Democracy Spraffa

IRED Committee 24 05 23 - Document Pack (Bookmarked)

West Dunbartonshire Council · 24 May 2023
Back to Infrastructure, Regeneration & Economic Development Committee — 24 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda
Infrastructure, Regeneration and
Economic Development Committee
Date:  Wednesday, 24 May 2023
___________________________________________________________________
Time:  10:00 a.m. 
___________________________________________________________________
Format:  Hybrid meeting
___________________________________________________________________
Contact:  Nicola.moorcroft@west-dunbarton.gov.uk
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Infrastructure, Regeneration and Economic
Development Committee as detailed above. 
Members will have the option to attend the meeting remotely, or in person, at the Civic
Space, 16 Church Street, Dumbarton, G82 1QL.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor David McBride (Chair)
Councillor Jonathan McColl
Councillor Michelle McGinty
Councillor John Millar 
Councillor Lawrence O’Neill (Vice Chair)
Councillor Lauren Oxley
Councillor Chris Pollock
Councillor Martin Rooney
Councillor Gordon Scanlan
Councillor Hazel Sorrell
Councillor Clare Steel
Councillor Sophie Traynor
All other Councillors for information
Chief Executive
Chief Officer – Regulatory and Regeneration
Chief Officer – Supply, Distribution and Property
Chief Officer – Roads and Neighbourhood
Date of Issue:  11 May 2023
Audio Streaming
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and the
Council’s host’s webcast/audio stream platform.
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including, but not
limited to, for the purpose of keeping historical records and making those records available
via the Council’s internet site.
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/
Page 2

Page 3

INFRASTRUCTURE, REGENERATION AND ECONOMIC
DEVELOPMENT COMMITTEE
WEDNESDAY, 24 MAY 2023
AGENDA
1 STATEMENT BY CHAIR – AUDIO STREAMING
The Chair will be heard in connection with the above.
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Committee is asked to agree that all votes taken during the meeting be done by
roll call vote to ensure an accurate record.
5 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
6 MINUTES OF PREVIOUS MEETING  7 – 10
Submit for approval as a correct record, the Minutes of the Meeting of the
Infrastructure, Regeneration and Economic Development Committee held on 1
February 2023. 
7/
Page 3

Page 4

7 REGULATORY AND REGENERATION DELIVERY PLAN   11 – 34
(ECONOMIC DEVELOPMENT ELEMENTS) 2022/2023 YEAR
END REPORT AND REGULATORY AND REGENERATION 
(ECONOMIC DEVELOPMENT ELEMENTS) DELIVERY PLAN
2023/2024
Submit report by the Chief Officer – Regulatory and Regeneration, setting out
the Regulatory and Regeneration (Economic Development Elements) Delivery Plan
2022/23 end of year report and Regulatory and Regeneration (Economic
Development Elements) Delivery Plan for 2023/24.
8 ROADS AND NEIGHBOURHOOD DELIVERY PLAN   35 – 69
2022/23 YEAR END REPORT AND ROADS AND 
NEIGHBOURHOOD DELIVERY PLAN 2023/24
Submit report by Chief Officer – Roads and Neighbourhood, setting out the Roads
and Neighbourhood Delivery Plan 2022/23 end of year report and Roads and
Neighbourhood Delivery Plan for 2023/24.
9 SUPPLY, DISTRIBUTION AND PROPERTY   71 – 90
(CORPORATE ASSET MANAGEMENT) DELIVERY PLAN 
2022/23 YEAR END REPORT AND SUPPLY, DISTRIBUTION
AND PROPERTY (CORPORATE ASSET MANAGEMENT) 
DELIVERY PLAN 2023/24 
Submit report by Chief Officer – Supply, Distribution and Property, setting out the
Supply, Distribution and Property (Corporate Asset Management) Delivery Plan
2022/23 Year End Report and Supply, Distribution and Property (Corporate Asset
Management) Delivery Plan for 2023/24.
10 SALE OF 90-96 NORTH STREET, ALEXANDRIA G83 0EB 91 – 98
Submit report by Chief Officer – Supply, Distribution and Property seeking approval
to enter into a contract for the disposal of the property at 90-96 North Street,
Alexandria to NWL Investment Ltd.
11 SALE OF PROPERTY AT 26-30 GLASGOW ROAD 99 – 101
CLYDEBANK G81 1SE
Submit report by Chief Officer – Supply, Distribution and Property seeking approval
enter into a contract for the disposal of the property at 26-30 Glasgow Road,
Clydebank to Idrigil Ltd.
12/
Page 4

Page 5

12 DEPOT RATIONALISATION PROJECT DELIVERY PHASE 2  103 – 111
Submit report by Chief Officer – Supply, Distribution and Property providing an
update on the current status of the Depot Rationalisation Project and seeking
approval to progress with Phase 2, which would see the delivery of refurbished depot
accommodation across two sites.
13 ASSET TRANSFER OF LAND AT KILMARONOCK 113 – 116
KIRK, G83 0SB
Submit report by Chief Officer – Supply, Distribution and Property seeking approval
for the transfer of an area of land to Kilmaronock Old Kirk Trust following a
Community Asset Transfer request.
14 ASSISTED UPLIFT POLICY REVIEW   117 – 119
Submit report by Chief Officer – Roads and Neighbourhood, setting out detail on the
review of the Assisted Uplift Policy and the proposed eligibility criteria to be adopted
and issued to all current users.
15 LEASE DISPOSAL OF FORMER LOCH LOMOND To Follow
OUTDOOR CENTRE 
Submit report by Chief Officer – Supply, Distribution and Property regarding the
above.
16 UPDATE ON DISPOSAL STRATEGY       To Follow
Submit report by Chief Officer – Supply, Distribution and Property regarding the
above.
_________________________________________________________________
Page 5

Page 6

Page 6

Page 7

INFRASTRUCTURE, REGENERATION AND ECONOMIC
DEVELOPMENT COMMITTEE
At a Hybrid Meeting of the Infrastructure, Regeneration and Economic Development
Committee held in the Civic Space, 16 Church Street, Dumbarton on Wednesday, 
1 February 2023 at 10.00 a.m.
Present: Councillors David McBride, Jonathan McColl, Michelle McGinty,
John Millar, Lawrence O’Neill, Lauren Oxley, Chris Pollock,
Martin Rooney, Gordon Scanlan, Hazel Sorrell, Clare Steel and
Sophie Traynor.
Attending: Peter Hessett, Chief Executive; Angela Wilson, Chief Officer –
Supply, Distribution and Property; Gail Macfarlane, Chief Officer
– Shared Services Roads and Neighbourhood; Craig Jardine,
Corporate Asset Manager; Michelle Lynn, Asset Coordinator;
Laurence Slavin Chief Officer – Resources; Alan Douglas, Chief
Officer – Regulatory and Regeneration Gillian McNamara,
Economic Development Manager; and Nicola Moorcroft and
Lynn Straker Committee Officers.
Councillor David McBride in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor David McBride, Chair, advised that the meeting was being audio streamed
and broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
RECORDING OF VOTES
The Committee agreed that all votes taken during the meeting be done by roll call
vote to ensure an accurate record.
OPEN FORUM
The Committee noted that no open forum questions had been submitted by
members of the public.
ITEM 6
Page 7

Page 8

MINUTES OF PREVIOUS MEETING
The Minutes of Meeting of the Infrastructure, Regeneration and Economic
Development Committee held on 2 November 2022 were submitted and approved as
a correct record.
ECONOMIC DEVELOPMENT ELEMENTS OF THE REGULATORY AND
REGENERATION DELIVERY PLAN 2022/23 INTERIM PROGRESS REPORT
A report was submitted by the Chief Officer – Regulatory and Regeneration, setting
out the interim progress of the Economic Development Elements of the Regulatory
and Regeneration Delivery Plan 2022/23.
It was noted that following the issue of the papers for the meeting, a revised version
of the appendix to the report, had been issued. 
After discussion and having heard the Chief Officer – Regulatory and Regeneration
and the Economic Development Manager, in further explanation and in answer to
Members’ questions, the Committee agreed to note the progress achieved.
ROADS AND NEIGHBOURHOOD DELIVERY PLAN 2022/23 INTERIM
PROGRESS REPORT
A report was submitted by the Chief Officer – Roads and Neighbourhood, setting out
interim progress of the Roads and Neighbourhood Delivery Plan 2022/23.
After discussion and having heard the Chief Officer – Shared Services Roads and
Neighbourhood in further explanation and in answer to Members’ questions, the
Committee agreed to note the progress achieved.
SUPPLY, DISTRIBUTION AND PROPERTY DELIVERY PLAN 2022/23,
CORPORATE ASSET MANAGEMENT INTERIM PROGRESS REPORT
A report was submitted by the Chief Officer – Supply, Distribution and Property
setting out the interim progress of the Corporate Asset Management priorities within
the Supply, Distribution and Property Delivery Plan 2022/23.
After discussion and having heard the Chief Officer – Supply, Distribution and
Property, in further explanation and in answer to Members’ questions, the Committee
agreed to note the progress achieved.
Page 8

Page 9

UPDATE ON THE ACTIVITY BY CLYDEBANK PROPERTY COMPANY LTD.
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing an update on the financial position of Clydebank Property Company
following completion of the final audit accounts.
After discussion and having heard the Chief Officer – Resources, in further
explanation and in answer to Members’ questions, the Committee agreed:-
(1) to note that Clydebank Property Company returned a net loss of £0.176m in
2021/22;
(2) to note that, as at 31 March 2022, Clydebank Property Company had total
reserves of £3.635m of which £2.929m were non-distributable and £0.706m
were distributable; and
(3) to note the change of directors on the Clydebank Property Company Board
with the resignation of Peter Hessett and appointment of Alan Douglas.
SALE OF SITE AT GAITSKELL AVENUE, ALEXANDRIA G83 0QL
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval for the Council to enter into a contract for the disposal of a
development site at Gaitskell Avenue, Alexandria to William Mayberry.
After discussion and having heard the Asset Coordinator in further explanation and
in answer to Members’ questions, the Committee agreed:-
(1) to approve the sale of the property to William Mayberry for the sum of £25,500
with the potential for a further sum of £10,000 on receipt of a successful
planning consent;
(2) to authorise the Chief Officer – Supply, Property and Distribution to conclude
negotiations; and
(3) to authorise the Chief Officer –  Regulatory and Regeneration to conclude the
transaction on such conditions as considered appropriate.
CORPORATE ASSET FRAMEWORK AND PROPERTY ASSET PLAN
2023 – 2028
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing the new Corporate Asset Framework and the Property Asset Plan 2023 –
2028.
Page 9

Page 10

After discussion and having heard the Corporate Asset Manager in further
explanation and in answer to Members’ questions, the Committee agreed to approve
the Corporate Asset Management Framework; and the Property Asset Plan 2023 –
2028.
INFRASTRUCTURE, REGENERATION AND ECONOMIC DEVELOPMENT
BUDGETARY CONTROL REPORT 2022/23 TO PERIOD 8 (30 NOVEMBER 2022)
A report was submitted by the Chief Officer – Resources providing an update on the
financial performance to 30 November 2022 of those services under the auspices of
the Infrastructure, Regeneration and Economic Development Committee (IRED).
After discussion and having heard the Chief Officer – Resources in further
explanation and in answer to Members’ questions, the Committee agreed:-
(1) to note the contents of this report which showed the revenue budget forecast
to overspend against budget by £0.956m (7.02%) at the year-end, of which
£0.030m was COVID-19 related, therefore the non-covid variance was
currently projected at £0.926m adverse, and
(2) to note the net projected annual position in relation to relevant capital projects
which was highlighting a projected variance of £19.235m (40.14%) due to re-
profiling of £18.033m (37.63%) and an underspend of £1.203m (8.25%).
The meeting closed at 10.27 a.m.
Page 10

Page 11

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Regulatory & Regeneration
Committee: Infrastructure, Regeneration and Economic Development
Committee 24 May 2023
Subject: Regulatory & Regeneration Delivery Plan 2022/23 - Economic
Development Year-end Progress
Regulatory & Regeneration Delivery Plan 2023/24 - Economic
Development
1 Purpose
1.1 This report sets out the year-end progress of the 2022/23 Plan and presents
the new Plan for 2023/24 in relation to Economic Development.
2 Recommendations
2.1 It is recommended that Committee notes the progress achieved at year-end
and the new Plan for 2023/24.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators for monitoring progress and considers the
relevant risks.
4 Main Issues
2022/23 Year-end Performance
4.1 The 2022/23 Plan was presented to Infrastructure, Regeneration and
Economic Development Committee on 2 November 2022 and interim
progress reported on 1 February 2023.
4.2 Full details of year-end progress are set out in Appendix 1.
4.3 Of the 6 actions due to be completed by 31 March, all were completed as
planned.
4.4 Data is available for one of the five performance indicators set out in the Plan
and this met the target set.
4.5 The full set of performance indicators will be reported through the Council’s
annual performance reporting process once all data becomes available.
ITEM 7
Page 11

Page 12

2023/24 Plan
4.6 An extract from the Regulatory & Regeneration 2023/24 Delivery Plan is
included in Appendix 2. This sets out the achievements and challenges for
Economic Development over the past year, as well as the priorities for the
year ahead, namely:
• monitoring and reporting the progress of the 2023/24 Economic
Development action plan;
• delivering key regeneration sites across West Dunbartonshire;
• promoting the next phase of Queens Quay Housing;
• identifying and developing commercial opportunities;
• supporting business recovery;
• supporting town centre revitalisation;
• monitoring and reporting the progress of the Climate Change Action Plan;
and
• developing a Local Heat and Energy Efficiency Strategy.
4.7 Implementation of the Plan will be monitored by the management team with
mid-year and year-end progress reported to Infrastructure, Regeneration and
Economic Development Committee around November 2023 and May 2024
respectively.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Economic Development may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
Page 12

Page 13

10 Strategic Assessment
10.1  The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Alan Douglas
Service Area: Regulatory & Regeneration
Date:  3 May 2023
_____________________________________________________________
Person to Contact:  Lynn Henderson
lynn.henderson@west-dunbarton.gov.uk
Appendices: Appendix 1: Regulatory & Regeneration Delivery Plan
2022/23 - Economic Development Year-end Progress
Appendix 2: Regulatory & Regeneration Delivery Plan
2023/24 - Economic Development
Background Papers: Regulatory & Regeneration Delivery Plan 2022/23 -
Economic Development, Infrastructure, Regeneration and
Economic Development Committee, 2 November 2022
Regulatory & Regeneration Delivery Plan 2022/23 -
Economic Development Interim Progress, Infrastructure,
Regeneration and Economic Development Committee, 1
February 2023
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 13

Page 14

Appendix 1: Regulatory & Regeneration Delivery Plan 2022/23 - Economic Development Year-end Progress
Our Environment
Our resources are used in an environmentally sustainable way
Performance Indicator
2021/22 2022/23
Owner Value Status Value Target Short
Trend
Long
Trend Note
Tonnage of carbon dioxide
emissions from Council
operations and assets
24,022
Data available end of August 2023 when all utilities bills and waste figures are validated in
advance of preparing our annual mandatory climate change report for submission to
Scottish Government in November 2023.
Gillian
McNamara
Action Status Progress Due Date Note Owner
Co-ordinate, monitor and report
the progress of the Council’s
Climate Change Action Plan for
2022/23
31-Mar-
2023
The Climate Change Action Plan continues to be
monitored regularly and progress reported quarterly to
the Recovering & Renewal Board via the Climate
Change Action Group. The most recent progress report
was submitted to the Recovering & Renewal Board in
December 2022. At that point, 7 actions were complete,
11 actions were progressing as planned, and 4 PI's were
off-track. The year-end position will be available in
August and reported to IRED.
Gillian
McNamara
ITEM 7 - APPENDIX 1
Page 14

Page 15

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Inability to reduce
carbon footprint in
line with targets
The risk that the Council will be unable
to achieve net zero emissions by 2045,
both in relation to mitigating carbon
emissions and adapting to the impacts
of climate change. Net zero refers to
achieving an overall balance between
emissions produced and emissions
taken out of the atmosphere. This target
has been developed in a way that
mirrors the emission reduction trajectory
set by the Scottish Government in light
of the Climate Emergency.
11-Apr-2023
Until all carbon emissions
data becomes available in
August 2023 and analysed,
the risk profile will remain the
same.
Gillian
McNamara
Our neighbourhoods are sustainable and attractive
Action Status Progress Due Date Note Owner
Promote the next phase of
Queens Quay Housing
31-Mar-
2023
Regular meetings are taking place with the owner and
development agent of the site to discuss the next
housing phase for Queens Quay. The Council are
investigating ways of supporting the provision and
implementation of further housing on Queens Quay.
Pamela
Clifford;
Gillian
McNamara
Page 15

Page 16

Our Economy
Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Performance Indicator
2021/22 2022/23
Owner Value Status Value Target Short
Trend
Long
Trend Note
Number of businesses given
advice and assistance to
start up through Business
Gateway
201 205 200
During 2022/23, 205 business
start-ups were supported through
the Business Gateway service
which slightly exceeded the target
of 200.
Gillian
Scholes
No of business gateway
start-ups per 10,000
population
22.9
2022/23 data for LGBF indicators will be available in the first quarter of 2024 following
publication by the Improvement Service.
Gillian
Scholes
Cost of Economic
Development & Tourism per
1,000 population
154,517 Gillian
Scholes
Proportion of properties
receiving superfast
broadband
98% Gillian
Scholes
Action Status Progress Due Date Note Owner
Deliver key regeneration sites
across West Dunbartonshire
31-Mar-
2023
Exxon site - Council (August 2022) and Glasgow City
Region (November 2022) agreed to defer Final Business
Case that unlocks capital funding for the infrastructure at
the Exxon site until June 2023.
Carless site - Officers are working with the Malin Group to
progress the Scottish Marine Technology Park at Carless.
Malin Group are creating flood storage to enable
Gillian
McNamara
Page 16

