Overview of Key Principles and
Models
A SINGLE AUTHORITY
MODEL FOR ARGYLL
AND BUTE

Page 2

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Introduction
This Paper outlines the work undertaken thus far
by Argyll and Bute Council to explore the
possibility of a Single Authority Model (SAM) for
the area. It outlines they key principles that have
guided the work to date, the potential benefits of a
SAM for the area, and an overview of the possible
models that have been identified.
Background
Understanding Argyll and Bute
Argyll and Bute is made up of a rich mix of
remote, rural and island communities, which
presents a number of challenges in terms of
service delivery. For planning and service delivery
purposes Argyll and Bute is divided into four
areas: Bute and Cowal; Helensburgh and
Lomond; Mid Argyll, Kintyre and the Islands; and
Oban, Lorn and the Isles. The area has a
population of 87,810 (NRS 2023 Mid-Year
Estimates), spread across the second largest
local authority area in Scotland.
There are 28 inhabited islands in Argyll and Bute
(Census 2022) - more than any other local
authority in Scotland. Approximately 17.5% of
Argyll and Bute’s population live on islands.
Moreover, many of Argyll and Bute’s mainland
peninsulas could be considered to share the
same characteristics and challenges to the island
communities – given their remote/remote rural
nature. 47.6% of Argyll and Bute’s population live
in areas classified by the Scottish Government as
‘rural’ and 43.2% live in areas classified as
‘remote rural’.
The changing demographic profile of Argyll and
Bute presents one of the greatest challenges. By
2028, the population is projected to decrease to
83,796. This is a decrease of 5.9% which
compares to a projected population increase of
1.8% for Scotland as a whole. Argyll and Bute's
population is predicted to continue ageing,
with  the proportion of 0-15 year olds projected to
fall by 17.6%, working age population to decrease
by 4.7%, and the proportion of those of
pensionable age to decrease by 1.7%. However,
it is anticipated that there will be an increase of
23.3% in the population aged 75 and over.
(National Records of Scotland 2018-based
Population Projections).
Other key challenges include:
• increased demand for health and social
care services due to a projected increase
in the number of older people in the area;
• increased need for end of life care;
• recruitment and retention of the local
workforce as the working-age population
decreases;
• the physical geography of Argyll and Bute
provides limitations in terms of developing
the road network, and a reliance on ferry
travel in parts. This also creates issues in
terms of the accessibility of services for all
across a significant remote and rural
geography;
• there is fragility in the economy in Argyll
and Bute due to reliance on part time and
seasonal employment;
• the Council recently declared a housing
emergency in Argyll and Bute, with a
consistent reduction in available housing,
coupled with a rise in demand and
increasing property prices;
• thirteen data zones in Argyll and Bute are
included in the 20% most overall deprived
data zones in Scotland; and
• although Argyll and Bute falls within the
NHS Highland health board area, almost
all patient pathways for Argyll and Bute
residents are to NHS Greater Glasgow
and Clyde. This factor, coupled with the
unique geography of Argyll and Bute,
poses a further challenge to the delivery of
health services and outcomes for patients.
Addressing the Challenges
In recognition of the challenging demographics
and geography outlined above, and the
subsequent impacts of COVID-19 on the social
determinants of health, we understand that a shift
in public sector structures is required and that
increased collaborative working is needed to

