Democracy Spraffa

Item 10 -Sale of former ATC site Auchentoshan Estate, Clydebank

West Dunbartonshire Council · 16 August 2023
Back to Infrastructure, Regeneration & Economic Development Committee — 16 August 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer: Supply, Distribution and Property
Infrastructure Regeneration and Economic Development Committee:
16 August 2023
___________________________________________________________________
Subject :   Sale of 1.08 Hectares (2.66 acres) of land at Auchentoshan Estate,
Mountblow Road, Clydebank
1. Purpose
1.1 The purpose of this report is to seek Committee approval for the Council of
the Committee that the Council enter into a contract for the disposal of 1.08
Hectares (2.66 acres) of land at Auchentoshan Estate, Mountblow Road,
Clydebank to Brian Kilgour.
2. Recommendations
2.1      It is recommended that the Committee:
(i) Approve the disposal of the site to Brian Kilgour, at a price of £225,000
plus VAT.
(ii) Authorise the Chief Officer, Supply, Property and Distribution to
conclude negotiations on such conditions as considered appropriate.
(iii) Authorise the Chief Officer, Regulatory and Regeneration to conclude
the transaction on such conditions as considered appropriate.
3. Background
3.1 This land is wholly owned by West Dunbartonshire Council and comprises
cleared land which previously housed the former Auchentoshan Day Centre at
the Auchentoshan Estate in Clydebank. The land is currently unoccupied and
has been for a number of years, extending to 1.08 Hectares (2.66 acres) or
thereby and as shown delineated bold on the Location Plan attached as
Appendix 1.
3.2 A lease disposal (with Option to Purchase) to The Church of Scotland
operating as ‘CrossReach’ was previously approved by Committee on 17
September 2014. However, the transaction with CrossReach ultimately did
not conclude and has remained available and marketed for sale by Asset
Management since that time.
ITEM 10

Page 2

3.3. The site is accessed by a private road leading from Mountblow Road,
Clydebank, which in turn connects the A82 trunk road to the north with
Dumbarton Road (A814) to the south.
3.4 In terms of historic use, the Day Centre which was owned and operated by
the Council, closed in February 2009 and the service was relocated. Following
the closure, the property suffered from extensive vandalism and was subject
of several arson incidents. As a result, the building became dilapidated,
unsafe and a financial burden on the Council in terms of ongoing maintenance
and security. The building was therefore demolished by the Council in 2013.
3.5 The main part of the site (was previously occupied by the former Day
Care building) is level which then drops steeply to the south down to a level
terrace which is accessed by a rough roadway. The lower area accessed by
stone steps from the upper terrace is included within the area to be potentially
sold.
3.6 Generally the site is unfenced and open apart from palisade fences to the
east and south of the building. At other boundaries, there is a mixture of trees
and low timber post and wire fencing. The site is secluded within an extensive
woodland area subject to Tree Preservation Order(s). 
3.7 Three residential dwellings border the site on the west and existing vehicle
and pedestrian access rights to them must be retained. In addition, two
woodland paths emerge at the north end of the site and access to the same
must also be reserved.
3.8 The site property benefits from mains water, electricity and gas connections.
The drainage system is via a private sewer leading generally south of the site,
through Dalmuir Golf Course and joins the public sewer which also runs
through the golf course and into Littleburn Place, Clydebank. Part of the
drainage system from the Kilpatrick Nursery School and the three houses to
the west of the site also link into the private sewer.
4. Main Issues
4.1 The property is not required by the Council for any operational purposes.
4.2 The site has been available for sale and ultimately unsold for a considerable
number of years.
4.3 The Property has been extensively marketed and an offer was received by
Brian Kilgour for him to purchase the property.
4.4 Brian Kilgour intends to develop the site for Social Housing use in the form of
new build detached, semi-detached and terraced units.

Page 3

4.5 Officers believe this to a fair and competitive price for the property having due
regard to its characteristics and challenging disposal history.
4.6 Any application for a specific land use and erection of any structures by the
proposed purchaser will require to be considered by the Planning Committee
in due course.
4.7 Officers are advised construction of this new housing will be via an innovative
3D printing process (the likes of which has been implemented in Germany, for
example) and will be the first of its kind in Scotland. The favoured application
for this would be COBOD 3D printing or better. Planning consent has not yet
been sought or obtained for the prospective purchaser’s proposal.
5. People Implications
5.1 There are no significant people implications other than the resources required
by Legal Services to negotiate missives and conclude the transaction.
6. Financial and Procurement Implications
6.1 The Council will benefit from a capital receipt of £225,000 plus VAT.
6.2 The Council will no longer have to incur resources in managing the property.
6.4 There are no procurement implications arising from this report.
7. Risk Analysis
7.1 The disposal is subject to legal due diligence.
7.2 As with any transaction of this nature there is a risk of the sale not proceeding
due to issues which arise during the due diligence process and the property
may require to be retained on a leasehold basis.
8. Environmental Sustainability
8.1 We understand the prospective purchaser intends to develop the site for
Social Housing use, in particular, via sustainable construction techniques and
methods.
9. Equalities Impact Assessment (EIA)
9.1 An Equality Impact Assessment is not applicable for the purpose of this
report.
10. Consultation
10.1 Consultations have been undertaken with Finance and Regulatory Services,
Planning and Road Services.

Page 4

11. Strategic Assessment
11.1 By agreeing to this proposal the Council will benefit in terms of receiving a
capital receipt and removing a potential liability from the Councils books.
11.2 A site which has lain vacant and unused for a number of years will be brought
back into positive land use.
11.3 By agreeing to this proposal this will be contributing to the Council’s strategic
priority for a strong local economy and improved opportunities.
Angela Wilson
Chief Officer: Supply, Distribution and Property
Date: 20 July 2023
Person to Contact: Michelle Lynn, Asset Coordinator.
Email: michelle.lynn@west-dunbarton.gov.uk
Craig Maxwell, Estates Surveyor. 
Email: craig.maxwell@west-dunbarton.gov.uk
Appendices: Appendix 1 - Location Plan
Background Papers:  None 
Wards Affected: Ward 5