Democracy Spraffa

Document Pack (Bookmarked) IRED Committee 02 11 22

West Dunbartonshire Council · 2 November 2022
Back to Infrastructure, Regeneration & Economic Development Committee — 2 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Agenda
Infrastructure, Regeneration and
Economic Development Committee
Date:  Wednesday, 2 November 2022
___________________________________________________________________
Time:  10:00 a.m. 
___________________________________________________________________
Format:  Hybrid meeting
___________________________________________________________________
Contact:   Nicola.moorcroft@west-dunbarton.gov.uk
committee.admin@west-dunbarton.gov.uk
Dear Member
Please attend a meeting of the Infrastructure, Regeneration and Economic
Development Committee as detailed above. 
Members will have the option to attend the meeting remotely or in person at the Civic
Space, 16 Church Street, Dumbarton.
The business is shown on the attached agenda.
Yours faithfully
PETER HESSETT
Chief Executive
Page 1

Page 2

Distribution:-
Councillor David McBride (Chair)
Councillor Jonathan McColl
Councillor Michelle McGinty
Councillor John Millar 
Councillor Lawrence O’Neill (Vice Chair)
Councillor Lauren Oxley
Councillor Chris Pollock
Councillor Martin Rooney
Councillor Gordon Scanlan
Councillor Hazel Sorrell
Councillor Clare Steel
Councillor Sophie Traynor
All other Councillors for information
Chief Executive
Chief Officer – Regulatory and Regeneration
Chief Officer – Supply, Distribution and Property
Chief Officer – Roads and Neighbourhood
Date of Issue:  20 October 2022
Audio Streaming
Audio recordings of the meeting (including the attendance or contribution of any party
participating or making a contribution) will be published on the Council’s website and the
Council’s host’s webcast/audio stream platform.
You should be aware that the Council is a Data Controller under the General Data
Protection Regulation.  Data collected during this audio stream will be retained in
accordance with the Council’s Privacy Notice* and Retention Schedules including, but not
limited to, for the purpose of keeping historical records and making those records available
via the Council’s internet site.
*http://www.west-dunbarton.gov.uk/privacy/privacy-notice/
Page 2

Page 3

INFRASTRUCTURE, REGENERATION AND ECONOMIC
DEVELOPMENT COMMITTEE
WEDNESDAY, 2 NOVEMBER 2022
AGENDA
1 STATEMENT BY CHAIR – AUDIO STREAMING
The Chair will be heard in connection with the above.
2 APOLOGIES
3 DECLARATIONS OF INTEREST
Members are invited to declare if they have an interest in any of the items of
business on this agenda and the reasons for such declarations.
4 RECORDING OF VOTES
The Committee is asked to agree that all votes taken during the meeting be done by
roll call vote to ensure an accurate record.
5 OPEN FORUM
The Committee is asked to note that no open forum questions have been
submitted by members of the public.
6 MINUTES OF PREVIOUS MEETINGS  5 – 14
Submit for approval as a correct record, the following Minutes of Meetings of the
Infrastructure, Regeneration and Economic Development Committee: 
(a) Ordinary meeting - 17 August, and
(b) Special meeting - 27 September 2022.
7 FLOOD PREVENTION LEVENHOWE AND THE RIVER LEVEN 15 – 20
AND GRUGGIES BURN FLOOD PREVENTION SCHEMES 
Submit report by Chief Officer – Roads and Neighbourhood, providing an update on
progress of the Levenhowe and the River Leven and Gruggies Burn flood prevention
schemes and seeking approval to progress with recommended works.
Page 3

Page 4

8 REGULATORY & REGENERATION DELIVERY   21 – 29
PLAN 2022/23 - ECONOMIC DEVELOPMENT ELEMENTS
Submit report by Chief Officer – Regulatory and Regeneration, providing the
Economic Development elements of the Regulatory and Regeneration Delivery Plan
2022/23
9 ROADS & NEIGHBOURHOOD DELIVERY PLAN 2022/23 31 – 53
Submit report by Chief Officer – Roads and Neighbourhood, providing the Roads and
Neighbourhood Delivery Plan 2022/23.  
10  SUPPLY DISTRIBUTION & PROPERTY DELIVERY 55 – 69
PLAN 2022/23 - CORPORATE ASSET MANAGEMENT
Submit report by Chief Officer – Supply Distribution and Property, providing the
Corporate Asset Management priorities within the Supply Distribution & Property
Delivery Plan 2022/23.
11 INFRASTRUCUTRE, REGENERATION & ECONOMIC To Follow
DEVELOPMENT BUDGETARY CONTROL REPORT 2022/23
TO PERIOD 5 (31 AUGUST 2022)
Submit report by the Chief Officer – Resources, providing an update 
on the financial performance to 31 August 2022 of those services 
under the auspices of the Infrastructure, Regeneration & Economic Development
Committee (IRED).
12 NEW ECONOMIC DEVELOPMENT STRATEGY 2022-2027  To Follow
Submit report by the Chief Officer – Regulatory and Regeneration,
13  SALE OF FORMER OIL STORAGE SITE, CARSON ROAD,           71 - 76
BALLOCH
Submit report by the Chief Officer – Supply, Distribution and Property, seeking
approval that the Council enter into a contract for the disposal of this property to site
to Sava Estates Ltd.
Page 4

Page 5

INFRASTRUCTURE, REGENERATION AND ECONOMIC
DEVELOPMENT COMMITTEE
At a Hybrid Meeting of the Infrastructure, Regeneration and Economic Development
Committee held in the Civic Space, 16 Church Street, Dumbarton on Wednesday, 17
August 2022 at 10.00 a.m.
Present: Councillors David McBride, Jonathan McColl, Michelle McGinty,
Lawrence O’Neill, Lauren Oxley, Chris Pollock, Martin Rooney,
Gordon Scanlan, Clare Steel and Sophie Traynor.
Attending: Angela Wilson, Chief Officer – Supply, Distribution and Property;
Gail Macfarlane, Chief Officer – Shared Services Roads and
Neighbourhood; Craig Jardine, Corporate Assets Manager;
Michelle Lynn, Assets Coordinator; Jackie Nicol-Thomson,
Business Partner – Resources; Gillian McNamara, Regeneration
Coordinator; Pamela Clifford, Planning, Building Standards and
Environmental Health Manager; Alan Douglas, Manager of
Legal Services; Gabriella Gonda and Lynn Straker, Committee
Officers.
Apologies: Apologies for absence were intimated on behalf of Councillors
Craig Edward and John Millar. 
Councillor David McBride in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor David McBride, Chair, advised that the meeting was being audio streamed
and broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
Councillor Chris Pollock declared a non-financial interest in Item 14 – Infrastructure,
Regeneration & Economic Development Budgetary Control Report and advised he
would leave the meeting during consideration of this item. 
RECORDING OF VOTES
The Committee agreed that all votes taken during the meeting would be done by roll
call vote to ensure an accurate record.
ITEM 6a
Page 5

Page 6

OPEN FORUM 
The Committee noted that no open forum questions had been submitted by
members of the public. 
ROADS & NEIGHBOURHOOD DELIVERY PLAN 2021/22 - YEAR END
PROGRESS REPORT 
A report was submitted by the Chief Officer – Shared Services Roads and
Neighbourhood providing the year-end progress of the 2021/22 Delivery Plan. 
After discussion and having heard the Chief Officer – Roads and Neighbourhood in
further explanation of the report and in answer to Members’ questions, Councillor
McColl, seconded by Councillor Pollock moved:- 
That Council does not believe that the benefits of reducing the current two
weekly landfill waste collection service to three or four weekly, outweigh the
negative impact on the amenity of our residents. 
This is a ‘savings option’ that has repeatedly been brought to Council by
officers and has been repeatedly rejected by both the SNP and Labour. 
Committee agrees that this remains an inappropriate proposal and agrees
that it should not feature in any proposals arising from the various waste
services reviews referred to in this report. 
As an amendment Councillor McBride, seconded by Councillor O’Neill moved:- 
That Committee notes the year-end position for 2021/22. 
On a roll call vote being taken 5 Members voted for the amendment, namely
Councillors McBride, McGinty, O’Neill, Rooney and Steel and 5 Members voted for
the motion, namely Councillors McColl, Oxley, Pollock, Scanlan and Traynor. There
being an equality of votes Councillor David McBride, Chair, used his casting vote in
favour of the amendment which was accordingly declared carried. 
ECONOMIC DEVELOPMENT ELEMENTS OF THE REGULATORY &
REGENERATION DELIVERY PLAN 2021/22 – YEAR-END PROGRESS 
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing the year-end progress of the Economic Development elements of the
Regulation & Regeneration Delivery Plan 2021/22. 
Page 6

Page 7

After discussion and having heard the Chair, Councillor McBride in further
explanation of the report, the Committee agreed to note the year-end position for
2021/22. 
SUPPLY DISTRIBUTION & PROPERTY DELIVERY PLAN 2021/22 YEAR END
PROGRESS 
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing the year-end progress of the 2021/22 Delivery Plan. 
After discussion and having heard the Chair, Councillor McBride and the Assets
Coordinator in further explanation of the report and in answer to Members’
questions, the Committee agreed to note the year-end position for 2021/22 plan. 
SALE OF SITE AT 12 OVERTON STREET, ALEXANDRIA 
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval for the Council to enter into a contract for the disposal of this site to
McPherson Memorials Ltd. 
After discussion and having heard the Chair, Councillor McBride and the Assets
Coordinator in further explanation of the report, the Committee agreed:- 
(1) to approve the disposal of the site to McPherson Memorials Ltd (SC236286)
for a value of £25,000 (Twenty Five Thousand Pounds); 
(2) to authorise the Chief Officer – Supply, Distribution and Property to conclude
negotiations; and 
(3) to authorise the Chief Officer – Regulatory and Regeneration to conclude the
transaction on such conditions as considered appropriate. 
SALE OF SITE AT LEVENBANK, JAMESTOWN, G83 8BZ 
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval for the Council to enter into a contract for the disposal of this site to
Turnberry Homes Limited. 
After discussion and having heard the Assets Coordinator in further explanation of
the report and in answer to Members’ questions, the Committee agreed:- 
(1) to approve the disposal of the site to Turnberry Homes Limited (SC129174) or
nominated subsidiary company for a gross value of £5,055,050 (Five Million
and Fifty Five Thousand and Fifty Pounds) subject to abnormals; 
(2) to authorise the Chief Officer – Supply, Distribution and Property to conclude
negotiations; and
Page 7

Page 8

(3) to authorise the Chief Officer – Regulatory and Regeneration to conclude the
transaction on such conditions as considered appropriate. 
SALE OF LAND AT REAR OF FERRYDYKES COTTAGE, OLD KILPATRICK 
A report was submitted by report by the Chief Officer – Supply, Distribution and
Property seeking approval for the Council to enter into a contract for the disposal of
land to Mr. Malik. 
After discussion and having heard the Chair, Councillor McBride and the Assets
Coordinator in further explanation of the report and in answer to Members’
questions, the Committee agreed:- 
(1) to approve the disposal of the site to Mr Malik for the sum of £20,000 (Twenty
Thousand Pounds); 
(2) to authorise the Chief Officer – Supply, Property and Distribution to conclude
negotiations; and 
(3) to authorise the Chief Officer – Regulatory and Regeneration to conclude the
transaction on such conditions as considered appropriate. 
SALE OF SITE AT BURROUGHS WAY, VALE OF LEVEN INDUSTRIAL ESTATE,
DUMBARTON 
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval for the Council to enter into a contract for the disposal of land to
Muirfield Ltd. 
After discussion and having heard the Chair, Councillor McBride and the Assets
Coordinator in further explanation of the report and in answer to Members’
questions, the Committee agreed:- 
(1) to approve the sale of the site to Muirfield Ltd SC NO 330244 with registered
office at 69 Bothwell Road, Hamilton, ML3 0DW, Vat registration number
982624983, for a figure of £950,000 plus vat; 
(2) to authorise the Chief Officer – Supply, Distribution and Property to conclude
negotiations; and 
(3) to authorise the Chief Officer – Regulatory and Regeneration to conclude the
transaction on such conditions as considered appropriate. 
Page 8

