WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Roads & Neighbourhood
Infrastructure, Regeneration and Economic Development 16 August 2023
___________________________________________________________________
Subject: Waste Strategy
1. Purpose
1.1 The purpose of this report is to seek approval from the Committee on a new Waste
Strategy, which provides an overarching route map on how the Council intends to
achieve our regulatory and legislative targets over the next 5 years.
2. Recommendations
2.1 It is recommended that the Committee approves the Waste Strategy and Action Plan
attached in Appendix 2;
2.2  Notes that the Waste Service will develop funding bids for submission to the
Recycling Improvement Fund;
2.3  Notes the options appraisal undertaken in partnership with Zero Waste Scotland to
model a collection regime that improves recycling performance;
2.4  Notes the progress made in relation to the development and delivery of a Recycling,
Resource and Reuse Centre to support compliance with the Landfill Tax Ban; and
2.5 Notes the progress on delivery of the actions set out in the Fit for the Future Waste
Review.
3. Background
3.1 The Scottish Government have set out ambitious targets to achieve zero waste to
landfill by December 2025, Waste Services have created a waste strategy that looks
at the aims of the service and the key deliverables required to achieve the ambitious
targets set out by the Scottish Government.
3.2 The Scottish Government places duties on all public bodies to contribute to waste
reduction targets, deliver programmes to increase resilience, and to act in a more
‘Sustainable’ way. This Strategy will be underpinned by a suite of actions which will
support delivery and allow for more effective reporting.
3.3      The Waste Strategy is broken down into sections which includes:
• The creation of a Recycling, Resource and Reuse Centre;
• The development of a Communications Strategy to engage and inform
communities and businesses;
ITEM 13

Page 2

• Route optimisation and operational efficiencies; and
• Changes to our waste collection to increase recycling performance
4. Main Issues
4.1    The Council adopted the Climate Change Strategy in November 2020.  One of the
themes focused on waste and the circular economy.  To contribute towards meeting
the targets locally and nationally, the Council have developed a new ‘Waste
Strategy’ (Appendix 2) as a route map to 2025 and beyond.  Our vision is an
overarching Strategy that will set the foundation for a plan of action and a response
to changing legislation.
4.2    The Strategy aims to maximise the environmental, community and financial benefits
from the waste the Council produce, which will also help the Council to comply with
the statutory obligations, as set out in the Waste (Scotland) Regulations 2012, which
includes a ban on the landfilling of biodegradable waste by December 2025
(effectively this bans the landfilling of any recyclable waste collected by the Council),
and working towards meeting the reuse and recycling targets set by the Scottish
Government (70% recycling by 2025).
4.3 The Strategy looks at the following key principles.  These are:
• Mitigation - Contribute to reduction targets directly, and indirectly through wider
functions such as waste reduction and improved recycling performance.
• Adaptation - Deliver measures that reflect changing legislation and increase
resilience
• Sustainability - Consider social, economic and environmental impact of all
activities, policy decisions and Strategy.
4.4    The overall themes of this Strategy are:
• preventing waste at source
• enhancing recycling services to maximise recycling as close to source as possible
• maximising the value of the remaining waste
• driving efficiencies across the service
• engaging communities and ensuring services are fit for future
The activities outlined will be subject to ongoing and regular review to ensure they  
achieve their sustainability objectives and continue to demonstrate best value.
4.5 Successful implementation of the Waste Strategy will require internal governance at
both strategic and operational levels.  To ensure that this Strategy is delivered
effectively, a Waste strategy project board has been implemented involving senior
management from each Council service area, ensuring shared responsibility.

