ARGYLL AND BUTE COUNCIL  COUNCIL   
24th April 2025 
POLICY LEADS REPORT   
1. INTRODUCTION 
1.1 This report provides members with an update on key areas of activity for
each Policy Lead Councillor. This aims to provide updates from all Policy
Leads as regularly as possible, so that all members are informed, up-to-date
and able to engage with current issues. This report covers the period since
the last update provided to Council on 21st November 2024 to 7th April 2025.   
2. RECOMMENDATIONS 
2.1 Members are asked to consider the report.   
3. POLICY LEAD FOR BUSINESS DEVELOPMENT – Cllr Math Campbell-
Sturgess     
3.1 Projects and Regeneration:
Argyll and Bute Gift Card: We continue to build on the Shop Local
message, with a focus on corporate sales and the introduction of the e-
card option. New points of sale, including one planned for Helensburgh,
aim to make purchasing even more accessible. This initiative is part of a
broader strategy to drive local spending and support town centre recovery. 
Regeneration Capital Grant Fund (RCGF): Ongoing RCGF-supported
projects remain on track, notably:
• Kilmory Business Park, Lochgilphead – Infrastructure works are
proceeding, including roads and utilities.
• Port Ellen Community Hub (Islay) – Completion is now projected
for Summer 2025, assisted by Crown Estate funds.

Page 2

• Aros Waterfront Development (Mull) – Construction is ongoing,
creating new outdoor activity and tourism amenities. 
Tarbert Heritage and Place Programme: We are in the development
phase, preparing final applications to both Historic Environment Scotland
and the National Lottery Heritage Fund. Council match funding must be
identified by July 2025 to progress this five-year delivery plan. This project
aims to preserve Tarbert’s historical assets and boost economic growth.
3.2 Conservation Area Regeneration Schemes (CARS):
Lochgilphead CARS: Two priority buildings have been completed, two
more are near completion, and a fifth is scheduled to start in March 2025.
Shopfront improvements and training courses in traditional building skills
are ongoing, supporting local craftsmanship and heritage preservation. 
Helensburgh CARS: Two further priority buildings have been approved for
funding and are expected to begin on-site works this summer. Two
shopfront improvements recently reached completion—one previously
vacant unit has already attracted a new tenant, reflecting positive town
centre regeneration efforts.
3.3 Film and Creative Industries:
Film Productions: Film and TV enquiries continue, with notable interest in
Argyll and Bute’s scenic locations. Recent enquiries include a new series
of Balamory and feature films scouting properties for period dramas.
Strategic Events and Festivals (SEF): Round 7 of SEF funding was
recently approved at Policy and Resources Committee, allocating grants
to 12 successful applicants. This demonstrates the Council’s ongoing
commitment to high-impact events and festivals that showcase the unique
cultural assets of Argyll and Bute.
3.4 Business Gateway:
UK Shared Prosperity Fund (UKSPF) – Business Support:
Business Gateway has successfully allocated the majority of 2024–25
UKSPF funding to Start-Up and Small Business Development Grants, with
a small remaining pot still open. Looking ahead, the transitional UKSPF
year (2025–26) will see a 40% reduction in funds, but an approved plan
will focus on proven interventions—ensuring grants, expert help, and
training remain available.

Page 3

Digital Reviews: Thirty-six digital reviews have been completed since April
2024, helping local businesses improve online presence and e-commerce.
Participants have indicated high satisfaction and tangible benefits from the
recommendations.
3.5 Economic Growth:
Settlement Project: The Settlement Project mailbox continues to receive
queries about relocating to or investing in Argyll and Bute. We are in the
process of recruiting a Settlement Project Support Officer to respond to
this interest and further promote the area. 
3.6 Employability and Skills Development:
Fair Start Scotland and Young Person’s Guarantee: Although referrals to
Fair Start Scotland ended last year, existing participants continue to
receive support. Meanwhile, the Young Person’s Guarantee has seen
strong retention rates, with over three-quarters of participants sustaining
employment. 
No One Left Behind (NOLB) All Age Employability and Child Poverty:
Employability support being delivered by the Council’s Employability Team
and third sector partners has now been allocated for this financial year
aligned to the Annual Investment Plan for 2024/25. Service Level
Agreements are in place with 3 sector partners. It is anticipated that by
31st March 2025 the following outcomes will be realised: 
- 162 individuals supported by the All Age Employability (excluding
parents) provision; and 176 individuals supported by the Tackling Child
Poverty (including parents) provision. 
- Starts achieved 1st April to 31st December 2025: All Age Employability
- 112 and Tackling Child Poverty - 105. 
- Data for the period December-March will be available by the time of my
next report. 
UKSPF Work Placements: Sixty-eight fully funded Real Living Wage
placements have been facilitated with 48 employers, with many
participants securing ongoing roles—frequently with the same employer.
Over 60% of participants have gained qualifications from their placements
and 30 are undertaking their training or awaiting their course starting.

Page 4

3.7 UK Shared Prosperity Fund (UKSPF):
Transition Year (2025–26): The Policy and Resources Committee
approved our investment plan for the final UKSPF transitional year, with a
reduced overall allocation. We will maintain successful initiatives (grants,
employability training, and more) that have demonstrated strong outcomes
for businesses and communities. 
3.8 Community Led Local Development (CLLD):
Argyll and the Islands CLLD Fund: The Local Action Group has allocated
additional 2024–25 funds to new and existing projects, including short-
term support for third-sector organizations in financial distress. A new
governance framework is under review to guide future CLLD direction. 
3.9 Islands: 
Islands Infrastructure Fund: Projects supported by this fund are now
complete, delivering improvements in remote areas. 
Islands Programme: Ongoing works in Tobermory (enabling infrastructure
for worker accommodation) and on Tiree (community care hub) are
moving toward completion with over £700,000 in funding claimed, and 
further £450,000 claimed for the Tiree Community Care Hub Project..
Procurement for 2024–25 projects is ongoing.
3.10 Digital Infrastructure:
Broadband and Mobile Connectivity: Over 96% of premises can now
access fibre-based broadband, with nearly 90% at superfast speeds. Full-
fibre coverage continues to rise. We remain engaged with Openreach and
others to address coverage gaps and streamline rollouts. 
Digital Exclusion Fund: Data from mobile-measurement units has helped
identify digital coverage weaknesses. Findings will inform future funding
bids and the development of community-based solutions. 
3.10 Site Visits and Engagements
Community Digital Hubs: Ongoing engagements with rural community
representatives to explore expanding municipal Wi-Fi or alternative
broadband solutions in underconnected areas, with special attention to
areas where extreme weather events may lead to a loss of all landline and
mobile connectivity, as noted earlier.

Page 5

4. POLICY LEAD FOR CARE SERVICES – Cllr Dougie McFadzean 
4.1 Budget: Since the last Full Council meeting in February, I have been
heavily engaged in the IJB’s 2025/26 budget-setting process. Some
difficult decisions have had to be made, and this is likely to be the case for
the foreseeable future. 
The HSCP continues to face significant challenges in terms of service
demands and level of available resources. At the time of writing the budget
process is nearing completion and further efficiency improvements and
reductions in service are required to better align spend with the funding
available. 
The increase in employers National Insurance contributions is also having
an impact on partners we work with in the delivery of health and social
care services. There has been no funding identified to cover this as yet
and therefore it must be a considered a risk to the HSCP budget and
partners. 
4.2 Adult Care: The refurbishment of the care facility on Tiree and the
residential accommodation attached is now in the final stages. This will
help reduce accommodation costs on Tiree and will mean the island has
access to a modern high quality residential care facility for years to come. 
Additionally, remodelling work at Campbeltown Hospital in advance of the
new X-ray equipment being installed later in the year has commenced and
the work in Helensburgh to create new facilities for the Community
Treatment and Care team is now complete. 
Campbeltown Hospital registered nursing resource remains a challenge
with a number of full time posts vacant and challenging to fill.  Ongoing
recruitment is taking place, including looking at a specific international
cohort and routes into nursing. 
The service is focusing on maintaining emergency care with six available
inpatient beds. Dialysis services have recommenced after a period of
pause, through supplementary staffing.  This service requires staff with
specific training and operational solutions will continue to be sought in
parallel with the overarching review of hospital haemodialysis which
commenced on 5th March 2025. 
In Lorn and Islands, medical staffing vacancies are ongoing with locum
costs continuing to impact on overall budgets. Early discussions on a
sustainable medical model are ongoing.

