Democracy Spraffa

Item 10 - Appendix 1

West Dunbartonshire Council · 6 November 2024
Back to Infrastructure, Regeneration & Economic Development Committee — 6 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

West Dunbartonshire Council
Active Travel Strategy
ITEM 10 - APPENDIX 1

Page 2

Document Produced by
On Behalf of

Page 3

Active Travel Strategy 
Foreword
I am delighted to introduce West Dunbartonshire Council’s
Active Travel Strategy.
The strategy recognises the crucial role that active travel can
play in mitigating climate change and empowering people to
make journeys in a more sustainable and affordable way.
We know that car ownership in West Dunbartonshire is at a lower
rate than the national average, providing a real opportunity for
change in our area.
In developing the active travel strategy, we have spoken to
residents and stakeholders and carried out in-depth research
into the journeys currently made.
We want to encourage residents to swap short car journeys for
active travel and it is part of the Council’s role to ensure options
are available to make walking, wheeling or cycling easier and
more attractive.
This active travel strategy aims to identify gaps in connectivity
at a local level and proposes appropriate changes and
upgrades to improve access, understanding and safety,
allowing for active travel to become a mode of choice. 
It is aimed to make transport modes accessible for all, regardless
of income, mobility and location; reduce transport emissions
and congestion to improve air quality; and unlock healthy
lifestyles through active living. It also aims to improve the quality
of public transport and integrate different modes of public
transport, ensuring future resilience by improving connectivity
across the region.
This vision forms the basis of this strategy, ensuring a coherent,
effective, and informed approach aimed at helping West
Dunbartonshire become an area which embraces active travel
for the benefit of everyone. 
Councillor David McBride
Convener of Infrastructure,
Regeneration and Economic
Development

Page 4

Active Travel Strategy 
Contents
Introducing the Strategy .......................... 1   
Part of a National, and Regional Vision.. 6
West Dunbartonshire at a Glance......... 11
Our Travel Needs.................................... 16
Actions and Outcomes .......................... 24
Reference List .......................................... 39

Page 5

1 
Introducing the
Strategy
Why does West Dunbartonshire need an active travel
strategy? In this section we provide necessary definitions and
answer this question to understand why the strategy is being
developed and what our vision is for active travel.
1

Page 6

2  Active Travel Strategy 
Defining Active Travel
What is active travel?
According to Transport Scotland1 “Active Travel refers to journeys made by
modes of transport that are fully or partially people-powered, irrespective of
the purpose of the journey. It includes walking, people using wheelchairs,
cycling (including e-bikes) to name a few. Active travel modes are at the top
of the transport hierarchy and should be prioritised accordingly, with walking
and wheeling considered first, followed by cycling, then the remainder of the
modes, as per the Transport Hierarchy diagram.”
The transport hierarchy1 is a framework used to prioritise different modes of
transport based on their sustainability, accessibility, and overall benefit to
public health and the environment. In Scotland the National Transport Policy
has declared that this hierarchy will be embedded in all policies and will be
used as a tool to address national priorities.
Why an active travel Strategy? 
The West Dunbartonshire Active Travel Strategy outlines our vision and plan for
promoting walking, wheeling, and cycling within our community in alignment
with Scotland's national ambitions. At the heart of this strategy lies an
understanding of both national priorities and local needs. Scotland's push
towards active travel is driven by the recognition of its crucial role in mitigating
climate change, encouraging greener transport, and providing sustainable, affordable and accessible transport for all members of society. As
part of this broader context, West Dunbartonshire Council recognises the importance of active travel and its potential in addressing local
challenges and unlocking wider benefits. By increasing our focus on active travel, we aim to enhance the health and well-being of our residents,
improve air quality, reduce congestion, and contribute to the economic vitality of communities.
An active travel strategy identifies gaps in active travel connectivity at a local level and proposes appropriate changes and upgrades to
improve access, understanding, and safety, allowing for active travel to become a mode of choice. This strategic approach enables us to
identify vital local needs to increase walking, wheeling, and cycling throughout our region.

Page 7

3  Active Travel Strategy 
Benefits of Active Travel 
Improved active travel can have numerous positive impacts on our communities and is associated with a number of benefits including: 2 3  4  5 6  
Transport Scotland2 states
that “integrating active
travel into a commute is a
sustainable way of engaging
in exercise, which is
important as maintaining
consistent levels of physical
activity is crucial to accruing
the associated health
benefits”.
Promotion of
physical
health to
improve
cardiovascular
health, strengthen
muscles, and
maintain a healthy
weight2.
Active travel contributes
to mental well-
being by reducing
stress levels and
improving mood with
users being more
satisfied with this form of
transport than any
other2.
It fosters community
engagement and interaction,
as people share experiences
and connect during their
journeys3.
Active travel reduces
carbon emissions5 and
pollution, helping to mitigate
climate change and create
more sustainable urban
environments.
Walking, wheeling, and cycling
are associated with many
benefits including physical,
mental, social, and
environmental dimensions.
Active travel is a holistic
approach to transportation
that benefits individuals,
communities, and the planet
alike.
Inclusion of step-
free access and
improved walkways
can greatly improve
the experience for
all users and make
transport more
accessible to
everyone 6.
Active travel can be
more cost effective.
According to Sustrans1
“the amount saved for
each mile walked or
wheeled instead of
driven ranges from 19p
in Dunfermline, to 72p
in Glasgow”4.

Page 8

4  Active Travel Strategy 
Strategy Overview  
Strategy Overview 
Guidance published by Transport Scotland1 has been followed to ensure a consistent approach to strategy development. The process followed
to develop these actions and prepare this strategy are shown below: 
Strategy Development 
Following this introduction, the strategy is broken into four sections, each linked to one of the above steps in the process.  
Baseline
Part of a National and
Regional Vision:
A summary of relevant policy
from a national, regional, and
local level providing the
strategic context in which this
strategy will sit.
Data Gathering
West Dunbartonshire at a
Glance:
Provides insight into the existing
geographic, transport and
active travel context based
primarily on desk top study and
census data.
Engagement
Our Travel Needs:
Focuses on the travel needs
and desires of the community
through assessment of all
engagement activities and
through a cycle network plan.   
Action List Development
Actions and Outcomes:
This discusses the development
of the proposed action list and
outlines all actions to be taken
forward including routes,
associated infrastructure,
policy, and behaviour change. 
This stage focuses on
establishing initial aims and
objectives setting the
foundation for the strategy
and includes.
• Policy review.
• Equality Impact
Assessment.
• Engagement Plan. 
This stage develops a basis of
data gathering on transport
needs both within the council
region and across the country.
It includes:
• Desktop analysis including
travel data.
• Site visit to assess existing
infrastructure.
Engagement is essential to
foster dialogue with potential
users and capture diverse
perspectives ensuring that the
needs of communities are
understood. It includes:
• Online survey.
• Key stakeholder meetings.
• In-person engagement.
This stage combines all the
insight gained through the
previous stages and uses this to
develop proposed actions
tailored to the council's
aspirations. Combining the
national vision with local needs
and travel context.

Page 9

5  Active Travel Strategy 
Strategic Vision 
After reviewing national, regional, and local policy, we have
developed our own strategic active travel vision for the region: 
This vision will form the basis of this strategy, ensuring a coherent,
effective, and informed approach aimed at helping West
Dunbartonshire become an area which embraces active travel
and equally benefits from its positive attributes. 
Our vision is to create a future West
Dunbartonshire where walking,
wheeling, and cycling are the
preferred modes of everyday
journeys, fostering a more sustainable,
healthy, vibrant, and inclusive
community.

Page 10

6  Active Travel Strategy 
Part of a National,
and Regional
Vision
This strategy does not stand on its own but forms links with our
wider ambitions within the council, as well as the regional and
national vision. This section draws out some of the key links with
existing policies across all levels of governance.
6

Page 11

7    Active Travel Strategy 
Policy Context
Through an examination of national, regional, and local policies we have ensured that this
strategy aligns with our existing ambitions for both West Dunbartonshire and the broader context.
By thoroughly assessing existing policies at various levels of governance, we aim to ensure that our
strategy harmonises with the overarching priorities of our community. This comprehensive review
allows us to identify themes, address potential conflicts, and leverage opportunities for strategic
collaboration. Through this process, we aim to create a consistent and integrated approach to
active travel that reflects the unique needs and aspirations of our region while contributing to
broader sustainable development objectives.
Several policies at each level impact active travel, key themes of the analysis conducted are
discussed below however summaries of each policy reviewed are outlined in Appendix A.
Across the policy documents reviewed there were common themes which emerged: 
• Climate Change and Carbon Emissions
• Safety
• Economic Growth
• Health and Well-being
• Inclusivity and Equality
Active
Travel
Strategy
National
Policy
Regional
Policy
Local
Policy

Page 12

8    Active Travel Strategy 
National Policy 
At a national level, a growing concern is climate change leading to commitments to
reducing greenhouse gas emissions with the Scottish Government pledging to reach net zero
by 2045. Climate change is now a consideration in most strategies along with well-being and
economic growth. The National Planning Framework 4 (NPF4)7 has three policy themes
which reference climate needs including: sustainable places, liveable places, and productive
places with the intent “to encourage, promote and facilitate developments that prioritise
walking, wheeling, cycling and public transport for everyday travel and reduce the need to
travel unsustainably.” 
In terms of transport, a key document is the National Transport Strategy (NTS2)8 which has
four main priorities. Any initiatives put in place to address these should be informed by the
Sustainable Travel Hierarchy: 
Walking, wheeling, and cycling form the top tiers of the transport hierarchy which has
been recognised by governance at all levels. Scotland’s Active Travel Framework (SATF)9
vision for 2030 is that “Scotland’s communities are shaped around people and place,
enabling walking and cycling to be the most popular modes of travel for short, everyday
journeys”. Active travel is also referred to as walking, wheeling, and cycling which emphasises
the need for equity in active travel provision. Going Further10 (the national accessible travel
framework) emphasises disabled people should be considered at the start of transport
solutions rather than as an afterthought. This is echoed in the SATF’s outcomes outlined to the
right. 
List of relevant National Policies:
• National Planning Framework 4 (2023) 
• National Transport Strategy 2 (2020) 
• Active Travel Framework Scotland (2019)
• Going Further: Scotland’s Accessible
Travel Framework (2016)
• Cycling Framework and Delivery Plan for
Active Travel in Scotland, 2022-2030
• Let’s get Scotland Walking - The National
Walking Strategy (2014)
• Scotland’s Road Safety Framework to
2030 (2021)
• Climate Change Plan 2018-2032
• Climate Ready Scotland: climate change
adaptation programme 2019-2024
• Public Health Priorities for Scotland (2018)
• Cleaner Air for Scotland 2 (2021)
Scotland’s Active Travel Framework
Outcomes
▪ Increase the number of people choosing
active travel.
▪ High quality active travel infrastructure for
all.
▪ Active travel is safer for all.
▪ Active travel is available for all.
▪ Active travel delivery promoted and
supported by range of partners.
Deliver
economic
growth
Improve
health and
wellbeing
Take
climate
action
Reduce
inequalities

Page 13

9    Active Travel Strategy 
Regional Policy
West Dunbartonshire forms part of a greater region made up of nearby
authorities including neighbouring councils, Glasgow City and the Loch
Lomond & The Trossachs National Park. An essential document outlining
the transport ambitions of the area is the Regional Transport Strategy
(RTS)11 published by Strathclyde Partnership for Transport (SPT). This
highlights the transport needs for the region and outlines five key issues,
noted below.
▪ Provide access to all through the various transport modes.
▪ Reduce transport emissions. 
▪ Unlock healthy lifestyles through active living.
▪ Improve public transport quality and modal integration.
▪ Ensure future resilience by improving regional connectivity.
Active travel can contribute to each one of these and the RTS highlights
this by having a policy dedicated to Enabling Walking, Wheeling, and
Cycling. 
This is further emphasised in the Clydeplan development plan12
which vision includes low carbon, connectivity, and health and well-
being, among others. This strategy also lists several locations that should
be a focus for development in the area. 
West Dunbartonshire has six neighbouring authorities. Some of these
already have their own active travel strategies such as Glasgow or East
Dunbartonshire but even those that don’t reference the need for
walking, wheeling, and cycling in local development plans or their
websites. Each has been reviewed with a focus on existing and future
routes connecting them with West Dunbartonshire. 13  14  15  16  17 
List of relevant Regional Policies:
• Strathclyde Partnership for Transport Regional Transport
Strategy (2023-2038)
• Clydeplan Strategic Development Plan (2017)
• Live Park: Loch Lomond & the Trossachs National Park –
Local Development Plan (2017)
• Glasgow’s Active Travel Strategy 2022-2031
• Argyll and Bute Local Development Plan 2 (2024)
• Renfrewshire Local Transport Strategy (2017)
• East Dunbartonshire Active Travel Strategy 2023-2030
Active Travel in Neighbouring Authorities 
▪ Loch Lomond & The Trossachs National Park contains the
West Loch Lomond Cycle path which starts in West
Dunbartonshire connecting Balloch to Tarbet13. 
▪ Glasgow City Council and West Dunbartonshire are
already linked through NCN 7 and NCN 745 and there is
an on-road cycle lane on Great Western Road up to the
council border14.
▪ Part of Argyll and Bute Council’s future plan includes the
development of the Helensburgh to Cardross / West
Dunbartonshire cycleway15.
▪ The Renfrewshire Council active travel strategy includes
the action to link areas like Linwood to the Erskine Bridge
across the River Clyde16.
▪ In Stirling the NCN 7 already connects Balloch to
Drymen17.

Page 14

10    Active Travel Strategy 
Local Policy 
Within our own region, we have the Local Development Plan 2 (LDP2)18 which sets out
our spatial plans for the area. The LDP2 has an underlying theme of Climate Change for
all goals and initiatives, with specific emphasis on the reduction of carbon emissions and
taking a green infrastructure first approach. Our Climate Change Strategy19 includes
sustainable travel as a key programme to inspire change and lists “Improving
Infrastructure for walking, cycling and remote working” as a key investment priority. 
Within the LDP2 there is a spatial strategy which is dived into two focus areas: key
development and regeneration areas (termed Delivering Our Places), and key assets. The
role that transport, and specifically active travel, can play relating to both is in improving
connectivity specifically focusing on:
These are also further related to the council’s vision for the area as specified in the Strategic Plan 2022-202720. The strategic priorities include
improving: 
• Our Communities: Supporting resilient and thriving communities
• Our Environment: Working towards a greener future
• Our Economy: Creating a strong and flourishing economy 
List of relevant Local Policies:
• Local Development Plan 2 (2020)
• Climate Change Strategy (2021)
• Strategic Plan 2022-2027
• Road Safety Plan (2011)
• Our Green Network Supplementary
Guidelines (2015)
Town Centres
• Aimed at creating vibrant and
liveable spaces of which a modal
shift contributes to car free areas in
the city.
• Likewise, active travel should form
part of the links creating a 'network of
strategic town centres’. 
Business and Industry
• Active travel routes should
focus on linking the population
with the economic areas.
• The economy is a key priority
that should aim to address
inequalities. 
Greenspace
• West Dunbartonshire has a large rural area with
multiple green assets with specific goals to
promote health, recreation, and well-being. 
• This has been emphasised in 'Our Green
Network Supplementary Guidelines' which
state the need for active travel links and
provide specific guidance for such initiatives.