Page 9

SALE OF 77 BANK STREET, ALEXANDRIA, G83 0LZ 
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval for the Council to enter into a contract for the disposal of 77 Bank
Street, Alexandria to Aldi UK Ltd. 
After discussion and having heard the Assets Coordinator in further explanation of
the report and in answer to Members’ questions, the Committee agreed:- 
(1) to approve the disposal of the site to Aldi UK Ltd for the sum of £175,000
(One Hundred and Seventy Five Thousand Pounds); 
(2) to authorise the Chief Officer – Supply, Distribution and Property to conclude
negotiations; and 
(3) to authorise the Chief Officer – Regulatory and Regeneration to conclude the
transaction on such conditions as considered appropriate. 
SUBLEASE OF 3 BIRCH ROAD AND 1 OVERBURN AVENUE DUMBARTON,
BROADMEADOW INDUSTRIAL ESTATE, DUMBARTON 
A report was submitted by the Chief Officer – Supply, Distribution and Property
seeking approval of the Committee for the Council to grant consent to approve the
sublease of 3 Birch Road and 1 Overburn Avenue, Broadmeadow Industrial Estate,
Dumbarton. 
After discussion and having heard the Chair, Councillor McBride and the Asset
Coordinator in further explanation of the report and in answer to Members’
questions, the Committee agreed:- 
(1) to approve the sublease of 1 Overburn Avenue from Aggreko to Complete
Paving Requirements (Scotland) Limited (SC236251) with a rental of
£45,000pa for the remainder of lease, which is for a further 76 years; 
(2) to approve the sublease of 3 Birch Road from Aggreko to HBR Dumbarton
Limited (SC405581) with a rental of £21,750pa for the remainder of lease,
which is for a further 77 years; 
(3) to authorise the Chief Officer – Supply, Distribution and Property to conclude
negotiations; and 
(4) to authorise the Chief Officer – Regulatory and Regeneration to conclude the
transaction on such conditions as considered appropriate. 
Page 9

Page 10

UPDATE ON DEVELOPMENT AT MITCHELL WAY, REDEVELOPMENT SITE,
ALEXANDRIA 
A report was submitted by the Chief Officer – Supply, Distribution and Property
providing an update with indicative layout plans at Mitchell Way redevelopment site,
Alexandria. 
After discussion and having heard the Chair, Councillor McBride and the Assets
Coordinator in further explanation and in answer to Members’ questions, Councillor
McColl, seconded by Councillor Traynor moved:- 
That Committee agrees to continue this issue to August Council or a Special
IRED Committee Meeting to be called by the Convener. A more detailed
report should be presented, providing the history of this plan and why we are
where we are at this time. 
Officers should use the report to outline why this is a good deal for West
Dunbartonshire Council and the residents of the Vale of Leven. 
We would also like to see options and officer opinion regards the Council
using all or part of the site for Council Housing as an alternative either to the
sale to Lidl, or just for the housing aspect of the development. 
As an amendment Councillor Rooney, seconded by Councillor McGinty moved:- 
That the Committee agrees to note the contents of the report and agree to
recommendations in paragraph 4.3, 4.4 and 4.5 to the report. 
Councillor McColl asked if Councillor Rooney would accept as an addendum to his
amendment to add a line to paragraph 4.4 to the report that Council retains the
option to consider this for Council housing at a future date. 
Councillor Rooney confirmed his acceptance to the addendum. 
On a roll call vote being taken 5 Members voted for the amendment with addendum,
namely Councillors McBride, McGinty, O’Neill, Rooney and Steel and 5 Members
voted for the motion, namely Councillors McColl, Oxley, Pollock, Scanlan and
Traynor. There being an equality of votes Councillor David McBride, Chair, used his
casting vote in favour of the amendment with addendum which was accordingly
declared carried. 
INFRASTRUCUTRE, REGENERATION & ECONOMIC DEVELOPMENT
BUDGETARY CONTROL REPORT 2022/23 TO PERIOD 3 (30 JUNE 2022) 
A report was submitted by the Chief Officer – Resources, providing an update on the
financial performance to 30 June 2022 of those services under the auspices of the
Infrastructure, Regeneration & Economic Development Committee.
Page 10

Page 11

After discussion and having heard the Chief Officer – Supply, Distribution and
Property and the Business Partner – Resources in further explanation of the report
and in answer to Members’ questions, the Committee agreed:- 
(1) to note the contents of the report showing the revenue budget forecast to
overspend against budget by £0.486m (4.00%) at the year-end, of which
£0.064m was COVID-19 related, therefore the non-covid variance was
currently projected at £0.422m adverse; 
(2) to note the net projected annual position in relation to relevant capital projects
which was highlighting a projected variance of £1.962m (1.09%) due to
slippage of £1.971m (1.10%) and an underspend of £0.009m (0.001%); 
(3) to note the progress on efficiencies incorporated into budgets for 2022/23;
and 
(4) to note the projects to be accelerated. 
The meeting closed at 11.08 a.m.
Page 11

Page 12

INFRASTRUCTURE, REGENERATION AND ECONOMIC
DEVELOPMENT COMMITTEE
At a Special Hybrid Meeting of the Infrastructure, Regeneration and Economic
Development Committee held in the Civic Space, 16 Church Street, Dumbarton on
Tuesday, 27 September 2022 at 9.00 a.m.
Present: Councillors David McBride, Jonathan McColl, Michelle McGinty,
Lawrence O’Neill, Lauren Oxley, Chris Pollock, Martin Rooney,
Gordon Scanlan, Clare Steel and Sophie Traynor.
Attending: Peter Hessett – Chief Executive; Angela Wilson, Chief Officer –
Supply, Distribution and Property; Craig Jardine, Corporate
Assets Manager; Jackie Nicol-Thomson, Business Partner –
Resources; Gillian McNamara, Economic Development
Manager; Joshua Doyle, Placemaking Coordinator; Alan
Douglas, Manager of Legal Services; Nicola Moorcroft and Lynn
Straker, Committee Officers.
Apologies: Apologies for absence were intimated on behalf of Councillors
Craig Edward and John Millar.
Councillor David McBride in the Chair
STATEMENT BY CHAIR – AUDIO STREAMING
Councillor David McBride, Chair, advised that the meeting was being audio streamed
and broadcast live to the internet and would be available for playback.
DECLARATIONS OF INTEREST
It was noted that there were no declarations of interest in any of the items of
business on the agenda.
RECORDING OF VOTES
The Council agreed that all votes taken during the meeting would be done by roll call
vote to ensure an accurate record.
ITEM 6b
Page 12

Page 13

DEVELOPMENT STRATEGY FOR THE ARTIZAN CENTRE 
A report was submitted by the Economic Development Manager updating on the
progress made on the Artizan Centre proposals and seeking approval for delivery of
short term improvements, and for further work required to progress the
redevelopment. 
After discussion and having heard the Economic Development Manager in further
explanation and in answer to Members’ questions, the Committee agreed:- 
(1) to note the progress made on Artizan Centre proposals; 
(2) to authorise procurement and delivery of Phase 1 short term improvements
including the following:- 
a. Relocation of tenant(s) (6 months);
b. Demolition of the rear Artizan units (refer to Appendix 2 of the report)
(10 months); 
c. Design and delivery of temporary and permanent landscaping (12-15
months); 
d. Development of meanwhile uses on newly vacated land (12-15
months); 
e. Property improvements including external and internal works (6-15
months); and 
f. Further detailed feasibility and market studies (3-12 months).
(3) to authorise procurement and development of detailed feasibility studies to 
inform medium and long term development strategy; and 
(4) to note that the existing tenants would continue to be supported as part of the 
strategy. 
UPDATE ON ACTIVITY BY CLYDEBANK PROPERTY COMPANY LIMITED 
A report was submitted by the Chief Officer – Supply, Distribution and Property
updating on the progress of activity in Clydebank Property Company Limited (CPC)
for the period November 2021 to September 2022. 
After discussion and having heard the Chief Officer – Supply, Distribution and
Property, in further explanation and in answer to Members’ questions, the Committee
agreed:- 
(1) to note the progress being made in terms of the Council’s investment in 
Clydebank Property Company (CPC) Limited; and
Page 13

Page 14

(2) to note the position in relation to full repaint of the Titan Crane. 
The meeting closed at 9.22 a.m.
Page 14

Page 15

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer Roads and Neighbourhood (Shared Service)
Committee Name: IRED 2nd November 2022
Subject: Flood Prevention Schemes - Levenhowe, River Leven and
Gruggies Burn.
1. Purpose
1.1 As part of Roads and Transportation budget allocation for 2022/23 an
additional £500,000 was provided to allow acceleration of flood schemes
to reduce flooding in Levenhowe, the River Leven and Gruggies Burn.
1.2 The purpose of this report is to update IRED Committee on the progress
of these flood alleviation works and to seek approval to progress with the
recommended works. 
2. Recommendations
2.1 It is  recommended that the Committee:
• Note the contents of this report
• Agree the proposals as set out within the report to progress flood
alleviation works within Levenhowe, River Leven and Gruggies
Burn flood prevention schemes.
3. Background
3.1 A motion was raised at Council on 31st August 2022 by Councillor
Jonathon McColl, local ward member for Lomond, requesting officers to
provide an update to the next IRED Committee on the proposed works
and at the same time to produce a summary briefing that can be emailed
to Levenhowe residents to bring them up to date.
3.2 As part of West Dunbartonshire Councils duty & responsibility under the
Flood Risk Management Act (Scotland) 2009, Roads & Transportation
Services commissioned RPS Consultants to undertake a detailed flood
study for the River Leven, this study included Loch Lomond and all
tributary watercourses. It was agreed between WDC and SEPA that the
specified study area was subdivided into 8 Flood Cells.
3.3 The 8 Flood Cells created are:-
Flood Cell 1 – Dumbarton
Flood Cell 2 – Knowle Burn
Flood Cell 3 – Murroch Glen
Flood Cell 4 – River Leven
ITEM 7
Page 15

Page 16

Flood Cell 5 – Pappert Hill Burn
Flood Cell 6 – Alexandria Burn
Flood Cell 7 – Carrochan Burn
Flood Cell 8 – Ballaghan Burn 
3.4 This sub division was to assist with the deliverability and prioritisation of
what measure may be required to be implemented to reduce the overall
flood risk study area. 
• Levenhowe is located in FC4.
• Ballagan Burn is located FC8 
3.5 The Flood Study was submitted in December 2019 for the prioritisation list
for Flood Schemes for Cycle 2 of the Flood Risk Management Act
(Scotland) 2009, with Cycle 2 running from 2022-2028. 
3.6 A funding group has been set up to prioritise and allocate funding from the
Scottish Government based on a set criteria of prioritisation. Due to
significant cost increases delivering Cycle 1, the funding group is re-
evaluating how funding is allocated during Cycle 2. 
3.7 Whilst the final outcome for cycle for cycle 2 is still to be decided it is
expected that West Dunbartonshire Council will be in the higher tier for
any allocation of funding. 
3.8 It is a requirement of Scottish Government and SEPA that any proposed
flooding works do not cause a negative impact or increase flooding risks
to other locations. 
3.9 It was initially suggested that the additional funds could be used to
facilitate the flood alleviation works identified in Flood Cell 8 – Ballagan
Burn with works originally estimated at a cost of £500k in 2019. 
3.10 After investigation by our Consultant it was noted that FC8 Ballagan Burn
on its own is not cost beneficial and would not reduce the flood risk to
Levenhowe and the surrounding area. It was also noted that proposed
works in FC8 would result in a marginal increase to the flow rate of the
Ballagan Burn and therefore not meet the requirements set out by
Scottish Government and SEPA. 
3.11 Additionally due to the substantial increases in cost in all sectors as a
result of the current financial climate since the initial estimate in 2019, we
would not expect the current level of funding to be sufficient to deliver the
project. 
Page 16

