WEST DUNBARTONSHIRE COUNCIL 
Report by Chief Officer - Roads and Neighbourhood 
Infrastructure, Regeneration and Economic Development 
on 21 May 2025 
Subject:    Winter Plan 2025-2030 
1 Purpose 
1.1 This report presents the Winter Plan 2025-2030 to Committee for consideration. 
The Plan has been reviewed and updated to reflect the Council Budget decisions
for 2025/26 set out within RN09 Phase 2 Hire Vehicles Purchase, RN18 Cease
Footway Gritting and RN31 Reduce Winter Plan. 
2 Recommendations 
2.1 It is recommended that Committee: 
a) Note the contents of this report; and 
b) Approves the adoption of the Winter Maintenance Plan 2025-2030
(Appendix 1). 
3 Background 
3.1 The purpose of the Council’s Winter Plan is to set out the operational
parameters and procedures that will ensure that the statutory obligations are
achieved as set out within Section 34 of the Roads (Scotland) Act 1984.  This
states that a Roads Authority shall take such steps as they consider
reasonable to prevent snow and ice endangering the safe passage of
pedestrians and vehicles over public roads. 
3.2  The aim of the Winter Plan is to ensure the safe movement of pedestrians and
vehicles over as much of the public road network based on the forecasted
weather conditions and the available resources whilst ensuring the safety of
drivers undertaking these activities.   
3.3 The Winter Plan provides the Council response to winter activities on the
public road only. Any other Council owned land would be subject to the winter
maintenance practices of the other relevant Council departments. 
3.4 The maintenance responsibilities for the Trunk Road network lies with
Transport Scotland and are currently maintained by Amey Highways on their
behalf.  
ITEM 10

Page 2

3.5 The Roads and Transportation Service have liaised with neighbouring
authorities in Glasgow City Council, East Dunbartonshire Council, Stirling
Council and Argyll and Bute Council to ensure a consistent treatment method
on all cross-border roads.   
3.6      The Winter Plan has been developed in line with the Well Managed Highways
Infrastructure: A Code of Practice which was developed by the UK Road
Liaison Group to provide guidance on the management of an effective road
maintenance service. 
3.7 The Winter Plan will be reviewed on an annual basis and updated in response
to any issues or improvements that are highlighted over the winter season. 
4 Main Issues 
4.1 The Council has a requirement to set a balanced budget and at the Council
meeting on 5th March 2025 a number of saving options were considered by
elected members. 
4.2 The Winter Plan has been reviewed to reflect the implication of the following
saving options specific to the operation of the Winter Service and considers
the reduction in resource capacity within Roads and Greenspace operatives: 
• RN 18 Reduce Footway Gritting
• RN 31 Reduce Winter Plan 
In addition, the opportunities presented by the following management
adjustment agreed at the December Council has been considered: 
• RN 09 Phase 2 Hire Vehicles Purchase  
4.3 The Winter Plan has been updated in 3 key areas: 
• Carriageway Treatment
• Footway Treatment
• Location and Maintenance of Grit Bins 
4.4  Carriageway Treatment 
The carriageway treatment routes have been reviewed and optimised to
reduce the carriageway primary gritting routes from 6 to 5. 
Residential streets have been retained where main bus routes operate, provide
access to schools and with topographical features such as steep inclines are
experienced.  All other residential roads have been removed from the primary
treatment routes.

Page 3

4.5     Footway Treatment 
Footway gritting operations will no longer be undertaken and this is reflected in
the plan. 
It is recognised, however, that in certain weather conditions such as snow
clearance or prolonged inclement weather some footway gritting activities may
be required. As a result, footway gritting operations will only be undertaken in
response to severe weather, when services are unable to undertake their
normal duties and when resources allow. 
4.6  Grit Bin Policy 
There are currently over 450 grit bins placed across the authority and these
are located to maximise grit bin provision and support residents.   
To aid officers in assessing grit bin location requests the Service has reviewed
the criteria for where these should be placed. Any grit bin request received
over the course of the winter period will be assessed against this criteria to
ensure that the grit bin provision provides a benefit to the most number of
residents.  The Service will assess location specific conditions to determine if a
site requires a departure from the criteria set. 
Through this approach the Service can ensure a consistent approach and
spread of grit bin across the authority minimising the distance that residents
would need to travel to reach a grit bin location. The Service will ensure that
there is a balance between the number of grit bins provided with the volume
that can be reasonably maintained. 
4.7   Phase 2 Hire Vehicle Purchase 
The purchase of 5 gritters will increase efficiency and reliability as the Service
will have more control over accessing vehicles when required.  The vehicles
will be received in advance of the commencement of the winter season
2025/26. 
5 People Implications 
5.1 The Winter Plan considers the implications of the reduction in operational
resources and reduction in capacity. 
This includes a 3FTE reduction in Roads operatives and 4 FTE reduction in
Greenspace operatives.  It also includes consideration of the wider
Greenspace resource reductions. 
6 Financial & Procurement Implications 
6.1 The Winter Plan has been developed in line with the reduction in revenue
funding levels.

Page 4

7 Risk Analysis 
7.1 The Winter Plan has been designed in line with the Well Managed Highway
Infrastructure: A Code of Practice which provides guidance on a risk-based
approach to the delivery of the winter service. 
7.2 The aim of the Winter Plan is to set out our approach to addressing the risks to
our road network due to the effects of snow and ice with the resources  
available. 
7.3 Through the APSE performance benchmarking process the percentage of
network treated is regularly monitored and reviewed.  West Dunbartonshire
Council currently treats 40% of the network as part of our primary gritting
routes which places us 7th in our group of 12 similarly sized authorities. 
8 Equalities Impact Assessment 
8.1 An effective Winter Plan will provide an overall benefit to the wider community
and health and social/economic areas may also benefit. 
An Equality Impact Assessment has been undertaken and is attached to this report
(Appendix 2). 
Equalities Impact Assessments have also been completed in relation to RN09,
RN18 and RN31: 
Assessment 1129 RN09 Phase 2 Hire Vehicle Purchase
Assessment 1190 RN18 Reduce Footway Gritting
Assessment 1209 RN31 Reduce Winter Plan. 
9 Consultation 
9.1 Consultation has been undertaken with internal and external stakeholders to
consider communication, operational needs and partnership working. 
10 Strategic Assessment 
10.1 This report reflects the 2022 – 2027 Strategic Plan and in particular the  
following Strategic Priorities: 
• Our neighbourhoods are sustainable and attractive 
Chief Officer: Gail Macfarlane
Service Area:  Roads and Neighbourhood
Date:   7 May 2025

Page 5

_____________________________________________________________ 
Person to Contact:  Liam Greene    
Roads and Transportation Manager    
liam.greene@west-dunbarton.gov.uk 
Appendices:  The Winter Plan 2025/26 
Equality Impact Assessment 
Background Papers: Equality Impact Assessments 1129, 1190 and 1209 
Wards Affected: All