Page 3

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
implement positive action. These issues cannot
be addressed successfully by one single
organisation/partner and requires a whole system
approach, as advocated by Public Health
Scotland. This whole system approach is about
more than the delivery of clinical and care
services for Argyll and Bute and is reflected in the
relative success of the delegation of fully
integrated services. The basis for the approach is
rooted in an evidence based strategy that
supports the implementation of the Christie
Commission recommendations and supports
Community Empowerment and Islands
legislation.
National policy is increasingly prescriptive in its
human rights approach, and the ability to apply
this is becoming increasingly difficult in a remote
mainland, island, rural and urban geography
without some substantial change in how we can
affect the design and delivery of safe care
supported by sustainable services.  
Public sector service sustainability in Argyll and
Bute requires a multi-agency integrated model,
robust infrastructure and the coordination of
planning and commissioning for the longer term
that supports public sector organisations in the
area to meet their legislative and public duties.
Public Sector Reform
The Scottish Government has committed to a
number of strands of reform that affect local
government and HSCPs, which have the potential
to result in significant change. These include the
Local Governance Review, Fiscal Framework and
the National Care Service.
The Local Governance Review was launched
jointly by COSLA and the Scottish Government in
December 2017 (Democracy Matters) to explore
how power, responsibilities and resources might
be shared across ‘spheres’ of government and
with local communities, with a particular objective
to devolve powers as far as reasonably possible
in a manner that improves outcomes for
communities.
COSLA’s Plan (2022-2027) confirms that the
Local Governance Review remains a key priority,
and supports the following three inter-related
empowerments as set out by the Scottish
Government:
a) Community Empowerment through a
new relationship with public services
where communities have greater control
over decisions.
b) Functional Empowerment of public
sector partners to better share resources
and work together.
c) Fiscal Empowerment of democratic
decision-makers to deliver locally
identified priorities.
In August 2023, Phase 2 of Democracy Matters
was launched, which included a period of
engagement with communities and organisations
across Scotland. The report analysing the
responses to this engagement exercise was
launched on 19th September 2024 and can be
read here.
In terms of the Fiscal Framework, in May 2022
the Scottish Government published its Resources
Spending Review (RSR) - Investing in Scotland's
Future. The RSR set out the Scottish
Government’s plans for public service reform and
efficiency, and invited Local Government to take a
complementary approach.
The RSR also proposed a ‘New Deal’ between
the Scottish and Local Government, in the form of
a Partnership Agreement. 
A Fiscal Framework has also been proposed that
will support:
(i) working together to achieve better
outcomes for people and communities –
especially on national priorities including
addressing poverty, inequality, and
supporting the economy;
(ii) balancing greater flexibility over financial
arrangements with improved
accountability;

Page 4

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
(iii) providing certainty over inputs, outcomes
and assurance, alongside scope to
innovate and improve services; and
(iv) recognising the critical role played by local
authorities in tackling the climate
emergency, for example through
delivering our heat and buildings, waste,
active travel and nature restoration goals.
The Verity House Agreement, signed on 30th June
2023 as part of a New Deal between the Scottish
Government and Local Government, committed
to concluding a Fisal Framework which
establishes early and meaningful budget
engagement, the simplification and consolidation
of the Local Government Settlement, and
establishes a clear process for exploring local
revenue raising powers and sources of funding.
The Framework should also, wherever possible,
provide multi-year funding certainty to support
strategic planning and investment.
In December 2023, a Progress Report was
published in order to provide an update on those
sections of the Framework which were nearing
completion, as well as those where work was still
required.
Any proposals in relation to the possibility of a
SAM in Argyll and Bute would have to take into
account the above-mentioned Verity House
Agreement, which reiterates the importance of
working collaboratively to deliver sustainable
public services at a local/place level.
The Agreement sets out 3 key priorities and forms
a statement of intent in how Local Government
and the Scottish Government will work together
more effectively to improve the lives of the people
of Scotland. The 3 priorities are to:
1. tackle poverty, particularly child poverty, in
recognition of the joint national mission to
tackle child poverty; 
2. transform our economy through a just
transition to deliver net zero, recognising
climate change as one of the biggest
threats to communities across Scotland;
and 
3. deliver sustainable person-centred public
services recognising the fiscal challenges,
ageing demography and opportunities to
innovate.
The Scottish Government and Local Government
have jointly accepted that changes are required in
how they work together, how each are held to
account, how progress is monitored, and how
they will engage with each other in a positive and
proactive manner. The Agreement is a statement
of intent and provides a high-level framework for
working together more effectively to improve the
lives of the people of Scotland. Full detail on the 
Agreement can be found here.
National Care Service (Scotland) Bill
The National Care Service (Scotland) Bill was
introduced to the Scottish Parliament on 20th June
2022. It proposed to establish a National Care
Service (NCS) as well as powers to enable the
Scottish Ministers to transfer social care
responsibilities from local authorities to a NCS,
and also for the transfer of healthcare functions
from the NHS to the NCS.
The Council submitted a formal response to the
Stage 1 Call for Views on the Bill, highlighting a
number of key points including that any solution
proposed must meet the rural and remote rural
needs of Argyll and Bute. 
Following the introduction of the Bill, in July 2023,
COSLA and the Scottish Government announced
a shared accountability partnership for delivering
the NCS in an alternative way, with enhanced
national strategic direction through the creation of
a national NCS Board, but with a continued role
for local decision-making and Local Government. 
During the Stage 2 proceedings, the Bill was
amended to the extent that it no longer proposes
the structural reforms through the creation of a
NCS. The further amended Bill is now at Stage 3,
and has been renamed the Care Reform
(Scotland) Bill.