Page 15

11    Active Travel Strategy 
West Dunbartonshire
at a Glance
This section provides insight into our region focusing on data collected
from the national census, land use and travel related data, as well as
detailing the current active travel infrastructure in place. 
11

Page 16

12    Active Travel Strategy 
LOCH LOMOND &
THE TROSSACHS
NATIONAL PARK
ALEXANDRIA
DUMBARTON
CLYDEBANK
BALLOCH
Geographical Context 
Key Settlements
West Dunbartonshire is a region characterised by a blend
of urban and rural landscapes. The main towns within the
area are Clydebank, Dumbarton, Alexandria, and
Balloch, each located on the southern and western
edges of the council area, limited by topography. 
Landscape and Leisure 
The central area of the region is dominated by hills and
lochs limiting development but simultaneously providing
an area of natural attraction. Along with the hilly
landscape, water is a significant feature of the region's
geography and attractions. The area is bordered by Loch Lomond and the Trossachs
National Park to the north, and the River Clyde to the south. Additionally, the River
Leven and the Forth and Clyde Canal traverse the central urban areas, enhancing the
scenic beauty and providing numerous recreational opportunities.
Our Neighbours
This region is strategically situated adjacent to Glasgow city, generating
commuter trips to outside of the authority boundary.  In addition to
neighbouring Glasgow City Council, West Dunbartonshire borders several
other councils, including Stirling Council to the northeast, East
Dunbartonshire Council to the east, Argyll and Bute Council to the west,
and Renfrewshire Council to the south, across the River Clyde, with the
Erskine Bridge serving as a vital crossing point.

Page 17

13    Active Travel Strategy 
Existing Active Travel Infrastructure 
21  22 
Core Paths
We already have an established network of core paths as
specified in our Core Paths Plan 21. The plan outlines a system of
local paths aimed at “giving the public reasonable access
throughout their area”22 
West Dunbartonshire already has existing active travel
routes. Key pieces of infrastructure are highlighted below.
These are complemented by some localised provision of
shared use paths and cycle lanes.
Loch Lomond Walking paths
The national park functions under its own authority and
has its own path network dedicated predominantly to
leisure.
NCN Route 7
The NCN 7 runs through most of the region and a
large part of the route runs parallel to a water
course.
NCN Route 745
A limited section of the NCN 745 runs in the
southeast of West Dunbartonshire 
Bowline
This section of the NCN 7 was upgraded and
reopened in September 2021 and acts as a case
study for the region.

Page 18

14  Active Travel Strategy 
Transport Context  
This strategy seeks to provide the most appropriate solutions for West Dunbartonshire. To help achieve this, it is essential to understand the current
context with which our community lives. An extensive desktop study focusing on census23 data and supporting sites such as DataShine24 or
Crashmap25 provides insight into the region. 26  27  28  29  30  31
People of West Dunbartonshire: 
22% of the
population is over the
age of 60.
Scotland’s population is
ageing meaning an
increasing percentage of
the population will be over
65 28. To ensure West
Dunbartonshire is
futureproofing its transport
system active travel should
include “encouraging
older people to engage in
active travel such as
cycling or walking could
have health benefits and
reduce isolation”29 .
According to Transport
Scotland 27 “children and
young families are
disproportionately
affected by unsafe or
inaccessible street design
when compared with
other groups”.
Destinations associated
with young people such as
schools should be
accounted for. 
17.6% of the
population is under
the age of 16.
Women make up 52%
of the population and yet
only 13% cycle to
work. 
Despite making up more than
half the population women
are significantly less likely to
cycle than men and this
reflects national trends 30. In
their study on Travelling in a
Woman’s Shoes 31 Arup found
that “while women view
cycling as good for health,
this is negated by the
perception that it is the
least safe way to travel”.
Active travel should go
beyond physical infrastructure
to ensure users feel safe to
travel.
23% of the population say
their day-to-day activities are
limited by long term health
problem or disability.
Cycling can have additional
benefits for disabled people
related to both their physical and
mental health but “many
disabled people don’t get to
enjoy the amazing benefits of
cycling because of barriers that
are put in their way; be they
physical, attitudinal or
otherwise.”26. Any new or
upgraded active travel
infrastructure or initiatives should
be completed in accordance with
relevant inclusivity guidance to
ensure they are accessible to all.

Page 19

15  Active Travel Strategy 
How are people travelling?  
A third of traffic safety incidents involve pedestrians,
while approximately 10% involve cyclists 25. 
Casualty Hotspots 
Most casualties involving cyclists or pedestrians occur on
main roads such as the A811 in Alexandria or Glasgow
Road in Dumbarton. Clydebank has the most incidents but
has as many on residential streets as on the town’s main
roads. 
Commuter trips are vehicle focused with 64% of work
trips made by car and only 20% and 8% by public
transport and active travel respectively.
On the contrary, education-based trips are completed
on public transport for 30% and 32% by foot and only
26% by private vehicle.
30%
17%
36%
0 - 5km
5 - 10km
10 - 30km
West Dunbartonshire distances travelled by car to
school and work:
Most short distance commuter trips are within West
Dunbartonshire and head towards the centres of Dumbarton
and Clydebank. The shorter distances are prime
opportunities for modal shift to active travel. 
Longer trips out of the region are towards Helensburgh and
Glasgow24. The longer trips could imply a need for greater
public transport integration.
38%
41%
16% 3%
30%
42%
21% 5%
No car or van 1 car or van 2 cars or vans 3 or more cars or
vans
West Dunbartonshire
2011
Scotland 2011
Fewer households in West Dunbartonshire own private
vehicles than the national average, showing an existing
user base for alternative more sustainable travel modes.

Page 20

16  Active Travel Strategy 
Our Travel Needs
Determining the travel needs of those within West Dunbartonshire is
a key component of the Active Travel Strategy. This section seeks to
answer the questions of how people currently travel and what they
wish to see within their community in terms of active travel. This was
achieved primarily through community engagement as well as
analysis of travel movements and needs in the region.
16

Page 21

17  Active Travel Strategy 
Engaging with community and stakeholders 
Effective engagement is central to our desire to deliver an
active travel strategy that reflects the unique needs and
aspirations of communities across West Dunbartonshire. The
development of this strategy was supported by a Stakeholder
Engagement Programme that enabled a two-way process of
dialogue between the council and those engaged with to:
• Identify Active Travel and Behaviour Change issues
and opportunities based on the local area and its
users.
• Share and understand the desires for future
connections across West Dunbartonshire.
• Provide an opportunity to build collaborative and
long-term working relationships.
• Provide a platform to obtain accurate and up to
date information and inform outcomes.
The overall desire of the engagement programme was to
reach as many people as possible and to capture the views of
those living, working, and visiting West Dunbartonshire.
In line with the principles of the Engaging Communities Toolkit32
for West Dunbartonshire, the Stakeholder Engagement
Programme was carried out using a variety of communication
tools and techniques. These included virtual meetings, online
surveys, and in-person events. In this strategy we discuss key
insights from the engagement process, however a full report is
available in Appendix B. 
Promotional posters designed to help maximise our
reach were communicated through various channels
such as social media, email, local newspapers, and
provided in hard copy at engagement events.
Four in-person drop in events were held in March 2024
occurring at local centres in Clydebank, Alexandria,
Balloch, and Dumbarton.
A six-week public survey was held online. QR codes and
links were shared on posters and at all engagement
events and resulted in 122 responses.
Direct engagement with Councillors, education providers
and Community Councils provided a variety of
perspectives and a broader knowledge base of West
Dunbartonshire and its ambition for active travel. 
Briefing workshops consisting of virtual one-on-one
meetings with local, regional, and national stakeholders.
Providing an opportunity to build collaborative working
relationships aimed at improving active travel in the
region.

Page 22

18  Active Travel Strategy 
What you had to say
Public Engagement Events
Community Councils were well represented at these events and emphasised
the active travel focus expected within upcoming local place plans which
they are developing.
The events highlighted specific areas which are not accessible to active travel
users including the Old Military Road to Gartocharn, the A813 to Bonhill, as
well as Kilbowie Roundabout. It was further emphasised that the NCN provides
useful routes, however lighting and crossing facilities could be improved.
Briefing Workshops
These workshops highlighted the need to link the strategy with local place
plans and the 20-minute neighbourhood programme. It was mentioned that a
focus on well-being should be considered.
It was noted that people engage with leisure based active travel within the
Loch Lomond and the Trossachs National Park but will travel a long distance
by car to get there. Improved public transport and active travel integration
may help people visiting to travel sustainably.
Public Survey
The online survey went live in February 2024 which was publicly available for six
weeks. The survey focused on three key areas: Current Travel Habits, Existing
Travel Barriers, and Future Travel Aspirations. The questions aimed to gain
insight to how those within the area currently travel, what they view as barriers
to active travel, and what they’d like to see in the future. The key findings from
the questions in the survey are summarised below.

Page 23

19  Active Travel Strategy 
What are the main methods of
travel in West Dunbartonshire? 
There is a clear tendency within West
Dunbartonshire for private vehicles to be the
mode of choice to most destinations
particularly when travelling to the shops, key
services, or social activities; with over 50% of
respondents traveling by car to these
locations. One destination which is distinctly
different is travel to leisure activities where
69% of survey respondents travel by walking,
wheeling, or cycling. This emphasises the key
role that leisure activities play in the region
and that existing active travel infrastructure
focuses on leisure provision rather than
everyday journeys. 
The community were given the opportunity
to rate the ease at which they can use
different modes of transport. Private vehicles
were most highly rated with 63% of
respondents agreeing it is easy (followed by
train). Most modes were rated as easy to use
more than not, with 47% in agreement
regarding walking. The only mode which
didn’t have a high agreement score was
cycling, with 35% of respondents disagreeing
and only 30% agreeing, making it the least
accessible mode in our region.  
Current Travel Habits
19%
12% 16%
34%
20%
69%
22%
10%
8% 5% 18%
7%
39%
15%
74%
58%
59%
23%
Work Education Shopping Key Services Social Leisure
Active travel
Public Transport
Car
Current Travel Mode
-60% -40% -20% 0% 20% 40% 60% 80%
By walking or wheeling
By cycle
By bus
By car/van
By train
Other
Disagree Strongly disagree Neutral Agree Strongly agree
20% 40% 60%
Ease of Travel

Page 24

20  Active Travel Strategy 
What are our current barriers to active travel in West Dunbartonshire? 
When asked to identify barriers that users currently face when using active travel for their everyday journeys, these were the most
indicated reasons. 
Existing
Travel Barriers
32% of respondents say
aggressive driver
behaviour prevents them
traveling actively.
“I have experienced motorists
driving through red lights at
pedestrian crossings and
drivers on mobile phones
whilst driving.”
Walking and Wheeling 
29% feel unsafe while
walking and wheeling. 
30% quote
inadequate
lighting as the
barrier to travel.
Lack of continuous
footway or path
was noted by 29%
of respondents. 
“There are far too many cars
parked on pavements and
at drop kerbs making using
a wheelchair impossible
without having to go onto
the road to get around the
obstacles”.
23% say cars parked
on the pavement are
biggest obstacle.
The largest concern,
from 54% of
respondents, is the
condition of footways.
Cycling
42% of respondents
say lack of continuous
cycle routes prevents
them from travelling
this way. 
“Designated, joined up cycle
lanes across Dumbarton
would definitely encourage
me and others to cycle more
across the area.”
61% of those who
answered do not own
a cycle.
Poor road condition
was to blame by 45%
of respondents.
“I have suffered too many
punctures and have come
off my bike on more than
one occasion due to the
road conditions”.
“Main cycle path provides
good main artery but roads
unsafe to ride on due to
volume and driver
behaviour”.
Traffic safety concerns
were raised by 28% of
respondents.
39% quote lack of
segregated cycle
lanes as their
deterrent

Page 25

21  Active Travel Strategy 
What infrastructure and travel behaviour initiatives would you want
to see? 
The survey sought to provide insight into what residents and visitors of West
Dunbartonshire want to see from an active travel strategy. A series of possible
infrastructure and behaviour change based initiatives were provided and respondents
selected those that they felt would be most beneficial for the region. Each of these is
listed below with the size of the word indicating its priority. This clearly shows that path
maintenance is the most important initiative needed in the area, followed by the
provision of improved greenspaces, and rest areas along routes. Improved
connectivity and modal segregation were also important to respondents.
No Initiatives 
Path Maintenance 
Improved Connections 
Public Transport Integration 
Lighting 
Modal Segregation 
Better Bus & Train Service
Wayfinding
Rest Spaces  Social Walking Groups 
Motivational Signage 
Greenspace 
Public Art  Cycle parking 
Cycle Training
Continuous Cycle Network
Cycle Repair Access 
Cycle Hire
Organised Rides
Route Information 
Future
Travel Aspiration

Page 26

22  Active Travel Strategy 
STEP 1:
STRATEGIC
CONNECTIONS
GLASGOW
CARDROSS
DRYMEN
Cycle Network Plan 
What is a cycle network plan and why do
we need one?
The creation of a cycle network plan is an important step in the
development of the active travel strategy. Through this process we
can identify where people will want to travel to which allows a
network to be developed that could be provided in the future. This
aspirational everyday journey network connects key locations across
the region, and by being continuous and connected, will help more
people to make the journeys they want by cycle in the future. This
network was used as a starting point to determine routes that can be
taken forward for development as part of this active travel strategy.
The full network plan and process is outlined in Appendix C.
An aspiration to connect destinations
The network plan was developed by adopting a decide-and-
provide approach, meaning that instead of determining where
people currently travel by cycle, an aspirational perspective is taken
to determine where people would want to cycle to and from, if a
connected and safe route network could be provided.

