ARGYLL AND BUTE COUNCIL  COUNCIL   
26th June 2025 
POLICY LEADS REPORT   
1. INTRODUCTION 
1.1 This report provides members with an update on key areas of activity for
each Policy Lead Councillor. This aims to provide updates from all Policy
Leads as regularly as possible, so that all members are informed, up-to-date
and able to engage with current issues. This report covers the period since
the last update provided to Council on 24th April up to 13th June 2025.   
2. RECOMMENDATIONS 
2.1 Members are asked to consider the report.   
3. POLICY LEAD FOR BUSINESS DEVELOPMENT – Cllr Math Campbell-
Sturgess     
3.1 Introduction: This report provides an update on key activity in the
Business Development portfolio, including economic development,
employability, digital infrastructure, rural investment programmes and
film/media promotion. 
3.2 Economic development and regeneration: 
Rural Growth Deal (RGD): The Council’s RGD has now been signed off by
both governments. Work continues with partners on priority projects
including SAMS' Centre for Seaweed and Shellfish Innovation and
Development at Dunstaffnage.
Regeneration Capital Grant Fund (RCGF): We’ve secured £1.7m for the
Luing Slate Quarry project and £250k for Fyne Futures. Work continues at
Kilmory Business Park and Port Ellen Community Hub. Officers are
addressing subsidy control requirements related to Luing.

Page 2

Tarbert Heritage and Place Programme: Following a successful National
Lottery Heritage Fund (NLHF) review, we are preparing two major funding
bids (£850k to NLHF and c.£1m to Historic Environment Scotland) for
summer 2025 submission. Focus is on place-making, housing needs,
skills training and orientation improvements.
CARS Programmes:
Lochgilphead: Five priority buildings are now either complete or
progressing well, with a sixth project approved. Three shopfront
improvements are on track for June completion. 
Helensburgh: Priority Building 3 is progressing, with work likely to
commence mid-June. All three owners of Priority Building 4 are now
participating, with tender returns due end of May. 
3.3 Business Gateway and UK Shared Prosperity Fund:  The 2023–2025
Business Support Programme concluded with a 99.9% spend rate. Early
impact data from 20 clients shows an impressive 43% increase in
combined turnover and a 62% rise in FTE jobs. Transition year funding for
2025/26 (£200k) is already over 40% committed.
Business Gateway supported:
● 152 new start-ups 
● 301 existing businesses 
● Customer satisfaction remains exceptionally high: 94%+ across all
indicators
Follow-up monitoring continues, and we await details of any post-UKSPF
replacement scheme for 2026–27.
3.4 Employability Services: Despite annual funding cycles creating planning
difficulties, strong outcomes were achieved:
● 472 individuals supported in 2024–25 (181 carried over from 2023–24,
291 new starts) 
● 35% of new participants in 2024–25 moved into employment, with
stronger results from those carried forward (49%)

Page 3

New service level agreements for 2025/26 have been signed with
InspirAlba, Street League and Clyde Fishermen’s Trust. We continue to
press for multi-annual funding commitments from the Scottish Government
to enhance service stability.
3.5 Tourism: A range of tourism-related capital works progressed under the
Rural Tourism Infrastructure Fund, including:
● Port Ellen motorhome site (opening imminent) 
● Staffa conservation jetty work (Phase 2 fundraising underway) 
● Glen Loin car park (application submitted) 
● Clipper Race 2026: Oban has been confirmed as a host port 
3.6 Film, Events and Creative Economy: Film production activity remains
strong. Notable projects include:
● Jack of Spades (feature film by Joel Coen) filming at Kilberry and
Kilmelford 
● Whisky commercials in Oban and Easdale 
● Anticipated location interest from major Hollywood director 
To date in 2025 there have been 34 filming enquiries and nine confirmed
productions. 
Support continues for SEF-funded festivals, with Round 7 events now
underway.
3.7 Digital Infrastructure and Resilience: Digital broadband coverage has
improved slightly to 25% of premises with full fibre. Engagement with
Openreach continues to monitor rollout across the region. Strategic
meetings are planned to discuss the pace of delivery and local priorities.
Digital resilience remains a concern, especially following recent storms.
There is currently no identified funding for satellite phone support in
community hubs but I will continue to work with officers to explore
possibilities for resilience funding for communications for our more
isolated areas.

Page 4

3.8 Community-led Local Development (CLLD): In 2024/25, £599,206 of
CLLD funding supported 20 local projects. Key outcomes included
community centres in Oban and Tiree, and youth and health initiatives
across the area. The remaining underspend was less than £10k. The
2025/26 round is now live, with early grant allocations welcomed. 
3.9 Islands Programme and Infrastructure: The Council has claimed
£1.15m in funding for Tobermory and Tiree infrastructure in 2023/24.
Funding for 2025/26 is anticipated and officers are preparing project
proposals. Further updates will follow once allocations are confirmed. 
3.10   Site Visits and Engagements: In mid-May, I undertook a two-day visit to 
Islay and Jura that had originally been planned for earlier in the year but
postponed due to the weather (and I was lucky enough to have enjoyed
near perfect weather this time around!). This visit allowed me to see first-
hand the impact of Council-supported initiatives in our island communities,
emerging economic opportunities, and the strength of community-led
development.
On Islay, I visited a range of local projects, including:
● Portintruan Distillery, currently under construction, where we saw the
significant private investment being made in local production, jobs and
training opportunities. 
● Islay Development Initiative in Cornabus Forest, who outlined their
plans to develop sustainable crofts and housing, and showcased their
impressive community-run operations including a tree nursery,
beekeeping, and recycling. 
● Islay and Jura Community Enterprises, who operate the Mactaggart
Leisure Centre in Bowmore, supported by both the Council’s
Supporting Communities Fund and the Community-Led Local
Development (CLLD) Fund. Their work continues to provide vital
facilities for local residents.