Page 3

4.6 The Strategy and action plan will be monitored and reviewed annually and progress
on actions will be updated with more numerical targets being added when
developed.   Every 5 years it will go through a full progress review and then an
updated Strategy will be published as a result.  
4.7 Waste services will be accountable for the delivery of the Strategy and the action
plan.  The project board group will measure progress and will ensure targets and
objectives are being met.  These will be measured annually through our internal
performance system.
4.8 In order to determine the actions required to improve recycling performance Waste
Services have worked in partnership with Zero Waste Scotland to model waste
collections options.  The options appraisal recommended a 3 weekly collection of
residual waste with maintained or increased frequency of the collection of recycling
material. 
4.9 Operational service improvements have been delivered through the progressing of 
actions identified in the Fit for Future review for waste collection.  The Route
Optimisation will address the remaining actions and will be implemented in Autumn
2023 following communication and engagement with communities.  These actions 
directly link to service efficiencies and improving our recycling rates and target   
reducing the amount of waste sent to landfill.  
5. People Implications
5.1 There are no direct people implications arising from this report.
5.2 The indirect people implications include a requirement for Council wide engagement
and uptake, with staff at all levels across all service areas, in order to mainstream
Waste practices across the services delivered.
6. Financial and Procurement Implications
6.1 The Waste Strategy will support the implementation of the long term waste solution
including the construction of the, operational efficiencies and improving recycling
performance.
6.2 To deliver the actions set out in the Strategy procurement will be required of
technical expertise for example the detailed design of the Recycling, Resource and
Reuse Centre.
6.3 Delivery of the Strategy requires consideration of available funding sources, both
internally and externally, to achieve targets and actions. Various types of funding for
a range of projects and activities are currently available from the Scottish
Government, in particular the Recycling Improvement Fund.   This would ensure that
the Council takes advantage of additional funding streams to support delivery of the
actions.

Page 4

6.4 Consideration will be taken of the whole-life cost of the Strategy and action plans,
with more emphasis placed on the long term savings made from reducing waste and
efficiency improvements in waste collection.
7. Risk Analysis
7.1 All strategies are risk assessed in line with Council policy and procedures.
7.2 The Council has a duty to deliver services that demonstrate best value.
7.3 There is a risk that the Council is not compliant with the Landfill Tax Ban being
introduced in December 2025 if procurement of a long term waste solution is not
successful.
8. Equalities Impact Assessment (EIA)
8.1 The Waste Strategy is intended to work towards positive engagement with all
equality groups and the wider community, via partnerships, empowerment and
Engagement within and outside West Dunbartonshire.
Screening and impact assessments will be carried out on the Strategy delivery as
required.
9. Consultation
9.1 A public consultation on Waste was carried out via an online survey, receiving a total
of 600 responses.  The feedback has shaped the strategy and in particular the
communications strategy.
9.2 The trade unions have been consulted and are members of the Waste Project
Board.
10. Strategic Assessment
10.1 This report reflects the 2022 – 2027 Strategic Plan and in particular the following
Strategic Priorities:
• Our resources are used in an environmentally sustainable way
• Our Council is adaptable and focused on delivering best value for our
residents
•
Gail MacFarlane
Chief Officer, Roads & Neighbourhood
22 July 2023
Person to Contact:  Gail MacFarlane  
Chief Officer - Roads & Neighbourhood

Page 5

gail.macfarlane@west-dunbarton.gov.uk
Appendices: Appendix 1 – Additional Information
Appendix 2 – Waste Strategy
Background Papers: Zero Waste Scotland - Options Appraisal
Wards Affected: All
Page 5

Page 6

Appendix 1 
• Resource, Recovery & Recycling Centre
• Additional equipment/vehicles
• Resource Time (tight timescales)
• Deposit Return Scheme 
• The statutory obligations, as set out in the Waste (Scotland) Regulations 2012, 
• Ban on the landfilling of biodegradable waste by December 2025 (effectively this
bans the landfilling of any recyclable waste collected by the Council),
• Working towards meeting the reuse and recycling targets set by the Scottish
Government (70% recycling by 2025).
• Household Charter 
• 38% recycling rate
• Collaboration with Zero Waste Scotland
• Route options appraisal and modelling
• Community Questionnaire
• Resident engagement 
• Communications strategy to improve recycling performance
• Service delivery improvements
• Fit for the Future review
• Location approval for the RRRC
• Feasibility study 
Page 6

Page 7

• Consideration will be taken of the whole-life cost of the Strategy and action plans,
• Emphasis placed on the long term savings made from reducing waste
• Efficiency improvements in waste collection.
• Waste Strategy delivers key drivers towards the delivery of the Climate Change
Action Plan 
0
5
10
15
20
25
30
35
40
45
50
2017/18 2018/19 2019/20 2020/21 2021/22
How much waste is recycled
WDC Recycling Rate % National Average %
Page 7

Page 8

0 5,000 10,000 15,000 20,000 25,000 30,000
2019/20
2020/21
2021/22
2022/23
WDC Waste
Waste Landfilled (Tonnes) Waste Recycled(Tonnes)
Page 8