Page 5

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Examples of Successful
Strategic Joint Working in
Argyll and Bute
In terms of the Argyll and Bute Health and Social
Care Partnership (HSCP), it is one of only two
Partnerships in Scotland to have delegated all
health and social care functions permissible
under the Public Bodies (Joint Working)
(Scotland) Act 2014. This, coupled with other
factors, has prompted the partner organisations to
work innovatively and strategically in a joined-up
fashion, and has produced numerous benefits to
the people of Argyll and Bute – some of which are
set out within this section.
Partnership in Innovative Adult and Older Adult
Social Care Design and Delivery
The HSCP is currently developing an Older
Adults Strategy alongside a Housing for Older
People Strategy. The aim behind both is to design
a future model of care for older people to ensure
that residents of Argyll and Bute can live longer,
healthier and independent lives.
In order to deliver that aim, co-location of multi-
agency services in both health and social care
premises was an early partnership decision and is
the norm in all four localities. It provides an
effective model in the daily review of care needs
and supports discharges of patients from hospital
back to their homes. Innovative models of care,
such as this, support the attraction and retention
of the workforce which is a key priority for Argyll
and Bute.
In relation to care at home services, the HSCP
continues to work collaboratively to commission
flexible models of care which address different
needs in different localities, and ones which
connect with hospital pathways in order to secure
the best outcomes for individuals, families and
unpaid carers.
The delivery of effective palliative and end of life
care is another ongoing joint process between
social care, district nursing and community
hospitals within Argyll and Bute to secure
consistent approaches across the area, build
capacity, and support those receiving those
services.
The purchase of Kintyre Care Centre in
Campbeltown by the Council, on behalf of the
HSCP, is a recent example of positive joint
decision making, strategic joint working, and an
exercise which is generating positive wellbeing
outcomes and securing longer term care for
people in Kintyre.
The continued development of Technology
Enabled Care, through a Joint Digital
Modernisation Strategy, is a key strategic aim of
the HSCP and a service which has been
developed in cognisance of Argyll and Bute’s
unique and diverse geography.
Partnership in Planning with People
The Coll Health and Social Care Needs
Assessment replicated the Argyll and Bute wide
Joint Strategic Needs Assessment at a hyper-
local scale. This community-based partnership
approach aimed to deliver four overall priorities
for the residents on Coll:
• Choice, control and innovation.
• Prevention, early intervention and
enablement.
• Living well and active citizenship.
• Community co-production.
The approach taken in relation to this piece of
work has contributed to the basis for the HSCP’s
Island Strategy development, and co-production
approaches being implemented to the current
Jura Out of Hours Care development.
In 2023, the Improvement Service supported
place-based assessments for the HSCP, the
Council and Community Planning – initially with a
focus on Dunoon. The outputs of these
assessments will support the collaborative
approach to the delivery of the Joint Strategic
Plan, and will consolidate approaches to Islands
Community Empowerment, Wellbeing, Prevention
and Early Intervention. It will further support
delivering a human rights-based approach to