Page 6

Workforce levels continue to have an impact generally across health and
social care services. Vacancies and hard-to-fill post information have been
reviewed with partnership working on creative routes to fill roles and posts. 
Work to look at provision of accommodation is ongoing, especially on
islands, to help recruit and attract long-term workforce and have had some
success in the delivery of available accommodation. 
Older Adult Strategy work is complete and an action plan with priorities for
year one is in development. This will be presented to the IJB in May
following recommendation by the Strategic Planning Group. 
The Care at Home Strategic Group has an overview of the future of care
at home (both internal and externally commissioned services) and there is
an organisational group leading a full redesign of the internal services. 
Care Homes strategic work is on track, supported by Hub North to develop
modelling on projected care home beds over the next 25 years and then
work up an options appraisal for consultation on care housing models.
This work is reported through the Care Home and Housing Programme
Board. 
4.3 Children’s Services: With the support of the Scottish Government and
statutory partners, Argyll and Bute is on the cusp of opening its first Bairn’s
Hoose service in Helensburgh. This offers services for children
traumatised by abuse and neglect. A formal opening is envisaged in late
April. 
The focus is now moving from development of the building towards
development of the therapeutic models which will be deployed in
interviewing and supporting children and young people. 
An application has been made for a further Scottish Government grant to
cover operation and further development in 2025/2026. 
Self-evaluation and quality assurance work in relation to child protection
processes within Argyll and Bute is continuing apace. This involves
bringing managers from across the wider children’s partnership together
for a series of face to face meetings. The aim remains examining and
strengthening consistency and standardisation of processes and
approaches. Statutory Social Work Team Managers come together every
day in a ‘concern’ huddle to deal with any new issues raised over the
course of the previous 24 hours. This is acting as a significant safety net.

Page 7

At a national level, the Care Inspectorate is liaising with Scottish
Government to decide on the inspection programme for the next two
years. Early indications are that there will be a holistic concentration on
Public Protection. This will encompass child protection, adult protection
and the Multi-Agency Public Protection Arrangements. (MAPPA). 
It is recognised that there is a need for long term strategic service
planning, taking into consideration current challenges such as budgets
and staffing, however also looking ahead at such things as demographic
forecasts.  A review of maternity services will report its findings imminently
after which formal NHS organisational change processes will be initiated.
Reviews are under way of health visiting, school nursing and Child and
Adolescent Mental Health Services (CAMHS). 
Significant efforts are being made in terms of recruitment and absence
management within Children and Families social work teams where
staffing levels are under pressure. The priority is to focus on immediate
and significant child protection situations. 
4.4 Planning and Performance: Health services are subject to inspection by
both the Health and Safety Executive and Health Improvement Scotland
as part of the regulatory and oversight role.  Both ultimately result in
improvement actions which are managed through clinical and care
governance. 
A review of the Strategic Planning process and transformative capability is
taking place including planning sustainable services with communities,
along with wider partners and in the best utilisation of joint resource, and
ensuring that up to date census data is used when it is released. 
The Joint Digital and Joint workforce strategies will be due for renewal
alongside the Joint Strategic Plan and there is opportunity to align
partnership resources to support the best outcomes for people in Argyll
and Bute. A focus on the best use of technology for workforce and
communities will be explored. 
5. POLICY LEAD FOR CLIMATE CHANGE, RENEWABLES AND NET ZERO –
Cllr Luna Martin 
5.1 Climate Change Duties for Public Bodies:  The Scottish Government
has launched a consultation on new draft statutory guidance for public
bodies regarding the implementation of climate change duties. This
guidance will replace the original 2011 document and provide updated
direction on how public bodies, including Argyll and Bute Council, should

Page 8

fulfil their legal responsibilities under the Climate Change (Scotland) Act
2009, including the following three duties:- 
• Acting to reduce greenhouse gas emissions and contribute
to national emissions reduction targets;
• Contributing to the delivery of the Scottish National
Adaptation Programme to prepare for climate impacts;
• Acting in the most sustainable way possible in exercising
functions. 
Officers are in the process of finalising a draft response, which is due to be
submitted to the Scottish Government by 23rd May 2025.   
5.2 Net Zero Route Map Preparation: Preparatory work is well underway for
developing the Council’s Net Zero Route Map (NZRM) to guide the
Council towards operational net zero emissions, with activities including:- 
• Arrangements for five cross service workshops, including the
creation of a structured and visual framework to maximise benefit of
these sessions.  Thereafter, a formal working group will be
established to take forward the NZRM.
• Review of existing strategic priorities and policies to ensure that the
NZRM aligns with these – for example having regard to the draft
Scottish Government guidance for public bodies regarding climate
change duties;
• As part of the development work, the Council has been
collaborating with EDFs Urbanomy Team to produce a high level
NZRM document, which has provided valuable insights to inform
our own approach.
• The team have also been actively engaging with the Scottish
Climate Intelligence Service (SCIS) in implementing the
ClimateView/ClimateOS platform alongside other Scottish local
authorities. This digital solution enables the visualisation, planning
and tracking of climate action progress through a standardised yet
locally adaptable framework. 
5.3 ACT Service Level Agreement – Kilmory Projects: The final touches
are being made to the proposed Service Level Agreement (SLA) with
Argyll and Isles Coast and Countryside Trust (ACT) for the delivery of two
key projects: 
1. Kilmory Woodland Management Plan - A comprehensive baseline
review of the woodland resource using Scottish Forestry's WIAT
template, which will enable future funding applications and sustainable
management.

Page 9

2. Kilmory Walled Garden Business Case - Development of a business
case and phased delivery plan for restoration of this significant
botanical asset. 
The work of ACT will complement the work being undertaken as part of the
Kilmory Business Park development, particularly regarding woodland
management objectives and public access considerations. 
5.4 Supply Chain Management Tool Evaluation: Officers are currently in
the process of reviewing NETpositive Futures Supply Chain Carbon
Management Tool. NETpositive Futures provide advice and strategies to
enable organisations to implement sustainability commitments and drive
carbon reduction. 
The platform would enable suppliers to measure and manage their carbon
emissions while providing the Council with standardised data collection
mechanisms ahead of the Scottish Government's mandatory Scope 3
reporting requirements coming into effect in November 2027. The tool
offers suppliers free access to carbon management resources, tailored
action plans, and reporting capabilities. 
With the anticipated expansion of mandatory Scope 3 reporting potentially
increasing reported emissions by as much as 75% (from the current
20,000-25,000 tonnes to between 60,000-85,000 tonnes of CO2e
annually), this proactive approach would strengthen preparedness while
supporting local businesses in developing their sustainability practices.
This initiative complements the broader Net Zero Route Map development
and climate action planning. 
5.5 Property Services Energy Efficiency Initiatives: The Property Services
Team has made significant progress on energy efficiency projects across
our estate. They have installed 4G communications systems at 33 sites,
primarily schools, enabling remote access to Building Management
Systems (BMS). This technology allows for quicker, more efficient, and
more effective methodology for monitoring and energy management
activities. 
Additionally, the team has completed the installation of Thermostatic
Radiator Valves throughout Cardross Primary School, Islay High School,
and Dunbeg Primary School. These installations provide improved
temperature control and energy efficiency in these educational facilities. 
All these initiatives were funded using the £240,000 previously allocated in
the Central Energy Efficiency Fund (CEEF) to advance our climate action
goals while improving operational efficiency across our building portfolio.

Page 10

5.6 Arrochar coastline litter: Following my visit to Arrochar several months
ago, I returned to find the situation on the coastline was rapidly worsening.
The litter accumulation continues to sully the shoreline and impact the
local wildlife. 
I wrote to the Cabinet Secretary for Net Zero and Energy Gillian Martin to
discuss the previous mechanical cleaning arrangement on the shore and
the future of the litter sink. I have now requested a meeting to discuss the
litter sink further. 
Councillor Shonny Patterson and I have also written to Marine Scotland to
request a meeting about the litter sink. I will continue to engage with the
Scottish Government and Marine Scotland on this matter. 
5.7 Bikeability: I visited the fantastic Strath of Appin Primary School where I
learned about the impact of the Bikeability training the children are
undertaking. Bikeability helps to provide children with life skills, as well as
learning to cycle, students develop social skills and independence.

