WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer, Regulatory & Regeneration
Infrastructure Regeneration and Economic Development Committee:
2 November 2022
___________________________________________________________________
Subject: New Economic Development Strategy 2022-2027
1. Purpose
1.1 The purpose of this report is to provide Committee with an update of work
undertaken during 2021/22 to deliver the previous West Dunbartonshire
Economic Development Strategy 2015-2020 and to obtain approval for a new
Economic Development Strategy for the period 2022-2027.
2. Recommendations
2.1 The Committee is invited to:
(i) Note the work activity undertaken during 2021/22 to deliver the
previous West Dunbartonshire Economic Development Strategy 2015-
2020;
(ii) Approve the new Economic Development Strategy for the period 2022-
2027.
3. Background
3.1 Over the last couple of years COVID-19 has had a significant impact on the
economic climate and as a result officers have had to prioritise the delivery
and distribution of Scottish Government Covid grants to support the
community and local businesses. This has in turn led to a delay in the
development of a new Economic Development Strategy for the local area.
3.2 The economic climate continues to face many challenges, these include the
ongoing recovery from the Covid pandemic, the implications of Brexit, rising
energy costs, rising inflation generally, and the impact of the war in Ukraine.
3.3 A new Economic Development Strategy has been developed which will
provide an updated economic vision and strategic priorities for West
Dunbartonshire for a further five year period from 2022-2027. The new
Strategy aligns with the Council’s proposed new Strategic Plan, the Glasgow
City Regional Economic Strategy and the Scottish Government’s National
Strategy for Economic Transformation, Delivering Economic Prosperity.
3.4 This report also provides committee with an update on the work activity
undertaken during 2021/22 to deliver the previous Economic Development
ITEM 12

Page 2

Strategy 2015-2020 which was approved by the Infrastructure, Regeneration
& Economic Development Committee in September 2015.
4. Main Issues
4.1 An updated economic vision has been developed for the new Economic
Development Strategy 2022-2027 which is:
‘By 2027, West Dunbartonshire will have an inclusive and vibrant
economy through the creation of fairer jobs, a drive towards net Zero,
and the development of prosperous places in partnership with our
communities and businesses’.
4.2 A number of key strategic priorities have also been updated to assist us to
achieve this vision, these are:
• Stimulating economic investment and growing the business base;
• Establishing an inclusive economy by improving the skills of our people and
supporting them into work;
• Creating a prosperous place where people choose to live, work, visit and
invest;
• Addressing climate change and supporting a green recovery;
• Building stronger partnerships and new approaches to delivery.
4.3 A copy of the new proposed Economic Development Strategy 2022-2027 is
attached in Appendix 1 for approval. Once the new strategy has been
approved an action plan will be developed and brought to a future Committee
for approval. The action plan will detail the key actions and performance
measures necessary to achieve our new vision and will build on the
foundations established in our 2015-20 Economic Development Strategy.
4.4 Further detail on the work activity undertaken to deliver the Economic
Development Strategy 2020-2025 during 2021/22 under each of the priority
themes is provided in sections 5-9 of this report.
4.5 Our previous strategic approach focused on the four key themes listed below:
• Stimulating economic investment and growing the business base;
• Improving the skills of all our people and supporting them into work;
• Creating an inclusive and prosperous place where people choose to live, work
and invest; and
• Building stronger partnerships and innovative approaches to delivery.
5. Stimulating economic investment and growing the business base
5.1 During 2021/22, the Business Support team successfully administered a
range of Coronavirus Business Support Grant funds on behalf of the Scottish
Government. Last year in total, the team provided 1,716 grants totalling over
£3.2 million to local businesses/individuals to provide them with critical