Page 6

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
service design and delivery within the HSCP.
Such a place-based approach has also supported
the development and delivery of services through
the Alcohol and Drugs Partnership, identifying
gaps in wider services, and working together to
deliver the national standards.
Argyll and Bute have a long-term local strategy of
prevention and early intervention which supports
the public sector approach to alleviating
inequalities in the social determinants of health.
These are acutely visible post-pandemic, and the
HSCP are working in partnership with Live Argyll
to promote public health messaging and tackle
frailty.
Partnership in #KEEPINGTHEPROMISE
Children’s health and social care services in
Argyll and Bute offer a fully integrated approach
to care delivery from pre-conception to transition
– working closely with the Council’s Education
Service and jointly delivering on Child Poverty
Action Planning, the Children’s Service Plan, and
the implementation of the UN Convention on the
Rights of the Child.
Building on Successes
The preceding Section outlines several examples
of successes achieved by the HSPC working
across a breadth of regulated services, and the
positive outcomes it has generated for people in
Argyll and Bute. This is partly down to the fact
that Argyll and Bute have fully integrated services
in terms of the Public Bodies (Joint Working)
(Scotland) Act 2014. However, an opportunity to
extend this to a whole system approach, going
further than clinical and care services, could
present a further opportunity to build on these
successes.
Expansion or development of the current
arrangements could support a wider place-based
approach – based on common planning and
needs. It could also strengthen the resource and
capacity to influence and deliver national policy
with a consolidated rural approach.
All public sector organisations in Argyll and Bute
wish to work together to attract and retain the
skills and workforce in the area – ensuring that
whole families have access to opportunities to
grow, be educated, live, work and play in Argyll
and Bute.
As mentioned above, the partner organisations in
the Argyll and Bute HSCP have integrated all
functions permissible under the Public Bodies
(Joint Working) (Scotland) Act 2014. Many of the
benefits described above have been delivered, in
part, due to this fully integrated model. In order to
build upon the successes and go further, this
Paper explores options for a SAM in Argyll and
Bute, which could allow us to progress our
ambitions and improvements to the next stage.
Benefits of Exploring a SAM for
Argyll and Bute
The concept of a SAM for Argyll and Bute is being
explored as a tool to deliver lasting reform, which
can be adapted to fit the specific and unique
needs of this area (place-based – not one size fits
all), concentrating on optimum governance
arrangements to deliver the reform vision.
For the residents of Argyll and Bute, there would
be an expectation that a SAM would improve
the services they receive, or at least mitigate
financial constraints.
Services currently available under existing
frameworks can be, and mostly are, undertaken
locally – in many instances by several public
bodies. However, the strategic decision-making
on their direction and resourcing is often
determined elsewhere and at other times not
practically accountable to the local public. The
concept of a SAM could have the added value of
recognising the importance of local operational
decision-making and delivery, whilst re-aligning
the organisational priorities of those bodies
forming part of the SAM in order to deliver more
effective joined-up services – with the parameters
for that local delivery, in many cases, still being
set by national policy.

Page 7

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Local whole-system decision-making by
accountable decision-makers should result in
improved decisions, as there would be better
local knowledge of what is required and the
existing strengths and weaknesses of the local
system. In addition, the decision-makers would be
accountable to the local communities whom they
serve and which they live within.
Citizens need to know that, and how, they can
influence decision making or they may not fully
take part or even opt out of local democracy.
Local democracy offers the best form of
accountability with detailed scrutiny, analysis and
consideration in a public forum the standard way
of working.  Of course, the electoral opportunity to
remove the decision makers is the ultimate
sanction. A SAM would expand the democracy
and accountability which is inherent in Local
Government to include all services provided
through the SAM or by other agencies with
accountability to the SAM. One of the most
significant criticisms of unelected organisations
and agencies which discharge important public
functions is that they are de facto unaccountable.
The ultimate test of the vibrancy of local
democracy is the willingness of the members of
the community to participate in the democratic
process. If people can interact with, communicate
and believe they can influence the decision-
makers, indeed even be the decision-makers,
they are more likely to take part in the process
that gives the decision-makers democratic
legitimacy. Local planning and delivery of
services under an SAM would provide a
vehicle of opportunity for significantly
expanded democratic participation in the key
decisions affecting communities.
When considering the possibility of better and
more efficient use of declining revenue and
capital budgets, the fact of the Council, NHS
Highland and other potential partners all having
Chief Executives and associated Corporate
Management Teams promotes an obvious
question: is it really necessary, for a population of
87,810, that each of these public sector
organisations has a Chief Executive and
associated management structures, with all the
costs that this entails?
Below that executive level are multiple Finance,
HR, IT and other important internal structures
supporting the public sector within Argyll and
Bute. There are crossovers in those functions that
could produce efficiencies and provide better
value for money at a time of continuing financial
challenge. However, a SAM is not about losing
vital jobs in the public sector, which are essential
to population retention and growth. The
employment opportunities within the area which
arose from previous Local Government
reorganisations would be repeated following the
formation of a ground-breaking SAM, with jobs
and opportunities being better distributed across
Argyll and Bute than at present.
Looking at functions wider than Health and Social
Care, it can likewise be argued that in the context
of Housing, the purpose of stock transfer and the
formation of the Registered Social Landlords
(RSLs) in Argyll and Bute has successfully been
fulfilled. It is therefore now appropriate to consider
the best structure for providing social housing and
the essential role that can play in meeting the
critical objectives of combatting depopulation and
providing economic sustainability and prosperity
for Argyll and Bute’s communities – particularly in
light of the ongoing Housing Emergency in the
area, declared by the Council in June 2023. It
could also be appropriate to consider bringing
together the strategic housing role exercised by
the Council and the operational functions of the
RSLs. A SAM would provide the circumstances
and possible vehicle for doing so.
Argyll and Bute Council was the first local
authority in Scotland to declare a Housing
Emergency. This declaration was intended as a
call to action – envisioned as the catalyst to bring
partners, stakeholders, investors and
communities together to prioritise and commit to
the collective action needed to tackle the housing
shortage in Argyll and Bute. Several causes for
the Housing Emergency have been identified, and
they concern a range of agencies with
responsibility for both social and private housing.
The possibility of bringing those agencies