Page 17

4. Main Issues 
4.1 After review of the current works associated with the various flood
alleviation schemes to identify which projects would be best promoted to
provide the best overall benefit to residents within the area, the Roads and
Transportation team have identified the following works to progress: 
• Promote and support residents, in conjunction with the Scottish
Flood Forum, with the design, procurement and installation of
Property Level Flood Protection.
• Undertake embankment vegetation clearing and improvement
works within the Gruggies Burn, River Leven and Levenhowe,
as well as other urban water courses within the area, both in
advance preparation of future proposed flood schemes and to
improve water flow through the area.
• Undertake focused study of surface water high risk areas to
develop high level mitigation measures that could be introduced
as part of an overall Surface Water Management plan for the
area 
4.2 The anticipated cost of each element is shown below:- 
Works Element Cost
Promote and Install Property Level Protection £75,000
Embankment Improvements £50,000
Surface Water Management Study £375,000 
4.3 Whilst it is essentially the responsibility of residents to protect their
home from the impacts of flooding events, in conjunction with the
Scottish Flood Forum, West Dunbartonshire Council do offer subsidised
assistance in implementing property level flood protection. 
4.4 As part of this process we support residents with assessments and
design of flood protection systems for their property such as flood gates,
alteration of sockets, vent covers. We will provide funding to cover the
cost of these assessments, with an average cost of £500 per property. 
4.5 Additionally we will subsidise up to 50% of the cost for the procurement
of materials. We will also assist with the procurement of suitable
contractors to undertake the works however residents will be expected
to pay for any installation costs. 
4.6 Previous initiatives indicate that the average total cost for materials at
each property to cost approximately £1000, with West Dunbartonshire
then contributing half of this amount. 
4.7 The total cost of this assistance will depend on the uptake from local
residents however it is hoped at least 75 properties at risk of flooding
Page 17

Page 18

will participate. 
4.8 The subsidised scheme is available to all Council residents within the
risk areas identified in the Flood Maps and any who apply will be
provided with this assistance. Particular focus will be given to promote
the benefits and opportunities of the scheme with residents within the
risk area of the River Leven, Levenhowe and Gruggies Burn areas. 
4.9 It has been highlighted within the study that there are several watercourses
within the area where some improvements to the water edge and
embankments as well as clearing of vegetation would improve water flow
within the area. 
4.10 A number of these locations form part of future Flood Cells schemes and
early intervention would only help to promote these schemes as part of
future funding applications whilst providing some immediate improvement. 
4.11 The existing overall flood study has also identified a number of locations at
high risk to the impact of surface water and the need for a detailed Surface
Water Management plan to be developed to address current capacity issue
of the existing drainage system. 
4.12 Whilst the responsibility for surface water lies with the local authority,
the majority of drainage systems is owned and maintained by Scottish
Water and as such any plans need to be developed in conjunction with
them. 
4.13 As part of this investment we will liaise with Scottish Water to undertake
a focus study of the high risk areas with Levenhowe, the River Leven
and Gruggies Burn area and develop plans for water alleviation and
system upgrades to reduce the impact of surface water within the area. 
4.14 A summery briefing on the above actions will be developed and issued
updating local residents with current progress and to promote property
level protection. 
4.15 The Roads Capital team are currently in the final stages of procurement
with our preferred consultant, Balfour Beattie to deliver the detailed
design for the first phase of Gruggies Burn Flood prevention works. Site
investigation works were undertaken by Balfour Beatty as part of
previous funding streams to facilitate this. The final design will be
delivered by end of March 2023. 
4.16 Additionally the team are working with RPS Consultancy to prepare
consultation documents to inform local residents and update them on
proposed works related to Gruggies Burn Flood Prevention. 
Page 18

Page 19

5. People Implications 
5.1 There are no people implications associated with this proposal. 
6. Financial and Procurement Implications 
6.1 Existing procurement frameworks are in place to secure the required
Consultancy to undertake the proposals. 
6.2 Where any contracts exceed £50,000 a contract strategy will be
developed to determine the procurement route. 
6.3 £500,000 was included in 2022/23 budget to facilitate acceleration of
flood prevention schemes. This budget will be used to fund projects
related to the report. 
7. Risk Analysis 
7.1 It is not expected that any of the proposals within this report will negatively
impact on water flow or increase flood risk to locations further downstream. 
8. Equalities Impact Assessment (EIA) 
8.1 Screening and impact assessments will be carried out on specific activities
as required. 
9. Consultation 
9.1 All key stakeholders will be consulted as part of the development of any
proposals. 
10. Strategic Assessment 
10.1 A full Strategic Assessment was not required for this Report but will
be included in any future assessment. 
Name: Liam Greene
Email: liam.greene@west-dunbarton.gov.uk
Designation: Roads and Transportation Manager
Date: 10th October 2022 
Person to Contact: Gail MacFarlane, Chief Officer Roads and Neighbourhood
Services. 
Email: gail.macfarlane@west-dunbarton.gov.uk 
Wards Affected: Ward 1 - Lomond, Ward 2 - Leven, Ward 3 - Dumbarton
Page 19

Page 20

Page 20

Page 21

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer - Regulatory & Regeneration
Committee: Infrastructure, Regeneration and Economic Development
2 November 2022
Subject: Regulatory & Regeneration Delivery Plan 2022/23 - Economic
Development Elements
1 Purpose
1.1 The purpose of this report is to provide members with the Economic
Development elements of the Regulatory & Regeneration Delivery Plan
2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the Regulatory & Regeneration
Delivery Plan is one of eight. 
3.3 The implementation of the Economic Development elements of the Plan will
be monitored by the management team with interim progress reported to
Infrastructure, Regeneration and Economic Development Committee in
February 2023 and year-end progress in May 2023.
4 Main Issues
4.1 An extract from the Regulatory & Regeneration 2022/23 Delivery Plan is
included at Appendix 1. This sets out the achievements and challenges for
Economic Development over the past year, as well as the priorities for
2022/23.
ITEM 8
Page 21

Page 22

4.2 They include: delivering key regeneration sites across West Dunbartonshire;
promoting the next phase of Queens Quay housing; exploring commercial
opportunities in our town centres and wider regeneration sites; supporting
town centres to recover following the pandemic; implementing the Climate
Change Action Plan to support the implementation of the Climate Change
Strategy; and developing a new Economic Development Strategy and action
plan.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Regulatory & Regeneration,
including Economic Development, may have a direct impact on the delivery of
the Council’s Strategic Plan. It is essential that remedial action is taken to
ensure strategic delivery plans achieve the commitments detailed and
approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Alan Douglas
Service Area: Regulatory & Regeneration
Date:  5 October 2022
_____________________________________________________________
Person to Contact:  Lynn Henderson
lynn.henderson@west-dunbarton.gov.uk
Page 22

Page 23

Appendices: Appendix 1: Economic Development Extract from the
Regulatory & Regeneration Delivery Plan 2022/23
Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 23

Page 24

Appendix 1: Economic Development Extract from the Regulatory &
Regeneration Delivery Plan 2022/23
Key Achievements in 2021/22
Cross Service
• Services across R&R continued to meet the significant challenges posed by the
pandemic, delivering services as efficiently and effectively as possible with limited
impact on service users.
• There was strong collaborative working by Regeneration, Planning, Building
Standards, Environmental Health and Legal Services on key regeneration sites.
• The District Heating Network at Queens Quay became fully operational, winning
two prestigious awards in its first year:
o District Heating Network at The European Heat Pump Awards, Heat Pump
City of the Year category, for the most efficient, smart and sustainable
project of the year; and
o Carbon Reduction Award at the Scottish Green Energy Awards.
• Commenced remediation work at the Exxon site at Bowling and appointed the
contractor for the infrastructure works.
• Created the Clydebank Development Framework with Regeneration, Planning
and Asset Management to provide a 15 year vision for Clydebank, with the aim of
re-establishing a distinct town centre heart.
• 146 new social housing units were constructed at Queens Quay, which will bring
the first of approximately 1,200 households to the waterfront site by August 2022.
• Entered into a legal agreement with the Malin Group for the initial stages of a
major marine development at the former Carless site which will see millions of
pounds of private, Council and Scottish Government monies invested in a Marine
Technology Park creating jobs and economic opportunities.
• Prepared and approved the Alexandria Town Centre Masterplan.
Economic Development
• Provided support to 201 new business start-ups and held 37 free business skills
webinars for 202 different clients including start-up and established businesses
during a very challenging period.
• Supported businesses by delivering over £31m of COVID-19 grants to over
1,500 businesses over the period of the pandemic.
• Agreed the Climate Change action plan with key services in our drive to net zero.
• Secured £20m UK levelling up funding to transform Dumbarton town centre,
including the redevelopment of Glencairn House, the purchase and regeneration
of the Artizan Shopping centre, and the delivery of connections from Dumbarton
Central to the Town Centre, all of which will have a significant impact on
Dumbarton and the town centre vibrancy.
ITEM 8 - APPENDIX 1
Page 24

Page 25

Key Challenges in 2021/22 
Cross Service 
• The loss, recruitment and training of key staff across Regulatory and
Regeneration was a particular challenge in 2021/22 when demands on all
services were higher than normal as a result of the pandemic. 
Economic Development 
• Delivering private sector homes at Queens Quay was a challenge in 2021/22.
We will continue to seek to ensure Queens Quay Housing is delivered by our
commercial partner in the year ahead. 
• Securing agreement to connect West College Scotland and the Golden Jubilee
Hospital to the District Heating Network has been a challenge in 2021/22, with
continued effort necessary in 2022/23.
• The impact of the pandemic on the business community during 2021/22 was
significant and the recovery process in the year ahead will be supported by
Business Gateway’s continued intervention and distribution of the Scottish
Government’s COVID-19 grants. 
Priorities for 2022/23 
Deliver Key Regeneration Sites 
A number of key regeneration projects will be taken forward in 2022/23 including:
• the Exxon project, with detailed design works and final business case due to be
delivered by November 2022;
• the North Clyde Riverside, an ambitious long term vision to promote the
redevelopment of our riverside sites from Clydebank to Dumbarton;
• key actions in the Alexandria Masterplan and Clydebank Development
Framework, both of which aim to develop their respective town centres; 
• the Scottish Marine Technology Park (SMTP) at the Carless site in Dalmuir; and
• a range of projects funded through the £20m Levelling Up fund, including the
redevelopment of Glencairn House, the purchase and regeneration of the Artizan
Shopping centre, and connecting Dumbarton Central to the Town Centre, all of
which will have a significant impact on Dumbarton and the town centre vibrancy. 
Queens Quay 
Infrastructure works for this 80 acre residential waterfront development were
completed in 2020/21. The focus in 2022/23 will be securing housing developments
across the site in partnership with site owner Clydeside Regeneration Ltd. The site
wide design codes, which set out a vision for the Clydebank site and ensure all new
developments meet the same high standards, are complete and efforts to promote
and market the plots will be critical to ensure the Council’s investment sees
economic as well as commercial returns. This continues to be a challenge,
particularly in relation to flatted private homes which the market is finding difficult to
make commercially viable. 
Page 25