Page 3

financial support to assist with Covid restrictions. The grants provided
businesses with financial support through the following funds:
• Discretionary Fund;
• Hospitality Fund;
• Nightclub and Brewery Fund;
• Public House Table Service Fund;
• Route map Extension Fund;
• Self-Catering Exclusive Use Fund;
• Strategic Framework Top Up Fund;
• Taxi and Operator Fund;
• Taxi and Private Hire Vehicle Driver & Operator Support Fund; and
• Ventilation Fund.
5.2 The Council’s Business Support team provides a range of discretionary
business grants to local businesses to assist them to grow and create local
jobs. During 2021/22:
• 81 businesses have been supported with grant support to assist them to
grow and create local jobs;
• 84 business employees have been supported with a training grant to assist
with training costs;
• 42 businesses have received a start-up grant to assist them to start-up
their own business.
5.4 The Business Gateway service has been successfully delivered by the
Council’s Business Support team since 1 October 2015. Although the team
had a continuing focus over the last year on the administration and delivery of
essential Covid grant support to local businesses, the team also continued to
provide an advisory service to our local start-up and growth businesses. In
2021/22 the Business Gateway service provided:
• 201 businesses with start-up assistance;
• 35 start-ups with growth potential were given early stage growth support;
• 42 businesses with action plans through growth advisory service support.
5.5 Business start-up numbers of 201 for 2021/22 have remained broadly
consistent with the previous year’s figure of 200. The Scottish Local
Government Benchmarking website provides information on the number of
Business Gateway start-ups per 10,000 populations for each Local Authority
area. The most recent data from 2020/21 shows West Dunbartonshire are
ranked 5th out of the 32 Local Authorities. During 2020/21, West
Dunbartonshire supported 22.3 start-ups per 10,000 population which
compares favourably with the figure of 11.2 start-ups per 10,000 population
for the whole of Scotland.
5.6 The Business Gateway service also delivers a variety of free business
workshops to provide advice to start-ups and established businesses. These

Page 4

workshops include areas such as business planning, marketing and financial
planning. During 2021/22, 33 workshops were held with 185 clients attending.
5.7  The Business Support team are responsible for the management and delivery
of the Digital Boost Programme which aims to deliver Information and
Communications Technology advice to businesses in the form of workshops
and one-to-one expert advice. This is a Scottish Government Nationally
funded project which from July 2017 has been managed and procured by
West Dunbartonshire Council for both West and East Dunbartonshire Council
areas. During 2021/22, there were 9 one-to-one specialist sessions delivered
in the West Dunbartonshire Council area and 10 within the East
Dunbartonshire Council area. Further funding for Phase 7 has been secured
from Scottish Government to deliver similar activity for the year 2022/23.
5.8  A Business survey has recently been undertaken with the businesses that
received a business growth grant during 2021/22 to evaluate the effectiveness
of the Council’s Business Growth Grants. So far, the survey has had a
response rate of 57% (16 responses) and feedback received shows that the
Council’s business growth grants have assisted with the creation of 27 jobs
and helped to safeguard 90 jobs within the local area. 100% of businesses
that have responded also advised that the grant support has helped them to
increase their turnover making them more sustainable. During 21/22, £56,258
of business growth grant support was provided to 28 local businesses which
levered an additional £251,068 of private investment into the local area.
5.9 A High Growth Start-Up Challenge Fund has been developed in partnership
with the Working4Business group to support the growth of start-up businesses
that show high growth potential in West Dunbartonshire. The Challenge Fund
will provide a competitive grant award of up to £5,000 to high growth start-ups
that can evidence the potential to grow and create employment within West
Dunbartonshire. The fund is open for applications and will close on 28th
October 2022. Working4Business partners have agreed to assist with the
scoring and panel interviews for the fund.
6. Improving the skills of all our people and supporting them into work
6.1    Working4U is an integrated service that supports clients and communities in
West Dunbartonshire to improve their skills, learning and financial situations,
assisting all on their progress into work and protecting the rights of our
citizens. During the period April 2021 to March 2022 we continued to deliver
services that were subject to compliance with health restrictions due to
COVID-19. As such, while our services were reduced. We nevertheless
continued to support people through our ‘Virtual Hubs’. We complemented
this with face to face services where this was appropriate and risks were
properly managed. Our activities continued to centre on: 
• the provision of information, guidance, and support to help residents to make
informed choices about debt and money, learning and employment
opportunities and enjoy improved life chances;

