Appendix 2 - R&N Quality Standards 2021/22 
Quality Standards 2021/22 
Fleet & Waste 
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of missed bins collected
within 3 working days of being
reported
100%  98.5% 100%    Kenny Lang
WM5: Percentage of abandoned
vehicles that require to be removed
by the council that are removed
within 14 days
100%  100% 100%   Target achieved. Kenny Lang 
Greenspace 
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of offensive graffiti
removed within 24 hours of being
reported
100%  100% 100%   Target achieved. Ian Bain
Percentage of non-offensive graffiti
removed within 5 working days of
being reported
100%  100% 100%   Target achieved. Ian Bain

Page 2

2   
Roads & Transportation 
Performance Indicator
2020/21 2021/22
Owner
Value Status Value Target Short Trend Long Trend Note
Percentage of emergency road
related defects repaired within 2
hours of being reported
100%  100% 100%   Target achieved. Liam Greene
Percentage of serious road related
defects repaired within 2 working
days of being reported
86.1%  85.1% 100%  
Adrift of target Reduction in available
resources and backlog of works impacted
response times. Additional resources and
working practices will be reviewed to bring
service levels back in line
Liam Greene
Percentage of non-serious road
related defects repaired within 7
working days of being reported
78.2%  72.2% 100%  
Target not achieved. Reduction in available
resources and backlog of works impacted
response times. Additional resources and
working practices will be reviewed to bring
service levels back in line
Liam Greene
Percentage of routine road related
defects repaired within 28 working
days of being reported
46.7%  38.8% 100%  
Target not achieved. Reduction in available
resources and backlog of works impacted
response times. Additional resources and
working practices will be reviewed to bring
service levels back in line
Liam Greene
RL2: Percentage of all traffic light
repairs completed within 48 hours 98.6%  100% 100%   Improved performance from previous year.
Target achieved. Liam Greene
RL3: Percentage of all street light
repairs completed within 7 days 100%  99% 99%    Target achieved. Liam Greene  
PI Status 
Significantly Missed Target 
Narrowly Missed Target 
Met or Exceeded Target 
Long Term Trends 
Improving 
No Change 
Getting Worse 
Short Term Trends 
Improving 
No Change 
Getting Worse