Democracy Spraffa

Clydebank PiP Neighbourhood Board 31 July 2026 Papers

West Dunbartonshire Council · 31 July 2026
Back to Clydebank Pride in Place Board — 31 July 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

OFFICIAL 07/31/2026   
1
Official
Clydebank 
Neighbourhood 
Board
Agenda 
Meeting details
Date Friday 31 July 2026  Time 9.30am
Location Clyde Shopping Centre Conference Room, 170 Kilbowie Road, Clydebank 
Agenda
Item Topic Lead
1 Welcome by Chair Liz Connolly
2 Apologies Brian McColgan
3 Previous minutes and actions All
4 Regeneration Plan Delivery
 Project Delivery Subgroup Updates
 A1. Three Queens Square (Laurence Slavin - WDC)
 B1. Improving connections (Gail MacFarlane - WDC)
 B2. Walking & cycling trails (Gail MacFarlane - WDC)
 C1. Employability, skills, & training (Ann Campbell –
WCS)
 A2. Meanwhile uses (Louise Ewing – Chamber of
Commerce)
 A3. Community Hub/Accessible Public Welfare
Facilities (Ben Ellis - SA)
 South Sylvania Way Feasibility Group Update (Alan
Douglas - WDC)
Group Chairs
5 Marketing and Communications Sandie Scott
6 Recruitment of Project Resources Alan Douglas
7 Finance
 Financial report
 Update on use of capacity funding 
Liz Connolly/Selina
Ross
8 Any Other Business
 PIP Peer Learning Experience 
Liz Connolly

Page 2

OFFICIAL 07/31/2026   
2
Official
9 Date and time of next Board meetings
Frequency of meetings to be discussed. Potential change to quarterly
meetings.

Page 3

OFFICIAL 06/30/2026   
1
Official Sensitive
Clydebank 
Neighbourhood 
Board
Minutes 
Meeting details
Date TBC   Time 9.30am
Location Clyde Shopping Centre
Item 3: Note of previous meeting
Date 29 May 2026 Time 9.30am
Location Clyde Shopping Centre
Members attending
Name Title
Liz Connolly Chair
Alan Douglas Chief Officer, Regulatory & Regeneration, West Dunbartonshire
Council
Andrew Forrester Centre Manager, Clyde Shopping Centre
Douglas McAllister Member of Parliament
Fiona McInnes Chief Executive, Clydebank Co-op
Lawrence O’Neill Elected Member, West Dunbartonshire Council
Laurence Slavin Chief Officer Resources, West Dunbartonshire Council
Selina Ross Chief Officer, West Dunbartonshire CVS
June Todd Community Activist
Louise Ewing Dunbartonshire Chamber of Commerce
Apologies
Name Title
Marie McNair Member of the Scottish Parliament
Sandie Scott Director of Strategic Communications and Stakeholder Relations,
Golden Jubilee Hospital
Peter Hessett Chief Executive, West Dunbartonshire Council
Gail Macfarlane Chief Officer, Roads & Neighbourhood, West Dunbartonshire
Council
William Rooney Elected Member, West Dumbartonshire Council
Anne Campbell Principal & Chief Executive, West College Scotland
Clare Steel Manager, Clyde Shopmobility
Reverend Ishaku Ajibauka Clydebank Churches Together
Captain Ben Ellis Corps Officer/Church Leader, Salvation Army
Lynn Edwards Chief Inspector, Police Scotland

Page 4

OFFICIAL 06/30/2026   
2
Official Sensitive
Lucy McGovern Working4U Development Officer, West Dunbartonshire Council
Michelle Lynn Assets Manager, West Dunbartonshire Council
Colin Smith Your Community Team Leader, West Dunbartonshire Council
Other attendees
Name Title
Davina Lavery Regeneration Officer, West Dunbartonshire Council
Brian McColgan Business Support Officer, West Dunbartonshire Council
Chris Young Project Development Worker, West Dunbartonshire Council     
1 Welcome by Chair Action 
Liz Connolly (LC) extended a welcome and said that there was a lot to
get through and to progress. 
2 Apologies Action 
Marie McNair,  Member of the Scottish Parliament 
Sandie Scott,  Director of Strategic Communications and
Stakeholder Relations, Golden Jubilee Hospital 
Peter Hessett Chief Executive, West Dunbartonshire Council 
Gail Macfarlane Chief Officer, Roads & Neighbourhood, West
Dunbartonshire Council 
William Rooney Elected Member, West Dumbartonshire Council 
Anne Campbell Principal & Chief Executive, West College
Scotland 
Clare Steel Manager, Clyde Shopmobility 
Reverend Ishaku Ajibauka Clydebank Churches Together 
Captain Ben Ellis Corps Officer/Church Leader, Salvation Army 
Lynn Edwards Chief Inspector, Police Scotland 
Lucy McGovern Working4U Development Officer, West
Dunbartonshire Council 
Michelle Lynn Assets Manager, West Dunbartonshire Council 
Colin Smith Your Community Team Leader, West Dunbartonshire
Council

