Democracy Spraffa

Item 12 - Appendix 1 CORPORATE ASSET MANAGEMENT FRAMEWORK

West Dunbartonshire Council · 1 February 2023
Back to Infrastructure, Regeneration & Economic Development Committee — 1 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

CORPORATE 
ASSET 
MANAGEMENT
FRAMEWORK 
ITEITE
ITEM 12 - APPENDIX 1

Page 2

CONTENTS
Executive Summary 3
01 Context 5
02 Introduction 6
03 Background 7
04 Strategic Approach 8

Page 3

WEST DUNBARTONSHIRE COUNCIL
CORPORATE ASSET FRAMEWORK 3 
WEST DUNBARTONSHIRE COUNCIL 
CORPORATE ASSET FRAMEWORK  
EXECUTIVE SUMMARY
The Strategic Vision shows our commitment to
partnership and creating a modern estate
that can attract, retain and empower our
people as well as enabling the use of
technology to improve operational
effectiveness and meet WDC’s Net Zero
ambitions by 2045. Our Framework needs to
align with the ambition of our strategic
outcomes.
3

Page 4

No embedded text on this page.

Page 5

WEST DUNBARTONSHIRE COUNCIL 
CORPORATE ASSET FRAMEWORK  3
01
CONTEXT 
West Dunbartonshire 
West Dunbartonshire Council is a Local
Authority in the West of Scotland, sitting
between Glasgow and the Loch Lomond &
Trossachs national park and often
considered the gateway to the Scottish
Highlands. With a population of just below
82,537 and an area of
68 sq. miles, West Dunbartonshire is a small
Council both in terms of population and
land coverage. 
However, despite its size, West
Dunbartonshire boasts a diverse range of
land uses, natural and built resources, and a
mix of dense urban form, rugged moorland
and spectacular watercourses. 
The Council is responsible for
provision of a range of services to its
residents and citizens, which includes
the collection of
waste and recycling, the provision of schools
and education, the management of planning
and building standards, the provision of
libraries, street lighting, and the collection
of Council taxes. 
In delivering these functions, the
Council owns and operates a large
built estate. Energy consumption from
our buildings and operations are
responsible for approximately 44% of
our carbon footprint; 47% of our
overall footprint results from the waste
and recycling of West Dunbartonshire 
(Both operational and domestic household
waste); and 9% of the remaining
emissions results from both Council and
staff vehicles and the operation of other
equipment, such as grass cutters. The
Council also has responsibility to ensure it
is delivering on Climate Change targets in
line with Climate Change strategy.

Page 6

6
WEST DUNBARTONSHIRE COUNCIL
CORPORATE ASSET FRAMEWORK 
WEST DUNBARTONSHIRE COUNCIL
CORP
02 
INTRODUCTION 
The Asset Management framework demonstrates how our assets support the strategic
priorities of the council, the delivery of key services, ensuring their efficiency and
effectiveness in achieving best value and meeting the needs of communities within West
Dunbartonshire. 
Sound and efficient management of our assets has a significant part to play in
continuing to improve and develop our services to the Community and through service
delivery planning, we will continue to clearly set out the service priorities and the asset
implications. 
Effective Asset Management can, as well as improving efficiency and effectiveness,
generate income by selling surplus assets, which will in turn generate long term
revenue savings as those assets would no longer be a financial burden. 
6

Page 7

CORPORATE ASSET FRAMEWORK  7
WEST DUNBARTONSHIRE COUNCIL 
03 
BACKGROUND 
Our Strategic Priorities 
The strategic priorities of the Council explain
how the Council will work to improve the lives of
residents, and support delivery of
Community Planning West
Dunbartonshire’s (CPWD) Local Outcomes
and Improvement Plan, and the West
Dunbartonshire Health and Social Care
Partnership (HSCP) strategic plan. 
This will ensure the Council is able to deliver on
its aspiration to reduce inequality for the
people of West Dunbartonshire.
Our priorities will be delivered through the
Council’s Strategic Plan 2022-27 and this
Corporate Asset Management Framework facilitates
the delivery of these strategic priorities.   
Through the strategic management of Assets, we will
demonstrate how we will deliver against the Council’s
Climate Change Strategy, actions and targets This
includes actions to reduce energy consumption and
improve energy and water efficiency in our
buildings and across our operations. We will drive
the rationalisation and improved utilisation of our
offices, depots and other buildings, ensuring that
we respond adequately to the green recovery of the
Covid19 pandemic and future proofing our assets
for a net zero. 
Energy and Water currently make up 44% of the overall
carbon footprint, so it is important that we continue to
make efforts to reduce consumption and emissions from
energy and water to have a greater chance of getting to
net zero by 2045. We will therefore look to exceed the
current energy reduction target of 2%   
The Framework has been developed taking
recognition of the Chartered Institute of Public
Finance and Accounting (CIPFA) guidance which
suggests assets should be classified under 6
generic categories.  Strategic management of
these is evidenced through Asset Management
Plans for each of these asset groups.  Each plan can be
accessed through the links below: 
Property
Open Spaces
Roads Structures & Lighting
Housing
Vehicle Fleet & Plant
Information and Communication Technology (ICT) 
.

