Democracy Spraffa

Housing Emergency - Empty Homes and Worker Accommodation Project

Argyll and Bute Council · 26 June 2025
Back to Argyll and Bute Council — 26 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ARGYLL AND BUTE COUNCIL     COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH  26 JUNE 2025     
HOUSING EMERGENCY – EMPTY HOMES AND WORKER ACCOMMODATION
PROJECT 
1.0 EXECUTIVE SUMMARY  
1.1 The main purpose of this report is to provide members with progress on a
project funded by Shelter and the Health and Social Care Partnership (HSCP)
which aimed to identify empty properties and bring them into use for HSCP
workers, and to seek funding to continue the post. 
1.2 The report provides examples of empty properties which have been identified
and brought back into use for HSCP workers. The report also provides
examples of workers being matched to available properties in the local
authority area to enable them to take up key positions within the HSCP. 
These are tangible successes in ensuring the provision of accommodation for
key workers. 
1.3 The project funding comes to an end in September and the HSCP no longer
have available funding.  However, to build on the work achieved to date
Shelter has offered to continue to part fund the post for another 2 years
widening the scope of the post beyond the HSCP to other public and private
sector employers, if the Council can match fund. The post has objectives which
are in line with 2 of the 4 high level actions within the Argyll and Bute Housing
Emergency Action Plan – Enable the Delivery of More Homes for Argyll
and Bute’s Workforce and Make the Best use of Existing Homes in Argyll
and Bute. 
RECOMMENDATIONS 
It is recommended that Council:- 
i) Consider the content of the report;
ii) Approve £60,000 of Strategic Housing Fund to match fund the Shelter
contribution for the 2 year extension to the post to cover all employers in
Argyll and Bute.

Page 2

ARGYLL AND BUTE COUNCIL     COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH  26 JUNE 2025     
HOUSING EMERGENCY – EMPTY HOMES AND WORKER ACCOMMODATION
PROJECT 
2.0 INTRODUCTION 
2.1 In September 2023 Housing Services appointed an Officer to identify empty
homes which could be used for Health and Social Care Partnership (HSCP)
workers taking up employment in Argyll and Bute. The post was jointly funded
by Shelter and the HSCP for a 2 year trial period, but the HSCP no longer have
continued funding. 
2.2 The objectives of the post fits with 2 of the 4 high level actions within the Argyll
and Bute Council Housing Emergency Action Plan:- 
• Enable the delivery of more homes for Argyll and Bute’s Workforce
• Make the best use of existing homes in Argyll and Bute 
2.3 The post has been a tangible success in providing accommodation for key
workers, which is outlined in section 4 of the report.  The post holder received a
commendation for her work at the National Empty Homes award in the
Outstanding Contribution category. 
2.4 Shelter has offered to match fund the post for another 2 years with the objective
of building on the work already carried out and widening the scope of the post
beyond the HSCP to other public and private sector employers. This is a key
opportunity to continue to facilitate accommodation for key workers. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Council:- 
i) Consider the content of the report;
ii) Approve £60,000 of Strategic Housing Fund to match fund the Shelter
contribution for the 2 year extension to the post to cover all employers in
Argyll and Bute   
4.0 DETAIL 
4.1 This section of the report provides detail on a wide variety of activity which has
been driven by the Empty Homes Project Officer over the last two years and

Page 3

demonstrates the tangible direct benefit that has been achieved.  Particularly
outlined are: 
• the major refurbishment projects linked to the post which have, or will,
enable empty homes to be brought back into use for HSCP workers;
• the facilitation of coordinated activity to better achieve results; 
• direct engagement with the social rented and private rented sector; and,
• direct engagement with staff to enable accommodation options to be
provided. 
4.2 Coll – Doctor and Nurses House 
The Doctor and Nurses houses on Coll were both long term empty properties
for approximately seven years.  These two properties required major
renovation and restoration. By securing Strategic Housing Fund funding,
these properties are currently in a programme of works, the Nurses House is
complete (Appendix 1) and the Doctor’s house to be completed shortly.  They
will accommodate the local GP and other health and social care workers.   
4.3 Dunallan – Connel 
Dunallan (Appendix 2) is situated in Connel village, and is a large standalone
property owned by ACHA.  Dunallan has been long term empty since 2018.  A
project team is in place with plans drawn up to renovate to a four bedroom
House of Multiple Occupancy, this has Strategic Housing Fund funding of up
to £200,000 already approved.  On completion this property will accommodate
workers to carry out health and social care services throughout the Oban
area. 
4.4 Tigh A Ruhda Flat – Tiree 
To accommodate staff on Tiree and enable a high standard of care within
Tigh A Ruhda Care Home (Appendix 3), the long term unoccupied flat has
now been brought back into use with assistance from Strategic Housing Fund. 
This will enable two HSCP staff to take up occupation on the island. 
4.5 Former Dental Surgery – Bowmore, Islay 
The NHS Dental Surgery in Bowmore has been closed for several years.  It
has been identified as a suitable building for a Change of Use to form a two
bedroom short term accommodation for workers coming to the area
temporarily, or as launchpad accommodation. It is in close proximity to the
Hospital and Care Home in Bowmore. Plans have been submitted for the
Change of Use (Appendix 4).  Conversion of the dental surgery is a cost-
effective use of redundant property for the HSCP and will assist with
relocation of permanent workers to Islay.