Page 17

Action Status Progress Due Date Note Owner
development and working towards submitting a planning
application.
Lomondgate site - Strathleven Regen Community Interest
Company are negotiating the sale of the final sites for
development at Lomondgate and considering options for a
successor company. 
Explore commercial
opportunities in our town
centres and wider regeneration
sites
31-Mar-
2023
Funding application submitted to the Scottish
Government's Green Growth Accelerator fund in early
December to expand the infrastructure and capacity of the
District Heating Network. Progressing the first phase of
the Artizan redevelopment. Early intervention works were
approved by IRED in September 2022 with demolition of
the vacant building to the rear commencing in mid-2023. A
feasibility study for redevelopment is also underway.
Gillian
McNamara;
Magda
Swider
Support Town Centre Recovery 31-Mar-
2023
Multi-year projects include: first phase of Alexandria
Masterplan, including Smollett Fountain roadworks, which
is now complete; first phase of the Clydebank Town
Centre Framework, including a Levelling Up Fund funding
application for the proposed transportation hub and
planning for the development of the Playdrome site; and
agreed first stage improvement plan for the Artizan
Centre, with works soon underway.
Gillian
McNamara;
Magda
Swider
Develop a new Economic
Development Strategy and
action plan
31-Mar-
2023
The Economic Development Strategy 2022/27 was
approved at IRED Committee on 2 November 2022. The
supporting action plan has been developed and
commenced implementation 1 April. 
Gillian
McNamara;
Gillian
Scholes
Page 17

Page 18

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Note Owner
Affordability of the
Exxon City Deal
Project
There is a risk that the affordability
of delivering the City Deal Exxon
project is beyond the resources
being made available from
Glasgow City Region City Deal.
13-Apr-2023
Risk remains unchanged. The
project board is looking at
savings options during the
design development to
mitigate rising costs.
Gillian
McNamara
Failure to deliver
Queens Quay
Masterplan
Following completion of Council
investment there is a risk the
housing plot sales do not
materialise in the next 3-7 years,
with implications for the return on
investment and the business case
for the District Heating Network.
05-Apr-2023
Risk remains unchanged.
Focus continues on
landowners securing new
housing developments for the
site.
Pamela
Clifford;
Gillian
McNamara
Inability to meet
demands of
Council to
progress
regeneration
projects within
desired timescales
The number and complexity of
regeneration projects is putting
considerable strain on the
resources available which can be
exacerbated by delays out with the
control of the service and when
pinch points on different projects
occur at roughly the same time.
05-Apr-2023
Risk remains unchanged.
Individual projects continue to
progress, reducing the
likelihood of undesirable
outcomes.
Pamela
Clifford;
Alan
Douglas;
Gillian
McNamara
Page 18

Page 19

Action Status
Overdue
Completed
PI Status
Target significantly missed
Target narrowly missed
Target met or exceeded
Risk Status
Alert
Warning
OK
Long Term Trends
Improving
No change
Getting worse
Short Term Trends
Improving
No change
Getting worse
Page 19

Page 20

2023/24
REGULATORY &
REGENERATION
Appendix 2: Regulatory & Regeneration Delivery Plan 2023/24 – Economic Development
Economic Development
Extract
ITEM 7 - APPENDIX 2
Page 20

Page 21

Contents
1. Introduction ................................................................................................................................................................................2
2. Performance Review .................................................................................................................................................................2
3. Strategic Assessment ................................................................................................................................................................5
4. Resources ............................................................................................................................................................................... 10
Appendix 1: Action Plan ..................................................................................................................................................................... 12
Page 21

Page 22

1. Introduction
Regulatory & Regeneration comprises a wide range of services covering legal, trading standards, licensing, records management,
planning, building standards, environmental health, democratic and registration services, and economic development. It is one of
eight strategic areas responsible for delivering the Council’s Strategic Plan. Key actions to help achieve that are set out in this
Delivery Plan, together with actions to address any performance issues and service priorities identified in the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services Committee
and Infrastructure, Regeneration & Economic Development Committee (economic development elements only) twice yearly, at mid-
year and year-end.
2. Performance Review
The management team completed a detailed review of 2022/23 performance, focusing on the following:
• 2022/23 Delivery Plan year end progress;
• Local Government Benchmarking Framework comparative data;
• Association for Public Service Excellence comparative data;
• Planning Performance Framework;
• Building Standards Performance Report;
• Citizens’ Panel feedback;
• Telephone Survey feedback;
• Complaints; and
• Continuous Improvement (Fit for Future reviews).
This review highlighted our key achievements in 2022/23 as well as the challenges to be addressed in 2023/24. Those for cross
service and Economic Development are summarised below.
Page 22

Page 23

Key Achievements in 2022/23
Listed below are some of the major achievements in each service area that were particularly challenging or unusual.  All services
achieve many other fantastic outcomes for the Council and its residents throughout the year which are not recorded here but are
often as important.
Cross Service
• Expansion of the Queens Quay District Heating Network continued, with Clydebank Town Hall and Library now connected and
the first domestic customers benefitting from low cost, low carbon energy.
• Preferred developer appointed for the Playdrome site, one of the early phases of the Clydebank Town Centre Development
Framework.
• Project Board set up in partnership with the Malin Group to oversee the development of the Scottish Marine Technology Park.
Malin Group using Clyde Mission funding to implement the flood mitigation works and the early phases of the quay
development.
• First phases of the Levelling Up Fund programme of work in Dumbarton town centre underway.
• Successfully awarded £1.25million of Scottish Government funding to help transform a vacant site into a development of eco-
friendly homes as part of stage two of the Vacant and Derelict Land Investment Programme.
Economic Development
• Provided support to 205 new business start-ups and held 56 free business skills webinars with 346 attendees to support
businesses during a very challenging time.
• Developed a new Economic Development Strategy for 2022 to 2027, providing a clear strategic approach to economic
development and resource allocation to improve economic performance.
• Secured funding totalling £750,000 through the UK Shared Prosperity Fund to provide a range of support interventions to local
businesses.
• First projects within the Alexandria Masterplan implemented.
Page 23

Page 24

Key Challenges in 22/23
Cross Service
• The loss, recruitment and training of key staff across Regulatory & Regeneration continued to be a challenge in 2022/23 when
demands on all services continued to be high.
• The national skills shortage of qualified and experienced officers in Planning, Environmental Health, Trading Standards and
Building Standards continued in 2022/23, resulting in reduced staff complements across many services and increased demands
on existing and inexperienced staff. This is a challenge experienced by most local authorities and has resulted in alternative
service delivery models, including the use of agency staff and initiatives being led at a national level such as Future Planners
Project and Building Standards hub.
Economic Development
• Delivering private sector homes at Queens Quay continued to be a challenge in 2022/23 but we meet with our commercial
partner regularly to monitor and encourage development interest.
• Securing Scottish Government Heat Network funding to connect the NHS Golden Jubilee and Dalmuir/Littleholm flats to the
District Heating Network has been a long and challenging process but we continue our efforts in anticipation of a positive
outcome in 2023/24.
• Businesses continued to face many economic challenges in 2022/23, including rising inflation and energy costs. The business
interventions approved through the UK Shared Prosperity Fund and the on-going advice and support available through
Business Gateway will continue to provide assistance to help them recover and grow in the year ahead.
• Delivery of the Levelling Up Fund programme of works in Dumbarton town centre against tight funding timescales was
challenging given the multi-disciplinary support required to deliver projects of this nature.
Page 24

Page 25

3. Strategic Assessment
The Regulatory & Regeneration management team completed a detailed strategic assessment to determine the major influences
on service delivery and priorities in 2023/24 and beyond. This covered a review of local and national political priorities, new
legislation and technology, Council policies, and our continued recovery from the pandemic, cost of living crisis and the financial
challenges facing the Council. The key issues are outlined below.
Key Factors
Financial Challenges
The entire public sector is continuing to face significant financial challenges due to a range of factors including inflationary cost
increases, rising utility costs and insufficient funding to support the delivery of front line and back office services. The Council are
currently faced with an estimated cumulative funding gap in 2024/25 of £9.7m rising to £29.5m by 2027/28.  We will continue to
monitor the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected
Members throughout 2023/24.
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that
within Regulatory & Regeneration, available funding will be reduced over time and we will need to reconfigure how we work, what
we do, where we work, and potentially reduce the number of people employed. In this context, we will aim to continue to provide a
sustainable, quality service to internal clients and the public.
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to the sensitivity of these budgets, in particular for higher
risk/ higher value budgets which may have a significant impact on budgetary control and future budget projections. The analysis
has considered sensitivity around demand, costs and charges, and income levels. 
In Regulatory and Regeneration there were no budgets identified as being more susceptible to fluctuations. However, on a more
Council-wide basis, the Council’s cost of borrowing is susceptible to fluctuations in the bank interest rate due to the level of the
Council’s short-term borrowing.
Page 25

Page 26

Economic Development Action Plan
A new Economic Development Strategy for 2022/27 was approved by IRED Committee in November 2022. It sets out the vision
and priorities for delivering economic growth and improved well-being in West Dunbartonshire’s communities and is aligned to the
new Strategic Plan 2022/27, the Glasgow City Region Economic Strategy and the Scottish Government’s National Strategy for
Economic Transformation.
An action plan to deliver the strategy has been developed for implementation in 2023/24. It focuses on delivering key regeneration
sites, developing the Queens Quay site, identifying and developing commercial opportunities, supporting business recovery, and
supporting town centre revitalisation (details below).  The action plan will be implemented throughout 2023/24 and progress
monitored and reported to IRED. 
Action: Produce, implement, monitor and report the progress of the 2023/24 Economic Development action plan
Deliver Key Regeneration Sites
A number of key regeneration projects, which span multiple years, will continue to be taken forward in 2023/24. These include:
• the Exxon project, with detailed design works and final business case due in 2023/24;
• Alexandria Masterplan and Clydebank Development Framework, both of which aim to develop their respective town centres;
• the Scottish Marine Technology Park (SMTP) at the Carless site which will be submitting a Planning In Permission application
for  the masterplan of the site which will indicate how the various parts of the site are to be remediated and developed; and
• a range of projects funded through the £20m Levelling Up fund, including the redevelopment of Glencairn House, the
regeneration of the Artizan Shopping centre, and connecting Dumbarton Central to the Town Centre, all of which will have a
significant impact on Dumbarton and the town centre vibrancy.
Actions: Deliver key regeneration sites across West Dunbartonshire; Ensure regenerations sites are progressed to enable high
quality development to be achieved on the ground; and Monitor the development of the key regeneration sites to ensure they
comply with the approved consent
Page 26

Page 27

Queens Quay
Infrastructure works for this 80 acre residential waterfront development were completed in 2020/21. In the year ahead, the focus on
securing housing developments across the site in partnership with site owner Clydeside Regeneration Ltd. will continue. The site
wide design codes, which set out a vision for the Clydebank site and ensure all new developments meet the same high standards,
are complete and efforts to promote and market the plots will be critical to ensure the Council’s investment sees economic as well
as commercial returns. This continues to be a challenge, particularly in relation to flatted private homes which the market is finding
difficult to make commercially viable. 
Action: Promote the next phase of Queens Quay Housing
Deliver Key Commercial Opportunities
Identifying commercial opportunities in conjunction with the private sector will continue to be a priority. Discussions with developers
who may wish to enter a partnership with the Council to achieve joint benefits from a commercial, housing and low carbon
perspective will be progressed. The Regeneration Capital Fund with £12.77m has been allocated across a number of projects. The
Fund’s key operating principles and allocations to specific projects agreed by Committee will be progressed. Opportunities include:
• Exxon – as infrastructure works progress, the Council will consider how to promote and deliver the best uses for the site and,
working with the City Region and Scottish Enterprise, will encourage developer interest in the site to meet the growth targets set
out in the City Deal business case.
• NHS Golden Jubilee – our strong partnership will continue as we collaborate on the extension of the District Heating network to
the hospital and explore opportunities presented by the expansion of the hospital for development and regeneration of Queen
Quay and Clydebank, generally.
• Scottish Marine Technology Park – we will continue to work with the Malin Group in their ambition to deliver the Scottish Marine
Technology Park at the former Carless site near Old Kilpatrick, and assist them in attracting business and funding to the site. A
project board has been established to provide support and direction as the Malin Group progress the development through the
planning and infrastructure implementation stages.
Action: Explore commercial opportunities in our town centres and wider regeneration sites
Page 27

Page 28

Supporting Business Recovery
In April 2022 the UK government launched the UK Shared Prosperity Fund, a central pillar of the UK government’s Levelling Up
agenda, providing funding for local investment across the UK by March 2025. A Local Investment Plan has been developed and
approved by the UK Government as part of a wider Glasgow City Region Investment Plan through the Fund. The business support
proposals within the Investment Plan will be available from April 2023 to support business recovery and include a Business
Recovery & Growth fund, Early Stage Growth grants, Towards Net Zero Grant, Enhancing Tourism Events & Attractions Fund,
Business Gateway Expert Help and Shopfront & Small Business Improvement Grants.
Action: Develop and implement business support interventions through the UK Shared Prosperity Fund
Supporting Town Centre Revitalisation
Assisting town centres to recover from the pandemic and cost of living crisis will continue to be a focus in 2023/24, with support for
high street businesses a key priority and in response to community needs. We will continue to develop projects to make our town
centres attractive places and take advantage of the Place-Based Investment Programme funds provided by Scottish Government.
• The approved Clydebank Development Framework includes the disposal and development of the former Playdrome site, a
transport hub at Clydebank Station, improved connections between the town centre and Queens Quay, with a linear green park
from Canal south to Transport Interchange, and related community-led activity, all as part of a cohesive plan for Clydebank. We
will look for ways to deliver these improvements including securing funding and attracting commercial and other development
interest.
• In Dumbarton, the focus for the next year and beyond will be the Levelling Up Fund programme of works including Connecting
Dumbarton which will be completed during 23/24; the refurbishment and reuse of Glencairn House as library and museum and
the revitalisation of the Artizan Centre.
• In Alexandria the next phase of the 2021 Masterplan will be implemented with an emphasis of place based funded projects. This
will include improved walking and cycling routes, town centre building improvements and projects that directly respond to local
community and business priorities
Action: Support town centre revitalisation
Page 28

Page 29

Climate Change Action Plan
The Council developed a Climate Change Strategy in response to the climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy informs annual action plans, with actions devolved to
relevant service areas. Progress against the 2023/24 action plan will be monitored and reported to senior management and Council
on a regular basis.
Action: Co-ordinate, monitor and report the progress of the Council’s Climate Change Action Plan for 2023/24
Local Heat and Energy Efficiency Strategy (LHEES)
The Council will develop a Local Heat and Energy Efficiency Strategy (LHEES) which will set out the long-term plan for heat
decarbonisation and improved energy efficiency of buildings throughout the Council area. Scotland’s statutory greenhouse gas
emissions reduction and fuel poverty targets will be the drivers of this area-based approach. The Strategy will set out the changes
needed to each sector of buildings stock, identify strategic heat decarbonisation zones and prioritise delivery areas. A Delivery Plan
will accompany the LHEES, developed in partnership with key stakeholders.   
Action: Develop Local Heat and Energy Efficiency Strategy
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed Regulatory & Regeneration priorities
for 2023/24. Appendix 1 sets out the action plan to address them. It also includes:
• performance indicators that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions to address workforce issues identified in the planning process; and
• strategic and/or service risks.
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated
strategic objectives and those that require strategic leadership. Service risks relate to service delivery and represent the potential
for impact on individual services, or the experience of those who work within the services, i.e. employees, partners, contractors and
volunteers or service users and clients in receipt of the services provided. In identifying the relevant risks for 2023/24 and actions to
mitigate them, we aim to improve or maintain the current position (i.e. the current risk score) set out in the appendix.
Page 29

Page 30

4. Resources
Finance
Regulatory & Regeneration has a net revenue budget of £3.196m and a capital budget of £0.079m in 2023/24. A breakdown by
service area is set out below. We will make the best use of the resources available to deliver on key priority areas and secure
external/match funding where this is possible.
Service Area 
(Figures subject to ongoing
verification)
Gross Expenditure
2023/24 (£m)
Gross Income
2023/24 (£m)
Net Expenditure
2023/24 (£m)
Capital Budget
2023/24 (£m)
Democratic & Registration 0.948 0.121 0.827 0.000
Environmental Health 1.120 0.375 0.744 0.000
Licensing 0.317 0.467 -0.149 0.000
Legal Services & Trading Standards 1.030 0.191 0.839 0.033
Building & Planning 1.363 0.615 0.748 0.000
Economic Development 1.391 1.204 0.187 0.046
Total 6.169 2.973 3.196 0.079
Employees
Employee Numbers
The headcount and full time equivalent (FTE) staff in each service area (as of 31st March 2023) are as follows:
Page 30

Page 31

Absence
The 2022/23 quarterly absence figures for Regulatory & Regeneration are shown below together with the Council average for the
same periods for comparison. Absence was significantly lower that the Council average throughout 2022/23:
Absence in 2022/23 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost
per FTE employee
Regulatory &
Regeneration
1.69 1.52 1.68 0.73 5.06
COUNCIL WIDE TOTAL 3.86 3.28 4.42 4.02 14.00
Regulatory and Regeneration Headcount FTE
Democratic Services 26 21.86
Economic Development 20 17.94
Legal Services 23 22.01
Planning, Building Control 44 41.80
Regulatory Management 2 2.00
TOTAL 115 105.61
Page 31