Page 26

Commercial Opportunities 
The regeneration team will seek to identify commercialisation opportunities for new
development opportunities in conjunction with the private sector. We will seek to
progress discussions with developers who may wish to enter a partnership with the
Council to achieve joint benefits from a commercial, housing and low carbon
perspective. The Regeneration Capital Fund with £12.77m and external funding of
£1m will need to be allocated across a number of projects. The Fund’s key operating
principles and allocations to specific projects agreed by Committee will be
progressed. 
Projects linked to the Scottish Marine Technology Park (SMTP) at the Carless site
and, importantly, the expansion of the District Heating Network to the Golden Jubilee
Hospital and beyond, will be progressed over this period. 
Mission Clyde is the Scottish Government’s latest flagship infrastructure approach to
Regeneration along the length of the River Clyde. West Dunbartonshire sits well in
term of potential areas for consideration of Mission Clyde funding with sites such as
the Exxon project, Carless, the Golden Jubilee Hospital and Queens Quay already
seen as key contributors to Mission Clyde. Officers have secured £2m of external
(Scottish Government) funding for the Carless site in partnership with the Malin
group and Cemineral have secured £179k to develop their cement handling facility at
Rothesay Dock in Clydebank.The Council has also committed £2m from the
Regeneration Fund to support the development of the Marine Technology Park. 
The UK Government’s Levelling UP funding has enabled the Council to acquire and
part demolish the Artizan shopping centre in Dumbarton, reducing the retail capacity
of the town. The regeneration of the shopping centre will provide a reduced source of
Council income in the future with limited retail capacity, however anticipate income
from potential new Council tax from housing on the site. 
Supporting Business Recovery 
Assisting town centres to recover from the pandemic will continue to be a focus in
2022/23, and we will prioritise support for High Street businesses. An unexpected
benefit of the pandemic is people demanding more from their local areas and town
centres, so we will continue to develop projects to make our town centres attractive
places, and take advantage of the Town Centre Fund and Place Based Investment
funds provided by Scottish Government. 
Underpinning the delivery of our Town Centre Recovery Plan and Masterplanning of
Towns is the Scottish Government’s policy driver on creating ‘20 minute
neighbourhoods’. The approved Clydebank Development Framework includes the
disposal and development of the former Playdrome site, a transport hub at
Clydebank Station, improved connections between the town centre and Queens
Quay, with a linear green park from Canal south to Transport Interchange, and
related community-led activity, all as part of a cohesive plan for Clydebank. 
Page 26

Page 27

Climate Change Strategy and Action Plan 
The Council has developed a Climate Change Strategy in response to Scotland’s
climate emergency and to provide a route map towards meeting Scotland’s national
net zero carbon target by 2045. This Strategy has informed the development of a
Climate Change Action Plan for 2022/23 to ensure environmental actions are
devolved to relevant service areas and climate change action is mainstreamed
across council policies, operations and the wider public. Progress against the plan
will be monitored and reported to the senior management team and to Council on a
regular basis. 
Economic Development Strategy 
A new Economic Development Strategy will be presented to Council in 2022/23 with
a vision that ‘By 2025, West Dunbartonshire will have an inclusive and vibrant
economy through the creation of fairer jobs, a drive towards net Zero, and the
development of prosperous places in partnership with our communities and
businesses’. The strategy will identify the key strategic priority for the Council in
delivering economic growth and improved wellbeing in our communities. It will also
align with the new Strategic Plan for 2022-27, the recent City Region Strategy and
anticipated Scottish Government transformation strategy. This will supersede the
current 2015-20 Economic Strategy and a series of actions will be developed and
presented to the IRED committee for approval. 
Action Plan 
An action plan has been developed to take forward the priorities in 2022/23 (below).
It comprises a range of performance indicators to enable progress to be monitored
and reported to stakeholders as well as relevant risks. Progress will be monitored
and managed on a regular basis and reported twice yearly to Committee, at mid-year
and year end. 
Our Environment 
Our resources are used in an environmentally sustainable way 
Performance Indicator Owner
Tonnage of carbon dioxide emissions from Council operations and assets Adam Armour -
Florence 
Action Due Date Owner
Co-ordinate, monitor and report the progress of the Council’s Climate
Change Action Plan for 2022/23 31-Mar-2023 Adam Armour -
Florence 
Page 27

Page 28

Risk Description Current
Assessment
Target
Assessment Owner
Inability to reduce
carbon footprint in
line with targets
The risk that the Council will be
unable to achieve net zero emissions
by 2045, both in relation to mitigating
carbon emissions and adapting to the
impacts of climate change. Net zero
refers to achieving an overall balance
between emissions produced and
emissions taken out of the
atmosphere. This target has been
developed in a way that mirrors the
emission reduction trajectory set by
the Scottish Government in light of
the Climate Emergency.    
Adam Armour –
Florence 
Our neighbourhoods are sustainable and attractive 
Action Due Date Owner
Promote the next phase of Queens Quay Housing 31-Mar-2023 Pamela Clifford;
Gillian McNamara 
Our Economy 
Our area has the infrastructure for sustainable and inclusive growth where businesses can flourish 
Performance Indicator Owner
Number of businesses given advice and assistance to start up through Business Gateway Gillian Scholes
No of business gateway start-ups per 10,000 population Gillian Scholes
Cost of Economic Development & Tourism per 1,000 population Gillian Scholes
Proportion of properties receiving superfast broadband Gillian Scholes 
Action Due Date Owner
Deliver key regeneration sites across West Dunbartonshire 31-Mar-2023 Gillian McNamara
Explore commercial opportunities in our town centres and wider
regeneration sites 31-Mar-2023 Gillian McNamara
Support Town Centre Recovery 31-Mar-2023 Gillian McNamara
Develop a new Economic Development Strategy and action plan 31-Mar-2023
Gillian
McNamara;
Gillian Scholes 
Risk Description Current
Assessment
Target
Assessment Owner
Affordability of the
Exxon City Deal
Project
There is a risk that the affordability of
delivering the City Deal Exxon project
is beyond the resources being made
available from Glasgow City Region
City Deal.  
Gillian McNamara
Failure to deliver
Queens Quay
Masterplan
Following completion of Council
investment there is a risk the housing
plot sales do not materialise in the
next 3-7 years, with implications for
the return on investment and the
business case for the District Heating
Network.    
Pamela Clifford;
Gillian McNamara
Page 28

Page 29

Risk Description Current
Assessment
Target
Assessment Owner
Inability to meet
demands of
Council to progress
regeneration
projects within
desired timescales
The number and complexity of
regeneration projects is putting
considerable strain on the resources
available which can be exacerbated
by delays out with the control of the
service and when pinch points on
different projects occur at roughly the
same time.    
Pamela Clifford;
Alan Douglas;
Gillian McNamara 
Our Council 
Our workforce is resilient and skilled where digital technology supports service delivery for our residents 
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and
training plans to enable capabilities, improved resilience and promotion of
a diverse workforce
31-Mar-2023 Management Team
Develop and implement employee life cycle plans in line with the People
First Strategy to attract and retain the workforce 31-Mar-2023 Management Team
Implement service review process including role design, use of new
technology and new ways of working to add resilience, address gaps, and
establish opportunities for efficiencies
31-Mar-2023 Management Team
Develop and implement training plans and development opportunities to
improve capabilities and resilience within the workforce 31-Mar-2023 Management Team 
Page 29

Page 30

Page 30

Page 31

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Roads and Neighbourhood
Committee: Infrastructure, Regeneration and Economic Development
Committee
2 November 2022
Subject: Roads and Neighbourhood Delivery Plan 2022/23
1 Purpose
1.1 The purpose of this report is to provide members with the Roads and
Neighbourhood Delivery Plan 2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the Roads and Neighbourhood
Delivery Plan is one of eight. 
3.3 The implementation of the Plan will be monitored by the management team
with interim progress reported to Infrastructure, Regeneration and Economic
Development Committee in February 2023 and year-end progress in May
2023.
4 Main Issues
4.1 The Roads and Neighbourhood 2022/23 Delivery Plan is included at Appendix
1. This sets out the achievements and challenges over the past year, as well
as the priorities for 2022/23.
4.2 Key priorities for 2022/23 include:
• deliver a new gymnasium, changing facilities and all weather running track
at Posties park;
ITEM 9
Page 31

Page 32

• review service delivery model that reflects the changes in quantities of
plastic and glass collections;
• finalise the delivery of a suitable new allotment site with provision for 40
traditional plots;
• develop a new local bio diversity action plan;
• continue to explore alternative methods of weed control;
• undertake Ash die back preparation work;
• rollout further installation of electric vehicle charging points;
• pavement parking- investigate and develop a strategy;
• progress the Gruggies Burn flood alleviation scheme;
• progress the next phase in Clydebank masterplan;
• deliver a design for new traffic control system at Kilbowie Roundabout
• review winter gritting programme;
• review business plans to align activities and reduce duplication (R&N
collaborative Programme);
• continue to work collaboratively with Argyll & Bute and Inverclyde Councils
to develop a best value proposal for procuring the reception;
transportation, treatment and compliant disposal of biodegradable
municipal waste;
• produce a business case for the development of a reuse recycling and
resource station within Council’s boundary;
• complete phase 1 of the Fit for Service review of waste services; and
• develop an action plan for depot rationalisation.
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to Roads and Neighbourhood, may
have a direct impact on the delivery of the Council’s Strategic Plan. It is
essential that remedial action is taken to ensure strategic delivery plans
achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
Page 32

Page 33

10 Strategic Assessment
10.1  The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Gail McFarlane
Service Area: Roads and Neighbourhood
Date:  30 September 2022
_____________________________________________________________
Person to Contact:  Karen Connelly
karen.Connelly@west-dunbarton.gov.uk
Appendices: Appendix 1: Roads and Neighbourhood Delivery Plan
2022/23
Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 33

Page 34

2022/23
Roads &
Neighbourhood
ITEM 9 - APPENDIX 1
Page 34

Page 35

Contents
1. Introduction .................................................................................................................................................................................................... 3
2. Performance Review ...................................................................................................................................................................................... 3
3. Strategic Assessment .................................................................................................................................................................................... 6
4. Resources .................................................................................................................................................................................................... 12
Appendix 1: Action Plan .......................................................................................................................................................................................... 14
Page 35

Page 36

1. Introduction
Roads & Neighbourhood comprises a wide range of services covering Roads and Transportation and Environment and Neighbourhood,
including Greenspace and Waste Management. It is one of 8 strategic areas responsible for delivering the Council’s Strategic Plan. Key actions
to help achieve this are set out in this Delivery Plan, together with actions to address any performance issues and service priorities identified in
the planning process.
The progress of this Plan will be monitored and managed by the management team and reported to Infrastructure, Regeneration and Economic
Development Committee twice yearly, at mid-year and year-end.
2. Performance Review
The Roads & Neighbourhood management team completed a detailed review of 2021/22 performance, focusing on the following:
• 2021/22 Delivery Plan year end progress;
• 2021/22 Quality Standards year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Association for Public Service Excellence (APSE) comparative data;
• Citizens’ Panel feedback;
• Telephone Survey feedback;
• Complaints;
• Continuous Improvement (Fit for Future reviews)
• Other benchmarking/feedback
This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are summarised below.
Key Achievements in 2021/22 
Listed below are some of the major achievements despite the unprecedented challenges the coronavirus pandemic has created including
restrictions and additional duties, each of the services within Roads & Neighbourhood has found new ways of continuing the delivery of critical
front line services. All services achieved many other key outcomes for the Council and its residents throughout the year which are not recorded
here but are as important.
Page 36