Page 27

23  Active Travel Strategy 
Connecting residents to key
destinations 
Initially key locations across the council area were identified
including schools, retail areas, industry, hospitals, and cultural
points as well as residential areas. These are mapped on page
29 of the appendix. These were clustered into strategic locations
indicated by the circles on the Step 1 map. These were then
linked by the most direct straight line which provides a strategic
overview of where people are likely to want to travel to and
from. Following this, the straight-line connections were
distributed to the existing road and path network using only the
shortest and quickest routes between points resulting in an
aspirational everyday journey network shown in orange the Step
2 map. This process focuses on direct travel for everyday
journeys; however, leisure routes are also an important
component of active travel across West Dunbartonshire and
existing routes including the NCN will still form part of the
network. The blue lines on the map to the left show the addition
of the existing NCN.
Network Planning Tool validation
This aspirational everyday journey network was then validated
using Transport Scotland’s Network Planning Tool (NPT)33 which
uses census data to assess the likely cycle networks needed
across Scotland. The output from the
NPT using the ‘Go Dutch’* scenario
illustrates a similar network.
*‘Go Dutch’ refers to a scenario used by the NPT
which imagines a future where people in Scotland
cycle to a similar degree as those in the Netherlands 
(while accounting for contextual differences)
STEP 2:
ASPIRATIONAL
EVERYDAY
JOURNEY
NETWORK

Page 28

24  Active Travel Strategy 
Actions and
Outcomes
Up until now we have focused on outlining the context and
data collection that has informed this strategy, but this section
looks to the future. Here we take the information we have
collected and use it to aid the development of actions
specific to West Dunbartonshire which will form the basis of a
future where active travel is a safe and convenient option.  
24

Page 29

25  Active Travel Strategy 
Challenges and Opportunities 
There is the opportunity to improve
the inclusivity of active travel within
West Dunbartonshire to ensure it is
suitable of all users.
Tourism is an attractor for the region
with Loch Lomond and The Trossachs
National Park drawing in visitors from
within and beyond West
Dunbartonshire. This provides an
opportunity to encourage sustainable
tourism. 
Many members of the
community face the
challenge of having
limited access to
cycles. 
There is the opportunity to
actively benefit from local
knowledge by ensuring that
community involvement is
embedded in future work.  
The upkeep of existing
infrastructure can be
improved in places,
therefore there is an
opportunity for prioritised
maintenance standards. 
Active travel infrastructure exists
across West Dunbartonshire
already, but there is a need for
improved connectivity
between local and regional link  
Use of active travel
infrastructure can be
hindered by safety
concerns which limits
where, who, and when
people are willing to travel.
For many users the quality of active
travel infrastructure is a barrier to
use with improved quality of both
the infrastructure and supporting
facilities essential to promoting
further use.
WDC supports various travel
modes including active travel and
public transport with the potential
to improve inter-connectivity
between modes.

Page 30

26  Active Travel Strategy 
Strategic Objectives 
Throughout the policy review, engagement, and data analysis
several key themes have become clear. These themes provide
underlying ambitions from a national perspective and are
echoed by the communities within West Dunbartonshire itself. 
Informed by this, six key objectives were established which will
form the basis of proposed actions suggested in this section of
the strategy. The development of these objectives began with
an analysis of existing policies in West Dunbartonshire as well as
wider policy goals. The engagement process was then crucial
in understanding the perspectives and priorities of the
community members, as it provided valuable input into the
type of objectives that were deemed important by the local
population. The engagement process helped identify key
themes and areas of focus that resonated with the community
members. As a result of this iterative process, the objectives of
Safety, Inclusivity, Climate Impact, Education, Health, and
Connectivity were identified.
These objectives were developed to address the ambitions for
active travel in the region, ensuring that the strategy is
responsive to the needs and aspirations of the local
population. As a result, each action proposed aligns with at
least one of the objectives listed alongside. 
Connectivity
Connect key land
uses and destinations
via a coherent active
travel network, taking
advantage of public
transport connections
as well as blue-green
infrastructure
improvements. 
Inclusivity
Ensure inclusive and
equitable access to
active travel for all.
Including people
with health
conditions, those
with different socio
and economic
needs, and the
elderly. 
Education
Raise awareness of
the benefits of
active travel and
promote
opportunities to get
involved and
reduce conflict
between users. 
Climate
Impact
Encouraging active
travel to be the
preferred mode for
short everyday
journeys. 
Safety
Improve actual and
perceived safety for
those travelling
actively, including
children, women,
and ethnic minority
groups. 
Health
Promote active
travel for individual
health gains,
including mental
wellbeing.

Page 31

27  Active Travel Strategy 
Action Plan
Using the evidence gathered throughout the strategy
development process, we have developed a comprehensive
action plan which reflects the needs and wants of the
communities across West Dunbartonshire. This plan proposes
several different measures aimed to help make active travel a
genuine mode choice within West Dunbartonshire. The plan
considers the evidence gained during the data gathering stage
which was reviewed and compiled in tandem with the valuable
insight obtained from the engagement exercises from those who
live, work, or visit West Dunbartonshire. This helps provide a clear
link to the strategy development stages undertaken and
provides confidence that the actions reflect the needs and
wants of the community. Stakeholder comments were also
reviewed alongside the cycle network plan which revealed that
there was crossover from both data sources. The proposed actions aim to meet the objectives outlined above ensuring that the vision of the
strategy is met. To highlight where the actions meet the objectives, a colour code has been used with each action associated with one or more
objective.
The actions proposed fall under four categories covering a wide range of possible solutions from infrastructure to policy changes. These are as
follows: 
Safety Inclusivity Climate Impact Education Health Connectivity
Action Plan
Policy
Review
Local
Context
Community
Engagement
Cycle
Network
Plan 
1  Routes
Corridors that connect areas
and provide improved
active travel infrastructure.
2  Associated
Infrastructure
Individual infrastructure
improvements or
programmes.
3  Policy
Changes to policy that
positively impact active
travel.
4  Behaviour
Change
Measures that support the
uptake of active travel.

Page 32

28  Active Travel Strategy 
Routes 
All the interventions in the action plan are important and should be considered a priority to implement. However, the actions that take the form
of routes have been put through a prioritisation process. 
Scoring Process
To understand where to first concentrate efforts to realise the implementation of the routes, a Multi Criteria Assessment Framework (MCAF)
methodology has been used. This approach assists in understanding which routes could have the greatest impact.
The scoring criteria used has been developed to reflect factors that can be quantitatively assessed at this stage. Throughout the development
of the assessment criteria, the strategy vision was considered to ensure that the categories align. The MCAF scoring criteria is outlined below. A
high, medium, or low score is assigned as the route is assessed under each of the criteria. The detailed assessment of each route is outlined in the
Appendix D. A total score for each route is calculated by combining the results of each criteria and those scoring highest are deemed to be the
greatest priority to implement. 33  34 
Does it link to key
land uses?
This is measured by
examining whether
there are key land
uses along the route
such as schools,
services, as well as
future development
areas. 
What is the current
level of cycle
friendliness?
This is measured using
NPT Scotland 33 using
the Cycle Friendliness
assessment option. 
What is the
stakeholder/
public
appetite like?
This is measured
through examination
of comments
received during the
engagement
exercise.
What will the
impact be on
areas of socio-
economic
deprivation?
This is measured using
the Scottish Index of
Multiple Deprivation
(SIMD) 34
What is the
potential level of
users?
This is measured using
Network Planning Tool
(NPT) Scotland 33 with
the ‘Go Dutch’ option
activated.
MCAF Criteria
Does it link to
public transport?
This is measured on
the proximity of routes
to railway and bus
stations.

Page 33

29  Active Travel Strategy 
Ref. Title Rationale Score Objectives
R-01 Kilbowie Road – Kilbowie
Roundabout to Clydebank
Kilbowie Road forms a north/south connection between
central Clydebank and areas to the north, linking key land
uses. The route also provides access to Clydebank and Singer
railway stations as well as the park & ride. The route currently
has a low cycle friendliness score and passes through areas of
deprivation.
28 ●●●●
R-02 A813 - Balloch to Bellsmyre
This route connects Balloch to Bellsmyre passing through Bonhill
and close to the Vale of Leven Industrial Estate. There is a high
level of potential users and good connectivity to key land uses.
The route currently has a low cycle friendliness score and
passes through areas of deprivation. The route provides a key
north/south connection.
26 ●●●●
R-03 B857 & A812 - Balloch to
Dalreoch Station
This route connects Balloch to the edge of Dumbarton passing
though Renton and Alexandria on route. There is a high level of
potential users and good connections to public transport. The
route also passes through areas of deprivation. The route
provides a key north/south connection.
26 ●●●●
R-04 Glasgow Road - Dalreoch to
Milton
Glasgow Road forms a key spine through Dumbarton and this
route connects Dalreoch and Dumbarton railway station as
well as providing access to key land uses. It currently has a low
cycle friendliness score and has a medium level of potential
users.
26 ●●●●
R-05 A811 - Balloch to Drymen
This route, while rural, connects settlements such as Gartocharn
with Balloch. The route links to Balloch railway station, as well as
key land uses such as Gartocharn Primary School and retail.
The route currently has a low cycle friendliness score and was
mentioned by stakeholders as a route they’d like to see
improved.
24 ●●●●

Page 34

30  Active Travel Strategy 
Ref. Title Rationale Score Objectives
R-06 A814 - Dalreoch Station to
Cardross
This route provides a connection to Dumbarton for those living
in Westcliff and Castlehill and connects to Dumbarton Joint
Hospital. The route provides access to Dalreoch railway station
and passes through areas of deprivation.
24 ●●●●
R-07 A82 – Bellsmyre to Drumchapel
The A82 is a key transport route but currently has a low cycle
friendliness score due to the vehicular nature of the road. It
was mentioned several times during engagement as having
potential for active travel movement but not in its current form.
The route connects key land uses, areas of medium
deprivation, as well as the park and ride.
24 ●●●●
R-08 Glasgow Road – Clydebank to
Yoker
This route provides a connection from Clydebank towards the
Yoker area of Glasgow. The route passes through areas of
deprivation and currently has a low cycle friendliness score. It
connects key land uses and facilitates access to Clydebank
and Yoker railway stations.
24 ●●●●
R-09 Renton to Bellsmyre via Vale of
Leven Industrial Estate
This route provides an east/west connection passing through
the Vale of Leven Industrial Estate where there are several key
land uses, and employers. The route connects to Renton
railway station and passes through areas of deprivation.
22 ●●●●
R-10 Mountblow Road – Mountblow to
Dalmuir
This route connects Dalmuir to the A82 and areas to the north.
It runs through areas of deprivation and serves as a useful
north/south connection. The route passes Dalmuir Public Park
as well as Kilpatrick School.
22 ●●●●
R-11 Townend Road - Bellsmyre to
Dumbarton
Townend Road serves as a north/south route linking
Dumbarton Central railway station to the north of the town. It
also links to the leisure centre and Braehead Primary School.
The route passes through areas of medium deprivation, and it
was mentioned several times during engagement.
20 ●●●●
R-12 Dumbarton Road – Bowling to
Clydebank
This route connects to Bowling railway station as well as
Kilpatrick station while heading towards Clydebank. The route
currently has a low cycle friendliness score. However, the
potential level of users is lower than other routes.
20 ●●●●

Page 35

31  Active Travel Strategy 
Ref. Title Rationale Score Objectives
R-13 Faifley to Kilbowie Road
Roundabout
This route has a high level of potential users; however, it
received limited mentions during engagement. The route has a
low cycle friendliness score and passes through areas of
medium deprivation.
20 ●●●●
R-14 Duntocher Road – Kilbowie
Roundabout to Dalmuir
Duntocher Road serves as a north/south link between Dalmuir
and areas to the north. The route links to Dalmuir railway station
and passes Brookland Nursery. The route passes through areas
of medium deprivation.
20 ●●●●
R-15 Erskine Bridge – Old Kilpatrick to
Erskine
This route connects Old Kilpatrick to Erskine but has a low cycle
friendliness score. Land use connections are limited, and it
passes through areas of medium deprivation.
20 ●●●● 
The following page contains maps with the 15 routes along with their respective score. The green route is that which scored the highest and so
should be prioritised as it has been deemed to be most beneficial to the community. The map indicates that the route-based actions offer a
good coverage throughout the region, connecting key areas within West Dunbartonshire, but also provide onward connections to destinations
outside of the council area.

Page 36

32  Active Travel Strategy 
ALEXANDRIA 
DUMBARTON
BALLOCH
CLYDEBANK  
Route Map 
Alexandria
&
Balloch
Dum
barton
Clydebank

Page 37

33  Active Travel Strategy 
Associated Infrastructure
Associated infrastructure measures are those which can act as standalone measures but also complement and enhance the routes outlined
above. This helps to ensure that these projects can be progressed independently of each other, but yet when brought forward in tandem
provide even greater benefits for active travel users. 
Ref. Title Barrier/Issue Description Objectives
In-01 Cycle
Parking
Comments made during engagement
that cycle parking infrastructure is
lacking
Undertake a review of cycle parking locations and type
to ensure they are secure and appropriately placed to
meet demand ●●●
In-02
Cycle
Maintenance
Stands
Cycle maintenance stands are
damaged or removed
Ensure that existing cycle maintenance stands are in
good condition and investigate where additional
stands could be placed ●●●
In-03 Condition
Audit
Comments made during engagement
suggest there are instances where
footway widths are inadequate
Carry out condition audits to understand where
improvements need to be made in regard to footway
widths, along with surface quality ●●●●
In-04 Wayfinding
Audit
Comments made during engagement
that active travel route signage is
lacking
Carry out a wayfinding audit to refresh and install
active travel signage with route timings and directions ●●●●
In-05 School Safety
Measures
Comments made during engagement
that children/parents not confident
enough to use active modes to travel
to school
Continue to review and implement road safety
measures around schools which aid active travel such
as zig-zag lining, speed limit reductions, restricted time
road closures
●●●●
In-06 Accessibility
Audits
Comments made during engagement
that walking infrastructure
improvements are required to ensure
they are suitable and inclusive for all
users
Undertake, in collaboration with local access groups,
accessibility audits to understand where improvements
need to be made in regard to dropped kerbs and
tactile paving, lighting, crossing provision, street
furniture, surveillance, and rest areas
●●●●