Page 5

OFFICIAL 06/30/2026   
3
Official Sensitive
3 Previous minutes and actions Action 
The minutes of the previous meeting were approved. 
Actions
Map project management skills and experience of Board members.
Board members interested in having project management training to
advise Brian McColgan (BM) – It was noted that the College would be
closing soon at the end of the academic year and hence training may
have to wait until the new academic year.  The mapping exercise and
offer of skills training should be extended to members of Delivery
Subgroups.  Ongoing 
Liz Connolly (LC) to send along to Gail Macfarlane (GM) key
information with reference to opportunities attached to art statues in
taking forward B2.  Completed 
Selina Ross (SR) to meet with Louise Ewing (LE), evaluating details
attached to meanwhile uses work, advising the board regarding
suitable members leading progress over the months ahead.  In
progress 
Ingrid Bjorkevoll (IB) to source from BM, updating LC and subsequently
circulate to the board, information with reference to the professionals
involved with ongoing Community Hub meetings.  Ongoing 
It was agreed that all those present will send along to BM future
schedules of upcoming meeting dates and relevant group members,
ensuring coordination of meeting dates is facilitated.  Ongoing 
A discussion in relation to the prospect of communicating either via
reporting to Council or via member briefing Pride in Place work and
achievements took place between all present. Sandie Scott (SS) to
highlight at the next upcoming Committee meeting with Golden Jubilee.
Ongoing 
SR brought forward applications to the two open adverts which will be
evaluated over the coming week; information will subsequently be
shared with the board.  Ongoing 
Anne Campbell (AC) to circulate out to the board feedback from a
focus group in relation to the college employability pathway.  Complete 
Board/Subgroups 
SR/LE 
IB/BM 
Subgroups 
SS 
SR

Page 6

OFFICIAL 06/30/2026   
4
Official Sensitive
4 Regeneration Plan Delivery Action 
Project Delivery Subgroup Updates 
A1. Three Queens Square 
An update paper had been circulated.  Laurence Slavin (LS) spoke to
this and highlighted the closing date for the Quick Quote process for
the architectural competition of June 9th.
LS suggested that the Board paper template may benefit from a
section giving information on the purpose of the Delivery Subgroup,
e.g. the key purpose of the project and its associated outcomes.  Liz
Connolly agreed that this was a good suggestion. 
Douglas McAllister (DM) asked whether subsequent meetings of the
Subgroup would be virtual or in person.  LC suggested they could be in
hybrid form. 
LS suggested the format of the meeting may depend on the content of
the meeting, e.g. potential site visits. 
DM noted that he is unable to attend meetings on Monday afternoons. 
DM suggested a potential stakeholder for the Subgroup in the form of
Awestruck Academy, whose premises are adjacent to the Square. 
B1. Improving connections / B2. Walking & cycling trails
Gail Macfarlane (GM) had submitted apologies for the meeting and
given a brief update to the effect that the business of the Subgroup is
being progressed. 
C1. Employability, skills, & training 
Anne Campbell (AC) had submitted apologies for the meeting. 
Discussion followed around the possibility of integrating Subgroup
meetings with Board meetings.  This was not considered appropriate
by the Board but the possibility of Subgroup meetings being held after
the Friday Board meetings could be considered.  LC stressed the
importance of the status of the Board meetings from the point of view
of governance. 
AC had raised the possibility of using existing structures relating to
employability and skills.  In discussion it was thought that this could
work if the outputs of these exiting structures aligned with the outputs
expected by the PiP programme. 
A2. Meanwhile uses 
Louise Ewing (LE) asked what the PiP boundaries were, what exactly
is meant by the “Town Centre” and could the boundary be published. 
BM/ Subgroup
leads

Page 7

OFFICIAL 06/30/2026   
5
Official Sensitive
Selina Ross (SR) said that the boundary was included in the
Regeneration Plan and she would forward a copy to LE.  LE said that
the map would be useful for discussing buildings and sites within the
area and to cross reference with the work of other Subgroups, e.g. A1.
LS agreed and suggested representation from Subgroup A1 on
Subgroup A2. 
Davina Lavery (DL) raised the Queens Quay site and that it’s use had
featured in the community engagement exercises.  This lead to the
question of where Meanwhile Uses should take place, i.e. the Town
Centre or the wider Clydebank area.  Alan Douglas (AD) highlighted
that works would be commencing on the Queens Quay site soon.  LC
noted that technically the PiP is for the whole area but that a business
case would have to be made for activities regardless of where these
activities would take place.  AD reminded the Board that the Queens
Quay site is privately owned.  DL echoed this and reminded the Board
that many sites within the Boundary will not be in WDC ownership.  LC
thought that the PiP may present opportunity in relation to such sites. 
The example of land adjacent to the former Lidl premises in Livingston
Street which has become overgrown was cited as a possible
opportunity for the PiP programme to have an impact. 
A3. Community Hub/Accessible Public Welfare Facilities 
Ben Ellis had submitted apologies and no update was available. 
LC said that in future Subgroup leads should ensure an update can be
provided to the Board if they are unable to attend the meeting. 
South Sylvania Way Feasibility Group Updates 
AD said that the group is due to meet on the 8th June and a written
report will be available for the next Board meeting. 
In general LC said that progress appears to be slow and stressed the
importance of progress being made and the actions and impacts of the PiP
programme being visible to the local community.
AD said that different Subgroups will work at different paces and a lot of
preparatory work may be involved for Subgroups.  AD suggested Subgroups
draw up a timetable setting out when tangible outputs may occur. LC agreed
and said that the Architectural Competition could be a good example of this.
DL agreed with this and said that it is likely that the work of the more
community led groups will take longer. 
LS stressed the importance of good communications and the need to “feed”
the communications process.  LC agreed and highlighted the philosophy that
communications should be both “relentless & boring”. 
SR 
Subgroup leads 
AD 
Subgroup leads