Page 5

The itinerary also included visits to the Port Ellen Community Hub and
motorhome facilities, Islay Energy Trust, the Islay Gaelic Centre, and local
housing developments in Port Charlotte and Kilarrow. 
I also visited Jura, accompanied by Fergus Murray, Head of Development
and Economic Growth, and ward councillor colleague Cllr Dougie
McFadzean. My thanks to both for their time in putting the visit together.
Our time on Jura included:

Page 6

● A meeting with Jura Development Trust to discuss infrastructure
challenges and development opportunities. 
● Visits to local enterprises such as The Antlers café and bistro, and
Deer Island Rum. 
This visit was a valuable opportunity to see how public and private
investment is being harnessed in our island communities, to support
sustainable development, inclusive growth, and place-based regeneration. 
4. POLICY LEAD FOR CARE SERVICES – Cllr Dougie McFadzean 
4.1 Introduction: The following Policy Lead report outlines some of the recent
challenges, opportunities and achievements of Argyll and Bute Health and
Social Care Partnership. Like other health and social care partnerships
across Scotland and indeed the whole of the UK, there are a number of
current and future challenges to contend with, including funding,
recruitment and retention, and growing demands on care provision. Argyll
and Bute HSCP is actively tackling these challenges head-on. 
Our Integration Joint Board has begun holding its meetings in different
locations across Argyll and Bute in an effort to connect better with our
communities and colleagues. Our first such ‘travelling’ board meeting took
place in Oban on Wednesday 28th May. The meeting was well attended in
person and was well received by our colleagues. We’ll hopefully be
meeting in Helensburgh and Dunoon in the coming months. 
4.2 Finance: Our HSCP continues its work on establishing how it intends to
address its financial pressures in the current year and for the 2026/27
financial year. It is anticipated that consultation with communities on the
first proposals will start over the summer period. The scale of the projected
deficit for 2026/27 is such that significant changes to service delivery are
likely. 
The HSCP has been working with Hub North on a strategic review of
residential care provision. The first stage is now complete and its findings
have been reported to the Care Home and Housing Project Board and the
Finance and Policy Committee. This work focusses on population
modelling through to the 2040s, the condition of HSCP operated/council
owned estate and the current capacity delivered by both independent and
HSCP care homes. This work clearly demonstrates increasing demand
along with a mismatch between current and future demand and capacity.
Therefore it has been agreed that this work will proceed to the next stage
which will look at options for addressing the issues raised in the stage 1
report.

Page 7

The refurbishment and re-modelling of the care home on Tiree is now in
its final stages and an opening event is being planned in August. This
project has been funded by the HSCP, Argyll and Bute Council and the
Scottish Government Islands Programme. 
Staff accommodation issues are now being addressed by the HSCP and it
now has eight additional residential rooms available to support recruitment
of staff and/or to reduce accommodation costs associated with temporary
staffing. These are mainly on islands at present, with six more anticipated
to become available in the Oban area over the course of the summer. This
has been enabled by the partnership project between the HSCP, Shelter
and Argyll and Bute Council. Funding to enable this has been provided by
the HSCP, the council Strategic Housing Fund and Shelter/the Scottish
Government. This project also won the Innovation award at the UK Empty
Homes Network conference in May 2025. 
4.3 Children, Families and Justice Services:  The Bairns Hoose was
opened on 6th May 2025 with the first Scottish Child Interview Model
interview taking place the following week. There is now an exemplary
environment for children involved in the child protection system to both be
interviewed and to receive support in their recovery from trauma. The
opening was supported by staff from the core partners of police, social
work, health and education. The crucial role of the Scottish Government in
funding this development requires to be recognised.

Page 8

Grant funding has been received to support further Bairns Hoose
developments over the next year. Focus will be on consolidating
investigative practice, developing the recovery model and exploring how
the service is further evolved to meet the needs of children in our remote
and island communities. 
It is intended that West Dunbartonshire will make use of our facilities in
Helensburgh. 
Extensive work is being carried out to stabilise Children and Families
social work staffing levels. While staffing levels remain challenging,
significant and immediate child protection matters will take priority. 
Self-evaluation and quality assurance work in relation to child protection
processes within Argyll and Bute is continuing apace. We are investing in
bringing managers from across the wider children’s partnership together
for a series of face to face meetings. The aim remains examining and
strengthening consistency and standardisation of processes and
approaches. Statutory Social Work Team Managers come together every
day in a ‘concern’ huddle to deal with any new issues raised over the
course of the previous 24 hours. This is acting as a significant safety net. 
At the start of May the Care Inspectorate published a report on a thematic
review of Social Work governance. Not unsurprisingly, they have reported
that there is no consistent model of governance across Scotland with
Social Work managed to varying degrees by councils and IJBs. It is
recognised that there should be an overall Social Work Governance
meeting for each local authority area. Time needs to be taken to digest
and reflect on the report before advising on implications for Argyll and
Bute. 
Strategic service reviews are continuing to progress across Children’s
Health Services. Maternity services are likely to be the first to report. The
aim is to future proof services taking into consideration demographic
projections, budgetary constraints and anticipated need. 
4.4 Health and Community Care: In line with the national picture, budget and
staff pressures are affecting health and community care services. A Care
at Home efficiency plan has been developed, which focuses on prioritising
need more consistently. Work is ongoing to develop clear communication
about what the HSCP is able to deliver or provide. The needs of the most
vulnerable adults – those at end of life care or where there are protection
concerns – continue to be prioritised.

Page 9

4.5 Care at Home: Discussion and workshops have taken place with front line
carers as part of organisational redesign. The role of front-line carers is
now being refreshed and evaluated as part of the process. 
A focus on reassessment and allocation of new resources is in place. We
are supporting the delivery of care reviews and ensuring that within the
finite funded resource we are prioritising care where it is required. 
4.6 Care Homes Strategy: The strategic work on care home bed projections
continues. It is important to note that the capital work on Thomson Court is
at this moment in time paused because of lack of funding. We are
exploring options to restart this development as the need for provision on
Bute is well recognised. 
4.7 Whole System Approach: A bid has been submitted to the Scottish
Government for a whole systems approach sitting under the umbrella of
unscheduled care which supports the integrated adult plan of bolstering
community approaches. Services are joining to deliver a whole systems
planning approach. 
4.8 Hospital at Home: A bid for second year funding has gone in for the
Oban Hospital at Home project with expansion and focus of GP and
ambulance pathways and seven days working, as well as scoping of the
functions of this approach beyond Oban. 
4.9 Campbeltown Hospital: The hospital has coped well with six beds and
has not required any escalations out with the area. Four-weekly reports
are being sent to local Elected Members. 
There was a small fire in the hospital overnight on the 5th of May. No
services or patients were affected. De-briefs are underway. 
4.10 Strategic Planning, Performance and Technology: The Swan 2
Network upgrade has been successfully completed at Campbeltown
Hospital ahead of schedule providing an upgraded infrastructure for our
integrated staff group. 
On 27th May the final switchover to an upgraded digital telecare system
will also be completed with commissioned partners Hanover. This will
continue to be risk assessed and monitored and any business continuity
planning upgraded as required. 
Pan-Highland area whole system strategic planning continues to develop
with current scoping being undertaken with partners around transformation
projects to support capacity and resource to expedite transformation
delivery.