Page 4

4.6 Islay Accommodation Group 
The Islay Accommodation Group was borne out of a need to have all
stakeholders and Housing Associations working together to source
accommodation, mainly for agency workers, coming to the island to work in
Gortanvogie Care Home and Care in the Community.  Currently there are
approximately seven agency workers in Short Term Lets.  By giving the option
of HSCP provided short term shared accommodation, there is a significant
reduction of costs. It is also crucial to move away from dependency on short
term let accommodation as that type of accommodation is not always
available in peak holiday seasons, thus putting at risk the delivery of essential
health services. Moreover, the level and location of accommodation is un-
predictable, and providing certainty in the provision of accommodation is
crucial to encouraging agency staff to return to the area. Following joint
working with Trust Housing Association and Argyll Community Housing
Association, the HSCP now has two properties it can use to address these
issues. 
4.7 Registered Social Landlord (RSL) Sector 
ACHA - Lennox Street, Port Ellen 
Two bedroom flat owned by ACHA is situated in Port Ellen (Appendix 5),
Lennox Street is decorated and furnished to a basic standard.  This will
accommodate two Care in the Community staff working within the community
of Port Ellen. 
Trust Housing Association - Donald Caskie Square, Bowmore 
Three bedroom flat owned by Trust Housing Association in the main village of
Bowmore.  This property is central to all areas of Islay.  Once furnished it will
be suitable as a two bedroom short-term accommodation for staff who are
working in the wider community of Islay and within the Care Home or Hospital. 
4.8 Private Rented Sector 
A property owner on Islay approached the Empty Homes Officer offering their
furnished house knowing the challenges of housing and recruitment on the
island.  Assisting the owner through Landlord Registration, the property is now
available to accommodate two workers who were previously in costly Short
Term Lets. 
A property investor in Dunoon made contact with the Empty Homes Officer
stating they had significantly refurbished a property and were looking to house
an HSCP Worker. An e-mail with details was issued to Managers and Team
Leaders with all information regarding the lease.  A Mental Health Assistant is
now a long-term resident in the property. 
Private Landlords who previously had HSCP staff leasing their properties also
make contact giving first offer on their property.  By making use of the

Page 5

Enabling Budget, the property can be secured temporarily, and an e-mail is
issued with the details of the property. 
4.9 Direct Employee Assistance 
In addition to enabling major refurbishment projects and working with RSLs
and the private rented sector to secure specific properties in areas of high
demand the project worker has pro-actively engaged with HSCP staff and
matched them to accommodation opportunities across the local authority
area. The tables below provide evidence of that work along with testimony
from partners including staff and landlords. 
Table 1: Specific Case Examples  
Job Title Area Support
Occupational
Therapist
Campbeltown Relocation from NZ. Flat sourced undergoing
renovation. Liaising with Landlord and OT.
Agreement on lease made and deposit paid from
discretionary funding. 
Team Lead Mid-
Argyll/Campbeltown
Assisted Team Lead based in Mid-Argyll.  No
suitable properties. Discussed options as a
hybrid/commute from Campbeltown. Put in touch
with new landlord I had provided advice, supporting
both Team Lead and Landlord in the process.  He
has now secured a long term rental within his
required budget. 
Care Worker Islay Care Worker resident in shared short term
accommodation with a minimal rental budget, non-
driving and working in the hospital.  Working with the
Housing Association he was offered a tenancy,
however, due to bereavement, had to leave the
country suddenly. The tenancy was secured by use
of discretionary fund and on return he took up
occupation and continued his role within the hospital
and integration in the community. 
Agency Dialysis
Nurse
Campbeltown Locating to cover renal unit, temporarily in an Air B
and B significantly out of town. Supporting in
viewing, liaising with letting agent with initially
teething issues, lease signing and furnishing
property.  Community support was fantastic with
social media requests.
Care Home
Manager
Islay Much needed permanent care home manager
resident in short term accommodation, provided with
Housing Options and advice, she then successfully
secured a tenancy with RSL. 
Mental Health
Nurse
Islay Relocating back to Islay, no issue with location.  An
owner had been in contact from outlying village. 
Negotiating rent and paying a period of time prior to
MH Nurse lease commencing to secure property.