Page 8

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
together, under the organisational banner of a
SAM, could have potential to be an effective
measure in promoting joint-working and more
effectively tackling the Housing Emergency in
Argyll and Bute.
In relation to the possibility of including the
Further and Higher Education sector within the
scope of a SAM, in an Argyll and Bute context, it
is noted that University of Highlands and Islands
(UHI) are currently undergoing a process of 
transformational activity - examining steps that
they can take to become more integrated as an
organisation – with the possibility of increased
delegation to their areas/campuses. It is noted
that there are currently effective links in place
between a number of the secondary schools in
Argyll and Bute (operated by the Council as the
Education Authority) and UHI Argyll, with co-
location in some instances. It is acknowledged
that there could be scope to develop this
relationship further under a SAM which could
include the Further and Higher Education Sector
– in order to produce further advantages for
learners, and to promote the coordination of
resources.
The challenges facing public funding, both
revenue and capital, coupled with the reducing
workforce, will demand significant changes to the
delivery of public services throughout Scotland,
and intervention at all levels of government is
needed to bring this about before communities
and services are detrimentally impacted even
further. It is always of particular concern in rural
and island communities that models will be
developed with an urban/mainland focus and then
imposed on rural/island areas without
consideration of their particular needs and
opportunities. The development of bespoke,
place-based models, tailored to the unique
needs and circumstances of each area would
help in avoiding that unintended, but
detrimental, outcome.
This is a critical time for Argyll and Bute, the
public sector and the delivery of services on
which communities have come to rely for
many years. Current models are anticipated to
face further strain in the forthcoming years. It
is therefore time to consider alternative
models, to free up resource currently tied into
servicing organisational structures and to
proceed with real, visible, accessible and
accountable empowered government for
areas such as Argyll and Bute. The
advantages could be hugely significant and
could offer enhanced opportunities for
safeguarding public services, enhancing
democratic oversight, making Argyll and Bute
even more attractive as a place to live and
work, whilst stimulating economic
sustainability and reversing depopulation.
Key Principles
As part of the Council’s ongoing exploration of the
possibility of a SAM for the area, one aspect of
this work has been the development of a set of
key/guiding principles to ensure that all parties
are clear from the outset, whilst engaging with
stakeholders, regarding what is on or off the table
in relation to the development of possible SAM
models for Argyll and Bute. These are as follows:
Brand Identity – The NHS brand is nationally
recognised and would have to, in our view,
continue to be prevalent within the context of a
SAM. The SAM would need to consider how the
brand identity is protected whilst articulating the
SAM ‘brand’ in much the same way as HSCPs
have had to accommodate this. With multiple
partners, it could become a ‘house of brands’
which, whilst possible, would need some
consideration to ensure clarity of purpose of the
SAM.
Protection of Professional status – Similar to
the brand identity, the professional roles within
each partner hold a significance in terms of both
identity and professional status. The ambitions of
the SAM would likely include opportunities to
redesign or define new roles that fulfil the tasks
undertaken within existing roles, potentially
including professional roles. The SAM proposals
would need to be clear on the ambitions for the
workforce models and how professional bodies
would be engaged at both a local and national
level.