Page 37

Strategic Team
• Further implemented and embedded the collaborative approach between Inverclyde and West Dunbartonshire councils to increase resilience
and share best practice in the delivery of the Roads & Neighbourhood service
• Despite continued significant impact of the COVID-19 pandemic, Roads & Neighbourhood front line services maintained essential service
levels with minimal disruption to service users.
• Progressed construction works on the A814 ‘Connecting Clydebank’ project.
• Provided training and employment opportunities for a number of modern apprentices across R&N and engaged with in excess of 200
volunteers to carry out environmental improvement work.
• Implemented food growing strategy action plan and improved biodiversity.
• Gained approval and commenced an options approval assessment for the delivery of an integrated waste management facility, resource
recovery and recycling centre (RRRC). In accord with our future long term waste solution.
• Gained approval for Gruggies Burn Flood Prevention project initial design to allow for site investigation works and finalised design works to
progress in the coming year.
• A811 Lomond Bridge replacement works completed over the course of 2021/22.
• Gained approval to progress with the procurement and installation on a Salt Barn within the existing Elm Road depot. The new dome
installation will be incorporated into the future depot design as part of the Depot Rationalisation Project.
Key Challenges from 2021/22
Along with the achievements noted above, there were significant challenges in 2020/21, not least the COVID-19 pandemic.
Strategic Team
• Demographic of Workforce. R&N has an aging demographic within the workforce and this is also the case nationally. We will continue to
carry out workforce analysis and development and will identify opportunities for apprentices and graduates to allow the Council to plan for the
future.
• Working Practices. Challenges in relation to ensuring frontline employees within the Roads and Neighbourhood Service were able to work
in a safe environment with all relevant risk assessments and safety measures in place included adapting to ever changing legislation and
guidance to ensure continued delivery of all Roads and Neighbourhood front line services. Responding to the longer term impact of COVID-
19, and particularly in the context of health and wellbeing will be an integral element of planned activity going forward.
• Staff. The national skills shortage of qualified and experienced officers in Roads and Neighbourhood Services resulting in reduced staff
complements across many services and increased demands on existing staff. Due to high demand outstripping the labour supply, labour
Page 37

Page 38

rates continue to increase together with challenges recruiting and retaining skilled staff. This means that we will have to optimise staff
retention and improve recruitment practices to ensure job roles are in line with demand.  
• Climate Change. Due to more adverse weather condition and extreme weather events due to climate change Roads and Neighbourhood
require to make changes to operational ongoing service delivery and response to events.
• Capital Projects delayed. Delivery of some key projects was delayed by the pandemic such as the repair of Lomond Bridge, Connecting
Clydebank, the remedial works at Renton Bridge, delivery of suitable allotments sites and completion of the new gymnasium, changing
facilities and all weather running track.
• Supply Chain. Increasing issues impacting on global supply chains have resulted in delays on the delivery of the capital fleet plan.
• Construction inflation remains a concern with labour and material costs significantly increasing over the last year.
Roads & Transport
• Roads maintenance programme delayed. Progressing the delivery of the Roads Asset Management Plan was delayed with resurfacing works
and structural patching works being carried out during the autumn/winter period due to lockdown and reduced operations during
spring/summer.
• Resurfacing of A814 Dumbarton Road. Works delayed due to conflicting works being undertaken by Network Rail. Resources were
redirected to other resurfacing projects with the resurfacing re-programmed to early in the 2022/23 programme.
• A811 Footway Improvements were unable to be progressed due to conflicting priorities however the service will develop designs over the
coming year and look to secure external funding to ensure that phase 1 can be delivered as part of the 2023/24 programme. We will also look
to finalise designs and secure land purchases to allow for future phases to be delivered.
Greenspace
• Challenges identifying safe week killer. We continue to have challenges identifying a cost effective and operationally effective alternative to
chemical weed control, further investigation will be carried out 2022/23.
Fleet & Waste
• Increase in household waste COVID-19 impacted on the services waste makeup as a direct result of more people working from home
resulting in household residual waste increases. The impact of this was that additional Biodegradable Municipal Waste was sent to landfill,
this is largely out with influence by the Council as we cannot directly control the proportion of biodegradable waste contained in
householders’ landfill waste bins or deposited at the household waste recycling centers. As a result our household waste figures for 2021/22
was 37%, significantly adrift of the 60% target.
• The Deposit return scheme has been delayed until late 2023. We will continue to progress plans for a revised service model 2022/23.
Page 38

Page 39

3. Strategic Assessment
The Roads & Neighbourhood management team completed a strategic assessment to determine the major influences on service delivery and
priorities in 2022/23 and identified a range of key factors recognised as significant. These are summarised below.
Financial Challenges 
The entire public sector is facing significant financial challenges. The Council are currently faced with an estimated cumulative funding gap in
2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to COVID will continue in 2022/23, and whilst there is still some
carried forward COVID funding from the Scottish Government available for use in 2022/23, it is difficult to assess whether it will continue to be
sufficient due to the ongoing unpredictability of the impact of the pandemic on people’s lives and local businesses. We will continue to monitor
the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected Members throughout
2022/23. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that, within Roads &
Neighbourhood available funding will be reduced and we will need to reconfigure how we work and what we do to deliver further efficiencies.
Budget Sensitivity Analysis
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher risk/ higher value
budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity around
demand, costs and charges, and income levels. 
Within this service, budgets which have been identified as being more susceptible to fluctuations include:
• Waste refuse disposal tonnage costs - 2022/23 budget £4.795m
This cost is dependent on level of waste produced by households and levels of recycling. The volume of waste has increased recently due to
the stay at home restrictions and recycling contamination levels have been relatively high. The 22/23 budget assumes waste volumes will not
return to the usual lower levels. Based on current year projections, the budget is sufficient if these assumptions are achieved. The budget has
been increased in anticipation of higher costs following a recent court ruling in favour of HMRC. However, if it continues to be at a higher
Page 39

Page 40

level the cost could rise up to current year spend of £4.922m. An HMRC review of our existing supplier (Barr Environmental ltd) has
increased the risk that the company may not be sustainable, a soft market test of potential suppliers has indicated a price increase of 25-30%
on current rates. 
• Transport fuel costs - 2022/23 budget £1.231m. The price of petrol/diesel can fluctuate a great deal based on market prices and has
increased substantially in recent months. Also changes in working practices to allow for social distancing will affect the costs since now, for
example, two vehicles need to be driven to a job whereas one would have sufficed pre COVID. Sustained price/volume fluctuations of 5%
would result in the costs ranging from £1.015m to £1.121m. Should prices increase by a further 10% an additional £123k will be incurred.
• Bitumen Availability and Costs – With the majority of bitumen in the UK sourced from Russian suppliers, the current sanctions imposed on
Russia are significantly effecting both the cost and availability of bitumous materials on a national level. Restrictions have already been
placed on the procurement of materials at weekends with further possible limits on the daily volume of materials being produced by suppliers
should shortages in the raw materials continue. Issue has been raised through CSA, CoSLA and SCOTS as well as direct to the Scottish
Government. Service will provide updates through committee as situation develops
Roads & Neighbourhood Services Collaborative Programme
In January 2019, Council introduced a shared management model for Roads & Neighbourhood, and grounds, focusing initially on Roads. This
was extended to include Neighbourhood Services in October 2019. The Shared Fleet & Waste Manager commenced in April 2020. Due to the
pandemic the majority of work was done on a reactive basis, which was undertaken on a fully collaborative basis. Business plans are under
review for the new financial year to identify sharing opportunities such as joint procurement exercises.
Roads & Transport
Transport (Scotland) Act 2019 – Pavement Parking
The Transport (Scotland) Act, promoted by the Scottish Government, received Royal Assent in November 2019. It will have a very significant
impact on local authorities in relation to a number of areas in particular pavement parking. Guidance was not provided in 21/22, but is expected
22/23. The service will investigate and develop appropriate strategies, in line with Scottish Government guidance once it is released.
Transition to Electric Vehicle Fleet
The Council was awarded Scottish Government funding in 2021 to introduce further electric vehicle charging points on street and at key
locations to support the transition to electric vehicle use within West Dunbartonshire. Funds have been made available through the Councils
capital investment programme for 2022/23 for the installation of an additional two charging points to be installed. Funding is no longer available
Page 40

Page 41

through Scottish Government for the installation of charging points. The service is instead investigating as part of a working group, with our
partners in the Glasgow City Region, the needs, demands and possible partnership opportunities with suppliers to deliver wider scale availability
to charging points. The service will also investigate the possible charging of existing EV points, which will be required to encourage any future
partnerships.
Clydebank Masterplan
Connecting Clydebank is a transformational project which seeks to revitalise the civic core of Clydebank; forming essential links with the ongoing
Queen’s Quay development, the present town centre and the many active and public transport routes into the area. It aims to link different
strands of investment to reinforce Clydebank as a destination. This significant programme includes a high quality pedestrian environment, with
better and improved roads footpaths and links to public transport. 
Connecting Dumbarton
Through consultation with the local community and in collaboration with Sustrans, West Dunbartonshire Council have developed plans to
improve the public realm around Dumbarton Station to create a more welcoming and inviting arrival into the town centre. It also aims to improve
pedestrian infrastructure and links to the town centre and quay tourist destinations, as well as improve cycle connections as part of a wider
Dumbarton Town Centre and Waterfront strategy. Initial plans to upgrade existing links to progress in 2022/23
Kilbowie Roundabout Improvements
Kilbowie Roundabout is an important roundabout on the A82 as it makes its way west out of Glasgow. It is one of the major routes in and out of
Clydebank. As it forms part of a major artery through the area it is subject to significant traffic flow and high vehicle emissions. Capital funding
has been received by the service to undertake a redesign and upgrade of the existing traffic lights to improve traffic flow, reduce travel time and
reduce the levels of pollution generated by vehicles at this location.
Depot Rationalisation 
Currently the Council runs from two depots, at Elm Road, Dumbarton and Richmond Street, Clydebank. There is an opportunity review depot
provision with a view to rationalising and upgrading on a phased basis. The review will also look at whether there is duplication in order to
optimise work processes and efficiency. This is a programme by capital assets. The service will review our current delivery model and working
practises to identify where resources can be shared and efficiencies achieved.
Winter Gritting 
West Dunbartonshire Council already provide a significant winter service programme which ensures the continuous safe use of the road network
throughout the winter period. To ensure that we continue to deliver a high level of customer service, the winter programme will be reviewed
Page 41

Page 42

ahead of the 2022/23 winter season. The review will ensure that we continue to deliver the service in line with the Well Maintained Highways
Infrastructure Code of practice and that the required efficiencies and resilience levels are provided. As part of this review we will also look at the
formalisation of our footway gritting operations. 
Greenspace
Food Growing Strategy and Allotments
The Greenspace service currently manages two allotment sites in Dumbarton. There is a 10 year waiting list for allocation of an allotment. The
Community Empowerment Act places an obligation on Local Authorities to provide sufficient allotments for its residents. There is an allocation of
£400k in the Council’s capital plan to develop new allotment sites. In addition we have applied for 100K to Scottish government vacant and
derelict land fund to enhance this programme. There have been difficulties in 21/22 identifying areas that are not contaminated, Environmental
Health has recently identified sites with low contamination to allow this initiative to move forward. 
Pesticides Regulations
Legislation surrounding the use of pesticides continues to change and this will have an impact on our ability to continue with the present level of
weed control. Alternative delivery methods will be labour intensive. Trials of alternative non chemical methods of weed control have taken place
although no suitable alternative has been identified further trials will continue into 22/23.
Posties Park Sports Hub
In line with the Council’s strategic priority to improve the health and wellbeing of residents, with investment in developing a new sports facilities
at Posties Park, including gymnasium, changing facilities and running track. Pressures due to the pandemic caused delays in completion which
is expected in the first half of 22/23. 
Ash Die Back
Ash dieback is a serious disease of ash trees caused by a fungus. The disease causes leaf loss and crown dieback in affected trees and can
lead to the death of the tree. Of the 10 million ash trees in Scotland 90% may die due to this disease. Infected trees need to be identified and
removed to prevent or minimise the spread of the disease. 
Page 42