Page 6

Has now gone on to purchase house.  Owner has
been in contact to offer house again. 
Mental Health
Support Worker
Dunoon Owners of a refurbished property in contact offering
to HSCP.  With all information, this was circulated to
team leads by e-mail.  The MHS Worker contacted
the owners and quickly secured their tenancy.
Owners have been back in contact asking for advice
out with location.  Therefore, putting in touch with
other EHOs. 
Radiographer Mid-Argyll In temporary accommodation, on initial contact
provided Home Argyll information and advice.  They
went on to be successful in securing a tenancy with
RSL. 
Social Worker Relocation Assisted and secured accommodation in another
area of Argyll. Also providing housing advice and
options. 
Table 2: Client Testimony 
Additional Information
OT Quote – “Isla made contact early on in the relocation and having her assistance to find, screen
& visit possible tenancies was massively supportive. This reduced the unknowns I was dealing with,
and was especially helpful given that I was in New Zealand. Also Isla liaising with my future landlady
helped enable me to secure a tenancy in a timely manner which meant I didn't have to scrabble
around trying to find somewhere when I arrived.  This felt like a streamlined and supportive process
for my relocation from NZ to Campbeltown.”
Landlord Quote – “We didn't realise the project Isla works with existed, this is a great way to help
people locating to Campbeltown for much needed jobs within the NHS. Isla has been great with
communication between myself and our new tenant *****. Hopefully we'll be able to work with Isla
again in the near future. “ 
Team Lead Quote – “Isla has been absolutely superb since my first interaction with her, kind,
knowledgeable and easy to speak with.  If it was not for the support I was given by Isla I would not
have been able to experience living and working in this wonderful part of Scotland.”
Landlord Quote – “My wife and I would personally like to thank you for all your work and expertise
in helping us to find a suitable tenant for our property. You went to great lengths in keeping us right
and advising us through till the end. Very much appreciated and will always be looking at you in the
future for advice.”

Page 7

Support Worker Team Lead Quote – “I would just like to say a big thank you from me as Senior
Charge Nurse for Islay Hospital for all your support and help with arranging and securing the
tenancy for one of my HCSW's. Accommodation on Islay is very difficult to find and afford and this
impacts on our ability to recruit staff to the island. Isla was a huge asset in being able to find suitable
accommodation and negotiate and secure a tenancy for our worker. This resulted in some job
security for the staff member and a commitment to stay on the island and continue his employment
and development. It is extremely difficult to find the time to look at the options available and navigate
the housing applications and systems. Having Isla in post made this so much easier for all
concerned. Having a contact to assist staff would hopefully improve our ability to recruit to posts on
the island.” 
Housing Association Quote – “The accommodation group meetings we have been having with NHS,
Argyll & Bute Council and other RSL’s have been very informative, giving us an insight into the
struggles of individuals finding permanent accommodation on Islay.  I worked alongside Isla Binnie,
Empty Homes Officer to secure a tenancy for Mr ******.  Sadly, Mr **** was unable to take on his
tenancy straight away.  Working with Isla meant that Mr **** was able to continue working within the
island community and ensure his tenancy was secured when he returned to the island.  Without her
assistance, we would have been unable to hold the property for Mr *****. 
We have also been liaising regarding another of our Empty Homes in Bowmore which are now in the
final stages of discussions.  This will be a lease between ourselves and Argyll & Bute council for their
employees on the island.” 
Support Worker Quote - I am very great full and happy with the level of support you gave to me
while securing my tenancy with Trust Housing.  You were forth coming with updates every week and
you were amazing with getting me settled especially as the offer came when i wasn't entirely ready.
But I was offered favourable options which enabled me to take the house offer and easily get
settled. Thank you once again for all your efforts. 
Dialysis Nurse Quote – “Isla had been very supportive and was never too busy to assist me  
Thank you Isla, I am settling in nicely. So grateful. Thank you for making all of this possible.” 
Area Manager Kintyre & Islay – “Within Campbeltown Hospital there is a small renal dialysis unit.
Service delivery was paused in November 2024 due to ongoing difficulties staffing the unit and a
decrease in need for the service locally.  Early in 2025 the local need increased again and planning
to restart the service began.  There was no scope for staffing the unit locally so it was agreed that
non local staffing models would be explored.  We were fortunate to find an experienced renal nurse
willing to move to Campbeltown.  The support of Isla Binnie, EHO, was invaluable in helping this
nurse source accommodation, navigate the lease process and furnish the property.  All of this was
done within a tight time frame and enabled the nurse to relocate quickly and commence work in
what is a highly valued local service.” 
5.0 CONCLUSION 
5.1 The report demonstrates the success which can be achieved by having a
dedicated worker co-ordinating resources across Argyll and Bute. This has led