Page 8

OFFICIAL 06/30/2026   
6
Official Sensitive
5 Marketing and Communications Action 
Website
DL advised that 2 submissions had been received for the Quick Quote
process to develop a website.  These had been assessed and
interviews would be held on 3 June with an award of contract to follow. 
DL asked if the Board wanted to approve the award or if this could be
left to the Comms Subgroup.  It was agreed that the Comms Subgroup
could approve the award of contract. 
In further discussion the following points were made:
Technical expertise in assessment of Quick Quote bids was provided
by West College Scotland staff.
Contact value £15k.  Some potential bidders were deterred by this
amount as they didn’t think it adequate.
LS asked if the £15k was for development of the website only.  DL
confirmed this was so.
Annual maintenance costs are estimated between £1k and £2k
There will be a 3-month lead time for the website
LC reminded Board members that portraits and biographies should be
supplied for inclusion on the website. 
Press Release
A press release publicising the approval of the PiP programme is
planned.  This includes a statement from a member of the Board
representing the community.  Fiona McInnes (FM) and LE offered to do
this. 
PiP Branding Guidleines
These have been circulated and should be followed closely. 
Appropriate branding should also be used by organisations benefiting
from PiP funding.  SR confirmed that such a requirement had been
incorporated into the conditions of grant for the community funding
processes. 
Marketing and Publicity Materials
A range of marketing and publicity materials will be purchased.  LON
stressed the importance of proof reading to ensure that all publicity
materials are correct. 
Use of Local Media Outlets
The Clydesider magazine could be used to do a publicity piece for the
PiP.  While the magazine has a good reach it would be a paid for
piece. 
Comms Subgroup 
SS/FM/LE 
Comms subgroup

Page 9

OFFICIAL 06/30/2026   
7
Official Sensitive
LC suggested that the local Lomond Radio station could also be
considered for publicity purposes. 
Each Project Delivery Subgroup should appoint a Communications
lead.  Subgroup leads 
6 Recruitment of Project Resource Action 
AD said that the Council’s Job Evaluation process had changed, hence
the delay to the approval of the Project Resource.  LC asked if there
was any timescale for completion of the Job Evaluation process.  AD
said there wasn’t, but the resource remains available in its current
format.  AD noted that the community engagement resource element is
also still available to the PiP programme. 
AD 
7 Finance Action 
 Financial report
 Update on use of capacity funding for community activities
DL said that the report is now clearer after suggestions made by LS
were adopted. 
Issues raised included:
Has the feasibility study budgeted for the Transport Interchange in the
report been commissioned?
Youth Engagement Budget – SR to liaise with Lucy McGovern to
progress.
Heritage Activity Funding – SR to provide update for next meeting
Publicity/Promotional Materials – costs to be identified by Comms
Subgroup
Gala Day and Clean Up Activities – WDC to transfer funding to
WDCVS to deliver these activities.  A range of groups are involved.  LC
asked for the dates of the Clean Up events to be circulated and
encouraged Board members to attend these events. 
LC noted that there remains a reasonable balance of capacity funding. 
DL agreed but reminded the group that resource and secretariat costs
have still to be deducted. LS noted that WDC costs need to be
identified. 
GM 
SR
SR 
Comms Subgroup 
SR 
LS/AD/DL 
8 Any Other Business Action 
 Connection with Dumfries Town Board
LC said that at the recent UK Government sponsored networking
event connection had been made with Dumfries Town Board, and it

Page 10

OFFICIAL 06/30/2026   
8
Official Sensitive
had been suggested that a meeting may be useful for both parties
and that the format and structure of such a meeting would need to
be established.  Discussion followed.  Points raised included:
LON said that it will be good to not work in isolation and that other
areas may have ideas that are worth considering for Clydebank.
LC noted that Dumfries Town Board has a very different structure
and that the Chamber of Commerce is heavily involved, including
as the employer of relevant staff.  What could Clydebank learn from
them?
It was noted that Dumfries is a very different area to Clydebank.
What does Dumfries’ community engagement look like?
DM asked what form Dumfries’s projects are taking.  DL said that
they have 19 projects. 
In terms of the format of the meeting, it was agreed that traveling by
either Board to the other was not viable and alternative
arrangements should be made, e.g. making use of West College
Scotland’s video-conferencing facilities.  Meeting options are to be
explored 
 Approach by National Lottery Community Fund (NLCF)
DL had been contacted by the NLCF.  There has historically been a
low uptake of lottery funding in Clydebank, although this varies
across the different NLCF funding sources.  Lottery funding
represents a potential source of match funding for PiP projects. This
avenue will be explored further once projects are more developed
and costs known.
LC noted that the UK Government has the view that PiP funding
should act as a lever to bring in additional external funding.
AD noted that other funders including the NLCF will have their own
branding requirements. 
 Community Hub
Chris Young (CY) gave an update on the Community Hub.  The
Subgroup was due to meet on the Tuesday following this Board
meeting.  CY also asked to be involved in the Employability & Skills
and Meanwhile Uses Subgroups. 
DM asked about the possible location of the Community Hub.  CY
said that the Salvation Army premises may be an option but there is
a duty to investigate other potential locations and there may be
more clarity after the Tuesday meeting of the Subgroup.
LC noted the importance of avoiding the displacement of existing
similar activities. 
LC/DL/AC

Page 11

OFFICIAL 06/30/2026   
9
Official Sensitive
9 Date and time of next Board meetings 
Date of next meeting to be confirmed.
LC said that she would be reluctant to decrease the frequency of Board
meetings.
LC acknowledged that the work of the Board is challenging for all
members, given that all have other responsibilities and thanked the
Board for the progress made to date.

