Page 1

ARGYLL AND BUTE COUNCIL       COUNCIL 
EDUCATION                               26 JUNE 2025 
EDUCATION REPLACEMENT DEVICES 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to present information regarding devices which
are not currently included in the Computer Rolling Replacement Programme
(CRRP) and to seek agreement for funding to bring all school devices into a
sustainable replacement programme. 
1.2  At present, devices within the Computer Rolling Replacement Programme
(CRRP) are replaced every five years.   
1.3 Devices purchased independently by schools are not included in the CRRP.
Due to a lack of current device replacement strategies at school level, schools
can face challenges when outdated equipment, which can no longer be
supported, is removed from the network. The service needs to reach a
position where the existing device replacement programme is expanded to
include all school devices (PC, laptop, iPad and Chromebooks) used by staff
and pupils. 
1.4 Due to identified security risks because of increasing cyber threats to the
council network, 2,273 iPads are scheduled for removal from schools over the
next eighteen months. No replacement funding is currently available for these
devices.  iPads are primarily used by pupils and not currently included in the
CRRP.   
1.5 It is recommended that Members approve the expansion of the existing CRRP
to cover all pupil devices. This would incur an additional annual cost from
August 2025 of £288,300 for computers and £7,800 annually to cover
accidental breakages.

Page 2

ARGYLL AND BUTE COUNCIL                                                  COUNCIL     
EDUCATION          26 JUNE 2025 
EDUCATION REPLACEMENT DEVICES 
2.0 INTRODUCTION 
2.1 Devices purchased independently by schools are not included in the current
Computer Rolling Replacement Programme (CRRP). Due to a lack of current
device replacement strategies at school level, schools can face challenges
when outdated equipment, which can no longer be supported, is removed from
the network due to becoming obsolete or posing a security risk to the network.
2.2 In April 2025, the ICT Security team advised of the immediate removal of 970
iPads running Apple iPad software below version 17 from the school network
due to critical security vulnerabilities.  This will be followed by a further 399
iPads becoming obsolete by October 2025 and an additional 904 by October
2026, culminating in a total of 2,273 iPads being removed from the network
within the next eighteen months.   
3.0 RECOMMENDATIONS 
It is recommended that Council:
3.1 Agree funding to expand the existing CRRP over the next 5 years as outlined in
paragraph 4.12.  Note that a longer term funding option will need to be
considered for beyond year 5 and this will be part of the capital review.
3.2 The current ICT model for CRRP device allocation has resulted in an uneven
distribution of devices across schools. To address this, the service will regularly
redistribute devices from schools with declining pupil rolls to larger schools in
order to ensure equity of access.

Page 3

3.3  An appropriate device should be available to every pupil and provided to every
permanent member of teaching staff, ensuring a centrally funded, fully
sustainable device replacement program.
3.4 Education recommends a flexible device strategy, providing a sufficient number
and range of devices appropriate for diverse learning needs. 
4.0 DETAIL 
Background
4.1 Devices within the Computer Rolling Replacement Programme (CRRP) are
replaced every five years. This rolling replacement programme is necessary to
address the obsolescence of older devices, provide pupils with access to
modern technology, and enhance network security by eliminating devices that
may be more vulnerable to security threats.
4.2  The 2019 Capital programme was such that there was not enough funding to
include iPads and as a result schools were advised to purchase iPads from their
own budgets. We are now aiming to establish a fully funded capital programme
to include iPads, Chromebooks and additional devices purchased from school
budgets. This will ensure that up to date technologies are available to enhance
and contribute to high quality learning, teaching and assessment across all our
schools and settings. 
4.3  Proposals set out in this paper support the administrations priorities to:
• enable learners to take full advantage of emerging technologies and to be
ready for the ‘jobs of the future’ in Argyll and Bute.
• pursue opportunities for investment in a 21st-century digital network for
schools and the wider education infrastructure.
Current Position
4.4 There are a total of 13,373 pupils and staff in schools and Early Years settings.
4.5  There are a total of 12,156 devices in circulation across schools.  This total
encompasses all devices, including those used by staff, early years staff, school
office, pupils as well as specialised computer labs.
Proposed approach 
4.6 Education plans to allocate 2,372 devices to staff and 1,712 devices for
specialist usage such as computer labs.
4.7  Education plans to implement a device to pupil ratio for all schools based on the
table below:

Page 4

Year
group
Pupil numbers Device to pupil
ratio
Total
devices*
ELC 1092 8 137
P1 668 3 223
P2 676 3 225
P3 737 3 246
P4 715 3 238
P5 777 2 388
P6 758 2 379
P7 833 2 417
S1 833 2 417
S2 816 1 816
S3 854 1 854
S4 867 1 867
S5 766 1 766
S6 502 1 502
Total 10,894  6,475
*Device total rounded up during calculation by 1 device.  
4.8  Transitioning to a stage-based allocation model will lower the overall device
requirement in schools from 12,156 to 10,559, representing a reduction of 1,597
devices.
4.9  A total of 6,475 devices are required for pupil use. Currently, the CRRP includes
1,670 of these devices. To ensure that all pupil devices are part of a sustainable
device replacement programme, funding for an additional 4,805 devices is
required.
4.10 Device prices can fluctuate on a regular basis and are subject to inflation, and
other variable costs.  For reporting purposes, the cost of both iPads and
Chromebooks is £300.   
Total devices
for pupils not in
the CRRP
Device cost
(subject to
inflationary
increases)
Total Cost Annual cost
(total cost
divided over
a 5-year
replacement
cycle) if
funded from
revenue
Additional
funding required
for the CRRP
4,805 £300 £1,441,500 £288,300 
4.11 Currently, no dedicated funding exists for replacing pupil devices damaged
before their scheduled replacement. Considering a reasonable annual breakage
rate of 2% for the 6,475 pupil devices, an additional budget of £38,850 each
year is required for these replacements (£194,250 over 5 years).

Page 5

4.12 The annual additional cost of £327,150 is not affordable within current revenue
budget constraints.  As devices for children in schools are required, we have
considered a medium term funding option and consideration will have to be
given as to how this rolling programme is funded in the future (beyond current 5
year financial outlook).  This can be considered as part of the review of capital
arrangements.  
4.12 For the medium term funding option, the total cost of new devices will be funded
by additional pooled borrowing.  As part of the capital grant/loans fund
flexibilities, the Council has scope to apply the General Capital grant to the
purchase of these devices and borrow for other longer term investments
projects.  The additional loans fund budget required, using this approach, would
be an additional £0.022m each year from 2026-27 stepping up to £0.110m
recurring budget by year 5 and this will be built into the revenue budget outlook
forecasts.   
4.13 Senior phase pupils will require more device time compared to ELC and
younger primary pupils, who have a lesser need for device usage.
4.14 Pupils will not have a personal device but will have access to a range of devices
such as a laptop, iPad or Chromebook best suited to the learning task. 
5.0 CONCLUSION
5.1 Providing all pupils with consistent access to devices capable of supporting
modern and ambitious digital learning experiences is vital. Delaying the
replacement of aging technology unfairly disadvantages pupils who then have to
rely on outdated and unsupported equipment. This delay also creates the risk of
device shortages when older equipment is decommissioned. 
5.2 6,475 devices are required for pupil use. Currently, the CRRP includes 1,670 of
these devices. To ensure all pupil devices are part of a sustainable computer
replacement programme, funding for an additional 4,805 computers is required. 
5.3 Additional capital of £1,441,500 is required over a period of 5 years (on a rolling
basis) to expand the CRRP to include all devices used in schools.
5.4 Additional capital of £194,250 is required over a period of 5 years (on a rolling
basis) to cover accidental breakages of devices used by pupils.  
5.5 A medium term funding option is recommended at this stage with consideration
given in the future as to how this can be funded beyond 5 years. 
6.0 IMPLICATIONS
6.1 Policy

Page 6

6.2 Financial – To fund the replacements over the next 5 years, the additional
loans fund budget required would be an additional £0.022m each year
from 2026-27 stepping up to £0.110m recurring budget by year 5. 
6.3  Legal - None
6.4  HR - None
6.5 Customer Service - None
6.6 Risk -  Obsolete technology in schools poses a security risk to the council
network.
6.7 Climate Change - Obsolete technology will be recycled as part of the CRRP.
6.8  Fairer Scotland Duty - None
6.9 Equalities - protected characteristics - None
6.10 Consumer Duty - None
6.11 Island Communities - None
6.12 Children’s Rights and Wellbeing: Right to an education 
Children and young people will have equal access to devices.   
Douglas Hendry - Executive Director with responsibility for Education
Councillor Audrey Forrest – Policy Lead for Education 
26 May 2025                                                  
For further information contact: 
Wendy Brownlie, Head of Education, Performance and improvement - 
wendy.brownlie@argyll-bute.gov.uk 
Brendan Docherty, Education Manager - brendan.docherty@argyll-bute.gov.uk 
Gary Clark, Digital Lead – gary.clark@argyll-bute.gov.uk 
APPENDICES

Page 7

None