Page 10

Internal transformation is being refreshed with additional board oversight
with Cllr Mulvaney supporting. Cllr Moreland is also providing additional
oversight to the Hospital Dialysis Review in his capacity as co-chair of the
Strategic Planning Group. 
The new strategic plan will be presented to the Integration Joint Board in
September 2025 and, pending approval, will progress to consultation. 
Further to consultation the final plan will be presented to the IJB by March
2026.  In the interim current priorities are maintained until this is in place. 
5 POLICY LEAD FOR CLIMATE CHANGE, RENEWABLES AND NET ZERO –
Cllr Luna Martin 
5.1 No Mow May and Let It Bloom June: I was delighted to bring the
Supporting our Pollinators motion to council which aims to support the “No
Mow May” and Let it Bloom June” initiatives. These initiatives help to
promote biodiversity and combat climate change by allowing more
wildflowers and grasses to grow. This will help to create vital habitats for
pollinators such as bees and butterflies which help to pollinate crops and
maintain healthy and diverse ecosystems. 
I am hopeful that efforts will continue to support pollinators for many years
to come and will allow Argyll and Bute to become a leading example of a
thriving, biodiverse region.

Page 11

5.2 Scottish Government Climate Change Duties Consultation:  The
recent Scottish Government consultation on new statutory climate change
guidance has been a constructive and significant development, offering
clearer direction on how Argyll and Bute Council can most effectively
enhance its response to the challenges and opportunities presented by
climate change. 
This guidance specifically addresses how public bodies are to meet their
three core statutory climate change duties: firstly, to act in the way best
calculated to contribute to emissions reduction targets (mitigation);
secondly, to act in the way best calculated to help deliver Scotland’s
National Adaptation Plan (adaptation); and thirdly, to act in a way that the
Council considers most sustainable. The draft guidance provided a
comprehensive framework, outlining practical expectations for these
duties across all council functions. 
To ensure a robust and representative view, the consultation document
was shared extensively across all council services, inviting diverse
perspectives and expertise from every part of the organisation. This wide
engagement was invaluable, allowing us to develop a holistic and well-
considered response that reflects our collective understanding. The
response was subsequently approved by the Climate Change Board early
May and formally submitted on 19th May 2025. 
5.3 Burnet Building, Campbeltown – Successful Low Carbon Adaptation: 
The successful stabilisation of the Grade A-listed Burnet Building in
Campbeltown provides a compelling local exemplar of Argyll and Bute
Council’s commitment to innovative and low-carbon climate adaptation
measures for our significant built heritage. This historic asset, constructed
on 19th-century reclaimed land, faced escalating structural challenges
directly attributable to current climate change impacts.

Page 12

In response, the Council sanctioned the use of Geobear’s geopolymer
resin injection technology. This cutting-edge, minimally disruptive
technique effectively stabilised the building, and critically, delivered
substantial environmental benefits. Compared to the estimated 65 tonnes
of CO₂ emissions from traditional underpinning methods, this innovative
solution generated only approximately 14.3 tonnes, achieving a carbon
saving of nearly 78% (around 50.7 tonnes CO₂). This outcome directly
supports our statutory climate change duties and emissions reduction
targets. The Burnet Building project therefore not only secures a valuable
community and Council asset for the future but also serves as an
important model for addressing similar climate-related structural
vulnerabilities elsewhere. 
5.4 Positive progress: ACT to deliver Kilmory Woodland and Garden
Plans:  We are pleased to report significant positive progress in our
nature restoration efforts. Following effective cross-service collaboration, a
Service Level Agreement has now been successfully finalised and issued
to our key environmental delivery partner, Argyll & Isles Coast &
Countryside Trust (ACT). 
This achievement unlocks vital Nature Restoration Funding. It enables
ACT to proceed with two important foundational projects: the development
of a comprehensive Woodland Management Plan for the Kilmory Estate,
aligning with Scottish Forestry's best practice, and the creation of a

Page 13

Business Case for the future restoration of the historic Kilmory Walled
Garden. 
These initial projects are crucial for supporting the Council's biodiversity
objectives and will inform future nature-based solutions. They will also
complement the strategic development of the Kilmory Business Park by
helping to integrate sustainable land management and enhance local
amenity value. Furthermore, this work will pave the way for potential future
funding applications and wider community engagement, contributing
positively to Argyll and Bute's natural heritage. 
6 POLICY LEAD FOR COMMUNITY PLANNING AND CORPORATE SERVICES
– Cllr Mark Irvine 
6.1 Introduction: It’s been another busy and highly productive period
across Community Planning and Corporate Services, and I want to
take a moment to express my thanks to all our officers and teams for
their continued energy, professionalism, and commitment. 
6.2 Governance:  We’ve now begun the consultation for the first stage of
the four-yearly review of the Council’s Scheme of Establishment for
Community Councils. This initial eight-week consultation phase runs
until Sunday 22nd June 2025 and will then be reported to the Policy
and Resources Committee. It’s a great opportunity to build on what
we’ve learned over the past four years—particularly in relation to the
complaints process—and I’m grateful to the team for their thoughtful
work in shaping this review. 
Looking ahead, preparations for the Scottish Parliament Elections in
May 2026 are already underway. The team are making great strides on
the early groundwork, ensuring we’ll be well positioned for the year
ahead. 
Thanks to an award of up to £100K from the Place Based Investment
Fund, we’re also progressing with the replacement of analogue CCTV
systems with modern IP (Internet Protocol) -compliant systems. This
will mean a more reliable and effective service for Police Scotland and
our communities. 
6.3 Licensing and Related Matters: The new 10 per cent taxi fare
increase, approved by the PPSL Committee, came into effect on 22nd
April. In line with Committee decisions, a company has been
commissioned to carry out a new taxi survey across Argyll and Bute.

Page 14

The work is well underway, and I appreciate the team’s efforts in
engaging operators and progressing this vital research. 
6.4 Compliance and Regulatory: Our teams continue to deliver
outstanding support to those most in need. Through Welfare Rights
intervention, £1.51 million in financial gains were achieved in March and
April alone. This includes: 
 £141,440 for those affected by cancer, through our Macmillan
Partnership
 £119,860 via referrals through the Welfare Advice and Health
Partnership (WAHP) project in the Mid Argyll, Kintyre and the
Islands area. 
My thanks go to the officers supporting this essential, life-changing
work helping the most vulnerable in our communities. 
6.5 Member Zone: One longstanding improvement I’d discussed with the
team is the ability to ‘drop a pin’ while travelling in rural parts of my ward—
something not always easy to do when time and conditions are tight. I’m
pleased that the service is now exploring ways to enhance Member Zone
with this functionality. It’s not a top-tier priority, but a really useful idea that
could make life easier for us all and benefit our communities through more
accurate reporting. 
6.6 iTrent: Thanks to additional funding approved by Policy and Resources
Committee in early May, the iTrent remediation work is progressing well.
The team is growing, and I appreciate the effort going into strengthening
capacity. 
6.7 Performance Excellence: The draft corporate plan was approved by
Policy and Resources in May and will now be considered at full Council in
this June meeting. Chief Officers have already begun looking closely at
Key Performance Indicators (KPIs) for the plan, with further sessions
planned to explore how the Local Government Benchmarking Framework
might align. 
A recent dashboard demo at the Senior Leadership Forum was very well
received, and work on the Corporate Improvement Plan (including Best
Value recommendations) is also advancing steadily. 
6.8 Flexible Retirement: The changes to our policy, enabling those aged 55+
to apply for flexible retirement, were approved by the Policy and
Resources Committee and are now being implemented. A meaningful
improvement, and thanks to all involved in taking it forward.