Page 32

Appendix 1: Action Plan
Our Environment
Our resources are used in an environmentally sustainable way
Performance Indicator 2023/24 Owner Target
Tonnage of carbon dioxide emissions from Council operations and assets 20,495 Gillian McNamara
Action Due Date Owner
Co-ordinate, monitor and report the progress of the Council’s Climate Change Action Plan for
2023/24 31-Mar-2024 Gillian McNamara
Develop a Local Heat and Energy Efficiency Strategy 31-Dec-2023 Gillian McNamara
Risk Description Current
Assessment
Target
Assessment Owner
Inability to reduce
carbon footprint in line
with targets
The risk that the Council will be unable to achieve net
zero emissions by 2045, both in relation to mitigating
carbon emissions and adapting to the impacts of climate
change. Net zero refers to achieving an overall balance
between emissions produced and emissions taken out of
the atmosphere. This target has been developed in a
way that mirrors the emission reduction trajectory set by
the Scottish Government in light of the Climate
Emergency.
Gillian
McNamara
Page 32

Page 33

Our neighbourhoods are sustainable and attractive
Action Due Date Owner
Promote the next phase of Queens Quay Housing 31-Mar-2024 Pamela Clifford;
Gillian McNamara
Our Economy
Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
Performance Indicator 2023/24 Owner Target
Number of businesses given advice and assistance to start up through Business Gateway 200 Gillian Scholes
Number of business gateway start-ups per 10,000 population 21.98 Gillian Scholes
Proportion of properties receiving superfast broadband 100% Gillian Scholes
Action Due Date Owner
Produce, implement, monitor and report the progress of the 2023/24 Economic Development
action plan 31-Mar-2024 Gillian McNamara
Deliver key regeneration sites across West Dunbartonshire 31-Mar-2024 Gillian McNamara
Explore commercial opportunities in our town centres and wider regeneration sites 31-Mar-2024 Gillian McNamara;
Magda Swider
Support town centre revitalisation 31-Mar-2024 Gillian McNamara;
Magda Swider
Develop and implement business support interventions through the UK Shared Prosperity Fund 31-Mar-2024 Gillian Scholes
Page 33

Page 34

Risk Description Current
Assessment
Target
Assessment Owner
Affordability of the
Exxon City Deal
Project
There is a risk that the affordability of delivering the City
Deal Exxon project is beyond the resources being made
available from Glasgow City Region City Deal.
Gillian
McNamara
Failure to deliver
Queens Quay
Masterplan
Following completion of Council investment there is a
risk the housing plot sales do not materialise in the next
3-7 years, with implications for the return on investment
and the business case for the District Heating Network.
Pamela
Clifford; Gillian
McNamara
Inability to meet
demands of Council to
progress regeneration
projects within desired
timescales
The number and complexity of regeneration projects is
putting considerable strain on the resources available
which can be exacerbated by delays out with the control
of the service and when pinch points on different
projects occur at roughly the same time.
Pamela
Clifford; Alan
Douglas;
Gillian
McNamara
Page 34

Page 35

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Roads and Neighbourhood 
Infrastructure, Regeneration and Economic Development 24 May 2023
Subject: Roads and Neighbourhood Delivery Plan 2022/23 - Year-end Progress
& Roads and Neighbourhood Delivery Plan 2023/24
1 Purpose
1.1 This report sets out the year-end progress of the 2022/23 Delivery Plan and
presents the new Delivery Plan for 2023/24.
2 Recommendations
2.1 It is recommended that Committee notes the progress achieved at year-end
and the new plan for 2023/24.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
4 Main Issues
2022/23 Year-end Performance
4.1 The 2022/23 Delivery Plan was presented to Infrastructure, Regeneration and
Economic Development Committee on 2 November 2022 and interim
progress reported on 1 February 2023.
4.2 Full details of year-end progress are set out in Appendix 1.
4.3 Of the 21 actions due to be completed by 31 March, 17 were completed as
planned with 4 outstanding. Outstanding actions relate to the following and will
be carried forward and completed in 2023/24:
• Develop a new local bio diversity action plan - 50% complete
• Finalise the delivery of a suitable new allotment site with provision for 40
traditional plots – 80% complete
• Completion of deliver new gymnasium, changing facilities and all weather
running track – 80% complete
• Progress changes in quantities of plastic and glass collections due to the
introduction of a national deposit return scheme – 80% complete
ITEM 8
Page 35

Page 36

4.4 Data is available for all of the 19 PIs set out in the plan. Of these, 13 met or
exceeded targets, two narrowly missed targets and four significantly missed
target. The latter relate to the following: 
• Percentage of routine road related defects repaired within 28 working days
of being reported – 37.7% against a target of 85%
• Percentage of residents satisfied with roads maintenance – 29% against a
target of 41%
• Percentage of total household waste that is recycled – 38.1% against a
target of 60%
• Tonnage of biodegradable municipal waste landfilled – 16,402 against a
target of 13,300
4.5 14 of the 19 PIs either improved over the previous year or sustained the high
performance recorded in 2022/23 (as shown in the short trend column in
Appendix 1) with 12 PIs performing similarly over the longer term (long trend
column).
4.6 The full set of PIs will be reported through the Council’s annual performance
reporting process once all data becomes available.
2023/24 Delivery Plan 
4.7 The 2023/24 Delivery Plan is set out at Appendix 2.
4.8 Key priorities include: 
• Continue to support collaborative and partnership working
• Respond to pavement parking regulations and deliver expansion plan for
electric vehicle (EV) charging points including charging for the use of Council
owned charging points
• Progress Gruggies Burn flood management and develop a surface water
management plan
• Respond to ash die back, pesticide regulations and review the bio diversity
strategy
• Improve play park and recreational facilities and expand the Vale of Leven
cemetery
• Prepare for the deposit return scheme
• Progress long term waste strategy to ensure compliance with legislation
• Prepare a strategy for transition to electric fleet
• Review service delivery models across Greenspace and Waste Services.
4.9 Implementation of the Plan will be monitored by the management team with
mid-year and year-end progress reported to Infrastructure, Regeneration and
Economic Development Committee around November 2023 and May 2024
respectively.
5 People Implications
Page 36

Page 37

5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Citizen, Culture and Facilities,
may have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Gail Macfarlane
Service Area: Roads and Neighbourhood
Date:  26 April 2023
_____________________________________________________________
Person to Contact:  Karen Connelly
Performance & Strategy Business Partner
karen.Connelly@west-dunbarton.gov.uk
Appendices: Appendix 1: Roads and Neighbourhood 2022/23 – Year-
end Progress
Appendix 2: Roads and Neighbourhood Delivery Plan
2023/24
Page 37

Page 38

Background Papers: Roads and Neigbourhood Delivery Plan 2022/23 –
Infrastructure Regeneration and Economic Development
Committee, 2 November 2022.
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 38

Page 39

Appendix 1 - R&N Delivery Plan Year-end Progress 22/23
1. Our communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of emergency road related defects
repaired within 2 hours of being reported 100% 96% 95% Performance exceeded target. Liam Greene
Percentage of non-serious road related defects
repaired within 7 working days of being reported 72.2% 92.65% 85% Performance exceeded target. Liam Greene
Percentage of routine road related defects repaired
within 28 working days of being reported 38.8% 37.7% 85%
Significantly missed target. Service
has prioritised emergency and
serious defects due to recovery from
the pandemic and activity that was
restricted during that period. The
percentage of non serious defects
repaired within timescales is likely to
increase now the winter period has
come to an end. Roads Operations
will undertake a review of working
practises and procedures including
implementation of the structural
patching project as approved
through the budget setting process
to improve performance and ensure
targets are achieved.
Liam Greene
Percentage of all traffic light repairs completed
within 48 hours 100% 100% 98% Performance exceeded target. Liam Greene
Percentage of all street light repairs completed
within 7 days 99% 98.75% 95% Performance exceeded target. Liam Greene
Action Status Progress Due Date Note Owner
ITEM 8 - APPENDIX 1
Page 39

Page 40

Action Status Progress Due Date Note Owner
Review winter gritting programme and
implement a more effective service provision
31-Mar-
2023
Action complete. Winter Plan reviewed and implemented prior to the start
of the winter season. Liam Greene
Objective 2. Our residents health and wellbeing remains a priority
Action Status Progress Due Date Note Owner
Completion of deliver new gymnasium, changing
facilities and all weather running track
31-Mar-
2023
Action completion delayed. Running track complete and final remedial
works underway at Posties Park. Due to connection issues with Scottish
Gas and Scottish Water the project has been delayed with an estimated
completion date of 31st July 2023. This action will be carried over to
2023/24.
Ian Bain
2. Our Environment
Objective 4. Our local environment is protected, enhanced and valued
Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of residents satisfied with the Waste
service overall 81% 82% 85%
Marginally missed target with
performance marginally improved
from last year. The route
optimisation project has been
approved through the budget setting
process and will deliver
improvements set out in the fit for
future service review.
Kenny Lang
Percentage of missed bins collected within 3
working days of being reported 98.5% 98.7% 95% Exceeded target. Kenny Lang
Percentage of offensive graffiti removed within 24
hours of being reported 100% 100% 100% Target met. Ian Bain
Percentage of non offensive graffiti removed within 100% 100% 100% Target met. Ian Bain
Page 40

Page 41

Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
5 working days of being reported
Percentage of total household waste that is
recycled 37% 38.1% 60%
Target significantly missed.
Performance has marginally
improved since last year.  The
service has reviewed the waste
strategy including collection and
separation of materials and are
developing a project that will create
a better recycling solution for WDC.
The feasibility study is complete for
the recycling reuse and resource
centre (RRRC) and approval is being
sought to move to detailed design.
Kenny Lang
Percentage of residents satisfied with the street
cleaning service 72% 72% 70% Performance exceeded target. Kenny Lang
Percentage of residents satisfied with Parks & open
spaces 87% 84% 85%
Marginally missed target and
performance marginally down from
last year. The planned improvement
to play parks and recreational
facilities should help improve this.
Ian Bain
Percentage of abandoned vehicles that require to
be removed by the council that are removed within
14 days
100% 100% 100% Target met. Ian Bain
Action Status Progress Due Date Note Owner
Produce a revised service delivery model that
reflects the changes in quantities of plastic and
glass collections due to the introduction of a
national deposit return scheme.
31-Mar-
2023
Due to the delay in the implementation of deposit return scheme, now due
March 2024, there will be changes to the delivery of the milestones
however preparatory works are at an advanced stage. This action will be
carried forward to 2023/24.
Kenny Lang
Finalise the delivery of a suitable new allotment
site with provision for 40 traditional plots
31-Mar-
2023
Action completion delayed. Following increase in funding allocated within
the Council Budget the scale of the project has been increased. Sites
identified and procured and the allotments will be sited at Dillichip
Loan and Dumbarton Common with an anticipated start date in Summer
2023. This action will be carried over to 2023/24.
Ian Bain
Develop a new local biodiversity action plan. 31-Mar-
2023
Action delayed. A draft Scottish Biodiversity Strategy was published in
December 2022. The delivery plan of the Scottish Biodiversity Strategy has
not yet been published although it has a due date of Spring 2023 for a
consultation period with the full document expected to be published in late
Ian Bain
Page 41

Page 42

Action Status Progress Due Date Note Owner
summer 2023.  The actions of our plan will be directly related to this
document. Stakeholder engagement is underway setting out the priorities
for delivery.
Continue to explore alternative methods of weed
control
31-Mar-
2023
Action complete. Trials of alternative non chemical methods of weed
control have taken place and analysis has been undertaken the results
show that of those that work effectively there could be either significant
cost implications. Further work will be undertaken in 2023/24 to prepare
potential options and next steps.
Ian Bain
Ash die back preparation work to inform the
action plan which will be developed in 2023/24
31-Mar-
2023
Action complete. Following work to audit of affected trees in West
Dunbartonshire a plan will be prepared to agree options and next steps in
2023/24.
Ian Bain
Objective 5. Our resources are used in an environmentally sustainable way
Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
Tonnage of biodegradable municipal waste
landfilled 17,263 16,402 13,300
Target significantly missed.
Performance has improved over the
last two years. Although we are
currently over our target tonnage,
we have made a considerable
decrease from the previous period
and are on our way to achieving our
target. The waste strategy has been
developed to review collection and
separation of materials.
Kenny Lang
Action Status Progress Due Date Note Owner
Produce a business case for the development of a
waste transfer station within Council’s boundary 31-Mar-2023
Action complete. We now have a detailed feasibility study and Business
Case to allow progression towards development of a resource recycling and
reuse centre (RRRC). Next steps will progress in 2023/24.
Kenny Lang
Rollout further installation of electric vehicle
charging points 31-Mar-2023
New fleet charge points were installed and maintenance and upgrade work
was carried out or underway on the current charging points. In line with
partnership working the service continues to work as part of City region
group to develop a long term EV charging point strategy and expansion
plan. This will progress in 2023/24.
Liam Greene
Page 42

Page 43

Objective 6. Our neighbourhoods are sustainable and attractive
Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of Class A roads that should be
considered for maintenance treatment 19.5% 16.81% 24% Target exceeded. Liam Greene
Percentage of Class B roads that should be
considered for maintenance treatment 18.9% 14.6% 24.5% Target exceeded. Liam Greene
Percentage of Class C roads that should be
considered for maintenance treatment 26.9% 21.42% 30% Target exceeded. Liam Greene
Percentage of unclassified roads that should be
considered for maintenance treatment 33.4% 30.19% 37% Target exceeded. Liam Greene
Percentage of residents satisfied with roads
maintenance 38% 29% 41%
Target significantly missed with
performance down from previous
year. Review of road maintenance
plan and roads communication and
engagement strategy will be
developed.
Liam Greene
Action Status Progress Due Date Note Owner
Pavement parking, investigate and develop a
strategy in line with Scottish guidance Phase 2 31-Mar-2023
Action complete. Guidance documents received in January 2023 and the
service is currently reviewing these with a strategy to be developed during
2023/24.
Liam Greene
Progress the Gruggies Burn flood alleviation
scheme Phase 1 31-Mar-2023
Action complete. Cost increase and design timescales have extended the
proposed plan for completion. The team have now procured a new design
team with design to be progressed over 2023/24.
Liam Greene
Clydebank Masterplan, progress the next phase
delivery of improved roads and pedestrian
environment within the plan Phase 2
31-Mar-2023 Action complete. All improvement works complete. Liam Greene
Deliver a design for new traffic control system -
Kilbowie Roundabout 31-Mar-2023
Action complete. Design works now complete with materials purchased.
Future installation linked with possible Levelling Up Fund Round 3 Bid. If not
progressed through this LUF3 works will be completed with existing
infrastructure budget. This will be progressed in 2023/24.
Liam Greene
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Page 43

Page 44

Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Impact of major adverse
weather incidents on
services
A significant period of adverse weather
may result on failure to deliver key
operational functions of E&N services
31-Mar-2023
The Business Continuity Plan would come
into effect in the event of a major adverse
weather incident.
No change to risk matrix
Ian Bain;
Kenny Lang
Failure to maintain road
network during adverse
weather
A significant period of adverse weather
may result in failure to deliver key
operational functions of R&T services and
other Council services.
31-Mar-2023
The service continues to put in place
contingency plans to forecast plan and
react to adverse weather conditions.
No change to risk matrix.
Liam Greene
Failure to manage and
maintain the road network
effectively
Failure to manage and maintain the road
network effectively will have an adverse
impact on user safety, traffic movement,
air quality, economic growth and reduce
access to facilities and amenities. The
Council’s reputation as a place to live
and work with access to employment,
education, leisure and health
opportunities would be adversely
affected.
31-Mar-2023
The service continued to address urgent
defects and regularly reviews the roads
maintenance programme.
No change to risk matrix.
Liam Greene
Challenges in delivering
effective services in relation
to Roads & Neighbourhoods
The risk that the Council’s fails to deliver
on the three services within Roads &
Neighbourhood: Roads & Transportation,
Fleet & Waste and Greenspace. These
areas provide services across a range of
areas including managing and maintain
roads, footpaths and associated
infrastructure, managing flood risk,
grounds maintenance, street cleaning,
burial and cremation, outdoor facilities,
waste and recycling and vehicle fleet
management. Failing to ensure these
services are not fully fit for purpose could
result in adverse consequences in
relation to delivering efficient and
effective services.
31-Mar-2023
Service continues to provide full service,
monitoring in place to ensure any adverse
issues are highlighted and appropriate
actions taken.
No change to Risk Matrix
Gail Macfarlane
Page 44

Page 45

4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Status Progress Due Date Note Owner
Develop and implement wellbeing, employee
engagement, equality and training plans to
enable capabilities, improved resilience and
promotion of a diverse workforce.
31-Mar-
2023
Action complete. The service have developed and implemented a
communications strategy covering all levels of employee engagement.
Employee meetings are in place and managers at varying levels regularly
meet with union reps and delegates across the service. Toolbox talks and
face to face meetings are in place and request and actions taken forward.
Be the Best Discussions in place identifying opportunities for training and
upskilling.  Employees are encouraged to attend training events run by
external organisations.
Fit for the future structural review underway identifying single points of
failure in addition to the aging demographic and where there are
recruitment difficulties.
All Managers
Develop and implement employee life cycle plans
in line with the People First Strategy to attract
and retain the workforce.
31-Mar-
2023
Action complete. Training and development have been offered where
appropriate within the service, for example Waste services, Driver HGV
training will increase resilience and opportunities not only in waste but
potentially for winter gritting in future. Health & Safety training and
development in Grounds has been shared across other service areas and
simplified our response and approach to H&S. Engagement with external
services to ensure mechanics are trained in emerging technology. Reviewing
services (led by Fit for Future ) and ensuring that the service is aligned to
meet future service requirements (Route optimisation)
All Managers
Implement service review process including role
design, use of new technology and new ways of
working to add resilience, address gaps, and
establish opportunities for efficiencies
31-Mar-
2023
Action complete. Fit for Future review has identified opportunities and will
lead to service improvements. Data management and gathering has
improved allowing more informed choices and the ability to identify areas of
concern or those requiring support. Service redesign facilitated by
investment in Capital such as the Salt Dome will ensure resilience and
improves our overall flexibility and responsiveness.
A structure review is underway to identify skills gaps, opportunities for
upskilling, single point dependencies and training needs.  This will be
continued into 23/24.
All Managers
Develop and implement training plans and
development opportunities to improve
capabilities and resilience within the workforce.
31-Mar-
2023
Action complete. Training needs and future service requirements are
identified through the ongoing dialogue and engagement with staff along
with the services strategic objectives. There is limited scope in this area
All Managers
Page 45