Page 43

Fleet & Waste
Waste (Scotland) Regulations 2012
In accordance with the Waste (Scotland) Regulations 2012 which was subsequently reviewed in 2019 landfilling of Biodegrable Municipal Waste
to landfill will be banned by 2025, this waste will need to require a form of treatment or processing at dedicated waste treatment facilities at that
time. The Council have two main initiatives which are being progressed; 
Continue to work collaboratively with Argyll & Bute, Inverclyde and supported by Zero Waste Scotland (ZWS) to develop a best value proposal
for procuring the reception, transportation, treatment and compliant disposal of biodegradable municipal waste; and
Development of a business case for the location and construction of a waste transfer station within the Council’s boundary in order to improve
the Council’s ability to access wider waste treatment markets and liaison with Zero Waste Scotland on external funding opportunities to support
this. Internal funding of £2M has been secured for this programme.
Deposit Return Scheme (DRS)
A deposit return system for PET plastic bottles, metal drinks cans and glass bottles has been approved by the Scottish Government. The
potential impact of the DRS scheme on the Council’s current kerbside and community recycling facilities has been assessed using the Zero
Waste Scotland DRS assessment tool. The date due to be implemented nationally has been delayed by the Scottish Government as a result of
the pandemic and is now likely in 2022/23. We will progress the development of a revised service delivery model for introduction in 2022/23 that
reflects the predicted reduction in the quantities of plastic bottles, glass bottles and metal drinks cans, currently collected by the Council through
its collections systems, as a result of the planned introduction of the DRS scheme.
Fit for Future Action Plan – Waste Services
Following the Fit for Future service review undertaken in April 2021, an action plan is being taken forward which will address the key findings
over a five year period 2021-2026. These include improving and streamlining the customer journey, the website and on line forms. The services
include recycling, the DRS, missed bins, bulky and special uplifts. Matters raised in relation to staffing vacancies, turnover, hierarchy, and spans
of control, together with the availability of training and development to support employee wellbeing, are all being addressed in the plan. Due to
competing priorities some actions from Phase 1 will be undertaken in phase 2.  
Page 43

Page 44

Council Wide 
Climate Change Strategy
The Council has developed a Climate Change Strategy in response to Scotland’s climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy has informed the development of a Climate Change Action Plan for
2022/23 to ensure environmental actions are devolved to relevant service areas and climate change action is mainstreamed across council
policies, operations and the wider public. Progress against the actions assigned to CCF will be monitored. R&N services will support the aims
and objectives of the Strategy in a number of ways. A high number of the actions and PI’s and actions detailed in this delivery plan contribute to
the climate change action plan 2022/23. Some key actions include;   
• progress the Gruggies Burn flood alleviation scheme;
• review the service delivery model to recognise the seasonal nature of the Greenspace service;
• review and update the local bio diversity action plan;
Community Empowerment Strategy
The West Dunbartonshire Community Empowerment Strategy was approved by Council in November 2019. It details the ambitions of the
Council and its partners to deliver the Community Empowerment (Scotland) Act 2015. Informed by an engagement process with local community
organisations and citizens, the strategy sets out objectives to be delivered in partnership with communities, underpinned by clear principles for
empowerment.
To support the implementation of the strategy, a partnership and community owned delivery plan is being developed, setting out specific actions
and ownership for taking forward. R&N will fully support the development of these actions and is already supporting community empowerment in
relation to the food growing strategy and allotments. 
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed Roads & Neighbourhood priorities for 2022/23.
Appendix 1 sets out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions to address workforce issues identified in the planning process; and
• strategic and/or service risks, including those relating to the pandemic.
In relation to the latter, strategic risks represent the potential for the Council to take advantage of opportunities or fail to meet stated strategic
objectives and those that require strategic leadership; while service risks relate to service delivery and represent the potential for impact on
individual services, or the experience of those who work within the services, i.e. employees, partners, contractors and volunteers or service
Page 44

Page 45

users and clients in receipt of the services provided. In identifying the relevant risks for 2022/23 and actions to mitigate them, the aim is to
improve or maintain the current position (i.e. the current risk score) set out in the appendix.
4. Resources
Finance
Roads & Neighbourhood has a net revenue budget of £14.546m and a capital budget of £22.316m in 2022/23. It should be noted that there are
some projects where the capital budget has yet to be agreed and the slippage from FY 21/22 has not yet been finalised and therefore not
included in the budgets. A breakdown by service area is set out below. We will make the best use of the Roads & Neighbourhood available to
deliver on key priority areas and secure external/match funding where this is possible.
Service Area Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£m)
Capital Budget
2022/23 (£m)
Transport, Fleet & Maintenance
Services 4.475 5.067 -0.592 4.218
Roads Services 6.513 3.580 2.933 14.786
Grounds Maintenance & Street
Cleaning Client 7.503 0 7.503 1.152
Outdoor Services 0.358 0.171 0.187 1.309
Burial Grounds 0.465 0.658 -0.193 0.130
Crematorium 0.409 1.440 -1.031 0.553
Waste Services 9.205 1.227 7.978 0.285
Depots 0.519 0.519 0 0
Ground Maintenance & Street
Cleaning Trading A/c 8.852 11.091 -2.239 0
Total 38.299 23.753 14.546 22.316
Page 45

Page 46

Employees
Employee Numbers
The headcount and full time equivalent staff in each service area (as of 31st March 2022) are as follows:
Absence in 2021/22
The quarterly absence statistics for Roads & Neighbourhood are shown below together with the Council average for the same periods for
comparison. The figures have been higher than the Council average in the first half of 2021/22 and lower in the second half of 2021/22:
Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Roads &
Neighbourhood
3.33 4.24 4.20 3.85 13.96
COUNCIL WIDE TOTAL 3.27 3.58 4.50 5.03 14.55
Service Area Headcount FTE
Fleet & Waste 139 132.89
Greenspace 159 147.14
Roads & Transportation 89 59.59
TOTAL 387 339.62
Page 46

Page 47

Appendix 1: Action Plan
1. Our communities
Objective 1. Our neighbourhoods are safe, resilient and inclusive
Performance Indicator Owner
Percentage of emergency road related defects repaired within 2 hours of being reported Liam Greene
Percentage of non-serious road related defects repaired within 7 working days of being reported Liam Greene
Percentage of routine road related defects repaired within 28 working days of being reported Liam Greene
RL2: Percentage of all traffic light repairs completed within 48 hours Liam Greene
RL3: Percentage of all street light repairs completed within 7 days Liam Greene
Action Due Date Owner
Review winter gritting programme and implement a more effective service provision 31-Mar-2023 Liam Greene
Objective 2. Our residents health and wellbeing remains a priority
Action Due Date Owner
Completion of deliver new gymnasium, changing facilities and all weather running track – Posties Park 31-Mar-2023 Ian Bain
Page 47

Page 48

2. Our Environment
Objective 4. Our local environment is protected, enhanced and valued
Performance Indicator Owner
% residents satisfied with the street cleaning service Ian Bain
% Residents satisfied with the Waste service overall Kenny Lang
% Residents satisfied with Parks & open spaces Ian Bain
Percentage of missed bins collected within 3 working days of being reported Kenny Lang
Percentage of offensive graffiti removed within 24 hours of being reported Ian Bain
Percentage of non-offensive graffiti removed within 5 working days of being reported Ian Bain
% of total household waste that is recycled Kenny Lang
Percentage of abandoned vehicles that require to be removed by the council that are removed within 14 days Kenny Lang
Action Due Date Owner
Produce a revised service delivery model that reflects the changes in quantities of plastic and glass
collections due to the introduction of a national deposit return scheme. 31-Mar-2023 Kenny Lang
Finalise the delivery of a suitable new allotment site with provision for 40 traditional plots 31-Mar-2023 Ian Bain
Page 48

Page 49

Action Due Date Owner
Develop a new local bio diversity action plan 22/23 31-Mar-2023 Ian Bain
Continue to explore alternative methods of weed control 31-Mar-2023 Ian Bain
Ash die back preparation work to inform the action plan which will be developed in 2023/24 31-Mar-2023 Ian Bain
Objective 5. Our resources are used in an environmentally sustainable way
Performance Indicator Owner
Tonnage of biodegradable municipal waste landfilled Kenny Lang
Net waste collection cost per premises Kenny Lang
Net waste disposal cost per premises Kenny Lang
Action Due Date Owner
Produce a business case for the development of a waste transfer station within Council’s boundary 31-Mar-2023 Kenny Lang
Rollout further installation of electric vehicle charging points 31-Mar-2023 Liam Greene
Objective 6. Our neighbourhoods are sustainable and attractive
Performance Indicator Owner
Page 49

Page 50

Performance Indicator Owner
% Residents satisfied with roads maintenance Liam Greene
% of Class A roads that should be considered for maintenance treatment 10-12 Liam Greene
% of Class B roads that should be considered for maintenance treatment 10-12 Liam Greene
% of Class C roads that should be considered for maintenance treatment 10-12 Liam Greene
Percentage of unclassified roads that should be considered for maintenance treatment Liam Greene
Action Due Date Owner
Pavement parking, investigate and develop a strategy in line with Scottish guidance Phase 2 31-Mar-2023 Liam Greene
Progress the Gruggies Burn flood alleviation scheme Phase 1 31-Mar-2023 Liam Greene
Clydebank Masterplan, progress the next phase delivery of improved roads and pedestrian environment
within the plan Phase 2 31-Mar-2023 Liam Greene
Deliver a design for a new traffic control system - Kilbowie Roundabout 31-Mar-2023 Liam Greene
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Impact of major
adverse weather
incidents on services
A significant period of adverse weather may
result on failure to deliver key operational
functions of E&N services
1-Sep-2022 Gail Macfarlane
Page 50

Page 51

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Failure to maintain
road network during
adverse weather
A significant period of adverse weather may
result in failure to deliver key operational
functions of R&T services and other Council
services.
1-Sep-2022 Gail Macfarlane
Failure to manage and
maintain the road
network effectively
Failure to manage and maintain the road
network effectively will have an adverse impact
on user safety, traffic movement, air quality,
economic growth and reduce access to facilities
and amenities. The Council’s reputation as a
place to live and work with access to
employment, education, leisure and health
opportunities would be adversely affected.
1-Sep-2022 Gail Macfarlane
Challenges in
delivering effective
services in relation to
Roads &
Neighbourhoods
The risk that the Council fails to deliver on the
three services within Roads & Neighbourhood:
Roads & Transportation, Fleet & Waste and
Greenspace. These areas provide services
across a range of areas including managing and
maintain roads, footpaths and associated
infrastructure, managing flood risk, grounds
maintenance, street cleaning, burial and
cremation, outdoor facilities, waste and recycling
and vehicle fleet management. Failing to ensure
these services are not fully fit for purpose could
result in adverse consequences in relation to
delivering efficient and effective services.
1-Sep-2022 Gail Macfarlane
Page 51

Page 52

4. Our Council
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce. 31-Mar-2023 Gail Macfarlane
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain
the workforce. 31-Mar-2023 Gail Macfarlane
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies 31-Mar-2023 Gail Macfarlane
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce. 31-Mar-2023 Gail Macfarlane
Objective 11. Our Council is adaptable and focused on delivering best value for our residents
Action Due Date Owner
Review business plans to align activities, identify opportunities to reduce duplication, and identify learning
opportunities (under R&N services collaborative programme) 31-Mar-2023 Gail Macfarlane
Continue to work collaboratively with Argyll & Bute and Inverclyde Councils to develop a best value proposal 31-Mar-2023 Kenny Lang
Page 52