Page 15

6.9 ICT: With 59 staff and responsibility for 200+ systems, ICT supports
around 2,000 users across offices, schools, and home working setups.
Socitm (Society for Innovation, Technology and Modernisation)
Benchmarking continues to rank the Council’s service among the most
cost-efficient and high-performing in the UK. That’s no small feat—and it’s
thanks to the dedication of engineers, cyber teams, developers, and
support staff. Well done to all. 
In May, the Compliance and Security team conducted a targeted phishing
exercise with 100 high-risk users. This proactive test helps strengthen
awareness and forms part of our broader resilience strategy. I’ve had
good conversations with the team about our posture and I’m reassured
that we’re not just resilient, but forward-thinking when it comes to cyber
threats. 
6.10 MS365 and AI: The new AI Policy was approved in May, and training
materials are being added to the Hub, with sessions for councillors also
planned. I’m particularly pleased to see the uptake of SOCITM/Microsoft’s
free Digital Champion training in June—with Council staff among those
attending. 
We’re also preparing for a pilot deployment of Microsoft Copilot, starting
with a security assessment and recommendations ahead of the proof-of-
concept project over the summer. As we adopt AI tools, we’re rightly
placing equal importance on training, governance, and data protection. 
6.11 Education Network Transformation: A major project is underway to
overhaul and modernise the education network. This work will support
secure, high-speed learning environments capable of enabling digital tools
like AI, Augmented Reality/Virtual Reality, and gaming-based learning. 
Officers are leading on technical upgrades, including a migration from
SWAN1 to SWAN2 and improvements to content filtering and
authentication—making digital classrooms more efficient and less
disruptive. 
6.12 Communications Team: We continue to balance reactive support with
proactive development. The team are currently supporting: 
 Tobermory Campus
 Helensburgh Leisure Centre 
 Rothesay Pavilion
 Council and committee decisions

Page 16

We’re also progressing communications work, including: 
 ‘You Said, We Did’ – clarifying how community feedback informs
council action 
 Weekly news round-ups, media FOIs and public enquiries 
Looking ahead, priorities will be the summer social media campaign and a
review of the Council’s social media policy. 
And finally, I’m delighted to say we’re finalists in the PRCA Awards under
the ‘Digital and Social Media’ category for our Christmas recycling
campaign. Huge congratulations to the team on this recognition—you
continue to do an excellent job. Fingers crossed for a win in November! 
7 POLICY LEAD FOR EDUCATION – Cllr Audrey Forrest 
7.1 The Promise, Scotland: Fraser McKinley, Chief Executive of The
Promise Scotland, was delivering the opening keynote speech at a recent
national conference.  During a Q&A session he referenced the ‘excellent’
work being done in A&B education services to keep the promise. He said
that in a lot of areas Keeping the Promise is still seen as a role
predominantly for children’s services, however in A&B education are really
driving change and modelling good practice for other areas. 
7.2 Head Teacher Conference: The latest Head Teacher Conference took
place on 30th April at the Corran Halls, Oban.  The event was facilitated by
the Mudd Partnership and focused on Strategic Leadership.  The Mudd
Partnership work with leaders in the public, private and third sector to
support leadership development.

Page 17

Edward Taylor, a Primary 5 pupil at Craignish Primary School has been
crowned the winner of Argyll and Bute’s regional heat in the Royal College
of Speech and Language Therapists’ (RCSLT) VoiceBox competition – a
national joke-telling contest designed to raise awareness of the fun and
importance of communication.  The national final is being held on 5th June
in the Scottish Parliament – good luck Edward! 
7.3 STEM – Science, Technology, Engineering, Maths: 24 of our schools
engaged in an interdisciplinary STEM project, Climate Smarter. This
culminated in a celebratory event at Corran Halls, Oban in May and was a
great success. 155 pupils and 59 parents/teachers attended the event,
showcasing their final projects and participating in various workshops and
talks from 20 industry professionals, as well as the Argyll and Bute STEM
team. 
The standard of work was exemplary and a credit to our teachers and
pupils.  Prosper have committed to delivering the project again in Argyll
and Bute over the next two years. The winners were: 
 Climate Smarter Winner - Small Isles Primary School
 Climate Smarter 2nd - Park Primary School
 Climate Smarter 3rd - Tayvallich Primary School
 STEM Challenge - Winner: Taynuilt Primary School
 STEM Challenge - Runner up: Bowmore Primary School 
Well done to all involved! 
7.4 Developing the Young Workforce (DYW): Developing the Young
Workforce (DYW) funding has been secured from the Scottish
Government for two further years.  This will allow DYW and Education to
continue their partnership work in supporting young people to understand
and develop the skills and attributes needed to achieve and sustain
positive employment destinations post-school.  Particular targets for the
coming year include: 
 instigating partnerships with those Argyll and Bute businesses and
employers with whom schools do not yet have links
 Increasing the number of bespoke, personalised work placements
for young people
 Supporting those young people most in need of employability
support through further developing DYW partnership with MCR
Pathways and InspirAlba.

