Item 5 - William Hill Layout Plan - A3 Required for Hard Copy
West Dunbartonshire Council · 10 January 2023
Back to Licensing Board — 10 January 2023 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
shelf shelfshelfLUCKY 6EBTV GANTRY (furniture plotted indicatively) shelf GROUND FLOOR PROPOSAL NO ACCESS ASSUMED LAYOUT STOPCOCK MOE KITCHEN STORE WC WC ELECS RSDRAMP RSD STORE WC ACCESSIBLE AREA STAFF shelf matwell LVT gantry carpet LVT price finder COUNTER AREAS CUSTOMER AREA FCH2750 SCH5750 Lucky 6 is able to be relocated closer to coffee tables if needed SSBT Gaming Machine Gaming Machine Gaming Machine Gaming Machine SSBT SSBT SSBT SSBTSSBT shelf( 3no. BDSDs ) r/p 1 r/p 2 r/p 3 SSBT 2no. 75" digital screens SSBT Anything shown on this plan which is required by Regulations 4(2) and 4(8) of the Gambling Act 2005 (Premises Licences and Provisional Statements) Regulations 2007, is for illustrative purposes only and does not form part of the premises licence. Betting Area Shown Hatched Total Floor Space 203 m/sq 2186 ft/sq REV:DRAWING No: DRAWING: SCALE: DRAWN: DATE: CONTRACT: REVISIONS: ampersand 3 The Stables Cannons Mill Lane Bishops Stortford Hertfordshire CM23 2BN t: 01279 505023 e: amp@ampersand-associates.com w: ampersand-associates.com commercial architectural design. and then some Notes: Whilst every care has been taken to ensure the accuracy of this survey, due to the age of the premises, non-exposure of the structure, occupancy, building methods & materials used, some assumptions have been made necessary. Specific areas must be checked on site prior to manufacture of fittings, ordering of materials & equipment & commencement of building operations. Any conflicting information found on the drawing must be reported for clarification. Under the 'control of asbestos regulations 2012' for buildings constructed before 2000, the building owner / tenant is legally obliged to manage the asbestos content within the premises. This is accomplished with an asbestos survey which will identify & make recommendations on how to manage any asbestos found. This specialist survey is not within the remit of Ampersand Associates Ltd & the client is strongly advised to check if there is already a suitable report available. If not, a 'Management' asbestos survey should be instigated by the client to cover the entire building, with a further 'Refurbishment & Demolition' survey being carried out, targeting all areas affected by any proposed works by a registered UKAS company. These surveys are to be made readily available prior to any operations commencing. All drawings produced adopt the principles of prevention in accordance with CDM2015 regulations. Hazards where foreseen have been considered and either designed out or managed where feasible. Any and all associated 3rd party drawings and designs must also take into account the CDM2015 principles of prevention as part of their production. By agreeing to the fee offer, the Client purchases raster & hard copies of the drawing only. Ownership of the vector files remains with Ampersand Associates Ltd & permission to distribute may be witheld. 'Design to Delivery & more' Brand Concept - Strategic Brand Design - Refurbishment & Regeneration Layouts - Measured Surveys - Acquisition Condition Reports - Merchandising & Store Layout - Commercial Design; Architectural, Interior, Exterior, Point of Sale, Fixtures & Fittings, Graphics, Visualising + Perspective Work, Value Engineering & Space Planning · Delivery of New Spaces - Building & Topographical Surveys - New Building Design - Approvals, Consents, Licenses, Party Wall Awards - Tender Procurement - Full Project Management; Project Review, Cost Evaluation, Quality Assurance, Successful Handover · CDM Consultants; Fire Risk Assessments, DDA Access Reviews - Dilapidation Surveys & Schedules of Disrepair - Energy Assessors; Planning Environmental Design. WILLIAM HILL 33 Sylvania Way South Clyde Shopping Centre Clydebank G81 1EA Licencing Drawing: 1:100 @ A3 June 2022 JP / AutoCAD LT22 8232_10 A Health & Safety The contractor's attention is drawn to their responsibility to ensure the safety and well-being of both site operatives and the public during the course of the building works. Any site works should be carried out in accordance with CDM regulations 2015 and the current health & safety guidelines & relevant building regulations. The appointed contractor is responsible for ensuring adequate temporary props are provided to ensure the stability of the existing building during any structural works. Structural Engineer to confirm all propping works. Prior to any demolitions or any modifications of the existing solid or suspected load bearing frames, an inspection is to be carried out by a certified approved Structural Engineer to ascertain whether the walls are structural or otherwise. All care is to be taken when demolishing any existing walls. SCALE 1:1250 0m 5m 10m 20m 30m 40m 50m 100m LOCATION PLAN 1 : 1250 scale