Page 53

Action Due Date Owner
for procuring the reception, transportation, treatment and compliant disposal of biodegradable municipal
waste
Complete phase 1 of the Fit for Service review of waste services 31-Mar-2023 Kenny Lang
Develop an action plan for depot rationalization 31-Mar-2023 Liam Greene
Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Challenge to delivery
of burial and
cremation services
A number of factors may impact on ability to
deliver these services.  For example a pandemic
would create significant immediate demand on
services.
1-Sep-2022 Gail Macfarlane
Inability to deliver
priority services as a
result of fuel
shortages
A fuel shortage would significantly impacting on
our ability to provide priority service across West
Dunbartonshire.
1-Sep-2022 Gail Macfarlane
Page 53

Page 54

Page 54

Page 55

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer – Supply, Distribution & Property
Committee: Infrastructure, Regeneration and Economic Development
2 November 2022
Subject: Supply, Distribution & Property Delivery Plan 2022/23 –
Corporate Asset Management
1 Purpose
1.1 The purpose of this report is to provide members with the Corporate Asset
Management priorities within the Supply Distribution & Property Delivery Plan
2022/23.
2 Recommendations
2.1 It is recommended that Committee notes the contents of the Plan.
3 Background
3.1 In line with the Strategic Planning & Performance Framework, each Chief
Officer develops an annual Delivery Plan which sets out actions to help deliver
the Strategic Plan and address the performance challenges and service
priorities identified in the planning process. The Plan also provides an
overview of services and resources, including employees and budgets, sets
out the performance indicators (PIs) for monitoring progress and considers the
relevant risks.
3.2 Following the local government election in May 2022, a new five-year
Strategic Plan was developed in consultation with stakeholders and submitted
to Council for approval in October. This sets out the Council’s priorities,
objectives and key PIs, providing clear direction for the development of the
first set of annual delivery plans, of which the Supply Distribution & Property
Delivery Plan (SD&P) is one of eight. 
3.3 The implementation of the Corporate Asset Management priorities contained
within the SD&P Delivery Plan will be monitored by the management team
with interim progress reported to Infrastructure, Regeneration and Economic
Development Committee in February 2023 and year-end progress in May
2023.
4 Main Issues
4.1 An extract from the SD&P 2022/23 Delivery Plan is included at Appendix 1.
This sets out the achievements and challenges for Corporate Asset
Management over the past year, as well as the priorities for 2022/23.
ITEM 10
Page 55

Page 56

4.2 They include: Progress delivery of the Corporate Asset Management Strategy
to align with the Councils Strategic Plan; Continue to secure capital receipts
through the progress of disposal of key strategic sites; and Monitor progress
of capital programmed construction works through consultancy services. 
5 People Implications
5.1 There are no direct people implications arising from this report.
6 Financial & Procurement Implications
6.1 There are no direct financial or procurement implications arising from this
report.
7 Risk Analysis
7.1 Failure to deliver on the actions assigned to SD&P including Corporate Asset
Management, may have a direct impact on the delivery of the Council’s
Strategic Plan. It is essential that remedial action is taken to ensure strategic
delivery plans achieve the commitments detailed and approved.
8 Equalities Impact Assessment
8.1 Screening and impact assessments will be carried out on specific activities as
required.
9 Consultation
9.1 The delivery plans were developed through consultation with officers from the
strategic service areas.
10 Strategic Assessment
10.1 The delivery plans set out actions to support the successful delivery of the
strategic priorities and objectives of the Council.
Chief Officer: Angela Wilson
Service Area: Supply Distribution & Property
Date:  30 September 2022
_____________________________________________________________
Person to Contact:  Karen Connelly
karen.Connelly@west-dunbarton.gov.uk
Appendices: Appendix 1: Corporate Asset Management Extract from
the Supply, Distribution & Property Delivery Plan 2022/23
Page 56

Page 57

Background Papers: Strategic Plan 2022/27 - Council, 26 October 2022
Strategic Planning & Performance Framework 2022/27
Wards Affected: All
Page 57

Page 58

2022/23
SUPPLY,
DISTRIBUTION AND
PROPERTY –
Corporate Asset
Management Extract
ITEM 10 - APPENDIX 1
Page 58

Page 59

Contents
1. Introduction .................................................................................................................................................................................................... 3
2. Performance Review ...................................................................................................................................................................................... 3
3. Strategic Assessment .................................................................................................................................................................................... 5
4. Resources ...................................................................................................................................................................................................... 7
Appendix 1: Action Plan .......................................................................................................................................................................................... 10 
Page 59

Page 60

1. Introduction
Supply, Distribution and Property comprises a wide range of services covering Corporate Asset Management, Building Services, Housing Asset
& Investment and the Corporate Procurement Unit (CPU). It is one of 8 strategic areas responsible for delivering the Council’s Strategic Plan.
Key actions to help achieve that are set out in this Delivery Plan, together with actions to address any performance issues and service priorities
identified in the planning process.
The progress of this Plan for will be monitored and managed by the management team and reported to Infrastructure, Regeneration and
Economic Development Committee twice yearly, at mid-year and year-end. 
2. Performance Review
The Supply, Distribution and Property management team completed a detailed review of 2021/22 performance, focusing on the following:
• 2021/22 Delivery Plan year end progress;
• 2021/22 Quality Standards year end progress;
• Local Government Benchmarking Framework (LGBF) comparative data;
• Telephone Survey feedback;
• Complaints;
• Continuous Improvement (Fit for Future reviews)
• Other benchmarking/feedback.
This review highlighted our key achievements in 2021/22 as well as the challenges to be addressed in 2022/23. These are summarised below.
Key Achievements in 2021/22   
Listed below are some of the major achievements in each service area. Despite the unprecedented challenges the coronavirus pandemic has
created including restrictions and additional duties, each service within SD&P has found new ways of continuing the delivery of critical front line
services. The service achieved many other outcomes throughout the year which are not recorded here but are as important.
Page 60

Page 61

Corporate Asset Management 
• Supported the delivery of major capital projects including delivery of phase 1 of the new Renton campus, development phase of new Faifley
Community Campus, new build housing projects and development phase of Exxon City Deal Project. 
• Effectively managed COVID-19 PPE store and supported COVID-19 testing facilities. 
• Developed office accommodation plans and managed access and occupancy. 
• Developed and implemented a new Disposal Strategy. 
Key Challenges from 2021/22 
Workforce.
• The principle challenge has continued to be in relation to the COVID-19 pandemic including adapting to changing legislation and guidance to
ensure continued delivery of front line services and safe working conditions for employees.  
• The turnover coupled with the time taken to replace, recruit and train employees across Supply Distribution and Property was a particular
challenge in 2021/22 when demands on all services were higher than normal as a result of the pandemic.
• Exceptionally high levels of sickness/ isolation particularly in Building Services had significant impact on our ability to deliver maintenance
and repairs and projects.
• The national skills shortage of qualified and experienced officers in Building Services, Procurement, and Corporate Asset Management,
resulted in reduced workforce numbers, increased demands on existing teams and a high staff turnover. This has resulted in alternative
service delivery models being introduced. 
Capital Projects
• Progression of key capital projects, including the new Renton Campus, Clydebank Care Home and the Housing Investment Programme
faced disruption due to COVID-19 where a significant period of time has been lost. 
• Increasing issues relating to supply of labour and materials, due to increased energy, transport and raw material costs, impacted on supply
chains, and third parties and our ability to carry out works within budget and on time.
• Construction inflation with labour and material costs increasing over the last year. 
• Increased scrutiny at both local and national level including funding applications, monitoring and reporting required a significant amount of
management time impacting on service delivery. 
Page 61

Page 62

3. Strategic Assessment 
The Supply Distribution and Property management team completed a strategic assessment to determine the major influences on service delivery
and priorities in 2022/23. These are summarised below. 
Financial Challenges 
The entire public sector is facing significant financial challenges. The Council are currently faced with an estimated cumulative funding gap in
2023/24 of £18.3m rising to £24.2m in 2024/25. Funding pressures relating to COVID-19 will continue in 2022/23, and whilst there is still some
carried forward COVID-19 funding from the Scottish Government available for use in 2022/23, it is difficult to assess whether it will continue to be
sufficient due to the ongoing unpredictability of the impact of the pandemic on people’s lives and local businesses. We will continue to monitor
the overall financial position of the Council and updates on estimated future budget gaps will be reported to Elected Members throughout
2022/23. 
These challenges mean further action is required to balance our budget and protect services for residents. This will mean that, within Supply
Distribution and Property available funding will be reduced and we will need to reconfigure how we work and what we do to deliver further
efficiencies 
Budget Sensitivity Analysis 
In reviewing the service budget projections, consideration has been given to sensitivity of these budgets, in particular for higher risk/ higher value
budgets which may have a significant impact on budgetary control and future budget projections. The analysis has considered sensitivity around
demand, costs and charges, and income levels. 
Within this service, budgets which have been identified as being more susceptible to fluctuations include:
• Building Materials; 2022/23 budget - £3.5M. Nationally there has been a significant inflation in cost of building supplies and materials as
well as challenges with supply due to increased energy, transport and raw material costs. Higher material costs will be passed onto client
budgets through service recharges and any cost increase will put pressure on client maintenance and investment budgets. 
• Labour costs; 2022/23 budget - £20.1M. Nationally there continues to be challenges in recruitment and retention of staff due to a skills
shortage of qualified and experienced officers. This impacts both our workforce and that of sub-contractors. 
• Transport fuel costs - 2022/23 budget £750,000. The price of petrol/diesel can fluctuate a great deal based on market prices. Also changes
in working practices to allow for social distancing will affect the costs since now, for example, two vehicles need to be driven to a job whereas
one would have sufficed pre COVID-19. Higher fuel and hire costs will be passed onto client budgets through service recharges and any cost
increase will put pressure on client maintenance and investment budgets. 
Page 62

Page 63

• Capital Plan - Nationally there has been a significant inflation in cost of building supplies and materials and in some cases shortfall in
supplies. For some projects this may need to increased costs or slippage in delivery of the capital projects. 
Corporate Asset Management 
Corporate Asset Management Strategy
The Service is responsible for the strategic management of the Council’s assets, including operational and non-operational properties and is
responsible for the delivery of the Corporate Asset Management Strategy. The new 5 year strategy will be developed in conjunction with and to
meet the aspirations of the council’s strategic priorities from 2022. 
Income from Capital Receipts
Continuing to secure income to the Council is a key priority and the Corporate Asset Management Plan supports this through delivery of capital
receipts from disposal of key strategic sites. The Plan will highlight non-performing property assets, inform the process for considering future
disposals, and generate additional income through the disposal of redundant assets. An annual update will be provided on the progress of
disposals. In the current financial climate there will be a significant dependency on the effectiveness of this plan and the outcomes. 
Consultancy Services
Consultancy Services sits within Corporate Asset Management and is the Council’s design and construction contract consultancy. Consultancy
Services administers and manages capital programmed construction works providing technical assistance, feasibility and cost studies on behalf
of other services. 
Council Wide Climate Change Strategy 
The Council has developed a Climate Change Strategy in response to Scotland’s climate emergency and to provide a route map towards
meeting Scotland’s national net zero carbon target by 2045. This Strategy has informed the development of a Climate Change Action Plan for
2022/23 to ensure environmental actions are devolved to relevant service areas and climate change action is mainstreamed across council
policies, operations and the wider public. Progress against the actions assigned to SD&P will be monitored. 
Page 63