Page 46

Action Status Progress Due Date Note Owner
given the relative repetitive and manual nature of the works. Training has
been provided to increase resilience across the workforce, but opportunities
exist to make this more fluid.
External and internal opportunities to upskill are encouraged such as
attendance at CPD events. Mentoring and upskilling being implemented
where appropriate.
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Action Status Progress Due Date Note Owner
Review business plans to align activities, identify
opportunities to reduce duplication, an identify
learning opportunities (under R&N services
collaborative programme)
31-Mar-
2023
Action complete. For all forthcoming activities, regular and continual reviews
are carried out to identify opportunities for collaborative delivery,
information sharing or the potential to procure jointly. For example the joint
lead for the LEV expansion plan and strategy activity.
Gail Macfarlane
Continue to work collaboratively with Argyll &
Bute and Inverclyde Councils to develop a best
value proposal for procuring the reception,
transportation, treatment and compliant disposal
of biodegradable municipal waste.
31-Mar-
2023
Action complete. Waste services continue to work collaboratively with Argyle
& Bute Council and Inverclyde Council to establish suitable options for the
procurement of our reception, transportation, treatment and compliant
disposal of biodegradable municipal waste. The development of the route to
procure for service delivery post introduction of landfill tax ban is underway
with the procurement timelines having been defined. The next phase of this
project will progress in 2023/24.
Kenny Lang
Complete phase 1 of the Fit for Service review of
waste services
31-Mar-
2023
Action complete. Improvements to website and processes are now
concluded to improve and streamlining the customer journey for waste
services including recycling, missed bins, and assisted uplifts.
Communications strategy was implemented and addition skills training to
support resilience across the service. The next phase will progress in
2023/24.
Kenny Lang
Develop an action plan for depot rationalization 31-Mar-
2023
Action complete. Roads service continues to liaise with Asset team to
support rationalization process. Liam Greene
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Page 46

Page 47

Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Challenge to delivery of
burial and cremation
services
A number of factors may impact on
ability to deliver these services.  For
example a pandemic would create
significant immediate demand on
services.
31-Mar-2023
We have completed extensions to
Dumbarton and North Dalnottar
cemeteries. This will mitigate the impact of
any challenges to the burial and cremation
services.
No change to risk matrix.
Ian Bain
Inability to deliver priority
services as a result of fuel
shortages
A fuel shortage would significantly
impacting on our ability to provide
priority service across West
Dunbartonshire.
31-Mar-2023
Council participates in the Scottish
Government Liquid Fuels Framework and
contributes to the work of the Scottish
Government Fuel Resilience Group. There
are no issues with fuel at this time.
No change to risk matrix.
Kenny Lang
Action Status
Cancelled
Overdue
Not on track
In Progress and on track
Completed
PI Status
Target significantly missed
Target narrowly missed
Target met or exceeded
Long Term Trends
Improving
No change
Getting worse
Short Term Trends
Improving
No change
Getting worse
Page 47

Page 48

Risk Status
Alert
High risk
Warning
OK
Unknown
Page 48

Page 49

2023/24
Roads &
Neighbourhood
ITEM 8 - APPENDIX 2
Page 49

Page 50

Contents
1. Introduction .................................................................................................................................................................................................... 3
2. Performance Review ...................................................................................................................................................................................... 3
3. Strategic Assessment .................................................................................................................................................................................... 5
4. Resources .................................................................................................................................................................................................... 12
Appendix 1: Action Plan .......................................................................................................................................................................................... 14
Page 50

Page 51

1. Introduction
Roads & Neighbourhood comprises a wide range of services covering Roads and Transportation and Environment and Neighbourhood,
including Greenspace and Waste Management. It is one of 8 strategic areas responsible for delivering the Council’s Strategic Plan. Key actions
to help achieve this are set out in this Delivery Plan, together with actions to address any performance issues and service priorities identified in
the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Infrastructure, Regeneration and Economic
Development Committee twice yearly, at mid-year and year-end.
2. Performance Review
The Roads & Neighbourhood management team completed a detailed review of 2022/23 performance, focusing on the following:
• 2022/23 Delivery Plan year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE) comparative data;
• Citizens’ Panel feedback;
• Telephone Survey feedback;
• Complaints; and
• Continuous Improvement (Fit for Future reviews)
This review highlighted our key achievements in 2022/23 as well as the challenges to be addressed in 2023/24. These are summarised below.
Key Achievements in 2022/23 
Listed below are some of the major achievements. All services achieved many other key outcomes for the Council and its residents throughout
the year which are not recorded here but are as important.
Strategic Team
• Further implemented the collaborative approach between Inverclyde and West Dunbartonshire councils and the wider City Region to
increase resilience and share best practice in the delivery of the Roads & Neighbourhood service. Further to an evaluation of the shared
Page 51

Page 52

service within Roads, Grounds, Fleet and Waste the collaborative management model with Inverclyde Council will now be dissolved from
June 2023.   
• Completed construction works on the A814 ‘Connecting Clydebank’ project.
• Provided training and employment opportunities for 12 modern apprentices across R&N and engaged with in excess of 200 volunteers to
carry out environmental improvement work.
• Completed the feasibility study and location appraisal for the delivery of an integrated waste management facility, resource recovery and
recycling centre (RRRC). In accord with our future long term waste solution.
• We increased Heavy Goods Vehicle (HGV) drivers with training and upskilling to alleviate the shortage of qualified HGV drivers and improve
our resilience.
• Created a community woodlands in Bonhill and Faifley in conjunction with the local school and community Councils. This included planting of
approx. 2000 trees.
• Completed procurement and design of new salt dome in Elem Road with construction to be carried out in early 2023.
• Procured 4 new updated gritting vehicles in advance of the winter period.
Key Challenges from 2022/23
Along with the achievements noted above, there were significant challenges in 2022/23.
Cross Service
• Demographic of Workforce. R&N has an aging demographic within the workforce and this is also the case nationally. We will continue to
carry out workforce analysis and development and will identify opportunities for apprentices and graduates. We are continuing to identify
skills gaps to provide upskilling appropriate training and succession planning to allow the Council to plan for the future.
• Staff. The national skills shortage of qualified and experienced officers in Roads and Neighbourhood Services resulting in reduced staff
complements across many services and increased demands on existing staff. Due to high demand outstripping the labour supply, labour
rates continue to increase together with challenges recruiting and retaining skilled staff. This means that we will have to optimise staff
retention and improve recruitment practices to ensure job roles are in line with demand.
• Climate Change. Due to more adverse weather condition and extreme weather events due to climate change Roads and Neighbourhood
require to make changes to operational ongoing service delivery and response to events. In particular flood risk management plans.
• Capital Projects. Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw material costs,
impacted on supply chains, and third parties and our ability to carry out works within budget and on time
• Construction inflation remains a concern with labour and material costs significantly increasing over the last year.
Page 52

Page 53

Roads & Transport
• Roads resurfacing programme. Delivery impacted due to increased material costs which resulted in the service having to reduce the number
of locations that could be addressed. Any locations unable to be resurfaced will be prioritised in the programme for 2023/24.
• Gruggies Burn. Challenges in sourcing and appointing a suitable consultant. The project has now been retendered with the project
programme for design and construction under review.
• Flood risk management – Additional funding was made available to address flooding issues in the Levenhowe area. Unfortunately early
studies indicated that works in this location could have a negative impact on flooding on any other vulnerable locations. Funds were instead
redirected to support the Surface Water Management Plans for both Clydebank and Vale of Leven and these will be progressed during
2023/24. Funds were also made available to support installation of property level flood protection at residences within our major flood areas.
• .
Greenspace
• We continue to have challenges identifying a cost effective and operationally effective alternative to chemical weed control, further
investigation will be carried out 2023/24.
• Ash Die Back, the scope and scale of the work required is very difficult to predict and may put an additional strain on resources.
Fleet & Waste
• Increase in household waste continues as there are more people working from home resulting in household residual waste increases. The
impact of this was that additional Biodegradable Municipal Waste was sent to landfill, this is largely out with the influence of the Council as
we cannot directly control the proportion of biodegradable waste contained in householders’ landfill waste bins or deposited at the household
waste recycling centres.
• Delivery of the Deposit Return Scheme has been delayed until March 2024 by the Scottish Government. We will continue to progress plans
for a revised service model 2023/24.
3. Strategic Assessment
The Roads & Neighbourhood management team completed a strategic assessment to determine the major influences on service delivery and
priorities in 2023/24 and identified a range of key factors recognised as significant. These are summarised below.
Page 53

Page 54

Financial Challenges 
The entire public sector is continuing to face significant financial challenges due to a range of factors including inflationary cost increases, rising
utility costs and insufficient funding to support the delivery of front line and back office services. The Council are currently faced with an
estimated cumulative funding gap in 2024/25 of £9.7m rising to £29.5m by 2027/28. We will continue to monitor the overall financial position of
the Council and updates on estimated future budget gaps will be reported to Elected Members throughout 2023/24. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that, within Roads &
Neighbourhood available funding will be reduced and we will need to reconfigure how we work, what we do, where we work, and potentially
reduce the number of people employed. In this context, we will aim to continue to provide a sustainable, quality service to the public.
.
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher risk/ higher value
budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity around
demand, costs and charges, and income levels. 
Within this service, budgets which have been identified as being more susceptible to fluctuations include:
Income - increases in budgeted income are significantly higher than in previous years and achieving such targets could be problematic.
Roads & Neighbourhood Action Plan
Roads & Neighbourhood Services Collaborative Working and Partnerships
Business plans are under review for the new financial year to include further progress working with partners in City Region to identify sharing
opportunities such as joint procurement exercises and service delivery.  
Roads & Neighbourhood – Leadership Model
Following agreement to step away from a shared service with Inverclyde Council from 1st June 2023 a review of the service management
structure in West Dunbartonshire will be undertaken to ensure a smooth transition. Including a strategic and structural review of roles and
responsibilities across the service.   
Roads & Transport
Page 54

Page 55

Transport (Scotland) Act 2019 – Pavement Parking
The Transport (Scotland) Act, promoted by the Scottish Government, received Royal Assent in November 2019. It will have a very significant
impact on local authorities in relation to a number of areas in particular pavement parking. The action will continue in 2023/24 as the guidance
was delayed and only received in January 2023. The service will investigate and develop appropriate strategies, in line with Scottish
Government guidance, leading with survey work. 
Electric Charging Points 
Scottish Government has indicated that funding is no longer available to assist Councils with the installation of EV charging points. To identify
current and future EV charging needs along with possible delivery methods the service is working with partners in the wider Glasgow City
Region as part of a working group. The aim of this working group is to develop a long term strategy and expansion plan for our EV charging
network and unlock any possible funding to support. This is expected to be finalised this financial year and will be presented to Committee for
consideration. Currently Council owned charging points within West Dunbartonshire are provided free of charge at significant cost to the Council.
To reduce this burden on the Council and support maintenance and future development of our EV network the service will also be introducing
charging for the use of these in June 2023 following a period of communication.
Parking Enforcement  
Parking enforcement within West Dunbartonshire Council currently is under the responsibility of Police Scotland. The Scottish Government have
however identified the key role local authorities play in improving traffic safety and reducing congestion across their area and as such LA have
the power under the Roads and Transport Act to request that these powers are transferred to them. The Roads and Transportation team have
been tasked with implementing decriminalised parking enforcement across the West Dunbartonshire area. 
Gruggies Burn  
As part of West Dunbartonshire Councils action for Cycle 1 of the Flood Risk Management Plan, we submitted a number of proposals for the
River Leven Flood Prevention to Scottish Government for approval and prioritisation with the Gruggies Burn scoring high on the priority list. As a
result the Roads and Transportation team will progress with the required review of existing studies, stakeholder engagement over the course of
2023/24 and submit the relevant plans for the scheme to Scottish Government for appraisal. After which we will proceed with the detailed design
with a view for works to commence in 2025 once funding is agreed.
Salt Dome  
A recent depot audit undertaken within Elm Road Depot highlighted safety concerns regarding the current method of salt storage with salt
previously stored outside. Additional reviews of process highlighted additional costs and limited resilience to respond to winter events as inside
Page 55

Page 56

storage limited the volume of materials which could be stock piled. The Road service has therefore been given approval to install a Salt Barn
within the Elm Road Depot. The design and location of the barn has been designed in such a way as to minimise the impact of ongoing depot
rationalisation works. Site investigation works, final design and procurement of a specialist contractor has been completed with works expected
to start on site in June 2023 with delivery ahead of the winter period in November.
Surface Water Management Plan 
The Clyde and Loch Lomond Flood Risk Management Plan highlights action which need to be undertaken by local Councils to address flooding
in the area. These actions are split into 6 years cycles to make outcomes easier to achieve and spread costs. As part of Cycle 1 of the Plan a
Surface Water Management Plan (SWMP) for Dumbarton and Vale of Leven was developed with the Flood Risk Management Plan for
Clydebank included in Cycle 3 (2028 to 2034). Due to flooding issues within the Levenhowe area additional funding was made available to
address issues in the area. Unfortunately a high level feasibility study indicated that the implementation of proposed measures in this area would
possibly have a negative effect on flooding on any other vulnerable locations. As a result part of this funding was redirected to undertake
improvement study for Dumbarton and Vale of Leven to modal the surface water, pluvial and sewer flooding to ensure suggested actions
identified in the SWMP for Dumbarton and the Vale were appropriate and provide high level estimates and designs for the implementation of any
actions. Additionally, as a result of continued flooding issues in the Clydebank area the service has secured approval from SEPA to escalate the
SWMP for Clydebank into Cycle 2. The service will liaise with Scottish Water and SEPA to undertake required survey works to the surface water
and sewer connectivity in the area. This will highlight what actions can be undertaken in the area to address flooding and support the
development of the SWMP for Clydebank.
Greenspace
Food Growing Strategy and Allotments
The Greenspace service currently manages two allotment sites in Dumbarton. There is a 10 year waiting list for allocation of an allotment. The
Community Empowerment Act places an obligation on Local Authorities to provide sufficient allotments for its residents. There is an allocation of
£400k in the Council’s capital plan to develop new allotment sites. In addition we have applied for 100K to Scottish government vacant and
derelict land fund to enhance this programme. Environmental Health has identified sites with low contamination. Following increase in funding
allocated within the Council Budget the scale of the project has been increased Draft project plans have been developed. The allotments will be
sited at Dillichip Loan and Dumbarton Common with an anticipated start date in summer 2023.
Ash Die Back
Page 56

Page 57

Ash dieback is a serious disease of ash trees caused by a fungus. The disease causes leaf loss and crown dieback in affected trees and can
lead to the death of the tree. Of the 10 million ash trees in Scotland 90% may die due to this disease. Infected trees need to be identified and
removed to prevent or minimise the spread of the disease. Following preparation work and audits the plan will be developed 2023-24.  
Pesticides Regulations
Legislation surrounding the use of pesticides continues to change and this will have an impact on our ability to continue with the present level of
weed control. Alternative delivery methods will be labour intensive. Trials of alternative non chemical methods of weed control have taken place
although no suitable alternative has been identified further trials will continue into 2023-24.
Bio Diversity
The new Scottish Biodiversity Strategy is being developed with the aim of halting biodiversity decline by 2030 and have nature restoration
underway by 2045. When the strategy is published WDC will develop a new local Biodiversity Action Plan identifying local actions that will
contribute to the overall aims of the national strategy. 
Play Parks and Recreation Facilities 
We will develop plans to upgrade play parks throughout West Dunbartonshire to improve accessibility and inclusivity. Build 4 new Multi Use
Games Areas (MUGA) at Bonhill, Goldenhill Park, Milton Park and Brevel Crescent to provide additional sports facilities for young people
throughout West Dunbartonshire.  
Vale of Leven Cemetery 
The existing Cemetery is nearing capacity with a limited number of available new burial lairs for purchase. An extension will be built that will
provide 1000 additional new burial lairs and ensure that the Vale of Leven area has a sustainable burial provision.    
Reduction in Workforce
The savings options agreed to deliver the 2023/24 budget have resulted in a reduction in resources and changes to the service delivery model
within Greenspace. This will require a review of workloads and re prioritisation of tasks and responsibilities including redesign of service delivery
to ensure quality services are still delivered without placing undue pressures on staff. In 2023-24, we will review the service provided by
greenspace.  
Fleet & Waste
Waste (Scotland) Regulations 2012
Page 57