Page 38

34  Active Travel Strategy 
Ref. Title Barrier/Issue Description Objectives
In-07
National Park
Sustainable
Integration
Encourage public transport and
active travel use when accessing the
national park
Investigate solutions to better integrate Balloch
railway station and active travel infrastructure to
encourage sustainable trips to Loch Lomond and the
Trossachs National Park
●●●●
In-08 NCN
Maintenance
Comments made during engagement
that the NCN is poorly maintained
Collaborate with Sustrans to ensure that NCN Route 7
is maintained to a good standard ●●●
In-09
Helensburgh
to
Dumbarton
Cycle Route
Comments made during engagement
regarding lack of progress on
Helensburgh to Dumbarton Cycle
Route
Collaborate with delivery partners to ensure that
ongoing development of this route progresses
●●●
In-10
NCN7 – Atlas
Street/Clyde
Street
On road section of NCN7 identified by
Sustrans for upgrade
Collaborate with Sustrans to ensure that this section of
the NCN earmarked for improvement is taken forward ●●●
In-11
Balloch to
Tarbet Active
Travel Route
Comments made during engagement
that the shoreside route is disjointed
Improve and extend route on the western shore of
Loch Lomond to serve communities as well as
promote leisure trips
●●●

Page 39

35  Active Travel Strategy 
Policy
Policy measures are those which seek to foster positive change for active travel users from the onset. By introducing a change of policy, the aim
is to create a culture where active travel is considered at a wider scale and becomes embedded in other council functions such as new
development.
Ref. Title Barrier/Issue Description Objectives
P-01 Footway Parking
Strategy
Site visit indicated that
vehicles are parking on the
footway
Develop footway parking strategy  ●●●●
P-02 Maintenance
Strategy
Comments made during
engagement that footway
and cycleway
infrastructure is poorly
maintained
Develop dedicated maintenance strategy for active travel
infrastructure ●●
P-03 Local Place
Plans
Comments made during
engagement for the need
to understand the active
travel wants of the
community
Consider the findings of the Local Place Plans developed by
Community Councils and local groups. ●●●

Page 40

36  Active Travel Strategy 
Behaviour Change 
To support our future vison of making walking, wheeling, and cycling the preferred mode of
transport for everyday journeys, we aim to continue to recognise the
importance of targeted behaviour change. We currently promote active
travel through initiatives such as travelling green and Bikeability and our
aim is to expand our behaviour change programmes through the
development of this strategy. 
Behaviour change programmes can be a crucial supporting measure that
enables usage of new or existing infrastructure to be maximised.
Implementing behaviour change programmes across West
Dunbartonshire will help create a clear pathway for walking, wheeling,
and cycling, motivating a wider range of people to access opportunities
to travel actively for leisure, work, and study purposes. 
Our ambition is to encourage and support our residents and visitors to take
up active travel so that they can feel the benefits of travelling actively. 
Community engagement has taken place throughout the development
of this strategy, helping to bring people together and provide a platform
for them to share ideas, and in doing so aid the identification of a
comprehensive set of behaviour change interventions. The engagement
undertaken acts as a baseline and any future delivery of behaviour
change measures should be co-designed, have key stakeholder buy-in,
and capture inclusive initiatives that meet the needs of our local
communities.
By working with partners, we will help make walking, wheeling, and
cycling more attractive and available through the delivery of measures
identified in this strategy. 
What do we
mean by
Behaviour
change?
Behaviour change
programmes seek to
engage communities,
schools, businesses,
and other users
through a combination
of interventions to
enable people to
travel more sustainably
by providing them with
the opportunity,
knowledge and skills to
do so.

Page 41

37  Active Travel Strategy 
Com
m
unity
School
Tourism
Ref. Title Barrier/Issue Description Objectives
BC-01
Road User
Awareness
Programme
Comments made during
engagement of
inconsiderate driver
behaviour
Support awareness raising campaigns to promote mutual
respect between all road users ●●
BC-02 Shared Use
Path Etiquette
Comments made during
engagement of poor NCN /
towpath user etiquette
Inform and encourage respect through awareness raising
campaigns between all users of shared use paths such as
the canal towpath and NCN sections ●●●
BC-03
Community
Active Travel
Initiatives
Comments made during
engagement of a lack of
active travel uptake within
the community
Continue to offer programmes that encourage active
travel uptake such as Love to Ride and explore
opportunities to develop this to cover walking ●●●●
BC-04 Ziggy Walking
Programme
Improving active travel
awareness from a young
age
Continue encouraging walking through Walk to Nursery
Week ●●●●●
BC-05 School Travel
Plans
Improving active travel
awareness from a young
age
Encourage schools within the local authority to keep their
travel plans up to date. ●●●●
BC-06 Promote
Active Tourism
Comments made during
engagement of the high
volume of vehicles
accessing the Loch Lomond
and Trossachs National Park
Work with the Loch Lomond and Trossachs National Park
Authority to encourage active tourism through ways to
access the park by active modes, as well as opportunities
to explore the park actively once visitors have arrived
●●●

Page 42

38  Active Travel Strategy 
Monitoring and Evaluation Plan 
To ensure the success of the active travel strategy, it is crucial to ensure that regular monitoring and evaluation is carried out. By doing so, the
impact of the active travel strategy’s objectives and actions can be reviewed, and progress tracked to ensure that positive change is occurring
within West Dunbartonshire.
The objectives within the strategy form the basis of the monitoring and evaluation review. From here, indicators can be used to benchmark
against, and provide a springboard for change using internal council data as well as external sources. The figure below provides further detail on
the indicators, data sources, and outcomes to be used as part of the monitoring and evaluation process and further detail is included in
Appendix E.  
Objective
This references the West
Dunbartonshire’s Active
Travel Strategy
Objectives: Climate
Impact, Connectivity,
Health, Inclusivity,
Education and Safety 
Indicator
The indicators outline
quantitative and
qualitative attributes
associated with the
specific objectives such
as “air and noise pollution
levels” or “the
percentage of people
who travel to work or
study by active modes” 
Data Source
A list of data sources
which contribute to the
measurement of
applicable indicators. This
includes both existing
data sources such as the
School Hands Up Survey
or Scottish Census as well
as suggested future data
collection such as Active
Travel Surveys and Post
Construction Audits 
Definition of Success
The level to which the
strategy has been
successful in reaching the
objectives is based on
defined levels of success
such as "Active travel
becomes attractive as a
mode of travel in the area
for everyday journeys." or
"users feel safer when
moving around"

Page 43

39  Active Travel Strategy 
Reference List 
1 Transport Scotland, Sustrans, Tactran, Edinburgh City Council, Public Health Scotland, Cycling Scotland, Society of Chief Officers of Transportation in Scotland
and Paths for all (2023) Active travel Strategy Guidance.
2 Transport Scotland (2023) Literature Review: Best practice in active travel and its associated benefits
3 Stroope, J (2021) Preventive Medicine: Active transportation and social capital: The association between walking or biking for transportation and community
participation 
4 Sustrans (2024) Walking and Cycling Index 2024: Scotland Report
5 Sustrans (2023) Reaching Net Zero: the Role of Active Travel
6 Wheels for Wellbeing (202) A Guide to Inclusive Cycling (4th Addition)
7 Scottish Government (2023) National Planning Framework 4
8 Scottish Government (2020) National Transport Strategy 2
9 Transport Scotland (2019) Scotland’s Active Travel Framework
10 Transport Scotland (2016) Going Further: Scotland’s Accessible Travel Framework
11 Strathclyde Partnership for Transport (2023) The Regional Transport Strategy for the west of Scotland 2023-2038
12 Clydeplan (2017) Strategic Development Plan
13 Loch Lomond & the Trossachs National Park (2017) Live Park: Local Development Plan 2017-2021
14 Glasgow City Council (2024) Cycling Information – interactive map
15 Argyll and Bute Council (2024) Helensburgh, Cardross and Dumbarton Cyclepath Update
16 Renfrewshire Council (2017) Renfrewshire Local Transport Strategy
17 Sustrans (2024) Route 7
18 West Dubartonshire council (2020) Local Development Plan 2
19 West Dunbartonshire (2020) Climate Change Strategy
20 West Dunbartonshire Council (2022) Strategic Plan 2022 – 2027 
21 Land Reform (Scotland) Act 2003, Section 17
22 West Dunbartonshire Core Path Plan 
23 Scotland’s Census (2011) Scottish National Census (data used from both Scotland and West Dunbartonshire)
24 National Records for Scotland and Scotland’s Census (2011) DataShine: Scotland Commute
25 Crashmap.co.uk (2022) CrashMap Data: Great Britain 1999 - 2022 (verified)
26 Wheels for Wellbeing (202) A Guide to Inclusive Cycling (4th Addition) 
27 Designing for children and Young people (showcase-sustrans.org.uk)
28 Scottish Government (2021) A Scotland for the future: opportunities and challenges of Scotland's changing population
29 age_friendly_places_guide.pdf (ageuk.org.uk)
30 Sustrans (2024) The case for gender budgeting in active travel

Page 44

40  Active Travel Strategy 
31 Arup (2020) Travelling in a Woman’s Shoes: Understanding Women’s Travel Needs in Ireland to Inform the Future of Sustainable Transport Policy and Design
32 West Dunbartonshire Council (2017) Engaging Communities Toolkit: A practical Guide to consultation and Engagement 
33 Network Planning Tool Scotland (NPT) (2023) NPT Scotland
34 Scottish Index of Multiple Deprivation (2020) SIMD (Scottish Index of Multiple Deprivation) 
All photographs courtesy of AtkinsRéalis

Page 45

West Dunbartonshire Active Travel Strategy
Appendix

Page 46

Contents
Appendix A. Policy Review................................................................................................................................................................................................................................ 1
Appendix B. Engagement Report ................................................................................................................................................................................................................... 13
Appendix C. Network Plan............................................................................................................................................................................................................................... 27
Appendix D. Multi-criteria Analysis ................................................................................................................................................................................................................ 35
Appendix E. Monitoring and Evaluation Plan ............................................................................................................................................................................................... 39
Appendix Reference List ....................................................................................................................................................................................................................................... 44

Page 47

Appendix page 1  Active Travel Strategy 
Appendix A.  Policy Review  
Appendix page 1

Page 48

Appendix page 2  Active Travel Strategy 
A.1.  Introduction 
This technical note provides a summary of the policy review
exercise undertaken in support of the development of the
active travel strategy (ATS). The policy review is an
important step in the ATS development process as it sets
the scene for the policy environment the ATS will sit within.
From the review, key themes have been identified which
are consistent throughout policies at all levels of
governance signifying their importance and relevance. The
latter section of this technical note examines these themes
and, from them, proposes several objectives. These
objectives should be incorporated into the ATS and steer its
development, informing the engagement process as well
as the interventions and actions which will be put forward
in due course. However, the objectives proposed should be
reviewed throughout the ATS development process.
Specifically, they should be examined after the
engagement process and, if required, be amended to best
reflect the needs and voices of those who live and work in
West Dunbartonshire.
A.1.1.  Policies Examined
Several policies were assessed to understand the aims and
objectives of policy documents relevant to active travel.
This policy examination was conducted at a national,
regional, and local scale to understand what the recurring
themes are and understand the policy environment the ATS
will sit within. The graphic to the right outlines the policies
that have been examined.
National
•National Planning Framework 4 (2023)
•National Transport Strategy 2 (2020)
•Active Travel Framework Scotland (2019)
•Going Further: Scotland's Accessible Travel Framework
(2016)
•Cycling Framework and Delivery Plan for Active Travel in
Scotland, 2022-2030
•Let’s get Scotland Walking - The National Walking
Strategy (2014)
•Scotland’s Road Safety Framework to 2030 (2021)
•Climate Change Plan 2018-2032
•Climate Ready Scotland: climate change adaptation
programme 2019-2024
•Public Health Priorities for Scotland (2018)
•Cleaner Air for Scotland 2 (2021)
Regional
•Strathclyde Partnership for Transport Regional Transport
Strategy (2023 – 2038)
•Clydeplan Strategic Development Plan (2017)
•Live Park: Loch Lomond & The Trossachs National Park -
Local Development Plan (2017)
•Glasgow Active Travel Strategy 2022-2031
•Argyll and Bute Local Development Plan 2 (2024)
•Renfrewshire Local Transport Strategy (2017)
•East Dubartonshire Active Travel Strategy 2023 - 2030
Local
•Local Development Plan 2 (2020)
•Climate Change Strategy (2021)
•Strategic Plan 2022-2027
•Road Safety Plan (2011)
•Our Green Network Supplementary Guidelines (2015)

Page 49

Appendix page 3  Active Travel Strategy 
A.2.  National Policy
National policy sets the scene for the country as a whole and provides a framework for the direction of policy at more local scales. In the
context of the ATS, the main national policy documents examined include: 
Table A-1 below outlines the key objectives of the relevant national policy along with the implications this may have on the ATS.
Table A-1: National Policy Summary
Policy  Key Objectives  ATS Implication 
National Planning
Framework 4
(2023)i
National Planning Policy 
Local Development Plans should support the principle and development
of 20-minute neighbourhoods (places where people can meet the
majority of their daily needs within a reasonable walk, wheel or cycle of
their home. The concept can be adjusted to varying geographical
scales. 
Central Scotland Green Network.  
Creation and connection of green infrastructure in Central Scotland
including active travel path networks which will include but be denser
than the National Cycle Network. 
National Walking, Cycling and Wheeling Network. 
Any new/and or upgraded routes for walking, cycling and wheeling that
help create a national network. 
The 20-minute neighbourhood concept is
very applicable to the ATS through ensuring
that enabling measures are in place to
realise this aim. 
National Transport
Strategy 2 (2020)ii 
The NTS2 vision has four priorities:  
• Reduce inequalities, 
• Take climate action, 
• Deliver economic growth,  
• Improve health and wellbeing. 
These are all relevant to the ATS. 
The document includes the Sustainable Travel Hierarchy and states that
“We will design our transport system so that walking, cycling and public
and shared transport take precedence ahead of private car use”. 
This hierarchy puts active travel at the top meaning the actions put
forward in the ATS should take precedence over other modes. 
The actions in the ATS should align with the
four priorities included in NTS2. 
Active travel measures should be designed
such that active travel is prioritised over
planning for the private car.

