WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer Roads and Neighbourhood 
Infrastructure, Regeneration and Economic Development 
on 21 May 2025 
Subject: 20mph Strategy for West Dunbartonshire Council 
1. Purpose 
1.1 To provide an overview on the process of prioritising and implementing
20mph speed limits across the authority and agree an appropriate strategy. 
2. Recommendations 
2.1 It is recommended that the Committee: 
a) Notes the contents of this report; 
b) Approves the new policy for implementing 20mph streets throughout the
authority; and
c) Notes that a programme of implementation will be developed following
confirmation of sufficient available external funding. 
3. Background 
3.1 A reduction in speed limits has been shown to reduce road collisions and
severity with a person hit by a road vehicle travelling at 30mph seven times
more likely to die than at 20mph. 
3.2 In addition, reduced vehicle speeds improve road safety and lead to
reductions in the number and severity of casualties. There are also benefits
in terms of reduced noise, reduced congestion, more potential for social
interaction and encouragement of active travel. Where widespread 20mph
speed limits have been implemented, the impacts on car and bus journey
times have been shown to be minimal. 
3.3 The Scottish Government are committed to streets safer and through the
Road Safety Framework 2030 aim to introduce 20mph limits across the
country by the end of 2025. 
3.4 West Dunbartonshire Council already has a commitment to the
implementation of 20mph zones around schools, helping to reduce both the
likelihood of incidents and seriousness of any potential accidents which may
occur and have developed the attached (Appendix 1) strategy to introduce
this across the authority.
ITEM 11

Page 2

3.5 In 2016, revisions were made to the Traffic Signs Regulations and General
Directions (TSRGD) and following that, Transport Scotland published revised
guidance on 20mph speed restrictions. This guidance relaxed the criteria for
introducing 20mph limits, allowing them to be considered without traffic
calming where the ‘existing mean speeds are no greater than 24mph’. 
3.6 This relaxation helps ensure that areas where vehicle speeds are below
24mph, can have 20mph limits without the need for costly traffic calming
measures such as speed cushions. This guidance also extended the
definition of traffic calming by permitting the use of repeater signs and 20mph
roundel road markings as traffic calming features. 
3.7 As a result of these changes, it is now possible to introduce widespread
20mph limits on many city roads without physical traffic calming measures.
This approach has been used widely in other Local Authorities and has
resulted in significant cost savings over the traditional approach of providing
traffic calming. 
3.8 Using the above information the Roads and Transportation service have
undertaken an assessment of the roads in West Dunbartonshire to identify
the likely impact of introducing 20mph limits on our road network and have
split these into 3 categories. 
• Green – those locations which would support the introduction of
20mph limits without the need for any supporting speed reduction
infrastructure.
• Amber – those locations where 20mph limits can be implemented but
speed should be monitored after implementation to assess if any
additional measures are required such as speed cushions, speed
tables and chicanes.
• Red – indicates those locations where 20mph can be introduced but
the road would need additional speed reduction measures to support
20mph. 
3.9   In addition, there are some locations which would remain above 30mph due
to the strategic importance such as A and B roads with minimal frontages. 
4. Main Issues 
4.1 To assist officers in implementing the roll out of 20mph limits 26 individual
20mph zones were created across the authority using the RAG assessment,
as well as physical boundaries such as major roads, railways, natural
barriers, and changes in area character. 
4.2 Each of these zones were then prioritised using criteria designed in line with
the principles of the Scottish Transport Appraisal Guidance.

Page 3

4.3 Each zone was evaluated against: - 
• Collision History
• Road Geometry and Engineering
• Existing Speed Limits
• Road User Composition
• Location of active travel routes 
4.4 The scores were then weighted appropriately and averaged across each
zone to calculate an overall score with this score dictating the priority order.
Details of the full scoring system and prioritisation list is provided as Appendix
2 – Technical Note Scoring System. 
4.5 The Scottish Government has an aim of having 20mph limits in place across
the country by the end of 2025 however in line with many other Local
Authorities progress has been dictated by both physical and financial
constraints and competing priorities. 
4.6 The service will aim to prioritise the implementation of 20mph limits within the
defined Amber and Green locations, subject to the statutory TRO process,
however those locations which require additional assessment and speed
reduction measures will take longer to implement.  A programme will be
developed following confirmation of available funding. 
4.7 Existing staff resources are already fully committed on agreed parking and
traffic projects. It is therefore anticipated that additional temporary staff would
be required to progress this project within the anticipated programme. 
4.8 The full introduction of a wider 20mph speed limit network throughout West
Dunbartonshire Council based upon the policy principles set out above and
subject to available funding and additional resource, could be achieved within
3 years providing benefits for communities and reducing the number and
severity of accidents. 
5.  People Implications 
5.1  An additional 1 FTE would be required to support the full delivery of the
strategy.   Recruitment would commence following confirmation of funding. 
6. Financial and Procurement Implications 
6.1  It has been indicated that sufficient funding will be made available by the
Scottish Government for 2025/26 to support Councils in the implementation
of 20mph however no decision has been provided for any future year’s
support.

Page 4

6.2 The service will first seek funding from available external funding streams to
support initial and future roll out. 
The extent of implementation will be determined by the availability of external
funding. 
7. Risk Analysis 
7.1  All traffic orders to support this strategy will be promoted via permanent
orders and whilst it is anticipated the introduction of this strategy will be
generally well received amongst residents there is the potential for isolated
objections for some locations which may impact the delivery times and
proposed budget. 
7.2 Where objections are received, the opportunity exists to promote a temporary
traffic regulation order.  This would allow the zone to be piloted and
monitored in advance of the permanent order. The consultation process for
permanent orders can be continued in a separate process. 
8. Equalities Impact Assessment (EIA) 
8.1  This proposal will help the socio-economically disadvantaged as there are
more likely to be the victims of road traffic accidents. Improves the health and
well-being of our residents by providing safer roads to encourage walking
and cycling. 
9. Consultation 
9.1 As a Scottish Government initiative consultation with appropriate key
stakeholders has been undertaken on a national level. Local consultations
will be undertaken through the statutory traffic regulation order consultation
process. 
10. Strategic Assessment 
10.1 The review sets out actions to support the successful delivery of the strategic  
priorities and objectives of the Council, in particular: 
• Our Neighbourhoods are sustainable and attractive. 
Chief Officer  Gail Macfarlane
Service Area Roads and Neighbourhood
Date:  7 May 2025

Page 5

Person to Contact: Liam Greene, 
Roads and Transport Manager, 
Liam.greene@west-dunbarton.gov.uk 
Appendix 
20mph Strategy 
Technical Note – Scoring System 
Equality Impact Assessment 
Wards Affected: All wards