Page 11

“After Bikeability, children are better at responding to risk and report
increased confidence. As a result, more children cycle to school which in
turn improves mental health and wellbeing. This allows children to get
more out of the classroom, improving their attention span and
engagement. Healthier habits lead to increased attendance and improved
academic results. Bikeability goes beyond a training course; it impacts
children’s lives.” 
The children at Strath of Appin Primary school have taken cycling to the
next level! The primary school encourages children to cycle their bicycles
in the playground at playtime and lunch time. The children let me know
that they thoroughly enjoy having their bicycles in the playground and they
have lots of other active outdoor games too. 
Bikeability training helps to encourage active travel and will hopefully still
benefit the children long after they leave school.

Page 12

5.8 KIMO – Fishing For Litter project: As the Council’s representative on
KIMO (Kommuners International Miljøorganisation, or Local Authorities
Environment Organisation) I would like to mention the award-winning
Fishing For Litter project which has been recently reinvigorated in both
Campbeltown and Tarbert. It’s great to see that now both communities
have a banner that states their participation in the project. They now have
supplies of leaflets, merchandise and bags. Campbeltown has been
signed up to participate since 2010 with four tonnes of waste recorded as
being collected. Tarbert has been participating since May 2006 with a
massive 134 tonnes of waste collected to date! 
Five Sisters Creeler Ross MacKay with Fishing for Litter Skip Bag 
What is Fishing For Litter? Fishing For Litter is a simple idea designed to
reduce the amount of marine litter in our seas. Participating vessels are
given hard-wearing bags to collect marine litter that is caught in their nets
as part of normal fishing activities. The project’s main aims are: 
• To remove litter from the marine environment.
• To maintain a network of harbours and fishing vessels around the
country so participating boats can land the marine litter they’ve caught
in their fishing gear.
• To change the working practices within the fishing industry, to help
prevent litter reaching the marine environment in the first place.

Page 13

Those taking part in the Fishing For Litter Project have recovered over
2,500 tonnes of marine litter in the UK to date.
Fishing For Litter Skips and Bins are for all marine litter found in nets
whilst fishing and all marine litter found floating or tangled on fishing gear. 
6. POLICY LEAD FOR COMMUNITY PLANNING AND CORPORATE SERVICES
– Cllr Mark Irvine 
6.1 Introduction: It has been an extremely busy period for the teams across
my Policy Lead portfolio, since my last report, and I thank the officers for
their continued diligence and hard work in delivering the best possible
outcomes across a wide range of issues and projects. 
It is also worth making a special note to acknowledge the hard work of all
our teams and officers during Storm Eowyn and my thanks go to everyone
across the region who went above and beyond to keep everyone safe and
for their hard work in the clean-up operations that followed. Thank you all.
6.2 Community Planning and Community Development: I have spent a
considerable amount of time engaging in various discussions with officers
and I am encouraged by the sheer breadth of activities across the entire
authority. A small but focused team are working hard across the region to
improve outcomes and enhance our communities. 
Argyll and Bute Council’s annual Supporting Communities Fund  - The
fund opened on 31st March for applications from not-for-profit community
organisations, who meet the eligibility criteria, for up to £1,500 to support
community projects across Argyll and Bute. Closing date is 26th May.

Page 14

Decisions on awards of funding will be made at Area Committees after the
July recess. 
The fund has supported a range of projects over the last ten years from
local sports clubs, village halls, community transport, climate friendly
initiatives, history and culture, music and the arts. Following feedback, this
year we have introduced a simplified online application process. Further
details are available on our website at Supporting Communities Fund |
Argyll and Bute Council.  Posters in English and Gaelic have been shared
with communities to help promote the fund. 
Community Development Support: Work continues to regularly support
community groups across Argyll and Bute. Since the start of the year this
has included support to over 40 groups including: 
Mid Argyll, Kintyre and the Islands: 
• Kintyre Highlands – support with funding and advice on community
benefits
• Lochside Champions – supporting partnership working
• Dochas – advice on funding and combatting social isolation
• Auchindrain – recruiting new members 
·        Helensburgh and Lomond:
• Princess Louise Hall - ongoing support with advice on lease,
funding options and partnership working to improve building
• Kirkmichael Community Development Group – cycling day planned,
walk-around, and support with funding
• Gibson Hall – support with funding and lease
• Helensburgh Repair Café – sharing experiences from volunteering
at Glasgow Repair Café to help establishment of a local group by
Helensburgh Hub and Jean’s Bothy 
Bute and Cowal:
• Scenic Sandbank
• Black Park Football Club
• Dunoon Community Development Trust 
• Glenan Community Woodland 
Oban, Lorn and the Isles: 
• Seil Island Hall – help to look for funding to upgrade the playpark
• Victory Hall, Benderloch – community engagement and grants for
energy saving upgrades 
• North Argyll Trail Association (NATA) – funding and advice on
lodging interest in acquiring forestry land for mountain bike trail
near Oban

Page 15

• Green Shoots, Hope Kitchen and ReStore Shop- developed and
facilitated a development session for 15 staff and volunteers using
a world café model. 
Local Place Plans – the team continues to support groups who are looking
for advice on creating Local Place Plans. Training sessions have been
attended by over 19 community groups. These are recorded and available
on the dedicated Local Place Plan webpage. 
The team produced a Framework on Engagement for the Council, and
developed a training module on Engagement for council staff, available on
LEON. 
The Community Planning Team were invited to present at a national
Community Planning Network on the development of the Argyll and Bute
Outcomes Improvement Plan to share the best practice in community
engagement that was undertaken in preparing the plan. 
The Community Planning Partnership met in March to discuss the results
of a self-assessment and to produce a draft Improvement Plan with a
focus on improving the partnership’s approaches to Board member
induction and ensuring members are clear on their roles and
responsibilities; and to further develop the partnerships mechanisms for
understanding the needs of individuals and communities to support the
work of the CPP. 
6.3      Customer Services – HR and Organisational Development, IT: 
Digital Innovation – Interactive Mapping Tool: I’ve been talking with the
team for some months now about this and they are actively investigating
options for an interactive mapping tool on the Member Zone. This
initiative—potentially evolving into an AI-powered smart map—will allow
users to generate mapping data on the move.  
Data Programme and Analytics: The ongoing data programme is a
cornerstone of digital transformation efforts. New Power BI reports—
covering everything from pupil attendance in schools to planning service
performance dashboards—are enhancing decision-making with real-time
analytics.
Adoption of AI Tools: The council is preparing to pilot Microsoft's Copilot
for selective strategic areas, reflecting the forward-looking vision to
harness artificial intelligence in routine operations and communications.
This includes workshops and readiness assessments aimed at integrating
AI within existing digital workflows.

Page 16

Website and Digital KPIs: There are notable successes in digital
engagement:
▪ Enhanced website performance with significantly higher unique
page views and visitor sessions.
▪ The Silktide accessibility scores have reached record highs, placing
the council’s website within the top 30 of all UK councils. (Ranked
23rd at the time of writing).
▪ Increased activity in digital channels (web payments, smart
assistant usage, chat bot engagements) demonstrates the
effectiveness of the revamped digital strategies.
Customer Engagement and Operational Successes:
Customer Service Excellence: Detailed KPIs for the registration services
and contact centre show significant improvements in areas such as call
answer rates, reduced abandonment, and an overall high level of service
delivery. 
Process Improvements and Digital Developments: Continuous
enhancements include the rollout of new online systems (from registration
management to business process mapping applications). 
Overall it has been a busy period of robust strategic planning and digital
transformation. The combined advancements in community engagement,
HR transformation, ICT resilience, and digital innovation not only reflect
current successes but also pave the way for greater efficiencies and
enhanced public service delivery in the future.
Workforce Planning: Workforce planning is advancing with the
implementation of a new HR and Payroll system capable of generating
detailed reports. This technical improvement supports more efficient and
data-driven planning, ensuring that workforce challenges are met with
modern solutions.
Wellbeing Strategy: a pivotal piece of work within my Policy Lead portfolio
is the very significant work that has been undertaken by officers on the
wellbeing of our staff within the organisation and I have been involved in
the process, taking a keen interest at key stages. The wellbeing of all of
our employees must always be a high priority as well as consideration of
the financial implications. 
The introduction of a comprehensive wellbeing strategy—with
commitments to provide education on wellbeing, focused support, and
improved work conditions—has been a central pillar to this enormous
piece of work.

