ARGYLL AND BUTE COUNCIL  COUNCIL
DEVELOPMENT AND
ECONOMIC GROWTH
26th  JUNE 2025
HOUSING EMERGENCY – WORKER ACCOMMODATION PROPOSALS - ISLAY 
1.0 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide information on a worker
accommodation proposal in Bowmore on Islay to enable essential HSCP
services to be delivered to our communities and to request Strategic Housing
Fund grant to support this proposal. 
1.2 The report confirms the requirement for the Council to work with partners to
enable an innovative housing solution using an existing building in Bowmore,
Islay. 
RECOMMENDATIONS 
It is recommended that Council:-
i. Approve a grant of up to £145,000 from the Strategic Housing Fund to
enable an NHS property in Bowmore, Islay to be brought back into use for
HSCP staff delivering health and social care services on the island. This
contribution will be match funded by the NHS.

Page 2

ARGYLL AND BUTE COUNCIL  COUNCIL
DEVELOPMENT AND
ECONOMIC GROWTH
26th  JUNE 2025
HOUSING EMERGENCY – WORKER ACCOMMODATION PROPOSALS - ISLAY 
2.0 INTRODUCTION 
2.1 As the strategic housing authority for Argyll and Bute, the Council has a statutory
duty to assess the need and demand for housing in the area and to ensure that
any unmet need for housing is addressed through the Local Housing Strategy
(LHS) and the Strategic Housing Investment Plan (SHIP). 
2.2 The Council declared a housing emergency in June 2023. One of the main issues
identified was the lack of worker accommodation in Argyll and Bute. If the lack of
worker accommodation is not addressed there will be a serious impact on the
general economy but more specifically there will be a risk that essential health
and social care services will not be delivered in communities across the local
authority area.
2.3 A housing summit took place in Oban on 27th November 2024. The 4 broad
themes of the summit focused on the delivery of more market homes, the delivery
of more affordable housing, the delivery of more workforce housing and how
partners make best use of existing housing. The proposal in this paper will help to
tackle the issue of delivering more workforce homes through bringing a property
back into use in an area of high demand for housing. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Council :-
i. Approve a grant of up to £145,000 from the Strategic Housing Fund to
enable an NHS building in Bowmore, Islay to be brought back into use for
HSCP staff delivering health and social care services on the island. This
contribution will be match funded by the NHS. 
4.0 DETAIL 
Background: The Housing Situation on Islay 
4.1 There are around 1962 homes on the island, of which 14% are deemed
ineffective in terms of meeting local needs, i.e. 192 are second/holiday homes

Page 3

and a further 82 are empty/long term unoccupied. In addition, there are also
currently 203 self-catering units on the island. 
4.2 ACHA, West Highland Housing Association and Trust Housing Association
currently provide 480 properties for social rent on the island; which amounts to
24% of the total dwelling stock or 28% of the occupied stock. 
4.3 Affordability on the open market remains a significant issue for local residents.
The average archived house price on Islay for the last 12 months is £268,947
which would require a household income of £76,842 to be considered
affordable. 75% of residents on the island cannot afford to purchase on the
open market; and therefore require alternative affordable options such as social
rent and shared equity. 
4.4 Expressed demand for RSL housing is registered via the HOMEArgyll waiting
list, and currently there are 202 active applicants with lslay as first or second
area of preference. 142 of the 202 applicants have been awarded housing need
points (HOMEArgyll Waiting List, May 2024). Turnover of social rented property
has been relatively low on the island resulting in a pressure ratio of 6 applicants
to every allocation rising to 7 applicants for every allocation of a 1 bedroom
property. 
4.5 The HSCP have indicated that health and social care services are being impacted
significantly on Islay due to lack of housing options for staff. HSCP have set up a
working group with a focus on accommodation for staff on Islay. There is a risk
that the HSCP will not be able to recruit staff to live on the island to provide care at
the care home and care in the community. There is a risk that the existing
health and social care facilities on the island will not be able to be utilised to
capacity if the worker accommodation issue is not addressed. 
Solution 
4.6 The Strategic Housing Fund grant will enable the HSCP to bring an NHS
owned empty building back into use. The empty building is a former dental
surgery in Bowmore. The funding will deliver a 2 bedroom property for HSCP
staff or staff from other organisations contracted by the HSCP to deliver health
and social care services on the island. This is an innovative approach which
makes best use of existing buildings on the island. 
4.7 This former dental surgery in Bowmore has been identified as surplus to
requirements by NHS Highland and could be redeveloped for the provision of
HSCP worker accommodation to help address the urgent shortage of housing
on Islay for HSCP staff. A costing exercise of various design options was
carried out in June 2024 to inform decision making with the assistance of IDP
Architects and Allied Surveyors Scotland.   This included consideration of
demolition and new build.  The option appraisal concluded that conversion of
the property, with a total project cost of £239,200, was considerably more
cost efficient.  Moreover, given the HNS consenting process required for
demolition, it will produce a significantly quicker solution with less
development risk, an important consideration given the pressing HSCP need. 
The proposed conversion option has been granted planning consent.