Page 50

Appendix page 4  Active Travel Strategy 
Policy  Key Objectives  ATS Implication 
Active Travel
Framework
Scotland (2019)iii
The Active Travel Framework sets out Scotland’s vision for the future of
active travel across the country. It establishes high level outcomes and
indicators to improve, develop and monitor active travel in Scotland. This
includes 5 strategic objectives: 
• Reduce pollution and carbon emissions,
• Deliver liveable communities,
• Improve health and safe travel,
• Reduce inequalities in areas like employment, service and leisure,
Support sustainable economic growth 
This framework promotes active travel across
Scotland. At all levels of this framework it
references the need for active travel to be
promoted at a local level through local
policy. The ATS will directly fulfil some of these
objectives
Going Further:
Scotland’s
Accessibility
Travel Framework
(2016)iv
The purpose of the framework is to ensure disabled people’s rights are
reached by removing transport barriers and including disabled people in
the work to do so. This framework was set out to ensure the rights of
disabled people are met as per the United Nations Convention on the
Rights of Persons with Disabilities (the Convention). Four outcomes of this
frameworks vision are: 
• Ensure successful door-to-door journey for all users,
• Involve disabled users in the design, 
• All involved in transport delivery have the capacity to provide
travel information to disabled users,
• Ensure safety and security for disabled users.
Although most of this framework is in relation
to public transport, it does state that active
travel can encompass this by “supporting
people through training and equipment to
engage fully in active travel”.
Cycling
Framework and
Delivery Plan for
Active Travel in
Scotland, 2022-
2030 (2022)v 
The national cycling policy with an associated delivery plan which
highlights: 
“The top priority for the achievement of our vision is for more dedicated,
high quality, safe cycling infrastructure delivered by effective resourcing
ensuring fair access and supported with training and education.” 
Actions in the delivery plan include: 
Build and maintain a dense, coherent
network of connected cycling infrastructure
in every town and city that is separate from
traffic and integrated with public transport,
and rural routes that link to these networks
and interface with the trunk road network
and NCN. 
Ensure investment in the creation of cycling
infrastructure integrated with public transport
in settlements, and inter-urban / rural routes
that link to these networks.

Page 51

Appendix page 5  Active Travel Strategy 
Policy  Key Objectives  ATS Implication 
Let’s get Scotland
Walking - The
National Walking
Strategy (2014)vi
The three strategic aims of the National Walking Strategy are: 
• Create a culture of walking where everyone walks more often as
part of their everyday travel and for recreation and well-being. 
• Better quality walking environments with attractive, well designed
and managed built and natural spaces for everyone. 
• Enable easy, convenient, and safe independent mobility for
everyone. 
The ATS should cater to walking and consider
the enabling factor of the low economic
threshold to entry. 
The health implications for the individual as
well as the environment are well understood
and should be emphasised in the ATS. 
Scotland’s Road
Safety Framework
to 2030 (2021)vii 
Contains a vision that is working towards a road traffic system that
becomes free from death and serious injury including emphasis on
journeys made on foot and by cycle and a specific casualty reduction
target for cyclists. 
Making the roads and roadsides safer is an objective. 
Segregation of active travel users and
vehicles is encouraged. 
A change in attitudes and behaviours is
required to ensure all road users are
respected. 
Update to the
Climate Change
Plan 2018 –2032
(2020)viii 
The action plan contains actions to reduce the impact of climate
change which are relevant to active travel. The main objective
applicable to the ATS is: 
Reduce car kilometres by 20% by 2030 
The ATS measures put froward will aim to
encourage active travel update and modal
shift. 
Behaviour change actions will help to
support reaching the 20% reduction target. 
Climate Ready
Scotland: climate
change
adaptation
programme 2019-
2024 (2019)ix
The document contains objectives which aim to prepare for a shift in
practices and attitudes to improve the environment. Those relevant to
the ATS are: 
• Our communities are inclusive, empowered, resilient and safe in
response to the changing climate. 
• Scotland’s buildings and places are adaptable to Climate
Change. 
Active travel has strong environmental
credentials and the proposals in the ATS will
cater to the communities of West
Dunbartonshire by facilitating sustainable
travel. 
Public Health
Priorities for
Scotland (2018)x
This document contains five priorities which are relevant to active travel. 
1. A Scotland where we live in vibrant, healthy, and safe places and
communities 
2. A Scotland where we flourish in our early years 
3. A Scotland where we have good mental wellbeing 
4. A Scotland where we have a sustainable, inclusive economy with
equality of outcomes for all 
5. A Scotland where we eat well, have a healthy weight and are
physically active 
Ensuring the measures proposed in the ATS
enable people access to greenspace,
reduce dependence on the private car,
cater to children, and encourage everyday
active travel will help to achieve these
priorities.

Page 52

Appendix page 6  Active Travel Strategy 
Policy  Key Objectives  ATS Implication 
Cleaner Air for
Scotland
2 (2021)xi
This document emphasises the importance of modal shift from private
car to active travel to help in reducing transport-related emissions which
contribute to poor air quality. 
Behaviour changes tools and enabling
infrastructure will help encourage a modal
shift towards active travel. 
A.3.  Regional Policy
Following the national policy is the regional policy. At this level the aims become more focused and pertinent for the region West Dunbartonshire
sits within. In the context of the ATS, the main regional policy documents examined include: 
Table A-2 below outlines the key objectives of the relevant national policy along with the implications this may have on the ATS.
Table A-2: Regional Policy Summary
Policy  Key Objectives  ATS Implication 
Strathclyde
Partnership for
Transport
Regional
Transport
Strategy 2023-
2038 (2023)xii 
A key objective of the RTS is, “To enable everyone to walk, cycle or wheel and
for these to be the most popular choices for short, everyday journeys.” 
There are several aims which follow, the most relevant to active travel being: 
• Policy 13 – Create a regional active travel network with a focus on the
sustainable travel hierarchy. 
• Policy 14 – Accelerate the delivery of AT Related infrastructure. 
• Policy 15 – Improve access to bikes through schemes such as ‘Cycle to
Work’ and ensure the availability of non-standard bikes. 
• Policy 16 – Integrate AT with public transport modes. 
• Policy 17 – Integrate AT with micromobility and review the emerging
guidelines around micromobility. 
The aims of the ATS should consider the
relevant RTS objectives. 
Ensuring elements such as access,
integration, and sustainability are
integrated into the ATS will help to ensure
the key aims listed are met.

Page 53

Appendix page 7  Active Travel Strategy 
Policy  Key Objectives  ATS Implication 
Clydeplan –
Strategic
Development
Plan (2017)xiii
The Clydeplan document states that planning, and policy should focus on four
relevant areas: 
• Regeneration including “Integrate land use with sustainable transport
networks.” 
• Economy  
• Low carbon infrastructure which states, “connected transport networks
including active travel, green networks”. 
• Placemaking which calls for safe, navigable spaces which enable good
health and wellbeing. 
The document also outlines areas for strategic development, investment, and
delivery in regard to transport, economic, and environmental factors. These
include: 
• Clyde Waterfront 
• Dumbarton 
• Clydebank 
• Lomondgate 
• Clydebank Riverside 
• Bowling 
The enabling element of active travel
through opening areas up for travel can
bring regeneration and economic
benefits. 
Ensuring that measures in the ATS
consider place as well as space will help
to create a welcoming and attractive
locality. 
Live Park: Loch
Lomond & the
Trossachs
National Park –
Local
Development
Plan (2017)xiv
Active travel forms an objective of the National Park’s plan: 
• Promoting sustainable Travel and Improved active Travel options. 
The close proximity of the national park to
the main settlements of West
Dunbartonshire means that there is
opportunity to integrate the outcomes
and actions of the ATS to better connect
greenspace and encourage journeys by
sustainable modes. 
Glasgow’s
Active Travel
Strategy 2022-
2031(2022)xv
Glasgow City’s active travel strategy covers three key themes: 
• Connectivity, people and place: rebalancing streets and spaces 
• Unlocking change: enabling everyone to walk, wheel or cycle
• Thinking differently: encouraging, motivating and sustaining change
The strategy is extensive focusing on providing effective actions to improve
active travel in Glasgow. 
Glasgow City Council neighbours West
Dunbartonshire and as the largest city in
Scotland is a key generator of trips to,
from and through West Dunbartonshire
Council (WDC).

Page 54

Appendix page 8  Active Travel Strategy 
Policy  Key Objectives  ATS Implication 
Argyll and Bute
Local
Development
Plan 2 (2024)xvi
Argyll and Bute include active travel as a key element of their upcoming Local
Development Plan and have released apps across their region to promote
active travel. 
Argyll and Bute are a neighbouring
council to WDC and home to a key trip
generator: Helensburgh. Part of their
future plan includes the development of
the Helensburgh to Cardross / West
Dunbartonshire cycleway
Renfrewshire
Local Transport
Strategy
(2017)xvii
This strategy promotes transport in general rather than just active travel but
includes objectives such as ‘encouraging healthy lifestyles’, ‘Ensure a healthy
and sustainable environment’ and ‘Encouraging a choice of transport options’
which all promote improved access to active travel.
Renfrewshire borders WDC at the River
Clyde with a key link being the Erskine
Bridge. This strategy promotes regional
connectedness and includes Erskine to
Clydebank/Glasgow as one of the
essential routes.
East
Dunbartonshire
Active Travel
Strategy 2023-
30 (2023)xviii
This is a recent and extensive strategy aimed at delivering improved active
travel in the region. There are four key themes on which this is based:
• Walking and wheeling network,
• Active Travel Neighbourhoods,
• Connectivity Corridors,
• Behaviour change.
East Dunbartonshire shares a mainly rural
border with West Dunbartonshire.
A.4.  Local Policy 
At a local scale, the policy starts to present an image of the key aims that are relevant to West Dunbartonshire. In the context of the ATS, the
main local policy documents examined include: 
Table A-3 below outlines the key objectives of the relevant local policy along with the implications this may have on the ATS.

Page 55

Appendix page 9  Active Travel Strategy 
Table A-3: Local Policy Summary
Policy  Key Objectives  ATS Implication 
Local
Development
Plan 2 (2020)xix
The key priorities of the LDP are; Flourishing, Independent, Nurtured,
Empowered, and Safe. 
Specific reference is made to active travel through a call for ‘Creating
Places’ which includes maintaining the ‘distinctive identity’ of WDC and
including ‘green infrastructure’ and importantly it states a desire to,
“Ensure that streets are safe, comfortable and attractive for all users;
creating an accessible, inclusive and walkable network of streets and
paths which consider the role of streets as places for people first.” (p75) 
Ensuring that the ATS caters to the key priorities
through well thought through actions will help
meet the objectives. 
The desire to make streets people centric
aligns to the transport hierarchy which the ATS
will follow. 
Climate
Change
Strategy (2021)xx
The council has established nine key themes which should form the basis
for any actions taken to tackle climate change. One of these is
‘Sustainable Travel’. 
Under this the council pledges to “take action to encourage active travel
through walking, cycling and public transport and deploy sustainable
alternatives to decarbonise transport”. (p26) 
The ATS will help progress sustainable travel
options across West Dunbartonshire. 
Ensuring integration with sustainable modes
such as public transport for longer journeys. 
Strategic
Plan 2022 – 2027
(2022)xxi
The Council’s priorities are community resilience, green future, and a
flourishing economy with the overarching priority being “Supporting our
Communities to Thrive” (p11) 
The strategy states that the council will “encourage and support active
and sustainable travel options, where appropriate, by learning from best
practice and encouraging the uptake and use of electric vehicles and
will work with partners to expand and promote sustainable modes of
transport including walking and cycling.” (p22) 
There is overlap with some of the priorities in
the LDP. 
Encompassing these themes in the ATS and
targeting them through specific actions will
help to ensure the policy objectives are met.

Page 56

Appendix page 10  Active Travel Strategy 
Policy  Key Objectives  ATS Implication 
Road Safety
Plan (2011)xxii
The safety plan includes initiatives focused on children including: 
• Teaching children about road safety within the school curriculum,  
• Encouraging walking and cycling to school to reduce CO2
emissions, 
• ‘Travelling Green’ project which encourages walking to school, 
• ‘Step Forward’ project which promotes physical activity,  
• ‘Scottish Cycle Training Scheme (Bikability Scotland Level 2)’ Which
encourages on road bike training, 
• Encouraging schools to apply for ‘Scotland’s Cycle Friendly School
Award’, 
• Reduced road speeds around school to make walking to school
safer. 
Existing education schemes and behaviour
change initiatives should be encompassed
within the ATS and new measures proposed
where required. 
Our Green
Network
Supplementary
Guidelines
(2015)xxiii 
Green infrastructure is defined as “the ‘green’ and ‘blue’ features of
natural and built environments. They can provide naturalised water
management, useable open space, active travel routes and habitats for
wildlife.” (p4) 
The documents highlight that one of the key principles involved in
enhancing the network is to link it with the existing network. 
Ensuring actions proposed in the ATS are
connecting to existing active travel routes to
make the green network more coherent and
improve the sustainability of the area.

Page 57

Appendix page 11  Active Travel Strategy 
A.5.  Recurring themes
As outlined, each policy, strategy or plan has key focus areas, visions, and motivations which indicate underlying themes for their solutions,
policies, and goals. Several of these occur commonly at a national, regional, and local level which presents an opportunity to identify them to
ensure the ATS aligns with them. The recurring themes identified from the policy review are outlined in Figure A-1. 
Figure A-1: Recurring Themes from the Policy Review
The recurring nature of these themes in the existing policy highlights the focus areas for the ATS. Active travel infrastructure and behaviour
change initiatives can impact all of the above topics and help to reach the aims and objectives of policy at all scales. From these themes
specific objectives for the ATS can be developed with confidence that they have been informed by the existing policy landscape.
A.6.  ATS Objectives
The five themes outlined above are broad categories which encompass several topics. For example, inclusivity and equality relates to ensuring
that the actions proposed in the ATS are mindful of the diverse range of users that may use them. However, it can also be linked to education
and opportunity, such as through outreach activities with schools, or through the provision of access to bikes or community groups.
Consequently, these themes provide a useful steer for what areas the ATS objectives should target. Table A-4 outlines the objectives developed,
in part, from the policy review for the ATS. These have been developed by starting with the overarching policy themes, narrowing them down to
relevant themes for the ATS, before forming objectives that align with policy but also aim to develop active travel uptake within West
Dunbartonshire. 
Climate Change
and Carbon
Emissions
Economic
Growth
Health and
Wellbeing
Inclusivity and
Equality Safety

Page 58

Appendix page 12  Active Travel Strategy 
Table A-4: ATS Objectives
Overarching Policy Theme ATS Theme ATS Objective
Climate Change & Emissions Climate Impact Encouraging active travel to be the preferred mode for short everyday journeys.
Economic Growth Connectivity Connect key land uses and destinations via a coherent active travel network,
taking advantage of public transport connections as well as blue-green
infrastructure improvements.
Health and Wellbeing Health Promote active travel for individual health gains, including mental wellbeing.
Inclusivity and Equality Inclusivity Ensure inclusive and equitable access to active travel for all. Including people with
health conditions, those with different socio and economic needs, and the elderly.
Inclusivity and Equality Education Raise awareness of the benefits of active travel and promote opportunities to get
involved and reduce conflict between users.
Safety Safety Improve actual and perceived safety for those travelling actively, including
children, women, and ethnic minority groups.