Page 8

to empty homes being brought into use, RSL’s offering tenancies in identified
areas of need, and private landlords engaging and offering properties for let
which may have otherwise been lost to the short term let market.   
5.2 Extending the Empty Homes and Key Workers project to all sectors of the
employment industry in Argyll and Bute will be key to delivering on the agreed
actions within the Housing Emergency in relation to delivering more homes for
Argyll and Bute’s workforce and making best use of existing homes. 
6.0 IMPLICATIONS 
6.1 Policy – the ongoing activity in the report is consistent with current Council
priorities and the Local Housing Strategy vision and outcomes which are
directly aligned with the overarching objectives of the Outcome Improvement
Plan – Outcome 2: Housing. 
6.2 Financial – the financial request is from the Strategic Housing Fund – this is a
ring fenced budget for housing activity – there is sufficient capacity in the
budget to meet the financial request in the report. 
6.3  Legal – none. 
6.4  HR – none. 
6.5 Customer Service – none. 
6.6 Risk – there is a risk of depopulation, damage to the economy, a risk to
delivering essential services in the local authority area if partners cannot
effectively tackle the Housing Emergency. 
6.7 Climate Change – making best use of existing stock by bringing empty
properties back into use and installing energy efficiency measures helps
towards achieving climate change targets. 
6.8  Fairer Scotland Duty - the delivery of housing opportunities across Argyll and
Bute facilitates social-economic opportunities for all. The activity in the report
links to the Child Poverty Strategy. 
6.9  Equalities – protected characteristics – the activity outlined in the report is
consistent with the aims and objectives set out in the Local Housing Strategy
which is subject to an EQIA.. 
6.10 Consumer Duty - the housing projects detailed in the paper deliver essential
affordable accommodation and will enable key workers to deliver services. 
6.11  Island Communities – many of the housing projects detailed in the report are
being delivered on the islands which will provided many benefits such as
employment and the continued delivery of essential services to island
communities..

Page 9

6.12 Children’s Rights and Wellbeing – the delivery of more housing options for
HSCP and other workers will enable more children to have a safe secure
environment. 
Kirsty Flanagan – Executive Director with Responsibility for Development and
Economic Growth 
Council Leader Jim Lynch – Policy Lead for Economic Development, Islands,
Rural Communities and Housing 
April 2025                                                  
For further information contact: 
Fergus Murray – Head of Development and Economic Growth
Fergus.murray@argyll-bute.gov.uk 
Matt Mulderrig – Development Policy and Housing Manager
Matt.mulderigg@argyll-bute.gov.uk 
Douglas Whyte – Team Lead – Housing Strategy
Douglas.whyte@argyll-bute.gov.uk

Page 10

APPENDICES 
Appendix 1 – Coll NHS houses
Appendix 2 – Dunallen, Connel
Appendix 3 – Tigh An Rhuda, Tiree
Appendix 4 – NHS Dental Surgery, Bowmore
Appendix 5 – Lennox Street, Port Ellen

Page 11

Nurses House Refurbishment Upgrades 
Appendix 1 – Coll NHS houses 
NHS Highland
Isle of Coll, Nurses House Refurbishment
Upgrades Value £ 170K 
Refurbishment Upgrade of existing semi-
detached nurse accommodation 
Design scope covered full external and
internal refurbishment of existing
property.
External works: New roof, external wall
additional insulation, with roughcast
render, new external windows and
fencing.
Internal works included new bathrooms,
kitchen, new fire doors, flooring and
decoration.

Page 12

Nurses House Refurbishment Upgrades 
Nurses House Refurbishment Upgrades 
Before: Front elevation. After: Front elevation with new roof, windows, insulation/ render
and fencing.

Page 13

Before: Existing kitchen After: New kitchen

Page 14

Before: Bathroom After: New shower room

Page 15

HSCP EMPTY HOMES PROJECT APPENDIX 2 
Dunallen, Connel – ACHA 4 bedroom property to be refurbished to
accommodate an HMO style suitable for four people.

Page 16

HSCP EMPTY HOMES PROJECT APPENDIX 3 
Tigh An Rhuda, Tiree – Flat which adjoins the care home now refurbished to
accommodate workers to carry out their role within the care home.

Page 17

HSCP EMPTY HOMES PROJECT APPENDIX 4 
NHS Dental Surgery, Bowmore – Unused dental surgery subject to planning to
be converted to short term accommodation for two workers.

Page 18

HSCP EMPTY HOMES PROJECT APPENDIX 5 
Lennox Street, Port Ellen – 2 bedroom ACHA property in Port Ellen, which has
been basic furnished and suitable to accommodate two workers short term to
carry out their role in the community.