Page 58

In accordance with the Waste (Scotland) Regulations 2012 which was subsequently reviewed in 2019 landfilling of Biodegrable Municipal Waste
to landfill will be banned by 2025, this waste will need to require a form of treatment or processing at dedicated waste treatment facilities at that
time. The Council have two main initiatives which are being progressed; 
Continue to work collaboratively with Argyll & Bute, Inverclyde and supported by Zero Waste Scotland (ZWS) to develop a best value proposal
for procuring the reception, transportation, treatment and compliant disposal of biodegradable municipal waste; and
Development of a business case for the location and construction of a waste transfer station within the Council’s boundary in order to improve
the Council’s ability to access wider waste treatment markets and liaison with Zero Waste Scotland on external funding opportunities to support
this. Internal funding of £2M has been secured for this programme.
For 2023/24 we will develop a detailed design for the preferred location and prepare for tender process. 
Deposit Return Scheme (DRS)
A deposit return system for PET plastic bottles, metal drinks cans and glass bottles has been approved by the Scottish Government. The
potential impact of the DRS scheme on the Council’s current kerbside and community recycling facilities has been assessed using the Zero
Waste Scotland DRS assessment tool. The date due to be implemented nationally has been delayed by the Scottish Government which, initially
scheduled for August 2023 the implementation date is now set at March 2024. We will progress the development of a revised service delivery
model for introduction in 2023-24 that reflects the predicted reduction in the quantities of plastic bottles, glass bottles and metal drinks cans,
currently collected by the Council through its collections systems, as a result of the planned introduction of the DRS scheme.
Fit for Future Action Plan – Waste Services
Following the Fit for Future service review undertaken in April 2021, an action plan is being taken forward which will address the key findings
over a five year period 2021-2026. These include improving and streamlining the customer journey, the website and on line forms. The services
include recycling, the DRS, missed bins, bulky and special uplifts. Matters raised in relation to staffing vacancies, turnover, hierarchy, and spans
of control, together with the availability of training and development to support employee wellbeing, are all being addressed in the plan. Phase 2
will commence and includes implementation of the route review in summer 2023.
Service Review
The savings options agreed to deliver the 2023/24 budget have resulted in changes to the service delivery model within Fleet & Waste services.
This will require a review of workloads and re prioritisation of tasks and responsibilities including redesign of service delivery to ensure quality
services are still delivered without placing undue pressures on staff. In 2023/24, we will review the service provided by Fleet and Waste and
deliver the Route Optimisation project.  
Long Term Waste Strategy
Page 58

Page 59

A long term waste strategy has been produced and consultation with key stakeholders undertaken. The Strategy will bring together a number of
key delivery elements identified in this report and build on them. Support has been provided from Zero Waste Scotland in terms of the
development of options for future waste services delivery which could includes review of collections which may be funded through the Recycling
Improvement Fund. This element supports the work undertaken in the current route review to build a baseline. The strategy covers
communication and engagement, infrastructure review, Household Recycling Charter and the development of a refuse transfer station. The
strategy is linked to the development of a Circular Economy and covers those waste elements of Climate Change. 
Transition to Electric Fleet
The service is developing a transition to electric fleet strategy which will set out a programme of implementation and consider financial
implications. The strategy will be completed this financial year.
Council Wide 
Climate Change Strategy
The Council has developed a Climate Change Strategy in response to Scotland’s climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy has informed the development of a Climate Change Action Plan for
2023/24 to ensure environmental actions are devolved to relevant service areas and climate change action is mainstreamed across council
policies, operations and the wider public. Progress against the actions assigned to CCF will be monitored. R&N services will support the aims
and objectives of the Strategy in a number of ways. A high number of the actions and PI’s and actions detailed in this delivery plan contribute to
the climate change action plan 2023/24. Some key actions include;   
• progress the Gruggies Burn flood alleviation scheme;
• review and update the local bio diversity action plan;
Community Empowerment Strategy
The West Dunbartonshire Community Empowerment Strategy was approved by Council in November 2019. It details the ambitions of the
Council and its partners to deliver the Community Empowerment (Scotland) Act 2015. Informed by an engagement process with local community
organisations and citizens, the strategy sets out objectives to be delivered in partnership with communities, underpinned by clear principles for
empowerment.
To support the implementation of the strategy, a partnership and community owned delivery plan is being developed, setting out specific actions
and ownership for taking forward. R&N will fully support the development of these actions and is already supporting community empowerment in
relation to the food growing strategy and allotments. 
Page 59

Page 60

Continuous Improvement
To support continuous improvement, the Council has an established programme of Fit for Future service reviews. Using a range of tools,
information is gathered and reviewed to identify improvements and to ensure our services are efficient and that we make best use of our
resources. During 2023/24 we will continually assess the performance of the services within R&N with a view to determining if any services
would benefit from a Fit for Future service review.
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed Roads & Neighbourhood priorities for 2023/24.
Appendix 1 sets out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions
• strategic and/or service risks
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated strategic
objectives and those that require strategic leadership; while service risks relate to service delivery and represent the potential for impact on
individual services, or the experience of those who work within the services, i.e. employees, partners, contractors and volunteers or service
users and clients in receipt of the services provided. In identifying the relevant risks for 2023/24 and actions to mitigate them, the aim is to
improve or maintain the current position (i.e. the current risk score) set out in the appendix.
4. Resources
Finance
Roads & Neighbourhood has a net revenue budget of £16.027m and a capital budget of £6.440m in 2023/24. A breakdown by service area is set
out below. We will make the best use of the Roads & Neighbourhood available to deliver on key priority areas and secure external/match funding
where this is possible.
Service Area Gross Expenditure
2023/24 (£m)
Gross Income
2023/24 (£m)
Net Expenditure
2023/24 (£m)
Capital Budget
2023/24 (£m)
Transport, Fleet & Maintenance Services 4.435 5.006 -0.571
Roads Services 6.960 3.931 3.029 6.340
Page 60

Page 61

Grounds Maintenance & Street Cleaning Client 7.416 0.000 7.416 0.100
Outdoor Services 0.421 0.190 0.231
Burial Grounds 0.482 0.735 -0.253
Crematorium 0.494 1.595 -1.101
Waste Services 11.156 1.359 9.797
Depots 0.620 0.620 0.000
Ground Maintenance & Street Cleaning Trading
A/c
8.801 11.322 -2.521
Total 33.825 24.758 16.027 6.440
Employees
Employee Numbers
The headcount and full time equivalent staff in each service area (as of 31st March 2023) are as follows:
Absence in 2022/23
The quarterly absence statistics for Roads & Neighbourhood are shown below together with the Council average for the same periods for
comparison. The figures have been lower than the Council average in 2022/23:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Roads &
Neighbourhood
3.59 2.97 3.50 4.92 13.86
Service Area Headcount FTE
Fleet & Waste 135 126.28
Greenspace 185 173.73
Roads & Transportation 96 63.32
TOTAL 415 363.34
Page 61

Page 62

COUNCIL WIDE TOTAL 3.86 3.28 4.42 4.02 14.00
Appendix 1: Action Plan
1. Our communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
Performance Indicator Target 23-24 Owner
Percentage of emergency road related defects repaired within 4 hours of being reported 95% Liam Greene
Percentage of non-serious road related defects repaired within 7 working days of being reported 85% Liam Greene
Percentage of routine road related defects repaired within 28 working days of being reported 85% Liam Greene
RL2: Percentage of all traffic light repairs completed within 48 hours 98% Liam Greene
RL3: Percentage of all street light repairs completed within 7 days 95% Liam Greene
Page 62

Page 63

Objective 2. Our residents health and wellbeing remains a priority
Action Due Date Owner
Upgraded play parks and recreation facilities 31-Mar-2024 Ian Bain
Completion of deliver new sport facilities at Posties Park 31-July-2023 Ian Bain
2. Our Environment
Objective 4. Our local environment is protected, enhanced and valued
Performance Indicator Target 23-24 Owner
Percentage of residents satisfied with the street cleaning service 73% Ian Bain
Percentage of residents satisfied with the Waste service overall 82% Gail Macfarlane
Percentage of residents satisfied with Parks & open spaces 85% Ian Bain
Percentage of missed bins collected within 3 working days of being reported 95% Gail Macfarlane
Page 63

Page 64

Performance Indicator Target 23-24 Owner
Percentage of offensive graffiti removed within 24 hours of being reported 100% Ian Bain
Percentage of non-offensive graffiti removed within 5 working days of being reported 100% Ian Bain
Percentage of total household waste that is recycled 60% Gail Macfarlane
Percentage of abandoned vehicles that require to be removed by the council that are removed within 14 days 100% Gail Macfarlane
Action Due Date Owner
Prepare for introduction of Deposit Return Scheme 31-Mar-2024 Gail Macfarlane
Develop Strategy for transition to electric fleet 31-Mar-2024 Gail Macfarlane
Finalise the delivery of a suitable new allotment sites 31-Mar-2024 Ian Bain
Develop a new local bio diversity action plan 31-Mar-2024 Ian Bain
Continue to explore alternative methods of weed control 31-Mar-2024 Ian Bain
Develop Ash die back action plan 31-Mar-2024 Ian Bain
Objective 5. Our resources are used in an environmentally sustainable way
Page 64

Page 65

Action Due Date Owner
Develop proposal for resource recycling and reuse centre (RRRC) 31-Mar-2024 Gail Macfarlane
Develop an Implementation Strategy and expansion plan for EV charging points 31 Mar-2024 Liam Greene
Introduce charging for the use of Council owned EV charging points 30-June-2023 Liam Greene
Develop Long term waste strategy 31-Mar-2024 Gail Macfarlane
Objective 6. Our neighbourhoods are sustainable and attractive
Performance Indicator Target 23-24 Owner
Percentage of residents satisfied with roads maintenance 40% Liam Greene
Percentage of Class A roads that should be considered for maintenance treatment 24% Liam Greene
Percentage of Class B roads that should be considered for maintenance treatment 24.5% Liam Greene
Percentage of Class C roads that should be considered for maintenance treatment 30% Liam Greene
Percentage of unclassified roads that should be considered for maintenance treatment 37% Liam Greene
Action Due Date Owner
Pavement parking, investigate and develop a strategy in line with Scottish guidance next phase 31-Mar-2024 Liam Greene
Page 65

Page 66

Action Due Date Owner
Prepare a plan to introduce Parking Enforcement 31-Mar-2024 Liam Greene
Finalise design plan for Gruggies Burn Flood Management 31-Mar-2024 Liam Greene
Undertake flood management Improvement Study for Dumbarton and Vale 31-Mar-2024 Liam Greene
Undertake survey works to support the development of a Surface Water Management Plan for Clydebank 31-Mar-2024 Liam Greene
Progress new Vale of Leven Cemetery extension 31-Mar-2024 Ian Bain
Risk Description Current Assessment Target Assessment Owner
Impact of major adverse
weather incidents on
services
A significant period of adverse weather may result on
failure to deliver key operational functions of E&N
services
Gail Macfarlane
Failure to maintain road
network during adverse
weather
A significant period of adverse weather may result in
failure to deliver key operational functions of R&T
services and other Council services.
Gail Macfarlane
Failure to manage and
maintain the road
network effectively
Failure to manage and maintain the road network
effectively will have an adverse impact on user safety,
traffic movement, air quality, economic growth and
reduce access to facilities and amenities. The
Council’s reputation as a place to live and work with
access to employment, education, leisure and health
opportunities would be adversely affected.
Gail Macfarlane
Page 66

Page 67

Risk Description Current Assessment Target Assessment Owner
Challenges in delivering
effective services in
relation to Roads &
Neighbourhoods
The risk that the Council fails to deliver on the three
services within Roads & Neighbourhood: Roads &
Transportation, Fleet & Waste and Greenspace.
These areas provide services across a range of areas
including managing and maintain roads, footpaths and
associated infrastructure, managing flood risk,
grounds maintenance, street cleaning, burial and
cremation, outdoor facilities, waste and recycling and
vehicle fleet management. Failing to ensure these
services are not fully fit for purpose could result in
adverse consequences in relation to delivering
efficient and effective services.
Gail Macfarlane
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and learning and development plans to
enable capabilities, improve resilience and promotion of a diverse workforce 31-Mar-2024 All Managers
Page 67

Page 68

Action Due Date Owner
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce.
31-Mar-2024 All Managers
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies
31-Mar-2024 All Managers
Develop and implement learning and development opportunities to improve capabilities and resilience within
the workforce.
31-Mar-2024 All Managers
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Action Due Date Owner
Continue to identify opportunities to work jointly with partnership in the City Region both through procurement
and service delivery 31-Mar-2024 Gail Macfarlane
R&N service review including a strategic and structural review of roles and responsibilities across the service.   31-Mar-2024 Gail Macfarlane
Progress development of a best value proposal for the management of biodegradable municipal waste 31-Mar-2024 Gail Macfarlane
Complete phase 2 of the Fit for Service review of waste services 31-Mar-2024 Gail Macfarlane
Progress construction of new Salt Dome 31-Mar-2024 Liam Greene
Undertake Greenspace Service Review 31-Mar-2024 Ian Bain
Review of Waste & Fleet Service Provision 31-Mar-2024 Gail Macfarlane
Page 68

Page 69

Risk Description Current Assessment Target Assessment Owner
Challenge to delivery of
burial and cremation
services
A number of factors may impact on ability to deliver
these services.  For example a pandemic would
create significant immediate demand on services.
Gail Macfarlane
Inability to deliver priority
services as a result of
fuel shortages
A fuel shortage would significantly impacting on our
ability to provide priority service across West
Dunbartonshire.
Gail Macfarlane
Page 69

Page 70

Page 70

Page 71

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution & Property
Infrastructure, Regeneration and Economic Development 24 May 2023
Subject: Supply, Distribution & Property Delivery Plan 2022/23, Corporate
Asset Management - Year-end Progress & 
Supply, Distribution & Property Delivery Plan 2023/24, Corporate
Asset Management  
1 Purpose
1.1 This report sets out the Corporate Asset Management priorities of the Supply
Distribution & Property (SD&P) year-end progress 2022/23 and presents the
new Delivery Plan for 2023/24.
2 Recommendations
2.1 It is recommended that Committee notes the progress achieved at year-end
and the new plan for 2023/24.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
4 Main Issues
2022/23 Year-end Performance
4.1 The 2022/23 Delivery Plan was presented to Infrastructure, Regeneration and
Economic Development on 2 November 2022 and interim progress reported
on 1 February 2023.
4.2 Full details of year-end progress are set out in Appendix 1.
4.3 Of the seven actions due to be completed by 31 March, all were completed as
planned. 
4.4 Data is available for all of the seven PIs set out in the plan. Of these, six met
or exceeded targets, and one significantly missed target. The latter relates to
the following: 
ITEM 9
Page 71

Page 72

• % of Special Needs Adaptation projects completed by consultancy
services within target. The year end performance is 36% against a target
of 70%.
4.5 Four of the seven PI’s were new for 2022-23, of the three PI’s with trend data
all either improved over the previous year or sustained the high performance
recorded in 2021/22 (as shown in the short trend column in Appendix 1) with
all PIs performing similarly over the longer term (long trend column).
4.6 The full set of PIs will be reported through the Council’s annual performance
reporting process once all data becomes available.
2023/24 Delivery Plan 
4.7 The 2023/24 Delivery Plan is set out at Appendix 2.
4.8 Key priorities include: 
• Secure income from capital receipts
• Progress and monitor key capital improvement programmes including,
depot refurbishment, Faifley Campus, Exxon, Glencairn House, District
Heating Network expansion and Artizan demolition
• Develop and implement plans and support other services to achieve the
various asset related options agreed by Council
• Implement revised Team restructure
4.9 Implementation of the Plan will be monitored by the management team with
mid-year and year-end progress reported to Infrastructure, Regeneration and
Economic Development Committee around November 2023 and May 2024
respectively.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to SD&P, may have a direct impact
on the delivery of the Council’s Strategic Plan. It is essential that remedial
action is taken to ensure strategic delivery plans achieve the commitments
detailed and approved.
8 Equalities Impact Assessment
Page 72

Page 73

8.1  Screening and impact assessments will be carried out on specific activities as
required. 
9 Consultation 
9.1  The delivery plans were developed through consultation with officers from the
strategic service areas. 
10 Strategic Assessment 
10.1  The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council. 
Chief Officer: Angela Wilson
Service Area:  Supply, Distribution & Property
Date:   04 May 2023
_____________________________________________________________ 
Person to Contact:  Karen Connelly    
Performance & Strategy Business Partner    
karen.Connelly@west-dunbarton.gov.uk 
Appendices:  Appendix 1: SD&P Delivery Plan 2022/23 – Corporate
Asset Management Year-end progress 
Appendix 2: SD&P Delivery Plan 2023/24 - Corporate
Asset Management. 
Background Papers: SD&P Delivery Plan 2022/23 – Corporate Asset
Management, 2 November 2022  
Strategic Planning & Performance Framework 2022/27   
Wards Affected: All
Page 73

Page 74

Appendix 1 - SD&P (CAM) Delivery Plan Year-end Progress 22/23
2. Our Environment
Objective 6. Our neighbourhoods are sustainable and attractive
Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
% of Special Needs Adaptation projects completed
by consultancy services from receipt of referral to
carrying out survey, design and submission of
building warrant within 60 day target for type 3
projects
New PI for
22/23 36% 70%
Target significantly missed. Due to
time filling a vacancy there was
limited work carried out at the start of
the financial year. During the design
phase there are some delays resolving
Occupational Health approval and
awaiting structural design certification.
The timelines for the more complex
projects will be reviewed along with
the monitoring arrangements. A
review of the architectural resource is
underway to ensure performance is
monitored, action is taking timeously
and resource is in place to meet the
standard set.
It should be noted that a total of 25
type 3 projects were requested in
22/23 with 9 completed within the 60
day standard.
Craig Jardine
% Consultancy Services project deliverables for
Housing and General Services projects that were
delivered to programme
New PI for
22/23 84% 80%
Target exceeded. Continue to support
HRA and General Service’s project and
ensure projects are delivered on
programme.
Craig Jardine
ITEM 9 - APPENDIX 1
Page 74