Page 59

Appendix page 13  Active Travel Strategy 
Appendix B.  Engagement Report  
Appendix page 13

Page 60

Appendix page 14  Active Travel Strategy 
B.1.  Introduction
To support the development of the active travel strategy (ATS), an interactive engagement programme was developed that placed an
emphasis on the need to ensure stakeholders and communities had the opportunity to be involved. The primary aim of the stakeholder
engagement programme was to identify current barriers to active travel and future connections across West Dunbartonshire. 
The stakeholder engagement programme ran between January 2024 to April 2024 with all engagement activity designed to help:
• Raise awareness and understanding of the need to develop an ATS for West Dunbartonshire.
• Understand where people travel to and from.
• Implement a people and place focus:
▪ Who currently uses the transport mode/infrastructure, who does not?
▪ The existing barriers to accessing their neighbourhoods/amenities/mode for different groups of people.
▪ What outcomes and benefits do people within the neighbourhood or communities want and need?
▪ What infrastructure and changes to the built environment could support these outcomes?
B.2.  Methodology
B.2.1.  Key Audiences
The first stage of the stakeholder engagement programme was to undertake a stakeholder mapping exercise to help identify stakeholders with
an interest in the project. A stakeholder database was created, and this provided an overview of each stakeholder including all publicly
available contact information and the planned engagement method. In general, stakeholders were identified on the basis of: 
• Those likely to have a role in developing the ATS.
• Those likely to be significantly impacted by the ATS measures.
• Those with an interest in transport in West Dunbartonshire.
• Those with knowledge or experience to contribute to the shaping and development of the ATS. 
The stakeholder database remained ‘live’ as the project progressed. This was important as the stakeholder’s level of interest in the project could
change as the ATS progressed. Table B-1 identifies some of the key stakeholders identified during the mapping exercise and sets out the
respective levels of stakeholder influence against anticipated levels of interest in the ATS. Each group was engaged with either by AtkinsRéalis or
by West Dunbartonshire Council.

Page 61

Appendix page 15  Active Travel Strategy 
Table B-1: Key Stakeholders 
Interest
Influence 
Consult Collaborate
- WDC Public Transport Officers 
- WDC Roads Officers
- WDC Sustainability & Active
Travel Officers 
- Elected Representatives
- Cycling UK
- NHS Scotland 
- Transport Scotland 
- Sustrans 
- Scottish Canals 
- Paths for All Global 
- Love to Ride 
- Loch Lomond and the
Trossachs National Park
Authority
Inform Involve
- WDC Communities Officers 
- WDC Communications
Officers 
- WDC Equalities Officers 
- WDC Member Services
Officers 
- Local Media/ Press 
- Accessibility/Disability Groups 
- Local Businesses 
- WD Residents & Associations 
- Schools/Education Institutions 
- Voluntary, Community, Faith,
Social Enterprise Sector
(VCFSE) 
B.2.2.   Delivery Approach
In line with the principles of the Engaging Communities Toolkit for West Dunbartonshire, the Stakeholder Engagement Programme was carried
out using a variety of communication tools and techniques.
The engagement delivery plan for the West Dunbartonshire Council (WDC) ATS is set out in Table B-2. The plan presents the main engagement
activity with a timeline of when each activity occurred. The stakeholders represented at the briefing sessions and those who provided feedback
across the wider engagement programme are those previously listed in Table B-1.

Page 62

Appendix page 16  Active Travel Strategy 
Table B-2: Engagement Delivery Plan
Engagement Activity Channel Stakeholder Audience  Timing 
2 x External stakeholder briefing
workshops 
Microsoft Teams
(Online)
External stakeholders  20th Feb 24  
1 x Internal WDC briefing Workshop  Microsoft Teams
(Online)
Internal WDC Officers  21st Feb 24
1x online survey, press release and
launch
WDC Website 
Survey 123
All stakeholders, including the general
public 
19th Feb 24 – 31st March
24
4x In-person public engagement sessions In-person All stakeholders, including the general
public 
11th - 14th March 24
The key findings from each engagement activity have been included in subsequent sections.
In addition to the engagement activity set out in Table B-2 collaboration was encouraged with key stakeholders throughout the duration of the
programme. As a result, some stakeholders provided further information on local initiatives and ongoing projects which were considered in the
development of the strategy. These interactions provided an opportunity to build collaborative and long-term working relationships whilst
ensuring the outcomes better matched the needs of the communities most impacted by the ATS.
B.3.  Briefing Workshops
To commence with the stakeholder engagement programme, two briefing workshops were held with external stakeholders, and one with WDC
Officers with an aligned interest in the development of the ATS. The main purpose of the briefing workshops was to raise awareness of the
strategy and engagement, invite stakeholder involvement and support, whilst also promoting the online survey and inviting feedback.
Virtual workshops were considered to be beneficial rather than face-to-face workshops primarily due to the size of West Dunbartonshire as a
council area. Material and content shared during the briefing workshops was done so via PowerPoint presentation. 
Stakeholders attending the briefing workshop for external partners included regional and nation-wide statutory bodies, transport groups, business
representatives, active travel interest groups, community councils, and local community-based organisations and groups. WDC Officers who
attended did so from departments such as Public Health, Planning, Housing, Roads, Regeneration, Green Space and Communications. There
was some overlap in attendees, with some strategic stakeholders attending both briefing workshops.

Page 63

Appendix page 17  Active Travel Strategy 
B.3.1.  Feedback Summary/Key Insights
Discussion points and key insight shared during the briefing workshops included:
• The link between the ATS and the Local Place Plans that are being developed across West Dunbartonshire. There is a need to ensure
both the strategy and the place plans align, particularly those that have an interest in active travel. 
• It would be beneficial to have a focus on place and wellbeing outcomes. A similar approach taken for the Clydebank place plan is
looking at key strategies and plans and then assessment based on place and wellbeing outcomes. Active travel has been one of the
strongest themes that has come through. 
• Engagement with Loch Lomond and the Trossachs National Park Authority is important and should continue throughout the development
of the emerging ATS.
• The national park authority is currently looking at how sustainable travel can reduce carbon emissions from visitor journeys. It was
highlighted that most journeys are not commuting but people travelling, often long distances, to the national park. Also highlighted were
that many people will contribute to carbon reduction in other areas through using sustainable travel methods to work, but then travel
long distances by car to visit the national park.  
• Key point raised was that the NCN could be made safer for year-round use with better connections to local communities. Connections
over the Erskine Bridge also need attention.  
B.4.  Survey
On the 19th February a six-week public survey was launched to help capture people’s views on the existing barriers they face in relation to
walking, wheeling and cycling across West Dunbartonshire. As well as what initiatives would encourage members of the public to walk, wheel,
and cycle more often. The online survey was made available in alternative formats and a printed copy could be posted, if required.
To ensure the survey reached as many people as possible it was publicised via email to a range of stakeholders including schools, community
councils, and local transport groups including active travel organisations and businesses. Awareness of the survey was also raised at the internal
and external workshop briefings and the public engagement events with a request to invite feedback and for stakeholders to share across their
networks.

Page 64

Appendix page 18  Active Travel Strategy 
The survey consisted of three main sections: travel habits, existing travel conditions, and future travel aspirations. Each section includes questions
related to the specific topic and aimed at understanding both users current and future needs relating to active travel. Each section is discussed
below. 
A total of 122 responses were received with a sample of
the key findings highlighted in the next section of this
report.
B.4.1.  Travel Habits
The first section of the survey focused on gaining insight
into the community’s current travel habits. The questions
asked users about their current main modes of travel as
well as querying how easy people find it to travel in the
region. 
Figure B-1 outlines participants current preferred transport
mode to key destinations. A private vehicle was the most
used form of transport for every journey except for leisure
activities where 69% of respondents use an active travel
method to travel. However, for work, shopping,
accessing key services, and social activities private
vehicles are the preferred mode of choice, with over 50%
of respondents choosing this mode for the latter three
journey types.
Although there is a high percentage of users using active
travel for leisure, few use it to get to other destinations
with less than 8% of users cycling to all other destinations
and less than 16% walking to most destinations (except
for visiting key services at 30%). Alongside this, public
transport use remains low with train use averaging 7%
and bus use averaging around 5% across all the journey
types.
0%
10%
20%
30%
40%
50%
60%
70%
Work School /
Further
education
Shopping Leisure
activities (e.g.
exercise)
Visiting Key
Services (e.g.
doctors)
Social
activities (e.g.
visiting friends
& family)
Percentage
Of Respondents
Journey Destination
Question A1: What is Your Main Method of Transport
When Undertaking the Following Journeys?
Walking/wheeling Cycling Bus
Private Car/Van (Driver) Private Car/Van (Passenger) Train
Figure B-1: Results of survey question A1 indicating current modal choice.

Page 65

Appendix page 19  Active Travel Strategy 
When asked to elaborate on how easy it is to travel
by these various modes, more respondents indicated
that it was easy to travel by all modes, except for
cycling where 35% disagreed that it was easy to
travel and only 30% agreed. This is outlined in Figure
B-2 which shows respondents’ level of agreement
with ease of travel in West Dunbartonshire. This
indicates that the least easy modes to travel by is
cycling (35%) followed by the bus (25%) and walking
or wheeling (24%) while the car and train appear to
be the easiest modes with 63% and 61% agreeing
respectively.
Further insight into respondents travel experience
highlighted that there tends to be a willingness and
positive attitude to moving towards more sustainable
modes of transport such as buses and trains, but that
people feel unable to do so currently. The unreliability
and limited frequency of the current bus and train
service was quoted as being a main barrier to better
public transport uptake. It was also noted that bus
stops and railway stations are too far to travel to and
not well integrated with each other. There was
additionally a concern about safety on public
transport that was raised repeatedly with
respondents stating this as a deterrent to using these modes. 
There was a general positive attitude to the NCN with users noting that it is good for leisure travel, with the main limitation raised being a lack of
lighting and some maintenance issues. However, it was noted that there is a distinct lack of any other cycle infrastructure and so travelling to
specific destinations such as school or work is difficult, as is travelling to the NCN from residential areas. Road safety and vehicle conflict was a
common concern with many users feeling unsafe cycling on the road, and that even when using the NCN, interaction with road junctions felt
unsafe. The A82 is a main artery through West Dunbartonshire, and this was noted to be busy, and often at risk of congestion and collisions
making it difficult to cross and interact with as an active travel user. 
Figure B-2: Results of survey question A2 indicating ease of travel in WDC.
-60% -40% -20% 0% 20% 40% 60% 80%
By walking or wheeling
By cycle
By bus
By car/van
By train
Other
Percentage of respondents
M
ode
of transport
Question A2:To what extent do you agree that West
Dunbartonshire is easy to access and travel through
by the following modes of transport. 
Disagree Strongly disagree Neutral Agree Strongly agree

Page 66

Appendix page 20  Active Travel Strategy 
There were specific concerns related to accessibility for mobility impaired users including the limitations that poor footway quality puts on
mobility scooters and wheelchairs. This was also raised as an issue concerning public transport with train station access having poor surface
quality and limited ramps. It was also noted that when there is active travel provision, such as the NCN, there is no separation between those
cycling and those walking and wheeling. 
B.4.2.  Existing Travel Conditions – Barriers
As part of the survey respondents were given an
opportunity to identify their current barriers to
walking, wheeling, and cycling in West
Dunbartonshire. Respondents were provided with a
list of potential barriers for walking and wheeling and
then for cycling, of which they could select three
and then they could further explain the detail of their
answers in a subsequent question.
Figure B-3 details the results of respondents’ barriers
to walking and wheeling in the region. It is clear that
the greatest barrier is the poor condition of footways
with 54% of respondents selecting it. This is followed
by aggressive driver behaviour (32%), poor lighting
(30%), feeling unsafe (29%), and lack of continuous
footways (27%).
When expanding on these answers, users reiterated
concerns with footway quality noting issues such as
overgrown vegetation, flooding, and irregular
paving as well as increasing instances of dog fouling.
The issue of cars parked on the footway was also
reiterated with respondents noting that they were
left walking on the road and that the issue is
particularly severe near schools. It was also noted
that lack of cycle lanes and segregation between
0% 10% 20% 30% 40% 50% 60%
Lack of walkable destinations
Lack of continuous routes
Poor conditions of footways
Car on pavement
No barriers
Lack of footways
Poor lighting
Feeling unsafe
Obstacles on pavement
Aggressive driver behaviour
Other modes more convenient
Cyclists on footway
Other
Cars blocking dropped kerbs
Health limitations
Percentage of Respondents
Type of barrier
Question B1: What are the main barriers you face when
walking and wheeling in West Dunbartonshire? 
Figure B-3: Results of survey Question B1 indicating barriers to walking and wheeling
in WDC.

Page 67

Appendix page 21  Active Travel Strategy 
pedestrians and cyclists often sees cyclists using 
the footway at speeds which makes other users
uncomfortable. Nighttime was noted to be a
period which is particularly unappealing to
pedestrians, drawing attention to a lack of passive
surveillance and the limited light produced from
new LED lights. 
Figure B-4 details the results of respondents’
barriers to cycling in the region. In regarding to
cycling, the most apparent barrier is access to a
cycle with 61% of respondents stating that they do
not own a cycle. The quality of the cycle route
itself was the next most common issue, including
poor road conditions (45%), lack of continuous
routes (42%), and lack of segregated cycle lanes
(39%). 
When elaborating on their answers, respondents
stressed that they want to cycle but are unwilling
to because of road safety, noting that even
though the NCN is good it is not easy to access.
Respondents mention the speed, volume, and
aggression of drivers as the main deterrents from
cycling on the road which, combined with
potholes and parked cars, make it difficult to
cycle on road in the region. This is a particular issue
because of the lack of cycle infrastructure outside
of the NCN and is significantly worse in rural areas
with high speeds and narrow roads. Other
concerns raised included conflict with pedestrians
on cycle paths and security limitations due to lack
of lighting and secure cycle parking.
0% 10% 20% 30% 40% 50% 60% 70%
Lack of continuous route
Do not own a cycle
Poor road condition
Other modes more convenient
No Barriers
Unsafe road traffic
Lack of segregated cycle lanes
other
Health limitations
Unsafe alone
Unsafe driver behaviour
Poor lighting
Cars double parked
Destinations too far
Limited cycle skills
Percentage of respondents
Types of Barriers
Question B3: What are the main barriers you face when
cycling in West Dunbartonshire?
Figure B-4: Results of survey Question B2 indicating barriers to walking and wheeling
in WDC.

