would be present on site at once.
To avoid a scenario where buses blocked the operation of the car park, bays could be incorporated to the site
access road to enable empty buses/coaches for the secondary school to dwell while the primary school buses
are boarded.
3.2.4.2 Existing safe active travel links to site
Existing Conditions 
There is currently limited active travel provision in Craignure. Footways which are provided on both sides of
the A849 in the 30mph section are narrow. The footway is present on the north side of the road only, beyond
the ferry terminal. This footway then stops beyond the entrance to the Mull Community Swimming Pool. There
are currently no formal pedestrian crossings on the A849.
Future Conditions 
While infrastructure is currently limited, it is clear that a package of off-site improvement works would be
required to ensure the safe integration of the site to the established transport network. The scope of those
works would emerge through the detailed Transport Assessment which would accompany and inform a
Planning Application. At the time of writing, it seems likely that this package would at least comprise
enhancements to existing footways, provision of new links where none are currently present and the delivery
of new, safe crossing opportunities. It seems reasonable to assume that the adjacent residential allocation
could be developed in a manner which facilitates active travel between Craignure and the school site.
Page 27

Page 28

Page 28

Page 29

Page 29

Page 30

25 
Classification: OFFICIAL
Site 02 Anticipated Bus Network 
School buses would be funded as school transport where pupils meet Argyll and Bute Council’s requirements
in line with the summary which is provided in Section 3.4 of the Transport Review in Appendix H.
Notwithstanding the Council’s preparedness to meet the costs of additional bus services, their provision
depends on the ability of operators to recruit and retain a sufficient number of drivers, noting the practical
operating issues relating to AM and PM-only journeys. 
3.2.4.4 Potential impact on public transport network
It is likely that additional buses will be required to facilitate pupil transport. The availability of more buses and
drivers has the potential enhance general levels of public transport provision on the island, noting that many
existing scheduled local bus services arise primarily because of school transport requirements.
3.2.4.5 Ability of existing (wider) roads infrastructure to service site
The site is well served by the adjoining A849 although there is currently no formalised access into the site. 
There is the potential for access to the site to be taken from a new junction formed on the A849. The design of
this junction would be subject to technical assessments at an early stage to ensure the suitability of its
placement and format in view of road characteristics and adjacent accesses, if applicable. Any new junction
would need to comply with driver visibility criteria in line with standard assessment procedures.
3.2.4.6 Trips with complex dependencies/multiple stages and modes of travel
Complex dependencies are likely to be broadly similar regardless of the selected site. Further details on this
criterion are provided in Section 9.3 of the Transport Review in Appendix H. For pupils who live remotely from
the main road network and key population centres, an additional leg of their journey will be required to
intersect the bus service. This secondary journey will be facilitated by specific arrangements to them and may
include a taxi or short car trip by a parent/carer.
Page 30

Page 31

Page 31

Page 32

Page 32

Page 33

Page 33

Page 34

29 
Classification: OFFICIAL
3.3 Site 3 – Garmony
3.3.1 Deliverability
3.3.1.1 Utility Infrastructure – capacity and need for any diversions
The site is situated to the west of the A849 with very little amenity or residential developments in close
proximity to the site.
The utilities record drawings received show that the proposed site is clear of existing utilities with no
anticipated abnormal costs for diversions within the proposed site.
HV Electric overhead lines exist in close proximity to the site. 11KV lines run along the western side of the
A849 and to the south11kV overhead lines connect the community hydro schemes 500kVA sub station to the
main infrastructure.
Access to the site will be constrained as it will require to pass under the overhead lines. This will likely be
subject to restrictions imposed by SSE in constructing a new access road and will present a risk for
construction traffic. At this stage we would suggest abnormal costs are applied to underground a section of
this supply cable as enabling works to minimise the associated risk.
If a new junction is formed off the A849 it is anticipated that alterations will be necessary to protect the existing
underground water and communications infrastructure introducing further abnormal costs. 
On the assumption that capacities are available in the existing infrastructure they would need to be extended
by approximately 250m to reach the proposed new school.
Potential for positive Business Case for future connection of Net Zero heat networks
The area around the Garmony site is not heavily populated and very little public amenity facilities in
close proximity. There are limited positive elements that could contribute to a business case.
3.3.1.2 Ground Conditions
Published mapping indicates raised marine deposits are present below Site 3.  Although indicated as Sand
and Gravel, raised marine deposits frequently contain soft organic clays which, dependant on thickness, may
potentially require more onerous foundation solutions such as piles, or ground improvement, in place of
traditional shallow foundations.   This is largely speculative however, based on reasonable assumptions from
published information only, and would require to be confirmed following completion of a targeted intrusive
ground investigation campaign.
The stratum recorded to underly Site 3 is predominantly Raised Marine deposits including gravel and shelly
sand. No site or laboratory testing information is currently available with regards to the strength, density, water
content and compressibility.  It is therefore recommended that an intrusive ground investigation including in-
situ testing and sampling for laboratory testing is conducted to fully assess the reusability characteristics of the
underlying geology.
The entirety of Site 3 is underlain by olivine basalt which may result in ‘hard-dig’ / possible need for blasting to
facilitate excavation dependant on depth to rock and site levels.
3.3.1.3 Topography
The site is expansive and generally level. There is a knoll of higher ground to the north west corner, but as this
sits in the flood plain, this would not be an area of land identified for development. Land rises significantly to
the west outside the site boundary, but topography is not a major constraint on the developable area of this
site.
Page 34