Page 75

4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Status Progress Due Date Note Owner
Develop and implement wellbeing, employee
engagement, equality and training plans to
enable capabilities, improved resilience and
promotion of a diverse workforce.
31-Mar-
2023
Action complete. Be the best/1-2-1 meetings takes place across Corporate
Asset Management. Training needs are identified by individuals and
delivered where budget available along with webinar activity to complete
CPD where required.
Craig Jardine
Develop and implement employee life cycle plans
in line with the People First Strategy to attract
and retain the workforce.
31-Mar-
2023
Action complete. Review of current structures completed to meet current
workload demands. The service continues to find it difficult to appoint a
number of professional posts.
Craig Jardine
Implement service review process including role
design, use of new technology and new ways of
working to add resilience, address gaps, and
establish opportunities for efficiencies
31-Mar-
2023
Action complete. The service continues to maximise and monitor
hybrid/home working practices and provide staff with equipment/ICT
solutions to deliver their roles effectively
Craig Jardine
Develop and implement training plans and
development opportunities to improve
capabilities and resilience within the workforce.
31-Mar-
2023
Action complete. Training needs are identified by individuals and delivered
where budget available along with webinar activity to complete CPD where
require.
Craig Jardine
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
CM4c: Percentage of council buildings in which all
public areas are suitable for and accessible to
disabled people
96.5% 96.5% 92% Target exceeded. Michelle Lynn
Proportion of operational buildings that are suitable
for their current use % 93.3% 93.3% 93% Target exceeded. Michelle Lynn
Proportion of internal floor area of operational
buildings in satisfactory condition % 91% 91% 91% Target met. Michelle Lynn
Page 75

Page 76

Performance Indicator
2021/22 2022/23
Owner
Value Status Value Target Short Trend Long Trend Note
% of capital projects supported by capital
investment team, delivered within agreed plan
New PI for
22/23 85% 80%
Target exceeded. Continue to
support major capital project and
ensure delivery against project
programmes.
Craig Jardine
% of capital receipts achieved as forecast New PI for
22/23 90% 90%
Target met. 1 disposal did not take
place as anticipated and 3 new
disposals which concluded in quarter
4 2022/23 were not accounted for in
the anticipated receipt total but are
scheduled to conclude in quarter 1
of 2023/24.
Craig Jardine
Action Status Progress Due Date Note Owner
Progress delivery of the Corporate Asset
Management Framework to align with the
Councils Strategic Plan
31-Mar-2023 Action complete. Corporate Asset Management Framework and Property
Asset Plan (2023-28) approved by IRED Committee. Craig Jardine
Monitor progress of capital projects managed by
Capital Investment team and Consultancy
Services
31-Mar-2023
Action complete. Projects continue to be reviewed and monitored each
quarter via progress meetings and or project boards. Consultancy Services
project deliverables for Housing and General Services projects that were
delivered to programme was above target for 2022/23.
Craig Jardine
Monitor the progress of disposal of key strategic
sites over 22/23 31-Mar-2023 Action complete. Quarterly reviews undertaken on the progress of key
strategic sites. For 2022/23 capital receipts totalled £711K. Craig Jardine
Risk Description Current
Assessment Target Assessment Date Reviewed Note Owner
Maintaining Council Assets
that are fit for purpose
The risk that the Council's assets and
facilities are not fully fit for purpose with
consequent adverse impact on our ability
to deliver efficient and effective services.
Assets included in this assessment are;
the Council’s property portfolio.
20-Mar-2023
No change to risk matrix score. The
Property Action Plan 2023-28 approved
February IRED Committee will monitor
all requirements to maintain risk score.
Craig Jardine;
Michelle Lynn
Action Status
Cancelled
Page 76

Page 77

Overdue
Not on track
In Progress and on track
Completed
PI Status
Target significantly missed
Target narrowly missed
Target met or exceeded
Risk Status
Alert
High risk
Warning
OK
Unknown
Long Term Trends
Improving
No change
Getting worse
Short Term Trends
Improving
No change
Getting worse
Page 77

Page 78

2023/24
SUPPLY,
DISTRIBUTION AND
PROPERTY –
Corporate Asset
Management Extract
ITEM 9 - APPENDIX 2
Page 78

Page 79

Contents
1. Introduction .................................................................................................................................................................................................... 3
2. Performance Review ...................................................................................................................................................................................... 3
3. Strategic Assessment .................................................................................................................................................................................... 4
4. Resources ...................................................................................................................................................................................................... 8
Appendix 1: Action Plan .......................................................................................................................................................................................... 10
Page 79

Page 80

1. Introduction
Supply, Distribution and Property comprises a wide range of services covering Corporate Asset Management, Building Services, Housing Asset
& Investment and the Corporate Procurement Unit (CPU). It is one of 8 strategic areas responsible for delivering the Council’s Strategic Plan.
Key actions to help achieve that are set out in this Delivery Plan, together with actions to address any performance issues and service priorities
identified in the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Corporate Services Committee twice yearly,
at mid-year and year-end for Corporate Procurement Unit (CPU), Infrastructure, Regeneration and Economic Development Committee for
Corporate Asset Management and Housing and Communities Committee for Building Services and Housing Asset & Investment.
2. Performance Review
The Supply, Distribution and Property management team completed a detailed review of 2022/23 performance, focusing on the following:
• 2022/23 Delivery Plan year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE)
• Scottish Housing Network (SHN)
• Complaints
• Continuous Improvement (Fit for Future reviews)
This review highlighted our key achievements in 2022/23 as well as the challenges to be addressed in 2023/24. These are summarised below.
Key Achievements in 2022/23 
Listed below are some of the major achievements in each service area. All services achieved many other outcomes throughout the year which
are not recorded here but are as important.
Page 80

Page 81

Corporate Asset Management
• Supported the delivery of major capital projects including delivery of phase 2 and 3 of the new Renton Primary campus, continued the
development phase of new Faifley Community Campus, new build housing projects, development phase of Exxon City Deal Project and
other general services and housing projects.
• Further developed office accommodation plans and managed access and occupancy rates.
• Continued to deliver Disposal Strategy outcomes and delivered income via capital receipts
• Developed and implemented new Council Asset Management Framework and Property Asset Plan.
Key Challenges from 2022/23
Cross Service
Workforce
• The turnover coupled with the time taken to replace, recruit and train employees across Supply Distribution and Property continued to be a
challenge in 2022-23.
• The national skills shortage of qualified and experienced officers in Corporate Asset Management, resulted in reduced workforce numbers
and increased demands on existing teams.
Capital Projects
• Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw material costs, impacted on supply
chains, and third parties and our ability to carry out works within budget and on time.
3. Strategic Assessment
The management team completed a strategic assessment to determine the major influences on service delivery and priorities in 2023/24. These
are summarised below.
Financial Challenges 
The entire public sector is continuing to face significant financial challenges due to a range of factors including inflationary cost increases, rising
utility costs and insufficient funding to support the delivery of front line and back office services. The Council are currently faced with an
Page 81

Page 82

estimated cumulative funding gap in 2024/25 of £9.7m rising to £29.5m by 2027/28.  We will continue to monitor the overall financial position of
the Council and updates on estimated future budget gaps will be reported to Elected Members throughout 2023/24. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that within the Service
available funding will be reduced over time and we will need to reconfigure how we work and what we do, where we work, and potentially reduce
the number of people employed. 
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher risk/ higher value
budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity around
demand, costs and charges, and income levels. 
Within this service, budgets which have been identified as being more susceptible to fluctuations include:
• Capital Plan and Operational Plan - Nationally there has been a significant inflation in cost of building supplies and materials and in some
cases shortfall in supplies. For some projects this may lead to increased costs or slippage in delivery of the operational and capital projects.
Supply Distribution & Property Action Plan
Corporate Asset Management
Income from Capital Receipts
Continuing to secure income to the Council is a key priority and the Corporate Asset Management Framework supports this through delivery of
capital receipts from disposal of key strategic sites. The Plan will highlight non-performing property assets, inform the process for considering
future disposals, and generate additional income through the disposal of redundant assets. An annual update will be provided on the progress of
disposals. In the current financial climate there will be a significant dependency on the effectiveness of this plan and the outcomes.
Consultancy Services
Consultancy Services is the Council’s design and construction contract consultancy and manages capital programmed construction works
providing technical assistance, feasibility and cost studies on behalf of other services. Delivering projects within programme is a significant
priority.
Page 82

Page 83

Revise Team Structure 
Following agreement at the Council Meeting in March 2023, the Consultancy Services, Capital Investment Team and Asset Management Team
will progress a review to deliver savings whilst streamlining processes. In line with planned reduction of capital projects, the support from
Consultancy Services and Capital Investment Team will be reviewed as well as considering how costs are recharged. For Asset Management,
this will include reviewing the support the team receive from CAS, processes involving monitoring physical assets and digital system holding
asset information, together with monitoring and instructing repairs to BAM schools. 
Depot Refurbishment
Following a review of the complete depot estate and preparation of a feasibility report it is proposed to refurbish the current estate due to cost
restrictions. An update report is currently being prepared for May IRED Committee. Following this, the Depots Project Board will be re-introduced
and the programme will progress. 
Faifley Campus
Continue to progress with the development phase of the Faifley Schools Community Campus in line with current programme. A specific Learning
Estate Project Boards meets to discuss this project providing governance and monitoring.
Exxon
Continue to progress with the development phase of the Exxon Project in line with the current programme with a view to submitting a full
business case and ensuring all contracts are put in place to meet the current programme. A specific Exxon Project Board meets to discuss this
project providing governance and monitoring.
District Heating Network 
Expand District Heating Network into the Golden Jubilee Hospital now that the energy centre project is fully operational. Project will commence
on approval of Scottish Government funding and full agreement with the NHS Trust.
Glencairn House 
Having achieved external funding to support the redevelopment of Glencairn House as a combined museum/library facility via WDC’s successful
Levelling Up Fund bid, work is underway to progress this project. A design concept has been delivered and detailed designs are now in
development. Scrutiny and monitoring of progress is via the Levelling Up Project Board.
Artizan Demolition
Page 83

Page 84

The Artizan demolition project is planned to take place over the summer months. A detailed plan will be produced once approvals granted. This
project is monitored at the Levelling Up Project Board.
Council Savings Options 
In line with the Councils agreed savings options for 2023/24 there are a number of initiatives that include changes to Council assets and will
require support from the Asset Management Team. We will work in partnership with the Service areas across the Council to ensure delivery of
the savings as a priority.
Council Wide Climate Change Strategy 
The Council has developed a Climate Change Strategy in response to Scotland’s climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy has informed the development of a Climate Change Action Plan for
2022/23 to ensure environmental actions are devolved to relevant service areas and climate change action is mainstreamed across council
policies, operations and the wider public. Progress against the actions assigned to SD&P will be monitored.
Continuous Improvement
To support continuous improvement, the Council has an established programme of Fit for Future service reviews. Using a range of tools, that
encapsulates service design, maturity assessments and employee engagement, information is gathered and reviewed to identify improvements
and to ensure our services are efficient and that we make best use of our resources. During 2023/2024 we will assess the performance of the
services within SD&P with a view to determining if further teams would benefit from a Fit for Future service review.  
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed SD&P priorities for 2023/2024. Appendix 1 sets
out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions; and
• strategic and/or service risks
The Council has identified risks at both a strategic and service level. Strategic risks represent the potential for the Council to take advantage of
opportunities or fail to meet stated strategic objectives and those that require strategic leadership; while service risks relate to service delivery
and represent the potential for impact on individual services, or the experience of those who work within the services, i.e. employees, partners,
Page 84

Page 85

contractors and volunteers or service users and clients in receipt of the services provided. In identifying the relevant risks for 2023/2024 and
actions to mitigate them, the aim is to improve or maintain the current position (i.e. the current risk score) set out in the appendix.
4. Resources
Finance
Supply Distribution and Property has a net revenue budget of £1.51m credit and a capital budget of £5.898 in 2023/2024. A breakdown by
service area is set out below. We will make the best use of the resources available to deliver on key priority areas and secure external/match
funding where this is possible.
.
Service Area Gross Expenditure
2023/24 (£m)
Gross Income
2023/24 (£m)
Net Expenditure
2023/24 (£m)
Capital Budget
2023/24 (£m)
Consultancy Services 1.009 -0.784 0.225
Corporate Assets 3.011 -5.331 -2.320
Capital Investment Team 0.219 -0.224 -0.005 1.72
Private Sector Housing Grant 0.527 -0.446 0.081
Corporate Asset Maintenance 3.300 -3.300 0 4.18
Housing Asset Maintenance &
Investment
0.446 -0.396 0.050
CPU 0.666 -0.500 0.166
HMTA 20.053 -20.928 -0.875
Office Accommodation 1.482 -0.314 1.168
Total 30.713 -32.223 -1.51 5.898
Page 85

Page 86

Employees
Employee Numbers (data to be confirmed)
The headcount and full time equivalent staff in each service area (as of 31st March 2023) are as follows:
Absence in 2022/23
The quarterly absence statistics for Supply Distribution and Property are shown below together with the Council average for the same periods for
comparison. The figures have been higher than the Council average throughout 2022/2023:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Supply, Distribution &
Property
3.96 4.56 4.94 4.00 16.52
COUNCIL WIDE TOTAL 3.86 3.28 4.42 4.02 14.00
Service Area Headcount FTE
Corporate Asset Management 42 36.97
Housing Asset & Investment 10 8.60
Maintenance & Repairs 360 348.36
CPU 16 15.54
TOTAL 428 411.27
Page 86

Page 87

Appendix 1: Action Plan
1. Our Communities
Objective 3. Our residents are supported to increase life and learning skills
Action Due Date Owner
Progress Glencairn House Improvements in line with agreed plan and timeframe 31-Mar-2024 Michelle Lynn
Progress Faifley Campus in line with agreed programme 31-Mar-2024 Craig Jardine
Objective 6. Our neighbourhoods are sustainable and attractive
Performance Indicator – Target 23-24 Owner
% of Special Needs Adaptation projects completed by consultancy services from receipt of referral to carrying
out survey, design and submission of building warrant within 60 day target for type 3 projects.
70% Craig Jardine
% of Consultancy Services project deliverables for Housing and General Services projects that were delivered
to programme.
80% Craig Jardine
2. Our Environment
Page 87

Page 88

3. Our Economy
Objective 7. Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish
4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and learning and development plans to
enable capabilities, improve resilience and promotion of a diverse workforce 31-Mar-2024 Craig Jardine
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce. 31-Mar-2024 Craig Jardine
Action Due Date Owner
Progress demolition of Artizan Centre within agreed timeframes 31-Mar-2024 Craig Jardine
Support the progress of Exxon City Deal Project 31-Mar-2024 Craig Jardine
District Heating Network Expansion Programme ( Golden Jubilee Hospital) 31-Mar-2024 Craig Jardine
Page 88

Page 89

Action Due Date Owner
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies 31-Mar-2024 Craig Jardine
Develop and implement learning and development opportunities to improve capabilities and resilience within
the workforce. 31-Mar-2024 Craig Jardine
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Performance Indicator Target 23-24 Owner
Percentage of council buildings in which all public areas are suitable for and accessible to disabled people 92%  Michelle Lynn
Proportion of operational buildings that are suitable for their current use % 93%  Michelle Lynn
Proportion of internal floor area of operational buildings in satisfactory condition % 91%  Michelle Lynn
% of capital projects supported by capital investment team, delivered within agreed plan 80%  Craig Jardine
% of capital receipts achieved as forecast 90%  Michelle Lynn
Action Due Date Owner
Progress capital projects managed by consultancy services in line with agreed plans 31-Mar-2024 Craig Jardine
Progress disposal of key strategic sites over 23/24 31-Mar-2024
Page 89

Page 90

Action Due Date Owner
Progress Depots Refurbishment Programme in line with agreed timeframe 31-Mar-2024 Craig Jardine
Implement revised CAM team structure 31-Mar-2024 Craig Jardine
Develop and implement plans and support other services to achieve the various asset related options agreed
by Council.
31-Mar-2024 Michelle Lynn
Risk Description Current Assessment Target Assessment Owner
Maintaining Council
Assets that are fit for
purpose
The risk that the Council's assets and facilities are not
fully fit for purpose with consequent adverse impact on
our ability to deliver efficient and effective services.
Assets included in this assessment are; the Council’s
property portfolio and open space
Craig Jardine
Page 90

Page 91

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer: Supply, Distribution and Property
Infrastructure Regeneration and Economic Development Committee:
24 May 2023
___________________________________________________________________
Subject :    Sale of Property at 90-96 North Street, Alexandria G83 0EB
1.
1.1
Purpose
The purpose of this report is to seek Committee approval for the Council to
enter into a contract for the disposal of the property at 90-96 North Street,
Alexandria to NWL Investment Ltd.
2. Recommendations
2.1      It is recommended that the Committee:
(i) Approve the sale of the property to NWL Investment Ltd (SC 653864)
for the sum of £153,000.
(ii) Authorise the Chief Officer, Supply, Property and Distribution to
conclude negotiations.
(iii) Authorise the Chief Officer, Regulatory and Regeneration to conclude
the transaction on such conditions as considered appropriate.
3. Background
3.1 The property is wholly owned by West Dunbartonshire Council and is
currently unused and surplus to the requirements of any Council service.
3.2 The site was previously let and used as a yard for vehicle storage. It has been
vacant and unused for many years.
3.3 Previously it was anticipated the site was going to be subject to a Community
Asset Transfer but this subsequently did not transpire.
3.4 This site is allocated in the Local Plan Adopted 2010 as GD2(20) Policy GD2
– Redevelopment Opportunities applies to this site, and Schedule GD2
proposed the following uses “Industrial/business/residential”.
ITEM 10
Page 91