Page 18

 Recruiting a further DYW Co-ordinator to ensure employability
support extends to children and young people across primary
schools and to those who are part of our neuro-diverse community. 
The DWY Conference was held at the Helensburgh and Lomond Civic
Centre on 13th June 2025.  The theme of this year’s event was Enterprise
and Entrepreneurship and how we can develop entrepreneurial skills in
our children and young people that will help them to build the knowledge
and confidence they need to succeed in the world of work.  We heard from
a range of guest speakers and held a number of interactive workshops
designed to meet the needs of all our partners.  I had the pleasure of
delivering the closing remarks at the conference which was, as always, an
enjoyable and well received event.  Thanks to everyone who helped to
organise such a successful day. 
7.5 Community Learning: Community Learning, for which the Council’s
Education Service has statutory responsibility, had a very successful
return visit from HMIe in the spring, as a follow-up to their Progress Visit of
January 2024.  HMIe inspectors recognised ongoing improvement in the
key areas they had previously highlighted, specifically in the quality of
Community Learning’s planning and evaluation cycle.  They were
confident that Community Learning in Argyll and Bute is in a good position
to maintain improvement and continue to support and empower learners
across all Argyll and Bute’s communities. 
7.6 Rights Respecting Schools: We are now only one school away from
having 100% of our schools accredited in relation to their RRS journey.
We believe this will be achieved before the end of term. The RRS Award
recognises those schools who create safe and inspiring places to learn,
where children are respected, their talents are nurtured and they are able
to thrive. Embedding these values in daily school life
gives children the best chance to lead happy, healthy
lives and to be responsible, active citizens.

Page 19

8 POLICY LEAD FOR FINANCE AND COMMERCIAL SERVICES – Cllr Ross
Moreland 
8.1 Financial Services:
Annual Accounts for the year ended 31 March 2025: At the time of writing,
the team are working on completion of the statutory annual accounts for
the year ended 31st March 2025.  This is a significant and highly technical
piece of work that requires to be completed in accordance with proper
accounting practice and by the statutory deadline of 30th June 2025. 
There has been one major change to the Code of Practice on Local
Authority Accounting in the United Kingdom 2024-25, with the adoption of
IFRS16 Leases from 1st April 2024.  This introduces new technical
accounting requirements for leases and lease type arrangements and
extends to our PPP arrangements in respect of the school estate (DBFM
and NPDO contracts).  The team has engaged with MUFG, our current
treasury advisors, to provide specialist technical services in this respect. 
Budget Outlook 2026-27 to 2030-31: The Budget Outlook reported to the
Policy and Resources Committee on 8th May 2025 outlined a projected
budget gap of £9.6m for 2026-27 rising to £33.8m by 2030-31, based on
the mid-range scenario. The Budget Outlook continues to be monitored on
an ongoing basis and reported through the Policy and Resources
Committee. 
Benefits: Housing Benefit speed of processing performance has been
strong during the 2024/25 financial year. From 1st April 2024 to 31st
March 2025, new claims were processed in an average of 14.67 days, and
changes in circumstances in 3.35 days. Both are within our internal target
of 21 days for new claims and six days for changes. 
The Department for Work and Pensions (DWP) has published national
performance data covering the period 1st April 2024 to 31st December
2024, during which our average processing times were 12 days for new
claims and four days for changes in circumstances. This compares
favourably with the Scottish averages of 20 days and six days
respectively. 
This strong performance supports timely access to Housing Benefit,
helping to reduce the risk of rent arrears and promoting housing stability
for claimants. 
Council Tax: Council Tax collection performance in 2024/25 was strong,
with £1.234 million collected above the Council’s budgeted income of
£63.278 million. This positive outcome reflects improved collection rates,

Page 20

continued recovery efforts, and successful implementation of policy
measures. 
Second Homes: Council Tax income collected specifically in respect of
second homes for the 2024/2025 year was £3.864 million, £0.115 million
more than was budgeted. Work is underway with services across the
Council to review the impact of the policy to charge double Council Tax on
Second Homes.   
Non Domestic Rates (NDR): In 2024/25, the Council recovered 93.51% of
the total Non-Domestic Rates (NDR) billed for the current year. While this
represents a slight decrease in percentage terms compared to the
previous year, it is important to note that there were significant late-year
changes to the NDR valuation roll. 
On 30 March 2025, the Assessor implemented rateable value increases
exceeding £3 million.   
In terms of the national picture and the year end processing for 2024/25,
the Council contributed £46.985 million to the national Non-Domestic
Rates (NDR) pool, an additional £5.780 million more than the Scottish
Government’s guaranteed distributable amount of £41.205 million for
Argyll and Bute for the year. 
Scottish Welfare Fund: In 2024/25, the Council spent a total of £549,134
through Community Care Grants and Crisis Grants, providing vital support
to the most vulnerable members of our community. This funding helped
individuals remain in their homes, avoid the need for residential care, and
recover from personal crises or emergencies. 
This level of spend exceeded the £458,254 in core programme funding
provided by the Scottish Government. However, it was managed within
the overall resources available, and the full amount of additional top-up
funding provided by the Scottish Government in February 2025 was not
required. 
The year-end underspend will be carried forward into 2025/26 as a
specifically earmarked reserve, ensuring continuity of support into the new
financial year. 
We have continued to maximise use of the SWF to ensure that people
who are eligible receive appropriate and timely assistance when most
needed.

Page 21

Discretionary Housing Payments: In 2024/25, the Council spent £968,036
in Discretionary Housing Payment (DHP) funding against a total
programme allocation of £1,069,525. These funds play a key role in
helping households sustain their tenancies and avoid homelessness. 
DHP funding is allocated across three categories:
 Benefit cap mitigation
 Bedroom tax mitigation
 Local Housing Allowance (LHA) reform and other financial hardship-
related DHPs
The Council’s year-end return to the Scottish Government confirms that all
funding provided to mitigate the benefit cap was fully utilised. However,
there was a slight underspend in the bedroom tax category. 
Spend relating to Local Housing Allowance reform and wider financial
hardship remains particularly low. This highlights the need to consider a
targeted take-up strategy, especially aimed at tenants in the private rented
sector who are in rent arrears but may not be aware of their eligibility for
support. 
To address this, a new DHP policy is being developed. It will include
relaxation of the current financial hardship criteria, allowing greater
flexibility to support those facing genuine and ongoing financial difficulties.
It is anticipated that the revised policy will be presented to Council for
consideration later in 2025. 
Visitor Levy: The consultation period for the proposed Visitor Levy closed
on 10th April 2025. The Council received over 3,500 responses, following
extensive engagement efforts with businesses, residents, and visitors to
gather views on the proposed levy. 
To support an objective evaluation of the feedback, external consultants
have been appointed to analyse the responses. A full report is expected to
be presented to Council later in 2025. 
8.2 Commercial Services:
Catering and Cleaning Service wins two national awards: The service has
been successful in securing two national awards for the wild venison in
schools pilot:- 
 Winner of ‘Best Sustainability Project in UK’ at the Public Sector
Catering Awards held in London on 24th April 2025

Page 22

 Winner of the ‘Sustainability’ Award at the ASSIST 2025 Scottish
National Awards 
The Catering team, in collaboration with Education and Procurement, and
supporting the local start-up company, Wild Jura, have introduced venison
to children and young people on Islay and Jura, who may not have
previously had access to this locally sourced product. The project enables
the company to provide venison cuts to local businesses, which previously
required transportation from the mainland. The initiative promotes
community wealth-building and educates young people about making
healthy food choices. 
By replacing more traditional mainland meat products (like chicken or
beef) from a national supplier, Wild Jura venison reduces food miles,
contributing to sustainability. Additionally, the required culling of deer to
manage the population on Jura helps prevent overgrazing, which can
damage vegetation and hinder biodiversity, supporting Scotland’s net-zero
and environmental goals.  The children have also been influential in
development of the menu’s and learning about the importance of food
provenance, local food, sustainable wildlife management and supporting
local businesses.   
The Duke and Duchess of Edinburgh, Prince Edward and Sophie, also
called in to Small Isles Primary School on Jura during their Scottish
islands visit in May and enjoyed sampling the venison meals. 
Moving forward, the Council are keen to explore further opportunities
across Argyll and Bute and potentially expand this initiative to more
schools.