Page 8

8
WEST DUNBARTONSHIRE COUNCIL
CORPORATE ASSET FRAMEWORK 
04
STRATEGIC APPROACH 
Elected Members, employees and partners
have a key role to play in continuing to
contribute to and inform the strategic
management and operational provision
of Assets. The Council’s corporate and
collaborative approach to Asset
Management will ensure that our assets are
fit for purpose and through each Service
Asset Plan provides the actions to be achieved
which continues to support this  Corporate
Asset Management Framework.  Asset Plans,
Property Disposal Strategy together with
other relevant plans such as Climate Change
actions, will be monitored, reviewed and
reported to various strategic forums and
Council Committees in line with appropriate
timescales.
The strategic responsibilities below outline
the key areas to deliver tangible benefits
contributing to the delivery of the Council’s
Priorities and Objectives: 
The Strategic Asset Management Group
oversees the Corporate Asset
Management for the Council.   
The Strategic Asset Management Group
chaired by the Chief Officer Supply,
Distribution and Property, with
membership from all service areas, facilitates
a corporate approach to the management
and prioritisation of all assets. 
• The Strategic Asset Management Group will
continue to consider the capital and asset
plans, opportunities and activities such as
disposals, energy and water management
etc. in line with best value and continued
optimisation of efficiencies. 
• We will generate additional income through an
active disposal of redundant assets
programme.  The disposal strategy and plan
can be found here. 
• We will carry out a further review of new
proposals which could lever additional
investment into West Dunbartonshire linked
to utilising our existing assets. This work should
be reviewed annually.   
Asset Management Performance Indicators
are monitored on a quarterly basis and
reported to Committee in line with the
delivery plans.  The Supply Distribution and
Property Delivery plan can be found here. 
• All Asset Plans will be reviewed and
approved by the Strategic Asset
Management Group and Committee as
required.

Page 9

CORPORATE ASSET FRAMEWORK  9
WEST DUNBARTONSHIRE COUNCIL 
Asset Management Plans 
All Asset Management Plans will support the delivery of the strategic plan these take account
of six key drivers which are promoted by CIPFA as being critical to effective Asset
Management. 
The six drivers and a description of each are illustrated below: 
Driver Description
Condition It is essential to understand the condition of the asset and it is
essential that regular surveys of condition are undertaken
Suitability This is also known as the “fit for purpose” test. It seeks to establish
how well an asset is suited to its current purpose
Sufficiency This relates to the demand and sustainability of the asset.
Sufficiency is concerned about how an asset is used now and in
the future. It helps to identify underused assets and is concerned
with asset capacity
Revenue Costs The costs of operating assets are important and need to be a
feature in any asset management plan in order both to monitor
against predicted costs but also to establish the economic asset use
Accessibility This has two aspects, the first linked to the Equality Act 2010and how
accessible the property is to disabled people, this is reported
under SPI CM4. The second how accessible is it generally, is it in
the right location
Value Knowing the value of assets is essential for decision making.
While valuations are required for accounting purposes it is also
essential to know the market value of the asset when considering
asset management plans

Page 10

10
WEST DUNBARTONSHIRE COUNCIL
CORPORATE ASSET FRAMEWORK 
Capital Project and Planning   
The Council utilises option appraisal techniques (where appropriate) for capital 
plan assessment. 
The full option appraisal process comprises five stages as follows.
1. Determine the strategic objectives of the organisation. This involves the 
examination of each option to identify the strategic contribution of each while
considering any other objectives that may have to be considered and any
wider social or economic benefits. This examination results in options being 
ranked according to how they meet the specified objective. 
2. Assessment of the whole life costs of the preferred option under different
Procurement options which may include lease versus buy, new build versus 
refurbishment or self- finance versus PFI. 
3. Adjusting the whole life costs taking account of risk and optimism bias and confirmation that the preferred
demonstrates value for money and that it is affordable. 
4. Implementation and monitoring of the preferred option at each stage in the 
project upon commencement.  
5. Post project evaluation and feedback of lessons learned - i.e. what did we do 
right and what did we do wrong?

Page 11

No embedded text on this page.