Page 12

OFFICIAL 06/17/2026   
1
Official
Clydebank 
Neighbourhood 
Board
Action Plan 
Actions from 29 May 2026 meeting 
Agenda item Action By whom
3 Previous
minutes and
actions 
Map project management skills and experience of
Board members. Board members or project delivery
group members interested in having project
management training to advise Brian McColgan
(BM).
Board/Subgroups
Gail Macfarlane (GM) to ensure relevant Youth Hub
representatives are invited to a future Clydebank
Neighbourhood Board meeting.
GM
Selina Ross (SR) to meet with Louise Ewing (LE),
evaluating details attached to meanwhile uses work,
advising the board regarding suitable members
leading progress over the months ahead.
SR/LE
It was agreed that all those present will send along to
BM future schedules of upcoming meeting dates and
relevant group members of project delivery groups,
ensuring coordination of meeting dates/attendees is
facilitated.
Subgroup Leads
Ingrid Bjorkevoll (IB) to source from BM, updating LC
and subsequently circulate to the board, information
with reference to the professionals involved with
ongoing Community Hub meetings.
IB/BM
A discussion in relation to the prospect of
communicating either via reporting to Council or via
member briefing Pride in Place work and
achievements took place between all present. Sandie
Scott (SS) to highlight at the next upcoming
Committee meeting with Golden Jubilee.
SS
SR brought forward applications to the two open
adverts which will be evaluated over the coming
week; information will subsequently be shared with
the board.
SR

Page 13

OFFICIAL 06/17/2026   
2
Official
4 Regeneration
Plan Delivery  Amend Board Paper template for future project
delivery group updates to include section giving
background to the purpose of the Delivery Subgroup
reporting.
BM
Delivery Subgroup leads to provide written update if
they are unable to attend Board meetings.
Subgroup Leads 
South Sylvania Way Feasibility Group Updates 
Group is due to meet on the 8th June and a written
report will be available for the next Board meeting.  AD 
Subgroups to draw up a timetable setting out when
tangible outputs may occur.
Subgroup Leads
5 Marketing and
Communications
Quick Quotes for website design to be assessed by
the appointed panel and approved by
Communications Subgroup.
Panel/Comms
Subgroup 
Board members to be reminded that portraits and
pen portraits will be required for inclusion on website.
BM 
Press Release regarding award of Pride in Place to
be prepared including quote from community
representative.
Comms
Subgroup/Sandie
Scott/Louise
Ewing/Fiona McInnes
Promotional materials, e.g. display boards, to be
ordered.
Comms Subgroup
Consider engaging with local media outlets to
publicise Pride in Place activities.
Comms Subgroup
Each Project Delivery Subgroup should appoint a
Communications lead. 
Subgroup Leads    
6 Recruitment of
Project
Resource
To be progressed. AD
7 Finance Has the feasibility study budgeted for the Transport
Interchange in the report been commissioned? 
GM
Youth Engagement Budget – SR to liaise with Lucy
McGovern (LM) to progress.
SR/LM 
Heritage Activity Funding – SR to provide update for
next meeting 
SR
SR

Page 14

OFFICIAL 06/17/2026   
3
Official
Publicity/Promotional Materials – costs to be
identified by Comms Subgroup 
Comms Subgroup 
Gala Day and Clean Up Activities – WDC to transfer
funding to WDCVS to deliver these activities. 
Dates of the Clean Up events to be circulated and
encouraged Board members to attend these events. 
WDC 
SR 
Resource and secretariat costs to be identified and
deducted. 
LS/AD/DL
8 Any Other
Business
Explore options for meeting with Dumfries Town
Board, e.g. online/video-conferencing.
LC/DL
9 Date of next
meeting
Identify and circulate possible dates for subsequent
Board meetings.
LC/BM

Page 15

OFFICIAL 07/31/2026   
1
Official
Clydebank 
Neighbourhood 
Board 
Meeting details
Date 31 July 2026 Time 9:30 am 
Location Clyde Regional Shopping Centre Management Suite, Clydebank 
Agenda item details
Item number 4 Item
description
Project A1: Three Queens Square
For
information X
For
decison  Date of report  27 May 2026
Lead name Laurence Slavin
Michelle Lynn
Lead email Laurence.Slavin@west-dunbarton.gov.uk
Michelle.Lynn@west-dunbarton.gov.uk 
Report item details
1. Main issues
Further work has been undertaken to develop and refine the scope, objectives and proposed
delivery approach for Project A1: Three Queens Square. Building on previous Clydebank
Neighbourhood Board discussions, stakeholder engagement activity and site walk-round
observations, the project is being developed as a transformational public realm and placemaking
initiative focused on enhancing and activating the civic space adjacent to the Forth & Clyde Canal,
Clyde Shopping Centre and wider town centre. Previous discussions have highlighted the
strategic importance of the site as a focal point within Clydebank and identified opportunities to
create a more attractive, accessible and flexible space capable of supporting community events,
cultural activities and everyday use. 
Following a procurement exercise, Jones Associates have been appointed to provide project
management and professional support for the next phase of Project A1: Three Queens Square.
An inception meeting has since been undertaken to review the project's scope, procurement
strategy, programme and key objectives. Building upon feedback previously provided by Board
members and stakeholders, it was agreed that the project should focus on delivering a high-
quality public realm enhancement rather than the construction or demolition of buildings. The
anticipated capital investment available for the project is in the region of £2.5 million to £3 million.