Page 23

Helensburgh Waterfront Development (Commercial Area): Following the
report tabled at Policy and Resources Committee on 15th August 2024,
officers have been implementing the agreed recommendations, including
proceeding with negotiations to agree detailed Heads of Terms with
Forrest Developments Ltd for the sale of the Helensburgh Waterfront
commercial area, with the provisionally agreed terms to be reported to a
future Policy and Resources Committee. 
Helensburgh Leisure Centre (HLC): Following my previous update to
Council in April 2025 regarding the devastating effects of Storm Eowyn,
Property Services continue to work hard to assist with the recovery work
across the Council estate.  I recently visited HLC with Councillor Mulvaney
and officers to see first-hand the progress that has been made so far and
would like to thank all involved for their hard work. 
With specific regard to HLC the following update can be provided:- 
- The roof has been damaged to such an extent that the entire roofing
system requires to be removed and re-laid layer by layer.  A technical
specification for the roofing repairs works is in progress and nearing
completion.
- As a result of almost 60% of outer roofing materials being lost during the
storm, an internal rainwater capture system has been installed to protect
the internals from further water damage, whilst allowing roofing
contractors to work on the building from above.  These measures have
been recommended by the insurers and disaster recovery experts.
- Discussions and tendering with contractors are underway with regard to
our specific technical and operational requirements.
- Ongoing discussions with loss adjustors and insurers who are progressing
our claim.
- Alternative arrangements are in place to allow for gym and fitness classes
to operate.

Page 24

In terms of a timescale for re-opening, the aim is achieve this as soon as
practicable. It is not possible at this time to give a definite timescale due to
the various key steps and survey works/repairs that are ongoing. The
timescale for completion will be dependent on those and also on the
availability of the roofing materials, availability of specialist labour and
sequencing of the repairs. Based on the information available at the
moment, a reasonable estimate for reopening could be no later than the
first quarter of the calendar year 2026.  Further updates will be provided
when in a position to do so.   
Tobermory Campus Project: A key milestone was marked on 14th May
2025 when all key partners involved in the project met at Kilmory to launch
Hub Stage 1 and Stage 2.  The session outlined progress to date and
discussed the design strategy, the programme, cost plan, procurement,
risks and opportunities. 
Another key step in the project is to launch a statutory education
consultation, as required under the Schools (Consultation) (Scotland) Act
2010.  A proposal paper for the relocation of the existing campus to the
new build site in Tobermory South was tabled at the Community Services
Committee on 5th June, where it was agreed:- 
“to adopt the draft Proposal, as set out in Appendix 1, as a “Relevant
Proposal” that is now to proceed to a statutory consultation under the
Schools (Consultation) (Scotland) Act 2010, in accordance with the
timeframe as set out with the draft Proposal Paper”. 
As per the proposal paper, a public meeting will be held at the Tobermory
2-18 campus to consult on the proposal to relocate the current Tobermory
2-18 Campus to a new purpose-built 2-18 campus school building. 
All updates and information in respect of the project can be found on the
dedicated webpages here. 
Kilmory Business Park: Work is well underway at the new Kilmory
Business Park on the outskirts of Lochgilphead, having made the most of
the welcomed dry and sunny start to summer.  Road formation is well
progressed and utilities and infrastructure are in the process of being laid. 
This is a joint venture in terms of land and funding from the Council,
Highlands and Islands Enterprise and local business M & K MacLeod.   
The new business park will provide new commercial spaces to serve Mid
Argyll and beyond and there are already tenants associated with the
renewables sector and power transmission in situ.

Page 25

The Council will retain ownership of several serviced business sites and
provide opportunities for future economic growth and investment in our
area.  The infrastructure works are scheduled to be completed late in
2025.   
Ground has also recently been broken at the other new Council Business
Park at Oban Airport and more updates will follow in future reports.   
Events Team: The Events Team have also made the most of the recent
warm and sunny weather conditions by hosting a number of successful
events at the Helensburgh and Lomond Civic Centre.  These included a
large Communion, Rave on the Clyde, the annual weekend long Beer and
Gin Festival as well as several weddings.   
Several thousand revellers and guests have enjoyed the facilities and
brought a buzz into the town centre, local businesses, restaurants and
bars during these events.   
A family day event is proposed again for the Front Green on Lochgilphead
on the 28th June 2025.

Page 26

9 POLICY LEAD FOR PLANNING AND REGULATORY SERVICES – Cllr Kieron
Green 
9.1 Introduction: In April and May I chaired meetings of the Planning,
Protective Services and Licensing (PPSL) committee on the 9th April, 23rd
April, and 21st May, the Licensing Board on 22nd April and a number of
Local Review Bodies, Civic Licensing Hearings and Short Term Lets
Hearings. 
I was present during the Customer Service Excellence Audit for Building
Standards on 1st May in Helensburgh. At this the auditor reviewed
evidence presented by officers, was able to see first-hand locations where
the team had involvement with dangerous buildings, and spoke with
stakeholders and partners, customers and agents, and staff. Four further
assessed elements have now met a compliance plus level, which now
make up over half of those in the standard. This thoroughly deserved
result reflects the commitment of the service to engaging with customers,
responding to feedback, and going above and beyond to meet
expectations. 
The COSLA Environment and Economy Board meeting on 2nd May saw
discussions around mandatory national training for Councillors taking
planning decisions and the potential introduction of a cruise ship levy. 
9.2 Development Management: New casework during 2025/26 remains at
levels which place a heavy demand on existing resources. However
performance by teams has been excellent, and supported by additional
resource the trend of reducing outstanding items has now continued for
eight successive quarters. The Central Validation Team consistently works
to a target of undertaking a first check within five working days from
receipt. New householder applications can now be expected to be
determined in an average of under eight weeks, discounting delays
outside the control of the planning authority, with other new local
applications having an average determination time of under 12 weeks. 
Planning fee income was £496k over budget during 2024/25, and requests
have been made to carry forward the following: £50k to support additional
use of agency staff to process ‘legacy’ applications, £100k to continue with
consultation contracts, £250k as a contingency should representation be
necessary at Public Local Inquiries, and £86k for a temporary graduate
planner post. 
The National Planning Improvement Framework (NPIF) Report Self-
Assessment Report was discussed with stakeholders on 27th March, with
positive feedback indicating that the improvement actions proposed were