Page 5

• the provision of good quality advice and learning assisting them to make
positive and sustained contributions to their community; and
• Improving the employability and resilience of local residents and making a
positive contribution towards increasing employment rates within our
community to close the gap with Scotland employment rates.
6.2     The specialist components of Working4U’s services include the
Learning service which primarily supports disadvantaged or vulnerable groups
and individuals of all ages to engage in learning. Our aim is to bring about
positive change in their lives and communities. The learning and employability
service are key components of the Employability Pathway. This covers a wide
range of activity, such as employability skills, youth work, family and adult
learning. It also includes adult literacy and English for Speakers of Other
Languages (ESOL) as well as individual capacity building to develop
confidence and self-esteem. Despite the impact of COVID-19 restrictions in
2021/22 we supported:
• 993 people to enter education or training; and
• 498 people to secure a nationally recognised qualification.
6.3   Information and Advice is set within the policy context that is designed to
support a flourishing Scottish economy. Working4U contributes to this aim
through the provision of debt counselling and welfare benefit advice. During
2021/2022 we supported local residents to: 
• secure £7.2million through benefit maximisation by the provision of  advice
and support; and
• renegotiate and manage £2.49million of debt.
6.4    Employability encompasses aspects that enable people to increase their
chances of getting a job, staying in a job, and progressing further in work. The
Council is responsive to those people in our communities with the greatest
need and our drive to real jobs is pursued in partnership with organisations,
agencies and employers that share our values. In 2021/22, despite the
constraints placed on us by COVID-19 health controls, Working4U supported
294 residents to secure employment. 
6.5    West Dunbartonshire Council has created a £1m Apprenticeship Investment
Fund to support apprenticeships over a four years period from 2018 to 2022.
The fund will see £0.250m spent in each of the four years to recruit
apprentices across a range of Council services and positions within the
Private sector. In addition to traditional apprenticeships, we will contribute to
workforce development in West Dunbartonshire Council. In 2021/22, 288
Apprenticeship opportunities were supported.
7. Creating an inclusive and prosperous place where people choose to
live, work and invest

Page 6

7.1   Availability of good quality homes and a choice of tenures is a fundamental
component of placemaking.  The latest draft strategic housing investment
programme 2022-27 (identifies 755 homes to be developed by the Council
and our Registered Social Landlord partners leveraging an estimated
£55.8million of grant funding from the Scottish Government over the five years
of the plan.   We have high levels of housing need in West Dunbartonshire
and therefore we will work closely with colleagues in other teams to deliver
more housing of all tenures and ensure that our housing is the best it can be
across the council area. We will continue to work with our colleagues to
review the private housing market and ensure there is an adequate supply of
private housing sites.   Any investment in housing reaps rewards beyond the
home itself and in addition to this our procurement processes include
significant community benefits including apprenticeships, school engagement
and investment in community spaces such as gardens, and to improve the
resilience of town centres and to create 20 minute neighbourhoods.
7.2   The Local Economic Development annual Capital Budget of £1m plays an
important role in developing shovel ready projects that can attract external
funding as those opportunities arise. The budget is also used as match
funding to lever in external funding; recent examples of which include the
Scottish Government/European Green Infrastructure funded Melfort Park at
the former St Eunan’s primary school site and  Regeneration Capital Grant
Funded Clydebank Can on the Canal Activities Centre. LED has funded long
term visioning for our towns and communities, as demonstrated in the
Alexandria Masterplan and Clydebank Town Centre Development
Framework. The Regeneration Fund of £12.4m was agreed at Council on 28
October 2015 to support development and regeneration projects where a
return would be achieved, whether in terms of wider economic growth or
financial returns. To date, Regeneration Fund has been invested in several
initiatives including the further development of the innovative District Heating
Centre at Queens Quay. Regeneration Fund will also part-fund the
repurposing of Glencairn House as a library, museum and community space,
Connecting Dumbarton and the proposed Scottish Marine Technology Park at
Carless.
7.3  The Council’s investment of £15.62m in Queens Quay over the past five
years has helped fund the infrastructure needed to prepare the site for
redevelopment. In collaboration with the development partners, good progress
has been made on key developments, including the completion of the energy
centre, new Care home, Wheatley developed flats and the new NHS
Clydebank health centre as well as the Titan Boulevard. Housing
development plots are being marketed to fulfil the ambition of delivering 1,000
new homes on Queens Quay. The redevelopment of this site will be
transformational for all our communities in Clydebank and through
implementation of Clydebank Town Centre Development Framework stronger
links with the town centre and public transport will follow.
7.4   The West Dunbartonshire Energy centre started delivering heat in November
2020. The Leisure centre, Care Home, Titan Enterprise, and Aurora House