Page 92

4. Main Issues
4.1 The property is not required by the Council for any operational purposes.
4.2 The property was extensively marketed for sale during February and March
2023. Details of Particulars were prepared (Appendix 1).
4.3 The availability of the site was listed on the Councils website and social
media. Details were also circulated to commercial property agents, local
solicitors, business development bodies and the property was listed on the
main Commercial property marketing websites.
4.4 A closing date was set for receipt of informal offers on Thursday 6th April
2023. Three offers were received ranging from £26,666 to £153,000 (NWL
Investment Ltd).
4.5 The offer from NWL Investment Ltd is subject only to standard commercial
conditions and importantly is not subject to survey, valuation or planning
consent for change of use.
4.6 We are advised that NWL Investment Ltd intend to use the site for the storage
of welfare vehicles for the film and tv industries as well as festivals weddings
etc.
4.7 NWL Investment Ltd are currently based in Gartocharn have been looking for
a site for several years in West Dunbartonshire.
4.8 They intend to develop the site as a centre showcasing the cutting edge in
green technology and carbon negative build. They also intend to expand their
workforce locally.
5. People Implications
5.1 There are no significant people implications other than the resources required
by Legal Services to negotiate missives and conclude the transaction.
6. Financial and Procurement Implications
6.1 The Council will benefit from a capital receipt.
6.2 The Council will no longer have to incur resources in managing and
maintaining the property.
6.3 The Council will no longer be liable for non domestic rates of £12,600 per
annum.
6.4 There are no procurement implications arising from this report.
Page 92

Page 93

7. Risk Analysis
7.1 The disposal is subject to legal due diligence.
7.2 As with any transaction of this nature there is a risk of the sale not proceeding
due to issues which arise during the due diligence process in which case the
property may require to be remarketed.
8. Environmental Sustainability
8.1 A Phase 2 Site Investigation Report and Non - native invasive species report
were obtained for the site both of which were passed to interested parties.
NWL Investment have confirmed that both reports have been reviewed by
their consultants.
9. Equalities Impact Assessment (EIA)
9.1 An Equality Impact Assessment is not applicable for the purpose of this
report.
10. Consultation
10.1 Consultations have been undertaken with Finance and Regulatory Services,
Planning and Road Services.
11. Strategic Assessment
11.1 By agreeing to this proposal the Council will benefit in terms of receiving a
significant capital receipt and removing a liability from the property portfolio.
11.2 A site which has been vacant and disused for a number of years will be
brought back into a serviceable and employment generating use and the
future liability for the ingoing upkeep and maintenance of the site will be
removed from the Council.
11.3 By agreeing to this proposal this will be contributing to the Council’s strategic
priority for a strong local economy and improved job opportunities.  .
Angela Wilson
Chief Officer: Supply, Distribution and Property
Date: 11 April 2023
Person to Contact: Michelle Lynn, Asset Coordinator.
Email: michelle.lynn@west-dunbarton.gov.uk
Page 93

Page 94

J David Johnston, Estates Surveyor. 
Email: david.johnston2@west-dunbarton.gov.uk
Appendices: Appendix 1 – Marketing Details.
Background Papers:  None 
Wards Affected: Ward 1
Page 94

Page 95

FOR SALE: DEVELOPMENT SITE
90-96 NORTH ST
ALEXANDRIA
G83 0EB
PROPOSAL
West Dunbartonshire Council are pleased to offer for sale this development site in central
Alexandria. The site may be suitable for development subject to the necessary consents being
obtained.
LOCATION
The town of Alexandria is situated approximately 17 miles north west of Glasgow City Centre,
within the ‘Vale of Leven’. Access to the M8 national motorway network can be gained via the
Erskine Bridge which is approximately 7 miles from Alexandria.. The subject property is located to
the north of Alexandria town centre on the south side of North Street at the junction with Lennox
Street.
DESCRIPTION
The subjects comprise a regular shaped level site which is partially surfaced.
Vehicular access to the site is from North Street. There is a derelict single storey building
within the curtilage of the site. The attached plan shows the location and site boundaries.
IITEMTEM 0II
ITEM 10 - APPENDIX 1
Page 95

Page 96

ACCOMMODATION
The site extends to 0.84 acres (0.34ha) or thereby.
RATEABLE VALUE
The property is entered in the Valuation Roll at NAV/RV (April 2023) at £12,600 per annum.
SITE CONDITIONS
A Phase 2 Site Investigation Report was prepared in May 2022 which concluded that there are
elevated levels of contamination at the site which may cause harm to human health in the absence of
remedial and/or mitigating measures. It is recommended that a Remediation Options Appraisal Report
should be prepared to address identified pollutant linkages and render the site suitable for use.
Copies of the Site Investigation report can be made available to seriously interested parties.
An Invasive non-native species survey was undertaken in August 2022 which identified that
Japanese knotweed, buddleia, and field horsetail were growing within the site. Any proposed
development will need to address the management or removal of these non-native species.
PLANNING
The Adopted Local Plan 2010 continues to form the development plan for West Dunbartonshire.
The Proposed Local Development Plan incorporating the recommended modifications of the
Examination Report, as agreed at the 19 August 2020 Planning Committee is a material
consideration in the determination of planning applications.
The National Planning Framework 4 (NPF4) has been approved by the Scottish Parliament and is
a significant material consideration for the determination of planning applications. It is anticipated
that NPF4 will be published and adopted on the 13th of February 2023; NPF4 will form part of the
development plan from this time.
This site is allocated in the Local Plan Adopted 2010 as GD2(20). Policy GD 2 - Redevelopment
Opportunities applies to this site, and Schedule GD2 proposes the following uses,
“Industrial/business/residential.”
In Local Development Plan 2 Proposed Plan (2020), this site is within an E1 existing industry and
business area. Policy E1 Economic Growth applies, and gives support for Business and Industrial
uses, Class 4, 5 and 6. Exceptions will be assessed against the criteria in Policy E1.
NPF4 Policy 26 in relation to business and industry  gives support for business and industry uses
at this location and other employment uses, “where they will not prejudice the primary function of
the area and are compatible with the business/industrial character of the area.”
NPF4 Policy 16 in relation to quality homes, gives support for housing on sites not allocated for
housing in a limited number of circumstances.
It is strongly recommended that interested parties contact Planning and Building Standards at
West Dunbartonshire Council. TEL  0141 951 7930   to discuss any proposals they might have for
the site.
Email:  development.management@west-dunbarton.gov.uk
Page 96

Page 97

ROADS
Access to the site is currently from North Street. The section of North Street between Lennox and
the railway bridge is not adopted and as such is not maintained by the Council.  The ownership of
this section of road is unknown.
TENURE
The heritable interest in the property is available for sale.
There is a servitude affecting the site as contained in a Deed of Servitude containing Disposition
by the Trustees of William S Buchanan in favour of the British Transport Commission, recorded
GRS (Dumbarton) 17 June 1959 as follows:-
• A heritable and irredeemable servitude right of construction, laying down and maintaining a
mast 22 feet or thereby in height and erected on a concrete base for the purpose of
supporting and carrying the overhead electric line equipment on the adjoining railway,
together with the relative overhead wires leading from the said mast over and across the said
subjects to the railway, also together with a right of access over the Trustees adjoining land
on all necessary occasions for the purpose of erecting, repairing and maintaining same, with
the Transport Commission being responsible for all surface damage caused as a result of the
erection, repair and maintenance of the mast – the position of the mast and line of overhead
wires are as indicated on the plan annexed to the attached Deed of Servitude.
Interested parties can be provided with a copy of this Deed of Servitude and are advised to seek
their own Legal advice as to the implications thereof.
OFFERS
We are seeking offers for the benefit of the Councils interest in the property.
It is likely that a Closing date will be set for receipt of offers and it is strongly recommended that
parties’ register their interest in writing.
FURTHER INFORMATION and VIEWING
Parties are asked to register their interest in writing with:
J David Johnston, Asset Management
West Dunbartonshire Council
Council Offices
16 Church Street
Dumbarton
G82 1QL
Tel: 07785632859
Page 97

Page 98

Reproduced by permission of Ordnance Survey on behalf of HSMO
(C) Crown Copyright and database right 2019. All rights reserved.
West Dunbartonshire Council Licence No. 100020790.
West Dunbartonshire Council
Title : 0.84 ACRES 90-96 NORTH STREET, ALEXANDRIA G83 0EB
Scale : 1:1250Date : 05/08/2013
Map Ref : NS3980SWMap No : DMB78924
LAND REGISTER
OF SCOTLAND
Officerʼs ID / Date
N
ORDNANCE SURVEY
NATIONAL GRID REFERENCE
Survey Scale
DMB78924
70m
1/1250
NS3980SW NS3980NW NS38SE
2814
TITLE NUMBER
5/8/2013
Page 98

Page 99

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer: Supply, Distribution and Property
Infrastructure Regeneration and Economic Development Committee:
24 May 2023
___________________________________________________________________
Subject :    Sale of Property at 26-30 Glasgow Road, Clydebank G81 1SE
1. Purpose
1.1 The purpose of this report is to seek the approval of the Committee that the
Council enter into a contract for the disposal of the property at 26-30 Glasgow
Road, Clydebank to Idrigil Limited
2. Recommendations
2.1      It is recommended that the Committee:
(i) Approve the disposal of the site to Idrigil Limited for the sum of
£120,000.
(ii) Authorise the Chief Officer, Supply, Property and Distribution to
conclude negotiations.
(iii) Authorise the Chief Officer, Regulatory and Regeneration to conclude
the transaction on such conditions as considered appropriate.
3. Background
3.1 This commercial property is wholly owned by West Dunbartonshire Council
and has been leased to the current tenant Idrigil Limited.  The lease was last
extended in 2017 for a further three years and has been running on a tacit
relocation, i.e. year to year, basis since 2020.
3.2 The agreed rent for the property is £19,000 per annum although this not
currently being levied due to the disruption of works around the Queens Quay
area. Prior to the Covid-19 pandemic, the property had traded as the ‘Lucky
Break’ licensed snooker hall. The property is currently closed and not trading.
3.3. The subjects consist of a two storey, end terrace property of brick
construction. In terms of layout, at the ground floor, the property extends to a
function and bar area at the front, with a sizable hall at the rear currently used
as the snooker hall.
ITEM 11
Page 99

Page 100

3.4 Generally, the property is in reasonable condition at ground level although
requires some level of repair and maintenance. On the upper floor, the
condition is very poor. This level is currently used as a store and is in a shell
state with no floor or wall finishes. The upper floor requires a significant level
of investment in order to bring it up to a standard consistent with the ground
floor.
3.5 The surrounding area has seen significant improvement of late as part of the
Queens Quay redevelopment at Clydebank Waterfront. This includes the new
Health Centre immediately to the rear of the property and the new multi-storey
residential scheme immediately to the east.
3.6 In order to facilitate construction of the new Health Centre, the toilet block
located at the rear of the property required to be demolished. The Council
undertook to replace and install new toilets in the property, at the Council’s
expense, in due course. This has not been undertaken as yet and if this
disposal proceeds this will not be carried out.
4. Main Issues
4.1 The property is not required by the Council for any operational purposes.
4.2 Asset Management have been approached by the current tenant, Idrigil
Limited, for them to purchase the property from the Council. This would be in
accordance with Council’s Disposal Strategy.
4.3 A valuation of the property by the District Valuer Office reported a Market
Value of £100,000 as at 30 August 2022.
4.4 Agreement has been reached, in principle, with Idrigil Limited for a sale of the
property to them at a price of £120,000 in its existing condition subject to
Committee Approval.
5. People Implications
5.1 There are no significant people implications other than the resources required
by Legal Services to negotiate missives and conclude the transaction.
6. Financial and Procurement Implications
6.1 The Council will benefit from a capital receipt.
6.2 The Council will no longer have to incur resources in managing the property.
6.3 The Council no longer have to incur the cost of reinstating the WC facilities
which were removed nor organise and contribute to a refurbishment of the
property.
Page 100

Page 101

6.4 There are no procurement implications arising from this report.
7. Risk Analysis
7.1 The disposal is subject to legal due diligence.
7.2 As with any transaction of this nature there is a risk of the sale not proceeding
due to issues which arise during the due diligence process and the property
may require to be retained on a leasehold basis or put on the open market.
8. Environmental Sustainability
8.1 An up to date Asbestos Report will be obtained for the property and passed to
the prospective purchaser. We understand that Idrigil Limited intend to reopen
and use the property for Snooker Hall and ancillary uses.
9. Equalities Impact Assessment (EIA)
9.1 An Equality Impact Assessment is not applicable for the purpose of this
report.
10. Consultation
10.1 Consultations have been undertaken with Finance and Regulatory Services,
Planning and Road Services.
11. Strategic Assessment
11.1 By agreeing to this proposal the Council will benefit in terms of receiving a
capital receipt and removing a potential liability from the Councils books.
11.2 A building which has lain vacant and disused for a number of years will be
brought back into serviceable use.
Angela Wilson
Chief Officer: Supply, Distribution and Property
Date: 11 April 2023
Person to Contact: Michelle Lynn, Asset Coordinator.
Email: michelle.lynn@west-dunbarton.gov.uk
Craig Maxwell, Estates Surveyor. 
Email: craig.maxwell@west-dunbarton.gov.uk
Appendices: None
Background Papers:  None
Wards Affected: Ward 6
Page 101

Page 102

Page 102

Page 103

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer : Supply, Distribution & Property
Chief Officer : Roads & Neighbourhood 
Infrastructure Regeneration and Economic Development Committee:
24 May 2023
___________________________________________________________________
Subject: Depot Rationalisation Project Delivery Phase 2
1. Purpose
1.1 The purpose of this Report is to update IRED Committee on the current
status of the Depot Rationalisation Project and to seek approval to progress
with Phase 2 which would see the delivery of refurbished depot
accommodation across two sites.
2. Recommendations
2.1 It is recommended that the Committee:
(i) Note the Depot Rationalisation Project update;
(ii) Agree proposals as set out within the Report to progress with the
refurbishment of depot accommodation across two existing
sites;
(iii) Agree proposals as set out within the Report to agree new
Recycling Reuse and Resource Centre (Waste Transfer Station)
on existing Poplar Road site in Dumbarton;
3. Background
3.1 Discussions around the depot provision had been put on hold during 2020 to
assess service provision and to review the impact of Covid 19.
3.2 Prior to this, the Depot Rationalisation Project Board last met in June 2019
where it was agreed the Project Board would meet again in the Autumn of
that year once the status was known on the options for a future Depot
location, as well as the potential impact of service delivery implications on
future depot requirements.
3.3 Further to the above, as a result in changing legislation within the Waste
Environment, there is a requirement for the Council to consider options to
develop and implement a Recycling, Reuse & Resource Centre (Waste
Transfer Station). This requires to be considered in conjunction with the
development of the Depot Rationalisation Project due to
interdependencies.
ITEM 12
Page 103

Page 104

3.4 A paper was presented to the Strategic Assessment Management Group
in December 2021 providing an update on the current status of the Depot
Rationalisation Project and an indicative timeline to conclude the Business
Case.. In addition it was noted that the implementation of a salt dome
should be delivered as Phase 1 of the project. 
3.5 The Depot Rationalisation (DRP) Project Board met in January 2022 and
agreed to progress with: 
a. Phase 1 - Procurement and installation of the salt dome; and
b. Options appraisal to be considered and full Business Case developed. 
3.6  Options appraisal considered : 
The options involved comparing the Business Case scenarios against the
existing estate baseline of ‘do- nothing’ for the following proposed
alternatives: 
• Demolish and rebuild facilities on Elm Road Dumbarton in a
phased/tandem build approach to accommodate continuity of existing
services delivery. Remodel Richmond and Stanford Street areas
retaining Waste Transfer station and providing satellite base and
welfare facilities for Greenspace, Roads, Waste, Fleet and Building
Services; and 
• As above but include all Depot provision currently split over both the
Dumbarton and Clydebank ends of the authority into one existing site
footprint. 
3.7 A procurement exercise has undertaken for long term waste contractor
and tenders received were unaffordable.  Feedback was assessed and it
was identified that a Waste Transfer station was required.  A feasibility
study was commissioned to determine the size location requirements and
sites were then assessed by officers for viability. 
4. Main Issues 
4.1 Phase 1 of the Depot Rationalisation was approved by Committee on
16 February 2022 which was the requirement to progress with the
provision of a new salt storage area.   
4.2 A Royal British Institute of Architects (RIBA) Stage 1 report was
produced in September 2022 which indicated costs are outwith the
existing budget provision of £8.4m and will therefore make the
continuance of the project for a new build facility no longer financially
viable.   
4.3 An alternative option to refurbish the existing depot estate with the
existing £8.4m budget set aside in the capital plan has been reviewed.   Page 104

Page 105

4.4 This alternative option would be to rationalise the existing Depot sites in
Dumbarton and Clydebank.  These sites would be redesigned and
improved for this purpose (Appendix 1). 
4.5 These new improved sites would provide capacity for a cohesive
workforce in the two existing locations whilst endeavouring to reduce
ongoing revenue costs for satellite offices.  They would also provide
services and employees with a fit for purpose, high quality working
environment. 
4.6 Refurbishment work would be carried out whilst the sites remained
operational and will be programmed accordingly using existing facilities
where appropriate.  Detailed discussions will be held with the workforce
and trade unions in advance of any temporary decants which may be
required. 
4.7 It is anticipated that the depot refurbishment works would be carried out
by Building Services incorporating specialist contractors where
appropriate with the Recycling, Reuse & Resource Centre (Waste
Transfer Station) being subject to a future procurement exercise. 
4.8 With the revised proposal we would be able to retain the economic
benefits that the two areas currently experience by having WDC in
these locations.  This would reduce the general running costs for the
services by providing a refurbished depot that is more energy efficient
and requires less maintenance 
4.9 The proposal would look at retaining Building Services functions across
both Dumbarton and Clydebank, with Waste, Greenspace, Roads and
Fleet being split across both locations which supports the fit for the
future service delivery model. 
4.10 The strategic service delivery review will determine the operational
requirements but it is anticipated Roads and Grounds would be
predominately in Dumbarton with Waste and Fleet in Clydebank with
small satellite bases.     
4.11 It is also anticipated that a number of smaller satellite sites will be
surplus assets which would be available for disposal as a result of this
new proposal.  Workstyle returns will also feed into what appropriate
office accommodation is now required across both locations.   
4.12 Initial visual surveys have been completed but detailed condition
surveys will be required with architectural input in terms of efficient
layouts and traffic management around both the two main locations
and any satellite provision.   
4.13 WDC require to meet Government targets to reduce biodegradeable
waste going to landfill by 95% as of 2025.   The Council also require to
be compliant with the landfill tax ban due for introduction in December Page 105