Page 27

generally in alignment with customer requirements and expectations of the
Planning Service. 
9.3 Development Policy: An updated Local Development Plan 3 (LDP3)
Development Plan Scheme has been approved by PPSL that provides an
improved alignment of timescales with the Oban and Helensburgh
Strategic Development Frameworks, and the Housing Need and Demand
Assessment. 
Feeding in to the LDP3 process, mapping for 20 minute neighbourhoods is
being progressed. 
A letter issued by the Chief Planner and Minister for Public Finance on
28th April provides updates on the annual review of the National Planning
Framework 4 (NPF4), a review of guidance on flood risk, the publication of
draft Biodiversity planning guidance, and the introduction of six-monthly
reporting on timescales for the production of a new LDP, with the
expectation that these should be in place by May 2028. 
9.4 Building Standards: Argyll and Bute Building Standards team received
the Scottish Local Authority Building Standards Scotland award in the
category of Outstanding Service and Commitment for supporting eight
other local authorities over nine years through commercialisation work.
With this being on top of the results for the Customer Service Excellence
Audit, the Scottish Government National Performance Award in November
as well as individual staff successes in gaining personal qualifications, the
team are to be congratulated on their successes. 
During 2024/25 income exceeded expenditure by £95,659, with approval
being sought to carry this forward to fund the Building Standards
Investment Plan 2025-27. Initial income for 2025/26 is comparable with
24/25 levels, but the lack of commercial income forecast this year due to
falling demand for warrants across Scotland poses a budget pressure. 
As part of the Building Standards Investment Plan 25/27 a Building
Standards Inspector post has been created to focus on carrying out
inspections during construction. 
9.5 Regulatory Services: An online application, charges, and payment
system is now in place for Section 50 Food Hygiene Certificates,
delivering on one of the budget savings for 2025/26. 
Successful recruitment to posts within the Animal Health and Welfare, and
Food Safety Teams will support ongoing operations in these areas,
although it remains challenging to attract Environmental Health Officers.

Page 28

Alternative career pathways have been developed although at present
some vacancies remain. 
The Scottish Government have confirmed the Private Water Supply
Emergency Bottled Water Scheme will continue for 2025, with Local
Authorities and Scottish Water reimbursed for supporting individuals and
communities. Where there is a loss of supply, or insufficient wholesome
water to households in domestic properties on private water supplies, this
allows for bottled water to be collected from storage points by individuals. 
9.6 Short Term Lets: The team is continuing to prioritise new applications for
licences, whilst making steady inroads into the number from existing
operators. With over 2,400 licences already determined, and under 900
remaining, maintaining the current progress of around 200 determinations
a month should see accumulated applications cleared by Autumn this
year.
Progress is also being made with developing renewals procedures,
revisions to the Short Term Let Policy, and reviewing finances. Permanent
staffing to handle Short Term Lets Licensing is to be a Team Lead, two
Licensing Officers and four Licensing Assistants, with Temporary
Licensing Assistants added during periods of high workload. 
10 POLICY LEAD FOR ROADS, TRANSPORT AND AMENITY SERVICES – Cllr
John Armour 
10.1 Introduction: Since my last report to Council in April 2025, I have
continued to have regular catch ups with Council officers and partners
such as HiTRANS, Highlands and Islands Airports Ltd and others, as well as
attending meetings such as the Craignure Marine Infrastructure Liaison
meeting.  I have done my best to capture as much of this as possible in
this report, however with such a wide ranging remit it is not possible to
capture every piece of work which is ongoing. As always, if anyone has any
queries or questions they would like me to pick up, I will be happy to try to
assist.   
Here are some of the works that have been taking place since my last
report.   
10.2 Ferries: Since my appointment as Policy Lead, I have been keen to find
out more about how each service works and get out and about to hear
from those on the ground. I had a very productive and informative day at
the three mainland Council run ferries with Scott Reid (Marine Operations 
Manager) and Robert Paton (Ferries Technical Officer).

Page 29

I travelled from Cuan to Luing, Seil to Easdale and from Port Appin to
Lismore. I was most interested to hear from the crew on all the vessels
and it gave me a great insight into the work they do and the challenges
that they and islanders face.  It was also good to meet some locals who
were keen to give me their views on the service. 
It was a really enjoyable day and has allowed me to be much more
informed on the workings of our ferry network. I also plan to visit the Port
Askaig to Jura Ferry sometime soon.   
10.3 Rest and Be Thankful Taskforce Meeting: I attended a meeting of the
Rest and Be Thankful Taskforce on 29th May which was chaired by the
Cabinet Secretary, Fiona Hyslop. A number of points were raised during
this meeting:- 
 The Cabinet Secretary met with the Head of News at BBC Scotland to
discuss the importance of accuracy in reporting on the Rest and Be
Thankful works and road status, given the potential impact on local
residents and businesses as well as visitors planning journeys to Argyll
and Bute. This was a positive discussion and the points made were
taken on board. 
 Discussions were had in respect of more business resilience being
built up at the request of the Cabinet Secretary, and it was noted that
contact with road haulage firms would take place with a view to getting
more engagement with different sectors such as tourism and farmers.
With this in mind, Transport Scotland will be arranging round table
events with relevant sectors as mentioned above to ensure effective
engagement, as well as Argyll and Bute Council.

Page 30

 Phase 1 has been completed on the lower section of the RABT (last
year), and the current fencing works above the A83 are due to be
completed later this year, all going well round about August.
 Update on medium to long term works: 
 The legislative process is ongoing for the relevant solutions with the
Objection period having closed.  Structural Soils Ltd are currently
working through the objections at present, as it is a restricted process
no further details re objections can be released at this time.  
 Structural Soils Ltd have received representation outside the
consultation in relation to avoid works on Fridays which they are
looking to reprogramme where able, and also about scope to avoid
programming any works during the Inveraray Highland Games. 
 Structural Soils Ltd showed the group some slides to demonstrate the
time needed in relation to these works and why they require full closure
of the A83. The pictures below show the size of the cranes required
and how far they are extending to. 
Further discussions were had on the issues locally 
with closures and Transport Scotland reiterated that 
they will only close the road when necessary. 
I raised issues with scrub cutting along the A83 and 
asked that when this is going on, Transport Scotland
cut higher up the tree as it is damaging HGVs.