Page 9

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Professional Governance (including clinical
and care governance) as outlined above, an IJB
model could enable the SAM to expand the range
of partners and retain professional accountability.
It would also enable governance to be enacted
through the IJB and the partner bodies’
governance structures. Any move to a single
corporate governance structure within one partner
would need to consider the legal and practical
implications of creating organisational level
professional roles and governance committees to
fulfil legislative and regulatory requirements.
Staff Terms and Conditions – Any SAM model
which includes moving to a single
employer/corporate structure would require
fundamental changes to the relevant legislation,
as well as the complication of managing national
terms and conditions for NHS staff and other
partners being integrated where national terms
and conditions exist. TUPE would also have to be
considered and whilst this is technically possible,
the practical reality is that staff would most likely
remain on their existing terms and conditions,
unless the alternatives were more favourable.
Single Authority Models –
Options
Against the above-mentioned reforms, Officers
have begun considering potential models for a
SAM in Argyll and Bute. A Working Group has
been established to explore the identified options
in further detail. In preparing the high-level
options thus far, Officers have had regard to a
number of guiding principles, including:
• Recognition that there is a spectrum of
options available.
• A focus on models with the potential to
achieve the most effective outcomes and
benefits for communities.
• Focus on those areas where developed
synergies already exist (such as Health
and Social Care), building on the current
level of integration.
The options for a SAM in Argyll and Bute
considered thus far have been:
Option 1 – Status Quo
This option would be a continuation of current
structures with the retention of the Health and
Social Care Partnership with governance through
the Integrated Joint Board.
In terms of positives, there would be continuity
given that nothing would need to change, no
transfer of staff would be required, and there
would be no change to the current governance
structures.
However, this option does not offer any change,
offers only limited options for shared services
(Health and Social Care only) and efficiency
savings, and there would continue to be the
existing issues around the burden of governance
and delivery of integrated services.
Option 2 – Community Planning Plus
This model would be based on the current
Community Planning Model and would maintain
separate organisations. It would give the
opportunity to pool budgets and share resources,
but employees and structures would remain
separate. It would build upon the provisions of the
Community Empowerment (Scotland) Act 2015.
However, given that the partner organisations
would maintain their independence and separate
governance structures, it is likely that any
integration would be very specific and limited.
Given the number of organisations that could be
involved in this model, it is likely that there would
be a high probability of procedural disputes
arising, meaning that developments could be
delayed if one or more partners were not on
board with a proposal.
Option 3 – Integrated Authority
This model would establish a new elected single
legal entity which would have fully integrated
service budgets (with opportunity for resource
efficiencies and more shared services) and would
be empowered by locally elected status to give
clear and accountable leadership. The Authority
would create specific Boards or Committees