Page 7

were the first four customers connected. The District Heating network is
performing well and the newly established West Dunbartonshire Energy LLP
is overseeing its growth. The 147 Wheatley flatted units on Titan Boulevard
are currently connected as the development nears its completion and we are
progressing with Clydebank Housing Association for flats on Dumbarton road
seeking to connect. Positive discussions continue to secure funding to
connect West College Scotland, the Golden Jubilee Hospital, and agreement
to connect the Clydebank Health centre. The Council are also pursuing
funding from the Scottish Government Green Growth Accelerator fund to
enable expansion and connection to the Dalmuir flats. Officers continue to
work with the Queens Quay landowners to bring in 1,100 new homes at the
former John Brown Shipyard. The Energy centre was showcased globally
during COP26. It has won a European Heat Pump award 2021 as well as
COSLA Excellence Awards in 2022. It was also in the final of Local
Government Chronicle Awards and Association for Public Service
Excellence Awards.
7.5   Good placemaking will continue to underpin the regeneration, development
and improvement work in the town centres as we aim to align funding and
resources, both Council and external funding,  to achieve our ambitions.
Building on the successes of previous charrettes in Clydebank and
Dumbarton, our collaboration with local community groups, citizens and
stakeholders has been instrumental in the production of  Alexandria
Masterplan and Clydebank Town Centre Framework.  The improvements we
have delivered in the town centres over the past five years have been guided
by placemaking and more recently, the move to creating 20 minute
neighbourhoods – where people have their day to day needs provided within
easy walking or cycling distance. For environmental and health & wellbeing
reasons active and sustainable transport is now one of the regeneration
priorities; Connecting Clydebank, Connecting Dumbarton and the proposed
Green Corridors project in Alexandria Masterplan will contribute to this
ambition. 
7.6 Scottish Government’s Town Centre Fund has funded a range of exciting
projects including Dumbarton Waterfront Path Gateway, Sylvania Way public
realm in Clydebank and enhancements to Smollett Fountain in Alexandria. A
new community-led Activities Centre in Clydebank funded by Regeneration
Capital Grant Fund is being developed and will be delivered in 2024. The
award of £19.9m from the Levelling Up Fund will help deliver ambitious plans
to regenerate Dumbarton Town Centre including the repurposing of Glencairn
House as a library, museum and community space, purchase and partial
redevelopment of the Artizan Centre, and delivery of the Connecting
Dumbarton project to enhance active travel connections between Dumbarton
Central railway station and the Town Centre. The Place Based Investment
Fund provides opportunities to deliver on our vision for the town centres in
partnership with community organisations, other public sector bodies,
landowners and developers. It contributed towards the Titan Boulevard in
Clydebank, and will fund a number of placemaking and active travel projects
identified in the Alexandria Masterplan. The UK Shared Prosperity Fund will