Page 16

OFFICIAL 07/31/2026   
2
Official
The Board's previous observations continue to inform the developing brief and include improving
accessibility and visibility around the existing bandstand area, rationalising street furniture such as
bins and cycle racks, enhancing lighting and wayfinding, strengthening connections to the canal
and surrounding transport hubs, addressing the visual impact of the shopping centre gable wall,
reviewing cycle route alignments and exploring opportunities for public art, event infrastructure
and wider place activation. Particular consideration will be given to ensuring the space is inclusive,
accessible, resilient and capable of supporting a wide range of community, cultural and
commercial activities. The existing bandstand remains an important local feature and, whilst
relocation may be considered as part of future design options, its removal is not currently
proposed. 
Jones Associates have commenced preparatory work to develop the procurement documentation
and are currently gathering key baseline information, including site boundary information, utility
records, stakeholder feedback and existing project documentation. This work will inform a targeted
procurement exercise to appoint a suitably qualified landscape architecture-led design team with
demonstrable experience in delivering civic spaces, town centre regeneration and public realm
projects. 
The current programme anticipates approximately six months for surveys, design development,
stakeholder engagement, statutory approvals and procurement activities, followed by a
construction period of approximately six months. As the project progresses, further engagement
will be undertaken with the Three Queens Square Project Group and Clydebank Neighbourhood
Board to ensure that emerging proposals continue to reflect local aspirations and support the
wider objectives of the Clydebank Pride in Place Programme. 
2. Outline of any issues/risks and how these are being managed
At this stage the project remains in the development and procurement phase and no significant
issues have been identified that would prevent progression of the project. However, a number of
project risks continue to be actively managed. 
The principal risk relates to ensuring that the emerging design proposals accurately reflect the
priorities and aspirations previously identified through community engagement, stakeholder
consultation and Clydebank Neighbourhood Board discussions. This risk is being mitigated
through the use of existing engagement outputs, continued involvement of the Three Queens
Square Project Group, and ongoing engagement with the Clydebank Neighbourhood Board as the
project develops. 
There is also a risk that unforeseen site constraints, utility infrastructure requirements, ground
conditions or statutory approval requirements could impact upon project costs, scope or
programme. To mitigate this risk, baseline site information is currently being gathered and will be
used to inform the appointment of the design team and subsequent design development process.
Early consideration will also be given to planning, accessibility and technical requirements to
minimise the risk of delays during later stages of the project.

Page 17

OFFICIAL 07/31/2026   
3
Official
Given the significance of the existing bandstand within the square and its importance to local
stakeholders, there is a potential risk that differing views may emerge regarding its future role
within the space. This will be managed through the design development process, ensuring that
any options are properly assessed and subject to stakeholder engagement before decisions are
made. Previous discussions have recognised the bandstand as a valued local feature and any
future proposals will take account of this. 
A further risk relates to achieving the desired level of transformation within the available budget
envelope. The project budget remains in the region of £2.5 million to £3 million and the proposed
appointment of an experienced landscape architecture-led design team will ensure that design
proposals are developed with deliverability, affordability, long-term maintenance and whole-life
costs in mind from the outset. 
Finally, as the project moves into the design procurement phase, there is a risk that programme
timescales could be affected by procurement, survey or statutory approval processes. This is
being managed through the appointment of Jones Associates to provide project management
support, the early development of procurement documentation and the establishment of an
indicative programme to monitor progress against key milestones. 
Overall RAG Status: Green – project progressing as planned with identified risks understood and
appropriate mitigation measures in place. 
3. Outline of the main outputs expected before next meeting
The key focus before the next meeting will be progressing the procurement of a landscape
architecture-led design team, including completion of the project brief, tender documentation and
supporting site information. 
Engagement will continue with Scottish Canals and other key stakeholders to ensure opportunities
for integration with the canal corridor are reflected within the emerging design brief. 
The previously proposed Scottish Canals learning visit and meeting to review comparable canal-
side regeneration projects in Edinburgh was postponed and subsequently cancelled. Revised
arrangements will be developed with Scottish Canals and a new date brought forward for
consideration. 
The next update will therefore focus on:
o Completion of project inception and information gathering activities.
o Progression of design team procurement.
o Confirmation of programme milestones and next-stage governance arrangements.
o Agreement of revised arrangements for the Scottish Canals visit and stakeholder
engagement activities. 
4. What are the requirements to achieve the outcomes of this report?

Page 18

OFFICIAL 07/31/2026   
4
Official
To achieve the outcomes of this report, it will be necessary to continue progressing the
development phase of the project, including completion of project planning activities, procurement
of the specialist landscape architecture-led design team and ongoing stakeholder engagement.
Continued collaboration will be required with Jones Associates, Scottish Canals, the Three
Queens Square Project Group and other key stakeholders to ensure that the emerging proposals
are deliverable, align with stakeholder aspirations and maximise opportunities to support wider
town centre regeneration objectives. 
The successful delivery of the project will also require the completion of any necessary surveys,
technical assessments and statutory approvals, together with ongoing monitoring of programme,
budget and project governance arrangements. The Clydebank Neighbourhood Board will continue
to receive regular progress updates and provide strategic oversight as the project moves through
procurement, design development and delivery stages. 
No additional approvals are sought at this stage beyond existing delegated authority
arrangements. 
5. Recommendations
It is recommended that the Clydebank Neighbourhood Board:
o Note the progress made in developing the scope and delivery approach for Project A1:
Three Queens Square, including the appointment of Jones Associates to support the next
phase of the project. 
o Note the proposed procurement approach for the appointment of a landscape architecture-
led design team to progress the design and delivery of the project. 
o Note the continued development of the project brief, informed by previous stakeholder
engagement, Board feedback and project group discussions. 
o Note the intention to reschedule the Scottish Canals learning visit and stakeholder
engagement session to inform the next stage of project development. 
o Note that further updates will be brought to future meetings of the Clydebank
Neighbourhood Board as the project progresses through procurement, design development
and delivery stages.