Page 106

2025. Following an unsuccessful procurement exercise for a long term
waste solution it was identified that a waste transfer station was
required. A feasibility study has been completed and following the
identification of a site, detailed design can commence.  This will
provide detailed costs for consideration.   
4.14 As both the future waste transfer station project and depot
rationalisation share a number of interdependences, incorporating both
projects into one would realise economies of scale and ensure that
both projects are in line with each other. 
4.15 A number of sites within WDC ownership have been reviewed by
officers from Waste, Greenspace and Asset Management with the
current site at Poplar Road being the proposed option for a transfer
station (Appendix 2).  Operationally it is far more cost effective to start
and finish refuse collection from the same base as the transfer facility
and it would therefore be proposed that waste operations are moved to
this site to retain flexibility in the service design. 
4.16 Waste transfer stations are designed specifically to aid the sorting and
storing of materials before they are moved on to larger sites for
disposal or treatment. Our waste transfer site will be able to house
recyclable material, general household waste, food waste, and green
waste, before it is treated or disposed of at an Energy from Waste
facility, or to a processor that will ensure our waste is suitably reused
or recycled in accordance with regulations. 
4.17 Disposal of Poplar Road is part of a savings option by Citizens Culture
& Facilities and it is anticipated being vacant in March 2025.  Utilising
this site would be an effective use of a surplus asset and ensure
maximum occupancy of Broadmeadow Industrial Estate with income
coming into Common Good Fund. 
5. People Implications 
5.1 There are no significant people implications other than the resources required by
officers within Supply, Distribution and Property and Roads and Neighbourhood. 
6. Financial and Procurement Implications 
6.1 The Depot Rationalisation project has a budget of £8.4k with spend to date
at £119k and an additional £2m allocated for the Recycling, Reuse &
Resource Centre.  The anticipated spend for installation of new salt dome
has not been achieved due to the project being delayed  as a result of site
conditions. The construction will commence Summer 2023.   
6.2 The cost for the refurbishment works are currently unknown but it is 
anticipated that full budget will not be required.  This will be reported via the
normal capital reporting via BCR process going forward.  Page 106

Page 107

6.3 There are no procurement implications arising from this report. 
7. Risk Analysis 
7.1 Should any unforeseen issues arise in terms of the existing buildings which
affect the refurbishment design and deliverables the project may require to be
redefined.   
8. Environmental Sustainability 
8.1 The repurposing of existing assets will improve service efficiencies by reducing
duplication of work and allow for the sharing of resources. 
9. Equalities Impact Assessment (EIA) 
9.1 Screening and impact assessments will be carried out on specific activities as
required as the project progresses. 
10. Consultation 
10.1 All Services involved with the Depots will be consulted during each key
stage of the project development and delivery. 
10.2 Procurement, Legal and Finance colleagues have been consulted and are
members of the Project Board. 
10.3 Joint Trade Unions have been consulted and are members of the Project
Board. 
11. Strategic Assessment 
11.1 A full Strategic Assessment was not required for this Report but will
be included in any future assessment. 
Angela Wilson
Chief Officer: Supply, Distribution and Property 
Gail MacFarlane
Chief Officer: Roads & Neighbourhood 
11 April 2023 
Person to Contact: Michelle Lynn, Asset Coordinator.  
Email: michelle.lynn@west-dunbarton.gov.uk 
Appendices: Appendix 1 – Current Depot Sites    
Appendix 2–  Draft Layout of Future Waste Transfer Station  Page 107

Page 108

Background Papers:        Report to Infrastructure, Regeneration and Economic Growth
Committee: 16 February 2022 - Depot Rationalisation Project
Delivery Phase 1 : Salt Storage 
Wards Affected: All 
Page 108

Page 109

DEAN STREET
9
11
RICHMOND STREET
7
9
27a232725
41
TCB
34
26
28
2
4
1
Whitecrook
Centre
10.1m
ESS
El
Sub Sta
10.0m
Depot
Depot Whitecrook
Primary School
LB Depot
10.8m
ESS
1 to 12
49
51
51
COCHNO
STREET
57
8
4
DEAN COURT
2
STANFORD STREET
29
626466
5658
7
9
1
13
15
46 to 50
53
65
77
W
HITECROOK
STREET
W
HITECROOK
STREET
78
54
50
FORTH
STREET
Job Title
Drawing Title
Scale
Job No.
Date
Drawing No.
Drawn
Rev.
Issue
Sheet
Important
Do not scale from this drawing.
Any discrepancies to be reported to the
Contract Administrator.
Rev. Date ByAmendments
Infrastructure & Regeneration
Executive Director : Richard Cairns
Corporate Asset Management
Consultancy Services
Council Offices
Garshake Road
DUMBARTON
G82 3PU
Tel:  01389 737000
Fax: 01389 737144
Consultancy Services
Architectural
Quantity Surveying
Engineering
Clerk of Works
Y:\WDC logo colour.jpg
Clydebank Depot
Richmond Street
Clydebank
Site Plan
NTS A1 May 23 DG
- AL(00)001 -
INFORMATION
As existing
Scale NTS
Operational site -
available for lease.
Estates.
ITEM 12 - APPENDIX 1
Page 109

Page 110

Football Pitch
8
Trees
Travelling Crane
LB
Broadmeadow
Industrial Estate
ELM
ROAD
POPLAR ROAD
Drain
Post
Post
Council Yard
8
ESS
Conveyor
Conveyor
ELM
ROAD
Track
El Sub Sta
Job Title
Drawing Title
Scale
Job No.
Date
Drawing No.
Drawn
Rev.
Issue
Sheet
Important
Do not scale from this drawing.
Any discrepancies to be reported to the
Contract Administrator.
Rev. Date ByAmendments
Infrastructure & Regeneration
Executive Director : Richard Cairns
Corporate Asset Management
Consultancy Services
Council Offices
Garshake Road
DUMBARTON
G82 3PU
Tel:  01389 737000
Fax: 01389 737144
Consultancy Services
Architectural
Quantity Surveying
Engineering
Clerk of Works
Y:\WDC logo colour.jpg
Dumbarton Depots
Overburn & Elm Road
Dumbarton
Site Plan
NTS A1 May 23 DG
- AL(00)002 -
INFORMATION
As existing
Scale NTS
Operational site -
available for lease.
Estates.
As existing
Scale NTS
Available for depot.
Planning application
for salt base.
Page 110

Page 111

� -
� -
0:,
.s
�
rf
�
(!) -.J
o·C:
ct)
-
�
� -
Waste transfer
station
-
�
� �
�
�
-
1
�
-
�
J
�
0
�
i
J
J
Important
Do not scale from this drawing.
Any discrepancies to be reported to the
Contract Administrator.
Rev.I Amendments
Consultancy Services
Architectural
Quantity Surveying
Engineering
Clerk of Works
Job Title
Date I By
Regeneration, Environment & Growth
Strategic Director : Richard Cairns
Corporate Asset Management
Consultancy Services
Council Offices
Bridge street
DUMBARTON
G82 1NT
Tel'. 01389 737000
Waste Transfer Station
Poplar Road
Drawing Title
As existing
site plan
Scale I Sheet
1:200 I A1
Job No.
Date I Drawn
March 23 I DG
Drawing No. I Rev.
AL(00)001
Issue
INFORMATION
ITEM  12 - APPENDIX 2
Page 111

Page 112

Page 112

Page 113

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer: Supply, Distribution and Property
Infrastructure Regeneration and Economic Development Committee:
24  May 2023
___________________________________________________________________
Subject :   Asset Transfer of Land at Kilmaronock Kirk G83 0SB
1. Purpose
1.1 The purpose of this report is to seek the approval of the Committee to the
transfer of an area of land to Kilmaronock Old Kirk Trust following a
Community Asset Transfer request.
2. Recommendations
2.1      It is recommended that the Committee:
(i) Approve the transfer of the land to Kilmaronock Old Kirk Trust (KOKT)
for nil consideration.
(ii) Authorise the Chief Officer, Supply, Property and Distribution to
conclude negotiations.
(iii) Authorise the Chief Officer, Regulatory and Regeneration to conclude
the transfer on such conditions as considered appropriate.
3. Background
3.1 The land in question comprises an area to the north of Kilmaronock Kirk and
cemetery extending to 0.77 acres or thereby  which is currently overgrown
with trees and vegetation and is unused by any Council Services.
3.2 The land was acquired several years ago by the Council with the intention of
extending the cemetery, but ground testing showed the land to be unsuitable
for this purpose due to the shallowness of the bedrock.
3.3 The land is inaccessible and is not considered to have any significant
development value.
3.4 Kilmaronock Old Kirk Trust (KOKT) is a Scottish Charitable Incorporated
Organisation SC047874.They have submitted a Community Asset Transfer
Application to have the land transferred to them to support and enhance their
overall development of the Old Kirk as a heritage destination  and cultural
activity centre.
ITEM 13
Page 113

Page 114

4. Main Issues
4.1 The property is not required by the Council for any operational purposes.
4.2 The transfer of the land to KOKT will allow them further develop and
implement their plans for the overall development of the Kilmaronock Old Kirk
area.
4.3 The land transfer will support KOKT’s case to National Lottery Heritage Fund
who will potentially fund a two year activity programme plus capital works to
the building and site.
4.4 The intention is that the land will be used for the following:-
o Location for installation of septic tank/mini treatment facility for the Old
Kirk.
o Potential location for ground-mounted solar panels.
o Location for Beekeeping activities and raised beds for herb growing
forming a well-being garden.
o An area will be landscaped for peaceful recreation and contemplation
with seating and an all abilities access path in close proximity to the
kirk and graveyard. Potential pedestrian access can be had by
continuing past the church entrance, with maintenance access from the
turning circle at the east end of the graveyard.
o Biodiversity will be promoted by managing the area as a wild flower
meadow with possible hedge planting along the eastern and northern
boundaries, maybe some heritage apple trees planted. Bat and barn
owl boxes will be installed. Wider access to the site will be on strimmed
paths.
o Planned outdoor daytime and evening activities.
4.5 We are satisfied that KOKT are a properly constituted and well run charity
who have the skills and expertise to  develop the land for the intended
purpose, which, will be a significant improvement on the existing situation.
5. People Implications
5.1 There are no significant people implications other than the resources required
by Legal Services to negotiate missives and conclude the transaction.
6. Financial and Procurement Implications
6.1 The Council will no longer have to incur any resources in managing and
maintaining the site which currently is a cost to the Council of £3,000 per
annum.
6.2 There are no procurement implications arising from this report.
Page 114

Page 115

7. Risk Analysis
7.1 The disposal will be subject to legal due diligence.
7.2 If the transfer does not proceed for whatever reason the Council will
continue to own the land.
8. Environmental Sustainability
8.1 The proposals which KOKT have for the land support environmental
sustainability including : solar panels, beekeeping and biodiversity.
The Old Kirk Project has to be operationally Net Zero for greenhouse gas
emissions by 2030.
9. Equalities Impact Assessment (EIA)
9.1 An Equality Impact Assessment is not applicable for the purpose of this
report.
10. Consultation
10.1 Consultations have been undertaken with Finance, Regeneration and
Regulatory and Greenspace.
11. Strategic Assessment
11.1 By agreeing to this transfer the Council will remove a potential maintenance
liability from the Council’s Asset Register.
11.2 Land which has lain vacant and disused for a number of years will be brought
back into a use which will provide educational, cultural and employment
generating opportunities.
Angela Wilson
Chief Officer: Supply, Distribution and Property
Date: 21 April 2023
Person to Contact: Michelle Lynn, Asset Coordinator.
Email: michelle.lynn@west-dunbarton.gov.uk
J David Johnston, Estates Surveyor. 
Email: david.johnston2@west-dunbarton.gov.uk
Appendices: Appendix 1 – Site Plan.
Background Papers:  None 
Wards Affected: Ward 2
Page 115

Page 116

KILMARONOCK
KIRK
GRAVEYARD
GRAVEYARD
PRIVATE
ROAD
FOOTPATH
Existing watercourse
New shrub / tree planting
New planting / wildflower
meadow in landscape 'dip'
New commemorative tree
/time capsule/monument?
4kW solar array
(16 panels)
Wildflower meadow
/ Planting
Informal / mowed paths in
grass
Grass
Shrub / bramble managed
back to boundaries
Benches at high point
looking towards views
Benches for sitting / contemplation
Covered Accessible
picnic area
Storage sheds?
Bee hives
New septic tank
location TBC
New hedgerow on eastern
boundary to promote feeling
of enclosure to garden
Footpath
Mature sycamore
Mature sycamore
Mature sycamore
Mature sycamore
Mature ash
Mature ash
New access point for landscaping
machinery.
Sloping access track between tarmac
road and North Plot to address level
difference between tarmac road and
North Plot
email: mail@thomasrobinsonarchitects.co.uk
SCALE (@ A1)
DRAWNG TITLE
PROJECT NO:
JOB TITLE
DRAWING NO: REV
PURPOSE OF ISSUE
THOMAS ROBINSON
I ARCHITECTS
THE RED HOUSE, CROFTAMIE, GLASGOW, G63 0EU
www.thomasrobinsonarchitects.co.uk
TEL 01360 661144
Only scale for planning purposes. If in doubt, ask.
This drawing is the property of Thomas Robinson
Architects and must not be copied, reproduced or
disclosed other than for the purposes of this project.
©
1 : 200
A
Proposed Option 1
1096
North Plot at Kilmaronock Old
Kirk
SK-200
CONCEPT
REV DESCRIPTION DATE
A Revisions to tree locations, and
addition of access point to SE corner
2023_03_
29
1 : 200
Site Plan - Proposed Option 1
40 128 16
GRAPHIC SCALE: 1:200
20
NORTH
Site Area: 0.75 Acres / 0.3 Hectare
ITEM 13  - APPENIDIX 1
Page 116

Page 117

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Roads and Neighbourhood
Infrastructure, Regeneration and Economic Development 24 May 2023
Subject: Assisted Uplift Policy Update
1 Purpose
1.1 This report sets out detail on the review of the Assisted Uplift Policy and the
proposed eligibility criteria to be adopted and issued to all current users.
2 Recommendations
2.1 It is recommended that Committee notes the review undertaken of the
Assisted Uplift Policy; 
2.2   Approves the proposed eligibility criteria for the scheme as set out in 4.4;  
2.3   Notes that all current users will be notified of the new Policy and criteria; and
2.4    Notes that the update of the Assisted Uplift Policy will support the
implementation of the route review.
3 Background
3.1 Waste and Fleet Services have undertaken a Fit for the Future review of the
current service delivery.  An action plan has been developed identifying areas
to improve operational service delivery, customer experience and efficiency. 
In addition the review sets out measures to be undertaken that supports the
service to implement a route review for the collection of residual and recycling
waste.
4 Main Issues
4.1 The Fit for the Future review identified an opportunity to improve the collection
of waste and become more efficient through the implementation of a route
review.  The time taken to undertake a route is extended should the number
of assisted uplifts be significant.  An assisted uplift is when waste operatives
pull out the bin from wherever stored at the home for emptying at the kerbside
and return to that location.
4.2 A review of the number of service users was undertaken and found to be in
excess of 3000 households. The scheme has not been reviewed for a number
of years and it is anticipated that a number of current service users do not
fulfil the eligibility criteria or continue to reside at the property.
ITEM 14
Page 117

Page 118

4.3       All current service users will be written to and informed of the review of the   
policy and criteria and provided with an application form.  Residents who do 
not qualify but who currently receive the service will be advised of the      
arrangements for their future collections.   
4.4 It is proposed to align the eligibility criteria to the care of garden eligibility
criteria.  All residents who qualify under the following criteria will receive this
service:
• Confirmation that the resident is in receipt of a disability benefit such as
Personal independence Payment, Disability Living Allowance,
Attendance Allowance, Pension Credits or a care service from HSCP;
• Able to provide evidence of benefit received; and
• Provide details of all residents at the address and provide evidence that
all residents over the age of 18 also meet the qualifying criteria.
4.5 An annual review will be undertaken to ensure the list of service users is
retained to reflect the needs of the residents in our communities.
4.6 Communication and engagement will be undertaken to ensure residents are
aware of the policy review and the eligibility criteria.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1      There are no direct financial or procurement implications arising from the     
Assisted Uplift Policy review.  
The implementation of the Assisted Uplift Policy will support the     
implementation of the route review which is a revenue saving approved as     
part of the budget setting 2023/24.
7 Risk Analysis
7.1 All policy changes are risk assessed in line with Council policy and
procedures.  
The Council has a duty to deliver services that demonstrate best value.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on the Policy as
required.
9 Consultation
Page 118

Page 119

9.1      Consultation has been undertaken with the workforce in relation to the route     
review and the measures required to support the implementation.
9.2      The Trade Unions have been consulted and are members of the Waste 
Project Board.
10 Strategic Assessment
10.1 This Report reflects the 2022 – 2027 Strategic Plan and in particular the
following Strategic Priorities:
.
• Our resources are used in an environmentally sustainable way
• Our Council is adaptable and focused on delivering best value for our
residents
Chief Officer: Gail Macfarlane
Service Area: Roads and Neighbourhood
Date:  10 May 2023
_____________________________________________________________
Person to Contact:  Kenny Lang
Fleet and Waste Manager
kenny.lang@west-dunbarton.gov.uk
Appendices:  N/A
Background Papers: N/A
Wards Affected: All
Page 119