Page 68

Appendix page 22  Active Travel Strategy 
B.4.3.  Future Travel Aspirations
Respondents were given an opportunity to indicate which initiatives they would most like to see in West Dunbartonshire that would encourage
walking, wheeling, and cycling. Lists of potential initiatives were provided for infrastructure and for behaviour change separately and
respondents were asked to choose two which they felt would encourage them to use active travel more. These were asked for walking and
wheeling, and then cycling respectively. 
Regarding walking and wheeling, Figure B-5 indicates the infrastructure initiatives users would like and Figure B-6 indicates the behaviour change
initiatives users would like to see. For the former, improved maintenance of paths and footways is a clearly the most important initiative with 58%
of respondents selecting this, followed by segregation from other modes selected by 32% of respondents. For behaviour change based initiatives
0% 10% 20% 30% 40% 50% 60% 70%
Nothing
Better maintenance
Improved connections
Integration with public transport
Improved lighting
Segregation from other modes
Better public transport links
Other
Better wayfinding
Percentage of respondents
Question C1: Which infrastructure initiatives would
enable you to walk or wheel more often?
0% 5% 10% 15% 20% 25% 30% 35% 40% 45%
Nothing
More rest spaces
Other
Social walking groups
Greenspace and public art
Motivational signage
Training opportunities
Charging points
Percentage of Respondents
Question C2: Which behaviour change initiatives
would enable you to walk or wheel more often?
Figure B-5: Results of survey Question C1 indicating which
infrastructure initiatives respondents feel will enable them to walk
and wheel more.
Figure B-6: Results of survey Question C2 indicating which
behaviour change initiatives respondents feel will enable them to
walk and wheel more.

Page 69

Appendix page 23  Active Travel Strategy 
40% of people said that greenspace or public art and more rest areas would enable them to walk or wheel more, however 21% said that no
initiatives would help. 
Across both sets of questions there are some respondents who suggested ‘other’ initiatives relating to walking and wheeling (2% for infrastructure
and 11% for behaviour change). These included litter picking events, women safety support, action against car owners, and most predominantly
public toilet provision.
Respondents were asked the same questions regarding cycling and the results regarding infrastructure initiatives are outlined in Figure B-7, and
regarding behaviour change are outlined in Figure B-8. For infrastructure initiatives, both segregation from other transport modes and better
maintenance were selected by 38% of respondents, and an improved and better-connected network was selected by 33%. However, 27% of
respondents also stated that nothing would encourage them to cycle more. In regard to behaviour change, no initiatives would encourage
active travel uptake was selected by 34% of respondents, more than any other option. Aside from this, the only other initiative that was selected
by more than 20% of users was better route and activity information (28%). 
0% 5% 10% 15% 20% 25% 30% 35% 40%
Access to cycle maintenance
Nothing
More rest spaces
Cycle hire facilities
Other
More cycle training
Organised cycle rides
Route and activity information
Motivational signage
Percentage of Respondents
Question C4: Which behaviour change initiatives
would enable you to Cycle more often?
0% 5% 10% 15% 20% 25% 30% 35% 40%
Secure cycle parking
Nothing
Better maintenance
Improved lighting
Improved network
Segregation from other modes
Intergration with public transport
Other
Better wayfinding
Percentage of Respondents
Question C3: Which infrastructure initiatives would
enable you to cycle more often?
Figure B-8: Results of survey Question C4 indicating which
behaviour change initiatives respondents feel will enable them
to cycle more.
Figure B-7: Results of survey Question C3 indicating which
infrastructure initiatives respondents feel will enable them to
cycle more.

Page 70

Appendix page 24  Active Travel Strategy 
Across both sets of questions there were some respondents who suggested ‘other’ initiatives relating to cycling (4% for infrastructure and 6% for
behaviour change). These included suggestions to improve junction design, vehicle driver education, and secure cycle parking.
Alongside initiatives, respondents were able to
indicate how much they agreed with
statements regarding West Dunbartonshire
Council’s (WDC) ambitions. The ambitions were
listed as follows: 
• Ambition 1: There is a need to improve the
actual and perceived safety for those
travelling actively, including children,
women, and ethnic minority groups.
• Ambition 2: To increase the number of
people traveling by active modes it is
important to raise awareness of the benefits
of active travel and promote opportunities
to get involved.
• Ambition 3: Promoting active travel across
West Dunbartonshire could contribute to the
improved physical, social and mental
wellbeing of people.
• Ambition 4: To promote inclusive and
sustainable growth, we need to connect key
land uses and destinations via a coherent
active travel network, taking advantage of
public transport connections as well as blue-
green infrastructure improvements.
• Ambition 5: To help reduce climate impact
we can encourage active travel to be the
preferred mode for short journeys.
-20% 0% 20% 40% 60% 80% 100%
Ambition 1
Ambition 2
Ambition 3
Ambition 4
Ambition 5
Percentage of Respondents
Question C5: Please indicate how you feel about the following
statements for ambitions for travel within West Dunbartonshire 
Disagree Strongly disagree Agree Strongly agree
Figure B-9: Results of survey Question C5 indicating respondents’ level of agreement
with WDC’s ambitions.

Page 71

Appendix page 25  Active Travel Strategy 
Respondents were able to rate each of these on a scale from strongly disagree
to strongly agree. Figure B-9 outlines the results and shows general support for
the ambitions. Every ambition was agreed or strongly agreed with by over 74%
of respondents and disagreed with by less than 10%. Ambition 3 relating to well-
being and health was the most strongly agreed with (52%), and Ambition 4 on
encouraging sustainable growth had the most overall support with 86% of
respondents agreeing or strongly agreeing. Ambition 1 was the least supported
with 9% strongly disagreeing, but still had 76% agreeing or strongly agreeing.
B.5.  Public Engagement Events
Four public engagement events were delivered in March 2024 to help facilitate
more in-depth discussions around active travel with communities across West
Dunbartonshire. The locations of these events are identified in Figure B-10 and
the corresponding dates are listed below:
• Monday 11th March: Clydebank Town Hall                                                   
• Tuesday 12th March: Alexandria Community Centre                               
• Wednesday 13th March: St Kessog’s Church Hall (Balloch)                            
• Thursday 14th March: Concord Community Centre (Dumbarton)
The purpose of the engagement events was to enable residents to share their
views on how walking, wheeling, and cycling connections across West
Dunbartonshire should look over the next 10 years and beyond. Residents
could also obtain information on the purpose of the ATS whilst sharing their
lived experience of active travel across West Dunbartonshire. 
To maximise reach, venues across the three main urban areas of West
Dunbartonshire were chosen to host the public engagement events. Officers
from WDC’s Roads and Neighbourhood teams as well as AtkinsRéalis staff
attended all four events, presenting maps of the focus area, recording the
views and suggestions shared by residents, whilst also providing paper copies
of the public survey for residents to complete. Social media, direct emails, and
Figure B-10: Public engagement event locations
Basemap © OpenStreetMaps.org contributors

Page 72

Appendix page 26  Active Travel Strategy 
local newsletters were some of the communication channels used to promote the
public engagement events and a promotional poster was created as seen in Figure
B-11.
B.5.1.  Feedback Summary / Key Insights
Discussion points and key insight shared during the in-person engagement events
included:
• Community council members took the opportunity to share their knowledge on
the area and highlight their upcoming Local Place Plans. The community council
members emphasised a number of local place plans which are due to be
released and that active travel is a common focus area across them.
• At all four of the locations similar barriers to cycling, walking, and wheeling were
raised which reflect those already noted in the survey results. The main barriers
noted were that improved maintenance is needed, safety is a concern and a
major reason as to why people don’t travel by cycle, and that the NCN lacks
lighting.
• Specific locations were noted, including the Old Military Road to Gartocharn and
the A813 to Bonhill which have narrow footways, the Park and Ride at Kilbowie is
currently underused which provides an opportunity to increase use, and that
crossing points to and from the NCN are safety concerns.
In addition to this, public transport was also a focus area of discussion with users
noting a lack of connectivity with key services (hospital) and other transport modes
(rail), and the positioning of bus stops means people don’t see the bus service as a
viable transport option. It was suggested that bus times do not align with train times,
leading to additional and unnecessary travel time, making private cars more
practical forms of transport.                   
Figure B-11: Promotional Poster

Page 73

Appendix page 27  Active Travel Strategy 
Appendix C.  Network Plan  
Appendix page 27

Page 74

Appendix page 28  Active Travel Strategy 
The aim of the network plan is to identify a strategic network connecting key destinations within the study region through the most direct routes
possible. In West Dunbartonshire there currently is, as previously discussed, the National Cycle Network running through the area, and although
an important connection for cycling in the area, is not always the most direct route between key locations and so is not typically used for
everyday travel. There may be more direct routes available, but they are not currently well-used because of a lack of infrastructure even though
there may be suppressed demand. The network plan will mitigate this limitation by predicting where people would be travelling if they had the
most direct route choice, rather than where they currently travel. This direct route choice is then used to provide a more aspirational and
optimised travel network. 
The process used to do this is broken down into four steps as outlined below and indicated in Figure C-1xxiv. Note that these steps are displayed
through maps on the following pages. 
Figure C-1: Visual representation of Step 1 – 3 of the network plan.
Key Points
Strategic Clusters
Desire Lines

Page 75

Appendix page 29  Active Travel Strategy 
Step 1: Identify Key Points 
The first step is to identify key origins and destinations within the
region that users will be travelling to and from. These are the
locations which will likely generate the most trips. In the case of
West Dunbartonshire, the key locations were identified using
mapping software, census data, and local knowledge and
included: 
• Main employers and industrial complexes,
• Schools including primary, secondary, and tertiary
education,
• Retail such as major shopping centres and high streets, 
• Culture and tourism attractions,
• Hospital and medical facilities, 
• Railway stations, and,
• Residential centres 
These key points are indicated on a map of West Dunbartonshire
in Figure C-2.  
Figure C-2: Map indicating Step 1 showing the identification of key
points across West Dunbartonshire.
STEP 1

Page 76

Appendix page 30  Active Travel Strategy 
Step 2: Clustering key points
The mapping of the key locations are then
grouped into clusters based on proximity to
each other. These clusters will represent strategic
locations used for the network plan. The cluster
locations considered the existing key points
identified in the previous steps while also
considering future developments as identified in
the Local Development Planxxv as well as key
locations within neighbouring councils.
This clusters will make up strategic locations used
to create the network and are shown in Figure
C-3. 
Figure C-3: Map indicating Step 2 showing strategic clusters 
DRYMEN
STIRLING COUNCIL
CARDROSS
ARGYLL AND BUTE
COUNCIL
GLASGOW
GLASGOW CITY
COUNCIL
ERSKINE
RENFREWSHIRE
STEP 2

Page 77

Appendix page 31  Active Travel Strategy 
Step 3: Desire Lines 
Each of the strategic clusters were then connected with straight links
representing desire lines. These indicate key movement corridors
which the cycle network should aim to support. In order to ensure
the network was usable all links were less than 5 milesxxvi. These desire
lines make up the strategic network as outlined in Figure C-4.  
Figure C-4: Map indicating Step 3 showing desire lines linking strategic
clusters.
STEP 3

Page 78

Appendix page 32  Active Travel Strategy 
Step 4: Aspirational Everyday Journey Network
The desire lines are straight links and so do not match the existing road network. Ideally active travel routes would be created along the most
direct desire lines, but existing infrastructure will prevent this (such as private property boundary lines, buildings, and water ways). Each straight
desire line identified in step 3 therefore needs to be aligned onto the existing roads and paths in West Dunbartonshire. This creates an
aspirational everyday journey network which takes the shortest possible route along actual roads and paths as mapped in Figure C-5. It will be
one of the aims of the active travel strategy to propose appropriate infrastructure on this aspirational everyday journey network, resulting in the
potential to provide a network which is optimal for users to access key destinations within the region. 
The aspirational everyday journey network is contained within West Dunbartonshire but as noted in previous steps, there are strategic links to
locations within neighbouring councils. It is outside of the scope of West Dunbartonshire Council (WDC) to make changes within the
neighbouring authorities however cross council movement should be considered. A number of the routes leading out of West Dunbartonshire
match with either established routes or planned routes by neighbouring councils, further supporting their strategic importance. Figure C-5
identifies those routes in neighbouring councils which relate to route-based actions in the WDC Active Travel Strategy.xxvii   xxviii   xxix  xxx

Page 79

Appendix page 33  Active Travel Strategy 
Figure C-5: Map indicating Step 4 showing the aspirational everyday journey e
network as applied to existing paths and roads.
STIRLING
This route links with
Drymen where active
travel upgrades of the
A811 has already been
put forward by local
community trusts xxix
aimed at connecting the
village as part of an
ambitious project
connecting Stirling to
Dumbarton Castle.
RENFREWSHIRE
In their 2017 Local
Transport Strategy xxviii
Renfrewshire Council
notes an active travel
action to ‘Design and
build inter urban cycle
routes between Linwood
and Bishopton and
Erskine Bridge’. And
although currently closed
there are cycle lanes on
each side of the Erskine
Bridge
GLASGOW CITY
COUNCIL
Glasgow has developed
an application which
provides information on
all cycle routes and their
quality across the city
called Glasgow Cycling
xxx.  At this point there is a
on road cycle lane
which ends at the WDC
border making it a prime
location for improved
cycle continuity.
ARGYLL & BUTE
This route links with the
existing planned cycle
path aimed at linking
Helensburgh to
Dumbarton through
Cardross as per Argyll
and Bute website xxvii
STEP 4

Page 80

Appendix page 34  Active Travel Strategy 
Step 5: Adding Leisure Routes
The aspirational everyday journey network focuses on everyday
routes designed to get users from one key cluster to another by
the shortest route possible. Active travel by its very nature of
being active is not only associated with direct movement
between two key points but also as a leisure activity. Leisure trips
tend to be longer and focus on quiet routes with attractive
features such as rivers or hills. In the case of West Dunbartonshire
there is already an established leisure route in the National Cycle
Network paths 745 and 7 which run through the council area.
These routes are essential to the region and provide a path for
those walking, wheeling, and cycling that is quiet, traffic free,
with views of the union canal, the River Leven or the Loch
Lomond and Trossachs National Park. Step 5 overlays the leisure
routes with the aspirational everyday journey network created in
step 4 providing a network that is encompassing of both
everyday and leisure travel needs as shown in Figure C-6. 
STEP 5
Figure C-6: Map indicating Step 5 showing leisure routes and everyday
travel routes as per the aspirational everyday journey network