Page 19

OFFICIAL 07/31/2026   
Official
Clydebank 
Neighbourhood 
Board 
Meeting details
Date 31 July 2026  Time 9.30am
Location Clyde Shopping Centre 
Agenda item details
Item
number
5

Item
description
Marketing and Communications Update
For
information  For
decision  Date of report  31/07/2026 
Lead name Sandie Scott
Lead email sandie.scott@gjnh.scot.nhs.uk 
Report item details
1. Main issues 
The Marketing and Communications subgroup are progressing several aspects of the
communication and engagement plan to ensure the work of the Neighbourhood Board is shared
with target audiences. Information on Revitalising Clydebank and the delivery of the Regeneration
Plan will be communicated via community events, workshops, and focused engagement sessions
as well as through digital and offline channels. 
The recent focus of activity of the subgroup has been advancing the new Board website and
considering Branding & Merchandise. An update on these is provided below: 
Website 
Following a competitive procurement process, Big Think Agency has been appointed to design
and develop a dedicated website for the Clydebank Neighbourhood Board. The agency brings
significant experience in delivering accessible, stakeholder-focused websites for public sector
organisations and has commenced work in line with the agreed project plan. 
A stakeholder engagement workshop was held on Friday 26 June 2026 at West Dunbartonshire
Community Voluntary Services (WDCVS). The session brought together partners, stakeholders
and members of the local community to inform the development of the website and ensure the

Page 20

OFFICIAL 07/31/2026   
Official
design reflects the needs of those who will use and contribute to it. The workshop provided
valuable insight into user requirements, content priorities and accessibility considerations. 
The project has now progressed into the design phase. Big Think Agency produced the first draft
website wireframes on 14 July 2026, providing an initial visual representation of the proposed
structure, user journeys and content layout. Consistent with the agency's agreed methodology, the
wireframes form the basis of stakeholder review before the development stage commences. 
Due to technical issues affecting access to the draft materials, some partners were unable to
review the wireframes immediately. As a result, a full discussion of the proposed designs took
place at the Communications Sub-Group meeting on 22 July 2026, ensuring that all partners had
the opportunity to consider and comment on the draft proposals. 
The Communications Sub-Group will meet with the Big Think Agency during the week
commencing 27 July 2026 to provide comprehensive feedback. This will allow the agency to
undertake the next iteration of the design, incorporating stakeholder feedback and ensuring the
website continues to reflect the aspirations of the Board and local community. 
Next Steps
 Consolidated partner feedback to be provided to Big Think Agency during the week
commencing 27 July 2026.
 Agency to revise wireframes and website architecture in response to stakeholder
comments.
 Updated designs to be presented for further review and approval before progressing to full
website development.
 Development timetable remains under review and will be reported through future Board
updates.
 Board members will be asked to review and user test the site at the appropriate time. 
Overall, the project is progressing as planned, with stakeholder engagement remaining central to
the website's development and ensuring the final platform supports transparency, community
participation and effective communication of the Clydebank regeneration programme. 
Branding and merchandise 
The Board's branding and visual identity work has continued to progress. Following the publication
of the Pride in Place brand guidelines by the UK Government, these guidelines have been shared
with partner organisations' graphic design teams and with Big Think Agency to ensure a
consistent approach across all communications and engagement materials. 
Building on the Pride in Place framework, the Board has established its own local brand identity
which is now being embedded across key communications channels. Meeting templates and
supporting documentation have been updated accordingly, and the branding will be reflected
throughout the dedicated website currently in development. This will help create a cohesive and
recognisable identity for the Board while maintaining alignment with the wider national Pride in
Place programme. 
The Communications Sub-Group is also exploring a range of practical and cost-effective
promotional materials to support stakeholder and community engagement. This includes the

Page 21

OFFICIAL 07/31/2026   
Official
development of lightweight foam boards for photo opportunities, banner stands and other branded
materials that can be used at community events, partner activities and public engagement
sessions. The focus is on creating reusable resources that provide visibility for the Board while
representing good value for money. 
Board and Working Group members are encouraged to liaise with the Communications Sub-
Group if they have specific promotional requirements or forthcoming events where branded
materials may be required. This will support a coordinated approach to branding, maximise
opportunities for community engagement and ensure consistency across all public-facing activity. 
Change to the communications plan 
The Communications Sub-Group has recently considered the role that social media could play in
supporting the Board's communications and community engagement objectives. While the Board
had previously discounted the use of dedicated social media channels due to the limited capacity
within partner organisations, stakeholder feedback has highlighted the value of social media as a
means of increasing awareness, improving accessibility of information and encouraging greater
community participation.
Research undertaken with other Pride in Place Boards across Scotland (below) has shown that
most have established a social media presence, either through internal resources, local authority
communications teams or commissioned support. The Sub-Group recognises the importance of
ensuring Clydebank residents are able to engage with Board activities through the channels they
use most frequently and is therefore exploring options for developing a sustainable approach to
social media.
Rather than commissioning an external company to manage social media activity, the
Communications Sub-Group is keen to explore opportunities that deliver wider community benefits
while supporting the Board's communications objectives. Subject to Board approval, the Sub-
Group would like to work with the Employability workstream to explore the creation of a
communications-focused apprenticeship, internship or similar development opportunity for local
young people. This would provide valuable skills and experience in communications, digital media
and community engagement, while helping to develop and manage the Board's communications
channels. 
Alongside this, the Sub-Group would like to establish a network of local community ambassadors
representing different communities, age groups and interests across Clydebank. The ambassador
network would help identify and share stories, successes and opportunities emerging from across
the programme, ensuring that local voices remain at the heart of the Board's communications.
Content generated through this approach could support social media activity, public relations,
website content and wider community engagement, while strengthening links between the Board
and the communities it serves. 
The Communications Sub-Group believes this approach presents an opportunity to build local
skills, create meaningful development opportunities and foster community ownership of the
Clydebank regeneration programme. The Sub-Group is therefore seeking the Board's support to