Page 17

The dedicated Wellbeing team has enabled focused case management
and ongoing research into absence trends, which is helping improve the
overall absence ranking relative to other councils.
Supportive Interventions and Data-Driven Actions: A range of initiatives
and targeted adjustments in policies and practices have contributed to
slowing the rate of the increase in sickness absence despite national
pressures and service delivery challenges.
The service have been working on planned actions such as updating case
management support, integrating new tracking modules through the iTrent
system, and promoting Mental Health First Aider initiatives. These are
positioned to further refine the Council’s response to workforce wellbeing.
The Wellbeing team also acknowledges national factors (such as NHS
treatment backlogs and longer recovery times) that are contributing to
rising absence levels. Despite these pressures, the Council’s slower rise
in absence suggests that its interventions are mitigating some of the
impacts compared to peers.
Digital HR and OD Transformation: There is a clear focus on transforming
HR operations through digital initiatives—including AI to streamline advice
services and case management. 
Cyber Security Initiatives: The IT team has successfully maintained
accreditation and managed multiple cyber threats. 
Teams Telephony Migration: A significant milestone is the successful
migration of over 75% of users to Teams Telephony, including critical
integration for the contact centre. The seamless transition and dedicated
training initiatives have ensured that communication remains uninterrupted
across the council’s network.
6.4   Legal and Regulatory Support:
Proactive Engagement with Stakeholders: During the last period the
service continued its excellent proactive work - for example, the meeting
with the Polish Consul to facilitate a polling station in Oban for the
upcoming Polish Election (May 18th onwards) and the well-attended
training session with the Standards Commission involving two-thirds of
Councillors which is set to become an annual event, supporting ongoing
member development.
Community Council Developments: Significant positive momentum was
noted in local governance with the Kilfinan Community Council by-election
resulting in the successful election of four new members.

Page 18

Collaborative Service Enhancements: Efforts to better align and support
Community Planning Partnerships (CPP/ACPGs) through collaboration
with the Communities and Partnerships Team are underway, promising
more integrated community services.
Outstanding Welfare Rights Achievements - Financial and Client Impact:
Welfare Rights interventions have delivered impressive results for local
people. January 2025 saw income of over £320,000—up from previous
months—with rising client numbers (117 clients in January versus 71–77
in the previous months). Partnerships, such as those with Macmillan
Cancer Support and the Welfare Advice and Health Partnership project,
have significantly contributed toward surpassing the annual target of
£2.8 million, demonstrating strong service delivery and community impact.
Procurement and Contract Management Successes:
Local Economic Support - the service continues to look towards local
suppliers wherever possible. The procurement activity shows that, among
the 14 available tenders in January 2025, local suppliers not only bid but
also achieved a 100% win rate on the opportunities they pursued. This
success enhances local economic engagement and supports community
wealth building.
Robust Savings and Value for Money - the detailed procurement and
Contract management processes have generated notable revenue and
capital savings. The service continually monitors procurement benefits,
enhanced savings through national contracts, and the effective use of
digital tools for contract management. This systematic approach ensures
that value for money is achieved and continually tracked.  
Resilience and Risk: 
Response to Adverse Weather - a major incident occurred due to Storm
Eowyn and decisive action was taken to close schools and offices and
switch to remote working. This rapid, coordinated response reflects strong
operational resilience and a commitment to staff and public safety. 
High Performance in Risk Management and Safety:
The Health and Safety team has rolled out new health surveillance
rounds, updated fire risk assessments, and innovative online training (for
moving and handling), all of which highlight the Council’s proactive
approach to employee and public safety.
The Resilience Team conducted workshops (such as the REPPIR
Workshop for Police Senior Managers) and exercised preparedness
through table-top exercises, ensuring that the Council is well-prepared for
future challenges.

Page 19

Compliance and Efficiency Improvements: The Compliance and
Regulatory Governance Unit reported excellent performance in handling
FOI/EIR requests and a measurable improvement in complaint response
times (with Stage 2 complaints achieving 100% within the required
timescale). This demonstrates the Council’s dedication to accountability
and quality service delivery.
Overall, this report reflects a period of proactive governance where
leadership, collaborative community engagement, exceptional legal
outcomes, and effective procurement practices have contributed to robust
public service delivery. These successes not only enhance operational
efficiency but also position the Council well for future challenges and
opportunities. 
7. POLICY LEAD FOR EDUCATION – Cllr Audrey Forrest 
7.1 Our Children, Their Future – Thriving Together:  The new vision and
strategy was considered and approved at the Community Services
Committee held on 6th March.   
The development of the new documentation would not have been possible
without the input of our children and young people across Argyll and Bute,
together with all our hardworking staff, parents/carers and wider partners. 
I would particularly like to express my thanks and appreciation to all the
young people who have participated in the consultation and to those who
have contributed to the extensive work to develop the interactive
documentation and support materials.

Page 20

Last, but not least, I want to commend the pupils from Colgrain Primary
School who attended the Community Services Committee on 6th March,
and demonstrated excellent presentation and communication skills. Well
done to all! 
7.2 Argyll Education Trust Award: I want to promote this scheme which 
provides financial support to eligible students, schools and educational
institutions on a range of criteria, for example:- 
• Students from the County of Argyll (excluding Helensburgh and Bute)
that reside away from home in order to attend
University/College/Central Institutions etc.
• Post Graduate Scholarships
• Supplementary awards for students attending
University/College/Central Institutions etc – i.e. travel
• Over 21’s reaching qualifications to attend University/College/Central
institutions etc
• Emergency assistance for students from the County of Argyll
• Assistance in obtaining practical experience of trades etc.
• Educational excursions
• Special educational equipment
• Sports facilities (pitches/pools/pavilions etc)
• Support of clubs etc that provide work of an educational nature
• School Hostel amenities
• Adult Education
• Promoting Education in the Visual Arts / Music / Drama
• Educational Experiments and Research 
The panel meets four times per year, with the next round of applications
due in by 31st May 2025. It is not means tested but funds are aimed,
primarily, at those who face financial constraints that would discourage
them from considering further study after leaving school. More
information/details of the application form can be found here. 
7.3  ALIEnergy MAK STEM Fest: I attended the ALIEnergy STEM event at
Machrihanish Airbase on 5th March, bringing together young people and
industry professionals to inspire the next generation of scientists,
engineers and renewable energy experts. 
This event provided S2 pupils with the opportunity to see the range of
careers available in STEM related subjects, including routes into
apprenticeships or College/University pathways, and to meet with a range
of employers including the Council, NHS, Scottish Power Renewables,
SSEN, SAMS, Siemens, Springbank Distillery, Tilhill, Bakkafrost, and
Balfour Beatty.

Page 21

This robot dog called Spot is very clever, it
can go places where it would be deemed
unsafe for humans, for example initially
unsfage strcutures or tight spaces, and it
can detect gas! 
7.4 Scottish Opera School Visits: 
I was delighted to be invited to meet with the cast of Scottish Opera, who
deliver an education and outreach programme for primary schools across
the country.  I was treated to a special performance of a Tale of Tam
O’Shanter by children from St Mun’s and Dunoon Primaries.  I was very
impressed by the acting and vocal skills of all involved. 
7.5 MCR Pathways – Extension to Rothesay Joint Campus: Following on
from the update provided in my last report, I am very happy to advise that
the Education Service have successfully recruited a 20-hour Coordinator
for Rothesay Joint Campus, who took up post in January 2025.

