Item 12 - Appendix 1
West Dunbartonshire Council · 16 August 2023
Back to Infrastructure, Regeneration & Economic Development Committee — 16 August 2023 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
SC SC SC FFL FFL FFL FFL FFLFFL LP RL RL RL RL RL RL EL EL EL EL EL EL AG1 AG1A H1 T1 76.52 76.90 77.30 77.59 78.19 78.83 79.53 80.32 80.94 81.54 82.17 82.48 82.84 84.15 85.39 91.38 88.73 84.08 80.41 77.08 81.95 84.31 84.89 82.60 83.21 85.53 78.29 77.69 77.0877.08 84.34 81.97 80.4280.62 85.51 83.15 92.76 92.72 93.80 94.80 92.75 92.38 90.75 91.18 94.01 94.21 94.42 94.01 93.84 93.65 92.63 92.12 92.35 91.82 91.44 90.52 89.75 89.41 88.96 87.34 86.53 85.50 86.89 88.06 87.16 85.48 84.03 84.33 83.68 82.91 81.72 80.86 79.05 77.81 77.37 78.21 82.06 83.32 86.26 90.05 91.26 91.18 90.90 90.81 90.50 89.74 89.17 88.48 87.61 86.41 85.88 87.88 89.18 89.81 90.14 90.27 89.23 87.82 84.82 82.26 81.10 79.88 80.79 82.10 84.16 86.80 89.08 89.85 89.31 88.38 86.79 84.09 82.59 84.45 86.92 88.54 87.74 85.48 84.97 87.05 85.49 85.08 84.95 80.28 83.35 83.33 83 36 92.10 93.36 88.82 87.32 81.10 86.66 87.08 89.15 90.75 91.01 89.10 81.91 81.64 76.64 77.28 77.78 78.36 78.93 79.26 80.05 80.68 81.34 81.87 82.25 82.54 82.65 82.77 82.75 82.73 82.62 82.49 82.34 81.96 81.43 80.77 80.16 79.66 79.37 79.10 78.75 78.39 77.80 77.26 76.86 76.83 76.81 76.56 76.49 76.82 77.07 77.67 78.31 79.03 79.31 79.61 80.08 80.69 81.37 81.85 82.26 82.57 82.65 82.70 80.50 85.0 85.0 85.0 84.5 84.5 85.5 85.5 94.0 94.0 93.5 93.0 92.5 92.0 92.0 91.5 91.5 91.0 91.0 90.5 90.5 90.0 90.0 89.5 89.5 89.0 89.0 88.5 88.5 88.0 88.0 87.0 87.0 87.0 86.5 86.5 86.5 86.0 86.0 86.0 84.0 84.0 87.5 87.5 78.0 78.5 79.0 79.5 80.0 80.5 80.5 81.5 81.5 82.0 82.0 81.0 81.0 82.5 82.5 83.5 83.5 83.0 83.0 80.5 1.0M Brick Wall 1.0M C/L Fence 1.8M P/R Fence Tarmac Footpath IC IC GY GY Tarmac Footpath 1.8M C/B Fence 1.8M C/B Fence 1.8M C/B Fence 1.5M Brick Wall 1.8M Palisade Fence 1.8M P/R Fence Grass 1.8M C/B Fence 1.2M P/W Fence EL. Sub Stn. Brambles Brambles Dense Brambles & Tipped Debris Contours Indicative Unable to Survey Ditch Upstream CRAIGIELEA ROAD GY DK MH CL GY MH CL CRAIGIELEA ROAD Building Building 2.2M Palisade Fence Public Open KASSELL KERB AT BUS STOP BUS STOP SIGN PROVIDED BY SPT BUS STOP MARKING TO DIAG 1025.1 1.8 2.7 EXISTING TRAFFIC CALMING TO BE REPOSITIONED. POSITION TO BE AGREED WITH WDC. 2.7 EXISTING FOOTWAY WIDENED TO 2.7m TO ACCOMMODATE 1.4m WIDE BY 4.1m LONG CANTILEVER BUS SHELTER KASSELL KERB AT BUS STOP EXISTING FOOTWAY WIDENED TO 2.7m TO ACCOMMODATE 1.4m WIDE BY 4.1m LONG CANTILEVER BUS SHELTER CUT SLOPE TO ACCOMMODATE WIDENED FOOTPATH88.264 88.705 89.146 89.422 89.363 88.974 88.474 87.974 87.474 86.974 86.473 85.973 85.473 84.973 84.472 83.972 83.472 82.972 82.713 REMOTE FOOTPATH LINK BETWEEN DEVELOPMENT AND BUS STOPS. GRADIENT 1 IN 20. PROPOSED REMOTE PATH (284M2) Barratt Homes West Scotland and David Wilson Homes Scotland 7 Buchanan Gate. Cumbernauld Road. Stepps. Glasgow. G33 6FB Tel : 0141 779 8300 Fax : 0141 779 8301 www.barratthomes.co.uk www.dwh.co.uk Drawn By: Drawing Number: Checked By: Date Drawn: Revision: Issue Status: Scales: Project Title: Drawing Title: DateDrwnRev Description Chckd © Indev Consult Ltd ITEM 12 - APPENDIX 1 · DO NOT SCALE FROM THIS DRAWING · THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND VERIFICATION OF ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT · THE CONTRACTOR SHALL CONFIRM AND BRING TO THE ATTENTION OF THE ENGINEER ANY DISCREPANCIES CONTAINED IN THIS DRAWING PRIOR TO COMMENCEMENT. Phone: 01698 744 610 Email: info@indevconsult.com Website: www.indevconsult.com Address: Duart House, 3 Finch Way, Strathclyde Business Park, Bellshill, ML4 3PR STOP LOCATIONS OFF-SITE BUS DUNTOCHER FARM ROAD DW 01.03.2022 1:500 21-028-42 B 0 5 15 25 SCALE 1:500 50m A Added scale bar ZB 13/04/2022 B Remote f'path added DW 27/04/2022