Page 4

5.0  CONCLUSION 
5.1 The Committee is asked to approve the recommendation to award a grant of
£145,000 from the Strategic Housing Fund, with the purpose of enabling the delivery
of worker accommodation on Islay which will provide a 2 bedroom worker
accommodation property. The Strategic Housing Fund was created to allow for
allocations in support of priority projects emerging from the Local Housing Strategy
and the requirement to address the shortage of worker housing is not only identified
within the Local Housing Strategy but has emerged as a key priority in addressing
the Housing Emergency which was declared in Argyll and Bute in June 2023. 
6.0 IMPLICATIONS 
6.1 Policy – The proposal is consistent with current Council policy which supports the
Local Housing Strategy vision and outcomes which are directly aligned to the
overarching objectives of the Outcome Improvement Plan. The proposal does
exceed the designated Officer approval for use of the Strategic Housing Fund to
enable the delivery of affordable housing which is £12,000 per unit. 
6.2 Financial – There are sufficient funds in the Strategic Housing Fund to support the
proposal. 
6.3 Legal – None. 
6.4 HR – None. 
6.5 Customer Service – None. 
6.6 Risk – there is a risk of depopulation, damage to the economy, a risk to delivering
essential services if partners cannot effectively tackle the Housing Emergency. 
6.7 Climate Change – making best use of existing stock by bringing empty properties
back into use and installing energy efficient measures helps towards achieving
climate change targets. 
6.8 Fairer Scotland Duty – the delivery of housing opportunities  across Argyll and Bute
facilitates socio-economic opportunities for all.  
6.9 Equalities – protected characteristics – the activity outlined in the report is consistent
with the aims and objectives set out in the Local Housing Strategy which is subject to
an EQIA. 
6.10 Consumer Duty – this housing project delivers opportunities for affordable
accommodation and will enable key workers to deliver services. 
6.11 Island Communities – this project delivers housing on an island within Argyll and
Bute. 
6.12 Children’s Rights and Wellbeing – the delivery of this worker housing assists in the
delivery of key health service to children. 
Kirsty Flanagan, Executive Director with responsibility for Development and
Economic Growth

Page 5

Policy Lead for Housing – Councillor Jim Lynch 
May 2025 
For further information contact: 
Fergus Murray – Head of Development and Economic Growth
Fergus.murray@argyll-bute.gov.uk 
Matt Mulderrig – Development Policy and Housing Manager
Matt.mulderrig@argyll-bute.gov.uk 
Douglas Whyte – Team Lead Housing Strategy
Douglas.whyte@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Photos of existing building, current layout and proposed layout

Page 6

Appendix 1 
e
f
b d c
g
a
Photo Reference Key
1 : 500 
Note: Photos are a mix of Google Street View and archive
information, therefore accuracy cannot be guaranteed. 
Rev Date Description 
IDP Architects LLP 
Project
Studio 1, Doges
Templeton on the Green
62 Templeton Street
Glasgow G40 1DA
Telephone 0141 550 4014
www.idparchitects.co.uk
Drawn Checked
2 Bed Staff Residences
Birch Drive, Islay
NHS Highland
Drawing Title
Site Photos 
Drawing No.
22023 01
JB
Date
15.06.22
Cad Ref 
Rev
GB 
Scale@A3
1 : 500
c d
a b
e f g

Page 7

No embedded text on this page.

Page 8

Surgery 1
12.4 m²
Recep/Waiting Room
8.1 m²
Surgery 2
12.4 m²
Entrance Corridor
4.1 m²
Kitchen
5.8 m²
Recption/Office
9.0 m²
High level window   
1
Existing Plan
1 : 50 
Rev Date Description 
IDP Architects LLP 
Studio 1, Doges
Templeton on the Green
62 Templeton Street
Glasgow G40 1DA 
Telephone 0141 550 4014
www.idparchitects.co.uk
Project Drawn Checked
2 Bed Staff Residences
Birch Drive, Islay
NHS Highland
Drawing Title
Location Plan & Existing Floor Plan
JB GB
Date
15.06.22
Cad Ref 
Location Plan
1 : 1000 Dra
win
g
No.
2202
3 02
12

Page 9

Rev Scale@A3
As indicated

Page 10

Bed 2
12.0 m²
En-suite
4.0 m² 
Bed 1
12.5 m² 
ND 
ND ND 
ND
Entrance Hall
3.6 m² 
Kitchen
5.2 m² ND
Utility
3.0 m²  NED 
Proposed 3D 
A 17.08.22 En-suites added to both bedrooms
Rev Date Description 
ND New 30 mins rated internal fire door
IDP Architects LLP 
Studio 1, Doges  Telephone 0141 550 4014
NS New 30 mins rated glazed screen Templeton on the Green
62 Templeton Street
NED New external door 
Project    Drawn Checked
New partition
Demolished element
2 Bed Staff Residences
Islay Hospital
NHS Highland 
Proposed Plan & 3D 
Drawing No.
22023 03
JB
Date
15.06.22
Cad Ref 
Rev
A
GB 
Scale@A3
As indicated
Glasgow G40 1DA www.idparchitects.co.uk
ND 
High level window 
Proposed Plan
1 : 50
Room Schedule
Name Area Comments 
Bathroom Not Placed Room fitted with new fixtures & fittings
Bed 1 12.5 m² 
Bed 2 12.0 m² 
En-suite 4.0 m² 
En-suite 4.4 m² 
Entrance Hall 3.6 m² 
Kitchen 5.2 m² Room fitted with new kitchen fixtures & fittings
Lobby 0.9 m² 
Sitting Area 8.4 m² 
Store Not Placed 
Utility 3.0 m² Room fitted with new fixtures & fittings 
Drawing Title