Page 8

enable us to offer Shop Front Improvement grants to the local businesses in
the town centres.
7.7   As the trend in online shopping continues, town centres everywhere are
having to change and adapt to a much reduced demand for high street
shopping.  Alternative scenarios for obsolete town centre property and land
include housing development, more restaurant and food outlets that help
create a night-time economy and encouraging community uses for vacant
property. In 2022 the Council purchased the ailing Artizan Centre in
Dumbarton to facilitate redevelopment of the parts of the Centre where
vacancy rates are high. This Levelling Up Fund project will help to increase
footfall and bring vibrancy back into the town centre. Phase 1 of the works
was approved by the IRED Committee in September 2022. In Clydebank, the
focus is to create the heart of the town by taking a proactive approach to the
future uses of land and buildings south of the Canal. Public realm works
around the Smollet Fountain in Alexandria will enhance the town centre and
make it more attractive for people to visit. 
7.8 We continue to work with town centre businesses to mitigate the impacts of
the current cost of living crisis and the pandemic on our already struggling
high streets. In partnership with the Chamber of Commerce funding was
secured to promote and support Loves Local, a Shop Local and Think Local
First to drive footfall into our town centres. Grants for shop front improvements
will be made available to small businesses in town centres. Covid-19 has had
an impact on the value and marketability of town centre premises, and so we
continue to maintain a dialogue with town centre property owners to discuss
their future plans.  
7.9   The Council has agreed terms to acquire the City Deal funded redevelopment
of the former Esso site at Bowling. A contractor has been appointed and
progress is being made with the delivery of the infrastructure. These are
significant milestones in the future re-use of the site for employment
generating uses. The site forms part of a much larger regeneration
opportunity along North Clyde Riverbank, and improved connections as well
re-use of riverfront vacant and derelict land will be a priority for the Council in
the coming years to create an attractive and vibrant riverfront.  The Council
applied for Vacant and Derelict Land Improvement Programme funding to
develop green network aspects of the Exxon development.
7.10     Many of the projects are delivered in partnership with other organisations.
The Council continues to support Scottish Canals in their transformation of
Bowling, most recently in the creation of the Bowline, an elevated
walkway/linear park on the former swing bridge at Bowling Basin, to create an
important new connection for pedestrians and cyclists. Scottish Canals have
refurbished the B listed Custom House to provide boutique self-catering
accommodation. Together these improvements have transformed the offer at
Bowling and consolidated its role as a compelling destination. The Council will
continue to work with Scottish Canals, other nearby landowners and Clyde

Page 9

Mission on a vision for North Clyde Riverbank that will regenerate the river
frontage and improve connections between Bowling and the former Esso site.
7.10    In partnership with Historic Environment Scotland and Scottish Maritime
Museum, the Council is delivering the vision set out in Dumbarton Visitor
Gateway Study. With the partially complete Waterfront Path being a key
connection between the Dumbarton town centre and the Rock and Castle, the
partnership is implementing an action plan that will strengthen the combined
offer of the Arc of Attraction incorporating the Rock and Castle, Denny Tank
Museum and Glencairn House when it is repurposed and open to the public.
This includes looking into options for delivering improved parking and access
for buses to the Castle, and the eastern end of the Waterfront Path.  The first
phases of Dumbarton Waterfront Path are finished and open, and talks
continue with the landowners of the later phases, Turnberry Homes and
Dumbarton FC, to determine their timescales for delivering their sections of
the Path. 
8. Building stronger partnerships and innovative approaches to delivery.
8.1 The Council continues to work in partnership with the Glasgow City Region to
implement the new Regional Economic Strategy which outlines the vision and
three grand challenges for the City Region until 2030.
‘By 2030, Glasgow City Region will have the most Innovative, Inclusive and
Resilient Economy in the UK’
• Creating an Inclusive Economy
• Enhancing Productivity
• Addressing the Climate Emergency
8.2 The UK Shared Prosperity Fund is the UK Government’s main funding to
replace European Union Structural Funds.  A Glasgow City Region
Investment Plan has been developed and submitted to the UK Government
for their consideration.  The anticipated timeline for the investment plans to be
approved is October 2023. If approved this fund will provide additional funding
of £3,895,815 to support Communities & Place, Local Business and People &
Skills.
8.3 Officers continue to work in partnership to explore opportunities for external
funding and have a strong track record of attracting external funding for
Economic Development, Regeneration, Infrastructure and Employability
projects.  Recent examples include £2m of funding from the Scottish
Government’s Clyde Mission Fund to enable construction of the Scottish
Marine Technology Park, £20m from the UK Government’s Levelling Up Fund
for our Town Centres regeneration   projects and various grants from the
Scottish Government’s Regeneration Capital Grant Fund.   We are a partner
to the Glasgow City Region and are developing a multi-million pound project
to create new industrial premises and associated infrastructure at the former
Exxon site near Dumbarton.