Page 81

Appendix page 35  Active Travel Strategy 
Appendix D.  Multi-criteria Analysis  
Appendix page 35

Page 82

Appendix page 36  Active Travel Strategy 
In total there were 15 routes suggested as part of the action list in the delivery plan. Each of these was assessed based on a set of criteria in
order to prioritise the delivery of these routes. The detailed criteria were as follows:
Criteria High - 5 Medium - 3 Low - 1
What is the potential level
of users?
Source: Network Planning
Toolxxxi
The corridor is anticipated to see a
high level of use – NPT “Go Dutch”
>1000 users
The corridor is anticipated to see a
medium level of use – NPT “Go
Dutch” 250-1000 users
The corridor is anticipated to see a
low level of use – NPT “Go Dutch”
<250 users
What is the
stakeholder/public 
appetite like?
Source: Stakeholder Comments
The corridor has been mentioned >3
times or is known to be a
problematic gap in the network
The corridor has been mentioned 2-
3 times or is a gap in the network
that would be desirable to fill
The corridor has been mentioned <2
times and while it is a gap in the
network there are alternative
corridors
What will the impact be
on areas of socio-
economic deprivation?
Source: SIMDxxxii 
The corridor passes through areas of
high socio-economic deprivation
(1st-3rd percentile) helping connect
residents to everyday destinations
The corridor passes through areas of
medium socio-economic
deprivation (4th-7th percentile),
helping connect residents to
everyday destinations
The corridor passes through areas of
low socio-economic deprivation
(8th-10th percentile), helping
connect residents to everyday
destinations
Does it link to public
transport?
Source: Google Maps
The corridor directly connects to a
public transport interchange such
as railway or bus station.
The corridor facilitates access to a
public transport interchange such
as railway or bus station but does
not directly connect to it.
The corridor does not connect to a
public transport interchange such
as a railway or bus station.
Does it link to key land
uses?
Source: Google Maps / LDP
Future Allocated Areas
The corridor directly connects to >3
key land uses such as schools,
health facilities, retail, new
development
(employment/housing)
The corridor directly connects to 2-3
key land uses such as schools,
health facilities, retail, new
development
(employment/housing)
The corridor directly connects to <2
key land uses such as schools,
health facilities, retail, new
development
(employment/housing)
What is the current level
of cycle friendliness?
Source: Network Planning Tool
The corridor has a score of <25 on
the NPT Cycle Friendliness
The corridor has a score of 25-50 on
the NPT Cycle Friendliness
The corridor has a score of >50 on
the NPT Cycle Friendliness

Page 83

Appendix page 37  Active Travel Strategy 
The scoring process involved assessing each route against the criteria above and allocating a score based on its performance. Using a broad
range of criteria helps to ensure that one or two criteria do not have unjust bias which could skew the results. Once each route has been scored
against the criteria it is totalled. The routes which have the highest score are those which are deemed to have the potential to have the greatest
impact and are those which should be considered for implementation first.
Ref Title Potential level
of users?
Stakeholder/
public
appetite?
Socio-
economic
impact
Link to public
transport?
Does it link to
key land
uses?
What is the
cycle
friendliness
level?
Total
R-01 Kilbowie Road – Kilbowie
Roundabout to Clydebank 
5 3 5 5 5 5 28
R-02 A813 - Balloch to Bellsmyre 5 3 5 3 5 5 26
R-03 B857 & A812 - Balloch to
Dalreoch Station
5 3 5 5 5 3 26
R-04 Glasgow Road - Dalreoch
to Milton
5 3 3 5 5 5 26
R-05 A811 - Balloch to Drymen 3 3 3 5 5 5 24
R-06 A814 - Dalreoch Station to
Cardross
5 1 5 5 3 5 24
R-07 A82 – Bellsmyre to
Drumchapel
5 5 3 3 3 5 24
R-08 Glasgow Road – Clydebank
to Yoker
3 3 5 5 3 5 24
R-09 Renton to Bellsmyre via Vale
of Leven Industrial Estate
1 3 5 5 5 3 22
R-10 Mountblow Road –
Mountblow to Dalmuir
5 3 5 3 3 3 22
R-11 Townend Road - Bellsmyre
to Dumbarton
3 3 3 5 3 3 20
R-12 Dumbarton Road – Bowling
to Clydebank
3 1 3 5 3 5 20
R-13 Faifley to Kilbowie Road
Roundabout
5 1 5 1 3 5 20

Page 84

Appendix page 38  Active Travel Strategy 
Ref Title Potential level
of users?
Stakeholder/
public
appetite?
Socio-
economic
impact
Link to public
transport?
Does it link to
key land
uses?
What is the
cycle
friendliness
level?
Total
R-14  5 3 3 5 1 3 20
R-15  5 3 3 3 1 5 20 
Duntocher Road – Kilbowie
Roundabout to Dalmuir
Erskine Bridge – Old
Kilpatrick to Erskine

Page 85

Appendix page 39  Active Travel Strategy 
Appendix E.  Monitoring and Evaluation Plan 
Appendix page 39

Page 86

Appendix page 40  Active Travel Strategy 
To ensure the success of the active travel strategy, it is crucial to ensure that regular monitoring and evaluation is carried out. By doing so, the
impact of the active travel strategy’s objectives and actions can be reviewed, and progress tracked to ensure that positive change is occurring
within West Dunbartonshire.
The objectives within the strategy form the basis of the monitoring and evaluation review. From here, indicators can be used to benchmark
against, and provide a springboard for, change using internal council data as well as external sources. The table below outlines indicators, data
sources, and outcomes to be used as part of the monitoring and evaluation process. 
Indicators Data Sources Definition of Success
Clim
ate
Im
pact • Air and noise pollution levels
• Percentage of people travelling to
work or study by active modes
• Length (km) of active travel trips
undertaken
• Perceived barriers to active modes 
Existing data sources:
• Scottish Transport Statistics
• Cycling Scotland Annual Monitoring Report
• Scottish Environment Protection Agency (SEPA)
Pollution Mapping
Future data collection requirements:
• Post construction/implementation engagement
feedback.
• Localised pollution monitoring
• Postal residents’ surveys
• Active travel surveys
• Traffic speed and volume surveys
• Findings from project governance groups
• Active travel becomes attractive as a
mode of travel in the area for
everyday journeys.
• Climate indicators show an
improvement within West
Dunbartonshire.
• Interventions result in increased
uptake of active travel in the area.

Page 87

Appendix page 41  Active Travel Strategy 
Indicators Data Sources Definition of Success
Connectivity
• Length (km) of active travel
paths/links improved or created
• Percentage of people travelling to
work or study by active modes
• Length (km) of active travel trips
undertaken
• Percentage of key land uses with
cycle parking facilities
• Percentage of public transport
interchanges that can be accessed
actively
• Perceived barriers to active modes
• Perceived journey quality and safety
for all travel modes
Existing data sources:
• Cycling Scotland Annual Monitoring Report
• Scottish Transport Statistics 
• School Hands Up Surveys
• Department for Transport (DfT)/Transport Scotland (TS)
Traffic Counts
Future data collection requirements:
• Post construction/implementation engagement
feedback.
• Postal residents’ surveys
• Active travel surveys
• Traffic speed and volume surveys
• Findings from project governance groups
• Post construction audits (if undertaken)
• Users of route feel safer when moving
around.
• Engagement feedback highlights the
improved quality of public spaces and
their accessibility.
• Active travel becomes attractive as a
mode of travel in the area for
everyday trips.
• Survey findings point to increased
comfort when using active travel 
• Interventions result in increased
uptake of active travel in the area.
Health
• Community health and wellbeing
levels
• Percentage of active travel for
recreation / leisure trips
• Perceived barriers to active modes
• Perceived journey quality for active
travel modes
• Attitudes towards/propensity to
walking, cycling and other active
modes.
• Public awareness of active travel
Existing data sources:
• Scottish Transport Statistics
• Cycling Scotland Annual Monitoring Report
Future data collection requirements:
• Post construction/implementation engagement
feedback.
• Postal residents' surveys
• Questions regarding propensity to use active travel to
places of work/education/leisure and quality of
place/placemaking.
• Attitudes and comments from those from protected
characteristic groups.
• Active travel surveys
• Findings from project governance groups
• Reaction to online material and social media posts.
• Post construction audits (if undertaken)
• An increased number of people are
observed to use active travel each
day.
• Design interventions increase the
likelihood of residents
walking/wheeling in the area.
• Survey findings report an increase
physical and mental wellbeing.
• Survey findings point to increased
comfort when walking within the
design area.
• Users of all abilities can become more
independent when moving around
the area.
• Active travel access to facilities is now
direct and movement between areas
becomes easier and safer.

Page 88

Appendix page 42  Active Travel Strategy 
Indicators Data Sources Definition of Success
Inclusivity 
• Community health and wellbeing
levels
• Percentage of key land uses with
cycle parking facilities
• Percentage of public transport
interchanges that can be accessed
actively
• No. of streetscape improvements
• Vehicle movements by vehicle class
• Vehicle speeds
• Rate of traffic collisions and casualties
• Perceived barriers to active modes
• Perceived journey quality for active
modes
• Percentage of vehicle ownership
Existing data sources:
• Road collision statistics to-date
• Sustrans Walking and Cycling index
• Cycling Scotland Annual Monitoring Report
• Scottish Index of Multiple Deprivation (SIMD) Data
Future data collection requirements:
• Post construction engagement feedback.
• Postal residents’ surveys
• Pedestrian Route intercept surveys
• Questions regarding the width, quality of footways and
pedestrian experience.
• Attitudes and comments from those from characteristic
groups.
• Active travel surveys
• Traffic speed and volume surveys
• Findings from project governance groups
• Reaction to online material and social media posts.
• Post construction audits (if undertaken)
• Users of all abilities can become more
independent when moving around
the area.
• Active travel access to facilities is now
direct and movement between areas
becomes easier and safer.
• Design interventions result in
decreased vehicular traffic speeds in
the area.
• Engagement feedback highlights the
improved quality of active travel
journeys.
Education 
• Percentage of active travel for
recreation / leisure trips
• Percentage of people travelling to
work or study by active modes
• Rate of traffic collisions and casualties
• Perceived barriers to active modes
• Perceived journey quality for active
modes 
Existing data sources:
• Road collision statistics to-date
• Scottish Transport Statistics
• Cycling Scotland Annual Monitoring Report
Future data collection requirements:
• Post construction/implementation engagement
feedback.
• Postal residents' surveys
• Active travel surveys
• Findings from project governance groups
• Reaction to online material and social media posts.
• Post construction audits (if undertaken)
• Users feel safer when moving around.
• An increased number of people are
observed to use active travel each
day.
• Behaviour change interventions result
in an increase in understanding and
respect between users
• Active travel becomes attractive as a
mode of choice for everyday trips.

Page 89

Appendix page 43  Active Travel Strategy 
Indicators Data Sources Definition of Success
Safety
• Vehicle movements by vehicle class
• Vehicle speeds
• Rate of traffic collisions and casualties
• Perceived journey quality for active
modes
Existing data sources:
• Scottish Transport Statistics
• Cycling Scotland Annual Monitoring Report
Future data collection requirements:
• Post construction/implementation engagement
feedback.
• Postal residents' surveys
• Active travel surveys
• Findings from project governance groups
• Reaction to online material and social media posts.
• Post construction audits (if undertaken)
• Users of the route feel safe when using
it
• Design interventions result in
decreased vehicular traffic speeds in
the area.
• Survey findings point to increased
comfort when walking within the area.
• Audits highlight improvements across
all criteria.
• Engagement feedback highlights the
improved quality of active travel
journeys.

Page 90

Appendix page 44  Active Travel Strategy 
Appendix Reference List
Appendix page 44

Page 91

Appendix page 45  Active Travel Strategy 
i Scottish Government (2023) National Planning Framework 4
ii Scottish Government (2020) National Transport Strategy 2
iii Transport Scotland (2019) Scotland’s Active Travel Framework
iv Transport Scotland (2016) Going Further: Scotland’s Accessible Travel Framework
v Transport Scotland (2022) Cycling Framework and Delivery Plan for Active Travel in Scotland 2022- 2030 Draft for Consultation
vi The Scottish Government (2014) Let’s Get Scotland Walking: The National Walking Strategy
vii Transport Scotland (2021) Scotland’s Road Safety Framework to 2030: Together, making Scotland’s roads safer
viii Scottish Government (2020) Update to the Climate Change Plan 2018 – 2032
ix Scottish Government (2019) Climate Ready Scotland: Second Scottish Climate Change Adaptation Programme 2019-2024
x Scottish Government (2018) Public Health Priorities for Scotland
xi Scottish Government (2021) Cleaner Air for Scotland 2: Towards a Better Place for Everyone
xii Strathclyde Partnership for Transport SPT (2023) A Call to Action: The Regional Transport Strategy for the west of Scotland 2023-2038
xiii Clydeplan (2017) Strategic Development Plan
xiv Loch Lomond & the Trossachs National Park (2017) Live Park: Local Development Plan 2017-2021
xv Glasgow City Council (2022) Glasgow’s Active Travel Strategy 2022 – 2031 
xvi Argyll and Bute (2024) Local Development Plan 2 
xvii Renfrewshire Council (2017) Renfrewshire Local Transport Strategy
xviii East Dunbartonshire Council (2023) Active Travel Strategy 2023-30: Evidence Summary and Approach
xix West Dunbartonshire Council (2020) Local Development Plan 2
xx West Dunbartonshire Council (2021) Climate Change Strategy: A Route Map for a net zero future
xxi West Dunbartonshire Council (2022) Strategic Plan 2022 - 2027
xxii West Dunbartonshire Council (2011) Road Safety Plan 2011 - 2020
xxiii West Dunbartonshire Council (2015) Our Green Network Supplementary Guidance 
xxiv Figure based on the Department for Transport (2017) Local Cycling and Walking Infrastructure Plans: Technical Guidance for Local Authorities.
xxv See reference xix
xxvi Gallagher, R and Parkin, J (2014) Planning for Cycling CIHT: London
xxvii Argyll and Bute Council (2024) Helensburgh, Cardross and Dumbarton Cyclepath Update
xxviii See reference xvii
xxix Alyn Smith (2022) Stirling, the 'King's Highway' petition from Alyn Smith MP
xxx Glasgow City Council (2024) Cycling Information – interactive map
xxxi Network Planning Tool Scotland (NPT) (2023) NPT Scotland
xxxii Scottish Index of Multiple Deprivation (2020) SIMD (Scottish Index of Multiple Deprivation)