Page 22

8. POLICY LEAD FOR FINANCE AND COMMERCIAL SERVICES – Cllr Ross
Moreland 
8.1 Financial Services: 
2024-25 Revenue Budget Monitoring and Budget Outlook: As at 28th
February 2025, there is a forecast overspend of £4.071m or 1.3% against
the approved 2024-25 revenue net expenditure budget of £316.595m.
This is offset by an over-recovery of £0.328m in Council Tax income.
Overall, the forecast overspend for 2024-25 is now £3.743m, a reduction
of £0.357m from the forecast overspend position of £4.100m as at 31
January 2024. This movement relates mainly to a more favourable
position within both Education Services and Social Work Services. 
It is anticipated that the forecast overspend in respect of Social Work
Services of £2.448m will be managed within reserves available to the
HSCP. The remaining council forecast overspend of £1.295m will impact
the General Fund balance, a reduction of £0.208m from the previous
reported overspend. 
Members were advised at the Council budget meeting on 27th February, of
the updated forecast unallocated General Fund balance as at 31st March
2025 of £0.314m. Following Council budget decisions, the unallocated
General Fund balance available for 2025-26 was forecast at £0.235m.
This may now be updated to £0.443m following the favourable movement
in the forecast outturn position as at 28th February 2025. 
The budget outlook, following budget decisions taken on 27th February
2025, provides a projected budget gap of £9.588m for 2026-27 rising to
£29.490m by 2029-30, based on the mid-range scenario. The budget
outlook continues to be monitored on an ongoing basis and reported
through the Policy and Resources Committee. 
Benefits Processing: As at 28th February 2025, the average processing
time for new claims of Housing Benefit was 20.82 days for the month, with
a cumulative average of 14.87 days, well within our target processing time
of 21 days. For changes in circumstances, at 28th February 2025 our
processing time is 3.44 days. 
Council Tax:  As of 28th February 2025, current-year collections for
2024/25 stand at 93.73%, reflecting a 0.83% decrease compared to the
same period in 2023/24. 
The decline is largely due to significant movements in net billed amounts
in February 2024, following Assessor changes affecting the categorisation
of approximately 260 self-catering units, which were transferred from Non-
Domestic Rates (NDR) to Council Tax. This adjustment resulted in

Page 23

additional charges of £500,000 over the past two financial years.
However, this income is unlikely to be fully recovered within the current
year, impacting the percentage-based recovery rate. 
The cash position may improve before year-end, as the newly issued bills
contain a single instalment payable in March. This could lead to a number
of large lump-sum payments, boosting collections just before the financial
year closes. 
Second Homes: There has been a small reduction in the overall number of
second homes in February to 2,605, compared to 2,619 in January. 
Collection rate for the total charges on second homes is 97.47%, higher
than the 93.73% across the whole tax base at end of February with
second homes recoveries remaining strong.  £7.857m of both core and
additional 100% council tax charged on these properties. £8.061m was
charged in total, £4m relating to the double charge element. In-year
recovery at 99.04% (£3.962m) is anticipated, representing over recovery
of £0.213m on the budgeted level of income from second homes only. 
Non-domestic rates (NDR):  As of 28th February 2025, we have collected
96.55%, which is 0.17% down on the same period last year. 
Scottish Welfare Fund: As at 28th February 2025, we have spent £496,949
in the 2024/25 period. The confirmed budget allocation for the Scottish
Welfare Fund (SWF) in 2024/25 is £708,284, which includes £458,284
from the Scottish Government programme fund, supplemented by an
additional £250,000 provided directly by the Council to cover cost
pressures. This represents an underspend of £152,311 compared to our
monthly profiled allocation. 
Comparing current expenditure to the same period in 2023/24 there has
been a reduction of £57,306. The number of applications are down and
the number of awards has also decreased. 
Discretionary Housing Payments (DHP):  At 28th February 2025 our DHP
spent and committed amount was £961,371 for the full year.  The initial
DHP Tranche 1 funding allocation for 2024/25 in Argyll and Bute is
£955,941, with expected Tranche 2 funding of £213,584 due later in the
year.  This brings our total DHP allocation to £1,169,525 for the year. To
date we have had 880 applications for a DHP and made 686 awards. 
Visitor Levy: The consultation on a possible Visitor Levy in Argyll and Bute
continues. At the time of writing, ten of twelve planned events have now
been completed and a wide range of information from residents and

Page 24

businesses has been discussed in detail and will inform the consultation
report due to go to Council later in the year. 
The Council has done what it can to ensure broad awareness of the
consultation through a wide range of channels, highlighting the
consultation to stakeholders through partnership networks including Argyll
and Islands Strategic Tourism Partnership, Highlands and Islands
Enterprise and Loch Lomond and the Trossachs National Park. Leaflets
have also been issued via email to circa 7,000 Council Tax e-billers, a
printed insert to 42,000 households, and over 2,100 emails sent to
accommodation providers with short term letting licences. 
We are currently evaluating responses to a tender for an independent third
party organisation to analyse the consultation responses and provide a
detailed report on the feedback to the Council. 
8.2 Commercial Services: 
Helensburgh Waterfront Development (Commercial Area): Following the
report tabled at Policy and Resources Committee on 15th August, Officers
have been implementing the agreed recommendations, including
proceeding with negotiations to agree detailed Heads of Terms with
Forrest Developments Ltd for the sale of the Helensburgh Waterfront
commercial area, with the provisionally agreed terms to be reported to a
future Policy and Resources Committee. 
A petition for Judicial Review was received by the Council on 18th
November 2024 and legal proceedings in respect of this matter are
ongoing. 
Storm Eowyn: Following the devastating effects of Storm Eowyn on 24th
January, Property Services have been working hard to assist with the
recovery work across the Council estate, which saw over 100 incidents
logged with the team.   
The majority of incidents related to roof damage, broken windows, water
ingress, electrical issues and fallen debris, but there was notable damage
to a number of buildings including Park Primary School, Glencruitten
Hostel, Struan Lodge and Helensburgh Leisure Centre (HLC). 
With regard to HLC, the building has sustained extensive wind and
rainwater damage.  It has a fragile roof and to ensure public safety a
cordon has been put in place around it.  Works have been undertaken
since then to make the building wind and water tight through the
installation of waterproof membrane and a rainwater capture system. 
Survey work is also underway and the Council is working with its insurer to
inform the development of a strategy for a permanent design solution.

Page 25

Following this work a report will be prepared for Council setting out a
number of options for consideration. 
Live Argyll have put in place alternative arrangements to provide
temporary gym facilities at Helensburgh Library (available since 19th
February) with the Library re-locating to Hermitage Park Pavilion.  I would
like to thank all the staff at Live Argyll for their hard work and quick
response in restarting the gym facilities as quickly as possible. 
Rothesay Pavilion: A report was tabled at the Council meeting held on 26th
September 2024, where it was approved that the contract for Stages 2
and 3 of the construction works at the Pavilion should now be accepted.  I
am pleased to report that stage 2 and 3 works, which will primarily focus
on interior renovation, have commenced and are progressing to
programme with practical completion scheduled for December 2026. 
As previously reported, the Rothesay Pavilion project has been allocated
£9m from the Scottish Government Rural Growth Deal (RGD).  The official
RGD signing took place on 10th March 2025 at Bute Yard, with
representatives from both the Scottish Government (Deputy First Minister
– Kate Forbes) and UK Government (Scottish Secretary – Ian Murray) in
attendance. 
Mull Campus: A Special meeting of the Council was held on 7th March
2025 to give consideration to a report setting out the site assessment and
selection process; the contributing reports and analyses; the relative
benefits and challenges of each shortlisted site option; and a
recommendation to the Council as to the preferred site, based on the
evidence available.   
After due consideration, Council agreed the recommendations of the
report, including:- 
• Endorsement of the site scoring mechanism, criteria and supporting
assessments which is consistent with criteria categories commonly
used for site selection on previous Council school projects.
• Confirmation that Site 4 – Tobermory South is the preferred site for
a new Mull Campus and agrees to progress the Outline Business
Case on that basis.
• Noted that as the preferred option would constitute a proposal to
relocate the existing campus, a statutory consultation would be
legally required under the Schools (Consultation) (Scotland) Act
2010, the outcome of which will be reported back to full Council
upon completion of that process.