Page 22

OFFICIAL 07/31/2026   
Official
explore these proposals further and to work with the Employability workstream to develop a
sustainable model that maximises community benefit while providing an authentic and engaging
voice for the programme. 
For information:
Other Neighbourhood Boards were approached to determine who is responsible for updating their
website and posting/managing their social media accounts. The responses received are: - 
 Elgin - the Board is using the MyMoray website as their main website, which is managed
and updated by the Council's PR team. The Board works closely with Council PR to link in
with other regen activities in Elgin. The Board social media channels (FB, Instagram, and
LinkedIn) are separate from the Council and managed by the Board who have employed a
local social media consultant to manage them on their behalf. The consultant attends Board
meetings and has regular catch ups with the chair and project manager to decide on
postings. He links in with the Council PR team, takes photos/videos for content, etc. 
 Kirkwall (The Orkney Fund) - the Board website and social media are managed by the
Council's Communications team in consultation with the Board Chair. The Board pays
apportioned costs each year to Council for the service.
 Our Arbroath- the Board employs a local consultant to manage the website, social media
and PR including assisting with outreach to the community and ongoing consultation.
 We are Peterhead - the Board website and social media are managed in-house by the We
Are Peterhead project team in liaison with the Neighbourhood Board. 
 Dumfries Town Board- the Board website and social media managed by the secretariat
for the Board i.e., a member of the Board's staff who is employed via Chamber of
Commerce, in liaison with the Board chair and Programme Manager. 
 Our Irvine- the Board's vice chair is managing the website and social media at present (he
has a background in IT). Going forward, the Board is considering appointing a Comms
company to manage on their behalf. 
2. Outline of any issues/risks and how these are being managed
There is a risk that the Board's ability to effectively engage with communities and stakeholders will
be diminished if sufficient capacity is not identified to maintain the website and manage associated
communications channels, including social media. 
While awareness of the Board and its activity continues to grow through partner networks and
community engagement, it is important that communications are delivered through channels and
formats that are most accessible and relevant to different audiences. Without regular, timely and
accessible communications, there is a risk that sections of the community may be unaware of the
Board's activities, investment programmes and opportunities to participate in regeneration activity. 
This could result in reduced public engagement, missed opportunities to build community support
and confidence, and a perception that the Board is not communicating openly and transparently
about its work and achievements. 
3. Outline of the main outputs expected before next meeting

Page 23

OFFICIAL 07/31/2026   
Official
 Explore the development of a social media presence for the Board. 
 Work with the Employability workstream to develop proposals for an apprenticeship, internship
or similar opportunity. 
 Consider how we establish a community ambassador network to support content creation and
community engagement. 
 Develop a sustainable operating model and bring detailed proposals back to the Board for
approval. 
4. What are the requirements for achieving the outcomes of this report? 
To achieve the outcomes outlined in this report, continued collaboration and commitment from
Board members and partner organisations will be required. 
5. Recommendations
It is recommended that the Board:
 Notes the progress being made by the Marketing and Communications Sub-Group in
relation to the development of the website, branding and communications activity.
 Supports the proposed direction of travel to enhance community engagement through a
dedicated website, social media presence and community-led communications approach.
 Acknowledges the need for sustainable resource and capacity to effectively manage and
maintain these communications channels and support ongoing engagement activity.
 Supports further exploration of apprenticeship, internship and community ambassador
opportunities in partnership with the Employability workstream as a means of delivering
both communications capacity and wider community benefit.
 Agrees that the Communications Sub-Group should continue to develop these proposals
and bring forward detailed recommendations on delivery and resourcing for future Board
consideration.

Page 24

OFFICIAL 07/31/2026   
Official
Clydebank 
Neighbourhood Board 
Meeting details
Date 31 July 2026  Time 9.30am
Location Clyde Shopping Centre 
Agenda item details
Item
number
7

Item
description
Pride in Place Financial Update
For
information  For
decision  Date of report  31/07/2026 
Lead name Davina Lavery
Lead email davina.lavery@west-dunbarton.gov.uk 
Report item details
1. Main issues
Capacity Funding: The income and expenditure breakdown is shown below: 
INCOME (Capacity Funding)  
2023/24 plus 2024/25 £250,000
2025/26 £200,000
2026/27  £150,000
Total  £600,000
EXPENDITURE (Capacity Funding)  
FY 2024/25  
Community Grants Funding -£4,300
Consultancy Fees for development of LT plan and
Community Engagement
-£86,939
Board Meetings (*4) -£600
Adobe License -£185
WDC Staff Costs -£60,000
FY 2025/26  
Community grants & CVS Fees -£12,400
Board Workshop -£3,216
Regeneration Plan Prep (KMA) -£29,372
FY 2026/27

Page 25

OFFICIAL 07/31/2026   
Official
Grants for Gala Days (£20,000) & Planting and
Clean Ups (£10,000)
-£30,000
Website Development, Stage 1 -£3,700.00
Total Expenditure (end July 2026) -£231,034
Balance Remaining £368,966
Future Commitments  
Transport Interchange Feasibility Study -£5,000
Project Delivery Support (£10,000 per project to
assist with community engagement/consultation
activity)
-£60,000
Additional Community Clean ups and Planting  -£10,000
Youth Engagement Budget -£5,000
Heritage Festival activities -£5,000
Website Development, completion -£11,090
Total Future Commitments -£96,090
Balance remaining after commitments £272,876
An allocation will also be required to cover:
 additional resources to administer the funding i.e. Board secretariat (including legal,
procurement and other support); Programme Manager, Community Engagement Officer
 Communication & marketing aspects (e.g. branding and merchandise) as identified by the
Communications subgroup 
Delivery funding: The signed Clydebank Memorandum of Understanding was returned to the
MHCLG on 2 April 2026. This allowed the delivery funding for FY 26/27 to be released. The
income and expenditure breakdown is shown below:
INCOME (Delivery Funding) 
2026/27 Capital Funding £360,000
2026/27 Revenue Funding £232,000
Total £592,000
EXPENDITURE (Capital Funding)  
TQS Consultancy - Jones Associates  - £6,950
Total Expenditure (end July 2026) -£6,050
Balance Remaining £353,050
EXPENDITURE (Revenue Funding)   
0
Total Expenditure (end July 2026) 0
Balance Remaining £232,000 
The schedule of future payments outlined government guidance is: -