Page 35

30 
Classification: OFFICIAL
3.3.1.4 Flood Risk
The SEPA flood map indicates that Site 3 is not impacted by flooding from high tides or storm surges but is
impacted on its northern boundary by fluvial flooding from the watercourse that bounds the northern boundary.
It will be necessary to assess the 1:200-year flood event including an appropriate allowance for climate
change. No development will be permitted within the flood plain other than landscaped features that do not
alter the existing levels and affect flood plain storage. Proposed school buildings sit out with indicative flood
extents but Flood Risk Assessment with modelling of watercourse would be required to confirm site constrains
for school buildings and the finished floor level. 
Scottish Water’s infrastructure records indicate that there are no public sewers nearby for wastewater
disposal. Wastewater generated by the school would need to be treated at source via a reed bed, or other
treatment process, prior to discharge into the watercourse, subject to SEPA approval. 
Suitable space within the red line boundary of the development would need to be provided for this treatment
but is not expected to be an issue. 
There is no public surface water drainage shown on the Scottish Water infrastructure records within the
boundaries of the site. However, there is a watercourse in the vicinity of the site which surface water runoff
could be discharged to. 
The appropriate form of SUDS for redevelopment of the site will depend on the method of surface water
disposal. Irrespective of the actual form of the SUDS, a significant proportion of the lowest lying area of the
site will require to be allocated for the SUDS and this will place a constraint the development proposals.
SEPA approval would not be required for disposal of surface water to the watercourse if drainage complies
with their General Binding Rules. A non-return valve would need to be included to restrict flood waters entering
the drainage system with overland flood routes considered to ensure surcharging of drainage network during
flood event does not pose a risk to school building.
3.3.1.5 Site Abnormals 
The Garmony site will require a significant upgrade to the junction with the A848, and a new access road into
the useable area of the site. The wider site is larger than required, so agreeing final extents and any treatment
to land left over needs to be considered. The exact extent of the watercourse flood plain will need to be
clarified through FRA modelling.
3.3.1.6 Habitat Constraints
All sites will require to have habitat and ecological surveys carried out as a matter of course as part of
statutory approvals process to identify any protected and invasive species present. The site contains a range
of different natural settings, including grassland, wetland, watercourses and areas of trees. This diversity of
natural setting increases the likelihood that there may be some habitat constraints found on the site.
3.3.2 Educational Impact
3.3.2.1 Is the site capable of accommodating the brief in full? 
The Garmony site is large at 9 ha, although the actual usable area is smaller at approximately 2.4 ha. This
useable area has sufficient capacity to accommodate the new campus building at two storeys, a full size all
weather pitch, external learning areas and associated car parking, servicing and bus drop off areas on site.
Page 35