Page 26

The Mull Campus Team are now preparing for the next key stages of this
£43 million project which will be the Council’s single biggest investment. 
All updates and information in respect of the project can be found on the
dedicated webpages here. 
9. POLICY LEAD FOR PLANNING AND REGULATORY SERVICES – Cllr Kieron
Green 
9.1 Introduction: Following my previous report to November Council I have
chaired meetings of the Argyll and Bute Licensing Board on the 19th
November and 25th February, and the PPSL Committee on the 20th
November, 13th December, 18th December, 11th January and 19th March.
In addition I have been chair for various Community Council Conduct
Reviews, Local Review Boards, Civic Hearings and Short Term Lets
Hearings over this period. 
I was in attendance at meetings of the Clyde Marine Planning Partnership
on the 26th November and 4th March which focused on continued
discussion around governance arrangements, as well as the COSLA
Environment and Economy Board on 13th December and 7th February. 
At both COSLA and PPSL meetings responses to the UK Government
Consultation were agreed, and COSLA also received a presentation on
the National Energy Systems Operator. 
9.2 Development Management: Over 2024/2025 there has been a positive
trend of determinations exceeding new submissions. This continues to be
expedited by additional short-term resource, and excluding ‘legacy’ items,
the average time for a determination of ‘local’ applications is improving.
For newer applications, which make up the majority of determinations,
turnaround is under ten weeks for householder applications and around 12
weeks for other local items. 
The Central Validation Team are currently operating at full capacity and
consistently working on items that are inside five working days of receipt.
Planning resource is being managed across areas to best ensure
casework is at manageable levels for staff, and will be further reviewed.
Capacity within the major applications team is being utilised to provide
support for area team functions. 
The Planning and Enforcement Charter was approved at PPSL in
September 2024, and by Scottish Government in December 2024. This
will next require to be reviewed by September 2026. Work has
commenced to review workflow and performance reporting on

Page 27

enforcement activity. The Development Management Customer Service
Charter and Development Management Service Plan were also approved
at PPSL in September 2024. 
The National Planning Improvement Framework Self-Assessment Report
is currently being finalised, and the Improvement Action Plan was
reviewed with stakeholders at an event on 27th March 2025. 
A high number of Section 36 consultations were received during
December and January, resulting in £450k of income over and above
normal receipts. However these also bring substantial costs to secure
consultant advice on Landscape and Noise. Should the Council raise an
objection there can be further costs relating to a Public Local Enquiry. A
review of receipts and expected costs is identifying whether surplus
income can be carried forward to 2025/26 to offset these. 
Planning fee income was £335k over-recovered at the end of February
2025, with scope to use surplus receipts to provide the additional resource
necessary to conclude the remaining ‘legacy’ cases by extending agency
staff use. 
Statutory planning fees were increased by an average of 15% in
December 2024, taking into account inflation since they were last
reviewed in 2022. However as developers submitted larger schemes in
advance of this any increase in income for 2024/25 is likely to be limited. 
Three actions have now been completed in relation to an audit on
efficiency of processes and improving customer communication – these
have involved updated process guidance for officers handling planning
applications and the reinstatement of customer user forums. 
Resumption of consultation around the pre-application advice service is
currently awaiting officer availability. 
9.3 Development Policy: Work is ongoing regarding the collection of
information for the Evidence Report for Local Development Plan 3 (LDP3)
and the Development Plan Scheme annual revision is due to be brought to
PPSL in April. 
The strategic development frameworks for Helensburgh and Oban are
progressing. Members have been involved through a seminar and PPSL
training. In Helensburgh the first site visits took place in February, initial
discussions have taken place between Development Policy Staff, Roads
and the consultants, and it is planned to meet with the Faslane Naval
Base. A draft engagement strategy has been developed for Oban.

Page 28

The Biodiversity Officer is arranging tenders with procurement to cover the
Local Biodiversity Action Plan refresh and Nature Network Mapping. This
will include a review of Local Nature Conservation Sites. 
9.3 Building Standards: Argyll and Bute Council was awarded the Scottish
Government National Performance Award for medium sized local
authorities at the Building Standards Leaders Forum on the 26th November
2024. This reflects the commitment shown by all within the service, and
the outstanding performance delivered to customers, which continues to
surpass all targets year after year. 
Storm Eowyn caused considerable disruption on the 24th January 2025
with the Building Standards team involved in responding to reports of
damage to buildings on the Friday/Saturday of this period - they are still
dealing with the after effects. 
Of significance was the damage to Helensburgh Leisure Centre, but there
were other reports of dangerous buildings across Argyll and Bute,
principally across Helensburgh and Lomond, Bute and Cowal, where a
chimney head fell through a lower-level block of flats (thankfully no one
was injured) and Campbeltown. 25 buildings required assessment to
determine whether they posed a risk to public safety. 
Action was taken in all instances, which in some cases required road
closures, restricting access to the area or for two buildings, evacuation.
Owners were contacted to carry out the necessary works. In six cases, the
Council instructed works to remove the danger and these costs will be
recharged to the property owners. 
This response involved team leaders and surveyors working during the
weekend to protect the public and my thanks to them for meeting the
demands imposed by the challenging circumstances. 
Building Standards Surveyors continue to work with property owners to
ensure public safety. Over the last few months this has included properties
in Helensburgh and Tighnabruaich. Where necessary, dangerous or
defective buildings notices are issued to prompt remedial work to be
carried out. 
Scottish Government proposals for a Building Levy have been outlined.
This will be applied to owners/developers on issue of building completion
certificate. It is intended that this levy will be collected by Revenue
Scotland and used to fund repairs and replacement of cladding materials
nationally. Further information is awaited on how this may impact on small
developments in rural areas.

Page 29

Despite a downturn in warrant numbers and loss of commercial income, it
is anticipated that building warrant income for 24/25 will be above budget
projections. This has been due to several larger applications being
submitted and the 14% increase in fees that was applied in April 2024. 
The loss of commercial income from other local authorities is projected to
continue into 25/26. This budget pressure of £100k will be offset by the
increase in fees in 25/26 and the measures already outlined in the Building
Standards Investment Plan 24-27, of: 
• Increasing capacity within the team, and developing the workforce and
competencies
• Reducing dependency on commercialisation with resource directed to
increase inspections during construction
• Retaining performance and customers focus, and making better use of
digital services. 
However a budget pressure exists for 25/26 due to a £26k reduction in
Building Standards funding received as part of GAE from the Scottish
Government. 
9.4 Regulatory Services: There continues to be resourcing challenges within
environmental health due to the national shortage of qualified
Environmental Health Officers (EHO) and Regulatory Services Officers
(RSO), and difficulty attracting suitable candidates to other posts. This is
impacting on workload capacity and the service is targeting resources on a
risk-based approach. The service has been innovative and creative in
developing “career pathways” for a range of posts, created new temporary
Authorised Officer posts and have short-term agency staff.
Notwithstanding, there are currently 3.5 EHO and one RSO posts vacant. 
There are ongoing food alerts relating to recall of products including
products containing mustard that may be contaminated with peanut butter
and Environmental Health took action to protect public health. 
As a result of the recent confirmed case of Foot and Mouth Disease
(FMD) in Germany, from 15th January 2025 it is not permitted to bring 2kg
of products from susceptible species, such as sheep, pigs and cows, from
Germany into Great Britain for personal consumption. Due to further
spread of the disease this has since been extended to cover imports from
Austria, Hungary and Slovakia. 
Continued vigilance is required around avian influenza with confirmed
cases in Yorkshire, and one report of a case in a wild bird in Argyll and
Bute. The risk to the general public avian influenza continues to be

Page 30

classed as very low, although advice to not handle wild bird carcasses
remains in effect. 
Amending legislation removes the 16-week limit on the length of time
packs of Class A eggs can continue to be marked as “free-range” where
the laying hens’ daytime access to open-air runs has been subject to
restrictions. 
A watching brief is continuing around Bluetongue, with cases identified in
England last year. 
The Food Control general food program has now recommenced. 
The Council’s Regulatory Services Manager, Alan Morrison has had the
honour of been elected as President of the Royal Environmental Health
Institute of Scotland. This is the professional accreditation qualification
body, and aims to promote the advancement of Environmental Health. 
A historic land use database, mapping all historic industrial land in Argyll
and Bute has been created. With over 5,000 areas this will streamline and
support work carried out by development management and environmental
health. 
The Scottish Government is seeking to further regulate non-surgical
cosmetic procedures. They are seeking a model of regulation which
protects the public while being proportionate and providing a framework
where potential clients can undergo procedures with confidence, and
responsible, safe providers can continue offering them. 
9.4 Short Term Lets: A total of 3,462 short-term let licences have been
submitted to the Council, with 1,166 applications still to be determined.
Overall this means that 66% of applications have been determined
compared to the Scottish average of 67%. 
Delays have been due to various factors including the new licensing
scheme, lack of resources and absence of documentation in some
applications. 
The team continue to receive between 20 and 30 new applications per
month. With there being a nine-month limit for determinations this means
resources must be maintained to progressing these applications. As of
March first checks were being carried out on new applications received on
20th February 2025, and second checks for those received on 15th January
2025.