Page 64

Continuous Improvement
To support continuous improvement, the Council has an established programme of Fit for Future service reviews. Using a range of tools, that
encapsulates service design, maturity assessments and employee engagement, information is gathered and reviewed to identify improvements
and to ensure our services are efficient and that we make best use of our resources. During 2022/2023 we will assess the performance of the
services within SD&P with a view to determining if any service would benefit from a Fit for Future service review.   
Action Plan
The challenges identified in Section 2 and the key factors identified in Section 3 have informed SD&P priorities for 2022/2023. Appendix 1 sets
out the action plan to address them. It also includes:
• performance indicators and targets that will enable progress to be monitored and reported to stakeholders;
• strategic workforce actions to address workforce issues identified in the planning process; and
• strategic and/or service risks, including those relating to the pandemic. 
The Council has identified risks at both a strategic and service level. Strategic risks represent the potential for the Council to take advantage of
opportunities or fail to meet stated strategic objectives and those that require strategic leadership; while service risks relate to service delivery
and represent the potential for impact on individual services, or the experience of those who work within the services, i.e. employees, partners,
contractors and volunteers or service users and clients in receipt of the services provided. In identifying the relevant risks for 2022/2023 and
actions to mitigate them, the aim is to improve or maintain the current position (i.e. the current risk score) set out in the appendix. 
4. Resources 
Finance 
Supply Distribution and Property has a net revenue budget of £2.73m (net income) and a capital budget of £6.20m in 2022/2023. A breakdown
by service area is set out below. We will make the best use of the resources available to deliver on key priority areas and secure external/match
funding where this is possible. 
Service Area Gross Expenditure
2022/23 (£m)
Gross Income
2022/23 (£m)
Net Expenditure
2022/23 (£m)
Capital Budget
2022/23 (£m)
Consultancy Services                        0.845  (0.235)                        0.610  0.000    
Page 64

Page 65

Corporate Assets                        2.628  (4.781) (2.153) 0.000    
Capital Investment Team                        0.557  (0.719) (0.162) 2.785
Private Sector Housing Grant                        0.525  (0.446)                        0.079  0.000    
Corporate Asset Maintenance                        4.862  (5.128) (0.266) 3.337
Housing Asset Maintenance &
Investment                        0.494  (0.412)                        0.082  0.000    
CPU                        0.981  (0.500)                        0.481  0.000    
HMTA                     18.395  (19.796) (1.401) 0.078
Total                     29.287  (32.017) (2.730) 6.200 
Employees 
Employee Numbers (data to be confirmed) 
The headcount and full time equivalent staff in each service area (as of 31st March 2022) are as follows: 
Absence in 2021/22 
The quarterly absence statistics for Supply Distribution and Property are shown below together with the Council average for the same periods for
comparison. The figures have been higher than the Council average throughout 2021/2022: 
Function  Headcount FTE
Corporate Asset Management 43 36.10
Housing Asset & Investment  10 8.80
Maintenance & Repairs 347 336.12
CPU 19 17.14
TOTAL 419 398.16
Page 65

Page 66

Absence in 2021/22 Quarter 1 Quarter 2 Quarter 3 Quarter 4 Annual FTE days lost per FTE employee
Supply, Distribution &
Property
5.4 5.00 4.41 4.56 17.20
COUNCIL WIDE TOTAL 3.27 3.58 4.5 5.03 14.55 
Page 66

Page 67

Appendix 1: Action Plan - CAM   
2. Our Environment 
Objective 6. Our neighbourhoods are sustainable and attractive 
Performance Indicator Owner
% of Special Needs Adaptation projects completed by consultancy services from receipt of referral to carrying out survey,
design and submission of building warrant Craig Jardine
% of Housing and General Services projects supported by consultancy services  Craig Jardine 
4. Our Council 
Objective 10. Our workforce is resilient and skilled where digital technology supports service delivery for our residents 
Action Due Date Owner
Develop and implement wellbeing, employee engagement, equality and training plans to enable capabilities,
improved resilience and promotion of a diverse workforce. 31-Mar-2023 Craig Jardine
Develop and implement employee life cycle plans in line with the People First Strategy to attract and retain 31-Mar-2023 Craig Jardine
Page 67

Page 68

Action Due Date Owner
the workforce.
Implement service review process including role design, use of new technology and new ways of working to
add resilience, address gaps, and establish opportunities for efficiencies 31-Mar-2023 Craig Jardine
Develop and implement training plans and development opportunities to improve capabilities and resilience
within the workforce. 31-Mar-2023 Craig Jardine 
Objective 11. Our Council is adaptable and focused on delivering best value for our residents 
Performance Indicator Owner
Percentage of council buildings in which all public areas are suitable for and accessible to disabled people Craig Jardine
Proportion of operational buildings that are suitable for their current use % Craig Jardine
Proportion of internal floor area of operational buildings in satisfactory condition % Craig Jardine
% of capital projects supported by capital investment team, delivered within agreed plan Craig Jardine
% of capital receipts achieved as forecast Craig Jardine 
Action Due Date Owner
Progress delivery of the Corporate Asset Management Strategy to align with the Councils Strategic Plan 31-Mar-2023 Craig Jardine
Monitor the progress of disposal of key strategic sites over 22/23 31-Mar-2023 Craig Jardine
Monitor progress of capital projects managed by Capital Investment team and Consultancy Services 31-Mar-2023 Craig Jardine 
Page 68

Page 69

Risk Description Current
Assessment
Target
Assessment
Date
Reviewed Owner
Maintaining Council
Assets that are fit for
purpose
The risk that the Council's assets and facilities
are not fully fit for purpose with consequent
adverse impact on our ability to deliver efficient
and effective services. Assets included in this
assessment are; the Council’s property portfolio
and open space
01-Sept-2022 Angela Wilson
Page 69

Page 70

Page 70

Page 71

WEST DUNBARTONSHIRE COUNCIL
Report by Chief Officer: Supply, Distribution and Property
Infrastructure Regeneration and Economic Development Committee:
2 November 2022
___________________________________________________________________
Subject :    Sale of Property at Carson Road, Balloch G83 0QG
1. Purpose
1.1 The purpose of this report is to seek the approval of the Committee that the
Council enter into a contract for the disposal of this property to site to Sava
Estates Ltd.
2. Recommendations
2.1      It is recommended that the Committee:
(i) Approve the disposal of the site to Sava Estates Ltd (SC 383078) for a
figure of £25,666 (Twenty five thousand six hundred and sixty six
pounds).
(ii) Authorise the Chief Officer, Supply, Property and Distribution to
conclude negotiations.
(iii) Authorise the Chief Officer, Regulatory and Regeneration to conclude
the transaction on such conditions as considered appropriate.
3. Background
3.1 The property is wholly owned by West Dunbartonshire Council and is
currently unused and surplus to the requirements of any Council service.
3.2 The site was previously the boiler house providing communal heating to the
properties within the Dalvait area. It has not been used for this purpose for
many years and was more recently used by the Council for document storage.
3.3. Initial advice from the Planning service was that although the property is
within a residential area the site is possibly too small to accommodate a
residential unit with the required garden ground and off- street parking
Main Issues
4.1 The property is not required by the Council for any operational purposes.
ITEM 13
Page 71

Page 72

4.2 The property was extensively marketed for sale during August and September
2022. Details of Particulars were prepared (Appendix 1).
4.3 The availability of the site was listed on the Councils website and social
media. Details were also circulated to commercial property agents, local
solicitors, business development bodies and the property was listed on the
main Commercial property marketing websites.
4.4 A closing date was set for receipt of informal offers on Wednesday 5th October
2022.Five offers were received ranging from £9,111 to £25,666.(Sava Estates
Ltd).  
4.5 The offer from Sava Estates Ltd is subject only to standard commercial
conditions and importantly is not subject to survey, valuation or planning
consent for change of use. 
4.6 Sava Estates Ltd proposed intended use for the property for Class 2 office
building.
5. People Implications
5.1 There are no significant people implications other than the resources required
by Legal Services to negotiate missives and conclude the transaction.
6. Financial and Procurement Implications
6.1 The Council will benefit from a capital receipt of £25,666.
6.2 The Council will no longer have to incur resources in managing and
maintaining the property.
6.3 There are no procurement implications arising from this report.
7. Risk Analysis
7.1 The disposal is subject to legal due diligence.
7.2 As with any transaction of this nature there is a risk of the sale not proceeding
due to issues which arise during the due diligence process and the property
may require to be remarketed.
8. Environmental Sustainability
8.1 An Asbestos Report was obtained for the building which has been passed to
interested parties. We are advised that Sava Estates intend to use the
property for Class 2 office building.
Page 72

Page 73

9. Equalities Impact Assessment (EIA)
9.1 An Equality Impact Assessment is not applicable for the purpose of this
report.
10. Consultation
10.1 Consultations have been undertaken with Finance and Regulatory Services,
Planning and Road Services.
11. Strategic Assessment
11.1 By agreeing to this proposal the Council will benefit in terms of receiving a
capital receipt and removing a liability from the property portfolio..
11.2 A building which has lain vacant and disused for a number of years will be
brought back into serviceable use.
11.3 By agreeing to this proposal this will be contributing to the Council’s strategic
priority for a strong local economy and improved job opportunities.
Angela Wilson
Chief Officer: Supply, Distribution and Property
Date: 11 October 2022
Person to Contact: Michelle Lynn, Asset Coordinator.
Email: michelle.lynn@west-dunbarton.gov.uk
J David Johnston, Estates Surveyor. 
Email: david.johnston2@west-dunbarton.gov.uk
Appendices: Appendix 1 – Marketing Details.
Background Papers:  None
Wards Affected: Ward 2
Page 73

Page 74

FOR SALE: FORMER OIL STORAGE BUILDING
CARSON ROAD
BALLOCH
ALEXANDRIA
G83 0QG
PROPOSAL
West Dunbartonshire Council are pleased to offer for sale this building, which was previously used
as an oil storage facility / boiler house. The Council are offering For Sale the heritable interest in
the property.
LOCATION
The property is located on the west side of Carson Road within the Dalvait area of Balloch .
The surrounding area is predominantly residential in character.
PROPERTY
The subject property is of brick construction with part sloping/ part flat roofs. Access to the building
is via double wooden access doors. The building has mains water and electricity.
Page 74

Page 75

EPC
The building has an EPC rating of A5. A copy of the EPC certificate is available for interested parties.
FLOOR AREA
The property has a Net Internal floor area of 842 sqft (78.25 sqm).
SITE AREA
The property is on a site of 102 sq meters or thereby.
PLANNING
The site lies a predominantly residential area.
Initial discussions with the Planning Department indicate that in principle a residential use for the
property/site may be appropriate subject to compliance with other relevant Local Plan and Local
Development Plan policies. The caveat is that the site area may be too small to accommodate
a residential unit together with the requisite garden ground and off street parking. An alternative
suitable use for the property may be storage.
It is strongly recommended that interested parties contact Planning and Building Control at West
Dunbartonshire Council.
Tel:  0141 951 7930 to discuss any proposals they might have for the building.
Email:   Planning&BuildingControl@west-dunbarton.gov.uk           
Development.Management@west-dunbarton.gov.uk
RATEABLE VALUE
The property is currently listed in the Valuation Roll with a rateable value of £1,050.
TENURE
The heritable interest in the property is available for sale.
OFFERS
We are seeking offers for the benefit of the Council’s interest in the property. It is likely that a
closing date will be set for receipt of offers and it is strongly recommended that parties’ register
their interest in writing.
FURTHER INFORMATION and VIEWING
Parties are asked to register their interest in writing with:
J David Johnston, Asset Management
West Dunbartonshire Council
Council Offices
16 Church Street
Dumbarton
G82 1QL
Tel: 07785632859
Page 75

Page 76

Sub
22
Governor
43
39
1
15
44
El
12
5
6
38
47
36
7
21
ROAD
5
4
4
14
5
9
Sta
BEATON
11
27
Gas
26
11
Reproduced by permission of Ordnance Survey on behalf of HSMO
(C) Crown Copyright and database right 2019. All rights reserved.
West Dunbartonshire Council Licence No. 100020790.
West Dunbartonshire Council
Title : Former Oil storage tank building - Carson Road G83 8QG
Scale : 1:500Date : 09/11/2021
Map Ref : NS3981NWMap No : AM639
Page 76