Page 10

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
which would provide the governance and
decision-making structures required to ensure
that resources and services are managed
effectively.
Under this model, the Council would no longer
exist and Council staff (as well as others falling
under the umbrella) would need to be moved over
to the employment of the new Integrated
Authority. This type of model would require a
significant change to structures across most, if
not all, public bodies. It would also require a new
scheme of public sector primary legislation to
implement the model. Nonetheless, there is
greater potential as to the range of public sector
functions that could fall within the scope of such a
model.
If this model were to be explored further, the role
of local democratically elected members would be
a vital component to the decision-making
structure of such an Authority.
Option 4 – Further Empowered Local Boards
The starting point for this model would be through
strengthening the Integration Joint Board (IJB)
and the functions delegated to by the partners
(i.e. the Council and NHS Highland) it under the
Public Bodies (Joint Working) (Scotland) Act
2014. It could initially build on the existing
synergies and effective partnership working that
has been demonstrated thus far between the
Council and NHS Highland.
However, in an Argyll and Bute context, it should
be noted that the maximum functions permissible
under the 2014 Act have already been delegated
to the IJB. As such, in order to build upon the
existing successes of integration in the area, and
to go any further, the 2014 Act would have to be
amended to expand the functions that could be
delegated to the IJB to build upon the current
level of partnership working.
In order to go to the next stage in an Argyll and
Bute context, it might be possible either through
amendment to the 2014 Act, or the enactment of
new primary legislation, to open up the public
bodies and public functions that can be integrated
wider than just health and social care (but with
similar governance structures to the HSCP/IJB) –
for example, a statutory Housing Partnership,
Further Education Partnership, Enterprise
Partnership, etc. However, if new statutory
partnerships and boards are created for all of
those service areas, it is appreciated that this
might result in a complex landscape of statutory
partnerships/boards which could be difficult for
those working within the public sector, and the
wider public, to navigate. Confusion could be
generated as to where certain roles,
responsibilities and powers lie. It may also appear
that additional layers of bureaucracy have been
created.
This model is built upon existing legislation as a
logical starting point, as well as numerous
examples of effective local partnership working as
a starting point.
More strategic alignment amongst the partnership
organisations’ priorities may have potential to
generate a more user-focused approach to
services delivered under this model. It can retain
local accountability, decision-making structures,
and knowledge to allow the circumstances and
issues particular to Argyll and Bute to be
addressed at a local level – according to the
priorities and needs expressed by our local
communities.
Under the current framework, the IJB has its own
set of statutory responsibilities to engage the
public. The IJB is also required by law to preside
over locality planning arrangements, which
prescribe further devolution of power to local
professional and community groups, to ensure
that services develop in line with local need and
circumstances. These functions could be mirrored
in any other statutory boards that would be
established under this model, to ensure
consistency of approach.
However, it should also be noted that under the
current integration arrangements, the Council and
NHS Highland are the partner bodies, but many
of the patient pathways for Argyll and Bute
residents is to the Greater Glasgow and Clyde
Health Board. This arrangement, with its

Page 11

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
perceived barriers, would remain in place initially
under this model.
Option 5 – Single Authority Partnership
A change of the delivery model under the 2014
Act from the current IJB structure to a Lead
Agency arrangement in Argyll and Bute, with NHS
Highland as the Lead Agency, would have the
same benefit (as discussed in the context of other
models) of whole system planning. However, it
would not satisfy the aspiration of local elected
members to hardwire local accountability into the
system of governance. This was also a key
aspect of the Council’s objection to the National
Care Service (Scotland) Bill. Alternatively, the
Council could become the Lead Agency.
However, in these circumstances there is
arguably a greater risk of fragmentation with
secondary care, loss of NHS identity as an
agency, employer and clinical network. To that
end, a traditional Lead Agency arrangement (as
currently envisaged within the 2014 Act) is
potentially highly problematic.
An alternative option could be to consider a
variant of the Lead Agency arrangement under
the banner of a Single Authority Partnership. This
could take effect by conducting a review of the
current Integration Scheme (Under Section 45 of
the 2014 Act), preparing a new Integration
Scheme (under Section 47 of the 2014 Act), and
subsequently through the use of Directions
(issued under the 2014 Act).
Under such a Strategic Lead Agency
arrangement, there would be no transfer of staff –
only functions and resources. Under these terms,
the Health Board would delegate all functions and
resources to the Council (as Lead Agency) which
could then:
• redesign back office and business
functions to secure maximum efficiency
through a process of aggregation (e.g. the
two asset management services coming
together);
• provide direction back to the Health Board
to deliver its functions in accordance with
a Strategic Plan conceived to deliver
maximum functional integration alongside
Council services; and
• Provide direction to the Health Board to
devise operational arrangements that
promote a single delivery agency.
In practice, under such a Single Authority
Partnership (SAP) arrangement, the existing
process for local government elections and
political representation is acknowledged as being
tried and tested, and would offer a suitable
foundation for development to fit the particular
requirements of Argyll and Bute. A Health and
Social Care Board, or Committee – forming part
of the SAP could act as the engine room of health
and social care delivery. This could be populated
in a way which is sympathetic to the principle of
shared accountability – with local Elected
Members, NHS Non-Executive Directors,
professional leads, carers, third sector, etc. – a
similar group to the membership of the IJB at
present. In effect, the Board would become
responsible for the strategic development of
services.
The Health Board would accordingly play a
different role under this governance arrangement.
It would still be accountable to central
Government for use of public funds, and it would
retain its obligations as an employer and for
clinical governance, but strategic matters would
pass to the Health and Social Care Committee
and the SAP.
The Chief Executive of NHS Highland would
maintain oversight of all health services. They
would continue to have a line of sight to the Chief
Executive of NHS Scotland, but would also be
accountable to the SAP for the delivery of
services undertaken by Council employees and
the strategic development of all health and social
care services. Their relationship with the Health
Board would be unchanged.
The Chief Executive of the Council would in effect
function as the principal advisor to the SAP. They
would not have a hierarchical or line management
relationship with the Chief Executive of the NHS
Board. They would ultimately be responsible,
however, for ensuring discharge of functions and