Page 31

For existing applications the team are currently carrying out second
checks on those received up to 21st September 2023. 
The team have started the process of issuing deemed grant licences for
those applications which cannot be fully processed to a 3-year licence, in
these cases deemed grant licences are being issued for a period of one
year. 
Preparation is underway for renewals for those hosts who are deemed
granted or for early approvals. Work includes development of processes,
consideration of fees and changes to our ICT systems. 
Maintaining resources on new applications is to be progressed to ensure
they do not go out with processing timescales. 
Currently there are six full time and two part time licensing assistants
carrying out work on new and existing applications. These complement the
two licensing officers who concentrate on objections, enquiries and
inspections, variations, and transfer of licences. 
An audit of processes being carried out by the team has taken place and
was positive. 
10. POLICY LEAD FOR ROADS, TRANSPORT AND AMENITY SERVICES – Cllr
John Armour 
10.1 Introduction: Since my last report to November 2024 Council, there has
been a significant amount of work going on within my Policy Lead remit, I
have done my best to capture as much of this as possible, however with
such a wide ranging remit it is not possible to capture every piece of work
which is ongoing – as always, if anyone has any queries or questions they
would like me to pick up, I will be happy to try to assist.   
Here are some of the works that have been taking place since my last
report.     
10.2 Storm Eowyn: I have been reflecting on all of the different things that the
Council has done during what was a pretty stressful and anxious time for a
lot of people across Argyll and Bute with the red weather warning in
January.  Since the day of the storm, I have received a number of positive
comments from residents and communities regarding the efforts and
commitment from staff in helping clear up the aftermath, and those efforts
being carried out in what were quite often challenging times for staff to be
out working in.

Page 32

I was out and about myself shortly after the warning was lifted and
witnessed first-hand the aftermath and the efforts from staff.  It’s safe to
say I am sure some of our staff will have had their fair share of issues at
home as a result of the storm as well and I just want to ensure that my
sincerest thanks are passed on to all staff who were instrumental in
making sure that our residents were able to get back to some form of
normality.   
The hard work and dedication of staff is very much appreciated and their
efforts have not gone unnoticed so a sincere thank you to each and every
one of them.   
We cannot underestimate the effect climate change will have on weather
systems in years to come. Storm Eowyn had a devastating effect on
communities across Argyll and Bute - power cuts, cancelled ferries,
damage to property, blocked roads and localised tidal flooding. We are still
picking up the pieces.   
In the recent budget, we agreed to set aside funding for future
emergencies, like October 2023 and Storm Eowyn, so we can get back on
our feet as quickly as possible. However, we would also like to work with
the Scottish Government to find the best way of funding storm damage
and finding ways to mitigate against the impact of climate change on this
type of event across diverse, rural communities such as ours.   
10.3 Roads Reconstruction Programme: The Administration’s February
budget included an £8m uplift to the Roads Reconstruction Programme. 
The annual roads reconstruction programme plays a vital role in making
Argyll and Bute’s road network more resilient, less susceptible to damage
and so requiring fewer reactive repairs such as filling potholes or jet
patching.

Page 33

It takes sustained funding at adequate levels to ensure that the network
can be maintained in the long-term. Realistically, it would take £122m to
bring all Argyll and Bute’s roads up to A1 standard. Most Councils are in a
similar position, albeit with varying backlogs. 
However, the £80m investment the Council has made over the past
decade has had a positive effect on the network conditions. The new
programme of work will include surface dressing and bituminous surfacing
inlays and overlays. Included within the schemes are improvements to
culverts and ditches, to prevent water running across roads, will in turn
prevent future damage to the structure of roads in winter. 
Argyll and Bute’s roads keep our communities connected and drive our
economy. The Council recognises their strategic importance and so chose 
to increase the roads reconstruction budget for 2025/26 from £2m to £10m
in its budget. 
Maintaining our roads is challenging, nearly one third of our network is
made up of unclassified roads, over 80% of the network is in rural areas
and 24% are over peat, which costs more for construction and
maintenance. That’s why it takes considerable investment and we will
continue to invest wisely, and where it will make the most difference.   
You can read more about the programme of works in the March
Environment, Development and Infrastructure Committee papers.   
10.4 Waste Transfer Station: At the Environment, Development and
Infrastructure Committee in March, Members took the decision not to
proceed with a new Waste Transfer Station, in Helensburgh.   
A review of the project undertaken by officers indicated that it was not
value for money and not the best solution to provide Biodegradable
Municipal Waste (BMW) Ban compliant waste disposal arrangements for
Helensburgh and Lomond. 
This makes a saving of £3 million which will be used to address cost
pressures within the waste service.

Page 34

The original plan was to build a Waste Transfer Station that would enable
the Council to become compliant with the new waste regulations.
However, after the project was started, the Council’s waste off-taker for
the area withdrew from the market. The alternative arrangements made,
with a firm in Linwood, are already compliant with the BMW ban. 
After modelling the costs to finance the build and running costs of a new
waste transfer station, it was clear that continuing with the arrangements
with the third party waste management company provided better value for
money at this point in time. 
This decision shows how the Council can adapt when circumstances and
new opportunities present. Our duty is to manage public money prudently,
and at the moment this money can be better used on other waste projects. 
However, should circumstances change in the future, there are plans and
permissions in place for a waste transfer station that can be actioned
swiftly so the Council are a in a good position to meet any future
requirements. 
10.5 Pavement Parking Ban: On 11th December 2023, the Scottish
Government brought part 6 of its Transport (Scotland) Act 2019. This
introduced three new parking prohibitions:
• Pavement parking
• Double parking
• Dropped footway parking 
The Council agreed to enforce these restrictions from Monday 3rd March
2025.  It is important to remember that the legislation was designed to
make things safer for pedestrians who should not be forced onto busy
roads because the pavement or dropped kerb is blocked by a vehicle.   
The creation of two new warden posts was agreed by Committee; one
based in Mid Argyll, Kintyre and the Islands, and one based in
Helensburgh and Lomond, to support both the enforcement of the new
prohibitions but also to enhance the capacity to enforce restrictions under
the Decriminalised Parking Enforcement (DPE) regime.   
Officers within the service are preparing information to share with Elected
Members and members of the public which aims to provide guidance on
the assessment and implementation of Exemption Orders, the signing and
lining requirements and the enforcement of the prohibitions (including the
issue and processing of Penalty Charge Notices) – please do keep an eye
out for this helpful guidance.

Page 35

Have a look at the FAQs on Pavement Parking which can be found on the
Council’s website Pavement Parking prohibition FAQs | Argyll and Bute
Council 
10.6 20mph Speed Limits: The Environment, Development and Infrastructure
Committee in December 2024 heard how Transport Scotland has provided
funding to identify suitable areas to introduce 20mph restrictions locally,
for a trial period, to make streets safer and encourage active travel
choices.   
The project is in response to a Scottish Government commitment to create
a healthier, greener and safer Scotland and that the introduction of 20
mph restrictions can help create a safer street environment that can be
shared more equally between different road users.   
Currently the default speed limit on restricted roads (generally where there
are street lights) is 30mph. In December 2023, the Scottish Government
advised that it would follow its 20mph project locally through traffic
regulation orders rather than a using a default 20mph speed limit on all
restricted roads. 
Monitoring and evaluation before and after the trial will inform whether or
not limits have achieved appropriate speed reductions. If not, and without
funding for physical measures like signage, chicanes and speed bumps,
the speed limits may revert to existing levels.  Our roads are used more
than they have ever been, in different ways, so we have to make sure they
are safe and work for everyone.   
I welcome this Scottish Government funding because it will help us gather
enough data to make informed decisions we can use going forward. We
are not deciding to implement any restrictions right at this moment – we
will have more detail to consider at a future meeting. The 20mph zones
might not be right in every instance, but this is our chance to find the right
speed for the right place. If asked for your views, I would encourage you to
feedback. 
I do feel there is some confusion and would want to clarify that there is no
consultation on 20mph zones at the moment, what we have is Scottish
Government funding to allow the Council to obtain extra resource required
to deliver the project, to identify suitable areas to introduce 20mph
restrictions locally, for a trial period. Monitoring and evaluation before and
after the trial will inform whether or not limits have achieved appropriate
speed reductions. 
It is estimated that the project will take up to two years to complete and
you can read about the key stages in the report which went to the