Page 36

Page 36

Page 37

32 
Classification: OFFICIAL
3.3.2.6 Access and connectivity to good community facilities
The Garmony site is isolated, with the only potential connectivity being with the Isle of Mull Rugby Club
pitches.
The Garmony site is remote from residential areas and other amenities, with the closest facility being the Isle
of Mull Rugby Club and associated pitches to the north.
3.3.3 Community and Place
3.3.3.1 Impact on family life
Site 03 – Garmony is impacted similarly to Site 02 – Craignure and is detailed in Section 3.2.3.1
3.3.3.2 Equitable – unites north & south of island
This is considered to be similar to Site 02 – Craignure and is detailed in Section 3.2.3.2
3.3.3.3 Sustain and support local economy
An Economic Impact Assessment has been prepared, this outlines that if the campus was located in
Tobermory, the economic benefit would be £3,147,000 higher than would be the case if the campus was built
in a central island location. 
This assessment takes into account investment stimulus acknowledging that schools influence the
attractiveness of an area for potential residents and therefore the value of future housing developments.
The full Economic Impact Assessment is included in Appendix K.
3.3.3.4 Impact of construction activities on existing school/ residential facilities 
The Garmony site has no residential properties in close proximity, with the nearest structures at Argyll
Industrial Supplies being over 300m away. The impact of construction activity on existing properties is
negligible.
3.3.4 Accessibility & Transport
3.3.4.1 Good public transport links to site and location
Existing Conditions
The service 95/495 currently stops at the nearby rugby club, although this stop is unmarked. 
Future Conditions
The site would incorporate four bus stances to enable pupils to board and disembark safely. These bays
would ideally be positioned within the site such that bus doors opened directly onto an expansive pedestrian
space, thereby removing the needs for pupils to interact with the car park and other trafficked spaces.  
The primary and secondary school days finish approximately 20 minutes apart. Unlike the morning period,
where buses are only present on site for as long as it takes for pupils to disembark, buses are required to be
present on site in anticipation of the afternoon school bell.  This means it is more likely that several buses
would be present on site at once.  To avoid a scenario where buses blocked the operation of the car park,
bays could be incorporated to the site access road to enable empty buses/coaches for the secondary school
to dwell while the primary school buses are boarded.
Page 37

Page 38

Page 38

Page 39

Page 39

Page 40

35 
Classification: OFFICIAL
Site 03 Anticipated Bus Network 
Notwithstanding the Council’s preparedness to meet the costs of additional bus services, their provision
depends on the ability of operators to recruit and retain a sufficient number of drivers, noting the practical
operating issues relating to AM and PM-only journeys. 
3.3.4.4 Potential impact on public transport network
As discussed in Paragraph 14.2.7 and 14.2.8 of the Transport review in Appendix H, it is likely that additional
buses will be required to facilitate pupil transport. The availability of more buses and drivers has the potential
enhance general levels of public transport provision on the island, noting that many existing scheduled local
bus services arise primarily because of school transport requirements.
3.3.4.5 Ability of existing (wider) roads infrastructure to service site
The site is well served by the adjoining A849 although there is currently no formalised access into the site. 
There is the potential for access to the site to be taken from a new junction formed on the A849. The design of
this junction would be subject to technical assessments at an early stage to ensure the suitability of placement
and format in view of road characteristics and adjacent accesses, if applicable. Any new junction would need
to comply with driver visibility criteria in line with standard assessment procedures. 
3.3.4.6 Trips with complex dependencies/multiple stages and modes of travel
Complex dependencies are likely to be broadly similar regardless of the selected site. Further details on this
criterion are provided in Section 9.3 of the Transport Review in Appendix H. For pupils who live remotely from
the main road network and key population centres, an additional leg of their journey will be required to
intersect the bus service. This secondary journey will be facilitated by specific arrangements to them and may
include a taxi or short car trip by a parent/carer.
Page 40

Page 41

Page 41

Page 42

Page 42

Page 43

38 
Classification: OFFICIAL
3.3.7 Risk
3.3.7.1 Wayleaves, legal restrictions and site acquisition risk
Argyll and Bute Council have provided information detailing out ownership, wayleaves, legal restrictions and
site acquisition risks within Appendix J.
3.3.7.2 Construction Programme risk
If Site 03 – Garmony was selected then initial site investigation would be needed to fully understand site
conditions. Following visits to the site it’s expected that an element of remediate would be needed to make the
land suitable for development. All sites are impacted evenly in terms of reliance on ferry crossings to support
construction activities.
3.3.7.3 Planning designation and sensitive receptors
The site has no designation under the Local Development Plan. It is noted as within the countryside area.  
Page 43