Page 31

10.4 Support for No Mow May and Let It Bloom June: The Council agreed to
support the No-Mow-May and Let-It-Bloom-June campaigns, run by the
organisation Plantlife, as examples of easy ways to encourage natural
grass and wildflower growth which play a part in supporting pollinators
such as bees and butterflies.   
Research from The Butterfly Conservation organisation reports that more
than half of UK butterfly species are now in long term decline. There are
over 20 million gardens in the UK, so even the smallest areas allowed to
flourish can deliver environmental benefits for nature, people and places. 
The Council is now considering what it can do to support the objectives of
initiatives such as No Mow May within the context of its overall grass-
cutting and local maintenance programmes and available resources. This
will include reviewing all the green spaces for which the Council has
responsibility. This includes everything from parks to land around council
buildings, school facilities to play parks, and other open spaces such as
roadside verges. 
An example of the Council’s current maintenance schedule is for roadside
verges, it cuts a one metre strip of roadside verge which includes the
services and sightlines. The timing of cut fits with encouraging a second
flush of flowering plants whilst retaining wild plants out with this strip.
Maintenance plans are reviewed annually, and local teams work with
community led projects to improve plant diversity without compromising
road safety. 
The Council has a large land estate and to give some idea of scale, we
cut 32.4 million square metres of grass each year - we know that our
communities expect a standard of care for our green spaces so balancing
the practicalities of that with protecting pollinators and their habitats will
take careful consideration and planning, and the support of local groups. It
is important work and we have to get it right for our environment and our
people. 
Officers will consult with the Policy Lead for Climate Change, Renewables
and Net Zero and myself on the review of the grass cutting programme.
There will then be a report back to the Environment, Development and
Infrastructure Committee. 
10.5 Roads Reconstruction Programme: Officers continue to work hard to
deliver the Roads Capital Programme, details of which can be found here
Roads Capital Programme 2025/26 | Argyll and Bute Council 
The Council have also been successful in getting £150,353 of Strategic
Timber Transport Scheme (STTS) funding for A819 at Electric Cottage.

Page 32

This will be phase 5 of the project which has seen funding support from
STTS over several years to this point – well done to officers for achieving
this funding.   
10.6 A816 Rockfall: You will be aware of the rockfall on the A816 (just north of
Ardfern, towards Craobh Haven), which resulted in the road being partially
closed on 4th April 2025.  Officers undertook works to clear the debris
straightaway, which included:- 
 Creating an earth ramp to get the machinery 
up the slope to begin work and remove the 
loose rock;
 Building ‘benches’ or flat steps into the slope 
so that any other loose rock will land on the flat 
areas and not fall onto the road;
 Clearing loose materials from the benches 
 Forming a row of concrete blocks, two metres 
offset from the road edge, at the bottom of the 
slope as a permanent barrier against further 
debris reaching the road. 
The road was subject to one lane being open, managed by traffic lights to
ensure the travelling public could continue their day to day activities.  The
road is now back to two lanes with a two metre verge to the blocks
protecting the road from any further loose rocks – our thanks go out to all
officers and partners involved in getting this road re-opened and made
safe for the public.   
10.7 Drone Technology: For a number of years now, 
Council officers have been working with drone 
technology and have conducted a number of 
successful trials across the region.   
The Council collaborated with private company 
Skyports to carry out a large volume of Unmanned 
Aerial Vehicle (UAV) trials over the west coast of 
Scotland.  Completed last August, the year-long 
project received funding totalling £250,000 through 
the Department for Science, Innovation and Technology’s Regulators’
Pioneer Fund (RPF) and a report on the trials has now been approved by
Councillors.   
The aim of the project was to examine the feasibility of creating low-
density airspace over rural areas that would enable drones to be deployed
safely alongside regularly scheduled manned aircraft.  The Council carried
out trials for school meal deliveries and worked with partners including

Page 33

Royal Mail and NHS on deliveries of mail, medication to hospitals and
equipment between Islay and Jura. 
The Roads and Infrastructure Service also arranged trials for use in
vegetation management along the River Ba on Mull while Scottish and
Southern Electric Networks used drones for a transmission powerline from
Dunoon to Arrochar. Network Rail also deployed the technology on railway
inspections between Taynuilt and Dalmally. 
While discussions are still ongoing with the Civil Aviation Authority, these
trials have been extremely valuable in establishing the benefits drones
would bring to delivery of services in Argyll and Bute. 
A key aspect of the report involves outlining the benefits and impacts
drone services can bring to remote island communities and seeing how
this could help the expansion of drone networks within these areas. 
It also enhances the feasibility of establishing a permanent drone base
such as the Advanced Air Mobility Hub at Oban Airport, which has been
allocated £4 million through the Rural Growth Deal programme subject to
a successful business case being approved. 
10.8 Play Parks: Works in Kintyre play parks have started, with the anticipated
duration of works taking around six to eight weeks for completion – I am
looking forward to seeing the finished articles and our young people
enjoying these newly improved spaces.   
Officers continue to progress works in relation to play parks across Argyll
and Bute and updates will continue to be provided to members by the
service.   
In late 2024, the Council worked with local people and groups, who co-
designed the playpark, to ensure that children and young people in
Tarbert have a wonderful outdoor facility which contributes to their mental
and physical health and wellbeing – as well as being simply a great place
to play outside. 
Many people have been involved in bringing this vision to life, but one of
those who campaigned so passionately for a playpark in Tarbert is sadly
no longer with us to see the enjoyment it brings to the community. 
The late Councillor John McAlpine played a key role in ensuring that this
project was able to secure the funding it needed to make it a reality and
was tireless in his determination to ensure that the village he loved so
much could benefit from a new playpark. Sadly, John passed away in July
2022 and did not see the results of his hard work and dedication.

Page 34

Following discussions with his family and the local community and given
his service to the community over many years, a very fitting tribute to John
would be for the new playpark to bear his name and this has been
considered initially at the Mid Argyll, Kintyre and the Islands Area Committee.   
11. CONCLUSION 
11.1 This report provides members with an update on each of the Policy Lead
portfolios. Policy Lead Councillors will be happy to discuss any particular
issues with colleagues as required. 
Argyll and Bute Council – Policy Lead Councillors Report – 13th June 2025 
For further information please contact Aileen McNicol, Leadership Support and
Member Services Manager, telephone 01546 604014 or email
aileen.mcnicol@argyll-bute.gov.uk