Page 36

Council’s Environment, Development and Infrastructure Committee in
December 2024:- 
Agenda for Environment, Development and Infrastructure Committee on
Thursday, 19 December 2024, 11:00 am - Argyll and Bute Council (item
10) 
Feedback from everyone is welcome and I would encourage to speak to
your local members regarding your area to allow them to feed into the
discussions. 
10.7 Roads and Infrastructure Service Review (RIS Review): The
Environment, Development and Infrastructure Committee in March were
provided with an update on progress and next steps in relation to the
Roads and Infrastructure Service Review (RIS Review).  The previous
update in December 2024 set out that a review of the Stage 1
recommendations had been completed and that the work required to
conclude Stage 2 of the review process would be completed shortly and
result in the development of a set of priority improvement actions with the
intention of delivering change in a phased and prioritised manner.   
The March report noted that Stage 2 of the RIS Review had now been
completed resulting in a programme of 12 priority improvement actions that
have been grouped into thematic workstreams – further information on these
priority improvement actions can be found in the link below.  
REVIEW OF ROADS AND INFRASTRUCTURE SERVICES -
UPDATE.pdf 
10.8 Active Travel: There are a number of active travel activities underway,
including the Lochgilphead Front Green to Crinan Canal Active Travel
Route – the Council has been asking for views on the latest design
drawings for a walking, wheeling and cycling route between Lochgilphead
Front Green and the Crinan Canal, this consultation closed on 15th April
2025.   
I would want to remind everyone that this work is being fully funded
through Transport Scotland’s Local Authority Direct Award Scheme. This
funding scheme was formerly known as Cycling Walking Safer Streets and
can only be used for active travel projects. The Council cannot use this
funding for other related activities – I often see comments on social media
about why the Council are pursing active travel projects and that this
money should be spend on other activities. That simply cannot happen,
this funding is ring fenced.  Without officers being successful in gathering
this funding, a number of the active travel schemes that have been
implemented and are in progress would simply not be able to happen.

Page 37

Further in relation to Active Travel, at the December Environment,
Development and Infrastructure Committee, Members agreed the draft
Active Travel Strategy and agreed to put it out for public consultation.   
The Scottish Government has committed to national funding for active
travel to speed up the delivery of new active travel infrastructure and
behaviour change projects. However, opportunities to secure a share of
this funding require local authorities to demonstrate a relevant and up-to-
date Active Travel Strategy and delivery plan as one of the key criteria. 
We strive to provide a network of high-quality routes suitable for safe
cycling and walking within each of our main towns that link people to
places of employment and education, shopping areas, leisure centres,
hospitals and other prime hubs. 
Over the last five years, the council has secured £9.4 million of external
funding to develop some of these networks across Argyll and Bute, many
of which are now in operation and are being well used by local
communities. In addition, we have successfully secured highly competitive
external funding to fund the staff costs of the active travel team doing the
work to progress these plans. 
A key part of developing viable active travel routes, however, is listening to
what our communities, residents and businesses need, and I would urge
as many people as possible to let us know their views on the draft strategy
by taking part in our consultation when it is launched this year.   
10.9 Dog Fouling: Back in 2021, the Council undertook a campaign in a bid to
encourage the public to pick up after their dogs – again, we are calling for
dog owners to be responsible and pick up after their pups.  We know most
people clean up after their dogs, however we want to remind the small
minority of people who don’t that this just isn’t acceptable, particularly
when they let their dogs foul in areas where children play.  It’s a potential
health hazard, and it can be particularly unpleasant for wheelchair users
and other people with disabilities. I’m sure if more people considered the
effect not picking up after their dog has on others, they would be more
considerate. And remember, bagging it then leaving the bag on a tree or a
bush is not acceptable either.  The Council’s website has lots of
information about how to be a responsible dog owner, including
information on dog fouling and its consequences. There are also posters
you can download and use on community notice boards and farms to
remind people they are responsible for their dogs.   
Under the Dog Fouling (Scotland) Act, people responsible for a dog who
do not move to clear up after the animal can be fined £80 on the spot. The

Page 38

fines can be handed out by the environment wardens, some other Council
officers and the Police. 
I know communities feel really strongly about this issue. We want to do
something about it but we all need to act together. The Council has limited
resources so we need to target them effectively – knowing where and
when to send out our wardens would be helpful. If we have the evidence
we need to take appropriate action, we will.   
I was pleased to see on social media the Tarbert Academy Primary and
Early Level pupils campaign where they prepared an appeal to the
community for people to stop allowing their dogs to use the football pitches
– pupils did very well in their promotion of this campaign and are clearly
very proud of their area and want to be able to use all of the facilities – this
is the type of issue that irresponsible dog owners impact.   
To help us tackle the problem, and report instances of dog fouling, please
call 01546 605514 or visit the Council website. 
10.10 Strathclyde Concessionary Travel Scheme fares increase: Argyll and
Bute Council’s strategic Environment, Development and Infrastructure
Committee, for which I’m the Chair, at its meeting in December 2024,
resolved unanimously to request that I write to the First Minister of
Scotland to express our concerns about the disproportionately negative
impact of the above on the elderly and vulnerable people living in our rural
and island communities. 
I have expressed my concern to the First Minister that the new fare
structure approved by the Strathclyde Concessionary Travel Scheme
(SCTS) Joint Committee will mean that those vulnerable and elderly
transport users face an increase of 165% for rural train and ferry journeys. 
The latter is particularly concerning given that many of this particular user
group will often have to travel frequently to access health and social care
services on the mainland where there are no local options available to
them. 
An increase of this level, 165%, is deeply concerning especially in the
context of vulnerable people with no other alternatives and when it applies
to lifeline ferry services. 
People living in Argyll and Bute’s rural and island communities are
demonstrably exposed to higher overall living costs and more likely to
experience additional pressures like fuel poverty.  It will be very
challenging indeed for vulnerable and elderly people to have to find ways
to cope with significantly increased costs for essential travel.  The risks if

Page 39

they feel unable to travel due to unaffordability are serious in terms of
overall health, wellbeing, isolation and more. 
We are mindful of the pressures on all public agencies at the moment, but
this cannot be at the risk of the wellbeing of our most vulnerable residents
nor indeed on our already fragile local communities who depend on
transport links that are accessible at all levels, including that of cost. 
We are asking that the Scottish Government explores scope to provide
additional funding for the Strathclyde Concessionary Travel Scheme which
will first and foremost support older and vulnerable people to be able to
afford the travel they need, but which would also allow a phased approach
to pricing rather than the immediate imposition of such a steep increase. 
10.11 Winter Plans and moving into Spring/Summer: I would also like to
thank our hard-working staff on the ground who, year in year out, come to
work in difficult conditions, to make sure the rest of us can get to our daily
commitments as safely as possible.  You will now see staff carrying out
grass cutting and other maintenance works across the area as we head
into Spring.   
10.12 Highlands and Islands Airports (HIAL) and HiTRANS: I am having
regular meetings with HIAL and HiTRANS in my role as Policy Lead – I
am on a learning curve in terms of learning more about the great services
that they deliver and have been enjoying the journey so far, I find these
meetings really informative.  It has been great to see the HIAL set up
forums for each of our airports, and I attended the first meeting of
Campbeltown Airport, it was great to see a good turnout at the meeting.   
10.13  Surveys and Reviews:  
Bus Travel Survey: The Council are looking to hear about your 
experiences of travelling by bus, your views on local bus services, what
would make bus travel more appealing and therefore make the bus
services more sustainable in the future – please do take the time to look at
the survey and have your say – the survey closes on 30th April 2025 Bus
travel survey | Argyll and Bute Council 
Second Domestic Bin Review: At the December EDI Committee, the
Council committed to carry out a consultation exercise regarding second
bins and the criteria that should be considered for these. The Council is
seeking your views on what you think about current arrangements for
second green bins, and any changes we could make in the future to help
us recycle more. The consultation is live on the Council’s website until 15th
May and I would encourage everyone to take some time to respond. 
Consultation on second green bin collections | Argyll and Bute Council

Page 40

11. CONCLUSION 
11.1 This report provides members with an update on each of the Policy Lead
portfolios. Policy Lead Councillors will be happy to discuss any particular
issues with colleagues as required. 
Argyll and Bute Council – Policy Lead Councillors Report – 11th April 2025 
For further information please contact Aileen McNicol, Leadership Support and
Member Services Manager, telephone 01546 604014 or email
aileen.mcnicol@argyll-bute.gov.uk