Page 44

39 
Classification: OFFICIAL
3.4 Site 4 – South Tobermory
3.4.1 Deliverability
3.4.1.1 Utility Infrastructure – capacity and need for any diversions
The site is situated to southern edge of Tobermory with the western boundary adjacent to the A848.
The utilities record drawings received show that the proposed site is clear of existing utilities.
However, it is evident that 5 overhead power lines exist within the site and located in the vicinity of the
proposed car park area in the adjacent sketch. One of the poles appears to have a pole mounted transformer
but with no obvious signs that it is connected. As this infrastructure is not shown on record drawings and given
the above observations it is assumed that this infrastructure is redundant and can be removed without any
significant abnormal cost to the project
Existing Electricity (LV and 11kV), Mains Water and Communications infrastructure exists in close proximity to
the site.
Whilst existing infrastructure exists, further engagement will be necessary with Utilities companies in respect
of any anticipated increased capacities.
Potential for positive Business Case for future connection of Net Zero heat networks 
The site is located at the southern edge of Tobermory and approximately ¾ km from the most densely
populated part of town. The connection of the school to support a business would be positive but diminishes
the further it is away from the most populated areas. It would however help to support any proposals to extend
infrastructure to residences and business that are located towards the southern boundary of the town.
3.4.1.2 Ground Conditions
At Site 4, superficial deposits have not been recorded within the available mapping, if bedrock is present
beneath the topsoil strip, it is envisaged shallow strip or pad foundations could be utilised bearing directly onto
bedrock.
If Superficial deposits however are present at significant depths at Site 4, more onerous foundations may be
required.
The above is based on reasonable assumptions from published information only, and would require to be
confirmed following completion of a targeted intrusive ground investigation campaign.
The suitability of deposits underlying Site 4 are unknown and therefore the deposits earthworks suitability for
reuse cannot be speculated upon prior to an intrusive ground investigation.
The entirety of Site 4 is underlain by olivine basalt which may result in ‘hard-dig’ / possible need for blasting to
facilitate excavation dependant on depth to rock and site levels.
3.4.1.3 Topography
Commentary is based on the assumption the additional parcels of land adjacent to the A848 are included as
part of the overall site. Given the site is located on the ridge at the southern end of town, topography will play a
key role in the design solution.
From the western boundary, the site generally slopes down significantly towards the eastern edge defined by
the A848, with a significant shelf at the line of the current site boundary. On the Western edge of the site the
land falls steeply towards the West.
The sloping nature of the site will result in a design solution which has to address the level change, by
adopting a stepped floor plan. This is an approach that has been successfully adopted in schools for Argyll
Page 44

Page 45

40 
Classification: OFFICIAL
and Bute previously, such as Kirn Primary and will deliver a fully accessible learning environment. It is
anticipated that retaining walls will be required internally at this level change, and to external areas I
conjunction with some rock excavation, particularly around the all weather pitch provision which will add to
costs.
3.4.1.4 Flood Risk
The SEPA flood map indicates that Site 4 is not impacted by flooding from high tides or storm surges but
fluvial flooding is noted from the watercourse near its western boundary, but flooding does not enter Site. 
Proposed school buildings sit out with indicative flood extents but a Flood Risk Assessment with modelling of
watercourse will likely be required from planning to confirm site constrains for school buildings and the finished
floor level.    It will be necessary to assess the 1:200-year flood event including an appropriate allowance for
climate change. 
Scottish Water’s infrastructure records indicate that there are public sewers nearby for wastewater
disposal.  Wastewater generated by the school would connect to the foul sewer located within the grass verge
between the A848 and Meadhonish cottage. 
A Pre-Development Enquiry (PDE) would need to be submitted to Scottish Water to ensure capacity is
available within their network to allow a connection from the proposed school campus. 
There is an existing public surface water sewer shown on the Scottish Water infrastructure records located
within the grass verge between the A848 and Meadhonish cottage. 
A Pre-Development Enquiry (PDE) would need to be submitted to Scottish Water to ensure capacity is
available within their network to allow a connection from the proposed school campus and what limit surface
water would be restricted to. 
Alternatively, surface water could discharge to the Tobermory River, SEPA approval would not be required for
disposal of surface water to the watercourse if drainage complies with their General Binding Rules. A non-
return valve would need to be included to restrict flood waters entering the drainage system with overland
flood routes considered to ensure surcharging of drainage network during flood event does not pose a risk to
school building.
The appropriate form of SUDS for redevelopment of the site will depend on the method of surface water
disposal. Irrespective of the actual form of the SUDS, a significant proportion of the lowest lying area of the
site will require to be allocated for the SUDS and this will place a constraint the development proposals.
3.4.1.5 Site Abnormals 
The site has a number of abnormals. There are currently overhead powerlines which enter the site and then
stop in close proximity to the site boundary, which will need either removed or diverted. The sloping nature of
the site means that there will be areas of excavation and retaining walls under the proposed building location,
with retaining walls across the external areas on site, particularly between the car park and social areas, and
the south and east edges of the 7 aside all weather pitch.
Due to limitations in space, 14m long buses will require to be accommodated in a layby formed along the edge
of the A848 rather than within the site.
3.4.1.6 Habitat Constraints
All sites will require to have habitat and ecological surveys carried out as a matter of course as part of
statutory approvals process to identify any protected and invasive species present. The site is bound to the
Page 45