Page 10

8.4 The ‘Working4business’ group continues to provide a partnership approach to
supporting our local businesses. The priority over the last year for partners
and the Council in relation to supporting our local business during 2021/22
has continued to be related to the Pandemic and supporting business
recovery. 
8.5 In order to deliver the regeneration programmes, Council’s Regeneration
Team has partnerships with a diverse range of external stakeholders such as
Glasgow City Region, Scottish Enterprise, Strathleven Regeneration Cic,
Scottish Government, NHS, Golden Jubilee Hospital, Scottish Canals, Historic
Environment Scotland, Scottish Maritime Museum, Sustrans, Loch Lomond
and Trossachs National Park  Authority, Event Scotland, Dumbarton Castle
Society, Ysortit, Network Rail, Dumbarton Stations Improvement Trust and
Dunbartonshire Chamber of Commerce 
5. People Implications
5.1 There are no people implications related to this project.
6. Financial and Procurement Implications
6.1 The Council budget expenditure detailed in the action plan continues to be
monitored and reported regularly to ensure that performance targets are
achieved, maximising private sector leverage and external funding.
6.2 It is acknowledged that the achievement of the outcomes of this new Strategy
is reliant on the continued commitment and funding from both public and
private sector partners.
6.3 There are no procurement issues in relation to the strategy contained within
this paper; however each project through its development will require an
appropriate procurement process.
7. Risk Analysis
7.1 The consultation process with partners and key stakeholders ensured that the
content of the strategy is appropriate and relevant to economic conditions and
throughout the delivery process risk will be assessed and managed.
8. Environmental Sustainability
8.1 A pre-screening Strategic Environmental Assessment has been completed,
and is available as a background paper, which determined that although this
is a key strategic document it is expected that it will generate no or minimal
environmental effects at this stage. Any specific plans and programmes which
derive from the Strategy will be subjected to an environmental assessment as
and when required.

Page 11

9 Equalities Impact Assessment (EIA)
9.1 The Strategy has been impact assessed and is relevant to the general
equality duty. The Strategy will assist with reducing inequality and advancing
equality and has potential to produce positive impacts. A range of actions in
support of this are noted in the EIA which is available as Appendix 2 to this
report.
10. Consultation
10.1 A Consultation process has been undertaken to obtain feedback on the New
Economic Development Strategy which involved consultation with senior
officers across Council services and also with our partners through the
Community Planning Partnership - Flourishing Delivery & Improvement Group
and the Working4Business Partnership group.
10.2 A feedback survey was also developed and was available on the Council
website for individuals/organisations to provide their comments or feedback.
The feedback received through the survey was very positive.
11. Strategic Assessment
11.1 The new Economic Development Strategy 2022 – 2027 provides a clear
strategic approach to Economic Development for the local area and will help
determine how we allocate resources to improve our economic performance.
It responds to various local, regional and national policies and strategies. 
These include:
• West Dunbartonshire Council Strategic Plan;
• West Dunbartonshire Plan for Place/Local Outcome Improvement Plan;
• Glasgow City Region Economic Strategy; and
• The Scottish Government’s National Strategy for Economic Transformation,
Delivering Economic Prosperity.
Alan Douglas
Chief Officer, Regulatory & Regeneration
Date: 6.10.22
Person to Contact: Gillian McNamara, Economic Development Manager,
Council Offices, Church Street, Dumbarton, G82 1QL.
T: 07815705769
Email: Gillian.mcnamara@west-dunbarton.gov.uk
Appendices: Appendix 1 – New Economic Development Strategy
2022-2027
Appendix 2- EIA- New Economic Development Strategy
2022-2027

Page 12

Background Papers: IRED Committee Report – West Dunbartonshire
Economic Development Strategy Update November 2021
Strategic Environmental Assessment – New Economic
Development Strategy 2022-2027
Wards Affected: All Wards