Page 26

OFFICIAL 07/31/2026   
Official
2. Outline of any issues/risks and how these are being managed
The Board needs to decide how the remaining capacity funding and delivery funding will be spent.
A proportion of the delivery funding is assigned to the priority projects which are being progressed
by the project delivery groups. The current delivery funding allocation for each of the priority
projects over the first 4 years of the programme is outlined below: - 
Capital Funding Revenue Funding
A1. Three Queens Square £2,230,000 
A2. Meanwhile uses £200,000 £175,000
A3. Community Hub  £1,360,000 £225,000
A5. Investigate remodeling the
southern section of shopping
centre 
£50,000
B1. Improve connections £1,150,000 £225,000
B2.  Develop new walking and
cycling trails
£366,000 £63,000
C1. Employability, skills &
training 
£431,640
There is a risk that not all projects will be sufficiently advanced to enable full spend of the
allocated amount in the early years of the programme and there is also a risk that the costs of
some of the projects may exceed the PIPP allocation. Additional match funding for some projects
may need to be explored. 
3. Outline of the main outputs expected before next meeting
a. Agree the amount of capacity funding to be allocated towards: -
 Fund administration, i.e., Board secretariat (including legal, procurement and other
support); Programme Manager, etc.
 Other communication and marketing aspects

Page 27

OFFICIAL 07/31/2026   
Official
b. Clarify how the capacity funding for heritage activities, youth engagement and additional
grant support for community activities will be allocated/managed.
c. An indication on whether each of the project delivery groups will be able to spend their
allocated funding for year 1 this financial year.
4. What are the requirements for achieving the outcomes of this report?
Engage in the process outside the Board meetings (e.g., through the project delivery groups,
communications and marketing subgroup etc.) to progress delivery of all aspects of the PIPP and
ensure spend of available capacity and delivery funding remains on track.   
5. Recommendations
It is recommended that the Board notes the financial information and decides on the points noted
in section 3 above, relating to the allocation of capacity funding and the use of delivery funding.

Page 28

OFFICIAL
OFFICIAL 
Nesil Caliskan MP 
Parliamentary Under-Secretary of
State
2 Marsham Street 
London 
SW1P 4DF 
17 July 2026 
Dear Chair,
Through the Pride in Place Programme, I am firmly committed to ensuring that power
and funding sit squarely in the hands of the community. As the Chair of your
Neighbourhood Board, you are critical to this. You are already bringing your community
together to come up with a plan for the future of your place and leading the way to
make this vision a reality. The local authority and your local MP are also key partners,
and must support and enable your Neighbourhood Board to deliver the change that
your community wants to see.  The aspiration for Neighbourhood Boards is to work
with and convene key partners, not for them to be treated or function as an extension
of the local authority. 
We are committed to going further and have set out an expectation that all
Neighbourhood Boards should move towards a community-led delivery model by the
end of year three of the programme. This will look different from place to place, and  I
know that many of you are already thinking ambitiously about what this transition
means for your neighbourhood. Some of you are exploring how you can set up new
independent entities, whether that is a community interest company, a community
benefit society or a cooperative – your Board will decide on the approach that is right
for them. It is these structures that will allow you to crowd in more funding, take
ownership of assets and build wealth in your community over the long-term. 
We recognise that making this shift will be a challenge, and that you are already facing
capacity pressures with upcoming milestones for phase two areas to confirm your
Board and carry out deep engagement across your community to inform your Pride in
Place Plan. We are committed to supporting all areas to transition towards a
community-led model, and encourage those areas that are keen to move quickly to
get started.
I was pleased to confirm 20 Early Adopter areas last month, who will lead the way in
building and testing different models for community-led delivery which will be shared

Page 29

OFFICIAL
OFFICIAL
across the programme, giving you a set of blueprints that you can learn from and
adapt. 
All areas will also be supported through the Network for Neighbourhoods, a national
capacity-building and peer-learning offer designed to help places access expertise,
build strong community leadership, and share good practice. This summer, the
Network is offering a programme of events and learning opportunities for Chairs,
including a session with leaders from Grimsby who will be sharing how they have put
the community in the driving seat. We will also be producing practical, clear guidance
on the pathway towards community-led delivery over the summer to help you get
started. 
I would encourage you all to register to join (https://www.eventbrite.co.uk/e/pride-in-
place-programme-chairs-summit-tickets-1992044249976?aff=oddtdtcreator ) the all
Chairs event on Friday 11 September. Hosted by Local Trust and This Day, the event
will be your chance to meet with other Chairs from Pride in Place areas, hear directly
from MHCLG about how the programme is operating, learn what others are doing,
and explore how to take your projects to the next level.
Through the Pride in Place Programme, I am committed to putting power into the
hands of those who know their communities best and look forward to seeing how
your plans develop. 
Yours sincerely,
Minister Nesil Caliskan