Page 12

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
deployment of resources delegated through the
Integration Scheme.
A key driver of the Verity House Agreement is the
focus on the achievement of better outcomes
locally for individuals and communities by
recognising local differences. A move to a SAP
for Argyll and Bute has potential to build on the
recognised success of joint working which is
already in place via the fully integrated Argyll and
Bute Health and Social Care Partnership, which
operates in an environment where there are
significant challenges - not least around the
geography of the area.
Moreover, the Verity House Agreement’s maxim
of “local by default, national by agreement” can
be embraced to provide an approach to service
delivery through a SAP, delivering innovative
services for our citizens locally taking account of
need, efficiency and economy.  The move
towards greater flexibility in terms of budget and
the removal of “ring fencing” will also allow for
services to be developed and/or procured which
meet the specific local needs of Argyll and Bute’s
residents.
The Verity House Agreement also makes clear
that any exploration in terms of national delivery
models should work on the presumption in favour
of local flexibility. Evidence provided herein in
supporting further exploring this model in
particular strengthens the position for a more
local approach to be taken in respect of Argyll
and Bute. Such a model could allow for the
design and delivery of services for and around
people - which is pertinent in terms of the
proposals.
If the scope and functions of the Partnership is to
be increased beyond health and social care,
amendments to the 2014 Act, or new legislation
may be required.
This model protects the concept of strong local
accountability. Retaining local accountability,
decision-making structures, and knowledge allow
the circumstances and issues particular to Argyll
and Bute to be addressed at a local level –
according to the priorities and needs expressed
by our local communities.
Under the current framework, the IJB has its own
set of statutory responsibilities to engage the
public. The IJB is also required by law to preside
over locality planning arrangements, which
prescribe further devolution of power to local
professional and community groups, to ensure
that services develop in line with local need and
circumstances. These functions would be
transferred to the new decision-making Board
under this model.
Continuing with the current IJB arrangement
retains an additional third public body to sit
between the NHS Board and Council, and as
such, an additional bureaucratic layer. Moving to
the strategic lead agency model as described
above moves the decision-making functions to a
Board within the Council (as the lead agency).
Next Steps
It is important to highlight that the outline of the
potential models within this Paper is a very high-
level articulation of what a deeper partnership
between the Council and NHS Highland might
look like. To progress any further, it would need
both organisational and technical analysis.
In terms of a more detailed examination of a SAM
for Argyll and Bute, and what that may
encompass, a natural starting point is the high
degree of synergies between the Council and the
NHS. If or when a second phase of consideration
and/or implementation is carried out, the Council
may also wish to lobby the Scottish Government
in relation to amending the 2014 Act, or
considering the introduction of new legislation,
which would allow other partner bodies to fall
within the scope of this model (e.g. RSLs, HIE,
etc.) and/or the inclusion of other public sector
functions beyond health and social care. The
inclusion of Community Planning Partners in this
regard could be significant in promoting and
improving outcomes for our communities, as
Community Planning Partnerships are also to
play a key role in delivering the shared priorities
of the Verity House Agreement.

Page 13

Bute • Helensburgh • Islay • Tarbet • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
In terms of the further exploration of the feasibility
of the potential models as outlined within this
Paper, and/or identification of any other
possibilities, the Council’s Working Group are
clear that we are approaching the stage where
external expertise may be required in order to
fully assess the models. This has already been
highlighted to Scottish Government colleagues at
previous meetings. The Council are continuing to
explore the possibility and options for a SAM
generally on a joint basis with Comhairle nan
Eilean Siar, and will require both NHS Highland
and the Argyll and Bute HSCP to continue to
participate meaningfully with the ongoing work. 
25th March 2025