Page 46

Page 46

Page 47

Page 47

Page 48

43 
Classification: OFFICIAL
3.4.3.3 Sustain and support local economy
An Economic Impact Assessment has been prepared, this outlines that if the campus was located in
Tobermory, the economic benefit would be £3,147,000 higher than would be the case if the campus was built
in a central island location. 
This assessment takes into account investment stimulus acknowledging that schools influence the
attractiveness of an area for potential residents and therefore the value of future housing developments.
The full Economic Impact Assessment is included in Appendix K.
3.4.3.4 Impact of construction activities on existing school/ residential facilities 
The South Tobermory site only has one road adjacent to it’s boundary, the A848 to the west. While there are
residential properties north and south of the site, the impact on these properties would be minimal as
construction traffic would not use residential roads, instead coming directly into the site off the A848.
3.4.4 Accessibility & Transport
3.4.4.1 Good public transport links to site and location
Existing Conditions
The existing service 95/495 passes the site frontage. There are a pair of bus stops located south of the site at
Struan Crescent. 
Future Conditions
The site could incorporate approximately three bus stances adjacent to the school entrance to enable safe
boarding and disembarkation of pupils. Alternatively, as a result of site constraints, bus bays could be provided
adjacent to the site on the A848. 
The service 494 bus from Calgary to Tobermory would not have to be significantly diverted from its present
route in order to service the South Tobermory Site. 
3.4.4.2 Existing safe active travel links to site
Existing Conditions
There are currently footways on both sides of the A848 between Eas Brae and the site. Footways are provided
on at least one side of the road down into the town centre and up into Rockfield Road and the Tobermory
Medical Practice. These footways are generally lit and appear to be of a good quality, albeit narrow in some
locations. 
There are currently no footways provided on Dervaig Road or Breadalbane Street, both of which are narrow
and unsuitable for pedestrians. There is a pedestrian footway between Argyll Terrace and Eas Brae enabling
access between the site and the majority of housing in Tobermory.
There are currently no formalised pedestrian crossings on the A848 in the vicinity of the site.
Future Conditions
While crossing infrastructure is currently limited, off-site improvement works of this nature would likely be a
requirement following the standard consultation and transport assessment processes. It seems reasonable to
assume that the adjacent residential allocation could be developed in a manner which facilitates active travel
between these sites and the school site.
Page 48

Page 49

Page 49

Page 50

45 
Classification: OFFICIAL
As the Tobermory site is located just 0.7miles from the existing school site no changes to the current bus
operations are anticipated. The buses which would be required for secondary school pupils are one bus from
Calgary / Dervaig, one bus from Torloisk and Ulva Ferry via Salen and one bus from Lochbuie Crossroads.
The annual revisions of the network and its complex dependencies are expected to be broadly in line with
existing operations.
The map below illustrates the anticipated bus network for Site 04.
Site 04 Anticipated Bus Network 
School buses would be funded as school transport where pupils meet Argyll and Bute Council’s requirements
as detailed in Appendix K.
3.4.4.4 Potential impact on public transport network
As there will be no material requirement to amend the bus services associate with school transport there is
unlikely to be any impact, positive or negative, on the wider public transport network.
3.4.4.5 Ability of existing (wider) roads infrastructure to service site
The site is well served by the adjoining A848 although there is currently no formalised access into the site. 
There is the potential for access to the site to be taken from a new junction formed on the A848. The design of
this junction would be subject to technical assessments at an early stage to ensure the suitability of junction
placement and format in view of road characteristics and adjacent accesses, if applicable. Any new junction
would need to be checked for driver visibility in line with standard assessment procedures. 
Page 50

Page 51

Page 51

Page 52

Page 52

Page 53

Page 53

Page 54

49 
Classification: OFFICIAL
4.0 Appendices
Appendix A – Engagement Report
Appendix B – Long List Report
Appendix C – Short List Site Layouts
Appendix D – Existing Utilities Report
Appendix E – Desktop Geotechnical Report
Appendix F – Flooding and Drainage Report
Appendix G – Place Plans
Appendix H – Transport Review
Appendix I –   Site Abnormals Cost
Appendix J – Wayleaves, Legal and Site Acquisition Risk
Appendix K – Integrated Impact Assessment Report
Appendix L – Valuation Report
Page 54

Page 55

Document is Restricted
Page 55 Agenda Item 3cNOT FOR PUBLICATION by virtue of paragraph(s) 8, 9
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 56

This page is intentionally left blank